Technical Summary Contents Overview3 Architectural Summary Specification 4 Building Description 5 Location Map 6 Design Criteria 7 Floor Areas and Heights 7 Floor Plans 8 Exterior Envelope 15 Internal Design and Finishes 16 Public Art 19 Refuse and Waste 20 Accessibility20 BREEAM 20 Fire Safety 21 Acoustic Performance 21 Sanitary Provision 22 Structure23 Building Services Outline Specification Design Criteria Mechanical Services Description Controls Services Description Electrical Services Description Public Health Services Description Vertical Transportation Services 26 27 29 30 31 35 37 Professional Team 40 Imagery42 Building Elevations 43 Internal CGIs 45 p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 2 Overview This document is a description of the shell and core elements of the works and also the Category A fit-out of the works carried out by the Developer. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 3 Architectural Summary Specification p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 Architectural Summary Specification Introduction Building Description Overview Location Office Space The proposal for the redevelopment of 33 Davies Street received Planning Permission and Conservation Area Consent from the Westminster City Council on 29th June 2010. 33 Davies Street is situated on Davies Street in the heart of the Mayfair Conservation Area within the City of Westminster. The site is situated at the corner of Davies Street and Grosvenor Street in the south and the corner of Davies Street and Three Kings Yard in the north. In addition to these street façades the building shares a courtyard to the rear with the residential property at No 32 Grosvenor Street. The office reception is positioned in the central bay along Davies Street. Building Accommodation The new development has required the complete demolition of the pre-existing 1930’s building including the basement and foundations. The reception is designed to service multiple tenants and includes a reception area and a rear waiting area, whilst providing direct access to the vertical circulation in the central core. An open feature staircase leads from reception to the upper floors. The typical office floors are arranged around a linear core located against the courtyard area. Structural columns are arranged around the perimeter of the building spanning back to the core and providing flexible column free floor plates. The new building consists of: •Basement: Retail space, bicycle parking and changing facilities, toilets, refuse store, electrical sub-station, plant rooms and comms room •Ground floor: Retail space, office reception, building manager’s office, toilet •First to fifth floors: Office accommodation and associated toilet facilities. Sub-Division The building is designed to facilitate both a single occupier and a multi tenancy arrangement split on a floor by floor basis. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Retail Space The retail space at ground floor consists of two spaces, one either side of the office reception. Each of these spaces can be sub-divided giving potentially four retail tenancies. Two structural openings are provided from the ground floor to the basement to allow the linking of the retail areas. The design of the ground floor structural incorporates a soft spot to allow a third unit access to the basement. The permanent retail stairs and lifts to lower ground floor will be installed as part of the tenants fit-out. 3 3 d av ie s s t r e e t 5 SEYMOUR STREET CAVENDISH SQUARE MARGARET STREET OXFORD CIRCUS BOND STREET MARBLE ARCH OXFORD STREET BOND STREET HANOVER SQUARE BROOK STREET DAVIES STREET HYDE PARK EET STR HERTFORD STREET LY DIL CA C I P ET TRE TS EN REG N TO AT STR CURZON STREET EET STR ND BO EY KEL BER EET STR S E L AR CH EET STR N O AFT GR W NE EET STR L L HI BERKELEY SQUARE OW ER VIL SA EET STR N UTO BR MOUNT STREET T EA GR ET TRE HS G U RO LBO R MA ET TRE S T UI ND CO EET STR LE AR EM ALB ET TRE RS VE DO EET STR E LAN RK PA SOUTH AUDLEY STREET PARK STREET GROSVENOR STREET SOUTH STREET EET STR X O DD MA EET STR ND BO UPPER GROSVENOR STREET HANOVER STREET W NE GROSVENOR SQUARE p r i m e m ay fa i r o f f i c e d e v e l o p m e n t REGENT STREET DUKE STREET NORTH AUDLEY STREET PARK STREET UPPER BROOK STREET OXFORD STREET GREEN PARK PICCADILLY CIRCUS ROYAL ACADEMY LY DIL CA C I P ST JAMES’S SQUARE ST JAMES’S PALACE LL MA LL A P Location Map 3 3 d av ie s s t r e e t 6 Architectural Summary Specification Design Criteria Floor Areas Floor Heights Floor Area (Net Internal) sq m sq ft Basement Retail Ground South Retail Ground North Retail Ground Total Retail 364.1 163.6 179.5 343.1 3,919 1,761 1,932 3,693 Basement and Ground Retail 707.2 First Second Third Fourth Fifth 540.75,820 557.25,998 557.46,000 557.25,998 468.65,044 Office Total 2681.1 28,860 3388.3 36,472 Total Net Lettable 7,612 Level Description 6 Roof 5 Raised Floor (Gross) (mm) Finished Floor to Ceiling (mm) Finished Floor Level (m AoD) Structural Slab Level (m AoD) Structural Slab to Structural Slab (over) (mm) - - 44.410 44.160 - Offices 100 2,700 40.710 40.610 3,550 4 Offices 100 2,675 37.160 37.060 3,550 3 Offices 100 2,675 33.610 33.510 3,550 2 Offices 100 2,675 30.060 29.960 3,550 1 Offices 100 2,675 26.510 26.410 3,550 0 Retail North 0 4,220 21.410 21.310 5,100 0 Office Reception 100 3,750 21.870 21.770 4,640 0 Retail South 0 3,380 22.255 22.255 4,155 B Retail North 150 2,770 17.860 17.710 3,600 B Retail Central 150 3,300 17.860 17.710 4,060 B Retail South 150 3,680 17.860 17.710 4,545 Area of 3.3m2 of soft spot for future lift shaft opening to the retail units at ground floor included in measurement. Areas are on a net internal basis and are subject to measurement on site as built. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 7 Ground Floor Plan Reception 140 sq m / 1,504 sq ft North Retail 179.5 sq m / 1,932 sq ft South Retail 163.6 sq m / 1,761 sq ft SIDE ENTRANCE / CYCLE ACCESS LOUNGE AREA RISER LIFT LIFT RISER RECEPTION Franck Namani Three Kings Yard Grosvenor Street SERVICE LIFT Franck Namani Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 8 Lower Ground Floor Plan Retail 364.1 sq m / 3,919 sq ft 38 CYCLE STORE SPACES LAUNDRY 38 LOCKERS 1 RISER LIFT LIFT 2 RISER Three Kings Yard Grosvenor Street SERVICE LIFT CHANGING ROOM 3 4 Franck Namani Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 9 First Floor Plan 540.7 sq m / 5,820 sq ft LIFT LIFT RISER Three Kings Yard Grosvenor Street RISER DOUBLE HEIGHT ENTRANCE Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 0 Second Floor Plan 557.2 sq m / 5,998 sq ft LIFT LIFT RISER Three Kings Yard Grosvenor Street RISER Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 1 Third Floor Plan 557.4 sq m / 6,000 sq ft LIFT LIFT RISER Three Kings Yard Grosvenor Street RISER Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 2 Fourth Floor Plan 557.2 sq m / 5,998 sq ft LIFT LIFT RISER Three Kings Yard Grosvenor Street RISER Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 3 Fifth Floor Plan 468.6 sq m / 5,044 sq ft LIFT LIFT RISER Three Kings Yard Grosvenor Street RISER Davies Street N p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 4 Architectural Summary Specification Design Criteria, cont’d Exterior Envelope Planning Grid Design Concept Materials and Components The building is designed on a 1.5 metre planning grid, following through from window location to ceiling and lighting layouts. The proportion of the overall building mass is broken down into a series of five bays along Davies Street and two along both Grosvenor Street and Three Kings Yard. This division is reflected in plan with a projection of the central and end bays. The masonry elements will be pre-cast concrete panels faced in brick and stone. The materials and finishes have been designed as a careful response to the prevailing character of both the immediate and the wider surrounding conservation area. A rusticated Portland Stone base forms the base of the building above which the first floor is emphasised with taller windows and stone surrounds and string course. Similarly following the classical tradition is the presence of a stone cornice between third and fourth floor, above which the windows form the equivalent of a frieze in brickwork. The bricks are a handmade red brick with a face size of 290x50mm laid as pre-cast elements in a custom designed ‘Flemish’ bond. Building Regulations, Statutory Legislation and Construction Standards The building is designed to the current edition of the Approved Documents of the Building Regulations and based on the recommendations of the latest edition of the British Standards BS/BS EN. Where there is no relevant British Standard then the appropriate industry recognised and accepted European or International Standards will be used (where not over-ruled by this BBD). Design Life of Building Components The building is to have a design life developed in accordance with the procedures set out as per BS ISO 15686 and BS 7543:2000. Services plant and equipment generally in accordance with CIBSE Guide to the Ownership, Operation and Maintenance of Building Services March 2000 Table B14.3. The design life of the building structure, maintainable without major replacement, will be a minimum of 60 years. