FS SystemTM Ground Mount Installation Manual FS System The Schletter FS System for ground mount photovoltaic (PV) installations is specifically designed to meet or exceed applicable IBC, ASCE, and UL standards. For more information on the FS System, please see system brochure. Features • Conforms to UL 27031 • Certified to ULC/ORD STD C1703 • Electrically Bonded Unit2 • 30 Amp Series Fuse Rating • Pre-assembled Components • Fully Integrated and Modular Components • Includes grounding module clamps The FS System is capable of accommodating nearly any framed or frameless PV module currently on the market.3 Each FS System is custom designed to meet specific structural load requirements4. Included in the FS System are the Rapid5K™ grounding clamp specifically designed to secure the frame of a PV module to the FS System.5 In turn, the components and assemblies that comprise an FS System form an electrically bonded unit. While individual components and structural sections will vary between designs, the primary assemblies and installation methods will remain the same. 6 5 7 3 2 Key Components 1. Foundation post 2. Head assembly 3. Girder 4. Strut 5. Locking wedge 6. Purlins 7. Rapid5KTM grounding module clamps 1 4 The FS System is evaluated for electrical bonding only. The FS System meets all IBC and ASCE requirements for structural loading; it has not been evaluated for loading under UL 2703. 2 Installer is responsible for verifying that system meets applicable NEC and CSA standards. 3 Maximum number of modules shall not exceed system voltage. 4 Individual parts and components will vary from system to system. Please reference system specific drawings. 5 This racking system may be used to ground and/or mount a PV module complying with UL1703 only when the specific module has been evaluated for grounding and/or mounting in compliance with the included instructions. 1 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 1/13 FS SystemTM Ground Mount Installation Manual Sample Drawings Specific drawings are provided for each project. Key information included on these drawings is as follows: 1. Design Criteria 4. Array Tilt 2. Notes Section 5. Array Dimensions 3. Module Dimensions 6. Post Embedment 2 1 2 4 3 5 7 6 8 9 11 10 12 6200 [24481 in] [34 19 in] 4000 [15721 in] 1100 A [43165 SPLICE in] (20 in]) 16 17 LOADS: MODULE DEAD LOAD = 2.23 PSF SLOPED ROOF SNOW LOAD = 0 PSF A INSTALLATION TOLERANCES: LATERAL POST PLACEMENT IS ±5.0" TOTAL LATERAL DEVIATION OF POSTS WITHIN AN ARRAY IS ±5.0" POST HEIGHT VARIATION TOLERANCE IS ±0.40" POST VERTICALITY TOLERANCE <2.0° IN ALL DIRECTIONS POST ROTATIONAL TOLERANCE <±7.0° ARRAY TILT ANGULAR TOLERANCE ±1.0° B 5 3 3 D A 416 [16 3 8 3335 in] 833 [32 3 4 551 [21 11 E 16 2700 in] 2503 16 [106 5 16 1610 [6338 in] in] in] 2 15° 833 [32 3 [65 9 16 4 in] TY 416 [16 3 in] 88 [3 1 550 [2158 in] 2 549 [2158 in] 2900 [114163 in] 6 109 [4165 in] 1910 [75163 in] 1801 [7078 in] 2FT DIA X 6.25FT DEEP CONCRETE FOOTING I in] R D E L AMP FINISHED GRADE H 8 in] 5 [5016 in] 760 [2915 16 in] 1099 [4341 in] 1667 [6558 in] P S 893 [3581 in] NO. DRAWN: 0 1 2 3 4 K 5 6 7 8 FOUNDATIONS: 1. NO SOILS REPORT PROVIDED. FOUNDATION DESIGN IS BASED ON MINIMUM IBC SOIL BEARING VALUE = 1500 PSF PER IBC TABLE 1806.2. DRILLED SHAFT FOUNDATION SHALL BE BUILT IN UNDISTURBED SOIL OR COMPACTED FILL MATERIAL NOT LESS THAN 12 INCHES IN DEPTH. THE MINIMUM DEPTH OF FOOTINGS BELOW THE UNDISTURBED GROUND SURFACE SHALL BE 12 INCHES. 2. THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR ANY GEOTECHNICAL ASPECTS OF THIS PROJECT. IT IS RECOMMENDED THAT THE OWNER RETAIN A REGISTERED GEOTECHNICAL ENGINEER TO CONDUCT A GEOTECHNICAL INVESTIGATION AND PREPARE A REPORT WITH RECOMMENDATIONS FOR FOUNDATION AND EARTHWORK PROCEDURES. CONCRETE: 1.All CONCRETE WORK SHALL CONFORM WITH THE REQUIREMENTS OF ACI 301 AND ACI 318 CEMENT PER ASTM C150, TYPE II. AGGREGATE PER ASTM C33. CONCRETE SHALL BE READY MIXED IN ACCORDANCE WITH ASTM C94 AND SHALL BE DESIGNED FOR A MINIMUM 28 DAY COMPRESSIVE STRENGTH AS FOLLOWS: FOUNDATIONS…………………………………………………………3,000 PSI* *DESIGNED FOR 2,500 PSI Client: Ground Mount FS 2V x 10 15° 4 5 4 3 7 6 5 8 7 6 ISSUED BY: SCHLETTER INC. PROPRIETARY AND CONFIDENTIAL 9 8 10 9 12 11 10 A 12 13 1100 [43165 in] (20 [34 in]) 991 [39 in] TYP FINISHED GRADE 833 [32 3 4 551 [21 11 16 in] D A 416 [16 3 550 [2158 in] 8 88 [3 1 2 in] R D E L F FINISHED GRADE 6 2901 [114163 in] 4000 [15712 in] G 1610 [6338 in] 3490 [13738 in] TYP 760 [2915 16 in] 5 16 1278 [50 1610 [6338 in] in] in] G N I AW FRONT ELEVATION SCALE 1:35 549 [2158 in] 1099 [4314 in] 1667 [6558 in] 15° 833 [32 3 4 in] 1665 [65 9 16 in] TY P 601 [23 5 8 in] P M SA POST EMBEDMENT IS PRELIMINARY (SEE NOTES) 15 15 2 16 17 16 17 DESIGN CRITERIA: 2012 EDITION OF THE INTERNATIONAL BUILDING CODE, WITH LOCAL AMENDMENTS. LOADS: MODULE DEAD LOAD = 2.23 PSF SLOPED ROOF SNOW LOAD = 0 PSF A B GENERAL: 1. THE STRUCTURAL CONSTRUCTION DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OR SEQUENCE OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. THE STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES FOR PROCEDURE OF CONSTRUCTION, OR THE SAFETY PRECAUTIONS AND THE PROGRAMS INCIDENT THERE TO (NOR SHALL OBSERVATION VISITS TO THE SITE INCLUDE INSPECTION OF THESE ITEMS). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SCAFFOLDING, BRACING AND SHORING. 2. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR ADDENDA. 3 3335 [131 5 16 in] 2700 [106 5 2503 116 in] [98 in] 2 838 [33 in] in] SEE DRAWING VIEWS 14 INSTALLATION TOLERANCES: LATERAL POST PLACEMENT IS ±5.0" TOTAL LATERAL DEVIATION OF POSTS WITHIN AN ARRAY IS ±5.0" POST HEIGHT VARIATION TOLERANCE IS ±0.40" POST VERTICALITY TOLERANCE <2.0° IN ALL DIRECTIONS POST ROTATIONAL TOLERANCE <±7.0° ARRAY TILT ANGULAR TOLERANCE ±1.0° C in] SCALE: 14 WIND DESIGN: DESIGN BASED UPON WIND TUNNEL TEST REPORT # RC 1127/0611_1e WIND SPEED = 115 mph (3 SECOND GUST) EXPOSURE: C RISK CATEGORY = II B 4 SHEET: 1 of 2 13 1 4000 [15712 in] A 19 [34 in] UNLESS THIS DRAWING IS SIGNED AND SEALED BY A LICENSED STRUCTURAL ENGINEER, IT IS A PRELIMINARY DESIGN AND SHALL K NOT BE USED FOR CONSTRUCTION. v.01 JOB NUMBER: v 11 PRELIMINARY Drawing Number: Project Site: 10200 [401169 in] 8 H J REVISIONS: 6200 [24418 in] 416 [16 3 G ISOMETRIC VIEW SCALE 1:40 3 2 F MODULE SIZE: RACKING SYSTEM DESIGNED FOR MODULE SIZE: 1665 mm x 991 mm x 46 mm VERTICAL MODULE GAP: 23 mm HORIZONTAL MODULE GAP: 5 mm Dimensions and Specifications 1 H NOTE: RECOMMENDED SPEED FOR INSTALLATION OF SELF-DRILLING 1/4" DIAMETER SCREWS IS 1200-1800 RPMS. Exterior Racking Structure 2 E TORQUE: TORX BOLT FOR RAPID 2+ MODULE CLAMPS IS 14 N-M (10.5 FT-LBS) M6 AND 1/4" BOLT TORQUE IS 6 N-M (4.5 FT-LBS) M8 AND 5/16" BOLT TORQUE IS 14 N-M (10.5 FT-LBS) M10 AND 3/8" BOLT TORQUE IS 30 N-M (23 FT-LBS) M12 AND 1/2" BOLT TORQUE IS 50 N-M (37 FT-LBS) M16 AND 5/8" BOLT TORQUE IS 121 N-M (89 FT-LBS) M20 AND 3/4" BOLT TORQUE IS 244 N-M (180 FT-LBS) 2340 [9281 in] SECTION A-A SCALE 1:15 CHECKED: REVIEWED: APPROVED: 1 E STEEL: 1: ALL BOLTS AND WASHERS SHALL BE 304 STAINLESS STEEL CLASS 2 (A2-70). 2. ALL NUTS SHALL BE 316 STAINLESS STEEL CLASS 2 (A4-70) I 610 [24 in] J 5 G N I AW FRONT ELEVATION SCALE 1:35 in] 8 G Y L N O D ALUMINUM: 1. ALL ALUMINUM SHALL CONFORM WITH THE LATEST ALUMINUM DESIGN HANDBOOK. 2. ALL ALUMINUM SECTIONS SHALL BE: 1610 [6338 in] in] 1665 1278 C a. SEMI-HOLLOWS AND HOLLOWS SHALL BE 6105-T5, 6005A-T6, OR 6005-T5 b. SOLIDS SHALL BE 6063-T6 601 [23 5 F 3490 [13738 in] TYP [98 1 in] 838 [33 in] [131 5 B GENERAL: 1. THE STRUCTURAL CONSTRUCTION DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE THE METHOD OR SEQUENCE OF CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND PROVIDE ALL MEASURES NECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO, BRACING, SHORING FOR LOADS DUE TO CONSTRUCTION EQUIPMENT, ETC. THE STRUCTURAL ENGINEER SHALL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES FOR PROCEDURE OF CONSTRUCTION, OR THE SAFETY PRECAUTIONS AND THE PROGRAMS INCIDENT THERE TO (NOR SHALL OBSERVATION VISITS TO THE SITE INCLUDE INSPECTION OF THESE ITEMS). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SCAFFOLDING, BRACING AND SHORING. 2. WHERE REFERENCE IS MADE TO VARIOUS TEST STANDARDS FOR MATERIALS, SUCH STANDARDS SHALL BE THE LATEST EDITION AND/OR ADDENDA. FINISHED GRADE C 4 15 DESIGN CRITERIA: 2012 EDITION OF THE INTERNATIONAL BUILDING CODE, WITH LOCAL AMENDMENTS. WIND DESIGN: DESIGN BASED UPON WIND TUNNEL TEST REPORT # RC 1127/0611_1e WIND SPEED = 115 mph (3 SECOND GUST) EXPOSURE: C RISK CATEGORY = II [34 991 [39 in] TYP 14 13 1 10200 [401169 in] A 5 C Y L N O D ALUMINUM: 1. ALL ALUMINUM SHALL CONFORM WITH THE LATEST ALUMINUM DESIGN HANDBOOK. 2. ALL ALUMINUM SECTIONS SHALL BE: a. SEMI-HOLLOWS AND HOLLOWS SHALL BE 6105-T5, 6005A-T6, OR 6005-T5 b. SOLIDS SHALL BE 6063-T6 STEEL: 1: ALL BOLTS AND WASHERS SHALL BE 304 STAINLESS STEEL CLASS 2 (A2-70). 2. ALL NUTS SHALL BE 316 STAINLESS STEEL CLASS 2 (A4-70) E TORQUE: TORX BOLT FOR RAPID 2+ MODULE CLAMPS IS 14 N-M (10.5 FT-LBS) M6 AND 1/4" BOLT TORQUE IS 6 N-M (4.5 FT-LBS) M8 AND 5/16" BOLT TORQUE IS 14 N-M (10.5 FT-LBS) M10 AND 3/8" BOLT TORQUE IS 30 N-M (23 FT-LBS) M12 AND 1/2" BOLT TORQUE IS 50 N-M (37 FT-LBS) M16 AND 5/8" BOLT TORQUE IS 121 N-M (89 FT-LBS) M20 AND 3/4" BOLT TORQUE IS 244 N-M (180 FT-LBS) F NOTE: RECOMMENDED SPEED FOR INSTALLATION OF SELF-DRILLING 1/4" DIAMETER SCREWS IS 1200-1800 RPMS. MODULE SIZE: RACKING SYSTEM DESIGNED FOR MODULE SIZE: 1665 mm x 991 mm x 46 mm VERTICAL MODULE GAP: 23 mm HORIZONTAL MODULE GAP: 5 mm FOUNDATIONS: 1. FOUNDATION DESIGN IS BASED UPON GEOTECHNICAL REPORT/TESTING REQUIREMENTS BY SCHLETTER; PROJECT NO: TO BE DETERMINED ALL CONSTRUCTION SHALL CONFORM TO THE REQUIREMENTS OF THE GEOTECHNICAL REPORT. GEOTECHNICAL TEST LOADS: UPLIFT (Tension) = 5.17 kips, LATERAL (Shear) = 1.52 kips. 2. THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR ANY GEOTECHNICAL ASPECTS OF THIS PROJECT. IF THE INSTALLER NOTICES ANY SOIL THAT HAS DIFFERENT DRIVING CHARACTERISTICS THAN EXISTED FOR TESTED DRIVEN POSTS, CONTACT THE ENGINEER IMMEDIATELY. NOTE: THE POST EMBEDMENT DEPTH IS PRELIMINARY AND SHALL BE VERIFIED BY THE STRUCTURAL ENGINEER OF RECORD PRIOR TO CONSTRUCTION. BASED UPON ON SITE TESTING BY THE GEOTECHNICAL ENGINEER. I G H I ISOMETRIC VIEW SCALE 1:40 893 [3518 in] J 2340 [9218 in] SECTION A-A SCALE 1:15 NO. DRAWN: 0 1 2 3 4 CHECKED: REVIEWED: APPROVED: 5 J REVISIONS: Client: Ground Mount FS 2V x 10 15° 6 7 8 2/13 EMAIL: MAIL@SCHLETTER.US WWW.SCHLETTER.US 1 Drawing Number: Project Site: 2 3 4 5 6 7 8 9 Dimensions and Specifications ISSUED BY: SCHLETTER INC. PROPRIETARY AND CONFIDENTIAL 10 JOB NUMBER: v 11 12 UNLESS THIS DRAWING IS SIGNED AND SEALED BY A LICENSED STRUCTURAL ENGINEER, IT IS A PRELIMINARY DESIGN AND SHALL K NOT BE USED FOR CONSTRUCTION. v.01 Exterior Racking Structure 1001 COMMERCE CENTER DR. | SHELBY, NC 28150 TEL: (704) 595 - 4200 | Fax: ( 704) 595 - 4210 K 5 PRELIMINARY 13 SHEET: 1 of 2 SCALE: 14 SEE DRAWING VIEWS 15 16 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us 17 MI-008 072216 FS SystemTM Ground Mount Installation Manual Installation Tools • String line with Wood Line Blocks for level foundation post installation • Marker/permanent pen • Tape Measure • Rubber Mallet for locking wedge • 2’ Carpenter’s Square for square girder-to-purlin connection • Torpedo Level or Protractor • Wrench and/or Socket for all bolted connections • Torque Wrench • Ratchet and/or Rechargeable Power Drill • Torx® Bit for Rapid5K™ Module Clamps 15 mm 17 mm 18 mm 19 mm TX40 • • 3/8” Socket for self-drilling screws 3/8” Socket Hex Head Wrench for standard module clamps 6 mm © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 3/13 FS SystemTM Ground Mount Installation Manual Foundation Post Installation 1. Survey Proposed Site • Review final drawing at least one week prior to post installation. Drawing will include information vital to the proper installation of the foundation posts such as the embedment depth, post-to-post spacing, slope, rotation, and installation