Final Inspection and Testing for Water and Wastewater Networks Post: Watercare, Private Bag 94010, Auckland, 2241 Email: inspections@water.co.nz Please complete this form prior to a final inspection and test on the water/wastewater systems and before the council takes over works and assets being declared public watermains. Phone: (09) 442 2222 Website: www.watercare.co.nz Section 1: Project details Watercare inspector Site address Consultant engineer Contractor Water subcontractor Wastewater subcontractor Section 2: Site meeting tasks – water Action required 1. Confirm draft as-builts have been received or are on site. Date Yes / / 2. Carry out pressure test. / / 3. Note failures and arrange for re-checks/tests. / / 4. Confirm bacterial and chlorination tests were below limits. / / 5. Confirm connection to existing water network (signed Construction Activity Compliance form). / / 6. Inspect all fittings, chambers, valves, fire hydrants and duct markings. / / 7. Confirm abandoned lines are recorded on as-builts. / / 8. Confirm consultant engineer signoff on road reinstatement (on behalf of Auckland Council). / / 9. Check as-built against construction. / / 10. Final inspection. / / Completed No N/A Initial 16_04_15 Please turn over and complete other side Section 3: Site meeting tasks – wastewater Action required Date Yes 1. Confirm draft as-builts have been received or are on site. / / 2. Air test all lines. / / 3. Inspect all manholes. / / 4. Check as-builts against construction. / / 5. Confirm abandoned lines are recorded on as-builts. / / 6. Note all failures and arrange for re-checks/tests. / / 7. Confirm connection to existing wastewater network (signed Construction Activity Compliance form). / / 8. Final inspection. / / Completed No N/A Initial Section 4: Items to be provided/corrected Please note: All of the above must be completed before the Watercare representative can give final signoff. Watercare representative Date / / 16_04_15 Section 5: Final signoff