Appendix D: Stormwater Management Analysis BAYVIEW DRIVE/BIG BAY POINT ROAD CLASS ENVIRONMENTAL ASSESSMENT City of Barrie Drainage and Stormwater Management Technical Memorandum DRAFT prepared by: C.C. Tatham & Associates Ltd. 41 King Street, Unit 4 Barrie, ON L4N 6B5 Tel: (705) 733-9037 Fax: (705) 733-1520 info@cctatham.com prepared for City of Barrie February 16, 2016 CCTA File 415357 TABLE OF CONTENTS 1 Introduction 1 1.1 Objectives 1 1.2 Guidelines & Background Reports 1 2 Existing Drainage Conditions 3 2.1 Existing Storm Drainage Infrastructure 3 2.1.1 Bayview Drive 3 2.1.2 Big Bay Point Road 3 2.2 Assessment of Existing Drainage Infrastructure 5 2.2.1 Hydrologic Analysis 5 2.2.2 Existing Storm Sewer Capacity 5 2.2.3 Capacity of Downstream Receivers 6 3 Future Drainage Conditions 7 3.1 Proposed Road Improvements 7 3.1.1 Big Bay Point Road 7 3.1.2 Bayview Drive 7 3.2 Design Criteria 7 3.3 Assessment of Proposed Drainage Infrastructure 8 3.3.1 Minor System – Storm Sewer 8 3.3.2 Major System – Overland Flow in ROW 8 3.4 Watercourse Crossing Replacement 9 4 Proposed SWM Plan 10 4.1 SWM Quantity Controls 10 4.1.1 Oversized Pipes 10 4.1.2 Previously Identified Future Retrofit Opportunities 11 4.2 SWM Quality Controls 12 4.2.1 Oil Grit Separators (OGS) 12 4.2.2 Perforated Storm Sewer System (Exfiltration) 12 4.2.3 Enhanced Low Impact Development (LID) Road Cross Section (Bioretention) 13 4.3 Comparison of Alternatives 13 5 Conclusion 16 APPENDICES Appendix A: Existing Hydrologic Conditions Appendix B: Proposed Hydrologic Conditions Appendix C: Storm Sewer Design Sheets Appendix D: Oversized Pipe Design Appendix E: Retrofit Opportunities Appendix F: Overland Flow Calculations Appendix G: OGS Sizing Appendix H: Culvert Calculations LIST OF TABLES Table 1: Summary of Existing Culvert Structures 4 Table 2: Existing Conditions Peak Flow Summary 5 Table 3: Big Bay Point/Huronia Road Existing Storm Sewer Summary 6 Table 4: Overland Flow Conveyance Summary 8 Table 5: Recommended Actions for Existing Culvert Structures 9 Table 6: Summary of Proposed Controls 10 Table 7: Bayview Drive Alternative Comparison 14 Table 8: Big Bay Point Road Alternative Comparison 14 1 Introduction The following technical memorandum summarizes work completed for the Bayview Drive and Big Bay Point Road Class EA project with respect to storm drainage and stormwater management (SWM). The study area consist of Big Bay Point Road from Bayview Drive to Huronia Road and Bayview Drive from Big Bay Point Road to Little Avenue, in the City of Barrie. 1.1 Objectives The purpose of this memorandum is to: Identify existing drainage conditions; Assess existing drainage infrastructure and identify functional deficiencies; Identify drainage/SWM criteria to be applied to proposed road improvements; and Evaluate alternative SWM approaches and recommend feasible options. 1.2 Guidelines & Background Reports This report was prepared recognizing applicable guidelines on water resources and the environment, including the following publications: This report was prepared recognizing provincial guidelines on water resources and the environment, including the following publications: City of Barrie, Storm Drainage and Stormwater Management Policies and Design Guidelines (2009); Ministry of Environment [now Ministry of Environment and Climate Change (MOECC)] Stormwater Management Practices Planning and Design Manual (2003); Ministry of Natural Resources (MNR) Natural Hazards Training Manual: Provincial Policy Statement, Public Health and Safety Policies 3.1 (1997); Lake Simcoe Regional Conservation Authority (LSRCA) Technical Guidelines for Stormwater Management Submissions (April 26, 2013); and MOECC Lake Simcoe Protection Plan (LSPP) (2009). In addition, the following relevant background reports were considered in the development of this report. The Whiskey Creek Master Drainage Plan (AECOM, 2009) documents existing drainage conditions in the Whiskey Creek subwatershed and identifies future improvements that should be undertaken to address exiting deficiencies and/or allow for future planned development. The Master Drainage Plan (MDP) was relied upon for background information and served as a guidance document, as all proposed drainage and SWM works should demonstrate conformance to the plan. The City’s Comprehensive SWM Master Plan (Phase 1) for the Annexation Lands and the Barrie Creeks Study Area (CCTA, 2015) was also reviewed and referenced in the development of this report. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 2 February 16, 2016 2 Existing Drainage Conditions 2.1 Existing Storm Drainage Infrastructure 2.1.1 Bayview Drive The subject section of Bayview Drive is also functioning as a rural road cross section, with gravel shoulders and ditches in place. There are two (2) major watercourse crossings and three (3) minor crossings that convey flow across the municipal road and outlet to tributaries of Whiskey Creek. Bayview Drive is categorized as a collector road, and culvert crossings must convey the 25-year storm without overtopping the crown of the road. While this criteria applies to minor culvert crossings, the two major watercourse crossings (Culverts 3 and 5, as identified on Table 1) require 100-year conveyance capacity per the approved MDP. There are no specific water quality controls in place for the runoff that is generated from the existing road surface; however, the roadside ditches do provide some measure of water quality control through filtration/settling mechanisms. Existing drainage features for Big Bay Point Road are shown on the attached Figure 1. 2.1.2 Big Bay Point Road The subject section of Big Bay Point Road is functioning as a rural road cross section with gravel shoulders and ditches. The ditch system on Big Bay Point Road between Bayview Drive and Welham Road drains to a low point located at approximately 131 Big Bay Point Road and is diverted via the Cowden Woods stormwater channel through to the stormwater channel in the Ellis Natural Area, which discharges into a SWM pond (LV-2) before entering a tributary of Lovers Creek. Although there is a substantial drainage area for this outlet on the north side of Big Bay Point Road (approximately 15 ha), the railway line acts as a berm, causing drainage to back up behind it. Discharge to Big Bay Point Road is controlled by one 600 mm diameter corrugated steel pipe (CSP) culvert. East of Welham Road, the ditch system is connected to the existing storm sewer system at Huronia Road, which proceeds 180 m eastwards along Big Bay Point Road, where it turns northwards and is routed through Huronia North Park to Whiskey Creek. Existing drainage features for Big Bay Point Road are shown on the attached Figure 2. A summary of the existing culvert structures on Big Bay Point Road and Bayview Drive is provided in Table 1, overleaf. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 3 February 16, 2016 Table 1: Summary of Existing Culvert Structures Crossing No. Road Location Culvert Description Current Condition 1 Bayview Drive Adjacent to Tamarack Woods Townhomes No invert located on west side of Bayview Drive, flow is assumed to travel overland to a catchbasin manhole (CBMH) on the east side. An obvert was discovered downstream of the CBMH approximately 0.15 m underground. No outlet was located. Unknown. 2 Bayview Drive Across from the Allandale Rec Centre 20 m – 450 mm diameter CSP culvert that outlets to a manhole on the east side of Bayview Drive. 64 m – 600 mm CSP diameter culvert provides conveyance from the manhole to Lackie’s Bush. West 450mm diameter culvert end in poor condition. Insufficient to convey the 25-year peak flow. East end of 600mm diameter culvert in good condition. Erosion noted on east side of road during topographic survey. 3 Bayview Drive North of Mollard Court at West Tributary Crossing 35 m – 1200 mm diameter CSP culvert. East culvert end in poor condition. Insufficient to convey the 25-year peak flow per MDP. Bayview Drive 250 Bayview Drive, North of Mollard Court 25.9 m – 300 diameter CSP culvert. Insufficient to convey the 25-year peak flow and appears to have been implemented to provide conveyance for the more-recently developed parking lot. Bayview Drive 315 Bayview Drive Twin 32.7 m – 1600 x 1100 mm Corrugated Steel Pipe Arch (CSPA) culvert that transitions below grade to a 20.7 m – 3600 x 1800 mm open bottom cast in place box culvert Recently replaced per MDP recommendation and in excellent condition. Able to convey the 100-year peak flow. Open bottom structure for naturalized channel bottom. Big Bay Point Road Under Railway Berm at approximately 131 Big Bay Point Road 600 mm CSP culvert of unknown length. Unknown – unable to locate during topographic survey and follow-up site visit. City records indicate culvert is still in operation. Big Bay Point Road Approximately 131 Big Bay Point Road 600 mm CSP culvert of unknown length. North end in good condition, unable to locate south end during topographic survey and follow-up site visit. City records indicate culvert is still in operation. 4 5 6 7 2.2 Assessment of Existing Drainage Infrastructure 2.2.1 Hydrologic Analysis For the purposes of hydrologic modelling, the soils of the study area have been classified as Tioga sand loam (Type A). The study area has been divided into five (5) drainage outlet locations for the purpose of this assessment and the required hydrologic modelling. The existing site conditions have been modelled using the Visual OTTHYMO (VO2) hydrologic modelling software for both the 4-hour Chicago (CHI) and 24-hour SCS storm distributions. Detailed model results are provided in Appendix A. A summary of the existing peak flow rates is provided in Table 2. Table 2: Existing Conditions Peak Flow Summary Storm Event Catchment 101 (Bayview South) Catchment 102 (Bayview Central) Catchment 103 (Bayview North) Catchment 105 (Big Bay West) Catchment 107 (Big Bay East) 24-hr. SCS 2-year 0.10 0.14 0.12 0.23 0.15 24-hr. SCS 5-year 0.14 0.20 0.17 0.33 0.22 24-hr. SCS 10-year 0.16 0.24 0.21 0.39 0.27 24-hr. SCS 25-year 0.20 0.30 0.26 0.50 0.34 24-hr. SCS 50-year 0.23 0.35 0.30 0.57 0.39 24-hr. SCS 100-year 0.26 0.39 0.34 0.64 0.44 4-hr. CHI 2-year 0.11 0.15 0.13 0.23 0.17 4-hr. CHI 5-year 0.16 0.22 0.20 0.37 0.26 4-hr. CHI 10-year 0.19 0.28 0.24 0.46 0.32 4-hr. CHI 25-year 0.22 0.32 0.28 0.52 0.36 4-hr. CHI 50-year 0.24 0.36 0.31 0.59 0.40 4-hr. CHI 100-year 0.27 0.41 0.35 0.67 0.45 Timmins 0.16 0.20 0.12 0.31 0.22 2.2.2 Existing Storm Sewer Capacity As noted in Section 2.1.1 above, drainage from Big Bay Point Road east of Welham Road is collected by an existing storm sewer system that runs easterly along Big Bay Point Road and then turns north at Willow Landing Elementary School and outlets into a conveyance swale in North Huronia Park. The Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 5 February 16, 2016 location and general alignment of the storm sewer system are shown on Figure 2. A brief summary of the existing storm sewer system capacity is provided in Table 2. Table 3: Big Bay Point/Huronia Road Existing Storm Sewer Summary Pipe Location East of Huronia Road to Junction Manhole Willow Landing Elementary Property Line to Junction Manhole Junction Manhole to North Huronia Park Swale Contributing Ex. Pipe Ex. 5-year Drainage Size (mm) flow (m³/s) Area (ha) Ex. Pipe Capacity (m³/s) 2.2 858x1016* 0.51 1.60 0.76 750 0.17 0.66 0.72 1350 0.78 3.94 *Elliptical Pipe (Rise x Span) 2.2.3 Capacity of Downstream Receivers Drainage from the majority of the existing study area (approximately 6.3 ha) discharges to Whiskey Creek, which is known to be a constrained receiver. Sections of Whiskey Creek downstream of Lackie’s Bush are known to experience flooding under frequent storm events due to undersized existing infrastructure. Whiskey Creek also experiences erosion of its open channel sections through its downstream reaches due to the highly urbanized catchment areas draining to it. As a result, the SWM controls required for the Big Bay Point Road and Bayview Drive expansion must ensure that proposed Big Bay Point Road and Bayview Drive improvements result in no adverse impact on this already constrained receiver, both in terms of water quality and water quantity. The remaining 3.4 ha of drainage from the study area discharges to Lovers Creek through a set of naturalized stormwater conveyance channels and a stormwater detention pond. The rating curve for the stormwater detention pond (appended) demonstrates that the runoff received from the study area is adequately controlled for quantity. The SWM controls that are required for the increased runoff that would result from the Big Bay Point Road expansion must ensure that proposed improvements cause no adverse water quality or quantity impacts on Lovers Creek. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 6 February 16, 2016 3 Future Drainage Conditions 3.1 Proposed Road Improvements 3.1.1 Big Bay Point Road Four alternatives have been identified for improvements to Big Bay Point Road, all of which include urbanizing the road section to replace the roadside ditches with curb and gutter and a storm sewer system. The first two alternatives feature an expanded right-of-way (ROW) and widening of asphalt surface to accommodate seven (7) lanes of traffic to an approximate width of 40 m. The other two alternatives feature a configuration with five (5) traffic lanes that could potentially be expanded to seven (7) lanes. The proposed alternatives for Big Bay Point Road will additionally feature bike lane infrastructure, boulevards and sidewalks. 3.1.2 Bayview Drive Three alternatives have been identified as potential Bayview Drive configurations, all of which include urbanizing the road section to replace the roadside ditches with curb and gutter and a storm sewer system. Two of the alternatives involve widening of asphalt to accommodate three (3) lanes of traffic, while the third alternative features five (5) lanes of traffic. Each of the proposed alternatives will widen the ROW from its existing footprint and incorporate bike lane infrastructure and sidewalks. Post development hydrologic modelling results are included in Appendix B for reference. 3.2 Design Criteria The proposed road improvements should satisfy the following criteria with respect to water quantity and water quality control: Provide enhanced level water quality protection, which corresponds to 80% long term suspended solids removal for all impervious surfaces (existing and proposed) in the ROW; Post-development peak flow rates must be controlled to pre-development rates for any additional impervious surfaces that are proposed as part of the road improvements to ensure no adverse impacts for downstream landowners and City infrastructure; Storm sewer to provide conveyance for minor (5-year) flows; Address safe conveyance of runoff from the regulatory storm event (i.e. greater of the 100-year storm and Hurricane Hazel); and Culvert crossings should be designed to convey the 25-year design storm under the road and the 100-year event with a maximum overtopping depth of 0.1 m. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 7 February 16, 2016 3.3 Assessment of Proposed Drainage Infrastructure 3.3.1 Minor System – Storm Sewer An analysis of proposed condition peak flows has been completed for the most constrained alternatives that have been proposed for Big Bay Point Road and Bayview Drive to develop a 5-year storm sewer design sheet. The runoff coefficients for each catchment have been adjusted to account for the increased impervious areas of Alternative 2 for Big Bay Point Road and Alternative 3 for Bayview Drive. A storm sewer design sheet was created to determine the most critical downstream pipe sizes on Big Bay Point Road and Bayview Drive and also to confirm that the existing storm sewer at Huronia Road has capacity to receive additional flow generated from Welham Road to Huronia Road under the proposed development scenario. The storm sewer design sheets have been provided in Appendix C. At the detailed design stage, a more discrete analysis of the contributing drainage areas should be performed to further assess increase in peak flows, and provide a more detailed storm sewer design. 3.3.2 Major System – Overland Flow in ROW The overland flow conveyance capacity of the proposed ROW options for Big Bay Point Road and Bayview Drive have been modelled using the Hydraulic Express Extension for Autodesk AutoCAD Civil 3D design software to determine the maximum flow capacity within the proposed typical ROW cross sections. The overland flow capacities have been compared against the most constrained 100-year overland design flows (100-year less the 5-year) obtained from the developed storm sewer design sheets. The 100-year runoff coefficients have been increased by 25% as per the City of Barrie design guidelines. A summary is provided in Table 4 for cross sections on Big Bay Point Road and Bayview Drive. A full summary of conveyance calculations has been included in Appendix F. Table 4: Overland Flow Conveyance Summary ROW Configuration Capacity (m³/s) Typical Cross Section 100-year Overland Flow 7 Lane Configuration 0.45 0.18 5 Lane Configuration 0.46 0.19 3 Lane Configuration 0.53 0.17 City of Barrie guidelines state that roads may be used for major system overland flow conveyance during the Regulatory event (100-year storm, in this case) provided that the depth of ponding on the road does not exceed 0.10 m on collector roads and one lane remains open on arterial roads. The proposed 7 lane and 5 lane options meet this criterion, as they are able to maintain one lane open at a maximum flow of 0.71 m3/s and 0.32 m3/s respectively. The 3 lane option for Bayview Drive is also Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 8 February 16, 2016 able to meet this criterion, as the preferred option does not overtop the crown of the road at its maximum capacity. 3.4 Watercourse Crossing Replacement The proposed urbanization of Big Bay Point Road and Bayview Drive limits the opportunity for the continued use of the watercourse crossings that currently receive drainage from the existing ditch system. As the ditch system is to be removed, it is expected that the minor drainage that was previously conveyed through the ditch system and minor crossings will be conveyed through the proposed storm sewer system. However, three (3) watercourse crossings will be maintained, to not disturb the function of the watercourses. The following actions, as summarized in Table 5 below, are recommended for the existing watercourse crossings on Big Bay Point Road and Bayview Drive. Supporting culvert sizing calculations are included in Appendix H. Table 5: Recommended Actions for Existing Culvert Structures Crossing No. Road Location Recommended Action 1 Bayview Drive Adjacent to Tamarack Woods Townhomes If culvert is within ROW, remove 2 Bayview Drive Across from the Allandale Rec Centre Remove 3 Bayview Drive North of Mollard Court at West Tributary Crossing Replace with 1 – 2400 x 1200 mm Hy-Span per MDP 4 Bayview Drive 250 Bayview Drive, North of Mollard Court Remove 5 Bayview Drive 315 Bayview Drive Keep existing structure in place 6 Big Bay Point Road Under Railway Berm at approximately 131 Big Bay Point Road Remove 7 Big Bay Point Road Approximately 131 Big Bay Point Road Replace with 2 – 45 m long 800 mm diameter CSP culverts Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 9 February 16, 2016 4 Proposed SWM Plan A number of quantity and quality control measures are available and are identified here for consideration. Opportunities and constraints for maximizing the effective use of the control measures are discussed in this section. 4.1 SWM Quantity Controls The urbanized nature of the proposed road expansion poses a limitation to the type of SWM facilities that can be considered, as there is limited space within the proposed ROW. Underground storage is the only option that can provide quantity control within the ROW. 4.1.1 Oversized Pipes A system of oversized pipes has been proposed to provide the storage required to reduce the 100year post-development peak flow rates to the pre-development flow rates. A preliminary design has been carried out to confirm the feasibility of this option. The required storage to control the runoff from the 100-year storm was determined using Visual OTTHYMO (VO2) hydrologic modelling software for each alternative. The required storage volumes are identified in Tables 7 and 8, following this section. An Excel spreadsheet was developed to calculate the storage that could be made available through the implementation of an oversized pipe system of five sections, with each section discharging to an existing outlet. Outlet elevations obtained during topographic survey were used to verify the feasibility of the system. The oversized pipe system uses an orifice structure to control peak flows to predevelopment flow rates. Prior to discharging into the natural system, an oil and grit separator (OGS) unit has been proposed for each storm sewer to provide quality control. A summary of the oversized pipe system capacity and flow rate calculations is provided in Table 6. Complete preliminary design calculations for the proposed oversized pipe system are provided in Appendix D. Table 6: Summary of Proposed Controls Drainage Area ID Drainage Area Description Peak Flow (m3/s) Provided Storage (m3) 201 Bayview South 0.26 80 202 Bayview Central 0.39 219 203 Bayview North 0.33 224 205 Big Bay West 0.63* 216* 207 Big Bay East 0.44 116 *This system was not feasible under conditions where the outlet elevation is maintained. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 10 February 16, 2016 It was not feasible to maintain the existing outlet elevation in the design of the oversized pipe system for the Big Bay West Catchment. To implement an oversized pipe system in the Big Bay West Catchment, design alternatives need to be considered. Options include raising the road elevation or lowering the existing outlet. The required storage volumes for the 7 Lane Alternatives and 5 Lane Alternative on Big Bay Point Road and the 3 Lane Alternatives and 5 Lane Alternative on Bayview Drive exceed the maximum storage that can be provided by an oversized pipe system. While the peak flows are able to meet predevelopment levels, the lack of available storage will likely result in manhole surcharging under 100-year conditions. Therefore, the oversized pipe solution is recommended to be implemented in combination with other efforts to provide quantity control for each of the proposed alternatives. 