01 A striking new office development sq ft of 225,000 Light filled island site 1/4 acre roof top garden River views Centrally located A diverse range of local amenities 1 workspace per 8 sq m No compromise on employee comfort BREEAM Excellent 33 Central for your people and your business 02 03 6m An impressive tone for your business… ...with a striking, double height entrance that creates a real sense of arrival. hello The large double height space of over 4,800 sq ft creates the arrival experience of a truly world class building “A background for the life your business generates” Frank Lloyd Wright 04 05 Creatively designed collaborative space increases productivity Provides breakout spaces to relax and conduct informal meetings Our reception has an informal business hub for your clients, your guests and your people. 06 07 At 33 Central East meets West at a truly Central London address The O2 30 St Mary Axe Houses of Parliament London Eye St. Paul’s Cathedral Covent Garden Bank of England London Bridge Canary Wharf Stratford Olympic Village Tech City City Hall Tower Bridge 33 Central sits between Canary Wharf to the East and Westminster to the West, Southwark to the South and Tech City to the North. 08 City Rd 09 Our location goes a long way to ensure you don’t have to Moorgate London Wall St. Paul’s One New Change Can non Stre et Cannon Street Upp er T ham es S tree t Millennium Bridge Tate Modern Blackfriars Road Str eet Aldgate East Aldgate Leadenhall Street Lloyd’s of London Eastcheap Monument et tre S h urc ch n Fe Fenchurch Street Tower Hill Lowe r Tham es Str eet Tower of London London Bridge Borough Market Bo ro ug hH igh St re et Sou thw ark Southw ark Brid ge Roa d Southwark Bridge t ee Str Blackfriars Blackfriars Bridge Bank Can non Stre et 30 St Mary Axe The Royal Exchange King Willia m St reet Queen Victoria Street Be vis M ar ks Gr ac ec hu rch St ree t St. Paul's Cathedral Ho un ds dit ch Bank of England m illia gW Kin Centrally located between 6 mainline stations and 8 underground lines, 33 Central is one of the best located office buildings in Central London. Liverpool Street Lond on W all Moo rgate Ne wg ate Str eet London Bridge Tower Bridge The Shard Metropolitan line Hammersmith & City line Waterloo & City line To ol ey Borough St. Katharine Docks St re et 10 05 11 Cyclebeat Lombard Court 14 places to stay minutes walk Shangri-La Hotel At the Shard, London Moorgate London Wall Liverpool Street Lond on W all Moo rgate St. Paul’s St. Paul's Cathedral Bank of England One New Change Can non Stre et Upp er T ham es S tree t Millennium Bridge Tate Modern Str eet Aldgate t ee Str rch u h nc Fe Lloyd’s of London The Oyster Shed Angel Lane Fenchurch Street Lowe r Tham es Str eet Borough Market St. Katharine Docks London Bridge Tower Bridge The Shard To ol ey Borough 61 bars + Monument London Bridge Bo ro ug hH igh St re et Blackfriars Road Sou thw ark Southw ark Bridg e Road Southwark Bridge Aldgate East Leadenhall Street Eastcheap King Willia m Str eet Cannon Street t ee Str Can non Stre et 30 St Mary Axe The Royal Exchange Bank m illia gW Kin Queen Victoria Street Ho un ds dit ch Be vis M ar ks Gr ac ec hu rch St ree t 8 Ne wg ate Str eet ins m 23 gyms Tate Modern Bankside City Rd Discover a wide and eclectic range of restaurants, cafés and bars, both north and south of the river within 8 galleries & museums St re et City Social Old Broad Street 110 places to eat + 12 13 As an island site, daylight floods the space from all sides and floor to ceiling windows optimise the natural light. By increasing the natural light available to workers, productivity is also improved. Source: Forbes 2013 14 15 Relax & enjoy… 1/4 acre of unique roof top gardens with stunning views allowing you to think and unwind… Over 40 different species of plants and flowers 16 17 “There are 360 degrees, so why stick to one?”Zaha Hadid Panoramic views of the City and the Thames from 33 Central’s roof garden 18 19 of commuters would cycle to work if they could. Our cycling provision beats Mayoral targets by 50%. 