THE UNITED REPUBLIC OF TANZANIA
MINISTRY OF WATER AND IRRIGATION
GENERAL PROCUREMENT NOTICE
Name of Procuring Entity:
MINISTRY OF WATER AND IRRIGATION
1. The Government of the United Republic of Tanzania has set aside funds for the operations of the Ministry of Water and Irrigation during the Financial Year 2016/2017
2. The Ministry of Water and Irrigation is now issuing the General Procurement Notice in accordance with the requirement of the Public Procurement Act 2011 and Regulations 2013 for the purpose of informing
bidders, suppliers, Non Consultants and Consultants and the General Public on Tender opportunities during the Financial Year 2016/2017 as indicated here below:Description
1
Tender No.
2
Lot
Number
3
PRE-QUALIFICATION
INVITATION AND AWARD OF TENDER
INVITATION
Procurement Invitation Closing Notification
Tender
Tender
Notice of
Vetting/
Method
Date
Date
of
Invitation
Closingintention to Ratification
Applicants
Date
Opening
award Date of contracts
4
Notification
Award
Supply of fuel and lubricants
ME/011/2016/2017/G/01
5
GOODS
SS (GPSA)
N/A
6
7
8
9
10
11
12
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Supply and Installation of air conditioners
ME/011/2016/2017/G/02
GPSA/FWC
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Supply and installation of fire fighting
equipment and training
ME/011/2016/2017/G/03
GPSA/FWC
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Supply of office stationery
ME/011/2016/2017/G/04
GPSA-RCB
N/A
N/A
N/A
1 /08/ 2016
22/08/ 2016
12/09/ 2016
3 /10/ 2016
10 /10/ 2016
Service and maintenance of Motor Vehicles&
Cycles
ME/011/2016/2017/G/05
TEMESA
/RCB
N/A
N/A
N/A
1 /08/ 2016
22/08/ 2016
12/09/ 2016
3 /10/ 2016
10 /10/ 2016
Supply and Installation of scientific and
specialised equipment and fittings
ME/011/2016/2017/G/06
NCB
N/A
N/A
N/A
1 /08/ 2016
22/08/ 2016
12/09/ 2016
3 /10/ 2016
10 /10/ 2016
Supply and Installation computers, scanners,
printers, fax machines, photocopiers and other
related equipment
ME/011/2016/2017/G/07
ICB
N/A
N/A
N/A
9/08/2016
8 /09/ 2016
7 /11/ 2016
8 /12/2016
15 /12 2016
Supply and Installation of office furnitures
(Filing cabinets, fittings, desks, shelves, tables
and chairs)
ME/011/2016/2017/G/08
GPSA-RCB
N/A
N/A
N/A
15 /08 2016
6 /09/ 2016
26 /09/ 2016 17 /10/ 2016
24 /10/ 2016
Supply of Survey equipment (Photographic
equipment, GPS, etc)
ME/011/2016/2017/G/09
NCB
N/A
N/A
N/A
15 /08/ 2016
6 /09/ 2016
26 /09 2016 17 /10/ 2016
24 /10/ 2016
Supply of Survey equipment (Photographic
equipment, GPS, etc)
Supply of New four wheel drive vehicles
ME/011/2016/2017/G/10
GPSA-ICB
N/A
N/A
N/A
22 /08/ 2016 21 /09/ 2016 21 /11/ 2016 21 /12/ 2016
Supply of new motorcycles
ME/011/2016/2017/G/11
NCB
N/A
N/A
N/A
29 /08/ 2016 19 /09/ 2016
10 /10/2016 31 /10/ 2016
7 /12/ 2016
Supply and installation of computer software
and licence fee
ME/011/2016/2017/G/12
Shopping
N/A
N/A
N/A
7 /09/ 2016 12 /09/ 2016
3 /10/ 2016 17 /10/ 2016
24 /10/ 2016
Supply and distribute labaoratory glasswares,
tools and certified reference materials for 16
water quality laboratories
Supply of Uniforms
ME/011/2016/2017/G/13
NCB
N/A
N/A
N/A
14 /09/ 2016
27 /10/ 2016 18 /11/ 2016
25 /11/ 2016
ME/011/2016/2017/G/14
GPSA-FWC
N/A
N/A
N/A
N/A
Supply of household furniture, kitchen
appliances, untensils and crockery
ME/011/2016/2017/G/15
Shopping
N/A
N/A
N/A
N/A
Services and Maintanance of Office Machines
ME/011/2016/2017/G/16
