Accelerate Engineering, PLLC 140 Preston Executive Drive, Suite 100 D, Cary, NC 27513 Tel: (919) 263-5678 | (704) 666-5811 Fax: (919) 263-5687 www.AccelerateEng.com NC License No. P-1442 Memorandum To: David Spencer, PE, Town of Cary Reid Elmore, NCDOT From: Zhaolong “Gavin” Teng, PE, PTOE CC: Shayne Leathers, PE, Withers & Ravenel Jason Rivenbark, PE, CalAtlantic Homes Date: 3-18-2016 Project Name: Ashbourne Subdivision Access Traffic Analysis Re: Ashbourne Subdivision Access Traffic Analysis Memorandum Introduction Ashbourne Subdivision is a proposed residential development located on High House Road between NC 55 and Cranborne Lane/ Sir Walker Lane in Cary, NC. A total of 64 single family units are proposed to be constructed on the north side of High House Road, and up to 25 single-family units on the south side of High House Road. After discussions with the Town of Cary and NCDOT staff, traffic analyses were conducted to evaluate the development’s traffic impact on the High House Road corridor and the proposed right-in/right-out and median U-turn site access. This memo summarizes the traffic analysis results. Figures and traffic analysis output files are included in Appendix A and Appendix B, respectively. Vicinity Map North Site (64 lots) South Site (25 lots) Ashbourne Subdivision Access Traffic Analysis Memorandum Site Trip Generation and Distributions The proposed residential development is expected to generate a total of 847 daily trips, including 67 trips in the AM peak hour and 89 trips in the PM peak hour. Site trips were distributed to the study network based on traffic counts at the adjacent Cranborne Lane / Sir Walker Lane intersection. ITE CODE LAND USE SIZE Average Daily Trips (24 Hours) AM Peak Hour (one hour between 7and 9am) PM Peak Hour (one hour between 4 and 6pm) Enter Exit Total Enter Exit Total Enter Exit Total 210 Single Family 64 DU 305 305 609 12 36 48 40 24 64 210 Single Family 25 Total (90 Lots) DU 119 424 119 424 238 847 5 17 14 50 19 67 16 56 9 33 25 89 Source: ITE Trip Generation 9th Edition, ITE Trip Generation Handbook 2nd Edition, and NCDOT Congestion Management Capacity Analysis Guidelines. It is noted that the northern development has another access point on NC 55 (at the Wellesley Trade Lane intersection) through interconnectivity with the adjacent shopping center. Site trips to/from NC 55 likely will use this entrance. Given the overall low site traffic volumes and the projected trip distribution pattern (primarily to/from the east on High House Rd), the NC 55 access point and its potential trip assignments were not analyzed in this study. Assuming the High House Road entrance as the only access point for the northern development would yield more conservative analysis results. Traffic Impact and Access Analysis The study area includes five existing intersections on High House Road between NC 55 and Carpenter Upchurch Road (NC 55, Sir Walker Lane/Cranborne Lane, Widdington Lane, Jenks Carpenter Road, and Carpenter Upchurch Road), two proposed right-in/right-out site entrances, and two proposed median Uturn openings. Both weekday AM and PM conditions were analyzed for the following scenarios: 2016 Existing Conditions Recent traffic counts obtained from the Town of Cary were adjusted (assuming a 3% annual growth factor) to estimate the 2016 traffic volumes. Traffic signal plans and timing schedules were also obtained from the Town and NCDOT. This analysis evaluates the current intersection operational performance. 2021 Future No Build Conditions As the construction is expected to commence in late 2016, the future analysis year is 2021 (or five years from the start of construction) in accordance with the Town’s analysis guidelines. A 3% annual growth factor was used to estimate the 2021 background traffic volumes. The 2021 No Build traffic volumes also include trips from approved off-site developments as documented in the “Herndon Property TAR”. In Accelerate Engineering, PLLC 2 Ashbourne Subdivision Access Traffic Analysis Memorandum addition, this analysis takes into account the committed transportation improvement by the proposed H7 High School – a new 300’ westbound right-turn lane on High House Road at the NC 55 intersection. 2021 Build with Improvements Conditions –Alternative 1 (Median U-Turns Only) The 2021 Build traffic volumes include both the No-Build volumes and the site trips. In addition to the proposed median U-turns, this analysis also includes the future Town of Cary/NCDOT transportation improvements (a new traffic signal at the High House Road /Jenks Carpenter Road intersection, and a new westbound left-turn lane on High House Road at the Widdington Lane intersection) and the resulting trip (U-turn traffic) redistributions. 2021 Build with Improvements Conditions –Alternative 2 (Dual WB Left-Turns) As the NC 55/ High House Road intersection is expected to have significantly higher delays due to the future background growth and off-site developments, an alternative intersection configuration (converting the inside westbound through lane to a second westbound left-turn lane via pavement marking and signal revisions) was also evaluated for the Build with Improvement conditions. Intersection Capacity Analysis Results The traffic analysis results are summarized in a table on the following page. Comparing the 2021 No Build and Build with Improvements Conditions traffic analysis results, the subject development is expected to cause minimum delay increases at the two existing signalized intersections on High House Road (NC 55, Carpenter Upchurch Road). With the proposed median U-turn openings and the new westbound directional left-turn lane at the Widdington Lane intersection, the U-turn movements at the Cranborne Lane/Sir Walker Lane intersection are expected to be eliminated or significantly reduced. Traffic simulations, which more accurately model the gap acceptance behaviors, suggest that the Build with Improvements condition average delays on the Sir Walker Lane and Cranborne Lane approaches are similar (AM peak) or less than (PM peak) those in the No Build Conditions. At the High House Road and Widdington Lane intersection, the new westbound directional left-over is not expected to cause any noticeable delay increases. The traffic simulations and queue analysis also suggest that a westbound left-turn lane with 100’ of storage likely will provide adequate storage capacity (PM max queue length 103’) without negatively affecting the eastbound left-turn operations at the Carpenter Upchurch Road Intersection. Accelerate Engineering, PLLC 3 Accelerate Engineering, PLLC signalized High House Rd @ Carpenter Upchurch Rd unsignalized (Future Signal) High House Rd @ Jenks Carpenter Rd 4 Unacceptable Delay/LOS #: Excessive Delays (>600 Seconds) (): SimTraffic Simulation Delays and LOS System Performance High House Rd @ EB U-Turn unsignalized High House Rd @ N Entrance unsignalized High House Rd @ S Entrance unsignalized High House Rd @ WB U-Turn unsignalized unsignalized High House Rd @ Widdington Ln High House Rd @ unsignalized Sir Walker Ln / Cranborne Ln signalized NC 55 @ High House Rd / Green Level West Rd Intersection 5,530 147.3 61.7 93.5 66.9 46.8 56.5 15.2 3.7 8.6 78.3 0.1 3.0 15.9 (26.3) 457.8 (59.9) 0.0 0.0 19.1 14.6 -0.1 12.7 # (431.7) --------- 52.6 D Intersection Average 76.4 E EB - Green Level West Rd 66.6 E WB - High House Rd 40.4 D NB - NC 55 48.6 D SB - NC 55 12.4 B Intersection Average 5.3 A EB - High House Rd 7.3 A WB - High House Rd 54.3 D SB - Pilot Knob Rd 0.1 A EB - High House Rd 0.6 A WB - High House Rd 40.7 (17.5) E (C) NB - Cranborne Ln 105.3 (23.7) F (C) SB - Sir Walker Ln 0.0 A EB - High House Rd 0.0 A WB - High House Rd 16.5 C NB - Widdington Ln 0.0 A SB - Church Entrance --Intersection Average 0.1 A EB - High House Rd 1.1 A WB - High House Rd NB - Jenks Carpenter Rd 136.1 (55.1) F (F ) --EB - High House Rd --WB - U-Turn --EB - High House Rd --NB - South Entrance --WB - High House Rd --SB - North Entrance --WB - High House Rd --EB - U-Turn Throughputs (vph) 4,871 79.8 Total Delays (hr) PM Delay (sec) AM Delay (sec) LOS Approach Existing (2016) Ashbourne Subdivision Access Traffic Analysis Summary E F E D E B A B E A A C (D ) F (F) A A C B -A B F (F) --------- LOS 5,758 210.9 79.0 199.8 89.4 45.0 52.2 13.5 6.9 8.7 53.8 0.1 0.7 94.2 (24.6) 326 (33.7) 0.0 0.0 20.7 0.0 -0.1 1.6 430.9 (278.6) --------- Delay (sec) AM E F F D D B A A D A A F (C ) F (D) A A C A -A A F (F) --------- LOS PM 6,143 466.5 Delay (sec) 84.1 155.6 68.7 53.3 85.9 16.7 4.8 12.0 75.6 0.1 5.9 18.6 (30.1) # (112.5) 0.0 0.0 24.8 16.7 -0.1 39.3 (12.1) 383.8 (#) --------- No Build (2021) Delay (sec) 5,844 227.8 F 79.6 F 200.9 E 91.1 D 45.0 F 52.4 B 12.2 A 4.6 B 8.9 E 53.1 A 0.1 A 0.5 C (D) 111.6 (21.7) F (F) 374 (32.5) A 0.0 A 0.1 C 21.2 C 0.0 -13.9 A 11.5 E (B ) 3.6 F (F) 55.9 -0.0 -(13.6) -0.0 -16.3 -0.0 -12.9 -0.0 -(5.7) LOS E F F D D B A A D A A F (C ) F (D ) A A C A B B A E A (B) A C A B A (A) LOS 6,404 397.3 Delay (sec) 85.0 157.3 71.3 53.4 86.1 17.2 5.8 11.5 78.0 0.1 1.8 19.0 (18.9) # (67.7) 0.0 0.8 23.8 16.5 14.8 13.6 8.9 64.0 0.0 (16.0) 0.0 18.1 0.0 15.8 0.0 (11.7) Delay (sec) 5,977 156.3 E F F E D B A A D A A F (D) F (D) A A C A B B A E A (C ) A C A B A (A) LOS 6,566 295.2 Delay LOS (sec) 80.3 F 93.8 F 72.9 E 62.8 E 89.8 F 17.1 B 5.8 A 11.5 B 77.8 E 0.1 A 1.8 A 19.0 (21.5) C (C ) # (94.1) F (F) 0.0 A 0.8 A 23.8 C 16.5 C 14.8 B 13.6 B 8.9 A 64.0 E 0.0 A (16.5) (C ) 0.0 A 18.1 C 0.0 A 15.8 C 0.0 A (11.0) (B) Build (2021) with Improvements Alternative 2 (Dual WB LT) AM PM F 70.9 F 114.3 E 81.7 D 59.5 F 54.5 B 12.2 A 4.6 B 8.9 E 53.1 A 0.1 A 0.5 C (C ) 111.6 (29.6) F (F) 374.0 (36.2) A 0.0 A 0.1 C 21.2 C 0.0 B 13.9 B 11.5 A 3.6 E 55.9 A 0.0 (C ) (15.7) A 0.0 C 16.3 A 0.0 C 12.9 A 0.0 (B) (6.5) LOS Build (2021) with Improvements Alternative 1 (U-Turns Only) AM PM Ashbourne Subdivision Access Traffic Analysis Memorandum Ashbourne Subdivision Access Traffic Analysis Memorandum The new traffic signal at the High House Road / Jenks Carpenter Road intersection will greatly reduce delays on the northbound Jenks Carpenter Road approach. This intersection is expected to operate at LOS B during both AM and PM peak hours. The 2021 No Build analysis shows that, due to the background growth (3% per year) and off-site developments, the NC 55/ High House Road intersection is expected to operate at LOS E in the AM peak hour and LOS F in the PM peak hour. During both peak hour conditions, the eastbound Green Level Church Road approach will have heavy delays and excessive queueing. Converting the inside westbound through lane to a second exclusive left-turn lane, as shown in the Alternative 2 analysis, along with signal timing optimizations may improve the intersection operations during both peak hours. Median U-Turn and Site Access Locations Based on ten one-hour simulations runs, the westbound left-turn queues (maximum queues) at the NC 55/High House Road intersection may extend 610’ (Alternative 2) to 750’ (Alternative 1) during the PM peak hour, the worst condition of the day. Given the conservative nature of the traffic analysis (which accounted for both the 3% annual growth and off-site development trips, assumed only one access point for the northern development, and did not allow right-turn on red) and the queue length estimates, the westbound median U-turn may be located approximately 700’ from the NC 55 intersection (measured from the start of the raised median). A 125’ of storage length should be provided for this U-turn lane based on the projected traffic conflicts. The eastbound median U-turn may be located approximately 400’ from the Sir Walker Lane/Cranborne Lane intersection (measured from the end of the raised median), to provide at least 100’ of separation from the downstream eastbound left-turn lane (into Sir Walker Lane). A 100’ of storage length should be provided for this U-turn lane based on the projected traffic conflicts. The two proposed right-in/right-out site entrances on the current site plan are both located in the approximate midpoint between the new median U-turn openings (which are 1200’+/- apart), and appear to provide adequate weaving distances in traffic simulations. There are several factors that may affect the driveway locations: minimum intersection/driveway spacing, sight distance, and the historic property on the south side of High House Road. Considering the anticipated speed, acceleration distance, and stopping sight distance associated with a typical U-turn passenger vehicle, the downstream right-in/right-out driveway probably should not be located within 200’ from the median U-turn opening. On the south side of High House Road, to meet the minimum spacing distance and avoid encroaching on the existing historic property, the driveway likely needs to be located on the east side of the property. Accelerate Engineering, PLLC 5 Ashbourne Subdivision Access Traffic Analysis Memorandum Because of the existing horizontal curve on High House Road and the downstream eastbound U-turn movements, it is desirable to locate the South Entrance immediately to the east side of the historic property to maximize the sight distance and weaving distance. The current North Entrance location, approximately 600’ from either median U-turn openings, appears to be an acceptable location based on traffic simulation results. This entrance may be shifted to the east, if deemed necessary, to increase the weaving distance. Conclusions and Recommendations Traffic analyses were conducted to evaluate the traffic impact and access design for the proposed Ashbourne Subdivision. The analysis results indicate that the development will have overall minimum impact on the existing High House Road corridor, especially with the proposed new traffic signal at the High House Road /Jenks Carpenter Road intersection and a new westbound left-turn lane at the High House Road and Widdington Lane intersection (to be implemented by the Town or NCDOT). To mitigate the traffic congestion caused by the background growth and off-site developments, an alternative intersection configuration (converting the inside westbound through lane to a second westbound leftturn lane via pavement marking and signal revisions) may be considered in the future for the NC 55/ High House Road intersection. The median U-turn and site access locations were also evaluated based on traffic simulations and queue analyses, taking into account the traffic conflicts, minimum spacing distance, sight distance, and the existing historic property. It is suggested that the westbound U-turn should have 125’ of storage, and may be located approximately 700’ from the NC 55 intersection (measured from the start of the raised median). The eastbound median U-turn should have 100’ of storage, and may be located approximately 400’ from the Sir Walker Lane/Cranborne Lane intersection (measured from the end of the raised median). The South Entrance is recommended to be located immediately to the east side of the historic property, approximately in the current location. The North Entrance may also remain in the current location, approximately 600’ from either median U-turn openings. The North Entrance may be shifted to the east, if deemed necessary, to increase the weaving distance. The approximate median U-turn and site access locations are suggested based on relatively conservative traffic analyses and engineering judgement. The final locations may be adjusted for field conditions (e.g. grades, drainage structures, utilities), and to accommodate the Town and NCDOT’s preferences. Please feel free to let me know if you have any questions or comments regarding this memo. Accelerate Engineering, PLLC 6 APPENDIX A Figure 1: Site Plan Figure 2A: Original Traffic Counts Figure 2B: 2016 Existing Conditions Peak Hour Traffic Volumes Figure 3: 2021 Background Peak Hour Traffic Volumes Figure 4: 2021 Off-Site Development Trips Figure 5: 2021 No Build Conditions Peak Hour Traffic Volumes Figure 6: Peak Hour Site Trips Figure 7: Sir Walker Ln/Cranborne Ln U-Turn Trip Adjustments Figure 8: 2021 Build Conditions Peak Hour Traffic Volumes Figure 9: 2021 Build Proposed Lane Configuration NC 55 SIR W ER K AL LN U-TURN FOR PASSENGER CAR U-TURN FOR PASSENGER CAR GRAPHIC SCALE 160 0 80 160 320 Figure 1 Site Plan 1 inch = 160 ft. No. Revision Date By Designer Scale Drawn By Date Checked By Job No. AS NOTED ASHBOURNE HIGH HOUSE ROAD EXHIBIT WithersRavenel Engineers | Planners | Surveyors 115 MacKenan Drive | Cary, NC 27511 t: 919.469.3340 | license #: C-0832 | www.withersravenel.com Sheet No. N *** Not to Scale 91 (94) 1308 (703) (10) 12 247 (269) High House Rd (0) 2 (24) 36 (5) 4 (6) 1 (1108) 976 (27) 3 13 (0) 14 641 29 8 (57) (856) (90) (63) 0 (0) 34 (25) (4) 0 (1333) 1207 (86) 17 4 814 72 (71) (1) (1267) 628 36 (10) 14 (1016) 1062 (240) 110 Jenks Carpenter Rd 0 (3) (365) (384) (275) (6) Church Entrance 136 399 30 320 222 158 12 Widdington Ln (105) (451) (73) (503) 327 Cranborne Ln (1266) 509 NC 55 (76) 40 Sr Walker Ln 10/20/2015 3/31/2015 3/8/2016 12/9/2014 Carpenter Upchurch Rd 4/30/2015 88 (43) 168 (120) (1170) (176) (238) 174 (126) 144 (2) 2 (137) 239 (1163) 887 High House Rd Legend Turning Movement Existing Roadway Signalized Intersection Unsignalized Intersection Data Source: Town of Cary Traffic Counts and Herndon Property TAR. Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis 242 (72) 470 (1103) 4 (4) XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 2A Original Traffic Counts N 0 (3) (370) (390) (279) (6) 92 (95) 1328 (714) (10) 12 251 (273) High House Rd (0) 2 (24) 36 (5) 4 (6) 1 (1307) 1146 (27) 3 14 (57) 763 (1061) 29 (90) 8 (63) 13 (0) 0 (0) 34 (25) (4) 0 (1333) 1207 (86) 17 Carpenter Upchurch Rd 4 814 72 (71) (1) (1267) 713 37 (10) 14 (1147) 1132 (247) 133 Jenks Carpenter Rd 138 405 30 325 225 160 12 Widdington Ln (107) (458) (74) (511) 332 Cranborne Ln (1285) 517 NC 55 (77) 41 Church Entrance Sr Walker Ln *** Not to Scale 91 (44) 173 (155) (1214) (181) (238) 174 (126) 144 (2) 2 (137) 239 (1163) 1064 High House Rd XX Rebalanced Volumes Note: 1. October 2015 TMCs at the High House Rd /NC 55 intersection were grew by 1.5% to estimate the 2016 peak hour volumes. 