33 Central offers a high number of bike racks and staff shower facilities allowing more staff to cycle, walk or run to work. Source: YouGov, May 2013 Provision for up to 237 bike racks with showers and high quality changing facilities. Store with security 20 21 A latest generation futureproofed building •BREEAM Excellent reduces fuel consumption therefore lowering energy costs •Energy Performance Certificate rating Level B •At roof level 30m2 photovoltaic solar cells are installed providing 85kWh/m2 per annum 1:8 occupational efficiency allows for 20% more staff than conventional office design Further enhancement in design standards is a significant step to futureproofing against higher densities. Source: BCO Taking your CSR seriously 22 23 sq m Ninth 17,502 1,626.0 Eighth 22,7442,113.0 Seventh 22,7442,113.0 Sixth 22,7442,113.0 Fifth 22,7442,113.0 Fourth 22,7442,113.0 Third 22,7442,113.0 Second 22,7442,113.0 First 17,7601,650.0 22,744 sq ft Available St re et sq ft 17,115 sq ft Reception Core King William Street Floor Typical Floor Ar th ur Schedule of Areas Ground Floor Ground Office Entrance Hall 17,1151,590.0 4,822 448.0 Lower Ground Office Total 8,648803.4 225,05620,908 Upper Thames Street Summary Roof Garden 8,648 sq ft 16,890 sq ft ow Sh •Base design density ratio of 1:8m2 Lower Ground Floor ers •Density ratio of 1:6m2 on first and second floors •2.75m typical floor to ceiling height •2.8m floor to ceiling height on first floor and 3m on ninth floor Bike Racks •150mm raised floors (200mm on first floor) •7 x 21 person destination hall call passenger lifts and 1 x 2,500 kg goods lift • BREEAM ‘Excellent’ rating •Metal tiled suspended ceiling •Photovoltaic panels on the roof to reduce electrical output consumption Loading Bay •4-pipe fan coil air-conditioning •LG7 compliant lighting •Secure storage for up to 220 bicycles •2 wheelchair accessible parking spaces •1.5m planning grid Motorcycle Storage 22 Spaces Offices •Island site 24 25 Financial Layout Cellular Layout Space Plans Second Floor 22,744 sq ft /2,113.0 sq m Typical Floor 22,744 sq ft /2,113.0 sq m Single Offices 3 Offices /3 Desks Single Offices 5 Offices / 5 Desks Double Offices 3 Offices /6 Desks Double Offices 50 Offices /100 Desks Trading / Support Desks 340 Desks Double Internal Offices 5 Offices / 10 Desks Total Seat Count 349 Seats Total Offices / Desks 60 Offices /115 Desks Support Staff 27 Occupancy Ratios 1:65 sq ft /1:6 sq m Support Staff: Fee Earners 1:4 Total Headcount Count 142 IPR per Fee Earner 1:197 sq ft/1:18 sq m Occupancy Ratios 1:160 sq ft /1:15 sq m Corporate Open Plan Layout Client Meeting Suite Layout Typical Floor 22,744 sq ft /2,113.0 sq m Ninth Floor 17,502 sq ft /1,626.0 sq m Cellular Offices 10 Multi Function Rooms 18 Seats: 4 Rooms / 72 Seats Open Plan Desks 254 Desks Boardroom 20 Seats: 1 Room / 20 Seats Total Headcount Count 264 Meeting Rooms 18 Seats: 1 Room / 18 Seats 12 Seats: 1 Room / 12 Seats 10 Seats: 3 Rooms / 30 Seats 8 Seats: 1 Room / 8 Seats Meeting Rooms 14 Seats: 1 Room / 14 Seats 10 Seats: 2 Rooms / 20 Seats 6 Seats: 4 Rooms / 24 Seats 5 Seats: 3 Rooms / 15 Seats Total Seat Count 73 Seats Occupancy Ratios 1:86 sq ft /1:8 sq m Dining Rooms 12 Seats: 1 Room /12 Seats 10 Seats: 1 Room /10 Seats 6 Seats: 3 Rooms /18 Seats Total Rooms / Seats 17 Rooms /212 Seats Occupancy Ratios 1:97 sq ft /1:9 sq m Terrace 26 27 Specification 1.0Structure 1.1 33 Central has been designed to exacting standards, as a prime City of London office building. The building provides flexible Grade A floor space wrapped in a modern energy efficient façade with a target BREEAM 2011 rating of ‘Excellent’. Key Dimensions Typically 2.75m clear floor to ceiling, raised floor 150mm overall. Ninth floor is 3.0m clear floor to ceiling. First floor is 2.8m clear floor to ceiling, raised floor 200mm overall. Double height entrance hall at ground floor, 6.5m clear floor to ceiling. 1.2General Structural steel columns and beams with composite slab construction. Beams, designed with a Response Factor of 6, have web openings for services distribution and intumescent paint fire protection. 