INDUSTRIAL CONTRACTOR, S de RL de CV Installing the progress of Mexico and the world Rigging, installation & plant relocation experts Members of: www.ftindustrial.com.mx Objective F&T Industrial main objective is to provide the industry with the best quality in equipment installation, relocation and fabrication. From its opening F & T Industrial has gained a reputation as leading in the industry as an equipment installer, relocator and steel fabricator as well as logistics and transportation services. INDUSTRIAL CONTRACTOR, S de RL de CV 1 Principles & Philosophy F&T Industrial success is based in three principles: 1 People are the source of quality. With our staff of professional and self performing capabilities, we are prepared to organize, menage and complete every aspect of your project. 2 Continuous improvement. Since it´s begining, F&T has been providing equipment installation, export packaging transportation and steel fabrication for a wide range of commercial, institutional and industrial customers. Mantaining as an industrial leader throughout time. This maybe only acquired with a continous improvement philosophy. 3 The mission of F&T Industrial is to meet and satisfy our customer needs. F&T Industrial makes it possible to relocate an entire manufacturing operation, or transport and install new equipment all over the world, wich allow us to provide quality world at competitive prices. F & T Industrial has a team with more than 15 years of experience in the field; being professional trained and capable to take the challenge and resolve any aspect needed for an industrial project. F&T Industrial personnel philosophy is defined in 4 words: Reputation, Commitment, Experience and Satisfaction. Every word is an important link, strong enough to stand on its own, although it becomes stronger when they work together to form the integrity of the company. INDUSTRIAL CONTRACTOR, S de RL de CV Reputation Commitment Experience Satisfaction 2 Services F&T Industrial specializes in machinery moving & complete industrial plant relocations, providing the safest & most professional services. we offer you: • Complete "Turn-Key" plant relocations • New Machinery installation • Machinery moving • Heavy rigging • Press erection • Millwright services • Domestic and export crating • Electrical • Pipe-fitting • Heavy hauling • Steel Fabrication • Civil work INDUSTRIAL CONTRACTOR, S de RL de CV 3 Equipment To carry out task of installation, relocations and transportation equipment, F&T Industrial has equipment that ensures efficiency and accuracy in tasks performed. • 300 ton Power Tower Gantry. • Forklifts from 3 to 40 ton with boom lifter. • Industrial carry deck cranes. • Man lifts. • Scissor lifts. • Trucks & all necessary tools. INDUSTRIAL CONTRACTOR, S de RL de CV 4 Projects F & T Industrial born in Mexico, developing experience in automotive industry, construction, food, glass, plastic, etc. Realizing works for the following companies: Rexam Beverage Can Americas, S.A. de C.V. 2011 • Querétaro, Qro. • Relocation of (2) Control panels B1A & D1A. • Relocation of (1) Pin oven as well as their electromechanical drops. • Supply, fabrication and installation of several equipment in different areas as: Body Makers System, Spray System, Necker Machine, IBO Oven, Minster Press, Washer Machine, Decorator Machine, and Light Tester Machine Liberty Steel Products, Inc. 2011 • Saltillo, Coah. • Installation of 30 ton Over head crane. • Download and installation and start up of one 2000 Ton Press. Commercial Vehicle Group, Inc. 2011 • Saltillo, Coah. • Supply and installation of mainline piping to supply compressed air. • Installation of the busway. • Supply and installation drops for auxiliary equipment. • Aligment, leveling and interconection equipment. INDUSTRIAL CONTRACTOR, S de RL de CV Burns & McDonnell Engineering Company, Inc. 2011 • Mexicali, B.C. • Supply and installation of stainless steel pipe and black pipe of different diameters. • Supply and installation of ductwork for air extraction and supply. • Unload and installation of different equipment like heat exchangers, air and water coolers, compressors and the installation of the machines for the new room seasoned. Samsung Electronics México, S.A. de C.V. 2011 • Querétaro, • Alignment and leveling of 4 presses. • Relocation of (1) HWACHEON milling machine as well as electromechanical drops. • Drywall installation in the engine room. Nova Steel, Inc. 2011 • Ramos