Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 -- UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: i of i TABLE OF CONTENTS PART 1 – GENERAL ............................................................................................................................. 1 1.01 SUMMARY ........................................................................................................................... 1 1.02 REFERENCES ....................................................................................................................... 2 1.03 DEFINITIONS ....................................................................................................................... 4 1.04 SYSTEM DESCRIPTION ...................................................................................................... 4 1.05 SUBMITTALS ....................................................................................................................... 6 1.06 QUALITY ASSURANCE ...................................................................................................... 8 1.07 DELIVERY STORAGE AND HANDLING ........................................................................... 8 1.08 PROJECT CONDITIONS ....................................................................................................... 9 1.09 SCHEDULING ....................................................................................................................... 9 1.10 WARRANTY ......................................................................................................................... 9 1.11 SYSTEM START UP, EMPLOYERS INSTRUCTIONS AND COMMISSIONING............... 9 1.12 MAINTENANCE ................................................................................................................... 9 PART 2 – PRODUCTS ......................................................................................................................... 10 2.01 MANUFACTURED UNITS ................................................................................................. 10 2.02 COMPONENTS ................................................................................................................... 11 2.03 ACCESSORIES.................................................................................................................... 11 2.04 FINISHES ............................................................................................................................ 12 2.05 SOURCE QUALITY CONTROL ......................................................................................... 12 PART 3 – EXECUTION ....................................................................................................................... 14 3.01 FIELD QUALITY CONTROL ............................................................................................. 14 3.02 DEMONSTRATION ............................................................................................................ 14 LIST OF TABLES TABLE 1 - TRANSFORMER LOCATION ............................................................................................ 1 TABLE 2 - ASTM TRANSFORMER OIL STANDARDS .................................................................... 13 © CICP CONSULTORES INTERNACIONALES THIS PAGE INTENTIONALLY LEFT BLANK Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 1 of 14 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MEDIUM VOLTAGE TRANSFORMER PART 1 – GENERAL 1.01 SUMMARY A. B. Section includes 1. Requirements for design, manufacturing, furnishing, integration, shop assembly, inspection, factory testing, installation supervision, pre-commissioning test, commissioning tests, support up to the date of the ACP’s issuance of Taking-Over Certificate, testing after completion, training services and maintenance of eighteen (18) 12kV-480/277V and six (6) 12kV-4.16/2.4kV three phase, two winding, 60 Hz, outdoor, liquid-filled type, 65°C rise, self-cooled pad-mounted transformers for each of the two (2) locks as shown on the Drawings complete with all accessories as hereinafter specified. The work shall include all necessary and equipment and appurtenances for the safe, efficient, and reliable operation of the equipment within the scope of this specification whether or not such items are specifically referred to in the specification. The work shall also include start-up spare parts and special tools required for erection. 