Undergraduate Satellite Program @ Nanyang Technological University Kay Soon Low Centre Director, Satellite Research Centre Associate Professor Nanyang Technological University School of Electrical & Electronic Engineering ekslow@ntu.edu.sg 1 Satellite Research Centre Missions – Research and develop low earth orbit (LEO) nano- & pico-satellite missions – Research in space science and technologies for earth observation applications – Train undergraduate g &p postgraduate g students to meet the space industry needs 2 Satellite Centre • The centre has 3 labs & 1 clean room, and is equipped with simulators, analyzers, fabrication machines, thermal l f b i ti hi th l chamber, vacuum chambers etc. – 50 staffs. – Satellite Design lab, Satellite Engineering Satellite Design lab, Satellite Engineering lab, mechanical lab, Clean room (Class 5k, 314 m2) – Total lab Space 1172 m2 3 Satellite Stack-up 4 Research Activities in Centre • The centre has the following key activities: – – – – – – • Preparing for launch and operation of a micro-satellite, X-SAT Communication system y for a satellite Development of sensors for satellite attitude determination Real time multi-spectrum satellite image analysis Actuator and micro-thruster system y for nano-satellite Undergraduate satellite program : build a pico- & nano-sat pair International Collaboration – US Air Force Academy, Department of Astronautics • Student exchange program & payload development – DLR German Aerospace Centre • Collaborate on GIOVE satellites tracking, setup an operational ground station (1 of the 8 in the world) – CONGO 5 Undergraduate Satellite Program • Objective bj i – To introduce nano‐satellite design, assembly, integration, testing and operation into the integration, testing and operation into the engineering undergraduate program. • Motivation – To transfer our experience in micro‐satellite technology into our educational program. – To nurture creativity and imagination of To nurture creativity and imagination of undergraduate students by providing them a challenging multidisciplinary and team based project. – To train new satellite engineers for the aerospace industry in Singapore industry in Singapore. 6 Undergraduate Satellite Program SSchedule h d l • Phase 1 – Design and build a space qualified collaborative pico Design and build a space qualified collaborative pico‐sat sat & & nano‐sat – Design a space qualified remote sensing payload, a MEMS ADCS, & inter‐satellite communication system – Build a ground station – Train 150 undergraduate students T i 150 d d t t d t • Phase 2 – Launch and operate the satellites Launch and operate the satellites – System performance evaluation – Decommissioning g 7 Satellite pair: (left) 3U configuration before launch (right) separated as P P- & N N-SAT SAT in orbit 8 Key Features of the Satellite Pair • • • • • • • • Experiment of a satellite pair separating in space. Launched as 3u nanosat comprising 1u picosat Launched as 3u nanosat comprising 1u picosat & 2U nanosat & 2U nanosat 3u nanosat operates in space for six months before separation After initial launch, the N‐sat After initial launch, the N sat deploys solar panel, extend its deploys solar panel, extend its optics to an additional 2u length. Remote sensing payload. Image processing board is configured as a backup OBC. MEMS based ADCS, sun sensor. U Upon separation, inter‐satellite communication will be ti i t t llit i ti ill b experimented. RF ranging, camera pointing are planned. 9 Satellite Prototyping • 20 students on LEO satellite simulation in May 2009, 20 students work in Jan‐May 2010 to build a satellite ground station. • 20 final year students (EEE & MAE) work on satellite prototype from Aug 2009‐May 2010. 10 11 12 Conclusions • Nanyang Technological University has a well equipped satellite centre with a class 5k clean room centre with a class 5k clean room. • We have initiated an educational program to involve undergraduate students to work on a pico‐ & nano‐satellite pair. • Mission definition review and prototyping have been completed. completed • We will start the engineering model development with a new batch of undergraduate students in August 2010. 13