880 E. 11th Avenue, Columbus Ohio 43211 614.421.6000 IFB 2014-032: Fire Restoration @ 1107 Vesta Avenue Pre-Bid Conference: Tuesday, December 30, 2014 11:00am 880 E. 11th Avenue, Columbus, Ohio 43211 Bid Opening: Friday, January 9, 2015 11:00am 880 E. 11th Avenue, Columbus, Ohio 43211 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION IFB Document Table of Contents Section 1.0 2.0 2.1 2.2 2.3 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 4.0 4.1 4.2 4.3 5.0 5.1 5.2 5.5 6.0 [Table No. 1] Description Page Introduction IFB Information at a Glance HA’S Reservation of Rights Scope of Work/Technical Specifications Scope of Work (Attachment A) Cost Inclusions Proposal Page Bid Format Tabbed Bid Submittal Bidding Additional Information Pertaining to the Pricing Items Bid Submission Bidder's Responsibilities--Contact With the HA Pre-Bid Conference Recap of Attachments Bid Evaluation Public Opening Responsible Evaluation Restrictions Contract Award Responsive and Responsible Bidder Contract Award Procedure Index of Tables Additional Considerations Attachments Attachment A: Scope of Work Attachment B: Form of Bid/Fee Sheet Attachment C: HUD Forms Attachment D: Bidder’s Certification Attachment E: Instructions for Bidders/Bidders Attachment F: Profile of Firm Form Attachment G: Section 3 2 2 3 4 4 4 4 4 4 5 5-6 6-7 7 8 8 8 8 9 9 9 9 9 11 9-11 12-28 12 13 14 15 16-20 21-22 23-28 The Columbus Metropolitan Housing Authority Page 1 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION INTRODUCTION he Columbus Metropolitan Housing Authority (hereinafter, “CMHA”) is a public agency created by resolution of the City of Columbus in 1934. CMHA is a unit of the government and its function are essential governmental functions. The property of CMHA is used for essential pubic and governmental purposes and is exempt from all taxes, including sales tax on all its purchase of supplies and services. T C MHA enters into and executes contracts and other instruments that are necessary and convenient to the exercise of its powers. CMHA maintains contractual arrangements with United States Department of Housing and Urban Development (HUD) to manage and operate its low rent public housing program and administers the Section 8 Housing Choice Voucher programs. CMHA programs are federally funded along with development and modernization grants and rental incomes. I ts primary activity is the ownership and management of over 1,400 public housing units. It also administers rental assistance for almost 13,100 privately owned rental units throughout the Housing Choice Voucher Program. It operates and manages its housing developments to provide decent, safe, sanitary and affordable housing to low income families, the elderly and the disabled, and implements various programs designed and funded by HUD. Since 1937 it has been our mission to serve the residents of Franklin County by helping people access affordable housing. By working with our collaborative partners, we develop, renovate and maintain housing, promote neighborhood revitalization, and assist residents in accessing needed social services. n keeping with its mandate to provide efficient and effective services, the HA is now soliciting bids from qualified, licensed and insured entities to provide the above noted services to the HA. All bids submitted in response to this solicitation must conform to all of the requirements and specifications outlined within this document and any designated attachments in its entirety. I IFB INFORMATION AT A GLANCE [Table No. 2] HA CONTACT PERSON Merrill Tripp, Purchasing Agent mtripp@cmhanet.com 614.421.4434 HOW TO OBTAIN THE IFB DOCUMENTS ON THE APPLICABLE INTERNET SITE 1. Visit our website, www.cmhanet.com, “doing business with us”, procurement, open solicitations. 2. Contact the Purchasing Department, 614.421.4434. PRE-BID CONFERENCE & WALK THROUGH Tuesday, December 30, 2014 11:00am 1. As instructed within Section 3.0 of the IFB document, submit one (1) “original” bid to CMHA Corporate Offices, 880 E. 11th Avenue, Columbus, Ohio 43211. HOW TO FULLY RESPOND TO THIS IFB BY SUBMITTING A BID SUBMITTAL BID SUBMITAL RETURN & DEADLINE Friday, January 9, 2015 @ 11:00am The Columbus Metropolitan Housing Authority 880 E. 11th Avenue, Columbus, Ohio 43211 *The proposed costs and bid sheets must be received in-hand and date/time-stamped by the CMHA by no later than 11:00 a.m. on this date. BOARD APPLICATION January 2015 The Columbus Metropolitan Housing Authority Page 2 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION 1.0 HA’S RESERVATION OF RIGHTS: 1.1 The HA reserves the right to reject any or all bids, to waive any informality in the IFB process, or to terminate the IFB process at any time, if deemed by the HA to be in its best interests. 1.2 The HA reserves the right not to award a contract pursuant to this IFB. 1.3 The HA reserves the right to terminate a contract awarded pursuant to this IFB, at any time for its convenience upon 30 days written notice to the successful bidder(s). 1.4 The HA reserves the right to determine the days, hours and locations that the successful bidder(s) shall provide the services called for in this IFB. 1.5 The HA reserves the right to retain all bids submitted and not permit withdrawal for a period of 60 days subsequent to the deadline for receiving bids without the written consent of the HA Contracting Officer (CO). 1.6 The HA reserves the right to negotiate the fees proposed by the bidder entity. 1.7 The HA reserves the right to reject and not consider any bid that does not meet the requirements of this IFB, including but not necessarily limited to incomplete bids and/or bids offering alternate or non-requested services. 1.8 The HA shall have no obligation to compensate any bidder for any costs incurred in responding to this IFB. 1.9 The HA shall reserve the right to at any time during the IFB or contract process to prohibit any further participation by a bidder or reject any bid submitted that does not conform to any of the requirements detailed herein. By accessing the HA website, www.cmhanet.com and by downloading this document, each prospective bidder is thereby agreeing to abide by all terms and conditions listed within this document, and further agrees that he/she will inform the CO in writing within 5 days of the discovery of any item listed herein or of any item that is issued thereafter by the HA that he/she feels needs to be addressed. Failure to abide by this time frame shall relieve the HA, but not the prospective bidder, of any responsibility pertaining to such issue. The Columbus Metropolitan Housing Authority Page 3 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION 2.0 SCOPE OF WORK (SOW)/TECHNICAL SPECIFICATIONS (T/S): The CMHA is seeking bids from interested parties for the procurement of FIRE RESTORATION/REMODEL as described in Attachment A: 2.1 See Attachment A for Scope of Work as required by this IFB. 2.1.1 PLEASE NOTE: The HA is providing the following brand names as a sample only so that bidders have a better understanding as to the minimum product standards the HA desires. As required by HUD regulation, bidders may propose an "equal" or "same as" product, as long as such product is substantially equivalent to or exceeds the products identified. Also, all specifications are subject to normal manufacturing tolerances. 3.0 2.2 Cost will include the total to restore the unit, located in the Rosewind community, 1107 Vesta Avenue, Columbus, Ohio 43211, to its original condition. All labor, material, transportation, permits and any other associated costs will be included in the bid price. 2.3 Proposal Page: Please see Attachment B, which is a detailed bid page to be completed by all interested parties for the restoration of 1107 Vesta Avenue, Columbus, Ohio 43211. BID FORMAT: 3.1 Tabbed Bid Submittal: So that the CMHA can properly evaluate the offers received, all bids submitted in response to this IFB must be formatted in accordance with the sequence noted following. Each category must be separated by numbered index dividers or tabs (which number extends so that each tab can be located without opening the bid) and labeled with the corresponding tab reference also noted below. None of the proposed services may conflict with any requirement the HA has published herein or has issued by addendum. [Table No. 3] IFB Section 3.1.1 Tab No. 1 3.1.2 2 3.1.3 3 3.1.4 4 3.1.5 5 Description Form of Bid: This Form is attached hereto as Attachment B to this IFB document. This 1-page Form must be fully completed, executed where provided thereon and submitted under this tab as a part of the bid submittal. Form HUD-5369-C (8/93), Certifications and Representations of Offerors, Non-Construction Contract: This Form is attached hereto as Attachment C to this IFB document. This 2-page Form must be fully completed, executed where provided thereon and submitted under this tab as a part of the bid submittal. A complete description of the products and services the firms provides. Managerial Capacity/Financial Viability: The bidder entity must submit under this tab a concise description of its managerial and financial capacity to deliver the proposed services, including brief professional resumes for the persons identified within areas (5) and (6) of Attachment B, Profile of Firm Form. Such information shall include the bidder's qualifications to provide the services; a description of the background and current organization of the firm and three (3) years of audited financial statements to include cash flow. Client Information: The bidder shall submit a listing of former or current clients, including any other Public Housing Authority, for whom the bidder has performed similar or like services to those being The Columbus Metropolitan Housing Authority Page 4 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION bid herein. The listing shall, at a minimum, include: The client’s name; The client’s address/email address; The client’s telephone number A brief description and scope of the service(s) and the dates the services were provided; Subcontractor/Joint Venture Information (Optional Item): The bidder shall identify hereunder whether or not he/she intends to use any subcontractors for this job, if awarded, and/or if the proposal is a joint venture with another firm. Please remember that all information required from the bidder under the proceeding tabs must also be included for any major subcontractors (10% or more) or from any joint venture. Section 3 Participation (See Attachment G) Other Information (Optional Item): The bidder may include hereunder any other general information that the bidder believes is appropriate to assist the HA in its review. 3.1.5.1 3.1.5.2 3.1.5.3 3.1.5.4 3.1.6 6 3.1.7 3.1.8 7 8 If no information is to be placed under any of the above noted tabs (especially the "Optional" tabs), please place there under a statement such as "NO INFORMATION IS BEING PLACED UNDER THIS TAB" or "THIS TAB LEFT INTENTIONALLY BLANK." DO NOT eliminate any of the tabs. Bid Submittal Binding Method: It is preferable and recommended that the bidder bind the bid submittals. 3.2 Bidding: CMHA will award the bid based on best and lowest cost received. 