A Faus-Golfe, A. F G lf J.V. J V Civera, Ci C Blanch C. Bl h and d J.J. J J García-Garrigós G í G i ó whit the help of the CTF3 Collaboration CTF3 meeting Jan-09 1 Contents BPS prototypes p yp BPS series production Non-vacuum Non vacuum parts production production. Vacuum parts production. PCBs manufacturing/validation and BPS BPS’ parts assembly. BPS S Supports. t Low frequency set-up & Characterization Tests. High frequency set-up & Longitudinal Impedance Test Summary & Production Schedule (Back-up solution) CTF3 meeting Jan-09 2 TBL + BPM specifications 2 BPS prototypes t t has h been b d designed, i d constructed and characterized. TBL beam time structure CTF3 meeting Jan-09 3 BPS: Characterization Table (PCB Ver.1) BPS1 Sensitivity and Linearity Parameters Vertical Sensitivity, SV Horizontal Sensitivity, SH Vertical Electric Offset, EOSV Horizontal Electric Offset, EOSH Vertical overall precision (accuracy), σV Horizontal overall precision (accuracy), σH BPS1 Characteristic Output Levels Sum signal level, Σ Difference signals max. levels, ||ΔV||max, ||ΔH||max Centered beam level, Vsec (xV = 0, xH = 0) BPS1 Frequency Response (Bandwidth) Parameters Σ low cut-off frequency, fLΣ Δ low cut-off frequency, fLΔ Σ low cut-off cut off frequency calibration, calibration fLΣ [Cal] Δ low cut-off frequency calibration, fLΔ [Cal] High cut-off frequency, fhigh High cut-off frequency calibration, fhigh [Cal] BPS1 Pulse-Time Response Parameters Σ droop time constant, τdroopΣ Δ droop time constant, τdroopΔ Σ droop time constant calibration calibration, τdroopΣ [Cal] Δ droop time constant calibration, τdroopΔ [Cal] CTF3 meeting Jan-09 Rise time constant calibration, τrise Rise time constant calibration, τrise [Cal] 41.09 mm-1 41.43 mm-1 0.03 mm 0.15 mm 78 μm 170 μm 16.5 V 8.25 V 4.125 V 1.76 KHz 282 KHz 1 76 KHz 1.76 180 KHz > 100 MHz > 100 MHz 90 μs 564 ns 90 μs 884 μs < 1.6 ns < 1.6 ns 4 BPS: Characterization Table (PCB Ver. 2) BPS1 Sensitivity and Linearity Parameters Vertical V i l Sensitivity, S i i i SV Horizontal Sensitivity, SH Vertical Electric Offset, EOSV Horizontal Electric Offset,, EOSH Vertical overall precision (accuracy), σV Horizontal overall precision (accuracy), σH 44.57 44 57 mm-11 50.0 mm-1 -0.14 mm 0.27 mm 61 μm 431 μm BPS1 Characteristic Output Levels Sum signal level, Σ Difference signals max. levels, ||ΔV||max, ||ΔH||max Centered beam level, Vsec (xV = 0, xH = 0) BPS1 Frequency Response (Bandwidth) Parameters Σ low cut-off frequency, fLΣ Δ low cut-off frequency, fLΔ Σ low cut-off frequency calibration, fLΣ [Cal] Δ low cut-off frequency calibration, fLΔ [Cal] High cut-off frequency, fhigh High cut-off frequency calibration, fhigh [Cal] BPS1 Pulse Pulse-Time Time Response Parameters Σ droop time constant, τdroopΣ Δ droop time constant, τdroopΔ Σ droop time constant calibration, τdroopΣ [Cal] Δ droop time constant calibration, τdroopΔ [Cal] Rise time constant calibration, τrise CTF3 meeting Jan-09 Rise time constant calibration, τrise [Cal] 10.5 V 5.25 V 2.625 V 1 KHz 175 KHz 0.709 KHz 79 KHz > 100 MHz > 100 MHz 159 μs 909 ns 224 μs 2 μs < 1.6 ns < 1.6 ns 5 BPS prototypes • A set of two BPS prototypes (BPS1 and BPS2) with the associated electronics were designed and constructed. •The performed tests in BPS1 yield: o Good linearity results and reasonably low electrical offsets from the mechanical center. center o Good overall-precision/accuracy in the vertical plane considering the low test current; and, a misalignement in the h i horizontal t l plane l was detected d t t d by b accuracy offset ff t and d sensitivity iti it shift. o Low frequency cut-off for Σ/electrodes signals, fLΣ, and high