THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WATER AND IRRIGATION GENERAL PROCUREMENT NOTICE Name of Procuring Entity: MINISTRY OF WATER AND IRRIGATION 1. The Government of the United Republic of Tanzania has set aside funds for the operations of the Ministry of Water and Irrigation during the Financial Year 2016/2017 2. The Ministry of Water and Irrigation is now issuing the General Procurement Notice in accordance with the requirement of the Public Procurement Act 2011 and Regulations 2013 for the purpose of informing bidders, suppliers, Non Consultants and Consultants and the General Public on Tender opportunities during the Financial Year 2016/2017 as indicated here below:Description 1 Tender No. 2 Lot Number 3 PRE-QUALIFICATION INVITATION AND AWARD OF TENDER INVITATION Procurement Invitation Closing Notification Tender Tender Notice of Vetting/ Method Date Date of Invitation Closingintention to Ratification Applicants Date Opening award Date of contracts 4 Notification Award Supply of fuel and lubricants ME/011/2016/2017/G/01 5 GOODS SS (GPSA) N/A 6 7 8 9 10 11 12 N/A N/A N/A N/A N/A N/A N/A Supply and Installation of air conditioners ME/011/2016/2017/G/02 GPSA/FWC N/A N/A N/A N/A N/A N/A N/A N/A Supply and installation of fire fighting equipment and training ME/011/2016/2017/G/03 GPSA/FWC N/A N/A N/A N/A N/A N/A N/A N/A Supply of office stationery ME/011/2016/2017/G/04 GPSA-RCB N/A N/A N/A 1 /08/ 2016 22/08/ 2016 12/09/ 2016 3 /10/ 2016 10 /10/ 2016 Service and maintenance of Motor Vehicles& Cycles ME/011/2016/2017/G/05 TEMESA /RCB N/A N/A N/A 1 /08/ 2016 22/08/ 2016 12/09/ 2016 3 /10/ 2016 10 /10/ 2016 Supply and Installation of scientific and specialised equipment and fittings ME/011/2016/2017/G/06 NCB N/A N/A N/A 1 /08/ 2016 22/08/ 2016 12/09/ 2016 3 /10/ 2016 10 /10/ 2016 Supply and Installation computers, scanners, printers, fax machines, photocopiers and other related equipment ME/011/2016/2017/G/07 ICB N/A N/A N/A 9/08/2016 8 /09/ 2016 7 /11/ 2016 8 /12/2016 15 /12 2016 Supply and Installation of office furnitures (Filing cabinets, fittings, desks, shelves, tables and chairs) ME/011/2016/2017/G/08 GPSA-RCB N/A N/A N/A 15 /08 2016 6 /09/ 2016 26 /09/ 2016 17 /10/ 2016 24 /10/ 2016 Supply of Survey equipment (Photographic equipment, GPS, etc) ME/011/2016/2017/G/09 NCB N/A N/A N/A 15 /08/ 2016 6 /09/ 2016 26 /09 2016 17 /10/ 2016 24 /10/ 2016 Supply of Survey equipment (Photographic equipment, GPS, etc) Supply of New four wheel drive vehicles ME/011/2016/2017/G/10 GPSA-ICB N/A N/A N/A 22 /08/ 2016 21 /09/ 2016 21 /11/ 2016 21 /12/ 2016 Supply of new motorcycles ME/011/2016/2017/G/11 NCB N/A N/A N/A 29 /08/ 2016 19 /09/ 2016 10 /10/2016 31 /10/ 2016 7 /12/ 2016 Supply and installation of computer software and licence fee ME/011/2016/2017/G/12 Shopping N/A N/A N/A 7 /09/ 2016 12 /09/ 2016 3 /10/ 2016 17 /10/ 2016 24 /10/ 2016 Supply and distribute labaoratory glasswares, tools and certified reference materials for 16 water quality laboratories Supply of Uniforms ME/011/2016/2017/G/13 NCB N/A N/A N/A 14 /09/ 2016 27 /10/ 2016 18 /11/ 2016 25 /11/ 2016 ME/011/2016/2017/G/14 