2. The pad-mounted transformers will be installed outdoors, near the electrical room in the Locks Complex, to step down voltage for the 480/277V Motor Control Centers (MCCs) and the 4160V fire pumps. Products Supplied But Not Installed Under This Section: Table 1 - Transformer Location Transformer Location (at both Locks) ELR1-MVT-NORTH Outside of MR-G1 NORTH ELR1-MVT-SOUTH Outside of MR-G1 SOUTH ELR2-MVT-NORTH Outside of MR-G2 NORTH ELR2-MVT-SOUTH Outside of MR-G2 SOUTH ELR3-MVT-NORTH Outside of MR-G3 NORTH ELR3-MVT-SOUTH Outside of MR-G3 SOUTH ELR4-MVT-NORTH Outside of MR-G4 NORTH ELR4-MVT-SOUTH Outside of MR-G4 SOUTH ELR5-MVT-NORTH Outside of MR-V5 NORTH ELR5-MVT-SOUTH Outside of MR-V5 SOUTH ELR6-MVT-NORTH Outside of MR-V6 NORTH © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB C. 1.02 TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 2 of 14 Transformer Location (at both Locks) ELR6-MVT-SOUTH Outside of MR-V6 SOUTH ELR7-MVT-NORTH Outside of MR-V7 NORTH ELR7-MVT-SOUTH Outside of MR-V7 SOUTH ELR8-MVT-NORTH Outside of MR-V8 NORTH ELR8-MVT-SOUTH Outside of MR-V8 SOUTH LDER1-MVT LDER1 LDER2-MVT LDER2 FER1-MVT1 Outside of FER1 FER1-MVT2 Outside of FER1 FER1-MVT3 Outside of FER1 FER2-MVT1 Outside of FER2 FER2-MVT2 Outside of FER2 FER2-MVT3 Outside of FER2 Related Sections 1. G00/CICTSP-G0002 (Section 01 93 01) Maintenance Documentation Package 2. G00/CICTSP-E0003 (Section 26 00 00) General Electrical Requirements 3. G92/CICTSP-E0006 (Section 26 13 00) Medium Voltage Switchgear 4. G91/CICTSP-E0007 (Section 26 24 19) Motor Control Centers REFERENCES A. All work shall be in accordance with all applicable laws and regulations of the Republic of Panama, Autoridad del Canal de Panama and industry standards. References to these documents are to the latest issue date of each document, unless otherwise indicated, together with the latest additions, addenda, amendments, supplements, etc., thereto, in effect as of the date of contract for the work. Abbreviations listed indicate the form used to identify the reference documents in the Specification text. The specified equipment shall be designed and constructed in accordance with the Standards listed reference in this Section or the referenced sections of the Employer Requirements. B. American Society for Testing and Materials (ASTM) International Standards 1. ASTM D 92-05a Standard Test Method for Flash and Fire Points by Cleveland Open Cup Tester 2. ASTM D 445 Standard Test Method of Transparent and Opaque Liquids (and the calculation of Dynamic Viscosity) © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 3 of 14 3. ASTM D 877 Standard Test method for Dielectric Breakdown Voltage of Insulating Liquids Using Disk Electrodes 4. ASTM D 924 Standard Test Method for Dissipation Factor (or Power Factor) and Relative Permittivity (Dielectric Constant) of Electrical Insulating Liquids 5. ASTM D 971 Standard Test Method for Interfacial Tension of Oil against Water by the Ring Method 6. ASTM D 974 Standard Test method for Acid and Base Number by ColorIndicator Titration 7. ASTM D 1500 Standard Test Method for ASTM Color of Petroleum Products (ASTM Color Scale) 8. ASTM D 1524 Standard Test method for Visual Examination of Used Electrical Insulating oils of Petroleum Origin in the Field 9. ASTM D 1533 Standard Test Method for Water in Insulating Liquids by Coulometric Karl Fischer Titration 10. ASTM D 3951 Standard Practice for Commercial Packaging C. Autoridad del Canal de Panamá (ACP) Employer Requirements (ER): 1. Section 01 10 00 General Project Requirements 2. Section 01 33 00 Submittal Procedures 3. Section 01 40 00 Quality Requirements 4. Section 01 77 00 Taking-Over Procedures 5. Section 01 78 23 Operations Data 6. Section 01 79 00 Demonstration and Training 7. Section 01 86 13 Plant Mechanical Systems and Equipment 8. Section 01 91 00 Tests on Completion and Tests After Completion 9. Section 01 92 00 Facility Operation 10. Section 01 93 00 Maintenance Services 11. Section 09 90 00 Painting 12. Section 26 05 53 Identification for Electrical Systems 13. Section 26 90 00 Field Testing Electrical Systems 14. Section 40 00 00 Process System Integration D. Grupo Unidos Por el Canal (GUPC) Documents: 1. G00/CICCADD-G0001 CADD Manual 2. G80/CICDSR-E0001 Integration Management Plan 3. G00/CICTCR-G0001 Nomenclature and Identification Plan 4. G00/UPCQMM0001 Quality Management Manual © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB E. 14-Jul-10 Page: 4 of 14 1. IEEE Std C57.12.00 Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers 2. IEEE Std C57.12.29 Standard for Pad-Mounted Equipment-Enclosure Integrity for Coastal Environments 3. IEEE Std C57.12.34 Standard Requirements for Pad-Mounted CompartmentalType, Self –Cooled, Three-Phase Distribution Transformers (2500 kVA and Smaller) - High-Voltage: 34500 GrdY/19200 Volts and Below; Low-Voltage, 15 kV Nominal system Voltage and Below 4. IEEE Std