GPSA-FWC
N/A
N/A
N/A
5 /10/2016
N/A
29 /08/ 2016 19 /09/ 2016
N/A
N/A
10 /10/ 2016
N/A
28 /12/ 2016
N/A
N/A
31 /10 2016
N/A
7 /12/ 2016
N/A
N/A
NON -CONSULTANCY SERVICES
Service Level Agrement to support the existing
Water Sector MIS (Before Upscaling)
ME/011/2016/2017/NC/01
SS
NA
NA
NA
21/9/2016
26/9/2016 NA
31/11/2016
5/12/2016
Hosting of MoWI Systems (WPMS/MIS, etc),
Domains (Including payment for GMS,
GovSMS, etc)
ME/011/2016/2017/NC/02
SS
NA
NA
NA
21/9/2016
26/9/2016 NA
31/11/2016
5/12/2016
Provision of Internet for MoWI offices in Dar es ME/011/2016/2017/NC/03
Salaam and Dodoma
Service and Repair of ICT equipment
ME/011/2016/2017/NC/04
(Computers, Printers, Photocopiers, Scanners,
etc)
Calibration of analytical instruments in 16 water ME/011/2016/2017/NC/05
laboratories
SS
NA
NA
NA
21/9/2016
26/9/2016 NA
31/11/2016
5/12/2016
Shopping
NA
NA
NA
21/9/2016
26/9/2016 NA
31/11/2016
5/12/2016
SS
NA
NA
NA
21/9/2016
26/9/2016 NA
31/11/2016
5/12/2016
NA
NA
NA
NA
NA
Provision Cleaning and Ground Maintanance
Services
ME/011/2016/2017/NC/06
GPSA FWC
NA
NA
NA
Provision Reception and Security Services
ME/011/2016/2017/NC/07
GPSA FWC
NA
NA
NA
Supply of Air Travel Tickets
ME/011/2016/2017/NC/08
RCB
N/A
N/A
N/A
1 /08/ 2016
22/08/ 2016
12/09/ 2016
3 /10/ 2016
10 /10/ 2016
Provision of conference facilities
ME/011/2016/2017/NC/09
RCB
N/A
N/A
N/A
9 /08/2016
30 /08/2016
20 /09/ 2016 11 /10/ 2016
18 /10/ 2016
WORKS
PRE-QUALIFICATION
Description
Tender No.
Lot
Number
Rehabilitation of 4 dams (Itobo and Nkiniziwa in ME-011/2016-2017/W/01 Lot 1; Itobo
Nzega District, Enguikument II and Lemioni in
and
Monduli District) in Internal Drainage Basin.
Nkiniziwa in
Nzega
District
Lot 2;
Procurement Invitation ClosingMethod
Date
Opening
Notification
of
Applicants
Invitation for Tenders and Contract Signature
Tender
Invitation
Date
Tender
ClosingOpening
Notice of
intention to
award Date
Vetting/
Ratification
of contracts
Award
Notification
Date
NCB
N/A
N/A
N/A
16/08/2016
06/09/2016
18/10/2016
17/11/2016
24/11/2016
Rehabilitation and construction of heardquarters ME-011/2016-2017/W/02
office and water lab building for Pangani
Basin(Moshi, Arusha and Tanga) Headquaters
and field office
Rehabilitation and construction of heardquarters ME-011/2016-2017/W/03
office and water lab building for Rufiji basin
(Iringa ,Mkoji and Kimani) BWO Headquaters
and field offices
NCB
N/A
N/A
N/A
16/08/2016
06/09/2016
18/10/2016
17/11/2016
24/11/2016
NCB
N/A
N/A
N/A
16/08/2016
06/09/2016
18/10/2016
17/11/2016
24/11/2016
Rehabilitation and construction of heardquarters ME-011/2016-2017/W/04
office and water lab building for Wami/Ruvu
Basin ( Morogoro and Dodoma) BWO
Headquaters and field offices
NCB
N/A
N/A
N/A
16/08/2016
06/09/2016
18/10/2016
17/11/2016
24/11/2016
Rehabilitation of 4 water laboratories in
Dodoma, Tanga, Morogoro and Mtwara
ME-011/2016-2017/W/05
NCB
N/A
N/A
N/A
16/08/2016
06/09/2016
18/10/2016
17/11/2016
24/11/2016
Extension of KASHWASA Phase II and
rehabilitation of HTM, Makonde,
Wanging'ombe and water supply projects to
more village
Construction of water supply and sanitation
projects in Babati and Mtwara Towns
ME-011/2016-2017/W/06
NCB
N/A
N/A
N/A
15/08/2016
05/09/2016
17/10/2016
07/11/2016
14/11/2016
ME-011/2016-2017/W/07
ICB
N/A
N/A
N/A
15/08/2016
05/09/2016
17/10/2016
07/11/2016
14/11/2016
Construction of sanitation facilities for Kigoma ,
Lindi and Sumbawanga.
