level 2 - National Fuel Gas Company

advertisement
LAST REVISED
8/2 III 2
NATIONAL FUEL GAS SUPPLY CORPORATION
LOCAL PRODUCTION (LEVEL 2) METER STATION
INSTALLATION POLICY
Definitions/Abbreviations:
TYPES OF METER STATIONS:
:s
Gathering = stations to be installed on the gathering system lines @ MAOP 50 psig.
Levell = stations to be installed on Distribution or Supply lines @ MAOP < 125 psig.
Level 2 = stations to be installed on Distribution or Supply lines @ MAOP:>. 125 psig.
DEFINITIONS & ABBREVIATIONS:
CA = Contract Administration
NFG = National Fuel Gas
MAOP = Maximum Allowable Operating Pressure
MRC = Measurement, Regulation, and Corrosion
STATION PIPING = the length of piping between the meter assembly and National's main
line.
A. INITIAL CONTACT
I.
Producer will contact Contract Administration (CA) in writing as to pipeline operating
pressures, capacity, seasonal restrictions, and costs associated with building a meter
station to produce into NFG's pipelines. Producer must provide a map showing the
location of the requested tie-in point.
2. CA will route the NFG Local Producer Meter Request form along with a map showing
the proposed tie-in location to the District Engineer and the local Operations Supervisor
Engineering will work with Operations to document the Pipeline Capacity, Pressure,
MAOP and Relief Set Pressure. The form should be returned to CA within two weeks.
CA will respond in writing to the producer concerning pipeline capacity, pressure, type
of meter required, estimated costs, and required paperwork (i.e., well package) to initiate
the process of building the station.
3. Upon drilling (or purchase) of the well(s), producer will forward the appropriate
information to CA with a letter confirming their request for the meter station and gas
purchase or transportation arrangements.
4. After reviewing this policy and the attached exhibits (i.e., Exhibit A - Contractor &
Supplier List and Exhibit B- Material Specifications List), the producer must decide
which approved contractor will be employed by the producer.
5. If the station is to be installed on a transmission facility, the producer will be required to
provide CA with a current tax map showing the current name and address of the
landowner and all adjoining landowners' names and addresses so that CA can comply
with FERC Order 609.
B. APPROVED CONTRACTORS
I. An approved contractor must be selected from the list shown in Exhibit A - Table I. The
contractor must be chosen appropriately making sure they are approved for the NFG
division which owns the subject pipeline and for the type of work to be done (i.e., plastic
or steel).
2. For plastic work the contractor must be "Mechanical & Fusion Qualified" and certified
annually by NFG.
B. APPROVED CONTRACTORS (Cont.)
3. For steel welding the contractor must use a welder who is certified biannually by NFG to
weld according to "API 1104 & NFG Welding Procedures."
4. The contractor's "Qualified Foreman" must be present during the installation of any
meter station and related piping.
5. Unless otherwise specified herein, approved contractors shall perform all work according
to NFG's Operating & Procedures manual.
C. EXPENDITURE REQUEST (ER)
I. CA will generate an ER to build the station. A map will be attached showing the
approximate location of the station (exact location dimensions will be shown on the
Completion Report). The Line Pressure, MAOP and Relief Set Pressure, that were
determined by Operations and Engineering on the NFG Local Producer Meter Request,
will be shown on the ER.
2. The ER will be circulated to the appropriate NFG personnel for approval.
3. Producer will be invoiced for the appropriate amount dependent upon the extent of the
work to be performed by NFG.
4. Upon receipt of payment from producer, construction will proceed.
D. PRE-CONSTRUCTION MEETING
I. A meeting will be held at the appropriate field office or service center to discuss
construction details. Representatives of the producer and contractor must be present.
NFG's attendees may include the CA, the Supply or Distribution area engineer, the area
foreman andlor construction foreman, and an MRC representative.
2. Design Drawing and Specifications - the station will be constructed according to NFG's
standard local production meter station designs for Gathering Systems, Level I, and
Level 2 applications. The design drawings and material lists will be distributed and
reviewed at this time.
E. MATERIALS
I. Gathering - materials as specified in design drawing may be obtained at supply shops
shown in Exhibit A - Table 2, or at supply shops of choice. Any substitution of materials
or variation from the design drawing must be approved by NFG's area engineer.
Paperwork such as invoices, purchase order material lists, certified mill test reports
(CMTR), etc., supporting the pressure rating, strength, and suitability of such materials
must be submitted for approval by NFG' s area engineer and must be attached to the
Completion Report.
2. Level I - same as "Gathering" except that any plastic pipeline to be installed must be
purchased at NFG's Mineral Springs warehouse. (NOTE: No recycled or rebuilt
materials will be permitted for Levell stations.)
3. Level 2 - materials as specified in design drawing MUST be obtained from the sources
shown in Exhibit A - Table 2. All materials obtained from sources other than NFG's
warehouses must be supported by invoices, purchase order material lists, CMTR's, etc.,
and must be submitted to NFG's area engineer for approval. This paperwork must be
attached to the Completion Report. (NOTE: No recycled or rebuilt materials will be
permitted for Level 2 stations.)
-2-
F. PRE-FABRICATION OF METER STATIONS
I.