2. Volume imbalance between this and the next intersection at Sir Walker Ln/Cranborne Ln is assumed to be attributable to the driveway volumes at the Walmart and Dollar Tree entrances just east of NC 55. Legend Turning Movement Existing Roadway Signalized Intersection Unsignalized Intersection Data Source: Town of Cary Traffic Counts and Herndon Property TAR. Annual Growth Rate is assumed to be 3%. Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis 242 (72) 574 (1155) 4 (4) XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 2B 2016 Existing Conditions Peak Hour Traffic Volumes Build year = 2021 Years out = 5 Growth rate = 3.0% Formula = (1+3.0%)^5 Multiplier = 1.159 N 0 (3) (429) (452) (323) (7) 107 (110) 1540 (828) (12) 14 291 (316) High House Rd (0) 2 (28) 42 (6) 5 (7) 1 (1515) 1329 (31) 3 16 (66) 885 (1231) 34 (104) 9 (73) 15 (0) 0 (0) 39 (29) (5) 0 (1545) 1399 (100) 20 Carpenter Upchurch Rd 5 944 83 (82) (1) (1469) 828 43 (12) 16 (1329) 1312 (286) 154 Jenks Carpenter Rd 160 470 35 377 261 185 14 Widdington Ln (124) (531) (86) (592) 385 Cranborne Ln (1490) 599 NC 55 (89) 48 Church Entrance Sr Walker Ln *** Not to Scale 105 (51) 201 (180) (1407) (210) (276) 202 (146) 167 (2) 2 (159) 277 (1348) 1234 High House Rd Legend Turning Movement Existing Roadway Signalized Intersection Unsignalized Intersection Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis 281 (83) 667 (1339) 5 (5) XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 3 2021 Background Peak Hour Traffic Volumes N 12 (14) 57 (31) High House Rd (14) Carpenter Upchurch Rd (24) 12 46 11 (24) (12) (2) 46 43 3 Jenks Carpenter Rd 36 46 (24) Widdington Ln 12 NC 55 (8) (14) (59) 73 Cranborne Ln (12) 61 Church Entrance Sr Walker Ln *** Not to Scale 1 (2) (2) 2 (22) (2) (10) 9 3 40 High House Rd Legend Turning Movement Existing Roadway Signalized Intersection Unsignalized Intersection Data Source: Herndon Property TAR by Ramey Kemp & Associates, Inc dated December 2015. Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 4 2021 Off-Site Development Trips (20) N 0 (3) (429) (476) (323) (7) 107 (110) 1597 (859) (12) 14 291 (316) High House Rd (0) 2 (28) 42 (6) 5 (7) 1 (1529) 1375 (31) 3 16 (66) 897 (1255) 34 (104) 9 (73) 15 (0) 0 (0) 39 (29) (5) 0 (1559) 1445 (100) 20 Carpenter Upchurch Rd 5 956 83 (82) (1) (1493) 839 43 (12) 16 (1341) 1355 (288) 157 Jenks Carpenter Rd 196 516 35 377 273 185 14 Widdington Ln (132) (545) (86) (592) 385 Cranborne Ln (1549) 672 NC 55 (101) 109 Church Entrance Sr Walker Ln *** Not to Scale 106 (53) 201 (180) (1429) (210) (278) 204 (146) 167 (2) 2 (161) 280 (1358) 1274 High House Rd Legend Turning Movement Existing Roadway Signalized Intersection Unsignalized Intersection Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis 281 (83) 676 (1359) 5 (5) XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 5 2021 No Build Conditions Peak Hour Traffic Volumes Ashbourne Subdivision Trip Generation Site Trip Distribution Assumptions based on Dec 2014 AM and PM Peak Traffic Counts at High House Rd and Sir Walker Ln/Canborne Ln Enter: 84% from the East, 16% from the West Exit: 77% to the East, 23% to the West ITE Average Daily Trips AM Peak Hour PM Peak Hour LAND USE SIZE COD Enter Exit Total Enter Exit Total Enter Exit Total 210 Single Family 64 DU 305 305 609 12 36 48 40 24 64 210 Single Family 25 DU 119 119 238 5 14 19 16 9 25 Total (90 Lots) 424 424 847 17 50 67 56 33 89 Source: ITE Trip Generation 9th Edition, ITE Trip Generation Handbook 2nd Edition, and NCDOT Capacity Analysis Guidelines. N *** Not to Scale 30 5 High House Rd 14 (9) (8) (25) 5 39 14 (47) 14 (25) (25) Carpenter Upchurch Rd Church Entrance Sr Walker Ln EB U - Turn (40) (15) 39 (47) 12 (20) (5) 39 35 4 Jenks Carpenter Rd (24) (16) 12 7 (47) Widdington Ln 1 (2) 3 (8) (31) 14 Cranborne Ln (9) 1 11 32 (24) 36 North Entrance (3) (3) (2) NC 55 (3) 4 4 3 South Entrance (4) 1 WB U - Turn 64 Lots 2 (6) (3) 2 (41) (2) (18) 5 30 High House Rd 25 Lots Legend Turning Movement Existing Roadway Proposed Roadway Signalized Intersection Unsignalized Intersection Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis 10 XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 6 Peak Hour Site Trips (38) N (6) -(6) 5 -5 -5 -(6) -(6) -9 -5 Carpenter Upchurch Rd Church Entrance Sr Walker Ln EB U - Turn WB U - Turn North Entrance *** Not to Scale -9 9 -(63) -(63) -(63) (63) -9 Jenks Carpenter Rd Widdington Ln Cranborne Ln NC 55 South Entrance High House Rd High House Rd Legend Turning Movement Existing Roadway Proposed Roadway Signalized Intersection Unsignalized Intersection Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 7 Sir Walker Ln/Cranborne Ln U-TurnTrip Adjustments N *** Not to Scale High House Rd 14 (9) (14) 10 (1592) 1418 (0) 0 (7) 1 (1554) 1414 (31) 3 16 (66) 911 (1302) 34 (104) 0 (10) 15 (0) 0 (0) 39 (29) (5) 0 (1584) 1484 (37) 11 Carpenter Upchurch Rd Sr Walker Ln 940 (1314) (28) 42 5 961 9 83 (82) (1) (1477) (63) 851 43 (12) 16 (1361) 1390 (293) 161 Jenks Carpenter Rd 292 (318) (1597) 1414 (16) 5 (40) (1288) (0) 2 Church Entrance 1597 (859) 1387 12 938 (12) 14 Widdington Ln 107 (110) (1582) 942 (1281) 32 (31) (24) 36 Cranborne Ln 0 (3) (432) (479) (325) (7) EB U - Turn 196 517 35 381 277 188 14 North Entrance (132) (548) (86) (596) 386 South Entrance (1549) 672 NC 55 (101) 109 WB U - Turn 64 Lots 108 (59) 201 (180) (1470) (210) (281) 206 (146) 167 (2) 2 (163) 285 (1376) 1304 High House Rd 25 Lots Legend Turning Movement Existing Roadway Proposed Roadway Signalized Intersection Unsignalized Intersection Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis 281 (83) 686 (1397) 5 (5) XX AM Peak Hour Traffic Volume (XX) PM Peak Hour Traffic Volume Figure 8 2021 Build Conditions Peak Hour Traffic Volumes 275 ft storage *** Not to Scale 300 ft storage Convert Thru to LT lane 350 ft storage 325 ft storage 450 ft storage 125 ft storage 150 ft storage Carpenter Upchurch Rd 160 ft storage South Entrance 450 ft storage 325 ft storage NC 55 High House Rd 100 ft storage Cranborne Ln 100 ft storage 325 ft storage 100 ft storage Jenks Carpenter Rd 350 ft storage 400 ft +/- Widdington Ln 300 ft storage 600 ft +/- Church Entrance 600 ft +/- WB U - Turn 275 ft storage 400 ft storage 700 ft +/- Sr Walker Ln 64 Lots EB U - Turn 325 ft storage NC 55 High House Rd North Entrance 400 ft storage N Alternative Intersection Configuration for 2021 High House Rd 25 Lots Legend Existing Roadway Proposed Roadway Signalized Intersection Unsignalized Intersection Existing Lane Committed Improvemets (H7 High School) Developer Improvements Prop. Improvements By ToC/NCDOT Accelerate Engineering, PLLC 140 Preston Executive Dr, Suite 100 D Cary, NC 27513 Tel: (919) 263-5678 Fax: (919) 263-5687 www.AccelerateEng.com Ashbourne Subdivision High House Rd Access Traffic Analysis Figure 9 2021 Build Proposed Lane Configuration APPENDIX B1 2016 Existing AM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2016 Existing AM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT 138 138 1900 325 1 100 1.00 405 405 1900 30 30 1900 0 0 12 12 1900 225 225 1900 325 325 1900 0 1 251 251 1900 450 1 1.00 1.00 1.00 0.850 0.95 1.00 0.850 332 332 1900 338 2 200 0.97 517 517 1900 0.95 92 92 1900 325 1 100 1.00 1328 1328 1900 0.95 0.990 160 160 1900 350 1 100 1.00 3504 0 0 1863 1583 3539 1583 3504 0 No 0 1863 1583 No 3539 1583 No 0.950 1770 0.270 503 0.90 153 153 pm+pt 7 4 7 45 1121 17.0 0.90 450 483 NA 4 4 0.950 1770 0.146 272 0.90 33 0.90 13 0.90 178 0 0 pm+pt 3! 8! 3 191 pm+pt 3 8 3 45 1418 21.5 0.90 250 0.950 1770 0.950 1770 0.90 361 0.90 102 250 361 NA pm+ov 8 1 8 8 1 102 Prot 5 5 50 1312 17.9 0.90 1476 0.950 3433 0.950 3433 0.95 0.989 3500 3500 0.90 279 0.90 369 50 1897 25.9 0.90 574 1476 279 NA pm+ov 2 3! 2 2 3 369 Prot 1 620 NA 6 1 6 7.0 7.0 13.9 14.3 20.0 25.0 12.5% 15.6% 13.1 17.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 40.4 25.1 0.25 0.16 0.62 0.88 57.2 82.5 0.0 0.0 57.2 82.5 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 14.0 13.9 13.9 14.3 13.5 13.2 20.6 13.9 13.5 20.8 20.0 20.0 25.0 25.0 35.0 90.0 20.0 25.0 80.0 12.5% 12.5% 15.6% 15.6% 21.9% 56.3% 12.5% 15.6% 50.0% 13.1 13.1 17.7 18.5 28.8 83.4 13.1 18.5 73.2 3.1 3.1 5.0 3.0 3.0 5.1 3.1 3.0 5.3 3.8 3.8 2.3 3.5 3.2 1.5 3.8 3.5 1.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 -1.8 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lead Lag Lead Lead Lag Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 3.4 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 45.0 None None None None None C-Min None None C-Min 45.6 27.8 52.3 14.8 77.4 100.3 19.6 82.1 0.28 0.17 0.33 0.09 0.48 0.63 0.12 0.51 0.78 0.77 0.70 0.63 0.86 0.28 0.88 0.35 68.1 79.4 57.0 85.8 42.3 13.8 90.9 23.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 68.1 79.4 57.0 85.8 42.3 13.8 90.9 23.4 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2016 Existing AM 3/17/2016 SBR 41 41 1900 0 0 0.95 0 0 No 0.90 46 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL E 126 204 325 256 0 0 0 0.60 EBT F 76.4 E ~301 #422 1041 549 0 0 0 0.88 EBR WBU WBL E 161 #327 350 245 0 0 0 0.78 2016 Existing AM 3/17/2016 WBT E 66.6 E 262 #476 1338 WBR E NBL F 344 #510 105 167 522 0 0 0 0.69 325 331 0 0 0 0.31 323 0 0 0 0.77 NBT D 40.4 D 692 736 1232 1880 0 0 0 0.79 NBR B SBL F 115 163 198 #281 450 992 0 0 0 0.28 338 429 0 0 0 0.86 SBT C 48.6 D 191 235 1817 1796 0 0 0 0.35 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 52.6 Intersection LOS: D Intersection Capacity Utilization 84.5% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio 2016 Existing AM 3/17/2016 SBR Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2016 Existing AM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 239 239 1900 4 4 1900 574 574 1900 0% 242 242 1900 0.95 0.91 1.00 0.850 144 144 1900 2% 240 1 100 1.00 174 174 1900 0 1 100 1.00 1064 1064 1900 -2% 1583 0 0 0.950 1787 0.368 692 0.90 2 0.90 266 0 pm+pt 5! 2! 5 268 pm+pt 5 2 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.933 4745 0.90 4 45 1311 19.9 0.90 638 45 334 5.1 0.90 1182 1182 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 269 642 269 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 160 0 1 1.00 0.850 1567 1567 No 0.90 193 160 193 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 40.0 40.0 100.0 60.0 60.0 30.0 30.0 40.0 30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8% 33.6 33.6 93.4 53.4 53.4 23.8 23.8 33.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 6.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 15.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 102.6 102.6 86.5 109.9 17.4 34.1 0.79 0.79 0.67 0.85 0.13 0.26 0.42 0.42 0.20 0.20 0.68 0.47 5.9 5.2 9.3 2.4 67.9 43.0 0.0 0.0 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 5.9 A 47 89 840 0 0 0 0.32 EBT 5.2 A 5.3 A 138 214 254 2821 0 0 0 0.42 WBU WBT 9.3 A 7.3 A 70 111 1231 3156 0 0 0 0.20 2016 Existing AM 3/17/2016 WBR 2.4 A 31 60 300 1430 0 0 0 0.19 SBL 67.9 E 54.3 D 130 196 1230 240 336 0 0 0 0.48 SBR 43.0 D 138 191 699 0 0 0 0.28 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 63.4% ICU Level of Service B Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2016 Existing AM 3/17/2016 3.7 Movement EBU EBL EBT EBR WBU WBL WBT WBR Traffic Vol, veh/h 4 1 1146 3 8 29 763 14 Future Vol, veh/h 4 1 1146 3 8 29 763 14 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Free RT Channelized - None - None Storage Length - 100 - 150 Veh in Median Storage, # 0 0 Grade, % 0 -5 Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 Mvmt Flow 4 1 1273 3 9 32 848 16 Major/Minor Major1 Conflicting Flow All 644 Stage 1 Stage 2 Critical Hdwy 6.44 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 Pot Cap-1 Maneuver 561 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 583 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 863 4.14 2.22 775 583 - 0 - Major2 0 970 1277 - 6.44 4.14 - 2.52 2.22 - 347 540 - 470 470 - EB 0 WB 0.6 NBLn1 NBLn2 EBL 48 419 583 0.301 0.09 0.01 109.5 14.4 11.2 F B B 1 0.3 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EBT - 0 - 0 - NBL NBT NBR 13 0 34 13 0 34 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 14 0 38 Minor1 1793 2232 1286 1286 507 946 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 51 42 174 233 516 338 48 48 174 501 42 42 233 338 NB 40.7 E SBL SBT SBR 36 2 12 36 2 12 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 40 2 13 638 6.94 3.32 419 - Minor2 1586 938 648 7.54 6.54 6.54 3.52 73 284 425 419 - 66 66 284 387 2226 432 938 1288 6.54 6.94 5.54 5.54 4.02 3.32 43 572 341 233 43 43 341 233 572 - SB 105.3 F EBR WBL WBT WBR SBLn1 SBLn2 - 470 64 572 - 0.087 - 0.66 0.023 - 13.4 - 134.9 11.4 B F B - 0.3 2.8 0.1 Synchro 9 Report Page 1 HCM 2010 TWSC 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0.6 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 909 4.14 2.22 745 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2016 Existing AM 745 - NBLn1 393 0.204 16.5 C 0.8 EBT EBR 1207 17 1207 17 0 0 Free Free - None 0 0 90 90 2 2 1341 19 0 - 0 - WBL WBT WBR 0 814 4 0 814 4 0 0 0 Free Free Free - None 0 -5 90 90 90 2 2 2 0 904 4 Major2 1360 4.14 2.22 501 501 - 0 - 0 - WB 0 EBL 745 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 72 0 0 72 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 80 Minor1 1803 2260 1351 1351 452 909 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 50 40 158 217 557 352 50 50 158 557 NB 16.5 C 40 40 217 352 SBL SBT SBR 0 0 0 0 0 0 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 0 680 6.94 3.32 393 - Minor2 1578 907 671 7.54 6.54 6.54 3.52 74 297 412 393 - 59 59 297 328 2267 454 907 1360 6.54 6.94 5.54 5.54 4.02 3.32 40 553 353 215 40 40 353 215 553 - SB 0 A EBT EBR WBL WBT WBR SBLn1 - 501 0 0 A A 0 - Synchro 9 Report Page 2 HCM 2010 TWSC 8: Jenks Carpenter Rd & High House Road Intersection Int Delay, s/veh 3/17/2016 16.1 Movement EBU Traffic Vol, veh/h 14 Future Vol, veh/h 14 Conflicting Peds, #/hr 0 Sign Control Free RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor 90 Heavy Vehicles, % 2 Mvmt Flow 16 Major/Minor Major1 Conflicting Flow All 578 Stage 1 Stage 2 Critical Hdwy 6.44 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 Pot Cap-1 Maneuver 618 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 618 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS 2016 Existing AM EBT EBR 1132 133 1132 133 0 0 Free Free - None 0 0 90 90 2 2 1258 148 0 - 0 - EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity WBL WBT 37 713 37 713 0 0 Free Free - None 0 0 0 90 90 2 2 41 792 Major2 1406 5.34 3.12 248 248 - 0 - WB 1.1 NWLn1NWLn2 73 326 1.385 0.59 $ 336.5 30.7 F D 8.2 3.6 NWR 173 173 0 Stop None 0 90 2 192 Minor1 1841 1363 478 6.29 6.64 5.84 3.67 ~ 87 147 571 703 7.14 3.92 326 - ~ 73 ~ 73 147 477 326 - NW 136.1 F EBT EBR WBL WBT - 248 - 0.166 - 22.4 C 0.6 - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NWL 91 91 0 Stop 160 0 0 90 2 101 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 3 SimTraffic Simulation Summary 2016 Existing AM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6:45 8:00 75 60 2 1 4760 4756 168 172 3976 177.3 74.2 4053 146.6 10 6:45 8:00 75 60 2 1 4833 4857 213 189 4075 181.6 76.3 4124 150.0 2 6:45 8:00 75 60 2 1 5014 4982 172 204 4169 197.4 89.6 4477 156.9 3 6:45 8:00 75 60 2 1 4849 4829 167 187 3999 179.3 75.7 4113 148.0 7 6:45 8:00 75 60 2 1 4936 4963 205 178 4124 191.5 84.4 4327 154.4 8 6:45 8:00 75 60 2 1 4963 4940 172 195 4139 189.0 81.8 4308 153.5 9 6:45 8:00 75 60 2 1 4869 4838 178 209 4047 183.5 78.7 4168 149.4 Avg 6:45 8:00 75 60 2 1 4875 4871 179 183 4059 184.9 79.8 4206 150.4 4 6:45 8:00 75 60 2 1 4871 4869 195 197 4071 186.1 80.9 4296 150.5 5 6:45 8:00 75 60 2 1 4733 4711 150 172 3876 174.7 73.8 4025 141.8 6 6:45 8:00 75 60 2 1 4920 4954 198 164 4112 189.0 82.2 4205 153.0 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:45 End Time 7:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2016 Existing AM 3/17/2016 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 4760 4756 168 172 3976 177.3 74.2 4053 146.6 10 4833 4857 213 189 4075 181.6 76.3 4124 150.0 2 5014 4982 172 204 4169 197.4 89.6 4477 156.9 3 4849 4829 167 187 3999 179.3 75.7 4113 148.0 8 4963 4940 172 195 4139 189.0 81.8 4308 153.5 9 4869 4838 178 209 4047 183.5 78.7 4168 149.4 Avg 4875 4871 179 183 4059 184.9 79.8 4206 150.4 4 4871 4869 195 197 4071 186.1 80.9 4296 150.5 5 4733 4711 150 172 3876 174.7 73.8 4025 141.8 6 4920 4954 198 164 4112 189.0 82.2 4205 153.0 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 4936 4963 205 178 4124 191.5 84.4 4327 154.4 SimTraffic Report Page 2 SimTraffic Performance Report 2016 Existing AM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 1.0 71.5 WB 0.0 51.6 NB 0.8 47.2 SB 1.1 42.9 All 0.8 50.6 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.1 1.5 WB 0.0 1.1 NB 1.6 17.5 SB 1.1 23.7 All 0.1 2.2 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.6 WB 0.0 0.6 NB 0.1 13.8 All 0.0 1.7 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.3 WB 0.0 2.4 NW 1.6 55.1 All 0.2 8.5 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 5.7 WB 1.1 8.5 SB 2.0 50.1 All 0.6 12.5 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 1.1 55.8 SimTraffic Report Page 3 Queuing and Blocking Report 2016 Existing AM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 218 95 183 325 EB T 351 206 314 1050 EB TR 334 186 295 1050 WB UL 295 143 243 350 0 0 1 1 WB T 342 187 307 1329 WB R 423 224 379 1329 NB L 424 135 363 325 0 0 1 1 NB T 770 436 648 1246 NB T 731 397 618 1246 23 21 5 14 NB R 509 106 328 SB L 257 142 233 SB L 284 163 248 450 338 0 0 338 0 0 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB T 234 119 210 1840 SB TR 233 116 207 1840 0 0 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 17 1 8 EB TR 6 0 4 929 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC WB UL 58 15 42 150 NB LT 47 12 39 1316 NB R 61 25 54 100 SB LT 72 29 61 562 6 1 SB R 32 10 33 50 0 0 SimTraffic Report Page 4 Queuing and Blocking Report 2016 Existing AM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB TR 2 0 2 775 NB R 88 36 68 1245 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 58 9 38 418 EB T 15 1 9 418 EB TR 38 4 21 418 WB L 80 21 56 243 NW L 217 97 208 160 12 22 NW R 277 90 224 933 1 1 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 175 74 137 243 EB T 175 66 145 243 EB T 190 75 152 243 0 0 WB UT 57 12 41 300 WB T 186 93 166 1276 WB T 158 55 133 1276 WB R 124 43 96 SB L 224 115 202 300 240 0 1 SB R 235 104 196 1236 0 1 Network Summary Network wide Queuing Penalty: 61 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 5 APPENDIX B2 2016 Existing PM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2016 Existing PM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR SBL 107 107 1900 325 1 100 1.00 458 458 1900 74 74 1900 0 0 6 6 1900 390 390 1900 370 370 1900 0 1 3 3 1900 273 273 1900 450 1 0.95 1.00 1.00 1.00 0.850 0.95 95 95 1900 325 1 100 1.00 714 714 1900 0.95 0.979 279 279 1900 350 1 100 1.00 0.95 1.00 0.850 511 511 1900 338 2 200 0.97 3465 0 0 1863 1583 0 3539 1583 3465 0 No 0 1863 1583 No 0 3539 1583 No 0.950 1770 0.148 276 0.90 119 119 pm+pt 7 4 7 45 1121 17.0 0.90 509 591 NA 4 4 0.950 1770 0.125 233 0.90 82 0.90 7 0.90 310 0 0 pm+pt 3! 