Milford Youth Center Milford, MA September 08, 2014 Addendum #6 Page 1 of 2 TO: All Prospective Bidders FROM: Marcelo Arjona omr architects, inc. 543 Massachusetts Avenue West Acton, Ma 01720 Business: Facsimile: (978) 264-0160 (978) 266-1650 This addendum revises and takes precedence over all previously issued documents including any previously issued addenda and clarifications. Previously issued documents, which are not revised or affected by this addendum, shall remain in full force and effect. GENERAL NOTES 1.1 This addendum modifies, amends and supplements the Bid Documents for the above referenced project dated July 14, 2014. The items set forth herein, whether of omission, addition, substitution or clarification are all to be included in and form a part of the proposal submitted. The structure of this Addendum is: itemized comments, responses to Bidder questions, attached sketches (or full sheets), and attached specification revisions (if applicable). Itemized Comments: General ............................................ Item 6-1 thru 6-2 Specifications ................................. Item 6-3 thru 6-12 ATTACHED SPECIFICATIONS ISSUED WITH THIS ADDENDUM: Appendix 012201 Unit Price Sheet dated September 8, 2014 Document 004100 Form for General Bid dated September 8, 2014 ITEMIZED COMMENTS Item No. Spec or Drawing Reference Description General Rather than bidders proposing unit prices, unit prices are herein assigned by the Owner. All occurrences of the words “proposed by bidders” in the bidding and contract documents shall be revised to “assigned by Owner”. Refer to the attached Unit Price Sheet and revised Form for General Bid, following this addendum The Masonry Filed Sub-Bid provided by Commercial Masonry Corporation shall not be used; the Owner has ruled that it is acceptable for the bid to be withdrawn. 6-1 6-2 Specifications 6-3 Section 002113 omr architects, inc. At Paragraph 1.2, DELETE Subparagraph H. Renumber subsequent paragraphs accordingly. 543 Massachusetts Avenue, West Acton, MA, 01720 Milford Youth Center Milford, MA 6-4 Section 002113 6-5 Section 004100 6-6 Section 012200 6-7 Section 012200 6-8 Section 012200 6-9 Section 012200 6-10 Section 012200 6-11 Section 012200 6-12 Section 012201 September 08, 2014 Addendum #6 Page 2 of 2 At Paragraph 1.10 UNIT PRICES, DELETE Subparagraph A., B., and D. REVISE Subparagraph C. to read “A. Unit Prices listed in the Schedule of Unit Prices are solely for the purpose of establishing a fair value for work which, to the best of the Architect's knowledge at the time of bidding, will not be required for the satisfactory completion of the Project (unless an estimated quantity has been identified). Unit Prices will not be used in determining the lowest responsible Bidder or the original Contract Sum. Furthermore, the Owner and Bidders may reserve the right to reject any or all Unit Prices at any time prior to signing the Agreement, in which case the cost of additional or reduced work shall be as determined by one of the other methods set forth in Article 7 of the General Conditions.” DELETE this section in its entirety and REPLACE with attached “Document 004100 Form for General Bid”. At Paragraph 1.2, Subparagraph B., DELETE Items 1 and 2. RENUMBER Items 3 and 4 to 1 and 2, respectively. At Item 2, REVISE “UNIT PRICE PROPOSAL SHEET” to read “UNIT PRICE SHEET”. At Paragraph 1.3, Subparagraph A, REPLACE “proposed by Bidders on the Bid Form” with “on the Unit Price Sheet (Appendix 012201)”. REVISE “Unit Price Proposal Sheet” to read “Unit Price Sheet”. At Paragraph 1.4, Subparagraph B, REVISE “UNIT PRICE PROPOSAL SHEET for work that requires establishment of unit prices” to read “UNIT PRICE SHEET for work involving unit prices.” At Paragraph 1.4, Subparagraph D, Item 1., and Paragraph 3.1, Subparagraph A, REVISE “UNIT PRICE PROPOSAL SHEET” to read “UNIT PRICE SHEET”. At Paragraph 1.4, Subparagraph D, Item 2, REPLACE “proposed” with “assumed”. At Paragraph 1.4, DELETE Subparagraph E. DELETE this section in its entirety and REPLACE with attached “Appendix 012201 Unit Price Sheet”. End of Addendum 6 omr architects, inc. 543 Massachusetts Avenue, West Acton, MA, 01720 MILFORD YOUTH CENTER RENOVATIONS MILFORD, MA omr architects inc. SEPTEMBER 8, 2014 DOCUMENT 004100 FORM FOR GENERAL BID TO: The Awarding Authority A. BASE BID: The undersigned proposes to furnish all labor and materials required for renovation of the Milford Youth Center, located at 24 Pearl Street in Milford, MA in accordance with Contract Documents, including Drawings and Specifications, all as prepared by OMR Architects, Inc.; for the Contract Price specified below, subject to additions and deductions according to the terms of the Contract Documents. B. CONTRACT PRICE: The proposed Contract Price is ____________________________ Dollars ($ C. ). ALTERNATES: 1. 