3.3 Additional Information Pertaining to the Pricing Items: 3.3.1 Assumption: It shall be the HA’s assumption that the successful bidder has based his/her proposed bid for pricing items upon careful assessment of the technical scope provided (Attachment A). It is the bidder’s responsibility to obtain all information necessary for making a knowledgeable bid to include a physical assessment of the unit he/she will be offering in the bid. 3.3.5 Davis-Bacon (D/B) and/or State Prevailing Wage Rates: As may apply by statute, regulation or law, if, at any time during the ensuing contract period(s), the HA needs the successful bidder to provide services that require the successful bidder to pay Davis-Bacon or State Prevailing Wages Rates for a specific task order pertaining to the ensuing contract, then to compensate the successful bidder for any amount that the applicable Davis-Bacon or State Prevailing Wage Rates are greater than the applicable hourly fees listed within the Bid sheet the HA shall: 3.3.5.1 Ascertain the applicable hourly wage rate(s), as listed within the contract, that applies; 3.3.5.2 Ascertain the current applicable Davis-Bacon or State Prevailing Wage Rate(s) that applies; 3.3.5.3 Ascertain the difference between the two rates, which amount the HA will pay to the successful bidder for that task order only. The Columbus Metropolitan Housing Authority Page 5 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION 3.3.5.4 It is the sole responsibility of the bidder to ensure that the bid submitted includes the most recent Davis-Bacon wage published by www.wdol.com. The amounts listed in this IFB are based on published rates at the time of advertising for the IFB. 3.3.5.5 Locating Applicable Wage Rates: If, as detailed within 24 CFR 85.36(h)(5), the HA is required to pay Davis-Bacon wage rates (for all “construction contracts in excess of $2,000”), and for similar State requirements, the HA will then issue a General Decision as it applies to that work. Current Davis-Bacon wages rates may be viewed by following the following listed steps: 3.3.5.6 [Table No. 4] 3.3.2 RFP Section 3.3.6.4.1 3.3.6.4.2 3.3.6.4.3 3.3.6.4.4 Step No. 1 2 3 4 3.3.6.4.5 3.3.6.4.6 3.3.6.4.7 5 6 7 Description Enter www.wdol.com Select a State Enter a County Construction Type: Enter “Residential” or “Building” WD’s: Leave “All WDs” Click on “Search” View the wage rate applicable to the service(s) HUD Maintenance Wage Rates Determination (MWRD): HUD has determined that, for non-construction maintenance work (work not covered by Davis-Bacon requirements), the HA must ensure that contractors do not pay its employees that perform such work for the HA at a rate less than the rates listed on the HUD MWRD. Therefore, by submitting a proposal, each bidder is thereby agreeing to and verifying that he/she will not pay his/her employees at rates less than detailed within the following Table No. 7. Please note that, as detailed within Section 10.10 of HUD Procurement Handbook 7460.8 REV 2 (most specifically within Section 10.10.E therein), the contractor will not be required to submit certified payrolls; however, the contractor must make its payroll records available to either the HA or HUD on request, and failure on the part of the contractor to comply with this requirement will be the sole responsibility of the contractor, including any ensuing penalties, court costs, or wages due to employees as a result of the contractor’s failure to comply. [Table No. 5] RFP Section 3.3.8.1 3.3.8.2 3.3.8.3 3.3.8.4 3.3.8.5 3.4 Classification Carpenter Painter Electrician Roofer Laborer (general/common) Davis-Bacon Rates $13.86 $22.34 $20.47 $16.85 $15.09 Fringe Benefits $.83 $11.74 $10.38 $3.83 $0.00 Bid Submission: All bids must be submitted and time-stamped received in the designated HA office by no later than the submittal deadline stated herein (or within any ensuing The Columbus Metropolitan Housing Authority Page 6 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION addendum). A total of 1 original signature copy (marked “ORIGINAL”) of the bid submittal shall be placed unfolded in a sealed package and addressed to: The Columbus Metropolitan Housing Authority Attention: Merrill Tripp Purchasing Agent 880 E. 11th Avenue, Columbus, Ohio 43211 The package exterior must clearly denote the above noted IFB number and must have the bidder’s name and return address. Bids received after the published deadline will not be considered. 3.5 3.4.1 Submission Conditions: DO NOT FOLD OR MAKE ANY ADDITIONAL MARKS, NOTATIONS OR REQUIREMENTS ON THE DOCUMENTS TO BE SUBMITTED! Bidders are not allowed to change any requirements or forms contained herein, either by making or entering onto these documents or the documents submitted any revisions or additions; and if any such additional marks, notations or requirements are entered on any of the documents that are submitted to the HA by the bidder, such may invalidate that bid. 3.4.2 Submission Responsibilities: It shall be the responsibility of each bidder to be aware of and to abide by all dates, times, conditions, requirements and specifications set forth within all applicable documents issued by the HA, including the IFB document, the documents listed within the following Section 3.7, and any addenda and required attachments submitted by the bidder. By virtue of completing, signing and submitting the completed documents, the bidder is stating his/her agreement to comply with the all conditions and requirements set forth within those documents. Written notice from the bidder not authorized in writing by the CO to exclude any of the HA requirements contained within the documents may cause that bidder to not be considered for award. Bidder’s Responsibilities—Contact with the HA: It is the responsibility of the bidder to address all communication and correspondence pertaining to this IFB process to the PA or CO only. Bidders must not make inquiry or communicate with any other HA staff member or official (including members of the Board of Commissioners) pertaining to this IFB. Failure to abide by this requirement may be cause for the HA to not consider a bid submittal received from any bidder who may has not abided by this directive. 3.5.1 Addendums: All questions and requests for information must be addressed in writing to the PA or CO. The PA or CO will respond to all such inquiries in writing by addendum to all prospective bidders (i.e. firms or individuals that have obtained the IFB Documents). During the IFB solicitation process, the PA or CO will NOT conduct any ex parte (a substantive conversation—“substantive” meaning, when decisions pertaining to the IFB are made—between the HA and a prospective bidder when other prospective bidders are not present) conversations that may give one prospective bidder an advantage over other prospective bidders. This does not mean that prospective bidders may not call the CO—it simply means that, other than making replies to direct the prospective bidder where his/her answer has already been issued within the solicitation documents, the CO may not respond to the prospective bidder’s inquiries but will direct him/her to submit such inquiry in writing so that the CO may more fairly respond to all prospective bidders in writing by addendum. The Columbus Metropolitan Housing Authority Page 7 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION 3.6 Pre-bid Conference: The scheduled pre-bid conference identified on Page 2 of this document is, pursuant to HUD regulation, not mandatory. Typically, such conferences last 1 hour or less, though such is not guaranteed. The purpose of this conference is to assist prospective bidders to have a full understanding of the IFB documents so that he/she feels confident in submitting an appropriate bid; therefore, at this conference the HA will conduct a brief overview of the IFB documents, including the attachments. It is during this conference where prospective bidders will be able to familiarize themselves with the bid process prior to bidding. Prospective bidders may also ask questions, though the PA or CO may require that some such questions are delivered in writing prior to a response being delivered. Whereas the purpose of this conference is to review the IFB documents, attendees should bring a copy of the IFB documents to this conference. 3.6.1 General Directions to the Pre-bid Conference: [Table No.6] IFB Section 3.6.1.1 3.6.1.2 3.6.1.3 3.6.1.4 3.6.1.5 3.7 Attachment Description Take I-71 North/South Exit onto 11th Avenue Turn East onto 11th Avenue Turn left onto Wright Street (2nd left) Park in any open spot and enter the building through the double glass doors nearer to the east end of the building. Announce your arrival to the receptionist. Recap of Attachments: It is the responsibility of each bidder to verify that he/she has downloaded the following attachments pertaining to this IFB, which are hereby by reference included as a part of this IFB: [Table No. 7] IFB Section 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 4.0 Attachment A B C D E F G Attachment Description Scope of Work Form of Bid: Bid Sheet HUD Forms Bidder’s Certification HA Instructions To Bidders & Bidders Profile of Firm Section 3 BID EVALUATION: 4.1 Public Opening: At the set date and time, all bids received will be opened and publicly read aloud by the CO or designee, including the company name of the bidder and the total bid proposed. At the bid opening the HA will only disclose the following information: (a) The company name of each bidder; (b) the total bid; and (c) the identity of the apparent lowest bidder. A copy of the bid tabulation or recap recorded will be made available to each member of the public attending such opening and to anyone who requests such afterwards. The bids will not be made available for inspection by anyone at this time; the HA will, at a later time, review all bids in detail and will, in a timely manner (within 10 days), notify all bidders of any bidder that is, as a result of the more detailed inspection of bids submitted, ruled to be non-responsive or not-responsible (please remember, as detailed within Section 8(d) of form HUD-5369 and Section 7(b)(3) of form HUD-5369-B, the The Columbus Metropolitan Housing Authority Page 8 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION HA reserves the right to, as determined by the HA, “waive informalities and minor irregularities” in the offers received). 4.1.1 5.0 4.2 Responsible Evaluation: The HA will evaluate the apparent lowest responsive bidder to ensure that he/she is responsible (i.e. a firm that is qualified, responsible and able to provide to the HA the required services). If the HA ascertains that such firm has the required ability, capability, experience, knowledge, licensing, insurance and resources to provide the required services, the HA may proceed with award. If the HA determines that such firm is deemed to be not responsible, such firm will be notified of such in writing by the HA in a timely manner (in any case, in no less than 5 days after such determination is made); in such case the HA may proceed with the noted Responsive and Responsible Evaluations with the next lowest bidder. 4.3 Restrictions: Any and all persons having ownership interest in a bidder entity or familial (including in-laws) and/or employment relationships (past or current) with principals and/or employees of a bidder entity will be excluded from participation in the evaluation of the bid. CONTRACT AWARD: 5.1 Responsive and Responsible Bidder: Award of this IFB is made to the responsive and responsible bidder that submits the best and lowest bid for the required fire restoration/remodel. 5.2 Award Procedure: If an award is made pursuant to this IFB, the following detailed procedures will be followed: 5.2.1 6.0 Ties: In the case of bids, the award shall be decided as detailed within Section 6.12.C of HUD Procurement Handbook 7460.8 REV 2, by “drawing lots or other random means of selection.” By completing, executing and submitting the Form of Bid, Attachment B, the bidder is thereby agreeing to “abide by all terms and conditions pertaining to this IFB as issued by the HA. Accordingly, the HA has no responsibility to conduct after the submittal deadline any negotiations pertaining to the contract clauses already published; and in any case the HA has no power or authority to negotiate any clauses contained within any attached HUD documents. ADDITIONAL CONSIDERATIONS: 6.1 Required Permits and Licenses: Unless otherwise stated in the RFP documents, all Federal, State or local permits and licenses which may be required to provide the services ensuing from any award of this RFP, whether or not they are known to either the HA or the bidders at the time of the proposal submittal deadline or the award, shall be the sole responsibility of the successful Bidder and all offers submitted by the Bidder shall reflect all costs required by the successful Bidder to procure and provide such necessary permits or licenses. 6.2 Taxes: All persons doing business with the HA are hereby made aware that the HA is exempt from paying Ohio State Sales and Use Taxes and Federal Exercise Taxes. A letter of Tax Exemption will be provided upon request. The Columbus Metropolitan Housing Authority Page 9 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION 6.3 Official, Agent and Employees of CMHA Not Personally Liable: It is agreed by and between the parties hereto that in no event shall any official, officer, employee, or agent of the HA in any way be personally liable or responsible for any covenant or agreement herein contained whether expressed or implied, nor for any statement, representation or warranty made herein or in any connection with this agreement. 