GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED CONSTRUCTION DIVISION, ANJAR WEB TENDER NAME OF WORK : Page 1 Erection of 2 no's 66 kV feeder bay Structure / Equipment, Bus Bar Stringing and Earthing work at 66 kV Khambhara sub - station for proposed LILO line from Anjar-Khedoi line. TENDER INDEX Sr. No. Particulars Page No. 1 2 3 4 5 6 7 Details of tender Special instruction to tenderer Required Documents – Technical Bid Details to be furnish Tender Notice General Terms & Conditions General Terms & Conditions regarding Industrial Laws and Other Related Matters. Special condition for use of cement in work Technical Instruction to the Bidder Erection & Commissioning tools & tackles Completion of Erection (General) Specification for Erection of Switchyard Structure Specification for Erection of Equipment Specification for Erection of Circuit Breaker, Isolators, and Control & relay panel Specification for s/s structure & equipment earthing. Specification for Bus bar / Earth wire stringing. Specification for laying control cable & termination Drawings Schedule B (PRICE BID) 3 4 5 6 7-8 9-18 19-20 16 17 18 19 33 34 35-37 38-50 51-57 2 15 21-22 23 24 25 26-27 28-29 30-32 Page 8 9 10 11 12 13 14 Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com TENDER FOR THE WORK OF: Erection of 2 no's 66 kV feeder bay Structure / Equipment, Bus Bar Stringing and Earthing work at 66 kV Khambhara sub station for proposed LILO line from Anjar-Khedoi line. 1. ESTIMATE COST Rs. 1,90,455.00 2. EARNEST MONEY Rs. 1910.00 3. LAST DATE OF ISSUE OF TENDER Dt: _________ Up to 13:00 Hours. 4. LAST DATE OF RECEIPT OF TENDER (BY RPAD ONLY) Dt: _________ Up to 16:00 Hours. 5. DATE OF OPENING OF TENDER (IF POSSIBLE) Dt: _________ Up to 17:00 PM 6. TIME LIMIT 03 Month 7. PRICE PER REFUNDABLE) COPY (NON- Rs. 200.00 Note : Service tax will be reimbursed to contractor after producing proof of such payment made to appropriate authority. EXECUTIVE ENGINEER (CONST). GETCO: ANJAR. EMD should be paid only by DD in favour of GETCO payable at Anjar. Tender Fee Rs.200.00 vide ______________________dtd __________________ EMD Rs. 1910.00 vide __________________________dtd __________________ Page SIGNATURE OF CONTRACTOR. & SEAL OF COMPANY. 3 SUPDT. ACCOUNTS CONST DN GETCO: ANJAR I have read the terms & conditions of contract and abide by the same in all respect. Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com Tenders shall have to be down loaded in two parts. (1) Technical and Commercial bid. (2) Price Bid. The two bids shall be submitted in two separate envelopes to be sealed in the one envelope supplied by the Company. The price bid of only those Tenderers will be opened who are considered technically Acceptable. 2. The tenders will have to be down loaded two copies of blank Tender on payment of Tender fees (non refundable) as per Tender Notice. However, additional copies of Tender Specification can also be had on payment as per the Tender Specification. 3. The tenderers shall have to return the Tender duly filled in two separate envelope kept in a printed cover given by the Company without any additions/ alterations & duly signed page by page. The Tenderers are forbidden from furnishing their own printed/ typed commercial and other terms and conditions. 4. All commercial terms and conditions except rates shall be indicated in the technical & commercial bid only. 5. The Tenderers shall specifically note that the Tenders are invited on percentage basis only. 6. The Tenderers shall specifically note that the quantities mentioned in the Tender are likely to vary as per the actual requirement. As such, the successful tenderer shall have to execute the work at the same order rates for the changed quantities, if any, without any extra compensation whatsoever. 7. The Tenderers shall have to submit 10 copies of bidding schedule forming a part of prince bid as called for in the Tender Specifications for distribution at the time of opening to other participant Tenderer’s. 8. The tenderers will ensure submission of the Tenders duly filled in before the due date and time. 9. The price bid of those tenderers shall only be opened at the time and date to be informed by E.E.(Const), Anjar which are found technically acceptable and satisfying the requisite qualification & parameters. SIGNATURE & SEAL OF THE BIDDER. Page 1. 4 SPECIAL INSTRUCTION TO THE TENDERER. Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com Following document copies are required to be attached along with Technical Bid:- 1. Solvency Certificate latest issued by Scheduled Bank 2. Copy of Provident Fund No: 3. Copy of Service Tax registration No. 4. Partnership deed copy, if any 5. Power of attorney if given 6. Experience Certificate of similar work carried out 7. List of tools and tackles 8. Vehicle No: 9. Registration class approved GETCO : 10. Pan card No. 11. VAT No. EXECUTIVE ENGINEER (CONST). GETCO: ANJAR. Page 5 Signature of contractor with Seal & Date. GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED CIRCLE OFFICE, ANJAR. DETAILS TO BE FURNISHED BY THE TENDERER. Details required to be furnished by the Tenderers by writing Yes / No against each item. 1 2 3 4 5 a. c. 6 a. b. 7 Whether the Tenders submitted is on percentage basis as called for Whether rebate furnished is in percentage basis as called for Whether the tender is submitted by Registered