2. 3. 4. 5. 6. For Alternate No. 1: For Alternate No. 2: For Alternate No. 3: For Alternate No. 4: For Alternate No. 5: For Alternate No. 6: Add: $___________ Add: $___________ Add: $___________ Add: $___________ Add: $___________ Add: $___________ Subtract: $_________ Subtract: $_________ Subtract: $_________ Subtract: $_________ Subtract: $_________ Subtract: $_________ D. ADDENDA: This Bid includes Addenda numbered:_________________________ E. SUB-DIVISION OF BID: The sub-division of the proposed Contract Price is as follows: Item 1: The work of the General Contractor, being all work other than that covered by Item 2: Dollars ($ ). Item 2: Sub-Bids as follows: Sub-Trade Name of Sub-Bidder Amount Masonry $ Miscellaneous and Ornamental Iron Waterproofing, Dampproofing and Caulking Roofing and Flashing $ $ Metal Windows $ $ FORM FOR GENERAL BID 004100 - 1 Bonds required by General Bidder (Yes or No). MILFORD YOUTH CENTER RENOVATIONS MILFORD, MA omr architects inc. SEPTEMBER 8, 2014 Sub-Trade Name of Sub-Bidder Amount Lathing and Plastering $ Acoustical Tile $ Painting $ Elevators $ Fire Protection $ Plumbing $ HVAC $ Electrical $ Bonds required by General Bidder (Yes or No). Total of Item 2: ___________________________________________ F. SUB-BIDS: The undersigned agrees that each of the above named sub-bidders will be used for the work indicated at the amount stated, unless a substitution is made. The undersigned further agrees to pay the premiums for any performance and payment bonds furnished by sub-bidders as requested herein by the undersigned, and that all of the cost of all such premiums is included in the amount set forth in Item 1 of this bid. G. The undersigned agrees that if he is selected as general contractor, he will promptly confer with the awarding authority on the question of sub-bidders; and that the awarding authority may substitute for any sub-bid listed above a sub-bid filed with the awarding authority by another sub-bidder for the sub-trade against whose standing and ability the undersigned makes no objection; and that the undersigned will use all such finally selected sub-bidders at the amounts named in the respective sub-bids and be in every way as responsible for them and their work as if they had been originally named in this general bid, the total contract price being adjusted to conform thereto. H. TIME OF COMPLETION: The undersigned agrees to commence work within five (5) days of execution of a General Contract and to complete the Work so as to reach Substantial Completion for each Phase on or before the date specified in the Project Manual. In case the Work of a given Phase of the Work is not completed within the specified time, it is understood and agreed that the Contractor shall pay the Owner, not as a penalty but as liquidated damages, the sums stated in Document 002113 – INSTRUCTIONS TO BIDDERS, for each calendar day after which completion was required for that Phase, as further provided in Division 1 of the Specifications. I. CONTRACT: The undersigned agrees that, if he is selected as General Contractor, he will, within five (5) days, Saturdays, Sundays and legal holidays excluded, after presentation thereof by the Awarding Authority, execute a Contract in accordance with the terms of this General Bid and furnish a Performance Bond and also a Labor and Materials or Payment Bond, each of a Surety Company qualified to do business under the laws of the Commonwealth and satisfactory to the Awarding Authority, and each in the sum of one hundred percent (100%) of the Contract FORM FOR GENERAL BID 004100 - 2 omr architects inc. SEPTEMBER 8, 2014 MILFORD YOUTH CENTER RENOVATIONS MILFORD, MA Price, the premiums for which are to be paid by the General Contractor and are included in the Contract Price. J. LABOR: The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the Work, and that he will comply fully with all laws and regulations applicable to awards made subject to Section 44A of Chapter 149 of the Massachusetts General Laws. K. OSHA CERTIFICATION: In accordance with M.G.L.c. 30, Section 39S bidders shall include with their bids a certificate indicating “that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration...”