Exhibit 2 - Ashbourne Subdivision Access Traffic Analysis Memo

advertisement
Accelerate Engineering, PLLC
140 Preston Executive Drive, Suite 100 D, Cary, NC 27513
Tel: (919) 263-5678 | (704) 666-5811 Fax: (919) 263-5687
www.AccelerateEng.com NC License No. P-1442
Memorandum
To:
David Spencer, PE, Town of Cary
Reid Elmore, NCDOT
From:
Zhaolong “Gavin” Teng, PE, PTOE
CC:
Shayne Leathers, PE, Withers & Ravenel
Jason Rivenbark, PE, CalAtlantic Homes
Date:
3-18-2016
Project Name:
Ashbourne Subdivision Access Traffic Analysis
Re:
Ashbourne Subdivision Access Traffic Analysis Memorandum
Introduction
Ashbourne Subdivision is a proposed residential development located on High House Road between NC
55 and Cranborne Lane/ Sir Walker Lane in Cary, NC. A total of 64 single family units are proposed to be
constructed on the north side of High House Road, and up to 25 single-family units on the south side of
High House Road. After discussions with the Town of Cary and NCDOT staff, traffic analyses were
conducted to evaluate the development’s traffic impact on the High House Road corridor and the
proposed right-in/right-out and median U-turn site access. This memo summarizes the traffic analysis
results. Figures and traffic analysis output files are included in Appendix A and Appendix B, respectively.
Vicinity Map
North Site (64 lots)
South Site (25 lots)
Ashbourne Subdivision Access Traffic Analysis Memorandum
Site Trip Generation and Distributions
The proposed residential development is expected to generate a total of 847 daily trips, including 67
trips in the AM peak hour and 89 trips in the PM peak hour. Site trips were distributed to the study
network based on traffic counts at the adjacent Cranborne Lane / Sir Walker Lane intersection.
ITE
CODE
LAND USE
SIZE
Average Daily Trips
(24 Hours)
AM Peak Hour
(one hour between 7and 9am)
PM Peak Hour
(one hour between 4 and 6pm)
Enter
Exit
Total
Enter
Exit
Total
Enter
Exit
Total
210
Single Family
64
DU
305
305
609
12
36
48
40
24
64
210
Single Family
25
Total (90 Lots)
DU
119
424
119
424
238
847
5
17
14
50
19
67
16
56
9
33
25
89
Source: ITE Trip Generation 9th Edition, ITE Trip Generation Handbook 2nd Edition, and NCDOT Congestion Management Capacity Analysis Guidelines.
It is noted that the northern development has another access point on NC 55 (at the Wellesley Trade
Lane intersection) through interconnectivity with the adjacent shopping center. Site trips to/from NC 55
likely will use this entrance. Given the overall low site traffic volumes and the projected trip distribution
pattern (primarily to/from the east on High House Rd), the NC 55 access point and its potential trip
assignments were not analyzed in this study. Assuming the High House Road entrance as the only access
point for the northern development would yield more conservative analysis results.
Traffic Impact and Access Analysis
The study area includes five existing intersections on High House Road between NC 55 and Carpenter
Upchurch Road (NC 55, Sir Walker Lane/Cranborne Lane, Widdington Lane, Jenks Carpenter Road, and
Carpenter Upchurch Road), two proposed right-in/right-out site entrances, and two proposed median Uturn openings. Both weekday AM and PM conditions were analyzed for the following scenarios:
2016 Existing Conditions
Recent traffic counts obtained from the Town of Cary were adjusted (assuming a 3% annual growth
factor) to estimate the 2016 traffic volumes. Traffic signal plans and timing schedules were also obtained
from the Town and NCDOT. This analysis evaluates the current intersection operational performance.
2021 Future No Build Conditions
As the construction is expected to commence in late 2016, the future analysis year is 2021 (or five years
from the start of construction) in accordance with the Town’s analysis guidelines. A 3% annual growth
factor was used to estimate the 2021 background traffic volumes. The 2021 No Build traffic volumes also
include trips from approved off-site developments as documented in the “Herndon Property TAR”. In
Accelerate Engineering, PLLC
2
Ashbourne Subdivision Access Traffic Analysis Memorandum
addition, this analysis takes into account the committed transportation improvement by the proposed
H7 High School – a new 300’ westbound right-turn lane on High House Road at the NC 55 intersection.
2021 Build with Improvements Conditions –Alternative 1 (Median U-Turns Only)
The 2021 Build traffic volumes include both the No-Build volumes and the site trips. In addition to the
proposed median U-turns, this analysis also includes the future Town of Cary/NCDOT transportation
improvements (a new traffic signal at the High House Road /Jenks Carpenter Road intersection, and a
new westbound left-turn lane on High House Road at the Widdington Lane intersection) and the
resulting trip (U-turn traffic) redistributions.
2021 Build with Improvements Conditions –Alternative 2 (Dual WB Left-Turns)
As the NC 55/ High House Road intersection is expected to have significantly higher delays due to the
future background growth and off-site developments, an alternative intersection configuration
(converting the inside westbound through lane to a second westbound left-turn lane via pavement
marking and signal revisions) was also evaluated for the Build with Improvement conditions.
Intersection Capacity Analysis Results
The traffic analysis results are summarized in a table on the following page. Comparing the 2021 No
Build and Build with Improvements Conditions traffic analysis results, the subject development is
expected to cause minimum delay increases at the two existing signalized intersections on High House
Road (NC 55, Carpenter Upchurch Road).
With the proposed median U-turn openings and the new westbound directional left-turn lane at the
Widdington Lane intersection, the U-turn movements at the Cranborne Lane/Sir Walker Lane
intersection are expected to be eliminated or significantly reduced. Traffic simulations, which more
accurately model the gap acceptance behaviors, suggest that the Build with Improvements condition
average delays on the Sir Walker Lane and Cranborne Lane approaches are similar (AM peak) or less than
(PM peak) those in the No Build Conditions.
At the High House Road and Widdington Lane intersection, the new westbound directional left-over is
not expected to cause any noticeable delay increases. The traffic simulations and queue analysis also
suggest that a westbound left-turn lane with 100’ of storage likely will provide adequate storage capacity
(PM max queue length 103’) without negatively affecting the eastbound left-turn operations at the
Carpenter Upchurch Road Intersection.
Accelerate Engineering, PLLC
3
Accelerate Engineering, PLLC
signalized
High House Rd @
Carpenter Upchurch Rd
unsignalized
(Future
Signal)
High House Rd @
Jenks Carpenter Rd
4
Unacceptable Delay/LOS
#: Excessive Delays (>600 Seconds)
(): SimTraffic Simulation Delays and LOS
System Performance
High House Rd @ EB U-Turn unsignalized
High House Rd @ N Entrance unsignalized
High House Rd @ S Entrance unsignalized
High House Rd @ WB U-Turn unsignalized
unsignalized
High House Rd @
Widdington Ln
High House Rd @
unsignalized
Sir Walker Ln / Cranborne Ln
signalized
NC 55 @ High House Rd /
Green Level West Rd
Intersection
5,530
147.3
61.7
93.5
66.9
46.8
56.5
15.2
3.7
8.6
78.3
0.1
3.0
15.9 (26.3)
457.8 (59.9)
0.0
0.0
19.1
14.6
-0.1
12.7
# (431.7)
---------
52.6
D
Intersection Average
76.4
E
EB - Green Level West Rd
66.6
E
WB - High House Rd
40.4
D
NB - NC 55
48.6
D
SB - NC 55
12.4
B
Intersection Average
5.3
A
EB - High House Rd
7.3
A
WB - High House Rd
54.3
D
SB - Pilot Knob Rd
0.1
A
EB - High House Rd
0.6
A
WB - High House Rd
40.7 (17.5)
E (C)
NB - Cranborne Ln
105.3 (23.7) F (C)
SB - Sir Walker Ln
0.0
A
EB - High House Rd
0.0
A
WB - High House Rd
16.5
C
NB - Widdington Ln
0.0
A
SB - Church Entrance
--Intersection Average
0.1
A
EB - High House Rd
1.1
A
WB - High House Rd
NB - Jenks Carpenter Rd 136.1 (55.1) F (F )
--EB - High House Rd
--WB - U-Turn
--EB - High House Rd
--NB - South Entrance
--WB - High House Rd
--SB - North Entrance
--WB - High House Rd
--EB - U-Turn
Throughputs (vph)
4,871
79.8
Total Delays (hr)
PM
Delay (sec)
AM
Delay (sec)
LOS
Approach
Existing (2016)
Ashbourne Subdivision Access Traffic Analysis Summary
E
F
E
D
E
B
A
B
E
A
A
C (D )
F (F)
A
A
C
B
-A
B
F (F)
---------
LOS
5,758
210.9
79.0
199.8
89.4
45.0
52.2
13.5
6.9
8.7
53.8
0.1
0.7
94.2 (24.6)
326 (33.7)
0.0
0.0
20.7
0.0
-0.1
1.6
430.9 (278.6)
---------
Delay (sec)
AM
E
F
F
D
D
B
A
A
D
A
A
F (C )
F (D)
A
A
C
A
-A
A
F (F)
---------
LOS
PM
6,143
466.5
Delay
(sec)
84.1
155.6
68.7
53.3
85.9
16.7
4.8
12.0
75.6
0.1
5.9
18.6 (30.1)
# (112.5)
0.0
0.0
24.8
16.7
-0.1
39.3 (12.1)
383.8 (#)
---------
No Build (2021)
Delay (sec)
5,844
227.8
F
79.6
F
200.9
E
91.1
D
45.0
F
52.4
B
12.2
A
4.6
B
8.9
E
53.1
A
0.1
A
0.5
C (D) 111.6 (21.7)
F (F)
374 (32.5)
A
0.0
A
0.1
C
21.2
C
0.0
-13.9
A
11.5
E (B )
3.6
F (F)
55.9
-0.0
-(13.6)
-0.0
-16.3
-0.0
-12.9
-0.0
-(5.7)
LOS
E
F
F
D
D
B
A
A
D
A
A
F (C )
F (D )
A
A
C
A
B
B
A
E
A
(B)
A
C
A
B
A
(A)
LOS
6,404
397.3
Delay
(sec)
85.0
157.3
71.3
53.4
86.1
17.2
5.8
11.5
78.0
0.1
1.8
19.0 (18.9)
# (67.7)
0.0
0.8
23.8
16.5
14.8
13.6
8.9
64.0
0.0
(16.0)
0.0
18.1
0.0
15.8
0.0
(11.7)
Delay (sec)
5,977
156.3
E
F
F
E
D
B
A
A
D
A
A
F (D)
F (D)
A
A
C
A
B
B
A
E
A
(C )
A
C
A
B
A
(A)
LOS
6,566
295.2
Delay
LOS
(sec)
80.3
F
93.8
F
72.9
E
62.8
E
89.8
F
17.1
B
5.8
A
11.5
B
77.8
E
0.1
A
1.8
A
19.0 (21.5) C (C )
# (94.1)
F (F)
0.0
A
0.8
A
23.8
C
16.5
C
14.8
B
13.6
B
8.9
A
64.0
E
0.0
A
(16.5)
(C )
0.0
A
18.1
C
0.0
A
15.8
C
0.0
A
(11.0)
(B)
Build (2021) with Improvements
Alternative 2 (Dual WB LT)
AM
PM
F
70.9
F
114.3
E
81.7
D
59.5
F
54.5
B
12.2
A
4.6
B
8.9
E
53.1
A
0.1
A
0.5
C (C ) 111.6 (29.6)
F (F) 374.0 (36.2)
A
0.0
A
0.1
C
21.2
C
0.0
B
13.9
B
11.5
A
3.6
E
55.9
A
0.0
(C )
(15.7)
A
0.0
C
16.3
A
0.0
C
12.9
A
0.0
(B)
(6.5)
LOS
Build (2021) with Improvements
Alternative 1 (U-Turns Only)
AM
PM
Ashbourne Subdivision Access Traffic Analysis Memorandum
Ashbourne Subdivision Access Traffic Analysis Memorandum
The new traffic signal at the High House Road / Jenks Carpenter Road intersection will greatly reduce
delays on the northbound Jenks Carpenter Road approach. This intersection is expected to operate at
LOS B during both AM and PM peak hours.
The 2021 No Build analysis shows that, due to the background growth (3% per year) and off-site
developments, the NC 55/ High House Road intersection is expected to operate at LOS E in the AM peak
hour and LOS F in the PM peak hour. During both peak hour conditions, the eastbound Green Level
Church Road approach will have heavy delays and excessive queueing. Converting the inside westbound
through lane to a second exclusive left-turn lane, as shown in the Alternative 2 analysis, along with signal
timing optimizations may improve the intersection operations during both peak hours.
Median U-Turn and Site Access Locations
Based on ten one-hour simulations runs, the westbound left-turn queues (maximum queues) at the NC
55/High House Road intersection may extend 610’ (Alternative 2) to 750’ (Alternative 1) during the PM
peak hour, the worst condition of the day. Given the conservative nature of the traffic analysis (which
accounted for both the 3% annual growth and off-site development trips, assumed only one access point
for the northern development, and did not allow right-turn on red) and the queue length estimates, the
westbound median U-turn may be located approximately 700’ from the NC 55 intersection (measured
from the start of the raised median). A 125’ of storage length should be provided for this U-turn lane
based on the projected traffic conflicts.
The eastbound median U-turn may be located approximately 400’ from the Sir Walker Lane/Cranborne
Lane intersection (measured from the end of the raised median), to provide at least 100’ of separation
from the downstream eastbound left-turn lane (into Sir Walker Lane). A 100’ of storage length should be
provided for this U-turn lane based on the projected traffic conflicts.
The two proposed right-in/right-out site entrances on the current site plan are both located in the
approximate midpoint between the new median U-turn openings (which are 1200’+/- apart), and appear
to provide adequate weaving distances in traffic simulations. There are several factors that may affect
the driveway locations: minimum intersection/driveway spacing, sight distance, and the historic
property on the south side of High House Road. Considering the anticipated speed, acceleration
distance, and stopping sight distance associated with a typical U-turn passenger vehicle, the downstream
right-in/right-out driveway probably should not be located within 200’ from the median U-turn opening.
On the south side of High House Road, to meet the minimum spacing distance and avoid encroaching on
the existing historic property, the driveway likely needs to be located on the east side of the property.
Accelerate Engineering, PLLC
5
Ashbourne Subdivision Access Traffic Analysis Memorandum
Because of the existing horizontal curve on High House Road and the downstream eastbound U-turn
movements, it is desirable to locate the South Entrance immediately to the east side of the historic
property to maximize the sight distance and weaving distance.
The current North Entrance location, approximately 600’ from either median U-turn openings, appears
to be an acceptable location based on traffic simulation results. This entrance may be shifted to the east,
if deemed necessary, to increase the weaving distance.
Conclusions and Recommendations
Traffic analyses were conducted to evaluate the traffic impact and access design for the proposed
Ashbourne Subdivision. The analysis results indicate that the development will have overall minimum
impact on the existing High House Road corridor, especially with the proposed new traffic signal at the
High House Road /Jenks Carpenter Road intersection and a new westbound left-turn lane at the High
House Road and Widdington Lane intersection (to be implemented by the Town or NCDOT). To mitigate
the traffic congestion caused by the background growth and off-site developments, an alternative
intersection configuration (converting the inside westbound through lane to a second westbound leftturn lane via pavement marking and signal revisions) may be considered in the future for the NC 55/
High House Road intersection.
The median U-turn and site access locations were also evaluated based on traffic simulations and queue
analyses, taking into account the traffic conflicts, minimum spacing distance, sight distance, and the
existing historic property. It is suggested that the westbound U-turn should have 125’ of storage, and
may be located approximately 700’ from the NC 55 intersection (measured from the start of the raised
median). The eastbound median U-turn should have 100’ of storage, and may be located approximately
400’ from the Sir Walker Lane/Cranborne Lane intersection (measured from the end of the raised
median). The South Entrance is recommended to be located immediately to the east side of the historic
property, approximately in the current location. The North Entrance may also remain in the current
location, approximately 600’ from either median U-turn openings. The North Entrance may be shifted to
the east, if deemed necessary, to increase the weaving distance.
The approximate median U-turn and site access locations are suggested based on relatively conservative
traffic analyses and engineering judgement. The final locations may be adjusted for field conditions (e.g.
grades, drainage structures, utilities), and to accommodate the Town and NCDOT’s preferences.
Please feel free to let me know if you have any questions or comments regarding this memo.
Accelerate Engineering, PLLC
6
APPENDIX A
Figure 1:
Site Plan
Figure 2A:
Original Traffic Counts
Figure 2B:
2016 Existing Conditions Peak Hour Traffic Volumes
Figure 3:
2021 Background Peak Hour Traffic Volumes
Figure 4:
2021 Off-Site Development Trips
Figure 5:
2021 No Build Conditions Peak Hour Traffic Volumes
Figure 6:
Peak Hour Site Trips
Figure 7:
Sir Walker Ln/Cranborne Ln U-Turn Trip Adjustments
Figure 8:
2021 Build Conditions Peak Hour Traffic Volumes
Figure 9:
2021 Build Proposed Lane Configuration
NC 55
SIR
W
ER
K
AL
LN
U-TURN
FOR PASSENGER CAR
U-TURN
FOR PASSENGER CAR
GRAPHIC SCALE
160
0
80
160
320
Figure 1 Site Plan
1 inch = 160 ft.
No.
Revision
Date
By
Designer
Scale
Drawn By
Date
Checked By
Job No.
AS NOTED
ASHBOURNE
HIGH HOUSE ROAD EXHIBIT
WithersRavenel
Engineers | Planners | Surveyors
115 MacKenan Drive | Cary, NC 27511
t: 919.469.3340 | license #: C-0832 | www.withersravenel.com
Sheet No.
N
*** Not to Scale
91
(94)
1308
(703)
(10)
12
247
(269)
High House Rd
(0)
2
(24)
36
(5)
4
(6)
1
(1108) 976
(27)
3
13
(0)
14
641
29
8
(57)
(856)
(90)
(63)
0
(0)
34
(25)
(4)
0
(1333) 1207
(86)
17
4
814
72
(71)
(1)
(1267)
628
36
(10)
14
(1016) 1062
(240) 110
Jenks Carpenter Rd
0
(3)
(365)
(384)
(275)
(6)
Church Entrance
136
399
30
320
222
158
12
Widdington Ln
(105)
(451)
(73)
(503)
327
Cranborne Ln
(1266)
509
NC 55
(76)
40
Sr Walker Ln
10/20/2015
3/31/2015
3/8/2016
12/9/2014
Carpenter Upchurch Rd
4/30/2015
88
(43)
168
(120)
(1170)
(176)
(238)
174
(126)
144
(2)
2
(137) 239
(1163) 887
High House Rd
Legend
Turning Movement
Existing Roadway
Signalized Intersection
Unsignalized Intersection
Data Source: Town of Cary Traffic Counts and Herndon Property TAR.
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
242 (72)
470 (1103)
4
(4)
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 2A
Original Traffic Counts
N
0
(3)
(370)
(390)
(279)
(6)
92
(95)
1328
(714)
(10)
12
251
(273)
High House Rd
(0)
2
(24)
36
(5)
4
(6)
1
(1307) 1146
(27)
3
14
(57)
763 (1061)
29
(90)
8
(63)
13
(0)
0
(0)
34
(25)
(4)
0
(1333) 1207
(86)
17
Carpenter Upchurch Rd
4
814
72
(71)
(1)
(1267)
713
37
(10)
14
(1147) 1132
(247) 133
Jenks Carpenter Rd
138
405
30
325
225
160
12
Widdington Ln
(107)
(458)
(74)
(511)
332
Cranborne Ln
(1285)
517
NC 55
(77)
41
Church Entrance
Sr Walker Ln
*** Not to Scale
91
(44)
173
(155)
(1214)
(181)
(238)
174
(126)
144
(2)
2
(137) 239
(1163) 1064
High House Rd
XX
Rebalanced Volumes
Note:
1. October 2015 TMCs at the High House Rd /NC 55 intersection were grew by 1.5% to estimate the 2016 peak hour volumes.
2. Volume imbalance between this and the next intersection at Sir Walker Ln/Cranborne Ln is assumed to be attributable to the
driveway volumes at the Walmart and Dollar Tree entrances just east of NC 55.
Legend
Turning Movement
Existing Roadway
Signalized Intersection
Unsignalized Intersection
Data Source: Town of Cary Traffic Counts and Herndon Property TAR. Annual Growth Rate is assumed to be 3%.
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
242 (72)
574 (1155)
4
(4)
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 2B
2016 Existing Conditions
Peak Hour Traffic Volumes
Build year = 2021
Years out = 5
Growth rate = 3.0%
Formula = (1+3.0%)^5
Multiplier = 1.159
N
0
(3)
(429)
(452)
(323)
(7)
107
(110)
1540
(828)
(12)
14
291
(316)
High House Rd
(0)
2
(28)
42
(6)
5
(7)
1
(1515) 1329
(31)
3
16
(66)
885 (1231)
34 (104)
9
(73)
15
(0)
0
(0)
39
(29)
(5)
0
(1545) 1399
(100)
20
Carpenter Upchurch Rd
5
944
83
(82)
(1)
(1469)
828
43
(12)
16
(1329) 1312
(286) 154
Jenks Carpenter Rd
160
470
35
377
261
185
14
Widdington Ln
(124)
(531)
(86)
(592)
385
Cranborne Ln
(1490)
599
NC 55
(89)
48
Church Entrance
Sr Walker Ln
*** Not to Scale
105
(51)
201
(180)
(1407)
(210)
(276)
202
(146)
167
(2)
2
(159) 277
(1348) 1234
High House Rd
Legend
Turning Movement
Existing Roadway
Signalized Intersection
Unsignalized Intersection
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
281 (83)
667 (1339)
5
(5)
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 3
2021 Background
Peak Hour Traffic Volumes
N
12
(14)
57
(31)
High House Rd
(14)
Carpenter Upchurch Rd
(24)
12
46
11
(24)
(12)
(2)
46
43
3
Jenks Carpenter Rd
36
46
(24)
Widdington Ln
12
NC 55
(8)
(14)
(59)
73
Cranborne Ln
(12)
61
Church Entrance
Sr Walker Ln
*** Not to Scale
1
(2)
(2)
2
(22)
(2)
(10)
9
3
40
High House Rd
Legend
Turning Movement
Existing Roadway
Signalized Intersection
Unsignalized Intersection
Data Source: Herndon Property TAR by Ramey Kemp & Associates, Inc dated December 2015.