Gathering - meter stations can be pre-fabricated in contractor shops. Contractor must
notify NFG ' s area foreman at least 48 hours prior to assembly. It will be at the
foreman's discretion if inspection will be necessary at the shop during assembly.
2. Level I - same as Gathering.
3. Level 2 - meter stations can be pre-fabricated in contractor shops. Contractor must
notify NFG's area foreman at least 48 hours prior to assembly. NFG's area foreman ,
designated inspector, or engineer will be present to inspect during welding, X-ray, and
pressure testing procedures.
G. WELDING
I.
Gathering - not applicable during pre-fabrication of meter station. If welding is required
for line tap or station piping, it must be performed by an NFG certified welder according
to API 1104 & NFG Welding procedures.
2. Level I - any welding on the meter station, station piping, or line tap must be performed
by an NFG certified welder according to API 1104 & NFG Welding procedures.
3. Level 2 - any welding on the meter station, station piping, or line tap must be performed
by an NFG certified welder according to API 1104 & NFG Welding procedures. Weld
X-rays, or Radiographic Reports must be performed by an approved firm on 100% of all
welds in the shop during fabrication and in the field during installation. Producer or
contractor will notify the NFG area foreman at least 48 hours prior to any and all X-rays.
The NFG area foreman or designated inspector will be present during welding X-ray
procedures. The X-ray reports and film must be submitted to the area foreman and
attached with the Completion Report. (NOTE: The field X-ray al/d pressure testil/g
procedures should be scheduled simultal/eously thus allowil/g for these two evel/ts as
well as NFG il/spectiol/, meter il/stallatiol/, purge, al/d turn-ol/ to be accomplished 01/
the same day if possible. )
H. PRESSURE TESTING
I.
Gathering - once the meter station is installed in the field and prior to line tapping, the
meter station and station piping will be pressure tested to one and a half times or 150%
of the MAOP for a minimum of one hour. Longer tests should be considered for larger
diameters and longer lengths. (NOTE: For plastic pipe the MAOP will be 60 psig
ul/less otherwise specified thereby desigl/atil/g the test pressure at 90 psig.) Test
pressure must stabilize before timing begins for plastic pipe. Allow sufficient time for
fusion joints to cool properly before starting test. The testing medium, which in most
cases will be air but sometimes nitrogen or water, must be approved by the NFG area
foreman. The NFG area foreman will also determine whether spring gauges or dead
weight testers will be used. Spring gauges must be calibrated within 90 days prior to the
test and must indicate increments of two (2) psig or less. Dead weight testers will be
supplied by NFG where possible. The test pressure, duration, and test medium shall be
recorded on the Completion Report.
2. Level I - same as Gathering.
3. Level 2:
Test Pressure - 150 % of the MAOP, or fitting rating (whichever is greater) of the line
to be tapped.
Test Medium - normally water but air or inert gas may be used at the discretion of the
area foreman. Creek water may be used if relatively free of sediment.
Test Duration - a minimum of 12 hours in NY; 8 hours in PA. For short lengths of
pipe (i.e., < 100' ) when the entire circumference and length can be visually examined,
the test may be reduced to four (4) hours after stabilization.
-3-
H. PRESSURE TESTING (Cont.)
3. Level 2 (Cont.):
Test Gauges & Charts - a calibrated recording pressure gauge shall be used indicating
increments of five (5) psig or less. The recording gauge must be calibrated using a
dead weight tester at least hourly for the first and last two hours of the test. A
temperature recording gauge will be used to determine the effect of temperature on the
test.
Taps - final tie-in welds are exempt from the test.
Record Keeping - the test pressure, duration, and test medium shall be recorded on the
completion report. The pressure and temperature charts along with the hydrostatic test
report will also be attached. The recording chart shall be signed by the NFG employee
(and by the PSC staff member for NY stations) witnessing the test.
Notification - in NY the PSC must be notified at least five (5) business days prior to
testing. Either the contractor or NFG's Engineering Department will provide the
notification.
De-watering - the line must be de-watered with at least two (2) runs of a squeegee or
spherical pig. The test medium must be disposed of properly by the contractor. A run
of methanol is recommended during the winter. Any methanol collected at the
downstream end must be disposed of properly by the contractor.
I. LINE TAP
I. Gathering - the approved contractor will be permitted to tap NFG ' s gathering and low
pressure lines. Notice must be given to NFG's area foreman at least 48 hours prior to
tapping. It will be at the discretion ofNFG's foreman as to whether an NFG inspector
will be present during tapping. Any welding involved with tapping hot lines must be
done by a welder certified by NFG according to "API 1107 - Recommended Pipeline
Maintenance Welding Practices." Contractors tapping plastic lines must be qualified
according to section (8)(2) above.
2. Level I - same as Gathering. (NOTE: There may be occasions where due to the
sensitivity or future plans for certain pipelines NFG will reserve the right to utilize its
own crews for tapping.
3. Level 2 - NFG crews will perform any and all taps for Level 2 stations. The producer
will be invoiced.
J. DEPTH OF COVER - STATION PIPING
I. Gathering & Level I - the standard depth shall be 30 inches except in cultivated
farmland, which requires 40 inches. Also, #12 tracer wire and warning tape must be
installed with plastic pipe.