4.1.2 Previously Identified Future Retrofit Opportunities Through our review of the Whiskey Creek Master Drainage Plan (MDP) and the Comprehensive SWM Master Plans (Phase 1) for the Annexation Lands and the Barrie Creeks Study Area, we have identified a number of proposed stormwater detention facilities located downstream of the proposed storm sewer outlets that could provide quantity control for the proposed development and reduce flood conditions downstream. A brief description of each proposed stormwater control option is provided below. Excerpts from the Whiskey Creek MDP and the Comprehensive SWM Master Plan concerning the design of each noted facility have been appended to this memorandum in Appendix E. SWMF within Lackie's Bush - proposed under the Whiskey Creek MDP, located adjacent to the north side of The Source building on the east side of Bayview Drive. The originally proposed facility was designed to provide quantity control for all of the stormwater runoff west of Bayview Drive with a storage volume of 103,000 cubic meters. This facility could be adapted to provide quantity control for the post-development conditions of the drainage catchments on Bayview Drive. This facility also has the potential to reduce erosion conditions that have been noted for Lackie's Bush in the Comprehensive SWM Master Plan. Concerns related to the use of online storage, possible creation of dam, and potential natural heritage impacts may pose a challenge to obtaining the necessary approvals. North of Big Bay Point Road and between Huronia Road and Pickett Crescent (Huronia North Park) - proposed under the Comprehensive SWM Master Plan, identified as retrofit opportunity No. 26. This wet pond would receive the drainage that is currently routed to Huronia North Park via an existing storm sewer from the East Big Bay catchment in addition to the additional drainage resulting from the Big Bay Point Road expansion. Drainage Easement South of Ellis Drive - proposed under Comprehensive SWM Master Plan, identified as Retrofit Opportunity no. 67. This wet pond could provide additional storage to what is already provided by SWMF LV-2 for the West Big Bay catchment. With respect to the storage deficits that have been identified, each of these facilities could provide additional storage to reduce the storm sewer pipe sizes and offer more feasible alternatives for providing the required storage. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 11 February 16, 2016 4.2 SWM Quality Controls The existing stormwater quality controls provided for the runoff discharging into Whiskey Creek (approximate drainage area of 6.3 ha within the study limits) consist of the ditch system adjacent on both sides of each roadway. The existing stormwater quality controls provided for the runoff discharging into Lover’s Creek consist of the natural area storm water conveyance channels and the Lover’s Creek stormwater pond LV-2, which is located further downstream. The City’s Part 1 Comprehensive Stormwater Management Report recommends retrofits to provide water quality control for previously uncontrolled areas to be included as part of road reconstruction projects where possible. This practice is consistent with the City’s typical approach and the requirements of Lake Simcoe Region Conservation Authority (LSRCA). The City typically recommends installing OGS units at the downstream end of storm sewer systems when retrofitting existing urban road sections. Due to the large drainage area, multiple OGS units would be needed to provide the required Enhanced level quality control. 4.2.1 Oil Grit Separators (OGS) Preliminary sizing for two (2) OGS units on Big Bay Point Road and three (3) OGS units on Bayview Drive has been completed using PCSWMM for Stormceptor sizing software for each alternative. The external areas on Bayview Drive and Big Bay Point Road have not been provided with OGS units due to the large external drainage area and the fact that these drainage areas are outside of the study area limits. A summary of the sizing is provided in Tables 7 and 8 following this section and sizing details have been provided in Appendix G. 4.2.2 Perforated Storm Sewer System (Exfiltration) A perforated pipe storm sewer system could be implemented within the proposed road section in order to provide quality control for the contributing runoff. Perforated pipe systems are essentially long infiltration trenches or linear soakaways that are designed for both conveyance and infiltration of stormwater runoff. They are underground stormwater conveyance systems designed to attenuate runoff volume and, thereby, reduce contaminant loads to receiving waters. They are composed of perforated pipes installed in gently sloping granular stone beds that are lined with geotextile fabric that allow infiltration of runoff into the gravel bed and underlying native soil while it is being conveyed from source areas or other BMPs to an end-of-pipe facility or receiving waterbody. Perforated pipe systems can be used in place of conventional storm sewer pipes, where topography, water table depth, and runoff quality conditions are suitable. They are suitable for treating runoff from roofs, walkways, parking lots and low to medium traffic roads, with adequate pretreatment. A design variation can include perforated catch basins where the catch basin sump is perforated to allow runoff to infiltrate into the underlying native soil. The implementation of this option may be feasible as the storm sewer system will be entirely new construction, with details to be resolved at the final design stage. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 12 February 16, 2016 The benefit of these systems is that they promote water balance as well as water quality control. The soils in the area consist of sandy loam, which is suitable for infiltration practices. Detailed design of this system would be required at the final design stage. For more information, please refer to the Chapter 4.10 of the Credit Valley Conservation/Toronto Region Conservation Authority (CVC/TRCA) Low Impact Development Stormwater Management Planning and Design Guide. 4.2.3 Enhanced Low Impact Development (LID) Road Cross Section (Bioretention) Increasingly in many urban centres, stormwater quality controls are being provided with the implementation of bioretention practices within the ROW. These practices include enhanced swales, enhanced curb extensions, tree pits and planters which act as a stormwater management filtration and infiltration practice. The primary component of a bioretention practice is the filter media which is a mixture of sand, fines, organic material, mulch ground cover and plants adapted to the conditions of a stormwater practice. Bioretention is designed to capture runoff from frequent storm events. An overflow or bypass is necessary to convey large storm events. For more information, please refer to the Chapter 4.5 of the CVC/TRCA Low Impact Development Stormwater Management Planning and Design Guide. 4.3 Comparison of Alternatives Tables 7 and 8 have been provided to summarize the proposed alternatives for Bayview Drive and Big Bay Point Road. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 13 February 16, 2016 Table 7: Bayview Drive Alternative Comparison Catchment Name Catchment ID Catchment Area % Impervious Uncontrolled 100-yr 24 hr. SCS Design Storm Peak Flow 100-yr 24 hr. SCS Design Storm Required Storage (m3/s) (m3) Stormceptor Unit Required to Provide 80% TSS Removal EXISTING CONDITIONS Bayview South 101 0.96 62% 0.34 N/A N/A Bayview Central 102 1.67 50% 0.39 N/A N/A Bayview North 103 1.37 54% 0.26 N/A N/A ALTERNATIVE 1 - 3 LANE CONFIGURATION Bayview South 201 1.06 68% 0.38 234 STC 2000 Bayview Central 202 1.68 65% 0.54 282 STC 4000 Bayview North 203 1.38 80% 0.45 234 STC 4000 ALTERNATIVE 2 - 3 LANE CONFIGURATION Bayview South 301 1.06 72% 0.38 232 STC 2000 Bayview Central 302 1.68 69% 0.55 308 STC 4000 Bayview North 303 1.38 85% 0.47 263 STC 4000 ALTERNATIVE 3 - 5 LANE CONFIGURATION Bayview South 401 1.21 87% 0.46 357 STC 4000 Bayview Central 402 2.15 80% 0.77 639 STC 6000 Bayview North 403 1.70 79% 0.61 467 STC 4000 Table 8: Big Bay Point Road Alternative Comparison Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 14 February 16, 2016 Catchment Name Catchment ID Catchment Area % Impervious Uncontrolled 100-yr 24 hr. SCS Design Storm Peak Flow 100-yr 24 hr. SCS Design Storm Required Storage (m3/s) (m3) Stormceptor Unit Required to Provide 80% TSS Removal EXISTING CONDITIONS Big Bay West 105 2.62 54% 0.64 N/A N/A Big Bay East 107 1.85 51% 0.44 N/A N/A ALTERNATIVE 1 - 7 LANE CONFIGURATION Big Bay West 205 3.38 84% 1.25 1020 STC 9000 Big Bay East 207 2.20 81% 0.80 620 STC 6000 ALTERNATIVE 2 - 7 LANE CONFIGURATION Big Bay West 305 3.11 85% 1.16 890 STC 9000 Big Bay East 307 1.98 86% 0.74 540 STC 6000 ALTERNATIVE 3 - 5 LANE CONFIGURATION Big Bay West 405 2.88 81% 1.04 700 STC 9000 Big Bay East 407 1.91 78% 0.68 430 STC 4000 ALTERNATIVE 4 - 5 LANE CONFIGURATION Big Bay West 505 2.63 81% 0.95 570 STC 4000 Big Bay East 507 1.86 77% 0.65 400 STC 4000 Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 15 February 16, 2016 5 Conclusion The existing rural road cross section along Big Bay Point Road and Bayview Drive will be converted to urbanized road sections complete with storm sewer, curb and gutter as part of the proposed road improvements. Water quantity control is required to attenuate the increase in runoff that would result from the construction of additional impervious surface, to ensure no negative impacts are caused to the receiving watercourses. Water quality controls should be provided for both the new impervious area as well as the existing, uncontrolled road surface. During the detailed design phase of the Big Bay Point Road and Bayview Drive improvement project, a complete storm sewer design should be performed to confirm all required storm pipe sizes throughout the project limits. Water quantity controls should be provided through a combination of pipe storage and pond retrofit opportunities Water quality controls should be provided using a combination of OGS units with upstream LID controls and/or perforated pipe systems to provide additional water quality control and promote infiltration. Bayview Drive/Big Bay Point Road Class Environmental Assessment Drainage and Stormwater Management Technical Memorandum Page 16 February 16, 2016 N Bayview North ROW 1.37 ha Bayview Central ROW 1.67 ha Study Area Boundary Existing Major Crossing Existing Culvert Crossing Drainage Direction Bayview South ROW 0.96 ha Bayview Drive & Big Bay Point Road Class EA Existing Drainage Conditions – Bayview Drive Figure 1 N Study Area Boundary Big Bay East ROW 1.85 ha Big Bay West ROW 2.62 ha Existing Culvert Crossing Existing Storm Sewer Drainage Direction Bayview Drive & Big Bay Point Road Class EA Figure Existing Drainage Conditions – Big Bay Point Road 2 APPENDIX A: EXISTING HYDROLOGIC CONDITIONS BIG BAY POINT RD & BAYVIEW DRIVE EA EXISTING CONDITIONS Nashyd Route Pipe Standhyd 1 1 Route Channel Diverthyd 1 Addhyd 1 Duhyd 1 1 1 Route Reservoir 1 C.C. TATHAM & ASSOCIATES LTD. Consulting Engineers Project: File No.: Subject: Date: Big Bay Point Rd and Bayview Dr 415375 Otthymo Flow Schematic Jan-16 Figure: 1 Project: Big Bay Point Road and Bayview Drive EA File No.: 415375 Date: 13-Oct-15 Designed By: NHF Checked By: ALK Subject: CN Calculator - Culvert Capacity Big Bay Point Road and Bayview Drive EA CURVE NUMBER, INITIAL ABSTRACTION & TIME TO PEAK CALCULATIONS CONDITIONS Catchment 110 Area 10.15 ha WEIGHTED CN VALUE Soil Series Soil Series Runoff Hydrologic Soil Group Soil Texture Coefficient Type tisl TIOGA #N/A #N/A #N/A #N/A A #N/A #N/A #N/A #N/A Sand Loam #N/A #N/A #N/A #N/A Area 1 #N/A #N/A #N/A #N/A Totals Catchment Soil Characteristics Forest/Woodland Percent Area Percent Pasture/Lawns CN 10.15 0 0 0 0 1 0 0 0 0 0 0 10.15 1 0 0 32 #N/A #N/A #N/A #N/A Area Meadows Percent 6.699 0 0 0 0 0.66 6.699 0.66 CN 49 #N/A #N/A #N/A #N/A Gravel CN 0 0 0 0 0 38 #N/A #N/A #N/A #N/A Area Impervious Percent 0 0 0 0 0 0 0 0 0 CN 89 89 89 89 #N/A Area Percent 0.34 3.451 0.34 Initial Abstraction 3.98 mm 279 271 350 2% 10.15 Time of Concentration (Minutes) 13.41 m m m ha Maximum Catchment Elevation Minimum Catchment Elevation Catchment length Catchment Slope Catchment Area Time of Concentration (Minutes) 279 271 350 2% 10.15 m m m Runoff Coefficient 0.39 ha 33.01 Time of Concentration (Hours) 0.22 Time of Concentration (Hours) 0.55 Time to Peak (2/3 x Time of Concentration) 0.15 Time to Peak (2/3 x Time of Concentration) 0.37 0.37 hrs CN Calculator (Big Bay Point Road Culvert Cap).xls C.C. Tatham Associates Ltd. Landuse Type Forest/Woodland Gravel Pasture/Lawn Impervious Wetland/Lake/SWMF Meadows Soil Series Total tisl 1 0.08 0.6 0.1 0.95 0.05 0.09 0.389 Area 100 #N/A #N/A #N/A #N/A Percent 0 0 0 0 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Soil Series 0 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A CN 50 #N/A #N/A #N/A #N/A 0 Wetlands Woods Meadows Gravel Lawns Impervious Airport Method Maximum Catchment Elevation Minimum Catchment Elevation Catchment length Catchment Slope Catchment Area Wetland/Lakes/SWMF CN 3.451 0 0 0 0 For Runoff Coefficients less than 0.4 Bransby-Williams Formula Time to Peak Percent 0 Time of Concentration Calculations For Runoff Coefficients greater than 0.4 Area 0 Average CN for Soil Type 66.34 0 0 0 0 66.3 12 10 8 3 5 2 0 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A 1/15/2016 =========================================================================================================== V V V V V V I I I I I SSSSS SS SS SS SSSSS U U U U U U U U UUUUU A A A AAAAA A A A A L L L L LLLLL TTTTT T T T TTTTT T T T H H H H Y M M MM MM M M M M V V VV OOO O O O O OOO H H H H Y Y Y Y Y OOO O O O O OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** S U M M A R Y O U T P U T ***** Input filename: C:\Program Files (x86)\Visual OTTHYMO 2.3.2\voin.dat Output filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\CHI Design Storm - Existing.out Summary filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\CHI Design Storm - Existing.sum DATE: 1/15/2016 TIME: 2:28:20 PM USER: Existing Conditions - Chicago Design Storms COMMENTS: ____________________________________________________________ **************************** ** SIMULATION NUMBER: 1 ** **************************** W/E COMMAND 2 year 4-hour Chicago Storm HYD ID DT min AREA ha Qpeak Tpeak cms hrs R.V. R.C. mm Qbase cms START @ .00 hrs -------------------READ STORM 10.0 [ Ptot= 38.14 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: 4hr 2year CHICAGO STORM - CITY OF BARRIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .13 1.50 21.75 .57 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .15 1.50 20.41 .54 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .11 1.50 24.42 .64 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .17 1.50 20.75 .54 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .33 1.50 15.06 .39 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .12 2.00 6.93 .18 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .25 1.50 21.75 .57 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 .37 1.50 9.75 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 .62 1.50 11.48 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 2 ** **************************** W/E COMMAND 5 year 4-hour Chicago Storm HYD ID DT min AREA ha Qpeak Tpeak cms hrs START @ .00 hrs -------------------READ STORM 10.0 [ Ptot= 64.69 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: 4hr 5year CHICAGO STORM - CITY OF BARRIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .20 1.50 39.45 .61 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .22 1.50 37.34 .58 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .16 1.50 43.66 .67 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .26 1.50 37.87 .59 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .47 1.50 28.91 .45 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .28 1.83 18.74 .30 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .37 1.50 39.45 .61 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 .61 1.50 22.28 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 .98 1.50 24.75 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** 10 ** SIMULATION NUMBER: 3 ** **************************** year 4-hour Chicago Storm W/E COMMAND DT min HYD ID AREA ha Qpeak Tpeak cms hrs START @ .00 hrs -------------------READ STORM 10.0 [ Ptot= 73.86 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: 4hr 10year CHICAGO STORM - CITY OF BARRIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .24 1.50 45.89 .62 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .28 1.50 43.54 .59 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .19 1.50 50.58 .68 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .32 1.50 44.13 .60 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .58 1.50 34.16 .46 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .39 1.83 23.78 .33 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .46 1.50 45.89 .62 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 .76 1.50 27.39 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 1.23 1.50 30.06 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 4 ** **************************** W/E COMMAND 25 year 4-hour Chicago Storm HYD ID DT min AREA ha Qpeak Tpeak cms hrs START @ .00 hrs -------------------READ STORM 10.0 [ Ptot= 82.85 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: 4hr 25year CHICAGO STORM - CITY OF BARRIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .28 1.50 52.34 .63 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .32 1.50 49.78 .60 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .22 1.50 57.47 .69 .000 * * * * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .36 1.50 50.42 .61 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .65 1.50 39.52 .48 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .49 2.00 29.05 .36 .000 * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .52 1.50 52.35 .63 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 .87 1.50 32.69 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 1.40 1.50 35.53 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 5 ** 50 **************************** year 4-hour Chicago Storm W/E COMMAND DT min HYD ID AREA ha Qpeak Tpeak cms hrs START @ .00 hrs -------------------READ STORM 10.0 [ Ptot= 85.51 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: 4hr 50year CHICAGO STORM - CITY OF BARRIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .31 1.50 54.28 .63 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .36 1.50 51.65 .60 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .24 1.50 59.54 .70 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .40 1.50 52.31 .61 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .74 1.50 41.14 .48 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .55 1.83 30.77 .36 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .59 1.50 54.28 .63 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 1.00 1.50 34.37 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 1.58 1.50 37.24 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 6 ** **************************** W/E COMMAND 100 year 4-hour Chicago Storm HYD ID DT min AREA ha Qpeak Tpeak cms hrs START @ .00 hrs -------------------READ STORM 10.0 [ Ptot= 95.00 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: 4hr 100year CHICAGO STORM - CITY OF BARRIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .35 1.50 61.27 .64 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .41 1.50 58.43 .62 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .27 1.50 66.96 .70 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .45 1.50 59.14 .62 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .84 1.50 47.04 .50 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .68 1.83 36.72 .39 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .67 1.50 61.27 .64 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 1.16 1.50 40.31 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 1.82 1.50 43.33 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 7 ** **************************** W/E COMMAND Hurricane Hazel HYD ID DT min AREA ha Qpeak Tpeak cms hrs START @ .00 hrs -------------------READ STORM 60.0 [ Ptot=212.00 mm ] fname : T:\2015 PROJECTS\415375 - Bayview Dr & Big Bay Pt Rd EA\Design\SWM\VO2\City of Barrie Old\barrrie(ch remark: Hurricane Hazel for the last 12 hrs of the storm -INTENSITIE * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .16 10.00 155.75 .73 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .20 10.00 150.95 .71 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .12 10.00 165.36 .78 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .22 10.00 152.15 .72 .000 * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .57 10.00 131.74 .62 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 1.07 10.00 128.11 .60 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .31 10.00 155.75 .73 .000 ADD [0109 + 0110] 0111 3 5.0 15.56 1.64 10.00 129.37 n/a .000 ADD [0111 + 0105] 0108 3 5.0 18.18 1.95 10.00 133.18 n/a .000 * * * FINISH =========================================================================================================== =========================================================================================================== V V V V V V I I I I I SSSSS SS SS SS SSSSS U U U U U U U U UUUUU A A A AAAAA A A A A L L L L LLLLL TTTTT T T T TTTTT T T T H H H H Y M M MM MM M M M M V V VV OOO O O O O OOO H H H H Y Y Y Y Y OOO O O O O OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** S U M M A R Y O U T P U T ***** Input filename: C:\Program Files (x86)\Visual OTTHYMO 2.3.2\voin.dat Output filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\SCS Design Storm - Existing.out Summary filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\SCS Design Storm - Existing.sum DATE: 1/15/2016 TIME: 2:26:59 PM USER: Existing Conditions - SCS Design Storms COMMENTS: ____________________________________________________________ **************************** ** SIMULATION NUMBER: 1 ** 2 **************************** W/E COMMAND HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot= 40.80 mm ] year 24-hour SCS Storm DT min AREA ha Qpeak Tpeak cms hrs R.V. R.C. mm Qbase cms 15.0 * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .12 6.00 23.45 .57 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .14 6.00 22.03 .54 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .09 6.00 26.29 .64 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .15 