Arizpe, Coah. • Donwload and installation of one slitter line. • Download and installation of one mill tube line. • Reconditioning of equipment on site. 5 Projects • Supply of skilled labor, equipment and materials for the fabrication of one steel mezzanine, steps, structure, etc. Continental Automotive Mexicana, S.A. de C.V. 2010 • Silao, Gto. • Unload and installation of (16) sixteen CNC (Computer Numerical Control) (12) SW & (4) Weisser. Sonroca, S.A. de C.V. 2010 • Saltillo, Coah. • Load on trucks and transportation for Lazer machine. • Unload and installation of equipment. • Aligment, leveling and anchor equipment. Metecno, S.A. de C.V. 2010 • Querétaro, Qro. • Relocation a line of the fibro cement within the same Metecno facility included disconnecting and reconnecting electrical, pneumatic and mechanical. Emerson Power Systems 2010 • Reynosa, Tamps. • Receipt of machinery and equipment. • Unload and installation of 26´pin expander and 3500 lbs press. INDUSTRIAL CONTRACTOR, S de RL de CV • Aligment, leveling and anchor equipment. Ultra Protection Armoring México 2010 • Saltillo, Coah. • Receipt of machinery and equipment. • Unload and installation of one Cutting Lazer Machine • Aligment, leveling and anchor equipment. ABB Robotics Systems 2010 • Ramos Arizpe, Coah. • Supply of skilled labor, equipment and materials to fabricate (2) dress pack left and right according with the drawings provided by customer; as well as one set of safety guards. • Supply of skilled labor to disassembly and reassembly for accesories in robot area. Narmx Querétaro, S.A. de C.V. 2010 • Querétaro, Qro.· • Civil work: Design and construction of a Pit for the 500 ton Eagle Press. • Mechanic work: Unload and installation of (1) 500 ton Eagle Press and (2) 250 ton Verson Press and electrical interconnection. • Millwright: Design and construction of the Steel Pit Cover for the 500 ton Eagle 6 Projects Press as well as the scrap Shute construction. 2010 • Querétaro, Qro. • Design and construction of a structural mezzanine and cement slab. Windsor & Associates International, S.A. de C.V. 2010 • San José Iturbide, Gto. • Unload and installation of (1) 1000 ton Danly press within the Flex N Gate facility. Red Boxes México, S.A. de C.V. 2010 • León, Gto. • Mechanical disassembly and maneuvers to load on trucks one DURR Washer machine within the VCST facility. Kuehne & Nagel, S.A. de C.V. 2010 • Acapulco, Gro. • Unload and installation of one Control Panel. DR ENC, S.A. de C.V. 2010 • Querétaro, Qro. • Unload and installation of (9) KMC Presses of 200 Ton, (5) KMC Presses of 250 Ton, (2) KMC Presses of 300 Ton, (5) KMC Presses of 400 Ton, (1) KMC Press of 450 Ton, (1) KMC Press of 700 Ton. INDUSTRIAL CONTRACTOR, S de RL de CV • Unload and installation of of (1) LS Mtron Plastic Injection Molding Machine of 450 Ton, LS Mtron Plastic Injection Molding Machine of 550 Ton, (1) LS Mtron Plastic Injection Molding Machine of 650 Ton. • Assembly of (1) Over Head Crane for 20 Ton. CCL Container, S.A de C.V. 2010 • San José Iturbide, Gto. • Unload and installation of three lines G1, G2 & G3 for the production of aluminum cans. Windsor and Associates International, S.A. de C.V. 2009 • Nuevo Laredo, Tamps. • Offloading and installation of (5) Fin press, (4) Hair pin bender, (3) Expander, (1)200 ton press, (3) 250 ton presses, (2) 300 ton presses inside of Rheem Air Conditioning Plant. ThyssenKrupp System Engineering, S.A. de C.V. 2009 • Irapuato, Gto. • Offloading, uncrating and installation of several machinery of the next lines: Pre-assembly, assembly and test line inside of Getrag Transmission Manufacturing Plant. 7 Projects Getrag Transmission Manufacturing, S.A. de C.V. 2009 • Irapuato, Gto. • Offloading and installation of maintenance machinery, washing and materials handling. • Supply materials, manpower and installation of electrical, pneumatic and water drops for the assembly and test lines. Engicom S. de R.L. de C.V. 2009 • Ramos Arizpe, Coah. • Offloading and installation of several machines of the Bearing Cap Scorpion & Coyote Lines. Cambridge Riggers Ltd. 2009 • Querétaro, Qro. • Offloading and installation of (1) 600 ton stamping press and (1) 800 ton stamping press inside of VRK Queretaro Plant. • Offloading and installation of (1) 300 ton stamping press inside of VRK Puebla Plant. • Offloading and installation of 7 stamping presses: (3) 250 ton, (3) 300 ton and (1) 200 ton, inside of Troquelados Queretaro Plant. INDUSTRIAL