A. General
Department:
Buildings
Type of building material:
Fire protection materials for structural
use
Applications:
For protection of structural elements to
resist the action of fire for the specified
periods
B. Acceptance criteria
Testing standards:
Fire test/assessment should be carried out in accordance with BS
476: Parts 20 to 24: 1987.
Conditions of Acceptance:
• To satisfy section 6.5 of the Code of Practice for Fire Resisting
Construction 1996, valid and full fire test/assessment report shall
be submitted to demonstrate that the concerned product or
material has been tested in accordance with or assessed against
BS 476: Parts 20 to 24: 1987 by a laboratory accredited under
HOKLAS
or
recognized
under
mutual
recognition
agreements/arrangements with HOKLAS, or one of the assessing
organizations listed in PNAP 251.
• Details of application such as surface preparation, application of
primer, top coating etc, shall be strictly in accordance with the
manufacturer’s
specifications/recommendations
and
are
compatible with those adopted in the fire tests.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Bollom
Fireshield
J.W. Bollom &
Company Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
001
Details of Test or Assessment Report
Intumescent Coating Protection of
steel I-beams up
to 11/2 hrs. FRP;
steel I-columns,
CHS & RHS
columns up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1991.
Validity
Date
Report
CC81169
May 1991
May 1993
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire protection coating
should be in
accordance with
appendix 2 of the
report no. CC81169.
BD-FP
002
Cafco 280,
800 & Cafco
Blaze-Shield
Isolatek
International
(See remarks)
Cementitious
mineral fibre
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
376.3
December
1993
January 1997
18/01/2005
No-objection letter
issued in 1994.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Thickness of fire
protection material
should be in
accordance with data
sheets attached to BD’s
letter Ref. (37) in BD
GR/BM/2(23).
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Cafco 280
Cafco Europe Sarl
Foetz,
Luxembourg
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
003
Details of Test or Assessment Report
Cementitious
mineral fibre
Upgrade
structural
concrete slab up
to 4 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1996.
Validity
Date
Report
WFRC No.
C81024
January 1994
March 1998
BS 8110: Part 2:
1985
Required thickness of
fire protection material
should be in
accordance with Tables
1, 2 & 3 in the
assessment report
WFRC No. C81024.
Both structural stability
and insulation
requirements should be
considered and the
higher of the thickness
applied.
BD-FP
004
Cape Supalux
Board
Cape Building
Products Limited
(See remarks)
Fibre reinforced
calcium silicate
board
2 hrs. fire
protection to
timber floor in
terms of load
bearing capacity,
integrity and
insulation.
As the system
does not form an
integral part of
the structure, the
actual
application and
acceptability of
the system
should be
considered on a
job-by-job basis.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
TE6640
January 1989
N/A
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
The fire protection
system shall be as
described in the report
no. TE6640.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Cape Supalux
Board
Cape Building
Products Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
005
Details of Test or Assessment Report
Fibre reinforced
calcium silicate
board.
(See remarks)
Protection of
steel beams and
columns up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
CC82875
February 1993
February
1996
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire protection material
should be in
accordance with Tables
9 to 18 in the report no.
CC82875.
BD-FP
006
Cape
Vermiculux
Board
Cape Building
Products Limited
(See remarks)
Vermiculux board
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Building
Research
Establishment
The Loss
Prevention
Council
FRS.3/06/15
FCA/MEF
CC82017D
RHE/MB
March 1981
December
1991
18/01/2005
December
1994
No-objection letter
issued in 1992.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting board
shall be in accordance
with BRE’s assessment
letter ref.
FRS.3/06/15FCA/MEF
.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Cape
Vermiculux
Board
Cape Building
Products Limited
(See remarks)
BD-FP
008
Conlit 100
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
007
Details of Test or Assessment Report
Vermiculux board
Protection of
fixed by expansion
R.C. slabs up to
bolts with or without 4 hrs. FRP.
steel hat-sections.
As the system
does not form an
integral part of
the structure, the
actual
application and
acceptability of
the system
should be
considered on a
job-by-job basis.
Rockwool Limited Resin bonded rock
fibre insulation
(See remarks)
board
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1992.
Validity
Date
Report
CC10626/R
HE
November
1990
November
1992
BS 8110: Part 1:
1985
Updated information
on place of
manufacture to be
provided by the
manufacturer.
The fire protection
system shall be as
described in the report
no. CC10626/RHE.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC10806/R
HE,
CC81338A/
RHE
August 1989
May 1991
18/01/2005
May 1993
No-objection letter
issued in 1991.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting board
shall be in accordance
with the data indicated
in “Fire Protection for
Structural Steel in
Buildings (2nd
Edition)” published by
the Association of
Structural Fire
Protection Contractors
and Manufacturers Ltd.
(ASFPCM).
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Conlit 150 &
150P
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
009
Details of Test or Assessment Report
Rockwool Limited Mineral fibre
fire-resisting board
(See remarks)
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
CC81338
May 1991
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with
Figures 1 & 2 in the
report no. CC81338.
BD-FP
010
Cryosil
Cryotherm
Insulation Limited
(See remarks)
Silicate bonded
vermiculite board
Protection of
steel beams and
columns up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC81951
December
1991
December
1994
18/01/2005
No-objection letter
issued in 1992.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Figure
1 in the report no.
CC81951.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
(System)
Cape Durasteel
Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
011
Details of Test or Assessment Report
Durasteel 3DF2
panels (9.5mm
thick) enclosing a
core of Rocksil
LR/AT 140 (overall
thickness 120mm).
Fire resisting
floor for up to 4
hrs. FRP in terms
of loadbearing
capacity,
integrity and
insulation.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
TE82867
December
1992
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Clear spans of
the two way
floor slab limited
to 4.17m x 3.5m.
The construction
details should be in
accordance with that
shown in the technical
evaluation TE82867.
Imposed load
limited to 5kPa
maximum.
Strength design
of the steelwork
is to be carried
out and
considered
separately by the
RSE.
BD-FP
012
Fendolite MII
Mandoval
Coatings Limited
(See remarks)
Premix based on
vermiculite and
Portland cement.
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC82278A
July 1992
July 1995
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Table
5 in the report no.
CC82278A.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Firetex
M70/M71
W & J Leigh &
Co.
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
013
Details of Test or Assessment Report
Intumescent Coating Protection of
steel I-beams up
to 11/2 hrs. FRP;
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Consultants
Assessment
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1995.
Validity
Date
Report
WFRC No.
C81691
WFRC No.
C80529
Protection of
SHS and CHS
steel columns up
to 1 hr. FRP;
Date of
Posting on
CDB
WFRC No.
C47373
March 1995
April 1997
Updated information
on place of
manufacture to be
provided by the
manufacturer.
December
1992
June 1989
Protection of
steel I-columns
and RHS steel
beams up to 2
hrs. FRP.
BD-FP
014
Firetex M70
Intubuild
W & J Leigh &
Co.
(See remarks)
Intumescent Coating Protection of
steel columns up
to 1 hr. FRP.
Required thickness of
fire-resisting material
should be in
accordance with Tables
1 to 7 in the report
WFRC No. C47373.
Thickness quoted
refers to total dry film
thickness including the
primer and any top
sealer, where the
thickness of the primer
and any top sealer
together do not exceed
0.125mm.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
TE5944
November
1986
N/A
18/01/2005
No-objection letter
issued in 1990.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with the
test report no. TE5944.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Glulite Fire
Protection
Board
Cryotherm
Insulation Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
015
Details of Test or Assessment Report
Resin-bonded
mineral fibre board.
(See remarks)
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
CC80705B/
RHE
October 1990
October
1992
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Panels are glued
with Rockbond
WR adhesive,
fastened to the
noggins with
Rockbond WR
adhesive and
wire nails.
BD-FP
016
Impact Fire
Board
Pilkington
Insulation Limited
(See remarks)
Fibre reinforced
cement board.
Protection of
steel beams and
columns up to 2
hrs. FRP.
Special
consideration is
required when
the web depth
exceeds 686mm
or flange width
exceeds 325mm.
Required thickness of
fire-resisting material
should be in
accordance with
Figures 1 & 2 in the
report no.
CC80705B/RHE.
BS 476: Parts 20
& 21: 1987
N/A
Warrington
Fire Research
Consultants
WFRC No.
C44908
Re-Issue No.
1
October 1988
October
1990
18/01/2005
No-objection letter
issued in 1990.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Dry thickness of the
material should be in
accordance with Tables
4 & 4A in the report
WFRC No. C44908
(Re-Issue No. 1).
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Interbond
FP-HFA 900
International Paint
Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
017
Details of Test or Assessment Report
Intumescent Coating Protection of
hollow steel
sections up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Consultants
Warrington
Fire Research
Consultants
Protection of
steel I sections
up to 11/2 hrs.
FRP.
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
WFRC No.
C44900
WFRC No.
C49685
August 1988
July 1990
August 1990
Updated information
on place of
manufacture to be
provided by the
manufacturer.
