Ship - MARCOD

advertisement
Plug in to
Green Power
Shore Connection Solution
MARCOD event
Shore Connection
March 2015
René Andersen
Schneider Electric Shore
Connection team
Schneider Electric - Shore Connection – Confidential
1
Shore to Ships
• Available power on port ?
• Voltage on the MV ring ?
• Number of berths concerned ?
Schneider Electric - Shore Connection – Confidential
2
Shore Connection general overview
Electrical
network
Existing or
New substation
Frequency adaptation
And safety operation
Cable dispenser
to ship connection
Ship to
supply
ShoreBoxTM
Ferry
G
Utility
provider
Shore
To
Ship
Shore / Ship Interface
Quay, Wharf
Utility
Energy provider
Terminal Operator
Ship
Port
Schneider Electric - Shore Connection – Confidential
3
Shore connection general overview
Electrical
network
Existing or
New substation
Frequency adaptation
And safety operation
Cable dispenser
to ship connection
Ship to
supply
ShoreBoxTM
Container ship
Hinterland
Shore
To
Ship
Shore / Ship Interface
Quay, Wharf
Utility
Energy provider
Terminal Operator
Ship
Port
Schneider Electric - Shore Connection – Confidential
4
Shore side PORT project /
how to co-operate with partners
Step 1
Engineering
Existing
MV Substation
Civil Works
Buried MV Cable
ShoreBoxTM
Civil Works
Buried MV Cable
Step 2
Procurement &
Implementation
Interface Shore
Ship
Ship
Step 3
Commissionning
Schneider Electric - Shore Connection – Confidential
Local
Partner
Project Management
Electrical Studies
Civil works studies
X
X
X
X
X
Up stream MV Switchboard
X
Excavation
Cabling preparation
Cable connection
X
X
X
ShoreBox Basement preparation
ShoreBox
ShoreBox Implementation
X
X
X
Excavation
Cabling preparation
Cable connection
X
X
X
Jib Crane (Cable dispenser)
Erection of cable dispenser
X
X
Commissionning Shore
Commissionning Shore + Ship
Training
Services
Maintenance & Spare parts
X
X
X
X
X
X
X
X
X5
MV solution for Vessel Project plan
How to co-operate with partners
Step 1
Engineering
5
2
4
1
3
Step 2
Implementation
Step 3
Commissionning
Schneider Electric - Shore Connection – Confidential
Project Management
Electrical Studies
Mecanical studies
Waterproof Door
Ship Jonction Box
Control cde cabinet
Implementation
MV Cables
2 MV Premset Cubicle
Interlocking system
Sepam Trip Unit
Implementation
MV Cables
3 Transformer MV/MV or MV/LV
(if required) Implementation
MV / LV Cables
4 Main Switchboard
Shore incomer CB
Synchro module
Ship PMS modification
Switch board adaptation
Supervision adaptation
5 Captain piloting room
Local
Partner
X
X
1 Incomer
X
Commissionning Ship
Commissionning Ship + Shore
Training
Services
Maintenance & Spare parts
6
Plug in to
Green Power
Understand
What Shore
Connection is
& how to implement
it.
Shore Connection Solution
Questions to answer in order
to be able
Preliminary
phase
to plug a ship on the electrical network
Schneider Electric - Shore Connection –
7
Shore Power / Port - Partners and Suppliers how can
they work together
Classification
Societies
Port & Terminal
Associations
Shipyards
Association
of Port Cities
Investors
Financial agencies
Decision Makers
Politicians
Stakeholders
Regional
Be compliant
with regulation
Ship
Ferry
Terminal
Operator
Container
Cargo
Tanker
IMO
EU
MARPOL 6
2005/33/EC
Schneider Electric - Shore Connection –
Europe
City
Cruise
Port
Terminal
Operator
Repair
Maintenance
ShipYards
Ship
Country
Terminal
Operator
Authority
Navy
Naval
Base
Energy
provider
National
Grid
8
Landscape analyse
Data from Ships side
Which kind of ships could be
connected in your port and
for which level of power?
• Number of calls a year ?
• Time spent at berth ?
• On board frequency ?
• Power required ?
• Blackout accepted ?
• Seasonality
Ferry, Cargo, RoRo,
RoPax
< 3 MVA
< 6 MVA
Container
< 3 MVA
< 6 MVA
Cruise
< 9 MVA
Navy
< 12 MVA
River Cruise
Level of Power MVA ?