GPSA-FWC N/A N/A N/A N/A Supply of household furniture, kitchen appliances, untensils and crockery ME/011/2016/2017/G/15 Shopping N/A N/A N/A N/A Services and Maintanance of Office Machines ME/011/2016/2017/G/16 GPSA-FWC N/A N/A N/A 5 /10/2016 N/A 29 /08/ 2016 19 /09/ 2016 N/A N/A 10 /10/ 2016 N/A 28 /12/ 2016 N/A N/A 31 /10 2016 N/A 7 /12/ 2016 N/A N/A NON -CONSULTANCY SERVICES Service Level Agrement to support the existing Water Sector MIS (Before Upscaling) ME/011/2016/2017/NC/01 SS NA NA NA 21/9/2016 26/9/2016 NA 31/11/2016 5/12/2016 Hosting of MoWI Systems (WPMS/MIS, etc), Domains (Including payment for GMS, GovSMS, etc) ME/011/2016/2017/NC/02 SS NA NA NA 21/9/2016 26/9/2016 NA 31/11/2016 5/12/2016 Provision of Internet for MoWI offices in Dar es ME/011/2016/2017/NC/03 Salaam and Dodoma Service and Repair of ICT equipment ME/011/2016/2017/NC/04 (Computers, Printers, Photocopiers, Scanners, etc) Calibration of analytical instruments in 16 water ME/011/2016/2017/NC/05 laboratories SS NA NA NA 21/9/2016 26/9/2016 NA 31/11/2016 5/12/2016 Shopping NA NA NA 21/9/2016 26/9/2016 NA 31/11/2016 5/12/2016 SS NA NA NA 21/9/2016 26/9/2016 NA 31/11/2016 5/12/2016 NA NA NA NA NA Provision Cleaning and Ground Maintanance Services ME/011/2016/2017/NC/06 GPSA FWC NA NA NA Provision Reception and Security Services ME/011/2016/2017/NC/07 GPSA FWC NA NA NA Supply of Air Travel Tickets ME/011/2016/2017/NC/08 RCB N/A N/A N/A 1 /08/ 2016 22/08/ 2016 12/09/ 2016 3 /10/ 2016 10 /10/ 2016 Provision of conference facilities ME/011/2016/2017/NC/09 RCB N/A N/A N/A 9 /08/2016 30 /08/2016 20 /09/ 2016 11 /10/ 2016 18 /10/ 2016 WORKS PRE-QUALIFICATION Description Tender No. Lot Number Rehabilitation of 4 dams (Itobo and Nkiniziwa in ME-011/2016-2017/W/01 Lot 1; Itobo Nzega District, Enguikument II and Lemioni in and Monduli District) in Internal Drainage Basin. Nkiniziwa in Nzega District Lot 2; Procurement Invitation ClosingMethod Date Opening Notification of Applicants Invitation for Tenders and Contract Signature Tender Invitation Date Tender ClosingOpening Notice of intention to award Date Vetting/ Ratification of contracts Award Notification Date NCB N/A N/A N/A 16/08/2016 06/09/2016 18/10/2016 17/11/2016 24/11/2016 Rehabilitation and construction of heardquarters ME-011/2016-2017/W/02 office and water lab building for Pangani Basin(Moshi, Arusha and Tanga) Headquaters and field office Rehabilitation and construction of heardquarters ME-011/2016-2017/W/03 office and water lab building for Rufiji basin (Iringa ,Mkoji and Kimani) BWO Headquaters and field offices NCB N/A N/A N/A 16/08/2016 06/09/2016 18/10/2016 17/11/2016 24/11/2016 NCB N/A N/A N/A 16/08/2016 06/09/2016 18/10/2016 17/11/2016 24/11/2016 Rehabilitation and construction of heardquarters ME-011/2016-2017/W/04 office and water lab building for Wami/Ruvu Basin ( Morogoro and Dodoma) BWO Headquaters and field offices NCB N/A N/A N/A 16/08/2016 06/09/2016 18/10/2016 17/11/2016 24/11/2016 Rehabilitation of 4 water laboratories in Dodoma, Tanga, Morogoro and Mtwara ME-011/2016-2017/W/05 NCB N/A N/A N/A 16/08/2016 06/09/2016 18/10/2016 17/11/2016 24/11/2016 