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Brick Faced Cladding Stone Faced Cladding Stonework is fabricated as pre-cast concrete elements faced with Portland Basebed Stone with Cornish De Lank Granite base. The elevation is composed of recessed brickwork details on different planes. The windows are to be bronze anodised aluminium framed with vertical and horizontal sub-divisions. The fifth floor is conceived as a traditional composition of a metal roof finish and dormers. The dormers are highlighted by a pre-cast concrete (to match Portland Stone) surround, continuing the language used for the other windows. The recessed panels at the roof are clad in a bronze finished copper alloy. The masonry elements will be pre-cast concrete panels faced in brick and stone. 5th Floor Pre-cast Concrete Cladding Acid etched pre-cast concrete cladding to match Portland Stone. Shop Front Glazing and Doors Bespoke Architectural Bronze framing with single glazed low iron glass. Double glazed doors with Architectural Bronze frame and ironmongery. 3 3 d av ie s s t r e e t 1 5 Architectural Summary Specification Exterior Envelope, cont’d Internal Design and Finishes Two Storey Office Entry Screen Reception Design Concept Toilets Architectural Bronze framework. Glass is double glazed low iron glass. Double glazed doors, three metre high, with Architectural Bronze frame and bronze ironmongery. One set of doors powered assisted to provide access to people with disabilities. The palette of high quality materials emperador marble, routed limestone, American walnut, bronze and finest Italian leather are all used to create a rich, welcoming space. Toilet fit-out will comprise: Bronze anodised aluminium slim profile side hung openable windows. Glass is double glazed low iron high performance solar control glass. Roof Plant Enclosure The plant enclosure consists of acoustically treated bronze anodised extruded aluminium louvres & doors. A bespoke reception desk is provided with small power sockets, telephone point, three compartment trunking back to the adjacent electrical riser. The area incorporates localised heating and a floor rail to prevent the reception chair on wheels from damaging the tube feature wall. Finishes are: •Wall finishes: Stone, leather and timber panels •Floor finishes: Honed hard limestone including mats and matwell at doors Inverted roof system on concrete deck. High performance modified bitumen reinforced membrane, drainage layer, insulation, separating membrane and 600x600x50mm concrete paving. Roof finishes to include extensive sedum green roof system. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t •Ceiling: White painted dry lining/gypsum plank/ timber veneered ceiling •Doors: Walnut timber veneered and with solid hardwood frame •Toilet partitions: Full height 45mm thick solid core high quality walnut veneered panels •Lighting: Downlighters switched from the toilet lobby PIR detector. Concealed lighting at rear of cubicles •Sundry toilet items: Mirrors, single toilet roll and spare holders, paper towel dispensers, coat hooks, door stops, and towel bins •Full height mirror •Vanity tops: Limestone •Ceiling finishes: painted drylined ceilings •GRG (glass reinforced gypsum) upstands at concealed lighting Roof Construction •Floor: Fully vitrified Porcelain Ceramic •Skirtings: Brushed stainless steel Office Entrance Lobby Windows First To Fifth Floor •Walls: Fully vitrified Porcelain Ceramic, etched glass panels, and drylining •Bespoke decorative panel behind reception desk Programmable feature lighting is provided in the entrance lobby, designed by the specialist Lighting Design Consultant. The sanitary fittings for the toilets are as follows: •White vitreous china wall mounted WC pans, seats and covers together with duct mounted 6 litre cisterns, flush pipes, and flushing handles/buttons •Vitreous china basins with automatic stainless steel mixer spray taps 3 3 d av ie s s t r e e t 1 6 Architectural Summary Specification Internal Design and Finishes, cont’d Disabled Persons Toilet Shower Changing Room Lift Finishes High quality finishes are as those in the main toilets. Space is provided for a shower room and changing facility for cyclists and staff within the basement area, 3 No. showers & 1 No. disabled shower/WC with appropriate provision for drainage. 38 cycle spaces, 38 lockers and a laundry room are provided. Passenger lift cars: Architectural Bronze internal and external doors and architrave at ground floor with bronze anodised aluminium doors and architrave on the upper floors. High quality wall finishes of Italian leather panels with black American Walnut trim. Polyester coated metal ceiling with concealed cove and point lighting. Shell Gris cladding with emperor marble floor finish to match entrance lobby. Architectural bronze control panel and handrails. Lighting is by downlighters switched from a PIR within the disabled person toilet. Disabled person sanitary fittings and stainless steel grab rails to be provided. Finishes as follows: Disabled Alarm with facility to link to the BMS in Category A. •Walls: Ceramic fully vitrified Porcelain tiles from Domus range and drylining Sundry toilet items as main toilets. •Floor and skirtings: Ceramic Vitreous Porcelain tiles from Domus range •Ceiling: White painted dry lining/ metal ceiling pan Cleaners Cupboard •Doors: Walnut veneered and with solid hardwood frame A cleaner’s cupboard incorporating sink, hot and cold water and lighting are provided, at all office levels: •Shower partitions: Full height drylined partitions with ceramic tiles •Walls are painted dry lining and ceramic tiled sink splash back •Floor and skirtings are ceramic tile •Shelving •No ceiling •Lighting: Downlighters switched from the toilet lobby PIR detector •Sundry toilet items: Mirrors, single toilet roll and spare holders, paper towel dispensers, coat hooks, door stops, and towel bins •Counter tops: Hardwood Doors, Frames and Ironmongery Flush solid core walnut veneered doors with hardwood frames and lippings with polished finish are provided to all doors at office levels. Doors have stainless steel finish ironmongery. Painted flush steel doors and frames are provided in general service areas, such as plant rooms, storage areas, service corridors, etc and service access doors/panels around the cores. •Coat hooks in WC cubicles and general space •Lockers and benches: Hardwood BMS/Security Room/Fire Command Centre Office Finishes This room has the following finishes: Office external and core walls are paint finished. •Painted drylined walls •Metal tile ceiling •Raised access floor with carpet tile p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 7 Architectural Summary Specification Internal Design and Finishes, cont’d Category A Office Fit-Out Finishes Floor Finishes Ceiling Finishes Finishes Main stair lobbies: Carpet (painted/vinyl below ground floor). Main landings (main core): Painted drylining with skim coat. The office areas will be finished to following Category A standard. Plant rooms: Sealed/painted concrete with skirting as appropriate. Office ceiling: Tegular 750x750mm metal grid with 750x750mm modular perforated metal ceiling tiles with acoustic pad backing. Tiles formed with 600x600mm solid edge opening to accept light fittings and diffusers. Service corridors: Sealed concrete. Storage: Sealed concrete. Basement back of house: Painted soffit. Wall Finishes Stairs and secondary stair lobbies: Painted drylining. Stair core 2 to be impact resistant board. Office core walls and lift lobbies: Painted drylining with skim coat to accept the Category A Specification finishes. East wall facing office reinforced to allow hanging of art. Walls in plant rooms: Painted fair faced blockwork and/or drylining. Service corridors: Painted fair faced blockwork /concrete. Escape Stair Finishes Pre-cast concrete generally with carpet finish with nosings. Concrete/steel landings, carpet finish. Stainless steel handrails and balusters. Painted dry lining stair walls. Floors Medium grade (to PSA Method of Building Performance Specification MOB PF2 PS/SPU March 1992) raised access flooring with a nominal depth of 100mm on all office floors (inclusive of panel), comprising 600x600mm carpet tiles (not to be installed). Note: The MOB loadings for medium grade are as follows: •Concentrated static load: Not less than 4.5kN over 300mm sq and not less than 3.0kN over 25mm sq •Uniformly distributed load: Not less than and 8.0kN/m2 Painted soffits. Stone clad feature stair from reception to first floor. EDF incoming service room: To EDF specification. All necessary plenum barriers, fire breaks and closure details are provided. The concrete floor has a sealant applied to it prior to the installation of the raised floor. External Finishes Replace to new levels perimeter pavement to building threshold, comprising York Stone and Granite Kerbs. Applied MDF painted skirting to the drylined core walls, perimeter walls (solid). York Stone flooring to the Portico. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 8 Architectural Summary Specification Category A Office Fit-Out Finishes, cont’d Walls Internal Signs Base mist coat plus two coats of vinyl matt emulsion finish on skim coat to plasterboard walls, is provided on core walls, internal and external columns and other exposed walls in office areas. Statutory signs are provided in net lettable space as follows: •Fire exits •Fire doors •Fire fighting lift lobbies Public Art The portcullis gates to the entrance to the office are a special commission by artist Wendy Ramshaw. Cast in bronze the three gates mechanically move up to an open position during working hours and can be lowered to a closed position outside working hours. •All other statutory signs as required Suspended Ceilings Suspended ceiling comprising fully accessible polyester powder coated perforated metal pan ceiling tiles, fixed into a visible tegular drop-in suspension system. Suspended ceiling includes fully recessed luminaries/downlighters, and grilles etc fire stopping, access panels and insulation matting fully concealed in black plastic wrapping. Suspension system and fixings are of galvanised steel. •Office and retail tenant signage, builderswork and brackets by tenants Blinds Anti-glare blinds to be provided to all office windows. The ceiling tile system is laid out on a 750mm modular grid centred on the base building planning grid. Plasterboards margins to perimeter on galvanised steel suspension system. The office ceiling system has an acoustical absorption NRC value of approximately 0.8. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 1 9 Architectural Summary Specification Refuse and Waste Accessibility BREEAM The waste storage room serving the building is located at basement level. In total fourteen number 1100 litre Euro bins are provided in accordance WCC Waste Storage Guidance. Accessibility of the building is detailed in David Bonnet Associates AFE Stage D accessibility report. The development is designed to achieve BREEAM 2008 ‘Excellent’ rating. Refuse is collected on Grosvenor Street. Provisions for people with disabilities will be in accordance with the Building Regulations – Part M 2010 and in line with the DDA requirements. Means of Escape Associated with the stair cores a place of refuge has been allocated per stair. An appropriate facility is provided for communication between the refuge and the fire control centre by people with disabilities. Circulation Reception area only: One power assisted pivot door to office Reception (power operated) to suit peak through flow. Retail units: Manual door with provision for cable connection for power assisted door mechanism (door mechanism to be provided by retail tenant if required). p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 2 0 Architectural Summary Specification Fire Safety Acoustic Performance For fire purposes the building is designed to comply with the requirements of statutory regulations and authorities. Refer to Fire Strategy Report by SAFE. The Base Building design allows for the office space, subject to the completion of fit–out in accordance with the Category A Specification, to achieve a maximum noise criterion of NR38 from the Base Building Services installations, without any other contributions. All noise levels quoted are applicable when Base Building plant is running under normal operation only, i.e. not under emergency operation. The maximum noise criteria from the Base Building services installations for other areas are as follows: Means of Escape Means of escape is designed on the basis of one person per 6m2 for office floors and based on the area covered by the Category A Specification Works. Criteria for Plant Noise Transfer to Internal Areas The staircases are designed for simultaneous evacuation of all floors in the case of normal office occupancies. Tenant/Area Noise Criterion Ventilation Systems Serving Actual Area All Other Systems Open plan offices NR38 NR33 Fire Separation Structure and enclosures for specific areas have been designed with the following fire resistance: Structure above ground floor (except roof) 1hr Escape cores 1hr Lower ground, basement and ground floor structure 1hr Circulation areas/lobby NR40 Toilets NR45NR40 NR35 Retail stores NR45 NR40 Service areas NR55 NR50 Plant roomsTo suite adjacent areas (see above) Retail1hr EDF room p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 4hrs 3 3 d av ie s s t r e e t 2 1 Architectural Summary Specification Sanitary Provision Notes Male Toilets Number of sanitary fittings taken from BS6465:Part 1:2006 A 2009 Table 4. 12m²/Person, 60:60 Male:Female The three WC’s and three basins provide for 16-30 persons, male or female. Floor Office Area Occupancy No. of Males Male Male Male (m²) @ 12m²/Person (60%) WC's Urinals Basins First 539 45 27303 Second 558 47 28303 Third 558 47 28303 Fourth 558 47 28303 Fifth 473 39 23303 Female Toilets 12m²/Person, 60:60 Male:Female Floor Office Area Occupancy No. of Females Female Female (m²) @ 12m²/Person (60%) WC's Basins First539 45 27 3 3 Second558 56 28 3 3 Third558 56 28 3 3 Fourth558 56 28 3 3 Fifth473 39 23 3 3 p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 2 2 Structure p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 2 3 Structure Substructure Superstructure Loading Criteria The new basement slab is a reinforced concrete raft and distributes the building loads to the London Clay below. The superstructure generally consists of a steel frame with composite reinforced concrete slabs supported on permanent metal formwork. Stability is provided by the reinforced concrete lift and stair cores acting as cantilevers from the raft slab. Wind loads are transferred to the cores via diaphragm action of the composite floor slab. Structural provisions will be made to correspond with the requirements of the final plant replacement strategy. The waterproofing system for the basement has been designed to the equivalent of Grade 3 in accordance with BS 8102:2009:Table 2. In addition to external tanking the basement raft and perimeter concrete walls have been designed and detailed to BS8007 (Code of Practice for Design of Concrete Structures for Retaining Aqueous Liquids). Foundation Settlement Settlements, differential settlements, heave and lateral movement will be limited so that the building construction and finishes are not compromised. The minimum performance criteria for foundations shall result in a residual 10mm (maximum) total long term settlement and 5mm differential movement between adjacent columns. Differential settlement between horizontal has been designed not to exceed a 1:500 gradient. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t The office floors have been designed so that the magnitude of the floor vibrations will generally be limited to a Response factor of 8 as defined by SCI Publication P354 in all areas. The natural frequency of elements of the floor will not be less than 4Hz. Vibration shall not exceed the levels defined for offices in table 5 of BS6472 with reference to the base curve in figure 2. Internally, fire protection to steelwork is provided by intumescent coating. Steelwork will be minimum grade S355. The floor slabs are generally designed to accommodate the following uniform live loads (kN/m2): Area kN/m² Design Partition LoadLoad Office 3.51.0 Retail 5.01.0 Storage areas 7.5 Circulation/toilet cores 4.0 Basement plant 7.5 Roof plant 4.0 Roof maintenance access Highway surcharge 1.5 10.0 Deflections The deflection of floor elements due to imposed loads will be limited to the lesser of span/360 or 30mm under full-imposed load. The pre-cast concrete building façade is supported off the building columns therefore; the edge beams have not been designed to different criteria. On every office floor a 1.5m zone located around the stair cores is designed to accommodate an uplifted uniform live load of 7.5kN/m² together with a reduced floor live load of 2.5+1.0kN/m² to the remainder. Dead loads will be subject to chosen structural design details plus an allowance of 0.85kN/m² for ceiling, services and raised floors. 3 3 d av ie s s t r e e t 2 4 Structure Loading Criteria cont’d Design Standards Structural design is in accordance with relevant British Standards current at Building Control submission. Where a standard does not exist due consideration will be given to use standards of other countries making sure that they are suitable for the particular application. In the event of variation the appropriate standard should apply. Tolerances Office floors will be finished exposed concrete to accept raised flooring with tolerances complying with the National Structural Steelwork Specification for Building Construction (3rd edition) and National Structural Concrete Specification for Building Construction (2nd edition) as amended by relevant Ramboll specifications. Fire Resistance Structural elements have the degree of fire protection appropriate to their location and not conflict with finishes specified elsewhere. In principle a one hour fire protection is required to all the elements, except for the areas of the roof not forming part of a stability system which do not require fire protection or the basement which will require a two hour fire rating. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Concrete Generally Fire resistance for concrete elements is inherent to the material and no additional protection is required. Concrete strength is RC40 to the basement construction and RC35 to the suspended composite concrete slabs. Intumescent paint or alternative systems will need to be applied to steelwork elements requiring fire protection. All reinforcement bars and mesh to have a minimum yield strength of 460N/mm2. External grade intumescent paint to be applied to externally exposed structural steelwork. (For comprehensive structural fire protection, refer to structural fire report from SAFE SAFC0030-FS-005-RB). Corrosion Protection Cover to reinforcement has been determined in accordance with BS 8500 depending on location to prevent corrosion. Typically, cover to basement elements is 40mm and 30mm to superstructure elements. Cover to faces of elements in contact with the ground to be a minimum of 50mm. The recommended concrete class for concrete in contact with ground is AC-2 (based on table 2 of BRE Special Digest 1 Part 1, 2001). Tolerances Placing of the concrete shall be within the range of deviation normally achievable for construction, as detailed in BS 5606:1990, except that no point or surface above ground shall deviate from its nominal position or level by more than 20mm. Steelwork fabrication and erection tolerances to be in accordance with the National Structural Steelwork Specification (3rd edition) as amended by the Ramboll Steelwork specification. Public Health/Below Ground Drainage All below ground drainage designed and installed in accordance with The Building Regulations Part H1, inclusive of all current amendments, BS EN 752: 2008 and BS EN 12056 (all sections). All structural steel elements shot-blasted to Sa2½ and have the degree of protection appropriate to their location in both temporary and permanent exposure conditions to ensure adequate durability throughout the life of the structure. 