6.4 Termination: Any contract resulting from this RFP may be terminated under the following conditions: 6.4.1 By mutual consent of both parties, and 6.4.2 Termination For Cause: As detailed within Clause No. 3 of Form HUD-5370-C (10/2006), General Conditions for NonConstruction Contracts, Section I – (Within or without Maintenance Work), attached hereto: 6.4.2.1 The HA may terminate any and all contracts for default at any time in whole or in part, if the contractor fails to perform any of the provisions of any contract, so fails to pursue the work as to endanger performance in accordance with the terms of the RFP or any resulting contracts, and after receipt of written notice from the HA, fails to correct such failures within seven (7) days or such other period as the HA may authorize or require. 6.4.2.1.1 Upon receipt of a notice of termination issued from the HA, the Contractor shall immediately cease all activities under any contract resulting from this RFP, unless expressly directed otherwise by the HA in the notice of termination. 6.4.2.1.2 The HA may terminate any contract resulting from this RFP in whole or in part, if funding is reduced, or is not obtained and continued at levels sufficient to allow for the expenditure. 6.4.3 Termination For Convenience: In the sole discretion of the HA, the HA may terminate any and all contracts resulting from this RFP in whole or part upon thirty (30) days prior notice to the Contractor when it is determined to be in the best interest of the HA. 6.4.4 The rights and remedies of the HA provided under this section are not exclusive and are in addition to any other rights and remedies provided by law or under any contract. 6.4.5 In the event the resulting contract from this RFP is terminated for any reason, or upon its expiration, the HA shall retain ownership of all work products including deliverables, source and object code, microcode, software licenses, and documentation in whatever form that my exist. The Columbus Metropolitan Housing Authority Page 10 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION In addition to any other provision, the Contractor shall transfer title and deliver to the HA any partially completed work products, deliverables, source and object code, or documentation that the Contractor has produced or acquired in the performance of any resulting contract. Index of Tables Table 1 2 3 4 5 6 7 8 Description Table of Contents IFB Information at a Glance Tabbed Bid Submittal Davis-Bacon/Wage Rate Instructions Davis-Bacon Wages General Directions to Pre-Bid Conference Recap of Attachments Index of Tables The Columbus Metropolitan Housing Authority Page 11 [Table No. 8] Page 1 2 4-5 6 6 8 8 11 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION Attachment A: Scope/Statement of Work See Attached The Columbus Metropolitan Housing Authority Page 12 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION ATTACHMENT B FORM OF BID/BID SHEET Bid Price $____________________ (US Dollars); __________________________________ and ___/100 (To include all labor, material, permits, and all other associated costs to complete the work required in the Scope of Work) Bid Closing Date Friday, January 9, 2015 PLEASE PRINT OR TYPE Name ________________________________________ Address ___________________ City __________________, ST _______ ZIP CODE ___________ Contact number (_____)_________-___________ Signature of bidder:___________________________________________________ Date: _______________________,201__ The Columbus Metropolitan Housing Authority Page 13 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION Attachment C: HUD FORMS (if applicable) 5369 Instructions to Offerors Non-Construction http://www.hud.gove/offices/adm/hudclips/forms/files/5369.pdf 5369-C (8/93), Certifications & Representations of Offerors Non-Construction Contract http://www.hud.gov/offices/cpo/forms/hud5369c.pdf 5370-C Sections I & II General Conditions for Non-Construction Contracts, (With or without Maintenance Work) http://www.hud.gov/offices/adm/hudclips/forms/files/5370-C1.pdf http://www.hud.gov/offices/adm/hudclips/forms/files/5370-C2.pdf The Columbus Metropolitan Housing Authority Page 14 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION Attachment D: Bidder’s/Bidder’s Certification By signing below, Bidder certifies that the following statements are true and correct: 1. 2. 3. 4. 5. 6. He/she has fully authority to bind bid and that no member of Bidder’s organization is disbarred, suspended or otherwise prohibited from contracting with any federal, state or local agency, and the individual or business entity named in this bid is eligible to receive the specified payment and acknowledges that this Contract may be terminated and payment may be withheld if this certification is inaccurate. Bidder proposes to furnish and deliver all items, for which bids were provided herein, as specified in the IFB, in accordance with the terms, conditions, and specifications embodied herein, all of which terms, conditions, and specifications are hereby accepted and made a part of this IFB, all materials and supplies, which are described on the bid worksheets herein and opposite of which prices have been entered, at the price or prices quoted, subject to valid price reductions as hereafter defined, as ordered for delivery, by CMHA. Bidder agrees that this bid shall remain open and valid for at least a period of sixty (60) days from the date of the bid opening, or as may be specified herein, and that the bid shall constitute an offer, which, if accepted by CMHA and subject to the terms and conditions of such acceptance, shall result in a contract between CMHA and the undersigned Bidder. He/she has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with this bid. Bidder, (the firm, corporation, partnership, or institution represented by the Bidder), or anyone acting for such firm, corporation or institution has not violated the antitrust laws of the State of Ohio or the Federal Antitrust laws, nor communicated directly or indirectly this bid to any competitor or any other person engaged in such line of business. Bidder has not received compensation for participation in the preparation of the specifications for this solicitation. SIGNED:________________________________________ Date________________ PRINT NAME:________________________________________________________ PRINT COMPANY NAME:_______________________________________________ COMPANY PHONE:________________________ FAX:______________________ E-MAIL ADDRESS:____________________________________________________ The Columbus Metropolitan Housing Authority Page 15 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION ATTACHMENT E: INSTRUCTIONS FOR BIDDERS/BIDDERS SPECIAL CONDITION Special conditions included in the specifications shall take precedence over any provisions stipulated hereunder. SIGNATURE REQUIRED Any page format in which bid/proposal pricing is stated must be signed in ink followed by the person's signature printed or typewritten. If the bidder/bidder is a firm or corporation, insert the corporate name followed by the signature and title of a person authorized to sign said bid/proposal. PRINCIPALS, PARTNERSHIPS OR PROPRIETORS All bidders/bidders are required to attach to the bid/proposal packet a list of all principals, partners or proprietors of the company along with the appropriate title and/or position of each person. TAXES Federal and/or State taxes are not to be included in prices quoted. bidder/bidder will be furnished an exemption certificate if needed. The successful PRICING Bidders/Bidders are to quote firm prices unless otherwise noted in the specifications. In case of a discrepancy in computing the amount of the bid/proposal, the UNIT PRICE quoted will govern. In the event of a conflict between the price in numbers and the price in words, the price IN WORDS WILL CONTROL. Quotations are requested F.O.B. destination. If quoted F.O.B. Shipping Point, include freight estimate and full value insurance cost. ACCEPTANCE AND REJECTION This bid/proposal will be accepted or rejected within a period of sixty (60) days from the bid/proposal opening date. CMHA reserves the right to reject any and all bids/proposals, to waive technicalities, and to request a re-quote on the required materials and/or services. If more than one item is listed, prices shall be quoted on each unit. However, each item shall be considered a separate bid/proposal and CMHA reserves the right to award a contract on each item separately bid/proposed, or on all items as a whole or any combination thereof. Bidders/Bidders whose bid/proposal is made on an "all or none" basis must clearly state such fact in the bid/proposal. WITHDRAWAL OF BIDS/ PROPOSALS The Columbus Metropolitan Housing Authority Page 16 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION Bidder/Bidders may withdraw their bids/proposals at any time prior to the time specified in the advertisement as the closing time for the receipt of bids/proposals. However, no Bidder/Bidder shall withdraw or cancel his bid/proposal for a period of sixty (60) days after said advertised closing time for the receipt of bid/proposals. SUBMISSION OF BID/PROPOSAL Bids/Proposals must be submitted on the attached proposal page unless otherwise noted in the specifications. Blank spaces in the bid/proposal must be completed and the phraseology is not to be changed. Any additional conditions, limitations, or provisions attached to the bid/proposal may result in its rejection. It is important that all pages be in proper sequence. If the vendor does not wish to propose, the bid/proposal should be so marked. Bids/Proposals received prior to the time of the opening will be securely kept, unopened. No bid/proposal received after the specified time will be considered except under the following conditions: if a bid/proposal arrives by mail after the time fixed for opening, but before award is made, and it is shown to the satisfaction of the awarding officer that late arrival was due solely to delay in the mails, such bids/proposals will be received and considered. No responsibility will attach to an officer for the premature opening of a bid/proposal not properly addressed and identified. Bids/Proposals must be submitted in a sealed envelope and clearly state the Bidder/Bidder’s Name, Address, IFB number and IFB Submittal deadline date. CHANGES AND ADDENDA TO BID/PROPOSAL DOCUMENTS Each change or addendum issued in relation to this bid/proposal document will be on file in the office of the Purchasing Department no less than five (5) working days prior to the scheduled bid/proposal closing. In addition, to the extent possible, copies will be mailed to each person registered as having received a set of bid/proposal documents. Total bid/proposal or specific item cancellations may be issued later than the time specified above. DELIVERY Time will be of the essence for any orders placed as a result of this bid/proposal. Purchaser reserves the right to cancel such orders, or any part thereof, without obligation if delivery is not made within the time(s) specified. Delivery shall be made 8:00 a.m. to 4:00 p.m. Monday through Friday to the destination shown on the bid/proposal. QUALITY Unless otherwise stated by the bidder/bidder the bid/proposal will be considered as being in strict accordance with the specifications outlined in the Bid/Proposal Document. Reference to a particular trade, manufacturer’s catalog or model number is made for descriptive purposes to guide the bidder/bidder in interpreting the requirements of CMHA. They should not be construed as excluding bids/proposals on other types of materials, equipment and supplies. However, the bidder/bidder, if awarded a contract, will be required to furnish the particular The Columbus Metropolitan Housing Authority Page 17 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION item referred to in the specifications or description unless a departure or substitution is clearly noted and described in the bid/proposal. SAMPLES Samples, when requested, must be furnished free of expense and, if not destroyed, will upon request be returned at the bidder’s/bidder's expense. INELIGIBLE BIDDERS/BIDDERS CMHA is prohibited from making any awards to contractors, subcontractors or firms who are on lists of those ineligible to receive awards from the United States, as furnished periodically by HUD. The current list of ineligible firms is available for inspection by prospective bidders/bidders at the offices of CMHA. CMHA