Post Whether all pages of Tender Specifications are sealed and signed by the Contractor Whether the Tenderer is registered with GETCO or Transmission Line Erection. b. In case of Yes in above, please furnish following details:i) Registration Letter No. & Date:ii) Class of Registration iii) Validity Whether Tenderer is having PF Code No. Whether EMD Paid In case of Yes, Please furnish details Whether following documents of Section-E-IV Part B are submitted. (i) Human Resources Details (ii) Availability of tools, equipments etc (iii) Details of orders executed (iv) Financial capability (v) Erection / stringing capability (vi) Latest Income-Tax certificate (vii) Bank Guarantee (For E.M.D., if applicable) (viii) Company‟s Article Of Association (ix) Details Of Partners/Directors (x) B R /P A Authorized Person (xi) Power Of Attorney of Consortium Members Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Signature of Authorized representative Of Company/Agency NAME :----------------------------- STATUS :----------------------------- SEAL/STAMP Page 6 Name of tendering Company [ Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in TENDER FOR THE WORK OF: E-mail:- b.thumar@getcogujarat.com Erection of 2 no's 66 kV feeder bay Structure / Equipment, Bus Bar Stringing and Earthing work at 66 kV Khambhara sub station for proposed LILO line from Anjar-Khedoi line. Sr. No. 1. 2. 3. Particulars of Materials Fabricated Structural Material & Equipment. GI/MS Strips. Control Cables Approximately Quantity Rate at which the materials will be charged to the Contractor As per required Free of Cost -- DO --- DO -- -- DO --- DO -- Place/ Site of Delivery Any store Centre of Anjar Const. Dn. -- DO --- DO -- GENERAL:- Page 7 1. The above materials shall be issued to the contractor only to meet with the immediate requirement of the contractor and not much in advance. 2. The Contractor will submit the material account for the consumption of the material issued free of charge along with their bills. 3. The account for the issue of materials shall be settled by contractor before payment of pre-final bill. 4. Cement and steel will bee allowed to use in the contract and for allied connected works with the prior approval of the Chief Engineer, Head Office. 5. The steel material will be issued to the Contract by the GETCO on weight basis i.e. weighing on way-bridge wherever possible if there is no way-bridge the materials shall be issued on Section weight basis. However measurement for the work done will be done on line measurement basis by calculating weight as per the sectional measurement as per I.S.S. 6. The contractor will be allowed by unaccountable wastage up to 2% only. However in no case the Contractor will be allowed to take away any materials of the GETCO. 7. If the M.S.Bars pain or tor Steel are return of length 2 Mtr. And above it will not be considered as scrap. 8. If the accountable wastage together exceeds 5% then the contract value, the Contractor will be charged at book rate or market whichever is higher +15% as per rules of the GETCO for all wastage quantity in excess of 5%. 9. If any steel material, cement including a structural steel is no available in the GETCO‟S store and if the work of the Contractor if likely to be delayed then Engineer in change of the work permit the Contractor to purchase such materials from the open market in which case actual procurement cost shall be reimbursed by GETCO. However, in such case the Contractor shall have to indicate the price at which he can procure the materials based on the price us indicated the Engineer in change shall obtain prior approval from GETCO H.O. i.e. Chief Engineer before permitting such purchase. 10. If no finalizing the account of material by the GETCO. It is found that material is issued in excess of the actual consumption (Plus permissible an accountably) wastage the Contractor shall return the balance materials to the GETCO‟s store from which it was originally issued. In case to the contractor fails to return the balance materials to the GETCO‟s store from which it was original issued then for unreturned material. GETCO shall recover cost (a) stock rate or market rate whichever is higher plus +15%. 11. For the materials to be issued by the GETCO the contractor shall have to furnish indemnity bond on stamp paper of Rs. 100/- (One hundred only). 12. With permission of Engineer in writing from Engineer-in-Charge. 13. All the materials issued by GETCO shall be transported to the work site on same day and to be preserved in safe custody, failing to which GETCO shall intimate police action similarly as per instruction of Engineer in charge you have to credit the material of GETCO store without any loss time failing to which GETCO shall intimate police action. 8 EXECUTIVE ENGINEER (CONST). GETCO: ANJAR. Page SIGNATURE OF CONTRACTOR. GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED Transmission Circle, ANJAR. Construction Division Office, ANJAR The erection work should be carried out according to the specification and as per Instructions & programmed laid out by the D.E. / Executive Engineer-in-charge of the work. 2. The quantities mentioned in the accompanying schedule only approximate, Actual quantities will be decided after detailed survey and same may decrease or increase according to the local condition; the department reserves the rights for revising or omitting any of the quantities. The quantities actually executed by the contractor will be calculated at the rate given in the contract schedule of the rates. 