Construction of water supply systems in
Orkesment town
Construction and supervision of water supply
project for Mugango /Kiabakari national project
and Butiama
Construction and extension of water supply
system from Lake Victoria to Nzega, Igunga and
Tabora and Sikonge towns including villages
along the pipeline.
ME-011/2016-2017/W/08
NCB
ME-011/2016-2017/W/09
NCB
N/A
N/A
N/A
15/08/2016
05/09/2016
17/10/2016
07/11/2016
14/11/2016
ME-011/2016-2017/W/10
ICB
NA
NA
NA
22/08/2016
21/09/2016
28/10/2016
21/11/2016
28/11/2016
ME-011/2016-2017/W/11
RICB
NA
NA
NA
24/08/2016
23/09/2016
31/10/2016
21/11/2016
28/11/2016
Enguikument
II and
Lemioni in
Monduli
District)
NCB
NA
NA
NA
02/09/2016
23/09/2016
07/11/2016
21/11/2016
28/11/2016
Construction of water supply systems in Kilwa ME-011/2016-2017/W/13
Masoko town
Construction of new office building, stockyards ME-011/2016-2017/W/14 Lot 1;
and rehabilitation of warehouses for Maji
Construction
Central store
of office
building and
stock yards
Lot 2;
Rehabilitatio
Rehabilitation of five offices and construction
ME-011/2016-2017/W/15
of new five offices for districts, small towns and
NPs
Rehabilitation of MoWI HQ and Dodoma
ME-011/2016-2017/W/16 Lot 1;
Offices.
Rehabilitatio
n of HQ
Offices
Lot 2;
Rehabilitatio
n of Dodoma
offices
NCB
NA
NA
NA
9/19/2016
10/10/2016
11/21/2016
12/19/2016
12/27/2016
NCB
N/A
N/A
N/A
29/11/2016
20/12/2016
31/01/2017
14/02/2017
21/02/2017
NCB
N/A
N/A
N/A
01/03/2017
22/03/2017
03/05/2017
24/05/2017
31/05/2017
NCB
N/A
N/A
N/A
01/03/2017
22/03/2017
03/05/2017
24/05/2017
31/05/2017
Rehabilitation of water sources, transmmission
main, storage tanks, distribution system and
house connections to improve Water supply
services in Bariadi town
ME-011/2016-2017/W/17
NCB
N/A
N/A
N/A
3/3/2017
11/3/2017
7/5/2017
30/05/2017
3/06//2017
3/3/2017
11/3/2017
7/5/2017
30/05/2017
3/06//2017
Construction of water supply systems for
Busega, Bariadi, Lagangabilili and Mwanhuzi
towns.