8! 3 317 pm+pt 3 8 3 45 1418 21.5 0.90 433 0.950 1770 0.950 1770 0.90 411 0.90 3 0.90 106 433 411 NA pm+ov 8 1 8 8 1 0 Prot 5 109 Prot 5 5 5 50 1312 17.9 0.90 793 0.950 3433 0.950 3433 0.90 303 0.90 568 793 303 NA pm+ov 2 3! 2 2 3 568 Prot 1 1 7.0 7.0 13.9 14.3 18.0 31.0 11.3% 19.4% 11.1 23.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 39.4 27.4 0.25 0.17 0.66 1.00 56.5 101.0 0.0 0.0 56.5 101.0 7.0 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 13.9 13.9 14.3 13.5 13.2 13.2 20.6 13.9 13.5 30.0 30.0 43.0 40.0 17.0 17.0 59.0 30.0 40.0 18.8% 18.8% 26.9% 25.0% 10.6% 10.6% 36.9% 18.8% 25.0% 23.1 23.1 35.7 33.5 10.8 10.8 52.4 23.1 33.5 3.1 3.1 5.0 3.0 3.0 3.0 5.1 3.1 3.0 3.8 3.8 2.3 3.5 3.2 3.2 1.5 3.8 3.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lag Lag Lag Lead Lead Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 None None None None None None C-Min None None 58.0 40.9 77.7 12.3 55.2 85.8 31.8 0.36 0.26 0.49 0.08 0.34 0.54 0.20 0.96 0.91 0.54 0.80 0.65 0.36 0.83 83.0 81.8 38.7 109.5 47.3 23.0 72.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 83.0 81.8 38.7 109.5 47.3 23.0 72.8 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay SBT SBR 1285 1285 1900 77 77 1900 0 0 0.95 0.991 0.95 3507 0 3507 0 No 50 1897 25.9 0.90 1428 1514 NA 6 2016 Existing PM 3/17/2016 0.90 86 0 6 14.0 20.8 82.0 51.3% 75.2 5.3 1.5 -1.8 5.0 Lead Yes 6.0 3.4 20.0 45.0 C-Min 74.7 0.47 0.93 50.4 0.0 50.4 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL E 87 145 325 190 0 0 0 0.63 EBT F 93.5 F ~353 #481 1041 593 0 0 0 1.00 EBR WBU WBL F 288 #495 350 330 0 0 0 0.96 2016 Existing PM 3/17/2016 WBT F 66.9 E 460 #686 1338 WBR D NBU NBL F 331 461 114 #227 476 0 0 0 0.91 800 0 0 0 0.51 325 138 0 0 0 0.79 NBT D 46.8 D 366 448 1232 1222 0 0 0 0.65 NBR C SBL E 177 256 294 360 450 849 0 0 0 0.36 338 750 0 0 0 0.76 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 142 (89%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.00 Intersection Signal Delay: 61.7 Intersection LOS: E Intersection Capacity Utilization 91.3% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT D 56.5 E 752 863 1817 2016 Existing PM 3/17/2016 SBR 1687 0 0 0 0.90 Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2016 Existing PM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 137 137 1900 4 4 1900 1155 1155 1900 0% 72 72 1900 0.95 0.91 1.00 0.850 126 126 1900 2% 240 1 100 1.00 238 238 1900 0 1 100 1.00 1163 1163 1900 -2% 1583 0 0 0.950 1787 0.177 333 0.90 2 0.90 152 0 pm+pt 5! 2! 5 154 pm+pt 5 2 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.936 4760 0.90 4 45 1311 19.9 0.90 1283 45 334 5.1 0.90 1292 1292 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 80 1287 80 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 140 0 1 1.00 0.850 1567 1567 No 0.90 264 140 264 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 25.0 25.0 120.0 95.0 95.0 40.0 40.0 25.0 15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6% 18.6 18.6 113.4 88.4 88.4 33.8 33.8 18.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 6.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 15.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 131.6 131.6 115.9 140.3 18.4 34.7 0.82 0.82 0.72 0.88 0.12 0.22 0.42 0.44 0.37 0.06 0.70 0.78 6.8 3.3 9.1 1.4 85.4 74.6 0.0 0.0 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 6.8 A 23 m28 455 0 0 0 0.34 EBT 3.3 A 3.7 A 116 m117 254 2940 0 0 0 0.44 WBU WBT 9.1 A 8.6 A 173 229 1231 3448 0 0 0 0.37 2016 Existing PM 3/17/2016 WBR 1.4 A 8 14 300 1543 0 0 0 0.05 SBL 85.4 F 78.3 E 143 213 1230 240 383 0 0 0 0.37 SBR 74.6 E 262 355 430 0 0 0 0.61 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 55 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 15.2 Intersection LOS: B Intersection Capacity Utilization 81.3% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2016 Existing PM 3/17/2016 7.4 Movement EBU EBL EBT EBR WBU WBL WBT WBR Traffic Vol, veh/h 5 6 1307 27 63 90 1061 57 Future Vol, veh/h 5 6 1307 27 63 90 1061 57 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Free RT Channelized - None - None Storage Length - 100 - 150 Veh in Median Storage, # 0 0 Grade, % 0 -5 Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 Mvmt Flow 6 7 1452 30 70 100 1179 63 Major/Minor Major1 Conflicting Flow All 918 1242 Stage 1 Stage 2 Critical Hdwy 6.44 4.14 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 2.22 Pot Cap-1 Maneuver 375 556 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 450 450 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS 0 - Major2 0 1110 1482 - 6.44 4.14 - 2.52 2.22 - 282 450 - 347 347 - EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 0 - 0 - WB 3 NBLn1 NBLn2 EBL - 359 450 - 0.077 0.027 0 15.9 13.2 A C B - 0.2 0.1 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 25 0 0 25 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 0 0 28 Minor1 2421 3074 1492 1492 929 1582 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 17 12 129 185 288 167 17 17 129 281 12 12 185 167 NB 15.9 C SBL SBT SBR 24 0 10 24 0 10 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 27 0 11 741 6.94 3.32 359 - Minor2 2302 1551 751 7.54 6.54 6.54 3.52 ~ 21 119 369 359 - ~ 19 ~ 19 119 340 3058 621 1551 1507 6.54 6.94 5.54 5.54 4.02 3.32 12 430 173 182 12 12 173 182 430 - SB $ 457.8 F EBR WBL WBT WBR SBLn1 SBLn2 - 347 19 430 - 0.49 - 1.404 0.026 - 24.9 -$ 642.9 13.6 C F B - 2.6 3.7 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0.5 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1409 4.14 2.22 480 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2016 Existing PM 480 - NBLn1 334 0.236 19.1 C 0.9 EBT EBR 1333 86 1333 86 0 0 Free Free - None 0 0 90 90 2 2 1481 96 0 - 0 - WBL 0 0 0 Free 90 2 0 Major2 1577 4.14 2.22 414 414 - WBT WBR 1267 1 1267 1 0 0 Free Free - None 0 -5 90 90 2 2 1408 1 0 - 0 - WB 0 EBL 480 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 71 0 0 71 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 79 Minor1 2233 2938 1529 1529 704 1409 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 23 15 123 178 394 203 23 23 123 389 NB 19.1 C 15 15 178 203 SBL SBT SBR 0 0 4 0 0 4 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 4 788 6.94 3.32 334 - Minor2 2149 1408 741 7.54 6.54 6.54 3.52 27 146 374 334 - 21 21 146 286 2985 704 1408 1577 6.54 6.94 5.54 5.54 4.02 3.32 14 379 204 168 14 14 204 168 379 - SB 14.6 B EBT EBR WBL WBT WBR SBLn1 - 414 - 379 - 0.012 0 - 14.6 A B 0 0 Synchro 9 Report Page 2 HCM 2010 TWSC 8: Jenks Carpenter Rd & High House Road Intersection Int Delay, s/veh 3/17/2016 212.9 Movement EBU Traffic Vol, veh/h 10 Future Vol, veh/h 10 Conflicting Peds, #/hr 0 Sign Control Free RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor 90 Heavy Vehicles, % 2 Mvmt Flow 11 Major/Minor Major1 Conflicting Flow All 985 Stage 1 Stage 2 Critical Hdwy 6.44 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 Pot Cap-1 Maneuver 339 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 339 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS 2016 Existing PM EBT EBR 1147 247 1147 247 0 0 Free Free - None 0 0 90 90 2 2 1274 274 0 - 0 - EB 0.1 Major2 1549 5.34 3.12 211 211 - WBT 1214 1214 0 Free None 0 0 90 2 1349 0 - WB 12.7 Minor Lane/Major Mvmt NWLn1NWLn2 Capacity (veh/h) 2 293 HCM Lane V/C Ratio 24.444 0.588 HCM Control Delay (s) $ 13981.1 33.4 HCM Lane LOS F D HCM 95th %tile Q(veh) 8.1 3.5 Notes ~: Volume exceeds capacity WBL 181 181 0 Free 0 90 2 201 NWR 155 155 0 Stop None 0 90 2 172 Minor1 2511 1434 1077 6.29 6.64 5.84 3.67 ~ 34 133 282 774 7.14 3.92 293 - ~2 ~2 133 ~ 13 293 - NW $ 3117.3 F EBT EBR WBL WBT - 211 - 0.953 - 97.7 F 8.1 - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NWL 44 44 0 Stop 160 0 0 90 2 49 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 3 SimTraffic Simulation Summary 2016 Existing PM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 4:45 6:00 75 60 2 1 5533 5513 231 251 4875 281.4 159.3 5597 199.1 10 4:45 6:00 75 60 2 1 5765 5719 239 285 4985 270.8 145.7 6118 200.9 2 4:45 6:00 75 60 2 1 5538 5517 281 302 4841 280.3 159.0 5818 198.6 3 4:45 6:00 75 60 2 1 5582 5537 225 270 4837 266.5 145.2 5472 193.9 7 4:45 6:00 75 60 2 1 5597 5565 216 248 4872 260.0 137.5 5597 194.9 8 4:45 6:00 75 60 2 1 5578 5530 244 292 4846 318.1 197.0 5529 205.6 9 4:45 6:00 75 60 2 1 5441 5450 235 226 4740 264.5 145.8 5061 190.2 Avg 4:45 6:00 75 60 2 1 5569 5530 231 260 4847 268.9 147.3 5567 195.2 4 4:45 6:00 75 60 2 1 5506 5488 239 257 4799 252.8 132.3 5382 190.4 5 4:45 6:00 75 60 2 1 5597 5526 212 283 4850 261.5 139.7 5823 192.9 6 4:45 6:00 75 60 2 1 5531 5469 184 246 4828 233.1 111.6 5297 185.9 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 4:45 End Time 5:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2016 Existing PM 3/17/2016 Interval #1 Information Recording Start Time 5:00 End Time 6:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 5533 5513 231 251 4875 281.4 159.3 5597 199.1 10 5765 5719 239 285 4985 270.8 145.7 6118 200.9 2 5538 5517 281 302 4841 280.3 159.0 5818 198.6 3 5582 5537 225 270 4837 266.5 145.2 5472 193.9 8 5578 5530 244 292 4846 318.1 197.0 5529 205.6 9 5441 5450 235 226 4740 264.5 145.8 5061 190.2 Avg 5569 5530 231 260 4847 268.9 147.3 5567 195.2 4 5506 5488 239 257 4799 252.8 132.3 5382 190.4 5 5597 5526 212 283 4850 261.5 139.7 5823 192.9 6 5531 5469 184 246 4828 233.1 111.6 5297 185.9 Interval #1 Information Recording Start Time 5:00 End Time 6:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 5597 5565 216 248 4872 260.0 137.5 5597 194.9 SimTraffic Report Page 2 SimTraffic Performance Report 2016 Existing PM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.7 102.3 WB 0.0 50.3 NB 1.2 46.0 SB 1.1 73.7 All 0.8 65.9 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.6 WB 0.0 4.7 NB 2.1 26.3 SB 1.5 59.9 All 0.1 4.6 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 3.0 WB 0.0 1.0 NB 0.2 15.5 SB 0.1 9.3 All 0.0 2.4 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.9 WB 0.0 9.4 NW 138.7 431.7 All 9.3 31.2 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 4.8 WB 0.7 13.8 SB 1.6 63.2 All 0.5 16.5 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 5.9 85.9 SimTraffic Report Page 3 Queuing and Blocking Report 2016 Existing PM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 286 90 258 325 0 0 EB T 522 312 578 1050 0 0 EB TR 498 293 546 1050 0 0 15 16 WB UL 445 244 425 350 1 5 WB T 666 323 589 1329 WB R 418 187 347 1329 NB UL 260 87 188 325 10 28 NB T 387 246 352 1246 NB T 360 211 322 1246 2 2 NB R 251 104 208 SB L 391 222 347 SB L 538 347 595 450 338 1 6 338 3 17 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB T 989 544 863 1840 SB TR 948 544 829 1840 30 154 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 30 5 21 EB T 6 0 3 936 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB TR 23 1 11 936 WB UL 179 73 141 150 1 6 WB T 109 5 53 763 0 0 WB TR 5 0 4 763 NB R 63 22 54 100 0 0 SB LT 84 24 63 558 13 1 SB R 27 8 27 50 0 0 SimTraffic Report Page 4 Queuing and Blocking Report 2016 Existing PM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB T 4 0 3 763 EB TR 19 1 10 763 WB T 2 0 2 418 NB R 92 38 69 1255 SB R 28 4 20 754 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 80 10 46 418 EB T 20 1 10 418 EB TR 58 16 44 418 WB L 247 128 245 243 5 23 WB T 58 2 38 243 0 1 NW L 258 193 309 160 68 105 NW R 866 444 1097 933 25 0 3 2 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 122 52 97 243 EB T 170 60 143 243 EB T 185 66 150 243 WB UT 233 62 166 300 0 1 WB T 330 162 302 1276 WB T 283 126 257 1276 1 3 0 0 WB R 70 12 43 SB L 312 125 241 300 240 1 2 SB R 420 189 338 1236 7 8 Network Summary Network wide Queuing Penalty: 378 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 5 APPENDIX B3 2021 No Build AM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 No Build AM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT 196 196 1900 325 1 100 1.00 516 516 1900 35 35 1900 0 0 14 14 1900 273 273 1900 377 377 1900 300 1 291 291 1900 450 1 0.95 0.95 1.00 0.850 0.95 1.00 0.850 385 385 1900 338 2 200 0.97 672 672 1900 0.95 107 107 1900 325 1 100 1.00 1597 1597 1900 0.95 0.990 185 185 1900 350 1 100 1.00 3504 0 0 3539 1583 3539 1583 3504 0 No 0 3539 1583 No 3539 1583 No 0.950 1770 0.318 592 0.90 218 218 pm+pt 7 4 7 45 1121 17.0 0.90 573 612 NA 4 4 0.950 1770 0.204 380 0.90 39 0.90 16 0.90 206 0 0 pm+pt 3! 8! 3 222 pm+pt 3 8 3 45 1418 21.5 0.90 303 0.950 1770 0.950 1770 0.90 419 0.90 119 303 419 NA pm+ov 8 1 8 8 1 119 Prot 5 5 50 1312 17.9 0.90 1774 0.950 3433 0.950 3433 0.95 0.979 3465 3465 0.90 323 0.90 428 50 1897 25.9 0.90 747 1774 323 NA pm+ov 2 3! 2 2 3 428 Prot 1 868 NA 6 1 6 7.0 7.0 13.9 14.3 20.0 25.0 12.5% 15.6% 13.1 17.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 35.7 20.0 0.22 0.12 0.88 1.40 86.3 240.3 0.0 0.0 86.3 240.3 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 14.0 13.9 13.9 14.3 13.5 13.2 20.6 13.9 13.5 20.8 20.0 20.0 25.0 25.0 35.0 90.0 20.0 25.0 80.0 12.5% 12.5% 15.6% 15.6% 21.9% 56.3% 12.5% 15.6% 50.0% 13.1 13.1 17.7 18.5 28.8 83.4 13.1 18.5 73.2 3.1 3.1 5.0 3.0 3.0 5.1 3.1 3.0 5.3 3.8 3.8 2.3 3.5 3.2 1.5 3.8 3.5 1.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 -1.8 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lead Lag Lead Lead Lag Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 3.4 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 45.0 None None None None None C-Min None None C-Min 35.7 20.0 45.0 16.3 84.3 105.0 20.0 88.0 0.22 0.12 0.28 0.10 0.53 0.66 0.12 0.55 1.01 0.69 0.94 0.66 0.95 0.31 1.00 0.46 114.5 75.7 86.1 85.8 48.1 12.9 111.4 23.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 114.5 75.7 86.1 85.8 48.1 12.9 111.4 23.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 No Build AM 3/17/2016 SBR 109 109 1900 0 0 0.95 0 0 No 0.90 121 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL F 197 #309 325 247 0 0 0 0.88 EBT F 199.8 F ~448 #577 1041 438 0 0 0 1.40 EBR WBU WBL F ~211 #374 350 220 0 0 0 1.01 2021 No Build AM 3/17/2016 WBT E 89.4 F 162 217 1338 WBR F 431 #647 442 0 0 0 0.69 300 445 0 0 0 0.94 NBL F NBT D 45.0 D 122 897 188 #1042 1232 325 331 1880 0 0 0 0 0 0 0.36 0.94 NBR B SBL F 138 193 234 #352 450 1038 0 0 0 0.31 338 429 0 0 0 1.00 SBT C 52.2 D 276 360 1817 1905 0 0 0 0.46 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.40 Intersection Signal Delay: 79.0 Intersection LOS: E Intersection Capacity Utilization 98.2% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio 2021 No Build AM 3/17/2016 SBR Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2021 No Build AM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 280 280 1900 5 5 1900 676 676 1900 0% 281 281 1900 0.95 0.91 1.00 0.850 167 167 1900 2% 240 1 100 1.00 204 204 1900 0 1 100 1.00 1274 1274 1900 -2% 1583 0 0 0.950 1787 0.319 600 0.90 2 0.90 311 0 pm+pt 5! 2! 5 313 pm+pt 5 2 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.927 4714 0.90 6 45 1311 19.9 0.90 751 45 334 5.1 0.90 1416 1416 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 312 757 312 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 186 0 1 1.00 0.850 1567 1567 No 0.90 227 186 227 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 40.0 40.0 100.0 60.0 60.0 30.0 30.0 40.0 30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8% 33.6 33.6 93.4 53.4 53.4 23.8 23.8 33.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 6.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 15.