3. The tender shall remain open for acceptance at least for a period of six months from date of tenders. 5. The contractor should employee supervisor with sufficient qualification and experience who could supervise the execution of work throughout. He should always be present on the site as far as possible. Qualification & experience certificate of deputed supervisor to be submitted to GETCO. 6. The contractor shall be responsible for breakages, losses & thefts of material during transit or erection after the materials are issued from stores will, the completed work is taken over by the GETCO. 7. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any tender. The Executive Engineer (Const.), ANJAR reserves the right to reject any or all tender without signing any reasons whatsoever. 8. The erection work should be commenced immediately from the date of receipt of instructions from office and should be completed within thereafter. 9. As regard damage the materials, equipment and worker of the contractor, he himself will be responsible. If there is any compensation to be paid in respect of “WORKMAN” compensation act of any other statutory provisions, the same will have to be paid by the contractor direct. If he thinks fit he may take necessary insurance cover, at his cost. 10. SAFETY:Contractor shall have to execute the work as per GETCO safety policy. Safety Book let & safety policy shall be collected from concern EIC before work commencement.(Refer ISO document). 11. FIELD QUALITY PLAN:Contractor shall have to execute the work as per GETCO FIELD QUALITY PLAN & APPROVED DRAWING being the mandatory requirement of ISO 9001-2000. 12. SECURITY DEPOSIT:The successful tenderor will have to pay the Security Deposit of 5% of the order value. On placing the order 2.5% will have to pay in cash or demand draft in favour of GETCO LTD. within seven days from the date of receipt of intimation given by the office and the remaining 2.5% will be recovered from the first two R.A. Bills. And higher percentage of security deposit may be fixed at the discretion of the Executive Engineer / Superintending Engineer 13. The tender includes all minor accessories and items of work which may not have been specifically mentioned in the specification schedule etc. but are essential for completion of work. The contractor will not be eligible for any extra payment in respect of such minor accessories and items of work. Page 1. 9 GENERAL CONDITION :-. 3 Calendar Months from the date of the 15. SIGNING AGREEMENT:The Contractor will have to sign an agreement as per GETCO‟s rules in the prescribed form of the GETCO. The cost Rs. 50/- of the Stamp Paper will have to be borne by the Contractor. 16. PENALTY FOR DELAY: The tenderer should note that the completion time allowed for carrying out the work should be strictly observed. Any delay that may take place in supply and erection beyond contractual cutoff date stated as per stipulated delivery period shall be subject to the penalty at the rate of ½% of the delayed work (supply and erection work) per week with a ceiling of 10% of the total contract value. 17. GUARANTEE: It is the responsibility of the contractor to handover the complete work free of all defects. If within a period of one year from the date of handing over the work it is noticed that any defects occurs due to bad workmanship. It is the duty of the contractor to rectify / replace the same at his own cost. If within seven days from the date of receipt of such notice, the contractor does not take up the work, same will be carried out at his risk and cost. 18. Tender should be issued to those contractors who have P. F. Registration, Service tax registration, Vat registration & Work registration. 19. Service tax will be paid as per prevailing norms on production of service tax registration. 20. WORKING MONTHS: In case, it is not possible for the contractor to continue, the work either due to heavy rains or other reasonable causes, such facts should be immediate reasons to the notice of the Executive Engineer in writing. If the reasons for stopping the work are genuine, the Engineer may ask the contractor in writing to stop work be cases (for such stoppage) are overcome and the Engineer will ask the Contractor to start the work again in written, the period of such stoppage will not be considered as a part of working month moreover the contractor cannot claim compensation for such work. 21. As regard damages to the materials equipment and none of the contractor, be himself will be responsible. If there is any compensation to be paid in respect of "Workman" compensation Act. Or any other statutory the same will have to be paid by the contractor direct if he Thinks fit he may be taken but necessary insurance cover at this cost. Tenderers have to produce experience certificate along with tenders. Tender submitted without experience certificate will not be considered valid. 