Prequalification Document
Al Madar Contracting O.P.C.
Company’s Profile
Engineers‐Contractors
(Civil, Industrial & Marine Construction)
2
Al Madar Contracting O.P.C
TABLE OF CONTENTS
Section ‐1 COMPANY SUMMARY
The Company Company Statement
Relevant Company Data
Registration / Certificates/Classification
Registration / Certificates/Classification
Section‐2
RESOURCES
Organization Chart
Organization
Chart
Resources ‐ Personnel
Resources – Equipment
Section‐3 REFERENCES
List of Major Projects
Letters of Recommendation &Completion Certificates
Al Madar Contracting O.P.C
SECTION‐1
COMPANY SUMMARY THE COMPANY
Al‐Madar
Al
Madar Contracting O.P.C. is a Qatari Company, originally formed in 1992, specialized in
the field of design and construction of Civil and Industrial Construction as well as
Infrastructure and Marine development works.
The company has been certified by Lloyd’s Register Quality Assurance to the following Quality Management System Standards:
The Company has executed projects for local Ministerial authorities such as M/s ASHGHAL
(
(Building
g Affairs & Drainage
g Affairs),
), Ministryy of Interior,, KAHRAMAA,, Q
Qatari Armed Forces,,
Woqod, QTEL, HMC, LUSAIL, QP/DOPET as well as many private sector projects.
AL‐MADAR fields of operation are the following:
Civil & Industrial Construction:
Site Preparation, Combined Infrastructure, Construction of Towers, Schools, Industrial,
Office, Hotel, Hospitals, Residential & Commercial buildings, Public Landscaping projects,
Large compounds of Villas with Club House & Sub‐station amenities & services etc.
etc
Water & Wastewater:
Pumping Stations, Substations and Sewerage net works and Pump House etc.
Marine:
Concrete Quay Walls, Industrial and Private Jetties (Fixed and Floating) Concrete Repair of Water front, Shore & Beach protection.
p
Carpentry and Decoration:
A joinery/carpentry workshop to design, fabricate, supply and install various timber
products like doors, wardrobes, cup boards, cladding, handrail, skirting etc. Al‐Madar has
also been certified by BM Trada for production and installation of fire rated timber doors in
compliance with BS 476: Part 22, and the same has been approved by Civil Defense
Department.
5
The Company is employing more than 2000 persons in Qatar, Al Madar’s highest priority
and commitment is to provide the Client with sound and professional engineering
execution to the highest standard and satisfaction.
The enclosed reference in Qatar or other areas reflect the effective capacity & strength of the company.
As a whole, the Company owes its reputation and prosperity to the fact that it has always
retained a perspective of solid and innovative engineering. This has allowed it not only to
present improved solution to many current design and construction problems but equally
has permitted it to successfully complete a number of very delicate projects,
projects requiring in
addition a solid and disciplined management and organization.
COORDINATES
Address
AL‐MADAR CONTRACTING O.P.C.
P.O. Box: 2329
Doha, Qatar
Arabian Gulf
Tel.: (+974) 44674466
Fax.:(+974) 44671333
E‐mail: almadar.cont@almadar‐holding.com
Website: www.almadar
www almadar‐holding
holding.com
com
Location: Head Quarter Office is located at Al‐
Muntazah Street, Hilal Area in Doha. Workshops & Camps are located in the Industrial Area Street No. 41, Plot No. D‐36.
COMMERCIAL DATA:
Owner : Al‐Madar Holding W.L.L. is limited Company under Qatari law owned by Eng. Ali Al Mashhadi & Eng. Haidar Al Mashhadi
6
Classification:
Enclosed please find copy of Al‐Madar’s Registration with the Central Tenders Committee,
State of Qatar (Reg. No. 47455), which states that this contractor is classified as:
GRADE A
: Building Works, value limit from Qrs. 60 million up to 150 millions.
GRADE A
: Maintenance Works, value limit from Qrs. 10 million up to 30 millions.
GRADE B
: Various Drainage & Sewerage Works, Value limit from Qrs. 3 million up to 10 millions.
Q
p
Registration:
‐ Commercial Registration No. 47455
‐ Ministry of Public Works Registration No. 9292 & 47455
‐ CTC Registration No. 47455
‐ Qatar Chamber of Commerce & Industry, Membership Certificate No. 01/22406
Associated / Sister Company: ‐ Al Madar Engineering & Marine Construction OPC
‐ Al Madar Real Estate OPC.
‐ Al Madar Carpentry & Decoration OPC.
Al Madar Carpentry & Decoration OPC.
‐ Al Madar Wrought Iron OPC
‐ Scala Construction Engineering OPC
‐ AL Sakhr Aluminum, Glass & Kitchen W.L.L.
‐ Al Madar Project Management OPC
‐ AlMadar Transpt. &Vehicle Maintenance OPC ‐ Al Madar Trading OPC.
7
FINANCIAL DATA:
C it l
Capital
: The
Th Company
C
h a registered
has
i t d and
d paid‐up
id
capital
it l off Qrs.
Q
8,000,000 in Qatar. This does not include reserves and retained
earnings.
Banks
:
‐ The Commercial Bank of Qatar, Doha
‐ Qatar Islamic Bank, Doha
‐ Saderat Iran Bank, Doha
‐ Arab Bank, Doha
‐ Ahli Bank, Doha
Auditors :
‐ Ernst & Young, Doha ‐ Tel. No. 4414599
T l N 4414599
‐ Fax No. 4414649
Insurers
:
‐ Al‐Arabia Insurance Co., Doha ‐ Al Khaleej Insurance Co., Doha
‐ Oman Insurance Co., Doha Turnover :
Yearly turnover in Qatar has been Qrs. 300 to 350
millions.
8
Al Madar Contracting O.P.C
Registration / Certificates/Classification
Al Madar Contracting/ Commercial Registration (Page 1)
10
Al Madar Contracting/ Commercial Registration (Page 2)
11
Al Madar Contracting Trade License
12
Al Madar Contracting/ Classification Grade A
Certified by the Central Tender Committee C tifi d b th C t l T d C
itt
13
Al Madar Qatar Chamber of Commerce Membership Certificate
14
Lloyd’s Register Quality Assurance
15
BM Trada Certificate
16
Civil Defence Certificates for Fi R t d D
Fire Rated Doors (Page1)
(P 1)
17
Civil Defence Certificates for Fi R t d D
Fire Rated Doors (Page2)
(P 2)
18
Al Madar Contracting O.P.C
SECTION‐2
RESOURCES Al Madar Contracting O.P.C
Organization Chart
Al Madar Contracting
Organizational Chart
21
Al Madar Contracting O.P.C
RESOURCES‐PERSONNEL
RESOURCES – PERSONNEL
MANAGEMENT:
NAME QUALIFICATIONS, EXPERIENCE & OTHER RELEVANT DETAILS
ENG. ALI AL‐MASHHAD Chairman, Graduated as a Architect Engineer, from Dortmund University, Germany, in 1991.
ENG. HAIDER AL‐MASHHADI Managing Director, Graduated as a Architect Engineer, from Dortmund University, Germany, in 1991.
ENG. HAZIM M. AL‐FARRA
Deputy Managing Director Graduated as a Civil
Engineer, from Qatar University in 1989, with over 20
years of experience in Construction & Management.
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
MANPOWER STRENGTH:
Management, administration, engineering and technical staff is of Middle Eastern,
European and Asian Nationalities.
The Company has, on the average, employed between 35‐50 management and
administration staff, including a number of graduate and technical engineers, a selection
list of project managers and other staff is enclosed.
In total,
total the company has its own project management staff like Project Managers,
Managers
Project/Site Engineers, Planning Engineers, QA/QC Engineers, Site Foreman, Land
Surveyors, Site QS, AutoCAD Draftsman, Store/Time Keepers and Safety Officers.
As for the site manpower, we have skilled manpower like Carpenters, Steel fixers, Block
Masons, Plaster Masons, Ceramic Masons, Unskilled Laborers, drivers & Operators.
23
Supervisory & Specialist Staff:
Intermediate staff and specialist engineer’s
t d
tradesmen
h il from
hail
f
N
Nepal,
l Egypt,
E t India,
I di Pakistan
P ki t
and the Philippines.
Through our overseas contract, we are able to draw
on short notice, additional engineering, supervisory
and specialist personnel from Europe, should the
need arise.