6.00 22.39 .55 .000 * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .23 6.00 23.45 .57 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .15 6.17 8.16 .20 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .29 6.00 16.35 .40 .000 ADD [0110 + 0109] 0111 3 5.0 15.56 .40 6.00 11.01 n/a .000 ADD [0105 + 0111] 0108 3 5.0 18.18 .63 6.00 12.80 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 2 ** **************************** W/E COMMAND 5 year 24-hour SCS Storm HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot= 56.40 mm ] DT min AREA ha Qpeak Tpeak cms hrs 15.0 * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .17 6.00 33.76 .60 .000 * CALIB STANDHYD 1 5.0 1.67 .20 6.00 31.88 .57 .000 * 0102 [I%=50.0:S%= 2.00] * * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .14 6.00 37.52 .67 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .22 6.00 32.35 .57 .000 * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .33 6.00 33.76 .60 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .29 6.17 15.12 .27 .000 * * * 0110 ] .37] * * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .42 6.00 24.36 .43 .000 ADD [0110 + 0109] 0111 3 5.0 15.56 .64 6.00 18.33 n/a .000 ADD [0105 + 0111] 0108 3 5.0 18.18 .97 6.00 20.56 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 3 ** **************************** W/E COMMAND 10 year 24-hour SCS Storm HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot= 66.00 mm ] DT min AREA ha Qpeak Tpeak cms hrs 15.0 * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .21 6.00 40.36 .61 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .24 6.00 38.22 .58 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .16 6.00 44.64 .68 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .27 6.00 38.75 .59 .000 * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .39 6.00 40.36 .61 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .38 6.17 20.10 .30 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .51 6.00 29.65 .45 .000 ADD [0110 + 0109] 0111 3 5.0 15.56 .81 6.00 23.42 n/a .000 ADD [0105 + 0111] 0108 3 5.0 18.18 1.20 6.00 25.86 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 4 ** **************************** W/E COMMAND 25 year 24-hour SCS Storm HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot= 79.20 mm ] DT min AREA ha Qpeak Tpeak cms hrs 15.0 * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .26 6.00 49.71 .63 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .30 6.00 47.23 .60 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .20 6.00 54.66 .69 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .34 6.00 47.85 .60 .000 * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .50 6.00 49.71 .63 .000 * CALIB NASHYD [CN=66.3 1 10.0 10.15 .53 6.17 27.65 .35 .000 * * * * * 0110 ] [ N = 3.0:Tp .37] * * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .66 6.00 37.32 .47 .000 ADD [0110 + 0109] 0111 3 5.0 15.56 1.08 6.00 31.01 n/a .000 ADD [0105 + 0111] 0108 3 5.0 18.18 1.58 6.00 33.71 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 5 ** **************************** W/E COMMAND 50 year 24-hour SCS Storm HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot= 88.80 mm ] DT min AREA ha Qpeak Tpeak cms hrs 15.0 * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .30 6.00 56.69 .64 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .35 6.00 53.98 .61 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .23 6.00 62.10 .70 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .39 6.00 54.66 .62 .000 * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .57 6.00 56.69 .64 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .65 6.17 33.58 .38 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .76 6.00 43.16 .49 .000 ADD [0110 + 0109] 0111 3 5.0 15.56 1.28 6.00 36.91 n/a .000 ADD [0105 + 0111] 0108 3 5.0 18.18 1.85 6.00 39.76 n/a .000 R.V. R.C. mm Qbase cms * * * **************************** ** SIMULATION NUMBER: 6 ** **************************** W/E COMMAND 100 year 24-hour SCS Storm HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot= 98.40 mm ] DT min AREA ha Qpeak Tpeak cms hrs 15.0 * * CALIB STANDHYD 0103 [I%=54.0:S%= 2.00] 1 5.0 1.37 .33 6.00 63.81 .65 .000 * CALIB STANDHYD 0102 [I%=50.0:S%= 2.00] 1 5.0 1.67 .39 6.00 60.89 .62 .000 * CALIB STANDHYD 0101 [I%=62.0:S%= 2.00] 1 5.0 .96 .26 6.00 69.65 .71 .000 * CALIB STANDHYD 0107 [I%=51.0:S%= 2.00] 1 5.0 1.85 .44 6.00 61.62 .63 .000 * CALIB STANDHYD 0105 [I%=54.0:S%= 2.00] 1 5.0 2.62 .64 6.00 63.81 .65 .000 * CALIB NASHYD [CN=66.3 [ N = 3.0:Tp 1 10.0 10.15 .78 6.17 39.82 .40 .000 * * * * * 0110 ] .37] * * CALIB STANDHYD 0109 [I%=34.0:S%= 2.00] 1 5.0 5.41 .87 6.00 49.21 .50 .000 ADD [0110 + 0109] 0111 3 5.0 15.56 1.49 6.00 43.09 n/a .000 ADD [0105 + 0111] 0108 3 5.0 18.18 2.13 6.00 46.07 n/a .000 * * * FINISH =========================================================================================================== APPENDIX B: PROPOSED HYDROLOGIC CONDITIONS BIG BAY POINT RD & BAYVIEW DRIVE EA PROPOSED CONDITIONS BAYVIEW DRIVE ALTERNATIVES Nashyd Route Pipe Standhyd 1 1 Route Channel Diverthyd 1 Addhyd 1 Duhyd 1 1 1 Route Reservoir 1 C.C. TATHAM & ASSOCIATES LTD. Consulting Engineers Project: File No.: Subject: Date: Big Bay Point Rd and Bayview Dr 415375 Otthymo Flow Schematic Jan-16 Figure: 3 =========================================================================================================== V V V V V V SSSSS SS SS SS SSSSS U U U U U U U U UUUUU A A A AAAAA A A A A L L L L LLLLL TTTTT T T T TTTTT T T T H H H H Y M M MM MM M M M M V V I I I I I VV OOO O O O O OOO H H H H Y Y Y Y Y OOO O O O O OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** S U M M A R Y O U T P U T ***** Input filename: C:\Program Files (x86)\Visual OTTHYMO 2.3.2\voin.dat Output filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\CHI Design Storm - Proposed Road Use (Climate Change) - Big Bay.out Summary filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\CHI Design Storm - Proposed Road Use (Climate Change) - Big Bay.sum DATE: 2/2/2016 TIME: 5:07:35 PM USER: Big Bay Point Road Alternatives - Chicago Design Storm COMMENTS: ____________________________________________________________ **************************** ** SIMULATION NUMBER: 6 ** **************************** W/E COMMAND 100-year 4 hour Chicago Design Storm HYD ID START @ .00 hrs -------------------CHIC STORM [ Ptot= 87.58 mm ] DT min AREA ha Qpeak Tpeak cms hrs R.V. R.C. mm Qbase cms 10.0 * * CALIB STANDHYD 0205 [I%=84.0:S%= 2.00] 1 5.0 3.38 1.45 1.33 75.87 .87 .000 * CALIB STANDHYD 0207 [I%=81.0:S%= 2.00] 1 5.0 2.20 .93 1.33 73.86 .84 .000 * CALIB STANDHYD 0305 [I%=85.0:S%= 2.00] 1 5.0 3.11 1.35 1.33 76.54 .87 .000 * CALIB STANDHYD 0307 [I%=86.0:S%= 2.00] 1 5.0 1.98 .87 1.33 77.21 .88 .000 * CALIB STANDHYD 0405 [I%=81.0:S%= 2.00] 1 5.0 2.88 1.21 1.33 73.86 .84 .000 * CALIB STANDHYD 0407 [I%=78.0:S%= 2.00] 1 5.0 1.91 .78 1.33 71.86 .82 .000 * CALIB STANDHYD 0505 [I%=81.0:S%= 2.00] 1 5.0 2.63 1.11 1.33 73.86 .84 .000 * CALIB STANDHYD 0507 [I%=78.0:S%= 2.00] 1 5.0 1.86 .76 1.33 71.86 .82 .000 RESRVR [ 2 : 0205] 0212 {ST= .09 ha.m } 1 5.0 3.38 .58 1.42 75.86 n/a .000 RESRVR [ 2 : 0207] 0213 {ST= .05 ha.m } 1 5.0 2.20 .40 1.42 73.85 n/a .000 RESRVR [ 2 : 0305] 0312 {ST= .08 ha.m } 1 5.0 3.11 .59 1.42 76.53 n/a .000 RESRVR [ 2 : 0307] 0313 {ST= .05 ha.m } 1 5.0 1.98 .41 1.42 77.20 n/a .000 RESRVR [ 2 : 0405] 0412 {ST= .06 ha.m } 1 5.0 2.88 .60 1.42 73.86 n/a .000 RESRVR [ 2 : 0407] 0413 1 5.0 1.91 .42 1.42 71.85 n/a .000 * * * * * * * * * * * * * {ST= .04 ha.m } * RESRVR [ 2 : 0505] 0512 {ST= .05 ha.m } 1 5.0 2.63 .61 1.42 73.86 n/a .000 RESRVR [ 2 : 0507] 0513 {ST= .04 ha.m } 1 5.0 1.86 .42 1.42 71.85 n/a .000 * * FINISH =========================================================================================================== =========================================================================================================== V V V V V V SSSSS SS SS SS SSSSS U U U U U U U U UUUUU A A A AAAAA A A A A L L L L LLLLL TTTTT T T T TTTTT T T T H H H H Y M M MM MM M M M M V V I I I I I VV OOO O O O O OOO H H H H Y Y Y Y Y OOO O O O O OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** S U M M A R Y O U T P U T ***** Input filename: C:\Program Files (x86)\Visual OTTHYMO 2.3.2\voin.dat Output filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\SCS Design Storm - Proposed Road Use (Climate Change) - Big Bay.out Summary filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\SCS Design Storm - Proposed Road Use (Climate Change) - Big Bay.sum DATE: 2/2/2016 TIME: 5:06:42 PM USER: Big Bay Point Road Alternatives - SCS Design Storm COMMENTS: ____________________________________________________________ **************************** ** SIMULATION NUMBER: 6 ** **************************** W/E COMMAND 100-year 24 hour SCS Design Storm HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot=112.80 mm ] DT min AREA ha Qpeak Tpeak cms hrs R.V. R.C. mm Qbase cms 15.0 * * CALIB STANDHYD 0205 [I%=84.0:S%= 2.00] 1 5.0 3.38 1.25 6.00 98.91 .88 .000 * CALIB STANDHYD 0207 [I%=81.0:S%= 2.00] 1 5.0 2.20 .80 6.00 96.49 .86 .000 * CALIB STANDHYD 0305 [I%=85.0:S%= 2.00] 1 5.0 3.11 1.16 6.00 99.71 .88 .000 * CALIB STANDHYD 0307 [I%=86.0:S%= 2.00] 1 5.0 1.98 .74 6.00 100.52 .89 .000 * CALIB STANDHYD 0405 [I%=81.0:S%= 2.00] 1 5.0 2.88 1.04 6.00 96.49 .86 .000 * CALIB STANDHYD 0407 [I%=78.0:S%= 2.00] 1 5.0 1.91 .68 6.00 94.07 .83 .000 * CALIB STANDHYD 0505 [I%=81.0:S%= 2.00] 1 5.0 2.63 .95 6.00 96.49 .86 .000 * CALIB STANDHYD 0507 [I%=78.0:S%= 2.00] 1 5.0 1.86 .66 6.00 94.07 .83 .000 RESRVR [ 2 : 0205] 0212 {ST= .10 ha.m } 1 5.0 3.38 .64 6.08 98.90 n/a .000 RESRVR [ 2 : 0207] 0213 {ST= .06 ha.m } 1 5.0 2.20 .44 6.08 96.48 n/a .000 RESRVR [ 2 : 0305] 0312 {ST= .09 ha.m } 1 5.0 3.11 .64 6.08 99.70 n/a .000 RESRVR [ 2 : 0307] 0313 {ST= .05 ha.m } 1 5.0 1.98 .44 6.08 100.51 n/a .000 RESRVR [ 2 : 0405] 0412 {ST= .07 ha.m } 1 5.0 2.88 .64 6.08 96.48 n/a .000 RESRVR [ 2 : 0407] 0413 1 5.0 1.91 .44 6.00 94.06 n/a .000 * * * * * * * * * * * * * {ST= .04 ha.m } * RESRVR [ 2 : 0505] 0512 {ST= .06 ha.m } 1 5.0 2.63 .64 6.00 96.48 n/a .000 RESRVR [ 2 : 0507] 0513 {ST= .04 ha.m } 1 5.0 1.86 .44 6.00 94.07 n/a .000 * * FINISH =========================================================================================================== BIG BAY POINT RD & BAYVIEW DRIVE EA PROPOSED CONDITIONS BIG BAY POINT RD ALTERNATIVES Nashyd Route Pipe Standhyd 1 1 Route Channel Diverthyd 1 Addhyd 1 Duhyd 1 1 1 Route Reservoir 1 C.C. TATHAM & ASSOCIATES LTD. Consulting Engineers Project: File No.: Subject: Date: Big Bay Point Rd and Bayview Dr 415375 Otthymo Flow Schematic Jan-16 Figure: 2 =========================================================================================================== V V V V V V SSSSS SS SS SS SSSSS U U U U U U U U UUUUU A A A AAAAA A A A A L L L L LLLLL TTTTT T T T TTTTT T T T H H H H Y M M MM MM M M M M V V I I I I I VV OOO O O O O OOO H H H H Y Y Y Y Y OOO O O O O OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** S U M M A R Y O U T P U T ***** Input filename: C:\Program Files (x86)\Visual OTTHYMO 2.3.2\voin.dat Output filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\CHI Design Storms - Proposed (w Climate Change) - Bayview Altern.out Summary filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\CHI Design Storms - Proposed (w Climate Change) - Bayview Altern.sum DATE: 2/2/2016 TIME: 5:03:12 PM USER: Drive Alternatives - Chicago Design Storm COMMENTS: Bayview ____________________________________________________________ **************************** ** SIMULATION NUMBER: 6 ** **************************** W/E COMMAND 100-year 4 hour Chicago Design Storm HYD ID START @ .00 hrs -------------------CHIC STORM [ Ptot= 87.58 mm ] DT min AREA ha Qpeak Tpeak cms hrs R.V. R.C. mm Qbase cms 10.0 * * CALIB STANDHYD 0203 [I%=68.0:S%= 2.00] 1 5.0 1.38 .51 1.33 65.16 .74 .000 * CALIB STANDHYD 0202 [I%=65.4:S%= 2.00] 1 5.0 1.67 .60 1.33 63.42 .72 .000 * CALIB STANDHYD 0201 [I%=80.0:S%= 2.00] 1 5.0 1.05 .44 1.33 73.19 .84 .000 * CALIB STANDHYD 0303 [I%=72.0:S%= 2.00] 1 5.0 1.38 .54 1.33 67.84 .77 .000 * CALIB STANDHYD 0302 [I%=69.0:S%= 2.00] 1 5.0 1.68 .63 1.33 65.83 .75 .000 * CALIB STANDHYD 0301 [I%=85.0:S%= 2.00] 1 5.0 1.01 .44 1.33 76.54 .87 .000 * CALIB STANDHYD 0403 [I%=79.0:S%= 2.00] 1 5.0 1.70 .70 1.33 72.52 .83 .000 * CALIB STANDHYD 0402 [I%=80.0:S%= 2.00] 1 5.0 2.15 .90 1.33 73.19 .84 .000 * CALIB STANDHYD 0401 [I%=87.0:S%= 2.00] 1 5.0 1.21 .54 1.33 77.88 .89 .000 RESRVR [ 2 : 0203] 0209 {ST= .02 ha.m } 1 5.0 1.38 .31 1.42 65.15 n/a .000 RESRVR [ 2 : 0202] 0210 {ST= .03 ha.m } 1 5.0 1.67 .36 1.42 63.42 n/a .000 RESRVR [ 2 : 0201] 0211 {ST= .02 ha.m } 1 5.0 1.06 .24 1.42 73.18 n/a .000 RESRVR [ 2 : 0303] 0309 {ST= .02 ha.m } 1 5.0 1.38 .31 1.42 67.83 n/a .000 RESRVR [ 2 : 0302] 0310 1 5.0 1.68 .37 1.42 65.83 n/a .000 * * * * * * * * * * * * * {ST= .03 ha.m } * RESRVR [ 2 : 0301] 0311 {ST= .02 ha.m } 1 5.0 1.01 .24 1.42 76.52 n/a .000 RESRVR [ 2 : 0403] 0409 {ST= .04 ha.m } 1 5.0 1.70 .31 1.42 72.51 n/a .000 RESRVR [ 2 : 0402] 0410 {ST= .05 ha.m } 1 5.0 2.15 .35 1.42 73.18 n/a .000 RESRVR [ 2 : 0401] 0411 {ST= .03 ha.m } 1 5.0 1.21 .24 1.42 77.85 n/a .000 * * * * FINISH =========================================================================================================== =========================================================================================================== V V V V V V SSSSS SS SS SS SSSSS U U U U U U U U UUUUU A A A AAAAA A A A A L L L L LLLLL TTTTT T T T TTTTT T T T H H H H Y M M MM MM M M M M V V I I I I I VV OOO O O O O OOO H H H H Y Y Y Y Y OOO O O O O OOO Developed and Distributed by Clarifica Inc. Copyright 1996, 2007 Clarifica Inc. All rights reserved. ***** S U M M A R Y O U T P U T ***** Input filename: C:\Program Files (x86)\Visual OTTHYMO 2.3.2\voin.dat Output filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\SCS Design Storm - Proposed (w Climate Change) - Bayview Alterna.out Summary filename: T:\2015PR~1\415375~1\Design\SWM\VO2\V02\SCS Design Storm - Proposed (w Climate Change) - Bayview Alterna.sum DATE: 2/2/2016 TIME: 4:49:26 PM USER: Drive Alternatives - SCS Design Storm COMMENTS: Bayview ____________________________________________________________ **************************** ** SIMULATION NUMBER: 6 ** 100-year **************************** W/E COMMAND HYD ID START @ .00 hrs -------------------MASS STORM [ Ptot=112.80 mm ] DT min 4 hour SCS Design Storm AREA ha Qpeak Tpeak cms hrs R.V. R.C. mm Qbase cms 15.0 * * CALIB STANDHYD 0203 [I%=68.0:S%= 2.00] 1 5.0 1.38 .45 6.00 86.02 .76 .000 * CALIB STANDHYD 0202 [I%=65.4:S%= 2.00] 1 5.0 1.67 .54 6.00 83.92 .74 .000 * CALIB STANDHYD 0201 [I%=80.0:S%= 2.00] 1 5.0 1.05 .38 6.00 95.68 .85 .000 * CALIB STANDHYD 0303 [I%=72.0:S%= 2.00] 1 5.0 1.38 .47 6.00 89.24 .79 .000 * CALIB STANDHYD 0302 [I%=69.0:S%= 2.00] 1 5.0 1.68 .55 6.00 86.82 .77 .000 * CALIB STANDHYD 0301 [I%=85.0:S%= 2.00] 1 5.0 1.01 .38 6.00 99.71 .88 .000 * CALIB STANDHYD 0403 [I%=79.0:S%= 2.00] 1 5.0 1.70 .61 6.00 94.88 .84 .000 * CALIB STANDHYD 0402 [I%=80.0:S%= 2.00] 1 5.0 2.15 .77 6.00 95.68 .85 .000 * CALIB STANDHYD 0401 [I%=87.0:S%= 2.00] 1 5.0 1.21 .46 6.00 101.32 .90 .000 RESRVR [ 2 : 0203] 0209 {ST= .02 ha.m } 1 5.0 1.38 .33 6.00 86.01 n/a .000 RESRVR [ 2 : 0202] 0210 {ST= .03 ha.m } 1 5.0 1.67 .39 6.00 83.91 n/a .000 RESRVR [ 2 : 0201] 0211 {ST= .02 ha.m } 1 5.0 1.06 .26 6.00 95.67 n/a .000 RESRVR [ 2 : 0303] 0309 {ST= .03 ha.m } 1 5.0 1.38 .33 6.00 89.23 n/a .000 RESRVR [ 2 : 0302] 0310 1 5.0 1.68 .39 6.00 86.81 n/a .000 * * * * * * * * * * * * * {ST= .03 ha.m } * RESRVR [ 2 : 0301] 0311 {ST= .02 ha.m } 1 5.0 1.01 .26 6.00 99.70 n/a .000 RESRVR [ 2 : 0403] 0409 {ST= .05 ha.m } 1 5.0 1.70 .33 6.08 94.86 n/a .000 RESRVR [ 2 : 0402] 0410 {ST= .06 ha.m } 1 5.0 2.15 .39 6.08 95.67 n/a .000 RESRVR [ 2 : 0401] 0411 {ST= .04 ha.m } 1 5.0 1.21 .25 6.08 101.30 n/a .000 * * * * FINISH =========================================================================================================== APPENDIX C: STORM SEWER DESIGN SHEETS CITY OF BARRIE STORM SEWER DESIGN SHEET - 5 YEAR STORM CCTA Project No.: BIG BAY POINT ROAD & BAYVIEW DRIVE EA BAYVIEW DRIVE STORM SEWER ALTERNATIVE 3 - 5 LANE CONFIGURATION Maintenance Hole Area ID# Length (m) Increment Flow Time (min) red = user input I (mm/hr) Total Q (cms) S (%) Full V Nominal Actual DIA Q (mm) Full (m/s) (cms) DIA (mm) Percent Capacity (%) From To C A CA To In Pipe 1 Pipe 2 Pipe 3 Pipe 4 MH #0 MH #1 MH #2 MH #3 MH #1 MH #2 MH #3 STC#3 50.0 50.0 50.0 50.0 0.78 0.78 0.78 0.78 0.19 0.19 0.19 0.19 0.15 0.15 0.15 0.15 0.15 0.29 0.44 0.59 10.00 10.43 10.85 11.28 0.43 0.43 0.43 0.37 107 104 102 100 0.044 0.085 0.125 0.164 2.0 2.0 2.0 2.0 300 300 300 375 304.8 304.8 304.8 381 0.143 0.143 0.143 0.259 2.0 2.0 2.0 2.3 31% 60% 88% 63% Pipe 5 Pipe 6 Pipe 7 Pipe 8 Pipe 9 MH #4 MH #5 MH #6 MH #7 MH #8 MH #5 MH #6 MH #7 MH #8 STC#3 50.0 50.0 50.0 50.0 50.0 0.78 0.78 0.78 0.78 0.78 0.19 0.19 0.19 0.19 0.19 0.15 0.15 0.15 0.15 0.15 0.15 0.29 0.44 0.59 0.74 10.00 10.43 10.85 11.28 11.65 0.43 0.43 0.43 0.37 0.37 107 104 102 100 99 0.044 0.085 0.125 0.164 0.202 2.0 2.0 2.0 2.0 2.0 300 300 300 375 375 304.8 304.8 304.8 381 381 0.143 0.143 0.143 0.259 0.259 2.0 2.0 2.0 2.3 2.3 31% 60% 88% 63% 78% Pipe 10 STC#3 Crossing #2 Outlet 15.0 0.78 0.00 0.00 1.32 12.01 0.10 98 0.361 2.0 450 457.2 0.421 2.6 86% Pipe 11 Pipe 12 MH #9 MH #10 MH #10 STC#4 50.0 40.0 0.79 0.79 0.17 0.14 0.14 0.11 0.14 0.25 10.00 10.43 0.43 0.34 107 105 0.041 0.072 2.0 2.0 300 300 304.8 304.8 0.143 0.143 2.0 2.0 29% 51% Pipe 13 Pipe 14 Pipe 15 Pipe 16 Pipe 17 Pipe 18 Pipe 19 Pipe 20 MH #11 MH #12 MH #13 MH #14 MH #15 MH #16 MH #17 MH #18 MH #12 MH #13 MH #14 MH #15 MH #16 MH #17 MH #18 STC#4 75.0 75.0 75.0 75.0 75.0 50.0 50.0 50.0 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.26 0.26 0.26 0.26 0.26 0.17 0.17 0.17 0.21 0.21 0.21 0.21 0.21 0.14 0.14 0.14 0.21 0.41 0.62 0.83 1.04 1.17 1.31 1.45 10.00 10.64 11.28 11.83 12.38 12.87 13.19 13.52 0.64 0.64 0.55 0.55 0.49 0.33 0.33 0.33 105 102 100 97 95 94 92 91 0.061 0.118 0.172 0.224 0.273 0.306 0.337 0.367 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 300 300 375 375 450 450 450 450 304.8 304.8 381 381 457.2 457.2 457.2 457.2 0.143 0.143 0.259 0.259 0.421 0.421 0.421 0.421 2.0 2.0 2.3 2.3 2.6 2.6 2.6 2.6 43% 82% 66% 86% 65% 73% 80% 87% Pipe 21 STC#4 Crossing #4 Outlet 15.0 0.79 0.00 0.00 1.70 13.84 0.09 91 0.429 2.0 525 533.4 0.634 2.8 68% Pipe 22 Pipe 23 Pipe 24 Pipe 25 Pipe 26 Pipe 28 MH #19 MH #20 MH #21 MH #22 MH #23 STC#5 MH #20 MH #21 MH #22 MH #23 STC#5 Crossing #5 Outlet 50.0 50.0 50.0 50.0 50.0 15.0 0.84 0.84 0.84 0.84 0.84 0.79 0.24 0.24 0.24 0.24 0.24 0.00 0.20 0.20 0.20 0.20 0.20 0.00 0.20 0.40 0.61 0.81 1.01 1.01 10.00 10.43 10.85 11.22 11.59 11.91 0.43 0.43 0.37 0.37 0.33 0.10 107 104 102 101 99 99 0.060 0.117 0.173 0.226 0.279 0.278 2.0 2.0 2.0 2.0 2.0 2.0 300 300 375 375 450 450 304.8 304.8 381 381 457.2 457.2 0.143 0.143 0.259 0.259 0.421 0.421 2.0 2.0 2.3 2.3 2.6 2.6 42% 82% 67% 88% 66% 66% c I = A/(td + B) Q = (C*I*A)/360 (cms) A = 853.608 C: Runoff Coefficient B = 4.699 I: Rainfall Intensity (mm/hr) C= 0.766 A: Area (ha) Date: 2-Feb-16 Calculated By: NHF Checked By: td = Storm Duration (mins) Parameter A B C Total CA 415375 Return Period 2-Yr 678.085 4.699 0.781 5-Yr 10-Yr 853.608 4.699 0.766 975.865 4.699 0.76 25-Yr 50-Yr 100-Yr 1146.275 4.922 0.757 1236.152 4.699 0.751 1426.408 5.273 0.759 CITY OF BARRIE PRELIMINARY STORM SEWER DESIGN SHEET - 5 YEAR STORM CCTA Project No.: BAYVIEW DR AND BIG BAY POINT RD EA BIG BAY POINT RD SEWER ALTERNATIVE 2 - 7 LANE CONFIGURATION Maintenance Hole Increment From To Length (m) C A CA Total CA Pipe 29 Pipe 30 Pipe 31 Pipe 32 Pipe 33 Pipe 34 Pipe 35 Pipe 36 Pipe 37 Pipe 38 MH #24 MH #25 MH #26 MH #27 MH #28 MH #29 MH #30 MH #31 MH #32 MH #33 MH #25 MH #26 MH #27 MH #28 MH #29 MH #30 MH #31 MH #32 MH #33 STC#1 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 Pipe 39 Pipe 40 Pipe 41 Pipe 42 Pipe 43 Pipe 44 Pipe 45 Pipe 46 Pipe 47 MH #34 MH #35 MH #36 MH #37 MH #38 MH #39 MH #40 MH #41 MH #42 MH #35 MH #36 MH #37 MH #38 MH #39 MH #40 MH #41 MH #42 STC#1 45.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.18 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 Pipe 48 STC#1 Ellis Natural Area Outlet 25.0 0.82 Pipe 49 Pipe 50 Pipe 51 Pipe 52 Pipe 53 Pipe 54 Pipe 55 Pipe 56 Pipe 57 Ex. Pipe 1 Ex. Pipe 2 Ex. Pipe 3 MH #43 MH #44 MH #45 MH #46 MH #47 MH #48 MH #49 MH #50 STC #2 EX. STM MH #1 EX. STM MH #2 EX. STM MH #3 MH #44 MH #45 MH #46 MH #47 MH #48 MH #49 MH #50 STC #2 EX. STM MH #1 EX. STM MH #2 EX. STM MH #3 EX. STM MH#6 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 29.0 66.0 85.0 Ex. Pipe 4 Ex. Pipe 5 EX. STM MH#4 EX. STM MH#5 EX. STM MH#5 EX. STM MH#6 Ex. Pipe 6 Ex. Pipe 7 Ex. Pipe 8 Ex. Pipe 9 EX. STM MH#6 EX. STM MH#7 EX. STM MH#8 EX. STM MH#9 EX. STM MH#7 EX. STM MH#8 EX. STM MH#9 Ex. Huronia North Park Outlet Area ID# I = A/(td + B) c C: Runoff Coefficient B = 4.699 I: Rainfall Intensity (mm/hr) C= 0.766 A: Area (ha) A B C 2-Yr 678.085 4.699 0.781 5-Yr I (mm/hr) Total Q (cms) S (%) Nominal Actual DIA DIA (mm) (mm) Q Full (cms) Percent V Full (m/s) Capacity (%) In 0.13 0.27 0.40 0.54 0.67 0.80 0.94 1.07 1.21 1.34 10.00 10.33 10.66 10.99 11.27 11.55 11.84 12.09 12.34 12.59 0.33 0.33 0.33 0.28 0.28 0.28 0.25 0.25 0.25 0.25 107 105 104 102 101 100 98 97 96 95 0.040 0.078 0.116 0.152 0.188 0.222 0.256 0.289 0.322 0.354 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 300 300 300 375 375 375 450 450 450 450 304.8 304.8 304.8 381 381 381 457.2 457.2 457.2 457.2 0.148 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 0.436 2.0 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 2.7 27% 53% 78% 57% 70% 83% 59% 66% 74% 81% 0.15 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.15 0.28 0.42 0.55 0.69 0.82 0.95 1.09 1.22 10.00 10.37 10.70 11.03 11.31 11.59 11.88 12.13 12.38 0.37 0.33 0.33 0.28 0.28 0.28 0.25 0.25 0.25 107 105 103 102 101 99 98 97 96 0.045 0.083 0.120 0.157 0.192 0.226 0.260 0.293 0.326 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 300 300 300 375 375 375 450 450 450 304.8 304.8 304.8 381 381 381 457.2 457.2 457.2 0.148 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 2.0 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 30% 56% 81% 58% 72% 84% 60% 67% 75% 0.00 0.00 2.56 12.84 0.13 95 0.673 2.2 600 609.6 0.939 3.2 72% 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.00 0.01 0.01 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.00 0.00 0.01 0.18 0.37 0.55 0.73 0.91 1.10 1.28 1.46 1.65 1.65 1.65 1.66 10.00 10.41 10.82 11.18 11.53 11.88 12.20 12.51 12.83 13.11 13.28 13.56 0.41 0.41 0.35 0.35 0.35 0.31 0.31 0.31 0.28 0.17 0.28 0.81 107 104 103 101 99 98 97 95 94 93 92 89 0.054 0.106 0.157 0.205 0.252 0.298 0.343 0.387 0.430 0.427 0.424 0.411 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 1.2 2.4 0.4 300 300 375 375 375 450 450 450 525 750 750 858 304.8 304.8 381 381 381 457.2 457.2 457.2 533.4 762 762 871.728 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 0.658 1.272 1.814 1.601 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 2.9 2.8 4.0 1.7 37% 72% 58% 77% 94% 68% 79% 89% 65% 34% 23% 26% 95.3 96.5 0.83 0.83 0.01 0.01 0.01 0.01 0.01 0.01 10.00 11.10 1.10 1.12 103 98 0.002 0.004 0.6 0.3 450 750 457.2 762 0.236 0.657 1.4 1.4 1% 1% 17.5 8.5 155.0 5.0 0.83 0.83 0.83 0.83 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.00 1.67 1.67 1.68 1.68 14.37 14.48 14.49 15.26 0.11 0.01 0.77 0.03 89 89 86 86 0.413 0.413 0.403 0.403 0.6 16.5 0.8 0.5 1200 1350 1350 1350 1219.2 1371.6 1371.6 1371.6 3.151 22.618 4.980 3.937 2.7 15.3 3.4 2.7 13% 2% 8% 10% Date: 2-Feb-16 Calculated By: NHF Checked By: Table 3.1: Barrie WPCC IDF Curve Parameters - Adjusted to Account for Climate Change Parameter red = user input Flow Time (min) To Q = (C*I*A)/360 (cms) A = 853.608 415375 Return Period 10-Yr 853.608 975.865 4.699 4.699 0.766 0.76 25-Yr 1146.275 4.922 0.757 50-Yr 1236.152 4.699 0.751 100-Yr 1426.408 5.273 0.759 CITY OF BARRIE PRELIMINARY STORM SEWER DESIGN SHEET - 5 YEAR STORM CCTA Project No.: BAYVIEW DR AND BIG BAY POINT RD EA BIG BAY POINT RD SEWER ALTERNATIVE 2 - 7 LANE CONFIGURATION Maintenance Hole Increment From To Length (m) C A CA Total CA Pipe 29 Pipe 30 Pipe 31 Pipe 32 Pipe 33 Pipe 34 Pipe 35 Pipe 36 Pipe 37 Pipe 38 MH #24 MH #25 MH #26 MH #27 MH #28 MH #29 MH #30 MH #31 MH #32 MH #33 MH #25 MH #26 MH #27 MH #28 MH #29 MH #30 MH #31 MH #32 MH #33 STC#1 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 Pipe 39 Pipe 40 Pipe 41 Pipe 42 Pipe 43 Pipe 44 Pipe 45 Pipe 46 Pipe 47 MH #34 MH #35 MH #36 MH #37 MH #38 MH #39 MH #40 MH #41 MH #42 MH #35 MH #36 MH #37 MH #38 MH #39 MH #40 MH #41 MH #42 STC#1 45.