CONTRACTOR, S de RL de CV • Offloading and installation of (1) 600 ton stamping press, inside of Troquelados Queretaro Plant. Meritor Mexicana S.A de C.V. 2008 • El Marqués, Qro. • Structure and Bridges rehabilitation for two overhead cranes, two for 5 ton & one for 10 ton of capacity. • Supply and installation of two hoist 5 ton & one 10 ton of capacity. • Preventive and maintenance policy of the overhead cranes before mentioned ThyssenKrupp Krause, S.A de C.V. 2008 • Chihuahua, Chih. • Installation of two motors assembly lines & two engine assembly lines in Ford Motor Company Windsor & Associates International S.A. de C.V. 2008 • Querétaro, Qro. • Unload and Installation of "Tube mill line" in new plant Arvin Meritor. 2008 • Silao, Gto. • Unload and Installation of equipment in Deatwyler Rubber Mexico. 8 Projects 2008 • Ciudad de México • Disassembly and Truck load of one Verson Press 400T in Eaton Facility. Logikad 2008 • San Luis Potosí, S.L.P. • Assemble of one KMC Press 800T (Korea Machinery Corp.) in Posco Facility. Kuehne & Nagel, S.A de C.V. 2008 • Ciudad de México • Export Packing and trucks load of two lathes. 2008 • Toluca, Edo. de México. • 850 tons Nagel press installation for Intier Automotive, SA of Magna group. Inergy Automotive Systems México, S.A. de C.V. 2008 • Ramos Arizpe, Coah. • Relocation of several machines. Mahle Componentes de Motor de México, S. de R.L. de C.V. 2008 • Ramos Arizpe, Coah. • Relocation of several machines. Johnson Controls 2008 • Saltillo, Coah. • Isocianato and silicón tanks farm installation, pumps, pipe and fittings supply & installation. INDUSTRIAL CONTRACTOR, S de RL de CV • 8mx10mx3m steel fabrication for mezzanie, #5 and #6 line, foam area. • Complete process equipment installation for líne #5 y #6 foam area. Engicom, S. de R.L. de C.V. 2008 • Ramos Arizpe, Coah. • Offload and Installation of several equipment of the Scorpion Project. FFT México, SA de CV. 2008 • Puebla, Pue. • Identification, disconnection, crating and load trucks of the lines GMT-166/168. 2008 • Ramos Arizpe, Coah. • Unload, Unpacking and Installation of equipment line GMT-166/168 in Magna Stamping Facility. 2008 • Ramos Arizpe, Coah. • Project GMRA 166/168 Lowers, body shop plant, General Motors of Mexico complex Ramos Arizpe. • Materials supply, manufacture and installation of structure for catwalks approximately 120 tons. • Provision, rating and installation of pipe for water of chiller and compressed air, in catwalks. As well as interconnection of pipe of main header to catwalks. 9 Projects 2008 • Ramos Arizpe, Coah. • Provision personnel and supervision, equipmet necessary to performance HHR equipment relocation shotdown, floor line, body shop plant. 2008 • San Luís Potosi,SLP. • Materials supply, manufacture and installation of structure for mezanine, at FAURECIA EXHAUST MEXICANA, SA plant. Phoenix Machinery Movers, Inc. 2008 • Puebla, Pue. • Unload and Installation of one laser cell in Faurecia Facility. Technotrim de México, S. de R.L. de C.V. 2008 • Saltillo, Coah. • Several layout relocations, as well as #3 and #4 line installation for foam area. CCL Container, S.A. de C.V. 2008 • Cuatlitlán, Edo. México. • Disconnection and disassembling of P-8 line at Penetag, Canadá. • Transportation from Canadá to Cuautitlan, Edo. de México. • Unload and installation P-8 line equipment at CCL Container plant. INDUSTRIAL CONTRACTOR, S de RL de CV Inmagusa, S.A. de C.V. 2007 & 2006 • Castaños, Coah. • Anual maintenance as follows: > 4000 tons Danly stamping press. > Whitney 4400 cutting machine. Indiana Tube de México, S.A. de C.V. 2007 • Ramos Arizpe, Coah. • Unload and installation of Folder press, utilities included. Windsor & Associates Internacional, S.A. de C.V. 2007 • Nuevo Laredo, Tamps. • Disconnection, disassembling, wood supply for exportation, load in the trailers of machining complete line in Automotive Components Holding, LLC. 2007 • León, Guanajuato • Unload, set in site, align and leveling of 6 machining stations CVST plant. MPI Internacional, Inc. 2007 • Querétaro, Qro. • Civil works (pit) for press. • Teardown of PTC 1500 tons press in Michigan, USA. • Transportation from Michigan, USA to Querétaro, Qro. 10 Projects • Unload and complete installation of PTC 1500 tons press. Red Boxes Systems de México, S.A. de C.V. 2007 • Querétaro ,Qro. • 800 tons Blow press installation. 