July 1992
Required thickness of
fire-resisting material
should be in
accordance with Table
2 in the reports WFRC
No. C44900 & WFRC
No. C49685.
BD-FP
018
Mandolite CP2
Mandoval
Coatings Limited
(See remarks)
Pre-mix based on
vermiculite and
Portland cement.
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Warrington
Fire Research
Consultants
WFRC No.
C52252
November
1990
N/A
18/01/2005
No-objection letter
issued in 1991.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
12 & 13 in the report
WFRC No. C52252.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Mandolite CP2
Mandoval
Coatings Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
019
Details of Test or Assessment Report
Pre-mix based on
vermiculite and
Portland cement.
Upgrade
reinforced
concrete slabs up
to 4 hrs. FRP.
BS 476: Parts 20
& 21: 1987
BS 8110: Part 2:
1985
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1992.
Validity
Date
Report
WFRC No.
CP92117
March 1992
April 1994
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
1, 2 & 3 in the reports
WFRC No. CP92117.
Both structural stability
and insulation
requirements should be
considered and the
greater of the
thicknesses applied.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Mandolite CP2
Mandoval
Coatings Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
020
Details of Test or Assessment Report
Pre-mix based on
vermiculite and
Portland cement.
(See remarks)
Upgrade
reinforced
concrete beams,
columns and
walls up to 4 hrs.
FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
BS 8110: Part 2:
1985
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
WFRC No.
C80520
December
1992
WFRC No.
CP92117
January 1995
Updated information
on place of
manufacture to be
provided by the
manufacturer.
April 1994
March 1992
Required thickness of
fire-resisting material
should be in
accordance with Table
2 in the report WFRC
No. CP92117.
The minimum sizes of
reinforced concrete
beams, columns and
walls should not be less
than those specified in
the Code of Practice
for Fire Resisting
Construction.
BD-FP
021
Monokote
MK5 & MK6
W.R. Grace & Co.
Construction
Products Division
(See remarks)
Sprayed-applied
cementitious
fire-proofing plaster.
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Warrington
Fire Research
Centre
C80173-AH
B/mj
May 1992
N/A
18/01/2005
No-objection letter
issued in 1992.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with data
sheet referred to in the
letter Ref.
C80173-AHB/mj.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Monokote
Zonolite Z-106
W.R. Grace & Co.
Construction
Products Division
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
022
Details of Test or Assessment Report
Sprayed-applied
cementitious fire
protection material.
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Ian Smith
(Consultancy)
Limited
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1992.
Validity
Date
Report
CIS/ER/329/
B
November
1988
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
(See remarks)
Required thickness of
fire-resisting material
should be in
accordance with Table
2 attached to Ian Smith
(Consultancy) Ltd’s
letter Ref.
CIS/ER/329/B.
BD-FP
023
New Promalit
Eternit UK
Limited
(See remarks)
Lightweight
rockwool board.
Protection of
steel beams and
columns up to 3
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Building
Research
Establishment
FRO512/2
FT92/259/B
S
April 1993
N/A
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with the
table in BRE’s letter
Ref. FRO512/2
FT92/259/BS.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Nullifire S602
& S603
Nullifire Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
024
Details of Test or Assessment Report
Intumescent Coating Protection of
steel I-beams and
I-columns, RHS
and CHS
columns up to 1
hr. FRP.
Protection of
RHS beams up
to 11/2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Certifire
Limited
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1990.
Validity
Date
Report
CF103
May 1987 and
revised on
March 1990.
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
3, 4 & 5 in the
certificate no. CF103.
Thickness quoted refer
to total dry film
thickness including the
primer and any top
sealer, where the
thickness of the primer
and any top sealer
together do not exceed
0.1mm.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Nullifire S605
Nullifire Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
025
Details of Test or Assessment Report
Intumescent
Coating.
Protection of
steel I-beams and
I-columns up to
2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Certifire
Limited
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1990.
Validity
Date
Report
CF103
May 1987 and
revised on
March 1990.
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Protection of
CHS columns up
to 1 hr. FRP.
Required thickness of
fire-resisting material
should be in
accordance with Tables
6, 7, 8 & 9 in the
certificate no. CF103.
Thickness quoted refer
to total dry film
thickness including the
primer and any top
sealer, where the
thickness of the primer
and any top sealer
together do not exceed
0.1mm.
BD-FP
026
Nullifire S607
Nullifire Limited
(See remarks)
Intumescent Coating Protection of
steel I-beams up
to 11/2 hrs. FRP.
Protection of
steel I-columns,
RHS and CHS
columns up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Certifire
Limited
CF103
May 1987 and
revised on
October 1992.
N/A
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
10, 11 & 12 in the
certificate no. CF103.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Nullifire Firec
F333
Nullifire Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
027
Details of Test or Assessment Report
Intumescent
Coating.
(See remarks)
Protection of
steel I-beams and
I-columns and
CHS up to 2 hrs.
FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Certifire
Limited
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1990.
Validity
Date
Report
CF103
May 1987 and
revised on
March 1990.
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Protection of
solid circular tie
bars up to 3 hrs.
FRP.
BD-FP
028
Panelcrete
Impact Fire
Board
Panelcrete Limited Fibre reinforced
concrete board
(See remarks)
Protection of
steel beams and
columns up to 2
hrs. FRP.
Application
limited to
I-section with
web depth not
exceeding
686mm and
flange width not
exceeding
325mm.
Required thickness of
fire-resisting material
should be in
accordance with Tables
10 to 14 in the
certificate no. CF103.
Thickness quoted refer
to total dry film
thickness including the
primer and any top
sealer, where the
thickness of the primer
and any top sealer
together do not exceed
0.1mm.
BS 476: Parts 20
& 21: 1987
N/A
Warrington
Fire Research
Consultants
WFRC No.
C44908
Re-Issue No.
1
October 1988
October
1990
18/01/2005
No-objection letter
issued in 1994.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
4 & 4A in the report
WFRC No. C44908
(Re-Issue No. 1).
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Promatect H
Eternit UK
Limited,
Blackburn, UK.
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
029
Details of Test or Assessment Report
Fibre-reinforced
calcium silicate
insulating board.
Protection of
steel beams and
columns up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1992.
Validity
Date
Report
CC82518/R
HE
June 1992
June 1995
Required thickness of
fire-resisting material
should be in
accordance with Figure
1 in the report no.
CC82518/RHE.
or
Eternit N.V.
Kapelle-op-den-bo
s Belgium.
BD-FP
030
Promatect L
Eternit UK
Limited,
Blackburn, UK.
Fibre reinforced
calcium silicate
insulating board
N/A
The Loss
Prevention
Council
CC82519/R
HE
June 1992
June 1995
18/01/2005
Required thickness of
fire-resisting material
should be in
accordance with Figure
1 in the report no.
CC82519/RHE.
or
Eternit N.V.
Kapelle-op-den-bo
s Belgium.
BD-FP
031
Pyrok CV25
Pyrok Building
Products Limited
(See remarks)
Cement-based fire
resisting plaster
containing
vermiculite.
No-objection letter
issued in 1992.
N/A
Building
Research
Establishment
FRO512/-FT
91/409/BS
February 1992
N/A
18/01/2005
No-objection letter
issued in 1992.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with the
BRE’s letter Ref.
FRO512/-FT91/409/B
S.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Pyrok CV27
Pyrok Building
Products Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
032
Details of Test or Assessment Report
Cement-based fire
resisting plaster
containing
vermiculite.
Upgrade
reinforced
concrete slabs up
to 4 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
BS 8110: Part 2:
1985
Assessment
Date of
Posting
into CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
WFRC No.
C80277
September
1992
WFRC No.
41664
June 1987
October
1994
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
1, 2 & 3 in the report
WFRC 41664.
Both structural stability
and insulation
requirements should be
considered and the
greater of the
thicknesses applied.
BD-FP
033
Quelfire
Steelcote 60
Quelfire Limited
(See remarks)
Intumescent Coating Protection of
steel I- beams up
to 11/2 hrs. FRP.
Protection of
steel I-columns
and RHS beams
up to 2 hrs. FRP.
Protection of
RHS and CHS
columns up to 1
hr. FRP.
Protection of
circular hollow
and cruciform
cast iron
columns up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Warrington
Fire Research
Consultants
WFRC No.
C51739
October 1990
October
1992
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
1 to 6 in the report
WFRC No. C51739.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Rockcem
Cryotherm
Insulation Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
034
Details of Test or Assessment Report
Premix based on
rock-fibre and
Portland cement.
(See remarks)
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Building
Research
Establishment
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
A22/3349
FCA/IC
June 1984
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with the
BRE’s letter Ref.
A22/3349 FCA/IC.
BD-FP
035
Spiralite Fire
Protection
Board
Cryotherm
Insulation Limited
(See remarks)
Resin-bonded
mineral fibre board.
Protection of
steel beams and
columns up to 2
hrs. FRP.