Labor
:
The Company has used primarily Indian labor for all
qualified civil and finishing work, and Nepal,
Pakistani, Egyptian labor for other qualification.
Mechanical construction personnel are primarily
from India & Nepal.
In order to retain flexibility,
flexibility the Company is rotating
its qualified staff on long term leave at times of
reduced work load and is thus able to recall them
on short notice.
The Company has equally developed a reliable
reservoir of seconded labor in Doha in order to
meet short term peaks of demand.
Accordingly, the Company is able to mobilize rapidly,
as it has done successfully in the past, for many
large projects which would exceed its momentarily
available manpower.
Co. ORGANIZATION CHART:
Please refer to the attached sheet of AL‐MADAR corporate organization chart showing the company’s structure, divisions and departments.
24
DEPARTMENTS & STAFF
NAME QUALIFICATIONS, PROFESSION, TRADE, EXPERIENCE & OTHER RELEVANT DETAILS.
A. OPERATION MANAGER
ABDUL SALAM ALYEH
Operation Manager, Graduated as a Civil Engineer, 25 years
of experience in high rise buildings like towers & other civil
construction fields in the Gulf.
B. PROJECT MANAGERS:
ADEL AHMED
Project Manager Graduated as a Civil Engineer, 25 years of experience in building and civil construction
EMAD TAKLEEF Project Manager, Graduated as a Civil Engineer, 18 years of
experience in building and civil construction fields.
HUSSAIN SALAMA
Project Manager, Graduated as a Civil Engineer, 15 years of
experience in high rise buildings and civil construction fields.
ELIAS ASSAF
Project Manager, Graduated as a Civil Engineer, 12 years of experience in high rise buildings like towers & other civil
experience in high rise buildings like towers & other civil construction fields.
MOHAMMED AWAWDAH Project Manager, Graduated as a Civil Engineer,
16 years of experience in civil construction.
OMAR OTHMAN ABU EID Project Manager, Graduated as a Civil Engineer, 29 years of experience in building and civil construction fields.
MEDHAT ADUL‐AZIZ Project Manager, Graduated as a Civil Engineer,
15 years of experience in civil construction.
BABU RAJ K NAIR Project Manager, Graduated as a Civil Engineer with 20 years of experience in civil construction
years of experience in civil construction.
25
C . SITE ENGINEERS & SITE SUPERINTENDENT:
MAHMOOD AL NABI
MAHMOOD AL‐NABI
Site Engineer, Graduated as a Civil Engineer, 8 years of Sit
E i
G d t d
Ci il E i
8
f
experience in civil construction.
SALAH MAHMOUD
Site Engineer, Graduated as a Civil Engineer, 5 years of experience in civil construction.
MURAD HAIDAR
Site Engineer, Graduated as a Civil Engineer, 5 years of experience in civil construction.
JHALAK ACHARYA
Site Engineer, Graduated as a Civil Engineer, 12 years of experience in civil construction.
D‐BUSINESS DEVELOPMENT
TAREK NAJA Business Development Manager, BBA Graduated with over 8 years of experience in Sales & Marketing.
IMAN FARID Business Development Officer, Holder of Bachelor in Media and Mass Communication with extensive experience
in Public Relation.
E. SITE SUPERINTENDENT/ SUPERVISOR / FOREMAN:
ZAHOOR A. MAHER
Site Superintendent, with 42 years of experience in heavy concrete marine and industrial construction and remedial work in Kenya, Pakistan, Iraq and Qatar, 26
TENJI SHERPA
Site Foreman, Diploma in Civil Engineering, with 16 years of experience, experience in construction.
BEKHA SHAHI
BEKHA SHAHI
Site Foreman, Diploma in Civil Engineering, with 12 years of Sit
F
Di l
i Ci il E i
i
ith 12
f
experience, experience in construction.
TILAK KARKI Site Foremen, Diploma in Civil Engineering, with 12 years of experience in civil construction. PASANG SHERPA Site Foreman, Diploma in Civil Engineering, with 18 years of experiences in civil construction.
ARVINDAR SINGH
Site Foreman, Diploma in Civil Engineering, with 18 years of experiences in civil construction.
FAISAL ZAHOOR
Scaffolding Supervisor, Diploma in Civil Engineering, with 6 years of experiences in civil construction.
AMAR PRADHAN
Site Foreman, Diploma in Civil Engineering, with 16 years of experiences in civil construction.
p
RAM NARAYAN
Site Foreman, Diploma in Civil Engineering, with 12 years of experiences in civil construction.
KISHOR RAUT
Site Foreman, Diploma in Civil Engineering, with 10 years of experiences in civil construction.
MOHAN KUMAR
Site Foreman, Diploma in Civil Engineering, with 12 years of experiences in civil construction.
TIKARAJ ADHIKARI Site Foreman, diploma in civil Engineering, with 10 years of , p
g
g,
y
experience in civil construction
27
F. SURVEYING SECTION:
MOHD. KHALID
Surveyor with 10 years of experience in various civil &electro‐mechanical construction works
IBRAHIM SHAABAN
Surveyor with experience of 12 years in various civil &electro‐mechanical construction works
G. PLANNING SECTION:
MOHD. SHAMSUDDIN Head of Planning, Graduated as a Civil engineering, with 15 years of experience in construction, planning/scheduling of the projects.
AHMAD ALGYAR
Senior Planning Engineer, Graduated as a Civil engineering, with 10 years of experience in construction, planning/scheduling of the projects.
H. COST CONTROL SECTION:
RIZWAN N. KAZI
Head of Q.S., Graduated as a Civil Engineering, with 15
,
g
g,
years of experience in cost control.
NARESH KUMAR
Q. S., Graduated as a Civil Engineering, with 10 years of experience in Cost Control.
ROGER VIRAY
Q. S., Graduated as a Civil Engineering, with 7 years of Q
,
g
g,
y
experience in Q.S. & Cost Control.
28
I. ESTIMATION DEPT.:
RAJESH KUMAR
PETER AMTHONY
PETER AMTHONY
BIRENDRA SHAH
AJAY GUPTA MOHD. ASRAF
DHIRENDRA MISHRA
Head Estimator, 15 years experience in estimation
E ti t 10
Estimator, 10 years of experience in estimation
f
i
i
ti ti
Estimator, 15 years of experience in estimation
Estimator, 6 years of experience in estimation
Estimator, 5 years of experience in estimation
Estimator, 6 years of experience in estimation
J QA/QC & ISO SECTION
J. QA/QC & ISO SECTION:
VINAY ARALIKATTI Quality Manager (MR) Graduated as a Civil engineer with 10 years of experience, in civil construction & quality control.
K SAFETY SECTION
K. SAFETY SECTION:
JAFFER AL ALAWI Safety Manager, B.S.C in Mechanical Engineering, diploma in Quality Management, & Holder of ROSPA, IOSH, NEBOSH & FIRE Fighting training Certificate
MACARIO Safety Officer, with holding safety certificate
MUKTI NATH Safety Officer, with Safety holding Safety certificate
JAWED AKHTAR Safety Officer, with diploma of Industrial safety
certificate
L. STORE & LOGISTICS:
RAHMATULLAH
Main Store‐in‐Charge, with 12 years experience
K V S SHEKHARAN
K. V. S. SHEKHARAN
Storekeeper with 12 years of experience
Storekeeper, with 12 years of experience
MAHESH YADAV
Storekeeper, with 5 years of experience
29
M. PURCHASING SECTION:
MAHER IMAM
Act. Purchasing Manager with 10 years experience
ABDUL SAMAD
Purchasing, with 10 years experience
JAYKOD Purchasing Assistant with 5 years of experience
DIOGENES CANZANA Material Engineer with 10 years of experience
SHAH JAHAN
Material Engineer with 10 years of experience
N. PERSONNEL SECTION:
WAHIB AL‐TAMIMI
HR Manager, graduated with a Master Degree in Public Administration from University of Jordan, with
18 years of experience.
MOHAMED NIYAZ
Recruitment Officer, graduated with a MBA degree in
HR from Coventry University‐UK, Bachelor in Business Administration (BBA) – SL, with 10 years of experience.
MOHAMMAD AWAD Immigration Officer, graduated with a degree in Public Administration, with 10 years of experience.
