UNLESS OTHERWISE NOTED, ALL WORK IN THIS WRITE-UP TO FOLLOW THE STANDARDS AND GUIDELINES SET IN BID SPECIFICATIONS 2011 SPEC # DESCRIPTION OF THE WORK LOCATION COST EXTERIOR WORK 1 2 11 34 DEMOLITION / REMOVALS Remove the existing gravel /limestone. See Spec # 1 # 2 & # 88 Back Yard Info Only Remove existing windows. See spec # 34 Exterior Info only Remove existing exterior doors. See spec # 37 Exterior Info only Remove the rotted soffit and fascia and plywood soffit. See spec # 46 Exterior Info only Remove the existing gutters and downspouts .See spec # 49 Exterior Info only Remove the garage door. See spec # 72 Garage Info only Remove the exterior lights. See spec # 78 Exterior Info only Remove the HVAC. See spec # 79 Interior/Exterior Info only Remove the hose bibs. See spec # 81 Exterior Info only Remove the damaged section of fence. See spec # 84 Back Yard Info only Remove a section of walk-way and drive-way. See Spec # 86 Exterior Info Only Remove the rotted landscape timbers Back Yard FILL DIRT Fill dirt installed and compacted as required ready for sod. Field verify. Exterior Back Yard CARPENTRY – GENERAL SPECIFICATIONS At removed window opening, install new wood studs to close up opening to code. Insulate window cavity. Install backer board, felt and wire lathe, make ready for stucco. (Remove concrete sill) Den PAGE TOTAL HIGH IMPACT WINDOWS, LOW-E ENERGY STAR RATED Replace the existing windows with new white vinyl frame, high- impact, Low E, single hung, TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #1 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK 37 LOCATION COST or slider windows complete with screens. Contractor to field verify all windows openings. The contractor will submit product approval at contract signing and Energy Star rated documentation to be submitted Prior to final pay request. Entire House Egress windows (one per bedroom to meet code), must be high impact Low-E white vinyl. May be single hung, slider, single hung with hinged door, or casement with screens to meet the exit fire code. Contractor to field verify number of window openings. The contractor to submit product approval at contract signing and Energy Star rated documentation to be submitted Prior to final pay request. Bedrooms Interior/Exterior Info Only Replace existing side entry doors to meet the wind code for the area being installed. The door frames to be composite material and a fiberglass doors. The cost of the door to be $275.00 and lever lockset. The owner to select the design of the door. (Submit product approval at contract signing) Den/Outside Outside/Garage Replace existing front entry door with new. The door frame composite material and a fiberglass door. The cost of the door to be $300.00 and lever lockset. The owner to select the design of the door. Submit product approval at contract signing. Front Entry Furnish and install a new pre-hung paneled solid core door, frame, trim, weather stripping, and lever lock set to be keyed to the other exterior doors. Garage/Interior PAGE TOTAL CUM TOTAL Exterior EXTERIOR DOORS Note: All locks, hinges, and locksets are to be Brushed Nickel Submit product approval at contract signing. All locks to be keyed alike. A minimum of 4 keys. 45 EXTERIOR SIDING – MASONRY FINISH Install stucco at 2 window openings. To code and specs. Finish the exterior of the opening to match existing walls. 46 SOFFIT AND FASCIA Remove all areas of rotted, decayed fascia and TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #2 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION soffit. Replace all rotted wood removed with new pressure treated wood sufficient for nailing new aluminum fascia and vented soffit. Enclose all soffit with vented aluminum and enclose all fascia boards with new aluminum baked finish. Soffit and fascia to be white. See spec # 1 49 Entire House Entire house GARAGE DOOR AND FRAMING Remove the existing overhead garage door and replace with new sectional door to meet current codes. Include a new garage operator compatible with the new door. (Include 2 remotes and pad.) Garage ELECTRICAL Install a new waterproof GFCI near new A/C unit Exterior Den/Outside Garage/Outside Replace existing exterior light fixtures with new. Assume cost of new fixture at $20.00 each. Front Entry PLUMBING-GENERAL SPECIFICATIONS PLUMBING FIXTURES Provide inspection of the existing septic and drain field to determine if it is operating properly. This is an allowance item Exterior $200.00 PAGE TOTAL CUM TOTAL Exterior Back Yard GUTTERS AND DOWNSPOUTS Remove all existing gutters and downspouts install new gutters and down spouts, include splash blocks. White. 72 78 Furnish and install a new exterior light with proper wiring and interior switch to code. Assume cost of fixture at $20.00 80/81 80/81 84 86 COST PLUMBING-GENERAL SPECIFICATIONS CONTINUED: Replace all existing hose bibs with new hose bibs and vacuum breakers to code. FENCES Replace the existing East sections of fence with a gate. Re stretch and fasten to corner post. See spec # 1 PAVING OF DRIVEWAY(S), WALKWAY(S), TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #3 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK 87 88 LOCATION COST Install a new section of concrete driveway, and walkway About a 12’ X 5 See spec # 1 Field Verify. Exterior PAINTING- GENERAL SPECIFICATIONS Pressure clean, scrape and prepare exterior for painting. Paint the entire exterior of the house including all exposed