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 100.9 100.9 83.5 108.6 19.1 37.1 0.78 0.78 0.64 0.84 0.15 0.29 0.54 0.51 0.25 0.24 0.72 0.51 8.1 6.6 11.0 2.9 68.5 41.7 0.0 0.0 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 8.1 A 61 110 785 0 0 0 0.40 EBT 6.6 A 6.9 A 200 296 254 2774 0 0 0 0.51 WBU WBT 11.0 B 8.7 A 92 143 1231 3027 0 0 0 0.25 2021 No Build AM 3/17/2016 WBR 2.9 A 41 79 300 1394 0 0 0 0.22 SBL 68.5 E 53.8 D 151 223 1230 240 336 0 0 0 0.55 SBR 41.7 D 160 214 719 0 0 0 0.32 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 13.5 Intersection LOS: B Intersection Capacity Utilization 73.0% ICU Level of Service D Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2021 No Build AM 3/17/2016 10.1 Movement EBU EBL EBT EBR WBU WBL WBT WBR Traffic Vol, veh/h 5 1 1375 3 9 34 897 16 Future Vol, veh/h 5 1 1375 3 9 34 897 16 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Free RT Channelized - None - None Storage Length - 100 - 150 Veh in Median Storage, # 0 0 Grade, % 0 -5 Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 Mvmt Flow 6 1 1528 3 10 38 997 18 Major/Minor Major1 Conflicting Flow All 756 1014 Stage 1 Stage 2 Critical Hdwy 6.44 4.14 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 2.22 Pot Cap-1 Maneuver 476 680 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 489 489 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS 0 - Major2 0 1161 1531 - 6.44 4.14 - 2.52 2.22 - 262 431 - 365 365 - EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 0 - 0 - WB 0.7 NBLn1 NBLn2 EBL 25 345 489 0.667 0.126 0.014 295 16.9 12.5 F C B 2 0.4 0 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 15 0 39 15 0 39 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 17 0 43 Minor1 2138 2653 1543 1543 595 1110 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 28 23 120 175 458 283 25 25 120 441 23 23 175 283 NB 94.2 F SBL SBT SBR 42 2 14 42 2 14 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 47 2 16 766 6.94 3.32 345 - Minor2 1878 1101 777 7.54 6.54 6.54 3.52 ~ 44 226 356 345 - ~ 38 ~ 38 226 311 2645 507 1101 1544 6.54 6.94 5.54 5.54 4.02 3.32 23 511 286 175 23 23 286 175 511 - SB $ 326 F EBR WBL WBT WBR SBLn1 SBLn2 - 365 37 511 - 0.131 - 1.321 0.03 - 16.3 -$ 425.8 12.3 C F B - 0.4 5.1 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0.7 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1068 4.14 2.22 648 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 No Build AM 648 - NBLn1 321 0.287 20.7 C 1.2 EBT EBR 1445 20 1445 20 0 0 Free Free - None 0 0 90 90 2 2 1606 22 0 - 0 - WBL WBT WBR 0 956 5 0 956 5 0 0 0 Free Free Free - None 0 -5 90 90 90 2 2 2 0 1062 6 Major2 1628 4.14 2.22 395 395 - 0 - 0 - WB 0 EBL 648 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 83 0 0 83 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 92 Minor1 2148 2685 1617 1617 531 1068 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 27 22 108 161 500 296 27 27 108 500 NB 20.7 C 22 22 161 296 SBL SBT SBR 0 0 0 0 0 0 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 0 814 6.94 3.32 321 - Minor2 1868 1065 803 7.54 6.54 6.54 3.52 45 238 343 321 - 32 32 238 244 2693 534 1065 1628 6.54 6.94 5.54 5.54 4.02 3.32 21 491 297 159 21 21 297 159 491 - SB 0 A EBT EBR WBL WBT WBR SBLn1 - 395 0 0 A A 0 - Synchro 9 Report Page 2 HCM 2010 TWSC 8: Jenks Carpenter Rd & High House Road Intersection Int Delay, s/veh 3/17/2016 49.3 Movement EBU Traffic Vol, veh/h 16 Future Vol, veh/h 16 Conflicting Peds, #/hr 0 Sign Control Free RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor 90 Heavy Vehicles, % 2 Mvmt Flow 18 Major/Minor Major1 Conflicting Flow All 681 Stage 1 Stage 2 Critical Hdwy 6.44 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 Pot Cap-1 Maneuver 531 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 531 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS 2021 No Build AM EBT EBR 1355 157 1355 157 0 0 Free Free - None 0 0 90 90 2 2 1506 174 0 - 0 - EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity WBL WBT 43 839 43 839 0 0 Free Free - None 0 0 0 90 90 2 2 48 932 Major2 1680 5.34 3.12 181 181 - 0 - WB 1.6 NWLn1NWLn2 39 265 3.02 0.843 $ 1128 63.2 F F 13.2 6.9 NWR 201 201 0 Stop None 0 90 2 223 Minor1 2190 1628 562 6.29 6.64 5.84 3.67 ~ 53 ~ 100 518 840 7.14 3.92 265 - ~ 39 ~ 39 ~ 100 381 265 - NW $ 430.9 F EBT EBR WBL WBT - 181 - 0.264 - 31.9 D 1 - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NWL 106 106 0 Stop 160 0 0 90 2 118 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 3 SimTraffic Simulation Summary 2021 No Build AM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6:45 8:00 75 60 2 1 5829 5764 264 329 4786 332.2 208.5 5998 204.7 10 6:45 8:00 75 60 2 1 5949 5816 268 401 4823 322.5 197.9 6112 203.6 2 6:45 8:00 75 60 2 1 5892 5788 247 351 4814 314.0 189.3 5965 201.1 3 6:45 8:00 75 60 2 1 5858 5766 275 367 4774 378.1 254.4 6453 213.8 7 6:45 8:00 75 60 2 1 5858 5783 283 358 4818 417.6 293.0 6326 226.2 8 6:45 8:00 75 60 2 1 5896 5728 260 428 4768 426.7 303.1 6016 224.0 9 6:45 8:00 75 60 2 1 5895 5791 260 364 4825 298.6 173.4 6350 198.4 Avg 6:45 8:00 75 60 2 1 5853 5758 252 351 4783 334.8 210.9 6060 204.8 4 6:45 8:00 75 60 2 1 5728 5699 232 261 4757 251.5 128.5 5520 184.5 5 6:45 8:00 75 60 2 1 5813 5744 256 325 4715 332.2 209.5 5920 202.1 6 6:45 8:00 75 60 2 1 5831 5695 193 329 4749 274.8 151.8 5949 189.8 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:45 End Time 7:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2021 No Build AM 3/17/2016 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 5829 5764 264 329 4786 332.2 208.5 5998 204.7 10 5949 5816 268 401 4823 322.5 197.9 6112 203.6 2 5892 5788 247 351 4814 314.0 189.3 5965 201.1 3 5858 5766 275 367 4774 378.1 254.4 6453 213.8 8 5896 5728 260 428 4768 426.7 303.1 6016 224.0 9 5895 5791 260 364 4825 298.6 173.4 6350 198.4 Avg 5853 5758 252 351 4783 334.8 210.9 6060 204.8 4 5728 5699 232 261 4757 251.5 128.5 5520 184.5 5 5813 5744 256 325 4715 332.2 209.5 5920 202.1 6 5831 5695 193 329 4749 274.8 151.8 5949 189.8 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 5858 5783 283 358 4818 417.6 293.0 6326 226.2 SimTraffic Report Page 2 SimTraffic Performance Report 2021 No Build AM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 68.0 312.7 WB 0.0 68.8 NB 1.3 58.5 SB 1.0 77.8 All 11.4 103.7 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.1 1.8 WB 0.0 1.5 NB 1.5 24.6 SB 1.2 33.7 All 0.1 3.0 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.0 WB 0.0 0.7 NB 0.1 21.1 All 0.0 2.1 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.7 WB 0.0 3.1 NW 75.5 278.6 All 8.9 34.4 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 6.5 WB 1.2 10.7 SB 1.9 49.4 All 0.7 13.7 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 13.6 111.1 SimTraffic Report Page 3 Queuing and Blocking Report 2021 No Build AM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 425 338 567 325 6 15 EB T 1029 816 1319 1050 37 0 EB TR 1001 788 1298 1050 27 0 73 143 WB UL 352 187 322 350 2 3 WB T 474 143 319 1328 WB T 583 274 578 1328 0 0 4 14 WB R 400 311 442 NB L 425 210 480 300 23 31 325 0 0 NB T 1108 596 970 1246 1 0 NB T 1082 567 945 1246 1 0 33 36 16 47 NB R 550 226 584 SB L 400 282 473 450 338 18 59 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 453 317 537 338 26 87 SB T 515 266 589 1828 SB TR 476 233 501 1828 0 0 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 22 2 11 EB TR 2 0 1 929 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC WB UL 64 21 50 150 WB TR 6 0 5 775 NB LT 65 16 49 1316 0 0 NB R 73 30 61 100 0 0 SB LT 97 36 75 562 12 2 SB R 52 13 41 50 0 0 SimTraffic Report Page 4 Queuing and Blocking Report 2021 No Build AM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB TR 10 0 6 775 NB R 114 44 85 1245 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 91 14 54 418 EB T 35 1 15 418 EB TR 47 5 26 418 WB L 89 30 71 243 NW L 260 218 328 160 76 153 NW R 916 540 1120 933 28 0 11 11 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 186 86 155 243 0 0 EB T 219 79 171 243 0 0 EB T 210 89 181 243 0 0 WB UT 78 16 53 300 WB T 203 101 178 1276 WB T 184 87 165 1276 WB R 160 58 121 SB L 276 131 224 300 240 1 2 SB R 275 127 227 1236 1 1 Network Summary Network wide Queuing Penalty: 606 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 5 APPENDIX B4 2021 No Build PM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 No Build PM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR SBL 132 132 1900 325 1 100 1.00 545 545 1900 86 86 1900 0 0 7 7 1900 476 476 1900 429 429 1900 300 1 3 3 1900 316 316 1900 450 1 0.95 0.95 0.95 1.00 0.850 0.95 110 110 1900 325 1 100 1.00 859 859 1900 0.95 0.979 323 323 1900 350 1 100 1.00 0.95 1.00 0.850 592 592 1900 338 2 200 0.97 3465 0 0 3539 1583 0 3539 1583 3465 0 No 0 3539 1583 No 0 3539 1583 No 0.950 1770 0.369 687 0.90 147 147 pm+pt 7 4 7 45 1121 17.0 0.90 606 702 NA 4 4 0.950 1770 0.131 244 0.90 96 0.90 8 0.90 359 0 0 pm+pt 3! 8! 3 367 pm+pt 3 8 3 45 1418 21.5 0.90 529 0.950 1770 0.950 1770 0.90 477 0.90 3 0.90 122 529 477 NA pm+ov 8 1 8 8 1 0 Prot 5 125 Prot 5 5 5 50 1312 17.9 0.90 954 0.950 3433 0.950 3433 0.90 351 0.90 658 954 351 NA pm+ov 2 3! 2 2 3 658 Prot 1 1 7.0 7.0 13.9 14.3 18.0 31.0 11.3% 19.4% 11.1 23.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 38.6 26.0 0.24 0.16 0.59 1.25 48.9 177.9 0.0 0.0 48.9 177.9 7.0 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 13.9 13.9 14.3 13.5 13.2 13.2 20.6 13.9 13.5 30.0 30.0 43.0 40.0 17.0 17.0 59.0 30.0 40.0 18.8% 18.8% 26.9% 25.0% 10.6% 10.6% 36.9% 18.8% 25.0% 23.1 23.1 35.7 33.5 10.8 10.8 52.4 23.1 33.5 3.1 3.1 5.0 3.0 3.0 3.0 5.1 3.1 3.0 3.8 3.8 2.3 3.5 3.2 3.2 1.5 3.8 3.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lag Lag Lag Lead Lead Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 None None None None None None C-Min None None 56.0 38.4 77.4 12.0 55.0 85.0 34.0 0.35 0.24 0.48 0.08 0.34 0.53 0.21 1.14 0.62 0.62 0.95 0.78 0.42 0.90 133.0 53.1 36.4 136.8 52.9 24.8 77.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 133.0 53.1 36.4 136.8 52.9 24.8 77.9 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay SBT SBR 1549 1549 1900 101 101 1900 0 0 0.95 0.991 0.95 3507 0 3507 0 No 50 1897 25.9 0.90 1721 1833 NA 6 2021 No Build PM 3/17/2016 0.90 112 0 6 14.0 20.8 82.0 51.3% 75.2 5.3 1.5 -1.8 5.0 Lead Yes 6.0 3.4 20.0 45.0 C-Min 77.0 0.48 1.09 88.8 0.0 88.8 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL D 109 169 325 255 0 0 0 0.58 EBT F 155.6 F ~479 #612 1041 563 0 0 0 1.25 EBR WBU WBL F ~393 #591 350 323 0 0 0 1.14 2021 No Build PM 3/17/2016 WBT D 68.7 E 272 247 1338 WBR D 850 0 0 0 0.62 NBU NBL F 411 524 133 #270 300 775 0 0 0 0.62 325 132 0 0 0 0.95 NBT D 53.3 D 477 565 1232 1217 0 0 0 0.78 NBR C SBL E 219 303 346 #442 450 841 0 0 0 0.42 338 750 0 0 0 0.88 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 142 (89%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.25 Intersection Signal Delay: 84.1 Intersection LOS: F Intersection Capacity Utilization 105.0% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT F 85.9 F ~1128 #1261 1817 2021 No Build PM 3/17/2016 SBR 1687 0 0 0 1.09 Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2021 No Build PM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 161 161 1900 5 5 1900 1359 1359 1900 0% 83 83 1900 0.95 0.91 1.00 0.850 146 146 1900 2% 240 1 100 1.00 278 278 1900 0 1 100 1.00 1358 1358 1900 -2% 1583 0 0 0.950 1787 0.129 243 0.90 2 0.90 179 0 pm+pt 5! 2! 5 181 pm+pt 5 2 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.931 4734 0.90 6 45 1311 19.9 0.90 1510 45 334 5.1 0.90 1509 1509 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 92 1516 92 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 162 0 1 1.00 0.850 1567 1567 No 0.90 309 162 309 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 25.0 25.0 120.0 95.0 95.0 40.0 40.0 25.0 15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6% 18.6 18.6 113.4 88.4 88.4 33.8 33.8 18.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 6.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 15.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 129.6 129.6 110.8 137.2 20.4 39.8 0.81 0.81 0.69 0.86 0.13 0.25 0.55 0.52 0.46 0.07 0.73 0.79 16.9 3.3 12.6 2.1 84.9 70.6 0.0 0.0 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 16.9 B 39 m21 391 0 0 0 0.46 EBT 3.3 A 4.8 A 120 m147 254 2895 0 0 0 0.52 WBU WBT 12.6 B 12.0 B 231 366 1231 3279 0 0 0 0.46 2021 No Build PM 3/17/2016 WBR 2.1 A 10 28 300 1499 0 0 0 0.06 SBL 84.9 F 75.6 E 166 239 1230 240 383 0 0 0 0.42 SBR 70.6 E 311 374 452 0 0 0 0.68 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 16.7 Intersection LOS: B Intersection Capacity Utilization 93.1% ICU Level of Service F Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2021 No Build PM 3/17/2016 20.2 Movement EBU EBL EBT EBR WBU WBL WBT WBR Traffic Vol, veh/h 6 7 1529 31 73 104 1255 66 Future Vol, veh/h 6 7 1529 31 73 104 1255 66 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Free Free RT Channelized - None - None Storage Length - 100 - 150 Veh in Median Storage, # 0 0 Grade, % 0 -5 Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 2 2 Mvmt Flow 7 8 1699 34 81 116 1394 73 Major/Minor Major1 Conflicting Flow All 1085 1468 Stage 1 Stage 2 Critical Hdwy 6.44 4.14 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 2.22 Pot Cap-1 Maneuver 293 456 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 356 356 Mov Cap-2 Maneuver Stage 1 Stage 2 Approach HCM Control Delay, s HCM LOS 0 - Major2 0 1298 1733 - 6.44 4.14 - 2.52 2.22 - 213 360 - 265 265 - EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 0 - 0 - WB 5.9 NBLn1 NBLn2 EBL - 296 356 - 0.109 0.041 0 18.6 15.6 A C C - 0.4 0.1 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 29 0 0 29 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 0 0 32 SBL SBT SBR 28 0 12 28 0 12 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 31 0 13 Minor1 2836 1745 1091 7.54 6.54 6.54 3.52 8 90 229 3606 1745 1861 6.54 5.54 5.54 4.02 5 139 121 867 6.94 3.32 296 - Minor2 2702 1824 878 7.54 6.54 6.54 3.52 ~ 10 80 309 8 8 90 221 5 5 139 121 296 - ~9 ~9 80 275 NB 18.6 C 3586 734 1824 1762 6.54 6.94 5.54 5.54 4.02 3.32 5 363 127 136 5 5 127 136 363 - SB $ 1349.3 F EBR WBL WBT WBR SBLn1 SBLn2 - 265 9 363 - 0.742 - 3.457 0.037 - 49.7 -$ 1921 15.3 E F C - 5.3 5.1 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0.7 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1660 4.14 2.22 384 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 No Build PM 384 - NBLn1 272 0.335 24.8 C 1.4 EBT EBR 1559 100 1559 100 0 0 Free Free - None 0 0 90 90 2 2 1732 111 0 - 0 - WBL 0 0 0 Free 90 2 0 Major2 1843 4.14 2.22 326 326 - WBT WBR 1493 1 1493 1 0 0 Free Free - None 0 -5 90 90 2 2 1659 1 0 - 0 - WB 0 EBL 384 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 82 0 0 82 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 91 Minor1 2617 3448 1788 1788 829 1660 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 12 7 84 132 331 153 12 12 84 325 NB 24.8 C 7 7 132 153 SBL SBT SBR 0 0 5 0 0 5 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 6 922 6.94 3.32 272 - Minor2 2525 1659 866 7.54 6.54 6.54 3.52 14 102 314 272 - 9 9 102 209 3502 830 1659 1843 6.54 6.94 5.54 5.54 4.02 3.32 6 313 153 124 6 6 153 124 313 - SB 16.7 C EBT EBR WBL WBT WBR SBLn1 - 326 - 313 - 0.018 0 - 16.7 A C 0 - 0.1 Synchro 9 Report Page 2 HCM 2010 TWSC 8: Jenks Carpenter Rd & High House Road Intersection Int Delay, s/veh Major/Minor Major1 Conflicting Flow All 1159 Stage 1 Stage 2 Critical Hdwy 6.44 Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy 2.52 Pot Cap-1 Maneuver 262 Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver 262 Mov Cap-2 Maneuver Stage 1 Stage 2 - Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 3/17/2016 43.8 Movement EBU Traffic Vol, veh/h 12 Future Vol, veh/h 12 Conflicting Peds, #/hr 0 Sign Control Free RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor 90 Heavy Vehicles, % 2 Mvmt Flow 13 Approach HCM Control Delay, s HCM LOS 2021 No Build PM EBT EBR 1341 288 1341 288 0 0 Free Free - None 0 0 90 90 2 2 1490 320 0 - 0 - EB 0.1 Major2 1810 5.34 3.12 ~ 156 ~ 156 - WBT 1429 1429 0 Free None 0 0 90 2 1588 0 - WB 39.3 NWLn1NWLn2 18 240 3.272 0.833 $ 1461.6 66.4 F F 7.9 6.5 Notes ~: Volume exceeds capacity WBL 210 210 0 Free 0 90 2 233 NWR 180 180 0 Stop None 0 90 2 200 Minor1 2938 1677 1261 6.29 6.64 5.84 3.67 ~ 18 93 225 905 7.14 3.92 240 - ~ 18 ~ 18 93 225 240 - NW $ 383.8 F EBT EBR WBL WBT - ~ 156 - 1.496 -$ 306.9 F - 15.4 - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NWL 53 53 0 Stop 160 0 0 90 2 59 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 3 SimTraffic Simulation Summary 2021 No Build PM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 4:45 6:00 75 60 2 1 6334 6196 353 491 5380 557.1 421.7 9446 279.2 10 4:45 6:00 75 60 2 1 6332 6174 327 485 5420 536.9 400.8 8451 274.8 2 4:45 6:00 75 60 2 1 6261 6097 302 466 5376 561.4 426.4 8680 279.0 3 4:45 6:00 75 60 2 1 6335 6198 361 498 5474 575.2 437.4 8680 282.8 7 4:45 6:00 75 60 2 1 6271 6136 376 511 5382 666.1 530.7 9309 303.7 8 4:45 6:00 75 60 2 1 6224 6117 364 471 5375 624.8 489.8 9039 294.5 9 4:45 6:00 75 60 2 1 6278 6159 384 503 5373 747.7 612.9 9462 324.7 Avg 4:45 6:00 75 60 2 1 6282 6143 342 488 5383 601.8 466.5 8969 288.9 4 4:45 6:00 75 60 2 1 6299 6111 311 499 5325 580.5 447.2 8671 282.6 5 4:45 6:00 75 60 2 1 6259 6149 377 487 5425 592.8 456.2 9214 288.1 6 4:45 6:00 75 60 2 1 6232 6096 314 450 5304 575.2 442.2 8753 279.9 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 4:45 End Time 5:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2021 No Build PM 3/17/2016 Interval #1 Information Recording Start Time 5:00 End Time 6:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6334 6196 353 491 5380 557.1 421.7 9446 279.2 10 6332 6174 327 485 5420 536.9 400.8 8451 274.8 2 6261 6097 302 466 5376 561.4 426.4 8680 279.0 3 6335 6198 361 498 5474 575.2 437.4 8680 282.8 8 6224 6117 364 471 5375 624.8 489.8 9039 294.5 9 6278 6159 384 503 5373 747.7 612.9 9462 324.7 Avg 6282 6143 342 488 5383 601.8 466.5 8969 288.9 4 6299 6111 311 499 5325 580.5 447.2 8671 282.6 5 6259 6149 377 487 5425 592.8 456.2 9214 288.1 6 6232 6096 314 450 5304 575.2 442.2 8753 279.9 Interval #1 Information Recording Start Time 5:00 End Time 6:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 6271 6136 376 511 5382 666.1 530.7 9309 303.7 SimTraffic Report Page 2 SimTraffic Performance Report 2021 No Build PM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 276.5 452.6 WB 0.0 67.6 NB 1.1 47.1 SB 73.9 178.2 All 67.5 153.8 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.8 WB 0.0 5.4 NB 2.1 30.1 SB 1.4 112.5 All 0.1 5.8 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 3.0 WB 0.0 1.2 NB 0.1 16.1 SB 0.1 12.8 All 0.0 2.5 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 3.0 WB NW 0.0 779.5 12.1 1128.0 All 54.5 48.0 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 6.3 WB 0.7 22.5 SB 1.6 61.8 All 0.6 21.6 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 83.6 169.2 SimTraffic Report Page 3 Queuing and Blocking Report 2021 No Build PM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 425 329 587 325 EB T 1100 1006 1269 1050 71 0 EB TR 1094 994 1276 1050 65 0 88 116 WB UL 449 354 520 350 34 81 WB T 676 350 811 1328 WB T 577 229 517 1328 0 0 0 2 WB R 362 200 333 NB UL 267 117 223 300 2 5 325 0 0 NB T 417 284 394 1246 NB T 392 248 367 1246 4 5 0 0 NB R 290 125 238 SB L 398 256 368 450 338 3 22 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 538 513 647 338 5 42 SB T 1860 1644 2200 1828 37 0 SB TR 1845 1624 2198 1828 19 0 49 292 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 35 7 26 EB T 1 0 1 936 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB TR 34 3 17 936 WB UL 198 83 162 150 2 15 WB T 183 10 81 763 0 0 WB TR 18 1 17 763 NB R 77 25 61 100 0 0 SB LT 111 39 107 558 25 3 SB R 44 9 36 50 0 0 SimTraffic Report Page 4 Queuing and Blocking Report 2021 No Build PM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB T 11 0 7 763 EB TR 17 1 10 763 NB R 92 40 74 1255 SB R 30 4 19 754 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 79 10 45 418 EB T 10 0 7 418 EB TR 57 18 48 418 WB L 278 170 287 243 12 64 WB T 179 11 95 243 0 2 WB T 39 1 30 243 0 0 NW L 259 239 291 160 96 172 NW R 963 790 1285 933 73 0 3 1 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 157 67 130 243 EB T 201 73 165 243 0 0 EB T 208 75 165 243 0 0 WB UT 388 121 334 300 7 31 WB T 535 241 501 1276 0 0 WB T 461 209 435 1276 4 19 2 1 WB R 148 21 102 SB L 338 140 272 300 240 1 3 SB R 459 209 368 1236 9 14 Network Summary Network wide Queuing Penalty: 892 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 5 APPENDIX B5 2021 Build with Improvements Alternative 1 AM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 Build w/ Improvements_Alt1 AM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT 196 196 1900 325 1 100 1.00 517 517 1900 35 35 1900 0 0 14 14 1900 277 277 1900 381 381 1900 300 1 292 292 1900 450 1 0.95 0.95 1.00 0.850 0.95 1.00 0.850 386 386 1900 338 2 200 0.97 672 672 1900 0.95 107 107 1900 325 1 100 1.00 1597 1597 1900 0.95 0.990 188 188 1900 350 1 100 1.00 3504 0 0 3539 1583 3539 1583 3504 0 No 0 3539 1583 No 3539 1583 No 0.950 1770 0.309 576 0.90 218 218 pm+pt 7 4 7 45 1121 17.0 0.90 574 613 NA 4 4 0.950 1770 0.204 380 0.90 39 0.90 16 0.90 209 0 0 pm+pt 3! 