REQUEST FOR PROPOSALS for HAZARDOUS MATERIAL INSPECTION & SAMPLING. ADDENDUM #1 Project: SOUTH WINDSOR 10-YEAR MASTER PLAN EARLY PHASE STUDIES South Windsor Public Schools Request for Proposal Addendum No. 1 – June 21, 2016 The South Windsor Board of Education (SWBOE) is issuing this Addendum to the Request for Proposals namedabove (the “RFP”) to respond to questions and requests for clarifications the BOE received regarding the RFP for Hazardous Materials Inspection & Sampling, as well as issue additional information and clarifications that shall be incorporated as part of the RFP. ITEM 1: The due date for proposals has been postpone to Tuesday, June 28, 2016 @ 4:00 p.m. ITEM 2: Proposer Question: Can we get square feet of existing schools and dates of construction of original buildings and all additions/portables? Should stress that different building ages require additional sampling of building materials. Answer: See information requested below: 1. Eli Terry Building Area: 49,275 SF (Permanent Building, built 1965), 2,500 SF (portables) 2. Philip R. Smith Building Area: 43,382 SF (various years). 3. Note: 3-year AHERA reports were provided at the mandatory pre-bid site visits for both schools. 4. Eli Terry was built at one time without further additions since the original build in 1965. During the walk through sampling of all the three different years was discussed. Sampling required for all three years. ITEM 3: Proposer Question: Want to confirm that roof sampling will not be performed at Eli Terry but will be at Phillip Smith and if so, what areas. Answer: It is confirmed that no roof samples will be performed at Eli Terry. Provide one roof sample for each of the year construction areas at Philip R. Smith. If there is more than one area in a build year, e.g. 1959, take a sample at both areas. ITEM 4: Proposer Question: Want to confirm that sampling below terrazzo floors, exterior brick (for each building age of construction) and below ceramic floors/walls will be completed in limited areas as part of work. Answer: This is confirmed. It was discussed that three (3) floor cores and six (6) exterior brick/wall cores are to be performed at Eli Terry. At Philip R. Smith, provide 4 cores in the 1959 wings (1 in the front wing and 3 in the main area) and 2 cores in the 1962 areas (2 per area). Respondents shall assume one sample in the 1988 wing. South Windsor Orchard Hill: CM RFP Addendum #1 Page 1 of 2 ITEM 5: Proposer Question: Want to confirm bid sheet will include Roofer and Mason for Cuts/Repairs (contractor to be approved by owner) and will be billed at cost either by consultant or directly by owner. Answer: Bid sheet will include roofer and mason for cuts/repairs to be billed through the respondent. See attached revised sheet. The respondent is permitted to provide a 10% markup on the direct billing of the contractor(s). ITEM 6: Proposer Question: Want to confirm that the bid will not include specifications and abatement monitoring services. But will include abatement cost estimate. Answer: This is confirmed that specifications and abatement monitoring services are not included in this scope. An estimate for abatement cost is required. Bid proposal form has removed the monitoring services line items. ITEM 7: Proposer Question: Want to confirm inspection will include lead XRF screening and if requested 2 TCLP samples. Answer: Confirmed. ITEM 8: All consultants must use a third party testing laboratory. In-house testing will not be permitted. ITEM 9: Phase 1 and Phase 2 Environmental Site Assessments are NOT included in this scope of work. A different RFP is being published for this effort. ATTACHMENTS • • • Attendee List for the Mandatory Pre-Bid Site Visit on June 17, 2016 Philip R. Smith Construction Year Plan Revised Bid Proposal Sheet End. South Windsor Orchard Hill: CM RFP Addendum #1 Page 2 of 2 Orchard Hill Phase 2 Early Studies Hazardous Materials Inspection & Survey MEETING SIGN-IN SHEET June 21, 2016 Name: 1 2 3 4 5 Representing: Phone # Email: Ray Folino Eagle Environmental 860-589-8257 pfolino@eagleenviro.com Matthew Myers Langan 203-562-5771 mmyers@langan.com Ryan Rouillard Milone & MacBroom 203-271-1773 rrouillard@mminc.com Helen Rimsa Fuss & O'Neill 860-646-2469 hrimsa@fando.com Stephen DiNapoli Big East Environmental 203-354-4955 steve@bigeastlabs.com 6 7 8 9 10 11 12 13 14 Colliers International 1959 Original Construction 1962 Addition 1988 Addition Philip R. Smith Elementary School Construction Year Plan Addendum #1 - Attachment #1 Bid Proposal Form For South Windsor Phase 2 Early Studies Hazardous Materials Inspection and Sampling Lump Sum Fee for Inspection labor to include asbestos, lead, universal wasted, PCB caulking, glazing and compound sources. Fee shall include project management and report preparation. For purposes of bid evaluation, assume the following assumed samples and provide unit price for each. The lump sum fee proposal shall include the cost for testing samples. Cost of additional samples will be reimbursed at the unit rate. • PLM (180 samples) $___________/sample • PLM Point Count (25 counts) unit price $_________/count • TEM (10 total) $______________/TEM • TCLP for lead (2) $___________/TCLP • PCB Source Samples (27 Source Samples) $_________/sample Provide hourly labor rate for to sample adjacent materials if initial PCB Source Samples exceed 50 ppm, or 1ppm if not an excluded product Provide unit price to examine/test adjacent sample material Roofer and Mason for Cuts/Repairs (contractor to be approved by owner) Provide estimated cost for this line item however, costs will be reimbursed at the direct cost from the contractor(s) plus 10% markup for the consultant. $ $ $ $ Provide Costs for each Item Below Provide PCB specification and performance based plan (Lump Sum) $ Provide PCB specification with SIP (Self-Implementing Plan) $ Hazmat Specifications & Drawings Hourly Rate for Meetings & Bid Process Travel Mileage Rate (Not-To-Exceed 100 miles per day), not to exceed Federal Rate $ /mile