SUPPLY AND DELIVERY OF 110VDC BATTERY DISCHARGE TEST EQUIPMENT (BATTERY LOAD BANK) FOR TRANSMISSION SUBSTATION DIVISION TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. TSUB/2016/EN1 PART I TENDER PROCEDURES SECTION 1 INTRODUCTION This Introduction should be read in conjunction with Tender Appendix A [Description / Specification of Goods] set out in Part II, Section 2 of the Tender Documents. Part I, Section 1 Introduction INTRODUCTION PURPOSE The purpose of this tender process is to procure Tender Offers from contractor to supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division. The battery discharge test equipment (battery load bank) is an equipment /instrument designed mainly to check battery capacities. It applies an automatically controlled constant current or power load to the battery, irrespective of changes in battery voltage. This includes detecting the variations in the voltage and the automatically controlling a combination of internal discharge resistor maintain a constant current. BACKGROUND Sarawak Energy is wholly-owned by the State Government of Sarawak and is responsible for the generation, transmission and distribution of electricity to industrial and residential customers within Sarawak. Sarawak Energy has a proud history of more than 70 years of service to Sarawak community and now provides electricity to more than 500,000 account holders. In recent years, Sarawak Energy has made strong progress on an exciting transformation gas and coal to create new opportunities for the Sarawak community. With firm plans for further rapid growth, Sarawak Energy is on track to become the leading producer of renewable energy in South East Asia. program, Sarawak Energy is helping our community reach the goal of becoming a high-income State by 2020. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 1 Part I, Section 1 Introduction COMMERCIAL BASIS FOR TENDER OFFERS Tender Offers shall be submitted in accordance with the requirements set out in the Tender Documents. upported for the supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division. The Contract Price is a lump sum basis. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 2 Part I, Section 1 Introduction DESCRIPTION / SPECIFICATIONS OF GOODS The Goods to be supplied by the Supplier include the following: The successful tenderer shall undertake to include the scope of work as specified in a), b), c), d), e), f) and g) below: a) Supply and delivery 1. Supply and delivery of one (1) unit battery discharge test equipment (battery load bank) complete with all of necessary accessories and flexible test cable (test lead) minimum three (3) meter long for each polarity. 2. The discharge test equipment shall be supply with robust flight/storage case complete with carry handles and lockable catches. 3. To provide the reference list of the test equipment offered. 4. To provide local service support letter. 5. The supply and delivery of the discharge test equipment (battery load bank) shall DDP Transmission Substation Division, HQ, Level 5 South Wing, Manara Sarawak Energy. b) General requirements 1. The discharge test equipment to be used for battery system ranging from 10 to 288VDC that was often encountered in switchgear and similar equipment. 2. The discharge test equipment discharging load capacity shall not less than 110A. 3. The discharge test equipment designed primarily for maintaining the 110VDC battery system. 4. The discharge test equipment shall fully portable, indoor operation, light weight with top carry handle. 5. The discharge test equipment shall able to store nine (9) memories where the settings can be store and factory (standard) setting can be recalled. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 3 Part I, Section 1 Introduction 6. The discharge test equipment shall equip with a self-calibration function. 7. Has the capability to control (shutdown) an external load. 8. Batteries can be 9. 8.1. The discharge test equipment shall able to carry out testing without disconnecting the battery from the equipment it serves (during normal services). 8.2 Discharging can take place at constant current, constant power, constant resistance or accordance with a pre-selected load profile. Easily expandable for larger battery banks. 9.1. The discharge test equipment is expandable by connecting two identical unit of the discharge test equipment to provide higher load current. 9.2. The discharge test equipment shall also expandable by connecting extra load units to provide higher load current. 10. User adjustable alarm and shutdown point to avoid excessive discharge. 