CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE COVER SHEET SHEET NO. 1.00 CADD FILE NO. 0001-COVER SHEET DESCRIPTION SHEET # DESCRIPTION ELECTRICAL PHASE 5 Item # Spec Section 1 01050a Layout of Work and Surveys Item Description Unit CITY & COUNTY of DENVER Estimated Quantity 1 COVER SHEET 46 2 INDEX & QUANTITIES 47 MARKING PHASE 5 2 01505a Mobilization LS 1 3 GENERAL NOTES 48 GEOMETRY PHASE 6 3 01575a Cover Elevated Edge Lights EA 40 4 CONTRACTOR ACCESS 49 PAVING PHASE 6 4 01575b Cover Sign Panels EA 5 5 PROJECT LAYOUT 50 ELECTRICAL PHASE 6 5 01575c Install Shorting Plug on Secondary Isolation Transformer EA 131 6 PHASING DESCRIPTION TABLE 51 MARKING PHASE 6 6 01575d Install Tie Back EA 2 7 HAUL ROUTES - PHASE 1 & 2 52 GEOMETRY PHASE 7 7 01576a Traffic Control LS 1 8 HAUL ROUTES - PHASE 3 & 4 53 PAVING PHASE 7 8 01576b Flagger HR 6,000 9 HAUL ROUTES - PHASE 5 & 6 54 ELECTRICAL PHASE 7 9 01576c Gate Guard HR 1,000 10 HAUL ROUTES - PHASE 7 & 8 55 MARKING PHASE 7 10 P-150a Remove 17-inch Reinforced Concrete Pavement SY 486 11 HAUL ROUTES - PHASE 9 & 10 56 GEOMETRY PHASE 8 11 P-150b Remove 17-inch Non-Reinforced Concrete Pavement SY 10,319 12 HAUL ROUTES - PHASE 11 57 PAVING PHASE 8 12 P-150c Pavement Marking Removal SF 2,400 13 HAUL ROUTE - ALT. FROM GATE 7 TO GATE 5 58 ELECTRICAL PHASE 8 13 P-150d Demolish L-868B Base Can, 22" Length EA 11 14 P-150e Demolish L-868B Base Can, 26" Length EA 3 15 P-150f Remove and Cap Area Drains and Pipe LF 100 16 P-152a Unclassified Excavation, Export Off Site CY 450 17 P-152b DIA Upper Select Fill Borrow Embankment CY 450 18 P-152c Milling Existing Cement Treated Base SY 800 LS 1 14 BARRICADE LAYOUT - PHASE 1 - 4 59 MARKING PHASE 8 15 BARRICADE LAYOUT - PHASE 5 - 8 60 GEOMETRY PHASE 9 16 BARRICADE LAYOUT - PHASE 9 - 11 61 PAVING PHASE 9 17 SAFETY DETAILS / NOTES 62 MARKING PHASE 9 18 EROSION CONTROL DETAILS / NOTES 63 GEOMETRY PHASE 10 19 P-161a Bondbreaker Fabric SY 10,805 19 DEMOLITION DETAILS / NOTES 64 PAVING PHASE 10 20 P-162a Repair Soil Cement Base with CLSM (Flowable Fill) CY 50 20 JOINT DETAILS 65 MARKING PHASE 10 21 P-304a Cement-Treated Base Course (8-Inch) SY 695 21 PAVEMENT DETAILS 66 GEOMETRY PHASE 11 370 22 PAVEMENT REPAIR DETAILS 67 PAVING PHASE 11 23 22 P-401a Bituminous Surface Course (3-inch) TO N DOWEL BAR LAYOUT DETAILS 23 P-401b Bituminous Base Course (7-inch) TO N 864 24 ELECTRICAL DETAILS 1 24 P-403a Asphalt Treated Permeable Base Course (5 - 7 inch) SY 350 25 ELECTRICAL DETAILS 2 25 P-501a Install 17-inch Portland Cement Concrete Pavement, Plain SY 10,319 26 ELECTRICAL DETAILS 3 26 P-501b Install 17-inch Portland Cement Concrete Pavement, Reinforced SY 486 27 MARKING DETAILS 27 P-501c Concrete Blockout EA 5 GEOMETRY PHASE 1 28 P-501d Spall Repair Around Light Can SF 10 29 PAVING PHASE 1 29 P-501e Spall Repair SF 100 30 ELECTRICAL PHASE 1 30 P-501f Full Depth PCC Pavement Repair CY 12 28 31 32 MARKING PHASE 1 GEOMETRY PHASE 2 33 PAVING PHASE 2 34 ELECTRICAL PHASE 2 35 MARKING PHASE 2 36 GEOMETRY PHASE 3 37 PAVING PHASE 3 38 ELECTRICAL PHASE 3 39 MARKING PHASE 3 31 P-610a Repair Cement Treated Base with 1,200 psi concrete CY 100 32 P-620a Pavement Marking SF 6,240 33 D-751c Adjustment of Grate Elevation of Existing 4-Grate Inlet EA 3 DENVER INTERNATIONAL AIRPORT 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION SHEET # ISSUE RECORD NO. BY PURPOSE 1 RBN BID SCALE AS SHOWN DATE 1/23/13 34 L-108a Install Cable, 1/C #8, 19 strand, 5kV, L-824, Type B LF 2,276 35 L-108b Install Cable, 2/C #8, 19 strand, 5000V, L-824, Type B, Temporary Jumper LF 4,110 36 L-110a Install 1-way, 2-inch PVC Concrete Encased Duct LF 20 37 L-110b Remove 1-way, 2-inch PVC Concrete Encased Duct LF 20 WORK BREAKDOWN NO. 38 L-125a Remove,and Reinstall Existing Taxiway Edge Light Fixture EA 36 DESIGN CONTRACT NO. 39 L-125b Install new Transformer, 65 Watt EA 27 CONST. CONTRACT NO. 40 L-125c Install L-868B Base Can, 22" Length EA 11 VOLUME NO. 41 L-125d Install L-868B Base Can, 26" Length EA 3 SHEET TITLE Install New L-852C, Bi-directional,NB, Taxiway Centerline Light on Base Can G/G EA 13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A N/A N/A 201208796 40 GEOMETRY PHASE 4 41 PAVING PHASE 4 42 L-125e 42 ELECTRICAL PHASE 4 43 L-125f Drill Out Existing Light Can Bolt and Rethread Existing Bolt Hole EA 14 43 MARKING PHASE 4 44 L-125g Install New L-852D, Bi-directional,WB, Taxiway Centerline Light on Base Can, Quartz G/G EA 1 44 GEOMETRY PHASE 5 45 L-125h Install New L-852D, Uni-directional,WB, Taxiway Centerline Light on Base Can, Quartz Yellow EA 3 INDEX & QUANTITIES SHEET NO. 2.00 CADD FILE NO. 45 PAVING PHASE 5 DATE CKD 1/23/13 RBN 0002-INDEX QUANTITIES 1. THE TERM "OWNER" AS CONTAINED IN THESE PLANS SHALL REFER TO REPRESENTATIVES OF THE CITY AND COUNTY OF DENVER AS IT PERTAINS TO PROJECTS LOCATED AT DENVER INTERNATIONAL AIRPORT. THE TERM "CCD" IS SYNONYMOUS. 2. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE LATEST STANDARDS AND SPECIFICATIONS OF THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR AND CONTRACTOR'S FIELD CREW SHALL HAVE IN THEIR POSSESSION AT ALL TIMES ONE COPY OF THE PLANS, STANDARDS AND SPECIFICATIONS AS APPROVED BY THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ANY VARIANCE TO THE ABOVE DOCUMENTS. 3. THE CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL APPLICABLE CODES, LICENSES, STANDARDS, SPECIFICATIONS, PERMITS, BONDS, ETC. WHICH ARE NECESSARY TO PERFORM THE WORK. 4. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS AND CODES IN REGARD TO SAFETY, NOISE CONTROL, EROSION CONTROL, WATERSHED PROTECTION, AND EMISSIONS DURING CONSTRUCTION. 5. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, AND STATE TRAFFIC REGULATIONS CONCERNING THE USE OF STREETS AND ROADWAYS FOR HAULING. ANY DAMAGE DONE TO THE ROADWAYS DUE TO THE CONTRACTOR'S EQUIPMENT OR HAULING OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR, TO THE OWNER'S SATISFACTION, AT NO COST TO THE OWNER. CONTRACTOR SHALL MAINTAIN CLEANLINESS OF ALL AFFECTED STREETS AND ROADWAYS TO THE OWNER'S SATISFACTION. 6. THE CONTRACTOR'S PROJECT SUPERINTENDENT SHALL HAVE CONTROL OVER THE CONTRACTOR'S WORK FORCE AND THE KNOWLEDGE AND AUTHORITY TO IMPLEMENT ANY ACTIONS REQUIRED TO ENSURE COMPLIANCE WITH THE PLANS AND SPECIFICATIONS AND QUALITY CONTROL PROGRAM. 7. THE CONTRACTOR SHALL INSTALL AND MAINTAIN CONTRACTOR PROVIDED TRAFFIC CONTROL DEVICES DURING CONSTRUCTION IN ACCORDANCE WITH THE PLANS AND ALL STATE, COUNTY, AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL CONTACT THE OWNER 48 HOURS PRIOR TO ANY ROAD CLOSURES AND 24 HOURS FOR AIRFIELD CLOSURE REQUESTS. 8. THE CONTRACTOR SHALL DISCONTINUE OPERATIONS THAT VIOLATE EXISTING LAWS AND REGULATIONS OR CREATE AN UNDUE HAZARD TO AIR TRAFFIC. 9. THE RULES, REGULATIONS, AND REFERENCE SPECIFICATIONS ENUMERATED HEREIN SHALL BE CONSIDERED TO BE MINIMUM REQUIREMENTS. 10. THE CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION CONFERENCE PRIOR TO BEGINNING WORK TO COORDINATE WORK PROCEDURES WITH ALL INTERESTED PARTIES. THE CONTRACTOR SHALL ALSO ATTEND ALL JOB MEETINGS CALLED BY THE OWNER. 11. THE CONTRACTOR'S EMPLOYEE'S VEHICLES SHALL BE PARKED IN DESIGNATED AREAS. 12. CONSTRUCTION EQUIPMENT AND MATERIALS SHALL BE STORED IN DESIGNATED AREAS. 13. THE CONTRACTOR SHALL PROVIDE THE OWNER AND ITS REPRESENTATIVES ACCESS TO THE CONSTRUCTION WORK AREA AT ALL TIMES. 14. IF APPROVED TO WORK DURING HOURS OF DARKNESS, THE CONTRACTOR IS REQUIRED TO PROVIDE ADEQUATE LIGHTING TO CONDUCT CONSTRUCTION ACTIVITIES. ADDITIONAL LIGHTING IF REQUIRED IS CONSIDERED INCIDENTAL. 15. ALL WORK SHALL CONFORM TO THE MANUFACTURERS RECOMMENDATIONS AND INDUSTRY STANDARDS. 16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE OWNER AT LEAST 48 HOURS PRIOR TO START OF ANY CONSTRUCTION. IF WORK IS SUSPENDED FOR ANY PERIOD OF TIME AFTER INITIAL STARTUP, THE CONTRACTOR SHALL NOTIFY THE OWNER 48 HOURS PRIOR TO RESTART. 17. THE CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL BE SUBMITTED AND APPROVED BY THE OWNER BEFORE WORK COMMENCES. 18. THE CONTRACTOR IS ADVISED THAT OTHER CONSTRUCTION MAY BE IN PROGRESS DURING ALL OR PART OF THIS PROJECT. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHER CONTRACTORS, INCLUDING CITY AND COUNTY OF DENVER PERSONNEL. 19. NO ADJUSTMENT FOR ADDITIONAL COMPENSATION AND TIME WILL BE MADE FOR TIME LOST IN WORK AREAS DUE TO NON-ROUTINE AIRCRAFT TRAFFIC AND INCIDENTS. 20. AIRPORT RUNWAYS, TAXIWAYS, AND GATES, SHOULD REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. 21. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF PUBLIC UTILITIES SHALL BE PERFORMED ACCORDING TO THE REQUIREMENTS OF THESE AGENCIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED CONSTRUCTION PRIOR TO PROCEEDING WITH CONSTRUCTION. THE CONTRACTOR SHALL PROTECT, AT HIS OWN EXPENSE, ALL EXISTING UTILITIES AND BE RESPONSIBLE FOR THEIR REPAIR IF THEY ARE DAMAGED DURING CONSTRUCTION. 