This Installation/Owner's manual covers doors shipped: January 2013 to Date
Installed on:
Notice To User . . . . . . . . . . . . . . . . . . . . . . 2
Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Installation . . . . . . . . . . . . . . . . . . . . . . . . . 3
Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Made in the
USA
Language: English (Hazards are in English and French)
The English version of this manual shall prevail over any
error in, or conflicting interpretation of, any translations.
Model #: GUARDSTL
Publication No. 54450041rev3 March 2016
GuardRite® Steel Installation/Owner's ManualRite-Hite®
NOTICE TO USER
SAFETY
Thank you for purchasing the GuardRite® Steel safety
barrier from Rite‑Hite.
Safety Identifications
Read and understand this manual prior to installation or
operation of this equipment.
! DANGER
For best results, have this product serviced by your
authorized RITE-HITE® Representative.
Indicates a hazardous situation which, if not
avoided, will result in death or serious injury.
Your local RITE-HITE® Representative provides the
Planned Maintenance Program (P.M.P.) which can
be fitted to your specific operation. Call your local
representative or RITE-HITE® at 1-414-355-2600
or 1-800-456-0600.
Indique une situation dangereuse qui, si elle n’est
pas évitée, peut entraîner la mort ou de graves
blessures.
Unpack all components and compare to "Parts" on page
7 Notify the factory if parts are missing or damaged.
Installation Tools Required
2
3/4 in combination wrenches
(1 ratchet, 1 socket -Impact drivers can be used)
1
Hammer drill with a 3/4 in diameter masonry bit
Minimum drill bit length = 8 in [203.2 mm]
1
Impact driver
(with 120 ft-lbs of torque for concrete anchors)
1
1/18 in Impact socket
(for impact driver to tighten concrete anchors)
! WARNING / AVERTISSEMENT
Indicates a hazardous situation which, if not
avoided, could result in death or serious injury.
Indique une situation dangereuse qui, si elle n’est
pas évitée, peut entraîner la mort ou des
blessures graves.
! CAUTION / ATTENTION
Indicates a hazardous situation which, if not
avoided, could result in minor or moderate injury.
Indique une situation dangereuse qui, si elle n’est
pas évitée, peut entraîner des blessures légères à
modérées.
NOTICE
Indicates a situation which can cause damage to the
equipment, personal property and/or the environment,
or cause the equipment to operate improperly.
NOTE: A note is used to inform you of important
installation, operation, or maintenance information.
General
! CAUTION / ATTENTION
To prevent unauthorized use, barricade the work
area until the unit(s) are completely installed.
Pour éviter toute utilisation non autorisée,
barricader la zone de travail jusqu'à ce que
l'unité(s) sont complètement installé.
2
Publication No. 54450041rev3 March 2016
Rite-Hite®
Installation/Owner's Manual GuardRite® Steel
INSTALLATION
Post Assembly
NOTICE
The holes in the GuardRite® post for the rails are
not at the same level. Pay attention to this when
assembling to keep rails at the same level.
1. Stand the posts upright.
2. Bolt the rail bracket to the post using (2) 1/2 in x 6 in
bolts. Install a flat washer on the bolt before the bolt
is inserted through the rail bracket and post. If the
post will be a middle post of a continuous run, you will
also need to install a rail bracket on the bolt after it is
inserted through the post (Figure 1).
3. Secure the bolt in place with a second flat washer
and a 1/2 in nylon lock-nut. Repeat this process for
any other rail brackets. Tighten the bolts and nuts
securely (Figure 2).
Figure 1
Figure 2
Publication No. 54450041rev3 March 2016
3
GuardRite® Steel Installation/Owner's ManualRite-Hite®
INSTALLATION
42
Rail
Up120
Toin120"
Up to
[3048 mm]
Centerline
Centerline
21
5 in5
[127mm]
10
42.13 in
[1070
42mm]
44 in
1117.6
44 mm
11.8 in
11.8
[536.6
mm]
21.13
21 in
[536.6 mm]
10 in
10
[127mm]
0.625
23 in
584.2
23mm
.063 in
0.625
[15.9mm]
Figure 3
1. Position the posts with rail brackets attached
approximately the distance apart of the length of a
rail. Lift the rail into place and carefully set it in the rail
brackets on each end. Ensure that the label on the
rail is upright.
