We apologize for any inconvenience that this construction may cause and appreciate your patience while
we work hard to improve The Crescent® for our customers.
Effective Tuesday, August 25
Parking Garage
For the next few weeks, all garage monthly parkers will need to continue to enter the premises using the
South end garage. Starting this week, additional reshoring for a small tree well is being installed on
the back ramp from G3 to G5 under the 100 building. See the attached map for areas currently
blocked in the garage.
The garage is continuing to be monitored daily for open spaces and we have had an average
of 100 available spaces each day.
We anticipate the North helical ramp in the Retail garage to be reopened mid-September while
simultaneously doing a switch over of reshoring in the Office Tower garage. This switch over will block
the remaining ramp from G3 to G5; however, it will open up the drive cut thru lanes for easier access
between levels and additional parking spaces.
Retail Area
The concrete for the tree wells and center water feature have been poured for the retail court area. This is
currently on schedule to be complete end of October. The construction walls around the area have been
lowered for easy viewing.
The Crescent Management Office
200 Crescent Court, Suite 250
Dallas, Texas 75201
Telephone: 214.880.4500 | Fax: 214.880.4506 | Email: jrogers@crescent.com
Palomino New Deck
Palomino's new deck is ready to be enjoyed with the addition of the added handrails. Be sure to go over
and check it out.
Retail Exterior East Side
The Maple Ave side of retail in front of The Capital Grille is still closed for work. This is scheduled to be
complete late October. Surface is being prepped for water proofing this week and for the tree wells to be
poured.
Motor Court East Side
Tree wells continue to be cut in the east side of the motor court. Working on surface waterproofing along
with the pouring of a sidewalk in front of the 100 building and along side of Starbucks. This is on
schedule to complete late October.
The Crescent Management Office
200 Crescent Court, Suite 250
Dallas, Texas 75201
Telephone: 214.880.4500 | Fax: 214.880.4506 | Email: jrogers@crescent.com
Stanley Korshak
New awning has been installed for Stanley Korshak.
The Crescent Management Office
200 Crescent Court, Suite 250
Dallas, Texas 75201
Telephone: 214.880.4500 | Fax: 214.880.4506 | Email: jrogers@crescent.com
Effective Tuesday, July 14
All monthly parkers MUST continue to use the south ramp for entering the garage until early September.
Please continue to follow signage for building exits. This does not affect visitor parking.
There are two options to enter the garage from the south end.
1. At the corner of McKinney Ave and Maple Ave by the entrance in front of the old Arcodoro
location.
2. Off Pearl St. just north of McKinney Ave in front of the 200 building.
Visitors will continue to enter and exit as normal.
To exit the garage, you will need to use the South exit ramp, access to Maple/Pearl St., or follow a new
route that will allow you to use the Maple and Cedar Springs exits after 4 p.m. Please follow new exit
signage placed throughtout the garage for all exit options.
To help with traffic flow, exit gates will be raised in the evenings to avoid congestion.
Shoring in the Garage
Due to the installation of trees wells, extra shoring is being installed in the garage to support the weight of
the scaffolding being used on the G1 level. This is done for an extra safety precaution and there is no
reason for concern. Each area of shoring is temporary and will be moved approximately every 30 days
until complete.
Effective Monday, April 6
The North Side of the 100 Building lobby doors will be locked
The 100 Building lobby doors will be locked and remained locked during the duration of construction.
However, they will unlock automatically in case of an emergency. Please access the Hotel, Gourmet
Restaurant and Starbucks via the 200 Building North lobby, west wing door. This will remain closed
for approximately 6 months.
North Ramps outside Stanley Korshak Remains Closed
All Retail parkers will need to enter and exit the Retail garage via Maple Ave. or Cedar Springs. Additional
police officers have been added in the afternoon to assist with traffic. Visitor parking remains available in
the Retail parking area but only accessible from the Maple Ave. or Cedar Springs entrances. The area
outside Palomino, along Cedar Springs, remains under construction. All valet continues to be available at
The Capital Grille or Rosewood Crescent Hotel.
The Crescent Management Office
200 Crescent Court, Suite 250
Dallas, Texas 75201
Telephone: 214.880.4500 | Fax: 214.880.4506 | Email: jrogers@crescent.com
G-1
McK
inne
y Av
e
4th Set shoring for tree wells
Ingress/Entry
Egress/Exit
Egress/Exit after 4:00 p.m.
EAST
Vision update as of August 25, 2015
l
SOUTH
01
A02.306
06
Blocked
off
NORTH
Cedar Springs
WEST
Pearl St
ap
M
ve
A
e
G-2 Reserved Parking
McK
inne
y Av
e
4th Set shoring for tree wells
Ingress/Entry
Egress/Exit
Vision update as of August 25, 2015
EAST
l
ap
SOUTH
Pearl St
M
ve
A
e
NORTH
Cedar Springs
WEST
G-3 and Lower
McK
inne
y Av
e
4th Set shoring for tree wells
Ingress/Entry
Egress/Exit
EAST
Vision update as of August 25, 2015
l
ap
SOUTH
Pearl St
M
ve
A
e
NORTH
Cedar Springs
WEST
Download