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 4
2021 Off-Site Development Trips
(20)
N
0
(3)
(429)
(476)
(323)
(7)
107
(110)
1597
(859)
(12)
14
291
(316)
High House Rd
(0)
2
(28)
42
(6)
5
(7)
1
(1529) 1375
(31)
3
16
(66)
897 (1255)
34 (104)
9
(73)
15
(0)
0
(0)
39
(29)
(5)
0
(1559) 1445
(100)
20
Carpenter Upchurch Rd
5
956
83
(82)
(1)
(1493)
839
43
(12)
16
(1341) 1355
(288) 157
Jenks Carpenter Rd
196
516
35
377
273
185
14
Widdington Ln
(132)
(545)
(86)
(592)
385
Cranborne Ln
(1549)
672
NC 55
(101)
109
Church Entrance
Sr Walker Ln
*** Not to Scale
106
(53)
201
(180)
(1429)
(210)
(278)
204
(146)
167
(2)
2
(161) 280
(1358) 1274
High House Rd
Legend
Turning Movement
Existing Roadway
Signalized Intersection
Unsignalized Intersection
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
281 (83)
676 (1359)
5
(5)
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 5
2021 No Build Conditions
Peak Hour Traffic Volumes
Ashbourne Subdivision Trip Generation
Site Trip Distribution Assumptions based on Dec 2014 AM and PM Peak Traffic Counts at High House Rd and Sir Walker Ln/Canborne Ln
Enter: 84% from the East, 16% from the West
Exit: 77% to the East, 23% to the West
ITE
Average Daily Trips AM Peak Hour
PM Peak Hour
LAND USE
SIZE
COD
Enter Exit Total Enter Exit Total Enter Exit Total
210 Single Family 64
DU
305
305
609 12
36
48
40
24
64
210 Single Family 25
DU
119
119
238
5
14
19
16
9
25
Total (90 Lots)
424
424
847 17
50
67
56
33
89
Source: ITE Trip Generation 9th Edition, ITE Trip Generation Handbook 2nd Edition, and NCDOT Capacity Analysis Guidelines.
N
*** Not to Scale
30
5
High House Rd
14
(9)
(8)
(25)
5
39
14
(47)
14
(25)
(25)
Carpenter Upchurch Rd
Church Entrance
Sr Walker Ln
EB U - Turn
(40)
(15)
39
(47)
12
(20)
(5)
39
35
4
Jenks Carpenter Rd
(24)
(16)
12
7
(47)
Widdington Ln
1
(2)
3
(8)
(31)
14
Cranborne Ln
(9)
1
11
32
(24)
36
North Entrance
(3)
(3)
(2)
NC 55
(3)
4
4
3
South Entrance
(4)
1
WB U - Turn
64 Lots
2
(6)
(3)
2
(41)
(2)
(18)
5
30
High House Rd
25 Lots
Legend
Turning Movement
Existing Roadway
Proposed Roadway
Signalized Intersection
Unsignalized Intersection
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
10
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 6
Peak Hour Site Trips
(38)
N
(6)
-(6)
5
-5
-5
-(6)
-(6)
-9
-5
Carpenter Upchurch Rd
Church Entrance
Sr Walker Ln
EB U - Turn
WB U - Turn
North Entrance
*** Not to Scale
-9
9
-(63)
-(63)
-(63)
(63)
-9
Jenks Carpenter Rd
Widdington Ln
Cranborne Ln
NC 55
South Entrance
High House Rd
High House Rd
Legend
Turning Movement
Existing Roadway
Proposed Roadway
Signalized Intersection
Unsignalized Intersection
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 7
Sir Walker Ln/Cranborne Ln
U-TurnTrip Adjustments
N
*** Not to Scale
High House Rd
14
(9)
(14)
10
(1592) 1418
(0)
0
(7)
1
(1554) 1414
(31)
3
16
(66)
911 (1302)
34 (104)
0
(10)
15
(0)
0
(0)
39
(29)
(5)
0
(1584) 1484
(37)
11
Carpenter Upchurch Rd
Sr Walker Ln
940 (1314)
(28)
42
5
961
9
83
(82)
(1)
(1477)
(63)
851
43
(12)
16
(1361) 1390
(293) 161
Jenks Carpenter Rd
292
(318)
(1597) 1414
(16)
5
(40)
(1288)
(0)
2
Church Entrance
1597
(859)
1387
12
938
(12)
14
Widdington Ln
107
(110)
(1582)
942 (1281)
32
(31)
(24)
36
Cranborne Ln
0
(3)
(432)
(479)
(325)
(7)
EB U - Turn
196
517
35
381
277
188
14
North Entrance
(132)
(548)
(86)
(596)
386
South Entrance
(1549)
672
NC 55
(101)
109
WB U - Turn
64 Lots
108
(59)
201
(180)
(1470)
(210)
(281)
206
(146)
167
(2)
2
(163) 285
(1376) 1304
High House Rd
25 Lots
Legend
Turning Movement
Existing Roadway
Proposed Roadway
Signalized Intersection
Unsignalized Intersection
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
281 (83)
686 (1397)
5
(5)
XX
AM Peak Hour Traffic Volume
(XX)
PM Peak Hour Traffic Volume
Figure 8
2021 Build Conditions
Peak Hour Traffic Volumes
275 ft storage
*** Not to Scale
300 ft storage
Convert Thru to LT lane
350 ft storage
325 ft storage
450 ft storage
125 ft storage
150 ft storage
Carpenter Upchurch Rd
160 ft storage
South Entrance
450 ft storage
325 ft storage
NC 55
High House Rd
100 ft storage
Cranborne Ln
100 ft storage
325 ft storage
100 ft storage
Jenks Carpenter Rd
350 ft storage
400 ft +/-
Widdington Ln
300 ft storage
600 ft +/-
Church Entrance
600 ft +/-
WB U - Turn
275 ft storage
400 ft storage
700 ft +/-
Sr Walker Ln
64 Lots
EB U - Turn
325 ft storage
NC 55
High House Rd
North Entrance
400 ft storage
N
Alternative Intersection
Configuration for 2021
High House Rd
25 Lots
Legend
Existing Roadway
Proposed Roadway
Signalized Intersection
Unsignalized Intersection
Existing Lane
Committed Improvemets (H7 High School)
Developer Improvements
Prop. Improvements By ToC/NCDOT
Accelerate Engineering, PLLC
140 Preston Executive Dr, Suite 100 D
Cary, NC 27513
Tel: (919) 263-5678 Fax: (919) 263-5687
www.AccelerateEng.com
Ashbourne Subdivision
High House Rd Access Traffic Analysis
Figure 9
2021 Build Proposed Lane Configuration
APPENDIX B1
2016 Existing AM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2016 Existing AM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
138
138
1900
325
1
100
1.00
405
405
1900
30
30
1900
0
0
12
12
1900
225
225
1900
325
325
1900
0
1
251
251
1900
450
1
1.00
1.00
1.00
0.850
0.95
1.00
0.850
332
332
1900
338
2
200
0.97
517
517
1900
0.95
92
92
1900
325
1
100
1.00
1328
1328
1900
0.95
0.990
160
160
1900
350
1
100
1.00
3504
0
0
1863
1583
3539
1583
3504
0
No
0
1863
1583
No
3539
1583
No
0.950
1770
0.270
503
0.90
153
153
pm+pt
7
4
7
45
1121
17.0
0.90
450
483
NA
4
4
0.950
1770
0.146
272
0.90
33
0.90
13
0.90
178
0
0
pm+pt
3!
8!
3
191
pm+pt
3
8
3
45
1418
21.5
0.90
250
0.950
1770
0.950
1770
0.90
361
0.90
102
250
361
NA pm+ov
8
1
8
8
1
102
Prot
5
5
50
1312
17.9
0.90
1476
0.950
3433
0.950
3433
0.95
0.989
3500
3500
0.90
279
0.90
369
50
1897
25.9
0.90
574
1476
279
NA pm+ov
2
3!
2
2
3
369
Prot
1
620
NA
6
1
6
7.0
7.0
13.9
14.3
20.0
25.0
12.5% 15.6%
13.1
17.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
40.4
25.1
0.25
0.16
0.62
0.88
57.2
82.5
0.0
0.0
57.2
82.5
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
14.0
13.9
13.9
14.3
13.5
13.2
20.6
13.9
13.5
20.8
20.0
20.0
25.0
25.0
35.0
90.0
20.0
25.0
80.0
12.5% 12.5% 15.6% 15.6% 21.9% 56.3% 12.5% 15.6% 50.0%
13.1
13.1
17.7
18.5
28.8
83.4
13.1
18.5
73.2
3.1
3.1
5.0
3.0
3.0
5.1
3.1
3.0
5.3
3.8
3.8
2.3
3.5
3.2
1.5
3.8
3.5
1.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
-1.8
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lead
Lag
Lead
Lead
Lag
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
3.4
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
45.0
None None None None None C-Min None None C-Min
45.6
27.8
52.3
14.8
77.4 100.3
19.6
82.1
0.28
0.17
0.33
0.09
0.48
0.63
0.12
0.51
0.78
0.77
0.70
0.63
0.86
0.28
0.88
0.35
68.1
79.4
57.0
85.8
42.3
13.8
90.9
23.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
68.1
79.4
57.0
85.8
42.3
13.8
90.9
23.4
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2016 Existing AM
3/17/2016
SBR
41
41
1900
0
0
0.95
0
0
No
0.90
46
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
E
126
204
325
256
0
0
0
0.60
EBT
F
76.4
E
~301
#422
1041
549
0
0
0
0.88
EBR
WBU
WBL
E
161
#327
350
245
0
0
0
0.78
2016 Existing AM
3/17/2016
WBT
E
66.6
E
262
#476
1338
WBR
E
NBL
F
344
#510
105
167
522
0
0
0
0.69
325
331
0
0
0
0.31
323
0
0
0
0.77
NBT
D
40.4
D
692
736
1232
1880
0
0
0
0.79
NBR
B
SBL
F
115
163
198
#281
450
992
0
0
0
0.28
338
429
0
0
0
0.86
SBT
C
48.6
D
191
235
1817
1796
0
0
0
0.35
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay: 52.6
Intersection LOS: D
Intersection Capacity Utilization 84.5%
ICU Level of Service E
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
2016 Existing AM
3/17/2016
SBR
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2016 Existing AM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
239
239
1900
4
4
1900
574
574
1900
0%
242
242
1900
0.95
0.91
1.00
0.850
144
144
1900
2%
240
1
100
1.00
174
174
1900
0
1
100
1.00
1064
1064
1900
-2%
1583
0
0
0.950
1787
0.368
692
0.90
2
0.90
266
0
pm+pt
5!
2!
5
268
pm+pt
5
2
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.933
4745
0.90
4
45
1311
19.9
0.90
638
45
334
5.1
0.90
1182
1182
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
269
642
269
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
160
0
1
1.00
0.850
1567
1567
No
0.90
193
160
193
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
40.0
40.0 100.0
60.0
60.0
30.0
30.0
40.0
30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8%
33.6
33.6
93.4
53.4
53.4
23.8
23.8
33.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
6.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
15.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
102.6 102.6
86.5 109.9
17.4
34.1
0.79
0.79
0.67
0.85
0.13
0.26
0.42
0.42
0.20
0.20
0.68
0.47
5.9
5.2
9.3
2.4
67.9
43.0
0.0
0.0
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
5.9
A
47
89
840
0
0
0
0.32
EBT
5.2
A
5.3
A
138
214
254
2821
0
0
0
0.42
WBU
WBT
9.3
A
7.3
A
70
111
1231
3156
0
0
0
0.20
2016 Existing AM
3/17/2016
WBR
2.4
A
31
60
300
1430
0
0
0
0.19
SBL
67.9
E
54.3
D
130
196
1230
240
336
0
0
0
0.48
SBR
43.0
D
138
191
699
0
0
0
0.28
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.68
Intersection Signal Delay: 12.4
Intersection LOS: B
Intersection Capacity Utilization 63.4%
ICU Level of Service B
Analysis Period (min) 15
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2016 Existing AM
3/17/2016
3.7
Movement
EBU EBL EBT EBR WBU WBL WBT WBR
Traffic Vol, veh/h
4
1 1146
3
8
29 763
14
Future Vol, veh/h
4
1 1146
3
8
29 763
14
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
Sign Control
Free Free Free Free Free Free Free Free
RT Channelized
- None
- None
Storage Length
- 100
- 150
Veh in Median Storage, # 0
0
Grade, %
0
-5
Peak Hour Factor
90
90
90
90
90
90
90
90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
Mvmt Flow
4
1 1273
3
9
32 848
16
Major/Minor
Major1
Conflicting Flow All
644
Stage 1
Stage 2
Critical Hdwy
6.44
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52
Pot Cap-1 Maneuver
561
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 583
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
863
4.14
2.22
775
583
-
0
-
Major2
0 970 1277
- 6.44 4.14
- 2.52 2.22
- 347 540
- 470 470
-
EB
0
WB
0.6
NBLn1 NBLn2 EBL
48 419 583
0.301 0.09 0.01
109.5 14.4 11.2
F
B
B
1 0.3
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EBT
-
0
-
0
-
NBL NBT NBR
13
0
34
13
0
34
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
14
0
38
Minor1
1793 2232
1286 1286
507 946
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
51
42
174 233
516 338
48
48
174
501
42
42
233
338
NB
40.7
E
SBL SBT SBR
36
2
12
36
2
12
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
40
2
13
638
6.94
3.32
419
-
Minor2
1586
938
648
7.54
6.54
6.54
3.52
73
284
425
419
-
66
66
284
387
2226 432
938
1288
6.54 6.94
5.54
5.54
4.02 3.32
43 572
341
233
43
43
341
233
572
-
SB
105.3
F
EBR WBL WBT WBR SBLn1 SBLn2
- 470
64 572
- 0.087
- 0.66 0.023
- 13.4
- 134.9 11.4
B
F
B
- 0.3
2.8 0.1
Synchro 9 Report
Page 1
HCM 2010 TWSC
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0.6
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
909
4.14
2.22
745
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2016 Existing AM
745
-
NBLn1
393
0.204
16.5
C
0.8
EBT EBR
1207
17
1207
17
0
0
Free Free
- None
0
0
90
90
2
2
1341
19
0
-
0
-
WBL WBT WBR
0 814
4
0 814
4
0
0
0
Free Free Free
- None
0
-5
90
90
90
2
2
2
0 904
4
Major2
1360
4.14
2.22
501
501
-
0
-
0
-
WB
0
EBL
745
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
72
0
0
72
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
80
Minor1
1803 2260
1351 1351
452 909
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
50
40
158 217
557 352
50
50
158
557
NB
16.5
C
40
40
217
352
SBL SBT SBR
0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
0
680
6.94
3.32
393
-
Minor2
1578
907
671
7.54
6.54
6.54
3.52
74
297
412
393
-
59
59
297
328
2267 454
907
1360
6.54 6.94
5.54
5.54
4.02 3.32
40 553
353
215
40
40
353
215
553
-
SB
0
A
EBT EBR WBL WBT WBR SBLn1
- 501
0
0
A
A
0
-
Synchro 9 Report
Page 2
HCM 2010 TWSC
8: Jenks Carpenter Rd & High House Road
Intersection
Int Delay, s/veh
3/17/2016
16.1
Movement
EBU
Traffic Vol, veh/h
14
Future Vol, veh/h
14
Conflicting Peds, #/hr
0
Sign Control
Free
RT Channelized
Storage Length
Veh in Median Storage, # Grade, %
Peak Hour Factor
90
Heavy Vehicles, %
2
Mvmt Flow
16
Major/Minor
Major1
Conflicting Flow All
578
Stage 1
Stage 2
Critical Hdwy
6.44
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52
Pot Cap-1 Maneuver
618
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 618
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
2016 Existing AM
EBT EBR
1132 133
1132 133
0
0
Free Free
- None
0
0
90
90
2
2
1258 148
0
-
0
-
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
WBL WBT
37 713
37 713
0
0
Free Free
- None
0
0
0
90
90
2
2
41 792
Major2
1406
5.34
3.12
248
248
-
0
-
WB
1.1
NWLn1NWLn2
73 326
1.385 0.59
$ 336.5 30.7
F
D
8.2 3.6
NWR
173
173
0
Stop
None
0
90
2
192
Minor1
1841
1363
478
6.29
6.64
5.84
3.67
~ 87
147
571
703
7.14
3.92
326
-
~ 73
~ 73
147
477
326
-
NW
136.1
F
EBT EBR WBL WBT
- 248
- 0.166
- 22.4
C
0.6
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NWL
91
91
0
Stop
160
0
0
90
2
101
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 3
SimTraffic Simulation Summary
2016 Existing AM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6:45
8:00
75
60
2
1
4760
4756
168
172
3976
177.3
74.2
4053
146.6
10
6:45
8:00
75
60
2
1
4833
4857
213
189
4075
181.6
76.3
4124
150.0
2
6:45
8:00
75
60
2
1
5014
4982
172
204
4169
197.4
89.6
4477
156.9
3
6:45
8:00
75
60
2
1
4849
4829
167
187
3999
179.3
75.7
4113
148.0
7
6:45
8:00
75
60
2
1
4936
4963
205
178
4124
191.5
84.4
4327
154.4
8
6:45
8:00
75
60
2
1
4963
4940
172
195
4139
189.0
81.8
4308
153.5
9
6:45
8:00
75
60
2
1
4869
4838
178
209
4047
183.5
78.7
4168
149.4
Avg
6:45
8:00
75
60
2
1
4875
4871
179
183
4059
184.9
79.8
4206
150.4
4
6:45
8:00
75
60
2
1
4871
4869
195
197
4071
186.1
80.9
4296
150.5
5
6:45
8:00
75
60
2
1
4733
4711
150
172
3876
174.7
73.8
4025
141.8
6
6:45
8:00
75
60
2
1
4920
4954
198
164
4112
189.0
82.2
4205
153.0
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
6:45
End Time
7:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2016 Existing AM
3/17/2016
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
4760
4756
168
172
3976
177.3
74.2
4053
146.6
10
4833
4857
213
189
4075
181.6
76.3
4124
150.0
2
5014
4982
172
204
4169
197.4
89.6
4477
156.9
3
4849
4829
167
187
3999
179.3
75.7
4113
148.0
8
4963
4940
172
195
4139
189.0
81.8
4308
153.5
9
4869
4838
178
209
4047
183.5
78.7
4168
149.4
Avg
4875
4871
179
183
4059
184.9
79.8
4206
150.4
4
4871
4869
195
197
4071
186.1
80.9
4296
150.5
5
4733
4711
150
172
3876
174.7
73.8
4025
141.8
6
4920
4954
198
164
4112
189.0
82.2
4205
153.0
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
4936
4963
205
178
4124
191.5
84.4
4327
154.4
SimTraffic Report
Page 2
SimTraffic Performance Report
2016 Existing AM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
1.0
71.5
WB
0.0
51.6
NB
0.8
47.2
SB
1.1
42.9
All
0.8
50.6
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.1
1.5
WB
0.0
1.1
NB
1.6
17.5
SB
1.1
23.7
All
0.1
2.2
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.6
WB
0.0
0.6
NB
0.1
13.8
All
0.0
1.7
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.3
WB
0.0
2.4
NW
1.6
55.1
All
0.2
8.5
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
5.7
WB
1.1
8.5
SB
2.0
50.1
All
0.6
12.5
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
1.1
55.8
SimTraffic Report
Page 3
Queuing and Blocking Report
2016 Existing AM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
218
95
183
325
EB
T
351
206
314
1050
EB
TR
334
186
295
1050
WB
UL
295
143
243
350
0
0
1
1
WB
T
342
187
307
1329
WB
R
423
224
379
1329
NB
L
424
135
363
325
0
0
1
1
NB
T
770
436
648
1246
NB
T
731
397
618
1246
23
21
5
14
NB
R
509
106
328
SB
L
257
142
233
SB
L
284
163
248
450
338
0
0
338
0
0
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
T
234
119
210
1840
SB
TR
233
116
207
1840
0
0
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
17
1
8
EB
TR
6
0
4
929
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
WB
UL
58
15
42
150
NB
LT
47
12
39
1316
NB
R
61
25
54
100
SB
LT
72
29
61
562
6
1
SB
R
32
10
33
50
0
0
SimTraffic Report
Page 4
Queuing and Blocking Report
2016 Existing AM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
TR
2
0
2
775
NB
R
88
36
68
1245
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
58
9
38
418
EB
T
15
1
9
418
EB
TR
38
4
21
418
WB
L
80
21
56
243
NW
L
217
97
208
160
12
22
NW
R
277
90
224
933
1
1
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
175
74
137
243
EB
T
175
66
145
243
EB
T
190
75
152
243
0
0
WB
UT
57
12
41
300
WB
T
186
93
166
1276
WB
T
158
55
133
1276
WB
R
124
43
96
SB
L
224
115
202
300
240
0
1
SB
R
235
104
196
1236
0
1
Network Summary
Network wide Queuing Penalty: 61
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 5
APPENDIX B2
2016 Existing PM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2016 Existing PM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBL
107
107
1900
325
1
100
1.00
458
458
1900
74
74
1900
0
0
6
6
1900
390
390
1900
370
370
1900
0
1
3
3
1900
273
273
1900
450
1
0.95
1.00
1.00
1.00
0.850
0.95
95
95
1900
325
1
100
1.00
714
714
1900
0.95
0.979
279
279
1900
350
1
100
1.00
0.95
1.00
0.850
511
511
1900
338
2
200
0.97
3465
0
0
1863
1583
0
3539
1583
3465
0
No
0
1863
1583
No
0
3539
1583
No
0.950
1770
0.148
276
0.90
119
119
pm+pt
7
4
7
45
1121
17.0
0.90
509
591
NA
4
4
0.950
1770
0.125
233
0.90
82
0.90
7
0.90
310
0
0
pm+pt
3!