22. ALL KNOWN EXISTING UTILITIES ARE SHOWN IN APPROXIMATE LOCATION ON THE PLANS. THE ACTUAL LOCATION MAY VARY FROM THE PLANS, ESPECIALLY IN THE CASE OF UNDERGROUND UTILITIES. WHENEVER CONTRACTOR DISCOVERS A DISCREPANCY IN LOCATIONS, HE SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY. 23. ANY CONSTRUCTION DEBRIS, MUD, OR SLURRY DROPPED INTO MANHOLES, INLETS, OR PIPES SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE OWNER, AIRPORT OPERATIONS, AND D.I.A. ENVIRONMENTAL SERVICES SECTION SHALL BE NOTIFIED IMMEDIATELY AS WELL. CONSTRUCTION DEBRIS INCLUDING MUD AND SLURRY THAT IS TRACKED OUTSIDE DESIGNATED WORK AREAS SHALL BE REMOVED IMMEDIATELY BY THE CONTRACTOR. THE OWNER SHALL BE NOTIFIED PRIOR TO CLEANING THE TRACKED DEBRIS. CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT AREAS REQUIRING CLEANUP WILL BE TO THE SATISFACTION OF THE OWNER AND AT NO ADDITIONAL COST TO THE PROJECT. 24. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS AT AND ADJACENT TO THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN, OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 25. ANY DAMAGE TO EXISTING PAVEMENTS NOT TO BE REPLACED UNDER THIS CONTRACT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR PROMPTLY AT NO ADDITIONAL COST TO THE OWNER. REPAIR METHODS SHALL BE APPROVED BY THE OWNER PRIOR TO ACTUAL REPAIR. 26. THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN THE CONSTRUCTION WORK AREA FREE OF TRASH. ALL TRASH SHALL BE TOTALLY REMOVED FROM THE WORK AREA BEFORE THE END OF EACH WORK PERIOD. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AT LEAST ONE COVERED DISPOSAL SITE FOR TRASH DISPOSAL AT AN APPROVED LOCATION. NO ONSITE BURNING OF TRASH IS PERMITTED. 27. THE CONTRACTOR SHALL RESTORE ALL GRASSED AND PAVED AREAS USED FOR HAUL ROADS, SLURRY PITS, OR STAGING AREAS TO THEIR ORIGINAL CONDITION, INCLUDING THE ESTABLISHMENT OF TURF WHERE REQUIRED. NO DIRECT MEASUREMENT OR PAYMENT WILL BE MADE FOR THE CONSTRUCTION, MAINTENANCE, RESTORATION, OR REPAIR TO SAID AREAS. 28. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL CLEAN AND RESTORE THE CONSTRUCTION WORK AREA. ALL RUBBISH, SLURRY WASTE, AND OTHER MATERIALS SHALL BE DISPOSED OF OFF AIRPORT PROPERTY IN ACCORDANCE WITH ALL CURRENT CITY, COUNTY, STATE, AND FEDERAL REGULATIONS AT THE CONTRACTOR'S DISCRETION AND EXPENSE. THE CONTRACTOR SHALL RESTORE ALL AREAS TO THEIR PRE-CONSTRUCTION CONDITION. IN AREAS WHERE A DAILY CLOSURE EXISTS, THE CONTRACTOR MUST ABIDE BY THESE CONSTRAINTS AS WELL. 29. THE CONTRACTOR SHALL CONDUCT FINAL VACUUM CLEANING OF AFFECTED AIRPORT PAVEMENTS, TO THE OWNER'S SATISFACTION, PRIOR TO REOPENING THE PAVEMENTS TO AIRCRAFT AND VEHICLE TRAFFIC. IN AREAS WHERE A DAILY CLOSURE EXISTS, THE CONTRACTOR MUST ABIDE BY THESE CONSTRAINTS AS WELL. THE SWEEPER/VACUUM VEHICLE SHALL BE IN 100% WORKING ORDER AND CAPABLE OF CLEANING BOTH WET AND DRY PAVEMENTS. 30. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNER AND ENGINEER OF ANY PROBLEM IN CONFORMING TO THE APPROVED PLANS FOR ANY ELEMENT OF THE PROPOSED IMPROVEMENTS PRIOR TO ITS CONSTRUCTION. 31. NO FIELD CHANGES OR DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE MADE WITHOUT THE PRIOR APPROVAL OF THE 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION GENERAL NOTES: CITY AND COUNTY OF DENVER PROJECT MANAGER. 32. THE QUALITY CONTROL PROGRAM SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DEVELOP IN ACCORDANCE WITH ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN INDIVIDUAL SPECIFICATIONS AND TO BE APPROVED BY THE OWNER BEFORE WORK COMMENCES. 33. RETEST OF ANY FAILING QUALITY ASSURANCE TESTS CONDUCTED BY THE OWNER SHALL BE AT THE CONTRACTOR'S EXPENSE. 34. THE CONTRACTOR SHALL SAWCUT EXISTING PAVEMENTS AT ALL AREAS WHERE NEW PAVEMENT ABUTS EXISTING PAVEMENTS, UNLESS OTHERWISE NOTED ON THE PLANS OR DETAILS. ALL SAWCUTS SHALL BE MARKED BY THE CONTRACTOR AND APPROVED BY THE OWNER PRIOR TO CUTTING. 35. ONLY RUBBER TIRED VEHICLES SHALL BE ALLOWED ON EXISTING PAVEMENT NOT TO BE REPLACE UNDER THIS CONTRACT. 36. ANY AREAS TO BE RE-STRIPED SHALL MATCH CURRENT STRIPING PATTERNS. SCALE AS SHOWN 37. THE CONTRACTOR IS RESPONSIBLE FOR REPLACING ANY DAMAGE CAUSED BY THE CONTRACTOR TO ANY PAVEMENT SENSOR OR DATE 1/23/13 PAVEMENT UTILITY. DRAWN BY: 38. ENVIRONMENTAL TESTING WILL BE REQUIRED FOR SLURRY DISPOSAL SITES AND TO BE INCLUDED IN MOBILIZATION COSTS AND SHALL RBN CHECKED BY: INCLUDE PRE AND POST SOIL SAMPLING FOR pH, METALS, TPH AND/OR ADDITIONAL REQUIREMENTS UNDER CCD ENVIRONMENTAL DIRECTION. SAMPLING SHALL BE DONE PRIOR TO SLURRY PIT CREATION AND UPON WORK COMPLETION. A SOIL SAMPLING PLAN SHALL RBN FAA AIP NO: N/A BE SUBMITTED TO CCD FOR APPROVAL. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE SAMPLING WORK BREAKDOWN NO. AND REMEDIATION OF THE SLURRY PITS. DESIGN CONTRACT NO. 39. ALL CONTRACTOR VEHICLES SHALL HAVE A FLASHING AMBER BEACON LOCATED ON THE TALLEST POINT OF THE VEHICLE. SAID N/A N/A CONST. CONTRACT NO. 201208796 BEACON SHALL BE VISIBLE FOR 360 DEGREES AROUND THE VEHICLE. 40. ALL FLAGGERS SHALL BE CERTIFIED BY THE CDOT FLAGGER CERTIFICATION PROGRAM. INFORMATION ON THIS PROGRAM MAY BE FOUND AT www.dot_cdot_flagger@state.co.us OR BY CALLING 303-757-9662. VOLUME NO. SHEET TITLE GENERAL NOTES SHEET NO. 3.00 CADD FILE NO. 0003-GENERAL NOTES CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CONTRACTOR AOA ACCESS GATE G5 VANDRIVER ST. 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION SHADY GROVE ST. E 80th. AVE. TO I-70 PENA BLVD. E 75th. AVE. 75th. CIR. JACKSON GAP ST. E 74st. AVE. ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN 35L CONTRACTOR STAGING AREA SOUTH CONCRETE DISPOSAL SITE CONTRACTOR AOA ACCESS GATE G7 SCALE AS SHOWN DATE E 71st. AVE. 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE CONTRACTOR ACCESS N SHEET NO. 4.00 1000 CADD FILE NO. 0 2000 0004-CONTRACTOR ACCESS CITY & COUNTY of DENVER CONCOURSE C OAK HILL STREET DENVER INTERNATIONAL AIRPORT VSR PHASE 9 MILESTONE 4 VSR PHASE 10 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONCOURSE B VANDRIVER STREET MILESTONE 5 TAXIWAY L TAXIWAY M VSR MILESTONE 3 PHASE 8 PHASE 7 VSR ISSUE RECORD NO. BY PURPOSE 1 RBN CONCOURSE A MILESTONE 1 VSR BID DATE CKD 1/23/13 RBN MILESTONE 2 PHASE 2 PHASE 1 PHASE 3 PHASE 4 PHASE 5 PHASE 6 SCALE TO GATE G5 AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A LEGEND PHASE LIMITS MILESTONE LIMITS WORK BREAKDOWN NO. NOTES: MILESTONE 1 90 DAYS PHASE 1 - 5 MILESTONE 2 22 DAYS PHASE 6 MILESTONE 3 PHASE 7, 8 N/A ALL MILESTONES SHALL BE COMPLETED 112 CALENDAR DAYS AFTER NTP. DESIGN CONTRACT NO. PHASE 6 CLOSURE SHALL BE COORDINATED WITH PHASE 2E OF THE RUNWAY 17R-35L COMPLEX PAVEMENT REHAB PROJECT. CONST. CONTRACT NO. N/A 201208796 VOLUME NO. DEMO WORK NEAR GATE AREAS SHALL BE PERFORMED AT NIGHT. 40 DAYS SHEET TITLE PROJECT LAYOUT MILESTONE 4 PHASE 9 15 DAYS N MILESTONE 5 PHASE 10 19 DAYS SHEET NO. 600 MILESTONE 6 5.00 20 DAYS PHASE 11 0 1200 CADD FILE NO. 0005-PROJECT LAYOUT PHASE AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY WORK AREA LOCATION CLOSURE LIMITS CONTRACTOR ACCESS WORK TYPE WORK PERIOD WORK HOURS ESTIMATED WORK DURATION (CALENDAR DAYS) CON-CURRENT PHASES WORK RESTRICTIONS NOTES PROTECTION OF NAVAIDS ADG RESTRICTIONS N/A TW AS REDUCED TO GROUP III, TW AA CLOSED ABEAM A34 - A40 N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 19 7, 8, 9, 10 PHASE 2 -5 CANNOT BE CLOSED N/A GATE G5, VANDRIVER ST, VSR N/A TW AA REDUCED TO GROUP II, TW AS CLOSED ABEAM A40. A40 CLOSED N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 12 7, 8, 9, 10 PHASE 1, 3 -5 CANNOT BE CLOSED N/A GATE G5, VANDRIVER ST, VSR N/A TW AS REDUCED TO GROUP II, TW AA CLOSED ABEAM A40 - A48 N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 22 7, 8, 9, 10 PHASE 1, 2, 4, 5, CANNOT BE CLOSED N/A GATE G5, VANDRIVER ST, VSR N/A TW AS REDUCED TO GROUP III, TW AA CLOSED ABEAM A48 - A50 NORTH - SOUTH VSR RE-ROUTED AROUND CLOSURE PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 12 7, 8, 9, 10 PHASE 1, 2, 3, 5 CANNOT BE CLOSED N/A GATE G5, VANDRIVER ST, VSR N/A TW AS REDUCED TO GROUP III, TW AA CLOSED ABEAM A52 - A64 N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 25 7, 8, 9, 10 PHASE 1-4 CANNOT BE CLOSED N/A GATE G5, VANDRIVER ST, VSR N/A TW AS REDUCED TO GROUP III, TW AA & K INTERSECTION CLOSED N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 22 7, 8, 9, 10 WORK MUST BE PERFORMED IN CONJUNCTION WITH PHASE 2E OF RUNWAY PROJECT N/A GATE G5, VANDRIVER ST, VSR, OAK HILL ST N/A TW H & AN INTERSECTION CLOSED N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 14 1, 2, 3, 4, 5, 6, 9, 10 PHASE 8 CANNOT BE CLOSED N/A TRAFFIC RESTRICTIONS DENVER INTERNATIONAL AIRPORT NORTH = TW AS GROUP III OFA 1 TW AA, WEST OF CENTER CORE SOUTH = NORTH EDGE VSR EAST = ABEAM GATE A40 GATE G5, VANDRIVER ST, VSR CITY & COUNTY of DENVER WEST = ABEAM GATE A34 NORTH = SOUTH EDGE OF VSR SOUTH = TW AA GROUP III TSA 2 TW AS, ABEAM GATE A40 EAST = ABEAM GATE A40 WEST = ABEAM GATE A40 3 TW AA, EAST OF CENTER CORE SOUTH = NORTH EDGE OF SOUTH VSR EAST = ABEAM GATE A48 WEST = ABEAM GATE A40 NORTH = TW AS GROUP III OFA 4 TW AA, ABEAM GATE A48 - A50 SOUTH = NORTH EDGE VSR EAST = ABEAM GATE A50 WEST = ABEAM GATE A48 NORTH = TW AS GROUP III OFA 5 TW AA, ABEAM GATE A52 - A64 SOUTH = NORTH EDGE VSR EAST = ABEAM GATE A64 WEST = ABEAM GATE A 52 NORTH = TW AS GROUP III OFA 6 TW AA & TW K INTERSECTION SOUTH = NORTH EDGE VSR EAST = WEST EDGE OF VANDRIVER ST WEST = 250' WEST IF TW K CENTERLINE NORTH = TW BS GROUP V OFA 7 TW H & TW AN INTERSECTION SOUTH = 155' SOUTH OF TW AN CENTERLINE EAST = WEST EDGE OAK HILL ST. 