Panels are
fastened to the
noggins with
Spiralite coil
screws.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC10786/81
887A
RHE/MB
July 1989 and
reviewed in
November
1991
November
1993
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Table
1 in the report no.
CC10786/81887A
RHE/MB.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Spraydon F. G.
Thermoduric
Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
036
Details of Test or Assessment Report
Spray applied
mineral wool.
(See remarks)
Protection of
structural
steelwork up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
Warrington
Fire Research
Consultants
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1993.
Validity
Date
Report
WFRC No.
C80980
November
1993
WFRC No.
C43587
March 1988
November
1995
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with
Summary Table 1 in
the report WFRC No.
C43587.
BD-FP
037
Sprayed
Limpet
Mineral Wool
Pilkington
Insulation Limited
(See remarks)
Sprayed mineral
wool
Protection of
structural
steelwork up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
N/A
N/A*
* Test or
assessment
report could
not be
retrieved.
N/A
N/A
18/01/2005
No-objection letter
issued in 1994.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with the
data indicated on page
73 of “Fire Protection
for Structural Steel in
Buildings (2nd
Edition)” published by
the Association of
Structural Fire
Protection Contractors
and Manufacturers Ltd.
(ASFPCM).
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Sprayed
Limpet
Vermiculite
Pilkington
Insulation Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
038
Details of Test or Assessment Report
Sprayed vermiculite
cement
Protection of
structural
steelwork up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
N/A
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1994.
Validity
Date
Report
N/A*
N/A
N/A
* Test or
assessment
report could
not be
retrieved.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with the
data indicated on pages
75 & 77 of “Fire
Protection for
Structural Steel in
Buildings (2nd
Edition)” published by
the Association of
Structural Fire
Protection Contractors
and Manufacturers Ltd.
(ASFPCM).
BD-FP
039
Steelguard FM
Mebon Limited
(See remarks)
Intumescent Coating Protection of
steel I- beams,
I-columns and
RHS beams up
to 11/2 hrs. FRP.
Protection of
RHS columns up
to 1 hr. FRP.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC80320
December
1990
December
1992
18/01/2005
No-objection letter
issued in 1992.
CC81382
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Tables
5 & 6 in the report no.
CC80320, Table 2 in
the report no.
CC81382.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Steelmaster
Mebon Limited
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
040
Details of Test or Assessment Report
Intumescent Coating Protection of
steel I-beams,
I-columns and
RHS beams up
to 11/2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
The Loss
Prevention
Council
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1992.
Validity
Date
Report
CC81987
December
1991
December
1993
CC81987A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Protection of
RHS and CHS
columns up to 1
hr. FRP.
BD-FP
041
TD Board
Thermoduric
Limited
(See remarks)
Mineral Wool
Protection of
steel beams and
columns up to 4
hrs. FRP.
Required thickness of
fire-resisting material
should be in
accordance with Tables
5 & 6 in the report no.
CC81987, Table 2 in
the report no.
CC81987A.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC83128
December
1992
18/01/2005
No-objection letter
issued in 1993.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with
Figures 1 & 2 in the
report no. CC83128.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Unitherm
38091
Herberts GmbH.
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
042
Details of Test or Assessment Report
Intumescent Coating Protection of
steel I-beams and
I-columns up to
2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1994.
Validity
Date
Report
WFRC No.
C81065
March 1994
April 1996
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Table
1 in the report WFRC
No. C81065.
BD-FP
043
Unitherm A60
Herberts GmbH.
(See remarks)
Intumescent Coating Protection of
steel I-beams and
I-columns up to
1 hr. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Warrington
Fire Research
Consultants
WFRC No.
C44347
May 1988
18/01/2005
No-objection letter
issued in 1991.
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Figure
3 in the report no.
CC44347.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Unitherm Fire
Protection
Coating
Dispersal,
Water Soluble
Herberts GmbH.
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
044
Details of Test or Assessment Report
Intumescent Coating Protection of
internal steel
I-beams up to
11/2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Warrington
Fire Research
Centre
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1992.
Validity
Date
Report
WFRC No.
C80058
March 1992
April 1994
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Protection of
internal steel
I-columns up to
1 hr. FRP.
Required thickness of
fire-resisting material
should be in
accordance with Table
1 in the report WFRC
No. C80058.
BD-FP
045
Vicuclad
Eternit UK
Limited,
Blackburn, UK.
or
Eternit N.V.
Kapelle-op-den-bo
s Belgium
Insulation boards
produced from
mixing vermiculite
with inorganic
binders.
Protection of
steel beams and
columns up to 2
hrs. FRP in
screw-fix
Vicuclad system.
Protection of
steel beams and
columns up to 4
hrs. FRP in
bonded Vicuclad
system.
BS 476: Parts 20
& 21: 1987
N/A
The Loss
Prevention
Council
CC82520/R
HE
June 1992
June 1995
18/01/2005
No-objection letter
issued in 1992.
Required thickness of
fire-resisting material
should be in
accordance with Figure
1 in the report no.
CC82520/RHE.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Zonolite
W.R. Grace & Co.
(See remarks)
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
046
Details of Test or Assessment Report
Cementitious
fibre-reinforced
material.
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
N/A
Ian Smith
(Consultancy)
Limited.
Assessment
Date of
Posting on
CDB
Remarks /
Comments
18/01/2005
No-objection letter
issued in 1989.
Validity
Date
Report
CIS/ER/329/
B
November
1988
N/A
Updated information
on place of
manufacture to be
provided by the
manufacturer.
Required thickness of
fire-resisting material
should be in
accordance with Table
2 in Ian Smith
(Consultancy) Ltd’s
letter ref.
CIS/ER/329/B.
BD-FP
047
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Single pack solvent
based intumescent
coating
Protection of
steel I-beams and
I-columns up to
1 hr. FRP.
BS 476: Parts 20
& 21: 1987
Protection of
steel I-beams and
I-columns up to
2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C110854
Koahsiung,
Taiwan
BD-FP
048
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Koahsiung,
Taiwan
Single pack solvent
based intumescent
coating
WFRC No.
C123992
UKAS
Warrington
Fire Research
Centre
WFRC No.
C125252
8 April 2002
1 November
1999
19 June 2002
valid until 1
April 2007
28/04/2005
lapse on 1
December
2001
valid until 1
July 2007
28/04/2005
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
049
Date of
Posting on
CDB
Details of Test or Assessment Report
Accreditation
Assessing
Body
Organization
Assessment
Remarks /
Comments
Validity
Date
Report
Single pack solvent
based intumescent
coating
Protection of
4-side exposed
RHS and CHS
up to 2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C125331
19 June 2002
valid until 1
July 2007
28/04/2005
Single pack solvent
based intumescent
coating
Protection of
3-side exposed
RHS up to 2 hrs.
FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C126749
27 August
2002
valid until 1
September
2007
28/04/2005
WFRC No.
C115007
31 July 2000
valid until 1
August 2002
FCO-1299
(Revision)
22 October
2003
lapse on 31
July 2007
FCO-0812
(Revision)
9 November
2001
lapse on 1
March 2005
Koahsiung,
Taiwan
BD-FP
050
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Koahsiung,
Taiwan
BD-FP
051
Vermitex AF
L&A Fazzini
Gypsum-vermiculite Protection of
Manufacturing Pty coating
steel I-sections
Ltd.
up to 2 hrs. FRP.
Greenacre NSW,
Australia
AS 1530.4 and
BS 476: Part 21
NATA
CSIRO
28/04/2005
According to the
manufacturer’s
recommendation,
Vermitex AF is for
internal application.
CSIRO opinion no.
FCO-0812 (Revision)
assessed compatibility
of Vermitex spray
protection system with
certain types of primer.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Vermitex DX
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
052
Date of
Posting on
CDB
Details of Test or Assessment Report
L&A Fazzini
Cement-vermiculite
Manufacturing Pty coating
Ltd.
Protection of
steel I-sections
up to 2 hrs. FRP.
AS 1530.4 and
BS 476: Part 21
Accreditation
Assessing
Body
Organization
NATA
CSIRO
Greenacre NSW,
Australia
Assessment
Remarks /
Comments
Validity
Date
Report
FCO-1299
(Revision)
22 October
2003
lapse on 31
July 2007
FCO-0812
(Revision)
9 November
2001
lapse on 1
March 2005
28/04/2005
According to the
manufacturer’s
recommendation,
Vermitex DX is for
external application.
CSIRO opinion no.
FCO-0812 (Revision)
assessed compatibility
of Vermitex spray
protection system with
certain types of primer.
BD-FP
053
Cafco 300
Isolatek
International
New Jersey, USA
BD-FP
054
Hilti HIT-HY
150
Hilti Corporation
Kaufering,
Gemany
Single package
factory controlled
premix based on
vermiculite and
gypsum
Protection of
3-side exposed
UB and UC
sections up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Recognized by
PNAP 251
Building
Research
Establishment
Hybrid resin system
Injection system
for making
nominal
anchorage
connections of
Grade 460 rebars
of diameters up
to 25mm in
reinforced
concrete
elements up to 4
hrs. FRP.
