Studio Projects: Revision History

advertisement
Studio Projects: Revision History
Studio Project attendees can view earlier versions of a document. Additionally, Studio
Project administrators and users who have been given sufficient permissions can
revert a document to a previous version.
Compatibility
Revu Standard, CAD or eXtreme 11.5 or higher
Contents
Revision History Permissions for Users or Groups
Viewing Revision History
Viewing Previous Revisions
Restoring a Revision
www.bluebeam.com
1
Revision History Permissions for Users or Groups
Studio Project administrators can grant other attendees the ability to revert Project
documents to previous versions.
To set revision history permissions:
1. Open the Studio Project you want to set permissions for.
2. Click
Project Settings. The Project Settings dialog box opens.
3. Select the Permissions tab.
4. Select the user you want to set permissions for from the Users/Groups list.
Note: If more than one user needs permission to revert Project documents
back to earlier versions, it might be best to create one or more groups and
then set the permissions accordingly to make permission management
easier.
5. Set the Edit Files permission to either Allow or Deny.
l
l
When set to Allow, the user or group of users will be able to:
o
Check out, modify and check in files
o
Undo checkouts
o
Revert version history
When set to Deny, the user or group of users will not be able to do any of the
above.
6. Click OK.
www.bluebeam.com
2
Viewing Revision History
To view a document's previous versions:
1. Right-click the desired document in the Project list and select
Revision History.
The Revision History dialog box opens with all previous versions listed.
2. Select the desired revision and click Open Revision. The revision opens in a
read-only mode that does not interfere with the current version.
Each file listed in the Revision History dialog box is numbered, with Revision
#1 being the file’s initial upload. The latest revision, representing the current
state of the document, will appear bolded at the top of the list.
Viewing Previous Revisions
Each revision, including the latest, can be opened and viewed in a read-only state.
To open a previous version of a document:
1. Right-click the desired document in the Project list and select
Revision History.
The Revision History dialog box opens with all previous versions listed.
2. Select the document revision desired and click Open Revision. The revision will open
in its native application with the revision number automatically appended to its file
name.
www.bluebeam.com
3
Note: If opening a revision of a PDF file, the icon will appear in the file’s tab within
Revu. Click this icon and select Revision History to return to the Revision History
dialog box.
Restoring a Revision
To restore a document to a previous version:
1. Right-click the desired document in the Project list and select
Revision History.
The Revision History dialog box opens with all previous versions listed.
2. Select the desired revision and click Restore Revision. A new revision of the
document is created from the selected version and added to the Revision
History with a note regarding its origin. None of the previous versions are
overwritten or deleted.
Note: The Restore Revision button is unavailable to users who do not have
the Edit Files permission.
www.bluebeam.com
4