tolerances. • Please note: Schletter does not provide construction layouts. • For longer racks, intermediate stakes may be required. • Posts are installed vertical to grade. • Installation tolerances: Lateral post placement is ±5.0” Total Lateral deviation of posts within an array is ±5.0” Post height variation tolerance ±0.50” Post verticality tolerance <2.0° in all directions Post rotational tolerance <±7.0° Array tilt angular tolerance ±1.0° • For East-West slopes greater than 7°, contact your Schletter representative 4 inches Tolerance Maximum 7° 4” Maximum Embedment depth ±0.5” ±7° Rotation Lateral cantilever 4/13 E-W slope Elevation difference between adjacent post Support distance © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 FS SystemTM Ground Mount Installation Manual 2. Post Installation • Position each post at the respective installation locations based on the completed stake-out (use a forklift). • Position the hydraulic ram (GAYK) at the installation location and lift the post into position beneath the ram head. • Level mast of hydraulic ram. • Level post using a torpedo level. • Advance the post approximately two feet into the subsurface then re-level the post. • Advance the post to the embedment depth as shown on the final drawing. • Position string lines: bottom string line is used for correct placement of post; top string line indicates correct embedment depth; string is run from the top of the front post to the top of the last post. • When installing subsequent posts, ram until the hammer head touches the top string line. Mark each post location using soil nails with flagging Position posts on marked locations (use a forklift) Ram two posts at opposite ends of array for string line Use string lines as guide to determine correct placement and depth of posts Position hydraulic ram and lift post into position beneath ram head Hammer head touching top string line indicates correct depth is reached © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 5/13 FS SystemTM Ground Mount Installation Manual Mounting the Individual Assembly Groups 1. Optional Post Splice • Verify torque on all bolts. • Splices are used to extend the length of a post. • Splice location will vary depending on project. • Consult project specific drawings. 1 2. Head Assembly Install shim plates between post and splice tubing using 3/4” bolts, washers, and nuts (front view) 2 3 4 0.051 Secure head assembly in place using supplied hardware. • Head assembly has horizontal, vertical, and rotational adjustment. 9.911 WEIV TNORF 4 : 1 ELACS WEIV EDIS 4 : 1 ELACS 8 D 0.722 6.58 D • 6 C • C Run string line from first to last head piece and adjust in between. 3 7 WEIV CIRTEMOSI DELBMESSA 5 : 4 ELACS Head assembly 9 3. Mount Girder/Strut Assembly B • B 2 Slide girder onto bolt within the head assembly. 4 1 TSIL STRAP LAIRETAM REBMUN TRAP THGIEW NOITPIRCSED 957.1 6T-3606 5 noitareneG ,daeH SF ,esaB 100-005241 896.1 6T-3606 200-005241 5 noitareneG ,poT ,daeH SF 760.0 dliM ,leetS 2A ,339NID ,03x01M ,daeHxeH ,wercS 030-016349 820.0 01-81 iNrC5X/1034.1 2A ,9437 NID ,5.01 ,rehsaW 100-000349 430.0 )4A( 613 SS 4A ,3296 NID ,01M ,detarreS ,egnalF ,tuN 010-219349 600-000349 572.0 dliM ,leetS 2A ,139NID ,021x21M ,daeHxeH ,wercS 640.0 6T-3606 5 noitareneG ,etalP edilS oN 000-300161 070.0 6T-3606 mm18 ,5 noitareneG ,eveelS ,recapS 300-005241 750.0 1754.1 4A ,3296 NID ,21M ,detarreS ,egnalF ,tuN 210-219349 :LAIRETAM :SECNARELOT 8672 NID • Align strut with pre-drilled hole in foundation post then secure with provided hardware and tighten. 1 • :STNEMMOC 000-005241 21/11/4 HD THGIEW ETAD YB NOISIVER 2 IMPORTANT! Insert locking wedge into the connector using a rubber mallet immediately after installing the girders. After locking wedge is inserted it cannot be removed. • Verify that assemblies are set in place. • Strut-girder connection should be torqued to 10 ft-lbs to avoid compression of the assembly. 