Rehabilitation of Iguluba, Wegero, Nanja dams
ME-011/2016-2017/W/18
NCB
N/A
N/A
N/A
3/3/2017
11/3/2017
7/5/2017
30/05/2017
3/06//2017
ME-011/2016-2017/W/19
NCB
N/A
N/A
N/A
Improving of water supply systems through
Quickwin projects in 57 District and Small
Towns
Construction of water supply systems in
Omulushaka/Kayanga
ME-011/2016-2017/W/20
NCB
N/A
N/A
N/A
ME-011/2016-2017/W/21
NCB
N/A
N/A
N/A
Rehabilitation and expansion of water supply
system in Geita Town
ME-011/2016-2017/W/22
NCB
N/A
N/A
N/A
Construction of small scale water resource
infrascture
Construction of earth dams
ME-011/2016-2017/W/23
NCB
N/A
N/A
N/A
4/10/2016
3/11/2016
5/12/2016
19/12/2016
18/01/2017
ME-011/2016-2017/W/24
NCB
N/A
N/A
N/A
4/10/2016
3/11/2016
5/12/2016
27/12/2016
26/01/2017
Construction of water supply infrastructure in
Morogoro villages under support of JICA
ME-011/2016-2017/W/25
NCB
N/A
N/A
N/A
7/3/2017
6/4/2017
4/5/2017
25/05/2017
26/06/2017
Construction of water supply infrastructures for
rural water supply project in Kigoma under the
support of Belgium Construction of
infrustructure
ME-011/2016-2017/W/26
ICB
N/A
N/A
N/A
7/3/2017 21/04/2017
9/6/2017
11/7/2017
Construction of water supply from Malagalasi
River to Urambo and Kaliua towns
ME-011/2016-2017/W/12
3/3/2017
3/3/2017
3/3/2017
11/3/2017
11/3/2017
11/3/2017
7/5/2017
7/5/2017
7/5/2017
30/05/2017
30/05/2017
30/05/2017
3/06//2017
3/06//2017
3/06//2017
3/3/2017
11/3/2017
7/5/2017
30/05/2017
3/06//2017
3/3/2017
11/3/2017
7/5/2017
30/05/2017
3/06//2017
3/3/2017
11/3/2017
7/5/2017
30/05/2017
3/06//2017
3/3/2017
3/3/2017
11/3/2017
11/3/2017
7/5/2017
7/5/2017
30/05/2017
30/05/2017
3/06//2017
3/06//2017
19/05/2017
Construction of water supply infrastructures for
rural water supply project in Kigoma under the
support of Belgium Construction of
infrustructure
ME-011/2016-2017/W/26
Construction of water supply infrastructure in
rural Njombe, Urambo, Mbulu, Babati, Iramba,
Singida Rural, Kilosa, under the support of
WaterAID
Construction of water infrastructure in Tabora
Villages and istallation of New Water points
ME-011/2016-2017/W/27
NCB
N/A
N/A
N/A
7/3/2017
6/4/2017
4/5/2017
25/05/2017
26/06/2017
ME-011/2016-2017/W/28
NCB
N/A
N/A
N/A
7/3/2017
6/4/2017
4/5/2017
25/05/2017
26/06/2017
Construction of water supply and sanitation
projects in Babati and Mtwara Towns
ME-011/2016-2017/W/29
ICB
N/A
N/A
N/A
16/08/2016
30/09/2016
31/10/2016
21/11/2016
21/12/2016
Construction of water supply and sewerage
infrastracture for Mwanza, Musoma, Bukoba,
ME-011/2016-2017/W/30
ICB
N/A
N/A
N/A
16/08/2016
30/09/2016
31/10/2016
21/11/2016
21/12/2016
Water supply improvement in Mpanda
ME-011/2016-2017/W/31
ICB
N/A
N/A
N/A
2/9/2016 17/10/2016
17/11/2016
8/12/2016
7/1/2017
Construction of water supply system in Manyoni ME-011/2016-2017/W/32
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Muheza
ME-011/2016-2017/W/33
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Kasulu
ME-011/2016-2017/W/34
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Kasulu
ME-011/2016-2017/W/34
construction of water supply system in Sikonge
ME-011/2016-2017/W/35
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
Construction of water supply systems for
Makonde National Project Area
ME-011/2016-2017/W/36
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
Construction of water supply systems for HTM
National Project Area
ME-011/2016-2017/W/37
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Njombe
ME-011/2016-2017/W/38
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Mugumu ME-011/2016-2017/W/39
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Rujewa
