PUBLIC PROCUREMENT AND DISPOSAL OF PUBLIC ASSETS AUTHORITY PROCUREMENT AND DISPOSAL COMPLIANCE CHECK REPORT FOR NATIONAL ENTERPRISE CORPORATION (NEC) AUGUST 2007 1 TABLE OF CONTENTS ACRONYMS..................................................................................................................................3 1.0 INTRODUCTION .........................................................................................................4 1.1 OVERVIEW OF THE PROCURING AND DISPOSING ENTITY ........................4 1.2 BACKGROUND.............................................................................................................5 1.3 COMPLIANCE CHECK OBJECTIVES ....................................................................5 1.4 SCOPE OF COMPLIANCE CHECK ..........................................................................6 1.5 COMPLIANCE METHODOLOGY ............................................................................6 2.0 FINDINGS AND RECOMMENDATIONS ON GENERAL IMPLEMENTATION OF THE LAW................................................................................................................8 3.0 AGREED ACTIONS FOR FOLLOW-UP ................................................................22 2 ACRONYMS PPDA Act Public Procurement and Disposal of Public Assets Act, 2003 PPDA Regulations Public Procurement and Disposal of Public Assets Regulations, 2003 PPDA Public Procurement and Disposal of Public Assets Authority PDE Procuring and Disposing Entity PDU Procurement and Disposal Unit NEC National Enterprise Corporation 3 1.0 INTRODUCTION 1.1 OVERVIEW OF THE PROCURING AND DISPOSING ENTITY The name of the Procuring and Disposing Entity is National Enterprise Corporation (NEC) and its Headquarters are located in Kampala. This Entity has subsidiaries which include; NEC Construction Works and Engineering, Luwero Industries which is engaged in manufacturing hardware and is located in Nakasongola and NEC Farm Katonga. There are two (2) new subsidiaries being considered by the Board for possible establishment namely; NEC Tractor Project and NEC Shoe Manufacturing Plant. NEC Construction was delegated powers to handle its own procurements and disposal while Luwero Industries is considered a classified area by the Board. Legal Status and Mandate NEC was established by an Act of Parliament Cap 312 Vol.12. as a commercial enterprise. Its mandate is to own and hold property and carry out business to earn a profit to be used to improve the welfare of the members of the Uganda Peoples Defence Forces (UPDF). The Governing body of NEC is a Board of Directors which was recently appointed and comprising of 13 members. They are: 1. Eng. Andruale Awuzu - Chairman 2. Eng. Ivan Mbabazi Batuma - Member 3. Dr. Pascal Odoch - Member 4. Mr. Baalwa Isabirye Daniel - Member 5. Mr. Mulindwa Birimumaaso - Member 6. Ms. Gertrude C. Kulany - Member 7. Hajjat Aphwa K. Sebyala - Member 8. Prof. Foster E. Byaruhanga - Member 9. Prof. Victoria Mwaka Nakiboneka - Member 10. Mr. George Willy Odwong Member - 4 11. Mrs. Rosettie K. Byengoma - Member 12. Brig. Robert Rusoke - Member 13. Col. (Rtd) Fred Mwesigye - Managing Director Number of Staff: The entity has approximately 30 members of staff at its Headquarters, 100 at Luwero Industries and 100 at NEC Construction. The Managing Director, Col. (Rtd) Fred Mwesigye is the Accounting Officer. Source of Funds: The entity’s source of funding is the Government through the Consolidated Fund as well as funds generated by the above mentioned subsidiaries. Volume of expenditure on procurements: The entity’s budget is Ugs. 1.5 billion of which, approximately 60% is spent on procurement. The entity’s biggest procurement budget is spent in the engineering and construction sector. 1.2 BACKGROUND The Public Procurement and Disposal of Public Assets Authority (PPDA) is the regulatory and oversight agency that advises Government on matters relating to public procurement and disposal. Under Section 6 (d) and 7 (r) of the Public Procurement and Disposal of Public Assets Act (PPDA Act) and Regulation 6 (e) (iii) of the Public Procurement and Disposal of Public Assets Regulations (PPDA Regulations) of the Public Procurement and Disposal of Public Assets Regulations, the Authority is mandated to monitor compliance of Procuring and Disposing Entities, administer and enforce compliance with all the provisions of the Act, Regulations, Guidelines, solicitation documents and specification standards issued by the Authority. To this end, the Authority embarked on a compliance check on NEC on 13th and 14th August 2007. 