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.18 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 Pipe 48 STC#1 Ellis Natural Area Outlet 25.0 0.82 Pipe 49 Pipe 50 Pipe 51 Pipe 52 Pipe 53 Pipe 54 Pipe 55 Pipe 56 Pipe 57 Ex. Pipe 1 Ex. Pipe 2 Ex. Pipe 3 MH #43 MH #44 MH #45 MH #46 MH #47 MH #48 MH #49 MH #50 STC #2 EX. STM MH #1 EX. STM MH #2 EX. STM MH #3 MH #44 MH #45 MH #46 MH #47 MH #48 MH #49 MH #50 STC #2 EX. STM MH #1 EX. STM MH #2 EX. STM MH #3 EX. STM MH#6 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 29.0 66.0 85.0 Ex. Pipe 4 Ex. Pipe 5 EX. STM MH#4 EX. STM MH#5 EX. STM MH#5 EX. STM MH#6 Ex. Pipe 6 Ex. Pipe 7 Ex. Pipe 8 Ex. Pipe 9 EX. STM MH#6 EX. STM MH#7 EX. STM MH#8 EX. STM MH#9 EX. STM MH#7 EX. STM MH#8 EX. STM MH#9 Ex. Huronia North Park Outlet Area ID# c I = A/(td + B) Q = (C*I*A)/360 (cms) A = 853.608 C: Runoff Coefficient B = 4.699 I: Rainfall Intensity (mm/hr) C= 0.766 A: Area (ha) Parameter A B C 2-Yr 678.085 4.699 0.781 5-Yr red = user input Flow Time (min) I (mm/hr) Total Q (cms) S (%) Q Full (cms) V Full (m/s) Percent Capacity (%) 304.8 304.8 304.8 381 381 381 457.2 457.2 457.2 457.2 0.148 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 0.436 2.0 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 2.7 27% 53% 78% 57% 70% 83% 59% 66% 74% 81% 300 300 300 375 375 375 450 450 450 304.8 304.8 304.8 381 381 381 457.2 457.2 457.2 0.148 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 2.0 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 30% 56% 81% 58% 72% 84% 60% 67% 75% 2.2 600 609.6 0.939 3.2 72% 0.054 0.106 0.157 0.205 0.252 0.298 0.343 0.387 0.430 0.427 0.424 0.411 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 1.2 2.4 0.4 300 300 375 375 375 450 450 450 525 750 750 858 304.8 304.8 381 381 381 457.2 457.2 457.2 533.4 762 762 871.728 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 0.658 1.272 1.814 1.601 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 2.9 2.8 4.0 1.7 37% 72% 58% 77% 94% 68% 79% 89% 65% 34% 23% 26% 103 98 0.002 0.004 0.6 0.3 450 750 457.2 762 0.236 0.657 1.4 1.4 1% 1% 89 89 86 86 0.413 0.412 0.403 0.402 0.6 0.6 0.8 0.5 1200 1350 1350 1350 1219.2 1371.6 1371.6 1371.6 3.151 4.313 4.980 3.937 2.7 2.9 3.4 2.7 13% 10% 8% 10% Nominal Actual DIA (mm) DIA (mm) To In 0.13 0.27 0.40 0.54 0.67 0.80 0.94 1.07 1.21 1.34 10.00 10.33 10.66 10.99 11.27 11.55 11.84 12.09 12.34 12.59 0.33 0.33 0.33 0.28 0.28 0.28 0.25 0.25 0.25 0.25 107 105 104 102 101 100 98 97 96 95 0.040 0.078 0.116 0.152 0.188 0.222 0.256 0.289 0.322 0.354 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 300 300 300 375 375 375 450 450 450 450 0.15 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.15 0.28 0.42 0.55 0.69 0.82 0.95 1.09 1.22 10.00 10.37 10.70 11.03 11.31 11.59 11.88 12.13 12.38 0.37 0.33 0.33 0.28 0.28 0.28 0.25 0.25 0.25 107 105 103 102 101 99 98 97 96 0.045 0.083 0.120 0.157 0.192 0.226 0.260 0.293 0.326 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 0.00 0.00 2.56 12.84 0.13 95 0.673 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.00 0.01 0.01 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.00 0.00 0.01 0.18 0.37 0.55 0.73 0.91 1.10 1.28 1.46 1.65 1.65 1.65 1.66 10.00 10.41 10.82 11.18 11.53 11.88 12.20 12.51 12.83 13.11 13.28 13.56 0.41 0.41 0.35 0.35 0.35 0.31 0.31 0.31 0.28 0.17 0.28 0.81 107 104 103 101 99 98 97 95 94 93 92 89 95.3 96.5 0.83 0.83 0.01 0.01 0.01 0.01 0.01 0.01 10.00 11.10 1.10 1.12 17.5 8.5 155.0 5.0 0.83 0.83 0.83 0.83 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.00 1.67 1.67 1.68 1.68 14.37 14.48 14.53 15.30 0.11 0.05 0.77 0.03 Date: 02-Feb-16 Calculated By: NHF Checked By: Table 3.1: Barrie WPCC IDF Curve Parameters - Adjusted to Account for Climate Change Return Period 10-Yr 975.865 4.699 0.76 853.608 4.699 0.766 25-Yr 1146.275 4.922 0.757 50-Yr 1236.152 4.699 0.751 100-Yr 1426.408 5.273 0.759 415375 CITY OF BARRIE PRELIMINARY STORM SEWER DESIGN SHEET - 100 YEAR STORM CCTA Project No.: BAYVIEW DR AND BIG BAY POINT RD EA BIG BAY POINT ROAD SEWER ALTERNATIVE 2 - 7 LANE CONFIGURATION Maintenance Hole Area ID# Length (m) Increment Total CA Flow Time (min) 415375 red = user input I (mm/hr) Total Q (cms) S (%) Nominal Actual DIA DIA (mm) (mm) Q Full (cms) V Full (m/s) Percent Capacity (%) 5-Year Q (cms) 100-year Overland Q (cms) From To C A CA To In Pipe 29 Pipe 30 Pipe 31 Pipe 32 Pipe 33 Pipe 34 Pipe 35 Pipe 36 Pipe 37 Pipe 38 MH #24 MH #25 MH #26 MH #27 MH #28 MH #29 MH #30 MH #31 MH #32 MH #33 MH #25 MH #26 MH #27 MH #28 MH #29 MH #30 MH #31 MH #32 MH #33 STC#1 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.27 0.40 0.54 0.67 0.80 0.94 1.07 1.21 1.34 10.00 10.33 10.66 10.99 11.27 11.55 11.84 12.09 12.34 12.59 0.33 0.33 0.33 0.28 0.28 0.28 0.25 0.25 0.25 0.25 177 174 172 170 167 165 163 162 160 158 0.066 0.130 0.192 0.252 0.311 0.369 0.426 0.481 0.536 0.589 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 300 300 300 375 375 375 450 450 450 450 304.8 304.8 304.8 381 381 381 457.2 457.2 457.2 457.2 0.148 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 0.436 2.0 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 2.7 45% 88% 130% 94% 116% 138% 98% 110% 123% 135% 0.040 0.078 0.116 0.152 0.188 0.222 0.256 0.289 0.322 0.354 0.000 0.000 0.044 0.000 0.043 0.101 0.000 0.045 0.099 0.153 Pipe 39 Pipe 40 Pipe 41 Pipe 42 Pipe 43 Pipe 44 Pipe 45 Pipe 46 MH #34 MH #35 MH #36 MH #37 MH #38 MH #39 MH #40 MH #41 MH #42 MH #35 MH #36 MH #37 MH #38 MH #39 MH #40 MH #41 MH #42 STC#1 45.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 40.0 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.18 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.15 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.13 0.15 0.28 0.42 0.55 0.69 0.82 0.95 1.09 1.22 10.00 10.37 10.70 11.03 11.31 11.59 11.88 12.13 12.38 0.37 0.33 0.33 0.28 0.28 0.28 0.25 0.25 0.25 177 174 171 169 167 165 163 161 160 0.074 0.138 0.199 0.260 0.319 0.376 0.432 0.488 0.542 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 300 300 300 375 375 375 450 450 450 304.8 304.8 304.8 381 381 381 457.2 457.2 457.2 0.148 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 2.0 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 50% 93% 135% 97% 119% 140% 99% 112% 124% 0.045 0.083 0.120 0.157 0.192 0.226 0.260 0.293 0.326 0.000 0.000 0.051 0.000 0.050 0.108 0.000 0.052 0.106 Pipe 47 STC#1 Ellis Natural Area Outlet 25.0 0.82 0.00 0.00 2.56 12.84 0.13 157 1.121 2.2 600 609.6 0.939 3.2 119% 0.673 0.181 Pipe 48 Pipe 49 Pipe 50 Pipe 51 Pipe 52 Pipe 53 Pipe 54 Pipe 55 MH #43 MH #44 MH #45 MH #46 MH #47 MH #48 MH #49 MH #50 MH #44 MH #45 MH #46 MH #47 MH #48 MH #49 MH #50 STC #2 50.0 50.0 50.0 50.0 50.0 50.0 50.0 50.0 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.18 0.37 0.55 0.73 0.91 1.10 1.28 1.46 10.00 10.41 10.82 11.18 11.53 11.88 12.20 12.51 0.41 0.41 0.35 0.35 0.35 0.31 0.31 0.31 177 173 170 168 165 163 160 158 0.090 0.176 0.260 0.341 0.419 0.496 0.571 0.644 2.2 2.2 2.2 2.2 2.2 2.2 2.2 2.2 300 300 375 375 375 450 450 450 304.8 304.8 381 381 381 457.2 457.2 457.2 0.148 0.148 0.268 0.268 0.268 0.436 0.436 0.436 2.0 2.0 2.4 2.4 2.4 2.7 2.7 2.7 61% 119% 97% 127% 156% 114% 131% 148% 0.054 0.106 0.157 0.205 0.252 0.298 0.343 0.387 0.000 0.028 0.000 0.072 0.151 0.060 0.135 0.208 Pipe 56 Ex. Pipe 1 Ex. Pipe 2 Ex. Pipe 3 STC #2 EX. STM MH #1 EX. STM MH #2 EX. STM MH #3 EX. STM MH #1 EX. STM MH #2 EX. STM MH #3 EX. STM MH#6 50.0 29.0 66.0 85.0 0.83 0.83 0.83 0.83 0.22 0.00 0.01 0.01 0.18 0.00 0.00 0.01 1.65 1.65 1.65 1.66 12.83 13.11 13.28 13.56 0.28 0.17 0.28 0.81 157 155 154 149 0.716 0.711 0.705 0.686 2.2 1.2 2.4 0.4 525 750 750 858 533.4 762 762 871.728 0.658 1.272 1.814 1.601 2.9 2.8 4.0 1.7 109% 56% 39% 43% 0.430 0.427 0.424 0.411 0.058 0.000 0.000 0.000 Ex. Pipe 4 Ex. Pipe 5 EX. STM MH#4 EX. STM MH#5 EX. STM MH#5 EX. STM MH#6 95.3 96.5 0.83 0.83 0.01 0.01 0.01 0.01 0.01 0.01 10.00 11.10 1.10 1.12 171 163 0.003 0.006 0.6 0.3 450 750 457.2 762 0.236 0.657 1.4 1.4 1% 1% 0.002 0.004 0.000 0.000 Ex. Pipe 6 Ex. Pipe 7 Ex. Pipe 8 Ex. Pipe 9 EX. STM MH#6 EX. STM MH#7 EX. STM MH#8 EX. STM MH#9 EX. STM MH#7 EX. STM MH#8 EX. STM MH#9 Ex. Huronia North Park Outlet 17.5 8.5 155.0 5.0 0.83 0.83 0.83 0.83 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.00 1.67 1.67 1.68 1.68 14.37 14.48 14.53 15.30 0.11 0.05 0.77 0.03 148 148 144 144 0.689 0.688 0.672 0.672 0.6 0.6 0.8 0.5 1200 1350 1350 1350 1219.2 1371.6 1371.6 1371.6 3.151 4.313 4.980 3.937 2.7 2.9 3.4 2.7 22% 16% 13% 17% 0.413 0.412 0.403 0.402 0.000 0.000 0.000 0.000 c I = A/(td + B) Q = (C*I*A)/360 (cms) A = 853.608 C: Runoff Coefficient B = 4.699 I: Rainfall Intensity (mm/hr) C= 0.766 A: Area (ha) Date: 20-Nov-15 Calculated By: NHF Checked By: td = Storm Duration (mins) Table 3.1: Barrie WPCC IDF Curve Parameters - Adjusted to Account for Climate Change Parameter A B C 2-Yr 678.085 4.699 0.781 5-Yr Return Period 10-Yr 975.865 4.699 0.76 853.608 4.699 0.766 25-Yr 1146.275 4.922 0.757 50-Yr 1236.152 4.699 0.751 100-Yr 1426.408 5.273 0.759 APPENDIX D: OVERSIZED PIPE DESIGN Big Bay Point Road and Bayview Drive EA CCTA PROJECT NO.: 415375 Red Text denotes inlet elevation for existing storm sewer from record drawing. This value has been used to check system for feasibility. Slope = 0.019 Bayview Drive - Catchment 201 (South Bayview) ID T/G INV Diameter (m) Length (m) Width (m) Area (sq.m) Elevation (m) 273.20 273.30 273.40 273.50 273.60 273.70 273.80 273.90 274.00 274.10 274.20 274.30 274.40 274.50 274.60 274.70 274.80 274.90 275.00 275.10 275.20 275.30 275.40 275.50 275.60 275.70 275.80 275.90 276.00 276.10 276.20 276.30 276.40 276.50 276.60 276.70 276.80 276.90 277.00 277.10 277.20 277.30 277.40 277.50 277.60 277.70 277.80 278.50 278.60 283.90 MH #19 278.53 275.48 1.2 1.13 MH #20 277.68 274.50 1.2 1.13 MH #21 276.61 273.52 1.2 1.13 MH #22 275.19 272.54 1.2 1.13 MH #23 273.96 271.56 1.2 1.13 MH #19 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.14 0.25 0.36 0.48 0.59 0.70 0.81 0.93 1.04 1.15 1.27 1.38 1.49 1.61 1.72 1.83 1.95 2.06 2.17 2.28 2.40 2.51 2.62 3.42 3.45 3.45 MH #20 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 0.23 0.34 0.45 0.57 0.68 0.79 0.90 1.02 1.13 1.24 1.36 1.47 1.58 1.70 1.81 1.92 2.04 2.15 2.26 2.38 2.49 2.60 2.71 2.83 2.94 3.05 3.17 3.28 3.39 3.51 3.60 3.60 3.60 3.60 3.60 Maintenance Hole/Catchbasin Storage MH #21 MH #22 MH #23 (cu.m) (cu.m) (cu.m) 0.00 0.75 1.85 0.00 0.86 1.97 0.00 0.97 2.08 0.00 1.09 2.19 0.09 1.20 2.31 0.20 1.31 2.42 0.32 1.43 2.53 0.43 1.54 2.65 0.54 1.65 2.71 0.66 1.76 2.71 0.77 1.88 2.71 0.88 1.99 2.71 1.00 2.10 2.71 1.11 2.22 2.71 1.22 2.33 2.71 1.33 2.44 2.71 1.45 2.56 2.71 1.56 2.67 2.71 1.67 2.78 2.71 1.79 2.90 2.71 1.90 3.00 2.71 2.01 3.00 2.71 2.13 3.00 2.71 2.24 3.00 2.71 2.35 3.00 2.71 2.47 3.00 2.71 2.58 3.00 2.71 2.69 3.00 2.71 2.80 3.00 2.71 2.92 3.00 2.71 3.03 3.00 2.71 3.14 3.00 2.71 3.26 3.00 2.71 3.37 3.00 2.71 3.48 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 3.49 3.00 2.71 Orifice #5 273.34 270.58 0 0.00 Orifice #5 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ID Diameter U/S INV D/S INV AVG INV Length Total (cu.m) 2.60 2.83 3.05 3.28 3.60 3.94 4.28 4.61 4.91 5.13 5.36 5.59 5.81 6.04 6.38 6.72 7.06 7.40 7.74 8.08 8.40 8.63 8.86 9.10 9.44 9.78 10.12 10.46 10.80 11.14 11.48 11.82 12.16 12.50 12.84 13.07 13.30 13.53 13.75 13.98 14.21 14.43 14.66 14.88 15.11 15.31 15.43 16.22 16.25 16.25 Elevation (m) 273.20 273.30 273.40 273.50 273.60 273.70 273.80 273.90 274.00 274.10 274.20 274.30 274.40 274.50 274.60 274.70 274.80 274.90 275.00 275.10 275.20 275.30 275.40 275.50 275.60 275.70 275.80 275.90 276.00 276.10 276.20 276.30 276.40 276.50 276.60 276.70 276.80 276.90 277.00 277.10 277.20 277.30 277.40 277.50 277.60 277.70 277.80 278.50 278.60 283.90 Pipe 22 1.050 275.98 275.03 275.51 50 Pipe 23 1.050 275.00 274.05 274.53 50 Pipe 24 1.050 274.02 273.07 273.55 50 Pipe 25 1.050 273.04 272.09 272.57 50 Pipe 26 1.050 272.06 271.11 271.59 50 Pipe 28 0.375 271.08 270.85 270.96 15 Pipe 22 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 3.80 7.90 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 23 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 3.80 7.90 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Storm Sewer Storage Pipe 24 Pipe 25 Pipe 26 (cu.m) (cu.m) (cu.m) 0.00 12.65 12.65 0.00 12.65 12.65 0.00 12.65 12.65 0.00 12.65 12.65 0.75 12.65 12.65 3.80 12.65 12.65 7.90 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 28 (cu.m) 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 1.61 Type Orifice 1 Diameter 0.260 Area 0.0530929 INV 271.58 C\ 0.8 Total (cu.m) 25.30 25.30 25.30 25.30 26.05 29.10 33.20 37.95 37.95 37.95 37.95 37.95 37.95 37.95 38.70 41.75 45.85 50.60 50.60 50.60 50.60 50.60 50.60 50.60 51.35 54.40 58.50 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 TOTAL STORAGE (cu.m) 27.90 28.13 28.35 28.58 29.65 33.04 37.48 42.56 42.86 43.08 43.31 43.54 43.76 43.99 45.08 48.47 52.91 58.00 58.34 58.68 59.00 59.23 59.46 59.70 60.79 64.18 68.62 73.71 74.05 74.39 74.73 75.07 75.41 75.75 76.09 76.32 76.55 76.78 77.00 77.23 77.46 77.68 77.91 78.13 78.36 78.56 78.68 79.47 79.50 79.50 TOTAL STORAGE (ha-m) 0.0028 0.0028 0.0028 0.0029 0.0030 0.0033 0.0037 0.0043 0.0043 0.0043 0.0043 0.0044 0.0044 0.0044 0.0045 0.0048 0.0053 0.0058 0.0058 0.0059 0.0059 0.0059 0.0059 0.0060 0.0061 0.0064 0.0069 0.0074 0.0074 0.0074 0.0075 0.0075 0.0075 0.0076 0.0076 0.0076 0.0077 0.0077 0.0077 0.0077 0.0077 0.0078 0.0078 0.0078 0.0078 0.0079 0.0079 0.0079 0.0080 0.0080 Elevation (m) 273.20 273.30 273.40 Head 1 (m) 1.4900 1.5900 1.6900 Discharge Orifice 1 (cms) 0.230 0.237 0.245 Total (cms) 0.230 0.237 0.245 Big Bay Point Road and Bayview Drive EA CCTA PROJECT NO.: 415375 Red Text denotes inlet elevation for existing storm sewer from record drawing. This value has been used to check system for feasibility. Slope = 0.05 Slope = 0.011 Bayview Drive - Catchment 202 (Mid Bayview) ID T/G INV Diameter (m) Length (m) Width (m) Area (sq.m) Elevation (m) 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 273.20 273.30 273.40 MH #9 271.90 268.85 0.00 MH #10 272.30 266.32 1.4 1.54 MH #11 273.34 270.29 1.4 1.54 MH #12 272.89 269.44 1.4 1.54 MH #13 272.46 268.58 1.4 1.54 MH #9 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 MH #10 (cu.m) 2.59 2.74 2.89 3.05 3.20 3.36 3.51 3.66 3.82 3.97 4.13 4.28 4.43 4.59 4.74 4.90 5.05 5.20 5.36 5.51 5.66 5.82 5.97 6.13 6.28 6.43 6.59 6.74 6.90 7.05 7.20 7.36 7.51 7.67 7.82 7.97 8.13 8.28 8.44 8.59 8.74 8.90 9.05 9.21 9.21 9.21 9.21 9.21 9.21 9.21 9.21 9.21 9.21 9.21 9.21 MH #11 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.17 0.32 0.48 0.63 0.79 0.94 1.09 1.25 1.40 1.55 1.71 1.86 2.02 2.17 2.32 2.48 2.63 2.79 2.94 3.09 3.25 3.40 3.56 3.71 3.86 4.02 4.17 4.33 4.48 4.63 4.70 MH #12 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.25 0.41 0.56 0.72 0.87 1.02 1.18 1.33 1.49 1.64 1.79 1.95 2.10 2.26 2.41 2.56 2.72 2.87 3.02 3.18 3.33 3.49 3.64 3.79 3.95 4.10 4.26 4.41 4.56 4.72 4.87 5.03 5.18 5.32 5.32 5.32 5.32 5.32 5.32 MH #13 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.18 0.34 0.49 0.65 0.80 0.95 1.11 1.26 1.42 1.57 1.72 1.88 2.03 2.19 2.34 2.49 2.65 2.80 2.96 3.11 3.26 3.42 3.57 3.73 3.88 4.03 4.19 4.34 4.49 4.65 4.80 4.96 5.11 5.26 5.42 5.57 5.73 5.88 5.97 5.97 5.97 5.97 5.97 5.97 5.97 5.97 5.97 5.97 MH #14 272.06 267.73 1.4 1.54 MH #15 271.69 266.87 1.4 1.54 MH #16 271.03 266.02 1.4 1.54 MH #17 270.50 265.44 1.4 1.54 MH #18 270.48 264.86 1.4 1.54 Orifice #4 271.45 264.28 0 0.00 Maintenance Hole/Catchbasin Storage MH #14 MH #15 MH #16 (cu.m) (cu.m) (cu.m) 0.42 1.74 3.06 0.58 1.89 3.21 0.73 2.05 3.36 0.89 2.20 3.52 1.04 2.36 3.67 1.19 2.51 3.83 1.35 2.66 3.98 1.50 2.82 4.13 1.65 2.97 4.29 1.81 3.12 4.44 1.96 3.28 4.60 2.12 3.43 4.75 2.27 3.59 4.90 2.42 3.74 5.06 2.58 3.89 5.21 2.73 4.05 5.36 2.89 4.20 5.52 3.04 4.36 5.67 3.19 4.51 5.83 3.35 4.66 5.98 3.50 4.82 6.13 3.66 4.97 6.29 3.81 5.13 6.44 3.96 5.28 6.60 4.12 5.43 6.75 4.27 5.59 6.90 4.43 5.74 7.06 4.58 5.90 7.21 4.73 6.05 7.37 4.89 6.20 7.52 5.04 6.36 7.67 5.20 6.51 7.72 5.35 6.67 7.72 5.50 6.82 7.72 5.66 6.97 7.72 5.81 7.13 7.72 5.97 7.28 7.72 6.12 7.42 7.72 6.27 7.42 7.72 6.43 7.42 7.72 6.58 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 6.67 7.42 7.72 MH #17 (cu.m) 3.95 4.10 4.26 4.41 4.56 4.72 4.87 5.03 5.18 5.33 5.49 5.64 5.80 5.95 6.10 6.26 6.41 6.57 6.72 6.87 7.03 7.18 7.34 7.49 7.64 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 7.80 MH #18 (cu.m) 4.84 5.00 5.15 5.30 5.46 5.61 5.76 5.92 6.07 6.23 6.38 6.53 6.69 6.84 7.00 7.15 7.30 7.46 7.61 7.77 7.92 8.07 8.23 8.38 8.54 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 8.66 Orifice #4 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ID Diameter U/S INV D/S INV AVG INV Length Total (cu.m) 16.59 17.52 18.44 19.37 20.29 21.21 22.17 23.24 24.32 25.40 26.48 27.55 28.63 29.71 30.79 31.97 33.20 34.43 35.66 36.89 38.12 39.35 40.59 41.83 43.22 44.57 45.65 46.73 47.81 48.88 49.96 50.93 51.85 52.78 53.70 54.62 55.55 56.46 57.23 58.00 58.77 59.47 60.09 60.71 61.17 61.57 61.88 62.18 62.49 62.78 62.94 63.09 63.25 63.40 63.46 Elevation (m) 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 273.20 273.30 273.40 Pipe 11 1.050 269.35 266.85 268.10 50 Pipe 12 1.050 266.82 264.82 265.82 40 Pipe 13 1.050 270.79 269.97 270.38 75 Pipe 14 1.050 269.94 269.11 269.52 75 Pipe 15 1.050 269.08 268.26 268.67 75 Pipe 11 (cu.m) 0.00 0.00 2.10 5.75 10.20 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 12 (cu.m) 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 13 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.15 8.63 15.30 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 Pipe 14 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.13 5.70 11.85 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 Pipe 15 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.15 8.63 15.30 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 Pipe 16 1.050 268.23 267.40 267.81 75 Pipe 17 1.050 267.37 266.55 266.96 75 Storm Sewer Storage Pipe 16 Pipe 17 (cu.m) (cu.m) 5.70 18.98 11.85 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 18.98 Pipe 18 1.050 266.52 265.97 266.24 50 Pipe 19 1.050 265.94 265.39 265.66 50 Pipe 20 1.050 265.36 264.81 265.08 50 Pipe 21 0.675 264.78 264.30 264.54 16 Pipe 18 (cu.m) 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 19 (cu.m) 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 20 (cu.m) 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 21 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Type Orifice #4 Diameter 0.400 Area 0.1256637 INV 269.55 C\ 0.8 Total (cu.m) 72.75 78.90 88.12 91.77 96.22 98.67 98.67 98.67 101.82 107.30 113.97 117.65 117.65 117.65 117.65 117.65 118.77 123.35 129.50 136.62 136.62 136.62 136.62 136.62 136.62 139.77 145.25 151.92 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 155.60 TOTAL STORAGE (cu.m) 89.34 96.41 106.56 111.14 116.51 119.88 120.84 121.91 126.14 132.69 140.45 145.20 146.28 147.36 148.43 149.61 151.97 157.77 165.15 173.51 174.74 175.97 177.21 178.45 179.84 184.34 190.90 198.65 203.40 204.48 205.56 206.53 207.45 208.37 209.30 210.22 211.14 212.05 212.82 213.59 214.36 215.07 215.68 216.30 216.76 217.16 217.47 217.78 218.09 218.38 218.53 218.69 218.84 218.99 219.06 TOTAL STORAGE (ha-m) 0.0089 0.0096 0.0107 0.0111 0.0117 0.0120 0.0121 0.0122 0.0126 0.0133 0.0140 0.0145 0.0146 0.0147 0.0148 0.0150 0.0152 0.0158 0.0165 0.0174 0.0175 0.0176 0.0177 0.0178 0.0180 0.0184 0.0191 0.0199 0.0203 0.0204 0.0206 0.0207 0.0207 0.0208 0.0209 0.0210 0.0211 0.0212 0.0213 0.0214 0.0214 0.0215 0.0216 0.0216 0.0217 0.0217 0.0217 0.0218 0.0218 0.0218 0.0219 0.0219 0.0219 0.0219 0.0219 Elevation (m) 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 Head 1 (m) 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0500 0.1500 0.2500 0.3500 0.4500 0.5500 0.6500 0.7500 Discharge Orifice #4 (cms) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.100 0.172 0.223 0.263 0.299 0.330 0.359 0.386 Total (cms) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.100 0.172 0.223 0.263 0.299 0.330 0.359 0.386 Big Bay Point Road and Bayview Drive EA CCTA PROJECT NO.: 415375 Red Text denotes inlet elevation for existing storm sewer from record drawing. This value has been used to check system for feasibility. Slope = 0.01 Slope = 0.01 Bayview Drive - Catchment 203 (North Bayview) ID T/G INV Diameter (m) Length (m) Width (m) Area (sq.m) Elevation (m) 266.50 266.60 266.70 266.80 266.90 267.00 267.10 267.20 267.30 267.40 267.50 267.60 267.70 267.80 267.90 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 MH #0 270.13 267.93 1.13 MH #1 270.60 267.40 1.2 1.13 MH #2 270.40 