Most Immediate
"ft. 3/6/2015-~
~
fH:ctll{
Government of India
~~'3lIW"l
Ministry of Power
~l"ftp~,
~
-110 001
Shram Shakti Bhawan, Rafi Marg, New Delhi-ll0
9.n=f
ll11T, -;:p:ft ~
001
Dated: 6th May, 2016
To
As per list
Subject: -
Surrendered share of power by States in various power
stations - reg.
**********
Sir / Madam,
Please refer to this Ministry's letter dated 2ih February, 2015, 31st
March, 2015, 8th July, 2015, 31st August, 2015,
zo" October, 2015, 2ih
th
November, 2015 and 15 December, 2015 enclosed therewith the letters from
various Government regarding above subject.
The letters are again enclosed received from Govt. of Odisha, DVC,
Govt. of Rajasthan, Govt. Himachal Pradesh, Govt. of Haryana, Govt. of
Sikkim, Govt. of Meghalaya, Govt. of Manipur, Govt. of Punjab, Govt. of
Jharkhand, Govt. of Madhya Pradesh and Govt. ofNCT of Delhi surrendering
their power. These letters are also available in Ministry of Power web site
(-www.powermin.nic.in). If the State is interested to avail this power, the
quantum and the period may be indicated, so that suitable reallocation can be
considered by the Ministry.
Yours faithfully,
Encl: as above
~
(D. Guha)
Under Secretary to Govt. ofIndia
Tele-fax: 23719229
Email: opmonitor-power@nic.in
Distribution List:
1.
2.
3.
4.
S.
6.
7.
8.
9.
10.
11.
12.
13.
14.
IS.
16.
17.
18.
19.
20.
21.
22.
23.
24.
Secretary (Power), Govt. of Arunachal Pradesh, Jal Vidyut Bhawan, Niti Vlhar,
Near IG. Park Gate, ltanagar-791111
Commissioner & Secretary, Power Deptt., Government of Assam, P.O. Assam
Sachivalaya, Block-C, 3rd Floor, Dispur-781 006
Secretary (Energy), Government ofBihar, 8, Darogaroy Path, Patna-800001
Commissioner, Deptt. Of Power, Government of Manipur, Manipur Secretariat,
Imphal-79S00]
Secretary, Power & Electricity Deptt., Government of Mizoram, Mizoram Sectt.
Annexe-Il, Treasury Square, Aizwal-79600 1
Commissioner & Secretary, Power Deptt., Government ofNagaland, New Sectt.
Complex, Kohima-797001
Principal Secretary (Power), Government of Tripura, New Sectt. Complex,
Power Department, Agartala-79900 I
Addl Chief Secretary, Department of Power & NCES, Government of West
Bengal, 1, Kiron Shanker Roy Road, New Sectt. Building, 7th Floor, Kolkata70000]
Secretary (Power), Electricity Department, Govt. of Goa, Panaj i-40300 1
Principal Secretary (Power), Govt. of Haryana, Power Department, 37, 7th
Floor, Sector-I, Chandigarh-16000 1
Principal Secretary (Energy), Govt. of Uttar Pradesh, Bapu Bhawan, UP
Sachivalay,
Lucknow-22600 1
Principal Secretary (Energy), Govt. of Maharashtra, Mantralaya, Madam Cama
Road, Hutatma Rajguru Square,
Nariman Point, Mumbai-400032
Principal Secretary (Energy), Govt. of Chattisgarh, D.K.S. Bhavan, Mantralaya,
Raipur-49200 1
Principal Secretary (Energy), Energy Deptt., Block-S, Sth Floor, Govt. of
Gujarat, Sachivalya, Gandhinagar-382010
Principal Secretary (Power), Govt. of Himachal Pradesh, Shimla-171 002
Principal Secretary (Power), Govt. of Jarnmu & Kashmir, Civil Secretariat,
Jammu/Srinagar-180001
Principal Secretary (Energy), Govt. of Jharkhand, Nepal House, Doranda,
Ranchi-834002
Principal Secretary (Energy), Govt. of Madhya Pradesh, Energy Deptt.,
Mantralaya, Vallabh Bhavan, Bhopal-462004
Principal Secretary, Department of Energy, Govt. of Odisha, Bhubaneswar7S1001
Secretary (Energy), Govt. of Rajasthan, Room No. 4122, Main Building Sectt.,
Janpath,
Jaipur-302001
Add!. Chief Secretary (Energy), Govt. of Uttarakhand, Sectt Deharadun-24800 1
Secretary (Power), UT's of Dadra, Nagar Haveli, Daman & Diu, Sectt.,
Silvassa-396230
Secretary (Power), 4thfloor, UT Secretariat, Sector-9, Chandigarh-160009
Secretary (Power), Govt. of Punjab, Punjab Mini Secretariat, Sector-9,
Chandigarh160009
(Ph-0172-2743979,
fax-0172-2748036,
emailsecy.power@punjab.gov.in)
(a) Surrendered
SI.
NTPC's
share of Odisha for entire period:
Project
No
Installed
Allocated firm Power of
capacity (MW)
Odisha (MW)
1
BARH STPP-I U 1-3
1980
418
2
BARH STPP-lI
1320
166
UI,2
3
MUZAFF ARPUR
Ext. Ul,2
390
30
4
New nabinagar U 1-3
1980
155
Total
5670
769
(b) Surrendered
share of DYC for entire period:
Quantum of Power
(MW)
31.8
54
Name of NTPC Power Plants
Farakka STPS-UI
New Nabinagar STPS
New Muzaffarpur TPS Expansion
Project
(c) Surrendered
SI. No
Station
1
2
3
Anta
Auriya
Dadri
!Allocated td
Uttar Pradesh
Allocated to Uttad
Pradesh
10
share of Himachal Pradesh
Installed Capacity
for entire period
HP Share
(in MW)
% age
(d
SI.
No.
1
Surrendered
Station
419.33
663.36
829.78
share of Rajasthan for entire period
Installed Capacity (in MW)
APCPL, Jhajjar
()e
SI.
No.
S urren d ere d s h are
Station
1500
0 fM
e~ h alaya upto 2021
Installed Capacity
Bongaigaon TPS
1
(t): Surrendered
SI. No.
1
(in MW)
Share of Rajasthan
(MW)
9.75
Share of Meghalaya
(MW)
3x250 MW
share of Sikkim for entire
Station
Barh STPP (660 MW)
2.
