MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LTD. BHOPAL ANNUALREGULATORYCOMPLIANCE REPORT FOR THE PERIOD APRIL‟13 TO MARCH‟14 By- Reporter of Compliance (Central Discom) Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 1|Page M. P. MADHYA KSHETRA VIDYUT VITARAN COMP. LTD ( Government of M. P. Undertaking) NishthaParisar, Bijalee Nagar, Govindpura, Bhopal –462023 0755-2678325, 2602036, 35, 33; Fax:2589821 Website:-wss.mpcz.co.in CIN Number: U40109MP2002SGC01519 No. MD/MK/ROC/R-146/F-19 (A)/613 Bhopal Dated: 23 /06/2014 To The Secretary M.P. Electricity Regulatory Commission E-5 Arera Colony Metro Plaza (5th Floor) Bittan Market 462016 BHOPAL. Sub : Annual Regulatory Compliance Report for Year ending March‟14. ***** In compliance to the Clause 6.1 of the MPERC, Bhopal (Guidelines for Reporting Regulatory Compliance) Regulation, 2005, please find enclosed a draft of Annual Compliance Report in respect of MPMKVV Co. Ltd, Bhopal for period from April 2013 to March 14. The report has been prepared in the manner that meets the requirements of the compliance systems and reporting. The enclosed Annual report covers information about all the details that were required to be furnished for the period specified as above. Enclosed report has been discussed by the Board of Director and has their approval for submission before the Commission. The licensee, having made due enquiry, is not aware of any breach of any of the obligations of license conditions or regulations. Reporter of Compliance M.P.M.K.V.V. Co. Ltd BHOPAL Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal Managing Director M.P.M.K. V.V. Co. Ltd BHOPAL 2|Page INDEX, S. No. Chapter Regulations Clause Page no 5 1. Details of Format Enclosed 2. Regulations covered under report. 7 3. Directions of Regulations fully complied partially complied and not complied. 8 4. Preamble 9 5. Observation of MD 12 6. Guidelines for Reporting Regulatory compliance Regulations 2005. 5.2, 5.3, 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 14 7 I MIS Regulations 3.2, 3.3 17 8 II MP Regulation on treatment of other business of licensee 3 (1), 4 (1), 4 (2) 20 9 III Regulation on establishment of Ombudsman & Forum 5.4, 5.5 21 10 IV MP Distribution code 5.3.3 22 8.1, 8.8, 8.11, 8.13, 8.14,8.15, 8.17, 9.2, 9.3, 11 V MP Electricity Supply Code 9.4,9.11,9.13,9.15,9.16,10 23 .3.1,10.3.2,10.3.3,10.3.4, 10.3.5, 10.3.6, 10.3.7, 7.2, 9.1, 10.2a, 17.13, 20.2, 20.5 29 Distribution Performance Standard (3.1, 3.2, 3.3,), 5.6, ,8.1, 14.9 31 VIII Establishment of Ombudsman/Forums Chapter 1, 3.3, 39 IX Security deposit regulations 1.21, 1.22 40 12 VI Conditions of Licensee 13 VII 14 15 16 MIS Formats. 41 17 Supply code Formats. 51 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 3|Page Remarks 18 Formats I to V: Conditions of license. 68 19 Status of providing metering at all incoming and outgoing feeders of 11 KV and above for energy accounting 83 Annexure „A‟ Annexure- 20 Failure of DTR during the Year ending March‟2014 85 21 Failure of Power Transformers during Year ending March “2014 88 22 Projection of Category wise Sales 90 23 Projection of Monthly unrestricted and Restricted Max. demand 92 22 Reliability Index for DHQs for Year ending March “2014 94 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 4|Page „B‟ Annexure„C‟ Annexure„D‟ Annexure„E‟ Annexure„F‟ DETAILS OF FORMAT ENCLOSED S.n. Report name Format number a to h 1 Format name Page no. Quarterly report on guaranteed distribution performance standard 35 i Fatal Electrical Accidents 36 j Routine maintenance of power and distribution Transformers (H.Y) 36 k Power of Distribution and Transformers Failure 37 i Periodical testing of meters 37 m Status of metering for Energy Audit and accounting 38 D1 Demand, Collection, Sale and Arrears Details D2 LT Unmetered (Installation of meters to different categories for connections ) 45 D3 LT meter Urban, Rural 46 D4 HT meters/Metering Equipment D5 Details of irrigation Detected under section 135 47 48 D6 Distribution & Power Transformer Failure 49 D7 Accident (Electrical) 50 DPS 42 2 MIS ESC6 3 ESC Release of new connection with meter only ESC7 Details of Various Type of Meters Installed in area of licensee 52 55 ESC8 Periodic Inspection/Testing of Meters 60 ESC9 Testing of metres on consumer‟s request .(on deposition of contest. Fee) 64 ESC10 AII HT Consumers & LT Consumers Having Annual Demand More than Rs. 10 Lacs. (On Internet on Monthly Basis.) ESC11 Disconnection after issue of PFL notice On company website 65 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 5|Page ESC12 Redressal of disputed/errorous bills related complaints 66 ESC13 Connected Consumers having arrears more than 3 month & details of permanently disconnected consumers Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 6|Page 67 REGULATIONS COVERED UNDER REPORT As per provision under MPERC (Guidelines for Reporting Regulatory Compliance) regulation2005, following regulations are covered in this report Chapter wise. Chapter I II III IV Regulations MIS Regulations. MP Regulation on treatment of other business of licensee. Regulation on establishment of Ombudsman & Forum. MP Distribution code V MP Electricity Supply Code. VI Conditions of Licensee. VII Distribution Performance Standard. VIII IX Establishment of Ombudsman/Forums. Security deposit regulations. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 7|Page ISSUES, FULLY COMPLIED /PARTIALLY COMPLIED / NOT COMPLIED As desired in clause 6.3 of MPERC (guidelines for reporter of regulatory compliance) regulations 2005, fragmentation of the issues of regulatory compliance report in three parts is as under: (A) Issues Fully Complied Regulations S.n. (B) Clause reference 1 Guidelines for reporting Regulatory compliance Regulations 2005. 5.2, 5.3, 6.1, 6.2, 6.3, 6.4, 6.5, 6.6, 6.7, 2 MIS Regulations. 3.2, 3.3 3 MP Regulation on treatment of other business of licensee. 3(1), 4(1), 4(2) 4 5 Regulation on establishment of Ombudsman & Forum MP Electricity Supply Code. 6 Conditions of licensee. 7.2, 9.1, 10.2a, 17.13, 20.2 7 Distribution Performance Standards Regulation. (3.1, 3.2, 3.3,)5.6, ,8.1 8 Establishment of Forum and electricity ombudsman Regulations. Chapter-1., 3.3 9 Security Deposit Regulation. 1.21 , 1.22 5.4, 5.5 8.8, 8.11, 8.13, 8.14, 8.15, 8.17, 9.2, 9.3, 9.4,9.11,9.15,9.16,10.3.1,10.3.2,10.3.3,10.3.4, 10.3.5, 10.3.6, 10.3.7 (B) Issues Partially Complied. 1. MP electricity Supply Code. 8.1, 9.13 2. Conditions of licensee 20.5 3. 14.9 Distribution Performance Standards Regulation. (C ) Issues Not Complied NIL Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 8|Page ANNUAL REPORT ON REGULATORY COMPLIANCE IN RESPECT OF MADHYA PRADESH MADHYA KSHETRA VIDYUT VITARAN COMPANY LIMITED YEAR 2013-14 1. Preamble :1.1 Requirement under that act :One of the function of the State Commission mentioned in Section 86(1-i) of the Electricity Act 2003, is to specify or enforce standards with respect to quality, continuity and reliability of service by the Licensees .Accordingly, Hon‟ble MPERC in exercise of powers under Sub-section (1) of Section 181 of the said act notified on 5th May 2005 the MPERC (Guidelines for reporting of Regulatory Compliance) Regulations,2005. The objective of “Compliance Reporting System” is mentioned that the licensee should build a sound and effective regulatory compliance mechanism. The Regulations are applicable to all the licensees in the state including the MPMKVVCL involved in the business of distribution and retail supply in the areas covered by Commissionaries of Bhopal, Hoshangabad, Gwalior and Chambal. 1.2 About the licensee :Madhya Pradesh Madhya KshetraVidyutVitaran Company Limited (MPMKVVCL) was incorporated as a wholly owned Government Company on 31st May 2002, under the Companies Act 1956, the same has been notified vide order No. 5555/RS/4/13/2001 dated 1st July, 2002 of the Government of Madhya Pradesh. The Company undertakes the activities of distribution and retail supply in the areas covered by the Commissionaries of Bhopal, Hoshangabad, Gwalior and Chambal. The Company obtained certificate of commencement of business on 16th July 2002 from Registrar of Companies, Madhya Pradesh and Chattisgarh, Gwalior.Subsequently vide Government of Madhya Pradesh notification No. 3679/FRS/18/13/2002 dated 31.05.2005, the Company has been provided functional autonomy with effect from 01.06.2005. The Government of Madhya Pradesh vide its order no. 2671/12/13 dated 29th March, 2012 had transferred all the shares of the Company to M. P. Power Management Company Limited and subsequently our Company is now a subsidiary of M. P. Power Management Company Limited, Jabalpur. 1.3 Objective :"Madhya Pradesh Madhya KshetraVidyutVitaran Company Limited aims to become one of the best State Distribution Utilities in India by the year 2014 with continuous improvements in performance and service standards. We, as a State Distribution Utility, dedicate ourselves to plan, build up, operate and maintain the Distribution System to facilitate distribution of electricity to the consumers in a secure, reliable and economic manner. We aim to provide an efficient distribution service in a transparent and non-discriminatory manner by adopting the best practices and standards. We will always strive to fulfill customer needs by providing quality services on time, leading to customer satisfaction. This will be achieved by continuous team effort and improvement in our Quality Management System. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 9|Page 1.4 Salient features of regulations :The Regulations provide for; i ii. iii. iv v. 1.5 Ensure timely submission of periodical reports covering all the items under report. Appointment of Regulatory of Compliance by each licensee, entrusted with the responsibility of reporting Regulatory Compliance. Setting –up reporting procedures for formulation and submission of Half Yearly and Annual Reports by Reporter of Compliance. Specify the periodical reports to be included and specific areas to be covered, under the report the Reporter of the compliance. Taking cognizance of the reports by the Top Management/Directors of the Company. Reporter of compliance :- The MP KshetraMadhyaVidyutVitaran Company Limited appointed Smt. Swati Singh, Chief Engineer-Chief General Manager, O/o MD (CZ), as “Reporter of Compliance” vide order no. MD/MK/01//Co/1724 Bhopal dated 09/12/2013for reporting Regulatory Compliance to the MPERC as per the guidelines /regulations of MPERC. 1.6 Reporting procedure :The Regulations provide for submission of following reports by the Reporter of Compliance; i ii Half Yearly Report April to Sept.by 31st December . Annual Report of financial year by 30th June of next year. The reports are required to be fragmented in three parts. i ii iii Reports on issues fully complied with. Reports on issues partially complied with and Reports on issues not complied with, along with reasons and future course of action. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 10 | P a g e 1.7 Submission of earlier report by reporter of compliance:- In compliance to the Regulation, Following reports have submitted by the reporter of Compliance beforeHon‟ble Commission for earlier period; S.No. Report Reference of Submission 1 Half yearly report for period April‟08to Sept‟08 2 Annual Report for Year 2008-09 No.CMD/MK/MD/MPERC/1196 Bhopal dated 04-0709 3 Half yearly report for period April‟09 to Sept‟09 Letter No.CMD/MK/MD/MPERC/7079 Bhopal dated 19-12-2009 Annual Report for Year 2009-10 Letter No.CMD/MK/MD/MPERC/2346 Bhopal dated 30-06-10 5 Half yearly report for period April‟10 to Sept‟10 Letter No.CMD/MK/MD/MPERC/2153 Bhopal dated 28-12-11 6 Annual Report for Year 2010-11 Letter No.CMD/MK/MD/MPERC/2534 Bhopal dated 29-06-11 modified date03-07-11 7 Half yearly report for period April‟11 to Sept‟11 Letter No.CMD/MK/MD/MPERC/1870 Bhopal dated 24-12-11 Annual Report for Year 2011-12 Letter No.MD/MK/MD/MPERC/820 Bhopal dated 2106-12 Half yearly report for period April‟12 to Sept‟12 Letter No.MD/MK/MD/MPERC/2780 Bhopal dated 17-12-12 Annual Report for Year 2012-13 Letter No.MD/MK/MD/MPERC/562 Bhopal dated 0606-13 11 Half yearly report for period April‟13 to Sept‟13 Letter No.MD/MK/MD/MPERC/2114 Bhopal dated 18-01-14 1.8 Annual report for year 2013-14 ;- 4 8 9 10 No.CMD/MK/MD/MPERC/12114Bhopal dated 29-1208 The Distribution Licensee has submitted the periodical reports for all the four quarters of the year timely. The licensee has also reported compliance on other points to be covered under the report is based on above mentioned reports, and discussions/analysis is thereon. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 11 | P a g e OBSERVETIONS BY THE MD ON COMPLIANCE OF VARIOUS REPORTS. The reports submitted under regulatory compliance were discussed from time to time with the MD, MPMKVVCL by Reporter of Compliance. The observations by the MD are mentioned hereunder: various 8.1 Timely Submission:It was observed that all the periodical reports and the other compliances have been submitted timely and regularly. This needs to be ensured in future also. 8.2 MIS Reports:The MIS reports for all the four quarters of year have been submitted timely, covering all the items. Observations in following regardsareof significance. 8.2.1 Vigilance Checking:Intensive Vigilance Checking of connections has been done by vigilance& (O&M) staff. 39071 cases registered under section 135 during the year 13-14 and 8949 cases decided in the court. 8.2.2 T & D Losses:The T & D Loss recorded for the year14 is 30.88%.thishas dropped down by 1.03% as compared to last year loss of 31.91%. 8.2.3 STOP/Defective metreplacement:The overall percentage of stop/defective meters at the end of year 13-14 is 2.33% whereas last year it was 4.77%. 8.2.4 Distribution of transformer failure:The Distribution X‟mer failure during the year 13-14 is 15980 higher than the last year failure 12879. 8.2.5 Accidents:The fatal ElectricalAccident of outsider has been increased as compared to previous year. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 12 | P a g e 8.3 Distribution Performance Standards:The MIS reports for all the four quarter of year have been submitted timely, covering all the items. Observations in following regards are of significance. 8.3.1 Feeder metering for energy audit:Out of 1430, 33 KV feeders & 3679, 11KV feeders, feeder metering has been done on 1295 & 3091 i.e. 91 % and 84% respectively. 8.3.2 Sale Forecasting:The sale of units during the year 13-14 has been increased by 2243.55 MU as compared to last year and it may further increase in the ensuring year. 8.3.4 Reliability index of 11 KV feeders:11 KV feeder reliability Index has been improved as compared to last year and is within the permissible limit. 8.3.5 DTR/PTR failure:The DTR failure rate has gone up by 0.97% whereas PTR failure rate has gone down by 0.67%. **** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 13 | P a g e (MPERC (GUIDE LINES FOR REPORTING OF REGULATORY COMPLIANCE) REGULATIONS, 2005 This Annual report for the period from April‟13 to March‟14 covers status of compliance on nine clauses of „Guidelines for reporting of Regulatory compliance Regulations-2005‟ Out of these nine clauses all nine clauses complied in full. Brief details of status of compliance against each issue are as below. I. i. Directions covered in clause 5.2:- To submit a issue wise status report on all issues requiring implementation of directives, status of compliance, partial compliance and non-compliance be reported for the prescribed period. Such report should also contain justified reasons on the issues where the directions could not be complied, if any. Status of Compliance Issue wise report is being submitted on all issues requiring implementation along with their status for specified period. Justified reasons are also reported where issues are partial complied or not complied. ii. MD‟s observations on status of compliance:This directive is being complied in full. iii. Target date proposed for achieving full compliance/additional remarks, if any:No. II. Direction covered in clause 5.3:- To ensure internal audit by ROC. To authenticate information submitted through the Managing Director with the knowledge of Board of Directors of the licensee. i. Status of Compliance:ROC on a regular basis is auditing the information being submitted on regulatory compliance and these reports are being studied and signed by MD. Reports are being put up to Board of Directors for obtaining their approval. ii. MD‟s observations on status of compliance:This directive is being complied in full. III. iii. Target date proposed for achieving full compliance/additional remarks, if any:No. Directions covered in clause 6.1:- The licensee shall submit “Regulatory Compliance Report” to the commission half-yearly and annually. The report should be based on the issues as per relevant format specified in Annexure A (Content of compliance report) for the licensee. i. Status of Compliance:Regulatory compliance reports are regularly being submitted half-yearly and annually. All the issues as specified in Annexure A are covered in these reports. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 14 | P a g e ii. MD‟s observations on status of compliance:This directive is being complied in full. iii. Target date proposed for achieving full compliance/additional remarks, if any:No. IV Directions covered under clause 6.2:-The licensee shall be guided by but not be limited to the items specified in the Annexure A. i. Status of Compliance:Issues not included in Annexure „A‟, but are relevant for reporting are also being covered in compliance report. Status of some issues covered in amendments of different Regulations and found relevant for reporting are also covered in reports. ii. MD‟s observations on status of compliance:This directive is also being complied in full. iii Target date proposed for achieving full compliance/additional remarks, if any:No. Directions covered under clause 6.3:- The “Regulatory Compliance Report” should be fragmented in three parts as given below. V. a. Report on issues fully complied with. b. Report on issues partially complied with and details reasons for partial compliances and future course of action to achieve full compliance. c. Report on issues not complied with and detailed reasons and future course of action to achieve compliance i. Status of Compliance:Status of each issue has been mentioned in the report and in addition, a summary of issues fully complied and partially complied is prepared and attached with the report. ii. MD‟s observations on status of compliance:This directive is being fully complied. iii. Target date proposed for achieving full compliance/additional remarks, if any:No. VI Directions covered under clause 6.4:- Regulatory Compliance report shall be signed by the Report of Compliance and also by the Managing Director of the licensee. i. Status of Compliance:Regulatory compliance report submitted to MPERC is being signed by Reporter of compliance and Managing Director of the licensee. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 15 | P a g e ii. MD‟s observations on status of compliance:This directive is fully complied. iii VII. Target date proposed for achieving full No. compliance/additional remarks, if any:- Directions covered under clause 6.5:- Board of Directors of the licensee shall approve the “Regulatory Compliance Report” before its submission to the commission. i. Status of compliance:Regulatory compliance Report is being put up to Board of Directors and approval is obtained for every report. Some time when it is likely to be delayed from the due date of submission, a draft report is submitted to commission with the signatures of Reporter of Compliance and MD and subsequently approval from BOD is conveyed. ii. MD‟s observations on status of compliance:This directive is fully complied. iii. Target date proposed for achieving full compliance/additional remarks, if any:No. VIII Directions covered under clause 6.6:- A certificate shall be attached with the Regulatory Compliance report as is given at Annexure „B‟. (Half-Yearly/Annual Regulatory Compliance Report). i. Status of compliance:Certificate in accordance to the provision in regulation is being attached with every Regulatory compliance Report. IX ii. MD‟s observations on status of compliance:This directive is fully complied. iii. Target date proposed for achieving full compliance/additional remarks, if any:No Direction covered under clause 6.7:-Regulatory Compliance Report Shall be submitted Half yearly for the period from April 13 to September 13 by 31ST December and Consolidate report for the financial year by 30th June. i. Status of Compliance:Periodicity of report as per provision in Regulation is being maintained ii. MD‟s observations on status of compliance:This directive is being complied fully. iii. Target date proposed for achieving full compliance/additional remarks, if any:No. ***** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 16 | P a g e CHAPTER-I MIS REGULATIONS This Annual report covers status of compliance of the directives on two identified clauses (3.2, 3.3) of MIS regulation (Gazette notification No. 888 dated 02.04.2004 and published in official Gazette on dated 30.04.2004). Both the clauses (3.2, 3.3) arefullycomplied. The status of compliance is shown in enclosed formats (D1 to D7). The status of submission of reports witching prescribed limit to submit MPERC as below:- Duration Due date Date of submission of Report First quarter ending June 2013 15.08.2013 23.08.2013 Second quarter ending Sept‟2013 15.11.2013 22.11.2013 Third quarter ending December‟2013 15.02.2014 07.02.2014 Forth quarter ending March‟ 2014 15.05.2014 15.05.2014 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 17 | P a g e foSALIENT FEATURES OF MIS r achieving full compliance/ additional remarks, A. T & D Losses, Collection efficiency and AT&C Efficiency Period T& D losses Year ending March 2014 B. (%) Absolute AT & C efficiency (%) Collection efficiency (%) 69.12 100 30.88 Stopped/Defective meters (LT) Region Bhopal Gwalior Discom Area No. of Metered consumers S/D meters at the end of Year % of S/D meters at the end of Year Urban 797685 2237 0.28 Rural 588430 8173 1.39 Urban 565362 11578 2.04 Rural 353280 31841 9.01 Urban 1363047 13815 1.01 Rural 941710 40014 4.25 2304757 53829 2.33 Percentage of stopped defective meter has been reduce and compared to last year. March 2013. As per directive of commission the percentage of stopped defective meter has bring down less than 3%. C. Stopped/Defective meters HT Region No. Consumers Bhopal Defective meters ME Meters 1186 0 1 Gwalior 549 0 0 Discom 1735 0 1 At the end of March 2014, 0 Nos. MEs and 1Nos. HT meters remained defective. Replacement of this Meter is being ensured. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 18 | P a g e D. Irregularities Detected under section-135 Region Connection checked Case Registered Case submitted to Court Cases Compounded Cases decided by Court Bhopal 112727 21385 6923 7326 5306 Gwalior 59502 59502 17686 7283 3643 172229 39071 14206 10969 8949 Discom As a result of intensive checking of connections by vigilance and O&M staff 39071 cases registered under section 135. E. DTR failure. Distribution transformer failure during the period under report has remained as under. S. No. Region 1 Bhopal 2 Gwalior No of DTRs installed As on 30.03.14 No of DTRs failed 71734 8978 76667 7002 148401 15980 Discom %age of DTR failed 12.51 9.13 10.76 F. Accidents 391 Fatal and 119 Non-fatal electrical accidents occurred during the period under report. Fatal Electrical Non-fatal Electrical Depp. Grand outsiders Animals Total Employees Total Region Depp. Employees outsiders Animals Total Bhopal 4 60 67 131 16 27 07 50 181 Gwalior 7 78 175 260 23 45 01 69 329 Discom 11 138 242 391 39 72 08 119 510 Out of above 391, 11fatal accidents occurred to departmental employees, 138 accidents to outsidersand242 to animals. Field staff has been asked to spread awareness towards safe working on lines and to use safety appliances. It was gathered from reports that most of the outsiders who met with accidents were involved in theft of electricity/interference with live wires and unsafe working with electrical appliances. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 19 | P a g e CHAPTER-II M.P. REGULATION ON TREATMENT OF INCOME OF OTHER BUSINESS OF LICENSEE This Annual report for the period from April 13 to March‟14 covers status of compliance on three identified clauses (3.(1), 4(1), 4(2)) of "M.P. Regulation on treatment of income of other business of license" for implementation – All three clauses (3.