3.5Ventilation 4.6 Offices:12l/s/person with an additional 10% allowance at the risers for future Tenant use. Landlord’s CCTV system for surveillance of external areas and various landlords’ common parts in strategic locations. The following will also be provided: Toilets: 10 air changes per hour with air make up supply by transfer from offices. • Intruder alarm system to monitor all external doors leading from or to street level. 3.6 •A ccess control readers to the ground floor reception pass door, fire control entrance and loading bay. Acoustic Noise Levels Security and CCTV Average noise levels under normal operating conditions due to mechanical plant. • Audio/visual communication between the reception desk and entrance doors. General Office (open plan): NR38 • Remote door release from the reception desk to the pass door. Entrance Hall: NR40 Toilets: NR40 • Intercom (audio only) to loading bay entrance. •C ontainment with draw wires will be installed for turnstiles in the entrance hall and to designated doors on to the office floors, for installation of a future tenant’s access control system. 1.3Loadings Offices: 3.0kN/m2 (+1.0kN/m2 for demountable partitions) live load plus 5% office floor area at 7.5kN/m2. Ninth Floor Terrace:5.0kN/m2 Roof Garden:5.0kN/m2 Lobbies and circulation areas:5.0kN/m2 3.7 Building Management The building services plant will be provided with DDC automatic control. The BMS controllers associated with the plant will be intelligent and addressable and shall be connected via a communication network to a central network controller. 3.8Lifts Plant areas: 7.5kN/m2 to areas generally located at roof and basement areas. Loading bay:One refuse collection wagon with 7.5t and 11.5t front and rear axle loadings respectively, accompanied by 7.5t box vans plus 5.0kN/m2. 2.0 Occupational Densities The passenger lifts within the building incorporate the latest destination and access control systems, reducing waiting times during peak arrival and allowing for enhanced security and customisation. 5.0 Tenant Plant Provision will be provided in the form of risers and plant space allocation at ninth floor level for future tenant plant. 6.0 Terraces 7 x 21 person destination control lifts (1 no. Combined passenger/firefighting), designed to operate at 2.5m/s with an up peak arrival rate of 15% of the population in a 5 minute period and an average waiting time of less than 25 seconds. Roof Garden: A private landscaped roof garden, provides amenity space with 360° City and river views and combines soft and hard landscaping, stone pavers and hardwood timber decking to circulation areas and sedum roof. 1 x 2,500kg goods lift, designed to operate at 1.6m/s which serves lower ground to ninth floor levels. Ninth Floor: Incorporates a dedicated south-facing terrace with river views. 4.0 Electrical 7.0 Internal Building Services:1:8m2 of net office space (1:6m2 on levels 1 and 2). Toilets: 1:8m2 of net office space to comply with BS 6465:1 2009 and BCO Guide 2009, 60/60 male/female. Lifts:Levels 1 & 2: 1:6m2 of net office space based on 80% utilisation. Levels LG, GF, 3 – 9: 1:8m2 of net office space based on 80% utilisation. Means of Escape:1:6m2 of net office space. 3.0 Mechanical 3.1 Services Target Operative Temperatures General Office Areas: Summer 24°C (+/- 2°C). Winter 20°C (+/- 2°C). 3.2 Heating and Cooling 4.1 Services Electrical Distribution One UKPN substation rated at 2.6MVA provides the mains supply and is delivered at 11kV. 7.1 4.2 Floor: Proprietary screed floor system prepared to receive high quality natural stone flooring. The system incorporates the slopes within the entrance hall and lift lobby and entrance matting within a stainless steel matwell frames. Power Provision Lighting:12W/m2 Small Power: 25W + 10W/m2. Additional capacity within the risers. Levels 1 and 2 Small Power:150W/m2 4.3Lighting 4-pipe variable air volume fan coil unit system served by centralised low temperature hot water and chilled water systems. Lighting will generally be in accordance with the CIBSE LG7 2005 with the uniformity in the office Category ‘A’ spaces being no less than 0.8. Average lighting level within the space is 500 lux. 3.3 4.4 Chilled Water System Three packaged water cooled water chillers located at ninth floor level with space for a fourth chiller if required serve the primary CHW pumps located in the basement. Separate secondary circuits will serve the air handling units and fan coil units. 