Addendum No.1 - Chabot-Las Positas Community College District

advertisement
1
CHABOT- LAS POSITAS
COMMUNITY COLLEGE DISTRICT
Facilities Planning & Management Department
August 23, 2011
Addendum No. 1
REQUEST FOR INFORMAL BID NO.: 11-12-01
nd
2 Floor Training Room Remodel, 7600 Dublin Center
All Prospective Bidders:
This addendum is issued to clarify, add, delete, correct and/or change the contract documents
to the extent indicated and is hereby made a part of the above noted contract documents on
which the contract will be based. Any modifications/changes made by this addendum affect
only the portions or paragraphs specifically identified herein; all remaining portions of the
proposal to remain in force. It is the responsibility of all bidders to conform to this
addendum. Acknowledge receipt of this addendum in the space provided on the bid form.
Failure to do so may subject Bidder to Disqualification.
The original Bid Documents are modified by the revision as follows:
1.
Notice of Change:
SPECIFICATIONS
Item
Specification
Section
Description
AD1.1
Bid Documents
Subcontractors List: Deleted reference to Howell Electric, Inc
AD1.2
Terms and
Special
Conditions of
Contract for
Labor and
Materials
Replace Paragraph 3.2-A with the following:
Delayed Substantial Completion Milestone-Training Room 285 and IDF
Room 2.6. If the contractor fails to achieve Substantial Completion of
Training Room 285 and IDF Room 2.6 by November 1, 2011, including
adjustments thereto, in accordance with the Contract Documents, the
Contractor shall be subject to assessment of Liquidated Damages in the
amount of Five Hundred Dollars ($500) per calendar day from November
1, 2011 until Substantial Completion of Training Room 285 and IDF
Room 2.6 is achieved.
Replace Paragraph 19.2 with the following:
The Contractor shall be responsible for obtaining approvals from
permitting and approval agencies, including the City of Dublin. District
5020 Franklin Drive, Pleasanton, California 94588
will reimburse Contractor for permit fees assessed by permitting and
approval agencies, including the City of Dublin.
DRAWINGS
Item
Addendum
Dwg. No.
Sheet
AD1.3
AD1.4
A0.3A
A0.3B
AD1-A0.3A
AD1-A0.3B
Description
Revised scope of work
Revised scope of work
Sketches
1
None
BIDDER QUESTIONS
1
Bid Question 1
Question:
Is this a prevailing wage project? Howell Electric is unable to
perform a prevailing wage project. Our last project with Chabot
College was not.
Answer:
All public works projects at the District are Prevailing Wage
projects and must adhere to the Public Contract Code. The other
project you are referring to did not administered through this office.
Respondent: Victoria Lamica, CLPCCD
2
Bid Question 2
Question:
Is there a clean document (drawing) to access?
Answer:
Contact Victoria Lamica to obtain a clean document.
Respondent: Victoria Lamica, CLPCCD
END OF ADDENDUM #1
5020 Franklin Drive, Pleasanton, CA 94588
If you have any questions regarding this Addendum No.1, please contact the Office of the
Facilities Planning & Management in writing, via email. All other terms and conditions of
Request for Informal Bid No. 11-12-01 to remain the same.
Regards,
Victoria L. Lamica
Contracts Manager
vlamica@clpccd.org
C: Bid File
5020 Franklin Drive, Pleasanton, CA 94588
CHABOT LAS POSITAS COMMUNITY COLLEGE DISTRICT
7600 DUBLIN CENTER 2ND FLOOR TRAINING ROOM REMODEL
SECTION 1: PROGRAM
2.1 TRAINING ROOM 270 AND
CLOSETS A & B:
TRAINING ROOM FOR FLEXIBLE LECTURE FORMAT. POWER IN FLOOR PROVIDES
FLEXIBILITY IN SEATING ARRANGEMENTS. DATA IS NOT REQUIRED FOR FLOOR BOXES
.
2.2
SUITE 265
2.3
2.4
TRAINING ROOM 285
BREAKROOM 287
2.5
2.6
2.7
STORAGE ROOM 285A
IDF
ELECTRICAL ROOM
SECTION 2: PRODUCTS
FINISHES
CARPET
BASE
PAINT
FLOORING
CEILING TILE
EXISTING SUITE 265 IS SUBDIVIDED TO CREATE SUITE 270. SUITE 265 IS REESTABLISHED WITH A SMALLER AREA.
ROOM TO ACCOMMODATE STANDARD CLASSROOM TABLES FOR APPROXIMATELY 32.
THE DEMISING WALL ADDED TO CREATE THE TRAINING ROOM, PROVIDES ADDITIONAL
AREA FOR BOTH A BREAKROOM AND STORAGE.
SEE 2.4
ST
RECONFIGURE THE CURRENT BREAKROOM WHICH OVERLAPS IDF ON 1 FLOOR.
ACCOMMODATE REMOVAL AND NEW POWER IN TRAINING ROOMS; IDF, BREAKROOM
ETC.
