ELECTROLUX MAJOR APPLIANCES THE GLOBAL SUPPLIER QUALITY ASSURANCE SYSTEM GSQA POLICY and DEFINITIONS EL 29000 Edition 2007 Revision A GSQA EL29000 - 2007 1 AB ELECTROLUX VISION AB Electrolux will be the world leader in our products, which make everyday life more comfortable, easy and safe. We will provide products, services and marketing of such excellent value, that customers will actively choose to do business with us. From this we will create shareholder value. To reach our goals in providing value to customers and shareholders, we will continue to develop an AB Electrolux culture, built on the strengths of the multi-cultural organisation, and embraced by all our team members. Key values are co-operation, people development, environmental concerns, professionalism and speed. AB ELECTROLUX VALUES Co-operation Trusting Open-Non-productive Borderless-International Responsible Externally Oriented Professionalism Intellectually Sound Advanced-Simple Result Oriented GSQA EL29000 - 2007 People Development Respect and Encourage Diversity* Team Members* Equal Opportunities Environmental Concern Lifecycle Analysis Strategic-Proactive Speed Communicative Nonbureaucratic-Disciplined Willingness to Change 2 AB ELECTROLUX ENVIRONMENT POLICY Become a leader and driver in environmentally sound products and processes and to: Actively develop demand through the use of environmentally sound products. The responsibility of all business units includes: Complying with current legislation/regulations Planning for changes in legislation/regulations Analysis of environmental consequences of new products/production technology and capital expenditure Continuous reduction in the use of energy, chemicals and raw materials Communication of environmental progress to best commercial advantage To be correct and open on all environmental matters Purchasing Policy Mission To be world class in managing external resources. Objectives Engage pro-active suppliers who will contribute to: Generating innovation. Shortening the time to market. Reducing total product cost. Improve product quality. Optimise performance / cost ratio. GSQA EL29000 - 2007 3 Preface Purchased materials/components constitute a major proportion of the content of products manufactured by AB Electrolux, and, consequently, the quality of these materials/components is of utmost importance for the overall quality of our products. AB Electrolux is committed to put fault-free products on the market. This will be the combined result of good specifications, standardisation, supplier consolidation and supplier certification. AB Electrolux shall therefore be very careful in selecting suppliers, using only those that can demonstrate the full commitment and ability to comply with our requirements. The basic Supplier Quality Assurance objectives are to assist Purchasing to: (a) realise the greater combined purchasing opportunity of working through the entire AB Electrolux organisation, (b) achieve the optimised supplier base, and (c) consequently create the most effective network of alliances with the best suppliers in the industry. The Global Supplier Quality Assurance System (GSQA) is documented in a series of procedures and manuals .The purpose of this document, is to communicate to current and potential suppliers, the structure and contents of AB Electrolux Global Supplier Quality Assurance System. This release allies GSQA with the new AB Electrolux Purchasing Process. Signed Francois Van Caeyzeele Senior Vice President Purchasing AB Electrolux GSQA EL29000 - 2007 Dated Sture Ögren Senior Vice President Quality AB Electrolux Hans Stråberg President and CEO AB Electrolux 4 Contents. 1. Introduction 1.1 Global Organisation 1.2 Purchasing Strategy 1.3 The Purchasing Process 1.4 Reference documents 2 Global Supplier Quality Assurance Policy The Global SQA Policy consists of the following parts - Purchasing Documents, Assesment and Monitoring, Classification of Suppliers, Supplier Selection, Supplier Quality activities and Supplier Responsibility. 2.1 Purchasing Documents 2.1.1 Purchasing Documentation and Commercial Agreements 2.1.1.1 Purchase Contract 2.1.1.2 Purchase Order 2.1.1.3 Special Agreements 2.1.2 Product Specifications 2.1.3 Change Notifications 2.2 Assessment and Monitoring 2.2.1 The process of Assessment and Monitoring 2.2.2 Supplier Profile Questionnaire (EL29001) 2.2.3 Supplier Management Systems Assessment (EL29002) 2.2.4 Supplier Process Audit Questionnaire (EL29002A) 2.2.5 Supplier Preproduction Quality Assurance (EL29003) 2.2.6 Supplier/Commodity Quality Statusing Process (EL29005) 2.2.7 Supplier/Commodity Purchasing Statusing Implications Incl. On Hold Process (EL29005A) 2.2.8 Supplier Self Certification requirements (EL29006) 2.2.9 Supplier Ongoing Evaluation (EL3000) 2.3 2.4 2.5 2.6 3 Classification of Suppliers Supplier Selection Supplier Quality Activities Supplier Responsibility 2.6.1 General 2.6.2 Product Liability 2.6.3 Quality Targets Glossary GSQA EL29000 - 2007 5 GLOBAL SQA POLICY 1.0 Introduction 1.1 Global Organisation AB Electrolux - The Global Appliance Company