FOAD ABDULHAMED Camp Boss graduated with a degree in Art with 4 years of experience. HISHAM MOHAMED Camp Boss in Industrial Area with 3 years of experience.
30
O. MECHANICAL SECTION:
RAMADAN MUBARAK Plant Manager, B.S.C Mechanical Power Department, with 25 years of experience
SHAHID MURAD
Plant Superintendent, Diploma Mechanical engineer with 17 years of experiences
HANY MOHAMMAD Traffic Representative, with 10 years of experience in HANY
MOHAMMAD
Traffic Representative, with 10 years of experience in
transportation business. MOHD. DAMRA
Workshop Mechanics, with 14 years of experience, repairing and maintenance of heavy equipments.
DIPENDRA CHAUDHAR Store Keeper, Diploma in Commerce, with 6 years of experience.
P. IT SECTION:
AWAL AWAL
IT Manager, Computer Science graduated, with over 10
years of experience in Management Information System.
HOSSAM AL‐FARRA IT Site Coordinator, graduated with a degree in Computer science with over 10 years of experience in IT infrastructure.
GEORGE DELA CRUZ
IT Officer, graduated with a degree in computer science, with 12 years of experience in Computer Administration. CARLOS BURON
IT Officer, graduated with a degree in computer science with 10 years of experience in Computer Administration. RAYAN APORDONADO IT Officer, graduated with a degree in in Science Information with 6 years of experience.
31
Q. MAINTENANCE SECTION:
WALEED JEMMIEH
Head of Maintenance Graduated as a Civil Engineer with 18 years of experience in civil construction &
18 years of experience in civil construction & maintenance works.
KISHOR RAUT
Foreman, 15 years of experience in a civil construction
& maintenance works.
W. ACCOUNTS SECTION:
EHAB NAYIF
Head of Accounts, Graduated with a degree in Accounting, with 14 years of experience in accounting KHALIL ARAFAT
Accountant, graduated with a degree in Accounting, with 8 years of experience.
AHMAD AL‐SHOBAKI Accountant, graduated with a degree in Accounting, with 8 years of experience.
YUVRAJ MAHAT
Accountant, graduated with a degree in Accounting, with 6 years of experience.
MOHAMED SAFREEN Accountant, graduated with a degree in Accounting with 3 years of experience MOHAMED FAYROZ Accountant graduated with a degree in Accounting with 9 years of experience
UMESH KANDEL
Accountant, graduated with a degree in Accounting, with 8 years of experience.
X. LEGAL DEPARTMENT:
MAGED IBRAHIM Legal Affairs. graduated with a degree in Law, with 17 years of experience in law firm. ith 17
f
i
i l fi
ALI TAHA Legal Affairs graduated in Law, 11 years experience
32
Al Madar Contracting O.P.C
RESOURCES‐EQUIPMENT PLANT & EQUIPMENT
General Construction Equipt.:
Enclosed is an extract from Company Asset Register, indicating the primary equipment owned.
It should be noted that this may vary due to acquisitions and disposals depending on the requirements of individual projects.
In accordance with a policy to rationalize the use of the more general types of heavy equipment, an
i t
inter‐company pool of mobile plant has been l f
bil l t h b
created, to be used by all members of the group when required.
SUPPORT SERVICES:
Steel Fabricat./ Welding Workshop: Equipped with all necessary cutting, bending g
p
q pp
y
g
g
tools/equipment, gas cutting, oxygen acetylene welding, arc welding, tig and mig welding, grinding tools, etc.
Joinery/Carpentry Workshop:
Fabrication of all internal and external joinery works. The carpentry workshop is well equipped with surface planer, band saw machine, radial ith f
l
b d
hi
di l
cutting saw, timber cutting saw and various electric tools.
Aluminum/ Stainless Steel Workshop: Equipped with all necessary equipments & tools to fabricate, supply and install aluminum doors, windows, stainless steel handrail, cladding strip,
,
,
g
p,
kitchen cabinets etc. Plant Dept. /Workshop & Transport. : Mechanical, electrical repairs, monitoring plant maintenance schedules, alterations, denting, painting as well as maintenance.
Workshop Area : 2000
W
kh A
2000 m2
2
Yard Area
: 1700 m2
34
Al Madar Contracting O.P.C
Al Madar Mobile Cranes
1.A
Mobile Crane- TADANO
Reg. No
Model
Year Model
1
MC-01
32325
55 Ton Mobile
Crane
2008
35
Al Madar Contracting O.P.C
Al Madar Tower Cranes
2.A
Tower Cranes-Libhert
Hankcok
Reg. No
Model
Year Model
1
TC-1
N/A
N/A
2007
2
TC-2
N/A
N/A
2007
3
TC-3
N/A
N/A
2007
4
TC-4
N/A
N/A
2007
36
Al Madar Contracting O.P.C
Al Madar Lifting Machines
3.A
Electric Hoist- BAODA
Reg. No
Model
Year Model
1
PH-1
N/A
SC-200/200
N/A
2
PH-2
N/A
SC-200/200
N/A
3
PH-3
N/A
SC-200/200
N/A
37
Al Madar Contracting O.P.C
Al Madar Excavators
4.A
Carwler Hydraulic Excavator
Reg. No
Model
Year Model
1
EX-2 Hammer + Bucket
12042
Excavator (Case
Poclain) - 1288
1996
2
EX-4 Hammer + Bucket
12044
Excavator (Case
Poclain) - 1188
1996
3
EX-7 Hammer + Bucket
12581
Excavator (Case
Poclain) - 1288
1993
4
EX 8 Hammer + Bucket
EX-8
320B
Excavator
(Caterpillar 320B)
1998
5
EX-9 Hydraulic Breaker+ Bucket
41802
Excavator (Komatsu
PC 220)
2012
6
EX-10 Hydraulic Breaker +
Bucket
47902
Excavator (Komatsu
PC 220)
2012
38
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
1
Electrical Power
Generators- Caterpillar,
Cummins, Parkins,
Olympian
GEN 1
GEN-1
2
GEN-2
50 KVA
Perkins / D50317
3
GEN-3
50 KVA
Perkins
4
GEN-4
35 KVA
Perkins
5
GEN-5
110 KVA
Caterpillar / YD51130
6
GEN 6
GEN-6
250KVA
C t ill / 3306D1
Caterpillar
7
GEN-7
45 KVA
Caterpillar / GEP50-3
8
GEN-8
110 KVA
Caterpillar / YB51047
9
GEN-9
110 KVA
Caterpillar / YB51047
10
GEN-10
250 KVA
Olympian / GEH275
11
GEN-11
72 KVA
Perkins / 1004TG
12
GEN-12
15 KVA
Chinese
13
GEN-13
110 KVA
Cummins / C110D5
14
GEN 14
GEN-14
110 KVA
P ki
Perkins
15
GEN-15
75 KVA
Perkins
16
GEN-16
410 KVA
Caterpillar / 3456
17
GEN-17
227 KVA
Cummiims
18
GEN-18
410 KVA
Caterpillar / 3456
19
GEN-19
410 KVA
Caterpillar / C-15
20
GEN-20
25 KVA
Perkins
21
GEN-21
545 KVA
Caterpillar / C-18
5.A
Reg. No.
Model
50 KVA
P ki
Perkins
39
Al Madar Contracting O.P.C
Al Madar
M d Light&
Li ht& H
Heavy M
Machinery
hi
6.A
Dewatering Pumps
(Electrical, Diesel)- Sykes,
Pumpex
Reg. No
Model
1
WP-02
6" WP
Sykes
2
WP-03
6" WP
Sykes
3
WP-04
6" WP
Sykes
4
WP-05
6" WP
Sykes
7.A
Air Compressor- Atlas
Reg. No
Mark Model
1
AC-2
N/A
Atlas
2
AC-3
N/A
Atlas
3
AC-4
N/A
Atlas
4
AC-5
N/A
Atlas
5
AC-6
NA
Atlas
8.A
Medium Compacting
Rollers
Reg. No
Mark Model
Year Model
1
CR-1
11088
Compacting Roller
1990
2
CR-2
N/A
Compacting Roller (2 ton Dubai)
40
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
9.A
9A
Prime Movers (with Box Trailer,
Reg.