8!
3
317
pm+pt
3
8
3
45
1418
21.5
0.90
433
0.950
1770
0.950
1770
0.90
411
0.90
3
0.90
106
433
411
NA pm+ov
8
1
8
8
1
0
Prot
5
109
Prot
5
5
5
50
1312
17.9
0.90
793
0.950
3433
0.950
3433
0.90
303
0.90
568
793
303
NA pm+ov
2
3!
2
2
3
568
Prot
1
1
7.0
7.0
13.9
14.3
18.0
31.0
11.3% 19.4%
11.1
23.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
39.4
27.4
0.25
0.17
0.66
1.00
56.5 101.0
0.0
0.0
56.5 101.0
7.0
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
13.9
13.9
14.3
13.5
13.2
13.2
20.6
13.9
13.5
30.0
30.0
43.0
40.0
17.0
17.0
59.0
30.0
40.0
18.8% 18.8% 26.9% 25.0% 10.6% 10.6% 36.9% 18.8% 25.0%
23.1
23.1
35.7
33.5
10.8
10.8
52.4
23.1
33.5
3.1
3.1
5.0
3.0
3.0
3.0
5.1
3.1
3.0
3.8
3.8
2.3
3.5
3.2
3.2
1.5
3.8
3.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lag
Lag
Lag Lead
Lead
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
None None None None None None C-Min None None
58.0
40.9
77.7
12.3
55.2
85.8
31.8
0.36
0.26
0.49
0.08
0.34
0.54
0.20
0.96
0.91
0.54
0.80
0.65
0.36
0.83
83.0
81.8
38.7
109.5
47.3
23.0
72.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
83.0
81.8
38.7
109.5
47.3
23.0
72.8
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
SBT
SBR
1285
1285
1900
77
77
1900
0
0
0.95
0.991
0.95
3507
0
3507
0
No
50
1897
25.9
0.90
1428
1514
NA
6
2016 Existing PM
3/17/2016
0.90
86
0
6
14.0
20.8
82.0
51.3%
75.2
5.3
1.5
-1.8
5.0
Lead
Yes
6.0
3.4
20.0
45.0
C-Min
74.7
0.47
0.93
50.4
0.0
50.4
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
E
87
145
325
190
0
0
0
0.63
EBT
F
93.5
F
~353
#481
1041
593
0
0
0
1.00
EBR
WBU
WBL
F
288
#495
350
330
0
0
0
0.96
2016 Existing PM
3/17/2016
WBT
F
66.9
E
460
#686
1338
WBR
D
NBU
NBL
F
331
461
114
#227
476
0
0
0
0.91
800
0
0
0
0.51
325
138
0
0
0
0.79
NBT
D
46.8
D
366
448
1232
1222
0
0
0
0.65
NBR
C
SBL
E
177
256
294
360
450
849
0
0
0
0.36
338
750
0
0
0
0.76
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 142 (89%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 61.7
Intersection LOS: E
Intersection Capacity Utilization 91.3%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
SBT
D
56.5
E
752
863
1817
2016 Existing PM
3/17/2016
SBR
1687
0
0
0
0.90
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2016 Existing PM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
137
137
1900
4
4
1900
1155
1155
1900
0%
72
72
1900
0.95
0.91
1.00
0.850
126
126
1900
2%
240
1
100
1.00
238
238
1900
0
1
100
1.00
1163
1163
1900
-2%
1583
0
0
0.950
1787
0.177
333
0.90
2
0.90
152
0
pm+pt
5!
2!
5
154
pm+pt
5
2
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.936
4760
0.90
4
45
1311
19.9
0.90
1283
45
334
5.1
0.90
1292
1292
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
80
1287
80
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
140
0
1
1.00
0.850
1567
1567
No
0.90
264
140
264
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
25.0
25.0 120.0
95.0
95.0
40.0
40.0
25.0
15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6%
18.6
18.6 113.4
88.4
88.4
33.8
33.8
18.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
6.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
15.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
131.6 131.6
115.9 140.3
18.4
34.7
0.82
0.82
0.72
0.88
0.12
0.22
0.42
0.44
0.37
0.06
0.70
0.78
6.8
3.3
9.1
1.4
85.4
74.6
0.0
0.0
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
6.8
A
23
m28
455
0
0
0
0.34
EBT
3.3
A
3.7
A
116
m117
254
2940
0
0
0
0.44
WBU
WBT
9.1
A
8.6
A
173
229
1231
3448
0
0
0
0.37
2016 Existing PM
3/17/2016
WBR
1.4
A
8
14
300
1543
0
0
0
0.05
SBL
85.4
F
78.3
E
143
213
1230
240
383
0
0
0
0.37
SBR
74.6
E
262
355
430
0
0
0
0.61
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 55
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 15.2
Intersection LOS: B
Intersection Capacity Utilization 81.3%
ICU Level of Service D
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2016 Existing PM
3/17/2016
7.4
Movement
EBU EBL EBT EBR WBU WBL WBT WBR
Traffic Vol, veh/h
5
6 1307
27
63
90 1061
57
Future Vol, veh/h
5
6 1307
27
63
90 1061
57
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
Sign Control
Free Free Free Free Free Free Free Free
RT Channelized
- None
- None
Storage Length
- 100
- 150
Veh in Median Storage, # 0
0
Grade, %
0
-5
Peak Hour Factor
90
90
90
90
90
90
90
90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
Mvmt Flow
6
7 1452
30
70 100 1179
63
Major/Minor
Major1
Conflicting Flow All
918 1242
Stage 1
Stage 2
Critical Hdwy
6.44 4.14
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52 2.22
Pot Cap-1 Maneuver
375 556
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 450 450
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
0
-
Major2
0 1110 1482
- 6.44 4.14
- 2.52 2.22
- 282 450
- 347 347
-
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
0
-
0
-
WB
3
NBLn1 NBLn2 EBL
- 359 450
- 0.077 0.027
0 15.9 13.2
A
C
B
- 0.2
0.1
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
25
0
0
25
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
0
0
28
Minor1
2421 3074
1492 1492
929 1582
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
17
12
129 185
288 167
17
17
129
281
12
12
185
167
NB
15.9
C
SBL SBT SBR
24
0
10
24
0
10
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
27
0
11
741
6.94
3.32
359
-
Minor2
2302
1551
751
7.54
6.54
6.54
3.52
~ 21
119
369
359
-
~ 19
~ 19
119
340
3058 621
1551
1507
6.54 6.94
5.54
5.54
4.02 3.32
12 430
173
182
12
12
173
182
430
-
SB
$ 457.8
F
EBR WBL WBT WBR SBLn1 SBLn2
- 347
19 430
- 0.49
- 1.404 0.026
- 24.9
-$ 642.9 13.6
C
F
B
- 2.6
3.7 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0.5
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1409
4.14
2.22
480
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2016 Existing PM
480
-
NBLn1
334
0.236
19.1
C
0.9
EBT EBR
1333
86
1333
86
0
0
Free Free
- None
0
0
90
90
2
2
1481
96
0
-
0
-
WBL
0
0
0
Free
90
2
0
Major2
1577
4.14
2.22
414
414
-
WBT WBR
1267
1
1267
1
0
0
Free Free
- None
0
-5
90
90
2
2
1408
1
0
-
0
-
WB
0
EBL
480
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
71
0
0
71
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
79
Minor1
2233 2938
1529 1529
704 1409
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
23
15
123 178
394 203
23
23
123
389
NB
19.1
C
15
15
178
203
SBL SBT SBR
0
0
4
0
0
4
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
4
788
6.94
3.32
334
-
Minor2
2149
1408
741
7.54
6.54
6.54
3.52
27
146
374
334
-
21
21
146
286
2985 704
1408
1577
6.54 6.94
5.54
5.54
4.02 3.32
14 379
204
168
14
14
204
168
379
-
SB
14.6
B
EBT EBR WBL WBT WBR SBLn1
- 414
- 379
- 0.012
0
- 14.6
A
B
0
0
Synchro 9 Report
Page 2
HCM 2010 TWSC
8: Jenks Carpenter Rd & High House Road
Intersection
Int Delay, s/veh
3/17/2016
212.9
Movement
EBU
Traffic Vol, veh/h
10
Future Vol, veh/h
10
Conflicting Peds, #/hr
0
Sign Control
Free
RT Channelized
Storage Length
Veh in Median Storage, # Grade, %
Peak Hour Factor
90
Heavy Vehicles, %
2
Mvmt Flow
11
Major/Minor
Major1
Conflicting Flow All
985
Stage 1
Stage 2
Critical Hdwy
6.44
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52
Pot Cap-1 Maneuver
339
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 339
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
2016 Existing PM
EBT EBR
1147 247
1147 247
0
0
Free Free
- None
0
0
90
90
2
2
1274 274
0
-
0
-
EB
0.1
Major2
1549
5.34
3.12
211
211
-
WBT
1214
1214
0
Free
None
0
0
90
2
1349
0
-
WB
12.7
Minor Lane/Major Mvmt
NWLn1NWLn2
Capacity (veh/h)
2 293
HCM Lane V/C Ratio
24.444 0.588
HCM Control Delay (s) $ 13981.1 33.4
HCM Lane LOS
F
D
HCM 95th %tile Q(veh)
8.1 3.5
Notes
~: Volume exceeds capacity
WBL
181
181
0
Free
0
90
2
201
NWR
155
155
0
Stop
None
0
90
2
172
Minor1
2511
1434
1077
6.29
6.64
5.84
3.67
~ 34
133
282
774
7.14
3.92
293
-
~2
~2
133
~ 13
293
-
NW
$ 3117.3
F
EBT EBR WBL WBT
- 211
- 0.953
- 97.7
F
8.1
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NWL
44
44
0
Stop
160
0
0
90
2
49
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 3
SimTraffic Simulation Summary
2016 Existing PM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
4:45
6:00
75
60
2
1
5533
5513
231
251
4875
281.4
159.3
5597
199.1
10
4:45
6:00
75
60
2
1
5765
5719
239
285
4985
270.8
145.7
6118
200.9
2
4:45
6:00
75
60
2
1
5538
5517
281
302
4841
280.3
159.0
5818
198.6
3
4:45
6:00
75
60
2
1
5582
5537
225
270
4837
266.5
145.2
5472
193.9
7
4:45
6:00
75
60
2
1
5597
5565
216
248
4872
260.0
137.5
5597
194.9
8
4:45
6:00
75
60
2
1
5578
5530
244
292
4846
318.1
197.0
5529
205.6
9
4:45
6:00
75
60
2
1
5441
5450
235
226
4740
264.5
145.8
5061
190.2
Avg
4:45
6:00
75
60
2
1
5569
5530
231
260
4847
268.9
147.3
5567
195.2
4
4:45
6:00
75
60
2
1
5506
5488
239
257
4799
252.8
132.3
5382
190.4
5
4:45
6:00
75
60
2
1
5597
5526
212
283
4850
261.5
139.7
5823
192.9
6
4:45
6:00
75
60
2
1
5531
5469
184
246
4828
233.1
111.6
5297
185.9
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
4:45
End Time
5:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2016 Existing PM
3/17/2016
Interval #1 Information Recording
Start Time
5:00
End Time
6:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
5533
5513
231
251
4875
281.4
159.3
5597
199.1
10
5765
5719
239
285
4985
270.8
145.7
6118
200.9
2
5538
5517
281
302
4841
280.3
159.0
5818
198.6
3
5582
5537
225
270
4837
266.5
145.2
5472
193.9
8
5578
5530
244
292
4846
318.1
197.0
5529
205.6
9
5441
5450
235
226
4740
264.5
145.8
5061
190.2
Avg
5569
5530
231
260
4847
268.9
147.3
5567
195.2
4
5506
5488
239
257
4799
252.8
132.3
5382
190.4
5
5597
5526
212
283
4850
261.5
139.7
5823
192.9
6
5531
5469
184
246
4828
233.1
111.6
5297
185.9
Interval #1 Information Recording
Start Time
5:00
End Time
6:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
5597
5565
216
248
4872
260.0
137.5
5597
194.9
SimTraffic Report
Page 2
SimTraffic Performance Report
2016 Existing PM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.7
102.3
WB
0.0
50.3
NB
1.2
46.0
SB
1.1
73.7
All
0.8
65.9
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.6
WB
0.0
4.7
NB
2.1
26.3
SB
1.5
59.9
All
0.1
4.6
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
3.0
WB
0.0
1.0
NB
0.2
15.5
SB
0.1
9.3
All
0.0
2.4
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.9
WB
0.0
9.4
NW
138.7
431.7
All
9.3
31.2
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
4.8
WB
0.7
13.8
SB
1.6
63.2
All
0.5
16.5
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
5.9
85.9
SimTraffic Report
Page 3
Queuing and Blocking Report
2016 Existing PM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
286
90
258
325
0
0
EB
T
522
312
578
1050
0
0
EB
TR
498
293
546
1050
0
0
15
16
WB
UL
445
244
425
350
1
5
WB
T
666
323
589
1329
WB
R
418
187
347
1329
NB
UL
260
87
188
325
10
28
NB
T
387
246
352
1246
NB
T
360
211
322
1246
2
2
NB
R
251
104
208
SB
L
391
222
347
SB
L
538
347
595
450
338
1
6
338
3
17
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
T
989
544
863
1840
SB
TR
948
544
829
1840
30
154
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
30
5
21
EB
T
6
0
3
936
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
TR
23
1
11
936
WB
UL
179
73
141
150
1
6
WB
T
109
5
53
763
0
0
WB
TR
5
0
4
763
NB
R
63
22
54
100
0
0
SB
LT
84
24
63
558
13
1
SB
R
27
8
27
50
0
0
SimTraffic Report
Page 4
Queuing and Blocking Report
2016 Existing PM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
T
4
0
3
763
EB
TR
19
1
10
763
WB
T
2
0
2
418
NB
R
92
38
69
1255
SB
R
28
4
20
754
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
80
10
46
418
EB
T
20
1
10
418
EB
TR
58
16
44
418
WB
L
247
128
245
243
5
23
WB
T
58
2
38
243
0
1
NW
L
258
193
309
160
68
105
NW
R
866
444
1097
933
25
0
3
2
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
122
52
97
243
EB
T
170
60
143
243
EB
T
185
66
150
243
WB
UT
233
62
166
300
0
1
WB
T
330
162
302
1276
WB
T
283
126
257
1276
1
3
0
0
WB
R
70
12
43
SB
L
312
125
241
300
240
1
2
SB
R
420
189
338
1236
7
8
Network Summary
Network wide Queuing Penalty: 378
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 5
APPENDIX B3
2021 No Build AM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 No Build AM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
196
196
1900
325
1
100
1.00
516
516
1900
35
35
1900
0
0
14
14
1900
273
273
1900
377
377
1900
300
1
291
291
1900
450
1
0.95
0.95
1.00
0.850
0.95
1.00
0.850
385
385
1900
338
2
200
0.97
672
672
1900
0.95
107
107
1900
325
1
100
1.00
1597
1597
1900
0.95
0.990
185
185
1900
350
1
100
1.00
3504
0
0
3539
1583
3539
1583
3504
0
No
0
3539
1583
No
3539
1583
No
0.950
1770
0.318
592
0.90
218
218
pm+pt
7
4
7
45
1121
17.0
0.90
573
612
NA
4
4
0.950
1770
0.204
380
0.90
39
0.90
16
0.90
206
0
0
pm+pt
3!
8!
3
222
pm+pt
3
8
3
45
1418
21.5
0.90
303
0.950
1770
0.950
1770
0.90
419
0.90
119
303
419
NA pm+ov
8
1
8
8
1
119
Prot
5
5
50
1312
17.9
0.90
1774
0.950
3433
0.950
3433
0.95
0.979
3465
3465
0.90
323
0.90
428
50
1897
25.9
0.90
747
1774
323
NA pm+ov
2
3!
2
2
3
428
Prot
1
868
NA
6
1
6
7.0
7.0
13.9
14.3
20.0
25.0
12.5% 15.6%
13.1
17.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
35.7
20.0
0.22
0.12
0.88
1.40
86.3 240.3
0.0
0.0
86.3 240.3
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
14.0
13.9
13.9
14.3
13.5
13.2
20.6
13.9
13.5
20.8
20.0
20.0
25.0
25.0
35.0
90.0
20.0
25.0
80.0
12.5% 12.5% 15.6% 15.6% 21.9% 56.3% 12.5% 15.6% 50.0%
13.1
13.1
17.7
18.5
28.8
83.4
13.1
18.5
73.2
3.1
3.1
5.0
3.0
3.0
5.1
3.1
3.0
5.3
3.8
3.8
2.3
3.5
3.2
1.5
3.8
3.5
1.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
-1.8
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lead
Lag
Lead
Lead
Lag
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
3.4
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
45.0
None None None None None C-Min None None C-Min
35.7
20.0
45.0
16.3
84.3 105.0
20.0
88.0
0.22
0.12
0.28
0.10
0.53
0.66
0.12
0.55
1.01
0.69
0.94
0.66
0.95
0.31
1.00
0.46
114.5
75.7
86.1
85.8
48.1
12.9 111.4
23.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
114.5
75.7
86.1
85.8
48.1
12.9 111.4
23.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 No Build AM
3/17/2016
SBR
109
109
1900
0
0
0.95
0
0
No
0.90
121
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
F
197
#309
325
247
0
0
0
0.88
EBT
F
199.8
F
~448
#577
1041
438
0
0
0
1.40
EBR
WBU
WBL
F
~211
#374
350
220
0
0
0
1.01
2021 No Build AM
3/17/2016
WBT
E
89.4
F
162
217
1338
WBR
F
431
#647
442
0
0
0
0.69
300
445
0
0
0
0.94
NBL
F
NBT
D
45.0
D
122
897
188 #1042
1232
325
331 1880
0
0
0
0
0
0
0.36
0.94
NBR
B
SBL
F
138
193
234
#352
450
1038
0
0
0
0.31
338
429
0
0
0
1.00
SBT
C
52.2
D
276
360
1817
1905
0
0
0
0.46
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.40
Intersection Signal Delay: 79.0
Intersection LOS: E
Intersection Capacity Utilization 98.2%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
2021 No Build AM
3/17/2016
SBR
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2021 No Build AM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
280
280
1900
5
5
1900
676
676
1900
0%
281
281
1900
0.95
0.91
1.00
0.850
167
167
1900
2%
240
1
100
1.00
204
204
1900
0
1
100
1.00
1274
1274
1900
-2%
1583
0
0
0.950
1787
0.319
600
0.90
2
0.90
311
0
pm+pt
5!
2!