Electrolux is the world's leading appliance manufacturer. This includes Consumer durables such as refrigerators, washing machines, and vacuum cleaners, as well as gardening and forestry equipment such as lawn mowers, garden tractors and chainsaws. It also includes Commercial appliances for professional cooking, refrigeration and washing. Within the Corporate Group there are about 50 Product Divisions, spread all over the world. AB Electrolux consists of such companies as - AEG, Frigidaire and Zanussi, to name just a few. 1.2 Purchasing Strategy Corporate Purchasing and Supply Strategy is based on a global market outlook, and a long term, just in time, zero defect and cost oriented co-operation with global suppliers. Supplier selection will be strategic in that some will be global, some will be regional, some will be product type dependent, and others may be local. This will depend on many factors which will be assessed by the Group Purchasing Council. The objective, however, is to limit our supply base to a manageable few that can meet our expectations, rather than to focus on special quantity targets for suppliers or commodities. The intention is to reserve a major part of the total purchasing value for our Preferred suppliers, and that all suppliers are either Preferred or Active suppliers. (See Classification of Suppliers) 1.3 The Purchasing Process The purchasing Process is a documented process which contains a number of different procedures and tools to give support in the buying decisions. The results given by the GSQA Process is a vital input into the Purchasing Process. GSQA EL29000 - 2007 6 1.3 Reference Documents ISO9001:2000, ISO/TS16949, QS-9000 or equivalent - Quality Systems ISO9000:2005 - Quality Management Systems --- Fundamentals and Vocabulary The Global SQA is defined through the following documents: EL29000 EL29001 EL29002A EL29002P EL29003 EL29005 EL29005A EL29006 EL3000 GSQA Policy and Definitions Supplier Profile Questionnaire Supplier Process Audit Questionnaire Preliminary Supplier Process Audit Questionnaire Supplier Pre-Production Quality Assurance Supplier/Commodity Quality Statusing Process Supplier/Commodity Purchasing Status Incl. On Hold Process - Supplier Self Certification Requirements - Supplier Requirements relating to Ongoing Supply and Evaluation All these documents can be accessed in the following web site http://www.electrolux.com/node322.aspx These documents are supported by: The Integrated Product Development Process The Purchasing Process Procedures and Tools GSQA EL29000 - 2007 7 2.0 Global Supplier Quality Assurance Policy The Global SQA Policy consists of four parts; 1. 2. 3. 4. Purchasing Documents The Assessment and Monitoring Process Classification of Suppliers Supplier Responsibility 2.1 Purchasing Documents 2.1.1 Purchasing Documentation & Commercial Agreements All Purchasing & Commercial Agreements shall be written in English. A translation into a domestic language is optional. 2.1.1.1 Purchase Contract Purchase Contracts and Quality Agreements shall be established for all major components and raw material, through a standard format. The intention is to have a long term agreement for matters of lasting durability, and with separate enclosures of details that may have to be changed or re-negotiated at closer intervals. These appendices can be: Technical specifications Schedule for timing of purchases and forecasts Control plans and Quality Limits 2.1.1.2 Purchase Order While the Purchase Contract states the terms and conditions, the Purchase Order shall be a firm written order, comprising all relevant information necessary to effect delivery of the merchandise. It shall refer to price lists, drawings, specifications etc. 2.1.1.3 Special Agreements Special agreements shall be made for such matters as external product development, consulting etc. 2.1.2 Product Specifications The terms "Local" and "Common" Components are used frequently. Local Components are used only by one Product Division. Common Components are used by two or more Product Divisions. One Product Division is assigned Design Owner, this Product Division is responsible for the drawings and all design changes of the Common Component. All components should have the customer Part Number clearly assigned. 2.1.3 Change Notifications Suppliers will be notified of any relevant changes to the product which they supply, by an Electrolux Engineering Change Notice. This may or may not change the Revision Level of the associated Specification. Suppliers are expected to review and control this information, and ensure the product is updated in line with this. GSQA EL29000 - 2007 8 2.2 Assessment and Monitoring 2.2.1 The Assessment and Monitoring Process The Assessment and Monitoring Process consists of a number of different procedures starting with the gathering of Supplier Information through to the Self Certification of a well performing supplier, see table below. The procedures are documented in the EL files which serves both as a description of the procedures of Assessment and Monitoring, as well as defining the Electrolux