Al Madar Contracting O.P.C. Engineers‐Contractors (Civil, Industrial & Marine Construction) P.O.Box 2329 Doha, State of Qatar Tel: 446 74466, Fax: 446 71333 E‐Mail: almadar.cont@almadar‐holding.com Website: www.almadar‐holding.com g Prequalification Document Al Madar Contracting O.P.C. Company’s Profile Engineers‐Contractors (Civil, Industrial & Marine Construction) 2 Al Madar Contracting O.P.C TABLE OF CONTENTS Section ‐1 COMPANY SUMMARY The Company Company Statement Relevant Company Data Registration / Certificates/Classification Registration / Certificates/Classification Section‐2 RESOURCES Organization Chart Organization Chart Resources ‐ Personnel Resources – Equipment Section‐3 REFERENCES List of Major Projects Letters of Recommendation &Completion Certificates Al Madar Contracting O.P.C SECTION‐1 COMPANY SUMMARY THE COMPANY Al‐Madar Al Madar Contracting O.P.C. is a Qatari Company, originally formed in 1992, specialized in the field of design and construction of Civil and Industrial Construction as well as Infrastructure and Marine development works. The company has been certified by Lloyd’s Register Quality Assurance to the following Quality Management System Standards: The Company has executed projects for local Ministerial authorities such as M/s ASHGHAL ( (Building g Affairs & Drainage g Affairs), ), Ministryy of Interior,, KAHRAMAA,, Q Qatari Armed Forces,, Woqod, QTEL, HMC, LUSAIL, QP/DOPET as well as many private sector projects. AL‐MADAR fields of operation are the following: Civil & Industrial Construction: Site Preparation, Combined Infrastructure, Construction of Towers, Schools, Industrial, Office, Hotel, Hospitals, Residential & Commercial buildings, Public Landscaping projects, Large compounds of Villas with Club House & Sub‐station amenities & services etc. etc Water & Wastewater: Pumping Stations, Substations and Sewerage net works and Pump House etc. Marine: Concrete Quay Walls, Industrial and Private Jetties (Fixed and Floating) Concrete Repair of Water front, Shore & Beach protection. p Carpentry and Decoration: A joinery/carpentry workshop to design, fabricate, supply and install various timber products like doors, wardrobes, cup boards, cladding, handrail, skirting etc. Al‐Madar has also been certified by BM Trada for production and installation of fire rated timber doors in compliance with BS 476: Part 22, and the same has been approved by Civil Defense Department. 5 The Company is employing more than 2000 persons in Qatar, Al Madar’s highest priority and commitment is to provide the Client with sound and professional engineering execution to the highest standard and satisfaction. The enclosed reference in Qatar or other areas reflect the effective capacity & strength of the company. As a whole, the Company owes its reputation and prosperity to the fact that it has always retained a perspective of solid and innovative engineering. This has allowed it not only to present improved solution to many current design and construction problems but equally has permitted it to successfully complete a number of very delicate projects, projects requiring in addition a solid and disciplined management and organization. COORDINATES Address AL‐MADAR CONTRACTING O.P.C. P.O. Box: 2329 Doha, Qatar Arabian Gulf Tel.: (+974) 44674466 Fax.:(+974) 44671333 E‐mail: almadar.cont@almadar‐holding.com Website: www.almadar www almadar‐holding holding.com com Location: Head Quarter Office is located at Al‐ Muntazah Street, Hilal Area in Doha. Workshops & Camps are located in the Industrial Area Street No. 41, Plot No. D‐36. COMMERCIAL DATA: Owner : Al‐Madar Holding W.L.L. is limited Company under Qatari law owned by Eng. Ali Al Mashhadi & Eng. Haidar Al Mashhadi 6 Classification: Enclosed please find copy of Al‐Madar’s Registration with the Central Tenders Committee, State of Qatar (Reg. No. 47455), which states that this contractor is classified as: GRADE A : Building Works, value limit from Qrs. 60 million up to 150 millions. GRADE A : Maintenance Works, value limit from Qrs. 10 million up to 30 millions. GRADE B : Various Drainage & Sewerage Works, Value limit from Qrs. 3 million up to 10 millions. Q p Registration: ‐ Commercial Registration No. 47455 ‐ Ministry of Public Works Registration No. 9292 & 47455 ‐ CTC Registration No. 47455 ‐ Qatar Chamber of Commerce & Industry, Membership Certificate No. 01/22406 Associated / Sister Company: ‐ Al Madar Engineering & Marine Construction OPC ‐ Al Madar Real Estate OPC. ‐ Al Madar Carpentry & Decoration OPC. Al Madar Carpentry & Decoration OPC. ‐ Al Madar Wrought Iron OPC ‐ Scala Construction Engineering OPC ‐ AL Sakhr Aluminum, Glass & Kitchen W.L.L. ‐ Al Madar Project Management OPC ‐ AlMadar Transpt. &Vehicle Maintenance OPC ‐ Al Madar Trading OPC. 7 FINANCIAL DATA: C it l Capital : The Th Company C h a registered has i t d and d paid‐up id capital it l off Qrs. Q 8,000,000 in Qatar. This does not include reserves and retained earnings. Banks : ‐ The Commercial Bank of Qatar, Doha ‐ Qatar Islamic Bank, Doha ‐ Saderat Iran Bank, Doha ‐ Arab Bank, Doha ‐ Ahli Bank, Doha Auditors : ‐ Ernst & Young, Doha ‐ Tel. No. 4414599 T l N 4414599 ‐ Fax No. 4414649 Insurers : ‐ Al‐Arabia Insurance Co., Doha ‐ Al Khaleej Insurance Co., Doha ‐ Oman Insurance Co., Doha Turnover : Yearly turnover in Qatar has been Qrs. 300 to 350 millions. 8 Al Madar Contracting O.P.C Registration / Certificates/Classification Al Madar Contracting/ Commercial Registration (Page 1) 10 Al Madar Contracting/ Commercial Registration (Page 2) 11 Al Madar Contracting Trade License 12 Al Madar Contracting/ Classification Grade A Certified by the Central Tender Committee C tifi d b th C t l T d C itt 13 Al Madar Qatar Chamber of Commerce Membership Certificate 14 Lloyd’s Register Quality Assurance 15 BM Trada Certificate 16 Civil Defence Certificates for Fi R t d D Fire Rated Doors (Page1) (P 1) 17 Civil Defence Certificates for Fi R t d D Fire Rated Doors (Page2) (P 2) 18 Al Madar Contracting O.P.C SECTION‐2 RESOURCES Al Madar Contracting O.P.C Organization Chart Al Madar Contracting Organizational Chart 21 Al Madar Contracting O.P.C RESOURCES‐PERSONNEL RESOURCES – PERSONNEL MANAGEMENT: NAME QUALIFICATIONS, EXPERIENCE & OTHER RELEVANT DETAILS ENG. ALI AL‐MASHHAD Chairman, Graduated as a Architect Engineer, from Dortmund University, Germany, in 1991. ENG. HAIDER AL‐MASHHADI Managing Director, Graduated as a Architect Engineer, from Dortmund University, Germany, in 1991. ENG. HAZIM M. AL‐FARRA Deputy Managing Director Graduated as a Civil Engineer, from Qatar University in 1989, with over 20 years of experience in Construction & Management. ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ MANPOWER STRENGTH: Management, administration, engineering and technical staff is of Middle Eastern, European and Asian Nationalities. The Company has, on the average, employed between 35‐50 management and administration staff, including a number of graduate and technical engineers, a selection list of project managers and other staff is enclosed. In total, total the company has its own project management staff like Project Managers, Managers Project/Site Engineers, Planning Engineers, QA/QC Engineers, Site Foreman, Land Surveyors, Site QS, AutoCAD Draftsman, Store/Time Keepers and Safety Officers. As for the site manpower, we have skilled manpower like Carpenters, Steel fixers, Block Masons, Plaster Masons, Ceramic Masons, Unskilled Laborers, drivers & Operators. 