23
3. Install a 1/2 in nylon lock nut to hold the rail in place.
Repeat this process for all three bolts on each side
of the rail. If the system uses double high rails, install
the second rail in the same manner before tightening
all of these rail bolts securely.
2. Bolt the rail securely to the rail bracket by inserting
a 1/2 in x 1.5 in bolt with a washer installed through
the rail bracket and then through the rail from the
impact side.
4. Continue assembling the system in this manner.
Assemble the system completely before anchoring
the system to the floor.
4
Publication No. 54450041rev3 March 2016
Rite-Hite®
Installation/Owner's Manual GuardRite® Steel
INSTALLATION
Cutting Rails
Cut Off Varies
(never less than 3 in [76.2 mm)
3x
9
3 x Ø 9/16
in [14.7ALL
mm] " THRU
Thru16
All
CUT OFF VARIES,
NEVER LESS THAN 3"
2 in
2.00"
[50.8
mm]
RAIL
CUT LENGTH
Rail Cut Length
Figure 4
Some installations require rails to be cut in the field. Limit
cuts to 1 to 2 sections of a linear run of GuardRite® Steel.
1. Mark and cut the rail 2.875 in [73 mm] shorter than the
distance between the vertical posts (Figure 4).
NOTE: The rails can be cut with a saw-all, grinder,
portable band saw, etc.
2. Use the (included) touch-up paint to protect the end of
the rail from rusting.
3. Drill the 9/16 in diameter holes a minimum of 2 in
[51 mm] from the end of the rail. Center the hole
on the flat section of the front of the rail.
Publication No. 54450041rev3 March 2016
5
GuardRite® Steel Using the Impact wrench and 1‑1/8” socket, install the anchor through the base plate and
®
Installation/Owner's
Manual
Rite-Hite
into the hole you
drilled
into the concrete.
INSTALLATION
Titan
HD Concrete
Anchor Installation
Instructions
Titan
Instructions
Titan HD
HD Concrete
Concrete Anchor
Anchor Installation
Installation
Instructions
Anchoring to Concrete*
Column
Caps
Required:
1. Tools
Tighten
all rails and brackets securely before
Tools
Required:
Tools
Required:
Hammer Drill
with ¾”
¾” x 8”
8” Concrete
Concrete Drill Bit
Bit
Hammer
with
anchoring
theDrill
system
Hammer
Drill
with ¾”toxx concrete.
8” Concrete Drill
Drill Bit
2.
Use a rubber mallet to insert the plastic post cap into the
top of each post.
Impact
Wrench with
1‑1/8” Impact
Impact
with
Impact Socket
Socket
Impact Wrench
Wrench
with 1‑1/8”
1‑1/8”
SocketSteel in its
Position
theImpact
GuardRite
Securely
tighten
all
anchors
with base
the impact wrench. Make sure the hex washer head is in
intended position. Use the
Installation:
Installation:
Installation:
contact with the base plate.
Hole Plugs
plates of the posts as a template
hole
plugof(using
hand pressure or a rubber
Drill
¾” Diameter
in the
concrete.
hole Insert
should a
beyellow
drilled a
minimum
8” deep
anda drill
(4) 3/4 hole
in
diameter
holes The
Drill
Drill aa ¾”
¾” Diameter
Diameter hole
hole in
in the
the concrete.
concrete. The
The hole
hole should
should be
be drilled
drilled aa minimum
minimum of
of 8”
8” deep
deep
or
completely
through
the
concrete.
mallet)
for
open
holes
in
the
posts
not used for attaching
a completely
minimumthrough
of 8 in the
[203.2
mm] deep
or
concrete.
or
completely
through
the
concrete.
Using
a
drill
bit
that
is
too
small
or
excessively
worn
will
make
it
very
hard
to
install
the
the
hardware.
Using
aa drill
is
excessively
(or completely
theor
Using
drill bit
bit that
thatthrough
is too
too small
small
orconcrete).
excessively worn
worn will
will make
make itit very
very hard
hard to
to install
install the
the
anchor.