Supplier Quality Assurance Requirements. Approved Approved Approved Recommended Compatible Preferred Supplier EL 29006 Ongoing Evaluation EL3000 Quality Statusing EL29005 Process Audit EL 29002A Failed On Hold EL 29005A Q.A. Planning EL 29003 Preliminary Process Audit EL29002P Supplier Profile EL 29001 GSQA Policy and definitions EL29000 Suppliers Statusing System EL 29005 An unknown potential supplier Planning for production start up Time Production start up Below you will find a short description of the different procedures. GSQA EL29000 - 2007 9 2.2.2 Supplier Profile Questionnaire (EL 29001) The Supplier Profile questionnaire is a document which assists in the gathering of general business information about a supplier. Additionally, it also addresses topics which are strategically important, such as: Business Philosophy Long Range Strategy Environment and Communications. This in itself does not constitute a Supplier Profile as defined in the Purchasing Process but provides much of the information that makes up such a Supplier Profile. The details of any Suppliers Profile Questionnaire obtained is made available to all AB Electrolux Supply management personnel. 2.2.3 Supplier Process Audit (EL29002A) Well structured Management Systems are essential to assure consistent quality. Each supplier must have a system for ensuring the quality of goods produced. This must provide the most suitable framework and instrument for guaranteeing that the product conforms to the specifications defined. AB Electrolux recognises Third Party Management System Accreditations such as ISO 9001:2000, TS 16949, QS 9000 and various others of a similar nature such as Other company accreditations and as such will not conduct Management system assessments, but will concentrate on Process Auditing i.e. concentrating on those processes specific to the parts being produced for Electrolux as opposed to the whole operation. Where a supplier is strategically important to AB Electrolux then the supplier can expect to be visited by either AB Electrolux Supplier Quality Assurance personnel or Agents appointed on their behalf to have such an assessment conducted. Under certain circumstances AB Electrolux can allow a supplier to do a Self Assessment using the above questionnaire. This however will not carry the same weight as any of the above. The results of an AB Electrolux or Self Assessment are committed to the above questionnaire format and suppliers are rated accordingly. The AB Electrolux assessment questionnaire is ISO 9001:2000 Quality system based, and covers all items which influence the suppliers ability to meet the Management System requirements. TS 16949, QS 9000 are regarded as equivalent to ISO 9001:2000 for the purposes of this assessment. The details of a Suppliers Management System Assessment status are made available to all AB Electrolux personnel associated with Supply management. The Supplier Process Audit is similar in format to the Management System Assessment but concentrates in more depth on the processes used to produce the parts involved. It can be regarded as a Partial System Assessment but in fact goes into much more detail in relation to all areas affecting the manufacturing process. Its main function is to ensure that the supplier is using capable processes to manufacture the parts to be delivered to AB Electrolux. GSQA EL29000 - 2007 10 2.2.4 Preliminary Supplier Process Audit (EL29002P) This is a shortened version of the procedure in section 2.2.3. This procedure can be used by Quality and/or Purchasing personnel to do a quick initial assessment of New Potential Suppliers to get a feel for the supplier process capabilities. 2.2.5 Supplier Preproduction Quality Assurance (EL29003 The final quality of a component or process is due, in great part, to the early planning, and analysis & testing done prior to switching on production. To avoid non-conformance as much as possible, accent is placed on the Pre-Production aspects relating to quality. Supplier Preproduction Quality involves the QA Project Planning sheet which is a document that allows for the planning of a part or component from conception, through development, manufacture, qualification and final delivery. Supplier involvement shall be initiated during the conceptual stage of product development. The expectation here is that each supplier utilise the various tools for Continuous Improvement which are described in EL29003, to assure process capability, product quality and reliability. 2.2.6 Supplier Ongoing Evaluation (EL3000) The evaluation of supplier would not be complete without appraisal of current and past performance data in relation to the suppliers quality. Suppliers shall therefore be continuously evaluated on such aspects as rejects from incoming inspection and assembly lines, field failures, punctuality of deliveries and degree of cooperation between purchaser and supplier. The results of this evaluation shall be sent to the supplier on a regular basis. Supplier Ongoing evaluation concentrates on the suppliers quality as seen Internally within our factories. The results of the Supplier Ongoing evaluations shall be provided to the supplier on a regular basis. Line rejected components and samples of parts replaced by customer field service, shall also be returned to the supplier whenever it is deemed to be necessary. These faulty or out of specification components carry a lot of information about the failures. They must be examined by the supplier in order to find the root causes of the failures. This must be followed by corrective actions which will eliminate the failures. 