TANDUS; HAPHAZARD 03366 ; 6’ ROLL GOODS:
IN 265, REUSE EXISTING
ALL BUT 265: RUBBER BASE: BURKE 523 BLACK BROWN
IN 265, MATCH EXISTING
TRAINING ROOM AND CLOSETS: KM # 41 SNIP OF TANNIN LRV 63;
BREAKROOM, STORAGE AND IDF: KM # 42 WISE OWL LRV 51
SUITE 265: PAINT TO MATCH REMAINING WALLS
ACCENT : KM #73 CORTEZ LRV 13
ST
BREAKROOM AND STORAGE: MATCH EXISTING 1 FLOOR BREAKROOM;
IDF: RETAIN EXISTING
ARMSTRONG “MINABOARD GEORGIAN, 2X4, OR MATCH EXISTING, SUCH AS IN SUITE 270
KITCHEN CABINETS
SALVAGE AND REUSE EXISTING KITCHEN BASE AND WALL CABINETS FROM SUITE 270
KITCHENETTE; PROVIDE NEW COUNTER TOP TO MATCH CURRENT (AT CONTRACTORS
OPTION, EXISTING COUNTERTOP CAN BE REUSED IF IT IS NOT DAMAGED DURING THE
REMOVAL..
METAL STUDS/
GYPSUM BD.
3 5/8” X 18 GA METAL STUDS @ 16” O/C WITH 1 LAYER OF 5/8” TYPE X GYPSUM TYPICAL
AND 2 LAYERS 5/8” GYP WALL BD EACH SIDE, ATTACH WITH #6 SMS @ 8” O.C EDGE AND
12 O.C. FIELD.
HARDWARE
PROVIDE CODE COMPLIANT HARDWARE; HARDWARE IS TO MATCH EXISTING
ST
HARDWARE CURRENTLY LOCATED ON THE 1 FLOOR DISTRICT OFFICES.
WHITEBOARD AND
ELECTRONIC SMART BD
OWNER-PROVIDED, GC INSTALLED. GC TO PICK UP FROM LPC WAREHOUSE AND
INSTALL
POWER
PROVIDE AND/OR REPLACE ALL LIGHT SWITCHES WITH ROCKER STYLE IF NOT
CURRENTLY INSTALLED.
FLOOR: EVOLUTION 6AT, ONE CIRCUIT FOR EVERY 2 POKETHRUS;
ST
MECHANICAL
SEE 1 FLOOR CLASSROOM, MATCH CONTROLLER, SUPPLY AND RETURN GRILLS AS
NECESSARY
PLUMBING
CONNECT TO EXISTING WET WALL; DOWNTIME FOR EXISTING BREAKROOMS ON OTHER
FLOORS IS A MAXIMUM OF 1 CALENDAR DAY. IF RESTROOMS INVOLVED, WORK MUST
BE DONE DURING NON-BUSINESS HOURS.
LIGHT FIXTURES
CLEAR PRISMATIC FLUORESCENT FIXTURE LENS SIMILAR TO THOSE CURRENTLY IN
ST
SUITE 265 OR MATCH 1 FLOOR CLASSROOM
EMERGENCY/EXIT LIGHTS
PROVIDE EMERGENCY LIGHT AND LED EXIT LIGHT; PREFER INTEGRATED UNIT
ST
SIMILAR TO 1 FLOOR CLASSROOM.
FLOOR POWER BOX
LEGRAND EVOLUTION SERIES POKE-THOUGH DEVICES, 6AT SERIES
SPEAKERS/PROJECTOR
BRACKET AND
PROJECTION SCREEN
PROVIDE AND INSTALL RECESSED CEILING SPEAKERS -TANNOY CMS501 BM PER
MANUFACTURER’S RECOMMENDATIONS; PROVIDE AND INSTALL PROJECTOR BRACKET
ST
SIMILAR TO 1 FLOOR CLASSROOMS, IN COMPLIANCE WITH CODE; PROVIDE AND
INSTALL MOTORIZED PROJECTION SCREEN, RECESSED IN CEILING – Da-Lite Screen
Company OR EQUAL, 120” in 285 and 144” in 270 WITH 16:10 ASPECT RATIO.
ROOFING
FOR ALL ROOF PENETRATIONS, PATCH ROOF IN ACCORDANCE WITH MANUFACTURER
INSTRUCTIONS TO ENSURE ROOF WARRANTY IS MAINTAINED.
SECTION 3: SCOPE OF WORK
GENERAL:
All work to be compliant with current codes for the City of Dublin.
Architectural
1. General Scope of Work: Provide all engineering, submittals, shop drawings, labor,
materials, apparatus, tools, equipment, transportation, temporary construction, and
special services as required for the ARCHITECTURAL Work as called for in the Contract
Drawings and Specifications. Specifications as noted herein and on the drawings are specific requirements for
this scope of work.
Architectural, as defined, shall include but not limited to all walls, ceilings, insulation, finishes, accessories,
cabinets, doors and hardware.