10.1. The discharge test equipment shall give an alarm when the discharging drop to a level slightly above the final pre-set limits (voltage, current, power and power profile). 10.2. The discharge test equipment shall able to automatically stop or shutdown the discharging testing should the voltage drop so low that there is a risk for deep discharging the battery. 11. Easily save result to a PC for analysis, report generation and storage. 11.1. The discharge test equipment shall have the facility to store the total voltage curve and the reading taken at the end of the testing. 11.2. The discharge test equipment shall able to transferred the discharging recorded information to the connected device such as computer, printer. 12. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 4 Part I, Section 1 Introduction 12.1. During the test, a builds up a voltage curve on the screen in real time and displays current, voltage and capacity reading using WIN PC software designed for the test set. 12.2. Also able to control the test using the WIN PC software designed for the test set. c) Technical specifications 1. Environments Item 1 Descriptions Application field 2 3 Operating temperature Storage & transport temperature Humidity 4 Specifications The instrument is intended for use in highvoltage substations - - 5% to 95% RH, non-condensing 2. CE-marking item 1 2 Descriptions EMC LVD Specifications 2004/108/EC 2006/95/EC 3. General Item 1 2 3 4 Descriptions Mains voltage Frequency Power consumption (max) Protection 5 6 Display Languages Specifications 240 V AC ±10%. 50Hz 150 W Thermal cut-outs, automatic overload protection LCD Selectable Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 5 Part I, Section 1 Introduction 4. Measurement Item Descriptions Specifications 0.0 2999 A ±(0.5% of reading +0.2 A) 0.1 A 0 270 A Display range 1 Current measurements Basic inaccuracy Resolution 2 Internal current measurement Range Range 3 Input for clamon-ammeter 0 1V Software settable, 0.3 to 19.9 mV/A mV/A - ratio Input impedance 4 5 Voltage measurement Time measurement Basic inaccuracy Display range 0.0 60 V Resolution Display range 0.0 500 V Basic inaccuracy Resolution Basic inaccuracy ±(0.5% of reading +0.1) 0.1 V ±(0.5% of reading +1 V) 0.1 V ±0.1% of reading ±1 digit 5. Load section Item 1 2 3 Descriptions Max. battery voltage Max. current Max. power 4 Load patterns 5 6 7 Current setting Power setting Resistance setting 8 Battery voltage range 9 Stabilization (For internal current measurement) Specifications 288 Volt 110 A 15 kW Constant current, constant power, constant resistance, current or power profile. 0 110.0 A 0 15.00kW 0.1 4 ranges, selected automatically at start of test ±(0.5% of reading + 0.5 A) Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 6 Part I, Section 1 Introduction 6. Inputs, maximal values Item Descriptions 1 External current measurement 2 Start/Stop 4 5 6 7 8 Delay until start Stop delay Battery Voltage sense Serial 9 Alarm Specifications 1 V DC, 300 V DC to ground. Current shut should be connected to the negative side of the battery Closing/opening contact Closing and then opening the contact will start/stop the test set. It is not possible to keep the contact in close position. 200 300 ms 100 200 ms 480 V DC, 500 V DC to ground 480 V DC, 500 V DC to ground < 15 V 250 V DC 0.28 A 28 V DC 8 A 250 V AC 8 A 7. Outputs, maximal values Item 1 2 3 4 Descriptions Start/Stop Extended load bank Serial Alarm Specifications 5 V, 6 mA Relay contact < 15 V Relay contact d) Compliance with specifications 1.1. Notwithstanding any descriptions, drawing or illustration which may have been submitted with the tender, all details other than those shown on the Schedule of Departures will be deemed to be in accordance with the specification and the standard specifications and codes referred to therein. 1.2. Any case of doubts should be referred to the Engineer for his decision. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 7 Part I, Section 1 Introduction e) Inspection and testing 1. General requirement 1.1. The whole of the plant and equipment provided under the contract shall be subjected to inspection and test by the purchaser upon delivery. 1.2. The approval of the results of any such inspection or test shall not prejudice the right of the purchaser to reject the plant if it fails to comply with the specification when tested or to give complete satisfaction in service. 1.3. The costs of all tests including the provision of the necessary test equipment whether on site shall be borne by the contractor and shall be deemed to be included in the contract price and rates. 