9'-0" MIN, SEE NOTE 1 GENSET PER ELECTRICAL DRAWINGS CONCRETE SLAB ON GRADE18" THICK W/#4 AT 12" EACH WAY TOP AND BOTTOM STANDBY GENSET WITH SOUND INCLOSURE SLAB PER PLAN 10" MIN, TYP EPOXY DOWEL SEE NOTE 1 2" CLR A - TYP 1'-0", TYP 6", TYP FINISH GRADE 1'-0" TYP 3" CLR, TYP UNO STANDARD HOOK, TYPICAL 4'-0" MIN, SEE NOTE 1 NOTES: NOTES: 1. INSTALL 12"Ø THREADED ROD, ASTM F593, W/4" MIN EMBED INTO SLAB USING HILTI HIT-RE 500-SD EPOXY ANCHORING SYSTEM, INSTALL ANCHOR AT EACH MOUNTING HOLE PROVIDED IN EQUIPMENT. 2. SEE 1. MINIMUM DIMENSIONS INDICATED FOR BID PURPOSES, CONTRACTOR TO VERIFY ACTUAL EQUIPMENT DIMENSIONS WITH EQUIPMENT MANUFACTURER AND INCREASE SIZES AS NEEDED. 3 S-502 2 A GENSET PAD SECTION - 1 0 1/2' 1' GENSET PAD PLAN - 2' 0 1"=1'-0" Reuse of Documents Drawn This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written authorization. © GHD Inc. 2012 No Revision Plot Date: Note: * indicates signatures on original issue of drawing or last revision of drawing 31 December 2012 - 3:03 PM Plotted by: Chris Richards Drawn Cad File No: Date N:\US\san francisco\Projects\10344 sf dpw\8410177 sfdpw firestation 6 egu replacement\06-CAD\Sheets\103448410177 S501.dwg 1' 2' SEB Designer CSC Client Project Drafting CAR Check GHD Inc. Job Project Manager Director 1/2' 1"=1'-0" 718 Third Street Eureka California 95501 USA T 1 707 443 8326 F 1 707 444 8330 W www.ghd.com Design Check CSC Approved (Project Director) Date Scale AS INDICATED Title Contract No. This Drawing shall not be used for Construction unless Signed and Sealed For Construction Original Size 7437A-1 S-501 Sht 5 of 12 - SHEET GENERAL NOTES 2 1 3 (N) JUNCTION BOX (BELOW (E) MCB) 6" FROM EDGE 2 (E) POWER PANEL 16 15 (E) EGU CONTROL PANEL AND METERING N(ATS) 6 LB LB SEE SHEET E-501 FOR DETAILS. 3. SEE SHEET E-601 FOR SINGLE LINE DIAGRAM. 4. MAINTAIN 5-FOOT MINIMUM CLEAR SPACE BETWEEN GENERATOR FUEL TANK AND BUILDING IN ACCORDANCE WITH NFPA 30 T22.4.1.1(B). 5. PAINT EXPOSED CONDUIT TO MATCH ADJACENT SURFACES. 6. PATCH UNUSED OPENINGS AND REPAIR DAMAGE PER SPECIFICATIONS. 15 (E) METER MAIN TO CELL TOWER ON ROOF, N.I.C. (N) AUTOMATIC TRANSFER SWITCH 3 (E) MAIN CIRCUIT BREAKER 1 24" AFF J-BOX (BEHIND GUTTER) 2. (E) JUNCTION BOX 4 (N) WIRE GUTTER MIN 4" AFF 2 SEE SHEET E-101 FOR ADDITIONAL INFORMATION ON CONDUIT ROUTING. 14 A 5 4 1. (E) SERVICE METER KEYNOTES 14 (E) MAIN PANELBOARD EDGE OF WALL (APPROX) 15 3 REMOVE TILE BEHIND GUTTER AS REQUIRED FOR INSTALLATION. CLEAN, PATCH, AND PAINT REMAINING EXPOSED SURFACE. (N) WIRE GUTTER 1 ENLARGED PLAN SERVICE AREA 2 ROUTE INTERIOR CONDUIT ALONG ORIGINAL PATH. 2. PROVIDE (N) 6"x6"x6"-DEEP JUNCTION BOX IN WALL BELOW (E) PULLING COMPARTMENT (BELOW (E) MAIN CIRCUIT BREAKER). 