wood, concrete, stucco, masonry and ferrous metal. All newly installed wood shall receive one coat of primer or undercoat and two coats of semigloss paint. Color to be selected by owner. Housing specialist to inspect surface after pressure washing, first coat of paint and the final paint coat. Exterior Paint sidewalks and driveway with epoxy paint. Exterior Pressure-clean back-yard patio. Exterior LANDSCAPING Provide inspection of the existing irrigation system to determine if it is operating properly. At this point, if any serious deficiencies are found, they will be submitted on a written itemized proposal to the Housing Specialist. If an approved change order is issued, the repairs will proceed. This is an allowance item. Exterior $100.00 Fix patio blocks. (Level, raise, straighten ect) Exterior After proper prep and grading, furnish and install new Argentine Bahia sod. Back Yard PAGE TOTAL PROJECT EXTERIOR TOTAL =================================================================================== INTERIOR WORK 1 DEMOLITION/REMOVALS Remove all shelves, scrap wood, doors on in rafters and all old paint cans. Garage Remove existing carpeting. See spec # 19 Interior Info Only Remove existing ceramic tile flooring. See spec # 22 Both Baths Info Only Remove existing tile surround, wainscot, ½ Bath Info Only TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #4 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION COST and back splash See spec # 63 Kitchen Remove existing fixtures. See spec # 64 Both Baths Info Only Remove all interior doors except bi-fold. See spec # 69 Interior Info Only Remove existing vanity cabinets. See spec # 73 Hall Bath Info Only Remove existing medicine cabinets. See spec # 74 Hall Bath Info Only Remove existing kitchen cabinets. See spec # 75 Kitchen Info Only Remove existing ceiling fans. See spec # 78 Interior Info Only Remove existing shower, laundry sink, toilets. See spec # 81 Garage Info Only Remove existing appliances. See spec # 82 Kitchen Info Only Bedrooms 19 FLOOR COVERING / CARPET After the removal of existing flooring, install new carpeting to manufactures instructions. The carpet shall be (30) ounce, stains resistant over a minimum of 1/2 inch rebond, FHA approved. The installation shall be in an approved manner. all tack strips, metal accessories, etc., are included in this specification. The carpet shall be first quality, no seconds will be accepted. Product documentation will be provided by the contractor prior to installation. Included are all closets opening into newly carpeted areas. PAGE TOTAL 22 25 56 FLOOR COVERING / CERAMIC Install new ceramic tile floor to manufactures recommendation. Assume cost of tile to be installed at $2.00 per sq. foot of area. See spec # 1 Both Baths Furnish and install marble transition. Note: Existing ceramic tile to remain, use caution. Dining/Den Information only BASE & SHOE MOLDING Install new wood base and shoe molding on all walls in tiled floored areas. When new base is installed over carpeted flooring, no shoe is required. Interior CEILING INSULATION TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #5 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION Check existing ceiling insulation and add insulation as required to achieve an estimated R –30 (Minimum 10.375 “) in pitched roof areas. Contractor to post attic card on site. Second card to be supplied with final pay request. 58 63 64 69 Entire House INTERIOR WALL AND CEILING FINISH-PLASTER/DRYWALL REPAIR Repair all cracks and damaged surfaces to match existing. See Bid Specs 2011. Apply new skim coat to ceilings and walls before installing texture. Install new texture finish. Ceilings to have a heavy knock-down texture, walls to have orange peel texture Note; all textures to be professionally applied through a spray texture machine, not a hand held hopper. Contractor to provide sample boards prior to texturing. Interior Include any damage caused from wall at time of removals, surfaces and finishes. Include any additional damage caused by building modification, etc. in price. Information Only INTERIOR WALL FINISH-CERAMIC TILE (THIN SET) Remove all existing tile and shower pan. Install new pan, see spec (80) and Wonder board to ceiling. Re-tile existing shower area assuming the cost of the tile to be $2.00 per sq. foot. Color/design to be selected by the Housing Specialist. 63 COST ½ Bath PAGE TOTAL CUM TOTAL INTERIOR WALL FINISH-CERAMIC TILE CONTINUED: Install a new ceramic tile backsplash. Assume the “cost of the tile” at $2.00 per sq ft. of area. Color /design to be selected by the Housing Specialist. See spec # 1 Kitchen Both Baths INTERIOR DOORS Furnish and install new panel sliding doors with track and hardware for the pantry. See spec # 1 Bed Closets Furnish and install a new hollow core paneled door, hinges and lever lockset set. (slab only) Brushed Nickel See spec # 1 Beds/Baths Hall Closet FIXTURE SET Furnish and install a new ceramic fixture set. Color to be Bone. TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #6 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION Furnish and install new hardware. Brushed Nickel 73 COST All replaced Doors Info Only CABINET -VANITY Remove existing vanity and install a new wood vanity with a cultured marble top and integral lavatory. Follow 2011 spec. for Wood Cabinets; Oak or Maple. Drawer glides can be standard extension 74 75 78 epoxy-coated, stay-closed type. Doors to be raised panel. Hall Bath CABINET