1 # 5 noitareneG ,ylbmessA daeH :REBMUN TRAP 000-005241 YTQ METI 1 1 1 2 2 3 4 2 2 5 1 6 2 7 1 8 1 9 :YB NWARD SRC :DEKCEHC :ETAD N OITAERC 2102/21/4 :ETAD DE KCEHC : # TRAP DLO :REMOTSUC / TCEJORP / ELTIT 5 WEIV CIRTEMOSI DEDOLPXE 5 : 4 ELACS :TF/TW :THGIEW A :NWORC :EZIS C 1 FO 1:TEEHS 2^mm 571.421842 :AERA NWOHS SA :ELACS 3 Locking wedge :SUTATS A desaeleR :GFM :REM OTSUC :E TAD LAV OR PPA GFM :DEVORPPA :ETAD LAVOR P PA GNE REBMU N YL BMESSA :R OTCAR TN OCBUS Place head assembly onto foundation post with M10 bolt, washer, and nut smetsyS gnitnuoM raloS S RETTELH.cCnI 4 Insert locking wedge into connector after installing girder and strut assembly Installed girder and strut assembly on foundation post 6/13 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 FS SystemTM Ground Mount Installation Manual 4. Mount Purlins • Align purlins as shown on system specific drawings. • Loosen upper mounting clamp on girder. • Slide lip of purlin under lower mounting clamp. • Verify purlins are installed perpendicular to girder. • Secure purlin in place by tightening upper mounting clamp over top lip of purlin. • It may be necessary to loosen lower mounting clamp. Mark location with indelible marker prior to loosening. Verify that purlin is positioned correctly before tightening mounting clamps 5. Optional Splice Connection • In order to form a longer section, splices may be included to join two purlins. • Splices shall be located as specified on project specific drawings. • Attach first purlin to girder as stated in Step 4. • Insert splice piece halfway into the end of first purlin section and secure in place using one self-drilling screw. • Loosely attach second purlin section to girder and slide over splice piece that is connected to first purlin. Secure purlin in place using one self-drilling screw. • Verify purlin is installed in correct location as specified on the project specific drawings. • Secure assembled purlin in place by tightening all upper mounting clamps. Installed purlin (side view) Insert splice into end of two purlins and secure in place using self-drilling screws © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 7/13 FS SystemTM Ground Mount Installation Manual 6. Install Overcurrent Protection Device (grounding) • Shares bolt that connects strut to post. • Remove serrated flange and install grounding lug; torque to specification. • Accommodates stranded or solid copper wire (14 gauge to 2 gauge). • Must use bare copper wire to connect to the grounding lug. If using insulated grounding wire, remove at least 2 inches of insulation to expose copper wire. Loosen or remove top portion of grounding lug and insert grounding wire into appropriate groove Grounding wire must extend through grounding lug by at least 1/4” 7. Ground Path Diagram Grounding Clamp Purlin Splice Module Frame Purlin Girder Head Assembly Foundation Post 8/13 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 FS SystemTM Ground Mount Installation Manual Optional Accessories 1. Bonding Jumper • Electrically bonds adjacent systems forming a continuous ground path. • Available in 6-inch to 48-inch lengths. • Used for expansion joints or other breaks in the racking system. Bonding jumper can be installed on top channel of purlin using M8 hardware Bonding jumper connects directly to purlin 2. Cable Management • 3 2 If cable management was ordered with the system, install before modules are in place. 1 3 4 • 4 WIDTH of COMBINER BOX ENGTH LENGTH D 2 1 Snap ProKlip-Multi 8 into M8 3top channel 3 on purlin. 2 1 2 1 D 239.0 • Snap 4 ProKlip2000-P or ProKlip-Q cable clip onto side of S Purlin. WIDTH of 239.0 COMBINER BOX WIDTH of COMBINER BOX WIDTH of LENGTH COMBINER BOX • 3 2 D 5 239.0 For a more detailed cable management 239.0 7 installation see: LENGTH ProKlip-Multi 8 (129065-008) WIDTH of COMBINER BOX 3 9 239.0 Cable Management Installation Guide 2 6 7 5 9 4 2 7 6 9 5 1 5 4 ProKlip2000-P (129012-002) ProKlip-Q (129012-001) 2 7 6 9 5 2 5 3 1 4 6 5 3 1 4 C 7 9 2 6 5 4 LENGTH C LENGTH C 8 10 Attach cable duct (128014-000) against side of purlin with selfdrilling screws 8 10 8 10 8 10 B 8 Combiner box mount is