266.87 1.2 1.13 MH #3 270.20 266.34 1.2 1.13 MH #4 269.90 267.23 1.2 1.13 MH #5 273.07 266.70 1.2 1.13 MH #6 272.90 266.17 1.2 1.13 MH #0 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 0.20 0.31 0.42 0.54 0.65 0.76 0.88 0.99 1.10 1.21 1.33 1.44 1.55 1.67 1.78 1.89 2.01 2.12 2.23 2.34 2.46 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 2.49 MH #1 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.12 0.23 0.34 0.46 0.57 0.68 0.80 0.91 1.02 1.14 1.25 1.36 1.48 1.59 1.70 1.82 1.93 2.04 2.15 2.27 2.38 2.49 2.61 2.72 2.83 2.95 3.06 3.17 3.29 3.40 3.51 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 3.62 MH #2 (cu.m) 0.00 0.00 0.00 0.00 0.04 0.15 0.27 0.38 0.49 0.61 0.72 0.83 0.94 1.06 1.17 1.28 1.40 1.51 1.62 1.74 1.85 1.96 2.08 2.19 2.30 2.41 2.53 2.64 2.75 2.87 2.98 3.09 3.21 3.32 3.43 3.55 3.66 3.77 3.88 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 MH #3 (cu.m) 0.19 0.30 0.41 0.53 0.64 0.75 0.87 0.98 1.09 1.20 1.32 1.43 1.54 1.66 1.77 1.88 2.00 2.11 2.22 2.34 2.45 2.56 2.67 2.79 2.90 3.01 3.13 3.24 3.35 3.47 3.58 3.69 3.81 3.92 4.03 4.15 4.26 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 4.37 Maintenance Hole/Catchbasin Storage MH #4 MH #5 MH #6 (cu.m) (cu.m) (cu.m) 0.00 0.00 0.38 0.00 0.00 0.49 0.00 0.01 0.61 0.00 0.12 0.72 0.00 0.23 0.83 0.00 0.34 0.94 0.00 0.46 1.06 0.00 0.57 1.17 0.08 0.68 1.28 0.20 0.80 1.40 0.31 0.91 1.51 0.42 1.02 1.62 0.54 1.14 1.74 0.65 1.25 1.85 0.76 1.36 1.96 0.88 1.48 2.08 0.99 1.59 2.19 1.10 1.70 2.30 1.22 1.82 2.41 1.33 1.93 2.53 1.44 2.04 2.64 1.56 2.15 2.75 1.67 2.27 2.87 1.78 2.38 2.98 1.89 2.49 3.09 2.01 2.61 3.21 2.12 2.72 3.32 2.23 2.83 3.43 2.35 2.95 3.55 2.46 3.06 3.66 2.57 3.17 3.77 2.69 3.29 3.88 2.80 3.40 4.00 2.91 3.51 4.11 3.03 3.62 4.22 3.03 3.74 4.34 3.03 3.85 4.45 3.03 3.96 4.56 3.03 4.08 4.68 3.03 4.19 4.79 3.03 4.30 4.90 3.03 4.42 5.02 3.03 4.53 5.13 3.03 4.64 5.24 3.03 4.76 5.36 3.03 4.87 5.47 3.03 4.98 5.58 3.03 5.10 5.69 3.03 5.21 5.81 3.03 5.32 5.92 3.03 5.43 6.03 3.03 5.55 6.15 3.03 5.66 6.26 3.03 5.77 6.37 3.03 5.89 6.49 3.03 6.00 6.60 3.03 6.11 6.71 3.03 6.23 6.83 3.03 6.34 6.94 3.03 6.45 7.05 3.03 6.57 7.16 3.03 6.68 7.28 3.03 6.79 7.39 3.03 6.90 7.50 3.03 7.02 7.62 3.03 7.13 7.62 3.03 7.21 7.62 MH #7 271.90 265.64 1.2 1.13 MH #8 269.90 265.11 1.2 1.13 Orifice #3 269.90 263.71 1.2 1.13 MH #7 (cu.m) 0.98 1.09 1.20 1.32 1.43 1.54 1.66 1.77 1.88 2.00 2.11 2.22 2.34 2.45 2.56 2.67 2.79 2.90 3.01 3.13 3.24 3.35 3.47 3.58 3.69 3.81 3.92 4.03 4.15 4.26 4.37 4.48 4.60 4.71 4.82 4.94 5.05 5.16 5.28 5.39 5.50 5.62 5.73 5.84 5.95 6.07 6.18 6.29 6.41 6.52 6.63 6.75 6.86 6.97 7.09 7.09 7.09 7.09 7.09 7.09 7.09 7.09 7.09 7.09 7.09 7.09 7.09 MH #8 (cu.m) 1.58 1.69 1.80 1.92 2.03 2.14 2.26 2.37 2.48 2.60 2.71 2.82 2.93 3.05 3.16 3.27 3.39 3.50 3.61 3.73 3.84 3.95 4.07 4.18 4.29 4.41 4.52 4.63 4.74 4.86 4.97 5.08 5.20 5.31 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 5.42 Orifice #3 (cu.m) 3.16 3.27 3.39 3.50 3.61 3.73 3.84 3.95 4.07 4.18 4.29 4.41 4.52 4.63 4.74 4.86 4.97 5.08 5.20 5.31 5.42 5.54 5.65 5.76 5.88 5.99 6.10 6.21 6.33 6.44 6.55 6.67 6.78 6.89 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 7.01 ID Diameter U/S INV D/S INV AVG INV Length Total (cu.m) 6.28 6.85 7.42 8.10 8.82 9.61 10.40 11.19 12.07 12.98 14.00 15.01 16.03 17.05 18.07 19.17 20.30 21.43 22.56 23.69 24.82 25.96 27.09 28.22 29.35 30.48 31.61 32.74 33.87 35.00 36.13 37.26 38.39 39.53 40.66 41.45 42.24 42.95 43.52 44.08 44.54 44.99 45.33 45.67 46.01 46.35 46.68 47.02 47.36 47.70 48.04 48.38 48.72 49.06 49.40 49.62 49.85 50.08 50.30 50.53 50.76 50.98 51.21 51.43 51.66 51.77 51.85 Elevation (m) 266.50 266.60 266.70 266.80 266.90 267.00 267.10 267.20 267.30 267.40 267.50 267.60 267.70 267.80 267.90 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 Pipe 1 0.675 268.43 267.93 268.18 50 Pipe 2 0.675 267.90 267.40 267.65 50 Pipe 3 0.675 267.37 266.87 267.12 50 Pipe 4 0.675 266.84 266.34 266.59 50 Pipe 5 0.675 267.73 267.23 267.48 50 Pipe 6 0.675 267.20 266.70 266.95 50 Pipe 7 0.675 266.67 266.17 266.42 50 Pipe 8 0.825 266.14 265.64 265.89 50 Pipe 9 0.675 265.61 265.11 265.36 50 Pipe 10 0.300 264.21 257.88 261.04 30 Pipe 1 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.65 4.45 7.70 11.10 14.30 16.90 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 Pipe 2 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 2.95 6.05 9.40 12.75 15.70 17.75 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 Pipe 3 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 2.95 6.05 9.40 12.75 15.70 17.75 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 Pipe 4 (cu.m) 0.00 0.00 1.65 4.45 7.70 11.10 14.30 16.90 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 Storm Sewer Storage Pipe 5 Pipe 6 Pipe 7 (cu.m) (cu.m) (cu.m) 0.00 0.00 0.60 0.00 0.00 2.95 0.00 0.00 6.05 0.00 0.00 9.40 0.00 0.00 12.75 0.00 0.60 15.70 0.00 2.95 17.75 0.00 6.05 17.89 0.00 9.40 17.89 0.00 12.75 17.89 0.00 15.70 17.89 1.65 17.75 17.89 4.45 17.89 17.89 7.70 17.89 17.89 11.10 17.89 17.89 14.30 17.89 17.89 16.90 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 Pipe 8 (cu.m) 20.85 24.20 26.50 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 26.75 Pipe 9 (cu.m) 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 17.89 Pipe 10 (cu.m) 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 2.12 Total (cu.m) 41.46 47.16 54.21 60.61 67.21 74.16 81.76 88.20 94.89 101.34 107.64 114.69 121.18 128.83 135.47 142.02 147.97 151.91 155.61 158.55 161.80 165.20 168.40 171.00 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 171.99 TOTAL STORAGE (cu.m) 47.74 54.01 61.63 68.71 76.03 83.77 92.16 99.39 106.96 114.32 121.64 129.70 137.21 145.88 153.54 161.19 168.27 173.34 178.17 182.24 186.63 191.16 195.49 199.22 201.34 202.47 203.60 204.73 205.86 206.99 208.12 209.25 210.39 211.52 212.65 213.44 214.23 214.94 215.51 216.07 216.53 216.98 217.32 217.66 218.00 218.34 218.68 219.01 219.35 219.69 220.03 220.37 220.71 221.05 221.39 221.62 221.84 222.07 222.29 222.52 222.75 222.97 223.20 223.43 223.65 223.76 223.84 TOTAL STORAGE (ha-m) 0.0048 0.0054 0.0062 0.0069 0.0076 0.0084 0.0092 0.0099 0.0107 0.0114 0.0122 0.0130 0.0137 0.0146 0.0154 0.0161 0.0168 0.0173 0.0178 0.0182 0.0187 0.0191 0.0195 0.0199 0.0201 0.0202 0.0204 0.0205 0.0206 0.0207 0.0208 0.0209 0.0210 0.0212 0.0213 0.0213 0.0214 0.0215 0.0216 0.0216 0.0217 0.0217 0.0217 0.0218 0.0218 0.0218 0.0219 0.0219 0.0219 0.0220 0.0220 0.0220 0.0221 0.0221 0.0221 0.0222 0.0222 0.0222 0.0222 0.0223 0.0223 0.0223 0.0223 0.0223 0.0224 0.0224 0.0224 Elevation (m) 266.50 266.60 266.70 266.80 266.90 267.00 267.10 267.20 267.30 267.40 267.50 267.60 267.70 267.80 267.90 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 Type Diameter Area INV C\ Orifice #3 0.225 0.0397608 264.21 0.8 Head 1 (m) 2.1825 2.2825 2.3825 2.4825 2.5825 2.6825 2.7825 2.8825 2.9825 3.0825 3.1825 3.2825 3.3825 3.4825 3.5825 3.6825 3.7825 3.8825 3.9825 4.0825 4.1825 4.2825 4.3825 4.4825 4.5825 4.6825 4.7825 4.8825 4.9825 5.0825 5.1825 5.2825 5.3825 5.4825 5.5825 Discharge Orifice #3 (cms) 0.208 0.213 0.217 0.222 0.226 0.231 0.235 0.239 0.243 0.247 0.251 0.255 0.259 0.263 0.267 0.270 0.274 0.278 0.281 0.285 0.288 0.292 0.295 0.298 0.302 0.305 0.308 0.311 0.314 0.318 0.321 0.324 0.327 0.330 0.333 Total (cms) 0.208 0.213 0.217 0.222 0.226 0.231 0.235 0.239 0.243 0.247 0.251 0.255 0.259 0.263 0.267 0.270 0.274 0.278 0.281 0.285 0.288 0.292 0.295 0.298 0.302 0.305 0.308 0.311 0.314 0.318 0.321 0.324 0.327 0.330 0.333 Big Bay Point Road and Bayview Drive EA CCTA PROJECT NO.: 415375 Red Text denotes surveyed outlet invert elevation This value has been used to check system for feasibility. Oversized pipes are not feasible for this catchment if the existing outlet elevation is to be maintained. Slope = 0.017 Slope = 0.005 Big Bay Point Road - Catchment 205 (West Big Bay Pt) ID T/G INV Diameter (m) Length (m) Width (m) Area (sq.m) Elevation (m) 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 273.20 273.30 273.40 273.50 273.60 273.70 273.80 273.90 274.00 274.10 274.20 274.30 274.40 274.50 274.60 274.70 274.80 274.90 275.00 275.10 275.20 275.30 275.40 275.50 275.60 275.70 275.80 275.90 276.00 276.10 276.20 276.30 276.40 276.50 276.60 276.70 276.80 276.90 277.00 277.10 277.20 277.30 277.40 277.50 277.60 277.70 277.80 277.90 278.00 278.10 278.20 278.30 278.40 278.50 278.60 MH #24 278.59 275.54 1.2 1.13 MH #25 277.92 274.83 1.2 1.13 MH #26 277.07 274.12 1.2 1.13 MH #27 276.22 273.41 1.2 1.13 MH #28 275.25 272.70 1.2 1.13 MH #29 274.33 271.99 1.2 1.13 MH #30 273.40 271.28 1.2 1.13 MH #31 272.48 270.57 1.2 1.13 MH #32 271.61 269.86 1.2 1.13 MH #33 270.90 269.15 1.2 1.13 MH #34 273.18 270.81 1.2 1.13 MH #35 273.50 270.28 1.2 1.13 MH #24 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.18 0.29 0.41 0.52 0.63 0.75 0.86 0.97 1.09 1.20 1.31 1.43 1.54 1.65 1.76 1.88 1.99 2.10 2.22 2.33 2.44 2.56 2.67 2.78 2.90 3.01 3.12 3.23 3.35 3.45 MH #25 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 0.19 0.31 0.42 0.53 0.64 0.76 0.87 0.98 1.10 1.21 1.32 1.44 1.55 1.66 1.78 1.89 2.00 2.11 2.23 2.34 2.45 2.57 2.68 2.79 2.91 3.02 3.13 3.25 3.36 3.47 3.49 3.49 3.49 3.49 3.49 3.49 3.49 MH #26 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.09 0.20 0.32 0.43 0.54 0.66 0.77 0.88 1.00 1.11 1.22 1.33 1.45 1.56 1.67 1.79 1.90 2.01 2.13 2.24 2.35 2.47 2.58 2.69 2.80 2.92 3.03 3.14 3.26 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 3.34 MH #27 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.10 0.21 0.33 0.44 0.55 0.67 0.78 0.89 1.01 1.12 1.23 1.35 1.46 1.57 1.69 1.80 1.91 2.02 2.14 2.25 2.36 2.48 2.59 2.70 2.82 2.93 3.04 3.16 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 3.18 MH #28 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 0.23 0.34 0.45 0.57 0.68 0.79 0.90 1.02 1.13 1.24 1.36 1.47 1.58 1.70 1.81 1.92 2.04 2.15 2.26 2.38 2.49 2.60 2.71 2.83 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 2.88 MH #29 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.12 0.24 0.35 0.46 0.58 0.69 0.80 0.92 1.03 1.14 1.26 1.37 1.48 1.59 1.71 1.82 1.93 2.05 2.16 2.27 2.39 2.50 2.61 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 2.65 MH #30 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.02 0.14 0.25 0.36 0.48 0.59 0.70 0.81 0.93 1.04 1.15 1.27 1.38 1.49 1.61 1.72 1.83 1.95 2.06 2.17 2.28 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 MH #31 (cu.m) 0.03 0.15 0.26 0.37 0.49 0.60 0.71 0.83 0.94 1.05 1.16 1.28 1.39 1.50 1.62 1.73 1.84 1.96 2.07 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 2.16 MH #32 (cu.m) 0.84 0.95 1.06 1.18 1.29 1.40 1.52 1.63 1.74 1.85 1.97 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 1.98 Maintenance Hole/Catchbasin Storage MH #33 MH #34 MH #35 (cu.m) (cu.m) (cu.m) 1.64 0.00 0.36 1.75 0.00 0.48 1.87 0.00 0.59 1.98 0.11 0.70 1.98 0.22 0.81 1.98 0.33 0.93 1.98 0.45 1.04 1.98 0.56 1.15 1.98 0.67 1.27 1.98 0.79 1.38 1.98 0.90 1.49 1.98 1.01 1.61 1.98 1.13 1.72 1.98 1.24 1.83 1.98 1.35 1.95 1.98 1.46 2.06 1.98 1.58 2.17 1.98 1.69 2.28 1.98 1.80 2.40 1.98 1.92 2.51 1.98 2.03 2.62 1.98 2.14 2.74 1.98 2.26 2.85 1.98 2.37 2.96 1.98 2.48 3.08 1.98 2.60 3.19 1.98 2.69 3.30 1.98 2.69 3.42 1.98 2.69 3.53 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 1.98 2.69 3.64 MH #36 274.09 269.78 1.2 1.13 MH #37 274.27 269.28 1.2 1.13 MH #38 273.93 268.78 1.2 1.13 MH #39 273.20 268.28 1.2 1.13 MH #40 272.31 267.78 1.2 1.13 MH #41 271.43 267.28 1.2 1.13 MH #42 270.84 266.78 1.2 1.13 Orifice #1 270.68 266.28 1.2 1.13 MH #36 (cu.m) 0.93 1.04 1.15 1.27 1.38 1.49 1.61 1.72 1.83 1.95 2.06 2.17 2.28 2.40 2.51 2.62 2.74 2.85 2.96 3.08 3.19 3.30 3.42 3.53 3.64 3.75 3.87 3.98 4.09 4.21 4.32 4.43 4.55 4.66 4.77 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 4.87 MH #37 (cu.m) 1.49 1.61 1.72 1.83 1.95 2.06 2.17 2.28 2.40 2.51 2.62 2.74 2.85 2.96 3.08 3.19 3.30 3.42 3.53 3.64 3.75 3.87 3.98 4.09 4.21 4.32 4.43 4.55 4.66 4.77 4.89 5.00 5.11 5.23 5.34 5.45 5.56 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 5.64 MH #38 (cu.m) 2.06 2.17 2.28 2.40 2.51 2.62 2.74 2.85 2.96 3.08 3.19 3.30 3.42 3.53 3.64 3.75 3.87 3.98 4.09 4.21 4.32 4.43 4.55 4.66 4.77 4.89 5.00 5.11 5.23 5.34 5.45 5.56 5.68 5.79 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 5.82 MH #39 (cu.m) 2.62 2.74 2.85 2.96 3.08 3.19 3.30 3.42 3.53 3.64 3.75 3.87 3.98 4.09 4.21 4.32 4.43 4.55 4.66 4.77 4.89 5.00 5.11 5.23 5.34 5.45 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 5.56 MH #40 (cu.m) 3.19 3.30 3.42 3.53 3.64 3.75 3.87 3.98 4.09 4.21 4.32 4.43 4.55 4.66 4.77 4.89 5.00 5.11 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 5.12 MH #41 (cu.m) 3.75 3.87 3.98 4.09 4.21 4.32 4.43 4.55 4.66 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 4.69 MH #42 (cu.m) 4.32 4.43 4.55 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 4.59 Orifice #1 (cu.m) 4.89 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 4.98 ID Diameter U/S INV D/S INV AVG INV Length Total (cu.m) 26.13 27.46 28.70 29.99 31.12 32.25 33.38 34.53 35.78 36.94 38.07 39.10 40.12 41.14 42.17 43.30 44.43 45.56 46.59 47.59 48.49 49.40 50.41 51.43 52.45 53.47 54.46 55.25 56.05 56.83 57.50 58.18 58.86 59.54 60.14 60.69 61.24 61.77 62.14 62.48 62.82 63.16 63.50 63.92 64.37 64.82 65.27 65.67 66.01 66.35 66.76 67.21 67.66 68.11 68.57 69.02 69.47 69.83 70.17 70.51 70.85 71.19 71.53 71.87 72.21 72.51 72.74 72.96 73.19 73.42 73.64 73.87 74.10 74.32 74.46 74.57 74.68 74.80 74.91 75.02 75.12 Elevation (m) 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 273.20 273.30 273.40 273.50 273.60 273.70 273.80 273.90 274.00 274.10 274.20 274.30 274.40 274.50 274.60 274.70 274.80 274.90 275.00 275.10 275.20 275.30 275.40 275.50 275.60 275.70 275.80 275.90 276.00 276.10 276.20 276.30 276.40 276.50 276.60 276.70 276.80 276.90 277.00 277.10 277.20 277.30 277.40 277.50 277.60 277.70 277.80 277.90 278.00 278.10 278.20 278.30 278.40 278.50 278.60 Pipe 29 1.050 276.04 275.36 275.70 40 Pipe 30 1.050 275.33 274.65 274.99 40 Pipe 31 1.050 274.62 273.94 274.28 40 Pipe 32 1.050 273.91 273.23 273.57 40 Pipe 33 1.050 273.20 272.52 272.86 40 Pipe 34 1.050 272.49 271.81 272.15 40 Pipe 35 1.050 271.78 271.10 271.44 40 Pipe 36 1.050 271.07 270.39 270.73 40 Pipe 37 1.050 270.36 269.68 270.02 40 Pipe 38 1.050 269.65 268.97 269.31 40 Pipe 39 0.375 271.31 271.08 271.19 45 Pipe 40 0.375 270.78 270.58 270.68 40 Pipe 41 0.375 270.28 270.08 270.18 40 Pipe 42 0.375 269.78 269.58 269.68 40 Pipe 43 0.375 269.28 269.08 269.18 40 Pipe 44 0.375 268.78 268.58 268.68 40 Pipe 45 0.375 268.28 268.08 268.18 40 Pipe 46 0.375 267.78 267.58 267.68 40 Pipe 47 1.375 267.28 267.08 267.18 40 Pipe 48 0.525 266.78 268.77 267.78 25 Pipe 29 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 4.60 8.16 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 30 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 4.60 8.16 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 31 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 4.60 8.16 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 32 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 4.60 8.16 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 33 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.68 4.60 8.16 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 34 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 3.04 6.32 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 35 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.60 3.04 6.32 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 36 (cu.m) 0.00 0.00 0.60 3.04 6.32 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Pipe 37 (cu.m) 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 10.12 Storm Sewer Storage Pipe 38 Pipe 39 Pipe 40 (cu.m) (cu.m) (cu.m) 10.12 0.00 0.00 10.12 0.00 0.00 10.12 0.00 0.94 10.12 0.00 2.40 10.12 0.00 3.79 10.12 0.00 4.29 10.12 0.00 4.29 10.12 1.06 4.29 10.12 2.70 4.29 10.12 4.26 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 10.12 4.83 4.29 Pipe 41 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 42 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 43 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 44 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 45 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 46 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 47 (cu.m) 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 4.29 Pipe 48 (cu.m) 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 3.82 Type Orifice 1 Diameter 0.415 Area 0.1352652 INV 268.77 C\ 0.8 Total (cu.m) 50.28 50.28 51.83 55.72 60.39 64.70 64.70 65.76 67.39 69.56 72.56 75.84 79.64 79.64 79.64 79.64 80.24 82.68 85.96 89.76 89.76 89.76 89.76 89.76 91.44 94.36 97.92 99.88 99.88 99.88 99.88 101.56 104.48 108.04 110.00 110.00 110.00 110.00 111.68 114.60 118.16 120.12 120.12 120.12 120.12 121.80 124.72 128.28 130.24 130.24 130.24 130.24 131.92 134.84 138.40 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 140.36 TOTAL STORAGE (cu.m) 76.41 77.74 80.53 85.71 91.51 96.95 98.08 100.29 103.17 106.50 110.64 114.95 119.77 120.78 121.81 122.94 124.67 128.25 132.55 137.35 138.25 139.16 140.18 141.20 143.89 147.83 152.39 155.14 155.93 156.71 157.39 159.75 163.35 167.58 170.14 170.70 171.24 171.77 173.83 177.09 180.98 183.28 183.62 184.04 184.49 186.63 190.00 193.95 196.25 196.59 197.00 197.45 199.58 202.96 206.97 209.38 209.83 210.20 210.54 210.88 211.21 211.55 211.89 212.23 212.57 212.88 213.10 213.33 213.56 213.78 214.01 214.23 214.46 214.69 214.82 214.94 215.05 215.16 215.27 215.39 215.49 TOTAL STORAGE (ha-m) 0.0076 0.0078 0.0081 0.0086 0.0092 0.0097 0.0098 0.0100 0.0103 0.0107 0.0111 0.0115 0.0120 0.0121 0.0122 0.0123 0.0125 0.0128 0.0133 0.0137 0.0138 0.0139 0.0140 0.0141 0.0144 0.0148 0.0152 0.0155 0.0156 0.0157 0.0157 0.0160 0.0163 0.0168 0.0170 0.0171 0.0171 0.0172 0.0174 0.0177 0.0181 0.0183 0.0184 0.0184 0.0184 0.0187 0.0190 0.0194 0.0196 0.0197 0.0197 0.0197 0.0200 0.0203 0.0207 0.0209 0.0210 0.0210 0.0211 0.0211 0.0211 0.0212 0.0212 0.0212 0.0213 0.0213 0.0213 0.0213 0.0214 0.0214 0.0214 0.0214 0.0214 0.0215 0.0215 0.0215 0.0215 0.0215 0.0215 0.0215 0.0215 Elevation (m) 270.60 270.70 Head 1 (m) 1.6275 1.7275 Discharge Orifice 1 (cms) 0.611 0.630 Total (cms) 0.611 0.630 Big Bay Point Road and Bayview Drive EA CCTA PROJECT NO.: 415375 Red Text denotes inlet elevation for existing storm sewer from record drawing. This value has been used to check system for feasibility. Slope = 0.03 Big Bay Point Road - Catchment 207 (East Big Bay Pt) ID T/G INV Diameter (m) Length (m) Width (m) Area (sq.m) Elevation (m) 259.00 259.10 259.20 259.30 259.40 259.50 259.60 259.70 259.80 259.90 260.00 260.10 260.20 260.30 260.40 260.50 260.60 260.70 260.80 260.90 261.00 261.10 261.20 261.30 261.40 261.50 261.60 261.70 261.80 261.90 262.00 262.10 262.20 262.30 262.40 262.50 262.60 262.70 262.80 262.90 263.00 263.10 263.20 263.30 263.40 263.50 263.60 263.70 263.80 263.90 264.00 264.10 264.20 264.30 264.40 264.50 264.60 264.70 264.80 264.90 265.00 265.10 265.20 265.30 265.40 265.50 265.60 265.70 265.80 265.90 266.00 266.10 266.20 266.30 266.40 266.50 266.60 266.70 266.80 266.90 267.00 267.10 267.20 267.30 267.40 267.50 267.60 267.70 267.80 267.90 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 273.20 MH #43 273.18 270.13 1.2 1.13 MH #44 272.66 268.60 1.2 1.13 MH #45 271.79 267.07 1.2 1.13 MH #46 270.48 265.54 1.2 1.13 MH #43 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.08 0.19 0.31 0.42 0.53 0.64 0.76 0.87 0.98 1.10 1.21 1.32 1.44 1.55 1.66 1.78 1.89 2.00 2.11 2.23 2.34 2.45 2.57 2.68 2.79 2.91 3.02 3.13 3.25 3.36 3.45 MH #44 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.11 0.23 0.34 0.45 0.57 0.68 0.79 0.90 1.02 1.13 1.24 1.36 1.47 1.58 1.70 1.81 1.92 2.04 2.15 2.26 2.38 2.49 2.60 2.71 2.83 2.94 3.05 3.17 3.28 3.39 3.51 3.62 3.73 3.85 3.96 4.07 4.18 4.30 4.41 4.52 4.59 4.59 4.59 4.59 4.59 4.59 MH #45 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.15 0.26 0.37 0.49 0.60 0.71 0.83 0.94 1.05 1.16 1.28 1.39 1.50 1.62 1.73 1.84 1.96 2.07 2.18 2.30 2.41 2.52 2.64 2.75 2.86 2.97 3.09 3.20 3.31 3.43 3.54 3.65 3.77 3.88 3.99 4.11 4.22 4.33 4.44 4.56 4.67 4.78 4.90 5.01 5.12 5.24 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 5.34 MH #46 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.07 0.18 0.29 0.41 0.52 0.63 0.75 0.86 0.97 1.09 1.20 1.31 1.43 1.54 1.65 1.76 1.88 1.99 2.10 2.22 2.33 2.44 2.56 2.67 2.78 2.90 3.01 3.12 3.23 3.35 3.46 3.57 3.69 3.80 3.91 4.03 4.14 4.25 4.37 4.48 4.59 4.70 4.82 4.93 5.04 5.16 5.27 5.38 5.50 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 5.59 MH #47 268.80 264.01 1.2 1.13 MH #48 266.96 262.48 1.2 1.13 MH #49 265.09 260.95 1.2 1.13 MH #50 263.22 259.42 1.2 1.13 Orifice #2 259.59 257.89 1.2 1.13 Maintenance Hole/Catchbasin Storage MH #47 MH #48 MH #49 (cu.m) (cu.m) (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.06 0.00 0.00 0.17 0.00 0.00 0.28 0.00 0.00 0.40 0.00 0.00 0.51 0.00 0.00 0.62 0.00 0.00 0.74 0.00 0.00 0.85 0.00 0.00 0.96 0.00 0.00 1.07 0.00 0.00 1.19 0.00 0.00 1.30 0.00 0.00 1.41 0.00 0.00 1.53 0.00 0.00 1.64 0.00 0.02 1.75 0.00 0.14 1.87 0.00 0.25 1.98 0.00 0.36 2.09 0.00 0.48 2.21 0.00 0.59 2.32 0.00 0.70 2.43 0.00 0.81 2.54 0.00 0.93 2.66 0.00 1.04 2.77 0.00 1.15 2.88 0.00 1.27 3.00 0.00 1.38 3.11 0.00 1.49 3.22 0.00 1.61 3.34 0.00 1.72 3.45 0.10 1.83 3.56 0.21 1.95 3.68 0.33 2.06 3.79 0.44 2.17 3.90 0.55 2.28 4.01 0.67 2.40 4.13 0.78 2.51 4.24 0.89 2.62 4.35 1.01 2.74 4.47 1.12 2.85 4.58 1.23 2.96 4.68 1.35 3.08 4.68 1.46 3.19 4.68 1.57 3.30 4.68 1.69 3.42 4.68 1.80 3.53 4.68 1.91 3.64 4.68 2.02 3.75 4.68 2.14 3.87 4.68 2.25 3.98 4.68 2.36 4.09 4.68 2.48 4.21 4.68 2.59 4.32 4.68 2.70 4.43 4.68 2.82 4.55 4.68 2.93 4.66 4.68 3.04 4.77 4.68 3.16 4.89 4.68 3.27 5.00 4.68 3.38 5.07 4.68 3.49 5.07 4.68 3.61 5.07 4.68 3.72 5.07 4.68 3.83 5.07 4.68 3.95 5.07 4.68 4.06 5.07 4.68 4.17 5.07 4.68 4.29 5.07 4.68 4.40 5.07 4.68 4.51 5.07 4.68 4.63 5.07 4.68 4.74 5.07 4.68 4.85 5.07 4.68 4.96 5.07 4.68 5.08 5.07 4.68 5.19 5.07 4.68 5.30 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 5.42 5.07 4.68 MH #50 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.09 0.20 0.32 0.43 0.54 0.66 0.77 0.88 1.00 1.11 1.22 1.33 1.45 1.56 1.67 1.79 1.90 2.01 2.13 2.24 2.35 2.47 2.58 2.69 2.80 2.92 3.03 3.14 3.26 3.37 3.48 3.60 3.71 3.82 3.94 4.05 4.16 4.28 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 4.30 Orifice #2 (cu.m) 1.26 1.37 1.48 1.59 1.71 1.82 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 1.92 ID Diameter U/S INV D/S INV AVG INV Length Total (cu.m) 1.26 1.37 1.48 1.59 1.71 1.91 2.13 2.24 2.35 2.47 2.58 2.69 2.80 2.92 3.03 3.14 3.26 3.37 3.48 3.60 3.77 3.99 4.22 4.44 4.67 4.90 5.12 5.35 5.58 5.80 6.03 6.25 6.48 6.71 6.93 7.18 7.52 7.86 8.20 8.54 8.88 9.22 9.56 9.81 