3.
Dadri- Gas (NTPe)
91
91 MW
4.
Anta (NTPe)
44
44MW
735
735 MW
1.
5.
0 fD
Dadri Stage- 11 (Thermal)
53
(MW)
9.96
e Ihi. f or entire period:
Allocation to
Proposal for
Delhi (MW)
Surrender
BTPS (Badarpur) (NTPe)
705
(3X95 MW)=285
MW
Auraiya (NTPe)
72
72 MW
()
re» S urren dere d s hare
SI No.
Plant Name
MW
15.01
22.02
24.98
62.01
3.58
3.32
3.01
Total
6.
APPCL
Jhajjar
(Aravali) (NTPC)
693
693MW
7.
Koldam (NTPC)
8·,
&+MW
55.66 MW
8.
Dulharti (NHPC)
50
50MW
9.
Chamera-Ill
29
29MW
10.
ParwatUII
66
66MW
1l.
Tehri HEP (THDC)
103
103MW
(NHPC)
(NHPC)
2675
Allocated
50
MW
to
Telangana uR
to 31.05.2016.
Allocated to
Himachal
Pradesh
40 MW has
been allocated
to Chandigarh.
2255 MW
Total=
(h)
Surrendered
share of Delhi in Dadri-I upto 31st March, 2017: 180 MW of TPDDL.
(i)
Surrendered
share of Madhya Pradesh in Mouda STPS Stage-I (2x500 MW) of
M/s NTPC Ltd -156.41 MW
U)
Surrendered
share of Haryana
Anta, Auraiya & Dadri:
(k)
Surrendered
APPCL
102 MW
share of Haryana
Jhajjar
for two years:
for one year:
(Aravali) (NTPC): 693 MW
~]located
5Ql\1\Y to Telatig'!!l~
MP to 31.05.2016:
(I)
Surrendered
share of Punjab
SI. No
Station
1
2
3
4
Anta
Auriya
Dadri
APCPL, Jhajjar
Installed Capacity
(in MW)
Punjab
Share
MW
65.24
100.85
146.99
23.1
419.33
663.36
829.78
1500.00
Jh ar kh an d f or entire perro. d :
Station
Barh STPP (2x660 MW)
Farakka-1Il (500 MW)
( m:
) S urren d ere d s h are
SI. No.
1
2
for entire period
0f
(MW)
80
32
MW
9.96
0:
()
SI.
No.
1
S urren dere d s hare
Station
0fM
Bongaigaon TPS Unit 2
&3
arupur for entire perid
Installed Capacity (in MW)
3x250 MW
Share of Meghalaya
(MW)
31.4 (15.7x2)
1->--(1,'l. t"P~~Se.c '6 L v') ~\..
1--~\~
\"\
~"~
~T~
'i"-II f? x C'l
1.."
MA.NOHAR LAL
~
~
r--
~~q~o~Z)'\"1
"'> ~
~,
gR[!IOII.
i1 0;§lll et) I
CHIEF MIN[STER, HARYAI A,
CHAl'TDl G ARH.
,
Dated
•
I
J
I
.
...:'_!..J .. ~ ..,..)
U
.
O..
~~~
wli'M)
'V
c/V
~~x%
- ri
if
oY
v'"
•
y/v;;'
[../
X
(D
,) L-
\) 1·/\<1
l \
t
~/(J
-c·~
'
)(-'f
I(v
I may bring to your kind notice that Haryana has contracted more power than its
likely requirement
in next 2-3 years. Accordingly, the power is being scheduled as per
actual requirement in merit order. 693 MW power has been contracted from the NTPC
Aravali Power Company Private Limited (APCPL). Since the power of this plant is very
expensive and falls low in the merit order, it is not being scheduled. The Haryana Power
Companies, however, have to P<:iY the fix cost amounting to Rs.815 crore per year. This is
resulting into unnecessary burden on the consumers of the State.
It has been decided by the State to surrender this power for a period of one year, for
which a request has been made to the Ministry of Power for allocating it to any other
desirous State.
I may request for your kind intervention for expediting the surrender of power by
Haryana from NTPC APCPL plant and its allocation to any other state,:...
Yours sincerely,
Ji",/I
"
CzO?/I'I/,l'
(Manohar
Shri Piyush Goyal,
Minister of State (Independent Charge) for Power,
Government of India, Ministry of Power,
Shram Shakti Bhawan,
New Delhi-l10001.
Lal)
·3__
,.
,
0.0, No. _ ..
/PS/ACS (power)/!>£:
T-Z'1c
)
Rajan, Gupta, I.A.S.
t, \ \!
7\;
A-S(gH~
f'
;7
-
J)~:{
\
'
h'"\J
(rh)
l'\~'
Dated :.
r-.
/"
\"
~)lll//
~4R,\,
Surrendering of power from Indira
Thermal Power Project, Jhajjar.
S~
A~~:-/
j
Kindly refer to the subject noted above.
h'}//
t;?v y/
~~
e- ~
Gandhi Super
c::\,.
~ .~. ~~
,V:)/
\
tff
.3..7::/.2..~.20 J s:
\~
bject:
V;'"
Additional Chief Secretary to Govt. Haryana,
Power & Renewable Energy Departments,
Haryana Civil Secretariat, Chandigarh.
You are aware that NTPChas set up a 3xSOOMW Power Plant
at Jharli (Jhajjar). This plant started generating power from the year 2011.
~
46.2% of power, l.e. 693 MW, comes to the share of Haryana. This power
S; X
is amongst the more expansive power for the State. In the present
r-.l
scenario of low demand, Haryana Government has decided to surrender its
n:--6c.:
'\ X
)0"
~~'
....--
entire share of power in this Power Plant for a period of one year.
Government of Haryana shall be grateful,
if surrender of
power by the State in IGSTP Jhajjar is accepted by the MJD.j~tryot£'QY{§f,
or----,--"""",,,
, r
..•..•.••••
"-.-''
...
,,,,,"'---,,
..
¥ .••••.••
-,,
•••••
-....
---~.~
Government of India and reallocated to any other State. I shall be grateful
for an early action in this regard.
~~~~)
r>;
\YO~
~'-~
--....,.
----
~~
[,
(Rajan Gupta)
~-------~
I
~
Cl
a
---"-..