C57.12.70 Standard Terminal Markings and Distribution and Power Transformers 5. IEEE Std C57.12.80 Standard Terminology for Power Distribution Transformers 6. IEEE Std C57.12.90 Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers 7. IEEE Std 386 Standard for Separable Insulated Connector Systems for Power Distribution Systems Above 600 V Connections for National Electrical Manufacturers Association (NEMA) 1. G. 1.04 Date: Institute of Electrical and Electronics Engineers (IEEE) Standards F. 1.03 TECHNICAL SPECIFICATION SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS NEMA TR1 Transformers, Regulators and Reactors International Organization for Standardization (ISO) Standards: 1. ISO 9001 Quality Management Systems. Requirements 2. ISO 10005 Quality Management Systems. Guidelines for Quality Plans DEFINITIONS A. All numerical data shall be presented in SI units. B. The term “Employer” as used in this specification refers to the Autoridad del Canal de Panamá (Panama Canal Authority, ACP). C. The term “Contractor” as used in this specification refers to the Grupo Unidos Por el Canal (GUPC). D. The term “Supplier” as used in this specification refers to any person or firm submitting a proposal to meet the terms set forth herein. SYSTEM DESCRIPTION A. Design Requirements 1. All medium voltage pad mounted transformers shall be designed as per the requirements specified herein. 2. The medium voltage (MV) liquid-filled pad-mounted transformers shall be used to step down power from the Locks’ 12 kV distribution level to the 4.16/2.4 kV and 480V/277 volts levels for equipment use as required for the fire pumps medium voltage system and the low power distribution system for the Third Set of Locks. © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 5 of 14 3. The Supplier shall furnish pad-mounted transformers as specified, outdoor, with flame retardant biodegradable and ambient friendly oil, three-phase, 60 Hz, as specified herein. 4. The ratings of the transformers shall be as follows: a. kVA Rating @ 65°C Self- As shown on Drawings (6 x 2000 kVA, 12 x Cooled 1500 kVA and 6 x 750 kVA) b. Phase 3 c. Frequency 60 Hz d. High Voltage 12000 [Delta] e. Low Voltage 1) MCC Feeders 480/277V [Wye] 2) Fire Pump Feeders 4.16/2.4kV [Wye] f. Winding Material (High - Copper - Copper Low) g. HV BIL h. LV BIL 95 kV 1) MCC Feeders 30kV 2) Fire Pump Feeders 60kV i. Self-Cooled impedance 5.75% ± 7.5% j. HV de-energized Taps Two 2 ½ percent above and two 2 ½ percent below k. The transformers shall be three phase, 60 Hz, self-cooled, No-Load high voltage tap changer and be filled with flame retardant, biodegradable and ambient friendly oil. The no-load tap changer shall be manual with means of padlocking the operating handle in each tap position and provided with tap position indicator. l. For continuous operation at nominal rating, kVA self cooled, the average winding temperature rise by resistance measurement shall not exceed 65°C, with hottest-spot winding temperature rise not to exceed 80°C and the temperature rise of the insulating oil shall not exceed 65ºC when measured near the top of the tank, according to IEEE Std C57.12.00 and IEEE Std C57.12.34. m. The core and coil assembly shall be designed and manufactured to meet the short-circuit requirements of IEEE C57.12.00. n. Transformer regulation for the rated voltage, kVA and frequency shall be determined in accordance with IEEE Std C57.12.00. 5. Site Data a. Equipment shall be designed for outdoor installation in a high humidity coastal environment with a minimum life expectancy of 40 years under the project conditions specified in Section 1.08. © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB b. TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 6 of 14 Equipment and components shall be designed and constructed to resist the effects of earthquake motions in accordance with IBC 2006 and ASCE 7-05. The following criteria shall be used to certify seismic compliance: 1) Atlantic Side: a) Component Importance Factor, Ip = 1.5 b) Design Spectral Response Acceleration at Short Periods: (1) SDS = 0.85g 2) Pacific Side: a) Component Importance Factor, Ip = 1.5 b) Design Spectral Response Acceleration at Short Periods: (1) SDS = 6. 1.60g Utility Data Frequency Voltages Available 7. B. 1.05 60 Hz 12000 V, 3-phase 480 V, 3-phase 208 V, 3-phase 120 V, 1-phase 125 VDC The Supplier shall meet all applicable requirements of Section 40 00 00 (Process System Integration). Performance Requirements 1. The transformers in operation at all load levels shall not exceed the audible levels indicated in NEMA TR1. 