Extension of KASHWASA Phase II and rehabilitation of HTM, Makonde, Wanging'ombe and water supply projects to more village Construction of water supply and sanitation projects in Babati and Mtwara Towns ME-011/2016-2017/W/06 NCB N/A N/A N/A 15/08/2016 05/09/2016 17/10/2016 07/11/2016 14/11/2016 ME-011/2016-2017/W/07 ICB N/A N/A N/A 15/08/2016 05/09/2016 17/10/2016 07/11/2016 14/11/2016 Construction of sanitation facilities for Kigoma , Lindi and Sumbawanga. Construction of water supply systems in Orkesment town Construction and supervision of water supply project for Mugango /Kiabakari national project and Butiama Construction and extension of water supply system from Lake Victoria to Nzega, Igunga and Tabora and Sikonge towns including villages along the pipeline. ME-011/2016-2017/W/08 NCB ME-011/2016-2017/W/09 NCB N/A N/A N/A 15/08/2016 05/09/2016 17/10/2016 07/11/2016 14/11/2016 ME-011/2016-2017/W/10 ICB NA NA NA 22/08/2016 21/09/2016 28/10/2016 21/11/2016 28/11/2016 ME-011/2016-2017/W/11 RICB NA NA NA 24/08/2016 23/09/2016 31/10/2016 21/11/2016 28/11/2016 Enguikument II and Lemioni in Monduli District) NCB NA NA NA 02/09/2016 23/09/2016 07/11/2016 21/11/2016 28/11/2016 Construction of water supply systems in Kilwa ME-011/2016-2017/W/13 Masoko town Construction of new office building, stockyards ME-011/2016-2017/W/14 Lot 1; and rehabilitation of warehouses for Maji Construction Central store of office building and stock yards Lot 2; Rehabilitatio Rehabilitation of five offices and construction ME-011/2016-2017/W/15 of new five offices for districts, small towns and NPs Rehabilitation of MoWI HQ and Dodoma ME-011/2016-2017/W/16 Lot 1; Offices. Rehabilitatio n of HQ Offices Lot 2; Rehabilitatio n of Dodoma offices NCB NA NA NA 9/19/2016 10/10/2016 11/21/2016 12/19/2016 12/27/2016 NCB N/A N/A N/A 29/11/2016 20/12/2016 31/01/2017 14/02/2017 21/02/2017 NCB N/A N/A N/A 01/03/2017 22/03/2017 03/05/2017 24/05/2017 31/05/2017 NCB N/A N/A N/A 01/03/2017 22/03/2017 03/05/2017 24/05/2017 31/05/2017 Rehabilitation of water sources, transmmission main, storage tanks, distribution system and house connections to improve Water supply services in Bariadi town ME-011/2016-2017/W/17 NCB N/A N/A N/A 3/3/2017 11/3/2017 7/5/2017 30/05/2017 3/06//2017 3/3/2017 11/3/2017 7/5/2017 30/05/2017 3/06//2017 Construction of water supply systems for Busega, Bariadi, Lagangabilili and Mwanhuzi towns. Rehabilitation of Iguluba, Wegero, Nanja dams ME-011/2016-2017/W/18 NCB N/A N/A N/A 3/3/2017 11/3/2017 7/5/2017 30/05/2017 3/06//2017 ME-011/2016-2017/W/19 NCB N/A N/A N/A Improving of water supply systems through Quickwin projects in 57 District and Small Towns Construction of water supply systems in Omulushaka/Kayanga ME-011/2016-2017/W/20 NCB N/A N/A N/A ME-011/2016-2017/W/21 NCB N/A N/A N/A Rehabilitation and expansion of water supply system in Geita Town ME-011/2016-2017/W/22 NCB N/A N/A N/A Construction of small scale water resource infrascture Construction of earth dams ME-011/2016-2017/W/23 NCB N/A N/A N/A 4/10/2016 3/11/2016 5/12/2016 19/12/2016 18/01/2017 ME-011/2016-2017/W/24 NCB N/A N/A N/A 4/10/2016 3/11/2016 