2. Level 2 - the standard depth shall be 42 inches.
K. INSTALLATION OF RECEIPT FACILITIES
Receipt facilities shall be installed, owned and maintained by and at the expense of either
NFG or Operator according to the below schedule. Such equipment shall be installed,
which, in NFG's reasonable judgment, may be necessary to accommodate the deliveries
of gas received and projected to be received. The normal operation, calibration,
maintenance, adjustment and repair of the measurement equipment shall be performed by
the owner of the equipment. Modifications to Receipt Facilities resulting from changes
in Operator's operations shall be performed at Operator' s cost and expense. The Receipt
Facilities shall be operated in accordance with the applicable specifications of the Gas
Measurement Committee of the Natural Gas Department of the American Gas
Association, as amended from time to time, or in accordance with any other mutually
agreeable standard commonly accepted in the industry.
-4-
K. INSTALLATION OF RECEIPT FACILITIES (Cont.)
Equipment
Install by
MeterfRecording instrument
NFG
Meter run and valves
Either
Regulator
Operator
Drying Equipment
Operator
NFG
Odorizing Equipment
"Pop-offs"fRelief valves
Either
Either'
Mainline valve
Heaters
Operator
Water separatorfDrips
Operator
Communications facilities
Operator
TelemetricsfTotalflow
NFG
Telephone line
Operator
'Pursuant to a determination by NFG
Own by
Maintain by
Paid by
NFG
Either
Operator
Operator
NFG
Either
NFG
Operator
Operator
Operator
NFG
Operator
NFG
Either
Operator
Operator
NFG
NFG
NFG
Operator
Operator
Operator
NFG
Operator
NFG
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
Operator
L. COMPLETION REPORTS
NFG's area foreman will be responsible for submitting both the completion report for
both the meter station and the line tap. The producer will assist as needed.
For Level 2 stations the producer must provide the following information to the NFG
area foreman. This information will then be sent to NFG Engineering for review, and
written approval must be obtained before the producer will be allowed to start flowing
gas.
I. NFG Completion Report Form 4207947
2. Project Sketch or Design Drawing
3. Material List
4. Purchase Orders
S. Certified Mill Test Reports
6. Welding Procedures
7. Weld Location Report
8. Welder(s) Qualifications
9. X-Ray Inspection Reports
10. X-Ray Procedure Qualifications
II. X-Ray Certifications
12. Hydrostatic Test Report
13. Hydrostatic Test Chart
M. OWNERSHIP
I. NFG will maintain ownership of all equipment from the main line being tapped up to and
including the first valve (i.e., the control valve or street valve). NFG will also own the
physical meter (i.e. , the rotary meter and corrector, telemetricsftotalflow, the orifice
recording gauges, orifice plates, and meter house, etc.).
2. Producer will own all equipment directly upstream of the first above-ground valve back
to the producer's well line exclusive of the physical meter as described above in section
(M)( I). Once the meter station is approved and turned on, producer will not alter the
configuration of the station unless approved by NFG.
-5-
N. OPERATION & MAINTENANCE
I. NFG will "operate" the meter station during the life of the station unless otherwise
designated by NFG. "Operating" includes calibrations, gas quality testing, relief valve
adjustments, protection, line marking and one·call system, valve inspections, and
patrolling.
2. Producer will perfonn all "maintenance" duties at the stations and station piping such as
repairing or replacing faulty and/or leaking equipment (i.e., pipes, flanges, valves,
regulators, relief valves, etc.), removing partial or full blockages due to water, salt, and
foreign debris, painting, mowing of ROW's for station piping and meter station site,
stabilizing or straightening of meter run, and various other maintenance-type duties.
O. RETIREMENT
I.
When the station is to be retired, NFG will separate its equipment from the producer's
equipment and safely close and blind flange its control or street valve.
2. Producer is then responsible for safe removal of its equipment provided that NFG has
safely shut off the control valve and/or line tap.
-6-
National Fuel Gas Supply Corporation
Material Speclflcatiolls for Purchase Meter III.tallatiolls - Exhibit B
Revised June 21, 2012
All materials used in National Fuel's rotary, orifice, and ultrasonic purchase meter standards (all sizes) must
be domestic in origin and manufacture, new, and constructed to the latcst approved specifications as listed
below and as further detailed on the specific design drawings (any varianccs must be approved by National
Fucl's Rngineering Department):
Plain end Pipe:
API5L-PSL2 latest edition "X-" Grade
Wclded Fittings:
MSS SP-75 "Y-Grade or ASTM A234 Grade WPB, Scamless, Schedule 40,
to meet required MAOP
Weldneck Flnnges: MSS SP-44 "F-" Grade or ASTM AI05 carbon stccl forgcd flangcs to ANSI B16.5
dimensions, to match pipe and fittings to meet required MAOP
Flanged Plug
Valves: •
API 60 and ANSI B 16.34 carbon steel from NFG approved list of
manufacturcrs (Nordstrom, Texsteam, Delta, and PR Christensen).
Notc: These are the only approved vendors for plug valves on high·pressurc settings
(greater than 60 psig).
Flanged Ball
Valves: •
API 60 and ANSI B16.34 carbon steel from NFG approved list of
manufacturers (Cameron/Grove, PBV, and Delta).