2. The equipment supervision and control performance shall be in accordance with the requirements of Section 40 00 00 (Process System Integration) of the Employer’s Requirements. SUBMITTALS A. General 1. The Supplier shall comply with the Submittal requirements specified in the Employer Requirements, Section 01 33 00 (Submittal Procedures). B. Maintenance Documentation Package 1. The Supplier shall provide the Maintenance Documentation package as specified in Document G00/CICTSP-G0002 (Maintenance Documentation Package). C. Nomenclature and Identification Plan 1. The Supplier shall identify and code all the supplied equipment, component and parts in accordance with the requirements of Document G00/CICTCR-G0001 (Nomenclature and Identification Plan). All information shall be provided in electronic data base format to be approved by the Contractor. D. Integration © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 7 of 14 1. The Contractor is providing a fully integrated and functional Canal transportation system that requires full integration of electrical and mechanical support systems to meet the operation objectives of the Employer. The Supplier shall provide all the necessary technical information, shall participate in the Integration Team and provide all the coordination necessary to ensure that the equipment and components specified in this Section are fully integrated. 2. The Supplier shall provide all the information; and participate in the integration team as required in Document G80/CICDSR-E0001 (Integration Management Plan). E. CADD Drawings 1. The Supplier shall provide three-dimensional CADD outline drawings of major equipment items supplied, in Autodesk Revit 2010-compatible format. Supplier shall also provide the required equipment modeling information compatible with Autodesk Revit. 2. Drawing content and format shall be in conformance with Contractor's CADD Manual, document G00/CICCAD-G0001 (CADD Manual). F. All electrical drawings shall be prepare and submitted in AutoCad Electrical 2010 format. Other type of drawings shall be submitted in AutoCad 2010 format. G. Product Data 1. H. The Supplier shall submit copies (hard and electronic) of the drawings and complete technical literature (including datasheets and time-current characteristic curves for protective devices) describing the equipment to be furnished. Shop Drawings 1. The O&M manual shall include complete system description, components and procedures for installation, maintenance and operation and a reduced size copy of the “as-built’ drawings shall be included in the manuals. 2. Detailed dimensional drawings, including equipment weight and accessories 3. Structural loading drawings and certification of compliance with the specified seismic design requirements for each of the sites 4. Connection diagrams and schematic diagram drawings 5. Nameplate drawing/information 6. Material safety data sheets for oil and any other chemical being supplied I. Quality Assurance/Control Submittals 1. For submittal procedures and general requirements refer to ACP ER Section 01 33 00 (Submittal Procedures). 2. Manufacturer's Instructions a. 3. Supplier shall submit copies of installation manuals and field test procedures for the pad-mounted transformers. The manufacturer's pass/fail criteria for field tests shall also be included Manufacturer's Test Reports a. Certified factory test reports © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB J. 14-Jul-10 Page: 8 of 14 Maintenance documentation in accordance with G00/CICTSP-G0002 (Maintenance Documentation Package) QUALITY ASSURANCE A. General 1. For quality assurance general requirements refer to document G00/UPCQMM0001 (Quality Management Manual) and ACP ER Section 01 40 00 (Quality Requirements). 2. In the event of a conflict between the referenced standards and this Specification, the Supplier shall notify the Contractor and secure a written clarification as to what is acceptable before proceeding with the work. B. Qualifications 1. C. 1.07 Date: Closeout Submittals 1. 1.06 TECHNICAL SPECIFICATION SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Manufacturer shall be a firm specialized in manufacturing pad mounted transformers with minimum of ten years experience. Certifications 1. All transformers shall be UL listed and bear the UL label 2. Transformers Transformers shall be listed/approved as “Less-Flammable Liquid-Filled DELIVERY STORAGE AND HANDLING A. Packaging and Marking 1. All equipment, spare parts, tools, and inventory, shall be protected to withstand rough handling and corrosive environments during ocean shipment. Packing shall be in accordance with ASTM D 3951. a. Corrosion Prevention: All finished parts and surfaces that are subject to corrosion shall be coated and protected with a corrosion-resistant compound. b. Materials and Equipment Cleaning: The equipment, spare parts, tools, inventory, and materials shall be clean and free of all foreign material. c. Repainting: The surfaces of each equipment where paint has been damaged during shipment shall be cleaned and touched-up with a surface preparation and paint matching the approved coating system. 