2.2.7 Supplier/Commodity Quality Statusing Process (EL29005) The suppliers performance re Management system and Ongoing Evaluation is scored and the results aggregated by PD, and if the supplier is used by more than one PD then the PD results are averaged. On the basis of this aggregated scoring the supplier is given a Q status, see table below. These scorings and classifications attained are an integral part of the process used to identify the most appropriate suppliers for the provision of materials and components. This is referred to as the Supplier Certification Process which is an important input into the Supplier Classification according to the Purchasing Process. GSQA EL29000 - 2007 11 Q Approved Supplier Green Q Limited Supplier Yellow Q Restricted Supplier Red Quality Supplier Classifications Suppliers who consistently achieve the expected levels of quality in all that they deliver to whichever of our PDs. This is the level we want all suppliers to attain. Suppliers who attain this are candidates for Supplier Self Certification. These suppliers generally are also Purchasing Preferred. Suppliers who having some problem with their quality or delivery which is affecting any one or more of our PDs. Suppliers in this category have to take action within a reasonable time period to improve their status to that of Q Approved or they may find themselves moved down to the Q restricted category. These suppliers are generally regarded as Purchasing Active. These suppliers are having major problems with either Quality or Delivery to one or more of our PDs. Suppliers in this category are effectively On Hold and have to take drastic action within a reasonable time to improve to their status to that of Q Limited or Q Approved. These suppliers are generally regarded as Purchasing Restricted (On Hold) and if improvement does not happen within a reasonable time frame then the suppliers are in danger of becoming Purchasing Disqualified. Beyond Q Approved suppliers we also recognise Q Self Certificated suppliers. See section 2.2.9 2.2.8 Supplier/Commodity Purchasing Status incl. On Hold process (EL 29005A) A supplier can be put ‘‘On Hold’’ if it fails to fulfill the Electrolux purchasing requirements. One important signal for taking the decision is a low score in the Supplier/Commodity Quality status. There are implications relating to whichever Purchasing supplier status is attained. For various, Purchasing - Commercial reasons, a supplier can ultimately have an entirely different Purchasing status from that indicated by the Q status. A Q Approved supplier/commodity could under certain circumstances be downgraded to either Purchasing - Active or even Restricted. A Q Limited supplier/commodity could under certain circumstances be upgraded to Purchasing Preferred or downgraded to Purchasing Restricted. A Q Restricted supplier/commodity could under certain circumstances be upgraded and regarded as either Purchasing - Preferred or Active. GSQA EL29000 - 2007 12 Supplier Self Certification System Requirements (EL29006) Suppliers who are statused Q Approved suppliers in the above process and who have consistently shown their ability to retain this status can become Self Certificated. AB Electrolux is able to award some suppliers a Self Certificated status on the condition they sign a Declaration of Conformity stating that they will voluntarily, without pressure from AB Electrolux, continue to take all steps necessary to ensure continued good quality parts. 2.3 Classification of Suppliers according to the Purchasing Process The classification of a supplier is decided by its ability to support the Electrolux Purchasing strategy. That means the ability to meet Electrolux targets concerning Quality, Delivery, Cost, Enviroment, Engineering etc. The classification is communicated internally and is used as a tool in supply sourcing. The five levels are described in the table below. Classification Preferred Supplier Active supplier Restricted Supplier (On Hold) Disqualified Supplier Potential Supplier GSQA EL29000 - 2007 Description This is the level that each supplier is expected eventually to achieve. Only suppliers who have made a commitment to meet all the customer expectations will achieve this classification. Preferred Suppliers are characterised by financial stability, a leadership position in Engineering, Quality, Cost and Delivery. Suppliers classified as "Preferred" will be given first consideration on all new business. It is our eventual goal to have all commodities and parts supplied by Preferred Suppliers. An Active