3 3 d av ie s s t r e e t 2 5 Building Services Outline Specification p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 2 6 Building Services Outline Specification Building Services Design Criteria Introduction The new development is provided with a full Mechanical, Electrical, Public Health and Vertical Transportation services installation. The building offers the following flexibility features and provisions for the incoming tenants’ future use: The services are designed and specified to meet an established level of fit-out standards. •Plant space on the roof for future tenant plant The services are designed in accordance with all relevant standards, current building regulations and recognise established benchmarking in respect to good engineering practice such as BCO, CIBSE and British Standards. •Spare connections on the air conditioning system to install additional fan coil units on the floors The design criteria for the new development follows the recommendations of CIBSE and The British Council for Offices (BCO), as described in the 2009 Guide to Specification, and as noted below. •Openable windows for additional fresh air •Spare louvres or spare space in louvres on both sides of the courtyard for the installation of additional fresh air fans or extract from a tea point, shower or small kitchen Mechanical The services are designed in accordance with the requirements of BREEAM 2008 to achieve an ‘Excellent’ rating for the office building. Green technologies, such as photovoltaic arrays, and energy efficient design measures are employed to reduce CO2 emissions to meet the requirements of Part L 2010 of the Building Regulations and achieve an EPC rating of 40 or less. •Additional allowance in the building electrical supply infrastructure •Summer: 30°C db, 20°C wb The building is designed to incorporate plant rooms within the basement and roof areas. The plant is located to optimise the distribution routes and provide good access for maintenance purposes. Services distribution is by means of dedicated vertical risers. Risers are incorporated within the structural constraints of the building to ensure servicing zones are kept to a minimum. The building provides the incoming tenants with a high level of flexibility to facilitate incorporating the requirements of their Category B fit-out without the need for major works. In addition to the base build servicing strategies, provisions are made for future tenants’ servicing requirements. Space is provided on the roof and in the risers for potential future tenants’ DX condensers and pipework, tea point services and showers. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t •Capped services provisions in both risers to accommodate a tea point, a shower or both •Upgraded services connections in the south riser on the fifth floor to accommodate a full catering kitchen External Temperatures •Winter: -4°C saturated •For heat rejection plant: 35°C db Internal Temperatures Open plan: •Summer: 24°C +/–2°C (i.e. in cooling mode, the system shall cool the space to this temperature) •Winter: 20°C +/–2°C (i.e. in heating mode, the system shall heat the space to this temperature) Office reception/building manager’s office: •Summer: 24°C +/–2°C (i.e. in cooling mode, the system shall cool the space to this temperature) •Winter: 20°C +/–2°C (i.e. in heating mode, the system shall heat the space to this temperature) •Office toilets/changing room: 19°C min •Corridors/staircases: 19°C min •Occupancy: 1 person/10m2 3 3 d av ie s s t r e e t 2 7 Building Services Outline Specification Design Criteria, cont’d Mechanical cont’d Electrical Public Health Heat Gains Load Densities •Occupancy: 90W sensible/50W latent •Tenant small power provision: 25W/m •Lighting: 12W/m2 •Tenant small power additional allowance: 75W/m2 on any one floor Fresh Air Ventilation Rates •Tenant mechanical services provision: 60W/m2 •Office open plan: 12 l/s per person + 10% additional allowance for meeting rooms/areas of high occupation density. This equates to 12 l/s per person at an occupation density of 1 person/9m2 •Overall raised floor finish zone of 100mm with 64mm void The public health services design take due account of all current relevant British Standards, the requirements and Regulations of Local Authorities and the recommendations, insofar as they apply to this project, concerning the control of Legionella Pneumophila as contained within the CIBSE TM13 2000 document and the Health and Safety Commission Guidance Booklet L8 formerly HS (G) 70. Illumination Levels Population Density •Office toilets: Transfer from adjacent office space •Tenanted demise office 350-450 lux at the working plane 1 person per 10m2 •Changing room: 10 a/c per hour •Toilets: 150-200 lux at floor level •Cleaner’s cupboard: None •Lift Lobbies: 150-200 lux at floor level •Corridors/lobbies: None •Stairs: 150-200 lux at landing floor level (70 lux minimum at centre tread) 60/60 throughout Cold Water Storage •Office toilets/showers: 12 a/c per hour •Entrance: Lobby Special feature lighting to architectural requirements •Cleaner’s cupboard: 6 a/c per hour •Common areas: 100-150 lux at floor level •Small power: 25W/m 2 Extract Ventilation Rates •Corridors/lobbies: None Noise Levels 2 •Tenant lighting provision: 12W/m2 Fire Alarm To BS 5839 – L2 •Open plan offices: NR40 •Speculative offices: NR38 Emergency Lighting •Cellular offices: NR35 To BS 5266 Male/Female Split Offices = 20 litres per person based on a half day storage. The domestic cold water system are designed and arranged so that no stagnation occurs, and adequate backflow protection is provided to meet the requirements of the Water Supply (Water Fittings) Regulations 1999. Hot Water Provision Local unvented storage cylinders. Lightning Protection To BS EN 62305 and BS 7430 Small Power Installation Tenant’s Tea Points Connections available at each core on soil, vent and cold water risers for extension by tenant. 17th edition BS7671 p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 2 8 Building Services Outline Specification Design Criteria, cont’d Mechanical Services Description Public Health cont’d Heating and Cooling Tenant’s Showers Each office tenant’s space is heated and cooled using a high COP heat recovery VRF system. The system is capable of simultaneously heating and cooling individual spaces as required. Ducted concealed indoor units are located in the ceiling void to serve perimeter and internal zones as per the BCO guidelines. Around the perimeter of the building, one indoor unit is provided for each notional 6.0mx4.5m office module while for the internal areas, one indoor unit is provided to serve a maximum zone area of 70m². Connections available at each core on soil, vent and cold water risers for extension by tenant Tenant’s Kitchen Connections available in the south core on the fifth floor on soil, vent and cold water riser for extension by tenant. Surface Water Roof drainage is be designed in accordance with BS EN 12056 2000 and Building Regulation ‘H’ utilizing roof outlets. All rainwater outlets and pipe sizing is based upon a storm intensity of 0.030 litres/second/m² to suit the existing building infrastructure capacities. Pipe Sizing Pipe sizing of the hot and cold-water distribution systems is carried out using the ‘Loading Unit’ method. Soil and Waste Soil and wastewater sanitary pipework is designed and installed in accordance with BS EN 12056 2000 and Building Regulation ‘H’. The systems are designed as a fully ventilated single stack system. All pipe sizing is carried out using the ‘Discharge Unit’ method. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Heat from the VRF systems is rejected via air cooled condensers located within the louvred plant enclosures at roof level. Each tenant’s space independent VRF system is fed, electrically, from the corresponding tenant’s distribution board providing the facility of direct billing. Each air cooled condenser is connected to the indoor units via refrigerant pipework mounted on dedicated trays and routed vertically through the building inside the two main risers. On the floors, pipework is distributed to the indoor units by means of master and slave ‘BC’ zone controllers provided with spare ways to allow the tenant to add indoor units to suit the fit-out requirements. A centralised system controller, one per tenant’s space, is located within the tenant’s riser and is capable of controlling the indoor units individually or as a group. The controller is also connected to the central BMS and have the capability to be networked to other controllers should a future tenant occupy more than one floor or the whole building. The indoor units supply tempered air under the dictates of return air temperature sensors at the rear of each indoor unit. A 5 metre coiled control cable is provided at each indoor unit to allow the tenant to extend the space control to a wall mounted temperature sensor if required. Linear diffusers and associated pre-insulated plenums are installed around the perimeter of each floor with swirl type ceiling diffusers located within the internal ceiling grid. The indoor units are connected to the new plenums/diffusers with thermally insulated rigid sheet metal ductwork, complete with volume control dampers. The final connection to the diffuser plenum comprises a straight pre-insulated flexible duct, which is no more than 500mm long. Return air is drawn into the ceiling void via a combination of return air sections in the linear diffusers and air handling luminaires. Plant and riser space is provided for each office tenant to install any future condensers needed for a server room or to increase their system capacity to 100W/m² of small power cooling allowance in the case of a trading operation on one floor. Dedicated and labelled trays for the future pipework installation are provided in the two main risers. The toilets on each floor are provided with domestic hot water via an unvented storage cylinder served by a VRF heat pump boiler, connected to the office floor VRF system slave BC controller. 