Reg No
Flat and Lowbed (Mercedes)
Mark Model
Year Model
1
PM-3
147900
Prime Mover
2004
2
PM-4
129976
Prime Mover
2000
3
PM 5
PM-5
129977
P i Mover
Prime
M
2000
4
PM-6
194738
Prime Mover
2009
10 A
10.A
Portable Water TankersMercedes, GMC, FAW
Reg No.
Reg.
No
Mark Model
Year Model
1
WT-1
105208
Water Tanker (
Mercedes)
1993
2
WT-2
90142
Water Tanker (GMC)
1983
3
WT-3
90610
Water Tanker (FAW)
1999
11.A
Sewage Water Tanker-Falcon
Reg. No.
Mark Model
Year Model
1
SW-2
31784
Falcon
2012
41
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
Pickups- Toyota, Mitsubishi, Nissan
Reg no.
Model
Year Model
PK-2
71758
Toyota Dyna Pick-up
1996
PK-3
93780
Toyota Dyna Pick-up
2002
PK-4
94217
Toyota Dyna Pick-up
2002
PK-6
95329
Toyota Dyna Pick-up
2002
PK-7
95791
Toyota Dyna Pick-up
2002
PK-8
96271
Toyota Dyna Pick-up
2002
PK-10
133677
Mitsubishi Pick-Up
2006
PK-11
133780
Mitsubishi Pick-Up
2006
PK-12
126903
Toyota Dyna Pick-up
2006
PK-13
147261
Toyota Dyna Pick-up
2006
PK-14
151789
Toyota Dyna Pick-up
2006
PK-15
96598
Toyota Pick-up
D/Cabin
2002
PK-16
119103
Mitsubishi D/Cabin
2005
PK-17
78221
Mitsubishi Pick-Upp
2008
PK-18
192483
Mitsubishi Pick-Up
2008
PK-19
111569
Mitsubishi Pick-Up
2003
VE-2
53735
Isuzu Pick-up 1992
1992
42
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
Pickups-Toyota, Mitsubishi,
Nissan
Reg. No.
Model
Year Model
VE-8
71310
Nissan Pick-up
1996
VE-10
VE
10
48149
Nissan Pick
Pick-up
up
1991
VE-11
46069
Nissan Pick-up
1991
VE-12
112622
Nissan Pick-up
2003
VE-13
117384
Nissan Pick-up
2005
VE-14
143587
Nissan Pick-up
2006
VE-18
75950
Nissan D/Cabin
1998
VE-43
111583
Toyota Pick-up Hi
Lux
2004
VE-66
159065
Nissan D/C pick-up
2007
VE 77
VE-77
192624
Ni
Nissan
Pick-up
Pi k
2008
VE-78
192936
Nissan Pick-up
2008
VE-83
205742
Toyota Hilux Pick Up
2010
VE-87
109023
Nissan D/Cabin Pick
Up
2010
VE-88
20197
Nissan D/Cabin Pick
Up
2010
VE-64
115329
Datson Pick-up
2004
VE-75
VE
75
91641
Nissan Pick
Pick-up
up
2001
VE-89
187837
Nissan D/Cabin Pick
Up
2008
VE-102
230641
Nissan Pick Up
2012
43
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
SN
Description
16.A
Dewatering Pumps
(Electrical, Diesel)
6"
4
Sykes, pumpex
17.A
Air Compressor
300 cfm
250 cfm
3
2
Atlas Capco
18.A
Plate Compactor
N/A
2
Robin, Koshin
1.5 ton
2
Dynapac
N/A
2
Budai
N/A
2
Dynapac
N/A
2
Flextool
19.A
20.A
21.A
21.B
Medium Compacting
Rollers
Steel Bending and cutting
machines
Concrete Compaction
Equipment Handroller 500
kgs
Concrete Finishing
Equipment
Quantity
Brands
22.A
Sand Blasting Machine
N/A
2
Achtung
23.A
Concrete Chemical
Injection Pump
N/A
1
Otal
24.A
Concrete Coring Machine
N/A
1
Bosch
25.A
Theodolite
N/A
4
Leica
26.A
Level instrument
N/A
8
Leica/Topcon
27.A
GPS Instrument
N/A
4
Leica/Topcon
28.A
Saloon Cars/ Vehicles
N/A
48
BMW, Mercedes, Toyota,
Nissan, Mitsubishi, Range
Ro er
Rover
29.A
Transit Concrete Mixers
N/A
1
Mercedes
30.A
Welding Equipment
1.5 Ton
3
ESAB-Miller
44
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
12.A
Backhoe Loaders
1
JC-1
2
Reg. No
Model
Year Model
11089
Bachoh Loader
(Caterpiller)
1989
JC-2
12140
Bachoh Loader
(Caterpiller)
1996
3
JC-3
15449
Bachoh Loader
(Caterpiller)
2005
13.A
Telehandllers
Reg. No
Mark Model
Year Model
1
TE-1
13656
Telehandlers
T
l h dl
(Telescope)
1998
2
TE-2
22804
Telehandlers
(Telescope)
1997
3
TE-3
20951
Telehandlers
((Telescope)
p )
2001
14.A
Skid Loaders
Reg. No
Model
Year Model
1
BO-3
12141
Skid Loader
1997
2
BO-4
9495
Skid Loader
1999
3
BO-5
12868
Skid Loader
2004
4
BO-6
13216
Skid Loader
2004
5
BO-7
13692
Skid Loader
2004
6
BO-8
13694
Skid Loader
2004
7
BO-9
14548
Skid Loader
2005
8
BO-10
15448
Skid Loader
2005
9
BO-11
20935
Skid Loader
2006
10
BO-12
31288
Skid Loader
2008
45
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
Dump Trucks-Merceedes
Reg. No
Model
Year Model
DT-1
94492
Mercedes
Truck(Dumping)
k(
i )
2002
DT-2
95130
Mercedes
Truck(Dumping)
2002
15.A
Forklift- Toyota, Nissan
Reg. No
Model
Year Model
1
FL-01
13680
Forklift (Toyota)
1996
2
FL-02
9196
Forklift (Nissan)
1989
T
Transit
it Concrete
C
t Mixers
Mi
Reg.
g
No.
M k Model
Mark
M d l
Y
Year
M
Model
d l
CM-1
106591
Concrete Mixer
1994
Hand Rollers
g
Reg.
No.
Mark Model
Year Model
HR-01
Hand Roller
N/A
HR-02
Hand Roller
N/A
46
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
16.A
Passenger Transportation BusesTata, GMC, Nissan, Toyota
y
Reg. No.
Model
Year Model
1
LB-1
6445
Long Bus (Chevorlet)
1991
2
LB-2
96292
Long Bus (Chevorlet)
1990
3
LB-3
96296
Long Bus (GMC)
1990
4
LB-4
96300
Long Bus (Chevrolet)
1990
5
LB-6
97314
Long Bus (Chevorlet)
1989
6
LB-8
123352
Long Bus (TATA)
2005
7
LB-9
141383
Long Bus (TATA)
(
)
2006
8
LB-10
159127
Long Bus (TATA)
2007
9
LB-11
102326
Long Bus (GMC)
1989
10
LB-12
190957
Long Bus (TATA)
2008
11
LB-13
190959
Long Bus (TATA)
2008
12
LB-14
229985
Long Bus (TATA)
2012
13
VE-53
121345
Toyota Hi Ace Van
2005
14
VE-74
18762
Nissan Urvan
2008
15
VE-76
190965
Nissan Urvan
2009
16
VE-84
37278
Toyota Hi Ace Van
2008
17
VE-103
230642
Nissan Urvan
2012
47
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
17.A Saloon Cars/ Vehicles
Reg. No.