2. Delivery a. The Contractor shall deliver the equipment and components in accordance with these specifications. Items that, in the opinion of the Employer’s Representative, are damaged or defective shall be replaced by the Contractor at its own cost. Unless otherwise indicated, each lock gate shall be delivered to its designated destination, in accordance with the Contract’s delivery schedule. © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB 1.08 TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 9 of 14 PROJECT CONDITIONS A. Existing Conditions 1. Site Data Elevation Ambient Temperature Relative Humidity Vibration Wind Speed Other 1.09 1.10 SCHEDULING A. The Supplier shall comply with the Contractor’s schedule to the design of the project Intermediate, Final and Issued-For-Construction activities and coordination with other Suppliers. B. The schedule shall be as stated in the Request for Proposal. WARRANTY A. 1.11 The warranty shall be as stated in the Request for Proposal. SYSTEM START UP, EMPLOYERS INSTRUCTIONS AND COMMISSIONING A. 1.12 0 – 610 m above sea level 10°C (50°F) to 40°C (104 °F) with an average of 30°C (86°F) From 60 to 95%, non-condensing, with an average of 88% 5 Hz to 30 Hz with peak random vibrations of 2g 130 km/hr (80 miles/hr) steady, in any direction, gust factor of 1.3 Salty water in air, fog Support during start-up, Employer’s Instructions and Commissioning shall be as specified in Part 3 of this Section. MAINTENANCE A. The Supplier shall provide as an option a 3-Year maintenance Service starting after the issuance of the Taking Over Certificate (TOC) by Employer in full compliance with Section 01 93 00 (Maintenance Services). B. The work shall also include start-up spare parts and special tools required for erection. C. Supplier shall furnish a list of recommended spare parts for 3 years of operation. The list shall indicate which parts the Supplier recommends be carried in stock. The catalog number, lead-time and price shall be included. 1. An extra set of overcurrent protection fuses shall be provided for each transformer. © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 10 of 14 PART 2 – PRODUCTS 2.01 MANUFACTURED UNITS A. The transformers shall consist of a transformer tank and full-height, bolt-on high- and low-voltage cable terminating compartments located side-by-side separated by a rigid metal barrier. Each compartment shall have separate doors, designed to provide access to the high-voltage compartment only after the low-voltage has been opened. The high voltage door is held closed by captive stainless steel fastening device, accessible only after the low voltage door is opened. Doors shall be mounted flush with the cabinet frame. The low-voltage door shall have a handle-operated, three-point latching mechanism designed to be secured with a single padlock. A hex-head or penta-head bolt shall be incorporated into the low-voltage door latching mechanism. Both high and lowvoltage doors shall be incorporated into the low-voltage door latching mechanism. Both high and low-voltage doors shall be equipped with stainless steel hinges and door stops to secure them in the open position. B. The transformers base must be designed to allow rolling or skidding in any direction. C. Transformers shall be supplied with a welded main tank cover and be of a sealed-tank construction designed to withstand a pressure of 7 psig without permanent distortion and 15 psig without rupturing or displacing components of the unit or affecting cabinet security. The tank cover shall be designed to shed water and be supplied with a tamperresistant access handhole sized to allow access to internal bushing and switch connections. The transformer shall remain effectively sealed for a top-oil temperature of 5 oC to 105 oC. When necessary to meet the temperature rise rating specified above, flatcooling panels shall be provided. D. Compartment sills, doors and covers shall be removable to facilitate cable pulling and installation. The high-voltage door shall be on the left with the low-voltage door on the right. E. Compartments shall be designed for cable entry from below and shall be sized to the minimum dimensions of IEEE Std C57.12.34. Low voltage compartment for the 12 kV 480/277 V transformers shall be provided with the additional