8! 3 225 pm+pt 3 8 3 45 709 10.7 0.90 308 0.950 1770 0.950 1770 0.90 423 0.90 119 308 423 NA pm+ov 8 1 8 8 1 119 Prot 5 5 50 1312 17.9 0.90 1774 0.950 3433 0.950 3433 0.95 0.979 3465 3465 0.90 324 0.90 429 50 1897 25.9 0.90 747 1774 324 NA pm+ov 2 3! 2 2 3 429 Prot 1 868 NA 6 1 6 7.0 7.0 13.9 14.3 20.0 25.0 12.5% 15.6% 13.1 17.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 35.7 20.0 0.22 0.12 0.89 1.40 87.6 241.2 0.0 0.0 87.6 241.2 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 14.0 13.9 13.9 14.3 13.5 13.2 20.6 13.9 13.5 20.8 20.0 20.0 25.0 25.0 35.0 90.0 20.0 25.0 80.0 12.5% 12.5% 15.6% 15.6% 21.9% 56.3% 12.5% 15.6% 50.0% 13.1 13.1 17.7 18.5 28.8 83.4 13.1 18.5 73.2 3.1 3.1 5.0 3.0 3.0 5.1 3.1 3.0 5.3 3.8 3.8 2.3 3.5 3.2 1.5 3.8 3.5 1.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 -1.8 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lead Lag Lead Lead Lag Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 3.4 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 45.0 None None None None None C-Min None None C-Min 35.7 20.0 45.0 16.3 84.3 105.0 20.0 88.0 0.22 0.12 0.28 0.10 0.53 0.66 0.12 0.55 1.02 0.70 0.95 0.66 0.95 0.31 1.00 0.46 117.5 76.2 87.8 85.8 48.1 12.9 112.0 23.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 117.5 76.2 87.8 85.8 48.1 12.9 112.0 23.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 Build w/ Improvements_Alt1 AM 3/17/2016 SBR 109 109 1900 0 0 0.95 0 0 No 0.90 121 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL F 197 #313 325 245 0 0 0 0.89 EBT F 200.9 F ~449 #577 1041 438 0 0 0 1.40 EBR WBU WBL F ~218 #383 350 220 0 0 0 1.02 2021 Build w/ Improvements_Alt1 AM 3/17/2016 WBT E 91.1 F 165 221 629 WBR F 437 #660 442 0 0 0 0.70 300 445 0 0 0 0.95 NBL F NBT D 45.0 D 122 897 188 #1042 1232 325 331 1880 0 0 0 0 0 0 0.36 0.94 NBR B SBL F 139 194 235 #354 450 1038 0 0 0 0.31 338 429 0 0 0 1.00 SBT C 52.4 D 276 360 1817 1905 0 0 0 0.46 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 120 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.40 Intersection Signal Delay: 79.6 Intersection LOS: E Intersection Capacity Utilization 98.4% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio 2021 Build w/ Improvements_Alt1 AM 3/17/2016 SBR Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2021 Build w/ Improvements_Alt1 AM 3/17/2016 EBU EBT EBR WBL WBT NWL NWR 16 16 1900 200 1 100 0.91 1390 1390 1900 161 161 1900 0 0 851 851 1900 0.91 108 108 1900 160 1 100 1.00 201 201 1900 0 1 0 0.91 0.985 0.999 5004 0.921 4613 43 43 1900 0 1 100 1.00 0.90 18 45 478 7.2 0.90 1544 0 0 Perm 2 2 1741 NA 2 2 12.0 12.0 25.0 25.0 82.0 82.0 63.1% 63.1% 75.0 75.0 5.0 5.0 2.0 2.0 -2.0 5.0 Lag Lag Yes Yes 6.0 6.0 C-Min C-Min 89.7 0.69 0.55 11.5 0.0 11.5 B 11.5 B Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 0 No 0.950 1770 0.096 179 0.90 179 0.90 48 0 48 pm+pt 1 6 1 0.95 3539 0.950 1770 0.950 1770 45 334 5.1 0.90 946 35 1012 19.7 0.90 120 3539 946 NA 6 6 1.00 0.850 1583 1583 No 0.90 223 120 223 Prot pm+ov 8 1 8 8 1 7.0 12.0 7.0 7.0 14.0 25.0 25.0 14.0 20.0 102.0 28.0 20.0 15.4% 78.5% 21.5% 15.4% 13.0 95.0 21.0 13.0 5.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 -2.0 -2.0 -2.0 -2.0 5.0 5.0 5.0 5.0 Lead Lead Yes Yes 2.0 6.0 2.0 2.0 None C-Min None None 104.8 104.8 15.2 30.3 0.81 0.81 0.12 0.23 0.18 0.33 0.58 0.60 5.9 3.3 65.1 51.0 0.0 0.2 0.0 0.0 5.9 3.5 65.1 51.0 A A E D 3.6 55.9 A E Synchro 9 Report Page 5 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBT 236 346 398 3182 0 52 0 0.56 EBR 2021 Build w/ Improvements_Alt1 AM 3/17/2016 WBL 5 13 WBT 51 108 254 327 0 0 0 0.15 2853 945 0 0 0.50 NWL 97 157 932 160 313 0 0 0 0.38 NWR 171 235 428 0 0 0 0.52 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 96 (74%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.60 Intersection Signal Delay: 13.9 Intersection LOS: B Intersection Capacity Utilization 56.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 8: Jenks Carpenter Rd & High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2021 Build w/ Improvements_Alt1 AM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 285 285 1900 5 5 1900 686 686 1900 0% 281 281 1900 0.95 0.91 1.00 0.850 167 167 1900 2% 240 1 100 1.00 206 206 1900 0 1 100 1.00 1304 1304 1900 -2% 1583 0 0 0.950 1787 0.314 591 0.90 2 0.90 317 0 pm+pt 5! 2! 5 319 pm+pt 5 2 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.926 4709 0.90 6 45 1311 19.9 0.90 762 45 334 5.1 0.90 1449 1449 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 312 768 312 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 186 0 1 1.00 0.850 1567 1567 No 0.90 229 186 229 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 40.0 40.0 100.0 60.0 60.0 30.0 30.0 40.0 30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8% 33.6 33.6 93.4 53.4 53.4 23.8 23.8 33.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 2.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 100.7 100.7 83.1 108.4 19.3 37.5 0.77 0.77 0.64 0.83 0.15 0.29 0.56 0.52 0.26 0.24 0.72 0.51 7.8 3.8 11.3 3.0 67.6 41.2 0.0 0.1 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 7 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 7.8 A 29 56 779 21 0 0 0.42 EBT 3.9 A 4.6 A 68 91 254 2774 254 0 0 0.57 WBU WBT 11.3 B 8.9 A 94 149 1231 3009 0 0 0 0.26 2021 Build w/ Improvements_Alt1 AM 3/17/2016 WBR 3.0 A 41 81 300 1391 0 0 0 0.22 SBL 67.6 E 53.1 D 151 221 1230 240 339 0 0 0 0.55 SBR 41.2 D 162 213 721 0 0 0 0.32 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 12.2 Intersection LOS: B Intersection Capacity Utilization 74.2% ICU Level of Service D Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 8 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2021 Build w/ Improvements_Alt1 AM 3/17/2016 11.3 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL 1 1 0 Free 100 90 2 1 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1030 4.14 2.22 670 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 670 - EBT EBR 1414 3 1414 3 0 0 Free Free - None 0 0 90 90 2 2 1571 3 0 - WBL WBT WBR 34 911 16 34 911 16 0 0 0 Free Free Free - None 150 0 -5 90 90 90 2 2 2 38 1012 18 Major2 1574 4.14 2.22 415 - 0 - NBLn1 NBLn2 EBL 22 334 670 0.758 0.13 0.002 $ 356.5 17.4 10.4 F C B 2.2 0.4 0 415 - 0 - WB 0.5 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - NBL NBT NBR 15 0 39 15 0 39 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 17 0 43 Minor1 2158 2681 1575 1575 583 1106 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 27 22 115 169 465 284 22 22 115 406 20 20 169 258 NB 111.6 F SBL SBT SBR 42 2 14 42 2 14 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 47 2 16 787 6.94 3.32 334 - Minor2 1885 1097 788 7.54 6.54 6.54 3.52 ~ 43 227 350 334 - ~ 35 ~ 35 227 304 2674 515 1097 1577 6.54 6.94 5.54 5.54 4.02 3.32 22 505 287 168 20 20 261 168 505 - SB $ 374 F EBR WBL WBT WBR SBLn1 SBLn2 - 415 34 505 - 0.091 - 1.438 0.031 - 14.5 -$ 489.1 12.4 B F B - 0.3 5.3 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 2021 Build w/ Improvements_Alt1 AM 3/17/2016 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 0.7 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1073 4.14 2.22 645 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 645 - NBLn1 313 0.295 21.2 C 1.2 EBT EBR 1484 11 1484 11 0 0 Free Free - None 0 0 90 90 2 2 1649 12 0 - 0 - WBL WBT WBR 9 961 5 9 961 5 0 0 0 Free Free Free - None 100 0 -5 90 90 90 2 2 2 10 1068 6 Major2 1661 4.14 2.22 384 384 - 0 - 0 - WB 0.1 EBL 645 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 83 0 0 83 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 92 Minor1 2209 2748 1655 1655 554 1093 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 24 20 102 154 484 288 24 24 102 471 NB 21.2 C 19 19 154 281 SBL SBT SBR 0 0 0 0 0 0 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 0 831 6.94 3.32 313 - Minor2 1915 1091 824 7.54 6.54 6.54 3.52 41 229 333 313 - 28 28 229 235 2752 537 1091 1661 6.54 6.94 5.54 5.54 4.02 3.32 19 488 289 153 19 19 281 153 488 - SB 0 A EBT EBR WBL WBT WBR SBLn1 - 384 - 0.026 - 14.6 0 B A 0.1 - Synchro 9 Report Page 2 HCM 2010 TWSC 20: High House Rd EB & WB U-Turn Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt1 AM - EBL 0 A - EBT 1387 1387 0 Free None 0 0 90 2 1541 0 - WBT WBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 SBL 32 32 0 Stop 0 0 0 90 2 36 SBR 0 0 0 Stop None 90 2 0 Minor2 771 0 771 7.54 6.54 3.52 290 359 0 - 290 290 359 - SB EBT SBLn1 - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 HCM 2010 TWSC 30: South Entrance & High House Rd EB Intersection Int Delay, s/veh 3/17/2016 0.2 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 1414 5 1414 5 0 0 Free Free - None 0 0 90 90 2 2 1571 6 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt1 AM NBLn1 334 0.047 16.3 C 0.1 EBT - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - WBL WBT 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 NBL 0 0 0 Stop 0 0 90 2 0 NBR 14 14 0 Stop None 0 90 2 16 Minor1 1574 1574 0 7.54 6.54 3.52 74 115 - 787 6.94 3.32 334 - 74 74 115 - 334 - NB 16.3 C EBR - Synchro 9 Report Page 4 HCM 2010 TWSC 40: High House Road WB & North Entrance Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt1 AM 3/17/2016 0.5 EBL EBT 0 0 0 0 0 0 Free Free - None 0 0 90 90 2 2 0 0 WBT WBR 938 12 938 12 0 0 Free Free - None 0 -5 90 90 2 2 1042 13 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 0 - SBL 0 0 0 Stop 0 0 90 2 0 SBR 36 36 0 Stop None 0 90 2 40 Minor2 1049 1049 0 7.54 6.54 3.52 182 243 - 527 6.94 3.32 496 - 182 182 243 - 496 - SB 12.9 B WBT WBR SBLn1 - 496 - 0.081 - 12.9 B 0.3 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 HCM 2010 TWSC 50: EB U-Turn & High House Road WB Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt1 AM 3/17/2016 0 EBT EBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 WBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 0 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - WBT 940 940 0 Free None 0 -5 90 2 1044 0 - NBL 10 10 0 Stop 0 0 0 90 2 11 NBR 0 0 0 Stop None 90 2 0 Minor1 522 0 522 7.54 6.54 3.52 438 506 0 - 438 438 506 - NB - NBLn1 WBL WBT 0 A - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6:45 8:00 75 60 2 1 5828 5769 291 350 4758 427.4 303.8 6196 225.4 10 6:45 8:00 75 60 2 1 5911 5808 275 378 4907 358.3 231.5 6259 213.2 2 6:45 8:00 75 60 2 1 5919 5875 269 313 4858 354.7 228.4 6348 211.6 3 6:45 8:00 75 60 2 1 5901 5810 268 359 4886 389.3 262.7 6773 220.8 7 6:45 8:00 75 60 2 1 6090 6021 275 344 5023 286.0 156.4 6930 202.8 8 6:45 8:00 75 60 2 1 5940 5865 258 333 4877 313.5 186.7 6432 202.4 9 6:45 8:00 75 60 2 1 6015 5973 280 322 4949 350.0 221.1 6291 212.5 Avg 6:45 8:00 75 60 2 1 5926 5844 268 347 4881 354.4 227.8 6442 212.1 4 6:45 8:00 75 60 2 1 5897 5800 253 350 4887 310.6 184.4 6292 201.5 5 6:45 8:00 75 60 2 1 5913 5813 272 372 4838 386.2 260.0 6671 217.4 6 6:45 8:00 75 60 2 1 5856 5724 253 385 4829 368.2 243.1 6208 213.1 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:45 End Time 7:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 5828 5769 291 350 4758 427.4 303.8 6196 225.4 10 5911 5808 275 378 4907 358.3 231.5 6259 213.2 2 5919 5875 269 313 4858 354.7 228.4 6348 211.6 3 5901 5810 268 359 4886 389.3 262.7 6773 220.8 8 5940 5865 258 333 4877 313.5 186.7 6432 202.4 9 6015 5973 280 322 4949 350.0 221.1 6291 212.5 Avg 5926 5844 268 347 4881 354.4 227.8 6442 212.1 4 5897 5800 253 350 4887 310.6 184.4 6292 201.5 5 5913 5813 272 372 4838 386.2 260.0 6671 217.4 6 5856 5724 253 385 4829 368.2 243.1 6208 213.1 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 6090 6021 275 344 5023 286.0 156.4 6930 202.8 SimTraffic Report Page 2 SimTraffic Performance Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 184.0 402.3 WB 0.0 81.6 NB 1.0 51.4 SB 1.0 73.2 All 28.9 111.8 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.6 WB 0.0 1.5 NB 1.5 21.7 SB 1.1 32.5 All 0.1 2.2 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.4 WB 0.0 1.7 NB 0.1 24.2 All 0.0 2.9 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 9.6 WB 0.0 5.8 NW 1.7 52.6 All 0.2 13.5 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 8.5 WB 1.2 11.3 SB 2.0 47.5 All 0.7 14.6 20: High House Rd EB & WB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.2 SB 0.0 13.6 All 0.0 0.5 21: WB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 4.5 All 0.0 4.5 30: South Entrance & High House Rd EB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.8 NB 0.1 12.4 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC All 0.0 1.0 SimTraffic Report Page 3 SimTraffic Performance Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 40: High House Road WB & North Entrance Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.6 SB 0.1 7.3 All 0.0 0.9 50: EB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.1 NB 0.0 5.7 All 0.0 0.1 51: High House Rd EB & EB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.7 All 0.0 0.7 101: High House Road/High House Rd EB & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.1 3.5 SW 0.0 2.5 All 0.0 3.1 102: High House Rd EB & High House Road WB/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.3 NE 0.0 0.2 All 0.0 0.3 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 23.8 109.3 SimTraffic Report Page 4 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 425 367 562 325 3 7 EB T 1070 936 1314 1050 60 0 EB TR 1071 918 1311 1050 39 0 85 167 WB UL 382 212 384 350 7 9 WB T 523 178 410 616 0 0 WB T 619 344 697 616 12 56 0 0 3 12 WB R 400 330 459 NB L 425 195 456 300 31 42 325 0 0 NB T 912 545 814 1246 NB T 896 510 792 1246 30 32 13 38 NB R 550 198 545 SB L 396 269 440 450 338 12 41 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 447 296 489 338 17 58 SB T 557 239 560 1825 SB TR 522 218 490 1825 0 1 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 4 0 3 EB T 1 0 1 236 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB TR 6 0 5 236 WB L 65 19 49 150 NB LT 51 13 40 1316 NB R 72 28 58 100 0 0 SB LT 93 37 74 562 12 2 SB R 36 12 36 50 0 0 SimTraffic Report Page 5 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB T 15 1 16 775 EB TR 32 2 35 775 WB L 34 6 23 NB R 115 43 88 1244 100 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 194 49 126 200 0 0 EB T 303 104 220 417 0 0 EB TR 316 119 240 417 0 0 WB L 73 27 62 243 WB T 201 59 147 243 0 0 WB T 212 63 154 243 0 0 1 5 NW L 236 96 192 160 2 4 NW R 309 144 259 933 11 12 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 195 95 173 243 0 1 EB T 244 97 215 243 0 2 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB T 245 109 216 243 0 2 WB UT 66 14 45 300 WB T 219 106 186 1276 WB T 214 98 180 1276 WB R 137 52 110 SB L 255 124 218 300 240 1 1 SB R 236 116 206 1236 0 1 SimTraffic Report Page 6 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Intersection: 20: High House Rd EB & WB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 42 17 40 -12 Intersection: 21: WB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) WB L 28 2 16 125 WB T 97 15 123 639 WB T 122 35 216 639 0 0 Intersection: 30: South Entrance & High House Rd EB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB R 39 13 38 341 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 7 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Intersection: 40: High House Road WB & North Entrance Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB R 57 24 51 432 Intersection: 50: EB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB L 30 5 23 -3 Intersection: 51: High House Rd EB & EB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 8 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 AM 3/17/2016 Intersection: 101: High House Road/High House Rd EB & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SW R 26 2 26 89 0 0 SW R 56 19 102 89 10 46 Intersection: 102: High House Rd EB & High House Road WB/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 539 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 9 APPENDIX B6 2021 Build with Improvements Alternative 1 PM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 Build w/ Improvements_Alt1 PM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR SBL 132 132 1900 325 1 100 1.00 548 548 1900 86 86 1900 0 0 7 7 1900 479 479 1900 432 432 1900 300 1 3 3 1900 318 318 1900 450 1 0.95 0.95 0.95 1.00 0.850 0.95 110 110 1900 325 1 100 1.00 859 859 1900 0.95 0.980 325 325 1900 350 1 100 1.00 0.95 1.00 0.850 596 596 1900 338 2 200 0.97 3468 0 0 3539 1583 0 3539 1583 3468 0 No 0 3539 1583 No 0 3539 1583 No 0.950 1770 0.366 682 0.90 147 147 pm+pt 7 4 7 45 1121 17.0 0.90 609 705 NA 4 4 0.950 1770 0.131 244 0.90 96 0.90 8 0.90 361 0 0 pm+pt 3! 