Model
Year Model
1
VE-23
239184
Toyota Corolla Saloon
2002
2
VE-25
238741
Suzuki Station
2001
3
VE 26
VE-26
210260
Suzuki Station
1999
4
VE-27
231909
Suzuki Zimny
2001
5
VE-28
236754
Suzuki Vitara
2001
6
VE-30
231784
Suzuki 4X4
2001
7
VE-37
241293
Nissan Pathfinder
2002
8
VE-44
164473
Suzuki Grand Vitara
2004
9
VE-45
198461
Suzuki Grand Vitara
2004
10
VE-46
203361
Nissan Saloon
2004
11
VE-48
105168
Suzuki 4X4
2004
12
VE-49
283651
Nissan Sunnyy Saloon
2005
13
VE-50
250696
Hyundai Saloon
2005
14
VE-55
95411
Toyota Station GX
2004
15
VE-56
337909
Lexus Station
2006
16
VE-58
361984
Nissan Sunny Saloon
2007
17
VE-59
361983
Nissan Sunny Saloon
2007
18
VE-60
369406
GX Land Crusier
2007
19
VE-61
6441
BMW
2007
20
VE-62
375862
Nissan Sunny Saloon
2007
21
VE-67
18073
Land Cruise Prado
2007
22
VE-68
33205
Toyota Camry
2007
23
VE-69
37918
Nissan Sunny Saloon
2007
24
VE-70
161207
Mitsubishi Station
1997
48
Al Madar Contracting O.P.C
Al Madar Light& Heavy Machinery
18 A Saloon Cars/ Vehicles
Reg No.
Reg.
No
Mark Model
Year Model
25
VE-71
37492
BMW Station
2007
26
VE-72
352216
Mercedes Jeep
1998
27
VE-73
105821
Crsyler Saloon
2007
28
VE-79
335856
Nissan Extra
2008
29
VE-80
335869
Nissan Extra
2008
30
VE-81
389709
Range Rover
2008
31
VE-82
77398
Toyota Corolla
2007
32
VE-85
379952
Honda
2007
33
VE 86
VE-86
106363
T t Sequioa
Toyota
S i
2010
34
VE-90
360751
Toyota Yaris
2007
35
VE-91
199355
Chevorlet Tahoe
2008
36
VE-92
92028
Mercedez Benz Saloon
2008
37
VE-93
95644
Mercedez Benz Saloon
2009
38
VE-94
398515
Toyota Prado
2009
39
VE-95
364801
Toyota Prado
2009
40
VE-96
402630
Toyota Corolla
2010
41
VE-97
455743
Toyota Corolla
2011
42
VE-98
290219
Renult Clio
2005
43
VE-99
6336
Range Rover
2006
44
VE-100
143023
Mercedez Benz Saloon
2008
45
VE-101
211429
Ssyang Yong SUV
2000
46
VE 104
VE-104
417653
Mitsubishi Lancer
2012
47
VE-105
417546
Mitsubishi Lancer
2012
48
VE-106
417538
Mitsubishi Lancer
2012
49
Al Madar Contracting O.P.C
SECTION‐3
REFERENCES
LIST OF MAJOR PROJECTS
LETTERS OF RECOMMANDATION& COMPLETION
LETTERS OF RECOMMANDATION& COMPLETION
Al Madar Contracting O.P.C
REFERENCES OWNERS & CONSULTANTS – QATAR
Since 1992, AL‐MADAR’s organization has performed works for the following owners and / or Consultants in the state of Qatar. All of its work has been exclusively of either civil engineering or industrial nature and an important portion has been on a design & construction basis
or industrial nature and an important portion has been on a design & construction basis.
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Consulting Engineering Group (CEG)
Arab Engineering Bureau (AEB)
GHD Consultant
Arab Consulting Engineers
CICO C
CICO Consulting Engineers
lti E i
Adel Jaidah & Associates
Petra Design Consult
Al Sadd Engineering Consultant
Design & Consult Bureau (DCB)
Arabian Architects Group
M/ ASHGHAL B ildi & D i
M/s ASHGHAL, Building & Drainage Affairs
Aff i
Ministry of Interior (MOI)
Ministry of Electricity & Water
Doha Municipality
Al Asmakh Real Estate
Doha Bank
PEARL QATAR
Q
Qatar Telecom (Q‐Tel) Hamad Medical Corporation (HMC)
Qatar Petroleum‐QP / DOPET
Qatar Fuel Co.‐WOQOD
LUSAIL Real Estate Development
Qatar Fertilizer Co.‐ QAFCO
Al‐Madar Real Estate W.L.L
Al‐Mana Real Estate
Qatar Real Estate Investment Company/ AL AQARIA
52
BANKING REFERENCES
Al Madar’s primary bankers are:
•
Commercial Bank of Qatar
Q
P. O. Box: 3232
Doha, Qatar
Tel. No. 4490000
Fax. No.4490070
•
Qatar Islamic Bank
Qatar
Islamic Bank
P.O. Box: 559
Doha, Qatar
Tel. No. 4409548
Fax. No. 4412700
•
Doha Bank
Doha
Bank
P. O. Box: 3818
Doha, Qatar
Tel. No. 4456600
Fax. No.4416631
•
Bank Saderat
Bank
Saderat Iran
P.O. Box: 2256
Doha, Qatar
Tel. No. 4414646
Fax. No. 4430121
•
Arab Bank
Arab
Bank
P. O. Box: 172
Doha, Qatar
Tel. No. 4387777
Fax. No. 4410774
•
Ahli Bank
P. O. Box: 2309
Doha, Qatar
Tel. No. 4232411/ 4232222
53
Al Madar Contracting O.P.C
LIST OF MAJOR PROJECTS
LIST OF MAJOR PROJECTS
Al Madar Contracting O.P.C
COMPLETED PROJECTS Al Madar Main Office Building in Hilal
Project Description:
Construction
and
Maintenance
B+G+1+P of an office building with all
complete finishing works.
Client: Al Madar Real State
Consultant: German Design Group
Project Duration:12 months
Contract Value: QR 7 Million
55
Al Madar Contracting O.P.C
Woqod
d Office Tower ff
4B+G+M+30F in West Bay
Project Description: Construction of
Office tower with all complete finishing
works, substation and electro‐mechanical
installation landscaping etc.
Client: WOQOD
Client: WOQOD
Consultant: Romatre Project S.R.L
Project Duration: 23 months
Contract Value : QR 230 million
Al Noor Tower 2B+G+24F
Project Description: Construction of an office
tower
with all complete finishing works
substation and electro‐mechanical installation
etc.
Cli t Al M d Real Estate
Client: Al Madar
R lE t t
Consultant: Arab Engineering Bureau (AEB) Project Duration: 24 months
Contract Value: QR 122 Million
56
Al Madar Contracting O.P.C
Dunes Hotel Tower 2B+G+21F Project Description: Construction of Five Stars Dunes Hotel in West Bay
Client :Sheikh Fahad Al Thani
Consultant: Adil Jaidah, MZ& Partners Project Duration: 24 months Contract Value: QR 78 Million
One One Four in Old Salata
Project Description: Construction of
3B+G+14+Penthouse office building with
all completed works, substation and
electro‐mechanical installation etc.
Cli t QNB
Client :QNB
Consultant: Design and Consult Bureau
Project Duration: 20 months
Contract Value: QR 60 Million
57
Al Madar Contracting O.P.C
Office Building Construction
g
B+G+4F in Messaeed
Project Description: Construction of office building with all complete finishing works, substation and electro‐mechanical installation etc.
Client :QAFCO
Consultant: United Consultants
Project Duration: 16 months
Contract Value: QR 50 Million
58
Al Madar Contracting O.P.C
Four Stars Hotel B+G+M+12
in Old Salata
in Old Salata
Project Description: Construction of the Hotel
building with all complete finishing works,
substation and electro‐mechanical installation etc.
Client :Al Madar Real Estate Consultant: AAG
Project Duration: 16 months
Contract Value: QR 60 Million
Bilal Residential Building in Al Asmakh
2+G+10F
Project Description: Construction of an apartment
building with all complete finishing works,
substation and electro‐mechanical installation etc.
Client: Ahmed Hassan Bilal/ Est
Client: Ahmed Hassan Bilal/ Est
Consultant: GHD
Project Duration: 16 months
Contract Value: QR 29 Million
59
Al Madar Contracting O.P.C
Dialysis Center bldg G+2 in HMC Project Description:
Construction of Dialysis Center of
Sheikh Fahad Bin Jassem with all
complete finishing works,
works landscaping,
landscaping
substation and external works.
Client: Q‐TEL/HMC
Consultant: United Consultant
Project Duration: 12 Month Contract Value: QR 43 Million
60
Al Madar Contracting O.P.C
Al Khor
l h Hospital Medical Training l
d l
Center Project Description: Construction of
training center building with all complete
finishing works, pump room and electro‐
mechanical installation & landscaping etc.
