Double Sided LED Maintained Exit Box Installation Instructions p.1 For models: EBMDSLED This installation must be carried out by an electrician. Please read these instructions carefully before installation. Leave a copy for the user/maintenance engineer for future reference. Specification Installation Instructions • Double Sided LED Maintained Exit Box 1. Ensure the mains supply is off. • 220-240V 2. Ensure there is at least 100mm of free space around the luminaire. • 80-150mA Charging current 3. Check for concealed cables before drilling fixing holes. • 200-250mA Discharging current 4. Remove the front legend by removing the two crosshead screws retaining the end plate and sliding the legend plate out. • 8W LED • 2 x 12pcs SMD 2835 LED 5. Fix the main exit sign body to the wall having cleared an access hole in the body for the incoming cables. • 350 Lumen output 6. Wire up the luminaire in accordance with wiring regulations. An unswitched 240V A.C. supply must be connected to the Live (L), Earth (E) and Neutral (N) terminals on the PCB. For Maintained operation, connect an additional switched to the ‘L1’ terminal. • 3 Hours emergency duration • 24 Hours charging time • 35,000 Hours life expectancy • 1 Year guarantee 7. Plug battery leads onto the connector on PCB. Important Installation Information 8. Slide the legend panel back into the frame and refit the end plate with the two screws. • Installation should be carried out in accordance with the latest edition of the I.E.E. wiring regulations (BS7671) and taking into consideration the latest Building Regulations. If in doubt, consult a qualified electrician. IMPORTANT: Ensure that ALL electrical connections are tight with no loose strands, including factory made connections. 9. Check operation - restore A.C. supply. For emergency versions check the indicator LED is ‘on.’ Leave for 30 minutes, remove power and the LED’s should illuminate for a few seconds. 10. Restore the A.C. supply and check the LED’s operate on mains for maintained operation. • Input voltage – 240v 50HzAC • Ensure there is adequate free air circulation of at least 100mm around the luminaire. All luminaires run hot. It is the installer’s responsibility to consider fire risk and take appropriate precautions. • Before commencing installation or maintenance, ensure electricity is switched off at the mains. • The nearest illuminated surface must be at least 0.5m from the front of the fitting. • Allow the fitting to cool before servicing. Red Arrow Trading Elsworth House, Herries Road South, Sheffield, S6 1QS T: 0800 195 0006 F: 0870 043 3946 E: sales@redarrowtrading.com www.redarrowtrading.com Double Sided LED Maintained Exit Box Installation Instructions p.2 For models: EBMDSLED Testing The following test is designed to ensure the continued protection of your premises and occupants. Because of the possibility of a failure of the normal lighting supply occuring shortly after a period of testing, all tests should whenever possible, be undertaken at times of least risk, e.g. during daylight hours. 1. Daily - Visual inspection of battery charge LED. 2. Monthly – Each unit should be energised from its battery for about 15 minutes by simulation of a failure of the normal lighting supply to ensure the LED’s operate in the emergency condition. 3. Yearly - Each unit should be energised from its battery for the full rated duration. Inspect the LED’s and ensure that they all operate with similar lighti output. The LED’s have a life expectancy of over 10 years but it is recommended that the LED PCB is replaced at after 10 years in order to retain the design photometric characteristics. Operation Non-Maintained (No switched supply connected) • LED’s normally off and battery on automatic charge (green LED’s on) when the A.C. supply is healthy. Solid state circuitry automatically switches the emergency LED’s on when the A.C. supply is interrupted. Maintained • The LED’s are normally on. The battery is on automatic charge (green LED’s on). LED’s may be switched by independent switched live and will switch on (remain on) to emergency operation when the permanent A.C. supply is interrupted. Monitoring • Green indicator lamp (LED) normally continously ‘on’ indicator goes out if permanent A.C. supply or charger fails. Fault Finding and Corrective Action Monitoring LED Not Illuminated • A.C. supply not healthy. Battery not connected. Charger failed. Unit Not Meeting Required Emergency Period • May need cycling: discharge then recharge for full 24 hours. Retest. Battery pack may need replacing if emergency duration still not met. LED’s Not Fully Illuminated • If one or more of the LED’s do not illuminate the printed circuit board may be damaged and will require replacing. Guarantee This product is guaranteed for a period of 1 year from the date of purchase. The guarantee is invalid in the case of improper use, tampering, removal of the Q.C. date label, installation in an improper working environment or installation not according to the current edition of the I.E.E. Wiring Regulations (BS7671). The guarantee is also invalidated if the luminaire has been Mega tested. Should this product fail during the guarantee period it will be replaced free of charge, subject to reasonable use, correct installation and return of the faulty unit. We do not accept responsibility for any installation costs associated with the replacement of this product. If a PIR is used in conjunction with any Red Arrow lighting product we do not accept any responsibility for premature failure of lamps or control gear. Your statutory rights are not affected. We reserve the right to alterspecifications without prior notice. Red Arrow Trading Elsworth House, Herries Road South, Sheffield, S6 1QS T: 0800 195 0006 F: 0870 043 3946 E: sales@redarrowtrading.com www.redarrowtrading.com