In general, this scope of work shall include the following: all engineering required to accommodate demolition
and removal of components no longer required and new work.
Review existing conditions and provide field verifications insuring that existing walls, floors and ceilings
remain code-compliant. Do not begin demolition until you have identified all conditions to adjoining tenant
spaces and hallways.
It is the responsibility of the contractor to control and secure the areas of work. Demo will include removal
and disposal per City of Dublin requirements.
Unless otherwise indicated, all materials and finishes to be installed per manufacturers recommendations
The contractor shall include all acoustic controls between adjacent tenant spaces and public areas such as
hallways.
The contractor shall provide record drawings at the completion of project showing all changes that were
completed within this contract in PDF and CAD format.
Mechanical and Plumbing
1. General Scope of Work: Provide all engineering, submittals, shop drawings, labor,
materials, apparatus, tools, equipment, transportation, temporary construction, and
special services as required for the MECHANCIAL and PLUMBING Work as called for in the Contract
Drawings and Specifications. Specifications as noted herein and on the drawings are specific requirements for
this scope of work.
Mechanical systems, as defined, shall include all duct work, VAVs, diffusers, thermostats, controls, air &
water balance, Ductless Split System, condensate pump, DX piping and coring.
In general, this scope of work shall include the following: all engineering required to accommodate demolition
and removal of components no longer required and new mechanical work.
Review existing conditions and provide field verifications insuring that existing systems and HVAC systems
downstream of your work remains operational. Do not disconnect services until you have identified all
services and what they serve and have obtained approval to do so.
It is the responsibility of the Mechanical contractor to safe off, cap, and demo of all MECHANICAL equipment,
fixtures, piping, accessories, etc. as needed to accommodate new layout. Demo may include removal and
disposal of existing duct work, thermostat control wire/boxes, diffusers, etc.
The Mechanical contractor shall provide labeling for all new work. Labeling includes tags for valves, VAVs,
etc.
nd
Ensure all 2 floor HVAC systems are functioning at completion of renovation.
The Mechanical contractor shall provide record drawings at the completion of project showing all changes that
were completed within this contract in PDF and CAD format.
Electrical
1. General Scope of Work: Provide all engineering, submittals, shop drawings, labor,
materials, apparatus, tools, equipment, transportation, temporary construction, and
special services as required for the ELECTRICAL Work as called for in the Contract
Drawings and Specifications. Specifications as noted herein and on the drawings are specific requirements for
this scope of work.
Electrical systems, as defined, shall include all power, lighting, fire alarm, grounding and raceways/boxes and
as required for all low voltage work.
In general, this scope of work shall include the following: all engineering required to accommodate demolition
and removal of components no longer required and new electrical work, new circuits, relocation of electrical
circuits, installation of new breakers, and grounding.
Review existing conditions and provide field verifications insuring that existing systems and power
downstream of your work remains operational. Do not disconnect services until you have identified all circuits
and what they serve and have obtained approval to do so.
It is the responsibility of the ELECTRICAL contractor to safe off, cap, and demo of all ELECTRICAL
equipment, fixtures, piping, accessories, etc. as needed to accommodate new layout. Demo will include
removal and disposal of existing circuit wire(s)/cable(s)/conduit(s) back to existing electrical panel or low
voltage termination point.
Intercept, extend, relocate and/or reconnect existing lights to accommodate layout adjustments, circuits and
occupancy sensor.
Relocated and reconnect existing or provide and install emergency lights per code.
Relocate and reconnect existing or provide and install fire alarm devices to accommodate new layouts
All penetrations of rated walls to re-establish rated assembly.
Provide and install junction box, stub 3/4” conduit and to ceiling to accommodate all power in new and
existing walls.
Provide and install 4-11/16” J boxes and stub 1 ¼” conduit to ceiling space at all data locations.
The Electrical contractor shall include all audio visual conduits including empty 4 – 11/16” J boxes and 2”
conduit to ceiling space to accommodate new Smartboards, teaching stations and AV equipment.
Provide power above the ceiling to the projection screen motors and for wireless connectivity equipment.
The Electrical contractor shall include all Fire Alarm scope as required to accommodate new layout.
The Electrical contractor shall include all Telecomm/Data Conduit and Grounding.
The Electrical contractor shall assume that the existing electrical panel(s) located on the 2nd floor will have
adequate spares and circuits to accommodate new electrical scope.
The Electrical contractor shall provide labeling for all new work. Labeling includes fire alarm devices, light
fixtures, electrical outlets, etc.
nd
Ensure all 2 floor Power, Lighting and Fire Alarm systems are functioning at completion of renovation.
The Electrical contractor shall provide record drawings at the completion of project showing all changes that
were completed within this contract in PDF and CAD format.
1
Fire Suppression System
1. General Scope of Work: Provide all engineering, submittals, shop drawings, labor, materials, apparatus, tools,
equipment, transportation, temporary construction, and special services as required for the FIRE SUPPRESSION
SYSTEM Work as required to accommodate new layout.