2. Inspection and testing 2.1. The purchaser shall be entitled at all reasonable times to inspect/examine and test on of all the items supplied. The successful tenderer shall arrange and provide, at no additional cost, testing sessions and the facilities associated with the testing. 2.2. If any equipment is found defective or inferior in quality of differ in form of material to those as quoted in the contract, this item may rejected. The supplier shall at his own expenses and within the time for delivery specified in the contract to replace or make good to the satisfaction of the purchaser. 2.3. The supplier shall notify the purchaser 15 days in advance of the date on which any of the equipment will be ready for inspection. 2.4. Shipment can only be effected upon the consent and authorization of the purchaser and such consent shall not release the contractor from any liabilities to make good any defect or to replace any part that may fail for a warranty period of one (1) year commencing from the date of commissioning. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 8 Part I, Section 1 Introduction 3. Site Test and Commissioning 3.1. On completion of the work, prior to delivery, all equipment shall be tested to the satisfaction of the engineer to demonstrate that it is entirely suitable for commercial operation. f) Warranty The warranty period for the satisfactory performance of the battery discharge test equipment (battery load bank) shall not less than one (1) year commencing from the date of delivery to Transmission Substation Division, HQ. g) Documentation 1. Tender submission 1.1. Tender submission shall be accompanied by the following documents: i) ii) iii) iv) 1.2. Product reference list. Product catalogue. Local service support letter. Relevant support documents for the supply. Job references/contracts with Syarikat SESCO Berhad or Others user. Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 9 Part I, Section 1 Introduction Sarawak Energy shall provide to the Supplier the following, for the purposes of supplying the Goods: a). b). Site training: I). ISSUANCE OF ELECTRICAL PERMIT TO WORK (EPTW) ii). Authorise and competent person to assist with the training Classroom training i). Classroom ii). Projector or visual aid Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 10 SUPPLY AND DELIVERY OF 110VDC BATTERY DISCHARGE TEST EQUIPMENT (BATTERY LOAD BANK) FOR TRANSMISSION SUBSTATION DIVISION TENDER DOCUMENTS: SARAWAK ENERGY REF. NO. TSUB/2016/EN1 PART I TENDER PROCEDURES SECTION 2 TENDER PARTICULARS These Tender Particulars specify matters particular to this tender process and should be read in conjunction with the Instructions to Tenderers set out in of Part I, Section 3 of the Tender Documents. Part I, Section 2 Tender Particulars Tender Particulars Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division No. Clause Reference Description Details 1. Clause 1.1(c) Closing Date and Time 3:00 pm on 2nd March 2016 2. Clause 1.1(h) Eligibility Requirements UPK Registered (Bumiputra Registered Only) 3. Clause 1.1(u) and Clause 9 Name and designation: Representative Elvin Nanu Engineering Assistant (TSUB) Contact details: Tel (Office) : 082 388 388 ext. 8595 Tel (H/P) : 013 888 6127 Email : elvinnanu@sarawakenergy.com.my 4. Clause 1.1(cc) Tender Validity Period The period commencing from the Closing Date and Time and expiring on the date falling ninety (90) days from the Closing Date and Time 5. Clause 5.1 Tender Briefing Not applicable 6. Clause 6.1 Site Visit Not applicable 7. Clause 25.1 Pricing Method Lump Sum 8. Clause 29.1 Value of Tender Security The value of the Tender Security shall be 2% of the tender sum subject to a minimum of 100,000. 9. Clause 32.1 Copies of Tender Offer The Tenderer shall prepare and submit: (a) one (1) original version; Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 1 Part I, Section 2 Tender Particulars Tender Particulars Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division 10. Clause 33.1(b) and Clause 34.1 Address for submission of Tender Offers Delivery by hand or by courier to: The Chief Executive Officer Sarawak Energy Berhad Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division Tender Box, 8th Floor, Menara Sarawak Energy. No. 1 The Isthmus, 93050 Kuching, Sarawak Malaysia 11. Clause 35.1 Alternative Tender Offers Will not be considered Tender for supply and delivery of 110VDC battery discharge test equipment (battery load bank) for Transmission Substation Division (Sarawak Energy Ref. No. TSUB/2016/EN1) 2