(1), 4(1), 4(2)) are complied in full. ***** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 20 | P a g e CHAPTER-III ESTABLISHMENT OF FORUM AND ELECTRICITY OMBUDSMAN REGULATIONS This Annual report covers status of compliance on twoidentifiedclauses (5.4, 5.5) pertaining to MPERC regulation of “Establishment of Forum and Electricity Ombudsman for Redressal of grievances of the consumers” (Published in Official Gazette on dated 30.04.2004). All the two clauses (5.4, 5.5)have been complied in full. ***** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 21 | P a g e CHAPTER-IV MP DISTRIBUTION CODE Clause no.:- 5.3.3 5 year Demand forecast starting with ensuing year, revised Annually by 31st march 2014 every year. i) Status of Compliance:Load demand of various categories of consumers and forecast of demand of power within the area of supply in each of succeeding five years has been prepared and copy enclosed as Annexure D&E. ii) MD's observation on status of Compliance:The directive is fully complied by the Discom. iii) Target date proposed for achieving full compliance/ additional remarks if any:No. ***** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 22 | P a g e CHAPTER-V M.P. ELECTRICITY SUPPLY CODE – 2013 This Annual report for the period from April' 13 to March‟14 covers status of compliance on thirty identified clauses of supply code. Out of these Thirty clauses(8.1, 8.8, 8.11, 8.13, 8.14, 8.15, 8.15, 8.17, 9.2, 9.3, 9.4, 9.11,9.13, 9.14, 9.15 , 9.16, 10.3.1, 10.3.2, 10.3.3, 10.3.4, 10.3.5,10.3.6, 10.3.7, 10.3.10, 10.3,11. 10.3.12)Twenty four clauses ( 8.8, 8.11, 8.13, 8.14, 8.15, 8.17, 9.2, 9.3, 9.4, 9.11,9.15, 9.16,10.3.1, 10.3.2,10.3.3,10.3.4, 10.3.5, 10.3.6, 10.3.7)complied in full, while Two clause(8.1, 9.13,)have been partially complied .The status of compliance is shown in enclosed formats (ESC 6 to ESC 13).ESC 10 is uploaded on company website (i) Direction given in clause no. 8.1 NoNew connection shall be given without a meter and cut-out or a Miniature Circuit Breaker (MCB) or Circuit Breaker (CB) of appropriate specification complying with relevant standards. The Licensee should procure sufficient quantity of suitable meters/metering equipments for new service connections, providing metered for un-metered connections and replacement of stopped/defective meters/metering equipments. i) Status of Compliance:- During the period under report, 203345permanent connections have been released Out of which 100% meterizetion done in urban area for DLF category only few connections are without meter in rural area. Meters are being installed on un-metered DLF consumer of rural area after completing formalities.3685 connections have been released without meter to Agriculture category, the format enclosed as ESC 6. During this year 2013-14,no new energy meter purchased. The meters have installed form the available stock. The efforts are being taken up for meterizetion of un-metered DLF and agriculture consumer in rural area from the sufficient stock available. Status of availability of single phase and three phase (5-30 amp) at different A/S as on 31.03.2013 Closing stock (as on Bhopal Area Store Gwalior Area Store Guna Area Store 31.03.2013) 1 Phase 3 Phase 1 Phase 3 Phase 68727 80724 23996 Total 3 Phase Total 1 Phase 3 Phase 104720 44003 12272 56275 174331 55391 Total 1 Phase Total 229722 49604 19123 ii) iii) MD‟s observation on status of compliance:No new connection of DLF category has been served without meter. The efforts are being taken for meterizetion of un-metered DLF and agriculture consumers in rural area moreover DTR meterizetion of agriculture consumers is also being taken up. The directive is being complied partially. Target date proposed for achieving full compliance/additional remarks, if any:No. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 23 | P a g e (ii) Directions given in Clause 8.13 "The licensee shall submit a list of all the types of meters installed in its area of operation, to the Commission annually. The information shall include the specification of each type of meter and the total number of units of each type in use and in stock with the licensee" i. Status of compliance: The list of all the types of meters installed in its area of operation is shown in format ESC 7.Panel of suitable makes of meter manufacturers has been prepared as under:- S. No. 1 2 3 4 5 6 7 8 9 10 NAME & ADDRESS OF THE VENDOR (M/S) HPL SocomecPvt. Ltd., Atmaram Mansion, 1/21 Asaf Ali Road, New Delhi Genus Power Infrastructures Ltd., SPL-3, RIICO Industrial Area, Sitapura, Tonk Road, Jaipur-302022 Secure Meters Limited, P.O. Box-30, Pratapnagar Industrial Area, Udaipur-313003 Bentec Electrical & Electronics Pvt. Ltdl 150 Upen Banerjee Road, KolKata-700060 LinkwellTelesystemPvt. Ltd. GowraClassisc, 1-11-252/1/A Begumpet Hyderabad M/s Elymer International Pvt. Ltd., 37, Bungalow Road, Ist Floor, Delhi-07 Landis+ Gyr Ltd. J.K. Millenium Centre. 7th Floor. 46 D, Jawaharlal Nehru Road. KolKata -700071 West Bengal . Avon Meters Pvt. Ltd. D-15-16-17 Industrial Focal Point, Drabassi 140507 Punjab Near Chandigarh M/s Elymer Electrical Pvt. Ltd., 37, Bungalow Road, Ist Floor, Delhi-07 Larsen & Toubro Limited, North Wing, 2nd Floor, Gate No. 7 Saki Vihar Road, Powai Campus (East) Mumbai-400072 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 24 | P a g e S. Name of the Firm No. (M/s. ) P.O. No. & Date Type of Meter Qty. Procured (in Nos.) Price of Meter (Unit FOR price inclusive of all taxes & duties excl. Entry Tax) 3 Phase 4 Wire -5/Amp LTCT Meter, Accuracy Class 0.5S with Optical Communication PortRS-232. 3 Phase 3 Wire 132 KV/110 V, -/1 Amp CTPT operated HT Trivector Meter, Accuracy Class 0.2S with optical communication and GSM compatible. 3 Phase 4 Wire 3 Phase 3 Wire 33 KV/110 V 0.5 S Electronic Meter 2349 Nos. @ Rs.7574.26 Rs.17791936.74 1 M/s Genus Power Infrastructure Ltd., Jaipur 1494 dated 15.06.13 2 M/s Secure Meters Ltd., Udaipur 1518 dated 12.08.13 3 M/s Secure Meters Ltd., Udaipur 1548 dated 07.02.14 15 Nos. @ Rs.23000/Rs. 345000/- 160 Nos. 10 Nos. @ Rs.4359/Rs. 741030/- Basic Technical Specification & prices. a. 0.5S, 3 P 4 Wire, DTR Meter, Order No. 1494 dated 15.06.13 i) ii) iii) iv) v) Capacity Voltage Type of display Class of accuracy Parameter on display vi) Communication Mode 5 Amp. 3x240V, +20%-30% Seven Segment LCD Display 0.5 S Phase and line Voltage, Current, Power factor overall KVA, KW, KVAR, Frequency, KVAh, Kwh/KVArh (lag/lead), MD, in KW/KVA Optical Communication Port-RS 232 vii Price Rs.7574.26 per meter inclusive of all taxes b. 0.2S 3 Phase 3 Wire 132 KV/110 Volt, Order No. 1518 dated 12.08.13 i) ii) iii) iv) v) Capacity Voltage Type of display Class of accuracy Parameter on display vi) Communication Mode vii) Price 1 amp, CTPT operated 63.5 Volt (P-N) + 20% to -30% Digital (Seven digit, liquid crystal display) 0.2S Meter Sr. No. Real time & date phase wise line current, phase wise voltage, phase wise P.F., Instant average P.F. Frequency, Instant load in KVA, Active and Reactive Power, Active energy import, Apparent energy import, cum. tamper count, MD Reset count cum maximum demand, MD alongwith date & time of occurrence in KW & KVA Optical Communication Port-RS 232 GSM compatible. Rs.23000/- per meter inclusive of all taxes Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 25 | P a g e c. 0.5S, 3 P 4 Wire, Order No. 1548 dated 07.02.14 i) ii) Capacity Voltage iii) iv) v) Type of display Class of accuracy Parameter on display vi) Communication Mode vii) Price d. 1 Amp.(Basic Current) CTPT operated 110 V (Phase to Phase) 63.5 V (Phase to Neutral) Auto & Push Button Display 0.5 S Time, Date, Demand in kVA, MD, PF, Frequency, Voltage, Current Active & Apparent Load, Cumulative MD (KVA), Cumulative Power (Kwh) RS-232 Optical Communication Port with additional Port RS-485 Rs.4359.00 per meter inclusive of all taxes 0.5S, 3 P 3 Wire, Order No. 1548 dated 07.02.14 i) ii) iii) iv) v) Capacity Voltage Type of display Class of accuracy Parameter on display vi) Communication Mode vii) Price ii. 1 Amp.(Basic Current) CTPT operated 110 V (Phase to Phase) Auto & Push Button Display 0.5 S Time, Date, Demand in kVA, MD, PF, Frequency, Voltage, Current Active & Apparent Load, Cumulative MD (KVA), Cumulative Power (Kwh) RS-232 Optical Communication Port with additional Port RS-485 Rs.4359.00 per meter inclusive of all taxes MD's observation on status of compliance:The directive is fully complied. iii. Target date proposed for achieving full compliance/additional remarks, if any:No (ii) Direction given in clause no. 9.13 It shall be the responsibility of the licensee to ensure that no default in payment is continued beyond a reasonable period subject to a maximum of three months without action for temporary disconnection. The authorized official of the licensee will ensure that all the cases pertaining to default in payment are monitored regularly and timely action is initiated for temporary or permanent disconnection. i) Status of Compliance:The Company takes due care in case of default in payment. All HT Consumers are given 15 days notice, as per Supply Code, 2013 in case payment is not received by due date. The HT Consumers are temporarily disconnected invariably in case of default. Similar treatment is given to all Domestic, Non-Domestic and Industrial Consumer. The Statement of number of disconnection notices served and amount received during the year 2013-14 is given below:Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 26 | P a g e Amt. in Lakh Region Disconnection noticed issued 1 Bhopal Gwalior Total 2 841 416 1257 Amount received before actual disconnection 3 2952.96 1175.93 4128.89 Amount received after expiry of notice 4 470.77 227.35 698.12 From the above, it is clear that Company is vigilant in recovery of arrears. The temporary disconnection of defaulting consumers is being done at distribution center level. The Priority is given for disconnection of defaulter consumers having more arrears irrespective of the period of arrears. Government connections and connections of public utility are generally not disconnected as their payment are received subsequently, generally consolidated. ii) MD‟s observation on status of compliance:The CGMs & GMs of the field units are perusing hard to recover the arrear, however they againbeen have separately advised. iii) Target date proposed for achieving full compliance/additional remarks, if any:Full compliance could be observed only after sufficient manpower is managed when Company‟s financial health is improved. (iii) Direction given in code-2013 clause no. 9.14 If a consumer fails in payment of any bill in full, without the approval of the authorized Officer, by the due date, the service connection of the consumer will be liable to be disconnected on temporary basis after giving not less than fifteen clear days‟ notice in writing to such consumer. Effort should be made that before disconnecting a domestic connection; an adult member of the family should be informed. If the proof of removal of the cause for disconnection is produced to the satisfaction is produced to the satisfaction of the Licensee‟s employee deputed for the purpose, the supply shall not be disconnected. i) Status of Compliance:A monthly disconnection notice is generated by the billing software. For high value consumer list is being published on Company Website ii) MD‟s observation on status of compliance:The field offices have been given instruction to monitor serving Disconnection Notices immediately after due date, and effect disconnection if payment is not received within 15 days. iii) Target date proposed for achieving full compliance/additional remarks, if any:No. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 27 | P a g e (iv) Direction given in code-2013 clause no. 9.15 After temporary disconnection, the supply shall be restored only after the consumer pays the outstanding charges/dues/amount of instalment fixed along with disconnection-reconnection charges. i) Status of Compliance:Field officer are complying this directive. ii) MD‟s observation on status of compliance:Agree iii) Target date proposed for achieving full compliance/additional remarks, if any:No (v) Direction given in code-2013 clause no. 9.16 The consumer shall be required to make a written request to the licensee if the consumer wishes to get his connection temporarily disconnected for a period up to six months. For duration of temporary disconnection the consumer shall be liable to pay in advance all the monthly charges that are fixed in nature like fixed charge, minimum charge, metering charges etc. The consumer shall also be liable to pay disconnection /reconnection charges to avail the facility of temporary disconnection. The period of „disconnection on request‟ can be extended on receipt of a request in writing and on necessary charges being deposited in advance. i) Status of Compliance:The directives are fully complied with ii) MD‟s observation on status of compliance:Agree iii) Target date proposed for achieving full compliance/additional remarks, if any:No. ****** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 28 | P a g e CHAPTER-VI CONDITIONS OF LICENSE This Annual report for the period from April‟ 2013 to March‟14 covers status of compliance on Six identified clauses (7.2, 9.1, 10.2a, 17.13, 20.2, 20.5)of MPERC conditions of distribution license for distribution licensee-2004, out of these Five clauses (7.2, 9.1, 10.2a, 17.13, 20.2,) are complied fully, and only one clauses (20.5) is partially complied. The status of compliance is shown in enclosed formats (I to V). i) Direction given in Clause no.7.2:- “Profit & Loss account, Balance sheet, Cash flow statement. i) Status of Compliance:The Annual Financial Statement of Profit & Loss, Balance Sheet and Cash Flow Statement for Financial Year 2013-2014 are under process and will be prepared within the scheduled time ii) MD‟s observation on status of compliance:The Annual Financial Statements of MP MK VV Co. Ltd. For Financial year 2013-14 will be prepared within time. iii) Target date proposed for achieving full compliance/additional remarks, if any:Within the stipulated time i.e till 30th Sept. 2014. ii) iii) Direction given in Clause no. 9.1:-“Various details about licensee‟s business in formats enclosed with regulations.” i) Status of Compliance:Various details about licensee‟s business in format I to V is enclosed ii) MD‟s observation on status of compliance:Agree iii) Target date proposed for achieving full compliance/additional remarks, if any:No. Direction given in Clause no. 10.2a:- “Highlights of the annual investment plan as well as permission for reallocation of funds within approved schemes.” i) Status of Compliance:Year wise actual achievement upto the FY 13-14 has been given and provision for next three year i.e. FY 14-15 to FY16-17 has also mentioned. ii) MD‟s observation on status of compliance:Investment plan has been updated and approved by H‟ble commission . iii) Target date proposed for achieving full compliance/additional remarks, if any. NO Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 29 | P a g e The entire capital investment of Rs. 5544.28 crore has been prepared from various funding Agency as mentioned in the table below:- S. No. Name of Scheme Plan 10-11 (Actual) Plan 11-12 (Actual) Plan 12-13 (Actual) Plan 13-14 (Actual) Plan 14-15 Plan 15-16 Plan 16-17 Total 1 System Strengthening Scheme 139.37 131.61 260.44 238.00 255.00 270.00 1127.86 2422.28 2 New Agriculture pump connection 46.82 58.67 143.84 162.46 101.13 67.59 41.17 621.68 3 Feeder Separation 45.53 117.71 199.37 143.08 105.00 0.00 0.00 610.69 4 R-APDARP 52.11 146.99 184.95 145.72 112.04 10.77 9.53 662.11 5 ADB-II 40.13 154.79 216.97 172.16 117.60 0.00 0.00 701.65 6 RGGVY 93.16 113.10 103.03 65.93 82.64 0.00 0.00 457.86 7 HUDCO 25.58 0.00 0.00 0.00 0.00 0.00 0.00 25.58 8 DFID 19.90 12.51 0.00 0.00 0.00 0.00 0.00 32.41 9 HVDS for agriculture Pump 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10 Distribution infrastructure For urban slums/ Illegal colonies 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11 Other 9.13 0.89 0.00 0.00 0.00 0.00 0.00 10.02 471.73 736.27 1108.60 927.35 773.41 348.36 1178.56 5544.28 TOTAL iv) Direction given in Clause no. 20.5:- A compilation of the existing codes and practices relating to construction of the Licensee‟s Distribution System and its Distribution facilities shall be filed with the commission by Licensee within 60 days of the grant of this Licence. The Licensee shall follow the existing codes and practices with such modification as the Commission may direct from time to time. The construction practices shall be reviewed and upgraded by the Licensee from time to time, as appropriate, based on relevant technological improvements. i) i) ii) Status of Compliance:The construction practices is being reviewed and upgraded by the Licensee from time to time, as appropriate, based on relevant technological improvements and changes. MD‟s observation on status of compliance:Company‟s own code and practices relating to construction is being reviewed and upgraded Target date proposed for achieving full compliance/additional remarks, if any. No. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 30 | P a g e CHAPTER-VII DISTRIBUTION PERFORMANCE STANDARDS This Annual report for the period from April 2013 to March‟14 covers status of compliance on Four identified Clauses ((3.1, 3.2, 3.3,)5.6, 8.1, 14.9) of MPERC Distribution Performance standards regulation No. 1902 dated 13th July, 2004, published in official gazette on dated 16th July, 2004. Out of above, three (((3.1, 3.2, 3.3,)5.6, 8.1) clauses are compiled in full, one (14.9) partially complied. a) Distribution Performance Standard Clause no. 14.9 :- The distribution licensee shall provide energy accounting and audit meters at all incoming and outgoing feeders with 11 KV and above capacity so as to facilitate to account for the energy input and consumed in the various segments of sub-transmission system and the energy loss. . i) Status of Compliance:The meterization work of balance 33 & 11 KV Un-Metered feeder is under progress. The status of providing metering at all incoming and outgoing 33 and 11 KV feeder is enclosed (Annexure-A). MPMKVVCL has, given target for 100% feeder meterization of balanced feeders to its field unit during 2013-14. ii) MD‟s observation on status of compliance:The directive is being complied Partially. I. iii) Target date proposed for achieving full compliance/additional remarks, if any. Directions given in clause 3.1,3.2,3.3 Distribution Performance standards Duration Due date Date of submission of Report First quarter ending June 2013 31.07.2013 30.07.2013 Second quarter ending Sept‟2013 31.10.2013 31.10.2013 Third quarter ending December‟2013 31.01.2014 30.01.2014 Forth quarter ending March‟ 2014 30.04.2014 30.04.2014 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 31 | P a g e The salient activities covered under regulations are described as under. (a) Normal fuse off calls:Permitted deviation: Urban - 5 % , Rural - 5 % Particulars Bhopal Urban Instances occurred Rural Achievement with in prescribed limits Achievement not within prescribed limits 2013-2014 Gwalior Urban Rural Urban Rural Urban Percentage deviation Rural Total 153476 144598 298074 39545 42642 82187 153423 144499 297922 39470 42562 82032 53 99 152 75 80 155 0.03 0.07 0.05 0.19 0.19 0.19 The percentage deviation is well within permitted limits. (b) Line Breakdowns :- Permitted deviation: Urban-5%, Rural- 5% Particulars Bhopal Instances occurred Urban Achievement with in prescribed limits Urban Achievement not within prescribed limits Urban Percentage deviation Urban Rural Rural Rural Rural 2013-2014 Gwalior Total 1179 4383 5562 1827 7839 9666 1179 4343 5522 1827 7350 9177 0 40 40 0 489 489 0.00 0.91 0.72 0.00 6.24 5.06 The percentage deviation is well within permitted limits more efforts have been taken in Rural to maintain this limit. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 32 | P a g e c ) Replacement of failed Distribution Transformers :Permitted deviation : Urban -5 %, Rural - 5 % 2013-2014 Particulars Bhopal Gwalior Total 454 1528 1982 Rural 8524 5474 13998 Urban 440 1496 1936 7756 5074 12830 14 32 46 768 400 *1168 3.08 2.09 2.32 9.01 7.31 8.34 Urban Instances occurred Achievement with in prescribed limits Rural Achievement not within prescribed limits Urban Rural Urban Percentage deviation Rural *All failed transformers which could not be replaced within prescribed limit are because of arrear more than 50% (d) Meter Complaints :Permitted deviation: Urban-0.5 %, Rural-2.0 % Particulars Bhopal Urban Instances occurred Rural Achievement with in prescribed limits Achievement not within prescribed limits Urban Rural 2013-2014 Gwalior Total 20913 12738 33651 4632 5954 10586 20913 12716 33629 4632 5935 10567 0 22 22 0 19 19 0 0.17 0.11 0 0.32 0.17 Urban Rural Urban Percentage deviation Rural The percentage deviation is well within permitted limits. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 33 | P a g e (e) New Connections/Additional Loads :Permitted deviation : Urban - Nil Rural- Nil 2013-2014 Bhopal Gwalior Particulars Urban Instances occurred Rural Urban Total 40080 33376 73456 29361 18701 48062 40005 33356 73361 29304 18674 47978 75 20 95 57 27 84 0.19 0.06 0.13 0.19 0.14 0.17 Achievement with in prescribed limits Rural Urban Achievement not within prescribed limits Rural Urban Percentage deviation Rural The deviations are 0.13% in urban and 0.17 % in rural areas as against NIL % permitted (f) Transfer of Ownership and Conversion of Service :- Permitted deviation: Urban -2.0%, Rural - 2.0% 2013-2014 Particulars Bhopal Gwalior Total 819 1075 624 13 1189 646 819 1075 624 13 1189 646 0 0 0 Rural 0 0 0 Urban 0 0.00 0 Rural 0 0.00 0 Urban Instances occurred Rural Urban Achievement with in prescribed limits Rural Urban Achievement not within prescribed limits Percentage deviation Percentage deviation There is no percentage deviation. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 34 | P a g e (g) Billing Mistakes :Permitted deviation: Urban-0.1%, Rural- 0.1% 2013-2014 Particulars Urban Bhopal Gwalior Total 21451 39977 61428 4732 6421 11153 21451 39977 61428 4732 6421 11153 0 0 0 0 0 0 0.00% 0.00% 0 0.00% 0.00% 0 Instances occurred Rural Achievement with in Urban prescribed limits Rural Achievement not Urban within prescribed limits Rural Urban Percentage deviation Rural No percentage deviation noted. (h) Voltage Variations :2013-2014 (FY) Particulars Bhopal Gwalior Total Instances occurred 342 90 380 Achievement with in prescribed limits 342 90 380 Achievement not within prescribed limits 0 0 0 Percentage deviation 0 0 0 All the complaints received for voltage variations were attended well within Time limits set in regulation and no deviation noted during the period under report Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 35 | P a g e (i) Fatal electrical Accidents :Details of fatal electrical accidents to human during the period from April 13 to March 14 are as under: Name of Region Accidents2013-2014 (FY) Departmental Outsiders Total Bhopal 4 60 64 Gwalior 7 78 85 Total 11 138 149 Total 149 fatal electrical accidents occurred to human during April‟ 13, to march‟14, out of which 11 were of departmental employees and 138 outsiders. In order to minimize accidents, Company has organized Pathshala Program in all the rural and divisions from Jan to May 2013.In this program line staff has been trained for safely carrying out the quality maintenance/construction works using proper safety appliances and proper T&P. They have been trained for safe execution of line works. The instruction booklets in Hindi were distributed to all the participants during the program. The kit comprising of T&P and safety appliances has been provided to all the concern line staff as per norms. It is expected that aforesaid activity will definitely bring down the quantum of accidents in the current financial year. (j) Maintenance of Power and Distribution transformers :Status for the year 2013-14 has remained as under. (A) Power Transformers Regions Total No. Transformers As on 30-03-2014 No of Transformer for which Quarterly maintenance Half yearly maintenance done done Bhopal 937 875 1719 Gwalior 795 727 1207 Discom 1732 1602 2926 Quarterly maintenance done Annual maintenance done Bhopal Total no. Transformers as on 31-03-2014 71734 9969 14886 Gwalior 76667 25165 38682 Discom 148401 35134 53568 (B) Distribution Transformers Regions maintenance of 33/11 KV S/s,lines, 2926 PTRs and 53568 DTRs has been done. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 36 | P a g e (k) Failure of Transformers:- Status of failure of power and Distribution Transformers has remained as under: (A) Power Transformers Region Transformers failed April‟13– March ‟14 Percentage Failure Bhopal Transformer Installed As on 31-03-2014 937 5 0.53 Gwalior 795 7 0.88 Discom 1732 12 0.69 (B) Distribution Transformers Region Bhopal Transformer Installed as on 31-03-2014 71734 Transformers failed April‟13– March ‟14 Percentage Failure 8978 12.52 Gwalior 76667 7002 9.13 Discom 148401 15980 10.77 As per the guidelines issued by the commission to bring down power transformer rate below 1.5 % in the ensuring year. The power transformer failure rate has been reduced from 1.65 %to0.69 % in this year 2013-14 and DTR failure has gone high as compared to last year percentage failure of 9.79%. (l) Periodical Testing of Meters. :Status of Periodical testing of meters remained as under : Category Region Meters installed as on 01.04.13 HT Bhopal Single Phase Three Phase Meters tested % age achievement 1118 Meters due for testing as per esc up to march 2014 1118 1118 100 Gwalior 503 503 496 98 Discom CZ 1621 1621 1614 99 Bhopal 1127796 225559 169347 75 Gwalior 785567 157113 122720 78 Discom CZ 1913363 382672 292067 76 Bhopal 194150 64717 39231 60 Gwalior 65124 21708 14601 67 Discom 259274 86425 53832 62 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 37 | P a g e HT meters 99%, single Phase LT meters 76% and 3 Phase LT meters 62% tested up to march14 out of meters due for testing for FY 13-14 (m) Status of metering for energy audit :Status of metering for energy audit at the end of March-14 remained as under: Region Bhopal Gwalior Total No. Of ht feeders metering points Feeders provided with meters Defective meters % of defective meters 33 KV 11 KV 33 KV 11 KV 33 KV 11 KV 33 KV 11 KV 889 2028 807 1793 73 146 8.21 18.09 541 1298 488 1319 84 36 6.65 2.24 1430 3326 1295 3112 157 182 12.12 5.84 1430 Nos. metering points on 33 kV feeders have been provided by 1295meters.Out of these157 meters have become defective and action to replace these defective meters is in process. 3326Nos.metering points on 11 kV feeders have been provided by 3112 meters. Out of these 182 meters have become defectives. Field officer is in process of providing meters on balance feeders and replacement of defective meters. *** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 38 | P a g e CHAPTER-VIII Establishment of Ombudsman/Forums This Annual report March2014 covers status of compliance on two identified clauses (1., 3.3) pertaining to MPERC regulation of “Establishment of Forum and Electricity Ombudsman for Redressal of grievances of the consumers” (Published in Official Gazette on dated 30.04.2004). All the two clauses (1, 3.3) have been complied in full. Status of Redressal of consumer complaint S.no. PERIOD 1 April 13 to March 14 OPENING BALANCE AS ON 01.04.13 PENDING NO. OF CASE RECEIVED NO. OF CASE DECIDED 50 77 108 PENDING 19 *** Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 39 | P a g e CHAPTER-IX SECURITY DEPOSIT REGULATIONS This Annual report covers status of compliance on two identified Clauses (1.21, 1.22) of MPERC (Security deposit) regulations 2004 (Gazette Publication No. 2560 dated 22.09.2004 and published in official Gazette on date 01.10.2004. Which was further revised vide M.P. Gazette notification published on 04.09.09.Both the Clauses (1.21, 1.22) are complied in full. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 40 | P a g e MIS FORMATS Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 41 | P a g e ANNUAL REPORT ON OVERALL MIS PERFORMANCEFORMAT: D1 Year Ending March 14 DISCOM (CZ) S. No. Particulars 1 2 Units Discom 3 6 1 Total Input LAKH 1651762.00 2 Total Sales LAKH 1141679.00 3 Total Demand Rs Cr 5622.33 4 Total Collections Rs Cr 5975.34 5 Total actual collection efficiency % 100.00 6 Absolute (AT&C) efficiency achieved % 69.12 7 No. of consumers (HT+LT) NO 2938391 8 Total Connected/Contracted Load MW 5605.49 9 Distribution losses % 30.88 10 Average Tariff Rs/Unit 4.92 11 Total arrear Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal Rs Cr 42 | P a g e 1898.58 ANNUAL REPORT ON OVERALL MIS PERFORMANCE FORMAT: D1 BHOPAL (BR)Year Ending March 14 S. No. Particulars Units 1 1 2 Total Input 3 LAKH 6 969312.00 2 Total Sales LAKH 7125.32.00 3 Total Demand Rs Cr 3507.43 4 Total Collections Rs Cr 3660.77 5 Total actual collection efficiency % 100.00 6 Absolute (AT&C) efficiency achieved % 73.51 7 No. of consumers (HT+LT) NO 1805763 8 Total Connected/Contracted Load MW 3299.46 9 Distribution losses % 26.49 10 Average Tariff Rs/Unit 4.92 11 Total arrear Rs Cr 522.78 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal Discom 43 | P a g e ANNUAL REPORT ON OVERALL MIS PERFORMANCE FORMAT: D1 GWALIOR (GR) Year Ending March 14 S. No. Particulars Units Discom 1 1 2 Total Input 3 LAKH 6 682450.00 2 Total Sales LAKH 429147.00 3 Total Demand Rs Cr 2114.9 4 Total Collections Rs Cr 2314.57 5 Total actual collection efficiency % 100.00 6 Absolute (AT&C) efficiency achieved % 66.00 7 No. of consumers (HT+LT) NO 1132628 8 Total Connected/Contracted Load MW 2306.03 9 Distribution losses % 34.00 10 Average Tariff Rs/Unit 4.93 11 Total arrear Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal Rs Cr 44 | P a g e 1375.80 INS INSTALLATION OF METERS TO DIFFERENT CATEGORIES OF UNMETERD LT CONNECTIONS S.no. 1 Name of region 2 Category 3 Domestic 1 Bhopal Gwalior Agriculture Other Total Domestic 3 Discom (i) Life line (ii)Other than life line Agriculture Other Total (i) Life line (ii)Other than life line No. Of LT % age of LT consumers consumer without meters at the end of without year meters as the end of the year 4 453934 5 21542 6 179009 956299 24415 41518 235240 159104 1804577 208497 0 0 45957 5803 197935 0 418462 43709 4.34 84.14 0.00 23.19 20.96 646339 161043 116200 1132079 662431 10904 78 0 16785 27345 9352 43709 0 213437 222718 1.45 27.14 0.00 18.85 33.62 1602638 35319 50870 396283 275304 2936656 78 0 62742 326256 32055 631899 (i) Life line (ii)Other than life line Agriculture Other Total Domestic 2 FORMAT: D2 Year Ending March 14 No. No. Of meters OfLTconsumers installed at the end of year during the year Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 45 | P a g e 7 39.44 3.17 82.33 11.64 21.52 STOPPED/DEFECTIVE METERS (LT) FORMAT: D3 Year Ending March 14 Name of region Area Stopped/ Defective meter as on 01.04.13 Fresh S/D meters added S/Dmeters replaced during the year Balance S/Dmeter at the end of the year((col 3+col4)-5)=6) Total metered consumers at the end of the year % age of S/Dmeters at the end of year (col6/col7*100 =8) 1 2 3 4 5 6 7 8 Urban 10222 45929 53914 2237 797685 0.28 Rural 11339 17883 21049 8173 588430 1.39 Total 21561 63812 74963 10410 1386115 0.75 Urban 47719 36613 72754 11578 565362 2.04 Rural 34367 5247 7773 31841 353280 9.01 Total 82086 41860 80527 43419 918642 4.70 Urban 57941 82542 126668 13815 1363047 1.01 Rural 45706 23130 28822 40014 941710 4.25 Total 103647 105672 155490 53829 2304757 2.33 Bhopal Gwalior Discom Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 46 | P a g e STOPPED/DEFECTIVE METERS (HT) FORMAT: D4 Year Ending March 14 Total meters installed Stopped/Defective meter as on 01.04.13 Fresh s/ d meters added Total s/d meters S/d meters replaced during the year Balance s/d meters at the end of year Region 1 Bhopal Gwalior Discom Me Meters Me Meter Me Meter Me Meter Me Meter 2 3 4 5 6 7 8 9 10 11 12 1186 4 0 78 42 82 42 82 41 0 1 549 0 0 21 3 21 3 21 3 0 0 1735 4 0 99 45 103 45 103 44 0 1 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 47 | P a g e DETAILS OF IRREGULARITIES DETECTED UNDER SECTION 135 FORMAT: D5 Year Ending March 14 Name of region Connection checked Irregularities detected under sec 135 Cases filed in court Cases compounded Cases decided by court 1 Bhopal 2 112727 3 21385 4 6923 5 7326 6 Gwalior Discom 59502 172229 17686 39071 7283 14206 3643 10969 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 48 | P a g e 5306 3643 8949 DETAILS OF DISTRIBUTION FAILURE FORMAT: D-6 Year Ending March 14 Name of region No. Of x 'mer installed as on 31.03.14 X'mer failed during the year. X' mer replaced during the year. % age of x‟ mer failed 1 2 3 4 5 Bhopal 12902 461 454 3.61 Gwalior 12091 1528 1537 12.63 Discom 24993 1989 1991 7.96 Urban Rural Bhopal Gwalior Discom Urban Rural Total Discom 58832 8517 8589 14.47 64576 5474 5597 8.47 123408 24993 123408 148401 13991 1989 13991 15980 14186 1991 14186 16177 10.81 7.96 10.81 10.76 DETAILS OF POWER TRANSFORMER FAILURE Name of region No. Of x' mer installed as on 31.03.14 X' mer failed during the year. % age of x‟ mer failed 1 2 937 795 1732 3 5 7 12 5 0.53 0.88 0.69 Bhopal Gwalior Discom Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 49 | P a g e DETAILS OF ACCIDENTS FORMAT: D7 Year Ending March 14 ELECTRICAL REGION FATAL Dept Outsider NON-FATAL Animal Total Dept Employees Outsider Animal Total Employees Bhopal 4 60 67 131 16 27 7 50 Gwalior 7 78 175 260 23 45 1 69 Discom 11 138 242 391 39 72 8 119 NON ELECTRICAL REGION FATAL NON-FATAL Outsider Animal Total Bhopal Dept Employees 2 Outsider Animal Total 4 Dept Employees 12 2 0 0 0 12 Gwalior 1 0 0 1 9 3 0 12 Discom 3 2 0 5 21 3 0 24 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 50 | P a g e Supply Code Formats. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 51 | P a g e RELEASE OF NEW CONNECTIONS WITH METER ONLY FORMAT: ESC 6 Year Ending March 14 DISCOM (CZ) S.no. Category Total no. Of new connections released during the year No. Of new connections released without meter Total no. Of existing metered connections at the end of year Total no. Of existing unmetered connections at the end of year 137924 0 1547786 50870 1 DL&F 2 Non Domestic 8765 0 224879 0 3 Water Works 1730 0 8327 0 4 I.P 1910 0 30489 0 5 Agriculture 17400 3685 1430 326256 6 St.Light 1419 0 2483 0 7 BPL 23523 0 444833 222718 8 Others 10674 0 44530 32055 203345 3685 2304757 TOTAL Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 52 | P a g e 631899 RELEASE OF NEW CONNECTIONS WITH METER ONLY FORMAT: ESC 6 Year Ending March14 BHOPAL (BR) S. no. Category Total no. Of new connections released during the year No. Of new connections released without meter Total no. Of existing metered connections at the end of year 1 DL&F 71404 0 908800 2 Non Domestic 5217 0 133406 3 Water Works 171 0 4146 4 I.P 868 0 15335 5 Agriculture 11713 0 770 6 St. Light 3 0 1578 7 BPL 18340 0 280045 8 Others 0 0 42035 TOTAL 107716 0 1386115 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 53 | P a g e Total no. Of existing unmetered connections at the end of year 41518 0 0 0 197935 0 179009 0 418462 RELEASE OF NEW CONNECTIONS WITH METER ONLY FORMAT : ESC 6 Year Ending March14 GWALIOR (GR) S.no. Category 1 2 3 DL&F Non Domestic Water Works Total no. Of new connections released during the year No. Of new connections released without meter Total no. Of existing metered connections at the end of year 66520 0 638986 3548 0 91473 1559 0 4181 4 I.P 1042 0 15154 5 Agriculture 5687 3685 660 6 St.Light 1416 0 905 7 BPL 5183 0 164788 8 Others 10674 0 2495 TOTAL 95629 3685 918642 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 54 | P a g e Total no. Of existing unmetered connections at the end of year 9352 0 0 0 128321 0 43709 32055 213437 DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE FORMAT ESC 7 DISCOM (CZ)Year Ending 14 S.no. Year Ending March 14 Type of meters 1 Single phase electro mechanical 2 Single phase- electronic 3 Three phase electro mechanical 4 Three phase electronic 5 Three phase whole current meter 6 Three phase LTCT (A) 342359 1774400 4816 175934 3671 3577 2304757 LT TOTAL 8 HT Meter- Electro Mechanical 9 HTMeter- Electronic (B) no. Of meters installed as at the end of year 0 1735 1735 HT TOTAL 2306492 TOTAL (A+B) Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 55 | P a g e DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE FORMAT ESC 7 BHOPAL (BR) S.no. Year Ending March‟14 Type of meters 1 Single phase electro mechanical 2 Single phase- electronic 3 Three phase electro mechanical 4 Three phase electronic 5 Three phase whole current meter 6 Three phase LTCT (A) 184083 1071276 1570 125193 2474 1519 LT TOTAL 8 HT Meter- Electro Mechanical 9 HTMeter- Electronic (B) No. Of meters installed as at the end of year 1386115 0 1186 1186 HT TOTAL TOTAL (A+B) Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 1387301 56 | P a g e DETAILS OF VARIOUS TYPE OF METERS INSTALLED IN AREA OF LICENSEE FORMAT