----0
N
::S-.
...•.,
..:>
N
r-
r
--
M
!
C
.~)
Sincerely,
D
Shri B.N Sharrna, IAS
Additional Secretary I
Govt. of India, Ministry of Power,
New Delhi.
0.0. No..._ "",,:l__
Rajan Gupta,
I.A.S.
~
vV"""
, "',./
i;S~~~
'I
~)
Q.)Jf
) t
Additional Chief Secretary to Govt. Haryana,
Power & Renewable Energy Departments,
Haryana Civil Secretariat, Chandigarh.
W....
' ~
J
\
lv.t~
_ \~
, 4
/PSJACS(power)
~
-..?
O.tedJDfujl,L
~SUbject\ ~~~~ng
of Haryana Share from Anta, Auriya and
~
.,.~ ~ Oadri Gas Power Plants of NTPC.
1)~n
Haryana
has signed Power Purchase Agreement
Aurlva & Dadri Project on dated 31.01.1994
with Anta,
for supply of Power from the
said projects.
Presently,
,
r'
Haryana is getting
from the said projects.
its allocated share of 102 MW
In the present scenario, Haryanais a power surplus
State and very less power is being scheduled from these projects due to its
lower standing in merit order. However, Haryana is continuously paying the
fixed Charges which are burdening the consumers of Haryana in terms of
higher tariff.
In view of the above, as it is evident from the past trends that
the power demand will not picked up for next two years, I would, thus}
.
request that the share of HaryanO"state_ power from the said projects may
be considered
'--
surrendering
surrendered
and re-allocated
.
-
to the needy State(s).
-
-The
of power may kindly be made for a period of at least two
~:;:
(Rajan Gupta)
Shri B.N. Sharma, lASt
Additional Secretary,
Govt. of India, Ministry of Power,
New Deihi.
,
I'
---.----......::.
./
",;v
GOVERNMENT OFlvrAOHYA PRADESH
.
ENERGY DEr~AIrrMENT
VALLABH BHAWAN
,.
No. F - 3/58/2012/13
MANTRALAYA,
(VoI·Vil)
.re.
Bhopal, dated
k::rU') --~ rv~
.
-~--U
, T~e . .Secretary r
,--->
Ministry of Power,
".r$ ( 01\1)-)
Govt. of India,
,...
/
Shram Shakti Bhawan, ~::::::i Mnxg.
New Delhi
~
r ,
r
CJl/~/\/'v::f-r.:t-c1 /
~Neer~j AgrHVd}
Deputy Secretary
,.
i'uhn1rti •••• n·
For information
.
r
t)}S
------.-.---
'No. F - 3/58/2012/13
Copy to:
1.
The Chairman
New Delhi 110
The Chairman,
,
J;
.»:
•.••.•
, ••• ,•• _w"r.""
Subi- Surrender of power from Mouda STPS Stage-I (2x500 M1Vj of MI5
NTPC Limited.
~---1"1
(
• 1-----·--,,-,
Please refer to the letter dated 18JJ8.2010 cited under reference vide which
Ministry of POW~t. Covernrner+ of Indi;:; had allocated 156.41 MW power from
(2xSOOMW) Mouda Super Ther ...•al Pntw>( Station (Stage-I) or M/ s NTPC Limited
to Madhya Pradesh, A Power Purchase Agreement was also execut-ed between
erstwhile MP Power Trading Company Limited (now .M.P. Power Management
Company Ltd. (MPPMCL)) fmd NTPC U<l (i~ 24.12.2007 for pvrchase of the
, allocated power from Mouda S'TPS (Stage-I),
It has been observed that, off late: only about 37.5% of the allocated power
from Mouda STPS Stage-I (2x5UOMW) could be scheduled by the State, as variable
cost of power Mouda was on the hjgh(~'lsl',~e ,'IS compared to the power available to
the State from the 9thel tif>rl,·;;n;.~'l"i· ..~,;. ':l'1~.!) "'HI;cl.~f;;[ power rrom other riedup sources, this situation is ii~dy to prevcil ir: the coming years also. It has,
therefore been decided by lVlP?MCL to surrender this 156.41 M\N share of power
allocated to Madhya Pradesl. from l\,1o..:.daS~"'h3St~ge-I of NTPC
"
In view of the above, as direct ea, it is reque!!cd to kindly de~allo('ate MP's
share in the above power station w.rh irrur. c: ~!;(\~ec: feet.
,/1, 1
.._-'-
,
o SEP 2015'
{1
.J
(Vol..'in,l
[;:1('l,':J.1, d('lt<:d
& ;V;,t71<l;:jint:
U"CC)'
00:1
Central Elecrrcity /\f)!l)OfitJ" Sewa Bl1ilWf~n,HK Fnrsm
I
',-
~inm ~-.JlI '
I1
and further
-L
,..
~<;;.?dh.1 "',CI',,":
..,/
[:r! puty
~
,/
Secrc.a; ')'"
.
'V
GOVreTwnutH;r OF-ODIGHA
Dllt,~.l\n1i~M'BX'J1'OF ~aitR(J\,
·*('(",h~),·:it
r'\
J
Ja,
l'd
C
..
~
/1; ,
~~~'1_I
__
¥
,-'1/,: ';):
~.~
~:4'
'(' r.;
....
'1.",:" •.•.
,
J ••••.•
~
From
Sr i S'ure8h Ehandl~a' M~h:)PiltxO> lAS,
~jccretarY 'to (}6vt.'
Principal
"
To
,
The .ioint ~~f,;n!t;;.ry.'Min.ir,f~)uf'
Pr.'WC1',
Govt, of lndirl, ShnilnShsk-tiBhaw£lf"
, ,,'r~;,fiMMg, N/."!1.VDellli- '110001 .
I
Si.,wrenc1el.' Qf u.lloo·~wd'liO'~(if
all\!):
f£Q-11:l
N'fP~;
or~tp,i<1.~ ~h0
tit~th:)11t.'i;1()c;{t.3.d
iH21~o.