ME-011/2016-2017/W/40
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
construction of water supply system in Kilwa
Masoko
ME-011/2016-2017/W/41
ICB
N/A
N/A
N/A
3/10/2016 18/11/2016
19/12/2016
9/1/2017
8/2/2017
Construction of water supply systems for
Busega, Bariadi, Lagangabilili and Mwanhuzi
towns
Construction of Sewarage Systems, Pump
stations, Westwater Treatment Plant, Vehicles
and equipments For Musoma Municipality
ME-011/2016-2017/W/42
ICB
N/A
N/A
N/A
10/2/2017
28/03/2017
25/04/2017
17/05/2017
16/06/2017
ME-011/2016-2017/W/43
ICB
N/A
N/A
N/A
10/2/2017
28/03/2017
25/04/2017
17/05/2017
16/06/2017
Construction of Sewarage Systems, Pump
stations, Westwater Treatment Plant, Vehicles
and equipments For Bukoba Municipality
ME-011/2016-2017/W/44
ICB
N/A
N/A
N/A
10/2/2017
28/03/2017
25/04/2017
17/05/2017
16/06/2017
CONSULTANCY SERVICES
Request for Expression of Interest
Basic Data
Invitation of proposals and
approval for award
Description*
1
Consultancy service for carrying out service
level agreement for support and enhancement of
water point mapping system
Consutancy service for training of CA staff on
financial management (IFRS, IPSASs and
ESAAG) and Ms in finance and CPA reviews to
conduct assets verification and valuation
Tender No.
Lot No.
2
3
Procurement Selection
Method
Method
4
5
SSS
SSS
SSS
SSS
ME-011/2016-2017/C/1
ME-011/2016-2017/C/2
Contract
Type
6
Time
based
Lumpsum
Invitation
Date
ClosingOpening
Notification
Date
Invitation
Date
10
Submission/
Opening
Date
11
Notice of
intention to
award Date
12
Notification
to Award
7
8
9
N/A
N/A
N/A
20/07/2016
27/07/2016
23/08/2016
12/09/2016
13
N/A
N/A
N/A
25/08/2016
01/09/2016
23/09/2016
13/10/2016
Consutancy service for training of CA staff on
financial management (IFRS, IPSASs and
ESAAG) and Ms in finance and CPA reviews to
conduct assets verification and valuation
Consultancy service for carriying out studies on
water for production and key water sector
indicators
Consultancy service for provision of technical
support to WSDP Implementing Agencies in
preparing PPP Projects
Consultancy Service for review and
dissemination of Water and Irrigation Policies
of 2002 and their strategies
Consultancy service for review of ICT strategy
for MoWI
Consultancy service for screening of 122 subprojects, evaluation and supervision of 39 ESIA
and review monitoring 15 ESMP
Consultancy service for carrying out study of
institutional setup of the water resource research
centre of excellence
Consultancy service for preparation of detailed
design for water supply projects in Handeni,
Mombo, Korogwe, Kasela, Songe, Lushoto and
Chala towns.
ME-011/2016-2017/C/2
CQS
CQS
Lumpsum
05/09/2016
19/09/2016
07/10/2016
13/10/2016
20/10/2016
15/11/2016
05/12/2016
NCB
QCBS
Lumpsum
19/09/2016
03/10/2016
20/10/2016
04/10/2016
06/12/2016
13/02/2017
06/03/2017
MVS
MVS
Lumpsum
N/A
N/A
N/A
N/A
N/A
7/11/2016
25/11/2016
MVS
MVS
Lumpsum
N/A
N/A
N/A
N/A
N/A
15/09/2016
05/10/2016
CQS
CQS
Lumpsum
09/08/2016
23/08/2016
09/09/2016
14/09/2016
28/09/2016
31/10/2016
18/11/2016
CQS
CQS
Lumpsum
09/08/2016
23/08/2016
09/09/2016
14/09/2016
28/09/2016
31/10/2016
18/11/2016
NCB
QCBS
Lumpsum
01/08/2016
15/08/2016
02/09/2016
19/09/2016
19/10/2016
13/12/2016
06/01/2017
ME-011/2016-2017/C/3
ME-011/2016-2017/C/4
ME-011/2016-2017/C/5
ME-011/2016-2017/C/6
ME-011/2016-2017/C/7
ME-011/2016-2017/C/8
ME-011/2016-2017/C/9
Consultancy service for carrying out feasibility
studies, detailed design and tender documents
for projects in Ruangwa, Liwale, Nanyumbu,
Kibaya, Mbulu, Magugu, Galapo, Dareda,
Bashnet, Mahenge, Ifakara, Dakawa/Mvomero,
Mikumi, Chamwino, Bahi, Gairo and Kondoa
towns.