ESC 7 Year Ending March 14 GWALIOR (GR) S.no. Type of meters 1 Single phase electro mechanical 2 Single phase- electronic 3 Three phase electro mechanical 4 Three phase electronic 5 Three phase whole current meter 6 Three phase LTCT 703124 3246 50741 1197 2058 LT TOTAL (A) 8 HT Meter- Electro Mechanical 9 HTMeter- Electronic (B) No. Of meters installed as at the end of year 158276 918642 0 549 549 HT TOTAL 919191 TOTAL (A+B) Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 57 | P a g e PERIODIC INSPECTION / TESTING OF METERS DISCOM (CZ) S.no. Particulars Category Total no. Of meters installed at the end of the year No. Of meters inspected/ tested during year for verification of its accuracy Electro mechanical Electro nic Electro mechanical Electronic 342359 1774400 89381 361413 26 20 0 2 Commercial 2432 65899 1513 14439 62 22 0 0 Industrial 925 22043 148 5016 16 23 0 0 Others 1459 87992 1923 20798 132 24 0 0 Total 4816 175934 3584 40253 74 23 0 0 0 2363 0 776 0 33 0 0 6 794 0 437 0 55 0 0 0 508 0 213 0 42 0 0 6 3665 1426 0 39 0 1225 0 608 0 50 0 0 0 1578 0 950 0 60 0 0 0 774 0 417 0 54 0 0 0 3577 0 1975 0 55 0 0 Single Phase 1 Three Phase Commercial 3 Three Phase Whole Current Industrial Others Total Commercial Three Phase CTMeters FORMAT ESC 8 Year Ending March 14 % no. Found defective Industrial Others Total Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 58 | P a g e % of no. Of meters inspected/ tested during year for verification of its accuracy Electro Electron mechanical ic Electro mechanic al Ele ctr oni c 6 HT Meters 7 HT CT/PT Set TOTAL 0 1735 0 1789 0 103 0 1735 0 1789 0 103 92965 408645 27 21 347181 1959311 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 59 | P a g e 0 0 0 0 PERIODIC INSPECTION / TESTING OF METERS FORMAT ESC 8 Year Ending March 14 BHOPAL (CZ) S. Particulars No. Category Three Phase Three Phase Whole Current Electronic 184083 1071276 72840 255234 39.57 24 0 1 Commercial 512 41381 1228 8442 239.84 20 0 0 Industrial 39 9871 39 3033 100.00 31 0 0 Others 1019 73941 1688 15846 165.65 21 0 0 Total 1570 125193 2955 27321 188.22 22 0 0 0 1798 0 578 0 32 0 0 0 415 0 283 0 68 0 0 0 261 0 160 0 61 0 0 0 2474 0 1021 0 41 0 0 0 395 0 266 0 67 0 0 0 713 0 398 0 56 0 0 0 411 0 374 0 91 0 0 0 1519 0 1038 0 68 0 0 0 1186 0 1293 0 109 0 0 Industrial Others Commercial Industrial Others Total 6 HT Meters % no. Found defective Electro mechanical Total Three Phase CTMeters % of no. Of meters inspected/ tested during year for verification of its accuracy Electro Electr mechanical onic Electro nic Commercial 3 No. Of meters inspected/ tested during year for verification of its accuracy Electro mechanical Single Phase 1 Total no. Of meters installed at the end of the year Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 60 | P a g e Electro mechanical Electr onic 7 HT CT/PT Set TOTAL 0 1186 0 1293 0 109 0 0 185653 1202834 75795 29635 41 2 0.00 0 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 61 | P a g e PERIODIC INSPECTION / TESTING OF METERS FORMAT ESC 8 GWALIOR (CZ)Year Ending March 14 S.no. Particulars Category Total no. Of meters installed No. Of meters inspected/ at the end of the year tested during year for verification of its accuracy 1 Three Phase Electronic 158276 703124 16541 106179 10 15 0 1 Commercial 1920 24518 285 5997 15 24 0 0 Industrial 886 12172 109 1983 12 16 0 0 Others 440 14051 235 4952 53 35 0.06 0 Total 3246 50741 17170 12932 529 25 0.06 0 0 565 0 198 0 35 0 0 6 379 0 154 0 41 0 0 0 247 0 53 0 21 0 0 6 1191 0 405 0 34 0 0 0 830 0 342 0 41 0 0 0 865 0 552 0 64 0 0 0 363 0 43 0 12 0 0 0 46 0 2058 0 937 Commercial 3 Three Phase Whole Current Industrial Others Total Commercial Industrial Three Phase CTMeters % no. Found defective Electro mechanical Single Phase Others Total Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal Electro mechanical % of no. Of meters inspected/ tested during year for verification of its accuracy Electron Electro Electronic ic mechanical 62 | P a g e Electro mechanical Ele ctro nic 0 0 6 HT Meters 7 HT CT/PT Set TOTAL 0 549 0 496 0 90 0 0 0 549 0 496 0 90 0 0 161528 758212 33711 15266 21 2 0 0 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 63 | P a g e TESTING OF METERS ON CONSUMER'S REQUEST ON DEPOSITION OF CONTEST FEE FORMAT ESC 9 DISCOM S. No. Category 1 2 BHOPAL REGION 1 2 Domestic Commercial TOTAL GWALIOR REGION 1 Domestic 2 3 4 Commercial Industrial Power Water Works TOTAL DISCOM 1 Domestic 2 Commercial 3 4 Industrial Power Water Works TOTAL Year Ending march 14 No. Of consumers who applied for testing their meters No. Of consumers whose meters tested within 30 days applications No. Of consumers whose meters could not be tested within 30 days of application Reasons of delay in testing No. Of meters found within permissible Limits of accuracy Against col.4 No.of meters No. Of type of Found Meters found beyond beyond permissible permissible limits of Limits of Accuracy Accuracy against col.4 Against col.4 Electro-mech Electonic 3 4 5 6 7 8 9 10 2661 2661 0 0 1238 1423 39 1384 527 527 0 0 214 313 22 291 3188 3188 0 0 1452 1736 61 1675 5394 5394 0 0 3374 1997 755 1241 1155 1155 0 0 567 614 253 362 53 53 0 0 50 0 0 0 0 0 0 0 0 0 0 0 6602 6602 0 0 3991 2611 1008 1603 8055 8055 0 0 4612 3420 794 2625 1682 1682 0 0 781 927 275 653 53 53 0 0 50 0 0 0 0 0 0 0 0 0 0 0 9791 9791 0 0 5444 4347 1069 3278 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 64 | P a g e DISCONNECTION AFTER ISSUE OF PFL NOTICE FORMAT ESC 11 Year Ending 14 DISCOM (CZ) S. No. Name of circle No. Of consumers where meter readings not done during two consecutive reading cycles No. Of consumers to whom 2nd PFL notices issued No. Of consumers where readings could not be done after issue of 2nd PFL notice No. Of consumers to whom 24 hours notice issued under sec 163 (3) of e-act 2003 against col. 4 No. Of connections disconnected against col. 5 1 2 3 4 5 6 7 3496 790 127 664 39 60 72 5248 1616 285 127 18 17 60 50 2173 96 285 0 0 0 10 7 398 37 271 0 0 0 10 5 323 44 71 0 0 0 10 5 130 1854 8 88 0 648 0 205 218 0 51 0 158 0 430 50 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 2803 857 50 0 0 TOTAL DISCOM 8051 3030 448 323 130 BHOPAL REGION 1 City Bhopal 2 Bhopal 3 Vidisha 4 Shehore 5 Rajgarh 6 Hoshangabad 7 Betul TOTAL GWALIOR REGION 1 Gwalior City 2 Gwalior 3 Morena 4 Bhind 5 Guna 6 Shivpuri 7 Sheopur Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 65 | P a g e REDRESSAL DISPUTED/ERRONEOUS BILLS RELAED COMPLAINTS FORMAT ESC 12 Year Ending March 14 DISCOM (CZ) S. Circle No. 1 2 BHOPAL REGION 1 City Bhopal 2 Bhopal 3 Vidisha 4 Shehore 5 Rajgarh 6 Hoshangabad 7 Betul TOTAL GWALIOR REGION 1 Gwalior City 2 Gwalior 3 Morena 4 Bhind 5 Guna 6 Shivpuri 7 Sheopur TOTAL TOTAL DISCOM No. Of complaints pending at the beginning of year No. Of complaints received during the year Total of col. 3&4 No. Of complaints resolved during the year out of col. 5 No. Of complaints resolved within 7 days of receipt of application out of col. 5 No. Of complaints pending at the end of year 3 4 5 6 7 8 0 0 0 0 0 0 0 18037 1910 3996 2969 571 5047 544 18037 1910 3996 2969 571 5047 544 18037 1910 3996 2969 571 5047 536 18037 1910 957 857 554 5047 536 0 0 0 0 0 0 0 0 33074 33074 33066 27898 0 0 0 0 0 0 0 0 29696 2326 2879 462 2165 6196 2674 29696 2326 2879 462 2165 6196 2674 29696 2326 2879 462 2165 6196 2674 29696 2326 2879 462 2165 6053 2675 0 0 0 0 0 0 0 0 0 46398 79472 46398 79472 46398 79464 46256 74154 0 0 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 66 | P a g e Reasons for delay in resolving complaints for differnce of col (6-7) 9 0 CONNECTED CONSUMERS HAVING ARREARS FOR MORE THAN 3 MONTHS & DETAILS OF PERMANANTLY DISCONNECTED CONSUMER FORMAT ESC 13 Year EndingMarch14 DISCOM (CZ) S.n Name of circle 1 2 No.of connected consumers who are in arrears of more than three months Amount of arrears against col. 3 (Rs,inlacs) Reasons for non disconnection of consumers of col. 3 No.of connections permanently disconnected Amount of arrears against col. 6 (Rs. In lakhs) 3 4 5 6 7 31245 915.21 60490 4354.97 21092 2514.87 Being Govt. offices/ Water Works/ Street Light / VIPs / etc. 30212 6001.72 1010 67.21 20639 567.62 28183 1387.86 6673 153.35 814 230.74 17537 770.97 18867 119.84 37293 1590.54 26340 335.24 8295 217.38 127551 5570.97 181139 13656.55 20377 4572.18 40481 3910.11 6948 320.33 18436 1625.16 13218 13284.47 17554 7228.02 19214 1138.60 5162 1259.80 885 330.31 22475 1451.10 26863 4014.02 12250 502.31 49210 8413.93 4659 542.19 136715 32073.84 121017 16518.69 264266 37644.81 302156 30175.24 BHOPAL REGION 1 2 3 4 5 6 7 City Bhopal Bhopal Vidisha Shehore Rajgarh Hoshangabad Betul TOTAL GWALIOR REGION 1 2 3 4 5 7 Gwalior City Gwalior O&M Morena Bhind Guna Shivpuri Sheopur TOTAL TOTAL DISCOM Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal Govt Connections belongs to public interest .and disputed connections pending for deceision at court. 67 | P a g e Formats I to V: Conditions of license. Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 68 | P a g e SHORT TITLE DESCRIPTION OF THE PROPOSED UNDERTAKING FORMAT : I NAME OF THE COMPANY - Madhya Pradesh Madhya KshetraVidyutVitaran Company Limited REGISTERED ADDRESS - O/o M.D. NishthaParisar, Govindpura, Bhopal, Madhya Pradesh 462023 DATE OF INCORPORATION - 31st May, 2002 DATE OF REGISTRATION - 31st May, 2002 DATE OF COMMENCEMENT - 16th July, 2002 OF BUSINESS SHARE CAPITAL - Authorized Share Capital - Rs. 2500,00,00,000/- - Issued Capital - Rs. 17,633,243,500/- NUMBER OF SUBSCRIBER - 10- Shareholders NAME OF THE MD - ShriNiteshVyas Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 69 | P a g e NAME OF ALL DIRECTORS:1 ShriManuSrivastava 2 ShriNiteshVyas 3. ShriShrimanShukla 4 Shri A.C. Chakrabortti 5 Shri V. K. Singh 6 ShriMukulDhariwal 7. Shri K. K. Khare 8. Shri S.R. Prasad Company Secretary:- Mrs.Shairill A . Dubey Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 70 | P a g e SECRETARY Proposed Proposed functions functions (Please Tick) (Please Tick) Licence Applied for (Please Tick) Bulk Supply Distribution Retail Supply License System Operator/Load Dispatch Transmission Transmission Sub-Transmission Trading Distribution Distribution License √ Any other (please describe) Retail Supply Bulk Supply License Any other (please describe) Proposed Organization Structure ( Transmission License Distribution Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 71 | P a g e INTERFACE POINTS BETWEEN TRANSCO AND DISCOM (CENTRAL ZONE) Format-II INTERFACE POINTS BETWEEN TRANSCO AND DISCOM ( CENTRAL ZONE ) JUNE 14 ( INCOMERS ) LOCATION VOLTAGE NO. OF LEVEL METERING DETAILS OF METERS DETAILS OF CT DETAILS OF PT NAME OF FEEDERS POINTS TYPE CLASS OF ACCURACY RATIO CLASS OF ACCURACY 1 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 2 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 3 132KV LALGHATI BPL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 4 132KV KURAWAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 5 132KV KURAWAR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 6 132KV SEHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 7 132KV SEHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 220KV ASHTA 100MVA 220/33KV TRANSFORMER 33KV 2 STATIC 9 132KV ASHTA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 10 132KV ASHTA 40MVA 132/33KV TRANSFORMER 33KV 1 11 132KV SHYAMPUR 40MVA 132/33KV TRANSFORMER 33KV 12 132KV ICHHAWAR 40MVA 132/33KV TRANSFORMER 13 220KV BAIRAGARH 14 RATIO 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 800/1 0.5 1200/1 0.2 0.2s 800/1 0.5 STATIC 0.2s 800/1 0.5 1 STATIC 0.2s 800/1 0.2 33KV 1 STATIC 0.2s 800/1 0.2 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 220KV BAIRAGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 15 132KV BEORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 16 132KV BEORA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 17 132KV KHILCHIPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 18 132KV KHILCHIPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 19 132KV SARANGPUR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 20 132KV SARANGPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 33KV/110 8 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 72 | P a g e 0.2s 33KV/110 V CLASS OF ACCURACY 0.5 0.5 0.2 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 V 21 132KV SARANGPUR 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 