23 Supervisory & Specialist Staff: Intermediate staff and specialist engineer’s t d tradesmen h il from hail f N Nepal, l Egypt, E t India, I di Pakistan P ki t and the Philippines. Through our overseas contract, we are able to draw on short notice, additional engineering, supervisory and specialist personnel from Europe, should the need arise. Labor : The Company has used primarily Indian labor for all qualified civil and finishing work, and Nepal, Pakistani, Egyptian labor for other qualification. Mechanical construction personnel are primarily from India & Nepal. In order to retain flexibility, flexibility the Company is rotating its qualified staff on long term leave at times of reduced work load and is thus able to recall them on short notice. The Company has equally developed a reliable reservoir of seconded labor in Doha in order to meet short term peaks of demand. Accordingly, the Company is able to mobilize rapidly, as it has done successfully in the past, for many large projects which would exceed its momentarily available manpower. Co. ORGANIZATION CHART: Please refer to the attached sheet of AL‐MADAR corporate organization chart showing the company’s structure, divisions and departments. 24 DEPARTMENTS & STAFF NAME QUALIFICATIONS, PROFESSION, TRADE, EXPERIENCE & OTHER RELEVANT DETAILS. A. OPERATION MANAGER ABDUL SALAM ALYEH Operation Manager, Graduated as a Civil Engineer, 25 years of experience in high rise buildings like towers & other civil construction fields in the Gulf. B. PROJECT MANAGERS: ADEL AHMED Project Manager Graduated as a Civil Engineer, 25 years of experience in building and civil construction EMAD TAKLEEF Project Manager, Graduated as a Civil Engineer, 18 years of experience in building and civil construction fields. HUSSAIN SALAMA Project Manager, Graduated as a Civil Engineer, 15 years of experience in high rise buildings and civil construction fields. ELIAS ASSAF Project Manager, Graduated as a Civil Engineer, 12 years of experience in high rise buildings like towers & other civil experience in high rise buildings like towers & other civil construction fields. MOHAMMED AWAWDAH Project Manager, Graduated as a Civil Engineer, 16 years of experience in civil construction. OMAR OTHMAN ABU EID Project Manager, Graduated as a Civil Engineer, 29 years of experience in building and civil construction fields. MEDHAT ADUL‐AZIZ Project Manager, Graduated as a Civil Engineer, 15 years of experience in civil construction. BABU RAJ K NAIR Project Manager, Graduated as a Civil Engineer with 20 years of experience in civil construction years of experience in civil construction. 25 C . SITE ENGINEERS & SITE SUPERINTENDENT: MAHMOOD AL NABI MAHMOOD AL‐NABI Site Engineer, Graduated as a Civil Engineer, 8 years of Sit E i G d t d Ci il E i 8 f experience in civil construction. SALAH MAHMOUD Site Engineer, Graduated as a Civil Engineer, 5 years of experience in civil construction. MURAD HAIDAR Site Engineer, Graduated as a Civil Engineer, 5 years of experience in civil construction. JHALAK ACHARYA Site Engineer, Graduated as a Civil Engineer, 12 years of experience in civil construction. D‐BUSINESS DEVELOPMENT TAREK NAJA Business Development Manager, BBA Graduated with over 8 years of experience in Sales & Marketing. IMAN FARID Business Development Officer, Holder of Bachelor in Media and Mass Communication with extensive experience in Public Relation. E. SITE SUPERINTENDENT/ SUPERVISOR / FOREMAN: ZAHOOR A. MAHER Site Superintendent, with 42 years of experience in heavy concrete marine and industrial construction and remedial work in Kenya, Pakistan, Iraq and Qatar, 26 TENJI SHERPA Site Foreman, Diploma in Civil Engineering, with 16 years of experience, experience in construction. BEKHA SHAHI BEKHA SHAHI Site Foreman, Diploma in Civil Engineering, with 12 years of Sit F Di l i Ci il E i i ith 12 f experience, experience in construction. TILAK KARKI Site Foremen, Diploma in Civil Engineering, with 12 years of experience in civil construction. PASANG SHERPA Site Foreman, Diploma in Civil Engineering, with 18 years of experiences in civil construction. ARVINDAR SINGH Site Foreman, Diploma in Civil Engineering, with 18 years of experiences in civil construction. FAISAL ZAHOOR Scaffolding Supervisor, Diploma in Civil Engineering, with 6 years of experiences in civil construction. AMAR PRADHAN Site Foreman, Diploma in Civil Engineering, with 16 years of experiences in civil construction. p RAM NARAYAN Site Foreman, Diploma in Civil Engineering, with 12 years of experiences in civil construction. KISHOR RAUT Site Foreman, Diploma in Civil Engineering, with 10 years of experiences in civil construction. MOHAN KUMAR Site Foreman, Diploma in Civil Engineering, with 12 years of experiences in civil construction. TIKARAJ ADHIKARI Site Foreman, diploma in civil Engineering, with 10 years of , p g g, y experience in civil construction 27 F. SURVEYING SECTION: MOHD. KHALID Surveyor with 10 years of experience in various civil &electro‐mechanical construction works IBRAHIM SHAABAN Surveyor with experience of 12 years in various civil &electro‐mechanical construction works G. PLANNING SECTION: MOHD. SHAMSUDDIN Head of Planning, Graduated as a Civil engineering, with 15 years of experience in construction, planning/scheduling of the projects. AHMAD ALGYAR Senior Planning Engineer, Graduated as a Civil engineering, with 10 years of experience in construction, planning/scheduling of the projects. H. COST CONTROL SECTION: RIZWAN N. KAZI Head of Q.S., Graduated as a Civil Engineering, with 15 , g g, years of experience in cost control. NARESH KUMAR Q. S., Graduated as a Civil Engineering, with 10 years of experience in Cost Control. ROGER VIRAY Q. S., Graduated as a Civil Engineering, with 7 years of Q , g g, y experience in Q.S. & Cost Control. 28 I. ESTIMATION DEPT.: RAJESH KUMAR PETER AMTHONY PETER AMTHONY BIRENDRA SHAH AJAY GUPTA MOHD. ASRAF DHIRENDRA MISHRA Head Estimator, 15 years experience in estimation E ti t 10 Estimator, 10 years of experience in estimation f i i ti ti Estimator, 15 years of experience in estimation Estimator, 6 years of experience in estimation Estimator, 5 years of experience in estimation Estimator, 6 years of experience in estimation J QA/QC & ISO SECTION J. QA/QC & ISO SECTION: VINAY ARALIKATTI Quality Manager (MR) Graduated as a Civil engineer with 10 years of experience, in civil construction & quality control. K SAFETY SECTION K. SAFETY SECTION: JAFFER AL ALAWI Safety Manager, B.S.C in Mechanical Engineering, diploma in Quality Management, & Holder of ROSPA, IOSH, NEBOSH & FIRE Fighting training Certificate MACARIO Safety Officer, with holding safety certificate MUKTI NATH Safety Officer, with Safety holding Safety certificate JAWED AKHTAR Safety Officer, with diploma of Industrial safety certificate L. STORE & LOGISTICS: RAHMATULLAH Main Store‐in‐Charge, with 12 years experience K V S SHEKHARAN K. V. S. SHEKHARAN Storekeeper with 12 years of experience Storekeeper, with 12 years of experience MAHESH YADAV Storekeeper, with 5 years of experience 29 M. PURCHASING SECTION: MAHER IMAM Act. Purchasing Manager with 10 years experience ABDUL SAMAD Purchasing, with 10 years experience JAYKOD Purchasing Assistant with 5 years of experience DIOGENES CANZANA Material Engineer with 10 years of experience SHAH JAHAN Material Engineer with 10 years of experience N. PERSONNEL SECTION: WAHIB AL‐TAMIMI HR Manager, graduated with a Master Degree in Public Administration from University of Jordan, with 18 years of experience. MOHAMED NIYAZ Recruitment Officer, graduated with a MBA degree in HR from Coventry University‐UK, Bachelor in Business Administration (BBA) – SL, with 10 years of experience. MOHAMMAD AWAD Immigration Officer, graduated with a degree in Public Administration, with 10 years of experience. FOAD ABDULHAMED Camp Boss graduated with a degree in Art with 4 years of experience. HISHAM MOHAMED Camp Boss in Industrial Area with 3 years of experience. 