8! 3 369 pm+pt 3 8 3 45 709 10.7 0.90 532 0.950 1770 0.950 1770 0.90 480 0.90 3 0.90 122 532 480 NA pm+ov 8 1 8 8 1 0 Prot 5 125 Prot 5 5 5 50 1312 17.9 0.90 954 0.950 3433 0.950 3433 0.90 353 0.90 662 954 353 NA pm+ov 2 3! 2 2 3 662 Prot 1 1 7.0 7.0 13.9 14.3 18.0 31.0 11.3% 19.4% 11.1 23.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 38.6 26.0 0.24 0.16 0.59 1.25 49.0 179.9 0.0 0.0 49.0 179.9 7.0 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 13.9 13.9 14.3 13.5 13.2 13.2 20.6 13.9 13.5 30.0 30.0 43.0 40.0 17.0 17.0 59.0 30.0 40.0 18.8% 18.8% 26.9% 25.0% 10.6% 10.6% 36.9% 18.8% 25.0% 23.1 23.1 35.7 33.5 10.8 10.8 52.4 23.1 33.5 3.1 3.1 5.0 3.0 3.0 3.0 5.1 3.1 3.0 3.8 3.8 2.3 3.5 3.2 3.2 1.5 3.8 3.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lag Lag Lag Lead Lead Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 None None None None None None C-Min None None 56.0 38.4 77.5 12.0 55.0 85.0 34.0 0.35 0.24 0.48 0.08 0.34 0.53 0.21 1.14 0.63 0.63 0.95 0.79 0.42 0.91 137.3 58.3 35.0 136.8 53.0 24.8 78.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 137.3 58.3 35.0 136.8 53.0 24.8 78.3 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay SBT SBR 1549 1549 1900 101 101 1900 0 0 0.95 0.991 0.95 3507 0 3507 0 No 50 1897 25.9 0.90 1721 1833 NA 6 2021 Build w/ Improvements_Alt1 PM 3/17/2016 0.90 112 0 6 14.0 20.8 82.0 51.3% 75.2 5.3 1.5 -1.8 5.0 Lead Yes 6.0 3.4 20.0 45.0 C-Min 77.0 0.48 1.09 88.8 0.0 88.8 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL D 109 169 325 254 0 0 0 0.58 EBT F 157.3 F ~482 #615 1041 563 0 0 0 1.25 EBR WBU WBL F ~400 #617 350 323 0 0 0 1.14 2021 Build w/ Improvements_Alt1 PM 3/17/2016 WBT E 71.3 E 265 333 629 WBR C 850 0 0 0 0.63 NBU NBL F 365 494 133 #270 300 775 0 0 0 0.62 325 132 0 0 0 0.95 NBT D 53.4 D 477 565 1232 1215 0 0 0 0.79 NBR C SBL E 221 306 349 #448 450 840 0 0 0 0.42 338 750 0 0 0 0.88 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 142 (89%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.25 Intersection Signal Delay: 85.0 Intersection LOS: F Intersection Capacity Utilization 105.2% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT F 86.1 F ~1128 #1261 1817 2021 Build w/ Improvements_Alt1 PM 3/17/2016 SBR 1687 0 0 0 1.09 Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2021 Build w/ Improvements_Alt1 PM 3/17/2016 EBU EBT EBR WBL WBT NWL NWR 12 12 1900 200 1 100 0.91 1361 1361 1900 293 293 1900 0 0 1470 1470 1900 0.91 59 59 1900 160 1 100 1.00 180 180 1900 0 1 0.91 0.974 210 210 1900 0 1 100 1.00 0 0 4953 0.913 4522 0.90 13 45 478 7.2 0.90 1512 0 0 Perm 2 2 1851 NA 2 2 12.0 12.0 25.0 25.0 102.0 102.0 63.8% 63.8% 95.0 95.0 5.0 5.0 2.0 2.0 -2.0 5.0 Lag Lag Yes Yes 6.0 6.0 C-Min C-Min 112.8 0.70 0.58 13.6 0.0 13.6 B 13.6 B Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 No 0.950 1770 0.084 156 0.90 326 0.90 233 0 233 pm+pt 1 6 1 0.95 3539 0.950 1770 0.950 1770 45 334 5.1 0.90 1633 35 1012 19.7 0.90 66 3539 1633 NA 6 6 1.00 0.850 1583 1583 No 0.90 200 66 200 Prot pm+ov 8 1 8 8 1 7.0 12.0 7.0 7.0 14.0 25.0 25.0 14.0 32.0 134.0 26.0 32.0 20.0% 83.8% 16.3% 20.0% 25.0 127.0 19.0 25.0 5.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 -2.0 -2.0 -2.0 -2.0 5.0 5.0 5.0 5.0 Lead Lead Yes Yes 2.0 6.0 2.0 2.0 None C-Min None None 137.4 137.4 12.6 37.2 0.86 0.86 0.08 0.23 0.70 0.54 0.48 0.54 44.7 3.6 81.3 58.3 0.5 0.2 0.0 0.0 45.2 3.8 81.3 58.3 D A F E 8.9 64.0 A E Synchro 9 Report Page 5 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBT 327 469 398 3186 0 20 0 0.58 EBR 2021 Build w/ Improvements_Alt1 PM 3/17/2016 WBL 122 221 WBT 128 154 254 407 27 0 0 0.61 3039 513 0 0 0.65 NWL 67 118 932 160 232 0 0 0 0.28 NWR 186 247 441 0 0 0 0.45 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 113 (71%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 14.8 Intersection LOS: B Intersection Capacity Utilization 92.0% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 8: Jenks Carpenter Rd & High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2021 Build w/ Improvements_Alt1 PM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 163 163 1900 5 5 1900 1397 1397 1900 0% 83 83 1900 0.95 0.91 1.00 0.850 146 146 1900 2% 240 1 100 1.00 281 281 1900 0 1 100 1.00 1376 1376 1900 -2% 1583 0 0 0.950 1787 0.123 231 0.90 2 0.90 181 0 pm+pt 5! 2! 5 183 pm+pt 5 2 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.931 4734 0.90 6 45 1311 19.9 0.90 1552 45 334 5.1 0.90 1529 1529 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 92 1558 92 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 162 0 1 1.00 0.850 1567 1567 No 0.90 312 162 312 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 25.0 25.0 120.0 95.0 95.0 40.0 40.0 25.0 15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6% 18.6 18.6 113.4 88.4 88.4 33.8 33.8 18.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 2.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 129.6 129.6 111.7 138.1 20.4 38.9 0.81 0.81 0.70 0.86 0.13 0.24 0.59 0.53 0.47 0.07 0.73 0.82 22.7 3.6 12.0 1.8 84.9 74.4 0.1 0.1 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 7 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 22.8 C 19 74 381 12 0 0 0.50 EBT 3.7 A 5.8 A 49 60 254 2895 431 0 0 0.62 WBU WBT 12.0 B 11.5 B 247 346 1231 3305 0 0 0 0.47 2021 Build w/ Improvements_Alt1 PM 3/17/2016 WBR 1.8 A 11 22 300 1516 0 0 0 0.06 SBL 84.9 F 78.0 E 166 239 1230 240 383 0 0 0 0.42 SBR 74.4 E 313 398 450 0 0 0 0.69 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 17.2 Intersection LOS: B Intersection Capacity Utilization 94.5% ICU Level of Service F Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 8 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2021 Build w/ Improvements_Alt1 PM 3/17/2016 14.6 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL 7 7 0 Free 100 90 2 8 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1520 4.14 2.22 435 - Approach HCM Control Delay, s HCM LOS EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 435 - EBT EBR WBU WBL WBT WBR 1554 31 10 104 1302 66 1554 31 10 104 1302 66 0 0 0 0 0 0 Free Free Free Free Free Free - None - None - 150 0 0 0 -5 90 90 90 90 90 90 2 2 2 2 2 2 1727 34 11 116 1447 73 0 - Major2 0 1318 1761 - 6.44 4.14 - 2.52 2.22 - 207 351 - 326 326 - NBLn1 NBLn2 EBL - 290 435 - 0.111 0.018 0 19 13.4 A C B - 0.4 0.1 0 - WB 1.8 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - NBL NBT NBR 0 0 29 0 0 29 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 0 0 32 Minor1 2736 3532 1759 1759 977 1773 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 10 6 88 137 269 134 9 9 86 259 6 6 134 134 NB 19 C SBL SBT SBR 28 0 12 28 0 12 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 31 0 13 881 6.94 3.32 290 - Minor2 2616 1737 879 7.54 6.54 6.54 3.52 ~ 12 91 309 290 - ~ 11 ~ 11 89 270 3514 760 1737 1777 6.54 6.94 5.54 5.54 4.02 3.32 6 349 140 134 6 6 140 132 349 - SB $ 1061 F EBR WBL WBT WBR SBLn1 SBLn2 - 326 11 349 - 0.389 - 2.828 0.038 - 22.9 -$ 1509 15.7 C F C - 1.8 4.9 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 2021 Build w/ Improvements_Alt1 PM 3/17/2016 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1642 4.14 2.22 390 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 390 - NBLn1 281 0.324 23.8 C 1.4 EBT EBR 1584 37 1584 37 0 0 Free Free - None 0 0 90 90 2 2 1760 41 0 - 0 - WBL 63 63 0 Free 100 90 2 70 Major2 1801 4.14 2.22 338 338 - WBT WBR 1477 1 1477 1 0 0 Free Free - None 0 -5 90 90 2 2 1641 1 0 - 0 - WB 0.8 EBL 390 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 82 0 0 82 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 91 SBL SBT SBR 0 0 5 0 0 5 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 6 Minor1 2742 1781 961 7.54 6.54 6.54 3.52 9 85 275 3563 1781 1782 6.54 5.54 5.54 4.02 6 133 133 901 6.94 3.32 281 - Minor2 2662 1782 880 7.54 6.54 6.54 3.52 11 85 308 7 7 85 214 5 5 133 105 281 - 6 6 85 208 NB 23.8 C 3583 821 1782 1801 6.54 6.94 5.54 5.54 4.02 3.32 5 318 133 130 4 4 105 130 318 - SB 16.5 C EBT EBR WBL WBT WBR SBLn1 - 338 - 318 - 0.207 - 0.017 - 18.4 - 16.5 C C 0.8 - 0.1 Synchro 9 Report Page 2 HCM 2010 TWSC 20: High House Rd EB & WB U-Turn Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt1 PM - EBL 0 A - EBT 1582 1582 0 Free None 0 0 90 2 1758 0 - WBT WBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 SBL 31 31 0 Stop 0 0 0 90 2 34 SBR 0 0 0 Stop None 90 2 0 Minor2 879 0 879 7.54 6.54 3.52 242 309 0 - 242 242 309 - SB EBT SBLn1 - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 HCM 2010 TWSC 30: South Entrance & High House Rd EB Intersection Int Delay, s/veh 3/17/2016 0.1 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 1597 16 1597 16 0 0 Free Free - None 0 0 90 90 2 2 1774 18 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt1 PM NBLn1 284 0.035 18.1 C 0.1 EBT - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - WBL WBT 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 NBL 0 0 0 Stop 0 0 90 2 0 NBR 9 9 0 Stop None 0 90 2 10 Minor1 1783 1783 0 7.54 6.54 3.52 52 85 - 895 6.94 3.32 284 - 52 52 85 - 284 - NB 18.1 C EBR - Synchro 9 Report Page 4 HCM 2010 TWSC 40: High House Road WB & North Entrance Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt1 PM 3/17/2016 0.3 EBL EBT 0 0 0 0 0 0 Free Free - None 0 0 90 90 2 2 0 0 WBT WBR 1288 40 1288 40 0 0 Free Free - None 0 -5 90 90 2 2 1431 44 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 0 - SBL 0 0 0 Stop 0 0 90 2 0 SBR 24 24 0 Stop None 0 90 2 27 Minor2 1453 1453 0 7.54 6.54 3.52 91 137 - 737 6.94 3.32 361 - 91 91 137 - 361 - SB 15.8 C WBT WBR SBLn1 - 361 - 0.074 - 15.8 C 0.2 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 HCM 2010 TWSC 50: EB U-Turn & High House Road WB Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt1 PM 3/17/2016 0 EBT EBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 WBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 0 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - WBT 1314 1314 0 Free None 0 -5 90 2 1460 0 - NBL 14 14 0 Stop 0 0 0 90 2 16 NBR 0 0 0 Stop None 90 2 0 Minor1 730 0 730 7.54 6.54 3.52 310 380 0 - 310 310 380 - NB - NBLn1 WBL WBT 0 A - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6:45 8:00 75 60 2 1 6523 6429 368 462 5600 574.4 433.1 10140 290.5 10 6:45 8:00 75 60 2 1 6525 6433 384 476 5679 540.8 397.7 9995 284.9 2 6:45 8:00 75 60 2 1 6544 6445 336 435 5589 461.8 320.9 9402 264.1 3 6:45 8:00 75 60 2 1 6321 6270 397 448 5462 538.7 401.5 9493 278.1 7 6:45 8:00 75 60 2 1 6531 6417 345 459 5622 587.1 445.6 10605 295.1 8 6:45 8:00 75 60 2 1 6479 6378 353 454 5514 519.4 380.6 9691 276.1 9 6:45 8:00 75 60 2 1 6553 6442 364 475 5603 575.4 434.2 10322 292.4 Avg 6:45 8:00 75 60 2 1 6493 6404 361 455 5580 537.9 397.3 10020 281.9 4 6:45 8:00 75 60 2 1 6476 6417 377 436 5550 526.5 386.5 10249 278.6 5 6:45 8:00 75 60 2 1 6466 6392 378 452 5599 533.5 392.3 10037 281.1 6 6:45 8:00 75 60 2 1 6528 6420 332 440 5582 521.1 380.3 10288 278.2 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:45 End Time 7:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6523 6429 368 462 5600 574.4 433.1 10140 290.5 10 6525 6433 384 476 5679 540.8 397.7 9995 284.9 2 6544 6445 336 435 5589 461.8 320.9 9402 264.1 3 6321 6270 397 448 5462 538.7 401.5 9493 278.1 8 6479 6378 353 454 5514 519.4 380.6 9691 276.1 9 6553 6442 364 475 5603 575.4 434.2 10322 292.4 Avg 6493 6404 361 455 5580 537.9 397.3 10020 281.9 4 6476 6417 377 436 5550 526.5 386.5 10249 278.6 5 6466 6392 378 452 5599 533.5 392.3 10037 281.1 6 6528 6420 332 440 5582 521.1 380.3 10288 278.2 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 6531 6417 345 459 5622 587.1 445.6 10605 295.1 SimTraffic Report Page 2 SimTraffic Performance Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 344.7 466.1 WB 0.0 57.2 NB 1.1 48.2 SB 58.9 174.6 All 71.6 151.9 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.0 WB 0.0 4.2 NB 2.1 18.9 SB 1.3 67.7 All 0.0 3.6 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 3.5 WB 0.0 3.7 NB 0.1 24.3 SB 0.1 15.7 All 0.0 4.2 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 17.3 WB 0.0 9.1 NW 1.2 70.8 All 0.1 17.1 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 10.8 WB 0.8 16.8 SB 1.6 61.5 All 0.6 20.0 20: High House Rd EB & WB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.2 SB 0.0 16.0 All 0.0 0.5 21: WB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 1.8 All 0.0 1.8 30: South Entrance & High House Rd EB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.2 NB 0.1 15.1 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC All 0.0 1.3 SimTraffic Report Page 3 SimTraffic Performance Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 40: High House Road WB & North Entrance Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 1.0 SB 0.1 10.4 All 0.0 1.2 50: EB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.2 NB 0.0 11.7 All 0.0 0.3 51: High House Rd EB & EB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.0 All 0.0 1.0 101: High House Road/High House Rd EB & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 3.7 SW 0.0 1.0 All 0.0 2.4 102: High House Rd EB & High House Road WB/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.7 NE 0.0 0.3 All 0.0 0.5 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 59.4 150.0 SimTraffic Report Page 4 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 425 322 588 325 0 0 EB T 1097 1033 1236 1050 79 0 EB TR 1094 1027 1237 1050 74 0 89 117 WB UL 448 326 492 350 22 52 WB T 562 260 569 616 6 36 WB T 495 217 439 616 0 0 0 0 0 2 WB R 382 226 371 NB UL 286 125 248 300 4 10 325 0 2 NB T 423 278 389 1246 NB T 383 245 357 1246 4 4 0 0 NB R 293 122 236 SB L 404 268 376 450 338 4 29 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 538 519 633 338 8 58 SB T 1872 1628 2228 1825 35 0 SB TR 1875 1602 2228 1825 17 0 49 291 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 19 2 11 EB T 1 0 1 236 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB TR 11 0 6 236 WB UL 131 55 110 150 0 2 WB T 52 4 43 775 0 0 WB TR 36 1 19 775 NB R 66 25 56 100 SB LT 104 32 82 562 18 2 SB R 34 9 32 50 0 0 SimTraffic Report Page 5 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB T 54 2 24 775 EB TR 70 4 30 775 WB L 95 39 79 100 0 3 WB T 84 5 42 417 WB TR 11 0 11 417 NB R 108 40 80 1244 SB R 30 5 21 748 0 0 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 231 50 143 200 EB T 392 197 370 417 0 0 EB TR 399 223 395 417 0 1 WB L 206 107 190 243 1 3 WB T 250 90 231 243 1 4 WB T 247 89 230 243 1 3 8 36 NW L 228 61 147 160 0 0 NW R 358 163 286 933 17 10 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 180 73 142 243 0 0 EB T 266 134 286 243 2 11 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB T 265 138 285 243 2 10 WB UT 198 55 134 300 WB T 380 201 350 1276 WB T 366 191 345 1276 2 9 2 1 WB R 117 19 74 SB L 314 138 254 300 240 1 2 SB R 413 207 348 1236 8 12 SimTraffic Report Page 6 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Intersection: 20: High House Rd EB & WB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 43 18 41 -12 Intersection: 21: WB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) WB L 34 2 17 125 WB T 41 6 63 645 WB T 20 1 26 645 1 0 Intersection: 30: South Entrance & High House Rd EB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB R 35 9 31 341 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 7 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Intersection: 40: High House Road WB & North Entrance Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) WB TR 9 0 7 409 SB R 44 18 45 433 Intersection: 50: EB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB L 33 9 31 -3 0 0 Intersection: 51: High House Rd EB & EB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 9 0 5 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 8 Queuing and Blocking Report 2021 Build w/ Improvements_Alt1 PM 3/17/2016 Intersection: 101: High House Road/High House Rd EB & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SW R 54 10 65 89 3 17 SW R 37 2 26 89 0 0 Intersection: 102: High House Rd EB & High House Road WB/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 729 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 9 APPENDIX B7 2021 Build with Improvements Alternative 2 AM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 Build w/ Improvements_Alt2 AM 3/18/2016 EBL EBT EBR WBU WBL WBT WBR NBL NBT NBR SBL SBT 196 196 1900 325 1 100 1.00 517 517 1900 35 35 1900 0 0 14 14 1900 277 277 1900 381 381 1900 300 1 292 292 1900 450 1 1.00 1.00 1.00 0.850 0.95 1.00 0.850 386 386 1900 338 2 200 0.97 672 672 1900 0.95 107 107 1900 325 1 100 1.00 1597 1597 1900 0.95 0.990 188 188 1900 350 1 100 0.97 3504 0 0 1863 1583 3539 1583 3504 0 No 0 1863 1583 No 3539 1583 No 0.950 1770 0.140 261 0.90 218 218 pm+pt 7 4 7 45 1121 17.0 0.90 574 613 NA 4 4 0.950 3433 0.950 3433 0.90 39 0.90 16 0.90 209 0 0 Prot 3! 225 Prot 3 3 3 45 709 10.7 0.90 308 0.950 1770 0.950 1770 0.90 423 0.90 119 308 423 NA pm+ov 8 1 8 8 8 119 Prot 5 5 50 1312 17.9 0.90 1774 0.950 3433 0.950 3433 0.95 0.979 3465 3465 0.90 324 0.90 429 50 1897 25.9 0.90 747 1774 324 NA pm+ov 2 3! 2 2 3 429 Prot 1 868 NA 6 1 6 7.0 7.0 13.9 14.3 17.0 34.0 10.6% 21.3% 10.1 26.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 41.0 29.0 0.26 0.18 1.21 0.97 176.0 92.3 0.0 0.0 176.0 92.3 7.0 7.0 7.0 7.0 7.0 14.0 7.0 7.0 14.0 13.9 13.9 14.3 13.5 13.2 20.6 13.9 13.5 20.8 17.0 17.0 34.0 25.0 24.0 84.0 17.0 25.0 85.0 10.6% 10.6% 21.3% 15.6% 15.0% 52.5% 10.6% 15.6% 53.1% 10.1 10.1 26.7 18.5 17.8 77.4 10.1 18.5 78.2 3.1 3.1 5.0 3.0 3.0 5.1 3.1 3.0 5.3 3.8 3.8 2.3 3.5 3.2 1.5 3.8 3.5 1.5 -1.9 -2.3 -1.5 -1.2 -1.6 -1.9 -1.5 -1.8 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead Lead Lag Lead Lead Lag Lead Lead Lag Yes Yes Yes Yes Yes Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 2.0 2.0 2.0 2.0 3.4 2.0 2.0 3.4 0.0 0.0 0.0 0.0 0.0 20.0 0.0 0.0 20.0 0.0 0.0 0.0 0.0 0.0 45.0 0.0 0.0 45.0 None None None None None C-Min None None C-Min 12.0 29.0 54.0 15.7 79.0 96.0 20.0 83.3 0.08 0.18 0.34 0.10 0.49 0.60 0.12 0.52 0.88 0.91 0.79 0.69 1.02 0.34 1.00 0.48 103.9 95.0 60.2 89.5 65.2 17.3 112.0 26.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 103.9 95.0 60.2 89.5 65.2 17.3 112.0 26.