,"'-
I would
did
like to invite
J :2. ( 1.).0) ~ un d
['1.0,
a re lcrcncc to this
to thic;
D~')JtL
9 8~5 dti::i'..J 1,.l.L20 14 on ~hc ~ubj\:n
:,~,W'l' 1'1('),8.SG:'l
citt.d above u.ud
I(:qlle"sl thM.~upc om ing NTP;::'i,(~~'('.;/ii·;J1n 61a:tiuri$' locute.I nut~idc
(;di~b<l
a llorn
NOl'th l<nr<tr::<lp(lrJ,
{Exccp~
tctl 'it :'\))curly
Mi ni~',l'y
of
Sup:::!" 1'h<?nf1~I Fewer
cl/He.
power',
Q()vt.
of [lldih
>,,+e
b :'!tnge:t
, from B~\I'hstagc-tt (2x660) nr NTI'C !;ittw.Jc....;
\
I~tt~r
{tilted 14, t 1..2014 haw,
(tl111lfh) of B~~r11::ltHgt:-tl.(66'!
MW] (c<..'py
Barb ;:-/cagt:.u {ullit;ll~}l is hitdy
allocn
tlO;)~
horn
would
Sl:~til)n
the Stat~
i~.lW;. required.
therefore,
of NTPC
opq·;JtiQrI may
,[\!ctific.ltjot'l
may
be d~,
Lob~
dld,03,1l7,20 i<2 h;,d
1:3;<660 MV/) f_l'~d 16fl 1V1\,\'
in Biha/", In
rI!':t;)(J.r<~~ commercial
C1'1 •..jv~(;cl) (10111
',c0mmis!:1ibned
soon, In
~nd UMPP
power
of nnc
~Injl.
whi;:h GRlDCO have the
s(h~dulcd,
b~~~{eJNTPC
Ilf
rneuuru nc l'ape
tilt!
Pl,H;rutiOll
ourrently
.eritit le me nt of 132,96 ~,trw~vhit:h';j':ibclng
;' Stalion
the SL:\t? ()[
,
gllocr.l te d 4 J 8 MW ,Ofp~)\"er-frotn8:";'f
vide
St<tHon)
1(:
Another
vi<:\V
of
llnit of
»
incrr.,,;<:,1;j
plan te, power rrom
f),,)r'h
'
H'"ql.l~~I:!':',Lhp..t:
(I.tj
(I
G':!>'! H1t~f.j$\ire·power
(st,l\g~ { 8::, ff)' wr; iell ,11£\.3 ti1 esdy
be e n put
\\l'
trorn
'Bfll'j)
commerciul
be- dC-<-Itlocatea\mmcqi,F:.tdy,
\
.
DAMODAR
"
~r~
VALLEY CORPORATION
'
C,;'. ~~
~u
BY SPEED POS~
COMMERCIAL DEPARTMENT
DVC TOWERS, VIP ROAD
KOLKA'fA -700054.
-TeI.. No. + 91 33 2355 7931 / 6041 ; Fax No. + 91 33 2355 2129.
-N-o-.C-o-n-ll.-/:-f';-16pT--NTPC-Power /'2
m_.. Date
f 3\
3 0 OEe 1!J1~
To
TlH~ Director
(OM)
Ministry of Power
Government
of India
Shram Shakti
Bhawan,
Rafi Marg
New Delhi - 110001
Sub:
Surrender
Ref.
of NTPC Thermal
1. MOP, GOI letter
Power allocated to DVe
no, S/Sl/201O-Th.!l,
2. MOP, GOI letter no. 5/20/2010-Th.lI,
3. MOP, GOlletter
Expansion project
no. 5/14/2009-Th.ll,
d1d,09.12.2010
dtd.28.09,2010
dtd.1012.2010
regarding FSTPS·1I1
regarding Nabinagar STPS
regarding MazaffpurTPS
STPS
Dear Sir,
In terms of allocation
between
by
of power
DVC & NTPC
MOP,GO!
was executed
d.-tails are given in tabular
from
l
vide above
letters under reference,
the respective
thermal
bilateral
power plants of NTPC.
The
form as hereunder-
r----·-;:.j~~~·;TNT·PC
Power
Plant
I
Quantum
Oa-t;'' of Executi0:l0f
of Power
.
Ag~emeM
r-·--..
(6-:36% of K·
·--F-a-ri'-.k-k-a-sT-p-S---1-1I----~~8MW
~Nabmagar
STPS
I a JV
of NTPC & BSEBI 1
54 MW
I :~;O/~~f
I
I
30.12.2010
IC- 1980+---26.11.2~1O --
l
MW)
1-------.-----.-".----"""."
-----.+--.--------,------.----:--+----·---··-t Muzaffarpur TPS Expansion Project ( a '10 MW'( 2.6 % of IC- 390MW)
30.12.2010
.
PPA
I
__1
i
I
JV of NTPC & BSEB)
(
Meanwhile
Hon'bleJharkhand
State
Electricity
Regulatory
COO)!Tlissi<;?'1
, c:,
purchase cost from Farakka STPS-III,
NTPC during
04.09.2014.
STPS -lIl
period
for the period
state commission
2013-14.
Year
also did not allow power
disallowed
power
A,
STPS and Muzaffarpur
FY 2014-15 & 2015-16 in its Multi
from
The Hon'ble
Nabinagar
!tSEf,O
TPS (xpi!l1sion
Project of
Distribution
Tariff order dtd
purchase
cost from. Ferakka
Recovery of the fixed charges is as such not possible from the
-»
command
consumers
under
0409.2014
as mentioned
area of DVe as per directive
above.
of Hon'ble
JSERC in its Tariff order dtd.
/
.f
in this context it is further
mentioned
that
DVC has unallocated
surplus power to the tune of 1200
units. In spite of repeated persuasions, DVC could not tie up for sale of
MW from its new generating
above power under long term bi-lateral
agreement
with any beneficiary
f(ies) as on date resulting
significant backing down of its own generation.
Under the above back drop
-m (31.8
.
"
DVC has decided
MW), Nabinagar STPS (54MWj
It is, therefore,
requested
necessary formalities
to kindly
and
to surrender its share of allocation
Muzaffarpur
look into
TPS Expansion Project
the issue for reallocation
rnav be made immediately
for proposed
from Farakka STPS
{lOMWj .
of above
surrender
power. so that
from the above
NTPC
stations.
It is further requested
to advise
NTPC accordingly
so that
termination
of the Power
Purchase
..
Agreements
executed
between
DVC and NTPC in respect of Farakka STP$ -Ill,
Muzatfarpur
TPS Expansion Project can be made without
Nabinagar
STPS,
any further delay.