installed against exterior end of foundation post 10 SIDE VIEW SCALE 1 : 10 B ASSEMBLY VIEW SCALE 1 : 6 NT VIEW SIDE VIEW LE 1 : 10 SCALE 1 : 10 FRONT VIEW SIDE VIEW B SCALE 1 : 10 SCALE 1 : 10 FRONT SIDE VIEW NOTE: INC. - PROPRIETARY ANDVIEW CONFIDENTIAL d only with the express, written1consent SCALE : 10 of the Co: Schletter Inc. SCALE 1 :1.10MAXIMUM COMBINER BOX PLUS ASSEMBLY VIEW SCALE 1 : 6 ASSEMBLY VIEW SCALE 1 : 6 ASSEMBLY VIEW PARTS LIST SCALE 1DESCRIPTION :6 ITEM QTY PART NUMBER MATERIAL MASS SAE J2340 6105-T5 6105-T5 0.157 kg MATERIAL MASS DATE: LECREATION / PROJECT / CUSTOMER: NOTE: kg/m or kg/sq m: RT PART #: TOLERANCES: MATERIAL: ISSUED BY: SCHLETTER INC. - PROPRIETARY AND CONFIDENTIAL 4 4KIT119025-00200 Threaded Rod, 3/8"-16 UNC, 304 SS, Grade B8, L=200mmPARTS 304 SS 0.109 kg CONTENTS WEIGHT = 100 lbs. PER 8/5/2013Reproduction of any kind only with the express, written consent of the Co: Schletter Inc. LIST 1 1 143008-000 Post, 8, Custom, Galvanized SAE J2340 A s reserved. 1. MAXIMUM COMBINER BOX PLUS 000-000 TORQUE: 5 8AS943912-001 0.015 kg Nut,ITEM Flange, Serrated, 3/8"-16 UNC, 316 SS 316 SS CHECKED DATE: 2. PARTS LIST REFLECTS 2 KITS, PART NUMBER MATERIAL QTY DESCRIPTION MASS 2 2 123001-001 Rail, DN0, Custom 6105-T5 WEIGHT: CREATION DATE: NOTE: kg/m or kg/sq TOLERANCES: MATERIAL: M6 AND 1/4" BOLT TORQUE IS CONTENTS 6 N-M (4.5 FT-LBS) ISSUED BY:#RT SCHLETTER ANDm:CONFIDENTIAL WEIGHT =6 1004lbs.943919-126 PER KIT3 Nut, - 16 UNC, ASME-B18.2.2, 316 SSGalvanized Square, 316 SS PARTS LIST 0.013 kg OLD PART : PART #: INC. - PROPRIETARY SHOWN ABOVE 8/5/2013 1 13/8"143008-000 Post, Custom, 2 000009-555 Angle, 40x40, T=4,8,L=200, 2 Slots 41x11mm 6105-T5 SAE J2340 0.157 kg All Directions, rights reserved. Reproduction of any kind only with the express, written consent the Co: Inc. embly Combiner Box Mount, M10 M8ofAND 5/16"Schletter BOLT TORQUE IS 14 N-M (10.5 FT-LBS) CUSTOMER: 1. MAXIMUM COMBINER BOX PLUS 7 4 943914-010 0.013 kg Nut, Square, M10, DIN 557, 316 SS 316 SS CHECKED DATE: 2. PARTS LIST REFLECTS 2 KITS, AS TITLE / PROJECT / CUSTOMER: ITEMThreaded NUMBER QTY PART DESCRIPTION 2 2 123001-001 Rail, DN0, Custom 6105-T50.109 kgMATERIAL CREATION DATE: M10 AND BOLT TORQUE IS 30 N-M (23 FT-LBS) 4 4 119025-00200 Rod, 3/8"-16 UNC, 304 SS, Grade B8, L=200mm 304 SS A # REVISIONWEIGHT: BY DATE Y: kg/m or kg/sq m: 3/8" TOLERANCES: MATERIAL: CONTENTS WEIGHT = 100 lbs. PER KIT3 M10,2 DIN 8 4 943921-010 Washer, 304 SS 316 SS 41x11mm 0.004 kg OLD PART #RT: PART #: 8/5/2013 M12 AND 1/2" BOLTTORQUE: TORQUE ISSHOWN 50 N-M (37ABOVE FT-LBS) 1125, 143008-000 Post, Custom, Galvanized on.Hurley 000009-555 Angle, 40x40, T=4,8, L=200, Slots 6105-T50.015SAE 0.157 kg 000000-000 APPROVAL DATE: PART NUMBER: 5 8 943912-001 kg J2340 Nut,1 Flange, Serrated, 3/8"-16 UNC, 3162 SS 316 SS E: MFGCROWN: CUSTOMER: 9/13 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 4200 • Fax: (704) 595 4210 MI-008 CHECKED DATE: / PROJECT 2. PARTS LIST REFLECTS 2 KITS, AS 9 4 129010-001 KlickIn, M10 Polyamide (Nylon) 0.002 kg TITLE / CUSTOMER: M16 AND 5/8" BOLT TORQUE IS 121 N-M (89 FT-LBS) NOTE: 000000-000 M6 AND 1/4" BOLT TORQUE IS 6 N-M (4.5 FT-LBS) ISSUED BY: SCHLETTER INC.WEIGHT: - PROPRIETARY AND CONFIDENTIAL 2 Nut,2 Square, 123001-001 Rail,3/8"-16 DN0, Custom D: 4 4 119025-00200 Threaded Rod, UNC, 304316 SS,SS Grade B8,316 L=200mm 304 SS 6 4 943919-126 3/8" - 16 UNC, ASME-B18.2.2, SS 0.0136105-T5 kg 0.109 kg LIST ANDwritten 3/4" BOLT TORQUE IS 244 N-M (180 FT-LBS) AllDirections, rights reserved. Reproduction kind only with the M20 express, consent the Co: Schletter Inc. OLD PART : of any Screw,5 Hex Head, DIN 933, 304 SS 304UNC, SS 0.024 kg PARTS Assembly Combiner Box #Mount, M10 SHOWN M8ofAND 5/16" BOLT TORQUE IS 14ABOVE N-M10(10.5 4FT-LBS) mail@schletter.us • www.schletter.us 072216 1. 