supplier is used, if the Preferred suppliers cannot be used for specific reasons, as long as they fulfil AB Electrolux minimum requirements, e.g. are at least quality useable. This is for those suppliers who are participating in a project or negotiation, with the target of becoming a Preferred Supplier. Minimum expectation for this level, is the completion of Quality Plans for all parts being purchased. Suppliers in this category may be considered for new part development work. This category applies to suppliers who are having major problems either with quality or delivery or for some other reason. AB Electrolux will take steps to reduce the supply volume. Commitments will be limited in time. No new inquiries will be made and the supplier will not be involved in new projects. Any problem parts will be subjected to 100% inspection. If there is no improvement in an allotted time then the supplier could become disqualified. This supplier does not fulfil AB Electrolux minimum requirement. e.g. is Quality Restricted. They shall not receive any new business and the existing business will be phased out. This supplier is not currently an AB Electrolux supplier, but is regarded as having the potential to become a preferred or active supplier and it should therefore be supported by AB Electrolux. 13 2.4 Supplier Selection Supplier selection is based upon a Purchasing Review of various supplier criteria including such things as quality assurance measures as well as a competitive comparisons of price and cost. Thus a Supplier's Profile (See GRIP) needs to be reviewed prior to any supplier selection decision. This information will be reviewed to determine the most appropriate supplier for the specific commodity, component, or material involved. This will provide more security, minimise risks, and ensure that better decisions are made regarding supplier selection as well as fully documenting the suppliers situation. The supplier shall be advised of the result of any such Purchasing review. In accordance to this, the supplier may be expected to have to establish a Supplier Improvement plan. 2.5 Supplier Quality Activities AB Electrolux shall have a uniform handling of other quality matters, such as: Quality improvement activities and programmes Specific quality problems Quality target setting Quality assurance within joint product development projects. 2.6 Supplier Responsibility 2.6.1 General The supplier will be responsible for, and will ensure - that a batch that does not meet current quality requirements, will not be delivered; - that control plan documents will be drawn up for each article number; - that notified changes on drawings and in other information, are observed, so that the latest agreed edition of drawings and other documents are used; - that each division is notified immediately of any suspicion that the quality requirements are not met by a batch already delivered; - that routines are established for special handling of parts subject to safety requirements; - that notification is made of any plan which could impact the supplier product; - that there is a system in place which will control the quality of all sub-contractors and all sub-contracted purchased parts. All of the above are detailed in the various GSQA System documents. GSQA EL29000 - 2007 14 2.6.2 Product Liability All suppliers must take out and keep, such product liability insurance as may be necessary in view of the nature of the goods, their use, and the responsibility which is incumbent upon the supplier. 2.6.3 Quality Targets AB Electrolux is continuously running Quality Improvement and Cost Reduction programmes. In the long term co-operation concept, the supplier is expected to conduct corresponding programmes within quality, reliability, cost reduction and performance improvements. Quality Targets such as reject levels in incoming inspection, line rejects, field failures and delivery performance, shall be mutually agreed on a yearly basis for all major components. Actual performances shall regularly be measured and compared to the targets. The quality performance shall be used for the ongoing evaluation of the supplier, see EL3000 GSQA EL29000 - 2007 15 3.0 Glossary Audit / Assessment The structured activity of examining a system or process and related results, to assure adequacy to meet planned arrangements and whether these arrangements are implemented effectively and suitably to achieve objectives. Both terms can be interchanged. Batch quantity The collective quantity of a part/material which has been produced using nominally the same production setup of machine, material and operator. Commodity is used as an all-purpose general description for grouping and classification of specific materials and components. Common causes are sources of variation that are always present and are part of the natural (random) variation inherent in the process itself. Continuous improvements is meeting and exceeding customer needs and expectations on an ongoing basis, at a cost that represents value to the customer. Reducing variability, cost and waste through incremental