It is the responsibility of the Plumbing contractor to safe off, cap, and demo of all Plumbing equipment, fixtures, piping,
accessories as needed to accommodate new layout.
Connect Plumbing in existing wet wall; downtime for existing breakrooms on other floors is a maximum of 1 calendar day.
if restrooms involved, work must be done during non-business hours.
The Mechanical Contractor shall include Air and Water Balancing.
The Mechanical contractor shall include all Control scope as required to accommodate new layout.
The Mechanical contractor shall include coordinate with electrical contractor to determine power requirements
for Ductless Split System.
2
1
3
1. 08.22.2011 ADD. #1
HARDWARE
2.1 TRAINING ROOM 270
ARCHITECTURAL
SALVAGE
FINISHES
FLOORS
WALLS
CEILING
PARTITIONS
COORDINATE WITH MECHANICAL. ELECTRICAL, PLUMBING, AV, TECHNOLOGY, FIRE
SPRINKLERS
1.
KITCHEN CABINETS, SINK AND FAUCET TO BE USED IN NEW BREAKROOM
2.
3.
4.
5.
REMOVE EXISTING FLOORING MATERIAL AND BASE TO BARE CONCRETE;
REMOVE ALL EXISTING FLOOR MONUMENTS; PATCH;
PROVIDE AND INSTALL NEW CARPET AND BASE
CLEAN, PATCH AND PAINT INCLUDING PRIME AT NEW WALLS AND INFILL OF WALL
AREA
REVISE AND MATCH EXISTING CEILING TILE AND REWORK EXISTING CEILING GRID:
ACCOMMODATE ALL SYSTEMS SUCH AS AV, AUTOMATIC SPRINKLER SYSTEM
RECONFIGURATION, SPEAKERS, TECHNOLOGY, LIGHTING AND POWER
6.
7.
8.
9.
10.
11.
12.
13.
14.
DOORS
INSULATION
FIT-UP
MECHANICAL
DISTRIBUTION
CONTROLS
15. REVISE DOOR LOCATION AND CONFIGURATION PER PLANS; PROVIDE AND INSTALL
HARDWARE
16. ALL NEW WALLS CONTIGUOUS WITH ADJACENT SUITES TO HAVE ACOUSTIC BATT
INSULATION AND SEALANTAT PENETRATIONS
17. WHITEBOARDS PER PLANS
1.
REVISE CEILING SUPPLY AND RETURN DUCTS, EQUIPMENT AND DIFFUSERS/GRILL
FOR INDEPENDENT OPERATION OF SUITE PER CODE; CLEAN DUCTWORK;
2.
RELOCATE PER PLANS AND CONFIRM CONTROLS OPERATION.
ELECTRICAL
POWER
FLOORS,
1.
WALLS,
2.
CEILINGS and
ABOVE CEILING 3.
4.
5.
EQUIPMENT
1.
2.
3.
4.
LIGHTING
FIXTURES
DEMOLISH EXISTING KITCHEN AREA, RETAINING FURRED WALL TO ADJOINING SUITE
275.
DEMOLISH OFFICE WALLS
ADD NEW FLOOR TO DECK DEMISING WALL BETWEEN SUITE 270 AND 265.
IF CURRENT DEMISING WALL TO SUITE 275 DOES NOT EXTEND TO CEILING, EXTEND
FURRED WALL TO UNDERSIDE OF DECK WITH ACOUSTIC BATT AND 2 LAYERS OF
GYP ON 270 SIDE; ALL PENETRATIONS AND DUCTWORK TO PROVIDE ACOUSTIC
SEPARATION
ADD NEW WALLS FOR CLOSETS TO UNDERSIDE OF CEILING
WALL ASSEMBLY AT NEW RECESSED DOORS TO BE 1-HOUR RATED TO RETAIN
CURRENT 1-HOUR CORRIDOR
PROVIDE BACKING FOR ALL WALL-MOUNTED EQUIPMENT
1.
2.
REMOVE AND PATCH BACK CONCEALED FLOOR BOXES, AS REQUIRED.
DO NOT REMOVE EXISTING WALL RECEPTICLES UNLESS SHOWN WITHIN DEMO
LIMITS OR REQUESTED BY OWNER. IF DESIGNATED, REMOVE AND PATCH BACK.
PROVIDE AND INSTALL POWER DISTRIBUTION ON FLOOR AS SHOWN; CENTER
SECTION OF THE POKE-THRU IS TO BE PIPED WITH A 1 ¼” CONDUIT AND BLANK FOR
FUTURE CABLING.
PROVIDE AND INSTALL RECEPTICLES AS SHOWN ON WALLS, CEILING AND ABOVE.
REVISE CIRCUITS AS REQUIRED BY CODE; 1 CIRCUIT PER ROW OF 4 SEATS OR PER
2 FLOOR BOX MAX. UNLESS OTHERWISE APPROVED.
PROVIDE POWER FOR PROJECTION SCREEN ABOVE CEILING.POWER-OPERATED
PROJECTION SCREEN;
ADJACENT TO CEILING-PROJECTION BRACKET, PROVIDE RECEPTICAL FOR CEILING
PROJECTOR IN CEILING TILE.