BS 476: Part 20:
1987
UKAS
Warrington
Fire Research
Centre
CC 206998
WFRC No.
C121086
17 April 2002
next review
date: 4
March 2007
28/04/2005
25 September
2002
valid until 1
October
2007
28/04/2005
Load carrying capacity
of the injection system
for rebar fixing under
the effects of fire
should be assessed
with an appropriate
factor of safety
compatible with the
structural design of the
parent structure.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Hilti HIT-RE
500
Hilti Corporation
Durasteel
board
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Report No. Date of Test /
Accreditation
Assessing
Body
Organization
Assessment
Date of
Posting on
CDB
Remarks /
Comments
Validity
Date
Report
Epoxy resin system
Injection system
for making
nominal
anchorage
connections of
Grade 460 rebars
of diameters up
to 40mm in
reinforced
concrete
elements up to 4
hrs. FRP.
BS 476: Part 20:
1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C121086
25 September
2002
valid until 1
October
2007
28/04/2005
Load carrying capacity
of the injection system
for rebar fixing under
the effects of fire
should be assessed
with an appropriate
factor of safety
compatible with the
structural design of the
parent structure.
9.5mm thick
Durasteel board
Fire resisting
steel platform
floors covered
with two layers
of Durasteel
(constructions
are given in the
assessment
reports) when
exposed to fire
for 1 hr. FRP in
terms of
loadbearing
capacity,
integrity and
insulation.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC
Assessment
Report No.
138676
19 May 2004
valid until 1
June 2009
03/08/2005
The construction
details should be
identical to those
covered in the
assessment reports.
Kaufering,
Gemany
BD-FP
056
Name of
Laboratory Laboratory /
(City and
BD-FP
055
Details of Test or Assessment Report
Maximum
imposed load to
be 7.5kPa..
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Unitherm
38091
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
057
Dupont
Intumescent coating
Performance
Coatings GmbH &
Co.
Protection of
RHS and CHS
beams and
columns up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Warrington
Fire Research
Centre
Assessment
WFRC
Assessment
Report No.
C126392
Issue 3
WFRC No.
C105708
WFRC No.
C125342
Issue 2
WFRC
Assessment
Report No.
140896
Cafco 300
Isolatek
International
New Jersey, USA
Single package
factory controlled
premix based on
vermiculite and
gypsum
Protection of
steel I-columns,
RHS and CHS
beams and
columns up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Recognized by
PNAP 251
Building
Research
Establishment
Remarks /
Comments
Validity
Date
Report
Stuttgart, Gemany
BD-FP
058
Date of
Posting on
CDB
Details of Test or Assessment Report
CC 206998
22 July 2004
8 February
1999
13 August
2002
14 July 2004
17 April 2002
N/A
03/08/2005
See WFRC
Assessment
Report No.
C126392
Issue 3
valid until 1
September
2007
valid until 1
August 2009
next review
date: 4
March 2007
03/08/2005
Section 1.6.2 of Fire
Protection for
Structural Steel in
Buildings published by
the Association for
Specialist Fire
Protection contains
recommendations for
determination of spray
thickness for hollow
sections based on
technical data for steel
I-sections.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Cafco
SprayFilm
WB3
Cafco International Intumescent coating
UK
Guangzhou, China
BD-FP
060
Firetherm
Firesteel
Classic
Name of
Name of
Firetherm
Solvent based
Intumescent &
intumescent coating
Insulation Supplies
Ltd.
Protection of
steel I-beams,
I-columns, RHS
and CHS beams
and columns up
to 2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Protection of
steel I-beams and
I-columns up to
1 hr. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Warrington
Fire Research
Centre
Nullifire S606
Nullifire Limited
Intumescent coating
UKAS
Warrington
Fire Research
Centre
Nullifire S605
Nullifire Limited
BD-FP
063
Interchar 963
International Paint
Limited
Shanghai, China
Building
Research
Establishment
Date
Report
WFRC
Assessment
Report No.
C139823
27 May 2004
16 June 2004
valid until 1
June 2009
03/08/2005
valid until 1
July 2009
WFRC No.
123080
28 January
2001
valid until 1
February
2007
WFRC No.
100784
22 October
1997
CC 92856A
10 April 2003
next review
date: 10
April 2008
CC 92856B
10 April 2003
next review
date: 10
April 2008
03/08/2005
see WFRC
No. 123080
BS 476: Parts 20
& 21: 1987
Intumescent coating
Protection of
4-side exposed
RHS up to 1 hr.
FRP.
BS 476: Parts 20
& 21: 1987
Recognized by
PNAP 251
Building
Research
Establishment
CC 93058B
Review 2
21 July 2003
next review
date: 21 July
2008
26/10/2005
Intumescent coating
Protection of
3-side exposed
steel channels
and angles up to
1 hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC
Assessment
Report No.
136405
15 January
2004
valid until 1
February
2009
03/02/2006
Coventry, UK
Recognized by
PNAP 251
Validity
Protection of
4-side exposed I
sections, RHS
and CHS
columns up to 2
hrs. FRP.
Coventry, UK
BD-FP
062
Assessment
WFRC
Assessment
Report No.
139822
Dartford, UK
BD-FP
061
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
059
Date of
Posting on
CDB
Details of Test or Assessment Report
03/08/2005
Remarks /
Comments
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Phoenix 167
Phoenix Fire
Protection (Asia)
Ltd.
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
064
Date of
Posting on
CDB
Details of Test or Assessment Report
Accreditation
Assessing
Body
Organization
Assessment
Validity
Date
Report
Intumescent coating
Protection of
4-side exposed
hollow columns
up to 1 hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC
Assessment
Report No.
143912
20 December
2004
valid until 1
January 2010
03/02/2006
Intumescent coating
Protection of
3-side and 4-side
exposed I beam
sections up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C126964
30 September
2002
valid until 1
October
2007
03/02/2006
WFRC No.
C126965
30 September
2002
Mannheim,
Germany
BD-FP
065
Phoenix 168
Phoenix Fire
Protection (Asia)
Ltd.
Mannheim,
Germany
BD-FP
066
Cafco 280
Cafco International Cementitious
mineral fibre
Indiana, USA
Protection of
steel beams and
columns up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Recognized by
PNAP 251
Building
Research
Establishment
CC 376.3
17 March
2003
valid until 1
October
2007
next review
date: 17
March 2008
21/04/2006
Remarks /
Comments
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
Assemblies
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
067
Date of
Posting on
CDB
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened above and
below a framework
of steel channels,
enclosing a cavity
containing 140kg/m3
density rock wool
with a minimum
overall thickness of
80mm.
Fire resisting
floor assemblies
(construction
details are given
in the assessment
reports) for up to
2 hrs. FRP in
terms of
loadbearing
capacity,
integrity and
insulation.
Maximum
imposed load to
be 10kPa.
Primary
members of the
steel framework
are located
parallel with and
on top of main
structural
supporting
beams at 1m,
1.2m or 2.4m
centers as given
in the assessment
reports. Cross
members are
spaced at
600mm max.
centers.
BS 476: Parts 20
& 21: 1987
Assessment
Accreditation
Assessing
Body
Organization
Recognized by
PNAP 251
Building
Research
Establishment
CC 94333
Warrington
Fire Research
Centre
WFRC
Assessment
report No.
136396
UKAS
Remarks /
Comments
Validity
Date
Report
22 March
2002
22 March
2004
next review
date: 22
March 2007
valid until 1
April 2009
21/07/2006
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
The assembly shall be
supported by structural
steel beams that are
fitted with a
proprietary fire
protection system of
suitable thickness for
the relevant fire
resistance period and
for the section factor of
the beams.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
Assembly
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
068
Details of Test or Assessment Report
Two layers of 9.5mm
thick Durasteel
board, fastened to
the top of a steel
framework.
Fire resisting
floor assembly
(construction
details are given
in the assessment
report) for up to
1 hr. FRP (fire
attack from
either above or
below) in terms
of loadbearing
capacity,
integrity and
insulation.
Maximum
imposed load to
be 10kPa.
The steel
framework
consists of
primary
supporting
members at
maximum
2400mm centers
welded to
secondary
supporting
members at
maximum
600mm centers.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
21/07/2006
The construction
details should be
identical to those
covered in the
assessment report.
Validity
Date
Report
WF
Assessment
Report No.
148104
12 September
2005
valid until 1
October
2010
All requirements given
in the assessment
report should be
checked to ensure
compatibility with
proposed application.
The steel framework of
the floor shall be
designed to be able to
bear the specified
uniformly distributed
imposed load of up to a
maximum of 10kPa.
When it is required to
withstand fire attack
from below, the steel
framework shall be
cladded with a
proprietary fire
protection system of
suitable thickness for
the relevant fire
resistance period at the
designed critical steel
temperature and for the
section factors of the
members.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Standard
Manufacture
Country)
Phoenix Fire
Protection (Asia)
Ltd.