943610-020 MAXIMUM PLUS 3M10x20mm, 000009-555 Angle, 40x40, T=4, L=200, Slots 41x11mm 000000-000 MFG APPROVAL DATE: TORQUE: 8BOX 943912-001 Nut, Flange, Serrated, 3162 SS 316 SS 0.0136105-T5 ENG APPROVAL DATE: 7 COMBINER 4 943914-010 kg 0.015 kg Nut,2 Square, M10, DIN QTY 557, 316 SS3/8"-16 316 SS DESCRIPTION ITEM PART NUMBER 1DATE: SHEET: OF / 1CUSTOMER: ALE: AS SHOWN CREATION M10 AND ISTORQUE 30 N-M (23 FT-LBS) TITLE / PROJECT # REVISION BY DATE DRAWN AREA: BY: CUSTOMER: kg/m or kg/sq m: 3/8" TOLERANCES: MATERIAL: RT PART #: M6BOLT AND TORQUE 1/4" BOLT IS 6CONTENTS N-M (4.5 FT-LBS) 4 4 119025-00200 Threaded Rod, 3/8"-16 UNC, 304 SS, Grade B8, L=200mm 304 WEIGHT = 100 lbs. PER KIT 6 4 943919-126 316 316 SSGalvanized Nut, Square, - 16 UNC, ASME-B18.2.2, 316 SS 0.004 kg SS 0.013 kg 8 4 943921-010 Washer, M10, DIN SS 3 Box Mount, M10 1 Post, 8, Custom, 8/5/2013 M12 AND 1/2" IS TORQUE 50 N-M (37IS2FT-LBS) rkInProgress 1125, 304 13/8"SS 143008-000 Dillon.Hurley PART NUMBER: SIZE: CROWN: Assembly Directions, Combiner ASSEMBLY NUMBER M8BOLT AND TORQUE 5/16" BOLT 14 N-M (10.5 FT-LBS) 000000-000 MFG APPROVAL DATE: TORQUE: 5 8AS943912-001 ENG APPROVAL DATE: Serrated, 316 SS 0.013 kg 7 4 2943914-010 Nut, Square,Nut, M10,Flange, DIN 557, 316 SS3/8"-16 UNC, 316 SS 316 SS CHECKED DATE: 2. PARTS LIST REFLECTS KITS, PART #: kg/m or kg/sq m: TOLERANCES: MATERIAL: CONTENTS WEIGHT = 100 lbs. PER KIT 1 1 143008-000 Post, 8, Custom, Galvanized 2. PARTS LIST REFLECTS 2 KITS, AS FRONT SIDE VIEW NOTE: 2 2 123001-001 Rail, DN0, Custom ED BY: SCHLETTER INC. WEIGHT: - PROPRIETARY ANDVIEW CONFIDENTIAL ASSEMBLY PARTS VIEWLIST Deproduction PART # : of any kind only with the express, written1 consent SHOWNSCALE ABOVE 1 :1.10 SCALE : 10 of the Co: Schletter Inc. 2 000009-555 Angle, 40x40, T=4, L=200, 2 Slots 41x11mm1 : 6 MAXIMUM COMBINER BOX3 PLUS SCALE ITEM QTY PART NUMBER DESCRIPTION FS SystemTM Ground Mount Installation Manual Module Mounting 1. Position Modules 20 mm • Position end clamps approximately 20 mm from end of purlin. • Position first module and secure prepositioned end clamps; do not tighten. • Attach middle clamps to purlin on the exposed side of first module. • Place second module and secure using the middle clamp; do not tighten. • Repeat until end of row, then secure exposed side with end clamps. End (left) and middle (right) grounding clamps Rapid5KTM Grounding Clamp Horizontal module orientation 2. Secure Modules • Verify that the module clamp is fully engaged on the purlin and that the module clamp is aligned with the module frame. • Secure in place to specified torque. • When mounting modules, please observe the clamping points specified by the module manufacturer. Vertical module orientation 23 mm max. 1.5 mm maximum middle clamp to module offset 5 mm If adjustable end clamps are provided, slide attachment on to desired height. 10/13 Allowable gaps between modules © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 FS SystemTM Ground Mount Installation Manual Torque Specifications and Tolerances Systems are specifically designed for each project. Please reference the specific project drawing for allowable tolerances and recommended torque for each size of bolt used in the system. In the event of deviation from approved drawings, contact Schletter immediately. Torx Bolt for Rapid5K Module Clamps 14 N-M 10.5 FT-LBS M6 and 1/4” Bolt 6 N-M 4.5 FT-LBS M8 and 5/16” Bolt 14 N-M 10.5 FT-LBS M10 and 3/8” Bolt 30 N-M 23 FT-LBS M12 and 1/2” Bolt 50 N-M 37 FT-LBS M16 and 5/8” Bolt 121 N-M 89 FT-LBS M20 and 3/4” Bolt 244 N-M 180 FT-LBS Note: Recommended speed for installation of self-drilling 1/4” diameter is 1200-1800 RPMS. Equipment Grounding Many PV installations contain more than one mounting system. Such cases call for electrically bonding each of the different manufacturers systems. Since individual racks are fully bonded units it is only necessary to connect individual racks together from one single point to another single point.6 Only use stainless steel hardware when connecting harnesses or jumpers to the mounting system. Take care to prevent copper wires from directly contacting aluminum surfaces as this will cause corrosion. For this purpose, Schletter offers a bonding jumper (see page 