is required to procure contracts only with responsible contractors, i.e. those who have the technical and financial competence to perform and who have a satisfactory record of integrity. Before awarding a contract CMHA will review the proposed contractor’s ability to perform the contract successfully, considering factors such as the contractor’s integrity, record of past performance, and financial and technical resources. AWARD OF CONTRACT The contract will be awarded to the responsible bidder/bidder submitting the lowest bid/proposal complying with the conditions of the Invitation for Bids with equal consideration being given to the detailed action plan, provided his/her bid/proposal is reasonable and it is to the interest of CMHA to accept it. CMHA will consider proof of success of procedures (i.e., references) in the final determination. All specifications and bid/proposal documents become a binding part of the contract. PERFORMANCE BOND All bidders/bidders will be required to furnish a performance bond for any service/construction bids/proposals if requested by the HA. The performance bond of 100% of the full amount of the contract, which secures the faithful performance of the contract, must be furnished at the time of the bid/proposal closing. No exceptions will be granted without prior written permission of CMHA. Failure of the successful bidder/bidder to comply shall constitute a default. CMHA may either award the contract to the next reasonable bidder/bidder or re-advertise for bids/proposals; and CMHA may charge against the bidder/bidder the difference between the amount of the bid/proposal and the amount for which the contract for the work is subsequently executed. SUBCONTRACTORS The contractor shall not contract with any proposed subcontractor who has not been accepted by CMHA. The contractor shall notify CMHA in writing the name of each proposed subcontractor. The acceptance or any objection shall be expressed in writing by CMHA within ten (10) working days after receipt of said request. CMHA may, without claim for extra cost by the contractor, The Columbus Metropolitan Housing Authority Page 18 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION disapprove any subcontractor for cause on the basis of its own determination or, because the contractor is listed as ineligible to receive awards of contracts for the United States on a current list or lists furnished by HUD. CANCELLATION CMHA reserves the right to monitor and evaluate the performance of a vendor, pursuant to this bid/proposal, on a regular basis. Either CMHA or the vendor may terminate this contract upon a material violation of the terms herein, provided that the offended party issues written notice of the violation to the offending party. PRE-BID/PROPOSAL CONFERENCE Where advisable or in the Authority's interest a Pre-Bid/Proposal Conference will be conducted for all bidders/bidders as specified in the bid/proposal advertisement (time and location). However, in lieu of the aforementioned, any bidder/bidder or prospective bidder/bidder interested in a pre-bid/proposal conference may request one by contacting the Purchasing Agent within seven (7) days after the date of the first publication of the notice to bid/proposal. This conference shall be for clarification of procedures and requirements connected with the preparation of responsive bids/proposals only. The Columbus Metropolitan Housing Authority Page 19 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION MINORITY AND FEMALE BUSINESS ENTERPRISE POLICY As policy, the Columbus Metropolitan Housing Authority (CMHA) will aggressively seek to contract with minority and/or female business enterprises for at least twenty percent (20%) of its annual dollar expenditures for construction, development and supply of goods and services. Initially, CMHA will seek to meet this goal by expanding and improving its contacts with appropriate minority and/or female business enterprises, so that more responsive proposals and competitive quotations can be solicited and received from such business enterprises. CMHA will, therefore, compile and maintain a master list of minority and female business enterprises (categorized and referenced by types of businesses) and related non-profit or service organizations. These businesses and specific groups will be kept informed, through outreach activities, regarding general and specific business opportunities with CMHA. Formal bidding through public advertisements will also be paid for or sponsored by CMHA with minority press and media as well as the major Columbus newspaper. Training sessions, focusing on both CMHA's general business practices and specific construction jobs or purchasing transactions, will also be conducted for the benefit of minority and/or female business enterprises on a regular basis. Actual contract awards for construction and purchasing will be recorded and monitored for minority and/or female business enterprise participation, and selected bidders will be expected to achieve their minority and/or female business enterprise commitments. Implementation duties for this policy will be delegated to the Minority Business/Contract Compliance Officer (for development activities) and the Purchasing Agent (for procurement activities), under the general supervision of the President\CEO. The Columbus Metropolitan Housing Authority Page 20 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION RFP 2014-032: PROFILE OF FIRM FORM (Attachment F) (This Form must be fully completed and placed under Section No. 3 of the “hard copy” sectioned proposal submittal.) (1) Prime___ Joint Venture/ Partner___ Sub-contractor___ (This form must be completed by and for each). (2) Name of Firm:_____________________________ Telephone:_____________ Fax: ____________ (3) Street Address, City, State, Zip:______________________________________________________ (4) Please attached a brief biography/resume of the company, including the following information: (a) Year Firm Established; (b) Year Firm Established in (Jurisdiction); (c) Former Name and Year Established (if applicable); (d) Name of Parent Company and Date Acquired (if applicable). (5) Identify Principals/Partners in Firm (Provide resumes for each under Section No. 3): NAME TITLE % OF OWNERSHIP (6) Identify the individual(s) that will act as project manager and any other supervisory personnel that will work on project; please submit under Section No. 3 a brief resume for each. (Do not duplicate any resumes required above): NAME TITLE (7) Identify the rate in which employees are paid: POSITION WITHIN ORGANIZATION MANNER OF PAY (HOURLY/COMMISSION, OTHER) (8) Bidder Diversity Statement: You must circle all of the following that apply to the ownership of this firm and enter where provided the correct percentage (%) of ownership of each:  Caucasian  Public-Held  Government  Non-Profit American (Male) Corporation Agency Organization ________% _________% _________% _________% Resident- (RBE), Minority- (MBE), or Woman-Owned (WBE) Business Enterprise (Qualifies by virtue of 51% or more ownership and active management by one or more of the following: Resident- African Owned* American _______% _______% **Native American _______% Woman-Owned Woman-Owned (MBE) (Caucasian) _______% _______% Hispanic American _______% Disabled Veteran ______% Asian/Pacific Hasidic Asian/Indian American Jew American ________% ______% ________% Other (Specify): _______% The Columbus Metropolitan Housing Authority Page 21 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION WMBE Certification Number:___________________ Certified by (Agency):______________________ (9) Federal Tax ID No.:__________________________________________________________________ (10) Columbus, Ohio Business License No.:______________________________________ (11) State of ______ License Type and No.:________________________________________________ (12)Worker’s Compensation Insurance Carrier:______________________________________________ Policy No.:__________________________________ Expiration Date:_______________________ (13) General Liability Insurance Carrier:___________________________________________________ Policy No. __________________________________ Expiration Date:_______________________ (14) Professional Liability Insurance Carrier: _______________________________________________ Policy No. __________________________________ Expiration Date:_______________________ (15) Debarred Statement: Has this firm, or any principal(s) ever been debarred from providing any services by the Federal Government, any state government, the State of _______, or any local government agency within or without the State of _________? Yes  No  If "Yes," please attach a full detailed explanation, including dates, circumstances and current status. (16) Disclosure Statement: Does this firm or any principals thereof have any current, past personal or professional relationship with any Commissioner or Officer of the HA? Yes  No  If "Yes," please attach a full detailed explanation, including dates, circumstances and current status. (17) Non-Collusive Affidavit: The undersigned party submitting this proposal hereby certifies that such proposal is genuine and not collusive and that said bidder entity has not colluded, conspired, connived or agreed, directly or indirectly, with any bidder or person, to put in a sham proposal or to refrain from proposing, and has not in any manner, directly or indirectly sought by agreement or collusion, or communication or conference, with any person, to fix the proposal price of affiant or of any other bidder, to fix overhead, profit or cost element of said proposal price, or that of any other bidder or to secure any advantage against the HA or any person interested in the proposed contract; and that all statements in said proposal are true. (18) Verification Statement: The undersigned bidder hereby states that by completing and submitting this form he/she is verifying that all information provided herein is, to the best of his/her knowledge, true and accurate, and agrees that if the HA discovers that any information entered herein is false, that shall entitle the HA to not consider nor make award or to cancel any award with the undersigned party. ______________________ __________ Signature Date _______________________ ___________________ Printed Name Company The Columbus Metropolitan Housing Authority Page 22 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION Attachment G: Section 3 CERTIFICATION FOR BUSINESS CONCERNS SEEKING SECTION 3 BUSINESS PREFERENCE IN CONTRACTING AND DEMONSTRATION OF CAPABILITY NAME OF BUSINESS: ADDRESS OF BUSINESS: TYPE OF BUSINESS: Corporation Partnership Sole Proprietorship Joint Venture Attached is the following documentation as evidence of status: For business claiming status as a Section 3 resident-owned Enterprise: Copy of resident lease Other evidence Copy of evidence of participation in a public assistance program For the business entity as applicable: Copy of Articles of Incorporation Certificate of Good Standing Assumed Business Name Certificate Partnership Agreement List of owners/stockholder and % of each Corporation Annual Report Latest Board minutes appointing officers Additional documentation Organization chart with names and titles and brief functional statement For business claiming Section 3 status by subcontracting 25% of the dollar awarded to qualified Section 3 business: List of subcontracted Section 3 business and subcontract amount For business claiming Section 3 status, claiming at least 30% of their workforce are currently Section 3 residents or were Section 3 eligible residents within 3 years of date of first employment with the business: List of all current full time employees List of all employees claiming Section 3 status PHA Residential lease (less than 3 years from date of employment) Other evidence of Section 3 status (less than3 years from date of employment) Evidence of ability to perform successfully under the terms and conditions of the proposed contract: Current financial statement List of owned equipment Statement of ability to comply List of all contracts for the past 2 years with public policy Corporate Seal Authorizing Name and Signature Notary My term expires: Title _____________________________________________________________________________________ Signature Date The Columbus Metropolitan Housing Authority Page 23 Printed Name INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION (Attachment G) SUGGESTED AFFIRMATIVE ACTION PLAN FOR UTILIZATION OF PROJECT AREA BUSINESSES Number Of All Contracts Proposed: Name Of Company: Dollar Value Of All Contracts Proposed: Project: To The Greatest Extent Feasible, Contracts Will Be Awarded Through Negotiation Or Proposal To Qualified Project Area Businesses. Goal Of These Contracts For Project Area Businesses: PROPOSED TYPE OF CONTRACT APPROX. COST PROPOSED TYPE OF CONTRACT APPROX. COST Outline The Program To Achieve These Goals For Economically And Socially Disadvantaged: NOTE: To Complete The Affirmative Action Plan, Follow Steps Outlines In Attached Exhibit. (INSERT THIS DOCUMENT IN PROPOSAL DOCUMENTS AND WITH PROPOSAL) DATE: _____________________________________________________________________________________ Signature Date The Columbus Metropolitan Housing Authority Page 24 Printed Name INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION (Attachment G) SUGGESTED AFFIRMATIVE ACTION PLAN FOR UTILIZATION OF PROJECT AREA BUSINESSES (con'd) SUGGESTED SECTION 3 PRELIMINARY WORKFORCE STATEMENT UTILIZATION OF LOWER INCOME PROJECT AREA RESIDENTS AS REGULAR, PERMANENT EMPLOYEES, TRAINEES, APPRENTICES. COMPANY NAME: ADDRESS: PROJECT: PRESENT PERMANENT EMPLOYEES (At Time of Contract Signing) SECTION 3 WORKFORCE PROJECTION (Residents) TOTAL PROJECTED WORKFORCE INCREASE TRAINEES APPRENTICES JOURNEYPERSONS LABORERS SUPERVISORY SUPERINTENDENT PROFESSIONAL CLERICAL NOTE: RESIDENTS ARE THOSE LOWER INCOME PROJECT AREA RESIDENTS WHO HAVE BEEN QUALIFIED AS ELIGIBLE. _____________________________________________________________________________________ Signature Date The Columbus Metropolitan Housing Authority Page 25 Printed Name INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION SECTION 3 BUSINESS PREFERENCE CLAUSE (Attachment G) This contract is subject to the following conditions under Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). A. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low and very low-income persons, particularly persons who are recipients of HUD assistance for housing. B. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 135, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other impediment that would prevent them from complying with the Part 135 regulations. C. The contractor agrees to send to each labor organization or representative of workers with which the contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor or organization or workers' representative of the contractor's commitments under this Section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin. D. The contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR Part 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon finding that the subcontractor is in violation of the regulations in 24 CFR Part 135. The contractor will not subcontract with any subcontractor where the contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR Part 135. E. The contractor will certify that any vacant employment positions, including training positions that are filled (1) after the contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR Part 135 require employment opportunities to be directed, were not filled to circumvent the contractor's obligations under 24 CFR Part 135. F. Noncompliance with HUD's regulations in 24 CFR Part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts. G. With respect to work performed in connection with Section 3 covered Indian housing assistance, Section 7(b) of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 450e) also applies to the work to be performed under this contract. Section 7(b) requires that to the greatest extent feasible (preference and opportunities for training and employment shall be given to Indians, and (ii) preference in the award of contracts and subcontracts shall be given to Indian organizations and Indian-owned Economic Enterprise. Parties to this contract that are subject to the provisions of Section 3 and Section 7(b) agree to comply with Section 3 to the maximum extent feasible, but not in derogation of compliance with Section 7(b). The Columbus Metropolitan Housing Authority Page 26 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION PREFERENCE FOR SECTION 3 BUSINESS CONCERNS IN CONTRACTING OPPORTUNITIES (Attachment G) The HA has established the following priority for preference when providing contracting opportunities to Section 3 Businesses: Priority I Category 1a Business Business concerns that are 51 percent or more owned by residents of the housing development or developments for which the Section 3-covered assistance is expended. Priority II Category 1b Business Business concerns whose workforce includes 30 percent of residents of the housing development for which the Section 3-covered assistance is expended, or within three (3) years of the date of first employment with the business concern, were residents of the Section 3-covered housing development. Priority III Category 2a Business Business concerns that are 51 percent or more owned by residents of any other housing development or developments. Priority IV Category 2b Business Business concerns whose workforce includes 30 percent of residents of any other public housing development or developments, or within three (3) years of the date of first employment with the business concern, were “Section 3” residents of any other public housing development. Priority V Category 3 Business Business concerns participating in HUD Youth-build programs being carried out in the metropolitan area in which the Section 3-covered assistance is expended. Priority VI Category 4a Business Business concerns that are 51 percent or more owned by Section 3 residents in the metropolitan area, or whose permanent, full-time workforce includes no less than 30 percent of Section 3 residents in the metropolitan area, or within three (3) years of the date of employment with the business concern, were Section 3 residents in the metropolitan area. Priority VII Category 4b Business Business concerns that subcontract in excess of 25 percent of the total amount of subcontracts to Section 3 business concerns. Eligibility for Preference A business concern seeking to qualify for a Section 3 contracting preference shall certify or submit evidence that the business concern is a Section business concern. The Columbus Metropolitan Housing Authority Page 27 INVITATION FOR BIDS (IFB) NO. 2014-032 FIRE RESTORATION (Attachment G) HUD directs within 24 CFR 135 that the HA may make award to qualified Section 3 business concern with the highest priority ranking and with the lowest responsive proposal if that proposal is: (a) within the maximum total contract price established by the HA; or (b) not more than “X” higher than the total proposal price of the lowest responsive proposal from any responsible bidder. “X” is determined as follows: “X” = LESSOR OF: When the lowest responsive proposal is less than $100,000 When the lowest responsive proposal is at least: $100,000.00, but less than $200,000.00 10% of that proposal, or $9,000.00 9% of that proposal, or $16,000.00 $200,000.00, but less than $300,000.00 8% of that proposal, or $21,000.00 $300,000.00, but less than $400,000.00 7% of that proposal, or $24,000.00 $400,000.00, but less than $500,000.00 6% of that proposal, or $25,000.00 $500,000.00, but less than $1,000,000.00 5% of that proposal, or $40,000.00 $1,000,000.00, but less than $2,000,000.00 4% of that proposal, or $60,000.00 $2,000,000.00, but less than $4,000,000.00 3% of that proposal, or $80,000.00 $4,000,000.00, but less than $7,000,000.00 2% of that proposal, or $105,000.00 $7,000,000.00, or more 1.5% of the lowest responsive and responsible proposal with no dollar limit THE COLUMBUS METROPOLITAN HOUSING AUTHORITY (HA) Page 28 2 *Replace the entire unit flooring with Durafloor (Honey Tree). All carpet and EAGLE ADJUSTING baseboards to be removed. *Replace all receptacles throughout the EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 entire unit, including but not limited to light NOBLESVILLE,INDIANA46061 switches, outlets, cover plates, tele/data T:877-839-8152;F:866-509-2719 ports, etc. *Approved equals for all items may be 14-58261 accepted pending CMHA review. SKETCH1 *Include $1,500.00 in the bid for permits. Main Level Porch 12' 8' 2" 8' 8" 4' 3" 11' 6" 1' 1" 11" 3' Porch 6' 5" 3' OM ONE Bedroom 2 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 93.92 SF Ceiling 93.92 SF Floor 36.33 LF Floor Perimeter Door Kitchen Window 3' X 6' 8" Opens into LIVING_ROOM 3' X 5' Opens into KITCHEN WASH/DRYER REFRIGERATOR (1) (2) DESCRIPTION QTY 1a. Remove 2" x 8" Stairs lumber (1.33 BF per LF) 474.00 LF Linen 1b. 2" x Closet 8" lumber (1.33 BF per LF) Up 474.00 LF Bathroom Hallway 2a. Remove Sheathing - plywood - 1/2" CDX-Includes front upper wall 137.12 SF GFCI loset (1) 279.67 373.58 10.44 39.33 GFCI GFCI Living Room Height: 8' 2b. Sheathing - plywood Closet (1) - 1/2" CDX-Includes front upper wall 137.12 SF 3a. Remove Gutter / downspout - aluminum - up to 5" 31.42 LF 3b. Gutter / downspout - aluminum - up to 5" Match Existing 31.42 LF 4a. Remove Soffit - metal 90.12 SF Bedroom 3 4b. Soffit - metal Match Existing 90.12 SF 5a. Remove Fascia - metal - 8" 39.84 LF 5b. Fascia - metal - 8" Match Existing 6a. Remove In-wall speaker 39.84 LF 1.00 EA 6b. In-wall speaker Match Existing to Property 7. Clean with pressure/chemical spray - Very heavy- INCLUDES FLOOR AND CAP 1.00 EA 245.48 SF 8a. Remove Exterior light fixture 8b. Exterior light fixture 1.00 EA Match Existing to Property 1.00 EA 9a. Remove Storm door assembly 9b. Storm door assembly 1.00 EA Match Existing to Property 1.00 EA 10a. Remove Light fixture 10b. Light fixture 1.00 EA Match Existing to Property 1.00 EA 11a. Remove 110 volt copper wiring run and box - rough in only 1.00 EA 11b. 110 volt copper wiring run and box - rough in only 1.00 EA 12a. Remove 110 volt copper wiring run, box and switch 1.00 EA 12b. 110 volt copper wiring run, box and switch 1.00 EA 14-58261 12/5/2014 Page: 2 3 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Porch DESCRIPTION QTY 13a. Remove 110 volt copper wiring run, box and outlet 3.00 EA 13b. 110 volt copper wiring run, box and outlet 3.00 EA 9' 2" 5' 5" 3' Porch GFCI GFCI Living Room 7' 3" 7' 1" Living Room 5' 3" 9' 6' 9" 1' 1" 6' 7" 11" 3' 4' 3" 3' Kitchen 2' 11" 3' 7' 8" 3' 11" 3' 3' 7" 7' 4" 11' 5" 11' 9" NOTES: WASH/DRYER (1) (2) 4' 1"REFRIGERATOR Stairs Linen Closet BEDROOM ONE Hallway Bathroom Up 11' 5" 11' 1" GFCI Missing Wall - Goes to Floor Door Closet (1) Closet Closet (1) (1) Window Window Bedroom 2 Bedroom 3 Height: 8' 475.67 811.39 37.30 70.08 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 335.72 SF Ceiling 335.72 SF Floor 64.08 LF Floor Perimeter 3' X 6' 8" Opens into KITCHEN 3' X 6' 8" Opens into PORCH 3' X 5' Opens into Exterior 3' X 5' Opens into Exterior Window 3' X 5' Opens into Exterior Missing Wall 4' 1" X 8' Opens into HALLWAY DESCRIPTION QTY 14. Content Manipulation charge - per hour 2.00 HR 15. Seal truss system - up to 5/12 335.72 SF 16a. Remove Blown-in cellulose insulation - 10" depth - R38 335.72 SF 16b. Blown-in cellulose insulation - 10" depth - R38 335.72 SF 17a. Remove Batt insulation - 4" - R13 - paper faced 238.00 SF 17b. Batt insulation - 4" - R13 - paper faced 238.00 SF 18. Seal masonry - elastomeric sealer 124.64 SF 19. Seal stud wall for odor control (shellac) 475.67 SF 20. Seal attic framing for odor control - up to 5/12 14-58261 12/5/2014 335.72 SF Page: 3 4 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Living Room DESCRIPTION QTY 21. Seal floor or ceiling joist system 335.72 SF 22a. Remove 5/8" drywall - hung, taped, floated, ready for paint 335.72 SF 22b. 5/8" drywall - hung, taped, floated, ready for paint 335.72 SF 23. Seal the ceiling w/latex based stain blocker - one coat 335.72 SF 345. Acoustic ceiling (popcorn) texture Field verify per site visit if this is required. 335.72 SF 25. Mask and prep for paint - plastic, paper, tape (per LF) 70.08 LF 26a. Remove 1/2" drywall - hung, taped, floated, ready for paint 475.67 SF 26b. 1/2" drywall - hung, taped, floated, ready for paint 475.67 SF 27. Seal/prime then paint the walls and ceiling (2 coats) 811.39 SF SW-7526 Maison Blanche 28a. Remove Ductwork - hot or cold air 31.00 LF 28b. Ductwork - hot or cold air 31.00 LF Simonton Reflections model #5500, or equal to fit opening. 