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
Phoenix 270
Remarks /
Comments
valid until
July 2010
20/10/2006
A critical temperature
of 550℃ has been
assumed for 4-side
exposed steel sections.
valid until 1
June 2008
20/10/2006
For use on reinforced
concrete beams,
columns and walls, the
minimum size
requirements specified
in the Code of Practice
for Fire Resisting
Construction 1996 and
the criterion of stability
should be satisfied.
Testing
and Place of
BD-FP
069
Date of
Posting on
CDB
Details of Test or Assessment Report
Intumescent coating
Accreditation
Assessing
Body
Organization
Assessment
Validity
Date
Report
Protection of
4-side exposed Isections up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Recognized by
PNAP 251
International
Fire
Consultants
Ltd.
Field of
Application
Report
IFCA/05199
July 2005
Upgrade
reinforced
concrete slabs,
beams, columns
and walls up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C132081C
19 May 2003
Mannheim,
Germany
BD-FP
070
Mandolite CP2
Cafco International Pre-mix based on
vermiculite and
Alfreton,
Portland cement.
Derbyshire, UK
BS 8110: Part 2:
1985
WFRC No.
C80520
Issue No. 2
WFRC No.
C132081A
WFRC No.
CP92117
Rev.1
BD-FP
071
Nullifire
System E
Carboline
USA
Intumescent coating
Protection of
4-side exposed
CHS up to 1 hr.
FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C124329A
WFRC No.
C100578
19 January
1993
19 May 2003
5 March 1992
19 April 2002
30 September
1997
valid until 1
February
1995
valid until 1
June 2008
valid until 1
April 1994
valid until 1
May 2007
valid until 1
November
1999
For use on reinforced
concrete slabs, the
criteria of stability and
insulation should be
satisfied.
20/10/2006
A critical temperature
of 550℃ has been
assumed for 4-side
exposed steel sections.
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Phoenix 270
Phoenix Fire
Protection (Asia)
Ltd.
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
072
Date of
Posting on
CDB
Details of Test or Assessment Report
Accreditation
Assessing
Body
Organization
Assessment
Validity
Date
Report
Intumescent coating
Protection of
4-side exposed
hollow sections
up to 2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
Recognized by
PNAP 251
International
Fire
Consultants
Ltd.
Field of
Application
Report
IFCA/05196
July 2005
Dupont
Intumescent coating
Performance
Coatings GmbH &
Co.
Protection of
steel I-beams and
I-columns up to
2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
Assessment
Summary
WFRC No.
133394
10 July 2003
valid until
July 2010
22/01/2007
Mannheim,
Germany
BD-FP
073
Unitherm
38091
Stuttgart, Gemany
WFRC No.
133000
WFRC No.
C125126
N/A
valid until
1 July 2008
20 June 2003
3 July 2002
WFRC No.
C128560
27 November
2002
WFRC No.
C105561
Issue 2
8 February
1999
valid until
1 August
2007
valid until
1 December
2007
valid until
1 March
2001
22/01/2007
Remarks /
Comments
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Renitherm
PMA 1200
Audax-Keck
GmbH
Pyrok CV27
Axiom
Engineering Ltd.
Hong Kong
Name of
Report No. Date of Test /
Accreditation
Assessing
Body
Organization
Assessment
Date
Report
Protection of
3-side and 4-side
exposed
I sections up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warringtonfire
WF
Assessment
Report No.
156366
12 July 2006
valid until
1 August
2011
22/01/2007
Cement-based fire
resisting plaster
containing
vermiculite.
Upgrade
reinforced
concrete slabs up
to 4 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C139153
21 April 2004
valid until
1 May 2009
22/01/2007
BS 8110: Part 2:
1985
Remarks /
Comments
Validity
Intumescent coating
Weiherstrasse,
Germany
BD-FP
075
Name of
Laboratory Laboratory /
(City and
BD-FP
074
Date of
Posting on
CDB
Details of Test or Assessment Report
WFRC No.
41664
June 1987
Required thickness of
fire-resisting material
should be in
accordance with Tables
1, 2 & 3 in the report
WFRC 41664.
Both structural stability
and insulation
requirements should be
considered and the
greater of the
thicknesses applied.
BD-FP
076
Firetherm
Firesteel
Classic 120
Firetherm
Solvent based
Intumescent &
intumescent coating
Insulation Supplies
Ltd.
Kent, UK
Protection of
3-side exposed
steel channel
sections /
I-section up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC No.
C130413
6 March 2003
valid until 1
April 2008
3/8/2007
Assessment applicable
to steel I-section up to
a maximum web size
of 686mm and flange
size of 305mm
Reference List of Fire Protection Materials for Structural Use
BD-FP
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Hilti HIT-RE
500
Hilti Corporation
Epoxy resin system
Kaufering,
Gemany
BD-FP
078
Firetherm
Firesteel
Classic 120
Firetherm
Solvent based
Intumescent &
intumescent coating
Insulation Supplies
Ltd.
Kent, UK
BD-FP
079
Nullifire S605
Nullifire Limited
Coventry, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
077
Details of Test or Assessment Report
Solvent based
intumescent coating
Injection system
for making
nominal
anchorage
connections of
Grade 460 rebars
of diameters up
to 40mm in
reinforced
concrete
elements up to 2
hrs. FRP.
BS 476: Part 20:
1987
Protection of
3-sides/ 4-sides
exposed steel
hollow beam
sections up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Protection of
Built up Box
Sections up to 2
hrs FRP and
SHS up to 1 hr.
FRP (4-side
exposed for both
sections)
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Bodycote
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
21.1.2008
Load carrying capacity
of the injection system
for rebar fixing under
the effects of fire
should be assessed
with an appropriate
factor of safety
compatible with the
structural design of the
parent structure.
Validity
Date
Report
WF 166402
26 October
2007
valid until
1 November
2012
UKAS
HOKLAS
Warrington
Fire Research
Centre
WFRC No.
C130414
Research
Engineering
Development
Façade
Consultants
Limited
R07K15
6 March 2003
valid until
21.1.2008
1 April 2008
24 October
2007
Valid until
21 July 2008
21/1/2008
The relationship
between protection
thickness, section
factor, and fire
resistance of structural
steel shall refer to BRE
assessment report
number CC 93058B.
The assessment of the
built up box section
under the fire test
report R07K15 was
based on fire test of a
rolled hollow section.
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Nullifire S606
Nullifire Limited
Coventry, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
080
Details of Test or Assessment Report
Solvent based
intumescent coating
Protection of
SHS beam
sections with
3-side exposed
and maximum
span of 1.3m for
2 hrs FRP
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
HOKLAS
Research
Engineering
Development
Façade
Consultants
Limited
Assessment
Date of
Posting on
CDB
Remarks /
Comments
21/1/2008
The relationship
between protection
thickness, section
factor, and fire
resistance of structural
steel shall refer to BRE
assessment report
number CC92856B.
Validity
Date
Report
R07L03
9 November
2007
Valid until
8 November
2009
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
Assemblies
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
081
Date of
Posting on
CDB
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened above and
below a framework
of steel channels,
enclosing a cavity
containing 140kg/m3
density rock wool
with a minimum
overall thickness of
120mm.
Fire resisting floor
assemblies
(construction details
are given in the
assessment reports)
for up to 4 hrs. FRP
in terms of
load-bearing
capacity, integrity
and insulation.
Maximum imposed
load to be 5.0kPa.
Primary members of
the steel framework
are located parallel
with and on top of
main structural
supporting beams at
1m, 1.2m or 2.4m
centers as given in
the assessment
reports. Cross
members are spaced
at 600mm c/c.
Additional 2 nos. of
cover strips shall be
required for the top
and bottom flange of
the channel sections
for insulation use.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Warrington
Fire Research
Centre
Assessment
Remarks /
Comments
Validity
Date
Report
WFRC
Assessment
report No.
136396
22 March
2004
valid until 1
April 2009
25/4/2008
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
The assembly shall be
supported by structural
steel beams that are
fitted with a
proprietary fire
protection system of
suitable thickness for
the relevant fire
resistance period and
for the section factor of
the beams.
Maximum load ratio of
structural steel
elements inside the
assembly shall be less
than or equal to 0.5
to BS5950: Part 1
Fire stop/ sealant shall
be provided for the
interface between the
perimeter of the
Durasteel floor and the
surrounding structures
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel
Protected Steel
Stair
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
082
Date of
Posting on
CDB
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened above and
below a framework
of steel angles and
cold formed steel
sheet, enclosing a
cavity containing
140kg/m3 density
rock wool with a
minimum overall
thickness of 120mm.
Protected stairs
(construction details
are given in the
assessment reports)
for up to 4 hrs. FRP
in terms of
loadbearing capacity,
integrity and
insulation.
Maximum imposed
load to be 5.0kPa.