9). • The PV INSTALLER of Schletter’s electrically bonded FS system must provide the components necessary for the final connections to the grounding electrode system. Typically the installation will incorporate a grounding electrode (ground rod), appropriately sized copper wire, rated wire connectors, and grounding lugs which are rated for this purpose. The PV INSTALLER must follow all manufacturers’ installation literature. Installation must comply with all applicable NEC/CSA sections including but not limited to; NEC 250 (Grounding and Bonding), NEC 690 (Solar Photovoltaic Systems), CSA 22.1 (Safety Standard for Electrical Installations), and all other applicable state, and local electrical code requirements. • PV INSTALLER shall be fully responsible for all connections between Schletter’s bonded FS system and PV grounding electrode system. • Equipment grounding conductors shall be no less than 14AWG (copper) or 12AWG (aluminum). • Equipment grounding conductors can be connected to any exposed metallic portion of rack system provided that: a. b. c. d. connection area is sufficiently sized dissimilar metals are not in direct contact connection does not interfere with other components connection is protected from damage Safety Precautions Follow proper installation and safety procedures at all times. Edges of parts may be sharp. Follow proper lifting procedures. 6 Schletter recommends two bonding jumpers to connect separate systems for redundancy. © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 11/13 FS SystemTM Ground Mount Installation Manual Maintenance • Yearly inspection of system should be conducted to maintain optimal performance. • Visually inspect for signs of damage, wear, corrosion, or movement. Replace any affected components immediately. • Check for loose wiring • Mechanical details of the structure • At least 2% of bolted connections must be checked using a calibrated torque wrench. The torque wrench must have a display or be a click type torque wrench. • Torque wrench should be set at 50% of the intended tightening torque. Check is successful if the bolt cannot be loosened. • If >10% of the checked bolted connections are loose, the check has to be increased by a factor of five. • If more than 10% of connections are still loose, all bolted connections much be checked. • Tighten to specified torques • Requirements per ASME B107 and AISC • WARNING: Risk of death by electric shock • Maintenance should only be performed by qualified personnel. For More Information For more information on the FS System, please see: FS System Product Sheet Ground Mount System Overview FS Mounting Kit Product Sheet Torx® is a registered trademark of the Camcar Corp. division of Textron Industries. 12/13 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 FS SystemTM Ground Mount Installation Manual Approved Module Manufacturers Bonding and Grounding Canadian Solar CS6X-310|315|320P CS6X-P-FG CS6K-P-FG CS6K-M CS6K-M AB CS6P-P CS6P-P-SD CS6V-M Yingli Green Energy YL300C|295C|290C|285C|280C|275C-30b YL290D|285D|280D|275D|270D-30b YL340D|335D|330D|325D|320D|315D-36b YL275P|270P|265P|260P|255P|250P-29b YL260P|255P|250P|245P|240P-29b YL325P|320P|315P|310P|305P|300P-35b Hanwha Q Cells Q.PRO BFR G4|G4.1|G4.3 Q.PLUS BFR G4.1 Q.PRO L G4.1 Q.PLUS L G4.1|G4.2 LG LGxxxN1C-G4 LGxxxN1W-G4 LGxxxS1C-G4 LGxxxS1W-G4 LGxxxN1K-G4 LGxxxN2C-B3 LGxxxN2W-B3 SolarWorld Sunmodule SW 80 MONO RHA Sunmodule SW 150 POLY R6A Sunmodule SW 150 MONO R6A Sunmodule SW 100 POLY RGP Sunmodule Plus SW 280-295 MONO Sunmodule Plus SW 285-300 MONO (5-busbar) Sunmodule Plus SW 280-290 MONO BLACK (5-busbar) Sunmodule Plus SW 275-290 MONO BLACK Sunmodule Pro-Series SW 260 POLY WOB Sunmodule Protect SW 275-280 MONO BLACK Sunmodule SW 320-325|340-350 XL MONO Trina TSM-PD14 TSM-PD05 TSM-PD05.08 TSM-PD05.05 TSM-PEG5 TSM-PEG5.07 TSM-PEG14 TSM-PEG40.07 © Schletter Inc • 1001 Commerce Center Drive • Shelby, North Carolina 28150 • Tel: (704) 595 - 4200 • Fax: (704) 595 - 4210 mail@schletter.us • www.schletter.us MI-008 072216 13/13