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION NORTH = TW AS GROUP III TSA ISSUE RECORD NO. BY PURPOSE WEST = 155' WEST OF TW H CENTERLINE 1 RBN BID DATE CKD 1/23/13 RBN NORTH = TW BS GROUP V TSA 8 TW AN & PURPLE LINE INTERSECTION, WEST SIDE OF APRON SOUTH = PURPLE LINE GROUP III OFA EAST = ABEAM GATE A27 GATE G5, VANDRIVER ST, VSR N/A TW BS REDUCED TO GROUP IV, TW AN CLOSED ABEAM A25 - A27 N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 26 1, 2, 3, 4, 5, 6, 9, 10 PHASE 7 CANNOT BE CLOSED N/A GATE G5, VANDRIVER ST, VSR N/A TW CS REDUCED TO GROUP III, PURPLE LINE CLOSED ABEAM C32. C32 CLOSED N/A PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 15 ANY N/A N/A WEST = AS REQUIRED NORTH = SOUTH EDGE OF VSR 9 PURPLE LINE ABEAM GATE C32, SOUTHWEST QUADRANT CONCOURSE C SOUTH = TW CS GROUP III OFA EAST = ABEAM GATE C32 SCALE AS SHOWN DATE WEST = EAST EDGE VSR 1/23/13 DRAWN BY: NORTH = SOUTH EDGE OF VSR 10 INNER HORSESHOE TW ABEAM GATES B81 - B89 SOUTH = TW GROUP III TSA & OFA EAST = ABEAM GATE B89 GATE G5, VANDRIVER ST, VSR N/A TW REDUCED TO GROUP III, REDUCED TO GROUP II ABEAM B81 - B83 RBN CHECKED BY: EAST - WEST VSR REDUCED TO ONE LANE PCCP REMOVE & REPLACE DAY & NIGHT NO RESTRICTIONS 19 ANY N/A N/A N/A WORK BREAKDOWN NO. WEST = EAST EDGE VSR N/A DESIGN CONTRACT NO. NORTH = PLACED AS NEEDED SOUTH = PLACED AS NEEDED 11 DE-ICE PAD WA EAST = PLACED AS NEEDED WEST = PLACED AS NEEDED RBN FAA AIP NO: N/A GATE G5, VANDRIVER ST, VSR N/A N/A N/A ASPHALT PAVEMENT REMOVE & REPLACE CONST. CONTRACT NO. DAY & NIGHT NO RESTRICTIONS 19 ANY N/A N/A 201208796 VOLUME NO. SHEET TITLE PHASE DESCRIPTION SHEET NO. 6.00 CADD FILE NO. 0007-PHASE DESCRIPTION CITY & COUNTY of DENVER VSR DENVER INTERNATIONAL AIRPORT 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TERMINAL TERMINAL HAUL ROUTE ISSUE RECORD NO. BY PURPOSE VANDRIVER ST. VANDRIVER ST. HAUL ROUTE 1 RBN CONTRACTOR AOA ACCESS GATE G5 CONTRACTOR AOA ACCESS GATE G5 BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: PHASE 1 RBN PHASE 2 FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES PHASE 1 -2 N SHEET NO. 600 0 7.00 1200 CADD FILE NO. HAUL ROUTE -1 CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TERMINAL TERMINAL HAUL ROUTE ISSUE RECORD NO. BY PURPOSE VANDRIVER ST. VANDRIVER ST. HAUL ROUTE 1 RBN CONTRACTOR AOA ACCESS GATE G5 CONTRACTOR AOA ACCESS GATE G5 BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: PHASE 3 RBN PHASE 4 FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES PHASE 3 - 4 N SHEET NO. 600 0 8.00 1200 CADD FILE NO. HAUL ROUTE -2 CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TERMINAL TERMINAL HAUL ROUTE ISSUE RECORD NO. BY PURPOSE VANDRIVER ST. VANDRIVER ST. HAUL ROUTE 1 RBN CONTRACTOR AOA ACCESS GATE G5 CONTRACTOR AOA ACCESS GATE G5 BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: PHASE 5 RBN PHASE 6 FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES PHASE 5 - 6 N SHEET NO. 600 0 9.00 1200 CADD FILE NO. HAUL ROUTE -3 CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT PHASE 7 CONCOURSE C CONCOURSE B VSR TERMINAL CONCOURSE A PHASE 8 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION OAK HILL ST. ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE CONTRACTOR AOA ACCESS GATE G5 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES PHASE 7 - 8 HAUL ROUTE SHEET NO. 10.00 600 VANDRIVER ST. CADD FILE NO. 0 1200 HAUL ROUTE - 4 CITY & COUNTY of DENVER OAK HILL ST. CONCOURSE C CONCOURSE B TERMINAL CONCOURSE A PHASE 9 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE 1 RBN DATE CKD 1/23/13 RBN VSR CONTRACTOR AOA ACCESS GATE G5 BID PHASE 10 SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: HAUL ROUTE N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. VANDRIVER ST. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES PHASE 9 - 10 SHEET NO. 11.00 600 CADD FILE NO. 0 1200 HAUL ROUTE - 5 CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT TA X IW AY B4 DE-ICE PAD WA PHASE 11 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TAXIWAY G CONTRACTOR AOA ACCESS GATE G5 CONCOURSE B VSR TERMINAL CONCOURSE A OAK HILL ST. ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: HAUL ROUTE N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A VANDRIVER ST. CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES PHASE 11 SHEET NO. 12.00 600 CADD FILE NO. 0 1200 HAUL ROUTE - 5.1 CARGO APRON E CONTRACTOR AOA ALTERNATE ACCESS GATE G7 DENVER INTERNATIONAL AIRPORT .A th 75 . VE 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION E 71st. AVE. CONTRACTOR STAGING AREA CITY & COUNTY of DENVER CONTRACTOR AOA ACCESS GATE G5 SIGNATURE APRON VANDRIVER ST. ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN ALTERNATE HAUL ROUTE TO GATE G5 SCALE AS SHOWN DATE 1/23/13 35L DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE HAUL ROUTES GATE 7 - 5 SHEET NO. 600 13.00 0 1200 CADD FILE NO. HAUL ROUTE - 6 CITY & COUNTY of DENVER CONCOURSE A CONCOURSE A A30 A32 A36 A34 A40 A38 A42 A48 VSR PED. BRIDGE VSR TAXIWAY AS 93.0' GROUP III OFA LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET A46 A44 TAXIWAY AS LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET 59' GROUP III TSA BEGIN BARRICADES AT N. E. CORNER OF BLDG. TAXIWAY AA 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION A28 DENVER INTERNATIONAL AIRPORT AIRPORT OFFICE BLDG PHASE 1 93.0' GROUP III OFA TAXIWAY AA AIRPORT OFFICE BLDG PHASE 2 CONCOURSE A CONCOURSE A ISSUE RECORD NO. BY PURPOSE 1 RBN A40 A42 A46 A44 A48 A48 VSR VSR TO BE ROUTED AROUND PHASE 4 CLOSURE, SEE PHASE 4 PLAN SHEET TAXIWAY AS A50 A52 A56 A58 A60 BID DATE CKD 1/23/13 RBN A62 VSR TAXIWAY AS SCALE 59' GROUP III TSA 93.0' GROUP III OFA LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET 93.0' GROUP III OFA AS SHOWN LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET DATE 1/23/13 DRAWN BY: RBN CHECKED BY: TAXIWAY AA RBN TAXIWAY AA FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 AIRPORT OFFICE BLDG VOLUME NO. SHEET TITLE BARRICADE LAYOUT PHASE 1 - 4 N SHEET NO. 14.00 200 CADD FILE NO. PHASE 3 PHASE 4 0 400 BARRICADE LAYOUT CITY & COUNTY of DENVER GSE PARKING A62 A62 TAXIWAY AS VSR LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET 93.0' GROUP III OFA TAXIWAY AS LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET 93.0' GROUP III OFA 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION A60 TAXIWAY AS TAXIWAY L A58 TAXIWAY K A56 GSE PARKING A52 AE3 AE3 A50 AE3 A48 AE3 CONCOURSE A DENVER INTERNATIONAL AIRPORT 93.0' GROUP III OFA TAXIWAY AA TAXIWAY AA TAXIWAY AA PHASE 6 TO BE PERFORMED AT SAME TIME AS PHASE 2E OF RUNWAY PROJECT B1W B1W B1W PHASE 6 B1W PHASE 5 B1 B1 B1 B1 GREEN LINE TAXIWAY BS ISSUE RECORD NO. BY PURPOSE 107.0' GROUP V TSA 1 RBN BID DATE CKD 1/23/13 RBN LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET TAXIWAY AN SCALE OAK HILL STREET LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET TAXIWAY BS 160' GROUP V OFA TAXIWAY H TAXIWAY G TAXIWAY F TAXIWAY BS AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: 93.0' GROUP III OFA TAXIWAY AN N/A WORK BREAKDOWN NO. TAXIWAY AN N/A PURPLE LINE DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE N A25 A27 A29 A31 BARRICADE LAYOUT PHASE 5 - 8 A5 15.00 200 A4W A4W A4W A5 A5 SHEET NO. CADD FILE NO. PHASE 7 PHASE 8 0 400 BARRICADE LAYOUT 2 CONCOURSE C CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT C32 C34 C36 LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END, SEE SAFETY DETAIL SHEET C36 VSR STOP VSR C38 C40 STOP CTC RAMP HOLD HOLD C38 PURPLE LINE CONCOURSE B B81 B83 B85 B87 B89 CTC RAMP HOLD HOLD 93.0' GROUP III OFA 59' GROUP III TSA B91 93.0' GROUP III OFA TAXIWAY K TAXIWAY CS 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION C30 VANDRIVER STREET C28 CONCOURSE B PHASE 9 PHASE 10 TAXIWAY WA ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN LOW PROFILE AIRCRAFT BARRICADES PLACED END-TO-END OUTSIDE MOVEMENT AREA WA6 WA5W WA5 WA4 WA3W WA3 SCALE AS SHOWN DATE GLYCOL FILL STATION DE-ICE PAD WA 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. WA6 WA5W WA5 WA4 WA3W N/A B4 WA3 W AY DESIGN CONTRACT NO. TA XI N/A CONST. CONTRACT NO. 201208796 VOLUME NO. A3 W W A3 A5 W A4 W W W A5 W TAXIWAY G W A6 SHEET TITLE BARRICADE LAYOUT PHASE 9 - 11 N VS R SHEET NO. PHASE 11 200 0 16.00 400 CADD FILE NO. BARRICADE LAYOUT 3 CITY & COUNTY of DENVER TUBING ENDS OPEN DENVER INTERNATIONAL AIRPORT 3" MIN/ 6" MAX RED FLASHING BATTERY OPERATED LIGHT SAFETY ORANGE 36" HEAVY DUTY REFLECTOR TAPE (WHITE) 48" HEAVY DUTY REFLECTOR TAPE (WHITE) STABILIZE DELINEATOR BASE WITH SAND BAGS SAFETY ORANGE NTS NTS NTS NTS TEMPORARY ELECTRICAL JUMPER, WHERE NEEDED. SAFETY ORANGE BACKGROUND WITH BLACK LETTERS STABILIZE SIGN BASE WITH SAND BAGS 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION EXISTING EDGE LIGHT ISSUE RECORD NO. BY PURPOSE 1 RBN NTS NTS BID DATE CKD 1/23/13 RBN NTS SCALE AS SHOWN NTS DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE SAFETY DETAILS SHEET NO. 17.00 CADD FILE NO. 0008-SAFETY DETAILS EROSION CONTROL NOTES (CITY AND COUNTY OF DENVER): 1. THE CONTRACTOR SHALL REMOVE ALL SEDIMENT, MUD, CONSTRUCTION DEBRIS, OR OTHER POTENTIAL POLLUTANTS THAT MAY HAVE BEEN DISCHARGED TO OR, ACCUMULATE IN, THE FLOWLINES, STORM DRAINAGE APPURTENANCES, AND PUBLIC RIGHTS OF WAYS OF THE CITY AND COUNTY OF DENVER AS A RESULT OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THIS SITE DEVELOPMENT OR CONSTRUCTION PROJECT. SAID REMOVAL SHALL BE CONDUCTED IN A TIMELY MANNER. 