improvements in existing processes, systems and products. Innovating new products and processes that out perform the old ones. Contract review Systematic activity carried out before initiating the procurement of a product from a supplier or subcontractor to assure that requirements for quality are adequately defined and can be realised by that supplier. Control Plan A document setting out the specific quality practices, resources and sequence of activities, and frequency thereof, relevant to a particular product, project or contract. Cm - Machine Process Potential - see Pp Cmk - Machine Process Capability - see Ppk Cp (Process Potential) (See also Pp ) is an index which compares the process spread with the width of the specification without regard to the location of the data. The process spread is taken to be six times the standard deviation. This can only be calculated after the process is in a state of statistical control. GSQA EL29000 - 2007 16 Cpk (Process Capability) (See also Ppk ) is an index which considers both process spread, and the proximity of the process spread to specification average and limits. This can only be calculated after the process is in a state of statistical control. The process capability target is Cpk 1.67 (6 Sigma). Critical characteristics Those product requirements (dimensions, specifications) or process parameters, which can affect the product function or reliability. Critical characteristics are identified with [ # ] on the Common Component drawings and/or specifications. Critical Process Characteristic Those characteristics (dimensions or process parameters), which will give early indications when a process is going out of control. There should only be 3 to 4 of these per part, as one dimension or parameter can control many others. These are normally defined as a result of FMEA analysis and Process Capability Studies, and should be defined in agreement with the supplier. Customer Refers to all AB Electrolux divisions (PDs) throughout this EL29000 series of documents, inclusive of AEG, Frigidaire, WCI, Zanussi, etc. Declaration of Compliance is where a supplier agrees to fulfil all the Pre-Production criteria as identified, and agrees to fulfil the Quality Targets imposed at that particular time. The supplier signifies agreement by signing the Declaration of Compliance document and supplies a Certificate of Conformity, as requested. Delivery Quantity A delivery quantity of a part made during one supplier visit to one of our factories. Design Input any input, received from any source, by the Design Group, which the Design Group convert into Drawings or Specifications. Design Output are typically the Drawings Product Specification, Test Specifications, Parts Lists etc. which Design generate as a result of input received. Design Verification the process of examining the result of a given activity to determine conformity with the stated requirement for that activity. Design Validation The process of examining a product to determine conformity with end users needs. GSQA EL29000 - 2007 17 EDI an acronym for Electronic Data Interchange. EDI is a system that allows the exchange of electronic data freely between computer systems. FMEA (Failure Mode and Effect Analysis) is an analytical technique which uses the potential failure modes and the causes to prioritise improvement activities. GRIP --- Globally Realised & Integrated Purchasing. The year 2000 Purchasing process. GSQA --- Global Supplier Quality Assurance IDCO - Material Identification Code (Commodity Code) an alpha-numerical code used to group components and materials into commodities. Initial Samples are small, statistically significant quantities (30-300) of products taken from a specific production run, made with production tooling, process data and cycle times. Initial samples are checked by the supplier for conformance to all the product requirements on the drawings, and/or specifications. Inventory Turns Number of times the manufacturing inventory is replaced (turned over) in a specific time Total Inventory Value held for last 12 months Inventory Value held for current month Letter of Understanding is a document stating the relationship between Customer and a supplier. Lot is a definitive quantity of a part or commodity which can be separated, and regarded as one unit. This could be due to the packaging used for example. Normally an Electrolux Lot consists of the quantity used during one production shift. Lot Reject a bulk quantity of material rejected due to a perceived percentage of defects, usually arrived at through epidemic failure or acceptance sampling. Management System / Quality System Terms are interchangeable. See "Quality System". Non-conforming material are products or lots which do not meet the specifications. GSQA EL29000 - 2007 18 Non-Verified Quality Material Material that has not yet received the required quality verification. Pilot an analysis of each critical new design or re-design of a component or system that occurs prior to production use. Engineering pilots are performed to review the fit and function of the