MEDICINE Supply and install new recessed mounted mirrored medicine cabinet. Include a new wall mounted mirror sized properly to vanity. Hall Bath CABINETS - KITCHEN/ COUNTER TOP Remove existing kitchen cabinets. Install new kitchen wood cabinets and counter tops with plastic laminate backsplashes. Wood doors to be raised panel doors. Kitchen ELECTRICAL Install new hardwired smoke/carbon detectors to code. PAGE TOAL CUM TOTAL Entire House Install arc-fault circuit interrupters for each bedroom outlet to code. Include sub-panel and separating. circuits if required Bedrooms Install a new GFCI outlet to code. ½ Bath Wire existing electric water heater, to code. Garage Install a new combo light exhaust fan Energy Star Rated with switch and wiring to code. ½ Bath Replace existing entrance service, breakers and meter can. All timers, Sub-panels, etc. to be eliminated. Install a new TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #7 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK 78 79 . 80/81 LOCATION COST 150 amps service With G.E.C. system and service drop conductors to meet all codes. Make sure GFCI outlets are properly wired. Garage Furnish and install a new outlet for overhead door. Garage Install new wiring for range receptacle to accommodate the new range. Kitchen Furnish and install a new door bell system. Entire House Furnish and install new switches and receptacles. Include all new switch, receptacle, co-axial phone and blank plated. Entire House After removal of existing light fixture, furnish and install a new 4’ energy efficient florescent fixture with. light diffuser Include new j-box. Garage Furnish and install new ductless micro-wave over the range, complete with proper wiring to code. Kitchen PAGE TOTAL CUM TOTAL ELECTRICAL CONTINUED: Re-lamp all new and existing fixtures with standard energy efficient bulbs or florescent bulbs. Entire House Re wire gable vent fan to code. Garage H.V.A.C. Install a new 2 1/2 Ton heat pump central heating and air conditioning system complete with all new ductwork, vents, drops, returns, controls and electrical. (minimum SEER required - 15.0) 7.5 KW heat strip. Heat pump air cooled condensing unit set on a concrete (or equal) pad. A.H. unit may be installed in attic space with access, to code, if possible Note: include cost of stopping block if required. The exact size A/C to be determined by the air condition Interior Exterior PLUMBING-GENERAL SPECIFICATIONS PLUMBING FIXTURES TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #8 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION COST Install a new heavy duty stainless steel double compartment deep bowl sink. Sink shall be installed complete with supplies, a faucet, fittings, traps, etc. Supplies must be equipped with stop valves. Kitchen Furnish and install new, drain, plumbing, and shower head and faucet. Access thru bed closet. Repair leaking pipe. Hall Bath Furnish and install new pan, faucet, plumbing drain, and shower had for the shower. ½ Bath Install a new elongated toilet complete with new supply line and angle stop with new escutcheon. Hall Bath 80/81 82 line and angle stop with new escutcheon. Install a new round toilet complete with new supply ½ Bath Connect new vanity lavatory with new faucet, trap, stops, supplies. See spec # 1 Hall Bath Bring the hot water heater to code Garage PAGE TOTAL CUM TOTAL PLUMBING-GENERAL SPECIFICATIONS CONTINUED: Provide a new copper water line complete with shutoff valve for icemaker. (See spec. #82) Kitchen Furnish and install a new laundry tub, & faucet. See specs. Garage MAJOR APPLIANCES Furnish and install a new 30" electric range/oven. The cost of the stove to be $450.00 Kitchen Furnish and install a new 21 cubic foot refrigerator. The cost of the refrigerator to be $750.00 Kitchen TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #9 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK 85 87 94 LOCATION COST Furnish and install a new dish washer. The cost of the dish washer to be $250.00. All appliances to be of the same brand. White Kitchen Information only PEST EXTERMINATION Inspect house for termite and/or other insect infestation. If active infestation is found, treatment will be completed by change order. Contractor to furnish a inspection report. Entire house PAINTING GENERAL Plug, patch and paint the entire interior of the building including all walls, ceilings, doors, trim, and baseboard in accordance with the requirements of this section. Stained ceilings are to be prepared properly to insure coverage of final coat. All wallpaper to be removed, walls properly prepared and painted. Include the painting of garage floor, porches. After primer coat, Housing Specialist needs to inspect work. After second coat, Housing Specialist needs to approve the work before painting the final coat. Interior PAGE TOTAL CUM TOTAL MISCELLANEOUS Furnish and install heavy duty spring door stops. (All replaced doors). Interior Info Only Furnish and install PVC vertical blinds. Entire House CLEAN-UP Clean house completely ready for re-sale. Entire House PERMITS AND FEES PAGE TOTAL TOTAL INTERIOR AMOUNT TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #10 Rev. 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION COST TOTAL EXTERIOR AMOUNT TOTAL PROJECT AMOUNT IF ANY ENGINEERING IS REQUIRED TO COMPLETE THE WORK IN THIS WRITE UP, OR TO GET A PERMIT, THE CONTRACTOR TO FURNISH IT. TB-C.D.C. Panola 10-6529 DATE: 03/26/12 PAGE: #11 Rev. 3/10/11