cable entry area required to allow the use of non-segregated phase bus duct or cable bus duct on the low voltage side. F. The transformers shall be compartmental-type, self-cooled and tamper-resistant for mounting on a pad. The unit shall restrict the entry of water (other than flood water) into the compartments so as not to impair its operation. There shall be no exposed screws, bolts or other fastening devices which are externally removable. G. Transformer oil must be biodegradable, ambient friendly, flame retardant type. Oil fluid shall be Envirotemp® FR3® fluid from Cooper Power Systems or an equivalent ambient friendly fluid. The transformer manufacturer shall certify that the transformer's oil is Non-PCB containing no PCB's. H. The core material shall be high-grade, grain-oriented, non-aging silicon core steel with high magnetic permeability, low hysteresis and eddy current losses. Magnetic flux densities are to be kept well below saturation to allow for a minimum of 10 percent over voltage excitation. The cores shall be properly annealed to reduce stresses induced during the manufacturing processes and reduce core losses. © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB 2.02 Date: 14-Jul-10 Page: 11 of 14 I. The core frame shall be designed to provide maximum support of the core and coil assembly. The core frame shall be welded or bolted to ensure maximum short-circuit strength. J. A C200 neutral bushing CT shall be provided on each transformer (2000-5A for MCC transformers and 1000-5A for Fire Pump transformers). Secondary terminals shall be wired to a shorting type terminal block. COMPONENTS A. Bushings 1. Transformers shall be provided with high-voltage integral bushings Radial-Feed configuration on the high-voltage compartment of the transformers suitable for loadbreak elbow terminations, 200A and 15kV class, 95kV BIL rating. Elbows terminations shall include insulating plugs with test point and test point caps. The bushings shall comply with IEEE C57.12.00 and C57.12.34. 2. Transformers shall be provided with four epoxy or porcelain bushings enclosed in low-voltage compartment as per IEEE C57.12.34. Terminal shall be copper plated with NEMA hole configuration per IEEE C57.12.34. Bushings shall be rated for full transformer capacity. Bushings shall be able to be replaced, hand holes must be provided if necessary. B. Over-Current Protection 1. C. 2.03 TECHNICAL SPECIFICATION SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Over-current Protection: Transformers shall be protected for internal transformer fault and thermal protection. The transformer shall have a two-fuse protection scheme consisting of a bayonet type cutout in series with oil immersed expulsion currentlimiting fuses. The bayonet type cutout shall be located in the primary compartment, shall be of the load-break type (load break current of 100 amperes minimum) and be hot-stick operable to permit external replacement of fuses and the disconnection of the apparatus from the line. The two-fuse protection scheme shall have a minimum shortcircuit rating of 18 kA. Reserved ACCESSORIES A. Each of the transformers shall be furnished complete with the following features and accessories: 1. Lifting hooks for lifting the completely assembled transformer. 2. Jack pads on case bottom for jacking complete transformer. 3. One or more hand-holes and manholes on cover for leads connection access and bushing removal. 4. Tank with welded cover suitably braced for partial vacuum, and capable of vacuum filling in the field. 5. Magnetic liquid gauge. 6. Dial-type liquid temperature indicator. 7. Transformer gas pressure/vacuum gauge © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB 2.04 2.05 TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 12 of 14 8. Upper filter press inlet 1” valve. 9. Lower filter press outlet 1” valve-drain with sampling device. 10. Automatic reset pressure-relief device with a flow of 35 SCFM at sea level and 15 psi at the transformer tank. 11. Two tank-grounding pads tapped for and furnished with suitable connectors for 350 kcmil bare stranded copper ground cable. 12. Standard diagrammatic nameplate conforming to IEEE C57.12.00 13. Non-PCB label. 14. Skid surface provisions. 15. High temperature pre-alarm and alarm sensor with remote indication. FINISHES A. All interior and exterior ferrous metal shall be cleaned and painted with corrosion protective coating system as per IEEE C57.12.29 and Section 09 96 00 (Corrosion Control Coatings) of the Employer’s Requirements. B. The coating color of the transformer tank, including radiators, shall be ANSI Standard 61 Light Gray. SOURCE QUALITY CONTROL A. Factory Testing shall be as specified in the Employer’s requirements Section 01 40 00 (Quality Requirements), Item 1.10 (Quality Control and Verification of the Works). B. The following standard factory tests shall be performed in accordance with the latest revision of the applicable ASTM and IEEE standards. 