22. TERMS OF PAYMENT: Normally, one R.A. Bills will be paid every month, however, looking to the progress of the work it will be reviewed mutually and 90% of the cost of work done will be paid to the Contractor on his presentation of R.A. Bill giving the material account thereof. Remaining 10% Payment will be made after the entire work is completed satisfactorily in all respect. The payment will be made through Account Payee Cheque. The Bill should be submitted to our Deputy Engineer (Const.) S/Dn-I, Anjar with a copy to Executive Engineer (Const.), Anjar. Final bill will be prepared by our Deputy Engineer (Const.) S/Dn-I, Anjar within about fortnight from the date of completion of the work by the Contractor. 23. Contractor will be required to produce a SOLVENCY CERTIFICATE FOR AN AMOUNT AS DECIDED BY E.E. & also to produce his income tax clearance certificate and latest P.F receipt. 24. The tender includes all minor accessories & items of work which may not have been specifically mentioned in the specification schedule etc. but are essential for completeness 10 TIME LIMIT:Time limit allowed for completion the work is commencement of the work. Page 14. PROGRESS OF WORK: If it is found that the work is unsatisfactory or not progressing as per the programme / BARCHART / Target period, any action taken by the GETCO, as may be deemed fit, to see that work is completed as required by the GETCO, would be at the risk and cost of the contractor. If the work is not completed within time limit penalty of 1/2 % of the contract value per week will be levied, Maximum 10% of order value unless time quotation as granted for valid reasons by the competent authority. 26. The contractor will be responsible for loss, distribution or deterioration of the materials, stores or articles supplied to him by the GETCO, even if such a less distribution of deterioration has occurred under any circumstances whatsoever beyond his control as if the materials, stores or articles so supplied were his property. 27. The contractor shall see the line route before quoting the rates. 28. The contactor shall co-operative with the GETCO in recording measurement etc. as expeditiously as possible and he shall fulfill the all the requirement which are necessary to finalizes the accounts on the basic of its records and pay him such amounts as if found due to him ,together with the amount of security deposit if any remaining payable to him after deduction there from the amount due by him to the GETCO. The GETCO shall not entertain further claim from thereafter. 29. The competent authority can delete any items in schedule of the tender, if he feels that the rate quoted by contractor act. That item is abnormally high completed to the estimated rates. 30. Contractor has to submit work completion certificate of 66 KV line satisfactory under any Construction Division of GETCO at least for 10 Km. 31. Contractor has to submit their working schedule along with tender to complete the line in view of time limit given in tender Bar chart is also to be submitted. 32. Time limit extension will be given if line material is not supplied in time and farmer's objection not cleared in time subject to merits / demerits & approval of competent authority as per DOP but if material given in time and farmer's objection cleared in time, then no time limit extension will be grant and penalty will be imposed as per rules. Time limit application with justification & supporting documents shall be produced. 33. DELIARY MATERIAL: All material / equipment required for this work as per schedule shall be delivered at any store center of Const. Dn. ANJAR jurisdiction & contractor has to take delivery from these stores at his own cost only. 34. In case of any farmer's objection / ROW, contractor has to mobilize his all efforts to Clear the objection in consultation with GETCO authority. No extra Charge will be Paid for such effort. 35. SPECIAL TOOLS :No special tools and tackles such as compression joint machine, jointing dies, come along clamps, dynamo meter etc. shall be given by GETCO. 36. GENERAL TERMS FOR ERECTION OF TRANSMISSION LINE :1. The bidder shall have the experience of erection of 66KV line. 2. The tenderer should quote for complete erection work, testing and commissioning of line as indicated in the Schedule “B” and as per terms and conditions. 3. It will be bidder sole responsibility for erection of complete line in all respect, accordance with latest rules under Electricity Act and approved by Electrical Inspector. 4. Above terms and conditions are part and partial of tender and will be observed. Page 25. 11 of work the contractor will no be eligible for any extra payment in respect of such minor accessories and o item of work. 37. TESTING AND COMMISSIONING : i. The contractor after completion of erection work will ensure that all works connected with line have been completed correctly as per Indian Electricity Rule and procedure, any extra cost involved due to incompleteness of work or bad workmanship found out subsequently shall be set right forth with by the contractor at his cost. The clearances at major crossing & Earthing resistance value of H-frame / tower footing to be taken & data to be handed over to EIC. ii. After the erection is completed in all respects, the line should be thoroughly patrolled and checked for continuity and clearances. The line should be meggared to check its insulating level. Afterwards, a line clear should be given to the Engineer-in-charge that the line is clear and free of men and materials and is fit to be charged. If on charging the line is found not to hold, the contractor should arrange to patrol the line and find out the causes for the tripping and rectify the defects. 