Note: These arc the ollly approved vendors for ball valves 011 high pressure
sellings (greater than 60 psig).
Floating Ball
Valves (screw):
APl6D and ANSI B 16.34 carbon steel from NFG approved list of
Manufacturers (Marpac, VCI, and Balon). On high-presssure settings (greater than 60
psig). these valves can only be used for gauge connections.
!
Conc Chcck
Valvcs:
Stainless Steel Cone, Type 316 for mounting between adjacent pipe flanges to BS 4504
NP 16 or equivalent, from NFG approved list of Manufacturers (Norval).
Flanged Check
Valves:
API 60 and ANSI B 16.34 carbon steel from NFG approved list of
Manufacturers (VIT AS).
Ori fice Meter
Tubes:
AGA Report #3 (ANSI/API2530) from NFO approved list of Manufacturers
(Daniel 3-Seetion Simplex).
Ultrasonic Metor
Tubes:
AGA Report 119 (ANSI (00) from NFG approved list of Manufacturers
(Sick Maihak, Instromet) to NFG Specifications
Positive ShutOff Drips:
ASME Pressure Vessel Code Section VIII, Div. I from NFG approved list of
Manufacturers (Pride ufthe Hills Mfg. Inc.).
Strainer Tee:
Designed to ANSI 831.8 specifications. Comply with DOT Part 192 requirements,
welded per API 1104 procedures from NFG approved list of Manufacturers (Apollo).
Relief Valves:
AS ME Pressure Vessel Code Section VIII, Div. I from NFG approved list of
Manufacturers (Fisher, Axelson, Anderson Greenwood, and Flowsafe).
Threaded Nipples: ASTM A106, Or. B, Seamless, Seh. 160,3000 psi pipe nipple manufactured
to ASTM A733.
Page I of2
Threaded Fittings: ASTM AI05 , Forged Steel, 3000 psi, pressure and temperature rating equal
to A 106 Gr. B connecting pipe schedules.
Stud Bolts :
ASTM AI93 Grade 87 Alloy Steel Studs.
Cap Screws:
ASTM A354 Grade BI) or SAF. J 429 Grade 8 Alloy Steel
Nuts:
ASTM AI94 , Graue 2H Alloy Steel Hex Nu ts.
Gaskets:
ANSI 8 16.5 or ANSI B16 .2 1 dimensions, Flcxitallic Style CG, Type 304 SS
& fle xitc super (mica/graphite) color code yellow spiral wound gasket.
• For purchase meter instnllations tying into NFG pipelincs with an MAOP greater than 60 psig, the
Producer must use valves from NFG approved list of manufacturers as shown above. For NFG pipelines
wi th an MAOP of 60 psig or less, other plug and ball valvcs in the current NFG Material Catalog are
acceptable (e.g. Rockwell Fig. 143).
All materials (including valves) arc to be certifted as new and purchased from the Manufacturer's approved
area vendor. After market or re-manufactured valves arc not acceptable.
F:\Eng\Common\ J Dislricl Enginecrins ·
MJR\Tra n.~ m; r;.!~ion
I)roducer Inlt'rconneCIS - KJP\NFG Policy
Page 2 of2
LARGE VOLUME (GREATER THEN 5 MMCFD) PRODUCER INTERCONNECT
CONSTRUCTION PROCESS - 09-26-2012
Produ cer Interconnect Tap Construction Process
Page 2
Producer Interconnect Station Construction Process
Page 3
Responsibility Legend
Producer (Including Producer Hired NFG Approved Contractor)
National Fuel Local Production Manager
National Fuel Engineering
National Fuel Field Operations
National Fuel Hired Pipeline Construction Contractor
National Fuel Electrical Department
National Fuel Telecommunications I Gas Control {Electrical
National Fuel Welders
National Fuel Measurement & Regulation Department
National Fuol Williamson Crew
National Fuel Measurement & Regulation I Electrical
Producer, National Fuel (Local Production Manager,
Engineering, Operations, Electrical and Measurement &
Regulation Departments)
Note : National Fuel Responsibilities may include other 3 d Party Contractors
Note : Other Steps Outlined in the NATIONAL FUEL GAS SUPPLY CORPORATION LOCAL PRODUCTION (LEVEL 2)
METER STATION INSTALLATION POLICY, in the ER Process, in the Computer/Analytical Systems, and in the
Commissioning Process may not be detailed, but required
Page 1 of3
Producer Interconnect Tap Construction Process - 09-26-2012
Identify Interconnect
• Accnslli ly
• Powerlnd COmmunlcalion
Stte
Requ~em8flts
• ROW Limits
• SIte Okn8fl~on Requl~etlt.
