Finance and Resources Committee 10:00am, Thursday, 30 October 2014 Street Lighting - Supply and Delivery of LED Luminaires Item number 7.22 Report number Executive/routine Wards All Executive summary The introduction of Light Emitting Diode (LED) lighting represents an opportunity for the Council to make significant savings in terms of energy consumption and carbon emissions. The Council has secured £2.1m interest free funding through Salix to replace approximately 7,200 obsolete street lights with LED luminaires. This funding will support the purchase of LED luminaires, associated galvanised sleeves and the full installation work associated with this project. Links Coalition pledges P44 Council outcomes CO18, CO19, CO25 Single Outcome Agreement SO4 Report Street Lighting - Supply and Delivery of LED Luminaires Recommendations 1.1 It is recommended that the Finance and Resources Committee notes the award of this contract to MacLean Electrical to supply and deliver approximately 7,200 Light Emitting Diode (LED) luminaires to the City of Edinburgh Council. 1.2 The decision to award this contract was made under the urgency provisions of the Committee’s Terms of Reference and Delegated Functions in order to take up the funding from Salix. This action is being reported to this Committee as required by Provision-4 of these Terms of Reference. Background 2.1 Due to the mixed profile of street lighting columns in Edinburgh, it is intended to install the LED luminaires on both steel and concrete columns. 2.2 The procurement of galvanised steel sleeves will support the LED project by enabling LEDs to be fitted on to concrete lighting columns. The procurement of these sleeves was approved by the Acting Head of Service for Transport as the Contract value was £162,852.00. 2.3 Salix Finance Limited is an independent, not for profit, company funded by the Department for Energy and Climate Change, the Welsh Assembly Government and the Scottish Government, via the Carbon Trust. Its borrowing interest rate is 0%. A business case was presented, based on the replacement of old lighting with new more energy efficient LED white light technologies. The Business Case was approved by Salix on 31 October 2013. 2.4 The Salix funding was originally offered on the premise that the LED project was to be completed by 1 September 2014. 2.5 The procurement of the LED luminaires and the steel sleeves was to be through the Scotland Excel Street Lighting Materials Framework. Scotland Excel was the process of producing a new framework contract for street lighting as the existing one was due to expire at the end of March 2014. Due to delays with procurement, the new framework was not scheduled to commence until 1 July 2014 however, a subsequent legal challenge has meant that the award of the Framework was suspended and the Council was unable to utilise the Framework as a route to market. Finance and Resources Committee – 30 October 2014 Page 2 2.6 Consequently, the Council was unable to carry out a new procurement exercise in time for the deadline of 1 September 2014 requested by Salix. 2.7 Due to the legal challenge against the new framework contract, the existing Scotland Excel Street Lighting Materials Framework has been extended until 31 October 2014 and is being utilised as the route to market for LEDs and Sleeves. 2.8 Salix has agreed to extend the funding deadline to the 31 March 2015, provided that the LEDs and Sleeves are delivered to the Council in sufficient time to support significant completion of the project by the end of 2014, and full completion of the project by the end of February 2015. 2.9 In order to ensure that the overall programme is successfully delivered, emergency powers were used on an exceptional basis, in order to mitigate the risks of: (i) non-delivery; (ii) avoiding any delays to the programme; and (iii) safeguarding access to the significant Salix funding which both LEDs and Steel Sleeves procurements are critically dependent upon. Main report 3.1 This contract will provide approximately 7,200 LED luminaries to the Council and enable these to be fitted on to concrete and steel columns across Edinburgh. 3.2 A Mini-Competition was advertised on Public Contracts Scotland portal on 5 September 2014, utilising the Scotland Excel Street Lighting Materials Framework Agreement. 3.3 The technical evaluations were carried out by three Street Lighting staff overseen by two representatives from Commercial and Procurement Services. 3.4 The pricing evaluation was undertaken after the completion of the quality evaluation, and the most economically advantageous tender was identified. 3.5 The evaluation criteria utilised a ratio of 70% commercial and 30% technical to ensure that suppliers were evaluated on their ability to supply materials at competitive rates and to measure their ability to meet the technical performance specification. 3.6 The six suppliers under Lot 1 – Luminaires/Lanterns of the Framework Agreement were invited to participate in the Mini-Competition. 3.7 The tender consisted of eight design configurations based on different road layouts and Street Lighting design standards. Finance and Resources Committee – 30 October 2014 Page 3 3.8 The six suppliers were invited to submit bids for either, some or all of the configurations. This resulted in a total of fifteen bids being submitted across all design configurations. 3.9 Following the conclusion of the technical and commercial evaluation of all submissions and for all design configurations, MacLean Electrical has been identified as the most economically advantageous tender. 3.10 The overall estimated value of the Contract is £1,689,120. 3.11 For the purposes of this report, all projections and costs are based on purchasing 7,200 LEDS. It should be noted that this quantity may be subject to change during the term of the contract. Measures of success 4.1 Utilising LED luminaires on existing concrete and steel columns will allow the Council to make considerable energy savings as well as reduced carbon emissions. Financial impact 5.1 The overall purchase cost of the 7,200 LED luminaires is £1,689,168. 5.2 The estimated savings figure in regard to unit cost is £168.26, based on an average unit cost of £402.86, resulting from the two procurements carried out in Financial Year 2012/13 as per section 5.4 below. 5.3 On the basis of the quantities of this procurement, there is a purchase cost saving of £1,211,472. 