38. TECHNICAL PARTICULARS : The general technical details of the type of towers to be erected conductors and earth wire to be strung and relevant loading particulars for the same are given in section –II of the specification. 39. ELECTRICITY RULES : All works shall be carried out in accordance with the revised and latest providing under Indian Electricity Act and Rules made the rounder. 40. ERECTION TOOLS : Erection tools required during construction of lines shall be arranged by the contractor at his own cost. Adjustable stub templates will however be supplied by the GETCO which shall be returned by the contractor in Good condition on completion of the works. 41. WASTAGE : You shall make every effort to minimize the breakage/Looses and wastage of materials, etc. supplied “ Free of cost “ by the GETCO for erection of line. line The ceiling for wastages permitted is as under :i) Conductor and Earth wire. ii) iii) v) Insulators. Bolts & Nuts Hardware & Accessories. :a) 0.5% (For jumpering/sag/sisterwire). :b) 0.5% (For credit length upto 30 Mtr.) :c) 2% (For credit in pieces as good conductor from 30 Mtr. To 100 Mtr.) : 0.25% : NIL (No extra Bolts/Nuts will be supplied). : NIL. 42. PROGRESS REPORT : Fortnightly progress reports in DUPLICATE shall be regularly submitted to the GETCO Executive Engineer(Const.) ANJAR and the Engineer-in-charge with a copy of Superintending Engineer (TR) C.O. ANJAR. Bar chart duly signed by contractor shall be submitted at the time of commencement of work. 43. INSPECTION BY GETCO REPRESENTATIVES: The Engineer-in-charge, higher authority of GETCO or his representatives will be free to visit the contractor‟s work, their stores site and erection sites and also verify the GETCO‟s materials in the custody of the contractor as and when required. All the bills for erection, separately for each line should be presented with the following information on each bill. (i) 90% bills for erection should be serially numbered giving the work done under each item up to period of billing, work done for which the claim is made in the bill and up to date 12 PRESENTATION OF BILLS : Page 44. work so for done. Items in erection bill should correspond to items mentioned in schedule of A/T. (ii) Balance payment bills should be prepared at the end of the job for each line section under the jurisdiction of the concerned Deputy Engineer which should give the complete information of work carried out, total payment due, actual payment received up to date and the balance amount claimed, It should also accompany a statement of reconciled material account tower wise and line wise. 45. FORCE MAJEURE :Force majored is defined as “Any cause which is beyond control of contractor or the GETCO as the case may be, natural phenomena like floods, draught, - earthquake, epidemics etc. acts of any Government Authorize domestic or foreign including but not limited to war, declare or undeclared, priorities quarantine, embargoes Licensing control or production or distribution restrictions accidents like Fire, Explosions, Break-Downs etc.”. 46. QUANTITY OF WORK : The quantities of various items of erection indicated in Schedule-A are tentative, final quantities shall be determined after completion of the details route surveys. The contractor has to carry out the work according to quantities as determined at site for which the rates quoted in the Tender shall be valid. 47. Liquidation Damages ; The date stipulated for completion of work shall be strictly adhered to except for the provision of the clause no. 1.21. Above if the work is not completed by the scheduled date of completion, the GETCO recover amount of liquidated damages at the rate of ½% per every RETURN OF EMPTY CONDUCTOR DRUMS : The empty wooden drum of earth wire and conductor as well as insulator crates will not be required to be returned back by the contractor to the GETCO stores. 49. TAKING DELIVERY AND INSURANCE: a. The contractor has keep tower materials & line materials in safe custody and transport to the respective sites and will be fully responsible for any damage to or loss of all materials at any stage during transportation or erection or taking over of the line by GETCO. The Contractor has to open site store near by the route of the line and ensure for safe custody of all the stored materials at his own cost. The contractor shall have total responsibility for the entire materials stored, loose, semi assembled and/or erected by him at site in his custody. The contractor shall make suitable security arrangement at his own cost to ensure the protection of all materials, equipment and works from theft, fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to arrange for security till the works are finally taken over by the corporation. STORAGE-CUM-INSURANCE:The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of 60% cost of line materials, which are required to complete the line. Contractor shall have to take comprehensive insurance policy against any loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and commissioning up to the time of taking over of the transmission line by the Board. The contractor shall deal directly and pursue the claim with the insurance company and shall be responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The proof of insurance policy taken by the successful contractor shall be furnished to Engineer-InCharge. In absence of the above insurance policy. R. A. Bill payment will be with held. In the event of any damage, theft, loss, pilferage, fire etc. contractor will be responsible to lodge, pursue and settle all the claims with the insurance company for all items, materials b. c. d. e. Page 48. 