Yours faithfully,
'\-~1r?p.:\J-. t +
/-;~~jf.~
c/
Executive Director- (Coml)
Encl.,
"
n..u dtd.09.12
a)
letter no. 5/51/2010-
b)
letter no. 5/20/2010-Th.l1 dtd.28.09.201O of MOP, GOL
.2010 of MOP, GO!.
c)
letter no. 5/14/2009-Th.!l
cl)
Relevant portion of PPA between
DVC and Farakka STPS-In.
e)
Relevant portion of PPA between
DVC and Nabinagar STPS
f)
Relevant
DVCand
1.
Member (PS), CEAi Sewa Bhawan,
portion
dtd.1O.12.2010of
of PPA between
MOP, GOL
Muzaffarpur
TFS Expansion Project.
R.K. Purarn, New Delhi 110066
"".
>
, r
2.
Member (GO & Dj, (EA, Sewa Bhawan, R.K. Purarn, New Delhi 110066
3.
Director (Thermal,
4.
The Member . Secretary,
.
?
The General Manager,
DVC) MOP, GOI, Shrarn Shakti Bhawan, Rafi Marg, New Delhi - 11000.1
ERPC, 14 Golf Club
Road, Kolkata - 700033
(Fax~..
No. 033 ~
2422 1805)
..
'.
ERLDC, 14 Golf Club Road, Kolkata - 700033 (Fax No. 033 24235809)
6.
The Director (Commercial), NTPC limited, Scope Complex, Lodhi Road, New Delhi - 110003.
7.
The Chief Engineer
lie,
CEA, Grid Management
New Delhi 110066.
Copvto: {NOO}
I
Sr. PS to the Chairman,
11.
Sr. PS to Member (Technical),
DVC. Kolkata.
II!.
Sr. PS to Member
DVC, Kolkata.
DVC, Kolkata.
(Secretary),
Division, 6th Floor, Sewa Bhawan, R.K. Puram,
,.
,
•. '}
j
.iI
1
!i,
,
..'~ \,1 /'
'-1
j.~
J',' .
~ '.
_~»
J"
:
12 (,,),
•..
.
lJl Y,:.l
A<~v,",
Prlucipal Secretary, Energy
WI>f9 W'ilF1~,
~
or RAJASTHAN
GOVEHNMENT
~rGjx,?JI'i i(HqiH
SecreWrlat.
GOliiHrH1Hml
~rFH'1{1~('fll,
Jalpt.r·'30200~
302005
'~~."
.Jaipur, Dated 8.4.2015
No. F. 7(2} Energy /2003
I't.:--~
',':;.,.
/,,~'(.1
I
!)v,'''-i
> Secretary
Hr
Ministry of Power,
Government of India,
Shram Shakti Bhawan,
Rail Marg,
New Delhi- 110001.
-:1.:.
,!
(,'0-'"
1;.;'
~--,
~--/;r:------..
..t
..
..-~"''''''
t~\'1 t)~"\
Cl"')')
:!
Sub: Surrender
Jhajhar
In reference
to subject
trend of Rajasthan
Rajasthan
of Power receivmg from NTPC station,
Discoms and availability of cheaper
state is interested
••••••••••• --
cited above, looking to the load
to surrender
-"---'-~---.------.-.---"-.-.~
.•
~-
---
-'m
••••
the power share
_
Rajasthan of 9.75 MW in NTPC station, Jhajhar
,
j'
Therefore, you are requested
share
of power of Rajasthan
immediate
power,
of
•
forever.
to de-allocate the complete
in NTPC station,
Jhajhar
with
effect.
1~~
(Sanjay Malhotra)
Pr. Secretary, Energy
•
I
r'
(
HIMACHAL
PRADESH STATE ELECTRICITY
BOARD LIMITED
(A Stale Govt. Undertaking)
No.HPSE?BUCE{SO&P)/IS,-5A!2015
-
c. / .. c :~
Dated
C' / • (/ • i ~.,
To
The Secretary
f·
1\.1,,\
'
(Power),
Ministry of Power, GOIlt. of India.
Shram Shakti Bhawan, Raft Marg.
,-,
"
New Delhi·110001.
-
\
Subject:·
Surrendering
of Power from Anta, Auriya and Dadri Power Stations.
Sir,
I have t!H~ privilege to share witll you that dunng last one decade Govt. of
Hunachat Pradesn nas been able \0 add substantial Hydro Generation Capacities in the power
system through various stake holders viz. State Utilities, CPSUs, JVs & IPPs and by March,
2014 the installed hydro capacity of HP is pegged at 9000 MW, Thouqn major quantum of this
power flow out to neighbouring States and helps the Grid yet this simultaneously has facilitated
in big w3'i in meeting base load requirements of HP State during summer and winter months.
,
..•••
In light of above mentioned present developments
in Hydro power and the
emerging Scenario, the demand and supply position of the HP State has been reviewed by
Governmental,
r~egufatory and HPSEBl authorities and in principal decision has been taken
tint HP Stale in the first instance shall surrender Its allocated share in Anla, Auria and Oadri
Power Stations of NTPC as enshrined in the PPA dated 31.01.1994.
The detail of these
projects, liP share ete of power which is requested to be de-allocated for the entire period of
projects is appended hereunder:
I'
""':0'
It will be appreciaole.: if you could please take early action
matter ano allocate the power from these stations to other needy entities
Thanking
on the above
you,
Yours faithfully,
~
,,)
,
Managing Director,
HPSEBL, Vidyut Bhawan.
Shjmla-171004
Copy of the above is forwarded to the following
The Principal Secretary (Power), Govt. of Himachal
Pradesh, Shimla-2 for kind
information pleases,
_-;)8
Ci.:;:;:nnC:l6. Mana~ling O:recivr. i,n?C Ltd., NiPC O;lnWor., Scope Comp:ex-7
l~stltutlonaJ Area, New Oe!hi-110003 for kind information please. It is requested I~
take up the matter WIth Ministry of Power. Gol for de-allocation of above power.
--
.:.".~--
.