Provide Approved ER
Provide Approved Plot Pla n
Provide to National Fuel
. landowner Contact Info, E911 Address
. Easement Verification
- Signed Interconnect Agreement
- Payment
- Power and Communication Documentation
Environmental
Cleara nces
Order Material
45 Day Landowner
Notice
Clear and Grade Interconnect Station Site (off NFG ROW)
Stake Tap Location From Station to Pipeline
based on Plot Plan
(Verify with Producer)
'Schedule Hot Tap With National Fuel
Williamson Crew
Purge and Pack to First Valve
Page 2 of 3
Producer Interconnect Station Construction Process - 09-26-2012
Provide Approved ER •
Identjfy Interconnect Stte •
Provide Approved Plot Plan
*
provide to National Fyel *
- Easement Verification
landowner Contact Info, E911 Address
Signed Interconnect Agreement
- Payment
Power and C ommunication Do cumentation
Environmental·
SCADA
45 Day Landowner
•
Clearances
Not~
Setup
Clear and Grade Interconnect Station Site
(off N FG ROW)
Fabricate, Test & Install Station
as per National Fuel Design
Drawings
Install Piers per National Fuel
Specifications
Install Odorant Tank
Install Odorant Building
(If Applicable)
Install Electrical Building
Install Gen. Fuel
Gas Uoe
Power and Communication Installation to Panel per
National Fuel Specifications
Install Flow Control and
Metering Equipment
Inslall SOADA System
(If Applicable)
Install Gas Monitoring
Equipment
Install Odorization
Equipment
(If Applicable)
Install Fence and Signage
Submit Pre-Turn On Checklist, Final Station Conformance Report, and All
Supporting Station Documentation U
• S am e steps iIS in Tap Con struction Process
•• This step ean be cQlTl pteted earl ier in process ifp roOJce r WlII niS t o accet"",te schedule
Page 3 of3
Date: _ _ __ _ _ __
National Fuel· DOT Operator Qualification Ust for Contractor Employees
Contractor:
Project 10'
Name of Qualified Contractor Employee
Ime:
O.Q.
NFG
Co.
Task # Task #
11A
116
(X) If OQ
Required
for this job
Task Name I Description
Applying pipe coating in the field -Trenton wax &
epoxy patch stick
Applying pipe coating in the field - 2 part epoxy &
shrink sleeves
X
X
12
Cleaning and either coating or jacketing pipe for
atmospheric corrosion - Includes paint & Trenton
X
15A
Installing . replacing and testing electrical isolation
couplings on a pipeline
X
31A
Installation of pipe· Storage & handling
X
316
Installation of pipe - In open ditch
X
33A
Purging a pipeline out of service· standard
methods for removing gas from the pipeline
X
34A
346
49
54&
44
70
71
Name of OQ Company'
Performing pressure test on a pipeline using air,
water, natural gas, or inert gas to test for leaks
Performing pressure test on a pipeline Hydrotest
Mechanical joining of pipe other than plastic·
indudes screw, flange & compression coupling
Weld ing on a pipeline andudes tie-in) •
& Repair of in·line weld
X
X
X
X
Properties of natural gas and abnormal operating
conditions
Operator excavation and bacldilling in the vicinity
of a pipeline (within tolerance zone)
X
X
A "Date" in the above boxes indicates the contract employee currently has the required Operator
Qualifications for that specific covered task and the qualification expires on the listed "Date"
• In addition to Task 54 & 44, all welders must have current NFG welding qualifications for specific procedures being used (Confirm qualification wI Bill Hanley)
Fomn Last Updated· 05/15/ 11 Revised 8/1712012 for Producers
Page 1 of 2
Instructions for use of this form:
1.
This form should be used to document Contractor employee qualifications on steel and other transmission type projects whenever contract employee is performing a covered
task on DOT regulated facilities and is not being directly supervised by a -qualified" National Fuel employee.
2.
Examples of where this form should be used include, but is not limited to : Pipeline Construction, Station Construction, Pipeline Remediation, CP Projects
3.
Project engineer I manager should initiate form and place "X" in the "IF OQ Required for this job" column indicating the OQ's required of the contractor for the specific job and
send to Contractor prior to the pre-construction meeting.
4.
Contractor to fill out this form by listing employee names that will be worning on the job and list "date" when current qualifications will expire for each qualified task.
5.
Contractor shall print out the individual employee qualification sheets from the appropriate qualifier program as back-up information and submit with this form to NFG Operations
supervisor at the pre-construction meeting. A copy of the form shall be given to the NFG inspector.
6.
This information should be used by National Fuel inspectors I supervisors in the field to ensure all covered tasks are performed by qualified person nel.
7.
Contractor shall update form and provide back-up information as needed when "new" contractor employees are added to the job site.
8.
This form should be maintained in National Fuel files for five (5) years after completion of project for audit purposes .
Form Last Updated - 05/15111 Revised 811712012 for Producers
Page 2 of 2
X-RAY SERVICES CONTRACTORS
Acuren
305 Kennedy Rd.
Akron, OH 44305
Email:
Contact:
Cellphone:
UPS Address
Vendor No.
Phone:
Fax:
21600
814-723-2135
814-723-4174
UPS Address
Vendor No.
Phone:
Fax:
2950
517-531-82 10
517-53 1-39 11
john.newland@agglusrtd.com
John Newland
MMD Vendor No.
UPS Address
Vendor No.
Phone:
Fax:
4739
716-853-26 11 135
716-853-2619
Don.Herzog@agglusrtd.com
Don Herzog
MMD Vendor No.
UPS Address
Vendor No.
Phone:
Fax:
412-787-8690
412-788-6816
ken .baits@teaminc.com
Ken Baits
MMD Vendor No.