22 132KV PACHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 23 132KV PACHORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 24 132KV JEERAPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 25 220KV RAJGARH(BEORA) 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 26 220KV ITARSI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 27 220KV ITARSI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 28 220KV SARNI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 29 220KV SARNI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 30 132KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 31 132KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 32 132KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 33 132KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 34 132KV MULTAI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 35 132KV MULTAI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 36 132KV GUDGAON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 37 220KV PIPARIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 38 132KV CHICHOLI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 39 220KV BETUL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 40 132KV HARDA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 41 132KV HARDA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 42 220KV HOSANGABAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 43 220KV HOSANGABAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 44 220KV HOSANGABAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 45 132KV SEONI MALWA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 800/1 0.5 46 132KV BANKHEDI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 47 132KV SULTANPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 73 | P a g e 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.2 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.2 48 132KV MACT BHOPAL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 49 132KV MACT BHOPAL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 50 132KV MACT BHOPAL 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 0.2s 220KV MANDIDEEP 800/1 0.5 1200/1 0.5 0.2s 800/1 0.5 STATIC 0.2s 800/1 0.5 1 STATIC 0.2s 400/1 0.5 33KV 1 STATIC 0.2s 400/1 0.5 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 132KV BARELI 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 59 132KV BARELI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 60 132KV BARELI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 61 132KV GAIRATGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 62 132KV NASURALLAHGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 63 132KV NASURALLAHGANJ 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 64 132KV GOPALPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 65 220KV VIDISHA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.2 66 220KV VIDISHA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.2 67 132KV BERASIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 68 132KV BERASIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 69 132KV BERASIA 16MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 70 132KV SIRONJ 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 71 132KV SIRONJ 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 72 132KV GANJBASODA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 73 132KV SHAMSABAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 220KV BHOPAL 100MVA 220/33KV TRANSFORMER 33KV 2 STATIC 1200/1 0.5 51 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 220KV MANDIDEEP 100MVA 220/33KV TRANSFORMER 33KV 2 STATIC 53 132KV MANDIDEEP 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 54 132KV MANDIDEEP 40MVA 132/33KV TRANSFORMER 33KV 1 55 132KV RAISEN 20MVA 132/33KV TRANSFORMER 33KV 56 132KV RAISEN 20MVA 132/33KV TRANSFORMER 57 132KV RAISEN 58 52 74 75 132KV BHOPAL(CH.) 20MVA 132/33KV TRANSFORMER 33KV Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 1 STATIC 74 | P a g e 0.2s 0.2s 0.2s 400/1 0.5 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.2 0.2 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.5 0.5 76 132KV BHOPAL(CH.) 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 77 132KV BHOPAL(CH.) 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 78 132KV BHOPAL(CH.) 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 79 132KV AYODHYANAGAR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 80 132KV AYODHYANAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 81 132KV AMRAWAD KHURD 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1600/1 0.5 82 220KV GWALIOR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 83 220KV GWALIOR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 84 220KV GWALIOR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 85 132KV MOTIJHEEL 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 86 132KV MOTIJHEEL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 87 132KV MOTIJHEEL 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 88 132KV BANMORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 89 132KV BANMORE 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 90 132KV TIGRA ROAD 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 91 132KV TIGRA ROAD 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 92 132KV MORAR 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 93 132KV MORENA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 94 132KV MORENA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 95 132KV AMBAH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 96 132KV AMBAH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 97 220KV SABALGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 98 220KV SABALGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 99 132KV JORA 63MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 1200/1 0.5 100 132KV PORSA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 101 220KV MEHGAON 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 102 220KV MEHGAON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 103 220KV MEHGAON 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 33KV/110 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 75 | P a g e 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.5 0.5 0.2 0.5 0.5 0.2 0.5 0.2 V 104 132KV BHIND 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 105 132KV BHIND 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 106 132KV SEONDHA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 107 132KV SEONDHA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 108 132KV SEONDHA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 109 132KV DATIA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 110 132KV DATIA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 111 132KV DABRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 112 132KV DABRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 113 132KV DABRA 12.5MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 114 220KV MALANPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 115 220KV MALANPUR 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 116 132KV LAHAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 117 132KV RON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 118 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 119 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 120 220KV GUNA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 121 132KV ASHOKNAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 122 132KV ASHOKNAGAR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 123 132KV RAGHOGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 124 132KV RAGHOGARH 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.5 125 132KV BHONRA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 126 132KV BHONRA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2 400/1 0.5 127 132KV BHONRA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.5 400/1 0.5 128 132KV ARON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 129 132KV ARON 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.5 800/1 0.5 130 132KV MAKSOODANGARH 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 76 | P a g e 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 0.5 0.5 0.5 0.2 0.2 0.5 0.5 0.5 0.5 0.2 0.5 0.2 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 131 132KV CHANDERI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 132 220KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 133 220KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 134 132KV PICHHORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 135 132KV PICHHORE 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 136 132KV PICHHORE 12.5MVA 132/66/33KV TRANSFORMER 33KV 1 STATIC 0.2s 200/1 0.5 137 132KV PICHHORE 5MVA 66/33KV TRANSFORMER 33KV 1 STATIC 0.2s 100/1 0.5 138 132KV PICHHORE 5MVA 66/33KV TRANSFORMER 33KV 1 STATIC 0.2s 100/1 0.5 139 132KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.6 140 132KV SHIVPURI 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 141 132KV SHIVPURKALA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 142 132KV SHIVPURKALA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 143 132KV SHIVPURKALA 20MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 400/1 0.2 144 132KV KARERA 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.5 145 132KV KOLARAS 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 146 132KV VIJAYPUR 40MVA 132/33KV TRANSFORMER 33KV 1 STATIC 0.2s 800/1 0.2 TOTAL 149 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 77 | P a g e 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 33KV/110 V 0.5 0.5 0.5 0.2 0.2 0.5 0.5 0.5 0.5 0.5 0.5 0.2 0.2 0.5.5 0.2 0.2 DESCRIPTION OF THE PROPOSED AREA Format : III S. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 PARAMETER Area Gross Cropped Area Gross Irrigated area Forest area Population Scheduled Caste/Scheduled Tribe Population Total Population BPL SC/ST Population Below Poverty Line(BPL) Total number of Households No.of Rural Households No.of urban Households No.of Households electrified No.of Rural Households electrified No.of Urban Households electrified Percentage of Households electrified No.of Districts No.ofCommissioneries No.of Tehsils No.of Villages No.of villages electrified ( As per old definition) UNIT Sq km Sq km Sq km Sq km No No No No No No No No No No % No No No No No DATA as on 31.03.2014 96069 NA NA NA 22394122 4088159/2337793 NA NA 4446283 3095345 1350938 2891905 1632245 1259660 65.04% 16 4 104 16650 15446 SOURCE Census data 2011 Census data 2011 not received -do-doCensus data 2011 Census data 2011 Census data 2011 not received Census data 2011 not received Census data 2011 Census data 2011 Census data 2011 Census data 2011 Census data 2011 Census data 2011 No of villages electrified ( As per new definition) No 12583 Company Data Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 78 | P a g e Census data 2011 Census data 2011 Census data 2011 Census data 2011 Company Data INFORMATION ABOUT DISTRIBUTION LICENSEE (INCLUDING DEEMED LICENSEE) FORMATE-IV Category No. of Consumer No. Contracted/ Connected Load KW Energy Billed MU Working Meters No. Defective Meters No. Consumers Without Meters No. Arrears as on March-14 Rs. In Lakh 2054305 92529 273588 8256 0 16929.84 460 0 1877.6 172 0 611.45 1197 0 7435.9 34 326256 37135.18 LT 119477.51 Domestic 2268092 2039578 218.39 Non-Domestic 230611 563647 50.23 Public Water Works 8569 54662 20.13 Street Lights 2483 23457 9.23 Industrial 30618 263234 18.27 Irrigation Pump 395768 1728962 822.10 Other Agricultural 515 3037 9.74 468 47 32055 158.96 Total LT 2936656 4676577 1148.09 2712703 102695 631899 183626.44 18 5 862 701 8 24 71 43 0 0 1 2 0 0 0 0 0 0 0 0 0 0 0 0 0.22 0 6320.09 38.51 74.38 7.4 46.09 -8.79 1732 2714435 3 102698 0 631899 6477.9 190104.34 222355 8109 2311 29421 395734 HT Railway Traction Coal Mines Industrial Non-Industrial Seasonal Irrigation Water Works Bulk Residential 18 5 863 703 8 24 71 43 290700 10872 426896 135068 1143 4352 32434 27461 Total HT Grand Total 1735 2938391 928926 5605503 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 75.65 3.12 163.00 27.96 0.17 0.48 12.45 11.58 294.41 1442.50 79 | P a g e INFORMATION ABOUT DISTRIBUTION LICENSEE (INCLUDING DEEMED LICENSEE) FORMATE-V S.N Parameter 1 2 3 4 5 6 7 8 9 10 