2. THE CONTRACTOR SHALL PREVENT SEDIMENT, DEBRIS AND ALL OTHER POLLUTANTS FROM ENTERING THE STORM SEWER SYSTEM DURING ALL DEMOLITION, EXCAVATION, TRENCHING, BORING, GRADING, OR OTHER CONSTRUCTION OPERATIONS THAT ARE PART OF THIS PROJECT. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR REMEDIATION OF ANY ADVERSE IMPACTS TO THE MUNICIPAL SEPARATE STORM SEWER SYSTEM, RECEIVING WATERS, WATERWAYS, WETLANDS, AND OR OTHER PUBLIC OR PRIVATE PROPERTIES, RESULTING FROM WORK DONE AS PART OF THIS PROJECT. 3. SOIL STABILIZATION MEASURES SHALL BE IMPLEMENTED WITHIN FOURTEEN (14) DAYS FOLLOWING COMPLETION OF GRADING ACTIVITIES. STABILIZATION OF DISTURBED AREAS ADJACENT TO RECEIVING WATERS OR WITH SLOPES 3 TO 1 OR GREATER SHALL BE COMPLETED WITHIN SEVEN (7) DAYS FOLLOWING COMPLETION OF GRADING ACTIVITIES. NOTE: FEDERAL AND STATE REGULATIONS MAY SOON REQUIRE STABILIZATION WITHIN SEVEN (7) DAYS OF COMPLETION OF GRADING ACTIVITIES. IN SUCH CASES, THE SHORTER TIMEFRAME SHALL APPLY TO PROJECTS WITHIN DENVER AS WELL. 4. THE DEVELOPER, GENERAL CONTRACTOR, GRADING CONTRACTOR AND/OR THEIR AUTHORIZED AGENTS SHALL INSURE THAT ALL LOADS OF CUT AND FILL MATERIAL IMPORTED TO OR EXPORTED FROM THIS SITE SHALL BE PROPERLY COVERED TO PREVENT LOSS OF THE MATERIAL DURING TRANSPORT ON PUBLIC RIGHTS OF WAY. (SEC.49-552; REVISED MUNICIPAL CODE) CITY & COUNTY of DENVER INLET SEE JOINT DETAIL DENVER INTERNATIONAL AIRPORT ANY GAP AT JOINT SHALL BE FILLED WITH 1 1/2" CRUSHED ROCK AND WRAPPED WITH ADDITIONAL WIRE MESH SECURED TO ENDS OF REINFORCED ROCK BERM REINFORCED ROCK BERM 12" 12" 5. 6. 1-1/2" CRUSHED ROCK ENCLOSED IN WIRE MESH 10" MIN. SOILS THAT WILL BE STOCKPILED FOR MORE THAN THIRTY (30) DAYS SHALL BE PROTECTED FROM WIND AND WATER EROSION WITHIN FOURTEEN (14) DAYS OF STOCKPILE CONSTRUCTION. STABILIZATION OF STOCKPILES LOCATED WITHIN 100 FEET OF RECEIVING WATERS, OR WITH SLOPES 3 TO 1 OR GREATER SHALL BE COMPLETED WITHIN SEVEN (7) DAYS FOLLOWING STOCKPILE CONSTRUCTION. STABILIZATION AND PROTECTION OF THE STOCKPILE MAY BE ACCOMPLISHED BY ANY OF THE FOLLOWING: MULCHING, TEMPORARY/PERMANENT REVEGETATION OPERATIONS, CHEMICAL SOIL STABILIZER APPLICATION (REQUIRES DENVER PUBLIC WORKS APPROVAL), OR EROSION CONTROL MATTING/GEOTEXTILES. IF STOCKPILES ARE LOCATED WITHIN 100 FEET OF RECEIVING WATERS, A DRAINAGEWAY OR THE SITE PERIMETER, ADDITIONAL SEDIMENT CONTROLS SUCH SHALL BE REQUIRED. FILTERED RUNOFF 2" IN SOIL 0" ON PAVMENT 7. INLET THIS PROJECT. AT A MINIMUM, THE PERMITTEE OR CONTRACTOR SHALL PRODUCE AND RETAIN WEEKLY WRITTEN INSPECTION RECORDS FOR ALL BMPS AND AFTER SIGNIFICANT PRECIPITATION EVENTS. ALL NECESSARY MAINTENANCE AND REPAIR SHALL BE COMPLETED IMMEDIATELY. ADDITIONALLY, STREET SWEEPING IS TO BE COMPLETED BY THE CLOSE OF THE BUSINESS DAY OR (AND) ON AN AS NEEDED BASIS THROUGHOUT THE DAY. 8. WATER USED IN THE CLEANING OF CONCRETE TRUCK DELIVERY CHUTES SHALL BE DISCHARGED INTO A PREDEFINED, CONCRETE WASHOUT AREA ON THE JOB SITE. BERMED CONTAINMENT OR COMMERCIALLY AVAILABLE CONCRETE WASHOUT DEVICES THAT FULLY CONTAIN ALL WASH WATER ARE ACCEPTABLE. WASH WATER DISCHARGED INTO THE CONTAINMENT AREA OR DEVICE SHALL BE ALLOWED TO INFILTRATE, EVAPORATE, AND OR BE DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE REGULATIONS. DRIED CEMENT WASTE IS TO BE REMOVED FROM THE CONTAINMENT AREA AND PROPERLY DISPOSED. SHOULD THE USE OF A PREDEFINED BERMED CONTAINMENT AREA OR APPROVED WASHOUT DEVICE BE TECHNICALLY INFEASIBLE DUE TO THE PROJECT SIZE, OR LACK OF AN AREA WITH A SUITABLE GROUND SURFACE FOR ESTABLISHING CONTAINMENT, PROPER DISPOSAL OF CONCRETE WASHOUT AND WASH WATER AT THE JOB SITE SHALL CONFORM TO THE APPROVED TECHNIQUES AND PRACTICES IDENTIFIED IN THE (SEC.56-102A, C; REVISED MUNICIPAL CODE, CITY AND COUNTY OF DENVER). 9. THE CONTRACTOR SHALL PROTECT ALL STORM SEWER FACILITIES ADJACENT TO ANY LOCATION WHERE PAVEMENT CUTTING OPERATIONS INVOLVING WHEEL CUTTING, SAW CUTTING, OR ABRASIVE WATER JET CUTTING ARE TO TAKE PLACE. THE CONTRACTOR SHALL REMOVE AND PROPERLY DISPOSE OF ANY WATER CONTAMINATED BY WASTE PRODUCTS FROM CUTTING OPERATIONS TO THE STORM SEWER SYSTEM IS PROHIBITED. (SEC.56-102A, C; REVISED MUNICIPAL CODE, CITY AND COUNTY OF DENVER) 10. PAVED AND IMPERVIOUS SURFACES WHICH ARE ADJACENT TO CONSTRUCTION SITES MUST BE SWEPT ON A DAILY BASIS AND AS NEEDED DURING THE DAY WHEN SEDIMENT AND OTHER MATERIALS ARE TRACKED OR DISCHARGED ONTO THEM. EITHER SWEEPING BY HAND OR USE OF STREET SWEEPERS IS ACCEPTABLE. STREET SWEEPERS USING WATER WHILE SWEEPING IS PREFERRED IN ORDER TO MINIMIZE DUST. FLUSHING OFF PAVED SURFACES WITH WATER IS PROHIBITED. (SEC.56-102A, C; REVISED MUNICIPAL CODE, CITY AND COUNTY OF DENVER) INLET PROTECTION INSTALLATION NOTES: 1. CRUSHED ROCK SHALL BE FRACTURED FACE (ALL SIDES) AND SHALL COMPLY WITH GRADATION SHOWN ON THIS SHEET. RECYCLED CONCRETE MEETING THIS GRADATION MAY BE USED. 2. WIRE MESH SHALL BE FABRICATED OF 10 GAUGE WIRE TWISTED INTO A MESH WITH A MAXIMUM OPENING OF 1.0 INCH (COMMONLY TERMED "CHICKEN WIRE"). ROLL WIDTH SHALL BE 48-INCHES. 3. WIRE MESH SHALL BE SECURED USING "HOG RINGS" OR WIRE TIES AT 6-INCH CENTERS ALONG ALL JOINTS AND AT 2-INCH CENTERS ON ENDS OF BERM. 4. REINFORCED ROCK BERM SHALL BE CONSTRUCTED IN ONE PIECE OR SHALL BE CONSTRUCTED USING JOINT DETAIL. INLET PROTECTION MAINTENANCE NOTES: 1. THE CONTRACTOR SHALL INSPECT INLET PROTECTION WEEKLY, DURING AND AFTER ANY STORM EVENT AND MAKE REPAIRS OR CLEAN OUT AS NECESSARY. MORE FREQUENT INSPECTIONS AND REPAIRS SHALL BE REQUIRED DURING WINTER CONDITIONS DUE TO FREEZE/THAW PROBLEMS. 2. SEDIMENT ACCUMULATED UPSTREAM OF INLET PROTECTION SHALL BE REMOVED WHEN THE SEDIMENT DEPTH UPSTREAM OF ROCK BERM IS WITHIN 2-1/2 INCHES OF THE CREST. 3. INLET PROTECTION IS TO REMAIN IN PLACE UNTIL THE UPSTREAM DISTURBED AREA IS STABILIZED AND GRASS COVER IS APPROVED BY THE LOCAL JURISDICTION. 4. WHEN INLET PROTECTION AT AREA INLETS ARE REMOVED, THE DISTURBED AREA SHALL BE DRILL SEEDED AND CRIMP MULCHED OR OTHERWISE STABILIZED IN A MANNER APPROVED BY THE LOCAL JURISDICTION. 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION REQUIRES APPROVAL FROM THE CITY AND COUNTY OF DENVER SWMP REVIEWER OR THE STORMWATER ENFORCEMENT INVESTIGATOR PRIOR TO INSTALLATION. ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN EROSION CONTROL SEQUENCING NOTES: 1. INSTALL ALL VEHICLE TRACKING CONTROL, INLET PROTECTION ON EXISTING INLETS, SEDIMENT CONTROL LOGS AROUND TOPSOIL STOCKPILE LOCATIONS, CONSTRUCTION FENCING, AND SEDIMENT CONTROL LOGS AT THE TOE OF SLOPES PRIOR TO COMMENCING CLEARING AND GRUBBING OPERATIONS. 2. AS FINISHED GRADES ARE COMPLETED, AREAS SHOULD BE SURFACE ROUGHENED WITHIN 48 HOURS. 3. ALL DISTURBED AREAS SHALL BE SEEDED AND HYDRAULIC MULCHED WITHIN 14 DAYS OF COMPLETION OF GRADING. 4. ADDITIONAL EROSION AND SEDIMENT CONTROL BMPS SHALL BE INSTALLED AS NEEDED AND REDLINED ON THE PLANS BY THE SWMP ADMINISTRATOR. SCALE AS SHOWN DATE 1/23/13 BMP MAINTENANCE NOTE: DRAWN BY: RBN CHECKED BY: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES AND OTHER PROTECTIVE MEASURES IDENTIFIED IN THE SWMP MUST BE MAINTAINED IN EFFECTIVE OPERATING CONDITION. PROPER SELECTION AND INSTALLATION OF BMPS AND IMPLEMENTATION OF COMPREHENSIVE INSPECTION AND MAINTENANCE PROCEDURES, IN ACCORDANCE WITH THE SWMP, SHOULD BE ADEQUATE TO MEET THIS CONDITION. BMPS THAT ARE NOT ADEQUATELY MAINTAINED IN ACCORDANCE WITH GOOD ENGINEERING, HYDROLOGIC AND POLLUTION CONTROL PRACTICES, INCLUDING REMOVAL OF COLLECTED SEDIMENT OUTSIDE THE ACCEPTABLE TOLERANCES OF THE BMPS, ARE CONSIDERED TO BE NO LONGER OPERATING EFFECTIVELY AND MUST BE ADDRESSED. RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE EROSION CONTROL DETAILS SHEET NO. 18.00 CADD FILE NO. 0009-EROSION CONTROL CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE DEMOLITION DETAILS SHEET NO. 19.00 CADD FILE NO. 00010-DEMO DETAILS CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE JOINT DETAILS SHEET NO. 20.00 CADD FILE NO. 00011-JOINT DETAILS CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE PAVEMENT DETAILS SHEET NO. 21.00 CADD FILE NO. 00012-PAVEMENT DETAILS CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT EXISTING JOINTS PCCP SLAB EXISTING SPALL SAW CUT A MIN. OF 2" BEYOND AND PARALLEL AND PERPENDICULAR TO EXISTING JOINTS PLAN VIEW SAW CUT FULL DEPTH SAW CUT FULL DEPTH VARIES T/2 EXISTING PCC T NEW PCC EXISTING PCC 1 1/2" x 20" SMOOTH DOWEL ON 18" CENTERS 5/8" TIE BAR, 20" LONG ON 30" CENTERS BOND BREAKER FABRIC EXISTING CTB TO REMAIN. REPAIR AS REQUIRED PRIOR TO PLACING P-501 SECTION VIEW 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION EXISTING SPALL ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN EXISTING JOINT TIE BAR EXISTING SPALL 3" MIN. SCALE AS SHOWN 10" MIN. DATE 1/23/13 DRAWN BY: RBN EXISTING JOINT CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DOWEL / TIE BAR LAYOUT DESIGN CONTRACT NO. N/A NOTES: 1. PAVEMENT SHALL BE REMOVED IN A WAY AS TO NOT DAMAGE THE PAVEMENT TO REMAIN. ANY DAMAGE TO PAVEMENT WHICH IS TO REMAIN SHALL BE REPAIRED AT NO ADDITIONAL COST TO THE OWNER. 