Managing Director,
HPSEBL, Vidyut Bhawan,
Shimla-04
, r
,
I'
Tete«
: 0264202
r:1X
: 03592222927
pnanee :
PBX;
POWER IN
2IJ2244
222908
222916
222028
GOVERNMENT OF SIKKIM
POWER DE:PARTMEN'r
ENERGY AND
To,
,
I'
The Under Secretary to the Government
of India, Thermal+ll
Ministry of Power, Government of India,
Shram Shakti Bhawan.Raf Marg.
New Delhi - 110001.
SUBJECT: . SURRENDER OF CENTRAL AllOCATrON
OF POWER FROM I3ARH-1I
STPP ~660 MW.
Dear Sir,
,
With reference to our letter no lS!TRDjE&Pj2014-15!l,dated
is"
MAY 2015,it is to again remind your good office that the Energy and Power
Department, Government of Sikkirn has a share of 1.51% of thermal power
from BARH 11 {660 STPP, NTPCj i.e 9.96 MW of share to the state of Sikkirn.
However the cost per unit is exceeding Rs 6jKwh and at such a high rate it
becomes totally unviable for the state of Sikkim to continue drawing the
allocated share of power. It is therefore requested that the 1.51% of share
allocated for Sikkim may kindl~Jl~ withdrawn and the same reallocated
elsewhere. The Energy and Power,..,SlncerelYregrets the surrender of the power
allocated to Sikkirn
"
It is also requested that an order for the cancellation
\\~abrle may kifOd!Yhbeissue~ aththe earliest s~ce hEnehrgYd.
& power d epartme r1tis
/1 la e to payor
t e capacity cnarges even tnoug te
epartrnent h as not been
/\:.~
/,
of the allocated
.\
the power from the said generating unit.
/\s~JletiuHng
\;)~;/~,/~
,/
~//
(".
Thanking You,
¥Y.<,j,
'\)\
(~~
'D
.
K,S KUNWAR
Chief Engineer/Head of Office
Copy to :-
1, Member Secretary (ERPC), Eastern Regional Power
Committee 14, Golf C!ubRoadTOllygUnje-K. 0Ikata-700033'.1.':'
2. Regional Executive Director [East-l], NTPC,Patna,
.
I'
I
,
!
/ _.:
..L.'~]~T('\'\5:::-
oC:-,,>~
Chief Engineer/Head
~
of Office
GOVEHNMENT
OF MEGHALAVA
POWER DEPARTMENT
Ls" May,
Dated Shlliong, the
NO,POWER95!2012!107,
Government
2015
[!J.j
of India,
~v1inistrv of Power, Shrarn
r
lLi)
Shakti Bhavan, Ran Marg,
New De!hi - 110001
IT
Sut) .
Temporarv
Station
i'
!
Fax,
In
entered
upon
Theffnai
Power
Meghalaya
power
front
the
Corporation
relt."'rence), i arn to Stale
surrendering
your
er stwhile
tnat
the upcorning
2021
of Power
IVlOUld
Irorn
also request
to the Power
Meghalaya
State
the share allocated
the
Purchase
Electricity
Thermal
Power
Thermal
Agreement
80ard
\ a copy
by the I'v1ifllsHy
3x250 MW Bongaigaon
(MeSEB)
(PPA) which wa(,
and the National
of wt')ich is enclosed
of Power,
Power Station
Government
for ready
at India to
is 53 r'IlW However,
of Meghalaya
NTPC-8TPS
you to kindlvarr
wouldtherefore
temporarily
without
like to sur r ender this entire allocation
the levy of fixed
charges
up to the year
ange for issue of necessary order'S In this regard.
Yours faithfully,
(5 LY~~~~;'
Commissioner
'.
/'
after
up to the year 2021.
The Government
<:.::-.-,~,--,,-
kind attention
Limited (NTPC) on 13-07-2007
to n,eel Its reqLwement
of S3tj1W
of Power from NTPC·Bongaigaon
(BTPS).
drawing
between
23721487)
& secre.'tarY5A"'the Govt of Meghalava.
Power Depahmen:
..
in
tk-,,·,<
ti
P
I.'
Delhi being a land locked city with neither coal reserves nor hydel
potential is largely dependent upon CPSUs as major source of its power
supply, The average power purchase cost of Delhi is high vis-a-vis many
States in India resulting in the levy of a higher electricity tariff, The matter of
costly power was also discussed with your good self during our meeting on
28,04,2015 and you were kind enough to offer that If Delhi wants to surrender
the power allocated from few central sector stations it will get the full
cooperation in this regard from the Centra! Government
On the basis of the inputs from the deliberations conducted with all the
stake holders with an objective to reduce the burden of high electricity tariff, it
is proposed to surrender the power from the foHowing central sector stations
in the same sequence of priority as mentioned hereunder-
contd. ..2/-
(
~ 2
9.
Ch"amera-III (NHPC)
j
29
____
,..
;.
,_
__
""_. +10.
Parwati-lll (NHPC)
r..--r----------l
11.
Tehri HEP (THDC)
i
66
i
103
,
I Fuff-29-'''MW
-aflo'cation
to be
~urrend~~d
per~...,.a.,"'C..n"'C..e_n."'C..tIY'---:----:---l
i Full 66 MW allocation to be
I surrendered permanently
i Full 103 MW allocation to be
surrendered permanently
I
In view of the above, you are requested to accede to the request of
Delhi Government for surrender of above referred power with immediate
effect and reallocate the same to other needy States.
r\
h \ \ y,""
\}\J \ '\
.
"
Shri Piyush Goyal,
Hon'ble Minister of State (lie) for Power,
Coal and New & Renewable Energy,
Govt. of India,
Shram Shakti Bhawan, Raft Marg,
New Delhi - 110001.
,
I'
DEPARTMENT OF POWEI{
GOV'r. OF NeT OF DELHI
8'h Level, B-Wing, Delhi Secretariat, II' Estate, New Delhi '" 110002
No.I-'.I 1'-(4-J-)/-2-007/Powcr7i)a~t=jT'-cf?-Z:-(~""'--"-"'-'
The Director (OM)
Mini stry of Power
Dated: 13.08,2015--
ll!