11 12 13 15 o) p) Unit Data No.of Region No.of Circles No.ofDivisions No.of Sub-Divisions No.of Distribution Centres (City zone (68)+ Town Zone (19)+D/c (260) ) No.of Fuse off call centres Length of 33 KV line Length of 11 KV line Length of LT Line Total No.of 33 KV feeders Total No.of 11 KV feeders Total No.of 33 KV feeders metered Total No.of 11 KV feeders metered Total no. or Transformers with rating of: No No No No No No ckm ckm ckm No No No No 2 14 49 72 347 a) b) c) d) e) f) g) h) i) j) k) l) 750 KVA/630 KVA 630 KVA 500 KVA 400 KVA 315 KVA 300 KVA 250 KVA 200 KVA 160 kVA 150 KVA 100 KVA 75 KVA No No No No No m) n) 63 KVA 50 KVA 25 KVA 16 KVA No Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal No No No No No No No 80 | P a g e 13923 92133 108591 1430 3679 1295 3091 0/01 01 50 01 1269 09 12 8641 12 05 28123 0 34450 03 65744 7249 q) 17 18 a) b) 19 20 21 22 23 24 25 a) b) c) 26 27 28 a) b) 5 KVA /10 KVA Total number of Distribution transformers Total number of power transformers Total Transformation capacity Power Transformer Distribution Transformer Energy Input Energy billed Energy Lost Amount billed Amount collected Percentage Collected Total Arrears Arrears<90 days Arrears between 90-180 days Arrears > 180 days No. of HT & LT consumers with Arrears above 10 lakh No. of LT consumers with Arrears above Rs.25,000/Total Number of technical employees Total number of non-technical employees Total number of employees Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal No 5/2827 No 148401 No 1732 MVA 7913.1 MVA 8933.01 MU 1651762 MU 1141679 % 30.88 RsCr 5622.33 RsCr 5975.34 % 106.27 Rs Lakhs 1901014.42 Rs Lakhs 14049.13 Rs Lakhs 18208.73 Rs Lakhs 157846.56 No 3491 No 4327 No 10205 No 2671 No 12,876 81 | P a g e Status of Providing Metering At All Incoming and Outgoing Feeders of 11KV And Above For Energy Accounting Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 82 | P a g e STATUS OF 33/11 KV METERING INSTALLED FOR ENERGY AUDITING AT THE END OF MAR.'2013 - CENTRAL DISCOM Annexure-A STATUS OF 33/11KV SUBSTATION S. NO . 1 2 3 4 5 6 7 NAME OF CIRCLE CITY BHOPAL O&M BHOPAL VIDISHA RAJGARH SEHORE BETUL HOSHANGABA D DETAILS OF 33 KV FEEDER 33 KV FEEDER TOT AL NO. OF S/S TOT AL NO. OF POW ER X/ME R 61 132 50 74 58 56 85 516 121 226 83 126 113 113 155 937 52 85 27 46 33 37 61 341 200 182 74 101 69 133 130 889 40 87 59 43 64 39 93 425 82 137 108 77 109 65 178 756 26 27 41 31 28 15 59 227 941 1693 568 TOTAL NO. OF 33KV FEEDE R METERING INSTALLED NO. OF MET ERIN METER G POIN T METERIN G TO BE PROVIDED DETAILS OF 11 KV FEEDER METER/ME FOUND STOP/ DEFECTIVE 11 KV FEEDER NO. OF METE RING POIN T METER M.E. MET ER M.E. MET ER M.E. METERING INSTALLED METERING TO BE PROVIDED METER/ME FOUND STOP/ DEFECTIVE M.E. ME TE R M.E . ME TER M.E. TOTA L NO. OF 11KV FEED ER 200 161 66 91 67 122 100 807 200 161 66 91 67 122 100 807 0 21 8 10 2 11 30 82 0 21 8 10 2 11 30 82 0 14 1 31 0 1 26 73 7 14 5 28 2 4 37 97 249 490 209 293 209 246 332 2028 249 490 209 293 209 246 332 2028 249 377 199 272 187 255 254 1793 249 377 199 272 187 255 254 1793 0 127 19 11 22 11 89 279 0 127 19 11 22 11 89 279 0 48 7 48 0 6 37 146 0 36 10 58 13 13 80 210 54 104 65 62 80 39 137 541 54 103 56 58 72 25 120 488 0 1 9 4 8 14 17 53 0 1 9 4 5 14 16 49 0 21 0 0 0 10 5 36 5 28 2 8 14 10 17 84 170 292 197 166 220 122 440 1607 170 292 197 166 220 122 440 1607 170 255 170 145 180 54 324 1298 170 255 170 142 192 54 336 1319 0 37 27 21 40 68 116 309 0 37 27 24 28 68 104 288 0 37 27 24 28 68 104 288 0 23 0 0 1 6 6 36 10 99 0 29 71 9 51 269 1430 1295 860 131 118 157 1704 3635 3326 3112 2102 567 567 182 479 BHOPA REGION 8 9 10 CITY GWALIOR O&M GWALIOR MORENA 11 BHIND 12 SHIVPURI 13 SHEOPUR 14 GUNA GWALIOR REGION CENTRAL DISCOM Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 83 | P a g e Failure of DTR During Year Ending March‟14 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 84 | P a g e DISTRIBUTION TRANSFORMER FAILURE(URBAN) Annexure-B Format – 6(i) Year Ending March 14 Sl no Circle 1 2 No of transforme rs installed as on 31.03.14 3 No of transformer s servicing predominan tly* agricultural consumers 4 Defective trans. Start of year Trans. Failed during the year(no) Trans. Replaced/ repaired during the year (no) 7803 37 0 0.00 97 90 7 1428 0 0 0.00 196 196 0 697 387 836 1084 667 12902 19 0 37 11 0 104 0 0 0 0 0 0 0.00 0.00 0.00 0.00 0.00 0.00 42 19 62 32 13 461 42 19 62 32 13 454 0 0 0 0 0 7 0.00 0.00 0.00 0.00 0.00 0.00 0.05 5001 823 2555 1726 802 663 298 12091 24993 0 165 223 185 39 62 78 752 856 0 19 49 31 1 137 18 255 255 0.00 2.73 0.75 0.25 0.12 228 93 380 593 51 228 93 380 597 51 0 19 49 27 1 0.00 2.49 1.94 1.56 0.12 6.31 1.40 0.94 0.47 172 11 1528 1989 175 13 1537 1991 134 16 246 253 20.21 5.56 2.09 0.01 No. % of total 5 6 7 8 Defective trans. At end of the year No (5+78=9) % of total 9 10 Percentage of transformers replaced within 7 days 11 BHOPAL REGION 1 2 3 4 5 6 7 CITY BHOPAL O&M BHOPAL VIDISHA SHE RAJGARH H'BAD BETUL TOTAL 0.09 92.78 100.00 100.00 100.00 100.00 100.00 100.00 98.48 GWALIOR REGION 1 2 3 4 5 6 7 DISCOM CITY GWALIOR GWALIOR MORENA BHIND GUNA SHIVPURI SHEOPUR TOTAL Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 85 | P a g e 100.00 83.04 95.24 100.00 98.08 74.15 86.67 93.78 94.81 DISTRIBUTION TRANSFORMER FAILURE (RURAL) Format – 6(i) Sl No Circle 1 2 No of Transfor mers installed as on 31.03.14 No of transforme rs servicing predomina ntly* agricultura l consumers Defective Trans. Start of year 3 4 5 % of tota l 6 15192 13202 25 6885 7176 12662 10177 6740 58832 5885 6416 8766 8036 4731 47036 14 19 104 24 2 188 No. Trans. failed during the Year(No) Trans. replaced/ repaired during the year (No) 7 0.19 0.23 0.30 1.08 0.25 0.34 0.37 Defective Trans. at end of the year Percentage of transforme rs replaced within 7 days No (5+78=9) % of total 8 9 10 11 2195 2184 36 1489 1100 1804 1144 785 8517 1498 1112 1856 1156 783 8589 5 7 52 12 4 116 0.24 0.07 0.10 0.41 0.12 1.06 0.20 98.38 99.67 99.37 99.27 98.97 99.49 98.67 1454 802 558 1719 780 284 5597 14186 1991 14186 16177 28 5 28 133 3 0 197 313 253 313 566 0.29 0.05 0.36 0.70 0.03 0.00 0.31 0.25 0.01 0.25 0.38 98.04 99.40 95.22 92.72 99.62 100.00 96.58 97.84 94.81 97.84 96.61 BHOPAL REGION 2 3 4 5 O&M BHOPAL VIDISHA SEHORE RAJGARH H'BAD 6 BETUL 1 TOTAL GWALIOR REGION 1 (O&M)GWALI OR MORENA BHIND GUNA SHIVPURI SHEOPUR TOTAL 9767 7582 112 0.01 1370 2 10729 8348 9 0.00 798 3 7803 6136 40 0.00 546 4 18920 12012 95 0.01 1757 5 8957 6658 24 0.00 759 6 8400 6950 40 0.00 244 64576 47686 320 0.51 5474 DISCOM 123408 94722 508 0.44 13991 URBAN 24993 856 255 0.47 1989 DISCOM RURAL 123408 94722 508 0.44 13991 TOTAL 148401 95578 763 0.91 15980 *Transformers where at least 70% of the connected load is for agricultural connections Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 86 | P a g e Failure of Power Transformers During Year Ending March14 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 87 | P a g e POWER TRANSFORMER FAILURE Annexure “c” S. N. Circle PTR in service As on 31.03.14 PTR failed during reporting year % failure 1 BPL(City) 121 0 0.00 2 BPL (O&M) 226 3 1.33 3 Vidisha 83 2 2.41 4 Sehore 113 0 0.00 5 Rajgarh 126 0 0.00 6 Hos'bad 155 0 0.0 7 Betul 113 0 0.00 937 5 0.53 Total 1 Gwl. City 88 0 0.00 2 Gwalior (O&M) 144 0 0.00 3 Morena 112 1 0.89 4 Bhind 85 1 1.18 5 Guna 192 3 1.56 6 Shivpuri 109 0 0.00 7 Sheopur 65 2 3.08 795 7 0.88 1732 12 0.69 Total Total Discom Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 88 | P a g e PROJECTION OF CATEGORY WISE SALES Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 89 | P a g e PROJECTION OF CATEGORY WISE SALES Annexure-D S.NO . LT SALES IN MU 2009-10 ACTUALS 2010-11 2011-12 ESTIMATES 2012-13 2013-14 PROJECTION 2014-15 2015-16 LV-1 Domestic 1599 1893 2064 2514 3500.84 4358.79 LV-2 Non-Domestic 410 479 532 626 717.00 883.08 LV-3 P.W.W. & Street Light 181 223 236 306 321.66 432.50 LV-3 Industrial 183 193 204 256 261.64 359.19 LV-5 Agriculture 2320 2540 2794 3190 3946.85 4683.35 Total 4693 5328 5830 6892 8747.99 10716.91 HV-1 Railway Traction 678 704 760 831 850.82 978.45 HV-2 Coal Mines 33 34 33 33 34.73 34.73 HV-3 Industrial & Non-Industrial 1326 1536 1702 1908 2,219.83 2,477.95 HV-4 Seasonal 1 1 2 2 1.81 2.05 HV-5 Irrigation & Water Works 77 80 99 107 159.34 192.99 HV-6 Bulk Residencial 126 141 152 167 169.03 190.37 HV-7 Bulk Supply to Exm. 10 0 0 0 3435.56 3876.54 6942 7824 8577 9940 12,183.55 14,593.45 4987.29 906.51 592.56 384.11 5,570.67 12,441.14 HT Total Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 90 | P a g e 978.45 34.73 2,528.27 2.37 234.46 216.82 3995.10 16436.24 PROJECTION OF MONTHLY UNRESTRICTED AND RESTRICTED MAXIMUM DEMAND IN MW FOR NEXT FIVE YEARS Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 91 | P a g e PROJECTION OF MONTHLY UNRESTRICTED AND RESTRICTED MAXI. DEMAND IN MW FOR NEXT FIVE YEARS. Annexure-E Year Ending March 14 Max. Demand in MW (Rest.) S.No. Max. Demand in MW (Un-Rest.) Month 2013-14 2014-15 2015-16 2016-17 2017-18 2013-14 2014-15 2015-16 2016-17 2017-18 1 April 2443 2387 2578 2784 3007 2443 2387 2578 2784 3007 2 May 2362 2398 2590 2797 3021 2362 2398 2590 2797 3021 3 June 2157 2145 2317 2502 2703 2280 2145 2317 2502 2703 4 July 1924 2057 2222 2400 2592 1924 2057 2222 2400 2592 5 August 1954 2029 2192 2367 2557 1954 2029 2192 2367 2557 6 September 2726 2300 2484 2683 2897 2726 2300 2484 2683 2897 7 October 2714 3004 3244 3504 3784 2714 3004 3244 3504 3784 8 November 3147 3291 3555 3839 4146 3147 3291 3555 3839 4146 9 December 3321 3276 3538 3821 4127 3321 3276 3538 3821 4127 10 January 2996 3125 3375 3645 3937 2996 3125 3375 3645 3937 11 February 2960 2803 3027 3269 3531 2960 2803 3027 3269 3531 12 March 2296 2683 2897 3129 3379 2296 2683 2897 3129 3379 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 92 | P a g e Reliability Index for DHQs For year ending March‟14 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 93 | P a g e REPORT OF OUTAGES OF 11 KV FEEDERS Annexure-F Year Ending March 14 S.No. Town 1 2 Type of Town No.Of Feeder s On Last Day Of The Month Total No.Of Outages of feeders During the month 3 4 5 Total Duration Of Outages of Feeders During the month(in Feeder Minutes) 6 Cumulative No.Of Outages w.e.f.1 st April till lastday of The month Cumulative Duration of Outages w.e.f.1st April till lastday of month(in Feeder Minutes) 7 8 Monthly Average No.of Outages of feeders (COL5/ COL4) 9 Monthly Average Duration of Outages of Feeders (in Minutes)(COL 6/COL4) 10 Monthly Feeder Reliability Index*(%) 11 Cumulative Average No.of Outages of Feeders (COL7/CO L4) 12 Cumulative Average Duration of Outages of Feeders ( in Minutes)(C OL8/COL4) Cumulative Feeder Reliability Index** (%) 13 14 BHOPAL REGION 1 Bhopal SC 249 1921 43629 15807 509675 7.71 175.22 99.61 63.48 2046.89 99.61 2 Raisen DH 3 31 2160 308 19496 10.33 720.00 98.39 102.67 6498.80 98.76 3 Vidisha DH 17 147 6840 2112 91380 8.65 402.35 99.10 124.24 5375.29 98.98 4 Sehore DH 15 206 3070 2570 43880 13.73 204.68 99.54 171.33 2925.36 99.44 5 Rajgarh DH 2 7 99 4493 3.50 161.40 99.64 49.50 2246.40 99.57 6 H'bad DH 9 262 322.8 3929 2585 61085 29.11 436.60 99.02 287.22 6787.20 98.71 7 Harda DH 6 148 2075 1527 39526 24.67 345.90 99.23 254.50 6587.70 98.75 8 Betul DH 9 216 5174 2256 55131 24.00 574.93 98.71 250.67 6125.67 98.83 GWALIOR REGION 1 Datia DH 13 52 1812 774 25244.4 4.00 139.38 99.69 59.54 1941.88 99.63 2 Guna DH 13 419 6922.2 3983 68302.8 32.23 532.48 98.81 306.38 5254.06 99.00 3 Gwalior MT 167 1164 55200 44036 545700 6.97 330.54 99.26 263.69 3267.66 99.38 4 Morena DH 23 337 18420 4075 237720 14.65 800.87 98.21 177.17 10335.65 98.03 5 Sheopur DH 7 46 3438.6 172 24090.6 6.57 491.23 98.90 24.57 3441.51 99.35 6 Shivpuri DH 19 224 15426 2915 230275.8 11.79 811.89 98.18 153.42 12119.78 97.69 7 AshokNagar DH 4 278 2649 2419 27965.2 69.50 662.25 98.52 604.75 6991.30 98.67 8 Bhind DH 16 107 7980 1489 141120 6.69 498.75 98.88 93.06 8820.00 98.32 Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 94 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 95 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 96 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 97 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 98 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 99 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 100 | P a g e Annual Regulatory compliance Report 2014 M.P.M.K.V.V.C.L Bhopal 101 | P a g e