3.4 Heating System Two gas fired condensing boilers, with space for connection to a future district heating scheme, located in the basement boiler room serving the primary heating circuit. Separate secondary circuits will serve the air handling units and fan coil units. Finishes: Landlord’s Areas Standby Power A landlord’s standby diesel generator set will be provided at basement level to support the life safety equipment. Space provision will be provided for 2 No. 1 MVA Tenant Standby Generators, with fuel storage for 24 hours. 4.5 Telecommunications Services Two IT/Comms rooms with incoming sleeved provisions will be provided at basement level. Each office floor will be provided with 2 x IT/Comms riser cupboards. Entrance Hall and Ground Floor Lift Lobby Walls: Full height high quality glass or stone feature wall to entrance hall continuing through to panelling on lift lobby walls and stainless steel architraves to lifts. Ceiling: Painted plasterboard suspended ceiling system with integrated downlights, air diffuser grilles and ceiling mounted mechanical and electrical services. A feature chandelier will be provided. Fitments: Building address signage and interactive tenant directory to be provided within the entrance hall. Bespoke reception desk with integral lockable storage, service facilities and controls complaint with current accessibility recommendations. The desk finishes will be a high quality to compliment reception materials. 7.2 Passenger Lift Lobbies Floor: High quality stone floor finishes to match reception area at first – ninth floor levels. Walls:High quality wall finish. All fitments are stainless steel. Ceiling: Feature ceiling with downlights and air diffuser grilles, and ceiling mounted mechanical and electrical services. Doors: Full height glazed central lobby doors and side lights. Stainless steel fittings to office entrances on the east and west side of the lift lobby areas 28 29 7.3 Fire Escape Stairs/Core 1 and 2 Floor:Stair treads and half landings comprise folded metal steel pan treads, risers and landings with a proprietary rubber studded floor finish with stair nosings. Cubicles:Doors and toilet cubicles panelling comprising full height, high quality finish partitions. Glass faced panelling and integral push-flush button to WCs. Window Blinds Internal blinds to be provided by the tenant. Internal Signage Sand and cement screed to main floor landings prepared for durable floor finish. Ceilings:Painted plasterboard ceilings installed throughout the toilet areas with downlights. Walls:Painted plasterboard drylining. Vanity Top:Polished stone tops with countersunk basins or similar, soap dispensers and taps. • Electrical/telephone risers Sanitaryware:Sanitary fittings are white glazed vitreous china. WC pans, seats and covers together with duct mounted cisterns, flush pipes. Wall mounted urinal bowls with duct mounted cisterns and toughened glass privacy screens to male toilets. • Cleaners cupboards Ceiling:Painted plasterboard ceilings in stair lobbies and half landings. Staircase ceilings and soffits will be painted plasterboard. Downlights and emergency light fittings will be provided at landings and half landings. Fitments:Painted steel balustrades with stainless steel handrails. Fire escape signage and floor numerals will be provided within lobbies. Doors:Fire-rated white painted doors with stainless steel ironmongery and vision panels. 7.4 Passenger Lifts Floor: High quality natural stone finish to match lift lobby. Walls:2 no side walls of each lift are full height opaque glass panels with inset brushed stainless steel car controls including LCD flat screen indicator panels. Feature finish back wall with stainless steel handrail. Doors are brushed stainless steel finish. Ceiling: Backlit glass panel ceiling. Doors: Stainless steel. 7.5 Goods Lift Floor: Stainless steel chequer plate floor. Walls: Brushed stainless steel wall panels and rubber buffer rails. Ceiling: Polyester powder coated steel panels with inset lighting. Doors: Brushed stainless steel. Key locking system. 