2. CONCRETE PAVEMENT SHALL BE REMOVED DOWN TO THE CEMENT TREATED BASE. 3. THE CONTRACTOR SHALL SAW CUT ALONG ALL PAVEMENT TO BE REMOVED. EXISTING DOWEL BARS SHALL BE CUT OFF FLUSH AT THE SAW CUT LIMITS. 4. THE NEW PAVEMENT SHALL MATCH THE ELEVATION AND FINISH OF THE SURROUNDING PAVEMENT. 5. NEW JOINTS SHALL MATCH THE EXISTING JOINT PATTERN. 6. IF REPAIR LIMITS ARE WITHIN 4 FEET OF A JOINT, EXTEND REPAIR TO THAT JOINT. 7. ALL STEEL TO BE EPOXY COATED. CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE PAVMENT REPAIR DETAILS SHEET NO. 22.00 FULL DEPTH PCC PAVEMENT REPAIR CADD FILE NO. 00013-PAVEMENT REPAIRS CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE NOTES: 1. NO DOWEL SHALL BE WITHIN 10" OF EDGE OF PANEL 2. NO DOWEL SHALL BE WITHIN 5 TO 8" OF ANY EXISTING DOWEL 3. VERIFY ALL DOWEL PLACEMENTS PRIOR TO DRILLING DOWEL BAR LAYOUT SHEET NO. 23.00 CADD FILE NO. 00014-DOWEL BAR LAYOUT 1. 3" (TYP) SEE NOTE 3 USE MANUFACTURER RECOMMENDED METHODS TO SHAVE INSULATION L-823 SPLICE KIT. AMERACE SUPER COMPLETE KIT OR APPROVED EQUAL 3" (TYP) SEE NOTE 3 3" (TYP) SEE NOTE 3 2. ONLY THE LAST FIXTURE IN CIRCUIT SHALL BE CONNECTED TO THE RETURN LEAD (WHITE STRIPED CONDUCTOR) OF THE CCR. 3. ALL L-824 CABLES SHALL BE IDENTIFIED WITH A BLACK ON WHITE LAMINATE FACTORY ENGRAVED ID TAG WITH ITS RESPECTIVE CIRCUIT/LOOP NUMBER AT ALL ACCESSIBLE LOCATIONS. ATTACH THE ID TAG 12" FROM THE L-823 CONNECTORS, OR MIDLOOP IF NO CONNECTORS ARE REQUIRED. THE LOOPS SHALL BE IDENTIFIED ON EACH SIDE OF THE L-823 CONNECTORS. 4. ALL BASE CAN AND DUCT BANK COUNTERPOISE CONDUCTORS SHALL BE EXOTHERMICALLY WELDED TO THE EXISTING COUNTERPOISE SYSTEM. 5. BRASS ID MARKER TO BE INSTALLED ON OPPOSITE SIDE OF STRIPING ON SINGLE CIRCUIT FIXTURES. 6. CONTRACTOR SHALL WRAP THE SECONDARY OF THE TRANSFORMER TO FIXTURE LEAD WITH RUBBER AND VINYL TAPE FOR ALL NEW SIGN CONNECTIONS. 3/8" TEXT (TYP) 12" L-824, 1/C #8 (5KV) CABLE L-824, 5KV CABLE 19 STRAND, INSULATION ETHYLENE-PROPYLENE RUBBER NOTES: 1. THE CABLE SHALL BE THOROUGHLY CLEANED PRIOR TO THE INSTALLATION OF THE L-823 CONNECTOR KIT. TYPICAL ID TEXT NTS 2. INSTALLATION OF THE PIN/RECEPTACLE SHALL BE COMPLETED WITH "CRIMPING" TOOL SUPPLIED OR RECOMMENDED BY THE MANUFACTURER AND DESIGNED FOR THIS SPECIFIC PURPOSE. TOP VIEW FINISHED SURFACE +0.00" -1/16" TYPICAL L-824 (5KV) CABLE CONNECTOR DETAIL NTS L-823 SECONDARY, STYLE 7 CONNECTOR, SEE DETAIL 2 1/8" MIN STYLE 7 RECEPTACLE STYLE 1 PLUG L-830 TRANSFORMER L-823 PRIMARY CONNECTOR SECTION L-823 PRIMARY CONNECTOR, STYLE 2 SUPPLY CONDUCTOR BLACK CEMENTITOUS GROUT RETURN CONDUCTOR BLACK WITH WHITE STRIPE NOTE: 1. INSTALL ID MARKERS BY DRILLING IN AFTER CONCRETE HAS SET. WRAP CONNECTION WITH SCOTCH SUPER 88 TAPE 1 1/2" ON EACH SIDE OF JOINT AND 1/2 LAPPED L-823 PRIMARY CONNECTOR DO NOT INSTALL CONNECTOR IN RETURN CABLE UNLESS SHOWN ON THE PLANS OR DIRECTED BY THE RESIDENT ENGINEER. UPDATE THE AS-BUILTS TO SHOW EXACT LOCATION OF THE SPLICES WHERE EXISTING CABLE INTERFACES WITH NEW CABLE. INSTALL NEW CONNECTOR ON EXISTING CABLE. SEE NOTE 2 A/F LIGHTING FIXTURE ID MARKER NTS IN-PAVEMENT FIXTURE SECONDARY CONNECTOR DETAIL * INSTALL SHRINKABLE TUBING OVER CONNECTOR NTS CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT ISSUE RECORD NO. BY PURPOSE NOTES: 1 RBN 1. DO NOT USE HEAT SHRINK TUBING ON THE SECONDARY OF THE L-830 TRANSFORMER WHEN CONNECTED TO AN ELEVATED FIXTURE. COMPLETE UNIT YELLOW BRASS L-823 CONNECTORS SHALL BE INSTALLED ON ALL CABLES, BASE CAN, OR OTHER ACCESSIBLE LOCATIONS EXCEPT AS MODIFIED BELOW: CONNECTORS ARE NOT REQUIRED IN CABLES PASSING THROUGH A LIGHT BASE WITH A FIXTURE AND NOT FEEDING THAT FIXTURE. THESE CABLES SHALL HAVE THE REQUIRED SLACK AND CABLE ID TAGS IN EACH BASE CAN. CONNECTORS ARE REQUIRED IN ALL CABLES IN ALL LIGHT BASE CANS THAT ARE USED ONLY AS PULL-CANS (WITH NO FIXTURES). 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION NOTES: CABLE ID TAG, SEE DETAIL BID DATE CKD 1/23/13 RBN 2. BOLD INFORMATION IS NEW. SCREENED INFORMATION IS EXISTING. 1/2" SQUARE TYPICAL LIGHTING CONNECTION SCHEMATIC IN BASE CAN NTS SCALE AS SHOWN CABLE WITH A T & B TYRAP CAT #TY524MX OR APPROVED EQUAL TOP VIEW DATE 1/23/13 L-852 TWO-CIRCUIT FIXTURE FIXTURE ID TAG FOR TR9SB3 (LEAD-OFF) DRAWN BY: RBN CHECKED BY: RBN LAMINATE ENGRAVED ID TAGS SEE NOTE 5 1/8" FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. 1/4" 3/8" TEXT. SEE NOTE 3. ID PER CIRCUITING PLANS 3/4" WELD ALL AROUND N/A FIXTURE ID TAG FOR TR9SB2 (LEAD-ON) CONST. CONTRACT NO. 201208796 2" VOLUME NO. 1/2" SHEET TITLE TYPICAL L-824 CABLE ID TAG ELECTRICAL DETAILS NTS 1/4" 3/8" SHEET NO. 24.00 SECTION NTS FIXTURE ID NUMBER LOCATION NTS CADD FILE NO. 00015-ELECTRICAL DETAILS 1 CITY & COUNTY of DENVER NOTES: 1. THE TOPS OF BASE CANS SHALL BE SURVEYED TO BE LOCATED A MINIMUM 2 3 8 BELOW THE FINISH SURFACE OF THE P501. SPACER RINGS AND/OR EXTENSION L-823 SECONDARY CONNECTOR KIT, SEE DETAIL L-850A, L-850B, L-850C L-852C, L-852D FIXTURE (STYLE 3) RINGS SHALL BE REQUIRED AND INSTALLED TO AC150/5345-42F OR LATEST. SPACER RING WITH CONCRETE RING, SEE NOTE 1 THE SPACER RING MAY BE REQUIRED TO BE THINNER OR THICKER DEPENDING #3 DEFORMED BAR 19" I.D. 3 PER BASE CAN REQUIRED LOAD RING SHALL BE RESPONSIBLE TO MEASURE AND DETERMINE THE EXACT REQUIRED THICKNESS OF EACH INDIVIDUAL SPACER RING REQUIRED TO PUT THE 3" AIRFIELD LIGHTING FIXTURE AT THE CORRECT ELEVATION, PER FAA #3 DEFORMED BAR 19" I.D. 3 PER BASE CAN REQUIRED AC150/5345-46 LATEST EDITION. THE CONTRACTOR'S BID PRICE SHALL INCLUDE FURNISHING AND INSTALLING ALL SPACER RINGS & CONCRETE PROPERLY SIZE L-830 ISOLATION TRANSFORMER L-823 PRIMARY CONNECTOR KIT, SEE DETAIL DENVER INTERNATIONAL AIRPORT ON BASE CAN INSTALLATION AND PAVING TECHNIQUES. THE CONTRACTOR 3 1/2" L-868B, CLASS I, EPOXY COATED, 12"x22", 24", OR 26" DEEP (NOTES 10 AND 11). NUMBER HUBS AS SHOWN ON PLAN SHEETS (NOTE 12) ANTI-ROTATION BAR (TYP OF 4) " #5 DEFORMED BAR 24" x 5". 6 PER BASE CAN REQUIRED LAMINATE CABLE TAG, SEE DETAIL 22" RINGS. FIXTURE FLANGE RING SHALL HAVE O-RING GASKETED. 2. THE P606 SEALER SHALL FILL THE VOID TO BE FLUSH OF THE TOP EDGE OF THE CONCRETE RING. ANY OVER-POURS SHALL BE REMOVED BY AND AT THE EXTERNAL GROUND LUG NOT TO EXCEED 4'-0" OF SLACK NOT TO EXCEED 4'-0" OF SLACK CONTRACTOR'S EXPENSE. BOND COUNTERPOISE TO REBAR CAGE AND BASE CAN BY APPROVED MECHANICAL MEANS MAINTAIN BASE CAN AZIMUTH OF SLIP-FITTER / RUBBER GROMMET TAXIWAY CENTERLINE. SEE NOTE 13 1.25" MIN 3. ALL BASE CAN INSTALLATION TECHNIQUES, METHODS, MATERIALS, ETC. SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO THE START OF WORK. 4. 2.5" 3" TO PREVENT WATER FROM ENTERING THE STABILIZED SUBGRADE. 5. BEFORE PAVING MAY PROCEED THE CONTRACTOR SHALL DEMONSTRATE TO THE RESIDENT ENGINEER BY SURVEY THAT THE BASE CANS ARE AT THE 5" CORRECT ELEVATION, AZIMUTH AND ROTATION AND THAT THE PROPER CLEARANCE EXISTING BETWEEN THE BASE CAN AND THE PAVING TRAIN, AFTER P610 ANCHOR. PLAN VIEW TYPICAL L-868B BASE CAN REBAR DETAIL FOR ALL L-868B BASE CANS NTS NTS 6. THE FINISHED PAVEMENT SURFACE SHALL BE PROTECTED FROM FOREIGN SUBSTANCES WHICH WOULD CAUSE STAINING I.E. OIL, P605, ETC. THE NTS CONTRACTOR SHALL IMMEDIATELY CLEAN ALL SPILLS AND CORRECT/CLEAN FINISH PCC ANY STAINED SURFACES AT THE CONTRACTORS EXPENSE. 7. USE ACETATE RESISTANT, CONDUCTIVE SEALANT BETWEEN ADAPTER/SPACE RINGS, AND USE BETWEEN ADAPTER/SPACER RING AND BASE CAN. DO NOT INSTALL SEALANT IN BASE CAN BOLT HOLES. 8. THE FIXTURE MOUNTING BOLTS SHALL EXTEND THROUGH THE BASE CAN MOUNTING FLANGE INTO THE BASE CAN 17" PCC 1 2" MIN TO 1 21" MAX. THE BOLTS SHALL HAVE ENOUGH THREAD LENGTH SO THEY DO NOT SHOULDER OUT BEFORE THE FIXTURE IS SECURELY TIGHTENED. THE BOLTS SHALL BE TORQUED PER LIGHT TO BE 0" TO 1/16" BELOW PAVEMENT AT FAR EDGE THE MANUFACTURERS RECOMMENDATIONS. THE BOLTS SHALL BE SUPPLIED #6 AWG B.S.D. CU. COUNTERPOISE WITH CEC LOCK WASHERS. 2" SC 40 PVC LIGHT FIXTURE (STYLE 3) 9. 2.5" NOMINAL, 2" MIN FLANGE WITH CONCRETE RING (USE O-RING BETWEEN FIXTURE AND CONCRETE RING) VEGA CAT. NUMBER 54028Y OR APPROVED EQUAL THE NUMBER OF HUBS FOR A BASE CAN SHALL BE AS SHOWN ON THE PLANS. THE HUBS SHALL BE FACTORY DRILLED PRIOR TO GALVANIZING AND EPOXY 0.25" TO 0.50" COATING. 10. BASE CANS ON EACH SIDE OF THE "B" JOINT SHALL BE 26" DEEP AND ALL CONDUITS ARE 2" MIN, BELOW THE TOP OF CTB. 5.25" 8" CEMENT TREATED BASE COURSE 3" 11. LOCATE, CUT, AND CAP, PVC CONDUIT 12" BEYOND THE EDGE OF THE BASE CAN. MINIMIZE DIGGING OF THE CTB COURSE TO REMAIN IN PLACE. CONDUIT (P-606) SEALANT, SEE NOTE 2 GALVANIZED 1 3/8" SPACER RING, SEE NOTE 1. USE SEALANT BETWEEN SPACER RING(S) AND CONCRETE RING, SEE NOTE 8 6" CUT SHALL BE NEAT, CLEAN, AND PERPENDICULAR TO CONDUIT. P-610 17" PORTLAND CEMENT CONCRETE PAVEMENT 12. ANY DAMAGE TO THE CTB COURSE SHALL BE CORRECTED BY THE 12" STABILIZED SUBGRADE SEE NOTE 9 CONTRACTOR AT THE CONTRACTOR'S EXPENSE. 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CUT CONDUIT LEVEL END BELL COURSE, THE BASE CANS SHALL BE INSTALLED AND THE P610 PLACED SO AS #5 DEFORMED BAR 24" x 5". 6 PER BASE CAN REQUIRED 2" SCH 40 PVC IMMEDIATELY AFTER THE HOLES ARE CORED IN THE CEMENT TREATED BASE 13. MEANS AND METHODS OF REMOVAL WILL DETERMINE CONCRETE REPLACEMENT AMOUNT AND SHALL BE INCIDENTAL TO THE BASE CAN LINE L-868B BASE CAN ITEM. EARTH 14. SHORTING PLUGS ON THE SECONDARIES OF THE TRANSFORMERS OF ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN IN-PAVEMENT FIXTURES, TEMPORARY JUMPERS INSTALLED IN CONDUIT AROUND REMOVAL AREA, AND SIGNS COVERED MAY BE REQUIRED. 