5/12/2016 27/12/2016 26/01/2017 Construction of water supply infrastructure in Morogoro villages under support of JICA ME-011/2016-2017/W/25 NCB N/A N/A N/A 7/3/2017 6/4/2017 4/5/2017 25/05/2017 26/06/2017 Construction of water supply infrastructures for rural water supply project in Kigoma under the support of Belgium Construction of infrustructure ME-011/2016-2017/W/26 ICB N/A N/A N/A 7/3/2017 21/04/2017 9/6/2017 11/7/2017 Construction of water supply from Malagalasi River to Urambo and Kaliua towns ME-011/2016-2017/W/12 3/3/2017 3/3/2017 3/3/2017 11/3/2017 11/3/2017 11/3/2017 7/5/2017 7/5/2017 7/5/2017 30/05/2017 30/05/2017 30/05/2017 3/06//2017 3/06//2017 3/06//2017 3/3/2017 11/3/2017 7/5/2017 30/05/2017 3/06//2017 3/3/2017 11/3/2017 7/5/2017 30/05/2017 3/06//2017 3/3/2017 11/3/2017 7/5/2017 30/05/2017 3/06//2017 3/3/2017 3/3/2017 11/3/2017 11/3/2017 7/5/2017 7/5/2017 30/05/2017 30/05/2017 3/06//2017 3/06//2017 19/05/2017 Construction of water supply infrastructures for rural water supply project in Kigoma under the support of Belgium Construction of infrustructure ME-011/2016-2017/W/26 Construction of water supply infrastructure in rural Njombe, Urambo, Mbulu, Babati, Iramba, Singida Rural, Kilosa, under the support of WaterAID Construction of water infrastructure in Tabora Villages and istallation of New Water points ME-011/2016-2017/W/27 NCB N/A N/A N/A 7/3/2017 6/4/2017 4/5/2017 25/05/2017 26/06/2017 ME-011/2016-2017/W/28 NCB N/A N/A N/A 7/3/2017 6/4/2017 4/5/2017 25/05/2017 26/06/2017 Construction of water supply and sanitation projects in Babati and Mtwara Towns ME-011/2016-2017/W/29 ICB N/A N/A N/A 16/08/2016 30/09/2016 31/10/2016 21/11/2016 21/12/2016 Construction of water supply and sewerage infrastracture for Mwanza, Musoma, Bukoba, ME-011/2016-2017/W/30 ICB N/A N/A N/A 16/08/2016 30/09/2016 31/10/2016 21/11/2016 21/12/2016 Water supply improvement in Mpanda ME-011/2016-2017/W/31 ICB N/A N/A N/A 2/9/2016 17/10/2016 17/11/2016 8/12/2016 7/1/2017 Construction of water supply system in Manyoni ME-011/2016-2017/W/32 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Muheza ME-011/2016-2017/W/33 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Kasulu ME-011/2016-2017/W/34 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Kasulu ME-011/2016-2017/W/34 construction of water supply system in Sikonge ME-011/2016-2017/W/35 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 Construction of water supply systems for Makonde National Project Area ME-011/2016-2017/W/36 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 Construction of water supply systems for HTM National Project Area ME-011/2016-2017/W/37 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Njombe ME-011/2016-2017/W/38 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Mugumu ME-011/2016-2017/W/39 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Rujewa ME-011/2016-2017/W/40 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 construction of water supply system in Kilwa Masoko ME-011/2016-2017/W/41 ICB N/A N/A N/A 3/10/2016 18/11/2016 19/12/2016 9/1/2017 8/2/2017 Construction of water supply systems for