2.00 EA 30. Baseboard - 3 1/4" REPLACE - Johnsonite RWDC-49 (beige) 64.08 LF 29. Vinyl window - double hung, 13-19 sf 31. Stain & finish baseboard 64.08 LF 32a. Remove Casing - 2 1/4"- INCLUDES WINDOW 49.00 LF 32b. Casing - 2 1/4"- INCLUDES WINDOW 49.00 LF 33. Paint casing - two coats Match Existing 49.00 LF 34a. Remove Exterior door - metal - insulated - flush or panel style 1.00 EA 34b. Exterior door - metal - insulated - flush or panel style Match Existing to Property 1.00 EA 35. Door lockset & deadbolt - exterior Insta-Key system to be used. Coordinate with CMHA. Temporary core to be used during construction. 36. Paint door or window opening - 2 coats (per side) 1.00 EA Match Existing to Property 37. Paint door slab only - 2 coats (per side) Match Existing to Property 3.00 EA 38a. Remove Light fixture 2.00 EA 38b. Light fixture 4.00 EA Lowes Item #40803 - Use with CFL Bulbs 2.00 EA 39a. Remove 110 volt copper wiring run and box - rough in only 2.00 EA 39b. 110 volt copper wiring run and box - rough in only 2.00 EA 40a. Remove 110 volt copper wiring run, box and switch 2.00 EA 40b. 110 volt copper wiring run, box and switch 2.00 EA 41a. Remove 110 volt copper wiring run, box and outlet 6.00 EA 41b. 110 volt copper wiring run, box and outlet 6.00 EA 42. Remove Carpet pad 335.72 SF 43. Carpet pad 335.72 SF 14-58261 12/5/2014 Page: 4 5 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Living Room DESCRIPTION 44. Remove Carpet 45. Carpet 335.72 SF REPLACE - All flooring to be Durafloor (honeytree) 386.08 SF 15 % waste added for Carpet. 46a. Remove Carpet - metal transition strip 10.00 LF 46b. Carpet - metal transition strip 10.00 LF 47a. Remove Smoke detector 1.00 EA First Alert model #41798, Lowes item #304176 47b. Smoke detector 1.00 EA NOTES: Porch GFCIGFCI Kitchen 7' 4" 7' 6" 6' 9" 6' 5" 3' 6' 7" 2' 1" Living Room OM ONE QTY 7" 5' 4" 2' 8" 6" 2' 6" 2" WASH/DRYER REFRIGERATOR (1) (2) Door Linen Closet Window Hallway 2' 6" 3' Kitchen Stairs Up Bathroom GFCI Missing Wall - Goes to Floor Height: 8' 213.83 330.31 12.94 34.87 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 116.48 SF Ceiling 116.48 SF Floor 26.87 LF Floor Perimeter 2' 6" X 6' 8" Opens into Exterior 3' X 5' Opens into PORCH 3' X 6' 8" Opens into LIVING_ROOM 2' 6" X 6' 8" Opens into STAIRS Closet (1) Door oset (1) Bedroom 3 edroom 2 14-58261 12/5/2014 Page: 5 6 Porch EAGLE ADJUSTING GFCIGFCI EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 Kitchen Porch Subroom: WASH/DRYER (1) 2' 11" 89.02 104.47 1.72 11.13 WASH/DRYER (1) REFRIGERATOR (2) 2' 8" GFCIGFCI 2" 2' 10" 5' 4" 2' 6" Height: 8' SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 15.45 SF Ceiling 15.45 SF Floor 11.13 LF Floor Perimeter Stairs Kitchen Linen Closet Missing Wall 5' 3 3/4" X 8' Up Opens into KITCHEN Bathroom Hallway 69.20 76.96 0.86 8.65 2' 11" Closet (1) 3' 1" 2' 11" Subroom: REFRIGERATOR (2) GFCI 2' 8" WASH/DRYER (1)REFRIGERATOR (2) 2' 10" Height: 8' SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 7.76 SF Ceiling 7.76 SF Floor 8.65 LF Floor Perimeter Stairs Missing Wall 2' 8" X 8' Linen Closet Opens into KITCHEN Up Bathroom DESCRIPTION QTY Bedroom 3 1.00 EA 48b. Heat/AC register - Mechanically attached 1.00 EA GFCI 48a. Remove Heat/AC register - Mechanically attached Closet (1) 49a. Remove Ductwork - hot or cold air 20.00 LF 49b. Ductwork - hot or cold air 20.00 LF 50. Seal masonry - elastomeric sealer 170.00 SF 51. Seal stud wall for odor control (shellac) 372.06 SF 52. Seal attic framing for odor control - up to 5/12 139.68 SF 53. Seal floor or ceiling joist system 139.68 SF 54. Rigid foam insulation board - 2" 156.00 SF Bedroom 3 55a. Remove Batt insulation - 4" - R13 - paper faced 186.00 SF 55b. Batt insulation - 4" - R13 - paper faced 186.00 SF 56a. Remove 5/8" drywall - hung, taped, floated, ready for paint 139.68 SF 56b. 5/8" drywall - hung, taped, floated, ready for paint 139.68 SF 346. Deodorize building - Hot thermal fog 347. Acoustic ceiling (popcorn) texture 1117.46 CF Field verify per site visit if this is required. 139.68 SF 58. Seal the ceiling w/latex based stain blocker - one coat 139.68 SF 59a. Remove 1/2" drywall - hung, taped, floated, ready for paint 372.06 SF 59b. 1/2" drywall - hung, taped, floated, ready for paint 372.06 SF 60. Mask and prep for paint - plastic, paper, tape (per LF) 102.65 LF 61. Seal truss system - up to 5/12 139.68 SF 14-58261 12/5/2014 Page: 6 7 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Kitchen DESCRIPTION QTY 62. Seal/prime then paint the walls (2 coats) SW-7526 Maison Blanche 372.06 SF 63a. Remove Casing - 2 1/4" 34.00 LF 63b. Casing - 2 1/4" 34.00 LF 64. Stain & finish casing 34.00 LF 65. Paint door or window opening - 2 coats (per side) SW-6089 Grounded 3.00 EA 66a. Remove Exterior door - metal - insulated - flush or panel style 66b. Exterior door - metal - insulated - flush or panel style 67. Door lockset & deadbolt - exterior 68. Detach & Reset Casing - 2 1/4" 1.00 EA Match Existing to Property 1.00 EA Insta-Key system to be used. Coordinate with CMHA. Temporary core to be used during construction. 1.00 EA 34.00 LF SW-6089 Grounded 70. Door knob - interior Match Existing to Property 71. Paint door slab only - 2 coats (per side) Match Existing to Property 2.00 EA 72a. Remove Interior door unit 1.00 EA 69. Paint door/window trim & jamb - 2 coats (per side) 72b. Interior door unit 1.00 EA 2.00 EA Masonite flush door series with dorcor (solid core) 1.00 EA 73a. Remove Vinyl window, horizontal sliding, 12-23 sf 73b. Vinyl window, horizontal sliding, 12-23 sf 1.00 EA Simonton Reflections model #5500, or equal to fit opening. 1.00 EA 74a. Remove Cove base molding - rubber or vinyl, 4" high 74b. Cove base molding - rubber or vinyl, 4" high 46.65 LF REPLACE - Johnsonite RWDC-49 (beige) 46.65 LF 75a. Remove Smoke detector 1.00 EA First Alert model #41798, Lowes item #304176 76. Refrigerator - top freezer - 14 to 18 cf - Std grade Frigidaire Model #FFHT1826LB (black) 77. Range - freestanding - electric Frigidaire Model #FFEF3011LB (black) 78. Range hood Broan Model #F403023 (black) 1.00 EA 75b. Smoke detector 79a. Remove Tile - vinyl composition 79b. Tile - vinyl composition 1.00 EA 1.00 EA 1.00 EA 139.68 SF REPLACE - All flooring to be Durafloor (honeytree) 139.68 SF 80. 4" backsplash for flat laid countertop 16.25 LF 81. Paint casing - two coats 34.00 LF 82a. Remove Countertop - flat laid plastic laminate 82b. Countertop - flat laid plastic laminate 16.25 LF New Plastic Laminate countertop with 4" backsplash - Formica Butterum granite 7732-46. 357a. Remove Sink faucet - Kitchen 357b. Sink faucet - Kitchen 1.00 EA Peerless model #P110LF 1.00 EA 359a. Remove Sink - double - Standard grade 14-58261 16.25 LF 1.00 EA 12/5/2014 Page: 7 8 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Kitchen **Install new FRP wall backing in area's between top of back splash and bottom of cabinet. Use Marlite Symmetrix FRPC145-G44 (silver). DESCRIPTION 359b. Sink - double - Standard grade Houzer Model #3322-8BS3 QTY 1.00 EA Includes: Double bowl sink, "P" trap, end outlet continuous waste, and installation labor. Labor cost to remove a sink and to discard in a job-site waste receptacle. Excludes: Strainer/drain assemblies; see items PLM SNKST*. Quality: 20 gauge stainless steel, self-rimming sink. Note: This labor cost is to remove only the sink if the faucet is going to be detached and reset. This cost may also include the removal of the sink and the sink faucet if the faucet is also going to be discarded. Average life expectancy 50 years - Replace garbage disposal - In-Sink-Erator Model # Average depreciation 2% per year Badger 1 (1/3 HP, 120V/1HP). Maximum depreciation 100% - Check all piping, fittings, valves, shutoffs, etc. Replace 1.00 EA 360. Sink strainer and drain assembly 83a. Remove Cabinetry - upper (wall) units 83b. Cabinetry - upper (wall) units any items which are not working. 18.00 LF Armstrong Extreme Series, Coronet (mocha) 18.00 LF 84a. Remove Cabinetry - lower (base) units 16.25 LF 84b. Cabinetry - lower (base) units Armstrong Extreme Series, Coronet (mocha) 85a. Remove Light fixture 16.25 LF 85b. Light fixture 1.00 EA Lowes Item #40803 - Use with CFL Bulbs 1.00 EA 86a. Remove Fluorescent light fixture 86b. Fluorescent light fixture 1.00 EA Utilitech Under Cabinet Light, Hardwired - Lowes item #69486 1.00 EA 87a. Remove 110 volt copper wiring run and box - rough in only 5.00 EA 87b. 110 volt copper wiring run and box - rough in only 5.00 EA 88a. Remove 110 volt copper wiring run, box and switch 3.00 EA 88b. 110 volt copper wiring run, box and switch 3.00 EA 89a. Remove Outlet - High grade 2.00 EA 89b. Outlet - High grade 2.00 EA 90a. Remove 220 volt copper wiring run, box and receptacle 1.00 EA 90b. 220 volt copper wiring run, box and receptacle 1.00 EA 91a. Remove Ground fault interrupter (GFI) outlet 2.00 EA 91b. Ground fault interrupter (GFI) outlet 2.00 EA 92a. Remove 110 volt copper wiring run, box and outlet 6.00 EA 92b. 110 volt copper wiring run, box and outlet 6.00 EA 14-58261 12/5/2014 Page: 8 9 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Kitchen DESCRIPTION QTY NOTES: Porch GFCIGFCI Living Room Kitchen WASH/DRYER REFRIGERATOR (1) (2) 4' 1" 1' 2" 3' 5" 1' 3' 3" 4" 2' 9" GFCI 2' 6" Closet (1) Closet (1) 3' 1" 2' 6" 1' 1" Up Bathroom 2' 6" 6' 6" Linen Closet Hallway 2' 6" BEDROOM ONE 6" 6' 2" Hallway Closet (1) 7" Door Bedroom 2 Missing Wall Height: 8' Stairs Bedroom 3 169.31 221.75 5.83 31.58 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 52.44 SF Ceiling 52.44 SF Floor 19.08 LF Floor Perimeter 2' 6" X 6' 8" Opens into BEDROOM_ONE 4' 1" X 8' Opens into LIVING_ROOM Door 2' 6" X 6' 8" Opens into LINEN_CLOSET Door 2' 6" X 6' 8" Opens into BATHROOM Door 2' 6" X 6' 8" Opens into BEDROOM_3 Door 2' 6" X 6' 8" Opens into BEDROOM_2 DESCRIPTION QTY 348. Acoustic ceiling (popcorn) texture 52.44 SF 93a. Remove Batt insulation - 4" - R13 - paper faced 169.31 SF 93b. Batt insulation - 4" - R13 - paper faced 169.31 SF 94a. Remove Thermostat 1.00 EA 94b. Thermostat Match Existing 95a. Remove Smoke detector 1.00 EA 95b. Smoke detector 1.00 EA First Alert model #41798, Lowes item #304176 1.00 EA 96a. Remove Attic entrance cover and trim 1.00 EA 96b. Attic entrance cover and trim 1.00 EA 97. Seal truss system - up to 5/12 52.44 SF 98. Seal attic framing for odor control - up to 5/12 52.44 SF 99. Seal floor or ceiling joist system 14-58261 12/5/2014 52.44 SF Page: 9 10 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Hallway DESCRIPTION QTY 100a. Remove Blown-in cellulose insulation - 10" depth - R38 52.44 SF 100b. Blown-in cellulose insulation - 10" depth - R38 52.44 SF 101. Seal stud wall for odor control (shellac) 169.31 SF 102a. Remove 5/8" drywall - hung, taped, floated, ready for paint 52.44 SF 102b. 5/8" drywall - hung, taped, floated, ready for paint 52.44 SF 103. Seal the ceiling w/latex based stain blocker - one coat 52.44 SF 105. Mask and prep for paint - plastic, paper, tape (per LF) 31.58 LF 106a. Remove 1/2" drywall - hung, taped, floated, ready for paint 169.31 SF 106b. 1/2" drywall - hung, taped, floated, ready for paint 169.31 SF 107. Seal/prime then paint the walls and ceiling (2 coats) SW-7526 Maison Blanche 221.75 SF 108. Clean ductwork - Interior - Heavy clean (PER REGISTER) 1.00 EA 109. Baseboard - 3 1/4" REPLACE - Johnsonite RWDC-49 (beige) 110. Stain & finish baseboard 19.08 LF 19.08 LF 111a. Remove Light fixture 111b. Light fixture 1.00 EA Lowes Item #40803 - Use with CFL Bulbs 1.00 EA 112a. Remove 110 volt copper wiring run and box - rough in only 1.00 EA 112b. 110 volt copper wiring run and box - rough in only 1.00 EA 113a. Remove 110 volt copper wiring run, box and switch 2.00 EA 113b. 110 volt copper wiring run, box and switch 2.00 EA 114a. Remove 110 volt copper wiring run, box and outlet 3.00 EA 114b. 110 volt copper wiring run, box and outlet 3.00 EA 115. Remove Carpet pad 52.44 SF 116. Carpet pad 52.44 SF 117. Remove Carpet 52.44 SF 118. Carpet REPLACE - All flooring to be Durafloor (honeytree) 60.31 SF 15 % waste added for Carpet. NOTES: 14-58261 12/5/2014 Page: 10 11 Porch EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 Kitchen T:877-839-8152;F:866-509-2719 GFCIGFCI Living Room WASH/DRYER REFRIGERATOR (1) (2) 2' 10" 3' 2" 2" 2' 6" 3' 1" 7' Up Bathroom GFCI 6" Hallway 1' Linen Closet DROOM ONE Height: 8' 136.29 154.75 2.05 19.12 Stairs 6' 10" 1' 2" 3' 1" Linen Closet 2' 8" SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 18.46 SF Ceiling 18.46 SF Floor 16.62 LF Floor Perimeter Closet (1) Closet (1) Door 2' 6" X 6' 8" Opens into HALLWAY DESCRIPTION QTY 119. Content Manipulation charge - per hour Bedroom 2 1.00 HR Bedroom 3 120a. Remove Blown-in cellulose insulation - 10" depth - R38 18.46 SF 120b. Blown-in cellulose insulation - 10" depth - R38 18.46 SF 121. Seal truss system - up to 5/12 18.46 SF 122. Seal stud wall for odor control (shellac) 136.29 SF 123. Seal attic framing for odor control - up to 5/12 18.46 SF 124. Seal floor or ceiling joist system 18.46 SF 125a. Remove 5/8" drywall - hung, taped, floated, ready for paint 18.46 SF 125b. 5/8" drywall - hung, taped, floated, ready for paint 18.46 SF 349. Acoustic ceiling (popcorn) texture Field verify per site visit if this is required. 