7.6 Fire Fighting Lift Sundry Items:Built in paper towel dispensers, towel bins and associated fittings. 7.8 Accessible Toilets Sanitary fittings and accessories are provided and will match high quality finishes within main toilet areas. 1 no. separate unisex fully accessible toilet will be provided on each floor from lower ground floor to level 9 and will be handed on alternate floors. 7.9 Cycle Changing and Shower Facilities Cycle changing and shower rooms will be painted plasterboard walls, painted plasterboard ceilings and ceramic floor tiles throughout. Stainless steel ironmongery and floor drainage channels. Shower cubicles with laminate glass shower screens. Feature coloured solid grade laminate lockable changing room lockers. Hardwood timber bench seating. Decoration Emulsion paint wall decoration is provided on core walls and external walls in office areas. Access doors to all ducts and risers comprise fire rated steel access doors using a proprietary metal door system. Brushed stainless steel wall panels. 8.1Purpose Ceiling: Metal painted panels with inset lighting. Doors: Brushed stainless steel. It is intended that the following specification represents the uniform standard for the works by the Landlord in finishing the office areas to Category A standard or by way of a capital contribution to the incoming tenant. The design option will enable future compliance with Office Lighting LG7. The internal toilet finishes will be as follows: Floors:Vitrified ceramic floor tiles to match lift lobby stone finishes. 8.2Finishes Walls:High quality full height feature walls with opaque glass panelling and splashback to complement vanity tops. Painted plasterboard walls prepared to receive applied finishes. Medium grade raised access flooring with a nominal depth of 150mm (overall) at typical floors and 600mm x 600mm tiles. Raised Floor Suspended Ceilings A suspended ceiling system comprising polyester-powder coated smooth-finish perforated pressed metal tiles fixed into a non-visible clip-in suspension system with sound-absorbent mineral wool padding, compatible with the 1.5m building module / grid. The abutment of the suspended ceiling to the external wall is formed by a perimeter strip of plasterboard incorporating air diffuser slots, downlights and a space for blind boxes, painted in two coats emulsion. •S moke detectors and voice alarm speakers meeting the requirements of the Building Regulations and British Standards are provided on each office floor as part of the Base Building works. •A ny smoke detectors and voice alarm speakers installed as part of the base building adjacent to cores are to be repositioned to the Category A ceiling. • Power supplies to fan coil units. Sprinkler Installation Sprinklers and associated pipework protecting office areas are extended from the termination points of the base building system. Floor Boxes Sprinkler spacing in office areas is on the basis of Ordinary Hazard Group 3 Classification. A floor box allowance will be provided to the tenant. The sprinkler heads are likely to be of the pendant fast response. 8.3Services Ductwork & Fan Coil Units The 4-pipe fan coil units will be variable volume EC motors type. A Works •L uminaires at emergency exits plus the necessary quantity in the office floor are complete with self-contained batteries for three hours autonomous operation for escape lighting. A carpet allowance will be provided to the tenant. The fan coil units around the glazed perimeter are spaced to typically serve zones of 6m x 4.5m. In central areas on the office floors approximately two FCU per 50-65m2 is provided. 