3 3 d av ie s s t r e e t 2 9 Building Services Outline Specification Mechanical Services, cont’d Controls Services Description Ventilation Each office space is provided with a dedicated mechanical fresh air supply and extract system with heat recovery. The fan located above the ceiling in the toilet core comprises fan sections, motorised shut off dampers, an electric heater battery and filter banks. The fan is connected to intake and discharge louvres in the back façade by means of thermally insulated ductwork. Fresh air is heated to a temperature of 14°C and distributed from the fan through galvanised sheet steel ductwork to the back of the indoor units. Air is extracted from the occupied space by using the ceiling void as a return air plenum via air handling luminaires and dummy sections in the linear diffusers located within the suspended ceiling. Silencers are provided on the intake and discharge ductwork to both fan sections. The silencers comply with the requirements of the acoustic consultant’s specification. Ductwork between the fans and the louvres is acoustically lined. Mechanical toilet extract ventilation is provided for the landlord’s toilets and showers/changing room using a dedicated twin fan. Extract from each toilet/shower is achieved by way of circular extract valves in the ceiling connected to a ductwork riser. The riser collect the toilet extract air from the different floors and connect to the fan located inside the north enclosure at roof level. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t The toilet extract fan is controlled under the dictates of a time clock through the BMS. Power to the fan is provided from a landlord’s distribution board. Silencers is provided on the intake and discharge ductwork to the toilet extract fan. Make-up air is provided from the adjacent office spaces ceiling void via transfer ducts complete with cross talk attenuators. The transfer ducts connect to supply grilles located in the toilet ceiling. Supply air to the changing room in the basement is provided by means of the fresh air supply fan located in the back of house corridor serving the basement areas. At the central plant the air is heated to a temperature of 18°C. The refuse and plant room areas are provided with dedicated extract fans located within the spaces and discharging to the outside via an extract louvre located in the first floor lightwell. Silencers are provided on the intake and discharge ductwork to each of the above supply and extract fans. The silencers comply with the requirements of the acoustic consultant’s specification. Control of the building systems is provided by a direct digital control (DDC) system, including a head end management station, network controllers and DDC units. All control algorithms, computation and energy management functions is software-based and resident in the DDC system. The operator has the capability through the head end or network controllers to access all programs, display all data resident in the system memory and perform analogue and digital functions. All fans, pumps and other similar drives is variable speed drives. Simultaneous enabling of drives is prevented by a sequential start program in the DDC system. This program also provides sequential restart after failure of drives that were running prior to power failure or fire alarm shutdown. Software time delay relays is provided in the DDC system to allow fan motors to cool down before restarting. Motors have both a minimum interval time (between consecutive starts) and a minimum off time (between start and stop). The time periods is based on the motor rating. In the event of a fire alarm condition the BMS receives a signal from the fire alarm system which shuts down all HVAC systems. Automatic restart of fans after a fire alarm or power failure shutdown is software prohibited through the de-energisation of the remote start/stop contact. Fan restart is manually initiated by the operator either locally or remotely through the head end. 3 3 d av ie s s t r e e t 3 0 Building Services Outline Specification Controls Services, cont’d Electrical Services Description Incoming Electrical Services A Trend IQ3 building management system (BMS) is installed. The BMS consists of Trend IQ3 ‘web enabled’ outstations for the landlord’s plant and each tenanted area. The outstations is networked together with a dedicated TCP/IP BMS network. A Trend 963 head end supervisor is installed in the main reception. This acts as a central point of integration for the landlord’s and tenants’ plant and colour graphics is provided for each item of plant. All alarms is sent to the BMS head end. On the office floors, a Trend IQ3/XNC web enabled outstation is provided for each tenanted space. A dedicated control panel is provided in each tenant’s riser to control/monitor the primary ventilation system, the VRF heating/cooling system and the electrical metering. Each control panel/outstation also has 25% spare capacity to enable the incoming tenant to add his own services such as comms room cooling equipment etc. Each control panel comprises a Mitsubishi AG150 LCD touch screen intelligent controller and power supply, a Trend IQ3/XNC outstation and power isolation. Each control panel has 20m of coiled control cabling and a stainless steel cover plate with an audible and visual alarm. If required, the cover plate is extended by the tenant to his reception desk to notify of a common alarm from the Trend IQ3/XNC controller. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Each control panel also has a facia mounted plant extension button allowing the tenant to extend the operation of the VRF and ventilation systems for a further two hours after normal operation. Each time the button is pressed the systems operate for a two hour period even if pressed midway through a previous operation. A fire alarm interface is provided adjacent to each control panel. On receipt of a fire signal the plant is shutdown. The web enabled facilities on the AG150 controllers and Trend IQ3/XNC outstations provide the tenants with a facility to web browse their plant via a TCP/IP connection should they wish to as part of their fit-out plans. Should a tenant occupy more than one floor, he is able to web browse all controllers/outstations from a central point or consider a central PC to monitor the systems. A new substation is provided at basement level of the south building elevation, in line with UKPN design considerations and requirements. The new incoming supply will service landlords and tenants’ Low Voltage (LV) switchgear to distribute to lighting, small power, mechanical plant, lifts and associated systems. The landlord switchgear comprises a main form 4 type 5 method of construction LV switchboard, located within a dedicated landlord switch room at basement level. The landlord’s switchboard is provided with space allocation for automatic change over arrangements for the incoming services. Provision of the changeover arrangements, associated controls, wiring and connections shall be by the tenant’s fit-out team. All tenants’ IQ3/XNC controllers is linked to the head end located at the reception desk on the ground floor. This allows the building manager to monitor and control all features of the tenants’ plant and display colour graphics for each item of the plant. 3 3 d av ie s s t r e e t 3 1 Building Services Outline Specification Electrical Services, cont’d Sub-Main Electrical Distribution The main distribution arrangements originate from the dedicated landlord main Low Voltage main switch board. Spare ways are provided to allow for future flexibility. Power factor correction is be provided on a distributed basis with each piece of plant provided with suitably sized correction capacitance. Additional power factor correction is provided on a bulk basis together with surge suppression as part of the landlord main switchboard arrangements. Space provision has been made at roof level for future tenant plant. In addition, space provision is provided through the distribution system to allow for associated future cabling. The electrical distribution system comprises sub-main boards for landlord’s distribution of final sub circuits. Landlord distribution boards are located within landlord accessible areas only. Motor control is arranged on a distributed basis, negating the requirement for large motor control centres. A system of rising cable mains within each tenant electrical riser is provided, allowing single tenancy occupation across each office floor. Rising cable mains have been provided, suitably sized, for the connection of tenant composite distribution panels within each tenancy demise. Each tenant floor service is independently utility meter operated. The utility meters are located centrally within the main landlord LV switch room at basement level. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Each tenant’s demise is provided with a composite lighting and small power distribution panel to serve the tenant’s on floor electrical requirements. The panel is located within the risers at each floor and incorporates electrical energy (electronic) multi-meters. The metering arrangements are provided with pulsed output terminals for central meter reading via the BMS. The building electrical energy metering and monitoring systems are provided in a manner compliant with the requirements of Building Regulations Part L 2010. A dedicated earthing distribution system is provided to meet BS7671, with additional tenant riser earth bars for tenant services. A lightning protection system is provided comprising roof earth termination network and utilising the internal building structure for down paths and finally terminating at basement earth rods. No tenant specific under floor small power provision is provided as part of the base building works. Raised access flooring is provided as part of the architectural package of works and allows a clear void for future tenant power distribution requirements. The voids are maintained clear of all other landlord services to ensure maximum tenant flexibility. The base building distribution network arrangements are suitably sized to allow capacity for anticipated future tenant small power arrangements based upon BCO recommendations. Local cleaner’s sockets are provided at strategic points within the core and common areas, serviced from local landlord distribution boards. The landlord distribution boards also provide local power circuitry for toilet areas, and other miscellaneous services. Additional sockets are provided within the tenanted demise for cleaning purposes and supplied from the respective floor tenant distribution panels, these cleaners sockets are mounted flush within the raised floor utilising a cleaner’s hive type arrangement to allow maximum flexibility to the tenant’s Category B fit-out. High level power is provided within the tenant demise areas on each floor to serve the on floor mechanical systems and controllers. Each item of tenant mechanical plant is serviced from the composite tenant riser distribution panels, cabling is terminated locally within the ceiling void at a suitable isolation device. Ceiling void wiring arrangements comprise a prewired plug in distribution arrangement, providing maximum flexibility and speed to future tenant fit-out works and subsequent tenant alterations. The main building entrance hall is provided with a landlord distribution board which provides sub-circuitry to support local power, mechanical services, lighting and main reception desk facilities. Services to the reception desk incorporate strategic building control panels, reception lighting controls, over door heater controls and localised task lighting. 3 3 d av ie s s t r e e t 3 2 Building Services Outline Specification Electrical Services, cont’d Lighting, and Lighting Controls Office area lighting is provided generally meeting the intent of the recommendations within CIBSE Lighting Guide 7. Luminaires are low glare and high efficiency and complete with high efficacy lamp technology. All fluorescent luminaires include high frequency ‘DALI’ dimmable ballast control gear with integrated power factor correction to a minimum of 0.95 lagging. The overall lighting arrangements through the property have been selected to meet the requirements for compliance with part L of the Building Regulations 2010 Luminaires therefore meet the criterion of providing a minimum of 55 luminaire lumens per watt (LL/W) efficacy. Further lighting energy efficiencies have been provided to ensure full building wide compliance with building regulations. Luminaires are installed within the architectural accessible 750x750 ceiling arrangements in a regular pattern and provide even illumination throughout the space, and maximise future tenant flexibility. All external lighting is photocell controlled with automatic time clock control override to switch off luminaires between 2300hrs and 0700hrs. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Emergency lighting system to suit the needs of BS 5266 is provided throughout both tenanted demised areas and common areas, via integral conversion packs. Multi-port Lighting control marshalling boxes (LCM) are installed within the accessible ceiling voids to suit the needs of the Category A lighting arrangement, with integrated intelligence to allow for future reprogramming to suit a Category B tenant fit-out. Spare ports have been left at the marshalling boxes to allow for additional future tenant flexibility. The lighting control arrangements are initially set up to provide passive infra-red PIR presence detection with overall time scheduling allowing for out of normal working hours operation (one hour run on period). The system is programmed to minimise energy wastage due to luminaire activation when the offices demises are unoccupied. Additionally, the system is further enhanced with daylight linking sensors. These sensors form an integral part of the PIR detector heads to automatically decrease luminaire output, via their dimmable control gear, when natural illumination via the perimeter glazing is maintaining the required ambient illumination levels. Lighting control and ambient lighting detection is provided throughout the office demise floor plates for daylight harvesting over the complete demise. The lighting controls arrangements are arranged to function on a floor by floor basis, with facility to extend the system with a wired backbone to a central head end at the main building reception. It remains the tenant’s responsibility to modify the arrangements to suit his specific requirements. The lighting control system is based upon a plug and play methodology and is fully intelligent and programmable thus allows maximum flexibility to the tenants. General common areas lighting arrangements are provided to the core areas to suit the architectural design and the requirements of Part L 2010 of the Building Regulations. Toilet lighting and staircases are passive infra‑red controlled, thus reducing energy usage, with daylight linking where glazed windows are available. All other areas are locally controlled via PIR switches as necessary. Staircase core lighting control is PIR controlled via din real mounted LCM modules mounted within the risers. 3 3 d av ie s s t r e e t 3 3 Building Services Outline Specification Electrical Services, cont’d Fire Alarm Services A new fire alarm installation is provided throughout the office, with automatic detection coverage to L2 as defined in BS5839. The system is based upon an addressable analogue type arrangement. The fire alarm system comprises automatic smoke detection or where appropriate heat detection with combined sounder bases. Tenant demises are provided with a loop in interface connection to allow extension of the system for their bespoke Category B fit-out works. The system is interfaced with items of mechanical plant to ensure shut down in the event of alarm. Lifts are also interfaced to ensure grounding to the lowest non alarmed floor above basement. Smoke detector units are provided with integrated Xenon strobe visual indication located strategically within the tenant office demise areas to ensure a fully DDA compliant fire alarm installation. Security CCTV System A system of landlords CCTV monitoring is provided throughout the building with coverage extending to main access routes for egress and exit of the development. Cameras, where internal are Colour High resolution with CCD sensor. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t External CCTV cameras are night vision type IP66 and vandal resistant. All CCTV units are fixed head type only, with dome type housings with mounting brackets. CCTV coverage is provided to the following areas: Access control is provided to the following areas: •Basement lift lobby •Refuse store •Bicycle parking •Changing room •Internal access to retail units (basement) •Ground floor reception core doors •External exits at ground floor •Grosvenor St service entrance •Reception hall •Three Kings Yard service entrance •Internal rear access to retail units (ground) •Egress doors to office floors •Passenger and goods lift cars The system is centrally monitored at the building manager’s office at ground floor. The building manager’s office also houses the associated colour monitors and digital recording equipment. In additional to security access control addition door monitoring contacts are provided to each of the above areas and in addition: •Basement retail rear access doors •Ground floor retail rear access doors Recording is digital onto a hard drive devices sized to allow a minimum of 30 days recording to be stored. •Roof core access A system of security wiring carcassing and containment is provided to allow the future provision of CCTV and access control to the tenant demises. The CCTV and access control system installation is part of the tenant fit-out. Separate basic intruder alarm systems are installed to the office development and monitor all ground floor and basement floor common parts access doors against forced entry, by means of door contacts. Access Control System Swipe/proximity access control readers are provided at defined base building positions to maintain secure monitored access to landlord areas. Intruder Alarm System All ground floor windows also have vibration sensors linked back to the main access control panels, excluding those associated with the retail units which remain without sensors. A security containment system is installed through the commercial office accommodation electrical risers to enable future installation of a security system by incoming tenants. 