1.3 1. COMPLIANCE CHECK OBJECTIVES To establish whether NEC conducts procurement and disposal in a competitive, transparent, fair and non-discriminatory manner in accordance with the PPDA Act and 5 Regulations. 2. To establish whether NEC uses the Standard Bidding Documents and Guidelines issued by the Authority. 3. To ascertain the level of compliance with the PPDA Act and Regulations. 4. To report on the performance of the key players in the procurement cycle in the entity. 1.4 SCOPE OF COMPLIANCE CHECK The assignment covered procurements and disposals conducted in the period July 2006 to May 2007. Specifically, this exercise entailed: i. Reviewing the whole procurement process of sampled activities from requisition to contract management. ii. Reviewing the internal control system as regards the procurement and disposal processes. iii. Ascertaining the use of standard bidding documents and observance of the bidding thresholds and periods. iv. Assessing whether procurements and disposals are conducted in a transparent, fair and non-discriminatory manner. 1.5 COMPLIANCE METHODOLOGY The compliance check team reviewed the following documents: 1. Minutes of the Contracts Committee for the period July 2006 to May2007. 2. Procurement and disposal reports for the period July 2006 to May 2007. 3. Records of contract management for the period July 2006 to May 2007. 6 4. List of pre-qualified providers for the Financial Year 2006 – 2009. 5. Contract documents. The compliance team met the following: • Colonel (Rtd.) Fred Mwesigye - • Mr. Peter Rukasi - Chairman, Contracts Committee • Mr. J.B. Suuza - Member, Contracts Committee • Mr. Daniel Mukombozi - Member, Contracts Committee (Lawyer) • Ms. Ann Zawedde - Secretary, Contracts Committee • Mr. George Odongo - Marketing Officer • Mr. Ijoot Eric - Chief Accountant Accounting Officer, The compliance team met members of the Procurement and Disposal Unit which consists of 2 persons namely: • Ms. Alice Zahura - Assistant Procurement Officer • Mr. C. Twinamatsiko - Procurement Clerk 7 2.0 FINDINGS AND RECOMMENDATIONS ON GENERAL IMPLEMENTATION OF THE LAW NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE 1. Procurement • Structures Accounting Officer: The Managing Director, Colonel (Rtd.) Fred Mwesigye is the Accounting Officer. • Contracts Committee: The Contracts Committee has four (4) members and was approved by the PS/ST on 24th December 2004 and expires on 24th December 2007. • The following members currently comprise • The Accounting Officer the Contracts Committee: should i. Mr. Peter Rukasi ii. Mr. J.B. Suuza ensure composition Chairperson of full the Contracts Committee in Member iii. Mr. Daniel Mukombozi Member accordance with Third iv. Ms. Ann Zawedde Secretary Schedule of the PPDA Act by appointing a fifth member on the Committee and forward the name to PS/ST for approval. • In its response, the entity communicated a new list 8 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE of Contracts Co mmittee members as follows: • Mr. Peter Rukasi Chair man • Mr. Daniel Mukombozi Secretary • Mr. Joshua Abaho Member • Mr. Herbert Kaawa Member • Mr. Ishmael Katamanywa Member • The entity should avail PS/ST’s approval of the above Contracts Committee. • The Contracts Committee meets on average once a month. A file comprising of signed minutes was availed to the compliance team. • The Contracts Committee minutes are • however not detailed and indicate only the Committee best evaluated bidder. There is no reference should be detailed so that to other bidders that participated in the it is clear as to how and Detailed Contracts minutes process. 9 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE why decisions are arrived at. The subject of procurement, procurement method used, number of bidders invited, summary of the evaluation process and the best evaluated bidder’s contract price should be included in the minutes. • The Contracts Committee has not been • In its response, the entity trained by PPDA. There is need to train requested PPDA to fix them on the roles and responsibilities of the training within the last Committee as well as the different players two weeks of February in the procurement process since these are 2008 not clear for example, the Accounting Accounting Officer, User Officer Departments nominates the evaluation committee, the Assistant Procurement