30 O. MECHANICAL SECTION: RAMADAN MUBARAK Plant Manager, B.S.C Mechanical Power Department, with 25 years of experience SHAHID MURAD Plant Superintendent, Diploma Mechanical engineer with 17 years of experiences HANY MOHAMMAD Traffic Representative, with 10 years of experience in HANY MOHAMMAD Traffic Representative, with 10 years of experience in transportation business. MOHD. DAMRA Workshop Mechanics, with 14 years of experience, repairing and maintenance of heavy equipments. DIPENDRA CHAUDHAR Store Keeper, Diploma in Commerce, with 6 years of experience. P. IT SECTION: AWAL AWAL IT Manager, Computer Science graduated, with over 10 years of experience in Management Information System. HOSSAM AL‐FARRA IT Site Coordinator, graduated with a degree in Computer science with over 10 years of experience in IT infrastructure. GEORGE DELA CRUZ IT Officer, graduated with a degree in computer science, with 12 years of experience in Computer Administration. CARLOS BURON IT Officer, graduated with a degree in computer science with 10 years of experience in Computer Administration. RAYAN APORDONADO IT Officer, graduated with a degree in in Science Information with 6 years of experience. 31 Q. MAINTENANCE SECTION: WALEED JEMMIEH Head of Maintenance Graduated as a Civil Engineer with 18 years of experience in civil construction & 18 years of experience in civil construction & maintenance works. KISHOR RAUT Foreman, 15 years of experience in a civil construction & maintenance works. W. ACCOUNTS SECTION: EHAB NAYIF Head of Accounts, Graduated with a degree in Accounting, with 14 years of experience in accounting KHALIL ARAFAT Accountant, graduated with a degree in Accounting, with 8 years of experience. AHMAD AL‐SHOBAKI Accountant, graduated with a degree in Accounting, with 8 years of experience. YUVRAJ MAHAT Accountant, graduated with a degree in Accounting, with 6 years of experience. MOHAMED SAFREEN Accountant, graduated with a degree in Accounting with 3 years of experience MOHAMED FAYROZ Accountant graduated with a degree in Accounting with 9 years of experience UMESH KANDEL Accountant, graduated with a degree in Accounting, with 8 years of experience. X. LEGAL DEPARTMENT: MAGED IBRAHIM Legal Affairs. graduated with a degree in Law, with 17 years of experience in law firm. ith 17 f i i l fi ALI TAHA Legal Affairs graduated in Law, 11 years experience 32 Al Madar Contracting O.P.C RESOURCES‐EQUIPMENT PLANT & EQUIPMENT General Construction Equipt.: Enclosed is an extract from Company Asset Register, indicating the primary equipment owned. It should be noted that this may vary due to acquisitions and disposals depending on the requirements of individual projects. In accordance with a policy to rationalize the use of the more general types of heavy equipment, an i t inter‐company pool of mobile plant has been l f bil l t h b created, to be used by all members of the group when required. SUPPORT SERVICES: Steel Fabricat./ Welding Workshop: Equipped with all necessary cutting, bending g p q pp y g g tools/equipment, gas cutting, oxygen acetylene welding, arc welding, tig and mig welding, grinding tools, etc. Joinery/Carpentry Workshop: Fabrication of all internal and external joinery works. The carpentry workshop is well equipped with surface planer, band saw machine, radial ith f l b d hi di l cutting saw, timber cutting saw and various electric tools. Aluminum/ Stainless Steel Workshop: Equipped with all necessary equipments & tools to fabricate, supply and install aluminum doors, windows, stainless steel handrail, cladding strip, , , g p, kitchen cabinets etc. Plant Dept. /Workshop & Transport. : Mechanical, electrical repairs, monitoring plant maintenance schedules, alterations, denting, painting as well as maintenance. Workshop Area : 2000 W kh A 2000 m2 2 Yard Area : 1700 m2 34 Al Madar Contracting O.P.C Al Madar Mobile Cranes 1.A Mobile Crane- TADANO Reg. No Model Year Model 1 MC-01 32325 55 Ton Mobile Crane 2008 35 Al Madar Contracting O.P.C Al Madar Tower Cranes 2.A Tower Cranes-Libhert Hankcok Reg. No Model Year Model 1 TC-1 N/A N/A 2007 2 TC-2 N/A N/A 2007 3 TC-3 N/A N/A 2007 4 TC-4 N/A N/A 2007 36 Al Madar Contracting O.P.C Al Madar Lifting Machines 3.A Electric Hoist- BAODA Reg. No Model Year Model 1 PH-1 N/A SC-200/200 N/A 2 PH-2 N/A SC-200/200 N/A 3 PH-3 N/A SC-200/200 N/A 37 Al Madar Contracting O.P.C Al Madar Excavators 4.A Carwler Hydraulic Excavator Reg. No Model Year Model 1 EX-2 Hammer + Bucket 12042 Excavator (Case Poclain) - 1288 1996 2 EX-4 Hammer + Bucket 12044 Excavator (Case Poclain) - 1188 1996 3 EX-7 Hammer + Bucket 12581 Excavator (Case Poclain) - 1288 1993 4 EX 8 Hammer + Bucket EX-8 320B Excavator (Caterpillar 320B) 1998 5 EX-9 Hydraulic Breaker+ Bucket 41802 Excavator (Komatsu PC 220) 2012 6 EX-10 Hydraulic Breaker + Bucket 47902 Excavator (Komatsu PC 220) 2012 38 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery 1 Electrical Power Generators- Caterpillar, Cummins, Parkins, Olympian GEN 1 GEN-1 2 GEN-2 50 KVA Perkins / D50317 3 GEN-3 50 KVA Perkins 4 GEN-4 35 KVA Perkins 5 GEN-5 110 KVA Caterpillar / YD51130 6 GEN 6 GEN-6 250KVA C t ill / 3306D1 Caterpillar 7 GEN-7 45 KVA Caterpillar / GEP50-3 8 GEN-8 110 KVA Caterpillar / YB51047 9 GEN-9 110 KVA Caterpillar / YB51047 10 GEN-10 250 KVA Olympian / GEH275 11 GEN-11 72 KVA Perkins / 1004TG 12 GEN-12 15 KVA Chinese 13 GEN-13 110 KVA Cummins / C110D5 14 GEN 14 GEN-14 110 KVA P ki Perkins 15 GEN-15 75 KVA Perkins 16 GEN-16 410 KVA Caterpillar / 3456 17 GEN-17 227 KVA Cummiims 18 GEN-18 410 KVA Caterpillar / 3456 19 GEN-19 410 KVA Caterpillar / C-15 20 GEN-20 25 KVA Perkins 21 GEN-21 545 KVA Caterpillar / C-18 5.A Reg. No. Model 50 KVA P ki Perkins 39 Al Madar Contracting O.P.C Al Madar M d Light& Li ht& H Heavy M Machinery hi 6.A Dewatering Pumps (Electrical, Diesel)- Sykes, Pumpex Reg. No Model 1 WP-02 6" WP Sykes 2 WP-03 6" WP Sykes 3 WP-04 6" WP Sykes 4 WP-05 6" WP Sykes 7.A Air Compressor- Atlas Reg. No Mark Model 1 AC-2 N/A Atlas 2 AC-3 N/A Atlas 3 AC-4 N/A Atlas 4 AC-5 N/A Atlas 5 AC-6 NA Atlas 8.A Medium Compacting Rollers Reg. No Mark Model Year Model 1 CR-1 11088 Compacting Roller 1990 2 CR-2 N/A Compacting Roller (2 ton Dubai) 40 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery 9.A 9A Prime Movers (with Box Trailer, Reg. Reg No Flat and Lowbed (Mercedes) Mark Model Year Model 1 PM-3 147900 Prime Mover 2004 2 PM-4 129976 Prime Mover 2000 3 PM 5 PM-5 129977 P i Mover Prime M 2000 4 PM-6 194738 Prime Mover 2009 10 A 10.A Portable Water TankersMercedes, GMC, FAW Reg No. Reg. No Mark Model Year Model 1 WT-1 105208 Water Tanker ( Mercedes) 1993 2 WT-2 90142 Water Tanker (GMC) 1983 3 WT-3 90610 Water Tanker (FAW) 1999 11.A Sewage Water Tanker-Falcon Reg. No. Mark Model Year Model 1 SW-2 31784 Falcon 2012 41 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery Pickups- Toyota, Mitsubishi, Nissan Reg no. Model Year Model PK-2 71758 Toyota Dyna Pick-up 1996 PK-3 93780 Toyota Dyna Pick-up 2002 PK-4 94217 Toyota Dyna Pick-up 2002 PK-6 95329 Toyota Dyna Pick-up 2002 PK-7 95791 Toyota Dyna Pick-up 2002 PK-8 96271 Toyota Dyna Pick-up 2002 PK-10 133677 Mitsubishi Pick-Up 2006 PK-11 133780 Mitsubishi Pick-Up 2006 PK-12 126903 Toyota Dyna Pick-up 2006 PK-13 147261 Toyota Dyna Pick-up 2006 PK-14 151789 Toyota Dyna Pick-up 2006 PK-15 96598 Toyota Pick-up D/Cabin 2002 PK-16 119103 Mitsubishi D/Cabin 2005 PK-17 78221 Mitsubishi Pick-Upp 2008 PK-18 192483 Mitsubishi Pick-Up 2008 PK-19 111569 Mitsubishi Pick-Up 2003 VE-2 53735 Isuzu Pick-up 1992 1992 42 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery Pickups-Toyota, Mitsubishi, Nissan Reg. No. Model Year Model VE-8 71310 Nissan Pick-up 1996 VE-10 VE 10 48149 Nissan Pick Pick-up up 1991 VE-11 46069 Nissan Pick-up 1991 VE-12 112622 Nissan Pick-up 2003 VE-13 117384 Nissan Pick-up 2005 VE-14 143587 Nissan Pick-up 2006 VE-18 75950 Nissan D/Cabin 1998 VE-43 111583 Toyota Pick-up Hi Lux 2004 VE-66 159065 Nissan D/C pick-up 2007 VE 77 VE-77 192624 Ni Nissan Pick-up Pi k 2008 VE-78 192936 Nissan Pick-up 2008 VE-83 205742 Toyota Hilux Pick Up 2010 VE-87 109023 Nissan D/Cabin Pick Up 2010 VE-88 20197 Nissan D/Cabin Pick Up 2010 VE-64 115329 Datson Pick-up 2004 VE-75 VE 75 91641 Nissan Pick Pick-up up 2001 VE-89 187837 Nissan D/Cabin Pick Up 2008 VE-102 230641 Nissan Pick Up 2012 43 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery SN Description 16.A Dewatering Pumps (Electrical, Diesel) 6" 4 Sykes, pumpex 17.A Air Compressor 300 cfm 250 cfm 3 2 Atlas Capco 18.A Plate Compactor N/A 2 Robin, Koshin 1.5 ton 2 Dynapac N/A 2 Budai N/A 2 Dynapac N/A 2 Flextool 19.A 20.A 21.A 21.B Medium Compacting Rollers Steel Bending and cutting machines Concrete Compaction Equipment Handroller 500 kgs Concrete Finishing Equipment Quantity Brands 22.A Sand Blasting Machine N/A 2 Achtung 23.A Concrete Chemical Injection Pump N/A 1 Otal 24.A Concrete Coring Machine N/A 1 Bosch 25.A Theodolite N/A 4 Leica 26.A Level instrument N/A 8 Leica/Topcon 27.A GPS Instrument N/A 4 Leica/Topcon 28.A Saloon Cars/ Vehicles N/A 48 BMW, Mercedes, Toyota, Nissan, Mitsubishi, Range Ro er Rover 29.A Transit Concrete Mixers N/A 1 Mercedes 30.A Welding Equipment 1.5 Ton 3 ESAB-Miller 44 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery 12.A Backhoe Loaders 1 JC-1 2 Reg. No Model Year Model 11089 Bachoh Loader (Caterpiller) 1989 JC-2 12140 Bachoh Loader (Caterpiller) 1996 3 JC-3 15449 Bachoh Loader (Caterpiller) 2005 13.A Telehandllers Reg. No Mark Model Year Model 1 TE-1 13656 Telehandlers T l h dl (Telescope) 1998 2 TE-2 22804 Telehandlers (Telescope) 1997 3 TE-3 20951 Telehandlers ((Telescope) p ) 2001 14.A Skid Loaders Reg. No Model Year Model 1 BO-3 12141 Skid Loader 1997 2 BO-4 9495 Skid Loader 1999 3 BO-5 12868 Skid Loader 2004 4 BO-6 13216 Skid Loader 2004 5 BO-7 13692 Skid Loader 2004 6 BO-8 13694 Skid Loader 2004 7 BO-9 14548 Skid Loader 2005 8 BO-10 15448 Skid Loader 2005 9 BO-11 20935 Skid Loader 2006 10 BO-12 31288 Skid Loader 2008 45 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery Dump Trucks-Merceedes Reg. No Model Year Model DT-1 94492 Mercedes Truck(Dumping) k( i ) 2002 DT-2 95130 Mercedes Truck(Dumping) 2002 15.A Forklift- Toyota, Nissan Reg. No Model Year Model 1 FL-01 13680 Forklift (Toyota) 1996 2 FL-02 9196 Forklift (Nissan) 1989 T Transit it Concrete C t Mixers Mi Reg. g No. M k Model Mark M d l Y Year M Model d l CM-1 106591 Concrete Mixer 1994 Hand Rollers g Reg. No. Mark Model Year Model HR-01 Hand Roller N/A HR-02 Hand Roller N/A 46 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery 16.A Passenger Transportation BusesTata, GMC, Nissan, Toyota y Reg. No. Model Year Model 1 LB-1 6445 Long Bus (Chevorlet) 1991 2 LB-2 96292 Long Bus (Chevorlet) 1990 3 LB-3 96296 Long Bus (GMC) 1990 4 LB-4 96300 Long Bus (Chevrolet) 1990 5 LB-6 97314 Long Bus (Chevorlet) 1989 6 LB-8 123352 Long Bus (TATA) 2005 7 LB-9 141383 Long Bus (TATA) ( ) 2006 8 LB-10 159127 Long Bus (TATA) 2007 9 LB-11 102326 Long Bus (GMC) 1989 10 LB-12 190957 Long Bus (TATA) 2008 11 LB-13 190959 Long Bus (TATA) 2008 12 LB-14 229985 Long Bus (TATA) 2012 13 VE-53 121345 Toyota Hi Ace Van 2005 14 VE-74 18762 Nissan Urvan 2008 15 VE-76 190965 Nissan Urvan 2009 16 VE-84 37278 Toyota Hi Ace Van 2008 17 VE-103 230642 Nissan Urvan 2012 47 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery 17.A Saloon Cars/ Vehicles Reg. No. Model Year Model 1 VE-23 239184 Toyota Corolla Saloon 2002 2 VE-25 238741 Suzuki Station 2001 3 VE 26 VE-26 210260 Suzuki Station 1999 4 VE-27 231909 Suzuki Zimny 2001 5 VE-28 236754 Suzuki Vitara 2001 6 VE-30 231784 Suzuki 4X4 2001 7 VE-37 241293 Nissan Pathfinder 2002 8 VE-44 164473 Suzuki Grand Vitara 2004 9 VE-45 198461 Suzuki Grand Vitara 2004 10 VE-46 203361 Nissan Saloon 2004 11 VE-48 105168 Suzuki 4X4 2004 12 VE-49 283651 Nissan Sunnyy Saloon 2005 13 VE-50 250696 Hyundai Saloon 2005 14 VE-55 95411 Toyota Station GX 2004 15 VE-56 337909 Lexus Station 2006 16 VE-58 361984 Nissan Sunny Saloon 2007 17 VE-59 361983 Nissan Sunny Saloon 2007 18 VE-60 369406 GX Land Crusier 2007 19 VE-61 6441 BMW 2007 20 VE-62 375862 Nissan Sunny Saloon 2007 21 VE-67 18073 Land Cruise Prado 2007 22 VE-68 33205 Toyota Camry 2007 23 VE-69 37918 Nissan Sunny Saloon 2007 24 VE-70 161207 Mitsubishi Station 1997 48 Al Madar Contracting O.P.C Al Madar Light& Heavy Machinery 18 A Saloon Cars/ Vehicles Reg No. Reg. No Mark Model Year Model 25 VE-71 37492 BMW Station 2007 26 VE-72 352216 Mercedes Jeep 1998 27 VE-73 105821 Crsyler Saloon 2007 28 VE-79 335856 Nissan Extra 2008 29 VE-80 335869 Nissan Extra 2008 30 VE-81 389709 Range Rover 2008 31 VE-82 77398 Toyota Corolla 2007 32 VE-85 379952 Honda 2007 33 VE 86 VE-86 106363 T t Sequioa Toyota S i 2010 34 VE-90 360751 Toyota Yaris 2007 35 VE-91 199355 Chevorlet Tahoe 2008 36 VE-92 92028 Mercedez Benz Saloon 2008 37 VE-93 95644 Mercedez Benz Saloon 2009 38 VE-94 398515 Toyota Prado 2009 39 VE-95 364801 Toyota Prado 2009 40 VE-96 402630 Toyota Corolla 2010 41 VE-97 455743 Toyota Corolla 2011 42 VE-98 290219 Renult Clio 2005 43 VE-99 6336 Range Rover 2006 44 VE-100 143023 Mercedez Benz Saloon 2008 45 VE-101 211429 Ssyang Yong SUV 2000 46 VE 104 VE-104 417653 Mitsubishi Lancer 2012 47 VE-105 417546 Mitsubishi Lancer 2012 48 VE-106 417538 Mitsubishi Lancer 2012 49 Al Madar Contracting O.P.C SECTION‐3 REFERENCES LIST OF MAJOR PROJECTS LETTERS OF RECOMMANDATION& COMPLETION LETTERS OF RECOMMANDATION& COMPLETION Al Madar Contracting O.P.C REFERENCES OWNERS & CONSULTANTS – QATAR Since 1992, AL‐MADAR’s organization has performed works for the following owners and / or Consultants in the state of Qatar. All of its work has been exclusively of either civil engineering or industrial nature and an important portion has been on a design & construction basis or industrial nature and an important portion has been on a design & construction basis. • • • • • • • • • • • • • • • • • • • • • • • • • • Consulting Engineering Group (CEG) Arab Engineering Bureau (AEB) GHD Consultant Arab Consulting Engineers CICO C CICO Consulting Engineers lti E i Adel Jaidah & Associates Petra Design Consult Al Sadd Engineering Consultant Design & Consult Bureau (DCB) Arabian Architects Group M/ ASHGHAL B ildi & D i M/s ASHGHAL, Building & Drainage Affairs Aff i Ministry of Interior (MOI) Ministry of Electricity & Water Doha Municipality Al Asmakh Real Estate Doha Bank PEARL QATAR Q Qatar Telecom (Q‐Tel) Hamad Medical Corporation (HMC) Qatar Petroleum‐QP / DOPET Qatar Fuel Co.