Plug in to Green Power Shore Connection Solution MARCOD event Shore Connection March 2015 René Andersen Schneider Electric Shore Connection team Schneider Electric - Shore Connection – Confidential 1 Shore to Ships • Available power on port ? • Voltage on the MV ring ? • Number of berths concerned ? Schneider Electric - Shore Connection – Confidential 2 Shore Connection general overview Electrical network Existing or New substation Frequency adaptation And safety operation Cable dispenser to ship connection Ship to supply ShoreBoxTM Ferry G Utility provider Shore To Ship Shore / Ship Interface Quay, Wharf Utility Energy provider Terminal Operator Ship Port Schneider Electric - Shore Connection – Confidential 3 Shore connection general overview Electrical network Existing or New substation Frequency adaptation And safety operation Cable dispenser to ship connection Ship to supply ShoreBoxTM Container ship Hinterland Shore To Ship Shore / Ship Interface Quay, Wharf Utility Energy provider Terminal Operator Ship Port Schneider Electric - Shore Connection – Confidential 4 Shore side PORT project / how to co-operate with partners Step 1 Engineering Existing MV Substation Civil Works Buried MV Cable ShoreBoxTM Civil Works Buried MV Cable Step 2 Procurement & Implementation Interface Shore Ship Ship Step 3 Commissionning Schneider Electric - Shore Connection – Confidential Local Partner Project Management Electrical Studies Civil works studies X X X X X Up stream MV Switchboard X Excavation Cabling preparation Cable connection X X X ShoreBox Basement preparation ShoreBox ShoreBox Implementation X X X Excavation Cabling preparation Cable connection X X X Jib Crane (Cable dispenser) Erection of cable dispenser X X Commissionning Shore Commissionning Shore + Ship Training Services Maintenance & Spare parts X X X X X X X X X5 MV solution for Vessel Project plan How to co-operate with partners Step 1 Engineering 5 2 4 1 3 Step 2 Implementation Step 3 Commissionning Schneider Electric - Shore Connection – Confidential Project Management Electrical Studies Mecanical studies Waterproof Door Ship Jonction Box Control cde cabinet Implementation MV Cables 2 MV Premset Cubicle Interlocking system Sepam Trip Unit Implementation MV Cables 3 Transformer MV/MV or MV/LV (if required) Implementation MV / LV Cables 4 Main Switchboard Shore incomer CB Synchro module Ship PMS modification Switch board adaptation Supervision adaptation 5 Captain piloting room Local Partner X X 1 Incomer X Commissionning Ship Commissionning Ship + Shore Training Services Maintenance & Spare parts 6 Plug in to Green Power Understand What Shore Connection is & how to implement it. Shore Connection Solution Questions to answer in order to be able Preliminary phase to plug a ship on the electrical network Schneider Electric - Shore Connection – 7 Shore Power / Port - Partners and Suppliers how can they work together Classification Societies Port & Terminal Associations Shipyards Association of Port Cities Investors Financial agencies Decision Makers Politicians Stakeholders Regional Be compliant with regulation Ship Ferry Terminal Operator Container Cargo Tanker IMO EU MARPOL 6 2005/33/EC Schneider Electric - Shore Connection – Europe City Cruise Port Terminal Operator Repair Maintenance ShipYards Ship Country Terminal Operator Authority Navy Naval Base Energy provider National Grid 8 Landscape analyse Data from Ships side Which kind of ships could be connected in your port and for which level of power? • Number of calls a year ? • Time spent at berth ? • On board frequency ? • Power required ? • Blackout accepted ? • Seasonality Ferry, Cargo, RoRo, RoPax < 3 MVA < 6 MVA Container < 3 MVA < 6 MVA Cruise < 9 MVA Navy < 12 MVA River Cruise Level of Power MVA ? Schneider Electric - Power Solutions – Shore