Cold formed steel
sheet supported by
steel angles create
the treads and risers
of the stair assembly
as well as supporting
the Durasteel board
on top. Back-to-back
steel angle spaced at
1.2m c/c hanging the
Durasteel board at
the underside of the
stairs. The main
structural beam
(I-section or hollow
section) along the
staircase is enclosed
inside the assembly
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Warrington
Fire Research
Centre
Assessment
Remarks /
Comments
Validity
Date
Report
WFRC
Assessment
report No.
141176
31 August
2004
valid until 1
September
2009
25/4/2008
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
Maximum load ratio of
structural steel
elements inside the
assembly shall be less
than or equal to 0.5
to BS5950: Part 1
Either full thickness or
at least half the
required thickness of
rock wool shall be
fitted between the
Durasteel and the main
structural steel
members supporting
the stair.
Fire stop/ sealant shall
be provided for the
interface between the
perimeter of the
Durasteel floor and the
surrounding structures
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
083
Details of Test or Assessment Report
Single pack solvent
based intumescent
coating
Protection of steel
I-beams and
I-columns up to 2
hrs. FRP.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Bodycote
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
22/7/2008
This is resulted from
the expiry pf
BD-FP048
Validity
Date
Report
WF No.
164158
20 August
2007
valid until1
June 2012
Koahsiung,
Taiwan
BD-FP
084
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
It should be read in
conjunction with fire
assessment report
WFRC No. 125252
Single pack solvent
based intumescent
coating
Protection of steel
angle, channel and
T-section to 2 hrs.
FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
164158
20 August
2007
valid until1
June 2012
22/7/2008
It should be read in
conjunction with
Bodycote
Warringtonfire
assessment letter dated
22.10.2007regarding
sections with re-entrant
details.
Single pack solvent
based intumescent
coating
Protection of 4-side
exposed RHS and
CHS up to 2 hrs.
FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
164159
20 August
2007
valid until 1
June 2012
22/7/2008
This is resulted from
the expiry of
BD-FP049
Koahsiung,
Taiwan
BD-FP
085
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Koahsiung,
Taiwan
BD-FP
086
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
It should be read in
conjunction with fire
assessment report
WFRC No. 125331
Single pack solvent
based intumescent
coating
Protection of 3-side
exposed RHS up to
2 hrs. FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
164160
20 August
2007
valid until 1
June 2012
22/7/2008
Koahsiung,
Taiwan
BD-FP
087
Southwest A/D
Type 5GP
A/D Fire
Single component,
Protection Systems factory blended
cementitious spray
Toronto, Canada
applied coating
This is resulted from
the expiry of
BD-FP050
It should be read in
conjunction with fire
assessment report
WFRC No. 115007
Protection of beam
or column of
I-section and hollow
section up to 4 hrs
FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
163280
WF No.
160007
WF No.
160008
20 June 2007
N/A
N/A
Valid until 1
July 2012
22/7/2008
A/D Type 5GP is not
intended for direct
exposure to weather or
excessive physical
abuse.
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
Assemblies
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
088
Date of
Posting on
CDB
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened above and
below a framework
of steel channels,
enclosing a cavity
containing 140kg/m3
density rock wool
with a minimum
overall thickness of
80mm.
Fire resisting floor
assemblies
(construction details
are given in the
assessment reports)
for up to2 hrs. FRP
in terms of
load-bearing
capacity, integrity
and insulation.
Maximum imposed
load to be 10kPa.
Any point load shall
be distributed over
an area of
300mmx300mm.
Primary members of
the steel framework
are located parallel
with and on top of
main structural
supporting beams at
1m centers as given
in the assessment
reports. Cross
members are spaced
at 600mm c/c.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
Recognized by
PNAP 251
Building
Research
Establishment
Assessment
Remarks /
Comments
Validity
Date
Report
CC 94333
Review 2
20 July 2007
valid until
20 July 2012
22/7/2008
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
The assembly shall be
supported by structural
steel beams that are
fitted with a
proprietary fire
protection system of
suitable thickness for
the relevant fire
resistance period and
for the section factor of
the beams.
Maximum load ratio of
supporting steel
elements shall not
exceed 0.53 to
BS5950: Part 1
Fire stop/ sealant shall
be provided for the
interface between the
perimeter of the
Durasteel floor and the
surrounding structures
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Phoenix 168
Phoenix Fire
Protection (Asia)
Ltd.
Name of
Name of
Intumescent coating
(water based)
Protection of 3-side
and 4-side exposed I
beam sections up to
1 hr. FRP.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Bodycote
Warringtonfire
Mannheim,
Germany
BD-FP
090
Phoenix
270-120
Phoenix Fire
Protection (Asia)
Ltd.
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
089
Details of Test or Assessment Report
Assessment
Date of
Posting on
CDB
Remarks /
Comments
22/7/2008
This is resulted from
the expiry of BD-FP
065
Validity
Date
Report
WF No.
160031
1 December
2006
WF No.
160032
1 December
2006
Intumescent coating
( water based)
Protection of 4-side
exposed hollow
column sections up
to 2 hrs. FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
174358
19 June 2008
Intumescent coating
( water based)
Protection of high
strength steel rod
(MacAlloy Bars) up
to 2 hrs. FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
167802
16 October
2007
valid until 1
December
2011
It should be read in
conjunction with fire
assessment report
WFRC No. C126964
and C126965
valid until
1August
2010
22/7/2008
It should be read in
conjunction with fire
assessment report WF
No. 156367 (expired
on 1.8.2008)
valid until
1November
2009
22/7/2008
It should be read in
conjunction with fire
assessment report WF
No. 156367 (expired
on 1.8.2008)
Wigan , UK
BD-FP
091
Phoenix
270-120
Phoenix Fire
Protection (Asia)
Ltd.
Wigan , UK
Limiting temperature
for tension rod shall be
evaluated based on the
tensile force of the
member under
consideration.
BD-FP
092
Phoenix
270-120
Phoenix Fire
Protection (Asia)
Ltd.
Intumescent coating
( water based)
Protection of 4-side
exposed I- beam
sections up to 2 hrs
FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No.
174358
19 June 2008
valid until
1August
2010
22/10/2008
Protection of 3-side
exposed hollow
beam section; 4-side
exposed hollow
column section and
steel angle section
up to 2 hrs FRP.
BS 476:
Parts 20 &
21: 1987
HOKLAS
Rearch
Engineering
Development
Façade
Consultants
Limited
R08C06
9 April 2008
valid until
8 April 2013
22/10/2008
Wigan , UK
BD-FP
093
Tanda AP25
Warwick Building
Material Ltd
Single component,
factory blended
cementitious spray
Guangzhou, China or trowel applied
coating
It should be read in
conjunction with fire
assessment report WF
No. 156367 (expired
on 1.8.2008)
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Nullifire S605
Nullifire Limited
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
094
Details of Test or Assessment Report
Solvent-borne
intumescent coating
Coventry, UK
Protection of 3-side
exposed I-section
beams and 4-side
exposed I-section
columns & beams up
to 2 hrs FRP.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Bodycote
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
23/1/2009
This is resulted from
the expiry of BD-FP
025
Validity
Date
Report
WF No
165959
22 January
2008
Valid until
1 February
2013
The relationship
between protection
thickness, section
factor, and fire
resistance period of
structural steel shall
refer to Table 1 & 2 of
report WF No. 165959.
Protection of 4-side
exposed CHS
columns up to 1 hr.
FRP.
BD-FP
095
Nullifire
System E
Nullifire Limited
Intumescent coating
Coventry, UK
Protection of 4-side
exposed CHS up to
1 hr. FRP.
BS 476:
Parts 20 &
21: 1987
UKAS
Bodycote
Warringtonfire
WF No
164410A
25 May 2007
Valid until
23/1/2009
1 June 2012
This is resulted from
the expiry of BD-FP
071
It should be read in
conjunction with fire
assessment report
WFRC No. C100578
& WFRC No.
C124329A (expired on
1.11.1999 & 1.5.2007
respectively)
BD-FP
096
Cafco 300
Promat
International
Bankok, Thailand
Plaster/ vermiculite
based product for
internal use.
Protection of 3-side
exposed I-section
beams and 4-side
exposed I-section
columns up to 4 hrs
FRP
BS 476:
Parts 20 &
21: 1987
Recognized by
PNAP 251
Building
Research
Establishment
CC 206998
Review 1
30 April 2007
next review
30 April
2012
23/1/2009
This is resulted from
the expiry of BD-FP
058
It should be read in
conjunction with fire
assessment report CC
206998
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
BD-FP
098
Cafco
Mandolite CP2
Durasteel Floor
Assemblies
Promat
International
Spray applied, single
package factory
controlled premix,
Bangkok ,Thailand based on vermiculite
and Portland cement
for internal use.
Upgrade reinforced
concrete slabs and
beams up to 4 hrs.
FRP.
Intumex Asia
Pacific Pte. Ltd.