<
<,
(6 ~)
Govt. ofIndia
((1, _;<;K
p~
Shrarn Shakti Bhawan
New Delhi -- 110 OOi
Sub; Surrender ofTPDDLsha.re
March,2017,
from Dadri - I from 1st September,
Ref: Our letter No. F'.11 (41 )J2007/Pow..:rIPart•
fl240 I dated 30th
2015 to 31st
July, 2014
I'
Sir,
This is with reference to our aforementioned letter, wherein inter-alia, we had
requested the Ministry of Power, Govt. of India for surrender of 180 MW of TPDDL
share from Dadri-I for a period of one year i.e. upto 31 SI August, 2015,
In respect of the same, the Ministry of Power had agreed to our request and
allocated 180 MW of TPDDL share from Dadri-I to the state of Bihar up to
~ 1.3S.20~_ 5.
,
,
It was also mentioned in the said letter that the situation would be reviewed
again after one year. Accordingly, we have reviewed the power situation and it has
been observed that the said power may be surrendered upto 31 ~I March, 2017. It is
also informed by TPDDL that they are in discussion with the state of Bihar for further
extending the reallocation of Dadri-I for a further period of 1 to 2 years.
It is therefore, requested that the Ministry of Power, Govt. of India may
reallocate this power to other needy states up to 31 st March, 2017.
Yours sincerely,
Copv_J.Q information to: 1.
Secretary to Hou'ble
2.
PS
10
Minister of Power. GNCTD
Secretary (Power), GNCTD
Addl. Secretary (Power)
27
Jan
2016 9:52
HP
LASER JET
FAX
/
p.4
. ~_;i,~~~r.:.j!~i;
, '{~V.o;iT'(l~t.Ji!!
'j-~~-~:,
.
~~~~;~?:
;,.:''
~~~:.J)lP.l!
.-~f:ft .l.i1:ijfPl~.:<,~,
":;·;;~~l~~~·
:: ...
}:;~:H!!'~~f!;n':~:'
, .'d:
-.
'
-
.,,
. ,,"
.;,
p.5
27
Jan
2016
--,"-(,'
i
HP
10:01
FAX
"
./
13
05/~~/?Ol~
LASERJET
rt1782 POOl
71
l.7VV~~M~"'Il·
ENERGY
U~
AND POWER
~ll\..1U.M
DEPAR.
",",.•.
:rr-I
tne .,.
(,J~I...
"'(""'0'
20,.c
., .
.:..
To,
1-11
The Under Secretary tothe
Government of India, Ther
Ministry of Power, Government of India,
Shram Shakti Bhawan,Rafi Marg,
•
New Delhi -110001.
SUBJECT: - SURRENDER OF CENTRAL AllOCATION
0
POWER FROM BARH ....•
11
STPP -660 MW_
Dear Sir,
The E.nergy and Power Department, Government of 5
thermal power from BARH 11(660 STPP, NTPC) i.e 9.96 MW
However the cost per unit is exceeding Rs6/Kwh and at sue
unviable for the state of Sikklm to continue drawing the
kkim has a share of 1.51% of
f share to the state of Sikkim.
a high rate it becomes
, totally
Itocated share of power. It is
therefore requested that the 1.51% of share allocated for Si kim may kindlybe
and the
same reallocated
surrender
It is
of the power allocated to Slkkirn
atso requested that an order fer the cancellatio
elsewhere.
ower
The Ene·rgy and
sincerely
withdrawn
regrets
the
of the allocated share may
kindly be issued at the earliest since Energy & power depa ment is liable to pay for the
capacity charges even though the department has not bee scheduling the power from
the said generating unit.
Thanking You,
I
(K.L Gyurmed)
rember
Copy to;-
1. Member Secretary (ERPC), Eastern Regional Power
14, G~f Club RoadTollygunje-Kolkata-7Dq033.
2. Regional ExecutiviDirector
(East-I), NTPC,Patna.
\
Committee
b~
e-'
&0
({~I
&,rf1
(w~) 8t..~R·1
r;,
1~i71C- Ht9 ~)
~
rf)
~(1
C-1
Ir~~
Scanned by CamScanner
.
Secretary/trading
3 Ma~
FAX NO. :2700398
FROM :POWER REFFORMS
2015 10:08AM
P2
I
I
'
.~
.Venu Pras
r1-
PrrncipalS
.
~
i
re/e. No
I
ad,
/As
eCt(.>tary
.
·0
ln~~1~7
D.O.
f
No,_t\t8/o'<i\~'fU5_1~31k
Govt PUnjab
~
SUblect:
~
..j
Department
~
Chandigarh,
Surrendered Share of P
o\
~
A) l'('
,I
.
t
Ower
')
-
of P oWer
the~:q"4~2cJb
I
**
by States In
various
Power StOtions.
.
Punjab is having surplus power available after meeting up the demand .
In the State from its Own sources as well as external Sources tied up under various
long term Power Purchase Agreements. Due to this, P$PCL is not scheduling power
from Anto. Aurvlo, Dadri and APCPL Jhojcr. Power from these NTPC Thermal Projects
can easily be surrendered permanently as underSr.
No.
Name of NTPC Installed
capacity
Plants
Allocated share of
Punjab MW(%)
(MW)
UN-allocated
Share of Punjab
MW(%)
( 4+S)
1.
Anta G/ L/R
419
48.98 (11.69)
16.26 (3.88)
65.24
2.
Auryia G/L/R
663
83.01 (12.52)
17.84 (2.69)
100.85
3,
Dadrl G/L/R
830
131.97(15.90)
15.02 ( 1.81)
146.99
4.
APCPL Jhajjor
I. MW to 23.1.
6 MW to
MW
23.1 MW
1500
--
f
o1~~
0/0' SEC'i
01
(P)
~ ov ~(j-/4~7-~r
: EO
~::~1-t;J)9
Sh. P.K. Pujari, 'AS
Secrefary,
Ministry of Power,
Government
of 'ndia, New Delhi
to
1500
04%
(
of
1.54%
MW)
I
Total MW
Yours sfncerely,
M
(AV~
_
~t:~)li
~/v'~JVt
.pc
0
GOVERNMENT OF MEGHALAYA
POWER DEPARTMENT
Cfivv''1
r-
\)J
/
*****
zo" April,
Dated Shillong, the
NO.POWER.95/2012/147.
2016.
To
T~ecretary,
~·~:~rnment
Ministry
of India,
of Power, Shram Shakti Bhavan, Rafi Marg,
110001
(Tele Fax: 23721487)
New Delhi -
Sub:-
Surrendering
of Power from NTPC-Bongaigaon
Thermal Power
Station (BTPS).