TEACHING STATION ( OWNER-PROVIDED, OWNER INSTALLED)
ELECTRONIC SMART BOARDS (OWNER PROVIDED, GC INSTALLED, INCLUDING PICKUP FROM LPC WAREHOUSE IN LIVERMORE)
RETAIN FIXTURE AND LENS; RE-LAMP WITH T8, RELOCATE SWITCH AS SHOWN;
PROVIDE ABC SWITCHING FOR LIGHTS. FRONT LIGHTS ARE TO BE C SWITCHING
CONTROLED FROM BEHIND TECHER’S DESK. REMAINING SWITCHING PER TITLE 24.
4
SWITCHES
EMERGENCY/
EXIT LIGHTS
FIRE ALARM
REMOVE AND REPLACE, AS NECESSARY
REMOVE, RELOCATE IF INDICATED AND REPLACE EMERGENCY LIGHT AND EXIT LIGHT.
1.
PROVIDE AND INSTALL PER CODE
DATA
1.
PROVED (1) 3” CONDUIT BETWEEN CLOSET 270A AND 285 THAT PROVIDES ACCESS
FROM ADJACENT CEILING TILE
COORDINATE WITH DISTRICT’S TELECOMMUNICATIONS CONTRACTOR
2.
FIRE SPRINKLER SYSTEM
1.
TECHNOLOGY
SECURITY
HARDWARE
PROVIDE AND INSTALL PER CODE
TO BE INSTALLED CONCURRENTLY BY OWNER’S CONTRACTOR; COORDINATE
SCHEDULE WITH ELECTRICAL SCOPE.
SEE PRODUCTS ABOVE
2.3 SUITE 285
ARCHITECTURAL
FINISHES
FLOORS
WALLS
CEILING
3.
4.
PROVIDE AND INSTALL POWER-OPERATED PROJECTION SCREEN PER CODE
PROVIDE AND INSTALL BRACKET FOR PROJECTOR MOUNTED TO UNDERSIDE OF
ROOF DECK; BRACE
PROVIDE AND INSTALL SPEAKERS PER PLAN WITH CONNECTIVITY TO TEACHER’S
STATION AND AV EQUIPMENT
SMARTBOARDS PER PLAN
COORDINATE WITH MECHANICAL. ELECTRICAL, PLUMBING, AV, TECHNOLOGY, FIRE
SPRINKLERS
FINISHES
FLOORS
WALLS
1.
2.
CEILING
3.
PARTITIONS
DOORS
INSULATION
MECHANICAL
DISTRIBUTION
CONTROLS
ELECTRICAL
POWER
FLOORS/WALLS
EQUIPMENT
LIGHTING
FIXTURES
SWITCHES
EMERGENCY/
EXIT LIGHTS
FIRE ALARM
4.
5.
6.
1.
2.
3.
SALVAGE FOR AND REPAIR EXISTING FLOORING MATERIAL AND BASE
CLEAN, PATCH AND PAINT TO MATCH EXISTING INCLUDING PRIME AT NEW/PATCHED
WALLS ONLY.
SALVAGE AND REUSE EXISTING CEILING TILE AND REWORK EXISTING GRID;
REPLACE AND MATCH AS REQUIRED. REWORK EXISTING CEILING GRID.
COMPLETE DEMOLITION OF OFFICE IMPACTED BY NEW WALL.
REVISE DOOR LOCATION AND CONFIGURATION PER PLANS
ALL NEW WALLS CONTIGUOUS WITH ADJACENT SUITES TO HAVE ACOUSTIC BATT
INSULATION
REVISE CEILING SUPPLY AND RETURN DUCTS, EQUIPMENT AND DIFFUSERS/GRILL
FOR INDEPENDENT OPERATION OF SUITE; PER CODE;
CLEAN DUCTWORK
RELOCATE PER PLANS AND CONFIRM CONTROLS OPERATION.
1.
2.
PROVIDE PER PLANS FOR NEW WALL
NONE
3.
4.
5.
REUSE FIXTURE AND LENS; ADD TO MATCH;
RELOCATED PER PLAN
PROVIDE PER CODE
6.
PROVIDE AND INSTALL AS REQUIRED BY CODE
FIRE SPRINKLER SYSTEM
RECONFIGURE TO COMPLY WITH CODE.
TECHNOLOGY/AV
NOT REQUIRED
SECURITY
5
1.
2.
3.
4.
5.
6.
REMOVE EXISTING FLOORING MATERIAL AND BASE TO BARE CONCRETE;
REMOVE ALL EXISTING FLOOR MONUMENTS; PATCH;
PROVIDE AND INSTALL NEW CARPET AND BASE
CLEAN, PATCH AND PAINT INCLUDING PRIME AT NEW WALLS AND INFILL OF WALL
AREA
REVISE AND MATCH EXISTING CEILING TILE AND REWORK EXISTING CEILING GRID
ACCOMMODATE ALL SYSTEMS SUCH AS AV, AUTOMATIC SPRINKLER SYSTEM
RECONFIGURATION, SPEAKERS, TECHNOLOGY, LIGHTING AND POWER
7.