15. COUNTERPOISE SHALL BE TESTED PRIOR TO SAW CUT AND AFTER P501 B - SECTION JOINT DETAIL NTS PAVING TO ASSURE THE OHMIC RESISTIVE VALUE DOES NOT INCREASE. 16. WHEN ELECTRICAL JUMPER TIES LIGHTS TOGETHER ON EACH SIDE OF CENTERLINE THE LOW PROFILE BARRICADES SHALL BE CONTINUOUS FOR THE NTS LENGTH OF THE ELECTRICAL JUMPER. 17. IN LIEU OF STAINLESS STEEL BOLTS AND ANTI-SEIZING COMPOUND, THE SEE DETAIL THIS SHEET FIXTURE ID MARKER. FOR INSTALLATION, SEE DETAIL CONTRACTOR CAN INSTALL DUAL COATED BOLTS THAT CONFORM TO FAA FINISHED PCC MIN. 4" ENGINEERING BRIEF 83 OR CURRENT EDITION FOR FIXTURE MOUNTING BOLTS. 18. ALL BASE CAN BOLT REPAIRS SHALL BE DONE BY APPROVED MEANS USING A JIG SUCH AS GARD BASE CAN TOP FLANGE REPAIR KIT OR APPROVED EQUAL. FOR BASE CAN REQUIREMENTS, SEE DETAIL 1 THIS SHEET. FOR REBAR CAGE INSTALLATION, SEE DETAIL 4 THIS SHEET SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN 17" PCC INTERCEPT COUNTERPOISE AT EDGE OF PCCP REMOVAL INSTALL NEW COUNTERPOISE AFTER SUBGRADE PREP & PRIOR TO PLACING NEW PCCP CHECKED BY: RBN #6 AWG B.S.D. CU COUNTERPOISE THE P-610 ANCHOR SHALL NOT ENCROACH ON THE 17" PCC PAVEMENT THICKNESS FAA AIP NO: B - SECTION EXOTHERMIC WELD N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A 1 1/2" CONST. CONTRACT NO. 201208796 VOLUME NO. 10' X 3/4" GROUNDING ROD 6" MIN 12" STABILIZED SUBGRADE SHEET TITLE ELECTRICAL DETAILS SHEET NO. 25.00 TYPICAL INSTALLATION DETAIL FOR IN-PAVEMENT FIXTURE (STYLE 3) WITH L-868B BASE CAN NTS CADD FILE NO. 00017-ELECTRICAL DETAILS 3 CITY & COUNTY of DENVER TRUE TAXIWAY CENTERLINE (TYP) CORE TO REMOVE ALL EXISTING P-606 EPOXY SEALANT, FINISHED WIDTH SHALL BE LESS THAN 1/2" (SEE NOTE 2). PRIOR TO SEALING, THE AREA SHALL BE CLEANED BY SANDBLASTING OR COMPRESSED AIR. CORED LOCATION SHALL BE ROUND AND NEAT PRIOR TO SEALING EXISTING LOCK WASHERS COVER WITH RECESSED BOLTS INSTALL CONDUIT BETWEEN CENTERLINE AND RADIUS NEW LOCK WASHERS DENVER INTERNATIONAL AIRPORT STEEL COVER PLATE WITH RECESSED BOLTS NEW EPOXY COATED FLANGE WITH CONCRETE RING (SEE NOTE 3) EXISTING FLANGE WITH CONCRETE RING FILL WITH P-606 EPOXY SEALANT NOTE: EXISTING 17" PORTLAND CEMENT CONCRETE PAVEMENT EXISTING L-868B BASE CAN EXISTING 17" PORTLAND CEMENT CONCRETE PAVEMENT NEW BOLTS EXISTING L-868B BASE CAN EPOXY REMOVAL DETAIL 1. THE AXIS OF THE BEAM SHALL BE "TOED IN" TO INTERSECT THE CENTERLINE AT A POINT APPROXIMATELY EQUAL TO FOUR TIMES THE SPACING OF LIGHTS (EVERY FOURTH LIGHT) ON THE CURVE PORTION, AND SUCH SPACING SHALL BE MEASURED ALONG THE CHORD OF THE CURVE. CONDUIT INSTALL EPOXY REPAIR DETAIL NTS UNIDIRECTIONAL LIGHT ON SPIRAL CURVE NTS NTS NTS NOTES: 1. PRIOR TO ANY EPOXY SEALANT REPAIR, THE CONTRACTOR SHALL COORDINATE WITH THE DIA PROJECT MANAGER FOR LOCATIONS WHERE EPOXY SEALANT AROUND BASE CANS WILL TAKE PLACE. 2. THE CONTRACTOR SHALL USE A TEMPLATE THAT WILL PROTECT EXISTING PAVEMENT TO REMAIN AND SHALL BE APPROVED BY THE DIA PROJECT MANAGER. 3. EPOXY COATED FLANGE AND SPACER RINGS SHALL BE PROVIDED NEW ON BASE CANS WHERE EPOXY REPAIR TAKES PLACE. NEAREST POINT TO FIXTURE TANGENT TRUE TAXIWAY CENTERLINE SEE EPOXY REMOVAL AND REPAIR DETAIL FINISHED PCC EXISTING L-868 BASE CAN BEAM AXIS, PARALLEL WITH TANGENT (TYP FOR ALL FIXTURES) NOTE: EXISTING 17" PCC 1. THE AXIS OF THE TWO BEAMS SHALL BE ORIENTED PARALLEL TO THE TANGENT OF THE NEAREST POINT OF THE CURVE DESIGNATED AS THE TRUE CENTERLINE OF THE TAXIING PATH. 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION NEW EPOXY COATED SPACER RING (SEE NOTE 3) EXISTING SPACER RING ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN BIDIRECTIONAL LIGHT ON CIRCULAR CURVE EXISTING 8" CEMENT TREATED BASE COURSE EXISTING 12" STABILIZED SUBGRADE NTS SCALE AS SHOWN DATE 1/23/13 EXISTING P-610 CONCRETE DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE ELECTRICAL DETAILS SHEET NO. 26.00 REPAIR OF EPOXY SEALANT AROUND LIGHT CANS NTS CADD FILE NO. 00018-ELECTRICAL DETAILS 4 CITY & COUNTY of DENVER NOTES: ALL TAXIWAY MARKINGS WILL BE PAINTED AVIATION YELLOW, WITH REFLECTIVE MEDIA. MARKINGS WILL BE OUTLINED WITH A 6" WIDE BORDER OF BLACK PAINT, FOR TAXIWAY CENTERLINE MARKINGS ALONG SMGCS ROUTES. PURPLE OR GREEN MARKINGS WILL BE PAINTED IN COMPLIANCE WITH DIA PAINT DEPARTMENT REQUIREMENTS. 2. ALL TAXIWAY CENTERLINE MARKING SHALL MATCH EXISTING LAYOUT. FOR COMPLEX MARKING, CONTRACTOR SHALL LOCATE PAINT BY SURVEYING PRIOR TO CONSTRUCTION. 3. IN PAVEMENT LIGHT FIXTURES SHALL BE COVERED SO THEY ARE PROTECTED FROM BEING PAINTED. PAINT SHALL BE CLEANED FROM ALL LIGHT FIXTURES. 4. NEW PAVEMENT MARKING SHALL EXTEND ONE FULL PANEL ON EITHER SIDE OF REPLACED PCCP, FOR ALL NEW MARKINGS. EXISTING MARKING SHALL BE REMOVED PRIOR TO PLACING NEW MARKINGS. TAXIWAY CENTERLINE LIGHT TAXIWAY CENTERLINE LIGHT EDGE OF TAXIWAY PAVEMENT SHOULDER CURVE MEASURE POINT SOLID BLACK LINE 6" WIDE SOLID YELLOW LINE 12" WIDE NOTE: 1. SOLID BLACK LINE 6" WIDE CURVE MEASURE POINT TAXIWAY DOUBLE YELLOW LINES 6" WIDE SOLID YELLOW LINE 12" WIDE DENVER INTERNATIONAL AIRPORT CURVE MEASURE POINT NOTE: CENTERLINE DIMENSIONS ARE FOR REFERENCE PURPOSES ONLY. CENTERLINE STRIPING SHALL BE MARKED AT 2'-6" FROM CENTER OF MARKING TO CENTER OF CENTERLINE LIGHT. 1. CENTERLINE DIMENSIONS ARE FOR REFERENCE PURPOSES ONLY. CENTERLINE STRIPING SHALL BE MARKED AT 2'-6" FROM CENTER OF MARKING TO CENTER OF CENTERLINE LIGHT. DOUBLE BLACK LINES 6" WIDE TAXIWAY CENTERLINE MARKING DETAIL (NON-SMCGS ROUTE) NTS TAXIWAY CENTERLINE MARKING DETAIL (SMGCS ROUTE) NTS TAXIWAY EDGE (PCC) MARKING DETAIL NTS SOLID YELLOW LINE 6" WIDE SOLID YELLOW LINE 6" WIDE SOLID GREEN LINE 12" WIDE SOLID YELLOW LINE 12" WIDE SOLID PURPLE LINE 12" WIDE 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION 1. ISSUE RECORD NO. BY PURPOSE 1 RBN FOMO MARKING DETAIL NTS GREEN LINE MARKING DETAIL NTS BID DATE CKD 1/23/13 RBN PURPLE LINE MARKING DETAIL NTS SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING DETAILS SHEET NO. 27.00 CADD FILE NO. 00019-MARKING DETAILS CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT A34 A36 VSR A38 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TAXIWAY AS 93.00' 375.00' 59.00' 75.00' 362.80' 32.00' 75.00' TAXIWAY AA 106.51' ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN 725.00' 11.00' SCALE AS SHOWN DATE 1/23/13 TERMINAL DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 1 N SHOULDER PAVING REPAIR SHEET NO. 60 0 28.00 120 CADD FILE NO. PHASE 1 - GEOMETRY CITY & COUNTY of DENVER D F F D F F F F D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT D MATCH EXISTING ELEVATION 125.00' D D 75.00' D D F F ISSUE RECORD NO. BY PURPOSE 25.00' 1 RBN BID DATE CKD 1/23/13 RBN D D L 36.50' 200.00' L SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 1,000 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 32 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 1 N SHEET NO. SHOULDER PAVING REPAIR 60 0 29.00 120 CADD FILE NO. PHASE 1 - PAVING CITY & COUNTY of DENVER REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02579 TAXIWAY AS REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02578 REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02580 J T TAXIWAY AA S S S S 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT T S S T S C T S S S S S S S S S S R R R R R R ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 17 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 4 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 645 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 6 ELECTRICAL PHASE 1 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 464 LF 100 0 30.00 200 CADD FILE NO. PHASE 1 - ELECTRICAL CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT TAXIWAY AS REPLACE 554 SF OF TAXIWAY C/L (SMGCS ROUTE) TAXIWAY AA ISSUE RECORD NO. BY PURPOSE 1 RBN REPLACE 192 SF OF TAXIWAY EDGE MARKING BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 1 N SHEET NO. 60 0 31.00 120 CADD FILE NO. PHASE 1 - MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT CONCOURSE A 50.00' A42 VSR A44 A46 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION A40 100.00' 164.00' 152.16' TAXIWAY AS 18.00' 93.00' ISSUE RECORD NO. BY PURPOSE 59.00' 1 RBN BID DATE CKD 1/23/13 RBN TAXIWAY AA SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 2 N SHEET NO. 60 0 32.00 120 CADD FILE NO. PHASE 2 - GEOMETRY CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT D D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION 25.00' D D F F 100.00' F D D MATCH EXISTING ELEVATION D D ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 278 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 0 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 2 N SHEET NO. 60 0 33.00 120 CADD FILE NO. PHASE 2 - PAVING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT S S S S S T C S T S S S S 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TASC1-02569 S T J ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 11 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 3 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 340 