No.POWER-95/2012/107
Reference:-
Dated 15-05-2015
Sir,
Reference
of
is invited
to the above correspondence
53 MW of power from NTPC-Bongaigaon
without
the levy of fixed charges
~--~
-
Operation
that
w.e.f
up to the year
Power Station
the entire
allocation
(BTPS) was surrendered
2021, after having reviewed
the availability
---
of power vis-a-vis the demand
informed
Thermal
where
the 1st unit
situation.
of the 3x250
Further,
MW
the Executive
BTPS would
Director
be declared
00:00 Hrs of 01-04-2016 for which the allocated
(Comml)
NTPC has
as on Commercial
share for Meghalaya
is 18
MW.
Therefore,
we also propose
from the NTPC-BTPS , for which
,
necessary
to surrender
E-l1.r~C)cJ.2.AJ~)lAUJ~&
'If;HLz
of
18 MW of power
orders may kindly be issued in this regard.
~\
=
this share
!re
Commissioner
&
MANJPUR STATI;: POWER DISTRIBUTION COMPANY LIMITED
3rd Floor, New Directorate Building, near 2nd M.R Gate
Imphal- Dimapur Road, Imphal, Manipur - 795001
CIN: U40101MN2013SGC008343
To,
The Under Secretary (Power),
Ministry of Power, Govt. of India
Shram Shakti Bhawan, Rafi Marg
New Delhi - 110001 .
Subject:
Surrendering
Ref:
of Power Allocation from Unit 2 and 3 from NTPC Bongaigaon.
dated 1510 December 2015 regarding the
Ministry of Power Letter no. 3/6/2015-0M
surrender of power
Sir.
With reference to the aforementioned Ministry of Power letter above and in view of the
expected high energy tariff, MSPDCL with the approval of the State of Manipur.decided to surrender
the allocation of 31.4MW (15.7MW
Station.
tr""
x 2)
from Unit 2 and 3 of NTPC Bongaigaon
Thermal Power
2.
It is therefore requested that the Ministry of Power may kindly consider de-allocating
power from Unit 2 and 3 of NTPC Bongaigaon, details of which is given below:
SI.
No
1
Installed
Capacity
(in MW)
Station
NTPC Bongaigaon
,
Unit 1
250
the
Manipur Share
!
Proposal
I
%age
MW
!
6.28
15.7
To be allocated
I
2
NTPC Bongaigaon
Unit 2
250
6.28
15.7
Full permanent
surrender
3
I NTPC Bongaigaon
Unit 3
250
6.28
15.7
Full permanent
surrender
i
Thanking you,
yours
faithfully
fd'~1
~."i
___ . Sudhan, IAS)
-Managing Director
Manipur State Power Distribution
Company Limited
Copy to:
1.
The Commissioner
(Power), Govt. of Manipur for kind information
.
lA,
.--.-, •...
.--,
CHIEF MINISTER'S
VINE ET JOSHI, IAS
'l
COMMISS~ONER (POWER & PLANNING)
i/1 GOVT. OFMANIPUR
i(
r;;
Q)~
,;.
~,'J,U-~
.I ~~
y
Y')(:<
foY'
, ~
~--
(
.2.~
;jV
D.O.l/1/COM(POW}/2016
tmphal, the .26th April, 2016.
At the outset, I would like to convey my gratitude to the Ministry
v~
"Power
For All"
and "Ujwal
Discorn
Assurance
Fax: 0385·2451398 (0)
Ernail : vineet.joshi@nicin
}Lf
~)
'~"~~I
SECRETARIAT
IMPHAL - 795001, MANIPUR
Phone: 0385-2451272 (0)
Yojana
(UOAY)"
of Power (Govt. of India) for
initiatives
for improving the
distribution efficiency for DISCOMs all over India. Under UDAY, it is understood that Government of
India is planning to arrange Cheaper power to DISCOM to relieve the financial stress.
At present, total allocated share of Manipur from Central Generating
Stations is around 170
MW out of which the average availability is generally around 140 MW. Currently, the peak demand in
the State ranges from 130 to 150 MW. As such, the unrestricted demand in the State IS being met by
the present availability and allocation. In order to manage the seasonal fluctuations in availability and
demand, MSPDCL has also started banking of power (by banking surplus power in rnonsoon and
utilizing it in winter). Further, it may be noted that, with the implementation
of Pre-paid metering in most
of the urban areas in Manipur, the demand growth has 'been restricted
and there has been no
significant increase in demand in the State of late
At this juncture, NTPC Bongaigaon Plant has started commercial operations of its 1st unit of
250 MW from 01.04.2016. The other two units of 250 MW each are also expected to start commercial
operation in the next financial year. Manipur has an allocated share of around 47 MW (1570 MW x3) in
this plant. which is around 6.3% of the total capacity. This plant was expected to start commercial
operation from FY 2011-12 but has suffered inordinate delay in commissioning.
As Cl result, the capital
cost of the plant as well as the expected tariff of power to be generated has increased substantially. In
this context, it may also be noted that at present, the average power purchase cost in Manipur is
around INR 3.00 per unit. As compared to this, the tentative power pu rchase cost of NTPC Bongaigaon
is expected to be around INR 5.40 per unit, as also discussed
in several meetings with NTPC
representatives.
In such a scenario, if Manipur starts getting power from NTPC Bongaigaon, the State will not
only be unable to draw the additional power but will also be liable to pay for the high cost of power from
the Bongaigaon Station. This will put an undue financial burden on the State which is already under
financial stress. As such, Government
NTPC Bongaigaon
be surrendered.
of Manipur proposes that the allocated share of Manipur in
In this regard the Managing Director, MSPDCL (Manipur State
1/7.
1'1L'
I'L
11
U L L
ttt....·_I·jD
11.1.
r
V'·..'t....
Power Distribution Company Limited) had earlier given a request to Ministry of Power for surrendering
the allocation of Unit - 2 and 3 of NTPC Bongaigaon vide letter no. 2/21/2015/MSPDCL(Comml)8531-
32 dated 22nd February 2016 (copy enclosed).
Given the above facts, it is requested that urgent meettngs may please be called by the
Ministry of Power with all the stakeholders of the plant to expedite settlement of this issue.
Yours sincerely,
L
'-'/'1111
(Vineet Joshi)
Smt Jyoti Arora
Joint Secretary, Ministry of Power
Government of India
2/2