Insulated ceiling
membrane
construction to
achieve 4 hours FRP
for the underside of
a composite floor
slab formed by steel
profile sheeting.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
097
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened below a
framework of steel
channels spaced at
1000 center,
enclosing a cavity
containing 140kg/m3
density rock wool
with a minimum
overall thickness of
120mm.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Bodycote
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
23/1/2009
This is resulted from
the expiry of BD-FP
070
Validity
Date
Report
WF Report
No.
173530/A
Issue 2
28 May 2008
valid until
1 June 2013
It should be read in
conjunction with fire
assessment report
WFRC No CP92117
Revision 1
The ceiling
membrane is hung at
the slab soffit by
M20 steel threaded
hanger rods spaced
at 1200mm.
The ceiling
membrane will not
be subjected to
imposed load except
self weight.
BS 476:
Parts 22:
1987
Recognized by
PNAP 251
Building
Research
Establishment
CC208842
Review 1
6 July 2007
valid until
6 July 2012
23/1/2009
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
Fire stop/ sealant shall
be provided for the
interface between the
perimeter of the
Durasteel floor and the
surrounding structures
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Promatect H
Eternit
Guangzhou Co.
Ltd
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
099
Details of Test or Assessment Report
Fibre-reinforced
calcium silicate
insulating board.
Protection of steel
beams and columns
up to 2 hrs. FRP.
BS 476:
Parts 20 &
21: 1987
Accreditation
Assessing
Body
Organization
Recognized by
PNAP 251
Building
Research
Establishment
Assessment
Date of
Posting on
CDB
Remarks /
Comments
23/1/2009
This is resulted from
the expiry of BD-FP
029
Validity
Date
Report
CC84975
Review 5
9 January 2007
9 January
2012
Guangzhou,
China
BD-FP
100
Monokote
Type Z-146
Grace Korea Inc
Inchon, Korea
The relationship
between protection
thickness, section
factor, and fire
resistance period of
structural steel shall
refer to Table 3 of
report CC84975
Review 5
Sprayed-applied
cementitious fire
protection material.
Protection of 3-side
exposed or 4-sides
exposed I-section
beams and columns
for FRP up to 1 hr.
BS 476:
Parts 20 &
21: 1987
UKAS
NATA
Warrington
Fire Research
Centre
WFRC
Report No.
145418
8 March 2005
1 April 2010
23/1/2009
It should be read in
conjunction with fire
assessment report
WFRC No C81831 for
I-section and C109505
for hollow section.
FCO-1299
1 July 2007
31 July 2012
30/4/2009
According to the
manufacturer’s
recommendation,
Vermitex AF is for
internal application.
R08C06
9 April 2008
8 April 2013
30/4/2009
Protection of 4-side
exposed hollow
section beams and
column for FRP up
to 1 hr.
BD-FP
101
Vermitex AF
L&A Fazzini
Gypsum-vermiculite Protection of steel
Manufacturing Pty coating
I-sections, hollow
Ltd.
section and angle
section up to 1 hr.
Greenacre NSW,
FRP.
Australia
AS 1530.4
and BS 476:
Part 21
BD-FP
102
Tanda AP25
Warwick Building
Material Ltd
BS 476:
Parts 20 &
21: 1987
Single component,
factory blended
cementitious spray
Guangzhou, China or trowel applied
coating
Protection of 3-side
and 4-side exposed
I-section up to 4 hrs
FRP.
HOKLAS
CSIRO
Rearch
Engineering
Development
Façade
Consultants
Limited
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Hilti HIT-HY
150
Hilti Corporation
Interchar 963
International Paint
Limited
Interchar 973
International Paint
Limited
Vermiculux
Board
Intumex Asia
Pacific
Glasgow, UK
BD-FP
107
Cafco
SprayFilm
WB3
Assessing
Body
Organization
Load carrying capacity
of the injection system
for rebar fixing under
the effects of fire
should be assessed
with an appropriate
factor of safety
compatible with the
structural design of the
parent structure.
Date
Report
UKAS
Bodycote
Warringtonfire
WF Report
No. 166402
26 October
2007
1 November
2012
30/04/2009
Intumescent coating
Protection of
3-side and 4-side
exposed steel
angles up to 1 hr.
FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WFRC
Assessment
Report No.
136405
15 January
2004
1 February
2014
12/08/2009
WF Report
No. 179990
26 January
2009
NA
Intumescent coating
Protection of
4-side exposed
I-section beams
and column up
to 1 hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 159150
3 September
2007
1 September
2012
12/08/2009
Low density
lightweight
non-combustible
board made from a
blend of calcium
silicate, vermiculite
and reinforced with
selected inorganic
fibres and fillers
Protection of
4-side exposed
I-section beams
and columns up
to 4 hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Building
Research
Establishment
CC 83123
Review 3
14 July 2008
14 July 2013
12/08/2009
Required thickness of
fire-resisting board
shall be in accordance
with Table 14 of BRE’s
assessment report .CC
83123 Review 3
Protection of
steel channel
section up to 1
hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No.
176738A
19 September
2008
1 October
2013
4/11/2009
It should be read in
conjunction with
Warringtonfire’s
supplementary letter
176738/RHE.
Cafco International Intumescent coating
UK
Guangzhou, China
Accreditation
Assessment
Validity
BS 476: Part 20:
1987
Shanghai, China
BD-FP
106
Report No. Date of Test /
Remarks /
Comments
Injection system
for making
nominal
anchorage
connections of
Grade 460 rebars
of diameters up
to 25mm in
reinforced
concrete
elements up to 4
hrs. FRP.
Shanghai, China
BD-FP
105
Name of
Date of
Posting on
CDB
Hybrid resin system
Kaufering,
Gemany
BD-FP
104
Name of
Laboratory Laboratory /
(City and
BD-FP
103
Details of Test or Assessment Report
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
Assemblies
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
108
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened above and
below a framework
of steel channels,
enclosing a cavity
containing 140kg/m3
density rock wool
with a minimum
overall thickness of
80mm.
Fire resisting
floor assemblies
(construction
details are given
in the assessment
reports) for up to
2 hrs. FRP in
terms of
load-bearing
capacity,
integrity and
insulation.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Bodycote
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
4/11/2009
It should be read in
conjunction with fire
assessment report No
WFRC 141038.
Validity
Date
Report
WF Report
No.
C181794C
30 March
2009
1 April 2014
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
Maximum
imposed load to
be 7.5kPa.
Additional 2 nos.
of cover strips
shall be required
for the top and
bottom flange of
the channel
sections for
insulation use.
BD-FP
109
Firetherm
Firesteel
Classic 120
Firetherm
Solvent based
Intumescent &
intumescent coating
Insulation Supplies
Ltd.
Kent, UK
Protection of
3-sides/ 4-sides
exposed steel
hollow beam
sections and
3-side exposed
steel channel
sections /
I-section up to 2
hrs. FRP.
Maximum load ratio of
structural steel
elements inside the
assembly shall be less
than or equal to 0.5
to BS5950: Part 1
Fire stop/ sealant shall
be provided for the
interface between the
perimeter of the
Durasteel floor and the
surrounding structures
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No.
C155649/A
15 June 2006
1 July 2011
WF Report
No.
C155649/B
15 June 2006
1 July 2011
4/11/2009
It should be read in
conjunction with fire
assessment report
WFRC C130414 &
C130413
Assessment applicable
to steel I-section up to
a maximum web size
of 686mm and flange
size of 305mm
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Unitherm
38091
Sika
Korrosionsshutz
GmbH.
Name of
Name of
Accreditation
Assessing
Body
Organization
Unitherm
38091
Cafco
SprayFilm
WB3
Firecut F-1
Report
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 162163,
C105561
Issue 2,
C125126,
133000 and
summary
report WF
No. 133394.
19 March
2007
1 April 2012
22/2/2010
Intumescent coating
Protection of
steel RHS up to
2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 162164,
C105708,
C125342
Issue 2,
140896 and
summary
report WF
No. 126392
Issue 3..
19 March
2007
1 April 2012
22/2/2010
Cafco International Intumescent coating
UK
Protection of
steel RHS,
channel and
angle section up
to 2 hrs. FRP
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No.
176738B for
RHS,
176738A
for channel
and angle
sections
4 April 2009
1 October
2013
22/2/2010
Protection of
steel channel
section up to 1
hr. FRP
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 149330
Issue 2
18 November
2005
1 December
2010
25/8/2010
Protection of
steel channel and
hollow section
up to 2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No.
169583B &
169583C
19 December
2007
1 January
2013
17/10/2011
Sika
Korrosionsshutz
GmbH.
Guangzhou, China
BD-FP
113
Date
Protection of
steel I-beams and
I-columns up to
2 hrs. FRP.
Stuttgart, Gemany
BD-FP
112
Assessment
Yung Chi Paint &
Varnish Mfg. Co.