Using
a
bit
that
is
too
large
will
reduce
the
anchors
load
capacity.
anchor.
Using
aa drill
drill
bit
that
is
too
large
will
reduce
the
anchors
load
capacity.
anchor.
Using
drill
bit
that
is
too
large
will
reduce
the
anchors
load
capacity.
Using a drill bit that is too:
–– small or excessively worn will
make it very hard to install the
anchor.
3.
4.
–– large will reduce the anchors
load capacity.
Use
compressed
air to
the concrete
of the
hole. If
this is
not done,
you may
Use
compressed
airblow
to blow
the dust out
Use
Use compressed
compressed air
air to
to blow
blow the
the concrete
concrete dust
dust out
out of
of the
the hole.
hole. IfIf this
this is
is not
not done,
done, you
you may
may
not
be
able
to
tighten
the
anchor
completely.
concrete
dust
out
of
the
hole
so
you
not
be
able
to
tighten
the
anchor
completely.
not be able to tighten the anchor completely.
can tighten the anchor completely.
Use a Impact wrench and 1-1/8”
Using
thetoImpact
and
1‑1/8” socket,
the anchor
through the
base plate
and
socket
installwrench
the (provided)
3/4 install
Using
wrench
and
install
Using the
the Impact
Impact
wrench
and 1‑1/8”
1‑1/8” socket,
socket,
install the
the anchor
anchor through
through the
the base
base plate
plate and
and
into
the
hole
you
drilled
into
the
concrete.
into
hole
you
drilled
into
in
7 in
Titan
concrete
anchors
intoxthe
the
hole
you HD
drilled
into the
the concrete.
concrete.
through base plate and into the holes
drilled into the concrete.
5.
Securelytighten
tighten
all anchors
toimpact wrench. Make sure the hex washer head is in
Securely
all anchors
anchors
with the
the
Securely
tighten
all
with
Securely
tighten
all
anchors
with
the impact
impact wrench.
wrench. Make
Make sure
sure the
the hex
hex washer
washer head
head is
is in
in
120
ft-lbs
with
the
impact
wrench.
contact
with
the
base
plate.
contact
with
the
base
plate.
contact with the base plate.
Make sure the hex washer head is
in contact with the base plate.
6. Repeat this process for all of the concrete anchors on
the post.
*Image credits: Titan HD Concrete Anchor instructions (strongtie.com)
6
Publication No. 54450041rev3 March 2016
Rite-Hite®
Installation/Owner's Manual GuardRite® Steel
PARTS
Bracket/Cap/Anchor
Rail Assembly
1
3
DESCRIPTION
PART #
Rail, Assembly, 4 ft GuardRite,Steel
66110011
Rail, Assembly, 5 ft GuardRite,Steel
66110012
Rail, Assembly, 6 ft GuardRite,Steel
66110013
Rail, Assembly, 8 ft GuardRite,Steel
66110014
Rail, Assembly,10 ft GuardRite,Steel
66110015
Bracket/Cap/Anchor
1
2
2
#
DESCRIPTION
PART #
1
GuardRite Steel Barrier
GUARDSTL.XXX
2
GuardRite 23" High Double Post
65650025
3
GuardRite 44" High Double Post
65650024
Publication No. 54450041rev3 March 2016
3
#
DESCRIPTION
PART #
1
Bracket,Assembly,W/Hardware,GUARDSTL
14501281
2
Cap,Post,5X5,RITEHITE
16200059
3
Anchor,Concrete,HH,3/4X7,Zinc
11230005
7
LIMITED PRODUCT WARRANTY GUARDRITE® STEEL
RITE-HITE Company, LLC and its affiliates (collectively "RITE-HITE") warrant that the Product sold to the Owner will be
free of defects in design, materials and workmanship (ordinary wear and tear excepted) for the periods set forth below
("Limited Warranty").
One (1) Year on all mechanical and electrical parts.
One (1) Year labor, based on approved travel and labor repair times.
REMEDIES
PARTS- RITE-HITE's obligations under this Limited Warranty are limited to repairing or replacing, at RITE-HITE's
option, any part which is determined by RITE-HITE to be defective during the applicable warranty period. Such repair or
replacement shall be RITE-HITE's sole obligation and the Owner's exclusive remedy under this Limited Warranty.