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 Build w/ Improvements_Alt2 AM 3/18/2016 SBR 109 109 1900 0 0 0.95 0 0 No 0.90 121 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL F ~225 #406 325 180 0 0 0 1.21 EBT F 114.3 F 339 #464 1041 635 0 0 0 0.97 EBR WBU WBL F 122 #200 350 257 0 0 0 0.88 2021 Build w/ Improvements_Alt2 AM 3/18/2016 WBT F 81.7 F 320 #503 629 337 0 0 0 0.91 WBR E 401 548 300 534 0 0 0 0.79 NBL F NBT E 59.5 E 122 ~1026 193 #1162 1232 325 210 1747 0 0 0 0 0 0 0.57 1.02 NBR B SBL F 164 229 235 #354 450 949 0 0 0 0.34 338 429 0 0 0 1.00 SBT C 54.5 D 302 374 1817 1804 0 0 0 0.48 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 105 (66%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 130 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.21 Intersection Signal Delay: 70.9 Intersection LOS: E Intersection Capacity Utilization 97.3% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio 2021 Build w/ Improvements_Alt2 AM 3/18/2016 SBR Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2021 Build w/ Improvements_Alt2 AM 3/18/2016 EBU EBT EBR WBL WBT NWL NWR 16 16 1900 200 1 100 0.91 1390 1390 1900 161 161 1900 0 0 851 851 1900 0.91 108 108 1900 160 1 100 1.00 201 201 1900 0 1 0 0.91 0.985 0.999 5004 0.921 4613 43 43 1900 0 1 100 1.00 0.90 18 45 478 7.2 0.90 1544 0 0 Perm 2 2 1741 NA 2 2 12.0 12.0 25.0 25.0 82.0 82.0 63.1% 63.1% 75.0 75.0 5.0 5.0 2.0 2.0 -2.0 5.0 Lag Lag Yes Yes 6.0 6.0 C-Min C-Min 89.7 0.69 0.55 11.5 0.0 11.5 B 11.5 B Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 0 No 0.950 1770 0.096 179 0.90 179 0.90 48 0 48 pm+pt 1 6 1 0.95 3539 0.950 1770 0.950 1770 45 334 5.1 0.90 946 35 1012 19.7 0.90 120 3539 946 NA 6 6 1.00 0.850 1583 1583 No 0.90 223 120 223 Prot pm+ov 8 1 8 8 1 7.0 12.0 7.0 7.0 14.0 25.0 25.0 14.0 20.0 102.0 28.0 20.0 15.4% 78.5% 21.5% 15.4% 13.0 95.0 21.0 13.0 5.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 -2.0 -2.0 -2.0 -2.0 5.0 5.0 5.0 5.0 Lead Lead Yes Yes 2.0 6.0 2.0 2.0 None C-Min None None 104.8 104.8 15.2 30.3 0.81 0.81 0.12 0.23 0.18 0.33 0.58 0.60 5.9 3.3 65.1 51.0 0.0 0.2 0.0 0.0 5.9 3.5 65.1 51.0 A A E D 3.6 55.9 A E Synchro 9 Report Page 5 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBT 236 346 398 3182 0 52 0 0.56 EBR 2021 Build w/ Improvements_Alt2 AM 3/18/2016 WBL 5 13 WBT 51 108 254 327 0 0 0 0.15 2853 945 0 0 0.50 NWL 97 157 932 160 313 0 0 0 0.38 NWR 171 235 428 0 0 0 0.52 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 96 (74%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.60 Intersection Signal Delay: 13.9 Intersection LOS: B Intersection Capacity Utilization 56.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 8: Jenks Carpenter Rd & High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2021 Build w/ Improvements_Alt2 AM 3/18/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 285 285 1900 5 5 1900 686 686 1900 0% 281 281 1900 0.95 0.91 1.00 0.850 167 167 1900 2% 240 1 100 1.00 206 206 1900 0 1 100 1.00 1304 1304 1900 -2% 1583 0 0 0.90 2 0.950 1787 0.314 591 0.90 317 0 319 custom pm+pt 5 5! 2 5 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.926 4709 0.90 6 45 1311 19.9 0.90 762 45 334 5.1 0.90 1449 1449 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 312 768 312 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 186 0 1 1.00 0.850 1567 1567 No 0.90 229 186 229 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 40.0 40.0 100.0 60.0 60.0 30.0 30.0 40.0 30.8% 30.8% 76.9% 46.2% 46.2% 23.1% 23.1% 30.8% 33.6 33.6 93.4 53.4 53.4 23.8 23.8 33.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 2.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 100.7 100.7 83.1 108.4 19.3 37.5 0.77 0.77 0.64 0.83 0.15 0.29 0.56 0.52 0.26 0.24 0.72 0.51 7.8 3.8 11.3 3.0 67.6 41.2 0.0 0.1 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 7 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 7.8 A 29 56 779 21 0 0 0.42 EBT 3.9 A 4.6 A 68 91 254 2774 254 0 0 0.57 WBU WBT 11.3 B 8.9 A 94 149 1231 3009 0 0 0 0.26 2021 Build w/ Improvements_Alt2 AM 3/18/2016 WBR 3.0 A 41 81 300 1391 0 0 0 0.22 SBL 67.6 E 53.1 D 151 221 1230 240 339 0 0 0 0.55 SBR 41.2 D 162 213 721 0 0 0 0.32 Intersection Summary Area Type: Other Cycle Length: 130 Actuated Cycle Length: 130 Offset: 112 (86%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay: 12.2 Intersection LOS: B Intersection Capacity Utilization 74.2% ICU Level of Service D Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 8 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2021 Build w/ Improvements_Alt2 AM 3/18/2016 11.3 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL 1 1 0 Free 100 90 2 1 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1030 4.14 2.22 670 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 670 - EBT EBR 1414 3 1414 3 0 0 Free Free - None 0 0 90 90 2 2 1571 3 0 - WBL WBT WBR 34 911 16 34 911 16 0 0 0 Free Free Free - None 150 0 -5 90 90 90 2 2 2 38 1012 18 Major2 1574 4.14 2.22 415 - 0 - NBLn1 NBLn2 EBL 22 334 670 0.758 0.13 0.002 $ 356.5 17.4 10.4 F C B 2.2 0.4 0 415 - 0 - WB 0.5 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - NBL NBT NBR 15 0 39 15 0 39 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 17 0 43 Minor1 2158 2681 1575 1575 583 1106 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 27 22 115 169 465 284 22 22 115 406 20 20 169 258 NB 111.6 F SBL SBT SBR 42 2 14 42 2 14 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 47 2 16 787 6.94 3.32 334 - Minor2 1885 1097 788 7.54 6.54 6.54 3.52 ~ 43 227 350 334 - ~ 35 ~ 35 227 304 2674 515 1097 1577 6.54 6.94 5.54 5.54 4.02 3.32 22 505 287 168 20 20 261 168 505 - SB $ 374 F EBR WBL WBT WBR SBLn1 SBLn2 - 415 34 505 - 0.091 - 1.438 0.031 - 14.5 -$ 489.1 12.4 B F B - 0.3 5.3 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 2021 Build w/ Improvements_Alt2 AM 3/18/2016 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 0.7 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1073 4.14 2.22 645 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 645 - NBLn1 313 0.295 21.2 C 1.2 EBT EBR 1484 11 1484 11 0 0 Free Free - None 0 0 90 90 2 2 1649 12 0 - 0 - WBL WBT WBR 9 961 5 9 961 5 0 0 0 Free Free Free - None 100 0 -5 90 90 90 2 2 2 10 1068 6 Major2 1661 4.14 2.22 384 384 - 0 - 0 - WB 0.1 EBL 645 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 83 0 0 83 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 92 Minor1 2209 2748 1655 1655 554 1093 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 24 20 102 154 484 288 24 24 102 471 NB 21.2 C 19 19 154 281 SBL SBT SBR 0 0 0 0 0 0 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 0 831 6.94 3.32 313 - Minor2 1915 1091 824 7.54 6.54 6.54 3.52 41 229 333 313 - 28 28 229 235 2752 537 1091 1661 6.54 6.94 5.54 5.54 4.02 3.32 19 488 289 153 19 19 281 153 488 - SB 0 A EBT EBR WBL WBT WBR SBLn1 - 384 - 0.026 - 14.6 0 B A 0.1 - Synchro 9 Report Page 2 HCM 2010 TWSC 20: High House Rd EB & WB U-Turn Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/18/2016 0 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt2 AM - EBL 0 A - EBT 1387 1387 0 Free None 0 0 90 2 1541 0 - WBT WBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 SBL 32 32 0 Stop 0 0 0 90 2 36 SBR 0 0 0 Stop None 90 2 0 Minor2 771 0 771 7.54 6.54 3.52 290 359 0 - 290 290 359 - SB EBT SBLn1 - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 HCM 2010 TWSC 30: South Entrance & High House Rd EB Intersection Int Delay, s/veh 3/18/2016 0.2 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 1414 5 1414 5 0 0 Free Free - None 0 0 90 90 2 2 1571 6 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt2 AM NBLn1 334 0.047 16.3 C 0.1 EBT - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - WBL WBT 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 NBL 0 0 0 Stop 0 0 90 2 0 NBR 14 14 0 Stop None 0 90 2 16 Minor1 1574 1574 0 7.54 6.54 3.52 74 115 - 787 6.94 3.32 334 - 74 74 115 - 334 - NB 16.3 C EBR - Synchro 9 Report Page 4 HCM 2010 TWSC 40: High House Road WB & North Entrance Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt2 AM 3/18/2016 0.5 EBL EBT 0 0 0 0 0 0 Free Free - None 0 0 90 90 2 2 0 0 WBT WBR 938 12 938 12 0 0 Free Free - None 0 -5 90 90 2 2 1042 13 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 0 - SBL 0 0 0 Stop 0 0 90 2 0 SBR 36 36 0 Stop None 0 90 2 40 Minor2 1049 1049 0 7.54 6.54 3.52 182 243 - 527 6.94 3.32 496 - 182 182 243 - 496 - SB 12.9 B WBT WBR SBLn1 - 496 - 0.081 - 12.9 B 0.3 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 HCM 2010 TWSC 50: EB U-Turn & High House Road WB Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt2 AM 3/18/2016 0 EBT EBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 WBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 0 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - WBT 940 940 0 Free None 0 -5 90 2 1044 0 - NBL 10 10 0 Stop 0 0 0 90 2 11 NBR 0 0 0 Stop None 90 2 0 Minor1 522 0 522 7.54 6.54 3.52 438 506 0 - 438 438 506 - NB - NBLn1 WBL WBT 0 A - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6:45 8:00 75 60 2 1 5932 5910 254 276 4948 265.3 137.4 6474 193.8 10 6:45 8:00 75 60 2 1 6153 6040 237 350 5067 275.6 144.5 6804 200.6 2 6:45 8:00 75 60 2 1 6167 6087 248 328 5163 300.4 166.8 7358 208.8 3 6:45 8:00 75 60 2 1 5945 5933 254 266 4954 259.4 131.1 6497 193.6 7 6:45 8:00 75 60 2 1 6069 5991 244 322 5030 278.0 148.0 6899 200.2 8 6:45 8:00 75 60 2 1 6161 6155 251 257 5151 303.8 170.8 7365 210.1 9 6:45 8:00 75 60 2 1 6083 5905 213 391 4995 330.8 201.3 8096 213.4 Avg 6:45 8:00 75 60 2 1 6057 5977 237 318 5020 286.2 156.3 7056 201.8 4 6:45 8:00 75 60 2 1 6020 5964 251 307 5002 287.8 158.3 6776 201.1 5 6:45 8:00 75 60 2 1 6134 5986 218 366 5013 297.4 167.9 7747 204.0 6 6:45 8:00 75 60 2 1 5883 5797 233 319 4881 263.7 137.1 6520 192.7 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:45 End Time 7:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 5932 5910 254 276 4948 265.3 137.4 6474 193.8 10 6153 6040 237 350 5067 275.6 144.5 6804 200.6 2 6167 6087 248 328 5163 300.4 166.8 7358 208.8 3 5945 5933 254 266 4954 259.4 131.1 6497 193.6 8 6161 6155 251 257 5151 303.8 170.8 7365 210.1 9 6083 5905 213 391 4995 330.8 201.3 8096 213.4 Avg 6057 5977 237 318 5020 286.2 156.3 7056 201.8 4 6020 5964 251 307 5002 287.8 158.3 6776 201.1 5 6134 5986 218 366 5013 297.4 167.9 7747 204.0 6 5883 5797 233 319 4881 263.7 137.1 6520 192.7 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 6069 5991 244 322 5030 278.0 148.0 6899 200.2 SimTraffic Report Page 2 SimTraffic Performance Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 1.0 135.2 WB 0.0 87.5 NB 1.3 72.5 SB 1.0 71.4 All 0.9 84.7 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.6 WB 0.0 1.7 NB 1.6 26.9 SB 1.1 36.2 All 0.1 2.3 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 2.6 WB 0.0 1.8 NB 0.2 28.2 All 0.0 3.1 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 10.1 WB 0.0 6.0 NW 1.6 51.5 All 0.2 13.6 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 8.6 WB 1.1 10.7 SB 2.0 46.1 All 0.6 14.1 20: High House Rd EB & WB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.2 SB 0.0 15.7 All 0.0 0.5 21: WB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 2.9 All 0.0 2.9 30: South Entrance & High House Rd EB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.9 NB 0.1 14.9 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC All 0.0 1.0 SimTraffic Report Page 3 SimTraffic Performance Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 40: High House Road WB & North Entrance Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.7 SB 0.1 7.9 All 0.0 1.0 50: EB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.1 NB 0.0 6.5 All 0.0 0.2 51: High House Rd EB & EB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.8 All 0.0 0.8 101: High House Road/High House Rd EB & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.1 3.8 SW 0.0 1.6 All 0.0 2.9 102: High House Rd EB & High House Road WB/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.4 NE 0.0 0.2 All 0.0 0.3 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 1.2 88.3 SimTraffic Report Page 4 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 424 276 471 325 25 65 EB T 693 408 777 1050 1 0 EB TR 656 373 712 1050 0 0 15 30 WB UL 243 125 233 350 0 0 WB L 330 147 289 617 0 0 WB T 624 386 662 617 6 28 0 0 20 76 WB R 400 321 449 NB L 425 228 503 300 13 35 325 0 1 NB T 1141 752 1140 1246 1 0 NB T 1113 727 1115 1246 1 0 41 44 28 83 NB R 550 327 708 SB L 396 269 442 450 338 14 47 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 466 298 502 338 19 63 SB T 592 236 560 1831 SB TR 532 211 471 1831 0 1 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 13 1 6 EB TR 1 0 0 236 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC WB L 55 18 46 150 NB LT 65 14 44 1316 0 0 NB R 75 29 62 100 0 0 SB LT 95 35 79 562 12 2 SB R 43 11 37 50 0 0 SimTraffic Report Page 5 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB T 18 1 14 775 EB TR 27 1 16 775 WB L 39 7 26 NB R 111 45 90 1244 100 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 198 55 133 200 0 0 EB T 322 113 245 417 0 0 EB TR 346 128 265 417 0 0 WB L 86 31 70 243 WB T 192 54 133 243 0 0 WB T 202 67 151 243 0 0 2 9 NW L 216 87 173 160 2 3 NW R 287 144 246 933 10 10 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 220 102 183 243 0 1 EB T 244 101 212 243 0 2 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB T 253 110 222 243 1 3 WB UT 63 13 43 300 WB T 188 91 163 1276 WB T 199 99 178 1276 WB R 158 58 117 SB L 253 127 215 300 240 1 2 SB R 245 116 207 1236 0 1 SimTraffic Report Page 6 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Intersection: 20: High House Rd EB & WB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 42 17 39 -12 Intersection: 21: WB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) WB L 32 2 13 WB T 62 6 90 639 125 WB T 117 21 164 639 0 0 Intersection: 30: South Entrance & High House Rd EB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB TR 6 0 5 564 NB R 46 12 39 341 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 7 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Intersection: 40: High House Road WB & North Entrance Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB R 57 23 50 432 Intersection: 50: EB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB L 31 5 24 -3 0 0 Intersection: 51: High House Rd EB & EB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 3 0 3 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 8 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 AM 3/18/2016 Intersection: 101: High House Road/High House Rd EB & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SW R 3 0 3 89 SW R 64 16 89 89 4 19 Intersection: 102: High House Rd EB & High House Road WB/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 526 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 9 APPENDIX B8 2021 Build with Improvements Alternative 2 PM Peak Hour Traffic Analysis Output Files Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay 2021 Build w/ Improvements_Alt2 PM 3/17/2016 EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR SBL 132 132 1900 325 1 100 1.00 548 548 1900 86 86 1900 0 0 7 7 1900 479 479 1900 432 432 1900 300 1 3 3 1900 318 318 1900 450 1 0.95 1.00 1.00 1.00 0.850 0.95 110 110 1900 325 1 100 1.00 859 859 1900 0.95 0.980 325 325 1900 350 1 100 0.97 0.95 1.00 0.850 596 596 1900 338 2 200 0.97 3468 0 0 1863 1583 0 3539 1583 3468 0 No 0 1863 1583 No 0 3539 1583 No 0.950 1770 0.123 229 0.90 147 147 pm+pt 7 4 7 45 1121 17.0 0.90 609 705 NA 4 4 7.0 7.0 13.9 14.3 15.0 37.0 9.4% 23.1% 8.1 29.7 3.0 5.0 3.9 2.3 -1.9 -2.3 5.0 5.0 Lead Lag Yes Yes 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 None None 42.9 32.9 0.27 0.21 0.94 0.99 96.2 93.3 0.0 0.0 96.2 93.3 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0.950 3433 0.950 3433 0.90 96 0.90 8 0.90 361 0 0 Prot 3! 369 Prot 3 3 3 45 709 10.7 0.90 532 0.950 1770 0.950 1770 0.90 480 0.90 3 0.90 122 532 480 NA pm+ov 8 1 8 8 8 0 Prot 5 125 Prot 5 5 5 7.0 7.0 7.0 7.0 13.9 13.9 14.3 13.5 27.0 27.0 49.0 41.0 16.9% 16.9% 30.6% 25.6% 20.1 20.1 41.7 34.5 3.1 3.1 5.0 3.0 3.8 3.8 2.3 3.5 -1.9 -2.3 -1.5 5.0 5.0 5.0 Lead Lead Lag Lead Yes Yes Yes Yes 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 None None None None 21.1 44.0 83.4 0.13 0.28 0.52 0.82 1.04 0.58 82.5 105.3 29.6 0.0 0.0 0.0 82.5 105.3 29.6 7.0 13.2 15.0 9.4% 8.8 3.0 3.2 Lag Yes 2.0 2.0 0.0 0.0 None 50 1312 17.9 0.90 954 0.950 3433 0.950 3433 0.90 353 0.90 662 954 353 NA pm+ov 2 3! 