March 24-25, 2003 Tracker Peer Review Section 1.0 Topics Introduction, Overview, and Status Schedule Summary; Critical Paths; Risk Performance Predictions vs Requirements 2.0 Electronics Design and Status Radiation Testing SSD/Electronics FMEA Mechanical Design and Status 3.0 Engineering Model Tower Status EM Mini-Tower Status and Results 4.0 Safety and Mission Assurance 5.0 Parts and Materials Procurement Overview Electronics Parts and Materials SSD Procurement ASIC Procurement Mechanical Parts and Materials 6.0 Fabrication Overview SSD Receiving and Inspection Ladder Fabrication Composite Panel Fabrication MCM Fabrication Tray Assembly Tower Module Assembly Product Shipping and Storage 7.0 Test Plan Overview EGSE and MGSE Electronics Module Testing Panel and Tray Testing Tower Testing I&T Support On-Orbit Calibration and Test March 26, 2003 Section 1.00 Mechanical Integration Peer Review Presentation Section Introduction & Overview Topics Management Design Overview 2.00 System Engineering Action Items Requirements, Interface Control, and Metrics Technical Budgets Material and Parts List 3.00 Structural Design and Analysis Introduction Trade studies and requirements definition Analysis results and requirements flow-down 4.00 Thermal Systems Analysis Introduction Trade studies and requirements definition Analysis results and requirements flow-down Thermal Control System Design 5.00 LAT Verificatin Test Plans Environmental verification plans Dynamic test plans Thermal test plans 6.00 Summary March 27, 2003 Section 1.00 Conclusions, Further Work Mechanical Systems Peer Review Presentation Section Introduction & Overview Topics Mech systems management Production schedule 2.00 System Engineering Requirements and compliance Allocated budgets Drawing and procedure metrics Risk list and analysis 3.00 Design Overview Overview Design and Fab Responsibilities Changes since DPDR 4.00 Thermal Systems Design Radiator Assembly X-LAT and Mid plates Heat pipes Fabrication and assembly plans Qualification and verification 5.00 Grid Box Design Grid box base assembly Engineering modeling Fabrication and assembly plans Qualification and verification 6.00 Parts Analysis 7.00 Mechanical Systems Verification Verification test flow and matrix Test Plans Test plans 8.00 Summary March 19-20, 2003 ELEC/DAQ/FSW Peer Review Section 1.00 Introduction Presentation Section Introduction & Overview Topics Overview of LAT and Electronics Level III Requirements Summary Meeting Key Requirements Flowdown – Requirements to Design Design Evolution 2.00 Management 3.00 Systems Engineering Optimization Technical Heritage Reviews – Past and Future Status of January LAT PDR Recommendations Summary of July DPDR Team Leads Team Partners Contingency (Mass, Power, Cost) Organization Chart Work Flow Testing Overview Fabrication Plan Schedule & Critical Path Cost Procurements Configuration Management Issues and Concerns Summary System Overview Requirements External Interfaces (Mechanical, Electrical, Programming) Internal Interfaces (Mechanical, Electrical, Programming) Technical Budget (Mass, Power, Thermal, CPU) Design Decisions – Major Trades Verification (electrical/testing/environmental/requirements) Risk Reliability Allocations Redundancy Fault Tree, Instrument Protection Internal LAT Fault Tree Cost – Schedule – Contingency (incl. SW) Mechanical Parts List Electronics Parts List Spares Plan Technical Issues & Status Testing (redundancy /check) Drawing Tree System Documentation Summary Page 1 of 4 March 19-20, 2003 ELEC/DAQ/FSW Peer Review Section 5.00 Presentation Section Electronics 6.00 Instrument Software Topics Overview Team Architecture Trade Decisions (why this architecture) Development Plan Module Power and Mass Tower Electronics Module GLAST Calorimeter Cable Controller ASIC (GCCC) GLAST Tracker Cable Controller ASIC (GTCC) Power Distribution Unit GAS Unit GLAST Global Trigger Controller (GLTC) Spacecraft Interface Unit (S/C Interface Board, LAT Com Board, Power Supply) Event Processor Board Harness Verification & Test Test Bed Documents Status Summary Overview Team Development Plan Requirements (incl. Flowdown) Meeting Key Requirements (incl. Performance predications) Schedule & Milestones Cost Resource Profile Contingency Documents Interfaces (incl. Tree) Risk Analysis Design Elements Organization (show package tree) Package Descriptions Housekeeping/Monitoring Calibration Verification & Test Test Bed Status Reviews – Past and Future Summary Page 2 of 4 March 19-20, 2003 ELEC/DAQ/FSW Peer Review Section 7.00 Presentation Section Mechanical & Thermal 8.00 Power/Grounding/EMI 9.00 Monitoring & Thermal Control Topics Overview Team Requirements Mass Allocation Enclosures (each one) Material List Manufacturing Flow Thermal Vibration Documents Interfaces Verification & Test (QA) Heritage & Space Qualification Summary Overview (incl. component tree) Team Requirements Power Allocation Power Distribution Module GASU and Crate Power Module Tower Power Supply Module Grounding EMI/EMC EMI Allocation Documents Interfaces Verification & Test Summary Overview 10.00 EGSE Requirements Temperature Monitoring (Matrix) Voltage/Current Monitoring (Matrix) Operating Temperature Control Risk Analysis - Survival Documents Summary Overview Engineering Model 1 (DAQ, CAL, TKR, ACD) Engineering Model 2 (DAQ, CAL, TKR, ACD, SC Simulator, FE Simulator) Qual/Flight Model Software Test Bed Documents Summary Page 3 of 4 March 19-20, 2003 ELEC/DAQ/FSW Peer Review Section 11.00 General Presentation Section Safety & Mission Assurance Topics System Safety Program Parts & Packaging Program Materials & Processes Program Reliability and Continuous Risk Management Program Limited Lifetime Analysis Failure Modes and Effects Analysis Worst Case Analysis Numerical Reliability Analysis Parts Stress and Derating Analysis Software Quality Assurance Program Hardware Quality Assurance Program Contamination Control Program Integration Readiness Assurance Program Documents Summary 12.00 Manufacturing, AI&T 13.00 Review Summary Overview Manufacturing, Assembly, Test Flow Electrical Interface & Integration Software Integration Test Bed Qualification Plan Performance Verification (incl. redundancy test) Environmental Testing Performance Testing I&T Level communication?? Key I&T Milestones Documents Summary Page 4 of 4 March 28, 2003 Section 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 I&T Peer Review Topics Introduction, Overview, and Status Schedule Summary Integration, Facilities, Configuration Quality Assurance Test Plan Online System Mechanical Ground Support Equipment Particle Test Science Verification, Analysis, and Calibration Summary