8.0Category •T he perimeter fixtures will be controlled by daylight sensors with automatic dimming control. Carpet Ancillary spaces will be painted plasterboard linings and painted blockwork within lower ground or basement areas. High quality fire rated solid core hardwood doors with stainless steel ironmongery. Walls: Polished plate safety glass mirrors above vanity top splashback and to walls. • Storage rooms (see Base Building Definition for means of escape signage) 7.10 Ancillary Spaces Stainless steel chequer plate floor. Male and Female Toilets • Toilets symbols The fresh air ductwork system from connections adjacent to the cores on each floor. Fresh air ductwork is extended to each fan coil unit. Fan coil units can be shut off when the room temperature is correct, with fresh air supplied directly to the distribution element. Floor: 7.7 The following signs are provided as statutory signage: distribution boards located in the on floor electrical cupboard. •L ED recessed modular type luminaires, with reflector and semi-specular louver assembly, currently meeting the current industry standards including CIBSE LG7 (design intent) arranged to provide a maintained illuminance lighting level in open plan office spaces of 500 lux controlled by occupancy detector. Heating and cooling for the fan coil units is provided from the central boiler and chilled water systems. Energy meters will be installed on the heating and chilled water at each riser connection. At the perimeter air is supplied by slot diffusers. Air is returned to the ceiling void via combined linear slot diffusers / luminaires. In central office areas, air is supplied and returned to the ceiling void via combined linear slot diffusers / luminaires. The fan coil units are designed to a maximum noise criterion of NR 38 is achieved in the general office space. Controls Each FCU is provided with a BMS controller. Temperature sensors will be mounted in the ceiling void, for each unit, with coiled cable to allow for partition or column mounting at a later date. The Category A controls are fully compatible with the Base Building BMS and interface will be provided with the building control system for provision of mechanical ventilation LTHW and chilled water. Frost protection will be provided by the fan coil units. Electrical Services Category A electrical works includes the following: 9.0Environmental The environmental impact of 33 Central has been a key consideration of the building design. The development has improved the local environment and urban landscape through the removal of an existing outdated elevated concrete walkway and the installation of a new external pedestrian lift with public stair serving London Bridge from Upper Thames Street. The lower ground and basement levels are retained structures and the upper façade has been designed to a high performance to reduce heating and cooling loads. The building will demonstrate reduced carbon emissions and achieve BREEAM 2011 ‘Excellent’. Building plant has been selected to reduce fuel consumption and to achieve an Energy Performance Certificate rating (EPC) Level B. At roof level, photo voltaic cells will be installed, providing at peak performance 85kWh/m2 per annum. 10.0 Servicing and Car Parking The loading bay and vehicle entrance is located within the Arthur Street elevation providing access into the lower ground car parking areas, refuse storage and cycle changing facilities. Controlled access via a dedicated secure lobby will be afforded into the main building at lower ground level for those visitors arriving by car or motorcycle. Within the lower ground floor, 2 wheelchair accessible parking spaces and 22 motorcycle spaces are provided. Secure storage for 237 bicycles is provided with associated Male and Female showers (12 total) and changing facilities with lockers. •C ategory A lighting comprising all plug modular in wiring, switching and all controls meeting Part “L2B” of the Building Regulations from tenant Light fittings are integrated as part of the ceiling system. 30 31 River Garden Prague HB Reavis is Central and Eastern Europe’s leading commercial property group. Apollo 2 Bratislava Existing clients include Procter & Gamble, KPMG, Swiss Re, Heineken, AT&T, Unilever, ADP and Philips. Gdanski Business Center Warsaw Konstruktorska Warsaw •7 million sq ft delivered •Net equity EUR 0.9bn •Assets EUR 1.6bn •400 professionals •Presence in 6 countries •Exceptional track record over 20 years •Fully integrated business model including construction and asset management Vaci Corner Budapest www.hbreavis.com 32 33 Be part of something better... Floor sq ft sq m Ninth 17,502 1,626.0 Eighth22,744 2,113.0 Seventh22,744 2,113.0 Sixth22,744 2,113.0 Fifth22,744 2,113.0 Fourth22,744 2,113.0 Third22,744 2,113.0 