2 2 3 662 Prot 1 1 7.0 14.0 7.0 7.0 13.2 20.6 13.9 13.5 15.0 55.0 27.0 41.0 9.4% 34.4% 16.9% 25.6% 8.8 48.4 20.1 34.5 3.0 5.1 3.1 3.0 3.2 1.5 3.8 3.5 -1.2 -1.6 -1.9 -1.5 5.0 5.0 5.0 5.0 Lag Lag Lead Lead Yes Yes Yes Yes 2.0 6.0 2.0 2.0 2.0 3.4 2.0 2.0 0.0 20.0 0.0 0.0 0.0 45.0 0.0 0.0 None C-Min None None 10.0 51.6 77.7 34.4 0.06 0.32 0.49 0.22 1.14 0.84 0.46 0.90 189.9 58.3 29.9 76.7 0.0 0.0 0.0 0.0 189.9 58.3 29.9 76.7 Synchro 9 Report Page 1 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay SBT SBR 1549 1549 1900 101 101 1900 0 0 0.95 0.991 0.95 3507 0 3507 0 No 50 1897 25.9 0.90 1721 1833 NA 6 2021 Build w/ Improvements_Alt2 PM 3/17/2016 0.90 112 0 6 14.0 20.8 81.0 50.6% 74.2 5.3 1.5 -1.8 5.0 Lead Yes 6.0 3.4 20.0 45.0 C-Min 76.0 0.48 1.10 94.6 0.0 94.6 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 2 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBL F 106 #251 325 157 0 0 0 0.94 EBT F 93.8 F ~408 #541 1041 713 0 0 0 0.99 EBR WBU WBL F 195 256 350 472 0 0 0 0.78 2021 Build w/ Improvements_Alt2 PM 3/17/2016 WBT F 72.9 E ~600 #838 629 WBR C 512 0 0 0 1.04 NBU NBL F 331 449 ~151 #294 300 825 0 0 0 0.58 325 110 0 0 0 1.14 NBT E 62.8 E 496 587 1232 1140 0 0 0 0.84 NBR C SBL E 243 336 346 #427 450 777 0 0 0 0.45 338 772 0 0 0 0.86 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 120 (75%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.14 Intersection Signal Delay: 80.3 Intersection LOS: F Intersection Capacity Utilization 101.5% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ! Phase conflict between lane groups. Splits and Phases: 1: NC 55 & Green Level West/High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 Lanes, Volumes, Timings 1: NC 55 & Green Level West/High House Road Lane Group LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio SBT F 89.8 F ~1141 #1274 1817 2021 Build w/ Improvements_Alt2 PM 3/17/2016 SBR 1665 0 0 0 1.10 Intersection Summary Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 4 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS 2021 Build w/ Improvements_Alt2 PM 3/17/2016 EBU EBT EBR WBL WBT NWL NWR 12 12 1900 200 1 100 0.91 1361 1361 1900 293 293 1900 0 0 1470 1470 1900 0.91 59 59 1900 160 1 100 1.00 180 180 1900 0 1 0.91 0.974 210 210 1900 0 1 100 1.00 0 0 4953 0.913 4522 0.90 13 45 478 7.2 0.90 1512 0 0 Perm 2 2 1851 NA 2 2 12.0 12.0 25.0 25.0 102.0 102.0 63.8% 63.8% 95.0 95.0 5.0 5.0 2.0 2.0 -2.0 5.0 Lag Lag Yes Yes 6.0 6.0 C-Min C-Min 112.8 0.70 0.58 13.6 0.0 13.6 B 13.6 B Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 No 0.950 1770 0.084 156 0.90 326 0.90 233 0 233 pm+pt 1 6 1 0.95 3539 0.950 1770 0.950 1770 45 334 5.1 0.90 1633 35 1012 19.7 0.90 66 3539 1633 NA 6 6 1.00 0.850 1583 1583 No 0.90 200 66 200 Prot pm+ov 8 1 8 8 1 7.0 12.0 7.0 7.0 14.0 25.0 25.0 14.0 32.0 134.0 26.0 32.0 20.0% 83.8% 16.3% 20.0% 25.0 127.0 19.0 25.0 5.0 5.0 5.0 5.0 2.0 2.0 2.0 2.0 -2.0 -2.0 -2.0 -2.0 5.0 5.0 5.0 5.0 Lead Lead Yes Yes 2.0 6.0 2.0 2.0 None C-Min None None 137.4 137.4 12.6 37.2 0.86 0.86 0.08 0.23 0.70 0.54 0.48 0.54 44.7 3.6 81.3 58.3 0.5 0.2 0.0 0.0 45.1 3.8 81.3 58.3 D A F E 8.9 64.0 A E Synchro 9 Report Page 5 Lanes, Volumes, Timings 8: Jenks Carpenter Rd & High House Road Lane Group Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBT 327 469 398 3186 0 20 0 0.58 EBR 2021 Build w/ Improvements_Alt2 PM 3/17/2016 WBL 122 221 WBT 128 154 254 407 27 0 0 0.61 3039 514 0 0 0.65 NWL 67 118 932 160 232 0 0 0 0.28 NWR 186 247 441 0 0 0 0.45 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 113 (71%), Referenced to phase 2:EBTU and 6:WBTL, Start of Green Natural Cycle: 75 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.70 Intersection Signal Delay: 14.8 Intersection LOS: B Intersection Capacity Utilization 92.0% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 8: Jenks Carpenter Rd & High House Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Grade (%) Storage Length (ft) Storage Lanes Taper Length (ft) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Right Turn on Red Satd. Flow (RTOR) Link Speed (mph) Link Distance (ft) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Maximum Green (s) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) Minimum Gap (s) Time Before Reduce (s) Time To Reduce (s) Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay 2021 Build w/ Improvements_Alt2 PM 3/17/2016 EBU EBL EBT WBU WBT WBR SBL SBR 2 2 1900 163 163 1900 5 5 1900 1397 1397 1900 0% 83 83 1900 0.95 0.91 1.00 0.850 146 146 1900 2% 240 1 100 1.00 281 281 1900 0 1 100 1.00 1376 1376 1900 -2% 1583 0 0 0.90 2 0.950 1787 0.123 231 0.90 181 0 183 custom pm+pt 5 5! 2 5 5 0.95 300 1 200 0.91 3575 0 3575 0 5085 0.931 4734 0.90 6 45 1311 19.9 0.90 1552 45 334 5.1 0.90 1529 1529 NA 2 2 0 Perm 6 6 300 1 1583 No 0.90 92 1558 92 NA pm+ov 6 4 6 6 4 0.950 1752 0.950 1752 45 1310 19.8 0.90 162 0 1 1.00 0.850 1567 1567 No 0.90 312 162 312 Prot pm+ov 4 5! 4 4 5 7.0 7.0 12.0 12.0 12.0 7.0 7.0 7.0 13.4 13.4 18.6 18.6 18.6 13.2 13.2 13.4 25.0 25.0 120.0 95.0 95.0 40.0 40.0 25.0 15.6% 15.6% 75.0% 59.4% 59.4% 25.0% 25.0% 15.6% 18.6 18.6 113.4 88.4 88.4 33.8 33.8 18.6 3.0 3.0 4.7 4.7 4.7 3.0 3.0 3.0 3.4 3.4 1.9 1.9 1.9 3.2 3.2 3.4 -1.4 -1.6 -1.6 -2.2 -1.2 -2.0 5.0 5.0 5.0 4.0 5.0 4.4 Lead Lead Lag Lag Lead Yes Yes Yes Yes Yes 2.0 2.0 2.0 6.0 6.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 2.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 0.0 None None C-Min C-Min C-Min None None None 129.6 129.6 111.6 138.0 20.4 39.0 0.81 0.81 0.70 0.86 0.13 0.24 0.58 0.53 0.47 0.07 0.73 0.82 22.5 3.6 12.1 1.8 84.9 74.1 0.1 0.1 0.0 0.0 0.0 0.0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 7 Lanes, Volumes, Timings 9: High House Road & Carpenter Upchurch Road Lane Group Total Delay LOS Approach Delay Approach LOS Queue Length 50th (ft) Queue Length 95th (ft) Internal Link Dist (ft) Turn Bay Length (ft) Base Capacity (vph) Starvation Cap Reductn Spillback Cap Reductn Storage Cap Reductn Reduced v/c Ratio EBU EBL 22.7 C 19 74 381 12 0 0 0.50 EBT 3.7 A 5.8 A 49 60 254 2895 431 0 0 0.62 WBU WBT 12.1 B 11.5 B 247 348 1231 3302 0 0 0 0.47 2021 Build w/ Improvements_Alt2 PM 3/17/2016 WBR 1.8 A 11 22 300 1515 0 0 0 0.06 SBL 84.9 F 77.8 E 166 239 1230 240 383 0 0 0 0.42 SBR 74.1 E 313 398 450 0 0 0 0.69 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 160 Offset: 141 (88%), Referenced to phase 2:EBTL and 6:WBTU, Start of 1st Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.82 Intersection Signal Delay: 17.1 Intersection LOS: B Intersection Capacity Utilization 94.5% ICU Level of Service F Analysis Period (min) 15 ! Phase conflict between lane groups. Splits and Phases: 9: High House Road & Carpenter Upchurch Road Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 8 HCM 2010 TWSC 6: Cranborne Ln/Sir Walker Ln & High House Road Intersection Int Delay, s/veh 2021 Build w/ Improvements_Alt2 PM 3/17/2016 14.6 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBL 7 7 0 Free 100 90 2 8 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1520 4.14 2.22 435 - Approach HCM Control Delay, s HCM LOS EB 0.1 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) Notes ~: Volume exceeds capacity 435 - EBT EBR WBU WBL WBT WBR 1554 31 10 104 1302 66 1554 31 10 104 1302 66 0 0 0 0 0 0 Free Free Free Free Free Free - None - None - 150 0 0 0 -5 90 90 90 90 90 90 2 2 2 2 2 2 1727 34 11 116 1447 73 0 - Major2 0 1318 1761 - 6.44 4.14 - 2.52 2.22 - 207 351 - 326 326 - NBLn1 NBLn2 EBL - 290 435 - 0.111 0.018 0 19 13.4 A C B - 0.4 0.1 0 - WB 1.8 EBT - $: Delay exceeds 300s Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - NBL NBT NBR 0 0 29 0 0 29 0 0 0 Stop Stop Stop - None - 100 0 0 90 90 90 2 2 2 0 0 32 Minor1 2736 3532 1759 1759 977 1773 7.54 6.54 6.54 5.54 6.54 5.54 3.52 4.02 10 6 88 137 269 134 9 9 86 259 6 6 134 134 NB 19 C SBL SBT SBR 28 0 12 28 0 12 0 0 0 Stop Stop Stop - None 50 0 0 90 90 90 2 2 2 31 0 13 881 6.94 3.32 290 - Minor2 2616 1737 879 7.54 6.54 6.54 3.52 ~ 12 91 309 290 - ~ 11 ~ 11 89 270 3514 760 1737 1777 6.54 6.94 5.54 5.54 4.02 3.32 6 349 140 134 6 6 140 132 349 - SB $ 1061 F EBR WBL WBT WBR SBLn1 SBLn2 - 326 11 349 - 0.389 - 2.828 0.038 - 22.9 -$ 1509 15.7 C F C - 1.8 4.9 0.1 +: Computation Not Defined *: All major volume in platoon Synchro 9 Report Page 1 HCM 2010 TWSC 2021 Build w/ Improvements_Alt2 PM 3/17/2016 7: Widdington Ln/Church Entrance & High House Road Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 1 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 1642 4.14 2.22 390 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 390 - NBLn1 281 0.324 23.8 C 1.4 EBT EBR 1584 37 1584 37 0 0 Free Free - None 0 0 90 90 2 2 1760 41 0 - 0 - WBL 63 63 0 Free 100 90 2 70 Major2 1801 4.14 2.22 338 338 - WBT WBR 1477 1 1477 1 0 0 Free Free - None 0 -5 90 90 2 2 1641 1 0 - 0 - WB 0.8 EBL 390 0 A 0 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC NBL NBT NBR 0 0 82 0 0 82 0 0 0 Stop Stop Stop - None 0 1 0 90 90 90 2 2 2 0 0 91 SBL SBT SBR 0 0 5 0 0 5 0 0 0 Stop Stop Stop - None 0 0 0 90 90 90 2 2 2 0 0 6 Minor1 2742 1781 961 7.54 6.54 6.54 3.52 9 85 275 3563 1781 1782 6.54 5.54 5.54 4.02 6 133 133 901 6.94 3.32 281 - Minor2 2662 1782 880 7.54 6.54 6.54 3.52 11 85 308 7 7 85 214 5 5 133 105 281 - 6 6 85 208 NB 23.8 C 3583 821 1782 1801 6.54 6.94 5.54 5.54 4.02 3.32 5 318 133 130 4 4 105 130 318 - SB 16.5 C EBT EBR WBL WBT WBR SBLn1 - 338 - 318 - 0.207 - 0.017 - 18.4 - 16.5 C C 0.8 - 0.1 Synchro 9 Report Page 2 HCM 2010 TWSC 20: High House Rd EB & WB U-Turn Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 3/17/2016 0 EBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt2 PM - EBL 0 A - EBT 1582 1582 0 Free None 0 0 90 2 1758 0 - WBT WBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 SBL 31 31 0 Stop 0 0 0 90 2 34 SBR 0 0 0 Stop None 90 2 0 Minor2 879 0 879 7.54 6.54 3.52 242 309 0 - 242 242 309 - SB EBT SBLn1 - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 3 HCM 2010 TWSC 30: South Entrance & High House Rd EB Intersection Int Delay, s/veh 3/17/2016 0.1 Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow EBT EBR 1597 16 1597 16 0 0 Free Free - None 0 0 90 90 2 2 1774 18 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major1 0 - Approach HCM Control Delay, s HCM LOS EB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 2021 Build w/ Improvements_Alt2 PM NBLn1 284 0.035 18.1 C 0.1 EBT - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 0 - WBL WBT 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 NBL 0 0 0 Stop 0 0 90 2 0 NBR 9 9 0 Stop None 0 90 2 10 Minor1 1783 1783 0 7.54 6.54 3.52 52 85 - 895 6.94 3.32 284 - 52 52 85 - 284 - NB 18.1 C EBR - Synchro 9 Report Page 4 HCM 2010 TWSC 40: High House Road WB & North Entrance Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt2 PM 3/17/2016 0.3 EBL EBT 0 0 0 0 0 0 Free Free - None 0 0 90 90 2 2 0 0 WBT WBR 1288 40 1288 40 0 0 Free Free - None 0 -5 90 90 2 2 1431 44 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) 0 - SBL 0 0 0 Stop 0 0 90 2 0 SBR 24 24 0 Stop None 0 90 2 27 Minor2 1453 1453 0 7.54 6.54 3.52 91 137 - 737 6.94 3.32 361 - 91 91 137 - 361 - SB 15.8 C WBT WBR SBLn1 - 361 - 0.074 - 15.8 C 0.2 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 5 HCM 2010 TWSC 50: EB U-Turn & High House Road WB Intersection Int Delay, s/veh Movement Traffic Vol, veh/h Future Vol, veh/h Conflicting Peds, #/hr Sign Control RT Channelized Storage Length Veh in Median Storage, # Grade, % Peak Hour Factor Heavy Vehicles, % Mvmt Flow 2021 Build w/ Improvements_Alt2 PM 3/17/2016 0 EBT EBR 0 0 0 0 0 0 Stop Stop - None 0 0 90 90 2 2 0 0 WBL 0 0 0 Free 90 2 0 Major/Minor Conflicting Flow All Stage 1 Stage 2 Critical Hdwy Critical Hdwy Stg 1 Critical Hdwy Stg 2 Follow-up Hdwy Pot Cap-1 Maneuver Stage 1 Stage 2 Platoon blocked, % Mov Cap-1 Maneuver Mov Cap-2 Maneuver Stage 1 Stage 2 Major2 0 - Approach HCM Control Delay, s HCM LOS WB 0 Minor Lane/Major Mvmt Capacity (veh/h) HCM Lane V/C Ratio HCM Control Delay (s) HCM Lane LOS HCM 95th %tile Q(veh) - WBT 1314 1314 0 Free None 0 -5 90 2 1460 0 - NBL 14 14 0 Stop 0 0 0 90 2 16 NBR 0 0 0 Stop None 90 2 0 Minor1 730 0 730 7.54 6.54 3.52 310 380 0 - 310 310 380 - NB - NBLn1 WBL WBT 0 A - Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC Synchro 9 Report Page 6 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6:45 8:00 75 60 2 1 6608 6587 344 365 5716 395.6 252.0 9818 254.3 10 6:45 8:00 75 60 2 1 6664 6605 386 445 5782 499.2 353.7 10667 280.1 2 6:45 8:00 75 60 2 1 6736 6667 353 422 5909 478.9 330.3 10779 280.2 3 6:45 8:00 75 60 2 1 6478 6475 360 363 5601 414.9 273.7 9860 255.6 7 6:45 8:00 75 60 2 1 6691 6596 356 451 5804 507.8 361.4 11725 284.4 8 6:45 8:00 75 60 2 1 6527 6480 321 368 5704 411.3 268.1 10238 257.6 9 6:45 8:00 75 60 2 1 6457 6333 290 414 5533 383.5 244.5 9697 246.7 Avg 6:45 8:00 75 60 2 1 6638 6566 346 416 5761 440.0 295.2 10523 266.2 4 6:45 8:00 75 60 2 1 6654 6618 400 436 5838 460.7 313.9 11353 274.0 5 6:45 8:00 75 60 2 1 6690 6626 356 420 5828 421.0 274.7 10519 263.2 6 6:45 8:00 75 60 2 1 6857 6670 306 493 5892 427.6 279.3 10531 265.3 Summary of All Intervals Run Number Start Time End Time Total Time (min) Time Recorded (min) # of Intervals # of Recorded Intervals Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Interval #0 Information Seeding Start Time 6:45 End Time 7:00 Total Time (min) 15 Volumes adjusted by Growth Factors. No data recorded this interval. Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 1 SimTraffic Simulation Summary 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) 1 6608 6587 344 365 5716 395.6 252.0 9818 254.3 10 6664 6605 386 445 5782 499.2 353.7 10667 280.1 2 6736 6667 353 422 5909 478.9 330.3 10779 280.2 3 6478 6475 360 363 5601 414.9 273.7 9860 255.6 8 6527 6480 321 368 5704 411.3 268.1 10238 257.6 9 6457 6333 290 414 5533 383.5 244.5 9697 246.7 Avg 6638 6566 346 416 5761 440.0 295.2 10523 266.2 4 6654 6618 400 436 5838 460.7 313.9 11353 274.0 5 6690 6626 356 420 5828 421.0 274.7 10519 263.2 6 6857 6670 306 493 5892 427.6 279.3 10531 265.3 Interval #1 Information Recording Start Time 7:00 End Time 8:00 Total Time (min) 60 Volumes adjusted by Growth Factors. Run Number Vehs Entered Vehs Exited Starting Vehs Ending Vehs Travel Distance (mi) Travel Time (hr) Total Delay (hr) Total Stops Fuel Used (gal) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 7 6691 6596 356 451 5804 507.8 361.4 11725 284.4 SimTraffic Report Page 2 SimTraffic Performance Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 1: NC 55 & Green Level West/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 1.3 130.0 WB 0.0 77.0 NB 1.1 64.0 SB 67.5 178.7 All 27.6 121.8 6: Cranborne Ln/Sir Walker Ln & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.2 WB 0.0 4.6 NB 2.4 21.5 SB 1.3 94.1 All 0.0 4.3 7: Widdington Ln/Church Entrance & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 3.2 WB 0.0 3.7 NB 0.2 31.2 SB 0.1 15.7 All 0.0 4.2 8: Jenks Carpenter Rd & High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 12.3 WB 0.0 10.3 NW 1.3 64.6 All 0.1 14.9 9: High House Road & Carpenter Upchurch Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 7.4 WB 0.8 17.1 SB 1.6 59.7 All 0.5 18.4 20: High House Rd EB & WB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 0.2 SB 0.0 16.5 All 0.0 0.5 21: WB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 20.1 All 0.0 20.1 30: South Entrance & High House Rd EB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.3 NB 0.1 15.7 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC All 0.0 1.4 SimTraffic Report Page 3 SimTraffic Performance Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 40: High House Road WB & North Entrance Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 3.0 SB 0.1 25.7 All 0.0 3.4 50: EB U-Turn & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 0.3 NB 0.0 11.0 All 0.0 0.4 51: High House Rd EB & EB U-Turn Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 1.2 All 0.0 1.2 101: High House Road/High House Rd EB & High House Road WB Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) EB 0.0 4.0 SW 0.0 6.4 All 0.0 5.1 102: High House Rd EB & High House Road WB/High House Road Performance by approach Approach Denied Del/Veh (s) Total Del/Veh (s) WB 0.0 1.0 NE 0.0 0.4 All 0.0 0.7 Total Network Performance Denied Del/Veh (s) Total Del/Veh (s) Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC 23.1 129.9 SimTraffic Report Page 4 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 424 185 409 325 2 6 EB T 588 403 760 1050 3 0 EB TR 558 392 735 1050 2 0 25 33 WB UL 306 156 253 350 0 0 WB L 610 241 520 617 1 8 WB T 700 592 822 617 28 181 0 0 47 204 WB R 400 346 521 NB UL 374 233 411 300 4 18 325 14 62 NB T 498 321 465 1246 NB T 476 283 425 1246 7 8 0 0 NB R 288 137 249 SB L 403 265 386 450 338 4 32 Intersection: 1: NC 55 & Green Level West/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 538 503 660 338 6 49 SB T 1880 1678 2214 1831 38 0 SB TR 1873 1654 2212 1831 19 0 49 289 Intersection: 6: Cranborne Ln/Sir Walker Ln & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 25 3 16 EB T 1 0 1 236 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB TR 16 1 7 236 WB UL 132 59 111 150 0 1 WB T 63 3 35 775 0 0 WB TR 44 2 22 775 NB R 64 25 57 100 SB LT 115 43 102 562 29 4 SB R 57 12 44 50 0 0 SimTraffic Report Page 5 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Intersection: 7: Widdington Ln/Church Entrance & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB T 7 0 6 775 EB TR 38 4 20 775 WB L 103 40 84 100 1 9 WB T 98 6 51 417 WB TR 21 1 20 417 NB R 120 48 97 1244 SB R 26 3 17 748 0 0 Intersection: 8: Jenks Carpenter Rd & High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UT 183 43 120 200 0 0 EB T 345 147 290 417 0 0 EB TR 370 167 321 417 0 1 WB L 248 140 238 243 3 14 WB T 200 50 136 243 0 0 WB T 208 59 152 243 0 1 3 15 NW L 241 66 154 160 0 0 NW R 322 144 261 933 13 8 Intersection: 9: High House Road & Carpenter Upchurch Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB UL 174 81 151 243 EB T 230 75 176 243 0 1 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC EB T 242 84 184 243 0 2 WB UT 259 66 168 300 0 0 WB T 380 187 336 1276 WB T 383 191 339 1276 2 8 2 1 WB R 113 20 76 SB L 301 136 237 300 240 1 2 SB R 434 206 345 1236 7 11 SimTraffic Report Page 6 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Intersection: 20: High House Rd EB & WB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SB L 47 18 43 -12 Intersection: 21: WB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) WB L 96 6 51 125 WB T 616 132 511 645 1 7 WB T 699 244 706 645 6 43 2 0 Intersection: 30: South Entrance & High House Rd EB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB R 33 9 32 341 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 7 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Intersection: 40: High House Road WB & North Entrance Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) WB T 142 12 103 409 WB TR 206 24 156 409 0 1 SB R 65 20 51 433 Intersection: 50: EB U-Turn & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) NB L 34 9 31 -3 0 0 Intersection: 51: High House Rd EB & EB U-Turn Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) EB L 11 0 6 100 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 8 Queuing and Blocking Report 2021 Build w/ Improvements_Alt2 PM 3/17/2016 Intersection: 101: High House Road/High House Rd EB & High House Road WB Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) SW R 67 6 45 89 0 3 SW R 174 92 212 89 25 160 Intersection: 102: High House Rd EB & High House Road WB/High House Road Movement Directions Served Maximum Queue (ft) Average Queue (ft) 95th Queue (ft) Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1182 Ashbourne Subdivision Access Traffic Analysis Accelerate Engineering, PLLC SimTraffic Report Page 9