TEl Analytical Services, Inc.
P.O. Box 534
Washington, PA 15301
Email:
Contact:
Cellphone:
330·733·8160
330-733-8644
MMD Vendor No.
Team Industrial Services, Inc.
4525 Campbells Run Rd.
Pittsburgh, PA 15205
Email:
Contact:
Cellphone:
Phone:
Fax:
28690
danhoffman.eiint@verizon .net
Dan Hoffman
Quality Inspection Services, Inc.
37 Franklin St., Suite 400
Buffalo, NY 14202
Email:
Contact:
Cell phone:
Vendor No.
MMD Vendor No.
JANX
PO. Box 190
Pamna, MI 49269
Email:
Contact:
Cell phone:
UPS Address
mmore@acuren.com
Michael Moore
Engineering and Inspection
International
12370 Jackson Run Rd.
Sugar Grove, PA 16350
Email:
Contact:
Cellphone:
2/7/2011
UPS Address
Vendor No.
Phone:
Fax:
5606
724-228-2155
724228-9874
scottw@teiasi.com
Scott Weiss
MMD Vendor No.
Page 1 of 1
COMPLETION REPORT
HEADER SHEET
Workflow
Project t.D.
Dept. t.D.
Activny t.D.
Rev: 0111112012
Company ______________
Facility/Street Name
CityNiliagelBorough
Township _________________
CR Clerk
Start Date
Emp tON
-~
Pil(n1lY lrioti~~ Method (I>I<d . """
I"
.'.
State
Contractor Co. Name _________________________
NFG InspectorfCrew Leader
<T.
county _ _____________
In-Service Date _____________________
10 #
Contractor Foreman
Size
Date _ _ _ __ _ _
Reported by ___________________________
Div. Oist. or Field
Ill.
MopN
Ft.
.
A.
'Ft.
..,
,
' ••
FI.
"
.
(decimBllrdl.) Plastic - Nom. Dia., Steel- 0 .0.
PE Matenal ('or PIa"'I/ Grade (ror S~.I
Joint Type (Fused, Coupled, Screw, Welded)
Wall Thickness I SOR
longitudinal Seam Type (Steel Only)
Seamless., ERW, OSAW, CW
Type of Coating & Wrapping
(S~.
0'''1
CP Method (Modo, Rcclitiod)
Pipe Manufacturer Name
Pipe lot # (plastic) I
Serial
# I Heat # (Steel)
Tracer Wire Continuity Check (YIN)
Indicate r88!1Of1 if No.
"'-ret:..t Data
Test.r
:test't'2" .>',
if..tt13
iTett ll4
('il"
TiIoti15
Test Pressure @ (psig)
--
Test Duration (hours)
Test Medium (AIr, Water, Gal, Nillooen, fltc.)
I
Test Date
I
I
I
I
I
I
I
I
I
PU!gl!!g Medium
Plugging Method/Material
Pipe Damaqed on Job
Remarks: Note -list all PFI facilities (e,g, atatlons, valves, drips, etc" below:
CR Approved by: _ _ _ _ _ _ _ _ _ _ _ _ __
Employee ID # _ _ __ __
Sheet
of
Must Be Approved & Signed By Foreman or Above
Prolect Re-authorlz.atlon : Whenever a project will exceed the original approved footage or cost estimate, prior verbal approval is required , followed by
routing the Completion Report for documentation as shown below, (Attach a copy of the original ER.)
Redesign Approval: Dist. Engineer
S 250' or ::;$1 0,000: Olst. Mgr, I Asst. Supt. ___________________
> 250' or >$10,000: Superintendent
> 250' or>$1 0,000: Vice-President
,
COMPLETION REPORT
NOI&: Sk8~ch must eonIe'n a beginning and an ond.,g point with distances from oKisting
facilifes (a.g. pipe break, well, valve, etc.) dearly ahown
NORTH
t
Sheet _
_
of _ __
I
'0
I
ci
~
~
a.
~+-
0
z
~
Department 10:
Station or Line Name:
Project 10 :
Contractor :
X-ray Company:
X-ray Technician(s):
Project Start Date :
Project End Date:
Expiration Oate of Welder Quais.
Location of Fab Shop:
1.
Fabrication Unit #:
2.
Location to be Installed at:
3.
Where Pressure Tested:
4.
Pressure Test Medium:
5.
Min. Test Pressure (psig):
6.
Test Duration (hours)
7.
Note: For all off-site work., a job packet, induding as-built sketches, detailed welding,
x-ray a nd pressure test information is to be sent wit h fabrication to project
8.
manager.
Overall Welded Footage (Sum of Page Total Lengths) :
Inspector Name (Print): _ _ _ _ _ _ _ _ _ _ _ _ __
Signature: ___________________
9-7
Date: _ _ _ _ __
NATIONAL FUEL - WELD LOCATION REPORT
Project Name: _ _ _ _ _ _ _ _ _ _ _ __
Page Total length :,-1_ _
Inspector Name (Print): _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ __
9-7
Daw : ____________
National Fuel
PRESSURE TEST REPORT
Line/Station/Unit Number: _ _ _ _ __ _ __
Project 10:
Pipeline
Location:, _ _ _ _ _ _ _ _ _ __ _ _ __ _ _ _ _ _ _ _ _ _ _ __ _ _ __
Location of Pressure Test Gauge: _ _ _ _ _ _ __ __ _ _ ____ __ __ _ _ __
Weatherconditions: _ _ _ _ _ _ _ _ _ __ _ _ _ _ __ _ _ _ _ _ _ _ _ __ __
CHECK ONE:
0
Pipeline test
D
Fabrication test
Wall Thickness (in.)