cutoff frequency, fhigh, under specifications. o Low frequency cut-off for Δ signals, fLΔ, determined to perform the compensation p of droop p time constant, τdroopΔ, with the external amplifier. • BPS1 installed in TBL and BPS2 at IFIC CTF3 meeting Jan-09 6 BPS prototypes • Issues for improvement p in the BPS2 p prototype: yp o correct the possible misalignments of the horizontal plane electrodes suggested in the linearity error analysis o check if overall overall-precision precision below 50μm (under TBL specs), with enough wire current Æ New wire testbench at IFIC will allow higher currents, accurate (anti-vibration and micro-movement system) and automatized measurements. measurements o study the different low cut-off frequencies in the calibration, fLΔ[Cal], and wire excitation cases, fLΔ • Test Beam of the BPS1 in the TBLÆResolution at maximum current. CTF3 meeting Jan-09 7 BPS series Q Quantity: tit 15 units it (BPS1 +15 15 + 1 spare ffor ttesting) ti ) BSP section view - Paperwork and tendering process → week 37 (Sep 08) - Main supply contracts signed → week 51 (Dec 08) CTF3 meeting Jan-09 8 Non-Vacuum Parts Production - Copper body, electrode and bridge • Cu OFE p procurement → week 5 (2009) • Manufacturing and metrology → week 12 • Flash gold platting → week 13 - Cu-Be Cu Be screws • Manufacturing and metrology → week 12 • Flash Fl h gold ld platting l tti → week k 13 - Ferrites → week 5 - Steel split flange → week 12 - RF contacts → week 5 CTF3 meeting Jan-09 9 Vacuum Parts Production - Ceramic with metallic collars brazed & vacuum tests → week 12 - Ti sputtering at CERN → week 14 - Welding W ldi to t bellow b ll and d fl flanges (EBW and d TIG) and d vacuum ttests t → week k 16 CTF3 meeting Jan-09 10 PCBs manufacturing/validation and BPS’ parts assembly - BPS PCBs → week 9 • Manufacturing 40 PCBs and components insertion (Resistors and Transformers) - PCB gold ld plate l t mounting ti and d validation → week 10 • SMA connectors soldering with PCB mounted on golden plate. • PCB validation Test - BPS Assembly process → week 18 • Integration and alignment of the nonvacuum and vacuum parts parts, jointly with PCBs mounted on golden plates. CTF3 meeting Jan-09 11 BPS supports - Materials procurement → week 5 - Manufacturing → week 10 - Fix Fi alignment li t spheres h and d make k the metrology at CERN CTF3 meeting Jan-09 12 Low frequency set-up and Characterization Tests - BPS testbench manufacturing and assembly → week 10 - BPS series (15 units) characterization tests → week 20 Bandwidth of interest: 1KHz – 200 MHz VNA (10Hz – 300MHz) + PC Running LabVIEW GPIB Wire V+, V-, H+, H- VNA Cal +/- ΔV ΔH Σ XY + Rotatory stages Controller Stages g Control Signals XY + Rotatory Motorized micro-movers 13 Pneumatic Isolation Workstation Pulse Signal Generator High frequency set-up & Longitudinal Impedance Test - BPS HF testbench manufacturing and assembly → week 14 - Longitudinal impedance determination test. Performed to BPS2 prototype → week 20 VNA (100MHz – 20GHz) + PC Running LabVIEW Bandwidth of interest: 100MHz – 12 GHz High Frequency testbench VNA Output signal Input signal / Frequency sweep CTF3 meeting Jan-09 14 Summary and Production Schedule - Production of 15 BPS’s already started started. - LF & HF Test Set-ups. - Supports. Week # (2009) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Non-vacuum parts Ceramics with collars Ti sputtering (proposal) Electronic PCB's PCB s BPS welding & integration BPS supports Metrology of supports at CERN (proposal) Low frequency setup High frequency setup BPS tests (BPS2 + 2 units) could be delivered at week 12 using spares parts from prototypes production 15