3. PROVIDE (N) 6"x6"x48", MIN. 10 GAUGE SHEET METAL WIRE GUTTER ON WALL BELOW (E) METER, (E) MAIN CIRCUIT BREAKER AND (E) MAIN PANELBOARD. ALIGN IN FRONT OF (N) RECESSED JUNCTION BOX. 4. PROVIDE LB AND CONDUIT BETWEEN (N) GUTTER AND (N) ATS. SEE SINGLE LINE DIAGRAM FOR CONDUCTOR AND CONDUIT SIZES. ROUTE CONDUIT/FITTING TIGHT TO WALL. 0 1' 2' 5. PROVIDE CONDUIT BETWEEN (N) ATS AND (E) MAIN PANELBOARD. SEE SINGLE LINE DIAGRAM FOR CONDUCTOR AND CONDUIT SIZES. 6. PROVIDE (N) SURFACE MOUNT EGU ANNUNCIATOR PANEL ON WALL. MOUNT CENTER OF (N) EGU ANNUNCIATOR PANEL AT +44" AFF. 7. PROVIDE CONCRETE PAD FOR (N) EGU. COORDINATE EXACT DIMENSIONS AND PENETRATIONS WITH EGU VENDOR. CONCRETE PAD DIMENSIONS SHALL BE 12" WIDER AND LONGER THAN EGU (6" EACH SIDE). 8. PROVIDE GROUND ROD TEST WELL ADJACENT TO CONCRETE PAD. SEE DETAILS SHEET E-501. 9. COORDINATE EXACT LOCATIONS OF CONDUIT STUB-UPS WITH MANUFACTURER SHOP DRAWINGS. 10. PROVIDE (N) EMERGENCY GENERATOR UNIT, SUB BASE TANK, AND MOUNTING ACCESSORIES AND MOUNT ON CONCRETE PAD. SEE SINGLE LINE DIAGRAM AND SPECIFICATIONS FOR EQUIPMENT RATINGS. 11. PROVIDE GENERATOR FRAME GROUND. SEE DETAIL 1/E501 FOR CONNECTION BETWEEN EGU FRAME, REBAR AND CU GND ROD. 12. PROVIDE (N) NEMA 3R JUNCTION BOX ABOVE WINDOW. ROUTE CONDUIT AROUND WINDOW. AVOID CONFLICT WITH (E) WALL-MOUNTED LIGHT. 13. PROVIDE (N) JUNCTION BOX MOUNTED TO CEILING IN OFFICE. 14. PROVIDE 1-1/2" CONDUIT FOR EGU EMERGENCY FEEDER BETWEEN (N) EGU AND (N) ATS. SEE SINGLE LINE DIAGRAM FOR CONDUCTOR SIZES. 15. PROVIDE CONTROL WIRING BETWEEN (N) EGU, (N) EGU ANNUNCIATOR PANEL, AND (N) ATS IN MINIMUM 1-1/4" CONDUIT. COORDINATE WIRE TYPE AND QUANTITY WITH EGU MANUFACTURER. 16. PROVIDE (2) #12 AWG AND #12 GND IN MINIMUM 1" CONDUIT FROM (N) EGU BACK TO (N) CIRCUIT BREAKER IN (E) POWER PANEL FOR (N) EGU BATTERY CHARGER AND JACKET HEATER. 17. REUSE (E) BRICK SALVAGED DURING DEMOLITION TO FILL AREA AROUND GENERATOR PAD. FOLLOW EXISTING PATTERN AND RESTORE SURFACE TO ORIGINAL CONDITION. 4' 1/2"=1'-0" 2 3 (N) JUNCTION BOX 13 12 (E) WINDOW 6 (E) DOOR E-501 (N) JUNCTION BOX 12 (E) WALL-MOUNTED LIGHT TURN CONDUIT UP WALL TO +96" AFG APPROX. (ABOVE WINDOW) F PROVIDE (N) AUTOMATIC TRANSFER SWITCH ON WALL AS INDICATED. SEE SINGLE LINE DIAGRAM AND SPECIFICATIONS FOR EQUIPMENT RATINGS. MOUNT BOTTOM OF ATS AT +24" AFF. 16 SERVICE AREA ELEVATION E 1. HATCHED AREA INDICATES 5'-0" MINIMUM CLEAR SPACE BETWEEN BUILDING AND FUEL TANK 14 15 INSTALL CONDUIT BELOW GRADE 16 MINIMUM CLEARANCE PER GENERATOR MANUFACTURER RECOMMENDATIONS 6" 9 (TYP.) SALVAGED BRICK 17 8 (N) CONCRETE GENERATOR PAD 6" GROUND ROD TEST WELL 7 4" CURB (N) EGU 10 8'-0" (E) WALL 48" 48" 3 ENLARGED PLAN GENERATOR AREA 48" (N) REMOVABLE BOLLARD (TYP. OF 3) 0 1' 2' 4' 1/2"=1'-0" Reuse of Documents Drawn This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written authorization. © GHD Inc. 2012 No Revision Plot Date: Note: * indicates signatures on original issue of drawing or last revision of drawing 31 December 2012 - 3:09 PM Plotted by: Chris Richards Drawn Cad File No: Date N:\US\san francisco\Projects\10344 sf dpw\8410177 sfdpw firestation 6 egu replacement\06-CAD\Sheets\103448410177 