10.03 10.26 10.48 10.71 10.94 11.16 11.39 11.72 12.06 12.40 12.73 13.07 13.41 13.75 14.09 14.43 14.77 15.10 15.32 15.55 15.78 16.00 16.30 16.64 16.98 17.32 17.65 17.99 18.33 18.67 19.01 19.35 19.69 20.03 20.37 20.71 21.00 21.26 21.60 21.94 22.28 22.62 22.96 23.30 23.64 23.98 24.32 24.66 24.99 25.33 25.67 26.01 26.35 26.80 27.26 27.60 27.94 28.27 28.61 28.95 29.29 29.63 29.97 30.31 30.65 30.99 31.33 31.67 32.09 32.54 32.99 33.42 33.76 34.10 34.44 34.78 35.12 35.46 35.80 36.13 36.47 36.81 37.15 37.49 37.82 38.05 38.27 38.50 38.72 38.95 39.18 39.40 39.63 39.81 39.92 40.04 40.15 40.26 40.35 Elevation (m) 259.00 259.10 259.20 259.30 259.40 259.50 259.60 259.70 259.80 259.90 260.00 260.10 260.20 260.30 260.40 260.50 260.60 260.70 260.80 260.90 261.00 261.10 261.20 261.30 261.40 261.50 261.60 261.70 261.80 261.90 262.00 262.10 262.20 262.30 262.40 262.50 262.60 262.70 262.80 262.90 263.00 263.10 263.20 263.30 263.40 263.50 263.60 263.70 263.80 263.90 264.00 264.10 264.20 264.30 264.40 264.50 264.60 264.70 264.80 264.90 265.00 265.10 265.20 265.30 265.40 265.50 265.60 265.70 265.80 265.90 266.00 266.10 266.20 266.30 266.40 266.50 266.60 266.70 266.80 266.90 267.00 267.10 267.20 267.30 267.40 267.50 267.60 267.70 267.80 267.90 268.00 268.10 268.20 268.30 268.40 268.50 268.60 268.70 268.80 268.90 269.00 269.10 269.20 269.30 269.40 269.50 269.60 269.70 269.80 269.90 270.00 270.10 270.20 270.30 270.40 270.50 270.60 270.70 270.80 270.90 271.00 271.10 271.20 271.30 271.40 271.50 271.60 271.70 271.80 271.90 272.00 272.10 272.20 272.30 272.40 272.50 272.60 272.70 272.80 272.90 273.00 273.10 273.20 Pipe 49 1.050 270.63 269.13 269.88 50 Pipe 50 1.050 269.10 267.60 268.35 50 Pipe 51 1.050 267.57 266.07 266.82 50 Pipe 52 1.050 266.04 264.54 265.29 50 Pipe 49 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 5.75 10.20 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 50 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 3.80 7.90 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 51 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 3.80 7.90 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 52 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 5.75 10.20 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 53 1.050 264.51 263.01 263.76 50 Pipe 54 1.050 262.98 261.48 262.23 50 Storm Sewer Storage Pipe 53 Pipe 54 (cu.m) (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 0.00 3.80 0.00 7.90 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 0.00 12.65 2.10 12.65 5.75 12.65 10.20 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 55 1.050 261.45 259.95 260.70 50 Pipe 56 1.050 259.92 258.42 259.17 50 Pipe 57 1.050 258.39 257.70 258.04 50 Pipe 55 (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 5.75 10.20 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 56 (cu.m) 0.00 0.00 0.00 2.10 5.75 10.20 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Pipe 57 (cu.m) 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 Type Orifice 2 Diameter 0.395 Area 0.1225417 INV 258.39 C\ 0.8 Total (cu.m) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.75 3.80 7.90 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 12.65 14.75 18.40 22.85 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 25.30 27.40 31.05 35.50 37.95 37.95 37.95 37.95 37.95 37.95 37.95 37.95 37.95 37.95 37.95 37.95 38.70 41.75 45.85 50.60 50.60 50.60 50.60 50.60 50.60 50.60 50.60 50.60 50.60 50.60 50.60 51.35 54.40 58.50 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 63.25 65.35 69.00 73.45 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 75.90 TOTAL STORAGE (cu.m) 1.26 1.37 1.48 1.59 1.71 1.91 2.13 2.24 2.35 2.47 2.58 2.69 2.80 2.92 3.03 3.14 3.26 3.37 3.48 3.60 3.77 3.99 4.22 4.44 4.67 4.90 5.12 5.35 5.58 5.80 6.03 6.25 6.48 7.46 10.73 15.08 20.17 20.51 20.85 21.19 21.53 21.87 22.21 22.46 22.68 22.91 23.13 23.36 23.59 25.91 29.79 34.57 37.36 37.70 38.03 38.37 38.71 39.05 39.39 39.73 40.07 40.40 40.62 40.85 43.18 47.05 51.80 54.59 54.93 55.27 55.60 55.94 56.28 56.62 56.96 57.30 57.64 57.98 58.32 59.41 62.75 67.11 72.20 72.54 72.88 73.22 73.56 73.90 74.24 74.58 74.92 75.26 75.59 75.93 77.02 80.41 84.85 90.05 90.51 90.85 91.19 91.52 91.86 92.20 92.54 92.88 93.22 93.56 93.90 94.24 96.68 100.67 105.54 108.44 108.89 109.32 109.66 110.00 110.34 110.68 111.02 111.36 111.70 112.03 112.37 112.71 113.05 113.39 113.72 113.95 114.17 114.40 114.62 114.85 115.08 115.30 115.53 115.71 115.82 115.94 116.05 116.16 116.25 TOTAL STORAGE (ha-m) 0.0001 0.0001 0.0001 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0002 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0003 0.0004 0.0004 0.0004 0.0004 0.0004 0.0005 0.0005 0.0005 0.0005 0.0006 0.0006 0.0006 0.0006 0.0006 0.0007 0.0011 0.0015 0.0020 0.0021 0.0021 0.0021 0.0022 0.0022 0.0022 0.0022 0.0023 0.0023 0.0023 0.0023 0.0024 0.0026 0.0030 0.0035 0.0037 0.0038 0.0038 0.0038 0.0039 0.0039 0.0039 0.0040 0.0040 0.0040 0.0041 0.0041 0.0043 0.0047 0.0052 0.0055 0.0055 0.0055 0.0056 0.0056 0.0056 0.0057 0.0057 0.0057 0.0058 0.0058 0.0058 0.0059 0.0063 0.0067 0.0072 0.0073 0.0073 0.0073 0.0074 0.0074 0.0074 0.0075 0.0075 0.0075 0.0076 0.0076 0.0077 0.0080 0.0085 0.0090 0.0091 0.0091 0.0091 0.0092 0.0092 0.0092 0.0093 0.0093 0.0093 0.0094 0.0094 0.0094 0.0097 0.0101 0.0106 0.0108 0.0109 0.0109 0.0110 0.0110 0.0110 0.0111 0.0111 0.0111 0.0112 0.0112 0.0112 0.0113 0.0113 0.0113 0.0114 0.0114 0.0114 0.0114 0.0115 0.0115 0.0115 0.0115 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116 0.0116 Elevation (m) 259.00 259.10 259.20 259.30 259.40 259.50 259.60 Head 1 (m) 0.4125 0.5125 0.6125 0.7125 0.8125 0.9125 1.0125 Discharge Orifice 1 (cms) 0.279 0.311 0.340 0.367 0.391 0.415 0.437 Total (cms) 0.279 0.311 0.340 0.367 0.391 0.415 0.437 APPENDIX E: RETROFIT OPPORTUNITIES City of Barrie Whiskey Creek Master Draina ge Plan Update Environmental Assessment Document 3.3.5 Alternative 4 – Creation/Modification/Designation of Stormwater Management Facilities Alternative 4 expands on recommendations initially made in Alternative 3 (eliminated through pre-screening) by proposing to utilize natural storage areas which in fact detain and release storm runoff at a lower rate. Common stormwater modeling practice is not to include this reduction in peak flows unless the area is specifically designated to perform this function. There are several natural storage locations along the Whiskey Creek corridor where storm runoff is impeded by existing road crossings (Yonge Street, BC Railway, Tollendal Mill Road) and Alternative 4 proposes to designate two of these areas (Yonge Street and Tollendal Mill Road) as SWM Facilities. Furthermore, various channel improvements are proposed as well as increasing the hydraulic capacity of road crossing culverts. Alternative 4 is comprised of two options – 4A and 4B. Alternative 4A coincides with culverts and channels sized to convey the 100-year peak flow while culverts and structures in Alternative 4B have been sized for the Regional storm peak flow. The following sections outline the items that are to be included in Alternatives 4A and 4B. 3.3.5.1 Natural Storage Area Upstream of Yonge Street A significant storage area exists within the natural valley between Yonge Street and Little Avenue which reduces peak flows utilizing the existing box culvert at Yonge Street as a control structure. It is proposed to designate this natural area as a SWM facility so that this storage area can be accounted for in the hydrologic model and a reduction in peak flows realized. 3.3.5.2 Natural Storage Area Upstream of Tollendal Mill Road A natural storage area exists at the southeast corner of Tollendal Mill Road and Minets Point Road. Adjacent to the natural valley section within this area, is a detention pond that was constructed in early 1994 for the Tollendal Mill Road and Bay Lane Subdivisions. The topography in this area is such that the upper 2m of the facility is not used for quantity control. It is proposed to create a channel between the two areas such that storm runoff impeded by Tollendal Mill Road will be allowed to enter the existing Tollendal Mill Road Stormwater Management Facility utilizing the available storage. 3.3.5.3 Stormwater Management Facility within Lackies Bush The Whiskey Creek Master Drainage Plan completed in 1986 by Andrew Brodie Associates Inc. recommended the construction of a storage facility within Lackies Bush. The location of the proposed storage facility within the Andrew Brodie Report was upstream of McConkey Place. Approximately 500 metres upstream of McConkey Place, Lackies Bush becomes a well defined valley section. It was at this location that a large berm was proposed to be constructed to detain flows and utilize the significant storage available due to the existing topography of the Lackies Bush valley upstream of the proposed berm location. Due to the recreational usage of Lackies Bush, public safety concerns and potential environmental impacts (99111 ea document 2009 (aecom format).doc) - 15 - City of Barrie Whiskey Creek Master Draina ge Plan Update Environmental Assessment Document of creating a large berm within Lackies Bush at this location, an investigation of other potential locations for this facility was warranted. Appendix D of this report contains Drawing No. LB-1 which illustrates the original pond berm location within Lackies Bush. An off-line location adjacent to the northeast corner of The Source (formerly Radio Shack) building was reviewed for feasibility of a Stormwater Management Facility to take the place of the proposed berm within Lackies Bush. Drawing No. LB-2 in Appendix D of this report shows the location of the offline facility that was analyzed. The theory behind this facility was to capture all flows above the base flow at the northeast corner of The Source building and detain them within the proposed facility reducing peak flows to desired levels and outletting to Whiskey Creek. This land was originally chosen since it is undeveloped and is void of tree cover. A closer examination of this site indicated that significant earth excavation is required to obtain storage volumes to reduce peak flows. The off-line facility was deemed unacceptable for two reasons. The first reason was that area from the west side of Bayview Drive, which drains via the tributary along Mollard Court, could not be routed to the storage facility. Without controlling the peak flows from this area the required peak flow reductions could not be realized to substantially reduce the downstream improvements. Secondly, the cost to construct this off-line facility was substantial when compared to the results achieved with its implementation. A third location for the storage facility within Lackies Bush was analyzed. This location is immediately adjacent to the north side of The Source building and east of Bayview Drive. It is proposed to construct a berm across Whiskey Creek immediately north of the west tributary, which drains the area west of Bayview Drive (such that storm runoff from this area can be controlled). This area is part of an intermittent portion of Whiskey Creek. Drawing No. LB-3 in Appendix D of this report shows the location of the proposed SWM Facility. Immediately upstream of this location is a gabion basket lined channel which drops approximately 2 –3 metres in elevation, which acts a fish barrier. Furthermore, the area on the east side of Whiskey Creek is not as densely tree populated as areas further downstream within Lackies Bush. To accommodate this facility it is proposed to leave the low flow channel of the creek intact and all trees on the west side of the creek. Any earth excavation and tree clearing will be performed on the east side of the creek. It is also anticipated that some replanting which can withstand inundation will be completed as part of the Stormwater Management Facility. It is anticipated that the construction of this facility will require mitigation measures to address stagnant water, increased temperature concerns, sedimentation within the creek, etc. To mitigate these concerns a forebay may be required, tree cover would add significant canopy and other methods would be investigated during detail design to mitigate potential detrimental impacts to downstream fisheries. Azimuth Environmental has prepared an Environmental Impact Statement on the originally proposed berm within Lackies Bush and the Stormwater Management Facility locations immediately north of The Source. Appendix D contains this Impact Statement. This Impact Statement indicates that there are potential environmental impacts associated with the construction of on-line facilities, however, the location of the facility immediately adjacent to The Source has far fewer potential impacts. It is recognized that construction of any Stormwater Management Facility will require approval agencies to review and approve the proposed design. To maximize the effectiveness of the facility within Lackies Bush all of the stormwater runoff west of Bayview Drive should be routed to this facility. Currently the area adjacent to Little Avenue and Bayview Drive does (99111 ea document 2009 (aecom format).doc) - 16 - City of Barrie Whiskey Creek Master Draina ge Plan Update Environmental Assessment Document not drain to the location of the proposed Lackies Bush Storage Facility. Furthermore, the vertical profile of Bayview Drive shows a low point approximately 200 metres south of Little Avenue (The storage facility is located +500m south of Little Avenue). Due to the topography of Bayview Drive it is practically impossible to route major system flows overland southerly to the storage detention facility. Therefore, it is proposed to construct a 100-year storm sewer along Bayview Drive from Little Avenue such that all storm runoff west of Bayview Drive is conveyed to the proposed Lackies Bush Stormwater Management Facility. 3.3.5.4 Existing Southgate Subdivision Stormwater Management Pond The existing stormwater detention facility for the Southgate Subdivision is an ideal location to implement water quality controls. It is proposed to create a permanent wet cell west of the existing low flow channel through the facility. The current configuration of the pond will allow for a wet cell surface area of 2 approximately 6000m . The wet cell should be constructed 2 to 3m deep and route only flow through the cell from storms larger than the 25mm Storm and allow any base flow to by-pass. The wet cell is proposed to be located on the west side of the south tributary which traverses the detention facility. Excavation required for the creation of the wet cell in this area will also increase the available volume for quantity control above the 3 permanent pool by about 4500m . Modification of the outlet structure was analyzed within the hydrologic modeling in an effort to reduce peak outflows from the facility. However, modification of the outlet structure failed to show any appreciable reduction in peak flows. 3.3.5.5 Modification to Pond ‘A’ This recommendation applies only to Alternative 4B. As mentioned earlier, in 2003, a Supplementary Stormwater Management Report was prepared by F.J. Ternoway and Associates Ltd. for Pond ‘A’ and existing Stolp Pond Retrofit, west of Highway 400, south of Harvie Road. This pond currently detains peak flows for storm runoff for most of the Whiskey Creek watershed south of Harvie Road and west of Highway 400. The pond is to be expanded when additional lands south of Harvie Road are developed. Alternative 4B proposes the outlet structure for this pond be modified in an effort to reduce the regional storm event peak flows. Modification of the outlet structure includes the addition of a 900mm diameter orifice at elevation 293.00m, increasing the overflow weir elevation by 0.55m to elevation 297.50m and increasing the top of berm elevation by 0.25m to elevation 298.25m. Refer to Drawing ALT-4 at the back of this document for the proposed culvert schedule, pond details, and floodlines associated with Alternative 4. Although Alternative 4A and 4B provide an opportunity to improve water quality, the recommendations for new development and/or redevelopment as outlined in Section 3.2.3 should be followed. (99111 ea document 2009 (aecom format).doc) - 17 - W his ke y Cr ee k M as te r Dr aina ge Pla n Upda te Environm ental Assessm ent Document 3.3.6 Alternative 5 Increase Hydraulic Capacity of Creek Channel and Culverts and Designation of Stormwater Management Facilities Alternative 5 is similar to Alternative 4 in that it proposes to utilize natural storage areas to detain and release storm runoff at a lower rate. This alternative proposes to designate the natural storage areas upstream of Yonge Street and Tollendal Mill Road as SWM Facilities. Alternative 5 also includes various channel improvements and increases in the hydraulic capacity of road crossing culverts. Alternative 5 varies from Alternative 4 in that the existing peak flows are used for the drainage areas east of Highway 400 as these areas are already mostly developed. Any potential development or redevelopment within these drainage areas would be required to provide quantity and quality controls on site, resulting in post-development flows which will be less than or equal to the existing (i.e. pre-development) peak flows. The provision of on-site controls for future developments in this area reduces the flows to Whiskey Creek and therefore reduces the channel and culvert improvements required to provide the desired hydraulic capacity. For Alternative 5, culverts and channels have been sized to convey the 100-year storm peak flow. The following sections outline the items that are to be included in Alternative 5. 3.3.6.1 Natural Storage Area Upstream of Yonge Street A significant storage area exists within the natural valley between Yonge Street and Little Avenue. It is proposed to use this storage area to reduce peak flows by utilizing the box culvert at Yonge Street as a control structure. The existing 2.4m x 1.8m concrete box culvert will be replaced with a 3.6m x 1.8m HySpan structure designed to convey the 25-year peak flows. This natural area will be designated as a SWM facility so that this storage area can be accounted for in the hydrologic model and a reduction in peak flows realized. 3.3.6.2 Natural Storage Area Upstream of Tollendal Mill Road A natural storage area exists at the southeast corner of Tollendal Mill Road and Minets Point Road. A detention pond that was constructed in early 1994 for the Tollendal Mill Road and Bay Lane Subdivisions is located adjacent to the natural valley section within this area. The topography in this area is such that the upper 2m of the facility is not used for quantity control. It is proposed to create a channel between the two areas such that storm runoff impeded by Tollendal Mill Road will be allowed to enter the existing Tollendal Mill Road Stormwater Management Facility utilizing the available storage. It is also proposed to replace the existing 1.2m and 1.8m diameter CSP culverts with a 3m x 1.8m Hy-Span structure sized to convey the 25year peak flows. Refer to Drawing ALT-5 at the back of this document for the proposed culvert schedule, pond details, and floodlines associated with Alternative 5. Alternative 5 requires that quantity control for new development or redevelopment of existing lands east of Highway 400 be provided such that post-development flows are at or below pre-development peak flows. This alternative does not offer a complete solution for water quality improvement. Therefore, the (99111 ea document 2009 (aecom format).doc) - 18 - W his ke y Cr ee k M as te r Dr aina ge Pla n Upda te Environm ental Assessm ent Document recommendations for new development and/or redevelopment as outlined in Section 3.2.3 should be followed. 3.4 Improvement Summary 3.4.1 Construction Improvement All the alternatives previously discussed include various improvements within the watershed, including channel reconstruction, culvert replacement, and modification/construction of Stormwater Management Facilities. Table 2 provides a summary of all improvement works for each alternative. 