1. Factory Tests: The following standard factory tests shall be performed on the equipment provided under this Section. a. Resistance measurements of all windings on the rated voltage connection of each unit and at the top extremes. b. Ratio tests on the rated voltage connection and on all tap connections. c. Polarity and phase relation tests on the rated voltage connection. d. No-load losses at rated voltage and frequency on the rated voltage connection. e. Excitation current at rated voltage on the rated voltage connection. f. Impedance and load losses at rated current and frequency on the rated voltage connection. g. Temperature rise tests, at minimum and maximum ratings shall be made when there is no record available of a temperature test, made in accordance with IEEE standards, on a unit with essentially the same thermal characteristics. h. Applied potential tests to determine the adequacy of the barrier insulation and the space between windings and ground. i. Induced potential test to verify the turns insulation. j. Dielectric Tests © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 13 of 14 k. Low Frequency l. Lightning Impulse Test C. Defective material or material damaged in the course of shipment, transportation or test shall be replaced or repaired in a manner meeting with the approval of the Employer’s Representative. D. Manufacturer shall test the transformer oil as per the ASTM standards listed below. The following oil characteristics (based on Envirotemp FR3 fluid from Cooper Power Systems) are considered acceptable: Table 2 - ASTM Transformer Oil Standards PROPERTY Dielectric strength, 0.100" gap VALUE 50 kV min ASTM No. D877 Neutralization number, mg 0.06 max D974 Color L0.5 max D1500 Clear, light green D1524 Moisture content, mg/kg 50 max D1533 Interfacial tension, dynes/cm 35 min D971 Dissipation factor @ 25°C, % 0.06 max D924 Power factor @ 100°C, per cent 3.0 max D924 Flash point, °C 300 min D92 Fire point, °C 340 min D92 Viscosity @ 100°C, cSt 9 max D445 Viscosity @ 25°C, cSt 35 max D445 Condition, visual clear E. Contractor reserves the right to conduct any of the tests listed above. The comparison shall be supplied by the oil (fluid) manufacturer. F. Supplier shall submit certified factory test reports of all factory tests performed by the manufacturer, including tests required by the applicable standards. Results of factory tests performed shall be certified by the manufacturer, or an approved testing laboratory, and submitted following successful completion of the tests. © CICP CONSULTORES INTERNACIONALES Contract No. CMC-221428, Design and Construction of the Third Set of Locks Doc. No.: G92/CICTSP-E0005 – UB TECHNICAL SPECIFICATION Date: 14-Jul-10 SECTION 26 12 19 – PAD MOUNTED LIQUID FILLED MV TRANSFORMERS Page: 14 of 14 PART 3 – EXECUTION 3.01 3.02 FIELD QUALITY CONTROL A. The Supplier shall provide services of a qualified factory-trained manufacturer’s representative to assist the Contractor in installation and startup of the equipment specified under this section. The manufacturer’s representative shall provide technical direction and assistance to the Contractor in general assembly of the equipment, connections and adjustments, and testing of the assembly and components contained herein. After the equipment is put in Service, Contractor will run a performance test on the equipment under the Supervision of the Supplier to ascertain that it is performing according to the warranty in every respect. Supplier shall promptly remedy any deficiencies brought out by this test at no cost to Contractor. The Supplier shall provide three (3) copies of the manufacturer’s field startup report. B. In addition to providing support during the installation, the Supplier shall provide support during the Pre-Commissioning Test and Commissioning Test up to issuance of the Taking Over Certificate by Employer and Test After Completion two years after the date of the Taking-Over Certificate as specified in the Employer’s Requirements Section 01 91 00 (Tests on Completion and Tests after Completion). DEMONSTRATION A. The Supplier shall provide training to the Employer as specified in the Employer’s Requirements Section 01 79 00 (Demonstration and Training). B. Upon completion of the installation, the Supplier shall instruct the Employer in the operation and maintenance of the equipment. END OF SECTION © CICP CONSULTORES INTERNACIONALES