13 week‟s delay in completion of the line based on the value of the order amount of the work with a ceiling on such recoveries at 10% of order value. DEPARTURE FROM SPECIFICATION AND DRAWINGS:Should the tenderer wish to depart from the specification in any respect, they should draw attention to such departure giving his reasons thereof and should get approved the same before doing any further work, unless this is done this specification shall held good. The working drawings are attached with the tenders. However in case of any clarification the decision of Engineer in charge will be final & binding to the Contractor. 51. AVAILABILITY OF MATERIALS AND IDLE LABOUR CHARGE:Materials are readily available and arrangement made to procure the rest. However, the Contractor should be carry out the work as and when the materials are received. No idle labour charges will be borned by the GETCO in case such occasion of idle labour arises, due to want of a any materials. However, this idle period will be counted for the period of assessing the time limit for completion of work as mentioned in the work order. Contractor has to collect the material as and when available and should be keeping in his safe custody. 52. GETCO does not accept any responsibility as factory Act, Minimum wages Act, Workmen‟s Compensation Act, Insurance Rules etc. or any other act, rules or regulations that have to be observed by the contractor for carrying out the work. Subject to the availability of raw materials, the contract is to be completed within stipulated time period from the commencement date as mentioned in the work order. 53. ACCOUNTING OF GETCO MATERIALS :The contractor will be fully answerable and responsible for all the material issued to him for the work by the GETCO for any theft, loss of pilferage and shall have to furnish account for the same after completion of the work and before preparation of final bill, If the loss referred to above is not made good before final bill as per rules of the GETCO. Contractor has to maintain Site Register Material Account Register regularly. 56. The structure & equipment required for sub-station erection work shall be delivered at S/S. Site by GETCO at free of cost and it must be shifted to site without damaging the equipment must be kept in position as per instruction of In charge Engineer and Manufacturer‟s manual. The M.S. Girder required for line erection work will be provided at one end of the line by GETCO. The trip of Girder should be minimum of 20 Girders. 57. The Contract has to shift the material at site with packing case and it should open carefully without damaging the equipment. The packing case must be returned to the store in good condition and stacked as directed by Engineer-in-charge. 58. The equipments must be cleaned, washed if required before erection. The initial testing wherever required should be carried out first with the help of Engineer-in-charge before erection, such as measuring continuity test or any other test found necessary. 59. The mounting bolts should be properly fixed with equipment structure as per instruction of In charge Engineer. 60. 61. Contractor will not allow to work after working hours except in special case, if any. For Sub-station erection work, the contractor has to arrange for insurance of the fragile equipments for shifting and erection purpose on behalf of the GETCO at the cost of the contractor. 62. The Contractors has to engage required strength of skilled persons for Transportation, Loading & unloading work and proper Supervisor to avoid complication & unnecessary delay Page 50. 14 and the corporation shall be kept informed about it. Contractor shall replace the lost/damaged materials/items promptly irrespective of the settlement of the claims by underwriter and ensure that the work progress is as per agreed schedule. The loss, if any, such replacement will have to be borne by the contractor and Board will not entertain any claim/representation in this regard. However it will be contractor‟s responsibility to insure the entire project till the line is taken over by the Board. The detailed drawings of equipments can be seen from this office during any working day and the equipments which are to be erected can also be seen physically at Anjar store during any working day and time. 64. The erection work should be carried out according to the specification as per instructions and programmed laid out by the Engineer in charge. Contractor has to ensure safe shifting and erection of all accessories / equipments as per standard norms. 65. The Contractor has to arrange for minor fabrication (if required) at free cost & follow all labour laws I.E. Rules safety rules, Insurance rules, GETCO rules at his risk & cost. 66. The tenderer should furnish details of past experience of such job of similar nature completed by him satisfactorily within the time limit in GETCO without this certificate offer shall be rejected out rightly. 