5
313
pm+pt
5
2
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.927
4714
0.90
6
45
1311
19.9
0.90
751
45
334
5.1
0.90
1416
1416
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
312
757
312
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
186
0
1
1.00
0.850
1567
1567
No
0.90
227
186
227
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
40.0
40.0 100.0
60.0
60.0
30.0
30.0
40.0
30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8%
33.6
33.6
93.4
53.4
53.4
23.8
23.8
33.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
6.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
15.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
100.9 100.9
83.5 108.6
19.1
37.1
0.78
0.78
0.64
0.84
0.15
0.29
0.54
0.51
0.25
0.24
0.72
0.51
8.1
6.6
11.0
2.9
68.5
41.7
0.0
0.0
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
8.1
A
61
110
785
0
0
0
0.40
EBT
6.6
A
6.9
A
200
296
254
2774
0
0
0
0.51
WBU
WBT
11.0
B
8.7
A
92
143
1231
3027
0
0
0
0.25
2021 No Build AM
3/17/2016
WBR
2.9
A
41
79
300
1394
0
0
0
0.22
SBL
68.5
E
53.8
D
151
223
1230
240
336
0
0
0
0.55
SBR
41.7
D
160
214
719
0
0
0
0.32
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 13.5
Intersection LOS: B
Intersection Capacity Utilization 73.0%
ICU Level of Service D
Analysis Period (min) 15
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2021 No Build AM
3/17/2016
10.1
Movement
EBU EBL EBT EBR WBU WBL WBT WBR
Traffic Vol, veh/h
5
1 1375
3
9
34 897
16
Future Vol, veh/h
5
1 1375
3
9
34 897
16
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
Sign Control
Free Free Free Free Free Free Free Free
RT Channelized
- None
- None
Storage Length
- 100
- 150
Veh in Median Storage, # 0
0
Grade, %
0
-5
Peak Hour Factor
90
90
90
90
90
90
90
90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
Mvmt Flow
6
1 1528
3
10
38 997
18
Major/Minor
Major1
Conflicting Flow All
756 1014
Stage 1
Stage 2
Critical Hdwy
6.44 4.14
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52 2.22
Pot Cap-1 Maneuver
476 680
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 489 489
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
0
-
Major2
0 1161 1531
- 6.44 4.14
- 2.52 2.22
- 262 431
- 365 365
-
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
0
-
0
-
WB
0.7
NBLn1 NBLn2 EBL
25 345 489
0.667 0.126 0.014
295 16.9 12.5
F
C
B
2 0.4
0
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
15
0
39
15
0
39
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
17
0
43
Minor1
2138 2653
1543 1543
595 1110
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
28
23
120 175
458 283
25
25
120
441
23
23
175
283
NB
94.2
F
SBL SBT SBR
42
2
14
42
2
14
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
47
2
16
766
6.94
3.32
345
-
Minor2
1878
1101
777
7.54
6.54
6.54
3.52
~ 44
226
356
345
-
~ 38
~ 38
226
311
2645 507
1101
1544
6.54 6.94
5.54
5.54
4.02 3.32
23 511
286
175
23
23
286
175
511
-
SB
$ 326
F
EBR WBL WBT WBR SBLn1 SBLn2
- 365
37 511
- 0.131
- 1.321 0.03
- 16.3
-$ 425.8 12.3
C
F
B
- 0.4
5.1 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0.7
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1068
4.14
2.22
648
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 No Build AM
648
-
NBLn1
321
0.287
20.7
C
1.2
EBT EBR
1445
20
1445
20
0
0
Free Free
- None
0
0
90
90
2
2
1606
22
0
-
0
-
WBL WBT WBR
0 956
5
0 956
5
0
0
0
Free Free Free
- None
0
-5
90
90
90
2
2
2
0 1062
6
Major2
1628
4.14
2.22
395
395
-
0
-
0
-
WB
0
EBL
648
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
83
0
0
83
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
92
Minor1
2148 2685
1617 1617
531 1068
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
27
22
108 161
500 296
27
27
108
500
NB
20.7
C
22
22
161
296
SBL SBT SBR
0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
0
814
6.94
3.32
321
-
Minor2
1868
1065
803
7.54
6.54
6.54
3.52
45
238
343
321
-
32
32
238
244
2693 534
1065
1628
6.54 6.94
5.54
5.54
4.02 3.32
21 491
297
159
21
21
297
159
491
-
SB
0
A
EBT EBR WBL WBT WBR SBLn1
- 395
0
0
A
A
0
-
Synchro 9 Report
Page 2
HCM 2010 TWSC
8: Jenks Carpenter Rd & High House Road
Intersection
Int Delay, s/veh
3/17/2016
49.3
Movement
EBU
Traffic Vol, veh/h
16
Future Vol, veh/h
16
Conflicting Peds, #/hr
0
Sign Control
Free
RT Channelized
Storage Length
Veh in Median Storage, # Grade, %
Peak Hour Factor
90
Heavy Vehicles, %
2
Mvmt Flow
18
Major/Minor
Major1
Conflicting Flow All
681
Stage 1
Stage 2
Critical Hdwy
6.44
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52
Pot Cap-1 Maneuver
531
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 531
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
2021 No Build AM
EBT EBR
1355 157
1355 157
0
0
Free Free
- None
0
0
90
90
2
2
1506 174
0
-
0
-
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
WBL WBT
43 839
43 839
0
0
Free Free
- None
0
0
0
90
90
2
2
48 932
Major2
1680
5.34
3.12
181
181
-
0
-
WB
1.6
NWLn1NWLn2
39 265
3.02 0.843
$ 1128 63.2
F
F
13.2
6.9
NWR
201
201
0
Stop
None
0
90
2
223
Minor1
2190
1628
562
6.29
6.64
5.84
3.67
~ 53
~ 100
518
840
7.14
3.92
265
-
~ 39
~ 39
~ 100
381
265
-
NW
$ 430.9
F
EBT EBR WBL WBT
- 181
- 0.264
- 31.9
D
1
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NWL
106
106
0
Stop
160
0
0
90
2
118
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 3
SimTraffic Simulation Summary
2021 No Build AM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6:45
8:00
75
60
2
1
5829
5764
264
329
4786
332.2
208.5
5998
204.7
10
6:45
8:00
75
60
2
1
5949
5816
268
401
4823
322.5
197.9
6112
203.6
2
6:45
8:00
75
60
2
1
5892
5788
247
351
4814
314.0
189.3
5965
201.1
3
6:45
8:00
75
60
2
1
5858
5766
275
367
4774
378.1
254.4
6453
213.8
7
6:45
8:00
75
60
2
1
5858
5783
283
358
4818
417.6
293.0
6326
226.2
8
6:45
8:00
75
60
2
1
5896
5728
260
428
4768
426.7
303.1
6016
224.0
9
6:45
8:00
75
60
2
1
5895
5791
260
364
4825
298.6
173.4
6350
198.4
Avg
6:45
8:00
75
60
2
1
5853
5758
252
351
4783
334.8
210.9
6060
204.8
4
6:45
8:00
75
60
2
1
5728
5699
232
261
4757
251.5
128.5
5520
184.5
5
6:45
8:00
75
60
2
1
5813
5744
256
325
4715
332.2
209.5
5920
202.1
6
6:45
8:00
75
60
2
1
5831
5695
193
329
4749
274.8
151.8
5949
189.8
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
6:45
End Time
7:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2021 No Build AM
3/17/2016
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
5829
5764
264
329
4786
332.2
208.5
5998
204.7
10
5949
5816
268
401
4823
322.5
197.9
6112
203.6
2
5892
5788
247
351
4814
314.0
189.3
5965
201.1
3
5858
5766
275
367
4774
378.1
254.4
6453
213.8
8
5896
5728
260
428
4768
426.7
303.1
6016
224.0
9
5895
5791
260
364
4825
298.6
173.4
6350
198.4
Avg
5853
5758
252
351
4783
334.8
210.9
6060
204.8
4
5728
5699
232
261
4757
251.5
128.5
5520
184.5
5
5813
5744
256
325
4715
332.2
209.5
5920
202.1
6
5831
5695
193
329
4749
274.8
151.8
5949
189.8
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
5858
5783
283
358
4818
417.6
293.0
6326
226.2
SimTraffic Report
Page 2
SimTraffic Performance Report
2021 No Build AM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
68.0
312.7
WB
0.0
68.8
NB
1.3
58.5
SB
1.0
77.8
All
11.4
103.7
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.1
1.8
WB
0.0
1.5
NB
1.5
24.6
SB
1.2
33.7
All
0.1
3.0
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.0
WB
0.0
0.7
NB
0.1
21.1
All
0.0
2.1
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.7
WB
0.0
3.1
NW
75.5
278.6
All
8.9
34.4
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
6.5
WB
1.2
10.7
SB
1.9
49.4
All
0.7
13.7
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
13.6
111.1
SimTraffic Report
Page 3
Queuing and Blocking Report
2021 No Build AM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
425
338
567
325
6
15
EB
T
1029
816
1319
1050
37
0
EB
TR
1001
788
1298
1050
27
0
73
143
WB
UL
352
187
322
350
2
3
WB
T
474
143
319
1328
WB
T
583
274
578
1328
0
0
4
14
WB
R
400
311
442
NB
L
425
210
480
300
23
31
325
0
0
NB
T
1108
596
970
1246
1
0
NB
T
1082
567
945
1246
1
0
33
36
16
47
NB
R
550
226
584
SB
L
400
282
473
450
338
18
59
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
453
317
537
338
26
87
SB
T
515
266
589
1828
SB
TR
476
233
501
1828
0
0
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
22
2
11
EB
TR
2
0
1
929
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
WB
UL
64
21
50
150
WB
TR
6
0
5
775
NB
LT
65
16
49
1316
0
0
NB
R
73
30
61
100
0
0
SB
LT
97
36
75
562
12
2
SB
R
52
13
41
50
0
0
SimTraffic Report
Page 4
Queuing and Blocking Report
2021 No Build AM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
TR
10
0
6
775
NB
R
114
44
85
1245
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
91
14
54
418
EB
T
35
1
15
418
EB
TR
47
5
26
418
WB
L
89
30
71
243
NW
L
260
218
328
160
76
153
NW
R
916
540
1120
933
28
0
11
11
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
186
86
155
243
0
0
EB
T
219
79
171
243
0
0
EB
T
210
89
181
243
0
0
WB
UT
78
16
53
300
WB
T
203
101
178
1276
WB
T
184
87
165
1276
WB
R
160
58
121
SB
L
276
131
224
300
240
1
2
SB
R
275
127
227
1236
1
1
Network Summary
Network wide Queuing Penalty: 606
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 5
APPENDIX B4
2021 No Build PM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 No Build PM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBL
132
132
1900
325
1
100
1.00
545
545
1900
86
86
1900
0
0
7
7
1900
476
476
1900
429
429
1900
300
1
3
3
1900
316
316
1900
450
1
0.95
0.95
0.95
1.00
0.850
0.95
110
110
1900
325
1
100
1.00
859
859
1900
0.95
0.979
323
323
1900
350
1
100
1.00
0.95
1.00
0.850
592
592
1900
338
2
200
0.97
3465
0
0
3539
1583
0
3539
1583
3465
0
No
0
3539
1583
No
0
3539
1583
No
0.950
1770
0.369
687
0.90
147
147
pm+pt
7
4
7
45
1121
17.0
0.90
606
702
NA
4
4
0.950
1770
0.131
244
0.90
96
0.90
8
0.90
359
0
0
pm+pt
3!
8!
3
367
pm+pt
3
8
3
45
1418
21.5
0.90
529
0.950
1770
0.950
1770
0.90
477
0.90
3
0.90
122
529
477
NA pm+ov
8
1
8
8
1
0
Prot
5
125
Prot
5
5
5
50
1312
17.9
0.90
954
0.950
3433
0.950
3433
0.90
351
0.90
658
954
351
NA pm+ov
2
3!
2
2
3
658
Prot
1
1
7.0
7.0
13.9
14.3
18.0
31.0
11.3% 19.4%
11.1
23.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
38.6
26.0
0.24
0.16
0.59
1.25
48.9 177.9
0.0
0.0
48.9 177.9
7.0
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
13.9
13.9
14.3
13.5
13.2
13.2
20.6
13.9
13.5
30.0
30.0
43.0
40.0
17.0
17.0
59.0
30.0
40.0
18.8% 18.8% 26.9% 25.0% 10.6% 10.6% 36.9% 18.8% 25.0%
23.1
23.1
35.7
33.5
10.8
10.8
52.4
23.1
33.5
3.1
3.1
5.0
3.0
3.0
3.0
5.1
3.1
3.0
3.8
3.8
2.3
3.5
3.2
3.2
1.5
3.8
3.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lag
Lag
Lag Lead
Lead
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
None None None None None None C-Min None None
56.0
38.4
77.4
12.0
55.0
85.0
34.0
0.35
0.24
0.48
0.08
0.34
0.53
0.21
1.14
0.62
0.62
0.95
0.78
0.42
0.90
133.0
53.1
36.4
136.8
52.9
24.8
77.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
133.0
53.1
36.4
136.8
52.9
24.8
77.9
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
SBT
SBR
1549
1549
1900
101
101
1900
0
0
0.95
0.991
0.95
3507
0
3507
0
No
50
1897
25.9
0.90
1721
1833
NA
6
2021 No Build PM
3/17/2016
0.90
112
0
6
14.0
20.8
82.0
51.3%
75.2
5.3
1.5
-1.8
5.0
Lead
Yes
6.0
3.4
20.0
45.0
C-Min
77.0
0.48
1.09
88.8
0.0
88.8
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
D
109
169
325
255
0
0
0
0.58
EBT
F
155.6
F
~479
#612
1041
563
0
0
0
1.25
EBR
WBU
WBL
F
~393
#591
350
323
0
0
0
1.14
2021 No Build PM
3/17/2016
WBT
D
68.7
E
272
247
1338
WBR
D
850
0
0
0
0.62
NBU
NBL
F
411
524
133
#270
300
775
0
0
0
0.62
325
132
0
0
0
0.95
NBT
D
53.3
D
477
565
1232
1217
0
0
0
0.78
NBR
C
SBL
E
219
303
346
#442
450
841
0
0
0
0.42
338
750
0
0
0
0.88
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 142 (89%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.25
Intersection Signal Delay: 84.1
Intersection LOS: F
Intersection Capacity Utilization 105.0%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
SBT
F
85.9
F
~1128
#1261
1817
2021 No Build PM
3/17/2016
SBR
1687
0
0
0
1.09
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2021 No Build PM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
161
161
1900
5
5
1900
1359
1359
1900
0%
83
83
1900
0.95
0.91
1.00
0.850
146
146
1900
2%
240
1
100
1.00
278
278
1900
0
1
100
1.00
1358
1358
1900
-2%
1583
0
0
0.950
1787
0.129
243
0.90
2
0.90
179
0
pm+pt
5!
2!
5
181
pm+pt
5
2
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.931
4734
0.90
6
45
1311
19.9
0.90
1510
45
334
5.1
0.90
1509
1509
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
92
1516
92
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
162
0
1
1.00
0.850
1567
1567
No
0.90
309
162
309
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
25.0
25.0 120.0
95.0
95.0
40.0
40.0
25.0
15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6%
18.6
18.6 113.4
88.4
88.4
33.8
33.8
18.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
6.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
15.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
129.6 129.6
110.8 137.2
20.4
39.8
0.81
0.81
0.69
0.86
0.13
0.25
0.55
0.52
0.46
0.07
0.73
0.79
16.9
3.3
12.6
2.1
84.9
70.6
0.0
0.0
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
16.9
B
39
m21
391
0
0
0
0.46
EBT
3.3
A
4.8
A
120
m147
254
2895
0
0
0
0.52
WBU
WBT
12.6
B
12.0
B
231
366
1231
3279
0
0
0
0.46
2021 No Build PM
3/17/2016
WBR
2.1
A
10
28
300
1499
0
0
0
0.06
SBL
84.9
F
75.6
E
166
239
1230
240
383
0
0
0
0.42
SBR
70.6
E
311
374
452
0
0
0
0.68
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.79
Intersection Signal Delay: 16.7
Intersection LOS: B
Intersection Capacity Utilization 93.1%
ICU Level of Service F
Analysis Period (min) 15
m Volume for 95th percentile queue is metered by upstream signal.
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2021 No Build PM
3/17/2016
20.2
Movement
EBU EBL EBT EBR WBU WBL WBT WBR
Traffic Vol, veh/h
6
7 1529
31
73 104 1255
66
Future Vol, veh/h
6
7 1529
31
73 104 1255
66
Conflicting Peds, #/hr
0
0
0
0
0
0
0
0
Sign Control
Free Free Free Free Free Free Free Free
RT Channelized
- None
- None
Storage Length
- 100
- 150
Veh in Median Storage, # 0
0
Grade, %
0
-5
Peak Hour Factor
90
90
90
90
90
90
90
90
Heavy Vehicles, %
2
2
2
2
2
2
2
2
Mvmt Flow
7
8 1699
34
81 116 1394
73
Major/Minor
Major1
Conflicting Flow All
1085 1468
Stage 1
Stage 2
Critical Hdwy
6.44 4.14
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52 2.22
Pot Cap-1 Maneuver
293 456
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 356 356
Mov Cap-2 Maneuver
Stage 1
Stage 2
Approach
HCM Control Delay, s
HCM LOS
0
-
Major2
0 1298 1733
- 6.44 4.14
- 2.52 2.22
- 213 360
- 265 265
-
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
0
-
0
-
WB
5.9
NBLn1 NBLn2 EBL
- 296 356
- 0.109 0.041
0 18.6 15.6
A
C
C
- 0.4
0.1
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
29
0
0
29
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
0
0
32
SBL SBT SBR
28
0
12
28
0
12
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
31
0
13
Minor1
2836
1745
1091
7.54
6.54
6.54
3.52
8
90
229
3606
1745
1861
6.54
5.54
5.54
4.02
5
139
121
867
6.94
3.32
296
-
Minor2
2702
1824
878
7.54
6.54
6.54
3.52
~ 10
80
309
8
8
90
221
5
5
139
121
296
-
~9
~9
80
275
NB
18.6
C
3586 734
1824
1762
6.54 6.94
5.54
5.54
4.02 3.32
5 363
127
136
5
5
127
136
363
-
SB
$ 1349.3
F
EBR WBL WBT WBR SBLn1 SBLn2
- 265
9 363
- 0.742
- 3.457 0.037
- 49.7
-$ 1921 15.3
E
F
C
- 5.3
5.1 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0.7
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1660
4.14
2.22
384
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 No Build PM
384
-
NBLn1
272
0.335
24.8
C
1.4
EBT EBR
1559 100
1559 100
0
0
Free Free
- None
0
0
90
90
2
2
1732 111
0
-
0
-
WBL
0
0
0
Free
90
2
0
Major2
1843
4.14
2.22
326
326
-
WBT WBR
1493
1
1493
1
0
0
Free Free
- None
0
-5
90
90
2
2
1659
1
0
-
0
-
WB
0
EBL
384
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
82
0
0
82
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
91
Minor1
2617 3448
1788 1788
829 1660
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
12
7
84 132
331 153
12
12
84
325
NB
24.8
C
7
7
132
153
SBL SBT SBR
0
0
5
0
0
5
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
6
922
6.94
3.32
272
-
Minor2
2525
1659
866
7.54
6.54
6.54
3.52
14
102
314
272
-
9
9
102
209
3502 830
1659
1843
6.54 6.94
5.54
5.54
4.02 3.32
6 313
153
124
6
6
153
124
313
-
SB
16.7
C
EBT EBR WBL WBT WBR SBLn1
- 326
- 313
- 0.018
0
- 16.7
A
C
0
- 0.1
Synchro 9 Report
Page 2
HCM 2010 TWSC
8: Jenks Carpenter Rd & High House Road
Intersection
Int Delay, s/veh
Major/Minor
Major1
Conflicting Flow All
1159
Stage 1
Stage 2
Critical Hdwy
6.44
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
2.52
Pot Cap-1 Maneuver
262
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver 262
Mov Cap-2 Maneuver
Stage 1
Stage 2
-
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
3/17/2016
43.8
Movement
EBU
Traffic Vol, veh/h
12
Future Vol, veh/h
12
Conflicting Peds, #/hr
0
Sign Control
Free
RT Channelized
Storage Length
Veh in Median Storage, # Grade, %
Peak Hour Factor
90
Heavy Vehicles, %
2
Mvmt Flow
13
Approach
HCM Control Delay, s
HCM LOS
2021 No Build PM
EBT EBR
1341 288
1341 288
0
0
Free Free
- None
0
0
90
90
2
2
1490 320
0
-
0
-
EB
0.1
Major2
1810
5.34
3.12
~ 156
~ 156
-
WBT
1429
1429
0
Free
None
0
0
90
2
1588
0
-
WB
39.3
NWLn1NWLn2
18 240
3.272 0.833
$ 1461.6 66.4
F
F
7.9 6.5
Notes
~: Volume exceeds capacity
WBL
210
210
0
Free
0
90
2
233
NWR
180
180
0
Stop
None
0
90
2
200
Minor1
2938
1677
1261
6.29
6.64
5.84
3.67
~ 18
93
225
905
7.14
3.92
240
-
~ 18
~ 18
93
225
240
-
NW
$ 383.8
F
EBT EBR WBL WBT
- ~ 156
- 1.496
-$ 306.9
F
- 15.4
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NWL
53
53
0
Stop
160
0
0
90
2
59
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 3
SimTraffic Simulation Summary
2021 No Build PM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
4:45
6:00
75
60
2
1
6334
6196
353
491
5380
557.1
421.7
9446
279.2
10
4:45
6:00
75
60
2
1
6332
6174
327
485
5420
536.9
400.8
8451
274.8
2
4:45
6:00
75
60
2
1
6261
6097
302
466
5376
561.4
426.4
8680
279.0
3
4:45
6:00
75
60
2
1
6335
6198
361
498
5474
575.2
437.4
8680
282.8
7
4:45
6:00
75
60
2
1
6271
6136
376
511
5382
666.1
530.7
9309
303.7
8
4:45
6:00
75
60
2
1
6224
6117
364
471
5375
624.8
489.8
9039
294.5
9
4:45
6:00
75
60
2
1
6278
6159
384
503
5373
747.7
612.9
9462
324.7
Avg
4:45
6:00
75
60
2
1
6282
6143
342
488
5383
601.8
466.5
8969
288.9
4
4:45
6:00
75
60
2
1
6299
6111
311
499
5325
580.5
447.2
8671
282.6
5
4:45
6:00
75
60
2
1
6259
6149
377
487
5425
592.8
456.2
9214
288.1
6
4:45
6:00
75
60
2
1
6232
6096
314
450
5304
575.2
442.2
8753
279.9
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
4:45
End Time
5:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2021 No Build PM
3/17/2016
Interval #1 Information Recording
Start Time
5:00
End Time
6:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6334
6196
353
491
5380
557.1
421.7
9446
279.2
10
6332
6174
327
485
5420
536.9
400.8
8451
274.8
2
6261
6097
302
466
5376
561.4
426.4
8680
279.0
3
6335
6198
361
498
5474
575.2
437.4
8680
282.8
8
6224
6117
364
471
5375
624.8
489.8
9039
294.5
9
6278
6159
384
503
5373
747.7
612.9
9462
324.7
Avg
6282
6143
342
488
5383
601.8
466.5
8969
288.9
4
6299
6111
311
499
5325
580.5
447.2
8671
282.6
5
6259
6149
377
487
5425
592.8
456.2
9214
288.1
6
6232
6096
314
450
5304
575.2
442.2
8753
279.9
Interval #1 Information Recording
Start Time
5:00
End Time
6:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
6271
6136
376
511
5382
666.1
530.7
9309
303.7
SimTraffic Report
Page 2
SimTraffic Performance Report
2021 No Build PM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
276.5
452.6
WB
0.0
67.6
NB
1.1
47.1
SB
73.9
178.2
All
67.5
153.8
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.8
WB
0.0
5.4
NB
2.1
30.1
SB
1.4
112.5
All
0.1
5.8
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
3.0
WB
0.0
1.2
NB
0.1
16.1
SB
0.1
12.8
All
0.0
2.5
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
3.0
WB
NW
0.0 779.5
12.1 1128.0
All
54.5
48.0
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
6.3
WB
0.7
22.5
SB
1.6
61.8
All
0.6
21.6
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
83.6
169.2
SimTraffic Report
Page 3
Queuing and Blocking Report
2021 No Build PM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
425
329
587
325
EB
T
1100
1006
1269
1050
71
0
EB
TR
1094
994
1276
1050
65
0
88
116
WB
UL
449
354
520
350
34
81
WB
T
676
350
811
1328
WB
T
577
229
517
1328
0
0
0
2
WB
R
362
200
333
NB
UL
267
117
223
300
2
5
325
0
0
NB
T
417
284
394
1246
NB
T
392
248
367
1246
4
5
0
0
NB
R
290
125
238
SB
L
398
256
368
450
338
3
22
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
538
513
647
338
5
42
SB
T
1860
1644
2200
1828
37
0
SB
TR
1845
1624
2198
1828
19
0
49
292
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
35
7
26
EB
T
1
0
1
936
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
TR
34
3
17
936
WB
UL
198
83
162
150
2
15
WB
T
183
10
81
763
0
0
WB
TR
18
1
17
763
NB
R
77
25
61
100
0
0
SB
LT
111
39
107
558
25
3
SB
R
44
9
36
50
0
0
SimTraffic Report
Page 4
Queuing and Blocking Report
2021 No Build PM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
T
11
0
7
763
EB
TR
17
1
10
763
NB
R
92
40
74
1255
SB
R
30
4
19
754
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
79
10
45
418
EB
T
10
0
7
418
EB
TR
57
18
48
418
WB
L
278
170
287
243
12
64
WB
T
179
11
95
243
0
2
WB
T
39
1
30
243
0
0
NW
L
259
239
291
160
96
172
NW
R
963
790
1285
933
73
0
3
1
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
157
67
130
243
EB
T
201
73
165
243
0
0
EB
T
208
75
165
243
0
0
WB
UT
388
121
334
300
7
31
WB
T
535
241
501
1276
0
0
WB
T
461
209
435
1276
4
19
2
1
WB
R
148
21
102
SB
L
338
140
272
300
240
1
3
SB
R
459
209
368
1236
9
14
Network Summary
Network wide Queuing Penalty: 892
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 5
APPENDIX B5
2021 Build with Improvements Alternative 1 AM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 Build w/ Improvements_Alt1 AM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
196
196
1900
325
1
100
1.00
517
517
1900
35
35
1900
0
0
14
14
1900
277
277
1900
381
381
1900
300
1
292
292
1900
450
1
0.95
0.95
1.00
0.850
0.95
1.00
0.850
386
386
1900
338
2
200
0.97
672
672
1900
0.95
107
107
1900
325
1
100
1.00
1597
1597
1900
0.95
0.990
188
188
1900
350
1
100
1.00
3504
0
0
3539
1583
3539
1583
3504
0
No
0
3539
1583
No
3539
1583
No
0.950
1770
0.309
576
0.90
218
218
pm+pt
7
4
7
45
1121
17.0
0.90
574
613
NA
4
4
0.950
1770
0.204
380
0.90
39
0.90
16
0.90
209
0
0
pm+pt
3!