8.
9.
DOORS
10. REVISE DOOR LOCATION AND CONFIGURATION PER PLANS; PROVIDE AND INSTALL
HARDWARE
INSULATION
11. ALL NEW WALLS CONTIGUOUS WITH ADJACENT SUITES TO HAVE ACOUSTIC BATT
INSULATION AND SEALANTAT PENETRATIONS
FIT-UP
12. WHITEBOARDS PER PLANS
13. COORDINATE WITH DISTRICT TECHNOLOGY PLAN AND CONTRACTOR
2.2 SUITE 265
ARCHITECTURAL
COORDINATE WITH MECHANICAL. ELECTRICAL, PLUMBING, AV, TECHNOLOGY,
SPRINKLERS
PARTITIONS
AUDIO/VISUAL
1.
2.
SEE PRODUCTS ABOVE
MECHANICAL
DISTRIBUTION
CONTROLS
1.
REVISE CEILING SUPPLY AND RETURN DUCTS, EQUIPMENT AND DIFFUSERS/GRILL
FOR INDEPENDENT OPERATION OF SUITE PER CODE; CLEAN DUCTWORK;
2.
RELOCATE PER PLANS AND CONFIRM CONTROLS OPERATION.
ELECTRICAL
POWER
FLOORS,
1.
WALLS,
2.
CEILINGS and
ABOVE CEILING 3.
4.
EQUIPMENT
5.
6.
7.
8.
LIGHTING
FIXTURES
DEMOLISH INTERIOR WALLS
ADD NEW FLOOR TO DECK DEMISING WALL BETWEEN SUITE 285 AND 287-8.
PROVIDE BACKING FOR ALL WALL-MOUNTED EQUIPMENT
REMOVE AND PATCH BACK CONCEALED FLOOR BOXES, AS REQUIRED.
DO NOT REMOVE EXISTING WALL RECEPTICLES UNLESS SHOWN WITHIN DEMO
LIMITS OR REQUESTEDBY OWNER. IF DESIGNATED, REMOVE AND PATCH BACK.
PROVIDE AND INSTALL RECEPTICLES AS SHOWN ON WALLS, CEILING AND ABOVE.
REVISE CIRCUITS AS REQUIRED BY CODE; 1 CIRCUIT PER ROW OF 4 SEATS OR PER
FLOOR BOX MAX. UNLESS OTHERWISE APPROVED.
POWER-OPERATED PROJECTION SCREEN; PROVIDE POWER FOR PROJECTION
SCREEN ABOVE CEILING.
ADJACENT TO CEILING-PROJECTION BRACKET, PROVIDE POWER AND EMPTY AV
JUNCTION BOX FOR CEILING PROJECTOR IN CEILING TILE
TEACHING STATION ( OWNER-PROVIDED, OWNER INSTALLED)
ELECTRONIC SMART BOARDS (OWNER PROVIDED, GC INSTALLED, INCLUDING PICKUP FROM LPC WAREHOUSE IN LIVERMORE)
9. RETAIN FIXTURE AND LENS; RE-LAMP WITH T8, RELOCATE SWITCH AS SHOWN;
10. PROVIDE ABC SWITCHING FOR LIGHTS. FRONT LIGHTS ARE TO BE C SWITCHING
CONTROLED FROM BEHIND TECHER’S DESK. REMAINING SWITCHING PER TITLE 24.
SWITCHES
EMERGENCY/
EXIT LIGHTS
FIRE ALARM
11. REMOVE AND REPLACE, AS NECESSARY
12. REMOVE, RELOCATE IF INDICATED AND REPLACE EMERGENCY LIGHT AND EXIT
LIGHT.
13. PROVIDE AND INSTALL PER CODE
DATA
14. PROVED (2) 3” CONDUIT BETWEEN 285 AND IDF ROOM THAT PROVIDES ACCESS
FROM ADJACENT CEILING TILE
15. COORDINATE WITH DISTRICT’S TELECOMMUNICATIONS CONTRACTOR
6
AD1 -
A
FIRE SPRINKLER SYSTEM
1.
TECHNOLOGY
SECURITY
HARDWARE
SWITCHES
EMERGENCY/
EXIT LIGHTS
FIRE ALARM
PROVIDE AND INSTALL PER CODE
TO BE INSTALLED CONCURRENTLY BY OWNER’S CONTRACTOR; COORDINATE
SCHEDULE WITH ELECTRICAL SCOPE.
7.
8.
PROVIDE AND INSTALL
PROVIDE AND INSTALL EMERGENCY LIGHT AND EXIT LIGHT PER CODE.
9.