67. The tenderer will be abide by and fulfill all the terms & provisions of the “Tender and Contract” for works as applicable and in case of any default there to the GETCO shall forfeit the S.D. or any other action as may be decided by Executive Engineer (Const.) Anjar. 68. The contractor has to co-ordinate & co-operate fully with Engineer-in-Charge and commissioning Engineer of the supplier for erection of all equipments / structure / accessories, etc., and any other items which are not conveniently included in the specification but requires for completing the job. 69. THE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. shall supply Steel Section required, for earth mesh / structure / G.I. / M.S. strip for earthings the equipments structures with nut and bolts, power cable, control cable, L.T. cable, Clamps connectors and C.I. Plate for small pit etc. at free of cost subject to condition mentioned in schedule-B. 70. Wooden charcoal, salt, black cotton soil, G.I. pipe counter type earthing G.I. strip, G.I. wire, nut & bolts lugs etc. required for earthing shall be procured by the contractor as per specification given is Schedule „B‟ . 71. In case of any dispute / doubt, the decision of Executive Engineer (Const.) Anjar shall be unchallengeable, final and binding to the Contractor. 72. The quantum of work as mentioned in Estimate / Schedule „B‟ is tentative and it can very differ as per site condition. The payment shall be made only on actual work executed or order quantity whichever is less. 73. Security Deposit will be refunded after / completion of one year or guaranteed period over whichever is later. 74. 10% retention money will be deducted from each R.A. bill. 75. All legal complication or disputes are subject to Anjar jurisdiction only. 76. No higher rate or revised rate will be applicable for the work, if work is held-up / closed due to whatever so reasons. 77. R.A. Bill shall be paid if GETCO satisfy with the output of works otherwise only final bill shall be paid. 78. The Time Limit for the work may be reduced and contractor should make all this efforts to complete the work within stipulated time limit as may be given by the Engineer in charge depending upon emergency of work GETCO reserves the right to reduce the time limit without giving any notice. Page 63. 15 to complete work timely. The Contractor will be totally responsible for labour claims arising out of the labour employed for this job. 80. The contractor has to maintain Site Register covering all aspects of Material Received / utilized for day to day work and has to obtain signature of Site Engineer. 81. A fresh & valid solvency Certificate of the extent of 20% of the ordered value will have to be produced by the contractor and party has to surrender original solvency Certificate to GETCO before commencing of work. 82. Contractor will abide by and fulfill all the terms and conditions and general terms and condition of the contract for works available in the office. 83. The Contractor will be solely and responsible for any accident / damage either to equipments or any human being during the time of execution of work. 84. All other general terms and conditions as prevailing in the GETCO shall be applicable to this contract. 85. For transportation of Transformer and erection work the tenderer has to arrange for suitable insurance of all fragile items in the name of GETCO prevailing rules and shall have to produce the original documents with 2 Xerox copies for the insurance premium reimbursement before commencement of work. 86. Either you or your authorized person should contact our concern S.D.O. as well Division office, Anjar daily, for the availability of equipments required for this work, failing to which this work order shall be terminated without giving any notice. 87. Prior intimation in writing for starting the job will be given by GETCO for the work. 88. Contractor will have to make his own arrangement for all tools, tackles, wire ropes etc. for the work. 89. Contractor will fully and solely responsible for any shortage, damage, leakages to the transformer or any it‟s accessories that may occur during transportation dragging, draining of oil, erection work etc. 90. The cost of damages, if any will be recovered from the Contractor‟s bill. The assessment of which will be done by field Engineer at his sole discretion and his decision shall be binding to the contractor and shall be considered as final and unchallengeable. The Contractor will have to give indemnity bond to GETCO against any possible claim of compensation for damage to contractor‟s equipments or staff or any of third party during the execution of work. 91. 92. The Contractor will have to complete entire job as per directive and instruction of Engineer in charge. If he fails to do so entire work will be carried out at Contractor‟s risk and cost. 93. The Contractor must engage sufficient knowledgeable person round the clock, exclusively for oil filter machine provided by Contractor for oil filtration work. No loss of oil should occur and in case if occurs; its cost will be recovered from Contractor‟s bill. The Contractor has to apply sufficient nos. of cycles for oil filtration work as decided by the Engineer in charge. 