3 3 d av ie s s t r e e t 3 4 Building Services Outline Specification Electrical Services, cont’d Public Health Services Description Disabled Persons Alarm/Communication IT Services Cold Water Systems Disabled alarm systems are provided within each disabled person toilet with local indication and alarm. The system is capable of being extended to provide a central monitoring point. To allow each of the future tenants to provide their own communication requirement as part of their fit-out works a new incoming service frame room is incorporated into the design at Basement level inclusive of incoming service ducts terminating at the entry points of the building with puddle flanges. A complete drinking water distribution system is provided to supply water to all fixtures, water consuming equipment, hot water heating equipment, and valved outlets for future office and retail tenants’ use is provided. The metered office development supply is supplied from the Thames Water main in Davies Street. A new basement twocompartment cold water storage tank complying with regulation 16 of the Water Supply (Water Fittings) regulations 1999 is provided to serve the office development complete with division plate, overflows/warning pipes, air vents etc. In addition a system of ambulant disabled refuge call and communication is provided with central communication monitoring to the building manager’s office. Two way communications between each communication station and the head end panel are provided to allow fire brigade communication with each disabled person refuge location. Photovoltaics Part L 2010 of the building regulations imposes restrictions and requirements to minimise the carbon footprint of the development. Taken as a whole it is necessary to provide some sustainable technologies to offset some of the energy usage. The PV arrays are provided with inverter units locally at roof level incorporated within IP rated enclosures and generate electrical power supplied back into the landlord distribution arrangement from the local distribution board connections. Import and export meters are provided so that any excess energy not utilised by the landlord electrical systems shall be exported back to the electricity utility supply. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t A primary cable tray containment route is provided from the frame room to each floor via the electrical service riser. In this way tenant flexibility is met. Additional space allowance is made within the riser for the future installation by tenants of dedicated containment for their bespoke and secure IT requirements. All tenant IT and communication systems and wiring shall be part of the tenant fit-out works. The water supply to the office cold water storage tank is pre-filtered and treated via a UV steriliser. Electrically operated solenoid valves are provided on the main cold water supply to each section of the cold water storage tank. These shut off the supply to the tank upon receipt of a signal from the high water level sensors located within the tank. An electrically operated solenoid valve is also installed on the mains cold water supply directly downstream of the meter. This shuts the supply to the building upon receipt of a signal from the tank room leak detection tape. The solenoid valve activates an alarm when in the closed position and is monitored by the BMS. The solenoid valve is also provided with a facility for enabling manual reset. 3 3 d av ie s s t r e e t 3 5 Building Services Outline Specification Public Health Services, cont’d Cold Water Systems, cont’d Hot Water Systems Foul Water Drainage A new variable speed booster set takes suction from the water storage tank and supplies the office water requirements. The drinking water fixtures are served directly from the boosted system. The cold water fixtures are served via a double check valve arrangement from the boosted system. Pressure reducing valves are provided at every floor level to maintain a balanced equilibrium of outlet pressures. The hot water requirements for the office toilets are generated from localised unvented hot water storage cylinders. Hot water storage is set at 60°C. Hot water distribution pipework is traced heated to maintain the hot water temperature utilising self-regulating tape suitable for repeated long term performance. Hot water for future office tenants’ requirements is provided by the tenant’s own local hot water heaters. At each floor level a sanitary shut off valve is provided on the main branch cold water supply serving the toilet core. The valve is linked to PIR sensors located above the entrances to the male and female toilets. These valves isolate the supply to the toilet core during periods of no use. The PIRs and solenoid valves are served from the maintained live lighting circuits. Thermostatic mixing valves are provided on the water supplies serving the wash hand basins. Automatic spray taps are utilised on all wash hand basins, therefore providing a saving on water consumption for hand washing of approximately 66% when compared with flows from conventional taps. This also provides an energy saving by reducing the hot water consumption. Systems are installed in copper pipework, with capillary joints and fittings. All pipework is insulated except where on view, adjacent to sanitary fittings, where it is chrome plated. Local ballofix isolation valves are fitted on all appliances. Automatic spray taps are utilised on all wash hand basins, therefore providing a saving on water consumption for hand washing of approximately 66% when compared with flows from conventional taps. These also provide an energy saving by reducing the hot water consumption. All wash hand basins are fitted with individual D08/TMV3 approved thermostatic mixing valves located directly under each sanitary appliance and set at 43°C. A fully ventilated soil and waste pipework system is provided to collect the discharge from the foul and waste fixtures within the building. Drainage from ground floor and above is achieved by gravity. All soil and waste systems combine at high level basement and connect to the new buried drainage system before discharging into the new sewer outfall. The soil and waste system comprises of a number of fully ventilated single vertical cast iron soil and waste stacks terminating above roof level to atmosphere. Connections to these soil and waste stacks are incorporated to collect discharges from sanitary appliances via local range pipework. Ventilation of appliance traps and waste pipes is also provided to ensure against loss of trap seals. In all areas, the drainage pipework is accessible. Access is provided at all changes of direction and at every floor level as a minimum. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t The new hot water systems is installed in copper pipework, with capillary joints and fittings. All pipework is insulated except where on view, adjacent to sanitary fittings, where it is chrome plated. Local ballofix isolation valves are fitted on all appliances. Future office tenants’ tea point and shower facilities are provided with capped waste branch connections together with capped anti-siphon pipes for extension by the tenant. It is necessary to collect and pump the soil and waste products from the basement sanitary fittings, retail drainage points and the tank room floor drainage into the high level suspended gravity drainage systems. 3 3 d av ie s s t r e e t 3 6 Building Services Outline Specification Public Health Services, cont’d Vertical Transportation Services Surface Water Drainage Introduction A system of outlets and down pipes is provided to drain all roof areas. All rainwater pipes are located in accessible positions for future maintenance. Rainwater gutters are provided with a provision for overflow to protect the building fabric should the design rainfall intensity be exceeded and also to indicate blockage. Rainwater pipes are generally located in main riser ducts, plant rooms and ceiling voids. Two 14 person, 1000kg, general purpose passenger lifts serving all floors and one 26 person, 2000kg, passenger service lift serving basement and ground floor levels, are provided to serve the building. Access is provided at all changes of direction and at every other floor level as a minimum. Rain water pipes connect into the high level basement drainage system via running traps prior to connection to the sewer outfall intercepting trap. WC Overflows WC flushing cisterns are to comply with The Water Supply (Water Fittings) Regulations 1999 and incorporate internal overflows that discharge water via the flush pipe. All equipment complies with the standards of materials and workmanship detailed in the British Council of Offices guide and is suitable for a prestigious office building. The works undertaken comply with all necessary standards and regulations; in particular, the Health and Safety at Work Act 1974, EN81, BS7255, BS5588 where applicable, BS8300, The Lift Regulations, Lifting Operations and Lifting Equipment