Lot 1
Ruangwa,
Liwale,
Nanyumbu
Lot 2
Mbulu,
Magugu,
Galapo,
Dareda,
Bashnet
ME-011/2016-2017/C/10
Lot 3
Kibaya,
Chamwino,
Bahi,
Kondoa
Lot 4 Gairo,
Mahenge,
Ifakara,
Dakawa/Mvo
mero,
Mikumi
ICB
QCBS
Lumpsum
15/08/2016
14/09/2016
03/10/2016
07/11/2016
15/12/2016
20/03/2017
17/04/2017
ICB
QCBS
Lumpsum/
Time
Based
15/08/2016
14/09/2016
03/10/2016
07/11/2016
15/12/2016
20/03/2017
17/04/2017
Consultancy service for development and
ME-011/2016-2017/C/12
maintenance of comprehesive national fluoride
database
Consultancy service for training DUWS staff on
ME-011/2016-2017/C/13
contract management and proffesional
advancement
Consultancy service to support capacity building
for small UWSSAs by providing professional
training on financial management, contract
ME-011/2016-2017/C/14
management, and administration and retooling
NCB
CQS
Lumpsum
22/08/2016
05/09/2016
22/09/2016
26/09/2016
10/10/2016
17/11/2016
08/12/2016
NCB
QCBS
Lumpsum
22/08/2016
05/09/2016
22/09/2016
10/10/2016
09/11/2016
12/01/2017
02/02/2017
NCB
QCBS
Lumpsum
22/08/2016
05/09/2016
22/09/2016
10/10/2016
09/11/2016
12/01/2017
02/02/2017
Consutancy Service for training Maji Central
Store staff on specialized skills partaining to
water projects construction materials
NCS
CQS
Lumpsum
03/10/2016
17/10/2016
07/11/2016
24/11/2016
07/12/2016
17/01/2017
07/02/2017
NCS
CQS
Lumpsum
30/09/2016
17/10/2016
3/11/2016
21/11/2016
21/12/2016
6/2/2017
3/3/2017
NCS
QCBS
Lumpsum
30/09/2016
17/10/2016
3/11/2016
21/11/2016
21/12/2016
6/2/2017
3/3/2017
ICS
QCBS
Lumpsum
30/09/2016
31/10/2016
17/11/2016
6/12/2016
20/01/2017
28/03/2017
21/04/2017
ICS
QCBS
Lumpsum
30/09/2016
31/10/2016
17/11/2016
6/12/2016
20/01/2017
28/03/2017
21/04/2017
ICS
QCBS
Lumpsum
30/09/2016
31/10/2016
17/11/2016
6/12/2016
20/01/2017
28/03/2017
21/04/2017
Consultancy service for preparation of IWRMD
Plan for Lake Victoria Basins
Consultancy Service for Carrying out a Study on
Institutional Setup of the Water Resources
Centre of Excellence
Consultancy Service for building design and
suppervision for center of excellence and Wami
Ruvu Basin
Consultancy Service for ground Water aquifer
Mapping Survey
Consultancy Service for preparation future
investiments(small scale infrastructure)
Consultancy Service for Water Resources
Information System Development(including
ODSS&FEWS)
ME-011/2016-2017/C/11
ME-011/2016-2017/C/17
ME-011/2016-2017/C/18
ME-011/2016-2017/C/19
ME-011/2016-2017/C/20
ME-011/2016-2017/C/21
ME-011/2016-2017/C/22
Consultancy Service for Water Resources
Information System Development(including
ODSS&FEWS)
ME-011/2016-2017/C/22
Consultancy Service for Hydromet
modernization and Raw Data Portal
ME-011/2016-2017/C/23
ICS
QCBS
Consultancy service for design and supervision
of construction of water supply infrastructure in
ME-011/2016-2017/C/24
Morogoro villages under support of JICA
NCS
CQS
Consultancy service for design and supervision
of construction of Water supply infrastructures
for rural water supply project in Kigoma under
the support of Belgium Construction of