2007 • Silao, Gto. • Ajax 1300 tons forge press installation, in American Axle facilities. • Relocation of rectifier machine and work tables, in American Axle facilities. • Relocation Welabrador granules machine, in American Axle facilities. Phoenix Machinery Movers, Inc. 2007 • Matamoros, Tamps. • (2) 1000tons injection presses, in Therma Tru Corporation Puertas y Vidrios, SA facilities. 2007 •San José Iturbide, Gto. • (1) 300tons injection press in Catalina facilities. 2007 • Toluca, Estado de México. • Provision of personnel to CNC machine installation with graphite table. INDUSTRIAL CONTRACTOR, S de RL de CV Mega Empack, S.A. de C.V. 2007 • Querétaro, Qro. • Unload, set at place, align and leveling of (2) injection cell, as well as fabrication of structure for mezanine, electrical substation, eléctrical power drops, air and water drops, for new Crispura and Colgate lines. Contracting México IICC, S. de R.L. de C.V. 2007 • Ramos Arizpe, Coah. • Teardown of existing equipment and unload, unpacking, move final site, installation of new Alfing equipment station #10, Chrysler Engine plant. 2007 • San Luís Potosí, SLP. • Provision of personnel and supervisión to machinery and equipment installation, new body shop plant, GMT-225 project, 2 shift, 12 hours x shift, per 8 weeks. General Motors de México facility. • Provision of personnel and supervisión to MANN-HUMMEL filtration system equipment installation, BP-100 project in new Transmission plant. General Motors of México facility 11 Projects • Material supply, provision of personnel and supervision to steel structure fabrication as supports to coolant pipe main headers and other services. BP100 project, in new Transmission plant. General Motors of México facility. • Material supply, provision of personnel and supervision to steel structure fabrication to load assistance (cranes), plenum mist collector and andon board. BP-200 project, in new transmission plant. General Motors of México facility. • Provision of supervisión to machinery installation, BP-200 project in new transmission plant. General Motors of México facility. KMJ Machinery Movers, Inc. 2007 • Ramos Arizpe, Coah. • 2000 tons Danly stamping press installation, in Martínrea facilities. Centennial Technology, Inc. 2007 • Toluca, Edo. de México. • Provision of mechanical and electrical personnel to assembly and installation of differents parts of injection presses. In Intier Automotive, SA Magna group. INDUSTRIAL CONTRACTOR, S de RL de CV Ube Machinery, Inc. 2007 • Toluca, Edo. de México. • (1)3300 tons, (3)1100 tons, (1)750 tons, (2)2200 tons UBE injection presses installation, in Intier Automotive, SA Magna group. 2007 • Aguascalientes,Ags. • Provision of personnel to repair 850 ton injection press Calsonic plant. 2007 • Zacatecas,Zac. • Provision of personnel to repair 1200 tons injection press. O-I México, S. de R.L. de C.V. 2007 • Tlajomulco de Zúñiga, Jal. • Material supply, fabrication and installation of Mezanine. Machinery and equipment installation. • Supply and installation of main header pipes and drops each equipment, as well as civil works. • Supply and installation of cable tray and wires from electrical substation to main panel. As well as from main panel to each equiment. Rapid Plastic de México, S. de R.L. de C.V. 2007 • Ramos Arizpe, Coah. • Disassembling and load in the trailer, several equipment. 12 Projects Lamosa Recubrimientos, S.A. de C.V. 2006 • Tlaxcala ,Tlax. • BT-500 tons press installation for ceramic floor. INDUSTRIAL CONTRACTOR, S de RL de CV WM Wrigley Jr. Company, & Wrigley México, S. de R.L. de C.V. 2005 • Silao, Gto. • Installation of a complete manufacturing plant for Wrigley’s new facility. • Stainlees steel platform and Mixer #4 installation 13 Contact us @ E-mail José Flores Carmona General Director jflores@ftindustrial.com.mx Félix Treviño Operations Director ftrevino@ftindustrial.com.mx Andrés Arámburo Business Development Manager aaramburo@ftindustrial.com.mx Miguel Saucedo Estimator Manager msaucedo@ftindustrial.com.mx Héctor Saucedo Project Manager hsaucedo@ftindustrial.com.mx Alejandro Treviño Controller atrevino@ftindustrial.com.mx Address: F&T Industrial Contractor, S. de R.L. de C.V. Prol. Irlanda # 711 Priv. de Luxemburgo Saltillo, Coahuila, México. C.P. 25240 Office Location Headquarters Coahuila Bajio Representation Querétaro Phone & Fax Headquarters Phone: +52 (844) 415 2011 Fax: +52 (844) 415 2008 www Bajio Representation Phone & Fax: +52 (442) 148 5922 Nextel ID: 52*300176*9 Website www.ftindustrial.com.mx INDUSTRIAL CONTRACTOR, S de RL de CV 14