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 0 ELECTRICAL PHASE 2 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 216 LF 60 0 34.00 120 CADD FILE NO. PHASE 2 - ELECTRICAL CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION REPLACE 156 SF OF TAXIWAY C/L (SMGCS ROUTE) TAXIWAY AS TAXIWAY AA ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 2 N SHEET NO. 60 0 35.00 120 CADD FILE NO. PHASE 2 - MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT A40 A42 A44 A46 A48 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION VSR TAXIWAY AS 59.00' 93.00' 16.00' 525.00' 50.00' 59.00' TAXIWAY AA 106.50' ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN 12.50' 11.00' SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 3 N SHOULDER PAVING REPAIR SHEET NO. 60 0 36.00 120 CADD FILE NO. PHASE 3 - GEOMETRY CITY & COUNTY of DENVER D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT D 25.00' D D F MATCH EXISTING ELEVATION 77.00' D F 113.50' 575.00' F D D F F F F F F F F F F F F F F F F F F F F F F ISSUE RECORD NO. BY PURPOSE 1 RBN 25.00' F BID DATE CKD 1/23/13 RBN D L SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 1,881 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP= 32 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 3 N SHEET NO. SHOULDER PAVING REPAIR 60 0 37.00 120 CADD FILE NO. PHASE 3 - PAVING RK NO G IN PA CITY & COUNTY of DENVER REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02570 S S S S S 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT J T S C S S S S S S S S S T S S S S S S ISSUE RECORD NO. BY PURPOSE T 1 RBN BID DATE CKD 1/23/13 RBN R R R R R R R SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 16 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 3 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 820 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 7 ELECTRICAL PHASE 3 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 216 LF 100 0 38.00 200 CADD FILE NO. PHASE 3 - ELECTRICAL CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT TAXIWAY AS REPLACE 1,296 SF OF TAXIWAY C/L (SMGCS ROUTE) TAXIWAY AA ISSUE RECORD NO. BY PURPOSE 1 RBN REPLACE 187 SF OF TAXIWAY EDGE MARKING BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 3 N SHEET NO. 60 0 39.00 120 CADD FILE NO. PHASE 3 - MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT A46 A48 A50 A52 A56 A58 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION VSR PLACE DETOUR SIGN M4-9L, SEE SAFETY DETAIL 93.00' SHEET VSR TAXIWAY AS VSR RELOCATED 73.66' 196.05' 59.00' 12.50' 106.50' 76.07' ISSUE RECORD NO. BY PURPOSE TAXIWAY AA 1 RBN BID DATE CKD 1/23/13 RBN 20.00' 22.50' 262.50' SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 4 N SHEET NO. 60 0 40.00 120 CADD FILE NO. PHASE 4 - GEOMETRY CITY & COUNTY of DENVER D D D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT D MATCH EXISTING ELEVATION 125.00' 75.00' D D F F F F F F ISSUE RECORD NO. BY PURPOSE 1 RBN 25.00' BID DATE CKD 1/23/13 RBN D D 11.50' SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 556 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 0 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 4 N SHEET NO. 60 0 41.00 120 CADD FILE NO. PHASE 4 - PAVING CITY & COUNTY of DENVER S S S S S S S S S S S S S S S S 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT S ISSUE RECORD NO. BY PURPOSE 1 RBN R R BID DATE CKD 1/23/13 RBN R SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 17 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 0 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 0 SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 3 ELECTRICAL PHASE 4 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 0 LF 60 0 42.00 120 CADD FILE NO. PHASE 4 - ELECTRICAL CITY & COUNTY of DENVER REPLACE 328 SF OF TAXIWAY C/L (SMGCS ROUTE) 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT REPLACE 200 SF OF TAXIWAY C/L (SMGCS ROUTE) ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN REPLACE 52 SF OF VSR EDGELINE SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 4 N SHEET NO. 60 0 43.00 120 CADD FILE NO. PHASE 4 - MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT A52 A56 A58 A60 A62 B91 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION VSR TAXIWAY AS 93.00' 725.00' 59.00' 25.00' 32.00' 106.50' TAXIWAY AA ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN 25.00' 22.50' SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 5 N SHEET NO. 60 0 44.00 120 CADD FILE NO. PHASE 5 - GEOMETRY CITY & COUNTY of DENVER D D D D D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT D MATCH EXISTING ELEVATION 125.00' D D F 175.00' D D F F F F F F F F D F F D F F D F 325.00' D D F F F F F F F F F F F F F ISSUE RECORD NO. BY PURPOSE 1 RBN 25.00' F BID DATE CKD 1/23/13 RBN D D 625.00' 25.00' SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 2,181 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 0 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 5 N SHEET NO. 60 0 45.00 120 CADD FILE NO. PHASE 5 - PAVING NG I RK NO NO PA RK PA CITY & COUNTY of DENVER NG I DENVER INTERNATIONAL AIRPORT NG KI NO R PA 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION AE3 AE3 REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02549 REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02548 REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02547 J ISSUE RECORD NO. BY PURPOSE 1 RBN S S S S S S S S S S S S S S S S S S S S BID DATE CKD 1/23/13 RBN S C T T R R T R R T R R R R SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 21 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 4 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 870 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 8 ELECTRICAL PHASE 5 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 464 LF 100 0 46.00 200 CADD FILE NO. PHASE 5 - ELECTRICAL CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT TAXIWAY AS TAXIWAY AA REPLACE 1,402 SF OF TAXIWAY C/L (SMGCS ROUTE) ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 5 N SHEET NO. 60 0 47.00 120 CADD FILE NO. PHASE 5 - MARKING CITY & COUNTY of DENVER TAXIWAY AS TAXIWAY K DENVER INTERNATIONAL AIRPORT VSR 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TAXIWAY AS 93.00' 7.00' 541.98' 50.00' TAXIWAY AA VANDRIVER STREET 151.26' TAXIWAY AA 255.65' 237.12' ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN 166.17' DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 6 N SHEET NO. 60 0 48.00 120 CADD FILE NO. PHASE 6 - GEOMETRY CITY & COUNTY of DENVER D D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT B MATCH EXISTING ELEVATION 251.50' D F D D 52.00' D F F D D F F F F D F F F 25.00' 201.50' F F D F D F ISSUE RECORD NO. BY PURPOSE B 1 RBN 25.00' D BID DATE CKD 1/23/13 RBN D 100.00' F F 23.00' D MATCH EXISTING ELEVATION 75.75' D SCALE D AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 1,465 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 0 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 6 N SHEET NO. 60 0 49.00 120 CADD FILE NO. PHASE 6 - PAVING CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION GSE PARKING AE3 AE3 DENVER INTERNATIONAL AIRPORT REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02532 J S S S S S S S ISSUE RECORD NO. BY PURPOSE S 1 RBN C T BID DATE CKD 1/23/13 RBN T R R T R REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TAAC1-02531 R S R S S S S S R SCALE AS SHOWN R DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 33 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 3 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 665 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 7 ELECTRICAL PHASE 6 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 332 LF 100 0 50.00 200 CADD FILE NO. PHASE 6 - ELECTRICAL CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TAXIWAY K DENVER INTERNATIONAL AIRPORT TAXIWAY AS NON-SMGCS ROUTE REPLACE 613 SF OF TAXIWAY C/L TAXIWAY AA ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SMGCS ROUTE REPLACE 100 SF OF TAXIWAY C/L SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 6 N SHEET NO. 60 0 51.00 120 CADD FILE NO. PHASE 6 - MARKING CITY & COUNTY of DENVER 25.00' TYP. TAXIWAY AN 25.00' TYP. 