Schneider Electric - Power Solutions – Shore Connection – June 2012
LV , < 1 MVA
9
Actual ships context
& main
characteristics
Plug Into
Green Power
Schneider Electric - Partner Solutions – Shore Connection – August 2013
10
Others
Vessels - Power demand at berth
OSV
Passengers
River Cruise
Ferries, RoRo RoPax
Small Cruise
Cruise
Big Cruise
Goods
Cargo
Container
Oil Tanker LNG Tanker
1
3
6
9
Schneider Electric - PWB – Energy Management Solutions – Shore Connection Solution
12
15
20
MVA
11
The technical
challenge raised by
Schneider Electric
Plug Into
Green Power
Schneider Electric - Partner Solutions – Shore Connection – August 2013
16
Functional Architecture with conversion
0. Supply from energy provider
1. Input & grid connection
2. Output
3. Grid Conversion frequency
4. Load Management
5. Monitoring
6. Thermal Management
7. Enclosure box
8. Ship to shore connection
4
8
5
2
3
1
6
7
0
Schneider Electric - Partner Solutions – Shore Connection – August 2013
17
Functional Architecture
Without conversion
US Container ports 60 / 60hz
Europ Ferry ports 50 / 50hz
Schneider Electric - Partner Solutions – Shore Connection – August 2013
18
Functional Architecture
In Low Voltage
Navy Ships
Supply Ships
Small Container Ships
Usual power ~ 500kVA
Schneider Electric - Partner Solutions – Shore Connection – August 2013
19
A genuine test in
labs
Since 2010,
Plug Into
3
years
to
learn,
Green Power
Functional & Real Tests
Schneider Electric - Partner Solutions – Shore Connection – August 2013
20
3 Years of tests to learn the behaviour of
a global Solution in 3 test platforms
2 Eybens
Simulation Platform
• HVAC
• Fans
• LV Automation
Control Command
• Safety loop
• Interface Shore / Ship
• Adaptation to Ship
3 Volta Lab
Final test in Lab
• Test at In, 3 MVA
• TVD
• Type tested
Schneider Electric - Partner Solutions – Shore Connection – August 2013
1 Montbonnot
Platform GFC
• 10 GFC //, 5 MVA
• Genset 1 MVA
• Network Synchronization
• General behaviour21
Our Solution Offer
Plug in to
Green Power
Shore Connection Solution
Schneider Electric - Shore Connection – Confidential
22
ShoreBoxTM handling & lifting principle
Schneider Electric - Partner Solutions – Shore Connection – August 2013
23
ShoreBox design for Transportation
Schneider Electric - Shore Connection – Confidential
24
Riga Project, ShoreBoX departure
August 2014
Schneider Electric - Shore Connection – Confidential
25
Helsinki project
Connection to the vessel
Electrical
network
LV Cable dispenser
Cable to ship
connection
Ship to
supply
ShoreBoxTM
G
Hinterland
Utility
Terminal
Schneider Electric - Shore Connection – Confidential
Interface
Shore to Ship
Ship Gabriella
Mariella
26
Electrical
network
Supply Ships connection in Bergen
Power demand for 1 MVA :
• 3 Cables
• 2 output : 440V or 690V
• Frequency: 50 or 60hz
Energy Provider
Substation
ShoreBoxTM
G
HV Cable
ShoreBoxTM
G
Shore
Schneider Electric - Shore Connection – Confidential
To
Ship
27
Future secure shore power investment
Example:Total Power : 24 MVA (8+8+8)
8MVA
8MVA
8MVA
8MVA
8MVA
8MVA
Schneider Electric - Shore Connection – Confidential
28
Modular system
Total Power : 24 MVA (8+8+8)
8MVA
8MVA
8MVA
8MVA
8MVA
+8MVA
=16MVA
-MVA
Schneider Electric - Shore Connection – Confidential
29
Total Power : 36 MVA (12+12+12)
12MVA
16MVA
12MVA
12MVA
12MVA
8MVA
10MVA
Schneider Electric - Shore Connection – Confidential
30
Shorebox solution Vs Ususal projects
Optimize Leadtime & Site Works
Industrialised Solution offer time to market reduction of 50%
Order
4
Design &
Engineering
50 % Time
Saving
20
13
Procurement
18
9
Integration
20
2
Testing FAT
On-site
Installation
4
1
2
2
Commissioning
5
3 weeks only
on shore side to implement
31 weeks
on shore side to implement
Weeks
0
Schneider Electric
31
Industrialised
65
Traditional ETO
31
Plug in to
Green Power
Shore Connection Solu
Schneider Electric - Shore Connection
32