Connection – June 2012 LV , < 1 MVA 9 Actual ships context & main characteristics Plug Into Green Power Schneider Electric - Partner Solutions – Shore Connection – August 2013 10 Others Vessels - Power demand at berth OSV Passengers River Cruise Ferries, RoRo RoPax Small Cruise Cruise Big Cruise Goods Cargo Container Oil Tanker LNG Tanker 1 3 6 9 Schneider Electric - PWB – Energy Management Solutions – Shore Connection Solution 12 15 20 MVA 11 The technical challenge raised by Schneider Electric Plug Into Green Power Schneider Electric - Partner Solutions – Shore Connection – August 2013 16 Functional Architecture with conversion 0. Supply from energy provider 1. Input & grid connection 2. Output 3. Grid Conversion frequency 4. Load Management 5. Monitoring 6. Thermal Management 7. Enclosure box 8. Ship to shore connection 4 8 5 2 3 1 6 7 0 Schneider Electric - Partner Solutions – Shore Connection – August 2013 17 Functional Architecture Without conversion US Container ports 60 / 60hz Europ Ferry ports 50 / 50hz Schneider Electric - Partner Solutions – Shore Connection – August 2013 18 Functional Architecture In Low Voltage Navy Ships Supply Ships Small Container Ships Usual power ~ 500kVA Schneider Electric - Partner Solutions – Shore Connection – August 2013 19 A genuine test in labs Since 2010, Plug Into 3 years to learn, Green Power Functional & Real Tests Schneider Electric - Partner Solutions – Shore Connection – August 2013 20 3 Years of tests to learn the behaviour of a global Solution in 3 test platforms 2 Eybens Simulation Platform • HVAC • Fans • LV Automation Control Command • Safety loop • Interface Shore / Ship • Adaptation to Ship 3 Volta Lab Final test in Lab • Test at In, 3 MVA • TVD • Type tested Schneider Electric - Partner Solutions – Shore Connection – August 2013 1 Montbonnot Platform GFC • 10 GFC //, 5 MVA • Genset 1 MVA • Network Synchronization • General behaviour21 Our Solution Offer Plug in to Green Power Shore Connection Solution Schneider Electric - Shore Connection – Confidential 22 ShoreBoxTM handling & lifting principle Schneider Electric - Partner Solutions – Shore Connection – August 2013 23 ShoreBox design for Transportation Schneider Electric - Shore Connection – Confidential 24 Riga Project, ShoreBoX departure August 2014 Schneider Electric - Shore Connection – Confidential 25 Helsinki project Connection to the vessel Electrical network LV Cable dispenser Cable to ship connection Ship to supply ShoreBoxTM G Hinterland Utility Terminal Schneider Electric - Shore Connection – Confidential Interface Shore to Ship Ship Gabriella Mariella 26 Electrical network Supply Ships connection in Bergen Power demand for 1 MVA : • 3 Cables • 2 output : 440V or 690V • Frequency: 50 or 60hz Energy Provider Substation ShoreBoxTM G HV Cable ShoreBoxTM G Shore Schneider Electric - Shore Connection – Confidential To Ship 27 Future secure shore power investment Example:Total Power : 24 MVA (8+8+8) 8MVA 8MVA 8MVA 8MVA 8MVA 8MVA Schneider Electric - Shore Connection – Confidential 28 Modular system Total Power : 24 MVA (8+8+8) 8MVA 8MVA 8MVA 8MVA 8MVA +8MVA =16MVA -MVA Schneider Electric - Shore Connection – Confidential 29 Total Power : 36 MVA (12+12+12) 12MVA 16MVA 12MVA 12MVA 12MVA 8MVA 10MVA Schneider Electric - Shore Connection – Confidential 30 Shorebox solution Vs Ususal projects Optimize Leadtime & Site Works Industrialised Solution offer time to market reduction of 50% Order 4 Design & Engineering 50 % Time Saving 20 13 Procurement 18 9 Integration 20 2 Testing FAT On-site Installation 4 1 2 2 Commissioning 5 3 weeks only on shore side to implement 31 weeks on shore side to implement Weeks 0 Schneider Electric 31 Industrialised 65 Traditional ETO 31 Plug in to Green Power Shore Connection Solu Schneider Electric - Shore Connection 32