Officer signs PP Form 20 as for training the and Contracts Committee. the authorising officer. • Contracts • PPDA Regulation 169 Committee is also the Chairperson of the (7) states that in order to Evaluation Committee. maintain independence The Chairperson of the of functions and powers, a member of a contracts committee 10 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE shall not be a member of an evaluation Committee. This should be strictly adhered to in future procurements. • The Accounting Officer appoints members of the Evaluation Committee. • PPDA Regulation 169 (2) provides that the membership of Evaluation the Committee shall be recommended by the Procurement and Disposal Unit and approved by the Contracts Committee using PP Form 40 in the Ninth should Schedule, be this strictly adhered to in future procurements. • Procurement and Disposal Unit: The • The Accounting Officer PDU is manned by two (2) persons who are should not qualified in procurement and disposal. Procurement They have received training from PPDA on Disposal Unit at an the appropriate in new procurement and disposal establish a and level framework. They are : accordance with Section • 30 of the PPDA Act and Alice Zahura – Procurement Assistant 11 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE • Regulation 57 of the Twinamatsiko C – Procurement Clerk PPDA Regulations. • In its response, the Entity informed the Authority that the PDU had been with an reinforced experienced member of staff in the names of Lt. Eric Bazarwangye. • 2. Procurement • Reporting User Departments: (i) Works (ii) Information Technology (iii) Finance and Administration At the time of the compliance check the • The entity should submit entity had submitted monthly reports up to timely monthly reports June 2007. in accordance with the Fifth Schedule of the PPDA Regulations. • In its response, the Entity pledged to submit timely monthly reports. • Wrong Procurement Reference Numbers • The Entity is advised to were observed in some procurements. use correct reference 12 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE numbers in accordance with Guideline 2/2003 of the PPDA Regulations. • The monthly reports reviewed indicate • The splitting of procurements particularly in the aggregate its procurement of stationary. procurements in entity should accordance with PPDA Regulation 99. • The entity had not submitted the report on • The entity should submit Contracts in excess of USD 200,000 for the reports on contracts in period July 2006 to December 2006. excess of USD 200,000 as soon as possible. • There were no reports submitted by the • PPDA Regulations 66- subsidiaries of NEC and the procedure for 72 delegation to the subsidiaries had not been procedure for delegation followed. to a sub-division of the provides the Entity and this should be followed. • • Monthly reports procurement on and disposal submitted to the Authority should include 13 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE those from the NEC subsidiaries. 3. Procurement • Planning The entity did not ha ve a procurement plan • The for the current FY 2007/08 consequently, prepare a procurement all procurements are adhoc. plan in accordance with entity should Regulation 96 of the PPDA Regulations and submit it to the Authority in accordance with the Circular to all Accounting Officers. • In its response, the submitted a Entity procurement plan for FY 2007/08. 4. Pre - • The document used to solicit for bids under • PPDA Regulation 128 qualification of Prequalification Providers Bidding Document issued by the Authority of and therefore it is not clear what evaluation documents issued by the criteria was used and whether the terms Authority were clear. mandatory. was not a Standard (1) provides that the use standard Regulation solicitation shall be PPDA 128 (2) further provides that a procuring and disposing entity shall appropriate use the standard 14 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE solicitation documents issued by the Authority for each procurement requirement. • The entity had a pre-qualified list of • The entity should use the providers for three financial years i.e. FY Standard Bidding 2006/2007- 2008/2009 however, PPDA Document was not satisfied with the evaluation PPDA process since it was not done in accordance qualification with the law. quality providers for the issued for by Pre- and pre- next three financial years. • The following categories had only one • PPDA Regulation 142 provider: should be used in - Uniforms developing shortlists. At - Animal Drugs least - Fuel and Lubricants should be invited for - Office Furniture each - Stationary accordance with PPDA - Engraving Regulation 117 (3). - Telephone repairs & accessories - Air Ticketing three providers procurement in - Fire Equipment • Firms which are not on the Entity’s pre- • Only qualified list are invited to bid e.g M/s pre-qualified providers should be used to Kengrow Industries Ltd for computers and provide various goods, 15 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE telephone sets works and services. PPDA Regulation 142 should be used in updating the providers register. 5. Procurement • The compliance team noted that the • Contracts Committee methods and Contracts Committee minutes do not state minutes should clearly use of PP the approved Procurement method. state Forms the procurement method approved and any other relevant details. • The Entity uses the direct procurement • Clause 6 (1) of the method without sufficient justification as in Fourth Sche dule of the the case of procurement of consultancy PPDA Act provides the services from M/s Arch Tech Consults and circumstances under procurement of consultancy services for which direct NEC M/s procurement Associated Surveyors at a cost of Ushs may be used. Farm at Katonga from the method 10,000,000. • The compliance team observed that the • The entity was informed estimated cost on PP Form 20 is the one that this was an irregular which is always quoted by the best practice which had to be evaluated bidder. The entity explained that stopped and the proper the cost on the PP Form is that of the best procedure evaluated bidder since they first obtain establishing quotes and then prepare the PP Form based estimated of the price and 16 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE on the best evaluated bidder’s quote. method of procurement before soliciting for quotes should be followed in accordance with the law. • The entity uses PP Forms especially PP • The balance remaining Form 3, 20, 209, 51 e.t.c. However, PP on PP Form 20 should Form 20 is not duly filled in some be procurements and the balance remaining is accordance with PPDA not indicated. Regulation indicated in 104 to ensure that the entity does not commit government without adequate funding. • The Assistant Procurement Officer signs on • PP Form 20 should be PP Form 20 as the authorising officer in duly signed by the some procurements contrary to PPDA authorised Regulation 105 (3). namely, the originating officials officer (user), authorising officer (some one in charge of finance) and confirmation of funding (Accounting officer). • The entity uses PPDA’s evaluation report formats. 17 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE • The entity uses PPDA standard bidding documents in some procurements namely Construction of a similar house in Karama Training house. 6. The entity does not use the Standard forms • The entity should use the award of of Contracts issued by the Authority. Standard contracts However, the compliance team noted some Contract issued by the contract documents signed betwe en the Authority. Procedure for • forms of entity and providers for example, in the Procurement of Architectural Consultancy Services for building structures at Namanve by M/s Arch Technical Consults Ltd. • The Local Purchase Orders are managed by the PDU. • The entity conducts negotiations on price as shown in the above • mentioned PPDA Regulation 219 (3) (c) states under that procurement where prices were negotiated negotiations a from Ushs.8,378,000 /= to 4,720,000 /=. competitive procurement methods shall not be conducted primarily for the purposes of reducing prices. • Retrospective approvals were noted i.e. for • Retrospective approvals 18 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE fumigation services at Ug.shs 28m from are not permitted under M/s T & K Commercials. the law. The Contracts Committee should approve the Procurement and method Solicitation Documents in accordance with Section 28 (c) of the PPDA Act. • The entity does not use PPDA standard • notices in the Notification of Award. PPDA standard notices as provided for in the Seventh Schedule should be used in the Notification of Contract Award. 7. Display of The compliance team noted that the entity • The Statutory has a Procurement Notice Board outside advised Notices on the PDU where all Procurement Notices ensure Notice Board are displayed. Procurement Notices are compliance the PDU that displayed team on Procurement to only the Notice Board. 