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION 107.00' OAK HILL STREET DENVER INTERNATIONAL AIRPORT TAXIWAY AN 55.00' 87.50' 25.00' 20.00' 18.75' 75.00' ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN TAXIWAY H VSR SCALE AS SHOWN DATE 1/23/13 DRAWN BY: A5 A5 RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 7 N SHEET NO. 60 0 52.00 120 CADD FILE NO. PHASE 7 GEOMETRY CITY & COUNTY of DENVER TAXIWAY AN D B D D D D F D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION OAK HILL STREET DENVER INTERNATIONAL AIRPORT F F B B D D B ISSUE RECORD NO. BY PURPOSE MATCH EXISTING ELEVATION 1 RBN BID DATE CKD 1/23/13 RBN TAXIWAY H VSR SCALE AS SHOWN DATE 1/23/13 DRAWN BY: A5 A5 RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. NON-REINFORCED PCCP = 320 SY N/A CONST. CONTRACT NO. 201208796 VOLUME NO. REINFORCED PCCP = 0 SY SHEET TITLE B JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 7 N SHEET NO. 60 0 53.00 120 CADD FILE NO. PHASE 7 PAVING CITY & COUNTY of DENVER COVER TW EDGE LIGHTS 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION OAK HILL STREET DENVER INTERNATIONAL AIRPORT TIE BACK T TAXIWAY AN TAXIWAY AN T T REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # THC1-02633 & THC1-02634 T T REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # THC1-02647 1 RBN BID DATE CKD 1/23/13 RBN A5 VSR SCALE AS SHOWN TIE BACK AT FIXTURE # THC1-02601 A4W TAXIWAY H A4W A4W A5 A5 COVER TW EDGE LIGHTS ISSUE RECORD NO. BY PURPOSE DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN T FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 0 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 6 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 0 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 0 N C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 352 LF 100 ELECTRICAL PHASE 7 SHEET NO. 0 54.00 200 CADD FILE NO. PHASE 7 ELECTRICAL CITY & COUNTY of DENVER TAXIWAY AN REPLACE 219 SF TAXIWAY C/L, (NON-SMGCS ROUTE) 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION OAK HILL STREET DENVER INTERNATIONAL AIRPORT TAXIWAY AN TAXIWAY H REPLACE 136 SF TAXIWAY C/L, (SMGCS ROUTE) REPLACE 152 SF TAXIWAY C/L, (SMGCS ROUTE) ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN VSR SCALE AS SHOWN DATE 1/23/13 DRAWN BY: A5 A5 RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 7 N SHEET NO. 60 0 55.00 120 CADD FILE NO. PHASE 7 MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT TAXIWAY BS STORM INLET SDG-02561 107.00' STORM INLET SDG-02560 425.00' 15.00' 175.00' FIXTURE ID # TANC1-02577 25.00' TYP. 224.00' 25.00' TYP. 75.00' 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION STORM INLET SDG-02562 150.00' 322.19' TAXIWAY AN 50.00' FIXTURE ID # TANC1-02584 200.98' 93.00' ISSUE RECORD NO. BY PURPOSE 1 RBN PURPLE LINE BID DATE CKD 1/23/13 RBN SCALE VSR AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 8 N SHEET NO. 100 0 56.00 200 CADD FILE NO. PHASE 8 - GEOMETRY CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT TAXIWAY BS D NOTE: JOINT AROUND STORM INLET TO BE A B TYPE JOINT D D 100.00' D D D F F F D D F D 75.00' D D MATCH EXISTING ELEVATION D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION 25.00' D 25.00' 50.00' TAXIWAY AN D D F 50.00' D D D 250.00' D D F D D D F F F F F F F F 25.00' D D D MATCH EXISTING ELEVATION ISSUE RECORD NO. BY PURPOSE 1 RBN PURPLE LINE BID DATE CKD 1/23/13 RBN SCALE VSR AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCC = 1,320 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 70 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 8 N SHEET NO. 100 0 57.00 200 CADD FILE NO. PHASE 8 - PAVING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT TAXIWAY BS J TAXIWAY AN S S S S S S T C T S S S S S S R S S S T T R S 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION REMOVE & INSTALL NEW LIGHT CAN & FIXTURE # TANC1-02583 R R R ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE VSR AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. S = INSTALL SHORTING PLUG ON SECONDARY ISOLATION TRANSFORMER = 16 N/A DESIGN CONTRACT NO. N/A T = INSTALL NEW 65W TRANSFORMER = 4 CONST. CONTRACT NO. 201208796 VOLUME NO. J = INSTALL TEMPORARY JUMPER IN ORANGE CONDUIT, 2/C #8, 19 STRAND, 5000V, L-824, TYPE B = 770 LF SHEET TITLE R = REMOVE TW EDGE LIGHT AND INSTALL COVER PLATE, REINSTALL TW EDGE LIGHT = 5 ELECTRICAL PHASE 8 N SHEET NO. C = INSTALL CABLE, 1/C #8, 19 STRAND, 5000V, L-824, TYBE B = 232 LF 100 0 58.00 200 CADD FILE NO. PHASE 8 - ELECTRICAL CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION TAXIWAY BS REPLACE 229 SF OF TAXIWAY C/L (SMGCS ROUTE) TAXIWAY AN REPLACE 117 SF OF PURPLE LINE ISSUE RECORD NO. BY PURPOSE 1 RBN PURPLE LINE BID DATE CKD 1/23/13 RBN SCALE VSR AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 8 N SHEET NO. 100 0 59.00 200 CADD FILE NO. PHASE 8 - MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT C30 C28 C34 C32 C36 VSR C3 6 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION 106.34' PURPLE LINE 221.00' 221.00' 30.63' 25.00' FOMO 7.00' ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN 104.52' VSR 93.00' TAXIWAY CS SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 9 N SHEET NO. 60 0 60.00 120 CADD FILE NO. PHASE 9 - GEOMETRY CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT D D PURPLE LINE 50.00' D D D F F 75.00' D F F D D D ISSUE RECORD NO. BY PURPOSE 1 RBN D BID DATE CKD 1/23/13 RBN D MATCH EXISTING ELEVATION TAXIWAY CS SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 417 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 0 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 9 N SHEET NO. 60 0 61.00 120 CADD FILE NO. PHASE 9 - PAVING CITY & COUNTY of DENVER 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION DENVER INTERNATIONAL AIRPORT PURPLE LINE FOMO LINE REPLACE 100 SF OF FOMO LINE ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN TAXIWAY CS SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 9 N SHEET NO. 60 0 62.00 120 CADD FILE NO. PHASE 9 - MARKING VSR REDUCED TO 1 LANE 12 CRJ200 DENVER INTERNATIONAL AIRPORT EMB 120 CRJ700 11.39' VSR STOP 10.38' 22.40' CITY & COUNTY of DENVER 0 B EM 15.65' CTC RAMP HOLD HOLD 62.20' 50.00' 80.55' 150.00' 325.00' 4.00' 34.00' 93.00' CTC RAMP HOLD HOLD 59.00' B81 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION STOP B83 B85 B87 B89 B91 ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN J2 CR 00 CRJ700 CRJ700 CRJ700 CRJ700 CRJ200 CRJ200 CRJ700 CRJ700 CRJ200 CRJ200 CRJ2 00 SCALE AS SHOWN DATE 1/23/13 DRAWN BY: CRJ200 RBN CHECKED BY: CONCOURSE B RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE PCCP DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 10 N QUAD INLET SHEET NO. 60 MANHOLE 0 63.00 120 CADD FILE NO. PHASE 10 - GEOMETRY CITY & COUNTY of DENVER D D D VSR D D 325.00' D 50.00' D D D D 25.00' D F F F F F F D F F F F F 25.00' D 300.00' F F F CTC RAMP HOLD HOLD F DENVER INTERNATIONAL AIRPORT 75.00' D B D 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION B NOTE: JOINT AROUND STRUCTURES TO BE B TYPE JOINT D CTC RAMP HOLD HOLD MATCH EXISTING ELEVATION ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. NON-REINFORCED PCCP = 903 SY N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 REINFORCED PCCP = 348 SY B VOLUME NO. SHEET TITLE JOINT TYPE - SEE DETAIL SHEET PAVING PHASE 10 N SHEET NO. 60 0 64.00 120 CADD FILE NO. PHASE 10 - PAVING CITY & COUNTY of DENVER REPLACE 40 SF VSR EDGE LINE SEE DETAIL SHEET DENVER INTERNATIONAL AIRPORT STOP REPLACE 77 SF FOMO LINE SEE DETAIL SHEET STOP 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CTC RAMP HOLD HOLD REPLACE 188 SF TAXIWAY C/L (GREEN LINE) CTC RAMP HOLD HOLD ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 VOLUME NO. SHEET TITLE MARKING PHASE 10 N SHEET NO. 60 0 65.00 120 CADD FILE NO. PHASE 10 - MARKING CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT BARRICADES PLACED OUTSIDE MOVEMENT AREA TAXIWAY F GLYCOL TYPE IV TANK PAD 2+75 WA6 WA5W 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION WA5 2+00 CONCRETE DRAIN PAN 1+00 GLYCOL DISPENSER ISLAND ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN WA6 TA WA5W SCALE AS SHOWN DATE 1/23/13 DRAWN BY: R RBN VS WA5 XI W AY B4 0+00 CHECKED BY: RBN FAA AIP NO: N/A WORK BREAKDOWN NO. N/A REMOVE & REPLACE ASPHALT PAVEMENT DESIGN CONTRACT NO. N/A CONST. CONTRACT NO. 201208796 LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END VOLUME NO. SHEET TITLE GEOMETRY PHASE 11 N SHEET NO. 60 0 66.00 120 CADD FILE NO. PHASE 11 - GEOMETRY 14.8' (TYP.) 12' (TYP.) 7' (TYP.) 12' (TYP.) 7' (TYP.) TIE TO EXISTING GRADE FILL 0.4' TIE TO EXISTING GRADE TIE TO EXISTING GRADE ADJUST TO 2% SLOPE ADJUST TO 2% SLOPE CITY & COUNTY of DENVER 10.5' (TYP.) TIE TO EXISTING GRADE DENVER INTERNATIONAL AIRPORT ADJUST TO 2% SLOPE CUT 0.3' TIE TO EXISTING GRADE ADJUST TO 2% SLOPE CUT 0.3' TIE TO EXISTING GRADE ADJUST TO 2% SLOPE CUT 0.3' TIE TO EXISTING GRADE ADJUST TO 2% SLOPE CUT 0.3' CUT 0.4' 1+75 TIE TO EXISTING GRADE FILL 0.4' TIE TO EXISTING GRADE REMOVE & REPLACE CURB & GUTTER TIE TO EXISTING GRADE ADJUST TO 2% SLOPE ADJUST TO 2% SLOPE TIE TO EXISTING GRADE CUT 0.4' 2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION C/L CONC. DRAIN PAN REMOVE & REPLACE CURB & GUTTER 12' (TYP.) 1+50 TIE TO EXISTING GRADE FILL 0.4' TIE TO EXISTING GRADE REMOVE & REPLACE CURB & GUTTER TIE TO EXISTING GRADE ADJUST TO 2% SLOPE ADJUST TO 2% SLOPE TIE TO EXISTING GRADE CUT 0.4' 0+50 TIE TO EXISTING GRADE TIE TO EXISTING GRADE FILL 0.3' ADJUST TO 2% SLOPE REMOVE & REPLACE CURB & GUTTER TIE TO EXISTING GRADE ADJUST TO 2% SLOPE TIE TO EXISTING GRADE TIE TO EXISTING GRADE CUT 0.3' 0+25 ISSUE RECORD NO. BY PURPOSE 1 RBN BID DATE CKD 1/23/13 RBN SCALE AS SHOWN DATE 1/23/13 DRAWN BY: RBN CHECKED BY: RBN FAA AIP NO: N/A FILL ANGLE MAY VARY TO ACCOMMODATE 2% SLOPE WORK BREAKDOWN NO. 1.5' N/A DESIGN CONTRACT NO. 0.5' N/A 3" BITUMINOUS SURFACE CONST. CONTRACT NO. 201208796 CUT 0.5' 7" BITUMINOUS BASE VOLUME NO. 1.0' SHEET TITLE LOW PROFILE AIRCRAFT BARRICADES PLACED END TO END 12" COMPACTED SUBGRADE 6" AGGREGATE BASE COURSE (CDOT, CLASS VI) UNDER ALL CURB & GUTTER SECTIONS. PAYMENT FOR BASE COURSE IS INCIDENTAL TO CURB & GUTTER INSTALLATION. TYPICAL PAVEMENT SECTION PAVING PHASE 11 N SHEET NO. 6 0 67.00 12 CADD FILE NO. PHASE 11 - PAVING