18.46 SF 126. Seal the ceiling w/latex based stain blocker - one coat 18.46 SF 128. Mask and prep for paint - plastic, paper, tape (per LF) 19.12 LF 129a. Remove 1/2" drywall - hung, taped, floated, ready for paint 136.29 SF 129b. 1/2" drywall - hung, taped, floated, ready for paint 136.29 SF SW-7526 Maison Blanche 131. Baseboard - 3 1/4" REPLACE - Johnsonite RWDC-49 (beige) 154.75 SF 130. Seal/prime then paint the walls and ceiling (2 coats) 16.62 LF 132. Stain & finish baseboard 16.62 LF 133a. Remove Casing - 2 1/4" 17.00 LF 133b. Casing - 2 1/4" 17.00 LF 134. Stain & finish casing 17.00 LF SW - 6089 Grounded 136. Paint door slab only - 2 coats (per side) SW - 6089 Grounded 2.00 EA 137a. Remove Shelving - wire (vinyl coated) 6.50 LF 137b. Shelving - wire (vinyl coated) 6.50 LF 135. Paint door or window opening - 2 coats (per side) 138. Door knob - interior 2.00 EA Shelving to be wood with supports as required, painted to match walls. Match Existing 1.00 EA 139a. Remove Interior door unit 1.00 EA Masonite flush door series with dorcor (solid core) 140. Paint door/window trim & jamb - 2 coats (per side) SW - 6089 Grounded 1.00 EA 139b. Interior door unit 2.00 EA 141. Remove Carpet pad 14-58261 18.46 SF 12/5/2014 Page: 11 12 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Linen Closet DESCRIPTION QTY 142. Carpet pad 18.46 SF 143. Remove Carpet 18.46 SF 144. Carpet REPLACE - All flooring to be Durafloor (honeytree) 21.23 SF 15 % waste added for Carpet. 145a. Remove Carpet - metal transition strip 3.00 LF 145b. Carpet - metal transition strip 3.00 LF 343a. Remove Water supply line - copper with fitting and hanger, 1/2" 1.00 LF 343b. Water supply line - copper with fitting and hanger, 1/2" 1.00 LF NOTES: Porch GFCIGFCI m Kitchen Stairs 6" 2' 6" 5' 10" Stairs Linen Closet Up 1" Bathroom Hallway 9' 1" 8' 11" 3' 1" 2" WASH/DRYER REFRIGERATOR (1) (2) Height: 17' 225.11 250.55 5.91 17.82 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 25.44 SF Ceiling 53.16 SF Floor 23.69 LF Floor Perimeter 2' 9" GFCI Closet (1) Door 2' 6" X 6' 8" Opens into KITCHEN Missing Wall 1" X 17' Opens into Exterior Missing Wall 2' 9 1/4" X 17' Opens into CLOSET Bedroom 3 DESCRIPTION QTY 146a. Remove 1/2" drywall - hung, taped, floated, ready for paint 225.11 SF 146b. 1/2" drywall - hung, taped, floated, ready for paint 225.11 SF 147. Seal/prime then paint the walls (2 coats) SW-7526 225.11 SF Maison Blanche 148a. Remove 5/8" drywall - hung, taped, floated, ready for paint 25.44 SF 148b. 5/8" drywall - hung, taped, floated, ready for paint 25.44 SF 14-58261 12/5/2014 Page: 12 13 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Stairs DESCRIPTION QTY Field verify per site visit if this is required. 150. Seal/prime then paint the ceiling (2 coats) SW-7526 Maison Blanche 25.44 SF 151. Mask and prep for paint - plastic, paper, tape (per LF) 17.82 LF 152. Detach & Reset Handrail - round / oval - softwood - wall mounted 30.00 LF 153. Stain & finish handrail - wall mounted 30.00 LF 154. Clean stair tread - per side - per LF 45.00 LF 155. Clean stair riser - per side - per LF 451.00 LF 350. Acoustic ceiling (popcorn) texture 25.44 SF 156. Clean stair stringer - per side 32.00 LF 157a. Remove Light fixture 157b. Light fixture 1.00 EA Match Existing 1.00 EA 158a. Remove 110 volt copper wiring run and box - rough in only 1.00 EA 158b. 110 volt copper wiring run and box - rough in only 1.00 EA 159a. Remove 110 volt copper wiring run, box and switch 2.00 EA 159b. 110 volt copper wiring run, box and switch 2.00 EA 160a. Remove Smoke detector 1.00 EA 160b. Smoke detector First Alert model #41798, Lowes item #304176 1.00 EA NOTES: Porch Kitchen WASH/DRYER REFRIGERATOR (1) (2) 2' 6" 2' 8" 6' 10" 5' 4" 10' 3" Bathroom Up GFCI 2" Hallway 10' 9" 7' Linen Closet 1' 8" Closet (1) Bedroom 2 Stairs 5" 2' 6" OOM ONE GFCIGFCI Living Room Closet (1) Bathroom Height: 8' 232.33 286.79 6.05 31.13 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 54.45 SF Ceiling 54.45 SF Floor 28.63 LF Floor Perimeter 3' 9" Door 2' 6" X 6' 8" Opens into HALLWAY Bedroom 3 DESCRIPTION 14-58261 QTY 12/5/2014 Page: 13 14 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Bathroom DESCRIPTION QTY 161a. Remove Carpet - metal transition strip 3.00 LF 161b. Carpet - metal transition strip 3.00 LF 162. Seal truss system - up to 5/12 54.45 SF 163. Seal stud wall for odor control (shellac) 232.33 SF 164. Seal attic framing for odor control - up to 5/12 54.45 SF 165. Seal floor or ceiling joist system 54.45 SF 166a. Remove Blown-in cellulose insulation - 10" depth - R38 54.45 SF 166b. Blown-in cellulose insulation - 10" depth - R38 54.45 SF 167a. Remove 5/8" drywall - hung, taped, floated, ready for paint 54.45 SF 167b. 5/8" drywall - hung, taped, floated, ready for paint 54.45 SF 354. Acoustic ceiling (popcorn) texture Field verify per site visit if this is required. 355. Seal the ceiling w/latex based stain blocker - one coat 54.45 SF 168a. Remove Batt insulation - 4" - R13 - paper faced 76.00 SF 54.45 SF 168b. Batt insulation - 4" - R13 - paper faced 76.00 SF 169a. Remove 1/2" drywall - hung, taped, floated, ready for paint 232.33 SF 169b. 1/2" drywall - hung, taped, floated, ready for paint 232.33 SF 170. Seal/prime then paint the walls (2 coats) SW-7526 Maison Blanche 232.33 SF 171. Mask and prep for paint - plastic, paper, tape (per LF) 31.13 LF 172a. Remove Interior door unit 1.00 EA Masonite flush door series with dorcor (solid core) 173. Paint door slab only - 2 coats (per side) SW - 6089 Grounded 1.00 EA 174. Door knob - interior 1.00 EA 175. Paint door/window trim & jamb - 2 coats (per side) SW - 6089 Grounded 2.00 EA 176a. Remove Shelving - wire (vinyl coated) 8.00 LF 172b. Interior door unit 176b. Shelving - wire (vinyl coated) 2.00 EA Field verify this is to be installed during site visit. 8.00 LF 177. Clean floor - Heavy 54.45 SF 178a. Remove Medicine cabinet 1.00 EA 178b. Medicine cabinet Match Existing to Property 1.00 EA 179a. Remove Towel bar 2.00 EA 179b. Towel bar Lowes item #34B94 2.00 EA 180a. Remove Fiberglass tub & shower combination 1.00 EA 180b. Fiberglass tub & shower combination 14-58261 Tub - Briggs Pendant V, white enamel steel. (Verify this is required to be changed.) Surround - Swan Model #RM-58 (White) 12/5/2014 1.00 EA Page: 14 15 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Bathroom DESCRIPTION QTY 181a. Remove Tub/shower faucet 1.00 EA Peerless model #PTT188770 182. Sink faucet - Bathroom Install new Vanity Cabinet - Amstron Extreme series, 183a. Remove Sink - wall mounted coronet (mocha). 183b. Sink - wall mounted Vanity top - Formica Sandstone 7265-77 Drop in Sink - Mansfield Easton 2 Model # MS1390 (White) 184a. Remove Soap dish - Wall mounted Faucet - Peerless Model #P136LF 184b. Soap dish - Wall mounted 1.00 EA 185a. Remove Handicap grab bar - Stainless steel, 1 1/2" x 36" 4.00 EA 185b. Handicap grab bar - Stainless steel, 1 1/2" x 36" 4.00 EA 186a. Remove Handicap grab bar - Stainless steel, 1 1/2" x 24" 2.00 EA 186b. Handicap grab bar - Stainless steel, 1 1/2" x 24" 2.00 EA 187a. Remove Toilet 1.00 EA Clean toilet and seat. Replace if necessary upon 188. Toilet seat field verification. 1.00 EA 189a. Remove Light fixture 1.00 EA 181b. Tub/shower faucet 187b. Toilet 189b. Light fixture 190a. Remove 110 volt copper wiring run and box - rough in only 190b. 110 volt copper wiring run and box - rough in only 1.00 EA 1.00 EA 1.00 EA 2.00 EA 2.00 EA 1.00 EA REPLACE - Combo light/fan Broan Model #675, Lowes item #89247 1.00 EA 3.00 EA 3.00 EA 191a. Remove 110 volt copper wiring run, box and switch 2.00 EA 191b. 110 volt copper wiring run, box and switch 2.00 EA 192a. Remove Bathroom ventilation fan 1.00 EA 192b. Bathroom ventilation fan 1.00 EA 193a. Remove Ground fault interrupter (GFI) outlet 1.00 EA 193b. Ground fault interrupter (GFI) outlet 1.00 EA 194a. Remove 110 volt copper wiring run, box and outlet 3.00 EA 194b. 110 volt copper wiring run, box and outlet 3.00 EA NOTES: 14-58261 12/5/2014 Page: 15 16 Porch EAGLE ADJUSTING Porch GFCIGFCI GFCIGFCI EAGLE ADJUSTING SERVICES,INC. P.O.BOX Living 1140Room Living Room NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 Kitchen Kitchen WASH/DRYER REFRIGERATOR (1) (2) 11' 5" BEDROOM ONE 11' 1" 6' 6" 6' 2" Up Bathroom GFCI 6' 11" 1' 2" 1' Closet 4' 6"(1) 2' 1" Closet (1) Linen Closet Hallway 1' 8" 2' 6" 4' 8" 4' 6" BEDROOM ONE 3' 2' 10" 3' Height: 8' Stairs Closet (1) 294.33 SF Walls 408.86 SF WallsREFRIGERATOR & Ceiling (2) WASH/DRYER (1) 12.73 SY Flooring 42.83 LF Ceil. Perimeter 114.53 SF Ceiling 114.53 SF Floor 37.83 LF Floor Perimeter Stairs Door Closet 2' Linen 6" X 6' 8" Bedroom 2 BEDROOM ONE Window Bedroom 3 3' X 5' 2' 2' 4" 1' Closet (1) 4' 79.33 87.33 0.89 12.00 1' 2" Closet (1) 4' 2" Door DESCRIPTION Opens into Exterior GFCI 2' 6" Bathroom Hallway Subroom: Closet (1) 6" Opens into HALLWAY Up Height: 8' SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 2' 6" X 6' 8" Closet (1) 8.00 SF Ceiling 8.00 SF Floor 9.50 LF Floor Perimeter Opens into BEDROOM_ONE Bedroom 3 Bedroom 2 QTY 195a. Remove Shelving - wire (vinyl coated) 4.00 LF 195b. Shelving - wire (vinyl coated) 4.00 LF Shelving to be wood with supports as required, painted to match walls. 196. Content Manipulation charge - per hour 2.00 HR 197a. Remove Blown-in cellulose insulation - 10" depth - R38 122.53 SF 197b. Blown-in cellulose insulation - 10" depth - R38 122.53 SF 198a. Remove Batt insulation - 4" - R13 - paper faced 104.00 SF 198b. Batt insulation - 4" - R13 - paper faced 104.00 SF 199. Seal truss system - up to 5/12 122.53 SF 200. Seal stud wall for odor control (shellac) 373.67 SF 201a. Remove 5/8" drywall - hung, taped, floated, ready for paint 122.53 SF 201b. 5/8" drywall - hung, taped, floated, ready for paint 122.53 SF 351. Acoustic ceiling (popcorn) texture Field verify per site visit if this is required. 122.53 SF 202. Seal the ceiling w/latex based stain blocker - one coat 122.53 SF 204. Mask and prep for paint - plastic, paper, tape (per LF) 54.83 LF 205a. Remove 1/2" drywall - hung, taped, floated, ready for paint 373.67 SF 205b. 1/2" drywall - hung, taped, floated, ready for paint 373.67 SF 206. Seal/prime then paint the walls and ceiling (2 coats) SW-7526 Maison Blanche 496.19 SF 207. Vinyl window - double hung, 13-19 sf Simonton Reflections model #5500, or equal to fit opening. 1.00 EA 208. Baseboard - 3 1/4" REPLACE - Johnsonite RWDC-49 (beige) 47.33 LF 14-58261 12/5/2014 Page: 16 17 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - BEDROOM ONE DESCRIPTION QTY 209. Stain & finish baseboard 47.33 LF 210a. Remove Casing - 2 1/4" 34.00 LF 210b. Casing - 2 1/4" 34.00 LF 211. Stain & finish casing 34.00 LF 212. Clean ductwork - Interior - Heavy clean (PER REGISTER) 2.00 EA 213a. Remove Interior door unit 2.00 EA Masonite flush door series with dorcor (solid core) Paint door/window trim & jamb - 2 coats (per side) SW - 6089 Grounded Door knob - interior Match Existing Paint door or window opening - 2 coats (per side) SW - 6089 Grounded Paint door slab only - 2 coats (per side) SW - 6089 Grounded 213b. Interior door unit 2.00 EA 214. 2.00 EA 215. 216. 217. 2.00 EA 3.00 EA 4.00 EA 218a. Remove Light fixture 218b. Light fixture 2.00 EA Lowes Item #40803 - Use with CFL Bulbs 2.00 EA 219a. Remove 110 volt copper wiring run and box - rough in only 2.00 EA 219b. 110 volt copper wiring run and box - rough in only 2.00 EA 220a. Remove 110 volt copper wiring run, box and switch 2.00 EA 220b. 110 volt copper wiring run, box and switch 2.00 EA 221a. Remove 110 volt copper wiring run, box and outlet 6.00 EA 221b. 110 volt copper wiring run, box and outlet 6.00 EA 222. Remove Carpet pad 122.53 SF 223. Carpet pad 122.53 SF 224. Remove Carpet 122.53 SF 225. Carpet REPLACE - All flooring to be Durafloor (honeytree) 140.91 SF 15 % waste added for Carpet. 