I need to move my electricity meter because I’m having a new kitchen Do you need to move your underground electricity supply? If so, read our guide for the costs, timings, processes and how to apply 0845 234 0040 ukpowernetworks.co.uk 2 This is the approximate price to move the electricity meter at your property Price average £956 excluding VAT There may be some additional costs. Please follow the six steps below to find out which additional costs might affect you... Please be aware that not all these costs are payable to UK Power Networks. For example, you would pay your electrician (step 4) and electricity supplier (step 6) separately. 1 UK Power Networks standard connection cost (approximately) Streetworks costs (1 and 2 below) Other costs (3 to 6 below) + 0 + 0 = Probable total cost Do you have a front garden? If you don’t, then we will have to dig in the footpath or road to get to the electricity cable. Only an accredited company can dig in the highway. The council may charge us to close the footpath or road which can delay work. 956 etting you G connected 956 2 Parking. Do you have a parking space we can use to get close to the electricity cable? If not, there will be an extra cost to arrange this with the council. Price from £30 to £300 per parking bay (dependent on local authority) Upon receipt of payment, our aim is to meet your preferred connection date wherever possible. Price on average £500 but in rare circumstances could be as high as £10,000. Time: up to three months to obtain permits (dependent on local authority) 3 You will need to buy an electricity meter box and other material, such as ducting to protect our electricity cable. You can either buy this yourself or ask us to provide it for you. Price from £70 Where the electricity meter will be 4 You will need to employ a qualified electrician who will charge you a fee for any internal wiring changes. They will need to certify their work. Price from £200+ if you need to move your fuse board Where the electricity meter used to be C Electricity joint bay, where we will expose our live electricity cable to enable us to connect to your service cable A 6 You need to arrange for your electricity supplier to move the electricity meter. They can do this once we have moved the electricity cable. Price from £90 Who’s responsible? You Us – UK Power Networks Key If you are not sure about what your job might involve, please give us a call on 0845 234 0040 Any questions: 0845 234 0040 5 You will need to dig a trench from your new electricity meter position to our live cable. Normally a builder would do this but we can quote for it too. Price from £55 per metre (depending on surface type) What next? Please proceed to next page and fill in the application form 3 Application form to move your electricity meter If you have an underground electricity supply, have gone through the stages outlined on the previous page and want to apply, please fill in the below: 1. Site details (Where you need the work done) Name: Company name: Address: Postcode: Email: Telephone: Mobile: 2. Customer correspondence details (if different from site address) Name: Company name: Address: Postcode: Email: Telephone: Mobile: How would you prefer to be contacted by us? Email Would you like to receive your quote by email? Yes Phone Letter No When do you need the work completed? (This gives us an idea of your anticipated timescales) Month: Year: 3. Property details What is the main use for the property? Domestic (a house, flat etc used for domestic purposes) What type of service do you currently have? Single phase Is there enough parking for two of our vans? Yes Three phase Non-domestic (office, business premises or other) Don’t know No Please detail any issues restricting access to your property. For example, parking permits, double yellow lines etc. Where is the existing electricity meter position? (eg kitchen, outside wall, cupboard under the stairs) Where would you like the new electricity meter position? (eg box outside) Could this involve work on land not owned by you? Any questions: 0845 234 0040 Yes No Not sure 4 Application form to move your electricity meter continued 4. Your project Tell us about your project Your options Would you like to dig the joint bay around our electricity cable as this can save you some money? Yes No (see A on illustration). If you intend to carry out the excavation of the joint bay yourself or arrange for others to do so then please ensure you have understood the booklet ‘Avoiding danger from underground services‘ which is available at www.hse.gov.uk Please give me both prices Once we’ve visited your site, would you like us to quote for digging the trench from the joint bay (see A). to where you’d like the electricity meter to be? (see B) Yes No Would you like us to provide your new electricity meter box and the ducting to protect the cable? (see B). You will definitely need to buy the ducting to have this work carried out. If you want your electricity meter on an outside wall then you will need an electricity meter box. Would you like us to provide your new electricity meter box Yes No If yes, what type of meter box do you require? Built-in (normally new build) Surface mounted B A Built in meter box Surface mounted meter box Any questions: 0845 234 0040 continues overleaf 5 Application form to move your electricity meter continued 5. Drawing and maps Draw a plan of your property: Example plan of a property Draw where your property is: Draw a plan of your property: This can be a print from an online map or hand drawn. Please send or draw (right) a plan of your property. This should show where your current electricity meter is located (C on page 2) and where you want it moved to (B on page 2). Please see an example of what we need (far right). Please send us a map or draw (right) where your property is. Please show your site boundary, two road names which surround the property and let us know of any hazards or obstructions at site. Shire nt New Site Ho lla nd Wa y Be Any questions: 0845 234 0040 Cres ce lm on tR oa d 6 What next? Explaining the process Anticipated Responsibility time to complete Enquiry and application 1 Once you have an understanding of the potential costs involved and are confident that you want to go ahead, please complete and submit an application form. You Quotation Having applied, we will provide you with a formal quotation. This will be valid for 90 days, after which time the quote will expire. 2 Us 5 – 15 days Payment 3 We require full payment before any work is started. Normally we accept card payments, cheques and BACS/CHAPS. When you pay we will appoint a co-ordinator who will support you in getting your connection delivered. You Site visit 4 We will arrange a site visit to firm up plans. It is advisable for you and your electrician and possibly your builder to be there. Sometimes we might need to undertake a site visit before we can provide you with a quote. Us 5 – 7 days Agreeing dates 5 We may be able to provide dates for your work with you on site. If we can’t we will contact you to agree dates. Us Your on-site work 6 You will need to carry out any on-site works according to the design drawn up at your site visit. You also need to ensure your electrician has completed all his works and prepared a certificate that your electricity supplier will want to see when they connect your meter. You Making your connection 7 If your new or altered supply requires us to carry out any excavations we will normally complete this one or two days before the electrical works. It is helpful if your electrician is available on the day we complete the electrical works. Installing or moving your meter 8 You will need to arrange for your electricity supplier to fit or move your electricity meter. You should give your electricity supplier at least two weeks’ notice. If you have not arranged metering you will be without power. If you are having a new meter installed we will provide you with an MPAN number to give to your electricity supplier. Please be aware that during periods of high workload the times indicated may vary. Sending your application Print and scan this form then email it to: smallservices@ukpowernetworks.co.uk Print the form and post it to: Small Services Department, UK Power Networks, Metropolitan House, Darkes Lane, Potters Bar, Hertfordshire EN6 1AG or Fax it to: 08701 964133 ukpowernetworks.co.uk UK Power Networks (Operations) Limited Registered office: Newington House, 237 Southwark Bridge Road, London SE1 6NP Registered number: 3870728 registered in England and Wales V3Apr2014 You 15 – 20 days (for simple works) You and your electricity supplier Anticipated total time: 4 – 6 weeks (for simple works) Any questions: 0845 234 0040