infrustructure
NCS
CQS
31/10/2016
11/17/2016
12/6/2016
1/20/2017
3/28/2017
4/21/2017
15/08/2016
29/08/2016
12/9/2016
3/10/2016
2/11/2016
30/11/2016
19/12/2016
15/08/2016
29/08/2016
12/9/2016
3/10/2016
2/11/2016
30/11/2016
19/12/2016
15/08/2016
29/08/2016
12/9/2016
3/10/2016
2/11/2016
30/11/2016
19/12/2016
15/08/2016
29/08/2016
12/9/2016
3/10/2016
2/11/2016
30/11/2016
19/12/2016
15/08/2016
29/08/2016
12/9/2016
3/10/2016
2/11/2016
30/11/2016
19/12/2016
13/09/2016
27/09/2016
11/10/2016
28/10/2016
25/11/2016
17/01/2017
6/2/2017
Lumpsum/
time based
ME-011/2016-2017/C/25
NCS
Consultancy service for design and supervision
of construction of of water infrastructure in
Tabora Villages and istallation of New Water
points
Consultancy service for design and supervision
of construction of water supply infrastructure
for Same - Mwanga - Korogwe towns and
earmarked villages to install 1,828 water point
NCS
CQS
Lumpsum/
time based
CQS
Lumpsum/
time based
ME-011/2016-2017/C/27
NCS
CQS
Lumpsum/
time based
ME-011/2016-2017/C/28
NCS
ME-011/2016-2017/C/29
30/09/2016
Lumpsum/
time based
Consultancy service for design and supervision
of construction of water supply infrastructure in
rural Njombe, Urambo, Mbulu, Babati, Iramba, ME-011/2016-2017/C/26
Singida Rural, Kilosa, under the support of
WaterAID
Consultancy service for ESIA and RAP for the
Mbezi Beach Waste water Treatment Plant
Lumpsum
QCBS
Lumpsum
Consultancy service for Institutional
strengthening on Assets and Liabilities for the
restructured DAWASA and DAWASCO;
Consultancy service for Capacity building to
component three staff
Consultancy service for Supervision of water
supply scheme from Ruvuma river to Mtwara
Municipality including the villages along the
main pipeline
Consultancy Service for Technical Safeguard
Assistance to Support During the Preparation
stage of the World Bank’s WSDP II project
Consultancy Service for updating, upgrading,
refining and improvent of the PIM, workshops
NCS
QCBS
Lumpsum
13/09/2016
NCS
CQS
Lumpsum 13/09/2016
NCS
QCBS
27/09/2016
11/10/2016
28/10/2016
11/10/2016
1/11/2016
25/11/2016
17/01/2017
6/2/2017
ME-011/2016-2017/C/30
ME-011/2016-2017/C/31
NCS
IC
ME-011/2016-2017/C/33
17/01/2017
13/09/2016
27/09/2016
11/10/2016
28/10/2016
25/11/2016
17/01/2017
6/2/2017
1/10/2016
17/10/2016
31/10/2016
3/11/2016
1/12/2016
29/12/2016
19/01/2017
1/10/2016
17/10/2016
31/10/2016
3/11/2016
1/12/2016
29/12/2016
19/01/2017
Lumpsum
NCS
KEY:
ICB
NCB
QCBS
QBS
SS
CQS
RCB
CQ
FWC
GPSA
1/12/2016 29/12/2016
Lumpsum/
time based
ME-011/2016-2017/C/32
ME-011/2016-2017/C/34
27/09/2016
IC
Lumpsum
- International Competitive Bidding
- National Competitive Bidding
- Quality and Cost Based Selection
- Quality Based Selection
Single Source
Consultant Qualification Selection
Restricted Competitive Bidding
Competitive Quotation
Framework Contract managed by Government Procurement and Services Agency
Government Procurement and Supplies Agency
PERMANENT SECRETARY,
MINISTRY OF WATER AND IRRIGATION
P.O. Box 9153
DAR ES SALAAM
email ps@maji.go.tz