Client: The Public works Authority Client:
The Public works Authority
(ASHGHAL)
Consultant: ACE
Project Duration:17 months
Contract Value: QR 17 Million
Lusail Office Building
(G+1)
Project Description: Design &Construction of
office building with complete finishing&
services
installation
together
with
landscaping & ancillary structures
Client: Lusail Real Estate Development
Consultant: Parsons
Project Duration: 10 months
Project Duration: 10 months
Contract Value: QR 24 Million
61
Al Madar Contracting O.P.C
Admin Office Building & Car park for SCOJ in Industrial Area
SCOJ in Industrial Area
Project Description: Construction of an office
building with all complete finishing work
substation and electro‐mechanical installation etc.
Client: The Public works Authority(ASHGHAL)
Consultant: Arab Engineering Bureau(AEB)
Project Duration: 18 months
Contract Value: QR 15 Million
Scania Workshop in Industrial Area
Project Description Construction of a workshop
building with complete finishing service installation
together
g
with landscaping
p g & ancillaryy structures.
Client: Arabian Agencies Co
Consultant: Arab Engineering Bureau(AEB)
Project Duration: 10 months
Contract Value: QR 12 Million
62
Al Madar Contracting O.P.C
210 Nos (G+1) Villas, Club House& Amenities in Al Waab
Project Description: Design, Construction,
Completion and Maintenance of 210 nos Villas
with complete & finishing works.
Client: Al Asmakh Real Estate Co.
Consultant: Al Sadd Engg Consultant
Project Duration:18 months
Contract Value; QR63 Million
63
Al Madar Contracting O.P.C
Three Commercial Building in Old Airport Project Description:
Construct of 3 nos, office building &
substation with all complete finishing
works
and
electro‐mechanical
installation etc
Client: Al Madar Real State
Consultant: Petra Design
Project Duration: 12 months
Contract Value: QR 10 Million
Contract Value: QR 10 Million
Office Building in Ring Road 2B+G+2 Project Description: Construction of an
office building with all complete
finishing works substation and electro‐
mechanical installation etc
Client: APEX Trad & cont
Consultant: Al SADD
Project Duration: 18 months
Contract Value: QR 30 Million
64
Al Madar Contracting O.P.C
B+G+M+5 Office cum Commercial Building in Ring Road
Project Description:
Construction and Maintenance of an office cum
commercial building with central A/C system,
substation, parking area etc.
Client: Sheikh Fahad Al Thani
Consultant: Arab Engineering Bureau(AEB)
Project Duration:12 months
Contract Value: QR 8 Million
B+G+2 Office Building in Ring Road
Project Description: Construction &
Maintenance of an office building with
complete finishing& works.
Client: GRIDCO
Consultant: ASCO
Project Duration:14 months
Contract Value; QR 5 Million
65
Al Madar Contracting O.P.C
G+5 Building in Mansoura
Project Description:
Construction, Completion and Maintenance with complete finishing works. Client: Hitmi Ali Hitmi
Consultant: Qatar Design Consortium
Project Duration:12 months
Project Duration:12 months
Contract Value: QR 7 Million
B+G+2 Building in Ring Road
Project Description: Construction, j
p
,
Completion and Maintenance with complete finishing works. Client: Abdulah Salat
Consultant: Al Sadd Engineer Consultant
Project Duration: 12 months
Project Duration: 12 months
Contract Value: QR 5 Million
66
Al Madar Contracting O.P.C
Tow Commercial Villa in Hilal
Tow
Commercial Villa in Hilal
B+G+1 Project Description: Construction& Maintenance of an
office building with all complete
finishing works and electro‐mechanical
installation etc
Client: Al Madar Real Estate
Consultant: German Design
Project Duration: 12 months
Project Value: QR 7 Million
Refurbishment of AVM at Doha Bank
Project Description: Refurbishment works
completion of Maxi‐ AVM at Doha Bank‐ C Ring
Road Branch
Client: Doha Bank
C
Consultant: Adel Jaida/ Associates
lt t Ad l J id / A
i t
Project Duration: 6 months
Project Value: QR 6 Million
67
Al Madar Contracting O.P.C
10 Villas in Rawda
ll
d
Project Description: Construction of 10 nos
G+1 villas with complete finishing& services
installation together with landscaping&
boundary wall.
Client: Al Madar Real State
Consultant: German Design Group
Project Duration:13 months
Contract Value; QR 12 Million
33 Villas in Nuaija
Project Description: Construction &
Maintenance of 33 nos, G+1 villas with all
complete finishing works
Client: Al Madar Real State
Consultant: German Design Group
Project Duration:12 months
Contract Value; QR 15 Million
68
Al Madar Contracting O.P.C
Residential Building in Muntazah B+G+4 Project Description:
Construction of 2 nos. residential
buildings with all complete finishing
works
substation
and
electro‐
mechanical installation etc
Client: Sheikh Saoud Mohamed Al Thani
Consultant: Design and Consultant Bureau(DCB)
Project Duration: 16 months
Contract Value: QR 40 Million
69
Al Madar Contracting O.P.C
B+G+7 Building in Old Salata
Project
Description:
Construction,
Completion and Maintenance
with
complete finishing works.
Client: Al Ahad Contracting
Consultant: Consulting Engineering Group
Project Duration:16 months
Contract Value; QR 8 Million
Resid Building G+5 in Bin Mahmoud
Project
Description:
Construction
&
Maintenance of an apartment building with all
complete finishing works and electro‐
mechanical
h i l installation
i t ll ti etc
t
Client: Arab Engg. Office
Consultant: Consulting Engineering Group(CEG)
Project Duration: 13months
Contract Value: QR 5 Million
70
Al Madar Contracting O.P.C
B+G+5 Resid Building in Al Mirkab
Project Description: Construction & Maintenance with all complete finishing works
Client: Al Asmakh Real Estate
Consultant: German Design Group
Project Duration:16 months
Contract Value; QR 8 Million
G+5 Apartment in Najma
Project
Description:
Construction
&
M i t
Maintenance
off an apartment
t
t building
b ildi with
ith allll
complete finishing works.
Consultant: Arab Engg Office
Project Duration:13 months
Contract Value; QR 5 Million
71
Al Madar Contracting O.P.C
Secondary School for Boys in West Bayy
Project Description:
Construction, and Maintenance of G+1 School building with guard, gardener room, pump room, sports areas, parking area with precast boundary wall etc.. Client: Public Works Authority(ASHGHAL)
Consultant: CICO
Project Duration:10 months
Contract Value; QR 17 Million
Preparatory School for Boys in Azgawa
Project Description: Construction and Maintenance of G+1 School building with complete finishing works Client: Public Works Authority (ASHGHAL)
Consultant: Consulting Engineering Group
Project Duration:14 months
Contract Value; QR 20 Million
72
Al Madar Contracting O.P.C
Dahl Al Hammam
hl l
Public Park
bl
k
Project
Description:
Construction
&
Maintenance with all complete finishing works
Client: Public Works Authority(ASHGHAL)
Consultant: OJQEC
Project Duration:20 months
Contract Value; QR 18 Million
73
Al Madar Contracting O.P.C
Sewerage Project in Al Wakrah& Wukair
Project Description:
Construction and Maintenance of sewerage system with all sewer pipes laying, manholes, pumping station& house connection works etc.
Client: Public Works Authority(ASHGHAL)
Consultant: CICO
Project Duration:10 months
Project Duration:10 months
Contract Value; QR 12 Million
Factory cum Store with Labor Camp building Project Description:
Construction, and Maintenance of factory
cum store building with steel roof
structure, substation& electro‐ mechanical
works etc.
Client: Al Madar Real State
Consultant: German Design Group
Project Duration:24 months
Project Duration:24 months
Contract Value; QR 10 Million
74
Al Madar Contracting O.P.C
ONGOING PROJECTS Markaz Al Mana in Najma 2B+G+M+7F
Project Description: Construction, Completion and Maintenance of the building.
Client: Al Mana Trading
Consultant: Semac Qatar
Project Duration: 18 months
Contract Value: QR 66 Million
Progress: 15%
75
Al Madar Contracting O.P.C
PALM CITY COMMERCIAL COMPLEX AT SALWA ROAD (2B+G+2F)
Project Description:
Construction, completion of civil, steel structure, finishing and MEP Works, in
addition to commissioning and handing over the project.
Client: M/s. Al Mana Real Estate.