8!
3
225
pm+pt
3
8
3
45
709
10.7
0.90
308
0.950
1770
0.950
1770
0.90
423
0.90
119
308
423
NA pm+ov
8
1
8
8
1
119
Prot
5
5
50
1312
17.9
0.90
1774
0.950
3433
0.950
3433
0.95
0.979
3465
3465
0.90
324
0.90
429
50
1897
25.9
0.90
747
1774
324
NA pm+ov
2
3!
2
2
3
429
Prot
1
868
NA
6
1
6
7.0
7.0
13.9
14.3
20.0
25.0
12.5% 15.6%
13.1
17.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
35.7
20.0
0.22
0.12
0.89
1.40
87.6 241.2
0.0
0.0
87.6 241.2
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
14.0
13.9
13.9
14.3
13.5
13.2
20.6
13.9
13.5
20.8
20.0
20.0
25.0
25.0
35.0
90.0
20.0
25.0
80.0
12.5% 12.5% 15.6% 15.6% 21.9% 56.3% 12.5% 15.6% 50.0%
13.1
13.1
17.7
18.5
28.8
83.4
13.1
18.5
73.2
3.1
3.1
5.0
3.0
3.0
5.1
3.1
3.0
5.3
3.8
3.8
2.3
3.5
3.2
1.5
3.8
3.5
1.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
-1.8
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lead
Lag
Lead
Lead
Lag
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
3.4
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
45.0
None None None None None C-Min None None C-Min
35.7
20.0
45.0
16.3
84.3 105.0
20.0
88.0
0.22
0.12
0.28
0.10
0.53
0.66
0.12
0.55
1.02
0.70
0.95
0.66
0.95
0.31
1.00
0.46
117.5
76.2
87.8
85.8
48.1
12.9 112.0
23.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
117.5
76.2
87.8
85.8
48.1
12.9 112.0
23.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 Build w/ Improvements_Alt1 AM
3/17/2016
SBR
109
109
1900
0
0
0.95
0
0
No
0.90
121
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
F
197
#313
325
245
0
0
0
0.89
EBT
F
200.9
F
~449
#577
1041
438
0
0
0
1.40
EBR
WBU
WBL
F
~218
#383
350
220
0
0
0
1.02
2021 Build w/ Improvements_Alt1 AM
3/17/2016
WBT
E
91.1
F
165
221
629
WBR
F
437
#660
442
0
0
0
0.70
300
445
0
0
0
0.95
NBL
F
NBT
D
45.0
D
122
897
188 #1042
1232
325
331 1880
0
0
0
0
0
0
0.36
0.94
NBR
B
SBL
F
139
194
235
#354
450
1038
0
0
0
0.31
338
429
0
0
0
1.00
SBT
C
52.4
D
276
360
1817
1905
0
0
0
0.46
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 120
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.40
Intersection Signal Delay: 79.6
Intersection LOS: E
Intersection Capacity Utilization 98.4%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
2021 Build w/ Improvements_Alt1 AM
3/17/2016
SBR
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
2021 Build w/ Improvements_Alt1 AM
3/17/2016
EBU
EBT
EBR
WBL
WBT
NWL
NWR
16
16
1900
200
1
100
0.91
1390
1390
1900
161
161
1900
0
0
851
851
1900
0.91
108
108
1900
160
1
100
1.00
201
201
1900
0
1
0
0.91
0.985
0.999
5004
0.921
4613
43
43
1900
0
1
100
1.00
0.90
18
45
478
7.2
0.90
1544
0
0
Perm
2
2
1741
NA
2
2
12.0
12.0
25.0
25.0
82.0
82.0
63.1% 63.1%
75.0
75.0
5.0
5.0
2.0
2.0
-2.0
5.0
Lag
Lag
Yes
Yes
6.0
6.0
C-Min C-Min
89.7
0.69
0.55
11.5
0.0
11.5
B
11.5
B
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
0
No
0.950
1770
0.096
179
0.90
179
0.90
48
0
48
pm+pt
1
6
1
0.95
3539
0.950
1770
0.950
1770
45
334
5.1
0.90
946
35
1012
19.7
0.90
120
3539
946
NA
6
6
1.00
0.850
1583
1583
No
0.90
223
120
223
Prot pm+ov
8
1
8
8
1
7.0
12.0
7.0
7.0
14.0
25.0
25.0
14.0
20.0 102.0
28.0
20.0
15.4% 78.5% 21.5% 15.4%
13.0
95.0
21.0
13.0
5.0
5.0
5.0
5.0
2.0
2.0
2.0
2.0
-2.0
-2.0
-2.0
-2.0
5.0
5.0
5.0
5.0
Lead
Lead
Yes
Yes
2.0
6.0
2.0
2.0
None C-Min None None
104.8 104.8
15.2
30.3
0.81
0.81
0.12
0.23
0.18
0.33
0.58
0.60
5.9
3.3
65.1
51.0
0.0
0.2
0.0
0.0
5.9
3.5
65.1
51.0
A
A
E
D
3.6
55.9
A
E
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBT
236
346
398
3182
0
52
0
0.56
EBR
2021 Build w/ Improvements_Alt1 AM
3/17/2016
WBL
5
13
WBT
51
108
254
327
0
0
0
0.15
2853
945
0
0
0.50
NWL
97
157
932
160
313
0
0
0
0.38
NWR
171
235
428
0
0
0
0.52
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 96 (74%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.60
Intersection Signal Delay: 13.9
Intersection LOS: B
Intersection Capacity Utilization 56.0%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:
8: Jenks Carpenter Rd & High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2021 Build w/ Improvements_Alt1 AM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
285
285
1900
5
5
1900
686
686
1900
0%
281
281
1900
0.95
0.91
1.00
0.850
167
167
1900
2%
240
1
100
1.00
206
206
1900
0
1
100
1.00
1304
1304
1900
-2%
1583
0
0
0.950
1787
0.314
591
0.90
2
0.90
317
0
pm+pt
5!
2!
5
319
pm+pt
5
2
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.926
4709
0.90
6
45
1311
19.9
0.90
762
45
334
5.1
0.90
1449
1449
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
312
768
312
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
186
0
1
1.00
0.850
1567
1567
No
0.90
229
186
229
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
40.0
40.0 100.0
60.0
60.0
30.0
30.0
40.0
30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8%
33.6
33.6
93.4
53.4
53.4
23.8
23.8
33.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
0.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
100.7 100.7
83.1 108.4
19.3
37.5
0.77
0.77
0.64
0.83
0.15
0.29
0.56
0.52
0.26
0.24
0.72
0.51
7.8
3.8
11.3
3.0
67.6
41.2
0.0
0.1
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 7
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
7.8
A
29
56
779
21
0
0
0.42
EBT
3.9
A
4.6
A
68
91
254
2774
254
0
0
0.57
WBU
WBT
11.3
B
8.9
A
94
149
1231
3009
0
0
0
0.26
2021 Build w/ Improvements_Alt1 AM
3/17/2016
WBR
3.0
A
41
81
300
1391
0
0
0
0.22
SBL
67.6
E
53.1
D
151
221
1230
240
339
0
0
0
0.55
SBR
41.2
D
162
213
721
0
0
0
0.32
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 12.2
Intersection LOS: B
Intersection Capacity Utilization 74.2%
ICU Level of Service D
Analysis Period (min) 15
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 8
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2021 Build w/ Improvements_Alt1 AM
3/17/2016
11.3
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBL
1
1
0
Free
100
90
2
1
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1030
4.14
2.22
670
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
670
-
EBT EBR
1414
3
1414
3
0
0
Free Free
- None
0
0
90
90
2
2
1571
3
0
-
WBL WBT WBR
34 911
16
34 911
16
0
0
0
Free Free Free
- None
150
0
-5
90
90
90
2
2
2
38 1012
18
Major2
1574
4.14
2.22
415
-
0
-
NBLn1 NBLn2 EBL
22 334 670
0.758 0.13 0.002
$ 356.5 17.4 10.4
F
C
B
2.2 0.4
0
415
-
0
-
WB
0.5
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
NBL NBT NBR
15
0
39
15
0
39
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
17
0
43
Minor1
2158 2681
1575 1575
583 1106
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
27
22
115 169
465 284
22
22
115
406
20
20
169
258
NB
111.6
F
SBL SBT SBR
42
2
14
42
2
14
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
47
2
16
787
6.94
3.32
334
-
Minor2
1885
1097
788
7.54
6.54
6.54
3.52
~ 43
227
350
334
-
~ 35
~ 35
227
304
2674 515
1097
1577
6.54 6.94
5.54
5.54
4.02 3.32
22 505
287
168
20
20
261
168
505
-
SB
$ 374
F
EBR WBL WBT WBR SBLn1 SBLn2
- 415
34 505
- 0.091
- 1.438 0.031
- 14.5
-$ 489.1 12.4
B
F
B
- 0.3
5.3 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
2021 Build w/ Improvements_Alt1 AM
3/17/2016
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.7
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1073
4.14
2.22
645
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
645
-
NBLn1
313
0.295
21.2
C
1.2
EBT EBR
1484
11
1484
11
0
0
Free Free
- None
0
0
90
90
2
2
1649
12
0
-
0
-
WBL WBT WBR
9 961
5
9 961
5
0
0
0
Free Free Free
- None
100
0
-5
90
90
90
2
2
2
10 1068
6
Major2
1661
4.14
2.22
384
384
-
0
-
0
-
WB
0.1
EBL
645
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
83
0
0
83
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
92
Minor1
2209 2748
1655 1655
554 1093
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
24
20
102 154
484 288
24
24
102
471
NB
21.2
C
19
19
154
281
SBL SBT SBR
0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
0
831
6.94
3.32
313
-
Minor2
1915
1091
824
7.54
6.54
6.54
3.52
41
229
333
313
-
28
28
229
235
2752 537
1091
1661
6.54 6.94
5.54
5.54
4.02 3.32
19 488
289
153
19
19
281
153
488
-
SB
0
A
EBT EBR WBL WBT WBR SBLn1
- 384
- 0.026
- 14.6
0
B
A
0.1
-
Synchro 9 Report
Page 2
HCM 2010 TWSC
20: High House Rd EB & WB U-Turn
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt1 AM
-
EBL
0
A
-
EBT
1387
1387
0
Free
None
0
0
90
2
1541
0
-
WBT WBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
SBL
32
32
0
Stop
0
0
0
90
2
36
SBR
0
0
0
Stop
None
90
2
0
Minor2
771
0
771
7.54
6.54
3.52
290
359
0
-
290
290
359
-
SB
EBT SBLn1
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
HCM 2010 TWSC
30: South Entrance & High House Rd EB
Intersection
Int Delay, s/veh
3/17/2016
0.2
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBT EBR
1414
5
1414
5
0
0
Free Free
- None
0
0
90
90
2
2
1571
6
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt1 AM
NBLn1
334
0.047
16.3
C
0.1
EBT
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
WBL WBT
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
NBL
0
0
0
Stop
0
0
90
2
0
NBR
14
14
0
Stop
None
0
90
2
16
Minor1
1574
1574
0
7.54
6.54
3.52
74
115
-
787
6.94
3.32
334
-
74
74
115
-
334
-
NB
16.3
C
EBR
-
Synchro 9 Report
Page 4
HCM 2010 TWSC
40: High House Road WB & North Entrance
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt1 AM
3/17/2016
0.5
EBL EBT
0
0
0
0
0
0
Free Free
- None
0
0
90
90
2
2
0
0
WBT WBR
938
12
938
12
0
0
Free Free
- None
0
-5
90
90
2
2
1042
13
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
0
-
SBL
0
0
0
Stop
0
0
90
2
0
SBR
36
36
0
Stop
None
0
90
2
40
Minor2
1049
1049
0
7.54
6.54
3.52
182
243
-
527
6.94
3.32
496
-
182
182
243
-
496
-
SB
12.9
B
WBT WBR SBLn1
- 496
- 0.081
- 12.9
B
0.3
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
HCM 2010 TWSC
50: EB U-Turn & High House Road WB
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt1 AM
3/17/2016
0
EBT EBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
WBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
0
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
-
WBT
940
940
0
Free
None
0
-5
90
2
1044
0
-
NBL
10
10
0
Stop
0
0
0
90
2
11
NBR
0
0
0
Stop
None
90
2
0
Minor1
522
0
522
7.54
6.54
3.52
438
506
0
-
438
438
506
-
NB
-
NBLn1 WBL WBT
0
A
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6:45
8:00
75
60
2
1
5828
5769
291
350
4758
427.4
303.8
6196
225.4
10
6:45
8:00
75
60
2
1
5911
5808
275
378
4907
358.3
231.5
6259
213.2
2
6:45
8:00
75
60
2
1
5919
5875
269
313
4858
354.7
228.4
6348
211.6
3
6:45
8:00
75
60
2
1
5901
5810
268
359
4886
389.3
262.7
6773
220.8
7
6:45
8:00
75
60
2
1
6090
6021
275
344
5023
286.0
156.4
6930
202.8
8
6:45
8:00
75
60
2
1
5940
5865
258
333
4877
313.5
186.7
6432
202.4
9
6:45
8:00
75
60
2
1
6015
5973
280
322
4949
350.0
221.1
6291
212.5
Avg
6:45
8:00
75
60
2
1
5926
5844
268
347
4881
354.4
227.8
6442
212.1
4
6:45
8:00
75
60
2
1
5897
5800
253
350
4887
310.6
184.4
6292
201.5
5
6:45
8:00
75
60
2
1
5913
5813
272
372
4838
386.2
260.0
6671
217.4
6
6:45
8:00
75
60
2
1
5856
5724
253
385
4829
368.2
243.1
6208
213.1
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
6:45
End Time
7:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
5828
5769
291
350
4758
427.4
303.8
6196
225.4
10
5911
5808
275
378
4907
358.3
231.5
6259
213.2
2
5919
5875
269
313
4858
354.7
228.4
6348
211.6
3
5901
5810
268
359
4886
389.3
262.7
6773
220.8
8
5940
5865
258
333
4877
313.5
186.7
6432
202.4
9
6015
5973
280
322
4949
350.0
221.1
6291
212.5
Avg
5926
5844
268
347
4881
354.4
227.8
6442
212.1
4
5897
5800
253
350
4887
310.6
184.4
6292
201.5
5
5913
5813
272
372
4838
386.2
260.0
6671
217.4
6
5856
5724
253
385
4829
368.2
243.1
6208
213.1
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
6090
6021
275
344
5023
286.0
156.4
6930
202.8
SimTraffic Report
Page 2
SimTraffic Performance Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
184.0
402.3
WB
0.0
81.6
NB
1.0
51.4
SB
1.0
73.2
All
28.9
111.8
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.6
WB
0.0
1.5
NB
1.5
21.7
SB
1.1
32.5
All
0.1
2.2
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.4
WB
0.0
1.7
NB
0.1
24.2
All
0.0
2.9
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
9.6
WB
0.0
5.8
NW
1.7
52.6
All
0.2
13.5
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
8.5
WB
1.2
11.3
SB
2.0
47.5
All
0.7
14.6
20: High House Rd EB & WB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.2
SB
0.0
13.6
All
0.0
0.5
21: WB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
4.5
All
0.0
4.5
30: South Entrance & High House Rd EB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.8
NB
0.1
12.4
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
All
0.0
1.0
SimTraffic Report
Page 3
SimTraffic Performance Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
40: High House Road WB & North Entrance Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.6
SB
0.1
7.3
All
0.0
0.9
50: EB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.1
NB
0.0
5.7
All
0.0
0.1
51: High House Rd EB & EB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.7
All
0.0
0.7
101: High House Road/High House Rd EB & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.1
3.5
SW
0.0
2.5
All
0.0
3.1
102: High House Rd EB & High House Road WB/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.3
NE
0.0
0.2
All
0.0
0.3
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
23.8
109.3
SimTraffic Report
Page 4
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
425
367
562
325
3
7
EB
T
1070
936
1314
1050
60
0
EB
TR
1071
918
1311
1050
39
0
85
167
WB
UL
382
212
384
350
7
9
WB
T
523
178
410
616
0
0
WB
T
619
344
697
616
12
56
0
0
3
12
WB
R
400
330
459
NB
L
425
195
456
300
31
42
325
0
0
NB
T
912
545
814
1246
NB
T
896
510
792
1246
30
32
13
38
NB
R
550
198
545
SB
L
396
269
440
450
338
12
41
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
447
296
489
338
17
58
SB
T
557
239
560
1825
SB
TR
522
218
490
1825
0
1
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
4
0
3
EB
T
1
0
1
236
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
TR
6
0
5
236
WB
L
65
19
49
150
NB
LT
51
13
40
1316
NB
R
72
28
58
100
0
0
SB
LT
93
37
74
562
12
2
SB
R
36
12
36
50
0
0
SimTraffic Report
Page 5
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
T
15
1
16
775
EB
TR
32
2
35
775
WB
L
34
6
23
NB
R
115
43
88
1244
100
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
194
49
126
200
0
0
EB
T
303
104
220
417
0
0
EB
TR
316
119
240
417
0
0
WB
L
73
27
62
243
WB
T
201
59
147
243
0
0
WB
T
212
63
154
243
0
0
1
5
NW
L
236
96
192
160
2
4
NW
R
309
144
259
933
11
12
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
195
95
173
243
0
1
EB
T
244
97
215
243
0
2
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
T
245
109
216
243
0
2
WB
UT
66
14
45
300
WB
T
219
106
186
1276
WB
T
214
98
180
1276
WB
R
137
52
110
SB
L
255
124
218
300
240
1
1
SB
R
236
116
206
1236
0
1
SimTraffic Report
Page 6
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Intersection: 20: High House Rd EB & WB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
42
17
40
-12
Intersection: 21: WB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
WB
L
28
2
16
125
WB
T
97
15
123
639
WB
T
122
35
216
639
0
0
Intersection: 30: South Entrance & High House Rd EB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
R
39
13
38
341
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 7
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Intersection: 40: High House Road WB & North Entrance
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
R
57
24
51
432
Intersection: 50: EB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
L
30
5
23
-3
Intersection: 51: High House Rd EB & EB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 8
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 AM
3/17/2016
Intersection: 101: High House Road/High House Rd EB & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SW
R
26
2
26
89
0
0
SW
R
56
19
102
89
10
46
Intersection: 102: High House Rd EB & High House Road WB/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 539
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 9
APPENDIX B6
2021 Build with Improvements Alternative 1 PM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 Build w/ Improvements_Alt1 PM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBL
132
132
1900
325
1
100
1.00
548
548
1900
86
86
1900
0
0
7
7
1900
479
479
1900
432
432
1900
300
1
3
3
1900
318
318
1900
450
1
0.95
0.95
0.95
1.00
0.850
0.95
110
110
1900
325
1
100
1.00
859
859
1900
0.95
0.980
325
325
1900
350
1
100
1.00
0.95
1.00
0.850
596
596
1900
338
2
200
0.97
3468
0
0
3539
1583
0
3539
1583
3468
0
No
0
3539
1583
No
0
3539
1583
No
0.950
1770
0.366
682
0.90
147
147
pm+pt
7
4
7
45
1121
17.0
0.90
609
705
NA
4
4
0.950
1770
0.131
244
0.90
96
0.90
8
0.90
361
0
0
pm+pt
3!
8!
3
369
pm+pt
3
8
3
45
709
10.7
0.90
532
0.950
1770
0.950
1770
0.90
480
0.90
3
0.90
122
532
480
NA pm+ov
8
1
8
8
1
0
Prot
5
125
Prot
5
5
5
50
1312
17.9
0.90
954
0.950
3433
0.950
3433
0.90
353
0.90
662
954
353
NA pm+ov
2
3!