PROVIDE AND INSTALL PER CODE
SEE PRODUCTS ABOVE
FIRE SPRINKLER SYSTEM
1.
TECHNOLOGY
SECURITY
HARDWARE
N/A
1.
2.
AUDIO/VISUAL
N/A
AUDIO/VISUAL
3.
4.
PROVIDE AND INSTALL POWER-OPERATED PROJECTION SCREEN PER CODE
PROVIDE AND INSTALL BRACKET FOR PROJECTOR MOUNTED TO UNDERSIDE OF
ROOF DECK; BRACE
PROVIDE AND INSTALL SPEAKERS PER PLAN WITH CONNECTIVITY TO TEACHER’S
STATION AND AV EQUIPMENT
SMARTBOARDS PER PLAN
PROVIDE AND INSTALL PER CODE
SALVAGE
FINISHES
FLOORS
ARCHITECTURAL
COORDINATE WITH MECHANICAL. ELECTRICAL, PLUMBING, AV, TECHNOLOGY,
SPRINKLERS
1. INSTALL CABINETS, SINK AND FAUCET SALVAGED FROM SUITE 265
2. PROVIDE AND INSTALL NEW COUNTERTOP TO MATCH EXISTING. AT CONTRACTORS
OPTION, EXISTING COUNTERTOP CAN BE REUSED IF IT IS NOT DAMAGE DURING
REMOVAL.
3.
4.
5.
WALLS
6.
CEILING
7.
PARTITIONS
REMOVE EXISTING FLOORING MATERIAL AND BASE TO BARE CONCRETE;
REMOVE ALL EXISTING FLOOR MONUMENTS; PATCH;
PROVIDE AND INSTALL NEW RESILIENT SHEET FLOORING AND BASE SIMILAR TO
KITCHENETTE IN 265; CLEAN AND POLISH.
CLEAN, PATCH AND PAINT INCLUDING PRIME AT NEW WALLS AND INFILL OF WALL
AREA
REVISE AND MATCH EXISTING CEILING TILE AND REWORK EXISTING CEILING GRID.
8. DEMOLISH OFFICE WALLS
9. ADD NEW FLOOR TO DECK DEMISING WALL BETWEEN 287 AND 288.
10. PROVIDE BACKING FOR ALL WALL-MOUNTED EQUIPMENT
DOORS
11. PROVIDE AND INSTALL NEW DOOR PER PLANS; PROVIDE AND INSTALL HARDWARE
INSULATION
12. ALL NEW WALLS CONTIGUOUS WITH ADJACENT SUITES TO HAVE ACOUSTIC BATT
INSULATION AND SEALANT AT PENETRATIONS
FIT-UP
MECHANICAL
DISTRIBUTION
CONTROLS
PLUMBING
WALLS
CEILING
PARTITIONS
DOORS
INSULATION
MECHANICAL
DISTRIBUTION
CONTROLS
CONTROLS
1.
2.
REVISE CEILING SUPPLY AND RETURN DUCTS, EQUIPMENT AND DIFFUSERS/GRILL
FOR INDEPENDENT OPERATION OF ROOM PER CODE; CLEAN DUCTWORK;
MAY SHARE HVAC EQUIPMENT AND CONTROLS WITH 288
3.
RELOCATE PER PLANS AND CONFIRM CONTROLS OPERATION.
1,
2.
CONNECT TO EXISTING WET WALL;
REUSE EXISTING SINK AND FIXTURES
REMOVE AND PATCH BACK CONCEALED FLOOR BOXES, AS REQUIRED.
DO NOT REMOVE EXISTING WALL RECEPTICLES UNLESS SPECIFIED OR APPROVED
BY OWNER. IF DESIGNATED, REMOVE AND PATCH BACK.
PROVIDE AND INSTALL RECEPTICLES AS SHOWN.
REVISE CIRCUITS AS REQUIRED BY CODE AND AS DESIGNATED ON PLANS
5.
OWNER-PROVIDED, OWNER-INSTALLED VENDING EQUIPMENT
6.
RETAIN FIXTURE AND LENS; RE-LAMP WITH T8, PROVIDE AND INSTALL SWITCH AS
SHOWN;
7
COORDINATE WITH MECHANICAL. ELECTRICAL, PLUMBING, AV, TECHNOLOGY,
SPRINKLERS
1.
2.
3.
4.
5.
6.
REMOVE EXISTING MATERIAL TO BARE CONCRETE;
PROVIDE AND INSTALL RESILIENT SHEET FLOORING AND BASE
CLEAN AND POLISH.
CLEAN, PATCH AND PAINT INCLUDING PRIME FOR NEW WALLS:
REPLACE CEILING TILES TO MATCH AND REWORK EXISTING CEILING GRID.
SEE 2.4
7.
8.
PROVIDE PAIR OF DOORS PER PLAN
SEE 2.4
1.
2.
REVISE CEILING SUPPLY AND RETURN DUCTS, EQUIPMENT AND DIFFUSERS/GRILL
FOR INDEPENDENT OPERATION OF ROOM PER CODE; CLEAN DUCTWORK;
MAY SHARE HVAC EQUIPMENT AND CONTROLS WITH 288
3.