‐WOQOD LUSAIL Real Estate Development Qatar Fertilizer Co.‐ QAFCO Al‐Madar Real Estate W.L.L Al‐Mana Real Estate Qatar Real Estate Investment Company/ AL AQARIA 52 BANKING REFERENCES Al Madar’s primary bankers are: • Commercial Bank of Qatar Q P. O. Box: 3232 Doha, Qatar Tel. No. 4490000 Fax. No.4490070 • Qatar Islamic Bank Qatar Islamic Bank P.O. Box: 559 Doha, Qatar Tel. No. 4409548 Fax. No. 4412700 • Doha Bank Doha Bank P. O. Box: 3818 Doha, Qatar Tel. No. 4456600 Fax. No.4416631 • Bank Saderat Bank Saderat Iran P.O. Box: 2256 Doha, Qatar Tel. No. 4414646 Fax. No. 4430121 • Arab Bank Arab Bank P. O. Box: 172 Doha, Qatar Tel. No. 4387777 Fax. No. 4410774 • Ahli Bank P. O. Box: 2309 Doha, Qatar Tel. No. 4232411/ 4232222 53 Al Madar Contracting O.P.C LIST OF MAJOR PROJECTS LIST OF MAJOR PROJECTS Al Madar Contracting O.P.C COMPLETED PROJECTS Al Madar Main Office Building in Hilal Project Description: Construction and Maintenance B+G+1+P of an office building with all complete finishing works. Client: Al Madar Real State Consultant: German Design Group Project Duration:12 months Contract Value: QR 7 Million 55 Al Madar Contracting O.P.C Woqod d Office Tower ff 4B+G+M+30F in West Bay Project Description: Construction of Office tower with all complete finishing works, substation and electro‐mechanical installation landscaping etc. Client: WOQOD Client: WOQOD Consultant: Romatre Project S.R.L Project Duration: 23 months Contract Value : QR 230 million Al Noor Tower 2B+G+24F Project Description: Construction of an office tower with all complete finishing works substation and electro‐mechanical installation etc. Cli t Al M d Real Estate Client: Al Madar R lE t t Consultant: Arab Engineering Bureau (AEB) Project Duration: 24 months Contract Value: QR 122 Million 56 Al Madar Contracting O.P.C Dunes Hotel Tower 2B+G+21F Project Description: Construction of Five Stars Dunes Hotel in West Bay Client :Sheikh Fahad Al Thani Consultant: Adil Jaidah, MZ& Partners Project Duration: 24 months Contract Value: QR 78 Million One One Four in Old Salata Project Description: Construction of 3B+G+14+Penthouse office building with all completed works, substation and electro‐mechanical installation etc. Cli t QNB Client :QNB Consultant: Design and Consult Bureau Project Duration: 20 months Contract Value: QR 60 Million 57 Al Madar Contracting O.P.C Office Building Construction g B+G+4F in Messaeed Project Description: Construction of office building with all complete finishing works, substation and electro‐mechanical installation etc. Client :QAFCO Consultant: United Consultants Project Duration: 16 months Contract Value: QR 50 Million 58 Al Madar Contracting O.P.C Four Stars Hotel B+G+M+12 in Old Salata in Old Salata Project Description: Construction of the Hotel building with all complete finishing works, substation and electro‐mechanical installation etc. Client :Al Madar Real Estate Consultant: AAG Project Duration: 16 months Contract Value: QR 60 Million Bilal Residential Building in Al Asmakh 2+G+10F Project Description: Construction of an apartment building with all complete finishing works, substation and electro‐mechanical installation etc. Client: Ahmed Hassan Bilal/ Est Client: Ahmed Hassan Bilal/ Est Consultant: GHD Project Duration: 16 months Contract Value: QR 29 Million 59 Al Madar Contracting O.P.C Dialysis Center bldg G+2 in HMC Project Description: Construction of Dialysis Center of Sheikh Fahad Bin Jassem with all complete finishing works, works landscaping, landscaping substation and external works. Client: Q‐TEL/HMC Consultant: United Consultant Project Duration: 12 Month Contract Value: QR 43 Million 60 Al Madar Contracting O.P.C Al Khor l h Hospital Medical Training l d l Center Project Description: Construction of training center building with all complete finishing works, pump room and electro‐ mechanical installation & landscaping etc. Client: The Public works Authority Client: The Public works Authority (ASHGHAL) Consultant: ACE Project Duration:17 months Contract Value: QR 17 Million Lusail Office Building (G+1) Project Description: Design &Construction of office building with complete finishing& services installation together with landscaping & ancillary structures Client: Lusail Real Estate Development Consultant: Parsons Project Duration: 10 months Project Duration: 10 months Contract Value: QR 24 Million 61 Al Madar Contracting O.P.C Admin Office Building & Car park for SCOJ in Industrial Area SCOJ in Industrial Area Project Description: Construction of an office building with all complete finishing work substation and electro‐mechanical installation etc. Client: The Public works Authority(ASHGHAL) Consultant: Arab Engineering Bureau(AEB) Project Duration: 18 months Contract Value: QR 15 Million Scania Workshop in Industrial Area Project Description Construction of a workshop building with complete finishing service installation together g with landscaping p g & ancillaryy structures. Client: Arabian Agencies Co Consultant: Arab Engineering Bureau(AEB) Project Duration: 10 months Contract Value: QR 12 Million 62 Al Madar Contracting O.P.C 210 Nos (G+1) Villas, Club House& Amenities in Al Waab Project Description: Design, Construction, Completion and Maintenance of 210 nos Villas with complete & finishing works. Client: Al Asmakh Real Estate Co. Consultant: Al Sadd Engg Consultant Project Duration:18 months Contract Value; QR63 Million 63 Al Madar Contracting O.P.C Three Commercial Building in Old Airport Project Description: Construct of 3 nos, office building & substation with all complete finishing works and electro‐mechanical installation etc Client: Al Madar Real State Consultant: Petra Design Project Duration: 12 months Contract Value: QR 10 Million Contract Value: QR 10 Million Office Building in Ring Road 2B+G+2 Project Description: Construction of an office building with all complete finishing works substation and electro‐ mechanical installation etc Client: APEX Trad & cont Consultant: Al SADD Project Duration: 18 months Contract Value: QR 30 Million 64 Al Madar Contracting O.P.C B+G+M+5 Office cum Commercial Building in Ring Road