Length (fl.)
Pipe Diameter (in .)
Flange rating
Grade
~0
Time and Date Test Started: _ __ _ _ __ __
Recorded Pressure: _ _ __ _
Psig
Time and Date Test Ended:
Recorded Pressure:
Psig
Conducted By: ---,=-:::-:-_--,---::
(NFG Inspector, Contractor Name)
Medium (water/nitrogen/air/gas):
Serial Number: _ _ _ __
Type of Gaugo Used for Recording (circle one): Deadweight or Digital
Detailed Location & Elevation of Recording Gauge: _ _ __ _ _ __ Calibration Date:
_ _ _ _ _ _ _ _ _ ___________ __ _ ___ Elevation (feet): _ __ _
RECORDED READINGS
Time
Pressure
(PsiQ)
Pipe
Temp.
(oFi
Ambient
T~pP.
Time
Fi
Pressure
(Psig)
Pipe
Temp.
(oFi
Ambient
Temp.
(oFi
Pipeline Leaks/Failures: Yes No (circle one) If yes, document on a Potential Safety Related Condition Report.
Comments:
Witness: 1. N.F.G.
2, P.S.C.
_ _ _ __ _ _ _ _ __ _ _,(Inspector or Crew Leader)
_ _ _ _ _ _ _ _ _ _ _ _,(8tate Inspector, if present)
Start test only after pressure and temperature stabilize. Once stabilized, take readings at 15minute intervals for the first hour and at 30-mlnute Intervals thereafter. Please attach a map or
design drawing which clearly shows the pipeline section or fabrication being tested, highlight or
color il to clearly denote section of pipeline or fabrication being tested. For eXisting pipelines, use
the back of this form to document the Incremental build-up In test pressure.
9·9
National Fuel Ga. Supply Corporation
Producer I Interconnect : Pre·Turn On Checktlst
NFG Station No. .
Producer
NFG ProjecllD :
Iinierconnec~,C~c~om~p.~n~Y~N~a~m~9~';~~~~~~~====~;~~~~~~~~~~~~~~~~~~~~~~5
NFG Pipeline Name :
Requested
Init~1 Flowr~.~'.~'---;:========~IMCFD
Requested Flow Date :
Checkbox
Site Requirements :
1 1Commercial Power Installed and Functioning eccOf'ding to NFG Specifications
2) Communications Inslolled to sile according
c : JComplete
to NFG Specifications
C]Complete
3 } Meter, Flow Control , end PSO Run Fabricated, Hydrotested end Installed per NFG SpeclflC8tiona
c:JComplete
4 ) locking Devices Installed on Designated Valves
c:JComplete
5) Site Fenced and Stoned A coording to NfG SpecifICations
c:JcomPlete
6 ) Site Accessible by (2) Wheel Drive Vehicle
c:Jcomplele
7 ) Regulator Set to
PS1G
c : J Com pI9'9
8) Relief Valve Set to
PSIG
c:JComplele
9) Gas Sample Collected by NFG
c:JComplete
10} Producer/Interconnect Company Emergency Phone Number Posted at Site
24 Hour Emergency Phone Number : _ _ _ _ _ _ _ _ __ _
c : J Complete
Emergency Contact (local Supervisor) : _ _ _ _ _ _ _ _ _ __
11 } Piping and Meter Runs have been properly dried by all necessary means to meet tariff requirements
c:JCompk>',
Completion Report Materials (Provided to NFG Foreman at Least 1 Week Prior to Turn-on Request Date)
(Completion Report Material to be approved by NFG Engineer prior to Turn-on)
1 ) Project Sketch I Design {As-build} Drawings
c:JSubmitted
2) Material list
c:JSubmitted
3 ) Purchase Orders
c:JSUbmltted
4 J Certified Mill Test Reports I Malerial Test Reports (All pipe, fittings, valves, ext.)
C]Submitled
5) NFG Welding Procedures
c:JSubmilted
6 ) Wetd Location Report
c:JSubm~led
7 ) Welder(s) Qualifications
c:JSubm~ted
8) X-Ray Inspection Reports
c:JSubmitled
9 ) X-Ray Procedure QualifICations
c:JSubrnittod
10) X-Ray Technicia n Certifications
c:JSubmitted
11 ) Hydrostatic Test Report
c:JSubmilted
12) Hydrostatic Test Chart
L:]Submitied
1 Cay Prior to Turn-on, Produce,', Line will be required to be purged and packed so that 988 Is ready to flow.
Produco, Is Rosponslblo for pipellno quality galS which moela NFG Tarrif upon initial flows.