LABOR- RITE-HITE will provide warranty service without charge for labor per the specified warranty period. Thereafter,
a charge will apply to any repair or replacement under this Limited Warranty.
CLAIMS Claims under this Limited Warranty must be made (i) within 30 (thirty) days after discovery and (ii) prior to
expiration of the applicable warranty period. Claims shall be made in writing or by contacting the representative from
whom the Product was purchased directly. Owner must allow RITE-HITE or its agent, a reasonable opportunity to inspect
any Product claimed to be defective and shall, at RITE-HITE's option, either (x) grant RITE-HITE or its agent access to
Owner's premises for the purpose of repairing or replacing the Product or (y) return of the Product to the RITE-HITE, f.o.b.
RITE-HITE's factory.
NOT WARRANTED RITE-HITE does not warrant against and is not responsible for wear items such as fuses, batteries,
bulbs, vision and seals. No implied warranty shall be deemed to cover damages that result directly or indirectly from: (i) the
unauthorized modification or repair of the Product, (ii) damage due to misuse, neglect, accident, failure to provide necessary
maintenance, or normal wear and tear of the Product, (iii) failure to follow RITE-HITE's instructions for installation, failure
to operate the Product within the Product's rated capacities and/or specified design parameters, or failure to properly
maintain the Product, (iv) use of the Product in a manner that is inconsistent with RITE-HITE's guidelines or local building
codes, (v) movement, settling, distortion, or collapse of the ground, or of improvements to which the Products are affixed,
(vi) fire, flood, earthquake, elements of nature or acts of God, riots, civil disorder, war, or any other cause beyond the
reasonable control of RITE-HITE, (vii) improper handling, storage, abuse, or neglect of the Product by Owner or by any
third party.
DISCLAIMERS THIS LIMITED WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER REPRESENTATIONS AND
WARRANTIES, EXPRESS OR IMPLIED, AND RITE-HITE EXPRESSLY DISCLAIMS AND EXCLUDES ANY IMPLIED
WARRANTIES OF MERCHANTABILITY OR FITNESS FOR PURPOSE. RITE-HITE SHALL NOT BE SUBJECT TO ANY
OTHER OBLIGATIONS OR LIABILITIES, WHETHER ARISING OUT OF BREACH OF CONTRACT, WARRANTY, TORT
(INCLUDING NEGLIGENCE AND STRICT LIABILITY) OR OTHER THEORIES OF LAW, WITH RESPECT TO THE
PRODUCTS SOLD OR SERVICES RENDERED BY RITE-HITE, OR ANY UNDERTAKINGS, ACTS, OR OMISSIONS
RELATING THERETO.
LIMITATION OF LIABILITY IN NO EVENT SHALL RITE-HITE BE RESPONSIBLE FOR, OR LIABLE TO ANYONE FOR,
SPECIAL, INDIRECT, COLLATERAL, PUNITIVE, INCIDENTAL, OR CONSEQUENTIAL DAMAGES, EVEN IF RITE-HITE
HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. Such excluded damages include, but are not limited
to, personal injury, damage to property, loss of goodwill, loss of profits, loss of use, cost of cover with any substitute
product, interruption of business, or other similar indirect financial loss.
151207
GLOBAL SALES & SERVICE Representatives in All Major Cities
RITE-HITE WORLD HEADQUARTERS
8900 N. Arbon Drive
P.O. Box 245020
Milwaukee, Wisconsin 53224
Tel: 1-414-355-2600
U.S. Only: 1-800-456-0600
8
RITEHITE.COM
ritehite.com
RITE-HITE CHINA
First Floor, Building #3,
558 Tongxie Road,
Changning District
Shanghai 200335, China
Tel: +86-21-6237-6333
RITE-HITE LATIN AMERICA
Alameda Lorena, 800 - Conj. 401/402
- Jardim Paulista
São Paulo/SP, CEP 01424- Brazil
RITE-HITE GMBH
Carl-Zeiss-Strasse 3
34471 Volkmarsen, Germany
Tel: 011-55-11-3527-9590
Tel: 011-49-5693-9870 0
Publication No. 54450041rev3 March 2016