Ltd
Cementitious
coating
19 September
2009
Kaohsiung,
Taiwan
BD-FP
114
Isolatek WB3
Isolatek
International
Stanhope, USA
Water-based in
tumescent coating
Remarks /
Comments
Validity
Intumescent coating
Stuttgart, Gemany
BD-FP
111
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
110
Date of
Posting on
CDB
Details of Test or Assessment Report
It should be read in
conjunction with
Warringtonfire’s
supplementary letter
176738/RHE.for
channel and angle
section.
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Supalux Board
Intumex Asia
Pacific
Nullifire S606
Nullifire Limited
Monokote
MK6
W.R. Grace & Co.
Incheon City,
South Korea
BD-FP
118
Firecut F-1
Yung Chi Paint &
Vanish Mfg. Co.
Ltd.
Report No. Date of Test /
Accreditation
Assessing
Body
Organization
Assessment
Remarks /
Comments
Validity
Date
Report
Protection of
steel hollow
section up to1 hr.
FRP.
BS 476: Parts 20
& 21: 1987
N/A
Building
Research
Establishment
CC 82876
Review 2
Issue 2
27 March
2006
11 August
2010
17/10/2011
Required thickness of
fire-resisting board
shall be in accordance
with the provision
shown in BRE’s
assessment report
CC 82876 Review 2
Issue 2
Intumescent
coating
Protection of
steel hollow
section, channel
section, I-section
up to 1 hrs. FRP.
BS 476: Parts 20
& 21: 1987
N/A
Building
Research
Establishment
CC 92856A
Review 3
19 March
2008
next review
date: 10
April 2013
17/10/2011
The relationship
between protection
thickness, section
factor, and fire
resistance of structural
steel shall refer to BRE
assessment report
number CC92856A,
Review 3. and
CC92856B Review 3
Sprayed-applied
cementitious
fire-proofing
plaster.
Upgrading of
FRP of RC slab
and beam from 1
hr to 2 hrs.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 186522
3 September
2009
1 November
2014
17/10/2011
It should be read in
conjunction with fire
assessment report
WFRC No C107230
Cementitious fire
rated coating
Protection of
steel channel
section up to
1 hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Warrington
Fire Research
Centre
WFRC
Report No.
149330
18 November
2005
1 December
2010
17/10/2011
Single component,
factory blended
cementitious spray
or trowel applied
coating
Protection of
steel channel
section up to 4
hrs FRP.
BS 476: Parts 20
& 21: 1987
HOKLAS
Rearch
Engineering
Development
Façade
Consultants
Limited
R08C06
9 April 2008
valid until
8 April 2013
17/10/2011
Solvent based
intumescent
coating
Protection of
steel I-section up
to 2 hrs FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 170770
28 May 2009
1 June 2014
17/10/2011
Coventry, UK
BD-FP
117
Name of
Date of
Posting on
CDB
Non-combustible
board
Guangzhou, China
BD-FP
116
Name of
Laboratory Laboratory /
(City and
BD-FP
115
Details of Test or Assessment Report
CC92856B
Review 3
Kaohsiung,
Taiwan
BD-FP
119
Tanda AP25
Warwick Building
Material Ltd
Guangzhou, China
BD-FP
120
Hensotherm
3KS
Rudolf Hensel
GmbH
Bornsen, Germany
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Nullifire
S707-60
Nullifire Limited
Cafco
SprayFilm
WB3
Cafco International
UK
Name of
Report No. Date of Test /
Accreditation
Assessing
Body
Organization
Assessment
Date of
Posting on
CDB
Remarks /
Comments
Validity
Date
Report
Intumescent
coating
Protection of
steel I-section up
to 1 hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 205546
6 June 2011
next review
date: 1 June
2016
21/9/2012
It should be read in
conjunction with fire
assessment report WF
Report No 154065
Intumescent
coating
Protection of
steel I-section up
to 1 hr. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No.
176738A
19 September
2008
1 October
2013
21/9/2012
It should be read in
conjunction with fire
assessment report WF
Report No 152624
Issue 3.
Cementitious fire
rated coating
Protection of
steel I-section,
steel channel
section and angle
section up to 4
hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WFRC
Report No.
179160
11 December
2008
1 January
2014
21/9/2012
Water borne
intumescent
coating
Protection of
3-sides/ 4-sides
exposed steel
I-section and
4-side exposed
steel hollow
section up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Report
No. 169988
28 January
2008
1 February
2013
3/7/2013
Coventry, UK
BD-FP
122
Name of
Laboratory Laboratory /
(City and
BD-FP
121
Details of Test or Assessment Report
Guangzhou, China
BD-FP
123
Firecut F-1
Yung Chi Paint &
Vanish Mfg. Co.
Ltd.
Kaohsiung,
Taiwan
BD-FP
124
Firetherm
Firesteel
120WB
Firetherm
Intumescent &
Insulation Supplies
Ltd.
Kent, UK
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
Durasteel Floor
Assemblies
Intumex Asia
Pacific Pte. Ltd.
Blackburn, UK /
Zhejiang, PRC
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
125
Date of
Posting on
CDB
Details of Test or Assessment Report
Single layer of
9.5mm thick
Durasteel board,
fastened above and
below a framework
of steel channels,
enclosing a cavity
containing
140kg/m3 density
rock wool with a
minimum overall
thickness of
80mm.
Fire resisting
floor assemblies
(construction
details are given
in the assessment
report) for up to
1 hr. FRP in
terms of
load-bearing
capacity,
integrity and
insulation.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
Department of
Standards
Malaysia
UKAS
Fire Science
Research
Group
(Malaysia)
Exova
Warringtonfire
Assessment
Validity
Date
Report
FSRG
2014/005
WF Report
No. 189172
27 February
2014
21 December
2009
NA
9 June 2014
1 January
2015
The assembly shall be
supported by structural
members with fire
protection system for
the relevant fire
resistance period.
Additional 1 no.
of 9.5mm thick
Durasteel cover
strip shall be
required for the
top and bottom
flange of the
channel sections
for insulation
use.
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
BD-FP
127
Firecut
FM-900
Yung Chi Paint &
Varnish Mfg Co
Ltd.
Koahsiung,
Taiwan
Fire stop/ sealant shall
be provided for the
interface between the
perimeter of the
Durasteel floor and the
surrounding structures
Single pack
solvent based
intumescent
coating
Protection of
steel I-sections
with 3-side or
4-side exposed
up to 2 hrs. FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Exova
Warringtonfire
WF Review
Report No.
316831
23 March
2012
1 April 2017
9 June 2014
Single pack
solvent based
intumescent
coating
Protection of
steel angle,
channel and
I-sections with
3-side or 4-side
exposed to 1 hr.
FRP.
BS 476: Parts 20
& 21: 1987
UKAS
Bodycote
Warringtonfire
WF Review
Report No.
307644
16 May 2011
1 June 2016
9 June 2014
Koahsiung,
Taiwan
The construction
details should be
identical to those
covered in the
assessment report.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
Maximum
imposed load to
be 10kPa.
BD-FP
126
Remarks /
Comments
It should be read in
conjunction with
Bodycote
Warringtonfire fire
assessment report WF
No. 167317.
It should be read in
conjunction with
Bodycote
Warringtonfire
assessment report WF
No. 145918.
Reference List of Fire Protection Materials for Structural Use
Ref.
No.
Product
Name of
Name
Manufacturer
Material
Category
Application
Compliance
Testing
and Place of
Standard
Manufacture
Country)
BD-FP
129
Ramset
EPCON G5
Injection
Adhesive with
Grade 460
high yield
deformed bars
of diameters
12mm to
40mm
ITW Red Head
Firetex
FX-5090
Sherwin-Williams
Protective &
Marine Coating
Epoxy injection
system
Illinois, USA
Intumescent
coating
(water based)
Bolton, UK
Name of
Name of
Report No. Date of Test /
Laboratory Laboratory /
(City and
BD-FP
128
Details of Test or Assessment Report
Injection system
for making
anchorage
connections of
Grade 460 rebars
of diameters
12mm to 40mm
in reinforced
concrete
elements up to 4
hrs. FRP.
BS 476: Part 20:
1987
Protection of
steel I-sections
and hollow
sections with
3-side or 4-side
exposed up to 2
hrs. FRP.
BS 476: Parts 20
& 21: 1987
Accreditation
Assessing
Body
Organization
UKAS
Exova
Warringtonfire
Assessment
Date of
Posting on
CDB
Remarks /
Comments
01/09/2014
It should be read in
conjunction with
Warringtonfire
assessment report no.
45838.4.
Validity
Date
Report
EWFA
Report No.
25276-00
30 September
2010
30
November
2015
Load carrying capacity
of the injection system
for rebar fixing under
the effects of fire
should be assessed
with an appropriate
factor of safety
compatible with the
structural design of the
parent structure.
UKAS
Exova
Warringtonfire
WF Report
No. 336628
28 January
2014
1 February
2019
WF Report
No. 347568
9 July 2015
1 June 2020
31 August
2016
The construction
details should be
identical to those
covered in the
assessment reports.
All requirements given
in the assessment
reports should be
checked to ensure
compatibility with
proposed applications.
Download