5.4 This savings figure is based on historical spend data in comparison with the tender submission from the preferred bidder as follows: Financial Year Unit Cost Quantity Overall Cost 2012/13 £385.71 50 £19,285.50 2012/13 £420.01 50 £21,000.50 2014/15 £234.60 7,200 £1,689,120.00 5.5 The Council has benefitted from increased buying power, through economies of scale, by opting for a bulk purchasing strategy.The whole life costs, resulting from this contract, will deliver considerable benefits and savings to the Council. 5.7 The use of the LEDs is estimated to result in annual energy savings of £275,800. Finance and Resources Committee – 30 October 2014 Page 4 5.8 Over the 20 year life of the installation, this estimated energy saving will equate to £10,504,800, based on an estimated energy inflation of 8% per annum for the first 10 years and 3% per annum for the next 10 years. 5.9 LED luminaires do not require any ongoing maintenance and have a lifespan of approximately 20 years compared with the three to four year lifespan for a standard luminaire. 5.10 This procurement will contribute to the realisation of a significant reduction in Carbon Tax Commitment costs which is £16.40 per tonne, resulting in an estimated annual saving of approximately £23,255 from the procurement of 7,200 LED luminaires. 5.11 Over the 20 year life of the installation, the estimated saving in Carbon Tax Commitment costs will equate to £465,100 based on £16.40 per tonne. It is known that this charge will increase in future years however, accurate charging information for the full 20 years is not known at this time. Risk, policy, compliance and governance impact 6.1 The following risks have been identified as potential issues to the Council in relation to the successful delivery of this contract. Risk Mitigating Action Timescales – Salix funding must be fully utilised by March 2015 Salix has provided £2.1m of funding for this project and it is essential that the contract is substantively awarded as soon as possible, but no later than 31 October 2014, to ensure that the works are completed and the funding is utilised by 31 March 2014. Delivery Programme – the LED luminaires must be delivered within a maximum period of 12 weeks to ensure successful delivery of the LED programme. The quality assessment of suppliers focused on ensuring that bidders were able to meet the delivery programme under this contract. The preferred bidder clearly demonstrated the capability and capacity to service the requirements of this Contract. Quality of Materials Suppliers were asked to evidence that their proposed materials are in accordance with the specification. The preferred bidder demonstrated compliance with these requirements. Finance and Resources Committee – 30 October 2014 Page 5 Contract not Awarded before expiry date of 31 October 2014. This report needed to be signed off week commencing 13 October 2014 in order to complete the procurement process and subsequent contract award prior to the expiry of the Scotland Excel Framework on 31 October 2014. Therefore the decision to award this contract was made under the urgency provisions of the Committee’s Terms of Reference and Delegated Functions. 6.2 A representative from Road Services will be responsible for contract management and will monitor contract performance. 6.3 In the event of the supplier failing to meet the requirements specified in the contract, Road Services will ensure that strict contract management has minimal effect in regards to business continuity. Equalities impact 7.1 There is no relationship to the public sector general equality duty to the matters described in this report and no direct equalities impact arising from this report. Sustainability impact 8.1 The environmental benefits of LED luminaries are considerable and include a longer life span, reduced maintenance costs and a significant reduction in carbon emissions and energy usage. Consultation and engagement 9.1 Road Services has engaged with Commercial and Procurement Services throughout this procurement exercise. 9.2 A tendering exercise was undertaken through a Mini-Competition utilising the Scotland Excel Street Lighting Materials Framework Agreement taking forward the following Framework evaluation criteria: 9.3 • 70% - Commercial • 30% - Technical The criteria used to identify the preferred supplier utilised this ratio in order to determine the most economically advantageous suppliers by lot. Finance and Resources Committee – 30 October 2014 Page 6 Background reading/external references 10.1 Finance & Resources Committee Report, 10.00am, Thursday, 16 January, 2014 Item Number 7.20 - Street Lighting – Salix Funding. John Bury Acting Director for Services for Communities Contact: John McFarlane, Street Lighting & Workshops Manager E-mail: john.mcfarlane@edinbrugh.gov.uk | Tel: 0131 458 8037 Links Coalition pledges P44 - Prioritise keeping our streets clean and attractive. Council outcomes CO18 - Green – we reduce the local environmental impact of our consumption and production. CO19 – Attractive Places and Well Maintained. – Edinburgh remains an attractive city through the development of high quality buildings and places and the delivery of high standard and maintenance of infrastructure and public realm. CO25 – The Council has efficient and effective service that deliver on objectives. SO4 - Edinburgh’s communities are safer and have improved physical and social fabric. Appendix 1 – Summary of Tendering and Tender Evaluation Process Single Outcome Agreement Appendices Finance and Resources Committee – 30 October 2014 Page 7 Appendix 1 – Summary of Tendering and Tender Evaluation Processes Contract Supply and Delivery of LED Luminaires Ref: CT3121 Contract Period October 2014 – December 2014 (three months) Estimated Contract Value on the Basis of Purchase Cost Only £1,689,120 Estimated Savings on the Basis of Unit Price Comparison £1,211,472 (41.76%) Standing Orders Observed 2.4 EU Principles applied 2.7 Commercial and Procurement Manager provided resource to undertake tendering 3.1 Director has responsibility for selecting and appointing contractors 3.2 Director has responsibility for all Contracts tendered and let by their Directorate 5.1 Tenders were evaluated on the basis of most economically advantageous criteria 5.3 Tenders evaluated by a panel with the appropriate technical knowledge and expertise EU Procedure Chosen Mini-Competition utilising Scotland Excel Framework Invitations to Tender Issued Six Tenders Returned Six Tenders Fully Compliant Two Recommended Supplier One Primary Criteria Most economically advantageous tender to have met the qualitative and technical specification of the client department. Technical Evaluation Team • 70% Commercial • 30% Technical • 3 Street Lighting Staff within the Transport Division Finance and Resources Committee – 30 October 2014 Page 8