INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
Schedule ‘B” of Construction and Commissioning of Bio gas Plants for waste management
Indian Statistical Institute
Bangalore Center
CONTRACTOR QUOATED
Sl.
No.
Items of
Work
Unit
Qty
Rate
[I] Biogas Production and Reactor Unit.
[I] A
Design ,fabrication ,supply, errection of HDPE make Bio gas
plant/Reactor Sintex industries make comprises of Digester,
Bio gas holder with pressure mechanism etc inclusive of
VAT,CST
etc loading, un loading transportation etc.(
syntax industries make, or approved by MNRE, or, KVIC,
Others by Govt of india or State government.
4 cum
each x2
no
=
8Cum
[I] B
bio gas
Initial feeding of cow dung and water to form homogeneous
mixture in the ratio 1:1 to activate the bacteria culture for
production of methane
gas in the biogas plant
both primary and secondary reactor including purchase,
loading, unloading ,mixing, feeding, labour etc.,
Total
[I] C
2no of
plants
6 full tractor load
of cow dung
Construction and laying of HDPE methane gas convey line of
19.05mm ID of mechanical strength of 8kgf/
with proper
moisture trap, valves clamps,fasteners and with gas hose to
ensure proper pressure to establish good burning flame with
14-16 cft double burner of such two stoves, 40 cft single
burner of such two stoves. .( Suprime,ashrivad and other
like ISI Marked products)
Total
14-16 cft double
burner SS body
withISI
marked
two stoves and 40
cft single burner of
such two stoves
Page 1 of 12
Amount
figure
in
Amount in words
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
[II] In Feed preparation and Fermentation Unit
[II] A
Construction of plat form for stocking of decomposable
biomass & agro waste etc inclusive of earth work
excavation of soil upto 0.152 m depth, 4.5 m wide, 4.5 m
lenghlayed and rammed with 40 mm and down size
granite/morum and then laying of pcc of ratio 1:3:6 and
then followed by 1:6 cement mortor plaster in single coat
finishing inclusive of water curing in complete manner.
Total
[II] B
unit
1 no
Construction of fermented slurry feeder tank with modular
and Non modular cement brick or burnt brick with 1:6
cement mortor of size 2 m wide, 2 m length and 1 m height
followed by 1:6 CM plaster finishing inclusive of water
curing etc. in complete manner
Total
[II] D
1 no
Construction of fermentation tank with modular and Non
modular cement brick or burnt brick with 1:6 cement
mortor of size 2 m wide, 4 m length and 1 m height
followed by 1:6 CM plaster finishing inclusive of water
curing etc. in complete manner
Total
[II] C
unit
unit
1 no
Construction of quick perishable food waste / bio
decomposable fruits and vegetables etc slurry tank with
modular and Non modular cement brick or burnt brick with
1:6 cement mortor of size 2 m wide, 2 m length and 1 m
height followed by 1:6 CM plaster finishing inclusive of
water curing etc. in complete manner
unit
1 no
[III] Inspection unit
[III]A
Construction of inspection chamber for every 40 feet length
on disposed slurry line upto about 1000 feet from the
biogas reactor after digestion which leads to bio manure
production unit, with modular and Non modular cement
brick or burnt brick with 1:6 cement mortor of size 0.60 m
wide, 0.60 m length and 0.60 m height fixed with top CR
sheet lid of 10 SWG with frame L angle 50x50x4 mm size
welded with hinges, coated with primer followed by anti
corrosive black paint painting. followed by 1:6 CM plaster
finishing inclusive of water curing etc. in complete manner
Total
no
50 no
Page 2 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
[IV] Bio manure production unit
[IV]A
Laying of Rigid PVC pipe line of 6 inch ID of mechanical
strength 6Kgf/
with suitable bends, collars, Tee,
Valves etc fixed with solvent cement etc. This pipe line
layed upto 0.6m depth and lead length upto about 1000
feet to convey digested slurry from the biogas reactor to
the Bio manure production unit with suitable gradient to
ensure density flow after proper excavation of soil up to the
Bio manure production unit in complete manner. .(
Suprime,ashrivad and other like ISI Marked products)
Total
[IV]B
unit
1000
feet
Construction of manure pit with Non modular cement brick
with 1:6 cement mortor of size 3 m wide, 3 m length and 1
m height wall thickness of 0.152m after laying of 3m wide,
3m length and 0.152 m height of basement of PCC of ratio
1:3:6 after proper 40mm and down size morum rammed in
the excavated soil followed by 1:6 CM plaster finishing (of
tank wall) inclusive of water curing etc. in complete manner
Total
unit
4 no
Total Amount
AMOUNT IN WORDS:-
DATE:
SIGNATURE OF THE CONTRACTOR
PLACE:
NAME:
ADDRESS
Page 3 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
TECHNO SPEC PART DRAWINGS
Page 4 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-01
Page 5 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-02
Page 6 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-03
Page 7 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-04
Page 8 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-05
Page 9 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-06
Page 10 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-07
Page 11 of 12
INDIAN STATISTICAL INSTITUTE
BANAGLORE CENTER
FIG NO-08 PLAN
Page 12 of 12
Download