2
2
3
662
Prot
1
1
7.0
7.0
13.9
14.3
18.0
31.0
11.3% 19.4%
11.1
23.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
38.6
26.0
0.24
0.16
0.59
1.25
49.0 179.9
0.0
0.0
49.0 179.9
7.0
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
13.9
13.9
14.3
13.5
13.2
13.2
20.6
13.9
13.5
30.0
30.0
43.0
40.0
17.0
17.0
59.0
30.0
40.0
18.8% 18.8% 26.9% 25.0% 10.6% 10.6% 36.9% 18.8% 25.0%
23.1
23.1
35.7
33.5
10.8
10.8
52.4
23.1
33.5
3.1
3.1
5.0
3.0
3.0
3.0
5.1
3.1
3.0
3.8
3.8
2.3
3.5
3.2
3.2
1.5
3.8
3.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lag
Lag
Lag Lead
Lead
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
None None None None None None C-Min None None
56.0
38.4
77.5
12.0
55.0
85.0
34.0
0.35
0.24
0.48
0.08
0.34
0.53
0.21
1.14
0.63
0.63
0.95
0.79
0.42
0.91
137.3
58.3
35.0
136.8
53.0
24.8
78.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
137.3
58.3
35.0
136.8
53.0
24.8
78.3
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
SBT
SBR
1549
1549
1900
101
101
1900
0
0
0.95
0.991
0.95
3507
0
3507
0
No
50
1897
25.9
0.90
1721
1833
NA
6
2021 Build w/ Improvements_Alt1 PM
3/17/2016
0.90
112
0
6
14.0
20.8
82.0
51.3%
75.2
5.3
1.5
-1.8
5.0
Lead
Yes
6.0
3.4
20.0
45.0
C-Min
77.0
0.48
1.09
88.8
0.0
88.8
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
D
109
169
325
254
0
0
0
0.58
EBT
F
157.3
F
~482
#615
1041
563
0
0
0
1.25
EBR
WBU
WBL
F
~400
#617
350
323
0
0
0
1.14
2021 Build w/ Improvements_Alt1 PM
3/17/2016
WBT
E
71.3
E
265
333
629
WBR
C
850
0
0
0
0.63
NBU
NBL
F
365
494
133
#270
300
775
0
0
0
0.62
325
132
0
0
0
0.95
NBT
D
53.4
D
477
565
1232
1215
0
0
0
0.79
NBR
C
SBL
E
221
306
349
#448
450
840
0
0
0
0.42
338
750
0
0
0
0.88
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 142 (89%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 140
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.25
Intersection Signal Delay: 85.0
Intersection LOS: F
Intersection Capacity Utilization 105.2%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
SBT
F
86.1
F
~1128
#1261
1817
2021 Build w/ Improvements_Alt1 PM
3/17/2016
SBR
1687
0
0
0
1.09
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
2021 Build w/ Improvements_Alt1 PM
3/17/2016
EBU
EBT
EBR
WBL
WBT
NWL
NWR
12
12
1900
200
1
100
0.91
1361
1361
1900
293
293
1900
0
0
1470
1470
1900
0.91
59
59
1900
160
1
100
1.00
180
180
1900
0
1
0.91
0.974
210
210
1900
0
1
100
1.00
0
0
4953
0.913
4522
0.90
13
45
478
7.2
0.90
1512
0
0
Perm
2
2
1851
NA
2
2
12.0
12.0
25.0
25.0
102.0 102.0
63.8% 63.8%
95.0
95.0
5.0
5.0
2.0
2.0
-2.0
5.0
Lag
Lag
Yes
Yes
6.0
6.0
C-Min C-Min
112.8
0.70
0.58
13.6
0.0
13.6
B
13.6
B
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
No
0.950
1770
0.084
156
0.90
326
0.90
233
0
233
pm+pt
1
6
1
0.95
3539
0.950
1770
0.950
1770
45
334
5.1
0.90
1633
35
1012
19.7
0.90
66
3539
1633
NA
6
6
1.00
0.850
1583
1583
No
0.90
200
66
200
Prot pm+ov
8
1
8
8
1
7.0
12.0
7.0
7.0
14.0
25.0
25.0
14.0
32.0 134.0
26.0
32.0
20.0% 83.8% 16.3% 20.0%
25.0 127.0
19.0
25.0
5.0
5.0
5.0
5.0
2.0
2.0
2.0
2.0
-2.0
-2.0
-2.0
-2.0
5.0
5.0
5.0
5.0
Lead
Lead
Yes
Yes
2.0
6.0
2.0
2.0
None C-Min None None
137.4 137.4
12.6
37.2
0.86
0.86
0.08
0.23
0.70
0.54
0.48
0.54
44.7
3.6
81.3
58.3
0.5
0.2
0.0
0.0
45.2
3.8
81.3
58.3
D
A
F
E
8.9
64.0
A
E
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBT
327
469
398
3186
0
20
0
0.58
EBR
2021 Build w/ Improvements_Alt1 PM
3/17/2016
WBL
122
221
WBT
128
154
254
407
27
0
0
0.61
3039
513
0
0
0.65
NWL
67
118
932
160
232
0
0
0
0.28
NWR
186
247
441
0
0
0
0.45
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 113 (71%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 14.8
Intersection LOS: B
Intersection Capacity Utilization 92.0%
ICU Level of Service F
Analysis Period (min) 15
Splits and Phases:
8: Jenks Carpenter Rd & High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2021 Build w/ Improvements_Alt1 PM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
163
163
1900
5
5
1900
1397
1397
1900
0%
83
83
1900
0.95
0.91
1.00
0.850
146
146
1900
2%
240
1
100
1.00
281
281
1900
0
1
100
1.00
1376
1376
1900
-2%
1583
0
0
0.950
1787
0.123
231
0.90
2
0.90
181
0
pm+pt
5!
2!
5
183
pm+pt
5
2
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.931
4734
0.90
6
45
1311
19.9
0.90
1552
45
334
5.1
0.90
1529
1529
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
92
1558
92
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
162
0
1
1.00
0.850
1567
1567
No
0.90
312
162
312
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
25.0
25.0 120.0
95.0
95.0
40.0
40.0
25.0
15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6%
18.6
18.6 113.4
88.4
88.4
33.8
33.8
18.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
0.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
129.6 129.6
111.7 138.1
20.4
38.9
0.81
0.81
0.70
0.86
0.13
0.24
0.59
0.53
0.47
0.07
0.73
0.82
22.7
3.6
12.0
1.8
84.9
74.4
0.1
0.1
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 7
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
22.8
C
19
74
381
12
0
0
0.50
EBT
3.7
A
5.8
A
49
60
254
2895
431
0
0
0.62
WBU
WBT
12.0
B
11.5
B
247
346
1231
3305
0
0
0
0.47
2021 Build w/ Improvements_Alt1 PM
3/17/2016
WBR
1.8
A
11
22
300
1516
0
0
0
0.06
SBL
84.9
F
78.0
E
166
239
1230
240
383
0
0
0
0.42
SBR
74.4
E
313
398
450
0
0
0
0.69
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 17.2
Intersection LOS: B
Intersection Capacity Utilization 94.5%
ICU Level of Service F
Analysis Period (min) 15
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 8
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2021 Build w/ Improvements_Alt1 PM
3/17/2016
14.6
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBL
7
7
0
Free
100
90
2
8
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1520
4.14
2.22
435
-
Approach
HCM Control Delay, s
HCM LOS
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
435
-
EBT EBR WBU WBL WBT WBR
1554
31
10 104 1302
66
1554
31
10 104 1302
66
0
0
0
0
0
0
Free Free Free Free Free Free
- None
- None
- 150
0
0
0
-5
90
90
90
90
90
90
2
2
2
2
2
2
1727
34
11 116 1447
73
0
-
Major2
0 1318 1761
- 6.44 4.14
- 2.52 2.22
- 207 351
- 326 326
-
NBLn1 NBLn2 EBL
- 290 435
- 0.111 0.018
0
19 13.4
A
C
B
- 0.4
0.1
0
-
WB
1.8
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
NBL NBT NBR
0
0
29
0
0
29
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
0
0
32
Minor1
2736 3532
1759 1759
977 1773
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
10
6
88 137
269 134
9
9
86
259
6
6
134
134
NB
19
C
SBL SBT SBR
28
0
12
28
0
12
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
31
0
13
881
6.94
3.32
290
-
Minor2
2616
1737
879
7.54
6.54
6.54
3.52
~ 12
91
309
290
-
~ 11
~ 11
89
270
3514 760
1737
1777
6.54 6.94
5.54
5.54
4.02 3.32
6 349
140
134
6
6
140
132
349
-
SB
$ 1061
F
EBR WBL WBT WBR SBLn1 SBLn2
- 326
11 349
- 0.389
- 2.828 0.038
- 22.9
-$ 1509 15.7
C
F
C
- 1.8
4.9 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
2021 Build w/ Improvements_Alt1 PM
3/17/2016
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
1
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1642
4.14
2.22
390
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
390
-
NBLn1
281
0.324
23.8
C
1.4
EBT EBR
1584
37
1584
37
0
0
Free Free
- None
0
0
90
90
2
2
1760
41
0
-
0
-
WBL
63
63
0
Free
100
90
2
70
Major2
1801
4.14
2.22
338
338
-
WBT WBR
1477
1
1477
1
0
0
Free Free
- None
0
-5
90
90
2
2
1641
1
0
-
0
-
WB
0.8
EBL
390
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
82
0
0
82
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
91
SBL SBT SBR
0
0
5
0
0
5
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
6
Minor1
2742
1781
961
7.54
6.54
6.54
3.52
9
85
275
3563
1781
1782
6.54
5.54
5.54
4.02
6
133
133
901
6.94
3.32
281
-
Minor2
2662
1782
880
7.54
6.54
6.54
3.52
11
85
308
7
7
85
214
5
5
133
105
281
-
6
6
85
208
NB
23.8
C
3583 821
1782
1801
6.54 6.94
5.54
5.54
4.02 3.32
5 318
133
130
4
4
105
130
318
-
SB
16.5
C
EBT EBR WBL WBT WBR SBLn1
- 338
- 318
- 0.207
- 0.017
- 18.4
- 16.5
C
C
0.8
- 0.1
Synchro 9 Report
Page 2
HCM 2010 TWSC
20: High House Rd EB & WB U-Turn
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt1 PM
-
EBL
0
A
-
EBT
1582
1582
0
Free
None
0
0
90
2
1758
0
-
WBT WBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
SBL
31
31
0
Stop
0
0
0
90
2
34
SBR
0
0
0
Stop
None
90
2
0
Minor2
879
0
879
7.54
6.54
3.52
242
309
0
-
242
242
309
-
SB
EBT SBLn1
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
HCM 2010 TWSC
30: South Entrance & High House Rd EB
Intersection
Int Delay, s/veh
3/17/2016
0.1
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBT EBR
1597
16
1597
16
0
0
Free Free
- None
0
0
90
90
2
2
1774
18
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt1 PM
NBLn1
284
0.035
18.1
C
0.1
EBT
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
WBL WBT
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
NBL
0
0
0
Stop
0
0
90
2
0
NBR
9
9
0
Stop
None
0
90
2
10
Minor1
1783
1783
0
7.54
6.54
3.52
52
85
-
895
6.94
3.32
284
-
52
52
85
-
284
-
NB
18.1
C
EBR
-
Synchro 9 Report
Page 4
HCM 2010 TWSC
40: High House Road WB & North Entrance
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt1 PM
3/17/2016
0.3
EBL EBT
0
0
0
0
0
0
Free Free
- None
0
0
90
90
2
2
0
0
WBT WBR
1288
40
1288
40
0
0
Free Free
- None
0
-5
90
90
2
2
1431
44
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
0
-
SBL
0
0
0
Stop
0
0
90
2
0
SBR
24
24
0
Stop
None
0
90
2
27
Minor2
1453
1453
0
7.54
6.54
3.52
91
137
-
737
6.94
3.32
361
-
91
91
137
-
361
-
SB
15.8
C
WBT WBR SBLn1
- 361
- 0.074
- 15.8
C
0.2
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
HCM 2010 TWSC
50: EB U-Turn & High House Road WB
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt1 PM
3/17/2016
0
EBT EBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
WBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
0
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
-
WBT
1314
1314
0
Free
None
0
-5
90
2
1460
0
-
NBL
14
14
0
Stop
0
0
0
90
2
16
NBR
0
0
0
Stop
None
90
2
0
Minor1
730
0
730
7.54
6.54
3.52
310
380
0
-
310
310
380
-
NB
-
NBLn1 WBL WBT
0
A
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6:45
8:00
75
60
2
1
6523
6429
368
462
5600
574.4
433.1
10140
290.5
10
6:45
8:00
75
60
2
1
6525
6433
384
476
5679
540.8
397.7
9995
284.9
2
6:45
8:00
75
60
2
1
6544
6445
336
435
5589
461.8
320.9
9402
264.1
3
6:45
8:00
75
60
2
1
6321
6270
397
448
5462
538.7
401.5
9493
278.1
7
6:45
8:00
75
60
2
1
6531
6417
345
459
5622
587.1
445.6
10605
295.1
8
6:45
8:00
75
60
2
1
6479
6378
353
454
5514
519.4
380.6
9691
276.1
9
6:45
8:00
75
60
2
1
6553
6442
364
475
5603
575.4
434.2
10322
292.4
Avg
6:45
8:00
75
60
2
1
6493
6404
361
455
5580
537.9
397.3
10020
281.9
4
6:45
8:00
75
60
2
1
6476
6417
377
436
5550
526.5
386.5
10249
278.6
5
6:45
8:00
75
60
2
1
6466
6392
378
452
5599
533.5
392.3
10037
281.1
6
6:45
8:00
75
60
2
1
6528
6420
332
440
5582
521.1
380.3
10288
278.2
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
6:45
End Time
7:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6523
6429
368
462
5600
574.4
433.1
10140
290.5
10
6525
6433
384
476
5679
540.8
397.7
9995
284.9
2
6544
6445
336
435
5589
461.8
320.9
9402
264.1
3
6321
6270
397
448
5462
538.7
401.5
9493
278.1
8
6479
6378
353
454
5514
519.4
380.6
9691
276.1
9
6553
6442
364
475
5603
575.4
434.2
10322
292.4
Avg
6493
6404
361
455
5580
537.9
397.3
10020
281.9
4
6476
6417
377
436
5550
526.5
386.5
10249
278.6
5
6466
6392
378
452
5599
533.5
392.3
10037
281.1
6
6528
6420
332
440
5582
521.1
380.3
10288
278.2
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
6531
6417
345
459
5622
587.1
445.6
10605
295.1
SimTraffic Report
Page 2
SimTraffic Performance Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
344.7
466.1
WB
0.0
57.2
NB
1.1
48.2
SB
58.9
174.6
All
71.6
151.9
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.0
WB
0.0
4.2
NB
2.1
18.9
SB
1.3
67.7
All
0.0
3.6
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
3.5
WB
0.0
3.7
NB
0.1
24.3
SB
0.1
15.7
All
0.0
4.2
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
17.3
WB
0.0
9.1
NW
1.2
70.8
All
0.1
17.1
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
10.8
WB
0.8
16.8
SB
1.6
61.5
All
0.6
20.0
20: High House Rd EB & WB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.2
SB
0.0
16.0
All
0.0
0.5
21: WB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
1.8
All
0.0
1.8
30: South Entrance & High House Rd EB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.2
NB
0.1
15.1
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
All
0.0
1.3
SimTraffic Report
Page 3
SimTraffic Performance Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
40: High House Road WB & North Entrance Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
1.0
SB
0.1
10.4
All
0.0
1.2
50: EB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.2
NB
0.0
11.7
All
0.0
0.3
51: High House Rd EB & EB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.0
All
0.0
1.0
101: High House Road/High House Rd EB & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
3.7
SW
0.0
1.0
All
0.0
2.4
102: High House Rd EB & High House Road WB/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.7
NE
0.0
0.3
All
0.0
0.5
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
59.4
150.0
SimTraffic Report
Page 4
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
425
322
588
325
0
0
EB
T
1097
1033
1236
1050
79
0
EB
TR
1094
1027
1237
1050
74
0
89
117
WB
UL
448
326
492
350
22
52
WB
T
562
260
569
616
6
36
WB
T
495
217
439
616
0
0
0
0
0
2
WB
R
382
226
371
NB
UL
286
125
248
300
4
10
325
0
2
NB
T
423
278
389
1246
NB
T
383
245
357
1246
4
4
0
0
NB
R
293
122
236
SB
L
404
268
376
450
338
4
29
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
538
519
633
338
8
58
SB
T
1872
1628
2228
1825
35
0
SB
TR
1875
1602
2228
1825
17
0
49
291
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
19
2
11
EB
T
1
0
1
236
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
TR
11
0
6
236
WB
UL
131
55
110
150
0
2
WB
T
52
4
43
775
0
0
WB
TR
36
1
19
775
NB
R
66
25
56
100
SB
LT
104
32
82
562
18
2
SB
R
34
9
32
50
0
0
SimTraffic Report
Page 5
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
T
54
2
24
775
EB
TR
70
4
30
775
WB
L
95
39
79
100
0
3
WB
T
84
5
42
417
WB
TR
11
0
11
417
NB
R
108
40
80
1244
SB
R
30
5
21
748
0
0
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
231
50
143
200
EB
T
392
197
370
417
0
0
EB
TR
399
223
395
417
0
1
WB
L
206
107
190
243
1
3
WB
T
250
90
231
243
1
4
WB
T
247
89
230
243
1
3
8
36
NW
L
228
61
147
160
0
0
NW
R
358
163
286
933
17
10
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
180
73
142
243
0
0
EB
T
266
134
286
243
2
11
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
T
265
138
285
243
2
10
WB
UT
198
55
134
300
WB
T
380
201
350
1276
WB
T
366
191
345
1276
2
9
2
1
WB
R
117
19
74
SB
L
314
138
254
300
240
1
2
SB
R
413
207
348
1236
8
12
SimTraffic Report
Page 6
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Intersection: 20: High House Rd EB & WB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
43
18
41
-12
Intersection: 21: WB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
WB
L
34
2
17
125
WB
T
41
6
63
645
WB
T
20
1
26
645
1
0
Intersection: 30: South Entrance & High House Rd EB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
R
35
9
31
341
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 7
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Intersection: 40: High House Road WB & North Entrance
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
WB
TR
9
0
7
409
SB
R
44
18
45
433
Intersection: 50: EB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
L
33
9
31
-3
0
0
Intersection: 51: High House Rd EB & EB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
9
0
5
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 8
Queuing and Blocking Report
2021 Build w/ Improvements_Alt1 PM
3/17/2016
Intersection: 101: High House Road/High House Rd EB & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SW
R
54
10
65
89
3
17
SW
R
37
2
26
89
0
0
Intersection: 102: High House Rd EB & High House Road WB/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 729
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 9
APPENDIX B7
2021 Build with Improvements Alternative 2 AM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 Build w/ Improvements_Alt2 AM
3/18/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
196
196
1900
325
1
100
1.00
517
517
1900
35
35
1900
0
0
14
14
1900
277
277
1900
381
381
1900
300
1
292
292
1900
450
1
1.00
1.00
1.00
0.850
0.95
1.00
0.850
386
386
1900
338
2
200
0.97
672
672
1900
0.95
107
107
1900
325
1
100
1.00
1597
1597
1900
0.95
0.990
188
188
1900
350
1
100
0.97
3504
0
0
1863
1583
3539
1583
3504
0
No
0
1863
1583
No
3539
1583
No
0.950
1770
0.140
261
0.90
218
218
pm+pt
7
4
7
45
1121
17.0
0.90
574
613
NA
4
4
0.950
3433
0.950
3433
0.90
39
0.90
16
0.90
209
0
0
Prot
3!
225
Prot
3
3
3
45
709
10.7
0.90
308
0.950
1770
0.950
1770
0.90
423
0.90
119
308
423
NA pm+ov
8
1
8
8
8
119
Prot
5
5
50
1312
17.9
0.90
1774
0.950
3433
0.950
3433
0.95
0.979
3465
3465
0.90
324
0.90
429
50
1897
25.9
0.90
747
1774
324
NA pm+ov
2
3!
2
2
3
429
Prot
1
868
NA
6
1
6
7.0
7.0
13.9
14.3
17.0
34.0
10.6% 21.3%
10.1
26.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
41.0
29.0
0.26
0.18
1.21
0.97
176.0
92.3
0.0
0.0
176.0
92.3
7.0
7.0
7.0
7.0
7.0
14.0
7.0
7.0
14.0
13.9
13.9
14.3
13.5
13.2
20.6
13.9
13.5
20.8
17.0
17.0
34.0
25.0
24.0
84.0
17.0
25.0
85.0
10.6% 10.6% 21.3% 15.6% 15.0% 52.5% 10.6% 15.6% 53.1%
10.1
10.1
26.7
18.5
17.8
77.4
10.1
18.5
78.2
3.1
3.1
5.0
3.0
3.0
5.1
3.1
3.0
5.3
3.8
3.8
2.3
3.5
3.2
1.5
3.8
3.5
1.5
-1.9
-2.3
-1.5
-1.2
-1.6
-1.9
-1.5
-1.8
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
Lead
Lead
Lag Lead
Lead
Lag
Lead
Lead
Lag
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
6.0
2.0
2.0
6.0
2.0
2.0
2.0
2.0
2.0
3.4
2.0
2.0
3.4
0.0
0.0
0.0
0.0
0.0
20.0
0.0
0.0
20.0
0.0
0.0
0.0
0.0
0.0
45.0
0.0
0.0
45.0
None None None None None C-Min None None C-Min
12.0
29.0
54.0
15.7
79.0
96.0
20.0
83.3
0.08
0.18
0.34
0.10
0.49
0.60
0.12
0.52
0.88
0.91
0.79
0.69
1.02
0.34
1.00
0.48
103.9
95.0
60.2
89.5
65.2
17.3 112.0
26.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
103.9
95.0
60.2
89.5
65.2
17.3 112.0
26.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 Build w/ Improvements_Alt2 AM
3/18/2016
SBR
109
109
1900
0
0
0.95
0
0
No
0.90
121
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
F
~225
#406
325
180
0
0
0
1.21
EBT
F
114.3
F
339
#464
1041
635
0
0
0
0.97
EBR
WBU
WBL
F
122
#200
350
257
0
0
0
0.88
2021 Build w/ Improvements_Alt2 AM
3/18/2016
WBT
F
81.7
F
320
#503
629
337
0
0
0
0.91
WBR
E
401
548
300
534
0
0
0
0.79
NBL
F
NBT
E
59.5
E
122 ~1026
193 #1162
1232
325
210 1747
0
0
0
0
0
0
0.57
1.02
NBR
B
SBL
F
164
229
235
#354
450
949
0
0
0
0.34
338
429
0
0
0
1.00
SBT
C
54.5
D
302
374
1817
1804
0
0
0
0.48
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 130
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.21
Intersection Signal Delay: 70.9
Intersection LOS: E
Intersection Capacity Utilization 97.3%
ICU Level of Service F
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
2021 Build w/ Improvements_Alt2 AM
3/18/2016
SBR
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
2021 Build w/ Improvements_Alt2 AM
3/18/2016
EBU
EBT
EBR
WBL
WBT
NWL
NWR
16
16
1900
200
1
100
0.91
1390
1390
1900
161
161
1900
0
0
851
851
1900
0.91
108
108
1900
160
1
100
1.00
201
201
1900
0
1
0
0.91
0.985
0.999
5004
0.921
4613
43
43
1900
0
1
100
1.00
0.90
18
45
478
7.2
0.90
1544
0
0
Perm
2
2
1741
NA
2
2
12.0
12.0
25.0
25.0
82.0
82.0
63.1% 63.1%
75.0
75.0
5.0
5.0
2.0
2.0
-2.0
5.0
Lag
Lag
Yes
Yes
6.0
6.0
C-Min C-Min
89.7
0.69
0.55
11.5
0.0
11.5
B
11.5
B
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
0
No
0.950
1770
0.096
179
0.90
179
0.90
48
0
48
pm+pt
1
6
1
0.95
3539
0.950
1770
0.950
1770
45
334
5.1
0.90
946
35
1012
19.7
0.90
120
3539
946
NA
6
6
1.00
0.850
1583
1583
No
0.90
223
120
223
Prot pm+ov
8
1
8
8
1
7.0
12.0
7.0
7.0
14.0
25.0
25.0
14.0
20.0 102.0
28.0
20.0
15.4% 78.5% 21.5% 15.4%
13.0
95.0
21.0
13.0
5.0
5.0
5.0
5.0
2.0
2.0
2.0
2.0
-2.0
-2.0
-2.0
-2.0
5.0
5.0
5.0
5.0
Lead
Lead
Yes
Yes
2.0
6.0
2.0
2.0
None C-Min None None
104.8 104.8
15.2
30.3
0.81
0.81
0.12
0.23
0.18
0.33
0.58
0.60
5.9
3.3
65.1
51.0
0.0
0.2
0.0
0.0
5.9
3.5
65.1
51.0
A
A
E
D
3.6
55.9
A
E
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBT
236
346
398
3182
0
52
0
0.56
EBR
2021 Build w/ Improvements_Alt2 AM
3/18/2016
WBL
5
13
WBT
51
108
254
327
0
0
0
0.15
2853
945
0
0
0.50
NWL
97
157
932
160
313
0
0
0
0.38
NWR
171
235
428
0
0
0
0.52
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 96 (74%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.60
Intersection Signal Delay: 13.9
Intersection LOS: B
Intersection Capacity Utilization 56.0%
ICU Level of Service B
Analysis Period (min) 15
Splits and Phases:
8: Jenks Carpenter Rd & High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2021 Build w/ Improvements_Alt2 AM
3/18/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
285
285
1900
5
5
1900
686
686
1900
0%
281
281
1900
0.95
0.91
1.00
0.850
167
167
1900
2%
240
1
100
1.00
206
206
1900
0
1
100
1.00
1304
1304
1900
-2%
1583
0
0
0.90
2
0.950
1787
0.314
591
0.90
317
0
319
custom pm+pt
5
5!