Producer I Operalor Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Approved Contractor
I Fabricalor Signature :
O.'e, ______
Date: _ _ _ _ _ __
Note : Send NFG Local Producer Meter Request : Producer Turn-On Chocklist to National Fuel
Local Area Foreman (1) Weak Prior to Requested TUrn-on
F:\Eng\Common\1 District Engineering - MJB\Transmission Producer Interconnects - TJMllnterconnects\Documenlalion\NFG Interconnect - Producer PreTurn on ChecklistOB-20-2012 .xls
Revised Date : 812012012
National Fuel Gas Supply Corporalion
Transmission Producer I Interconnect : Station Conformance Report
NFG Station No ..
NFG ProJoct 10 :
I
I
NFG Pipeline Name :
Producer I Interconnect Company Name:
NFG Approved FabrlcatOf(s) I Conlractor(s) :
Producor' Contractor ResponslbllHles
(Inillals)
Material Review
_ _ _ __ - Verify P.O's for all Material
- Verify Material Matches Malerial Ust on NFG Approved Drawlng(s)
- - - --. Verify Material Is from NFG Approved Vendor and Is Oomestlc (Consull NFG Engineer fOf Variances)
. Verify all pipe. flanges, fittings have MTR's
~~~~~ - Verify MTRs meet requirements of Spec listed on NFG Drawing (Consult NFG Engineer for Variances)
- Verify ValYes have proper ANSI fating, Specifications match NFG Drawing . and have Specification Certification
~
- Verify any ASME vessels have proper ratings per NFG Approved Drawi1g(s)
_ _ _ _ _ • Verify all screw pipe and fittings have proper ratings
_ _ _ __ -ldentify any damaged materials
Woldlng
- Verify Welders have up-to-dale NFG Qualifications and Welder Card
- - - - - - Verify Welding Pracedure(s) being used are correct for malerial being used
-=====-
XRAY
Verify NFO Approved X-ray Company
_
- Verify XRAY company aware of NFG Spec 100 Requirements
_ _ _ _ _ - Review Film and Y9rify X-rays meats NFG Spec 100 Requirements
- Ensure the NDE procedure qualification are completed
======-
Verify X-ray Tedmldan Certifications
- Vorlfy All Butt Wolds hove been X-ray's and all fillot wolds have boon Mag Pllrtlcto'd
_
: ==== -
Fabrication Documentation
Complete the NFG Weld Report Form
- Verify actual rabricatlon matches design drawings with detailed :
- Size, Wall Ttickness, Grade of all pipe, fittings, flanges and their locations
- Heat No's, P,O's for all pipe, fittings, nanges and their locations
I
Hydrot"t
_ _ _ _ _ - Verify Hydrolest Pressure and duration on NFG approved drawing(s)
====-
Calibration Documentation for the Tester Used
• Pressure Chart with all proper labeling
:. NFG Pressure Test Sheet p4"operly completed
=
iFabriCatiOn Assembly I Installation
- - - i - -- - Verify Op Quais for all required tasks
====== -
, - Verify Proper Coatings and inslallatlon practices for above and below ground piping
Verify Pipe Supports for underground and above ground piping are proper malerials and in proper localion
:::::
- Verify proper installation and location of gaskels and insulating kits
_ _ _ _ _ - Verify bolts and nuts are properiylnslalled and torqued with minimum of 2-3 tlYeads showing
_ _ _ __ • Verify Meters, Regulators, Check Valves, etc are Installed in the correct direction of flow
- Verify all locking devices are In place per NFG Approved Drawing(s)
_ _ _ _ _ - Verify no damage to any materials
Dale : _ __ _ __
Conlractor Signature:
Interconnect Representative : _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
Dale :_ _ _ _ __
NFG (Minimum) Inspection Requ irements. NFG Local Foreman must be called minimum of (1) week prior for scheduling
1 , Review Material and Verify Welder Qualifications, Welding Procedure, and witness Init ial Welding
NFG Inspector Name : _ _ _ _ _ _ _ _ _ _ __ NFG Inspector Signature : _ _ _ _ _ _ _ __
NFG Inspector Name : _ __ _ _ _ __ _ _ _ _
NFG Inspector Signature : _ _ _ _ __ _ __
2) Verify X-ray Company Is NFG approved and using NFG Spec 100, VIsually Ins pect welda
NFG Inspector Name :
NFG Inspector Signature : _ _ _ _ _ __ _ __
NFG Inspector Name:
NFG Inspector SlgnalUfo : _ _ _ _ _ _ _ _ __
3) Verify Hydrot"t Pressure and Duration, Sign Hydrotost, Comploto NFG Prossure Teat Sheet
NFG Inspector Name :
NFG Inspector Signalure : _ _ _ __ _ _ __
NFG Inspector Name:
NFG Inspector Signature : _ _ _ _ _ _ _ _ __
--=========
Date :
Date:
- --
Data :
- ----
Data :
Date :
Date :
4) Fabrication Assombly - Verify propor assembly, supports In place, and station ready for commlllloning
NFG Inspector Name :
NFG Inspector Name:
NFG Inspector Signature:
NFG Inspector Signature: _
- --
---
Dale :
Date :
F:\Eng\Common\1 Dislrict Engineering - MJB\Transmission Producer Interconnects - TJM\!nlerconnects\Oocumenlallon\NFG Interconnect - Producer
QA_QC Inspection Cheddlslxls
Revised Dale : 8/2012012