Busega, Bariadi, Lagangabilili and Mwanhuzi towns Construction of Sewarage Systems, Pump stations, Westwater Treatment Plant, Vehicles and equipments For Musoma Municipality ME-011/2016-2017/W/42 ICB N/A N/A N/A 10/2/2017 28/03/2017 25/04/2017 17/05/2017 16/06/2017 ME-011/2016-2017/W/43 ICB N/A N/A N/A 10/2/2017 28/03/2017 25/04/2017 17/05/2017 16/06/2017 Construction of Sewarage Systems, Pump stations, Westwater Treatment Plant, Vehicles and equipments For Bukoba Municipality ME-011/2016-2017/W/44 ICB N/A N/A N/A 10/2/2017 28/03/2017 25/04/2017 17/05/2017 16/06/2017 CONSULTANCY SERVICES Request for Expression of Interest Basic Data Invitation of proposals and approval for award Description* 1 Consultancy service for carrying out service level agreement for support and enhancement of water point mapping system Consutancy service for training of CA staff on financial management (IFRS, IPSASs and ESAAG) and Ms in finance and CPA reviews to conduct assets verification and valuation Tender No. Lot No. 2 3 Procurement Selection Method Method 4 5 SSS SSS SSS SSS ME-011/2016-2017/C/1 ME-011/2016-2017/C/2 Contract Type 6 Time based Lumpsum Invitation Date ClosingOpening Notification Date Invitation Date 10 Submission/ Opening Date 11 Notice of intention to award Date 12 Notification to Award 7 8 9 N/A N/A N/A 20/07/2016 27/07/2016 23/08/2016 12/09/2016 13 N/A N/A N/A 25/08/2016 01/09/2016 23/09/2016 13/10/2016 Consutancy service for training of CA staff on financial management (IFRS, IPSASs and ESAAG) and Ms in finance and CPA reviews to conduct assets verification and valuation Consultancy service for carriying out studies on water for production and key water sector indicators Consultancy service for provision of technical support to WSDP Implementing Agencies in preparing PPP Projects Consultancy Service for review and dissemination of Water and Irrigation Policies of 2002 and their strategies Consultancy service for review of ICT strategy for MoWI Consultancy service for screening of 122 subprojects, evaluation and supervision of 39 ESIA and review monitoring 15 ESMP Consultancy service for carrying out study of institutional setup of the water resource research centre of excellence Consultancy service for preparation of detailed design for water supply projects in Handeni, Mombo, Korogwe, Kasela, Songe, Lushoto and Chala towns. ME-011/2016-2017/C/2 CQS CQS Lumpsum 05/09/2016 19/09/2016 07/10/2016 13/10/2016 20/10/2016 15/11/2016 05/12/2016 NCB QCBS Lumpsum 19/09/2016 03/10/2016 20/10/2016 04/10/2016 06/12/2016 13/02/2017 06/03/2017 MVS MVS Lumpsum N/A N/A N/A N/A N/A 7/11/2016 25/11/2016 MVS MVS Lumpsum N/A N/A N/A N/A N/A 15/09/2016 05/10/2016 CQS CQS Lumpsum 09/08/2016 23/08/2016 09/09/2016 14/09/2016 28/09/2016 31/10/2016 18/11/2016 CQS CQS Lumpsum 09/08/2016 23/08/2016 09/09/2016 14/09/2016 28/09/2016 31/10/2016 18/11/2016 NCB QCBS Lumpsum 01/08/2016 15/08/2016 02/09/2016 19/09/2016 19/10/2016 13/12/2016 06/01/2017 ME-011/2016-2017/C/3 ME-011/2016-2017/C/4 ME-011/2016-2017/C/5 ME-011/2016-2017/C/6 ME-011/2016-2017/C/7 ME-011/2016-2017/C/8 ME-011/2016-2017/C/9 Consultancy service for carrying