Project Description: Construction and Maintenance of an office cum commercial building with central A/C system, substation, parking area etc. Client: Sheikh Fahad Al Thani Consultant: Arab Engineering Bureau(AEB) Project Duration:12 months Contract Value: QR 8 Million B+G+2 Office Building in Ring Road Project Description: Construction & Maintenance of an office building with complete finishing& works. Client: GRIDCO Consultant: ASCO Project Duration:14 months Contract Value; QR 5 Million 65 Al Madar Contracting O.P.C G+5 Building in Mansoura Project Description: Construction, Completion and Maintenance with complete finishing works. Client: Hitmi Ali Hitmi Consultant: Qatar Design Consortium Project Duration:12 months Project Duration:12 months Contract Value: QR 7 Million B+G+2 Building in Ring Road Project Description: Construction, j p , Completion and Maintenance with complete finishing works. Client: Abdulah Salat Consultant: Al Sadd Engineer Consultant Project Duration: 12 months Project Duration: 12 months Contract Value: QR 5 Million 66 Al Madar Contracting O.P.C Tow Commercial Villa in Hilal Tow Commercial Villa in Hilal B+G+1 Project Description: Construction& Maintenance of an office building with all complete finishing works and electro‐mechanical installation etc Client: Al Madar Real Estate Consultant: German Design Project Duration: 12 months Project Value: QR 7 Million Refurbishment of AVM at Doha Bank Project Description: Refurbishment works completion of Maxi‐ AVM at Doha Bank‐ C Ring Road Branch Client: Doha Bank C Consultant: Adel Jaida/ Associates lt t Ad l J id / A i t Project Duration: 6 months Project Value: QR 6 Million 67 Al Madar Contracting O.P.C 10 Villas in Rawda ll d Project Description: Construction of 10 nos G+1 villas with complete finishing& services installation together with landscaping& boundary wall. Client: Al Madar Real State Consultant: German Design Group Project Duration:13 months Contract Value; QR 12 Million 33 Villas in Nuaija Project Description: Construction & Maintenance of 33 nos, G+1 villas with all complete finishing works Client: Al Madar Real State Consultant: German Design Group Project Duration:12 months Contract Value; QR 15 Million 68 Al Madar Contracting O.P.C Residential Building in Muntazah B+G+4 Project Description: Construction of 2 nos. residential buildings with all complete finishing works substation and electro‐ mechanical installation etc Client: Sheikh Saoud Mohamed Al Thani Consultant: Design and Consultant Bureau(DCB) Project Duration: 16 months Contract Value: QR 40 Million 69 Al Madar Contracting O.P.C B+G+7 Building in Old Salata Project Description: Construction, Completion and Maintenance with complete finishing works. Client: Al Ahad Contracting Consultant: Consulting Engineering Group Project Duration:16 months Contract Value; QR 8 Million Resid Building G+5 in Bin Mahmoud Project Description: Construction & Maintenance of an apartment building with all complete finishing works and electro‐ mechanical h i l installation i t ll ti etc t Client: Arab Engg. Office Consultant: Consulting Engineering Group(CEG) Project Duration: 13months Contract Value: QR 5 Million 70 Al Madar Contracting O.P.C B+G+5 Resid Building in Al Mirkab Project Description: Construction & Maintenance with all complete finishing works Client: Al Asmakh Real Estate Consultant: German Design Group Project Duration:16 months Contract Value; QR 8 Million G+5 Apartment in Najma Project Description: Construction & M i t Maintenance off an apartment t t building b ildi with ith allll complete finishing works. Consultant: Arab Engg Office Project Duration:13 months Contract Value; QR 5 Million 71 Al Madar Contracting O.P.C Secondary School for Boys in West Bayy Project Description: Construction, and Maintenance of G+1 School building with guard, gardener room, pump room, sports areas, parking area with precast boundary wall etc.. Client: Public Works Authority(ASHGHAL) Consultant: CICO Project Duration:10 months Contract Value; QR 17 Million Preparatory School for Boys in Azgawa Project Description: Construction and Maintenance of G+1 School building with complete finishing works Client: Public Works Authority (ASHGHAL) Consultant: Consulting Engineering Group Project Duration:14 months Contract Value; QR 20 Million 72 Al Madar Contracting O.P.C Dahl Al Hammam hl l Public Park bl k Project Description: Construction & Maintenance with all complete finishing works Client: Public Works Authority(ASHGHAL) Consultant: OJQEC Project Duration:20 months Contract Value; QR 18 Million 73 Al Madar Contracting O.P.C Sewerage Project in Al Wakrah& Wukair Project Description: Construction and Maintenance of sewerage system with all sewer pipes laying, manholes, pumping station& house connection works etc. Client: Public Works Authority(ASHGHAL) Consultant: CICO Project Duration:10 months Project Duration:10 months Contract Value; QR 12 Million Factory cum Store with Labor Camp building Project Description: Construction, and Maintenance of factory cum store building with steel roof structure, substation& electro‐ mechanical works etc. Client: Al Madar Real State Consultant: German Design Group Project Duration:24 months Project Duration:24 months Contract Value; QR 10 Million 74 Al Madar Contracting O.P.C ONGOING PROJECTS Markaz Al Mana in Najma 2B+G+M+7F Project Description: Construction, Completion and Maintenance of the building. Client: Al Mana Trading Consultant: Semac Qatar Project Duration: 18 months Contract Value: QR 66 Million Progress: 15% 75 Al Madar Contracting O.P.C PALM CITY COMMERCIAL COMPLEX AT SALWA ROAD (2B+G+2F) Project Description: Construction, completion of civil, steel structure, finishing and MEP Works, in addition to commissioning and handing over the project. Client: M/s. Al Mana Real Estate. Consultant: Not yet appointed Built-Up Area: SQM 12,750 Value: QR 38, 260,000 Project Duration: 15 months + 15 Day Mobilization. Commencement Date : 1st September 2013 76 Al Madar Contracting O.P.C 55 Villas Complex in Luqta Rayyan G+1 Project Description: Construction of 55 nos G+1 villas Project Description compound with complete finishing & service installation together with club house, landscaping &boundary wall Client : Al Mana Real State Consultant: Al Sariya Engg Project Duration: 18 months Contract Value: QR 63 Million Progress: 90% completion Security Complex in Wakrah Project Description: Construction of an office building with all complete finishing and electro‐mechanical installation works, substation, landscaping and other ancillary building etc Client: MOI Consultant CEG International Contract Value: QR 82 Million Progress: 25 % completion Progress: 25 % completion 77 Al Madar Contracting O.P.C Al Banush Club in Mesaeed Project Description: Construction of a new sport complex building along with renovation of club house with all complete finishing works and electro‐mechanical installation substation & landscaping etc Client : QAFCO Consultant: Al Manaa Design Consultant International (ADCI) Project Duration: 30 months Contract Value: QR 70 Million Progress: 95% completion 78 Al Madar Contracting O.P.C Health Center and Laundry Block in MIC in MIC Project