9. Ethical Code • Members of the Contracts Committee do • PPDA Regulation 53 by Contracts not sign the Code of Ethics prior to (2) (b) states that the Committee meetings consequently, they are not bound minutes to act ethically. contracts of each committee 19 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE meeting shall include the code of ethics signed by all members and other persons attending the meeting using PP Form 210 Part This should be strictly adhered to. 10. Contract • Management No contract management records were • Contract availed to the compliance team and records should be kept therefore it was difficult to ascertain by the User Department whether procurements are implemented in according to contractual obligations. Regulation 260 of the management accordance with PPDA Regulations. • The Procurement and Disposal Unit should get involved in contract monitoring in accordance with Regulation 258 (3) of the PPDA Regulations 2003. 11. Record Keeping • The entity keeps procurement records in • The entity was advised separate files. to ensure that all documents listed under 20 NO ISSUE FINDINGS AND OBSERVATIONS RECOMMENDATIONS & ENTITY’S RESPONSE PPDA Regulation 90 are kept on file by the PDU. 12. Complaints • The compliance team was informed that the entity had not handled any complaints from bidders on procurement or disposal. 13. Suspension of • Providers The team was informed that the entity had not considered suspension of any provider for breach of the PPDA Act, Regulations and best practices. 14. Disposal • The compliance team was informed that no The items had yet been identified for disposal. compliance team informed the entity of a new circular by the Permanent Secretary/Secretary to the Treasury on the powers of the Accounting officer to appoint Board s of Survey, issued July 2006. 21 2.2 GENERAL OBSERVATIONS 2.2.1 There is need to conduct training for the Accounting Officer, the Contracts Committee, Procurement and Disposal Unit and User Departments particularly on the following: • Preparation of procurement plans • Format for Procurement Reference Numbers • Initiation of Procurements using PP FORM 20 • Independence of functions and separation of powers by the Procurement Structures • Delegation of powers 2.2.2 The Best Evaluated Bidder’s prices are identical to the estimated costs indicated on PP Form 20 which indicates that there may be collusion between staff within the Entity and the bidders as evidenced in the procurement of Insurance Services from NIC at a cost of Ushs 7,025,000/= and printing of Freedom Fighters Magazine by M/s TTB Investments at a cost of Ushs. 2,800,000/=. 2.2.3 The compliance team noted that it required clearance to visit Luwero Industries. The Accounting Officer informed the team that clearance should first be sought by the team from the Permanent Secretary, Ministry of Defence. 3.0 AGREED ACTIONS FOR FOLLOW-UP 3.1 The Accounting Officer should nominate the fifth member of the Contracts Committee in accordance with the PPDA law and submit the name to the Permanent Secretary/Secretary to the Treasury for approval by January 2008. 3.2 The Accounting Officer should establish a Procurement and Disposal Unit at an appropriate level in accordance with the PPDA law by June 2008. 3.3 The Accounting Officer should delegate procurement and disposal to NEC subsidiaries in accordance with the PPDA law by January 2008. 22 3.4 The entity should communicate to PPDA and request for training for the Accounting Officer, Contracts Committee, Procurement and Disposal Unit and User Departments by December 2007. 3.5 The entity should use the Standard Bidding Document issued by PPDA for Prequalification and pre-quality providers for the next three financial years by March 2008. 3.6 The entity should prepare a procurement plan for the Financial Year 2007/08 and submit it to the Authority by December 2007. 3.7 The Authority is considering preparing a Guideline for Commercial Entities to add ress their peculiar operations that require them to comply with the PPDA Act while at the same time competing with providers in the private sector by the end of the Financial Year. 3.8 The Authority will write to the Permanent Secretary, Ministry of Defence requesting for clearance to visit Luwero Industries as part of the Compliance Check exercise by December 2007. 23