out feasibility studies, detailed design and tender documents for projects in Ruangwa, Liwale, Nanyumbu, Kibaya, Mbulu, Magugu, Galapo, Dareda, Bashnet, Mahenge, Ifakara, Dakawa/Mvomero, Mikumi, Chamwino, Bahi, Gairo and Kondoa towns. Lot 1 Ruangwa, Liwale, Nanyumbu Lot 2 Mbulu, Magugu, Galapo, Dareda, Bashnet ME-011/2016-2017/C/10 Lot 3 Kibaya, Chamwino, Bahi, Kondoa Lot 4 Gairo, Mahenge, Ifakara, Dakawa/Mvo mero, Mikumi ICB QCBS Lumpsum 15/08/2016 14/09/2016 03/10/2016 07/11/2016 15/12/2016 20/03/2017 17/04/2017 ICB QCBS Lumpsum/ Time Based 15/08/2016 14/09/2016 03/10/2016 07/11/2016 15/12/2016 20/03/2017 17/04/2017 Consultancy service for development and ME-011/2016-2017/C/12 maintenance of comprehesive national fluoride database Consultancy service for training DUWS staff on ME-011/2016-2017/C/13 contract management and proffesional advancement Consultancy service to support capacity building for small UWSSAs by providing professional training on financial management, contract ME-011/2016-2017/C/14 management, and administration and retooling NCB CQS Lumpsum 22/08/2016 05/09/2016 22/09/2016 26/09/2016 10/10/2016 17/11/2016 08/12/2016 NCB QCBS Lumpsum 22/08/2016 05/09/2016 22/09/2016 10/10/2016 09/11/2016 12/01/2017 02/02/2017 NCB QCBS Lumpsum 22/08/2016 05/09/2016 22/09/2016 10/10/2016 09/11/2016 12/01/2017 02/02/2017 Consutancy Service for training Maji Central Store staff on specialized skills partaining to water projects construction materials NCS CQS Lumpsum 03/10/2016 17/10/2016 07/11/2016 24/11/2016 07/12/2016 17/01/2017 07/02/2017 NCS CQS Lumpsum 30/09/2016 17/10/2016 3/11/2016 21/11/2016 21/12/2016 6/2/2017 3/3/2017 NCS QCBS Lumpsum 30/09/2016 17/10/2016 3/11/2016 21/11/2016 21/12/2016 6/2/2017 3/3/2017 ICS QCBS Lumpsum 30/09/2016 31/10/2016 17/11/2016 6/12/2016 20/01/2017 28/03/2017 21/04/2017 ICS QCBS Lumpsum 30/09/2016 31/10/2016 17/11/2016 6/12/2016 20/01/2017 28/03/2017 21/04/2017 ICS QCBS Lumpsum 30/09/2016 31/10/2016 17/11/2016 6/12/2016 20/01/2017 28/03/2017 21/04/2017 Consultancy service for preparation of IWRMD Plan for Lake Victoria Basins Consultancy Service for Carrying out a Study on Institutional Setup of the Water Resources Centre of Excellence Consultancy Service for building design and suppervision for center of excellence and Wami Ruvu Basin Consultancy Service for ground Water aquifer Mapping Survey Consultancy Service for preparation future investiments(small scale infrastructure) Consultancy Service for Water Resources Information System Development(including ODSS&FEWS) ME-011/2016-2017/C/11 ME-011/2016-2017/C/17 ME-011/2016-2017/C/18 ME-011/2016-2017/C/19 ME-011/2016-2017/C/20 ME-011/2016-2017/C/21 ME-011/2016-2017/C/22 Consultancy Service for Water Resources Information System Development(including ODSS&FEWS) ME-011/2016-2017/C/22 Consultancy Service for Hydromet modernization and Raw Data Portal ME-011/2016-2017/C/23 ICS QCBS Consultancy service for design and supervision of construction of water supply infrastructure in ME-011/2016-2017/C/24 Morogoro villages under support of JICA NCS CQS Consultancy service for design and supervision of construction