. L. CERTIFICATE OF ELIGIBILITY: The undersigned has included with this Bid his Certificate of Eligibility and Update Statement as required by Chapter 149, Section 44D. M. NON-COLLUSION CERTIFICATION: The undersigned certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this Paragraph, the word "person" shall mean any natural person, joint venture, partnership, corporation, or any other business or legal entity. N. TAXES: As required by MGL Chapter. 62c, Section49A, Chapter 62C, the undersigned certifies that the bidder has complied with all laws of the Commonwealth relating to taxes. O. DEBARMENT: The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under provisions of Section 29F of Chapter 29, or any other applicable debarment provisions of any other Chapter of the General Laws or any rule or regulation promulgated thereunder. Date: Name of General Bidder: By: Title: Business Address: City and State: NOTE: This proposal must bear the written signature of the Bidder. If the Bidder is a partnership, the proposal must be signed by a partner. If the Bidder is a corporation, the proposal must be signed by a duly authorized officer or agent of such corporation. END OF DOCUMENT FORM FOR GENERAL BID 004100 - 3 MILFORD YOUTH CENTER RENOVATIONS MILFORD, MA omr architects inc. SEPTEMBER 8, 2014 APPENDIX 012201 UNIT PRICE SHEET MILFORD YOUTH CENTER MILFORD, MA 1. The following unit prices as defined in the specifications covers those items for which indefinite quantities may be possible and, therefore, pre-agreed prices per unit of work are established as a means to determine adjustments to the Contract Price after actual quantities are determined. UNIT PRICES GIVEN HEREIN SHALL BE FOR ADDITIONAL WORK ONLY. DECREASED WORK SHALL BE DEDUCTED AT THE "ADD" PRICE LESS FIFTEEN PERCENT (15%). UNIT PRICE NUMBER 001 SPECIFICATION SECTION AND DESCRIPTION UNIT MEASURE UNIT PRICE DOLLARS/CENTS SQUARE FOOT LIN. FT. $18.00 Wood flooring repairs. LIN. FT. $17.00 LIN. FT $3.00 CU. YD. $12.00 LIN. FT $2.00 SQ. FT. $4.00 SQ. FT. $7.00 SQ. FT. $7.00 SQ. FT. $7.00 SQ. FT. $3.00 002 $7.00 Interior wood trim patching and repairs. 003 12 in. Corrugated Plastic Drain Pipe 004 Sawcut Pavement for Utility Trench 005 Utility Trench Restoration 006 Pavement Crack Sealing. 007 Milling and Asphalt overlay of Existing Pavement 008 Cloth with Black Coating on Scupper Box on Parapet Roof 009 Black coating on copper inside parapet 010 Roof tar on copper round parapet 011 9” x 9” tan floor tile in first floor maintenance room UNIT PRICE SHEET 012201 - 1 MILFORD YOUTH CENTER RENOVATIONS MILFORD, MA omr architects inc. SEPTEMBER 8, 2014 012 SQ. FT. $3.00 LN. FT. $5.00 SQ. FT. $5.00 LN. FT. $15.00 SQ. FT. $5.00 SQ. FT. $4.00 SQ. FT. $4.00 LN. FT. $5.00 LN. FT. $5.00 SQ. FT. $10.00 CU. YD. $63.00 CU. YD. $127.00 SQ. FT. $23.00 9” x 9” red floor tile in movie room 013 Exterior gray door caulk 014 Red slater cement at junction of short roof to tall roof 015 Pipe insulation and fittings behind wet walls, above plaster ceilings 016 Paper under stage 017 Glue Daubs under 1’ x 1’ ceiling tile near game room. 018 Insulation Inside Tin Pan Ceiling Panels in Game Room 019 Intermittent Black Tar Substance at Base of Granite at Ground at Bottom 020 Thin Layer Window Caulk 021 Concrete slab demolition 022 Unclassified soil excavation 023 Rock excavation 024 Temporary lateral earth support 025 $275 / DAY Dewatering of excavations 026 CU. YD. Structural fill UNIT PRICE SHEET 012201 - 2 $38.00 MILFORD YOUTH CENTER RENOVATIONS MILFORD, MA omr architects inc. SEPTEMBER 8, 2014 027 CU. YD. $25.00 CU. YD. $12.00 LN. FT. $43.00 Common fill 028 Backfilling excavations 029 Slab underdrain system 2. The unit prices listed herein include all costs for the indicated items of work, including such items as overhead, superintendence, general conditions, profit, bond, labor, materials, payments to and coordination of subcontractors, equipment costs, disposal fees, etc., and all other work incidental thereto. END OF APPENDIX UNIT PRICE SHEET 012201 - 3