3.4.2 Environmental Management Strategy A stream ecosystem is a continuum in which changes, albeit positive or negative, can affect habitat upstream and downstream from the point of disturbance. Therefore, a watershed management strategy should address the impacts associated with the local disturbance to the environment as well as areas far reaching from the source. Azimuth Environmental completed an environmental assessment along the Whiskey Creek Corridor and indicated that the aquatic habitat assessment and fish community data sampling completed for this study yielded positive results for the main branch of Whiskey Creek. Typically the integrity of coldwater fish habitat, such as that found on Whiskey Creek, are negatively influenced by development, however, these influences can be prevented if management strategies for the preservation of existing aquatic habitat conditions are considered part of the urban planning approach. The presence of the two indicator species in Whiskey Creek (brook trout and mottled sculpin) that both rely on coldwater habitat for survival and successful production of offspring indicates that the most prevalent management strategy for Whiskey Creek is to maintain the thermal characteristics for this creek system. Water temperature is affected by several factors including solar radiation, degree of ground water upwelling, stormwater discharge, surface runoff, quality and quantity of riparian vegetation, and base flow (to name a few). To maintain cold water habitat in Whiskey Creek, planning and design of urban expansion in the Whiskey Creek watershed should integrate ecosystem management as part of the planning process. To achieve this end, planning for development should attempt to maximize tree retention to ensure adequate shade cover of the creek to minimize solar radiation, and maintain adequate riparian buffers. In addition, stormwater facilities should be managed to ensure that adequate attenuation of pollutants, and removal of fines is occurring prior to discharge into the creek to maintain or improve the existing water quality conditions in Whiskey Creek. Through the use of effective monitoring to document detailed biological, physical and chemical components of Whiskey Creek, impacts upon the natural environment, whether positive or negative, will not go (99111 ea document 2009 (aecom format).doc) - 19 - City of Barrie Whiskey Creek Master Drainage Plan Update Environmental Assessment Document Table 2. Summary of Improvement Works Location Alternative 1 "Do-Nothing" (Future Conditions) Existing Outlet Channel (Downstream of Brennan Ave.) Brennan Avenue Varies 2 - 5m wide Max. 1.0m deep Ex 3.65 x 1.8m Concrete Box Channel between Brennan Avenue and The Boulevard The Boulevard + 2m Wide Low Flow Channel, Ex 8m Wide Top, 1.5m Deep Ex 1.79m x 1.35m CSP Arch Tollendal Mill Road Ex 1.8m Dia. CSP Ex 1.2m Dia. CSP N.A. Storage Facility Upstream of Tollendal Mill Road BC Rail Tracks Alternative 2 Increase Hydraulic Capacity of Creek Channel & Culverts 100-Year Peak Flow (m3/s) 52.62 Regional Peak Flow (m3/s) 73.82 52.50 73.66 52.25 73.32 52.25 73.32 52.03 72.99 N.A. N.A. 100-Year Peak Flow (m3/s) 52.62 2A 100-Year Storm 10m Flat Bottom Channel with 3:1 Sides Slopes, + 2.25m Deep 14 x 1.8m Hy-Span 52.50 8m Flat Bottom Channel with 3:1 Sides Slopes, + 2.0m Deep 7m x 1.8m Hy-Span Construct + 4m High Berm (Inlet of The Boulevard Culvert) 5 x 1.8m Hy-Span 52.25 52.25 52.03 N.A. N.A. Alternative 5 Increased Hydraulic Capacity( 100 yr) of Creek Channel and Culvert with 25 year conveyance @ Yonge Street and Tollendal Mill Road Alternative 4 Creation/Modification/Designation of Stormwater Management Facilities Regional Peak Flow (m3/s) 73.82 2B Regional Storm 15m Flat Bottom Channel with 3:1 Sides Slopes, + 2.25m Deep Twin 9 x 1.8m Hy-Span 73.66 10-15m Flat Bottom Channel with 3:1 Sides Slopes, + 2.0m Deep 9m x 1.8m Hy-Span Construct + 4m High Berm (Inlet of The Boulevard Culvert) 7 x 1.8m Hy-Span 73.32 73.32 72.99 N.A. N.A. 100-Year Peak Flow (m3/s) 19.25 4A 100 Year Storm 5m wide flat bottom channel, 3:1 Side Slopes, + 1.75 m Deep 6 x 1.8m Hy-Span 19.22 12.5m Flat Bottom Channel with 3:1 Side Slopes, + 1.75m deep 3m x 1.5m Hy-Span Construct + 4m High Berm (Inlet of The Boulevard Culvert) Ex. 1.8m dia. and 1.2m dia. CSP 19.17 19.17 19.12 Connect to existing Bay Lane Subdivision SWM Facility Designate as Stormwater Management Facility 19.12 Regional Peak Flow (m3/s) 58.20 4B Regional Storm 17.5m wide flat bottom channel, 3:1 Side Slopes, + 1.75 m Deep 14.0 x 1.8m Hy-Span 58.09 15m Flat Bottom Channel with 3:1 Side Slopes, + 1.75m deep 8m x 1.8m Hy-Span (Inlet of The Boulevard Culvert) Area to be graded to facilitate conveyance of flows 6 x 1.8m Hy-Span 57.86 57.86 57.63 Connect to existing Bay Lane Subdivision SWM Facility Designate as Stormwater Management Facility 57.63 Ex 1.5m Dia. Conc. Outlet Ex 1.5m Dia. CSP Inlet Ex 2.4m x 1.8m Concrete Box 50.70 71.32 6 x 1.8m Hy-Span 50.70 9 x 1.8m Hy-Span 71.32 2.4 x 1.8m Hy-Span 20.12 6 x 1.8m Hy-Span 56.82 48.84 68.39 5 x 1.8m Hy-Span 48.64 9 x 1.8m Hy-Span 68.39 Ex. 2.4 x 1.8m Hy-Span 19.50 7 x 1.8m Hy-Span 54.33 Storage Facility upstream of Yonge Street Channel between Little Avenue and Yonge Street N.A. N.A. N.A. N.A. N.A. N.A. N.A. Existing Low Flow Channel to Remain and 50m Wide Floodplain to be Constructed N.A. N.A. N.A. Existing Low Flow Channel to Remain and 50m Wide Floodplain to be Constructed N.A. N.A. Designate area as SWM Facility Existing Low Flow Channel to Remain and 50m Wide Floodplain to be Constructed 19.5 35.31 Designate area as SWM Facility Existing Low Flow Channel to Remain and 50m Wide Floodplain to be Constructed 54.33 55.28 Little Avenue Modification of Southgate Subdivision Detention Pond Channel downstream of Huronia Road Ex 6m Hy-Span N.A. 12.5 x 1.8 Hy-Span N.A. 47.61 N.A. Twin 8 x 1.8 Hy-Span N.A. 65.88 N.A. 35.31 35.31 55.28 55.28 14.93 13 x 1.8m Hy-Span Quantity = 4,500 m3 Quality = 7,500 m3 23m wide bottom floodplain, 3:1 side slopes, narrowing to a 1m wide 0.5m deep low flow channel and 15m wide bottom floodplain 9 x 1.8m Hy-Span 5 x 1.8m Hy-Span Existing 3.65 x 1.8m Conc. Box Quantity = 280,000 m3 2 Up to 1.35m Dia. sewer from Little Ave. to 550m south 2.4 x 1.2m Hy-Span 15m wide flat bottom Channel berm on building side of channel (Top=268.25) Yonge Street Huronia Road BC Rail McConkey Place Storage Facility within Lackie's Bush Bayview Drive 100-year Storm Sewer Bayview Drive (north of Mollard Court) Channel around Radio Shack 1m wide low flow channel, minimal overbank, narrowing to a 2m wide 1.5m deep channel Ex Twin 1.8m Dia. CSP Ex 1.2m Dia. Conc. Ex 3.65m x 1.8m Conc box N.A. N.A. Ex 1.2 Dia. CSP Ex ± 5m Wide Flat Bottom, 1.3m Deep 47.61 N.A. 65.88 N.A. N.A. N.A. 23m wide floodplain bottom, 3:1 side slopes 35.13 35.12 35.12 29.21 N.A. N.A. 12.20 51.19 51.19 43.60 N.A. N.A. 7.08 35.12 35.12 29.21 N.A. N.A. 12.20 14.93 26.45 8 x 1.8 Hy-Span 3.6 x 1.8 Hy-Span Existing 3.65 x 1.8m Conc box N.A. N.A. 2.4 x 1.2m Hy-Span 10m wide flat bottom Channel Berm on building side of channel (Top=268.50m) 14.93 1m high retaining wall along Little Ave Top of wall + 240.00m, 23m wide floodplain bottom, 3:1 side slopes 9 x 1.8 Hy-Span 6 x 1.8 Hy-Span Existing 3.65 x 1.8m Conc box N.A. N.A. 2.4 x 1.2m Hy-Span 12m wide flat bottom Channel berm on building side of channel (Top = 268.75m) 26.45 9 x 1.8m Hy-Span Quantity = 4,500 m3 Quality = 7,500 m3 23m wide bottom floodplain, 3:1 side slopes, narrowing to a 1m wide 0.5m deep low flow channel and 15m wide bottom floodplain 6 x 1.5m Hy-Span 3 x 1.5m Hy-Span Existing 3.65 x 1.8m Conc box Quantity = 280,000 m3 Up to 1.35m Dia. sewer from Little Ave. to 550m south 2.4 x 1.2m Hy-Span 15m wide flat bottom Channel berm on building side (Top=268.25) 51.19 51.19 51.19 43.60 N.A. N.A. 7.08 25.86 25.86 25.86 12.29 11.2 3.69 12.2 41.93 41.93 41.93 34.55 31.74 N.A. 7.08 22.56 Bayview Drive (north of Big Bay Point Rd) Ex Twin 1.63m x 1.12m CSP Arch 15.76 26.39 3.6 x 1.8m Hy-Span 15.76 7 x 1.8m Hy-Span 26.39 3.6 x 1.8m Hy-Span 15.76 6 x 1.8m Hy-Span 22.75 BC Rail Fairview Road Ex Twin 1.5m Dia. CSP Ex 1.2m x 1.2m Conc box 13.28 8.27 25.31 23.20 13.28 8.27 3 x 1.8m Hy-Span 4 x 1.5m Hy-Span 25.31 23.20 5.94 22.02 5.94 Existing 1.2 x 1.2m Hy-Span and proposed 2.4 x 1.8m Hy-Span 22.02 3 x 1.8m Hy-Span Existing 1.2 x 1.2m Conc box and proposed 1950mm Concrete Pipe Existing 1.2 x 1.2m Conc box and proposed 1950mm Dia. Conc. 21.73 19.72 Ex 1.2 x 1.2m Conc box Existing Twin 1.5m CSP Existing 1.2 x 1.2m Conc box and proposed 1200mm Dia. Concrete Pipe Existing 1.2m x 1.2m Conc box and proposed 2.4 x 1.8m Hy-Span1 13.28 8.27 Highway 400 Ex. Twin 1.5m dia. CSP Ex. 1.2x 1.2m Conc box and proposed 1200mm Dia. Concrete Pipe Existing 1.2 x 1.2m Con box and proposed 2.4 x 1.8m Hy-Span1 Harvie Road ( East of Bryne Dr) 1m wide low flow channel, minimal overbank, narrowing to a 2m wide 0.6m deep channel Ex 1.2m Dia. CSP Bryne Drive (Future), at pond A outlet Channel between Harvie road Culvert and Highway 400 5.94 18.70 22.02 7m flat bottom channel with 3:1 side slopes 5.94 7m flat bottom channel with 3:1 side slopes 22.02 7m flat bottom channel with 3:1 side slopes 5.94 7m flat bottom channel with 3:1 side slopes 18.70 3.21 16.25 3.6 x 1.5m Hy-Span 3.21 3.6 x 1.5m Hy-Span 16.25 3.6 x 1.5m Hy-Span 3.21 3.6 x 1.5m Hy-Span 13.53 N.A. 1.37 14.34 3.6 x 1.5m Hy-Span1 1.37 3.6 x 1.5m Hy-Span 14.34 3.6 x 1.5m Hy-Span1 1.37 3.6 x 1.5m Hy-Span 11.99 SWM Pond A - Modifications N.A. 1.37 14.34 N.A. 1.37 N.A. 14.34 N.A. 1.37 11.99 Harvie Road ( West of Bryne Drive or at Bryne Dr.) Ex 600mm dia csp 1.52 4.22 N.A. N.A. N.A. N.A. N.A. N.A Modify Outlet Structure Raise berm height by 0.25m. N.A N.A. N.A. N.A. SWM Pond B (Future) N.A. Notes: Unless indicated, all new structures assume the removal of the existing structure. 1. Sized to convey Regional peak flow 2. Designed for 100-year peak flow 3. All Concrete structures are to be high span or open bottom 0.76 3.58 1 1350mm Dia Concrete Storm sewer Quantity = 16,500 m Quality = 6,500 m3 3 1.52 0.76 1 1350mm Dia Concrete Storm sewer Quantity = 16,500 m Quality = 6,500 m3 3 4.22 3.58 1 1350mm Dia Concrete Storm sewer Quantity = 16,500 m Quality = 6,500 m3 3 1.52 0.76 1 1350mm Dia Concrete Storm sewer Quantity = 16,500 m Quality = 6,500 m3 3 Regional Peak Flow (m3/s) 26.74 71.08 26.72 70.94 26.67 70.63 26.67 70.63 26.62 70.28 Connect to existing Bay Lane Subdivision SWM Facility designate as SWM facility 26.62 70.28 8.5m Flat Bottom Channel 9 x 1.8m HY-Span 7.5m Flat Bottom Channel 8m x 1.5m HY-Span (Inlet of The Boulevard Culvert), Area to be graded to facilitate conveyance of flow 3 x 1.8m Hy-Span 3 x 1.8m Hy-Span 27.75 68.86 3.6 x 1.8m Hy-Span 27.00 66.13 Designate area as SWM Facility 27.00 66.13 Existing Low Flow Channel to Remain and 50m wide flood plain to be constructed 36.06 64.42 9 x 1.8 Hy-Span 36.06 64.42 N.A. N.A. N.A. 26.33 50.69 26.33 26.33 19.98 N.A. N.A. 7.47 50.69 50.69 43.34 N.A. N.A. 6.58 12.35 26.54 3.6 x 1.8m Hy Span 12.73 26.51 Existing Twin 1.5m CSP Existing 1.2 x 1.2m Conc. Box and proposed 1200 Dia concrete pipe Existing 1.2m x 1.2m Conc. Box and proposed 11.32 25.39 7.29 23.25 5.94 22.02 5.94 22.02 4.5 x 1.2m Hy-Span. Box 4.57 20.20 4.5 x 1.5m Hy-Span. Box1, to be established in the Bryne Dr. Master Plan Update. 4.57 20.20 1.36 14.34 4.22 23m wide bottom floodplain, 3:1 side slopes, narrowing to a 1m wide 0.5m deep low flow channel and 15m wide bottom floodplain 6 x 1.5 Hy-Span 3.0 x 1.5 Hy-Span Existing 3.65 x 1.8m Conc. Box N.A. N.A. 2.4 x 1.2m Hy-Span 5m wide flat bottom Channel, 15m width at top of banks, berm on building side of channel (Top=268.25) 6.0 x 1.8 Hy-Span 5.94 Harvie Road storm sewer 100-Year Peak Flow (m3/s) 5 1 N.A. N.A. N.A. 1.8 x 0.8mHy-Span1, subject to completion of the Bryne Drive Mster Plan Update 1.52 4.22 N.A. N.A. N.A. 0.75 3.58 3.58 Quantity = 16,500 m3 BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 BARRIE CREEKS STUDY AREA SWMF RETROFIT OPPORTUNITIES April 2, 2014 Management Unit Sophia Creek Kidds Creek Hotchkiss Creek Whiskey Creek Dyments Creek Management Unit 1 SWMF ID SP1 SP3 KD1 KD3 KD6 HT6 WK1 WK4 DY2 HR1 SWMF Location Southwest of St.Vincent Street and north of Grove Street East Southeast of Highway 400 and north of Ottaway Ave. Southwest of Bayfield Street between Coulter Street and Highway 400 North corner of Highway 400 and Sunnidale Road. South of Sunnidale Road and northeast of Irwin Drive North corner of Livingstone Street West and Ford Street. Between Morrow Road and Highway 400 north of Essa Road Between Patterson Road and Highway 400 east of Philips Street West of Patterson Road between Tiffin Street and Philips Street West of Bryne Drive, South of Ardagh North of Ardagh Road North of Big Bay Point Road and between Huronia Road and Pickett Crescent Southeast corner of Montserrand Street and Beacon Road Northeast corner of Chieftan Crescent Northwest corner of Herrell Avenue and Firman Drive South of Tollendal Mill Road and west of Wallwin's Way Northwest of McVeigh Drive and south of Cundles Road West . West. of Minet's Point Road, between Burton Avenue and Lakeshore Drive 1) City of Barrie Secondary Plan, Background Studies & Infrastructure Master Plan Intensification & Annexed Lands. Amec (October 2013). Exsisting SWMF Type of SWMF Retrofit Opportunity No. Feasible Treatment Level Yes Yes No Yes Yes Yes No No No Yes No No No No Yes Yes Yes Yes Dry Pond (Online) Dry Pond Wet Pond Dry Pond (Online) Dry Pond Dry Pond Wet Pond Wet Pond Wet Pond Dry Pond/Infiltration Wet Pond Wet Pond Wet Pond Wet Pond Dry Pond Wetland Dry Pond Dry Pond 4 8 17 14 13 11 44 39 38 3 55 26 42 40 25 20 15 28 Constrained Constrained Enhanced Enhanced Constrained Normal Enhanced Enahnced Enhanced Enhanced Enahnced Basic Enhanced Enhanced Enhanced Normal Enhanced Basic BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 BARRIE CREEKS STUDY AREA SWMF RETROFIT OPPORTUNITIES EVALUATION April 22, 2014 Physical Environment Management Unit Sophia Creek Kidds Creek Hotchkiss Creek Whiskey Creek Dyments Creek Management Unit 1 Rank SWMF ID 7 1 9 11 2 3 8 10 13 3 14 12 12 15 5 6 3 4 SP1 SP3 KD1 KD3 KD6 HT6 WK1 WK4 DY2 HR1 SWMF Location Southwest of St.Vincent Street and north of Grove Street East Southeast of Highway 400 and north of Ottaway Ave. Southwest of Bayfield Street between Coulter Street and Highway 400 North corner of Highway 400 and Sunnidale Road. South of Sunnidale Road and northeast of Irwin Drive North corner of Livingstone Street West and Ford Street. Between Morrow Road and Highway 400 north of Essa Road Between Patterson Road and Highway 400 east of Philips Street West of Patterson Road between Tiffin Street and Philips Street West of Bryne Drive, South of Ardagh North of Ardagh Road North of Big Bay Point Road and between Huronia Road and Pickett Crescent Southeast corner of Montserrand Street and Beacon Road Northeast corner of Chieftan Crescent Northwest corner of Herrell Avenue and Firman Drive South of Tollendal Mill Road and west of Wallwin's Way Northwest of McVeigh Drive and south of Cundles Road West . West. of Minet's Point Road, between Burton Avenue and Lakeshore Drive Type of SWMF Dry Pond Dry Pond Wet Pond Dry Pond Dry Pond Dry Pond Wet Pond Wet Pond Wet Pond Dry Pond Wet Pond Wet Pond Wet Pond Wet Pond Dry Pond Wetland Dry Pond Dry Pond Existing SWM Facility Yes Yes No Yes Yes Yes No No No Yes No No No No Yes Yes Yes Yes Sophia Creek Kidds Creek Hotchkiss Creek Whiskey Creek Dyments Creek Management Unit 1 Rank SWMF ID 7 1 9 11 2 3 8 10 13 3 14 12 12 15 5 6 3 4 SP1 SP3 KD1 KD3 KD6 HT6 WK1 WK4 DY2 HR1 SWMF Location Southwest of St.Vincent Street and north of Grove Street East Southeast of Highway 400 and north of Ottaway Ave. Southwest of Bayfield Street between Coulter Street and Highway 400 North corner of Highway 400 and Sunnidale Road. South of Sunnidale Road and northeast of Irwin Drive North corner of Livingstone Street West and Ford Street. Between Morrow Road and Highway 400 north of Essa Road Between Patterson Road and Highway 400 east of Philips Street West of Patterson Road between Tiffin Street and Philips Street West of Bryne Drive, South of Ardagh North of Ardagh Road North of Big Bay Point Road and between Huronia Road and Pickett Crescent Southeast corner of Montserrand Street and Beacon Road Northeast corner of Chieftan Crescent Northwest corner of Herrell Avenue and Firman Drive South of Tollendal Mill Road and west of Wallwin's Way Northwest of McVeigh Drive and south of Cundles Road West . West. of Minet's Point Road, between Burton Avenue and Lakeshore Drive Type of SWMF Dry Pond Dry Pond Wet Pond Dry Pond Dry Pond Dry Pond Wet Pond Wet Pond Wet Pond Dry Pond Wet Pond Wet Pond Wet Pond Wet Pond Dry Pond Wetland Dry Pond Dry Pond Maximum Score Criteria Weight 0 1 0 0 1 1 0 0 0 1 0 0 0 0 1 1 1 1 City City City City City City Private Private Private City City City Private Private City City City Private Online/Offline 2 2 2 2 2 2 0 0 0 2 2 2 0 0 2 2 2 0 Online Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline Offline 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Impact to Existing V 2t ti 3 1 0 2 2 3 2 2 2 0 1 1 3 2 1 2 2 Natural Feature Adjacency Natural Environment Linkage Potential Opportunity Fisheries Impact 1 1 0 0 1 1 1 1 1 0 0 0 0 1 1 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 2 0 0 3 1 2 2 2 2 2 1 2 2 2 2 3 0 Potential for Thermal Impacts Type Warm Warm Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Cold Score 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Existing SWMF (Yes/No) City / MTO / Private Online/Offline kg of P Reduction Impact (Yes/No) Sensitive/Non Sensitive Opportunity (Yes/No) Impact Potential Cold/Warm 1 3 2 3 1 3 5 5 3 2 1 1 1 1 3 3 1 3 Social Environment Economic Environment Capital Cost $ $/kg P $1,242,050 $97,255 $531,860 $65,588 $1,147,200 $158,730 $330,660 $104,762 $189,473 $62,915 $600,000 $75,472 $672,901 $233,464 $632,616 $236,216 $293,671 $193,189 $582,000 $158,730 $198,000 $104,762 $122,310 $62,791 $583,924 $158,438 $336,252 $183,792 $359,766 $104,762 $147,600 $75,472 $383,130 $104,762 $1,041,845 $124,328 Evaluation Criteria Maximum Score Criteria Weight Management Unit Land Ownership P Removal Opportunity kg Score 12.8 5 8.1 4 7.2 4 3.2 2 3 2 8 4 2.9 1 2.7 1 1.5 0 3.7 2 1.9 0 1.9 0 3.7 2 1.8 0 3.4 2 2 0 3.7 2 8.4 4 Evaluation Criteria Loss of Recreational U0 1 0 1 1 0 1 1 1 1 1 0 1 1 0 1 0 1 Adjacent Land Uses RES HWY, IND & RES OS & COM RES & EP RES & INS INS & RES IND & OS RES RES COM IND, RES & INS IND & INS RES & IND RES & IND COM & RES OS & RES RES & OS 0 1 2 1 1 1 3 3 3 3 0 2 2 0 1 1 1 3 COM Source 1: Score 2 3 1 2 3 3 0 0 0 1 2 3 1 0 2 3 2 1 16.3 27.0 13.7 13.0 22.3 20.3 14.0 13.3 12.3 20.3 12.0 12.7 12.7 10.0 18.3 17.7 20.3 19.3 Loss (Yes/No) Adjacent Land Use $/kg of P Reduction Total Score 1 2 3 3 3 3 32 - Appendix E - Stormwater Management Retrofit Assessment (Staff Report No.: ENG015-09). City of Barrie (February 2009) Total Score Note 1: RES - Residential, COM - Commercial, IND - Industrial, INS - Institutional, HWY - Highway, OP - Open Space, EP - Environmental Protection Note 2: Scores for each Evaluation Criteria are normalized by dividing by the Maximum Score before being multiplied by the Criteria Weight and then summed to get the Total Score for the Retrofit Opportunity. Note 3: Scoring System - Refer to Appendix E - Stormwater Management Retrofit Assessment for full explanation of scoring system. BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 BARRIE CREEKS STUDY AREA SWMF RETROFIT OPPORTUNITIES EVALUATION JULY 24, 2014 EVALUATION CRITERIA 1) RES - Resedential 2) Existing SWM Facility Is there an existing SWM facility? COM - Commercial Score 3) Land Ownership Retrofit Opportunity Value 5) Online / Offline Facility Type Value Score INS - Institutional Yes 1 City 2 >= 12 kg 5 Offline 1 HWY - Highway No 0 Other Public Body Private 1 < 12 kg, >=7 kg 4 Online 0 IND - Industrial OS - Open Space Score 4) Phosphorus Remnoval Opportunity Potential Phosphorus Score Removal (kg) 0 EP - Environmental Protection 8) Linkage Opportunity Linkage Opportunity Retrofit would create a Otherwise Score 1 0 9) Thermal Impacts to Downstream (receiving) Watercourse Retrofit Opportunity Value Value Score Warm water 1 Cold water 0 10) Potential Fisheries Impact Potential Fisheries Impact Ponds with some distance or a barrier to the watercourse 3 2 Presence of SAR fish and mussels or online coldwater stream opportunities 3 2 < 3 kg, >= 2 kg 1 < 2 kg 0 1 0 Adjacent Land Use Classification Value Score Industrial/commercial 3 Park / Open Space / Institutional Non-sensitive natural feature within 50m of SWM boundary Sensitive natural feature (wetland) within 50m of SWM boundary OR Any natural feature (or portion) within SWM boundary 12) Loss of Park Land Uses 11) Adjacent Land Use Value Score Ponds with creeks nearby Warm water stream online opportunities < 7 kg, >=4 kg < 4 kg, >= 3 kg 6) Natural Feature Adjacency Adjacency of Natural Features 7) Impact to Existing Vegetation Score 1 0 13) Capital Cost Capital Cost Score < $80,000 / kg 3 2 >= $80,000 / kg, <$120,000 / kg 2 Residential, existing quantity control pond 1 >= $120,000 / kg, <$180,000 / kg 1 Residential, no existing pond 0 >= $180,000 / kg 0 Loss of Parkland Value Score No 1 Yes 0 Impact to Existing Trees Score None (0 % tree cover) 3 Minor (0 – 25% tree cover) 2 Moderate (25 – 60% tree cover) 1 Significant (>60% tree cover) 0 Notes: Sources: Management Unit 5 Hewitts Creek Management Unit City City City City City City City City City HW01 HW04 HW05 HW06 HW08 HW09 HW10 BY01 BY03* Wet Pond Wet Pond/OGS Wet Pond Wet Pond Wet Pond Wet Pond Wet Pond Wet Pond Wet Pond Type of SWMF 1,280 7,468 4,647 14,325 2,815 - Permanent Pool Volume * SWMF misidentified in City of Barrie SWMF Database 4) Storm Pond Database (SWM reports, Certificates of Approval, Design Drawings, etc.) supplied by the City of Barrie. 5) City of Barrie Secondary Plan, Background Studies & Infrastructure Master Plan Intensification & Annexed Lands . Amec (October 2013). 3) Appendix E - Stormwater Management Retrofit Assessment (Staff Report No.: ENG015-09) . City of Barrie (February 2009) 2) Lake Simcoe Basin Stormwater Management and Retrofit Opportunities . Lake Simcoe Region Conservation Authority (2007). 