E202.dwg Designer CAR Client Project Drafting BNB Check GHD Inc. Job Project Manager Director SMG 718 Third Street Eureka California 95501 USA T 1 707 443 8326 F 1 707 444 8330 W www.ghd.com Design Check BNB Approved (Project Director) Date Scale 1/4" = 1'-0" Title Contract No. This Drawing shall not be used for Construction unless Signed and Sealed For Construction Original Size 7437A-1 E-202 Sht 10 of 12 - SHEET GENERAL NOTES 1. Reuse of Documents Drawn This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written authorization. © GHD Inc. 2012 No Revision Plot Date: Note: * indicates signatures on original issue of drawing or last revision of drawing 31 December 2012 - 2:53 PM Plotted by: Chris Richards Drawn Cad File No: Date N:\US\San Francisco\Projects\10344 SF DPW\8410177 SFDPW Firestation 6 EGU Replacement\06-CAD\Sheets\103448410177 E701.dwg Designer CAR Client Project Drafting BNB Check GHD Inc. Job Project Manager Director SMG CONTRACTOR TO COMPLETE PERMIT APPLICATION CHECKLIST FOR DIESEL GENERATORS, DIESEL FIRE PUMPS, AND FUEL TANKS SERVING GENERATORS AND FIRE PUMPS, LOCATED ON DRAWINGS E-701 AND E-702. APPLICATION IS PARTIALLY COMPLETED WITH INFORMATION AVAILABLE DURING DESIGN. CONTRACTOR TO REVIEW, UPDATE, AND CORRECT AS NECESSARY FOR BUILDING DEPARTMENT. 718 Third Street Eureka California 95501 USA T 1 707 443 8326 F 1 707 444 8330 W www.ghd.com Design Check BNB Approved (Project Director) Date Scale NO SCALE Title Contract No. This Drawing shall not be used for Construction unless Signed and Sealed For Construction Original Size 7437A-1 E-701 Sht 11 of 12 - SHEET GENERAL NOTES 1. Reuse of Documents Drawn This document and the ideas and designs incorporated herein, as an instrument of professional service, is the property of GHD Inc. and shall not be reused in whole or in part for any other project without GHD Inc.'s written authorization. © GHD Inc. 2012 No Revision Plot Date: Note: * indicates signatures on original issue of drawing or last revision of drawing 31 December 2012 - 2:51 PM Plotted by: Chris Richards Drawn Cad File No: Date N:\US\San Francisco\Projects\10344 SF DPW\8410177 SFDPW Firestation 6 EGU Replacement\06-CAD\Sheets\103448410177 E702.dwg Designer CAR Client Project Drafting BNB Check GHD Inc. Job Project Manager Director SMG CONTRACTOR TO COMPLETE PERMIT APPLICATION CHECKLIST FOR DIESEL GENERATORS, DIESEL FIRE PUMPS, AND FUEL TANKS SERVING GENERATORS AND FIRE PUMPS, LOCATED ON DRAWINGS E-701 AND E-702. APPLICATION IS PARTIALLY COMPLETED WITH INFORMATION AVAILABLE DURING DESIGN. CONTRACTOR TO REVIEW, UPDATE, AND CORRECT AS NECESSARY FOR BUILDING DEPARTMENT. 718 Third Street Eureka California 95501 USA T 1 707 443 8326 F 1 707 444 8330 W www.ghd.com Design Check BNB Approved (Project Director) Date Scale NO SCALE Title Contract No. This Drawing shall not be used for Construction unless Signed and Sealed For Construction Original Size 7437A-1 E-702 Sht 12 of 12 -