226a. Remove Carpet - metal transition strip 3.00 LF 226b. Carpet - metal transition strip 3.00 LF 227a. Remove Smoke detector 1.00 EA 227b. Smoke detector 14-58261 First Alert model #41798, Lowes item #304176 1.00 EA 12/5/2014 Page: 17 18 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - BEDROOM ONE Porch DESCRIPTION QTY Porch NOTES: GFCIGFCI Living Room Kitchen GFCIGFCI Living Room WASH/DRYER REFRIGERATOR (1) (2) Kitchen Stairs Linen Closet BEDROOM ONE Hallway Bathroom Up GFCI Closet (1) 2 Bedroom Bedroom 2 8' 2" 8' 6" Height: 8' 378.33 533.88 17.28 53.33 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Stairs Perimeter 155.55 SF Ceiling 155.55 SF Floor 48.33 LF Floor Perimeter WASH/DRYER (1) REFRIGERATOR (2) 12' 5" 10' 7" 10' 1" 2' 4" 2' 1" 2' 6" 2" Closet (1) 2' 6" 4' (1)Closet 4' 2" 2' 6" 3' Bedroom 3 3' 1" 3' 3" Linen Closet Door 2' 6" X 6' 8" BEDROOM ONE Window Up Opens into HALLWAY Bathroom Hallway 3' X 5' Opens into Exterior GFCI Subroom: Closet (1) Height: 8' Closet (1) Closet (1) 1' 10" 2' 6" 2" 2' Door 87.33 96.33 1.00 13.00 2' 4" 4' 6" Closet (1) 2' 4' 10" 6" SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 2' 6" X 6' 8" Bedroom 3 Bedroom 2 9.00 SF Ceiling 9.00 SF Floor 10.50 LF Floor Perimeter Opens into BEDROOM_2 DESCRIPTION QTY 228. Content Manipulation charge - per hour 2.00 HR 229a. Remove Shelving - wire (vinyl coated) 4.50 LF 229b. Shelving - wire (vinyl coated) 4.50 LF 230a. Remove Blown-in cellulose Shelving to be wood with supports as required, painted to match walls. - 10" depth - R38 insulation 164.55 SF 230b. Blown-in cellulose insulation - 10" depth - R38 164.55 SF 231. Seal truss system - up to 5/12 164.55 SF 232. Seal stud wall for odor control (shellac) 465.67 SF 14-58261 12/5/2014 Page: 18 19 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Bedroom 2 DESCRIPTION QTY 233a. Remove 5/8" drywall - hung, taped, floated, ready for paint 164.55 SF 233b. 5/8" drywall - hung, taped, floated, ready for paint 164.55 SF 352. Acoustic ceiling (popcorn) texture Field verify per site visit if this is required. 234. Seal the ceiling w/latex based stain blocker - one coat 164.55 SF 164.55 SF 236. Mask and prep for paint - plastic, paper, tape (per LF) 66.33 LF 237a. Remove 1/2" drywall - hung, taped, floated, ready for paint 465.67 SF 237b. 1/2" drywall - hung, taped, floated, ready for paint 465.67 SF 630.22 SF SW-7526 Maison Blanche 239. Vinyl window - double hung, 13-19 sf Simonton Reflections model #5500, or equal to fit opening. 1.00 EA 240. Baseboard - 3 1/4" REPLACE - Johnsonite RWDC-49 (beige) 58.83 LF 238. Seal/prime then paint the walls and ceiling (2 coats) 241. Stain & finish baseboard 58.83 LF 242. Clean ductwork - Interior - Heavy clean (PER REGISTER) 2.00 EA 243a. Remove Casing - 2 1/4" 34.00 LF 243b. Casing - 2 1/4" 34.00 LF 244. Stain & finish casing 34.00 LF 245a. Remove Interior door unit 2.00 EA Masonite flush door series with dorcor (solid core) Paint door/window trim & jamb - 2 coats (per side) SW - 6089 Grounded Door knob - interior Match Existing Paint door or window opening - 2 coats (per side) SW - 6089 Grounded Paint door slab only - 2 coats (per side) SW - 6089 Grounded 245b. Interior door unit 2.00 EA 246. 2.00 EA 247. 248. 249. 2.00 EA 3.00 EA 4.00 EA 250a. Remove Light fixture 250b. Light fixture 2.00 EA Lowes Item #40803 - Use with CFL Bulbs 2.00 EA 251a. Remove 110 volt copper wiring run and box - rough in only 2.00 EA 251b. 110 volt copper wiring run and box - rough in only 2.00 EA 252a. Remove 110 volt copper wiring run, box and switch 2.00 EA 252b. 110 volt copper wiring run, box and switch 2.00 EA 253a. Remove 110 volt copper wiring run, box and outlet 6.00 EA 253b. 110 volt copper wiring run, box and outlet 6.00 EA 254. Remove Carpet pad 164.55 SF 255. Carpet pad 164.55 SF 256. Remove Carpet 164.55 SF 14-58261 12/5/2014 Page: 19 20 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Bedroom 2 DESCRIPTION QTY REPLACE - All flooring to be Durafloor (honeytree) 257. Carpet 189.23 SF 15 % waste added for Carpet. 258a. Remove Carpet - metal transition strip 3.00 LF 258b. Carpet - metal transition strip 3.00 LF 259a. Remove Smoke detector 1.00 EA First Alert model #41798, Lowes item #304176 259b. SmokePorch detector 1.00 EA NOTES: GFCIGFCI Living Room Kitchen WASH/DRYER REFRIGERATOR (1) (2) Stairs Porch Linen Closet EDROOM ONE Up Bathroom Hallway GFCI Closet (1) 2' 1' 8" 2' 6" 1' 8" 7" 12' 5" 3' 8" 3' 10" 11" 5' 5" 3' 3' 9" 4' 4" 4' 6" 3' Kitchen Bedroom 3 Bedroom 2 Bedroom 3 Height: 8' 6" GFCIGFCI 5' 6" 4' 1" 1' 1" et (1)Closet (1) 322.33 466.87 16.06 50.33 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 144.53 SF Ceiling 144.53 SF Floor 42.33 LF Floor Perimeter 5' 9" Window 3' X 5' Opens into Exterior Door 2' 6" X 6' 8" Opens into HALLWAY 3' X 4' Opens into Exterior WASH/DRYER REFRIGERATOR (1) (2) Window Stairs Linen Closet Up Subroom: Closet (1) Bathroom Hallway Height: 8' 6' 5" Closet (1) 2' 1' 8" 3' 7" 3' 9" 5' 6" 11" 6" 6' 7" 4' 5" GFCI 4' 9" 2' 9" 148.72 172.82 2.68 23.17 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 24.10 SF Ceiling 24.10 SF Floor 17.67 LF Floor Perimeter Missing Wall 2' 9 1/4" X 8' Opens into STAIRS Door 5' 6" X 6' 8" Opens into BEDROOM_3 Bedroom 3 14-58261 12/5/2014 Page: 20 21 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 DESCRIPTION QTY 260. Content Manipulation charge - per hour 2.00 HR 261a. Remove Blown-in cellulose insulation - 10" depth - R38 168.63 SF 261b. Blown-in cellulose insulation - 10" depth - R38 168.63 SF 262. Seal truss system - up to 5/12 168.63 SF 263. Seal stud wall for odor control (shellac) 471.06 SF 264a. Remove 5/8" drywall - hung, taped, floated, ready for paint 168.63 SF 264b. 5/8" drywall - hung, taped, floated, ready for paint 168.63 SF 353. Acoustic ceiling (popcorn) texture Field verify per site visit if this is required. 265. Seal the ceiling w/latex based stain blocker - one coat 168.63 SF 168.63 SF 267. Mask and prep for paint - plastic, paper, tape (per LF) 73.51 LF 268a. Remove 1/2" drywall - hung, taped, floated, ready for paint 471.06 SF 268b. 1/2" drywall - hung, taped, floated, ready for paint 471.06 SF 639.68 SF SW-7526 Maison Blanche 270. Vinyl window - double hung, 13-19 sf Simonton Reflections model #5500, or equal to fit opening. 2.00 EA 271. Baseboard - 3 1/4" REPLACE - Johnsonite RWDC-49 (beige) 60.01 LF 269. Seal/prime then paint the walls and ceiling (2 coats) 272. Stain & finish baseboard 60.01 LF 273a. Remove Casing - 2 1/4" 34.00 LF 273b. Casing - 2 1/4" 34.00 LF 274. Stain & finish casing 34.00 LF 275. Clean ductwork - Interior - Heavy clean (PER REGISTER) 2.00 EA 276. Paint door/window trim & jamb - 2 coats (per side) SW 2.00 EA - 6089 Grounded 277a. Remove Interior door unit 1.00 EA 277b. Interior door unit Masonite flush door series with dorcor (solid core) 278. Door knob - interior Match Existing 1.00 EA 279. Paint door or window opening - 2 coats (per side) SW - 6089 Grounded 280. Paint door slab only - 2 coats (per side) SW - 6089 Grounded 3.00 EA 281. Bypass (sliding) door set - Colonist 1.00 EA 282. Paint bypass door set - slab only - 2 coats (per side) SW - 6089 Grounded 2.00 EA 283a. Remove Shelving - wire (vinyl coated) 6.50 LF 283b. Shelving - wire (vinyl coated) Shelving to be wood with supports as required, painted to match 6.50 LF 284a. Remove Light fixture 284b. Light fixture 1.00 EA 4.00 EA walls. 2.00 EA Lowes Item #40803 - Use with CFL Bulbs 2.00 EA 285a. Remove 110 volt copper wiring run and box - rough in only 2.00 EA 285b. 110 volt copper wiring run and box - rough in only 2.00 EA 286a. Remove 110 volt copper wiring run, box and switch 1.00 EA 286b. 110 volt copper wiring run, box and switch 1.00 EA 287a. Remove 110 volt copper wiring run, box and outlet 4.00 EA 287b. 110 volt copper wiring run, box and outlet 4.00 EA 14-58261 12/5/2014 Page: 21 22 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Bedroom 3 DESCRIPTION QTY 288. Remove Carpet pad 168.63 SF 289. Carpet pad 168.63 SF 290. Remove Carpet 168.63 SF 291. Carpet REPLACE - All flooring to be Durafloor (honeytree) 193.92 SF 15 % waste added for Carpet. 292a. Remove Carpet - metal transition strip 3.00 LF 292b. Carpet - metal transition strip 3.00 LF 293a. Remove Smoke detector 1.00 EA First Alert model #41798, Lowes item #304176 293b. Smoke detector 1.00 EA NOTES: SKETCH2 Main Level 23' 1" 22' 5" 25' 25' 8" Basement Basement Height: 8' 758.67 1319.08 62.27 94.83 SF Walls SF Walls & Ceiling SY Flooring LF Ceil. Perimeter 560.42 SF Ceiling 560.42 SF Floor 94.83 LF Floor Perimeter DESCRIPTION QTY 294. Clean the walls and ceiling 1319.08 SF 295. Clean water heater 1.00 EA 296a. Remove Furnace - forced air - 60 - 75,000 BTU 1.00 EA 296b. Furnace - forced air - 60 - 75,000 BTU 1.00 EA 297a. Remove Coil - 2 ton - cased 1.00 EA 14-58261 12/5/2014 Page: 22 23 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Basement DESCRIPTION QTY 297b. Coil - 2 ton - cased 1.00 EA NOTES: Front Elevation 181.13 SF Walls 181.13 SF Long Wall 19.94 LF Ceil. Perimeter Formula Elevation 17' 3" x 8' x 5' 17.25 LF Floor Perimeter 181.13 SF Short Wall DESCRIPTION QTY 298. Clean with pressure/chemical spray - Heavy 181.13 SF 299a. Remove Soffit - metal- INCLUDES FRONT WINDOW AND ROOF RAKE 30.00 SF 299b. Soffit - metal- INCLUDES FRONT WINDOW AND ROOF RAKE 30.00 SF 300. Fascia - metal - 8"-INCLUDES FRONT WINDOW AND ROOF RAKE 76.00 LF NOTES: 14-58261 12/5/2014 Page: 23 24 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 Right Elevation 360.00 SF Walls 360.00 SF Long Wall 45.00 LF Ceil. Perimeter Formula Elevation 45' x 8' x 0" 45.00 LF Floor Perimeter 360.00 SF Short Wall DESCRIPTION QTY 301. Clean with pressure/chemical spray - Heavy 200.00 SF 302a. Remove Gutter / downspout - aluminum - up to 5" 45.00 LF 302b. Gutter / downspout - aluminum - up to 5" 45.00 LF 303a. Remove Soffit - metal 45.00 SF 303b. Soffit - metal 45.00 SF 304a. Remove Fascia - metal - 8" 10.00 LF 304b. Fascia - metal - 8" 10.00 LF NOTES: Left Elevation DESCRIPTION QTY 305a. Remove Gutter / downspout - aluminum - up to 5" 45.00 LF 305b. Gutter / downspout - aluminum - up to 5" 45.00 LF 306a. Remove Soffit - metal 45.00 SF 306b. Soffit - metal 45.00 SF 307a. Remove Fascia - metal - 8" 10.00 LF 307b. Fascia - metal - 8" 10.00 LF 308. Clean with pressure/chemical spray - Heavy 200.00 SF NOTES: 14-58261 12/5/2014 Page: 24 25 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 ROOF Main Level Roof2 2' 1" 16' 9" 15' 463.15 Surface Area 128.42 Total Perimeter Length 31.55 Total Hip Length 14' 6" 0" '1 F4 21 Roof2 F5 (A) Roof3 (1) 4.63 Number of Squares 9.84 Total Ridge Length 2 8" ' " '6 11 16' 17'9"1" 15' 7' 9" 11' 19' 8" 11' 9' 10" 9' 10" 5' 9" 5' 2"1' 5" F3 (A) 8' 8" 7' 9" 31' 5" DESCRIPTION F2 (B) QTY Roof1 F1 309. Tear off composition shingles (no haul off) 4.99 SQ TEAR OFF AND REPLACEMENT OF LEFT FRONT HEAT DAMAGED SECTION OF ROOF ONLY. 310. Roofing felt - 15 lb. 1.99 SQ 311. Ice & water shield-iNCLUDES LEFT FRONT VALLEY 95.00 SF 312. Laminated - comp. shingle rfg. - w/out felt 6.00 SQ 313. Drip edge 23.75 LF 314. Continuous ridge vent - shingle-over style 4.00 LF 315. Ridge cap - composition shingles 40.00 LF 316a. Remove Counterflashing - Apron flashing 5.00 LF 316b. Counterflashing - Apron flashing 5.00 LF 317a. Remove Attic vent - gable end - vinyl - Large 1.00 EA 317b. Attic vent - gable end - vinyl - Large 1.00 EA NOTES: Debris Removal DESCRIPTION 318. Dumpster load - Approx. 30 yards, 5-7 tons of debris INCLUDES HOUSE ITEMS 14-58261 QTY No dumpster will be provided. Contractor to provide dumpster accordingly. 12/5/2014 1.00 EA Page: 25 26 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 CONTINUED - Debris Removal DESCRIPTION QTY NOTES: Miscellaneous DESCRIPTION QTY 319. Final cleaning - construction - Residential 1217.00 SF NOTES: Labor Minimums Applied DESCRIPTION QTY 320. Floor cleaning labor minimum 1.00 EA NOTES: 14-58261 12/5/2014 Page: 26 27 EAGLE ADJUSTING EAGLE ADJUSTING SERVICES,INC. P.O.BOX 1140 NOBLESVILLE,INDIANA46061 T:877-839-8152;F:866-509-2719 Grand Total Areas: 4,500.62 SF Walls 1,763.96 SF Floor 541.13 SF Long Wall 1,736.24 SF Ceiling 196.00 SY Flooring 541.13 SF Short Wall 6,236.86 SF Walls and Ceiling 558.34 LF Floor Perimeter 618.16 LF Ceil. Perimeter 1,763.96 Floor Area 2,492.61 Exterior Wall Area 1,870.33 Total Area 242.17 Exterior Perimeter of Walls 3,651.08 Interior Wall Area 1,702.86 Surface Area 41.67 Total Ridge Length 17.03 Number of Squares 31.55 Total Hip Length 14-58261 521.10 Total Perimeter Length 12/5/2014 Page: 27