3,979 1,850 13,600 7,515 30,735 4,495 9,899 3,979 12,162 3,656 Asset Management Plan 3 Storage Volume (m ) Active Storage Volume MOE Certificate of Approval 1) City of Barrie Asset Management Plan Storm Water Management Facilities (SWMF) . GHD (December, 2012). Ownership SWMF ID LOVERS CREEK, HEWITTS CREEK AND ANNEXATION LANDS STUDY AREA SWMF INVENTORY MARCH 21, 2014 BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 1,850 22,168 10,843 30,900 1,595 13,555 Drainage Plans / SWM Reports 62.8 37.3 111.4 11.5 36.5 MOE Certificate of Approval Drainage Area (ha) 9.0 10.2 62.8 37.3 111.4 6.8 33.9 Drainage Plans / SWM Reports - Assessment of SWMF No Risk High Risk High Risk High Risk No Risk No Risk No Risk No Risk WHPA Risk Normal Enhanced Enhanced Enhanced Enhanced Enhanced - Level of Water Quality Control Provided No No No No No No No No No Retrofit Opportunity No. - Retrofit Priority - Feasible Treatment Level LV1 LV3 LV5 LV7 LV10 LV12 LV13 LV18 - SWMF ID Drainage easement south of Ellis Drive South corner of Cox Mill Road and Hurst Drive East of Welham Drive. and North of Mapleview Drive. West of Bayview Drive and north of Saunders Road. West of Bayview Drive, North of Salem Road Northwest corner of Cox Mill Road and Mary Anne Drive East of Welham Road and north of Saunders Road. Northeast corner of Macmillan Crescent and Tomlin Crescentt. Southeast corner of Chalmers Drive and Loon Avenue Southeast corner of Walnut Crescent SWMF Location 1) City of Barrie Secondary Plan, Background Studies & Infrastructure Master Plan Intensification & Annexed Lands. Amec (October 2013). Hewitts Creek Lovers Creek Management Unit LOVERS CREEK, HEWITTS CREEK AND ANNEXATION LANDS STUDY AREA SWMF RETROFIT OPPORTUNITIES April 2, 2014 BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 No Yes Yes Yes Yes Yes Yes Yes Yes No Exsisting SWMF Wet Pond Wet Pond Dry Pond Dry Pond (Online) Dry Pond (Online) Dry Pond Dry Pond Dry Pond Dry Pond Wet Pond Type of SWMF 67 68 31 45 65 37 32 21 24 27 Retrofit Opportunity No. Constrained Normal Enhanced Basic Basic Constrained Enhanced Constrained Basic Enhanced Feasible Treatment Level LV1 LV3 LV5 LV7 LV10 LV12 LV13 LV18 - SWMF ID LV1 LV3 LV5 LV7 LV10 LV12 LV13 LV18 - 5 1 3 7 4 3 3 6 2 8 Rank 5 1 3 7 4 3 3 6 2 8 Hewitts Creek Management Unit Hewitts Creek Lovers Creek Lovers Creek SWMF ID Rank Management Unit Drainage easement south of Ellis Drive South corner of Cox Mill Road and Hurst Drive East of Welham Drive. and North of Mapleview Drive. West of Bayview Drive and north of Saunders Road. West of Bayview Drive, North of Salem Road Northwest corner of Cox Mill Road and Mary Anne Drive East of Welham Road and north of Saunders Road. Northeast corner of Macmillan Crescent and Tomlin Crescent. Southeast corner of Chalmers Drive and Loon Avenue Southeast corner of Walnut Crescent SWMF Location Drainage easement south of Ellis Drive South corner of Cox Mill Road and Hurst Drive East of Welham Drive. and North of Mapleview Drive. West of Bayview Drive and north of Saunders Road. West of Bayview Drive, North of Salem Road Northwest corner of Cox Mill Road and Mary Anne Drive East of Welham Road and north of Saunders Road. Northeast corner of Macmillan Crescent and Tomlin Crescent. Southeast corner of Chalmers Drive and Loon Avenue Southeast corner of Walnut Crescent SWMF Location LOVERS CREEK, HEWITTS CREEK AND ANNEXATION LANDS STUDY AREA SWMF RETROFIT OPPORTUNITIES EVALUATION April 22, 2014 BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 Maximum Score Criteria Weight Wet Pond Wet Pond Dry Pond Dry Pond Dry Pond Dry Pond Dry Pond Dry Pond Dry Pond Wet Pond $/kg of P Reduction 3 3 Adjacent Land Use 3 3 3 1 3 3 3 1 3 1 1 0 1 2 IND COM & RES IND & EP COM & IND IND RES & OS IND & EP OS & RES RES & EP RES Loss (Yes/No) 1 1 1 1 1 1 1 1 1 1 $/kg P $38,911 $75,472 $158,730 $106,047 $106,047 $35,329 $158,730 $75,356 $62,791 $104,762 Score 3 3 1 2 2 3 1 3 3 2 5 5 - 32 Total Score 19.3 23.3 21.3 17.0 21.0 21.3 21.3 17.7 22.0 15.0 Total Score kg of P Reduction 1 3 1 1 1 0 0 1 1 1 1 1 P Removal Opportunity kg Score 2 0 11.8 4 2 1 5.8 3 11.6 4 2.3 1 3.2 2 1 0 2.8 1 6.7 3 Evaluation Criteria Online/Offline Offline Offline Offline Online Online Offline Offline Offline Offline Offline Online/Offline Economic Environment Capital Cost $ $77,044 $888,000 $318,900 $619,704 $1,231,200 $80,619 $500,880 $76,393 $176,985 $697,554 Evaluation Criteria 2 3 2 2 2 2 2 2 2 2 2 2 City / MTO / Private City City City City City City City City City City 1 3 0 1 1 1 1 1 1 1 1 0 Physical Environment Land Ownership Existing SWMF (Yes/No) No Yes Yes Yes Yes Yes Yes Yes Yes No Existing SWM Facility Social Environment Type of SWMF Loss of Parkland Adjacent Land Uses Uses Maximum Score Criteria Weight Wet Pond Wet Pond Dry Pond Dry Pond Dry Pond Dry Pond Dry Pond Dry Pond Dry Pond Wet Pond Type of SWMF Note 3: Note 2: Note 1: Source 1: 3 2 Impact (Yes/No) 2 2 2 0 3 2 2 1 3 0 Impact to Existing Trees 3 3 Impact Potential 3 2 3 1 1 3 2 1 2 2 full explanation of scoring system. Scoring System - Refer to Appendix E - Stormwater Management Retrofit Assessment for Retrofit Opportunity. before being multiplied by the Criteria Weight and then summed to get the Total Score for the Scores for each Evaluation Criteriaa are normalized by dividing by the Maximum Score HWY - Highway, OP - Open Space, EP - Environmental Protection RES - Residential, COM - Commercial, IND - Industrial, INS - Institutional, No.: ENG015-09). City of Barrie (February 2009) 1 3 Cold/Warm Potential for Thermal Impacts Type Score Cold 0 Cold 0 Cold 0 Cold 0 Cold 0 Cold 0 Cold 0 Cold 0 Cold 0 Cold 0 Appendix E - Stormwater Management Retrofit Assessment (Staff Report 1 1 Opportunity (Yes/No) Sensitive/Non Sensitive 1 1 0 0 0 0 0 0 0 1 1 0 Potential Fisheries Impact Natural Environment Linkage Opportunity 1 1 1 0 1 1 1 0 1 0 Natural Feature Adjacency Score 1 0 Linkage Opportunity Retrofit would create a linkage of 2 non-sensitive natural features Otherwise 8) Linkage Opportunity EP - Environmental Protection Cold water Warm water 0 1 9) Thermal Impacts to Downstream (receiving) Watercourse Retrofit Opportunity Value Score Value 0 No HWY - Highway OS - Open Space 1 Score Yes 2) Existing SWM Facility Is there an existing SWM facility? INS - Institutional IND - Industrial COM - Commercial 1) RES - Resedential EVALUATION CRITERIA LOVERS CREEK, HEWITTS CREEK AND ANNEXATION LANDS STUDY AREA SWMF RETROFIT OPPORTUNITIES EVALUATION JULY 24, 2014 BARRIE COMPREHENSIVE STORMWATER MANAGEMENT MASTER PLAN CCTA PROJECT No.: 114001 Presence of SAR fish and mussels or online coldwater stream opportunities Warm water stream online opportunities Ponds with creeks nearby Ponds with some distance or a barrier to the watercourse 10) Potential Fisheries Impact Potential Fisheries Impact Other Public Body Private City 3) Land Ownership Retrofit Opportunity Value 0 < 2 kg 0 1 2 3 Residential, no existing pond Residential, existing quantity control pond Park / Open Space / Institutional Industrial/commercial Adjacent Land Use Classification 0 1 2 3 Value Score 1 < 3 kg, >= 2 kg 11) Adjacent Land Use 2 < 4 kg, >= 3 kg Value Score 3 < 7 kg, >=4 kg 4 < 12 kg, >=7 kg 5 0 >= 12 kg 4) Phosphorus Remnoval Opportunity Potential Phosphorus Score Removal (kg) 1 2 Score Yes No Loss of Parkland 12) Loss of Park Land Uses Online Offline Facility Type 5) Online / Offline 0 1 Value Score 0 1 Value Score >= $180,000 / kg >= $120,000 / kg, <$180,000 / kg >= $80,000 / kg, <$120,000 / kg < $80,000 / kg Capital Cost 13) Capital Cost Sensitive natural feature (wetland) within 50m of SWM boundary OR Any natural feature (or portion) within SWM boundary Non-sensitive natural feature within 50m of SWM boundary 6) Natural Feature Adjacency Adjacency of Natural Features 0 1 2 3 Score 0 1 Score Significant (>60% tree cover) Moderate (25 – 60% tree cover) Minor (0 – 25% tree cover) None (0 % tree cover) Impact to Existing Trees 7) Impact to Existing Vegetation 0 1 2 3 Score APPENDIX F: OVERLAND FLOW CALCULATIONS Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Feb 2 2016 3 Lane Configuration User-defined Invert Elev (m) Slope (%) N-Value = 1.0000 = 0.0200 = 0.020 Calculations Compute by: Known Depth (m) Known Depth = 0.2480 Highlighted Depth (m) Q (cms) Area (sqm) Velocity (m/s) Wetted Perim (m) Crit Depth, Yc (m) Top Width (m) EGL (m) = = = = = = = = 0.2480 0.5342 3.0128 0.1773 23.9667 0.1189 23.8620 0.2496 (Sta, El, n)-(Sta, El, n)... ( 0.0000, 1.2480)-(0.5000, 1.2380, 0.032)-(2.5000, 1.1980, 0.013)-(4.9000, 1.1500, 0.032)-(5.1000, 1.0000, 0.013)-(12.0000, 1.1380, 0.013)-(18.9000, 1.0000, 0.013 -(19.1000, 1.1500, 0.013)-(26.0000, 1.2920, 0.032) Elev (m) Depth (m) Section 1.6000 0.6000 1.4500 0.4500 1.3000 0.3000 1.1500 0.1500 1.0000 0.0000 0.8500 -0.1500 0.7000 -0.3000 -3 0 3 6 9 12 15 Sta (m) 18 21 24 27 30 33 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Feb 2 2016 5 Lane Configuration User-defined Invert Elev (m) Slope (%) N-Value = 1.0000 = 0.0200 = 0.017 Calculations Compute by: Known Depth (m) Known Depth = 0.2180 Highlighted Depth (m) Q (cms) Area (sqm) Velocity (m/s) Wetted Perim (m) Crit Depth, Yc (m) Top Width (m) EGL (m) = = = = = = = = 0.2180 0.4558 2.6646 0.1711 29.1057 0.1128 29.0000 0.2195 (Sta, El, n)-(Sta, El, n)... ( 0.0000, 1.2180)-(3.4000, 1.1500, 0.032)-(3.6000, 1.0000, 0.013)-(15.0000, 1.2280, 0.013)-(26.4000, 1.0000, 0.013)-(26.6000, 1.1500, 0.013)-(27.6000, 1.1700, 0.0 -(29.6000, 1.2100, 0.013)-(30.1000, 1.2200, 0.032) Elev (m) Depth (m) Section 1.6000 0.6000 1.4500 0.4500 1.3000 0.3000 1.1500 0.1500 1.0000 0.0000 0.8500 -0.1500 0.7000 -0.3000 -3 0 3 6 9 12 15 18 Sta (m) 21 24 27 30 33 36 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Feb 2 2016 5 Lane Configuration User-defined Invert Elev (m) Slope (%) N-Value = 1.0000 = 0.0200 = 0.016 Calculations Compute by: Known Depth (m) Known Depth = 0.1900 Highlighted Depth (m) Q (cms) Area (sqm) Velocity (m/s) Wetted Perim (m) Crit Depth, Yc (m) Top Width (m) EGL (m) = = = = = = = = 0.1900 0.3231 1.9310 0.1673 23.5046 0.0975 23.4000 0.1914 (Sta, El, n)-(Sta, El, n)... ( 0.0000, 1.2180)-(3.4000, 1.1500, 0.032)-(3.6000, 1.0000, 0.013)-(15.0000, 1.2280, 0.013)-(26.4000, 1.0000, 0.013)-(26.6000, 1.1500, 0.013)-(27.6000, 1.1700, 0.0 -(29.6000, 1.2100, 0.013)-(30.1000, 1.2200, 0.032) Depth of 0.19 m corresponds to maximum depth of ponding that allows for one lane of traffic to remain open Elev (m) Depth (m) Section 1.6000 0.6000 1.4500 0.4500 1.3000 0.3000 1.1500 0.1500 1.0000 0.0000 0.8500 -0.1500 0.7000 -0.3000 -3 0 3 6 9 12 15 18 Sta (m) 21 24 27 30 33 36 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Feb 2 2016 7 Lane Configuration User-defined Invert Elev (m) Slope (%) N-Value = 1.0000 = 0.0200 = 0.017 Calculations Compute by: Known Depth (m) Known Depth = 0.2180 Highlighted Depth (m) Q (cms) Area (sqm) Velocity (m/s) Wetted Perim (m) Crit Depth, Yc (m) Top Width (m) EGL (m) = = = = = = = = 0.2180 0.4538 2.6646 0.1703 29.1057 0.1128 29.0000 0.2195 (Sta, El, n)-(Sta, El, n)... ( 0.0000, 1.2180)-(3.4000, 1.1500, 0.032)-(3.6000, 1.0000, 0.013)-(18.2000, 1.2920, 0.013)-(32.8000, 1.0000, 0.013)-(33.0000, 1.1500, 0.013)-(34.5000, 1.1800, 0.0 -(36.5000, 1.2200, 0.013)-(37.0000, 1.2300, 0.032) Depth of 0.25 m corresponds to maximum depth of ponding that allows for one lane of traffic to remain open Elev (m) Depth (m) Section 1.6000 0.6000 1.4500 0.4500 1.3000 0.3000 1.1500 0.1500 1.0000 0.0000 0.8500 -0.1500 0.7000 -0.3000 -3 0 3 6 9 12 15 18 21 Sta (m) 24 27 30 33 36 39 42 45 Channel Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Tuesday, Feb 2 2016 7 Lane Configuration User-defined Invert Elev (m) Slope (%) N-Value = 1.0000 = 0.0200 = 0.017 Calculations Compute by: Known Depth (m) Known Depth = 0.2500 Highlighted Depth (m) Q (cms) Area (sqm) Velocity (m/s) Wetted Perim (m) Crit Depth, Yc (m) Top Width (m) EGL (m) = = = = = = = = 0.2500 0.7134 3.6594 0.1950 32.9065 0.1341 32.8000 0.2519 (Sta, El, n)-(Sta, El, n)... ( 0.0000, 1.2180)-(3.4000, 1.1500, 0.032)-(3.6000, 1.0000, 0.013)-(18.2000, 1.2920, 0.013)-(32.8000, 1.0000, 0.013)-(33.0000, 1.1500, 0.013)-(34.5000, 1.1800, 0.0 -(36.5000, 1.2200, 0.013)-(37.0000, 1.2300, 0.032) Elev (m) Depth (m) Section 1.6000 0.6000 1.4500 0.4500 1.3000 0.3000 1.1500 0.1500 1.0000 0.0000 0.8500 -0.1500 0.7000 -0.3000 -3 0 3 6 9 12 15 18 21 Sta (m) 24 27 30 33 36 39 42 45 APPENDIX G: OGS SIZING Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 1 Catchment Bayview South (C201) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.06 Imperviousness (%) 68 Storage (ha-m) 0 The Stormceptor System model STC 2000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 66 76 76 77 82 83 86 87 89 91 91 93 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 1 Catchment Bayview Central (C202) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.68 Imperviousness (%) 65 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 60 71 71 72 78 79 82 83 86 89 89 91 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 1 Catchment Bayview North (C203) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.38 Imperviousness (%) 80 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 60 71 71 72 78 79 82 83 86 89 89 91 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 2 Catchment Bayview South (C301) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.06 Imperviousness (%) 72 Storage (ha-m) 0 The Stormceptor System model STC 2000 achieves the water quality objective removing 81% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 65 75 75 76 81 82 85 86 88 91 91 93 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 2 Catchment Bayview Central (C302) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.68 Imperviousness (%) 69 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 59 70 71 72 77 78 82 83 85 88 88 91 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 2 Catchment Bayview North (C303) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.38 Imperviousness (%) 85 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 59 70 71 72 77 78 82 83 85 88 88 91 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 3 Catchment Bayview South (C401) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.21 Imperviousness (%) 87 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 83% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 61 72 72 73 78 79 83 84 86 89 89 91 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 3 Catchment Bayview Central (C402) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 2.15 Imperviousness (%) 80 Storage (ha-m) 0 The Stormceptor System model STC 6000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 53 65 66 67 73 74 78 79 82 86 85 88 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Bayview Drive - Alternative 3 Catchment Bayview North (C403) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.7 Imperviousness (%) 79 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 81% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 57 69 69 70 76 77 81 81 84 87 87 90 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 1 - East Big Bay Catchment Big Bay West (C205) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 3.38 Imperviousness (%) 84 Storage (ha-m) 0 The Stormceptor System model STC 9000 achieves the water quality objective removing 81% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 45 58 58 59 66 67 73 73 77 81 81 84 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes · Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 · Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. · Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. · Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. · Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. · Design estimates are based on stable site conditions only, after construction is completed. · Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. · Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. · For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 1 - West Big Bay Catchment Big Bay East (C207) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 2.2 Imperviousness (%) 81 Storage (ha-m) 0 The Stormceptor System model STC 6000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 52 65 65 66 72 73 78 79 82 85 85 88 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes · Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 · Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. · Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. · Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. · Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. · Design estimates are based on stable site conditions only, after construction is completed. · Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. · Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. · For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 2 - East Big Bay Catchment Big Bay West (C305) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 3.11 Imperviousness (%) 85 Storage (ha-m) 0 The Stormceptor System model STC 9000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 46 59 59 60 67 68 74 74 78 82 82 85 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes · Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 · Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. · Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. · Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. · Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. · Design estimates are based on stable site conditions only, after construction is completed. · Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. · Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. · For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 2 - West Big Bay Catchment Big Bay East (C307) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.98 Imperviousness (%) 86 Storage (ha-m) 0 The Stormceptor System model STC 6000 achieves the water quality objective removing 82% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 53 65 66 67 73 74 78 79 82 86 86 88 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes · Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 · Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. · Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. · Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. · Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. · Design estimates are based on stable site conditions only, after construction is completed. · Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. · Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. · For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 3 Catchment Big Bay West (C405) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 2.88 Imperviousness (%) 81 Storage (ha-m) 0 The Stormceptor System model STC 9000 achieves the water quality objective removing 83% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 48 61 61 62 69 70 75 76 79 83 83 86 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 3 Catchment Big Bay East (C407) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.91 Imperviousness (%) 78 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 80% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 55 67 68 68 74 75 80 80 83 87 87 89 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 4 Catchment Big Bay West (C505) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 2.63 Imperviousness (%) 81 Storage (ha-m) 0 The Stormceptor System model STC 6000 achieves the water quality objective removing 80% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 49 62 62 63 70 71 76 77 80 84 84 87 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date Project Name Name BARRIE WPCC State ON ID 557 Project Number Location 2/2/2016 Bayview Drive and Big Bay Point Road EA 415375 City of Barrie Years of Records 1968 to 2003 Designer Information Latitude 44°23'N Company Contact Longitude 79°41'W C.C. Tatham & Associates NHF Notes Water Quality Objective Big Bay Point Road - Alternative 4 Catchment Big Bay East (C507) TSS Removal (%) Drainage Area Upstream Storage Total Area (ha) 1.86 Imperviousness (%) 77 Storage (ha-m) 0 The Stormceptor System model STC 4000 achieves the water quality objective removing 80% TSS for a Fine (organics, silts and sand) particle size distribution. Stormceptor Sizing Summary Stormceptor Model STC 300 STC 750 STC 1000 STC 1500 STC 2000 STC 3000 STC 4000 STC 5000 STC 6000 STC 9000 STC 10000 STC 14000 TSS Removal % 56 68 68 69 75 76 80 81 84 87 87 89 Stormceptor Design Summary - 1/2 80 Discharge (L/s) 0 Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants, such as hydrocarbons and heavy metals that adhere to fine particles, are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Particle Size Distribution µm 20 60 150 400 2000 % 20 20 20 20 20 Specific Gravity 1.3 1.8 2.2 2.65 2.65 Fine (organics, silts and sand) Settling Particle Size Distribution Velocity m/s µm % 0.0004 0.0016 0.0108 0.0647 0.2870 Specific Gravity Settling Velocity m/s Stormceptor Design Notes Stormceptor performance estimates are based on simulations using PCSWMM for Stormceptor version 1.0 Design estimates listed are only representative of specific project requirements based on total suspended solids (TSS) removal. Only the STC 300 is adaptable to function with a catch basin inlet and/or inline pipes. Only the Stormceptor models STC 750 to STC 6000 may accommodate multiple inlet pipes. Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences STC 750 to STC Inlet Pipe Configuration STC 300 6000 Single inlet pipe 75 mm 25 mm Multiple inlet pipes 75 mm 75 mm STC 9000 to STC 14000 75 mm Only one inlet pipe. Design estimates are based on stable site conditions only, after construction is completed. Design estimates assume that the storm drain is not submerged during zero flows. For submerged applications, please contact your local Stormceptor representative. Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. For pricing inquiries or assistance, please contact Imbrium Systems Inc., 1-800-565-4801. Stormceptor Design Summary - 2/2 APPENDIX H: CULVERT CALCULATIONS HY-8 Culvert Analysis Report Site Data - Big Bay Point Rd Crossing Site Data Option: Culvert Invert Data Inlet Station: 0.00 m Inlet Elevation: 269.47 m Outlet Station: 45.00 m Outlet Elevation: 268.57 m Number of Barrels: 2 Culvert Data Summary - Big Bay Point Rd Crossing Barrel Shape: Circular Barrel Diameter: 800.00 mm Barrel Material: Corrugated Steel Embedment: 0.00 mm Barrel Manning's n: 0.0240 Culvert Type: Straight Inlet Configuration: Thin Edge Projecting Inlet Depression: NONE Table 1 - Downstream Channel Rating Curve (Crossing: Big Bay Point Rd Crossing) Flow (cms) Water Surface Elev (m) Depth (m) Velocity (m/s) Shear (Pa) Froude Number 0.49 268.93 0.26 1.39 159.68 1.19 0.79 1.01 1.33 1.57 1.82 268.98 269.01 269.05 269.08 269.10 0.31 0.34 0.38 0.41 0.43 1.58 1.69 1.81 1.89 1.96 192.29 211.97 236.65 253.06 268.56 1.23 1.25 1.27 1.29 1.30 Tailwater Channel Data - Big Bay Point Rd Crossing Tailwater Channel Option: Irregular Channel Channel Slope: 0.0630 User Defined Channel Cross-Section: Coord No. Station (m) Elevation (m) Manning's n 1 0.00 269.57 0.0320 2 3.66 269.31 0.0320 3 5.20 269.04 0.0320 4 7.06 268.67 0.0320 5 8.10 268.85 0.0320 6 8.99 269.16 0.0320 7 9.60 269.35 0.0320 8 10.97 269.49 0.0000 Roadway Data for Crossing: Big Bay Point Rd Crossing Roadway Profile Shape: Constant Roadway Elevation Crest Length: 10.00 m Crest Elevation: 270.71 m Roadway Surface: Paved Roadway Top Width: 40.00 m Table 2 - Summary of Culvert Flows at Crossing: Big Bay Point Rd Crossing Headwater Elevation (m) Discharge Names Total Discharge (cms) Big Bay Point Rd Crossing Discharge (cms) Roadway Discharge (cms) Iterations 269.90 2-yr 0.49 0.49 0.00 1 270.05 5-yr 0.79 0.79 0.00 1 270.15 10-yr 1.01 1.01 0.00 1 270.29 25-yr 1.33 1.33 0.00 1 270.42 50-yr 1.57 1.57 0.00 1 270.57 100-yr 1.82 1.82 0.00 1 270.71 Overtopping 2.05 2.05 0.00 Overtopping Summary of Whiskey Creek MDP Culvert Assessment – North of Mollard Court LOCATION DESCRIPTION West Tributary (from Highway 400 to Lackies Bush) The headwaters of the west tributary of the Whiskey Creek begin on the west side of Highway 400 approximately 600m north of Harvie Road. The west tributary flows under Highway 400 (through a 1.2 x 0.9m concrete box culvert) and continues easterly through an open field to Fairview Road. The Highway 400 culvert will convey the Regional Storm Event with a head of 1.85m. The 1.8 x 0.9m concrete box culvert under Fairview Road has sufficient capacity to convey the 100-year peak flows. However, Regional Event Peak Flows will overtop Fairview Road. East of Fairview Road the tributary traverses currently undeveloped industrial lands to a manmade channel north of Mollard Court. Peak flows are conveyed easterly within the channel to Bayview Drive. The channel north of Mollard Court has capacity to convey the 100-year peak flow (which is larger than the Regional peak flow). The existing 1.2m diameter CSP culvert under Bayview Drive does not have capacity to convey the 25-year peak flow. Since Bayview Drive is classified as a collector road within the City of Barrie Transportation Network the existing culvert is deficient. A 2.4m x 1.2m concrete box culvert will convey the 100-year peak flow without overtopping Bayview Drive. All calculations pertaining to the tributary can be found in Appendix Volume 2, Section 5A. (Whiskey Creek Master Drainage Plan Update pg.7, 2009) Appendix Volume 2, Section 5A Excerpt (Page 522 and 523 of PDF):