2
5
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.926
4709
0.90
6
45
1311
19.9
0.90
762
45
334
5.1
0.90
1449
1449
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
312
768
312
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
186
0
1
1.00
0.850
1567
1567
No
0.90
229
186
229
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
40.0
40.0 100.0
60.0
60.0
30.0
30.0
40.0
30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8%
33.6
33.6
93.4
53.4
53.4
23.8
23.8
33.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
0.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
100.7 100.7
83.1 108.4
19.3
37.5
0.77
0.77
0.64
0.83
0.15
0.29
0.56
0.52
0.26
0.24
0.72
0.51
7.8
3.8
11.3
3.0
67.6
41.2
0.0
0.1
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 7
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
7.8
A
29
56
779
21
0
0
0.42
EBT
3.9
A
4.6
A
68
91
254
2774
254
0
0
0.57
WBU
WBT
11.3
B
8.9
A
94
149
1231
3009
0
0
0
0.26
2021 Build w/ Improvements_Alt2 AM
3/18/2016
WBR
3.0
A
41
81
300
1391
0
0
0
0.22
SBL
67.6
E
53.1
D
151
221
1230
240
339
0
0
0
0.55
SBR
41.2
D
162
213
721
0
0
0
0.32
Intersection Summary
Area Type:
Other
Cycle Length: 130
Actuated Cycle Length: 130
Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 50
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay: 12.2
Intersection LOS: B
Intersection Capacity Utilization 74.2%
ICU Level of Service D
Analysis Period (min) 15
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 8
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2021 Build w/ Improvements_Alt2 AM
3/18/2016
11.3
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBL
1
1
0
Free
100
90
2
1
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1030
4.14
2.22
670
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
670
-
EBT EBR
1414
3
1414
3
0
0
Free Free
- None
0
0
90
90
2
2
1571
3
0
-
WBL WBT WBR
34 911
16
34 911
16
0
0
0
Free Free Free
- None
150
0
-5
90
90
90
2
2
2
38 1012
18
Major2
1574
4.14
2.22
415
-
0
-
NBLn1 NBLn2 EBL
22 334 670
0.758 0.13 0.002
$ 356.5 17.4 10.4
F
C
B
2.2 0.4
0
415
-
0
-
WB
0.5
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
NBL NBT NBR
15
0
39
15
0
39
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
17
0
43
Minor1
2158 2681
1575 1575
583 1106
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
27
22
115 169
465 284
22
22
115
406
20
20
169
258
NB
111.6
F
SBL SBT SBR
42
2
14
42
2
14
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
47
2
16
787
6.94
3.32
334
-
Minor2
1885
1097
788
7.54
6.54
6.54
3.52
~ 43
227
350
334
-
~ 35
~ 35
227
304
2674 515
1097
1577
6.54 6.94
5.54
5.54
4.02 3.32
22 505
287
168
20
20
261
168
505
-
SB
$ 374
F
EBR WBL WBT WBR SBLn1 SBLn2
- 415
34 505
- 0.091
- 1.438 0.031
- 14.5
-$ 489.1 12.4
B
F
B
- 0.3
5.3 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
2021 Build w/ Improvements_Alt2 AM
3/18/2016
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
0.7
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1073
4.14
2.22
645
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
645
-
NBLn1
313
0.295
21.2
C
1.2
EBT EBR
1484
11
1484
11
0
0
Free Free
- None
0
0
90
90
2
2
1649
12
0
-
0
-
WBL WBT WBR
9 961
5
9 961
5
0
0
0
Free Free Free
- None
100
0
-5
90
90
90
2
2
2
10 1068
6
Major2
1661
4.14
2.22
384
384
-
0
-
0
-
WB
0.1
EBL
645
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
83
0
0
83
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
92
Minor1
2209 2748
1655 1655
554 1093
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
24
20
102 154
484 288
24
24
102
471
NB
21.2
C
19
19
154
281
SBL SBT SBR
0
0
0
0
0
0
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
0
831
6.94
3.32
313
-
Minor2
1915
1091
824
7.54
6.54
6.54
3.52
41
229
333
313
-
28
28
229
235
2752 537
1091
1661
6.54 6.94
5.54
5.54
4.02 3.32
19 488
289
153
19
19
281
153
488
-
SB
0
A
EBT EBR WBL WBT WBR SBLn1
- 384
- 0.026
- 14.6
0
B
A
0.1
-
Synchro 9 Report
Page 2
HCM 2010 TWSC
20: High House Rd EB & WB U-Turn
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/18/2016
0
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt2 AM
-
EBL
0
A
-
EBT
1387
1387
0
Free
None
0
0
90
2
1541
0
-
WBT WBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
SBL
32
32
0
Stop
0
0
0
90
2
36
SBR
0
0
0
Stop
None
90
2
0
Minor2
771
0
771
7.54
6.54
3.52
290
359
0
-
290
290
359
-
SB
EBT SBLn1
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
HCM 2010 TWSC
30: South Entrance & High House Rd EB
Intersection
Int Delay, s/veh
3/18/2016
0.2
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBT EBR
1414
5
1414
5
0
0
Free Free
- None
0
0
90
90
2
2
1571
6
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt2 AM
NBLn1
334
0.047
16.3
C
0.1
EBT
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
WBL WBT
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
NBL
0
0
0
Stop
0
0
90
2
0
NBR
14
14
0
Stop
None
0
90
2
16
Minor1
1574
1574
0
7.54
6.54
3.52
74
115
-
787
6.94
3.32
334
-
74
74
115
-
334
-
NB
16.3
C
EBR
-
Synchro 9 Report
Page 4
HCM 2010 TWSC
40: High House Road WB & North Entrance
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt2 AM
3/18/2016
0.5
EBL EBT
0
0
0
0
0
0
Free Free
- None
0
0
90
90
2
2
0
0
WBT WBR
938
12
938
12
0
0
Free Free
- None
0
-5
90
90
2
2
1042
13
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
0
-
SBL
0
0
0
Stop
0
0
90
2
0
SBR
36
36
0
Stop
None
0
90
2
40
Minor2
1049
1049
0
7.54
6.54
3.52
182
243
-
527
6.94
3.32
496
-
182
182
243
-
496
-
SB
12.9
B
WBT WBR SBLn1
- 496
- 0.081
- 12.9
B
0.3
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
HCM 2010 TWSC
50: EB U-Turn & High House Road WB
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt2 AM
3/18/2016
0
EBT EBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
WBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
0
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
-
WBT
940
940
0
Free
None
0
-5
90
2
1044
0
-
NBL
10
10
0
Stop
0
0
0
90
2
11
NBR
0
0
0
Stop
None
90
2
0
Minor1
522
0
522
7.54
6.54
3.52
438
506
0
-
438
438
506
-
NB
-
NBLn1 WBL WBT
0
A
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6:45
8:00
75
60
2
1
5932
5910
254
276
4948
265.3
137.4
6474
193.8
10
6:45
8:00
75
60
2
1
6153
6040
237
350
5067
275.6
144.5
6804
200.6
2
6:45
8:00
75
60
2
1
6167
6087
248
328
5163
300.4
166.8
7358
208.8
3
6:45
8:00
75
60
2
1
5945
5933
254
266
4954
259.4
131.1
6497
193.6
7
6:45
8:00
75
60
2
1
6069
5991
244
322
5030
278.0
148.0
6899
200.2
8
6:45
8:00
75
60
2
1
6161
6155
251
257
5151
303.8
170.8
7365
210.1
9
6:45
8:00
75
60
2
1
6083
5905
213
391
4995
330.8
201.3
8096
213.4
Avg
6:45
8:00
75
60
2
1
6057
5977
237
318
5020
286.2
156.3
7056
201.8
4
6:45
8:00
75
60
2
1
6020
5964
251
307
5002
287.8
158.3
6776
201.1
5
6:45
8:00
75
60
2
1
6134
5986
218
366
5013
297.4
167.9
7747
204.0
6
6:45
8:00
75
60
2
1
5883
5797
233
319
4881
263.7
137.1
6520
192.7
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
6:45
End Time
7:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
5932
5910
254
276
4948
265.3
137.4
6474
193.8
10
6153
6040
237
350
5067
275.6
144.5
6804
200.6
2
6167
6087
248
328
5163
300.4
166.8
7358
208.8
3
5945
5933
254
266
4954
259.4
131.1
6497
193.6
8
6161
6155
251
257
5151
303.8
170.8
7365
210.1
9
6083
5905
213
391
4995
330.8
201.3
8096
213.4
Avg
6057
5977
237
318
5020
286.2
156.3
7056
201.8
4
6020
5964
251
307
5002
287.8
158.3
6776
201.1
5
6134
5986
218
366
5013
297.4
167.9
7747
204.0
6
5883
5797
233
319
4881
263.7
137.1
6520
192.7
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
6069
5991
244
322
5030
278.0
148.0
6899
200.2
SimTraffic Report
Page 2
SimTraffic Performance Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
1.0
135.2
WB
0.0
87.5
NB
1.3
72.5
SB
1.0
71.4
All
0.9
84.7
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.6
WB
0.0
1.7
NB
1.6
26.9
SB
1.1
36.2
All
0.1
2.3
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
2.6
WB
0.0
1.8
NB
0.2
28.2
All
0.0
3.1
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
10.1
WB
0.0
6.0
NW
1.6
51.5
All
0.2
13.6
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
8.6
WB
1.1
10.7
SB
2.0
46.1
All
0.6
14.1
20: High House Rd EB & WB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.2
SB
0.0
15.7
All
0.0
0.5
21: WB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
2.9
All
0.0
2.9
30: South Entrance & High House Rd EB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.9
NB
0.1
14.9
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
All
0.0
1.0
SimTraffic Report
Page 3
SimTraffic Performance Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
40: High House Road WB & North Entrance Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.7
SB
0.1
7.9
All
0.0
1.0
50: EB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.1
NB
0.0
6.5
All
0.0
0.2
51: High House Rd EB & EB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.8
All
0.0
0.8
101: High House Road/High House Rd EB & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.1
3.8
SW
0.0
1.6
All
0.0
2.9
102: High House Rd EB & High House Road WB/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.4
NE
0.0
0.2
All
0.0
0.3
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
1.2
88.3
SimTraffic Report
Page 4
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
424
276
471
325
25
65
EB
T
693
408
777
1050
1
0
EB
TR
656
373
712
1050
0
0
15
30
WB
UL
243
125
233
350
0
0
WB
L
330
147
289
617
0
0
WB
T
624
386
662
617
6
28
0
0
20
76
WB
R
400
321
449
NB
L
425
228
503
300
13
35
325
0
1
NB
T
1141
752
1140
1246
1
0
NB
T
1113
727
1115
1246
1
0
41
44
28
83
NB
R
550
327
708
SB
L
396
269
442
450
338
14
47
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
466
298
502
338
19
63
SB
T
592
236
560
1831
SB
TR
532
211
471
1831
0
1
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
13
1
6
EB
TR
1
0
0
236
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
WB
L
55
18
46
150
NB
LT
65
14
44
1316
0
0
NB
R
75
29
62
100
0
0
SB
LT
95
35
79
562
12
2
SB
R
43
11
37
50
0
0
SimTraffic Report
Page 5
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
T
18
1
14
775
EB
TR
27
1
16
775
WB
L
39
7
26
NB
R
111
45
90
1244
100
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
198
55
133
200
0
0
EB
T
322
113
245
417
0
0
EB
TR
346
128
265
417
0
0
WB
L
86
31
70
243
WB
T
192
54
133
243
0
0
WB
T
202
67
151
243
0
0
2
9
NW
L
216
87
173
160
2
3
NW
R
287
144
246
933
10
10
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
220
102
183
243
0
1
EB
T
244
101
212
243
0
2
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
T
253
110
222
243
1
3
WB
UT
63
13
43
300
WB
T
188
91
163
1276
WB
T
199
99
178
1276
WB
R
158
58
117
SB
L
253
127
215
300
240
1
2
SB
R
245
116
207
1236
0
1
SimTraffic Report
Page 6
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Intersection: 20: High House Rd EB & WB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
42
17
39
-12
Intersection: 21: WB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
WB
L
32
2
13
WB
T
62
6
90
639
125
WB
T
117
21
164
639
0
0
Intersection: 30: South Entrance & High House Rd EB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
TR
6
0
5
564
NB
R
46
12
39
341
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 7
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Intersection: 40: High House Road WB & North Entrance
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
R
57
23
50
432
Intersection: 50: EB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
L
31
5
24
-3
0
0
Intersection: 51: High House Rd EB & EB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
3
0
3
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 8
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 AM
3/18/2016
Intersection: 101: High House Road/High House Rd EB & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SW
R
3
0
3
89
SW
R
64
16
89
89
4
19
Intersection: 102: High House Rd EB & High House Road WB/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 526
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 9
APPENDIX B8
2021 Build with Improvements Alternative 2 PM Peak Hour
Traffic Analysis Output Files
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
2021 Build w/ Improvements_Alt2 PM
3/17/2016
EBL
EBT
EBR
WBU
WBL
WBT
WBR
NBU
NBL
NBT
NBR
SBL
132
132
1900
325
1
100
1.00
548
548
1900
86
86
1900
0
0
7
7
1900
479
479
1900
432
432
1900
300
1
3
3
1900
318
318
1900
450
1
0.95
1.00
1.00
1.00
0.850
0.95
110
110
1900
325
1
100
1.00
859
859
1900
0.95
0.980
325
325
1900
350
1
100
0.97
0.95
1.00
0.850
596
596
1900
338
2
200
0.97
3468
0
0
1863
1583
0
3539
1583
3468
0
No
0
1863
1583
No
0
3539
1583
No
0.950
1770
0.123
229
0.90
147
147
pm+pt
7
4
7
45
1121
17.0
0.90
609
705
NA
4
4
7.0
7.0
13.9
14.3
15.0
37.0
9.4% 23.1%
8.1
29.7
3.0
5.0
3.9
2.3
-1.9
-2.3
5.0
5.0
Lead
Lag
Yes
Yes
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
None None
42.9
32.9
0.27
0.21
0.94
0.99
96.2
93.3
0.0
0.0
96.2
93.3
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0.950
3433
0.950
3433
0.90
96
0.90
8
0.90
361
0
0
Prot
3!
369
Prot
3
3
3
45
709
10.7
0.90
532
0.950
1770
0.950
1770
0.90
480
0.90
3
0.90
122
532
480
NA pm+ov
8
1
8
8
8
0
Prot
5
125
Prot
5
5
5
7.0
7.0
7.0
7.0
13.9
13.9
14.3
13.5
27.0
27.0
49.0
41.0
16.9% 16.9% 30.6% 25.6%
20.1
20.1
41.7
34.5
3.1
3.1
5.0
3.0
3.8
3.8
2.3
3.5
-1.9
-2.3
-1.5
5.0
5.0
5.0
Lead
Lead
Lag Lead
Yes
Yes
Yes
Yes
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
None None None None
21.1
44.0
83.4
0.13
0.28
0.52
0.82
1.04
0.58
82.5 105.3
29.6
0.0
0.0
0.0
82.5 105.3
29.6
7.0
13.2
15.0
9.4%
8.8
3.0
3.2
Lag
Yes
2.0
2.0
0.0
0.0
None
50
1312
17.9
0.90
954
0.950
3433
0.950
3433
0.90
353
0.90
662
954
353
NA pm+ov
2
3!
2
2
3
662
Prot
1
1
7.0
14.0
7.0
7.0
13.2
20.6
13.9
13.5
15.0
55.0
27.0
41.0
9.4% 34.4% 16.9% 25.6%
8.8
48.4
20.1
34.5
3.0
5.1
3.1
3.0
3.2
1.5
3.8
3.5
-1.2
-1.6
-1.9
-1.5
5.0
5.0
5.0
5.0
Lag
Lag Lead
Lead
Yes
Yes
Yes
Yes
2.0
6.0
2.0
2.0
2.0
3.4
2.0
2.0
0.0
20.0
0.0
0.0
0.0
45.0
0.0
0.0
None C-Min None None
10.0
51.6
77.7
34.4
0.06
0.32
0.49
0.22
1.14
0.84
0.46
0.90
189.9
58.3
29.9
76.7
0.0
0.0
0.0
0.0
189.9
58.3
29.9
76.7
Synchro 9 Report
Page 1
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
SBT
SBR
1549
1549
1900
101
101
1900
0
0
0.95
0.991
0.95
3507
0
3507
0
No
50
1897
25.9
0.90
1721
1833
NA
6
2021 Build w/ Improvements_Alt2 PM
3/17/2016
0.90
112
0
6
14.0
20.8
81.0
50.6%
74.2
5.3
1.5
-1.8
5.0
Lead
Yes
6.0
3.4
20.0
45.0
C-Min
76.0
0.48
1.10
94.6
0.0
94.6
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 2
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBL
F
106
#251
325
157
0
0
0
0.94
EBT
F
93.8
F
~408
#541
1041
713
0
0
0
0.99
EBR
WBU
WBL
F
195
256
350
472
0
0
0
0.78
2021 Build w/ Improvements_Alt2 PM
3/17/2016
WBT
F
72.9
E
~600
#838
629
WBR
C
512
0
0
0
1.04
NBU
NBL
F
331
449
~151
#294
300
825
0
0
0
0.58
325
110
0
0
0
1.14
NBT
E
62.8
E
496
587
1232
1140
0
0
0
0.84
NBR
C
SBL
E
243
336
346
#427
450
777
0
0
0
0.45
338
772
0
0
0
0.86
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 120 (75%), Referenced to phase 2:NBT and 6:SBT, Start of Green
Natural Cycle: 150
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 1.14
Intersection Signal Delay: 80.3
Intersection LOS: F
Intersection Capacity Utilization 101.5%
ICU Level of Service G
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
! Phase conflict between lane groups.
