Update on Energy Imbalance Market and the EIM Transitional Committee March 2015 Page 1 Energy Imbalance Market is an important to tool for effective use of resources around the west • Builds on existing market: automated dispatch resolves imbalance & avoids congestion • Provides situational awareness, enhances reliability • No critical mass required, and no exit fees • Easily scalable, low-cost, low risk option for new participants • Preserves BAA autonomy, including compliance, balancing, and reserve obligations Page 2 Estimated benefits are consistent with earlier benefit analysis BAA November December Total ISO $0.65 $0.59 $1.24 PACE $1.05 $1.26 $2.31 PACW $1.39 $1.03 $2.42 Total $3.09 $2.88 $5.97 • The EIM generally dispatched energy transfers in a 15-minute interval between 80 and 120 megawatts (MW) with up to: • 200 MW from PAC East BAA (PACE) to PACW • 421 MW from PacifiCorp West BAA (PACW) and ISO • 220 MW from ISO to PACW March 2013 study by Energy + Environmental Economics (E3) for PacifiCorp and the ISO can be viewed here: http://www.caiso.com/Documents/PacifiCorp-ISOEnergyImbalanceMarketBenefits.pdf Page 3 EIM dispatching resources as designed to balance real-time supply/demand across the EIM areas 15-minute energy transfers (MWH) PACE to PACW PacifiCorp to ISO ISO to PacifiCorp (+) PacifiCorp to ISO / (‐) ISO to PacifiCorp Page 9 EIM Transitional Committee: guiding objectives drive long-term EIM structure Prompt & direct input Adaptable structure Promote successful implementation STEP 1 Stakeholder Transitional Committee Roles: •Advise on EIM matters •Propose long-term EIM structure STEP 2 Long-term EIM structure Page 5 Transitional Committee appointed in May 2014 1. Chair Rebecca Wagner, Commissioner, Public Utilities Commission of Nevada 2. Stephen Beuning, Xcel Energy, Inc. 3. Tony Braun, Braun Blaising McLaughlin & Smith, PC xxx(representing CA Municipal Utility Association) 4. Dede Hapner, Pacific Gas and Electric Company 5. Natalie Hocken, Representative from EIM Entity PacifiCorp 6. Travis Kavulla, Commissioner, Montana Public Service Commission 7. Kevin Lynch, Iberdrola Renewables 8. Mark Smith, Calpine Corporation 9. Walter Spansel, Representative from EIM Entity NV Energy 10. Robert Weisenmiller, Chair, California Energy Commission 11. Carl Zichella, Natural Resources Defense Council Page 6 The EIM Transitional Committee is following an iterative process POLICY AND PLAN DEVELOPMENT Issue Paper Straw Proposal Draft Final Proposal EIM TC Board Stakeholder Stakeholder Input Input We are here Page 7 Tentative stakeholder engagement schedule Date Event January 5 Issue Paper posted January 12 Stakeholder meeting on Issue Paper January 26 Stakeholder comments due March 5 EIM Transitional Committee meeting March 19 Committee to post Straw Proposal March 26 Stakeholder webinar on Straw Proposal April 16 Stakeholder comments due April 30 EIM Transitional Committee meeting May 21 Committee to post revised or final Straw Proposal May 28 Stakeholder webinar on revised or final Straw Proposal June 11 Stakeholder comments due June 25 EIM Transitional Committee meeting August 25 EIM Transitional Committee meeting Sept 17/18 ISO Board meeting Page 8 Issue paper describes three models representing a range of potential relationships Paper outlines • • • • The general relationship between the ISO and the EIM governing body; The nature and degree of the influence the EIM body should have over EIM rules. The nomination and selection process Funding and resources Central features common to each model • • • Independence of members Process for selecting new members Organization of state regulators Page 9 Model Advisory Committee Governing Board under Bylaws Autonomous Separate Entity Nomination and Selection Various stakeholder sectors identify nominees, subject to approval by the ISO Board Various stakeholder sectors identify nominees, subject to approval by the ISO Board initially and, subsequently, the EIM board Various stakeholder sectors and a member of the ISO Board identify nominees, subject to approval by EIM Sector Stakeholders Scope of Authority Advisory role only – Make recommendations to ISO Board about proposed tariff changes and other EIM-related matters Mixture of delegated authority and advisory role Have primary governing authority over the portions of the ISO tariff that address exclusively the EIM; secondary authority (advisory role to the ISO Board) over elements of the tariff that affect but are not limited to the EIM Complete rights under Section 205 to file changes to EIM tariff Have full rights under Section 205 for a free standing tariff separate from the ISO tariff. To change the market rules, the EIM organization would need to file at FERC and negotiate contractual changes with the ISO Relationship Members have contracts with ISO Through amendment, ISO bylaws No governance relationship - ISO and collectively serve as advisory establish role of EIM board and would provide services to the EIM with ISO body to ISO Board, like the Market Surveillance Committee and the Transitional Committee Resources/ Funding reflect delegation of authority ISO staff available to meet needs ISO staff available to meet needs of the committee; no additional of the committee; no additional funding needed funding needed organization, such as running the integrated market, pursuant to a contract with the ISO EIM organization hires staff, procures facilities, and pays the ISO for services under a contract. Recover costs through a new charge for EIM participation. Page 10 Resources EIM governance initiative page http://www.caiso.com/informed/Pages/StakeholderProcess es/EnergyImbalanceMarketGovernance.aspx EIM Transitional Committee Charter http://www.caiso.com/Documents/EnergyImbalanceMarket TransitionalCommitteeCharter.pdf Page 11 Questions Contact: Stacey Crowley Director, Regional Affairs scrowley@caiso.com (916) 608-7130 Page 12