Description: Construction of the hotel building with all complete finishing works, substation and electro‐ mechanical installation etc. Client: Al AQARIA/QP Consultant: CEG International Project Duration: 12 Months Contract Value: QR11 Million Progress: 40% Juma Masjed and Sport Facilities Project Description: Construction Completion and Maintenance of Juma Masjed and Sport Facilities in Dukhan Client: Al AQARIA/QP Consultant: Iproplan Planners Co. Project Duration: 15 Months Contract Value: QR 13 Million l ll Progress: 10% 79 Al Madar Contracting O.P.C 2 Villas at the Pearl Project Description: Construction, Completion and Maintenance with complete finishing works. Client: Ali Mashadi & Haidar Mashadi Consultant: German Design Group Project Duration: 24 months Contract Value: QR 15 Million 80 Al Madar Contracting O.P.C SELECTED PROJECTS QATAR The following is a cross‐section cross section of the projects completed in Qatar which illustrates Al‐ Al Madar’s capacity in the various fields of engineering & construction that the company is engaged in: S.n. 1 2 3 4 5 Project Title Project Description COMPLETED PROJECTS: 210 Nos. G+1 Design, Construction & Villas, Club House maintenance of 210 nos. villas & Amenities at Al‐ compound with a club house, Waab substation, guard & store room, electro‐mechanical installation, l d landscaping i works k etc. t 4B+G+M+30 Construction of an office tower WOQOD Office with all complete finishing works Tower in West Bay substation and electro‐ mechanical installation & landscaping etc. B+G+4 Office Construction of office building with all complete finishing works, Building for QAFCO substation and electro‐mechanical electro mechanical installation etc. Dahl Al‐Hammam Construction & maintenance of Public Park ancillary buildings, office bldg, amphitheatre, skating rings/ramp, sports ground, lawn areas, trees plantation, footpath, parking area of asphalt works along with electrical, plumbing, drainage & irrigation system installation etc. Secondary School Construction & maintenance of G+1 for Boys at school building with substation, guard and gardener room, pump room, sports areas, parking area, with precast boundary wall. Client/Consult. Project Durat. Contract Value ( (QR.) ) Al‐Asmakh Cont./ Al‐Sadd Engg. 18 63 Million Consultant months QATAR WOQOD /ROMATRE QAFCO/United Consultants 17 230 Million months 16 50 Million months ASGHAL‐Public Works Authority / 20 18 Million OJQEC months ASGHAL‐Public Works 10 Authority / months 17 Million CICO 81 Al Madar Contracting O.P.C S.n. 6 7 8 9 10 11 12 13 Project Title Project Description Construction & maintenance of Preparatory School for Girls h lf l G+1 school h l b ld building with h at Umm Salal substation, guard and gardener room, pump room, sports areas, parking area, with precast boundary wall etc. Elementary Construction & maintenance of School for Girls G+1 school building with at Al‐Khor t Al Kh substation, b t ti guard d and d gardener d room, pump room, sports areas, parking area, Wakrah & Construction & maintenance of a Wukair sewerage system with all sewer Sewerage pipes laying, manholes, pumping Project station & house connection works etc etc. B+G+M+5 Construction & maintenance of Office cum at an office cum commercial building with central A/C system, substation, parking area etc. B+G+7 Construction & maintenance of an apartment building with all Residential Building at Building at complete finishing works and Salata electro‐mechanical installation etc. B+G+5 Construction & maintenance of Residential an apartment building with all Building at complete finishing works and Mughelina electro‐mechanical installation etc. B+G+5 Construction & maintenance of a Residential twin apartment buildings with all Buildings‐ 2 complete finishing works and Nos. with Club electro‐mechanical installation House at together with swimming pool, Mansoura club house, multipurpose Hall & Al Noor Tower Construction of an office tower 2B+G+24F, with all complete finishing works Doha, West Bay substation and electro‐ mechanical installation etc. Client/Consult Project Contract Duratio Value n (QR.) ASGHAL‐Public k 10 18 Works Authority / months Million CICO ASGHAL‐Public 10 Works months A th it / Authority / CICO 18 Million ASGHAL‐ Drainage 18 12 Affairs / months Million Maunsell Engineering Sheikh Fahad / AEB 12 8 Million months Al‐Ahad Cont/ CEG Al‐Madar Real Estate/ GDG Al‐Mubarak Ivest./ AASCO Al Madar Real Estate 16 8 Million months 16 9 Million months 16 months 10 Million 24 months 122 Million 82 Al Madar Contracting O.P.C S.n . Project Title Project Description 13 G+5 Apartment Construction & maintenance of an Building at Najma apartment building with all complete finishing works and electro‐mechanical installation etc. 14 B+G+6 Apartment Construction & maintenance of an Building at Najma apartment building with all complete finishing works and electro‐mechanical installation etc. 15 B+G+2 Office Construction & maintenance of an Building at office building with all complete finishing works and electro‐ mechanical installation etc. 16 G+2 Office Construction & maintenance of an building for g office buildingg with all complete p Search & Follow‐ finishing works and electro‐ up Department mechanical installation, substation & landscaping works etc. 17 Factory cum Store With Labor Camp building at Sanaiya 18 B+G+5 Apartment Building at Mansoura Client/Consult. Project Contract time Value (QR.) Arab Engg. Office Al‐Ittefaq Consulting GRIDCO / ASCO Ministry of Interior 13 months 5 Million 12 months 8 Million 14 months 5 Million 18 months 8 Million Construction & maintenance of a Al‐Madar / factory cum store building with German Design 24 10 Million steel roof structure, substation & months electro mechanical works etc. electro‐mechanical etc CEG Construction & maintenance of an 14 8 Million apartment building with all months complete finishing works and electro‐mechanical installation etc. 19 Al Hit i / QDC Al‐Hitmi / QDC G+5 at Mansoura Construction & maintenance of an office building with all complete finishing works and electro‐ mechanical installation etc. 20 B+G+2 Office Building at Building at 14 months Construction & maintenance of an Abdullah Salat/ office building with all complete Al‐Sadd Engg. Engg 12 12 months finishing works and electro‐ consultant mechanical installation etc. 7 Million 5 Million 5 Million 83 Al Madar Contracting O.P.C S.n . Project Title Project Description Client/Consult. Project time 21 QP‐LPG Bottling at Construction of an admin building QP / DOPET New Industrial for DOPET together with ancillary Area structures like canteen block, gate house, store room etc. 7 months Contract Value (QR.) 8 Million 22 10 Villas at Al‐ Rawda Construction of 10 nos. G+1 villas Al‐Madar / with complete finishing & services GDG i t ll ti installation t th together with ith landscaping & boundary wall 13 12 Million months th 23 G+M+1 Commercial Building at Salwa Raod Construction & maintenance of a Consulting commercial building with all Engg Group complete finishing works and electro‐mechanical installation etc. 12 months 24 Modification Modification & & refurbishment works at various Branches of Doha Bank Construction & maintenance