Splits and Phases:
1: NC 55 & Green Level West/High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
Lanes, Volumes, Timings
1: NC 55 & Green Level West/High House Road
Lane Group
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
SBT
F
89.8
F
~1141
#1274
1817
2021 Build w/ Improvements_Alt2 PM
3/17/2016
SBR
1665
0
0
0
1.10
Intersection Summary
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 4
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
Total Delay
LOS
Approach Delay
Approach LOS
2021 Build w/ Improvements_Alt2 PM
3/17/2016
EBU
EBT
EBR
WBL
WBT
NWL
NWR
12
12
1900
200
1
100
0.91
1361
1361
1900
293
293
1900
0
0
1470
1470
1900
0.91
59
59
1900
160
1
100
1.00
180
180
1900
0
1
0.91
0.974
210
210
1900
0
1
100
1.00
0
0
4953
0.913
4522
0.90
13
45
478
7.2
0.90
1512
0
0
Perm
2
2
1851
NA
2
2
12.0
12.0
25.0
25.0
102.0 102.0
63.8% 63.8%
95.0
95.0
5.0
5.0
2.0
2.0
-2.0
5.0
Lag
Lag
Yes
Yes
6.0
6.0
C-Min C-Min
112.8
0.70
0.58
13.6
0.0
13.6
B
13.6
B
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
No
0.950
1770
0.084
156
0.90
326
0.90
233
0
233
pm+pt
1
6
1
0.95
3539
0.950
1770
0.950
1770
45
334
5.1
0.90
1633
35
1012
19.7
0.90
66
3539
1633
NA
6
6
1.00
0.850
1583
1583
No
0.90
200
66
200
Prot pm+ov
8
1
8
8
1
7.0
12.0
7.0
7.0
14.0
25.0
25.0
14.0
32.0 134.0
26.0
32.0
20.0% 83.8% 16.3% 20.0%
25.0 127.0
19.0
25.0
5.0
5.0
5.0
5.0
2.0
2.0
2.0
2.0
-2.0
-2.0
-2.0
-2.0
5.0
5.0
5.0
5.0
Lead
Lead
Yes
Yes
2.0
6.0
2.0
2.0
None C-Min None None
137.4 137.4
12.6
37.2
0.86
0.86
0.08
0.23
0.70
0.54
0.48
0.54
44.7
3.6
81.3
58.3
0.5
0.2
0.0
0.0
45.1
3.8
81.3
58.3
D
A
F
E
8.9
64.0
A
E
Synchro 9 Report
Page 5
Lanes, Volumes, Timings
8: Jenks Carpenter Rd & High House Road
Lane Group
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBT
327
469
398
3186
0
20
0
0.58
EBR
2021 Build w/ Improvements_Alt2 PM
3/17/2016
WBL
122
221
WBT
128
154
254
407
27
0
0
0.61
3039
514
0
0
0.65
NWL
67
118
932
160
232
0
0
0
0.28
NWR
186
247
441
0
0
0
0.45
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 113 (71%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green
Natural Cycle: 75
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.70
Intersection Signal Delay: 14.8
Intersection LOS: B
Intersection Capacity Utilization 92.0%
ICU Level of Service F
Analysis Period (min) 15
Splits and Phases:
8: Jenks Carpenter Rd & High House Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Lane Configurations
Traffic Volume (vph)
Future Volume (vph)
Ideal Flow (vphpl)
Grade (%)
Storage Length (ft)
Storage Lanes
Taper Length (ft)
Lane Util. Factor
Frt
Flt Protected
Satd. Flow (prot)
Flt Permitted
Satd. Flow (perm)
Right Turn on Red
Satd. Flow (RTOR)
Link Speed (mph)
Link Distance (ft)
Travel Time (s)
Peak Hour Factor
Adj. Flow (vph)
Shared Lane Traffic (%)
Lane Group Flow (vph)
Turn Type
Protected Phases
Permitted Phases
Detector Phase
Switch Phase
Minimum Initial (s)
Minimum Split (s)
Total Split (s)
Total Split (%)
Maximum Green (s)
Yellow Time (s)
All-Red Time (s)
Lost Time Adjust (s)
Total Lost Time (s)
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)
Minimum Gap (s)
Time Before Reduce (s)
Time To Reduce (s)
Recall Mode
Act Effct Green (s)
Actuated g/C Ratio
v/c Ratio
Control Delay
Queue Delay
2021 Build w/ Improvements_Alt2 PM
3/17/2016
EBU
EBL
EBT
WBU
WBT
WBR
SBL
SBR
2
2
1900
163
163
1900
5
5
1900
1397
1397
1900
0%
83
83
1900
0.95
0.91
1.00
0.850
146
146
1900
2%
240
1
100
1.00
281
281
1900
0
1
100
1.00
1376
1376
1900
-2%
1583
0
0
0.90
2
0.950
1787
0.123
231
0.90
181
0
183
custom pm+pt
5
5!
2
5
5
0.95
300
1
200
0.91
3575
0
3575
0
5085
0.931
4734
0.90
6
45
1311
19.9
0.90
1552
45
334
5.1
0.90
1529
1529
NA
2
2
0
Perm
6
6
300
1
1583
No
0.90
92
1558
92
NA pm+ov
6
4
6
6
4
0.950
1752
0.950
1752
45
1310
19.8
0.90
162
0
1
1.00
0.850
1567
1567
No
0.90
312
162
312
Prot pm+ov
4
5!
4
4
5
7.0
7.0
12.0
12.0
12.0
7.0
7.0
7.0
13.4
13.4
18.6
18.6
18.6
13.2
13.2
13.4
25.0
25.0 120.0
95.0
95.0
40.0
40.0
25.0
15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6%
18.6
18.6 113.4
88.4
88.4
33.8
33.8
18.6
3.0
3.0
4.7
4.7
4.7
3.0
3.0
3.0
3.4
3.4
1.9
1.9
1.9
3.2
3.2
3.4
-1.4
-1.6
-1.6
-2.2
-1.2
-2.0
5.0
5.0
5.0
4.0
5.0
4.4
Lead
Lead
Lag
Lag
Lead
Yes
Yes
Yes
Yes
Yes
2.0
2.0
2.0
6.0
6.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
2.0
2.0
2.0
0.0
0.0
0.0
15.0
15.0
0.0
0.0
0.0
0.0
0.0
0.0
30.0
30.0
0.0
0.0
0.0
None None C-Min C-Min C-Min None None None
129.6 129.6
111.6 138.0
20.4
39.0
0.81
0.81
0.70
0.86
0.13
0.24
0.58
0.53
0.47
0.07
0.73
0.82
22.5
3.6
12.1
1.8
84.9
74.1
0.1
0.1
0.0
0.0
0.0
0.0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 7
Lanes, Volumes, Timings
9: High House Road & Carpenter Upchurch Road
Lane Group
Total Delay
LOS
Approach Delay
Approach LOS
Queue Length 50th (ft)
Queue Length 95th (ft)
Internal Link Dist (ft)
Turn Bay Length (ft)
Base Capacity (vph)
Starvation Cap Reductn
Spillback Cap Reductn
Storage Cap Reductn
Reduced v/c Ratio
EBU
EBL
22.7
C
19
74
381
12
0
0
0.50
EBT
3.7
A
5.8
A
49
60
254
2895
431
0
0
0.62
WBU
WBT
12.1
B
11.5
B
247
348
1231
3302
0
0
0
0.47
2021 Build w/ Improvements_Alt2 PM
3/17/2016
WBR
1.8
A
11
22
300
1515
0
0
0
0.06
SBL
84.9
F
77.8
E
166
239
1230
240
383
0
0
0
0.42
SBR
74.1
E
313
398
450
0
0
0
0.69
Intersection Summary
Area Type:
Other
Cycle Length: 160
Actuated Cycle Length: 160
Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.82
Intersection Signal Delay: 17.1
Intersection LOS: B
Intersection Capacity Utilization 94.5%
ICU Level of Service F
Analysis Period (min) 15
! Phase conflict between lane groups.
Splits and Phases:
9: High House Road & Carpenter Upchurch Road
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 8
HCM 2010 TWSC
6: Cranborne Ln/Sir Walker Ln & High House Road
Intersection
Int Delay, s/veh
2021 Build w/ Improvements_Alt2 PM
3/17/2016
14.6
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBL
7
7
0
Free
100
90
2
8
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1520
4.14
2.22
435
-
Approach
HCM Control Delay, s
HCM LOS
EB
0.1
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
Notes
~: Volume exceeds capacity
435
-
EBT EBR WBU WBL WBT WBR
1554
31
10 104 1302
66
1554
31
10 104 1302
66
0
0
0
0
0
0
Free Free Free Free Free Free
- None
- None
- 150
0
0
0
-5
90
90
90
90
90
90
2
2
2
2
2
2
1727
34
11 116 1447
73
0
-
Major2
0 1318 1761
- 6.44 4.14
- 2.52 2.22
- 207 351
- 326 326
-
NBLn1 NBLn2 EBL
- 290 435
- 0.111 0.018
0
19 13.4
A
C
B
- 0.4
0.1
0
-
WB
1.8
EBT
-
$: Delay exceeds 300s
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
NBL NBT NBR
0
0
29
0
0
29
0
0
0
Stop Stop Stop
- None
- 100
0
0
90
90
90
2
2
2
0
0
32
Minor1
2736 3532
1759 1759
977 1773
7.54 6.54
6.54 5.54
6.54 5.54
3.52 4.02
10
6
88 137
269 134
9
9
86
259
6
6
134
134
NB
19
C
SBL SBT SBR
28
0
12
28
0
12
0
0
0
Stop Stop Stop
- None
50
0
0
90
90
90
2
2
2
31
0
13
881
6.94
3.32
290
-
Minor2
2616
1737
879
7.54
6.54
6.54
3.52
~ 12
91
309
290
-
~ 11
~ 11
89
270
3514 760
1737
1777
6.54 6.94
5.54
5.54
4.02 3.32
6 349
140
134
6
6
140
132
349
-
SB
$ 1061
F
EBR WBL WBT WBR SBLn1 SBLn2
- 326
11 349
- 0.389
- 2.828 0.038
- 22.9
-$ 1509 15.7
C
F
C
- 1.8
4.9 0.1
+: Computation Not Defined
*: All major volume in platoon
Synchro 9 Report
Page 1
HCM 2010 TWSC
2021 Build w/ Improvements_Alt2 PM
3/17/2016
7: Widdington Ln/Church Entrance & High House Road
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
1
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
1642
4.14
2.22
390
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
390
-
NBLn1
281
0.324
23.8
C
1.4
EBT EBR
1584
37
1584
37
0
0
Free Free
- None
0
0
90
90
2
2
1760
41
0
-
0
-
WBL
63
63
0
Free
100
90
2
70
Major2
1801
4.14
2.22
338
338
-
WBT WBR
1477
1
1477
1
0
0
Free Free
- None
0
-5
90
90
2
2
1641
1
0
-
0
-
WB
0.8
EBL
390
0
A
0
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
NBL NBT NBR
0
0
82
0
0
82
0
0
0
Stop Stop Stop
- None
0
1
0
90
90
90
2
2
2
0
0
91
SBL SBT SBR
0
0
5
0
0
5
0
0
0
Stop Stop Stop
- None
0
0
0
90
90
90
2
2
2
0
0
6
Minor1
2742
1781
961
7.54
6.54
6.54
3.52
9
85
275
3563
1781
1782
6.54
5.54
5.54
4.02
6
133
133
901
6.94
3.32
281
-
Minor2
2662
1782
880
7.54
6.54
6.54
3.52
11
85
308
7
7
85
214
5
5
133
105
281
-
6
6
85
208
NB
23.8
C
3583 821
1782
1801
6.54 6.94
5.54
5.54
4.02 3.32
5 318
133
130
4
4
105
130
318
-
SB
16.5
C
EBT EBR WBL WBT WBR SBLn1
- 338
- 318
- 0.207
- 0.017
- 18.4
- 16.5
C
C
0.8
- 0.1
Synchro 9 Report
Page 2
HCM 2010 TWSC
20: High House Rd EB & WB U-Turn
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
3/17/2016
0
EBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt2 PM
-
EBL
0
A
-
EBT
1582
1582
0
Free
None
0
0
90
2
1758
0
-
WBT WBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
SBL
31
31
0
Stop
0
0
0
90
2
34
SBR
0
0
0
Stop
None
90
2
0
Minor2
879
0
879
7.54
6.54
3.52
242
309
0
-
242
242
309
-
SB
EBT SBLn1
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 3
HCM 2010 TWSC
30: South Entrance & High House Rd EB
Intersection
Int Delay, s/veh
3/17/2016
0.1
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
EBT EBR
1597
16
1597
16
0
0
Free Free
- None
0
0
90
90
2
2
1774
18
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major1
0
-
Approach
HCM Control Delay, s
HCM LOS
EB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
2021 Build w/ Improvements_Alt2 PM
NBLn1
284
0.035
18.1
C
0.1
EBT
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
0
-
WBL WBT
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
NBL
0
0
0
Stop
0
0
90
2
0
NBR
9
9
0
Stop
None
0
90
2
10
Minor1
1783
1783
0
7.54
6.54
3.52
52
85
-
895
6.94
3.32
284
-
52
52
85
-
284
-
NB
18.1
C
EBR
-
Synchro 9 Report
Page 4
HCM 2010 TWSC
40: High House Road WB & North Entrance
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt2 PM
3/17/2016
0.3
EBL EBT
0
0
0
0
0
0
Free Free
- None
0
0
90
90
2
2
0
0
WBT WBR
1288
40
1288
40
0
0
Free Free
- None
0
-5
90
90
2
2
1431
44
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
0
-
SBL
0
0
0
Stop
0
0
90
2
0
SBR
24
24
0
Stop
None
0
90
2
27
Minor2
1453
1453
0
7.54
6.54
3.52
91
137
-
737
6.94
3.32
361
-
91
91
137
-
361
-
SB
15.8
C
WBT WBR SBLn1
- 361
- 0.074
- 15.8
C
0.2
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 5
HCM 2010 TWSC
50: EB U-Turn & High House Road WB
Intersection
Int Delay, s/veh
Movement
Traffic Vol, veh/h
Future Vol, veh/h
Conflicting Peds, #/hr
Sign Control
RT Channelized
Storage Length
Veh in Median Storage, #
Grade, %
Peak Hour Factor
Heavy Vehicles, %
Mvmt Flow
2021 Build w/ Improvements_Alt2 PM
3/17/2016
0
EBT EBR
0
0
0
0
0
0
Stop Stop
- None
0
0
90
90
2
2
0
0
WBL
0
0
0
Free
90
2
0
Major/Minor
Conflicting Flow All
Stage 1
Stage 2
Critical Hdwy
Critical Hdwy Stg 1
Critical Hdwy Stg 2
Follow-up Hdwy
Pot Cap-1 Maneuver
Stage 1
Stage 2
Platoon blocked, %
Mov Cap-1 Maneuver
Mov Cap-2 Maneuver
Stage 1
Stage 2
Major2
0
-
Approach
HCM Control Delay, s
HCM LOS
WB
0
Minor Lane/Major Mvmt
Capacity (veh/h)
HCM Lane V/C Ratio
HCM Control Delay (s)
HCM Lane LOS
HCM 95th %tile Q(veh)
-
WBT
1314
1314
0
Free
None
0
-5
90
2
1460
0
-
NBL
14
14
0
Stop
0
0
0
90
2
16
NBR
0
0
0
Stop
None
90
2
0
Minor1
730
0
730
7.54
6.54
3.52
310
380
0
-
310
310
380
-
NB
-
NBLn1 WBL WBT
0
A
-
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
Synchro 9 Report
Page 6
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6:45
8:00
75
60
2
1
6608
6587
344
365
5716
395.6
252.0
9818
254.3
10
6:45
8:00
75
60
2
1
6664
6605
386
445
5782
499.2
353.7
10667
280.1
2
6:45
8:00
75
60
2
1
6736
6667
353
422
5909
478.9
330.3
10779
280.2
3
6:45
8:00
75
60
2
1
6478
6475
360
363
5601
414.9
273.7
9860
255.6
7
6:45
8:00
75
60
2
1
6691
6596
356
451
5804
507.8
361.4
11725
284.4
8
6:45
8:00
75
60
2
1
6527
6480
321
368
5704
411.3
268.1
10238
257.6
9
6:45
8:00
75
60
2
1
6457
6333
290
414
5533
383.5
244.5
9697
246.7
Avg
6:45
8:00
75
60
2
1
6638
6566
346
416
5761
440.0
295.2
10523
266.2
4
6:45
8:00
75
60
2
1
6654
6618
400
436
5838
460.7
313.9
11353
274.0
5
6:45
8:00
75
60
2
1
6690
6626
356
420
5828
421.0
274.7
10519
263.2
6
6:45
8:00
75
60
2
1
6857
6670
306
493
5892
427.6
279.3
10531
265.3
Summary of All Intervals
Run Number
Start Time
End Time
Total Time (min)
Time Recorded (min)
# of Intervals
# of Recorded Intervals
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Interval #0 Information Seeding
Start Time
6:45
End Time
7:00
Total Time (min)
15
Volumes adjusted by Growth Factors.
No data recorded this interval.
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 1
SimTraffic Simulation Summary
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
1
6608
6587
344
365
5716
395.6
252.0
9818
254.3
10
6664
6605
386
445
5782
499.2
353.7
10667
280.1
2
6736
6667
353
422
5909
478.9
330.3
10779
280.2
3
6478
6475
360
363
5601
414.9
273.7
9860
255.6
8
6527
6480
321
368
5704
411.3
268.1
10238
257.6
9
6457
6333
290
414
5533
383.5
244.5
9697
246.7
Avg
6638
6566
346
416
5761
440.0
295.2
10523
266.2
4
6654
6618
400
436
5838
460.7
313.9
11353
274.0
5
6690
6626
356
420
5828
421.0
274.7
10519
263.2
6
6857
6670
306
493
5892
427.6
279.3
10531
265.3
Interval #1 Information Recording
Start Time
7:00
End Time
8:00
Total Time (min)
60
Volumes adjusted by Growth Factors.
Run Number
Vehs Entered
Vehs Exited
Starting Vehs
Ending Vehs
Travel Distance (mi)
Travel Time (hr)
Total Delay (hr)
Total Stops
Fuel Used (gal)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
7
6691
6596
356
451
5804
507.8
361.4
11725
284.4
SimTraffic Report
Page 2
SimTraffic Performance Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
1: NC 55 & Green Level West/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
1.3
130.0
WB
0.0
77.0
NB
1.1
64.0
SB
67.5
178.7
All
27.6
121.8
6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.2
WB
0.0
4.6
NB
2.4
21.5
SB
1.3
94.1
All
0.0
4.3
7: Widdington Ln/Church Entrance & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
3.2
WB
0.0
3.7
NB
0.2
31.2
SB
0.1
15.7
All
0.0
4.2
8: Jenks Carpenter Rd & High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
12.3
WB
0.0
10.3
NW
1.3
64.6
All
0.1
14.9
9: High House Road & Carpenter Upchurch Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
7.4
WB
0.8
17.1
SB
1.6
59.7
All
0.5
18.4
20: High House Rd EB & WB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
0.2
SB
0.0
16.5
All
0.0
0.5
21: WB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
20.1
All
0.0
20.1
30: South Entrance & High House Rd EB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.3
NB
0.1
15.7
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
All
0.0
1.4
SimTraffic Report
Page 3
SimTraffic Performance Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
40: High House Road WB & North Entrance Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
3.0
SB
0.1
25.7
All
0.0
3.4
50: EB U-Turn & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
0.3
NB
0.0
11.0
All
0.0
0.4
51: High House Rd EB & EB U-Turn Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
1.2
All
0.0
1.2
101: High House Road/High House Rd EB & High House Road WB Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
EB
0.0
4.0
SW
0.0
6.4
All
0.0
5.1
102: High House Rd EB & High House Road WB/High House Road Performance by approach
Approach
Denied Del/Veh (s)
Total Del/Veh (s)
WB
0.0
1.0
NE
0.0
0.4
All
0.0
0.7
Total Network Performance
Denied Del/Veh (s)
Total Del/Veh (s)
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
23.1
129.9
SimTraffic Report
Page 4
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
424
185
409
325
2
6
EB
T
588
403
760
1050
3
0
EB
TR
558
392
735
1050
2
0
25
33
WB
UL
306
156
253
350
0
0
WB
L
610
241
520
617
1
8
WB
T
700
592
822
617
28
181
0
0
47
204
WB
R
400
346
521
NB
UL
374
233
411
300
4
18
325
14
62
NB
T
498
321
465
1246
NB
T
476
283
425
1246
7
8
0
0
NB
R
288
137
249
SB
L
403
265
386
450
338
4
32
Intersection: 1: NC 55 & Green Level West/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
538
503
660
338
6
49
SB
T
1880
1678
2214
1831
38
0
SB
TR
1873
1654
2212
1831
19
0
49
289
Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
25
3
16
EB
T
1
0
1
236
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
TR
16
1
7
236
WB
UL
132
59
111
150
0
1
WB
T
63
3
35
775
0
0
WB
TR
44
2
22
775
NB
R
64
25
57
100
SB
LT
115
43
102
562
29
4
SB
R
57
12
44
50
0
0
SimTraffic Report
Page 5
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Intersection: 7: Widdington Ln/Church Entrance & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
T
7
0
6
775
EB
TR
38
4
20
775
WB
L
103
40
84
100
1
9
WB
T
98
6
51
417
WB
TR
21
1
20
417
NB
R
120
48
97
1244
SB
R
26
3
17
748
0
0
Intersection: 8: Jenks Carpenter Rd & High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UT
183
43
120
200
0
0
EB
T
345
147
290
417
0
0
EB
TR
370
167
321
417
0
1
WB
L
248
140
238
243
3
14
WB
T
200
50
136
243
0
0
WB
T
208
59
152
243
0
1
3
15
NW
L
241
66
154
160
0
0
NW
R
322
144
261
933
13
8
Intersection: 9: High House Road & Carpenter Upchurch Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
UL
174
81
151
243
EB
T
230
75
176
243
0
1
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
EB
T
242
84
184
243
0
2
WB
UT
259
66
168
300
0
0
WB
T
380
187
336
1276
WB
T
383
191
339
1276
2
8
2
1
WB
R
113
20
76
SB
L
301
136
237
300
240
1
2
SB
R
434
206
345
1236
7
11
SimTraffic Report
Page 6
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Intersection: 20: High House Rd EB & WB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SB
L
47
18
43
-12
Intersection: 21: WB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
WB
L
96
6
51
125
WB
T
616
132
511
645
1
7
WB
T
699
244
706
645
6
43
2
0
Intersection: 30: South Entrance & High House Rd EB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
R
33
9
32
341
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 7
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Intersection: 40: High House Road WB & North Entrance
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
WB
T
142
12
103
409
WB
TR
206
24
156
409
0
1
SB
R
65
20
51
433
Intersection: 50: EB U-Turn & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
NB
L
34
9
31
-3
0
0
Intersection: 51: High House Rd EB & EB U-Turn
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
EB
L
11
0
6
100
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 8
Queuing and Blocking Report
2021 Build w/ Improvements_Alt2 PM
3/17/2016
Intersection: 101: High House Road/High House Rd EB & High House Road WB
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
SW
R
67
6
45
89
0
3
SW
R
174
92
212
89
25
160
Intersection: 102: High House Rd EB & High House Road WB/High House Road
Movement
Directions Served
Maximum Queue (ft)
Average Queue (ft)
95th Queue (ft)
Link Distance (ft)
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 1182
Ashbourne Subdivision Access Traffic Analysis
Accelerate Engineering, PLLC
SimTraffic Report
Page 9