Consultant: Not yet appointed
Built-Up Area: SQM 12,750
Value: QR 38, 260,000
Project Duration: 15 months + 15 Day Mobilization.
Commencement Date : 1st September 2013
76
Al Madar Contracting O.P.C
55 Villas Complex in Luqta
Rayyan G+1
Project Description: Construction of 55 nos G+1 villas
Project Description compound with
complete
finishing
&
service
installation together with club house,
landscaping &boundary wall
Client : Al Mana Real State
Consultant: Al Sariya Engg
Project Duration: 18 months
Contract Value: QR 63 Million
Progress: 90% completion
Security Complex in Wakrah
Project Description:
Construction of an office building
with all complete finishing and
electro‐mechanical
installation
works, substation, landscaping and
other ancillary building etc
Client: MOI
Consultant CEG International
Contract Value: QR 82 Million
Progress: 25 % completion
Progress: 25 % completion
77
Al Madar Contracting O.P.C
Al Banush Club in Mesaeed
Project Description: Construction of a new
sport complex building along with
renovation of club house with all complete
finishing works and electro‐mechanical
installation substation & landscaping etc
Client : QAFCO
Consultant: Al Manaa Design Consultant International (ADCI)
Project Duration: 30 months
Contract Value: QR 70 Million Progress: 95% completion
78
Al Madar Contracting O.P.C
Health Center and Laundry Block in MIC
in MIC
Project Description: Construction of the hotel building with all complete finishing works, substation and electro‐
mechanical installation etc.
Client: Al AQARIA/QP
Consultant: CEG International
Project Duration: 12 Months
Contract Value: QR11 Million
Progress: 40%
Juma Masjed and Sport Facilities
Project Description:
Construction
Completion
and
Maintenance of Juma Masjed and
Sport Facilities in Dukhan
Client: Al AQARIA/QP
Consultant: Iproplan Planners Co.
Project Duration: 15 Months
Contract Value: QR 13 Million
l
ll
Progress: 10%
79
Al Madar Contracting O.P.C
2 Villas at the Pearl Project Description:
Construction,
Completion
and
Maintenance with complete finishing
works.
Client: Ali Mashadi & Haidar Mashadi
Consultant: German Design Group
Project Duration: 24 months
Contract Value: QR 15 Million
80
Al Madar Contracting O.P.C
SELECTED PROJECTS QATAR
The following is a cross‐section
cross section of the projects completed in Qatar which illustrates Al‐
Al
Madar’s capacity in the various fields of engineering & construction that the company
is engaged in:
S.n.
1
2
3
4
5
Project Title
Project Description
COMPLETED PROJECTS:
210 Nos. G+1 Design,
Construction
&
Villas, Club House maintenance of 210 nos. villas
& Amenities at Al‐ compound with a club house,
Waab
substation, guard & store room,
electro‐mechanical
installation,
l d
landscaping
i works
k etc.
t
4B+G+M+30 Construction of an office tower
WOQOD Office with all complete finishing works
Tower in West Bay substation and electro‐ mechanical
installation & landscaping etc.
B+G+4 Office Construction of office building with
all complete finishing works,
Building for QAFCO
substation and electro‐mechanical
electro mechanical
installation etc.
Dahl Al‐Hammam Construction & maintenance of
Public Park
ancillary buildings, office bldg,
amphitheatre, skating rings/ramp,
sports ground, lawn areas, trees
plantation, footpath, parking area
of asphalt works along with
electrical, plumbing, drainage &
irrigation system installation etc.
Secondary School Construction & maintenance of G+1
for Boys at school building with substation,
guard and gardener room, pump
room, sports areas, parking area,
with precast boundary wall.
Client/Consult. Project Durat.
Contract Value
(
(QR.)
)
Al‐Asmakh
Cont./ Al‐Sadd
Engg. 18 63 Million
Consultant
months
QATAR WOQOD
/ROMATRE
QAFCO/United Consultants
17 230 Million
months
16 50 Million
months
ASGHAL‐Public Works Authority / 20 18 Million
OJQEC
months
ASGHAL‐Public Works 10 Authority / months 17 Million
CICO
81
Al Madar Contracting O.P.C
S.n.
6
7
8
9
10
11
12
13
Project Title
Project Description
Construction & maintenance of
Preparatory School for Girls h lf
l G+1
school
h l
b ld
building
with
h
at Umm Salal
substation, guard and gardener
room, pump room, sports areas,
parking area, with precast
boundary wall etc.
Elementary Construction & maintenance of
School for Girls G+1
school
building
with
at Al‐Khor
t Al Kh
substation,
b t ti
guard
d and
d gardener
d
room, pump room, sports areas,
parking area,
Wakrah & Construction & maintenance of a
Wukair sewerage system with all sewer
Sewerage pipes laying, manholes, pumping
Project
station & house connection works
etc
etc.
B+G+M+5 Construction & maintenance of
Office cum at an office cum commercial
building with central A/C system,
substation, parking area etc.
B+G+7 Construction & maintenance of
an apartment building with all
Residential Building at
Building at complete finishing works and
Salata
electro‐mechanical
installation
etc.
B+G+5 Construction & maintenance of
Residential an apartment building with all
Building at complete finishing works and
Mughelina
electro‐mechanical
installation
etc.
B+G+5 Construction & maintenance of a
Residential twin apartment buildings with all
Buildings‐ 2 complete finishing works and
Nos. with Club electro‐mechanical
installation
House at together with swimming pool,
Mansoura
club house, multipurpose Hall &
Al Noor Tower Construction of an office tower
2B+G+24F, with all complete finishing works
Doha, West Bay substation
and
electro‐
mechanical installation etc.
Client/Consult Project Contract Duratio
Value
n
(QR.)
ASGHAL‐Public k
10 18 Works Authority / months Million
CICO
ASGHAL‐Public 10 Works months
A th it /
Authority / CICO
18 Million
ASGHAL‐
Drainage 18 12 Affairs / months Million
Maunsell
Engineering
Sheikh Fahad / AEB
12 8 Million
months
Al‐Ahad Cont/ CEG
Al‐Madar Real Estate/ GDG
Al‐Mubarak Ivest./ AASCO
Al Madar Real Estate
16 8 Million
months
16 9 Million
months
16 months
10 Million
24 months
122 Million
82
Al Madar Contracting O.P.C
S.n
.
Project Title
Project Description
13 G+5 Apartment Construction & maintenance of an
Building at Najma apartment building with all
complete finishing works and
electro‐mechanical installation etc.
14 B+G+6 Apartment Construction & maintenance of an
Building at Najma apartment building with all
complete finishing works and
electro‐mechanical installation etc.
15 B+G+2 Office Construction & maintenance of an
Building at office building with all complete
finishing works and electro‐
mechanical installation etc.
16 G+2 Office Construction & maintenance of an
building for g
office buildingg with all complete
p
Search & Follow‐ finishing works and electro‐
up Department
mechanical installation, substation
& landscaping works etc.
17 Factory cum Store With Labor Camp building at Sanaiya
18
B+G+5 Apartment Building at Mansoura
Client/Consult. Project Contract time
Value
(QR.)
Arab Engg. Office
Al‐Ittefaq Consulting
GRIDCO / ASCO
Ministry of Interior
13 months
5 Million
12 months
8 Million
14 months
5 Million
18 months
8 Million
Construction & maintenance of a Al‐Madar / factory cum store building with German Design
24 10 Million
steel roof structure, substation &
months
electro mechanical works etc.
electro‐mechanical
etc
CEG
Construction & maintenance of an
14 8 Million
apartment building with all
months
complete finishing works and
electro‐mechanical installation etc.
19
Al Hit i / QDC
Al‐Hitmi
/ QDC
G+5 at Mansoura Construction & maintenance of an
office building with all complete
finishing works and electro‐
mechanical installation etc.
20 B+G+2 Office Building at
Building at 14 months
Construction & maintenance of an Abdullah Salat/ office building with all complete Al‐Sadd Engg. Engg
12
12 months
finishing works and electro‐ consultant
mechanical installation etc.
7 Million
5 Million
5 Million
83
Al Madar Contracting O.P.C
S.n
.
Project Title
Project Description
Client/Consult. Project time
21 QP‐LPG Bottling at Construction of an admin building QP / DOPET
New Industrial for DOPET together with ancillary
Area
structures like canteen block, gate
house, store room etc.
