ceilings COMPONENTS ACOUSTIC CEILING SYSTEM MF/2FP Acoustic Suspended Ceiling System designed for use with timber floors. Perimeter Channel Length – 3,600mm Floor Joist Ceiling Channel Length – 3,600mm Primary Support Channel Length – 3,600mm Angle Section Length – 3,000mm MF Ceiling Framework Plasterboard The InstaCoustic MF/2FP suspended ceiling system incorporates acoustic hangers to isolate the framework from the structural soffit. This dramatically improves the airborne performance of the ceiling ensuring the best possible reduction of sound. Increased performance can be delivered by introducing the optional IN10 acoustic insulation quilt to the void created by the ceiling system. Note: Improved acoustic performance is achieved if the joist void is enclosed with one layer of 12.5mm plasterboard before fitting the MF/2FP acoustic ceiling. Connecting Clip Metal washer Acoustic Hangers Length – 70mm (Supplied with grommet) Acoustic Hanger Acoustic Sealant Perimeter Channel Optional Acoustic Insulation Clips Primary Support Channel Ceiling Channel Angle Section Tel: 0118 973 9560 Fax: 0118 973 9547 Email: sales@instacoustic.co.uk www.instacoustic.co.uk Insta House, Ivanhoe Road Hogwood Business Park, Finchampstead Wokingham, Berks RG40 4PZ E.7 ceilings INSTALLATION INSTRUCTIONS FOR ACOUSTIC CEILING SYSTEM MF/2FP Step 1 Fix the perimeter channels at the required height taking into account the number of layers of plasterboard. Fixings should be made at 50mm from the end of the channel and from then on at 600mm centres. Ensure that the perimeter channel is positioned so that the top face corresponds to the underside of the primary support channel (Diagram 2). Optional foam isolation strip Perimeter Channel Ceiling Channel As installation continues, the ceiling channel should be inserted into the perimeter channel and fixed in position with wafer head screws (Diagram 1). Plasterboard Diagram 1 Step 2 Acoustic Hanger Primary Support Channel Diagram 2 Fix the acoustic hangers to the structural soffit using suitable fixings, taking note of the appropriate suspension centres for the loading being applied to the ceiling (See Table 1). It is critical that the metal washer is fitted between the screw head and the rubber grommet. The acoustic hangers can be fixed directly to the primary support channel or you can choose to include the angle section between the acoustic hanger and the primary channel (Diagram 3) to increase the depth of void. The acoustic hanger/angle section should be fixed to the primary support channel with wafer head screws. Step 3 Rubber grommet Fix the primary support channel in accordance with the centres detailed in the loading Table 1. The acoustic hangers should be fixed to the primary support channel with two wafer head screws (Diagram 2). The underside of the primary support channel should align with the top of the perimeter channel (Diagram 2). The primary support channel does not need to be fixed to the perimeter Fixing channel but they should be tightly butted together. If the support channels need to be jointed, position the channels back to back with a min of 150mm overlap and fix with two wafer head screws. Primary Support Channel Angle Section Fixing Diagram 3 Rubber grommet Angle Section Acoustic Hanger Metal washer Clips Step 4 Diagram 4 E.8 Systems MF/2FP : Issue No. 2 Ceiling Channel Fix the ceiling channels so that they are positioned within the perimeter channel (Diagram 1). They must also align with the position of the edges of plasterboard. Please make sure that the centres match the size of board being applied to the ceiling. The ceiling channels are fixed by means of the connecting clips (Diagram 4). We reserve the right to change the specification without prior notice. ceilings INSTALLATION INSTRUCTIONS FOR ACOUSTIC CEILING SYSTEM MF/2FP Step 5 When all the primary support channels and ceiling channels are installed insert insulation if necessary above the primary support channel. It is important to make sure that the insulation is installed across the total area of the ceiling leaving no gaps. 1200mm Primary Support Channel Diagram 5 1200mm Optional Insulation Ceiling Channel 300mm Step 6 Two staggered layers of Plasterboard or Fireline Board screwed at 230mm ceiling channel 450mm Acoustic Hangers 300mm Offer the plasterboard up to the ceiling channels and fix the boards making sure that the face of the boards is facing outwards and secure with dry wall screws at 230mm centres. When fixing the corners of the boards reduce centres to 150mm (Diagram 6). Make sure that all joints are staggered and that all the boards are tightly butted together. Diagram 6 Table 1 Maximum Recommended Load for MF/2FP Ceiling System. Ceiling channels at 450mm centres If acoustic hangers are not required then the angle section can be spliced as shown in Diagram 7. This will enable the angle sections to be fixed directly into the concrete soffit. Diagram 7 Acoustic Hangers Centres mm Primary Support Channel Centres mm Maximum Load Including weight of board kg/m2 1200 1200 30 1200 900 40 1200 600 60 900 1200 35 NOTE: Acoustic hanger centres, please note that the first and last fixing from perimeter walls should be no more than 300mm. When fixing the framework of the ceiling into the timber joists make sure that a suitable fixing is used with adequate penetration into the joists to carry the load of the ceiling. E.9