K-KT914Z - Kona INSTRUCTION MANUAL FRAMELESS BATHTUB ENCLOSURE KK019 IN LINE GLASS SLIDING SHOWER DOOR Please keep this manual and product code number for future reference and replacement parts ordering if necessary. IN LINE GLASS SLIDING SHOWER DOOR INSTALLATION INSTRUCTIONS FOR CURVED GLASS SLIDING SHOWER DOOR Congratulations! You have made the right choice in buying the shower system. We are convinced that you will be entirely satisfied with our product. READ CAREFULLY AND COMPLETELY BEFORE PROCEEDING IT IS RECOMMENDED THAT YOU WEAR SAFETY GLASSES AT ALL TIMES DURING INSTALLATION INSTALLATION OVER CERAMIC TILE If your shower door is to be installed over ceramic tile, tile should extend completely under both wall jambs. Silicone should be used to seal the line where ceramic tile meets the base. HOW TO CARE FOR YOUR DOOR Never use scouring powder pads or sharp instruments on metal work or glass panels. An occasional wiping down with a mild detergent diluted in water is all that is needed to keep the panels and aluminum parts looking new. Product specifications are subject to change without notice. REQUIRED TOOLS LIST 1/4” 1/8” DRILL BIT CERAMIC TILE DRILL BIT SCREWDRIVERS 5/16’’ SILICON DRILL LEVEL HEX NUT DRIVER PENCIL MEASURE TAPE MALLET PACKAGING CHECK LIST & HARDWARE 5 4 8 OR 10 (FOR ‘’PARIS POINT ’’ GLASS ONLY) SET OF HANDLES (2) SIDE GASKET (4) 12 11 SIDE GASKET (2) 13 MAGNETIC DOOR GASKET (2) 14 (M4 X 8) BOTTOM SLIDER SHIM (4) GLASS SUPPORT (8) 16 15 SCREW 1 3/8” LG (14) SCREW 3/8” LG (8) 18 17 (M4 X 35) SCREW CAP (8) WALL PLUG (8) (M4 X 8) SCREW ½” LG (8) EXPANDER CAP (2) PAGE 2 IN LINE GLASS SLIDING SHOWER DOOR 8 9 6 5 4 11 3 2 10 1 7 1 2 3 WALL JAMB (2) 4 EXPANDER (2) 5 FIXED PANEL (2) 6 7 SET OF HANDLES (2) SIDE GASKET (4) DOOR PANEL ASSEMBLY (2) BOTTOM TRACK (1) 8 9 10 11 SIDE GASKET WALL JAMB SIDE (2) TOP TRACK (1) MAGNETIC DOOR GASKET (2) GLASS SUPPORT (8) PAGE 1 DOOR INSTALLATION STEPS TOP TRACK (1) BOTTOM TRACK (1) Step 1 EXPENDER (2) + TRACK (2) + SCREW 1 3/8’’ LG (8) Step 2 INSERT WALL JAMBS PAGE 3 DOOR INSTALLATION STEPS Step 3 POSITION AND CENTER THE FRAME TOGETHER WITH WALLJAMBS ONTO THRESHOLD OF SHOWER BASE. Step 4 - ADJUST AND LEVEL THE FRAME ASSEMBLY. - MARK DRILLING LOCATION FOLLOWING PILOT HOLES. - REMOVE FRAME ASSEMBLY FROM BASE. ON BOTH SIDES PAGE 4 DOOR INSTALLATION STEPS 5A 5B Step 5 - INSERT THE WALL PLUGS (8) AND PUT IN EACH A DROP OF SILICONE. ON BOTH SIDES INTERIOR SHOWER SIDE Step 6 SECURE THE FRAME USING 1 3/8” SCREWS (6) PAGE 5 DOOR INSTALLATION STEPS Step TOP TRACK 7 INSTALL THE FIXED PANELS (2) BY SECURING THEM WITH THE GLASS SUPPORTS (8) & SCREW 15/32” LG (4). INTERIOR SHOWER SIDE ON BOTH SIDES GLASS SUPPORT GLASS BOTTOM TRACK INTERIOR SHOWER SIDE A B INTERIOR SHOWER SIDE INTERIOR SHOWER SIDE C PAGE 6 DOOR INSTALLATION STEPS Step 8 PRIOR TO INSTALL DOOR PANELS INSERT MAGNETIC DOOR GASKET (2) (OPTIONAL) ENFONCER PUSH DOWN 9C PUSH DOWN 9A INTERIOR SHOWER SIDE 9B INTERIOR SHOWER SIDE Step 9 INSERT DOOR PANELS INTO TOP & BOTTOM TRACK INTERIOR SHOWER SIDE PAGE 7 DOOR INSTALLATION STEPS Step 10 USE HEX NUT DRIVER OR PLIERS FOR VERTICAL DOOR ADJUSTMENT 10A LOOSEN TIGHTEN 10B 10D 10C 10E VERTICAL ADJUSTMENT Step INTERIOR SHOWER SIDE INSERT SIDE GASKET WALL JAMB SIDE (2) (both sides) 15 OR (FOR ‘’PARIS POINT ’’ GLASS ONLY) INTERIOR SHOWER SIDE TOP VIEW Step 11 INSTALL SIDE PANEL GASKET ONTO FIXED PANELS & DOOR PANELS (4) PAGE 8 DOOR INSTALLATION STEPS Step 12 - LEVEL AND ADJUST FRAME - FASTEN FRAME WITH SCREW 3/8” LG (8) + SCREW CAP (8) INTERIOR SHOWER SIDE B A INTERIOR SHOWER SIDE B INTERIOR SHOWER SIDE A PAGE 9 DOOR INSTALLATION STEPS Step 13 24 INSERT EXPANDER CAPS Hours Step 14 SILICONE EXTERIOR ON BOTH SIDES, ALONG THE WALL JAMBS AND WALLS. ALSO ALONG THE BOTTOM TRACK AND THE SIDE PANELS. PAGE 10