7 months
Contract Value
(QR.)
8 Million
22 10 Villas at Al‐
Rawda
Construction of 10 nos. G+1 villas Al‐Madar / with complete finishing & services GDG
i t ll ti
installation
t th
together
with
ith
landscaping & boundary wall
13 12 Million
months
th
23 G+M+1 Commercial Building at Salwa
Raod
Construction & maintenance of a Consulting commercial building with all Engg Group
complete finishing works and
electro‐mechanical installation etc.
12 months
24 Modification
Modification & &
refurbishment works at various Branches of Doha Bank
Construction & maintenance of
modification and refurbishment
works at various branches of DOHA
BANK‐ C Ring Road Branch, Old DOHA BANK
Airport Branch, Kahrabah Branch,
Kharatiyat Branch, Musherib Branch
8 18 Million
months
25 33
33 Nos. G+1 Villas Nos G+1 Villas Construction & maintenance of 33
at Nuaija
nos. G+1 villas with complete Al‐Madar / finishing & services installation GDG
together with landscaping &
boundary wall
26 Refurbishment of Refurbishment works completion of
AVM at Branch
Maxi‐ AVM at Doha Bank‐ C Ring DOHA BANK
Road Branch
6 months
27 BANK‐Islamic Branch at 6 months
Construction & maintenance of
G+M Building with all complete DOHA BANK
finishing works and installation of
MEPD works
6 Million
12 15 Million
months
6 Million
5 Million
84
Al Madar Contracting O.P.C
S.n
Project Title
Project Description
Client/Consult. Project time
Contract Value
(QR.)
28 (3) Villa Compound‐76 Nos. Villas at Al‐
Waab
Construction of 76 nos. G+1 villas, Al‐Asmakh club house, substation, guard room, Cont./ GHD
tennis court, boundary wall,
external services, road works,
landscaping works etc.
29 26 Nos. G+1 Villas & Club House & Swimming Pool
Construction of 26 nos. G+1 villas & Al‐Madar / club house with complete finishing GDG
& services installation together with
landscaping, pump room, guard
room & boundary wall works etc.
30 49 Villas Compound at Al‐
Waab
Construction of 76 nos. G+1 villas, Al‐Asmakh Real club house, substation, guard room, Estate/ GHD
16 26 Million
tennis court,
court
boundary wall,
wall
months
external services, road works,
landscaping works etc.
31 B+G+5 Resid. Building at Al‐
Mirkab
Construction of an apartment
building with all complete finishing
works substation and electro‐
mechanical installation etc.
Construction of an apartment
building with all complete finishing
works substation and electro‐
mechanical installation etc.
Construction of an apartment
building with all complete finishing
works substation and electro‐
mechanical installation etc.
Construction of an apartment
building with all complete finishing
works substation and electro‐
mechanical installation etc
Al‐Asmakh Real Estate/ GDG
Construction of a residential
building with all complete finishing
works, substation and electro‐
mechanical installation etc.
Sheikh Fahad bin Qasim Al
bin Qasim Al‐
Thani / United Consultant
32 B+G+4 Bilal Complex at Al‐
Sadd
33 B+G+7+ at Muntazah
34 B+G+7+ at Najma
35 G+6 Residential Building at Bin
Building at Bin Mahmoud
Ahmad Hassan Bilal Est. / GHD
16 33 Million
months
10 months
16 months
8 Million
8 Million
16 29 Million
months
Ali Saeed Al‐
Owair / AL‐
SADD ENGG.
14 12 Million
months
Ali Saeed Al‐
Owair / AL‐
SADD ENGG.
14 months
8 Million
18 18
10 Million
10 Million
months
85
Al Madar Contracting O.P.C
S.n.
36
37
38
39
40
41
42
43
44
Project Title
Project Description
Client/Consult. Project time
for Qtel
for
Qtel at Wadi
at Wadi
Sail
Construction
completion
& QTEL/ ADCI
QTEL/ ADCI
maintenance of OSS Buildings‐NOc
& MATS and Substation inclusive of
all refurbishment and finishing
work.
G+1 SSB Clinic at Bin Omran
Compound
Construction of G+1 clinical
building with complete finishing &
services installation together with
landscaping & boundary wall
General & Health Services Building for Umm Salal Municipality
Construction of a office building ASHGHAL/ AEB
with complete finishing & services
12 installation
together
with
months
landscaping & ancillary structures.
Construction of training center
buildingg with all complete
p
finishingg
works pump room and electro
mechanical
installation
landscaping.
Scania WorkShop Construction of a workshop
in Industrial Area building with complete finishing&
services installation together with
landscaping& ancillary structures.
Al Khor Hospital g
Medical Training Center
Design& Build G+1 D
i & B ild G+1 D
Design&
i & Construction
C t ti
off a office
ffi
Lusail Office building with complete finishing&
Building
service installation together with
landscaping& ancillary structures.
12 months
Ministry of 10 Interior/ State Security
Security months
Bureau
Contract Value
(QR.)
21 Million
5 Million
8 Million
ASHGHAL/ACE
Arabian a=Agencies/ CO./ AEB
17 months
17 Million
10 months
12 Million
L il R l
Lusail Real Estate 10 Development/ months
Parsons
24 Million
Admin Office Building Car Park for SCOJ in Industrial Area
Construction of an office building ASHGHAL/AEB
with all complete and finishing
works
18 months 15 Million
B+G+2+P Office Building‐3 Nos at Ring Road
Construction of an office building Al Madar Real with all complete and finishing State/ GDG
works
12 months
10 Million
Preparatory Construction & maintenance of ASGHAL‐Public School for Boys at G+1 school building having Works 14 Azgawa
Assembly Hall & multipurpose Hall Authority/ CEG months
with space frames, substation,
guard and gardener room, pump
room, sports areas, parking area,
with precast boundary wall etc.
20 Million
86
Al Madar Contracting O.P.C
S.n Project Title
.
Project Description
Client/ Consultant
45 2B+G+21 Construction of an office building Shaikh Fahad Apartment in West with all complete and finishing works Bin Qasim Al Bay
Thani/ United Consultant
Project Contract time Value (QR)
18 months
10 Million
18 months
30 Million
16 months
60 Million
20 months
60 Million
12
12 months
21Million
14 months
18 Million
51 G+2 Dialysis center Construction of medical building Q‐TEL
b ildi
building at HMC
with
i h allll complete
l
fi i hi
finishing
works,
k /HMC/UNITED /
/
landscaping, substation and external Consultant
works.
12 months
43 Million
illi
52 B+G+4 Residential Construction of 2 nos. residential Sheikh Saoud/ Building in buildings with all complete finishing Mohammed Al Muntaza
works substation and electro‐ Thani/DCB
mechanical installation etc.
16 months
40 Million
53 2+G+10 Bilal Studio Construction of an apartment Ahmed Hassan in Al Asmakh
building with all complete finishing Bilal Est. GHD
works substation and electro‐
mechanical installation etc
16 months
29 Million
55 G+5 Resid Building Construction, maintenance of an Arab Engg. in Bin mahmoud
apartment building with all complete Office
finishing
works
and
electro‐
mechanical
h i l installation
i t ll ti etc.
t
13 months
5 Million
56 B+G+1+P Office Building in Al Hilal
12 months
46 2B+G+2 Office Building at C Ring Road
47 B+G+M+12 HOTEL Building IN Old Salata
48 3B+G+14 Office Building in Old Salata
49 OSS Building for Qtel in Wadi Sail
Qtel in Wadi Sail
50 G+1 Villas 20 Nos at Ain Khaled
Construction of an office building Apex Trad& with all complete and finishing works Cont/ Al SADD
Construction of an office building Al Madar/AAG
with all complete and finishing works
Construction of an office building QNB/DCB
with all complete and finishing works
Construction,
Completion& QTEL/ADCI
Maintenance of OSS building‐
building
NOC&MATS and Substation inclusive
of all refurbishment and finishing
works.
Construction of an office building Al Madar/GDG
with all complete and finishing works
Construction of an office building Al Madar/ with all complete and finishing works German Design
7 Million
87
Al Madar Contracting O.P.C
LETTERS OF LETTERS
OF
RECOMMANDATION & COMPLETION CERTIFICATES
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C
Al Madar Contracting O.P.C