of Water supply infrastructures for rural water supply project in Kigoma under the support of Belgium Construction of infrustructure NCS CQS 31/10/2016 11/17/2016 12/6/2016 1/20/2017 3/28/2017 4/21/2017 15/08/2016 29/08/2016 12/9/2016 3/10/2016 2/11/2016 30/11/2016 19/12/2016 15/08/2016 29/08/2016 12/9/2016 3/10/2016 2/11/2016 30/11/2016 19/12/2016 15/08/2016 29/08/2016 12/9/2016 3/10/2016 2/11/2016 30/11/2016 19/12/2016 15/08/2016 29/08/2016 12/9/2016 3/10/2016 2/11/2016 30/11/2016 19/12/2016 15/08/2016 29/08/2016 12/9/2016 3/10/2016 2/11/2016 30/11/2016 19/12/2016 13/09/2016 27/09/2016 11/10/2016 28/10/2016 25/11/2016 17/01/2017 6/2/2017 Lumpsum/ time based ME-011/2016-2017/C/25 NCS Consultancy service for design and supervision of construction of of water infrastructure in Tabora Villages and istallation of New Water points Consultancy service for design and supervision of construction of water supply infrastructure for Same - Mwanga - Korogwe towns and earmarked villages to install 1,828 water point NCS CQS Lumpsum/ time based CQS Lumpsum/ time based ME-011/2016-2017/C/27 NCS CQS Lumpsum/ time based ME-011/2016-2017/C/28 NCS ME-011/2016-2017/C/29 30/09/2016 Lumpsum/ time based Consultancy service for design and supervision of construction of water supply infrastructure in rural Njombe, Urambo, Mbulu, Babati, Iramba, ME-011/2016-2017/C/26 Singida Rural, Kilosa, under the support of WaterAID Consultancy service for ESIA and RAP for the Mbezi Beach Waste water Treatment Plant Lumpsum QCBS Lumpsum Consultancy service for Institutional strengthening on Assets and Liabilities for the restructured DAWASA and DAWASCO; Consultancy service for Capacity building to component three staff Consultancy service for Supervision of water supply scheme from Ruvuma river to Mtwara Municipality including the villages along the main pipeline Consultancy Service for Technical Safeguard Assistance to Support During the Preparation stage of the World Bank’s WSDP II project Consultancy Service for updating, upgrading, refining and improvent of the PIM, workshops NCS QCBS Lumpsum 13/09/2016 NCS CQS Lumpsum 13/09/2016 NCS QCBS 27/09/2016 11/10/2016 28/10/2016 11/10/2016 1/11/2016 25/11/2016 17/01/2017 6/2/2017 ME-011/2016-2017/C/30 ME-011/2016-2017/C/31 NCS IC ME-011/2016-2017/C/33 17/01/2017 13/09/2016 27/09/2016 11/10/2016 28/10/2016 25/11/2016 17/01/2017 6/2/2017 1/10/2016 17/10/2016 31/10/2016 3/11/2016 1/12/2016 29/12/2016 19/01/2017 1/10/2016 17/10/2016 31/10/2016 3/11/2016 1/12/2016 29/12/2016 19/01/2017 Lumpsum NCS KEY: ICB NCB QCBS QBS SS CQS RCB CQ FWC GPSA 1/12/2016 29/12/2016 Lumpsum/ time based ME-011/2016-2017/C/32 ME-011/2016-2017/C/34 27/09/2016 IC Lumpsum - International Competitive Bidding - National Competitive Bidding - Quality and Cost Based Selection - Quality Based Selection Single Source Consultant Qualification Selection Restricted Competitive Bidding Competitive Quotation Framework Contract managed by Government Procurement and Services Agency Government Procurement and Supplies Agency PERMANENT SECRETARY, MINISTRY OF WATER AND IRRIGATION P.O. Box 9153 DAR ES SALAAM email ps@maji.go.tz