Regulations 1998, The Machinery Regulations and good working practice. Details of Lift Car Finishes Passenger Lift Car Finishes General: Bespoke finishes include emperador stone floor, leather wall panelling, full height mirror with walnut frame, and bronze doors and trim. Ceiling: Powder coated metal with low energy fluorescent downlighters or super LED’s. One lift is to have a demountable ceiling to enable partitions to be transported. Additional lighting is provided above the ceiling. Handrails/bumper rails: 50mm bronze rails Drapes: Required Emergency lighting: Provided to operate from Nickel Cadmium batteries rechargeable – three hour duration. Control panel finish: Bronze to be located in the side walls 400mm from the front wall. Control panel features: Flush in the side wall with tactile markings, incorporating all floor pushes with call accepted signals door open and close pushes, car light and service key switches, emergency intercoms, position and overload indicators. The floor pushes is within 900-1200mm height. Enunciators are to be provided. Provision is to be made for car reader security system to restrict access. Car position indicators: Modern digital white LCD type. Lighting switch: Key operated in lift cars. p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 3 7 Building Services Outline Specification Vertical Transportation Services, cont’d Details of Lift Car Finishes, cont’d Ventilation: Visible high and low level natural ventilation with profile cut vents and backing plates with a maintained emergency extract fan. Fan: Battery operated silent fan operated by a thermostat mounted within the lift car ceiling. Overload indicator: Required Car preference: Required Emergency systems: Windcrest intercom, alarm and emergency breakdown telephone system with autodial to internal system and then external breakdown service. Inductive loops are to be provided for persons with impaired hearing. Car doors: Two panel centre opening doors in bronze. Entrance protection: Full height non contact multi beam detectors. Advance door opening: No Landing Furniture Position indicators: Modern digital white LCD required all floors. Pre-announcing direction indicators: Required at all floors. Landing stations: One riser with tactile markings and white call accepted signals. Landing entrances: Two panel centre opening finished in satin stainless steel Fire rating: Two hours required p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Architraves: Required Type: Small frame Finish: Bronze Sills: Aluminium Passenger Service Lift Car (Goods lift) Finishes General: Hard wearing, medium duty, easily cleaned finishes suitable for a passenger goods use able to accommodate rubbish bins, partitions and Euro pallets. Soffit rails: Stainless steel Front wall: Stainless steel Side walls: Stainless steel with applied panels above and below high and low level bumper rails. Rear wall: Stainless steel with applied panels above and below high and low level bumper rails. Floor: Allow for aluminium treadboard or similar. Skirting: Stainless steel Ceiling: White painted with twin recessed bulkhead fluorescent fittings. Handrails/ bumper rails: Stainless steel covered timber cored high and low level bumper rails. Drapes: Not required Emergency lighting: To be provided to operate from Nickel Cadmium batteries rechargeable – three hour duration. Control panel finish: Brushed satin stainless steel to be located in the side walls 400mm from the front wall. Control panel features: Flush in the side wall with tactile markings, incorporating all floor pushes with call accepted signals door open and close pushes, car light and service key switches, emergency intercoms, position and overload indicators. The floor pushes is within 900-1200mm height. Enunciators are to be provided. Provision is to be made for car reader security system to restrict access. Car position indicators: Modern digital white LCD type. Lighting switch: Key operated in lift cars. Ventilation: Visible high and low level natural ventilation with profile cut vents and backing plates. Fan: Not required Overload indicator: Required Car preference: Required Emergency systems: Windcrest intercom, alarm and emergency breakdown telephone system with autodial to internal system and then external breakdown service. Inductive loops are to be provided for persons with impaired hearing. Car doors: Four panel centre opening doors in satin stainless steel. 3 3 d av ie s s t r e e t 3 8 Building Services Outline Specification Vertical Transportation Services, cont’d Details of Lift Car Finishes, cont’d Weight (kg): 1000kg Type: Heavy duty passenger/goods lift Speed (m/s): 1.6 Capacity (persons): 26 person Average wait time: 25 seconds Weight (kg): 2000kg Landing Furniture Floors served: -1, 0, 1 -5 Speed (m/s): 0.5 Position indicators: Modern digital white LCD required all floors. Stops and openings: 7 stops 7 openings Floors served: -1, 0 Control system: Group control system Stops and openings: 2 stops 2 openings Machine room position: Machine roomless Control system: Simplex control system Drive system: Gearless traction variable frequency regenerative type Machine room position: Machine roomless Entrance protection: Full height non contact multi beam detectors. Advance door opening: Not required Pre-announcing direction indicators: Required at all floors. Landing stations: One riser with tactile markings and white call accepted signals. Landing entrances: Four panel centre opening finished in satin stainless steel. Fire rating: Two hours required. Architraves: Required Type: Small frame Finish: Patterned stainless steel. Sills: Heavy duty aluminium or stainless steel suitable for pallet trucks. Lift Details Lift numbers: 1, 2 Type: General purpose passenger lifts Capacity (persons): 14 person p r i m e m ay fa i r o f f i c e d e v e l o p m e n t Car door arrangement: Two panel centre opening Car door dimensions: 1000mm wide by 2400mm high Car size: 1600mm wide, 1400mm deep, 2600 internal height Landing doors: Two panel centre opening Landing door sizes: 1000mm wide by 2400mm high Drive system: Gearless traction variable frequency regenerative type Car door arrangement: Four panel centre opening Car door dimensions: 1500mm wide by 2100mm high Car size: 1500mm wide, 2700mm deep, 2300mm high, with a 700mm high top hat at the rear Landing doors: Four panel centre opening Shaft size: 2200mm wide by 1900mm deep Landing door sizes: 1500mm wide by 2400mm high Pit depth: 1500mm Shaft size: 2500mm wide by 3100mm deep Headroom: 4350mm Pit depth: 1500mm Electricity supply: 400Volt 3 phase 50 Hz 4 wire Headroom: 4400mm Emergency supply: DC for emergency light only Electricity supply: 400Volt 3 phase 50Hz 4 wire Lift numbers: 3 Emergency supply: DC for emergency light only 3 3 d av ie s s t r e e t 3 9 Professional Team p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 0 Professional Team Developer Quantity Surveyors Acoustic Consultant Grosvenor Stow Projects 2 Ltd Davis Langdon Hann Tucker 70 Grosvenor Street London W1K 3JP MidCity Place, 71 High Holborn London WC1V 6QS Duke House, 1-2 Duke Street Woking, Surrey GU21 5BA Architects Contractor Party Wall Surveyor HOK Sir Robert McAlpine Ltd Drivers Jonas Deloitte Qube, 90 Whitfield Street London W1T 4EZ 3rd Floor, 106 New Bond Street London W1S 1SX Athene Place, 66 Shoe Lane London EC4A 3BQ Structural Engineers Planning Consultant Occupational Audit Ramboll UK Ltd DP9 KKS Strategy LLP Carlton House, Ringwood Road Woodlands, Southampton SO40 7HT 100 Pall Mall London SW1Y 5NQ 124 Chancery Lane London WC2A 1PT M,E & Sustainability Engineers CDM Co-ordinator MTT Capita Symonds 9 Kingsway London WC2B 6XF 1 Procter Street London WC1V 6DV p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 1 Imagery p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 2 Grosvenor Street/ Davies Street Elevations p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 3 Davies Street Elevation p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 4 Reception Area p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 5 Seating Area p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 6 Toilets/Changing Rooms p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 7 Floor plate p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 8 p r i m e m ay fa i r o f f i c e d e v e l o p m e n t 3 3 d av ie s s t r e e t 4 9 www. 3 3 daviesstreet.com Agents Andrew Barnes 020 7087 5769 andrew.barnes@eu.jll.com Philip Hobley 020 7861 1192 philip.hobley@knightfrank.com A development by Misrepresentation Clause: Jones Lang LaSalle and Knight Frank as agents for the vendor/lessor give notice that: 1 These particulars are produced in good faith, but are a general guide only and do not constitute any part of an offer or contract and must not be relied upon as statements or representations of fact. 2 No person in the employment of the agent(s) has any authority to make or give any representation or warranty whatsoever in relation to this property. 3 This property is offered subject to contract. Unless otherwise stated, all rents/prices quoted are exclusive of VAT. 4 All descriptions, dimensions, references to condition and necessary permissions for use and occupation, and other details are given in good faith and are believed to be correct, but any intending purchasers should not rely on them as statements or representations of fact but satisfy themselves by inspection or otherwise as to the correctness of each of them. All plans are not to scale. February 2014. Designed & produced by Sectorlight (1402860) +44 (0)20 7264 7700 sectorlight.com