components. Production pilots are preliminary production lots, manufactured by the customer to assess manufacturability of the finished commodity. PLUS Programme a financial programme involving improved terms of payment. PPM an acronym for Parts Per Million. Which can be used anywhere that % is currently used. Where % is consistently above 99%, then PPM is a better terminology to illustrate performance. PPM Defective a calculation as follows:(Total Defective Material) x 1 million Total Material Usage during same period. Pp - Preliminary Process Potential is an index similar to Cp, but based on data from early, short term studies of new processes. This was previously called Cm. - Machine Process Potential Ppk (Preliminary Process Capability) is an index similar to Cpk, but based on data from early, short-term studies of new processes. Data from at least thirty sub-groups minimum, ideally 50 are required for preliminary assessments. This can only be calculated after the process is in a state of statistical control. A Preliminary Process is considered Capable if Ppk is 2.00 (6 Sigma) This was previously called Cmk - Machine Process Capability. Prevention is a management system that improves quality, by using "Plan-Do-Check-Act" cycle to eliminate failure modes and causes of process instability. Prevention is consistent with a philosophy of continual improvement in quality and productivity. Process is a system of people, equipment, methods, materials and environment, that produces a product or service. A process implies the receipt of some input, action, and output such as creation of products, ideas, information or service. GSQA EL29000 - 2007 19 Process Change is any change in the process which could alter its capability to meet the design requirements or durability of the product. this includes new, different, relocated, or rehabilitated production machinery/equipment. Process change also includes change in the sequence of operations. Product is any part, component, assembly, or material provided by a supplier to a customer unit. Quality Assurance is an overall quality approach, including market surveys, design, manufacturing, service and field evaluations. Quality System the organisational structure, responsibilities, processes and resources needed to implement quality management. Receiving / Incoming Inspection review of raw materials or components prior to assembly or manufacture. Safety characteristics are those product requirements (dimensions, specifications, test) or process parameters which can affect the product safety, and which require specific monitoring action. Safety characteristics are identified on customer drawings and specifications. Segregation separation of material in such a manner that it cannot be inadvertently applied to a use for which it is not intended, or for which it has been identified as unacceptable. Servicing the activity related to supporting a component / product once it has been released to the customer. Special causes Special causes are sources of variation that are intermittent and unpredictable (e.g. broken tools, interruptions in power, changes in raw material). SPC (Statistical Process Control) is the use of statistical techniques to analyse a process or its output, in order to take appropriate action to achieve and maintain a state of statistical control, and to improve the capability of the process. GSQA EL29000 - 2007 20 Special Processes are those process where quality cannot be monitored immediately during the process, without compromising the quality of the product, and thus must be measured by alternative methods. SQA (Supplier Quality Assurance) is the activity for interface with suppliers on quality matters. Stable processes are those processes in which variations in output arise only from common causes. A process that is in statistical control is stable and predictable. Statistical control is the condition describing a process from which all special causes of variation have been eliminated, and only common causes remain. A synonym for statistical control is "stability" Sub-Contractor the organisation that provides a product, material or component, to the supplier. Supplier the organisation that provides a product, material, component or service to the customer. Supplier Assessment a method of evaluating the suitability of a new supplier, carried out before orders are placed. Also used to audit currently used suppliers. Technical Specifications are documents containing necessary information for suppliers to produce and evaluate parts. Such information is typically related to function, performance, life and reliability. Both test methods and required results are included. Traceability the ability to trace material from its current stage of manufacture. Most useful as a tool to track root cause of a condition, or to segregate material with a defect. Type Approval is a special approval for functional and safety components which must be tested for life and reliability in every application. Type approval is a pre-requisite for ordering safety related parts. GSQA EL29000 - 2007 21