RELOCATE PER PLANS AND CONFIRM CONTROLS OPERATION.
ELECTRICAL
POWER
FLOORS,
1.
WALLS,
2.
CEILINGS and
ABOVE CEILING 3.
4.
TACK BOARD PER PLANS
ELECTRICAL
POWER
FLOORS,
1.
WALLS,
2.
CEILINGS and
ABOVE CEILING 3.
4.
EQUIPMENT
LIGHTING
FIXTURES
FINISHES
FLOORS
EQUIPMENT
LIGHTING
FIXTURES
SWITCHES
EMERGENCY/
EXIT LIGHTS
FIRE ALARM
REMOVE AND PATCH BACK CONCEALED FLOOR BOXES, AS REQUIRED.
DO NOT REMOVE EXISTING WALL RECEPTICLES UNLESS SHOWN WITHIN DEMO
LIMITS OR REQUESTED BY OWNER. IF DESIGNATED, REMOVE AND PATCH BACK.
PROVIDE AND INSTALL RECEPTICLES AS SHOWN.
REVISE CIRCUITS AS REQUIRED BY CODE AND AS DESIGNATED ON PLANS
5.
NONE
6.
7.
8.
RETAIN FIXTURE AND LENS; RE-LAMP WITH T8
PROVIDE AND INSTALL
PROVIDE AND INSTALL EMERGENCY LIGHT AND EXIT LIGHT PER CODE.
9.
PROVIDE AND INSTALL PER CODE
FIRE SPRINKLER SYSTEM
1.
PROVIDE AND INSTALL PER CODE
TECHNOLOGY
SECURITY
HARDWARE
AUDIO/VISUAL
CEILING
PARTITIONS
DOORS
INSULATION
FIT-UP
MECHANICAL
DISTRIBUTION
SEE PRODUCTS ABOVE
2.5 STORAGE ROOM 288
2.4 BREAKROOM 287
ARCHITECTURAL
FINISHES
FLOORS
WALLS
ELECTRICAL
POWER
FLOORS
WALLS
EQUIPMENT
LIGHTING
FIXTURES
EXISTING TO REMAIN; PATCH, CLEAN AND POLISH
PROVIDE AND INSTALL ¾” PLYWOOD BACKER ON WALL, SEE TECHNOLOGY FOR POWER
REQUIREMENTS AND DISTRIBUTION FOR LOCATION. ”
EXISTING TO REMAIN
N/A
N/A
N/A
COORDINATE WITH DISTRICT TECHNOLOGY PLAN AND CONTRACTOR
PROVIDE AND INSTALL (1) 2 TON MITSUBISHI DUCTLESS SPLIT SYSTEM.
PROVIDE AND INSTALL (1) CONDENSATE PUMP AND PIPING TO DRAIN.
PROVIDE AND INSTALL DX PIPING
PROVIDE MISC CORING NEEDED FOR WORK.
PROVIDE AND INSTALL CONTROL WITHIN ROOM.
CORE THREE 4” DIAMETER HOLES PER PLAN. COORDINATE WITH TECHNOLOGY PLANS
PROVIDE AND INSTALL POWER DISTRIBUTION AS SHOWN AS REQUIRED BY
TECHNOLOGY SCOPE DOCUMENT. COORDINATE WITH MECHANICAL EQUIPMENT;
IDF EQUIPMENT PROVIDED, OWNER-INSTALLED
REMOVE AND REPLACE FIXTURE TO COORDINATE WITH MECHANICAL AND IT
EQUIPMENT.
FIRE ALARM
TECHNOLOGY
SECURITY
HARDWARE
PROVIDE AND INSTALL AS REQUIRED BY CODE
COORDINATE WITH DISTRICT TECHNOLOGY PLAN AND CONTRACTOR
SEE PRODUCTS ABOVE
3.10 ELECTRICAL ROOM
ACCOMMODATE REMOVAL AND NEW POWER IN PROJECT AREA
MODIFY TO ACCOMMODATE TECHNOLOGY PER SEPARATE DOCUMENT
ELECTRICAL
POWER
REVISE PANELS TO ACCOMMODATE REMOVAL AND REDISTRIBUTION OF POWER FOR
THIS PROJECT. LABEL ALL CHANGES
COORDINATE WITH DISTRICT TECHNOLOGY PLAN AND CONTRACTOR
1
NOT REQUIRED
SEE PRODUCTS ABOVE
NOT REQUIRED
2.6 IDF
SEE SEPARATE TECHNOLOGY DOCUMENT; COORDINATE POWER REQUIREMENTS WITH ELECTRICAL SCOPE;
ARCHITECTURAL
COORDINATE WITH MECHANICAL. ELECTRICAL, PLUMBING, AV, TECHNOLOGY,
SPRINKLERS
8
9
1. 08.22.2011 ADD. #1
AD1 -
B