of modification and refurbishment works at various branches of DOHA BANK‐ C Ring Road Branch, Old DOHA BANK Airport Branch, Kahrabah Branch, Kharatiyat Branch, Musherib Branch 8 18 Million months 25 33 33 Nos. G+1 Villas Nos G+1 Villas Construction & maintenance of 33 at Nuaija nos. G+1 villas with complete Al‐Madar / finishing & services installation GDG together with landscaping & boundary wall 26 Refurbishment of Refurbishment works completion of AVM at Branch Maxi‐ AVM at Doha Bank‐ C Ring DOHA BANK Road Branch 6 months 27 BANK‐Islamic Branch at 6 months Construction & maintenance of G+M Building with all complete DOHA BANK finishing works and installation of MEPD works 6 Million 12 15 Million months 6 Million 5 Million 84 Al Madar Contracting O.P.C S.n Project Title Project Description Client/Consult. Project time Contract Value (QR.) 28 (3) Villa Compound‐76 Nos. Villas at Al‐ Waab Construction of 76 nos. G+1 villas, Al‐Asmakh club house, substation, guard room, Cont./ GHD tennis court, boundary wall, external services, road works, landscaping works etc. 29 26 Nos. G+1 Villas & Club House & Swimming Pool Construction of 26 nos. G+1 villas & Al‐Madar / club house with complete finishing GDG & services installation together with landscaping, pump room, guard room & boundary wall works etc. 30 49 Villas Compound at Al‐ Waab Construction of 76 nos. G+1 villas, Al‐Asmakh Real club house, substation, guard room, Estate/ GHD 16 26 Million tennis court, court boundary wall, wall months external services, road works, landscaping works etc. 31 B+G+5 Resid. Building at Al‐ Mirkab Construction of an apartment building with all complete finishing works substation and electro‐ mechanical installation etc. Construction of an apartment building with all complete finishing works substation and electro‐ mechanical installation etc. Construction of an apartment building with all complete finishing works substation and electro‐ mechanical installation etc. Construction of an apartment building with all complete finishing works substation and electro‐ mechanical installation etc Al‐Asmakh Real Estate/ GDG Construction of a residential building with all complete finishing works, substation and electro‐ mechanical installation etc. Sheikh Fahad bin Qasim Al bin Qasim Al‐ Thani / United Consultant 32 B+G+4 Bilal Complex at Al‐ Sadd 33 B+G+7+ at Muntazah 34 B+G+7+ at Najma 35 G+6 Residential Building at Bin Building at Bin Mahmoud Ahmad Hassan Bilal Est. / GHD 16 33 Million months 10 months 16 months 8 Million 8 Million 16 29 Million months Ali Saeed Al‐ Owair / AL‐ SADD ENGG. 14 12 Million months Ali Saeed Al‐ Owair / AL‐ SADD ENGG. 14 months 8 Million 18 18 10 Million 10 Million months 85 Al Madar Contracting O.P.C S.n. 36 37 38 39 40 41 42 43 44 Project Title Project Description Client/Consult. Project time for Qtel for Qtel at Wadi at Wadi Sail Construction completion & QTEL/ ADCI QTEL/ ADCI maintenance of OSS Buildings‐NOc & MATS and Substation inclusive of all refurbishment and finishing work. G+1 SSB Clinic at Bin Omran Compound Construction of G+1 clinical building with complete finishing & services installation together with landscaping & boundary wall General & Health Services Building for Umm Salal Municipality Construction of a office building ASHGHAL/ AEB with complete finishing & services 12 installation together with months landscaping & ancillary structures. Construction of training center buildingg with all complete p finishingg works pump room and electro mechanical installation landscaping. Scania WorkShop Construction of a workshop in Industrial Area building with complete finishing& services installation together with landscaping& ancillary structures. Al Khor Hospital g Medical Training Center Design& Build G+1 D i & B ild G+1 D Design& i & Construction C t ti off a office ffi Lusail Office building with complete finishing& Building service installation together with landscaping& ancillary structures. 12 months Ministry of 10 Interior/ State Security Security months Bureau Contract Value (QR.) 21 Million 5 Million 8 Million ASHGHAL/ACE Arabian a=Agencies/ CO./ AEB 17 months 17 Million 10 months 12 Million L il R l Lusail Real Estate 10 Development/ months Parsons 24 Million Admin Office Building Car Park for SCOJ in Industrial Area Construction of an office building ASHGHAL/AEB with all complete and finishing works 18 months 15 Million B+G+2+P Office Building‐3 Nos at Ring Road Construction of an office building Al Madar Real with all complete and finishing State/ GDG works 12 months 10 Million Preparatory Construction & maintenance of ASGHAL‐Public School for Boys at G+1 school building having Works 14 Azgawa Assembly Hall & multipurpose Hall Authority/ CEG months with space frames, substation, guard and gardener room, pump room, sports areas, parking area, with precast boundary wall etc. 20 Million 86 Al Madar Contracting O.P.C S.n Project Title . Project Description Client/ Consultant 45 2B+G+21 Construction of an office building Shaikh Fahad Apartment in West with all complete and finishing works Bin Qasim Al Bay Thani/ United Consultant Project Contract time Value (QR) 18 months 10 Million 18 months 30 Million 16 months 60 Million 20 months 60 Million 12 12 months 21Million 14 months 18 Million 51 G+2 Dialysis center Construction of medical building Q‐TEL b ildi building at HMC with i h allll complete l fi i hi finishing works, k /HMC/UNITED / / landscaping, substation and external Consultant works. 12 months 43 Million illi 52 B+G+4 Residential Construction of 2 nos. residential Sheikh Saoud/ Building in buildings with all complete finishing Mohammed Al Muntaza works substation and electro‐ Thani/DCB mechanical installation etc. 16 months 40 Million 53 2+G+10 Bilal Studio Construction of an apartment Ahmed Hassan in Al Asmakh building with all complete finishing Bilal Est. GHD works substation and electro‐ mechanical installation etc 16 months 29 Million 55 G+5 Resid Building Construction, maintenance of an Arab Engg. in Bin mahmoud apartment building with all complete Office finishing works and electro‐ mechanical h i l installation i t ll ti etc. t 13 months 5 Million 56 B+G+1+P Office Building in Al Hilal 12 months 46 2B+G+2 Office Building at C Ring Road 47 B+G+M+12 HOTEL Building IN Old Salata 48 3B+G+14 Office Building in Old Salata 49 OSS Building for Qtel in Wadi Sail Qtel in Wadi Sail 50 G+1 Villas 20 Nos at Ain Khaled Construction of an office building Apex Trad& with all complete and finishing works Cont/ Al SADD Construction of an office building Al Madar/AAG with all complete and finishing works Construction of an office building QNB/DCB with all complete and finishing works Construction, Completion& QTEL/ADCI Maintenance of OSS building‐ building NOC&MATS and Substation inclusive of all refurbishment and finishing works. Construction of an office building Al Madar/GDG with all complete and finishing works Construction of an office building Al Madar/ with all complete and finishing works German Design 7 Million 87 Al Madar Contracting O.P.C LETTERS OF LETTERS OF RECOMMANDATION & COMPLETION CERTIFICATES Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C Al Madar Contracting O.P.C