Second22,744 2,113.0 First17,760 1,650.0 Ground Office 17,1151,590.0 Entrance Hall 4,822448.0 Lower Ground Office 8,648803.4 Total •A striking new office development of 225,000 sq ft in a central London location •Highest central London office specification •1/4 acre roof top garden offers panoramic views over the City and river •Island site optimises the natural light on every floor •Over 170 places to eat and drink within an 8 minute walk •1 workspace per 8 sq m allows for 20% more staff than a conventional design, with greater fit-out flexibility •BREEAM Excellent Car parking spaces 2 Motorcycle spaces 22 Bicycle spaces 237 225,05620,908 For more information Owner •Base design density ratio of 1:8m2 •Category A specification Leasing Director Architect •Density ratio of 1:6m2 on first and second floors •Photovoltaic panels on the roof to reduce electrical output consumption Richard Saul John Robertson Architects +44 (0)7919 175016 richard.saul@hbreavis.com Structural Engineer •2.75 typical floor to ceiling height •4-pipe fan coil air-conditioning •2.8m floor to ceiling height on first floor and 3m on ninth floor •LG7 compliant lighting •150mm raised floors (200mm on first floor) •2 wheelchair accessible parking spaces •7 x 21 person destination hall call passenger lifts and 1 x 2,500 kg goods lift •BREEAM ‘Excellent’ rating •Secure storage for up to 220 bicycles •1.5m planning grid Development Managers Waterman Group Building Services Hilson Moran Cost Consultant AECOM •Island site Angus Goswell +44 (0)20 7861 5150 angus.goswell@knightfrank.com Matthew Elliott +44 (0)20 7303 3592 matthewelliott@deloitte.co.uk Peter Gray +44 (0)20 7861 1304 peter.gray@knightfrank.com Matthew Causer +44 (0)20 7303 3488 mcauser@deloitte.co.uk Julian Woolgar +44 (0)20 7861 1008 julian.woolgar@knightfrank.com Steve Johns +44 (0)20 7303 2581 stjohns@deloitte.co.uk Stephen Peers +44 (0)20 7303 3260 speers@deloitte.co.uk Important Notice: Deloitte and Knight Frank for themselves and for the vendors or lessors of this property for whom it acts, gives notice that the sole purpose of these particulars is to provide outline information on this property to prospective purchasers or tenants (as applicable), who are solely responsible for making their own investigations and seeking independent advice, including the costs of doing so, and forming their own view as to the condition of the property, its fitness for their requirements and the accuracy and completeness of the statements herein. These particulars do not constitute any recommendation or offer to enter into any contract regarding this property. Deloitte and Knight Frank do not guarantee the accuracy or completeness of any description, dimensions, references to condition, necessary permissions for use and occupation and other details contained herein, and prospective purchasers or tenants must not rely on them as statements of fact or representations. Rents quoted in these particulars may be subject to VAT in addition. Neither Deloitte and Knight Frank nor the vendors or lessors of this property accepts any liability or responsibility (whether in negligence or otherwise) for any loss arising from using or relying on these particulars. Any reference herein to any plant, machinery, equipment, services, fixtures or fittings at the property shall not constitute a representation (unless otherwise expressly stated) as to its state or condition or that it is capable of fulfilling its intended function. Neither Deloitte and Knight Frank nor any of its partners, employees or agents has any authority to make, and does not make, any representation or warranty, or to enter into any contract, in relation to the property. In this document references to Deloitte are references to Deloitte LLP, the United Kingdom member firm of Deloitte Touche Tohmatsu Limited (“DTTL”), a UK private company limited by guarantee, whose member firms are legally separate and independent entities. See www.deloitte.co.uk/about for a detailed description of the legal structure of DTTL and its member firms. Designed & produced by Sectorlight (1403234) +44 (0)20 7264 7700 sectorlight.com June 2015. 34 33 KING WILLIAM STREET, LONDON EC4R 9AS