94. The contractor has the experience of survey work and produces the list of survey instrument and bio-data of Supervisor / Surveyor / Engineer / Technician to be engaged for the job. 95. The tender shall be issued to only the experience and Contractor who has completed such job of similar nature and magnitude satisfactorily in time. However, issuance of blank tender, will does not qualifies the tenderer to offer the bid. 16 The Contractor has to remain in contact in close days with Engineer in charge of work who in turn shall issue detailed instruction for the commencement of the work. Page 79. 96. Tender offer without payment of E.M.D. required Certificate, Documents, bar chart list of Tools, Tackles, Equipments etc. required for execution of job will be out rightly rejected without assigning any reason thereof and decision of the Executive Engineer (Const.), Anjar will be final and unchallengeable. 97. The contractor will be governed by the GETCO‟s general conditions of works contract. The Booklet will be available in the concerned office in any working days. In the event of placing order, the contractor will have to sign this booklet along with other documents and agreement. All the usual terms and conditions of the GETCO, though the same might have not been mentioned in this specification or contractor booklet will applicable to this contract, and the decision of the Executive Engineer / Superintending Engineer shall be binding on the contractor. 98. In case of non - availability of some items / materials you will have to collect the same from other nearly store center for which you shall be paid as per GETCO‟s rules and S.O.R. rate. 99. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to the respective center of the GETCO as per instruction of Engineer in charge at your cost. 100. Specification in any items mentioned in tender are subject to change without any prior notice and binding to the Contractor. 101. THE GETCO shall deduct the Income - Tax & Taxes as per prevailing rules from each and every bill. 102. If the work is required to be carried out during specified outage then the contractor has to deploy adequate man power, material, tools etc. well advance and has to complete the entire work during this specific outage period only, failing to which GETCO shall be at liberally to deduct the amount of revenue loss due to prolong outage. Contractor has to coordinate E.I.C. of planning of outage & work schedule thereof, so as to complete all the planned work in outage. 103. If required by GETCO you shall have to provide free to & for traveling facility to our field Engineer or Surveyor for the work. 104. The tender include all minor accessories and items of work which may not have been specifically mentioned in the specification / Schedule etc. but are essential for completion of work. The Contractor will not be eligible for any extra payment in respect of such minor accessories and item of work. 105. The Contractor shall not refuse to execute the work order at any time and it will be his sole responsibility to execute and complete this work as per the instruction of Engineer - in charge. 106. For shortages of any materials issued by the GETCO for the work, recovery shall be made from you, on the basis or prices of the materials (prevailing the date of settlement of materials Account) plus 15% supervision charges. 107. The Contractor has to carry out all the works in accordance with revised and latest provision under I.E. Rules Act made there under and as per instruction of Engineer-in-charge. Page 109. Registered class „A‟ Contractors with the GETCO and having furnished Rs. 5 Lacs Bank Guarantee towards lump sum permanent deposit are exempted from to renew / extend the validity of registration and Bank Guarantee well in time before expiry dates. 17 108. The tender shall be issued only to capable contractor and must have of experience for transportation of transformer and erection work must have sufficient capacity of trailer and carried out 3 such job of heavy carting and power transformer erection work. 110. The S.S.I. Industries will be exempted from the payment of Security Deposit provided a competency certificates is issued by the Regional Division Officer of the National Small Scale Industries Corporation to the effect that the firm is capable of executing the order. 111. The tender shall invariably furnish a monthly average erection capacity (in Km. and rating) along with list of available machinery, tools and tackles etc. for erection of line. 112. The tenderer shall submit offer for erection or foundation work. 113. No subcontractor, Power of Attorney shall be allowed. 114. All the materials issued by GETCO shall be transported to the work site on same day and to be preserved in safe custody failing to which GETCO shall initiate Police actions, similarly as per instruction of Engineer-in-charge, you have to credit the material at GETCO store without any loss of time failing to which GETCO shall initiate Police action. 115. Any excess work done beyond specification and drawing shall be at Contractor‟s risk and cost. 116. The undersign reserve rights to reject any or all the tenders without assigning any reasons thereof. Issuance of blank tender does not automatically qualifies the tenderers for award. 117. The Contractor has to follow all labours laws, safety rules and regulations. The GETCO does not take any responsibility in case of accident or injury to the workers. The safety / security of men, materials & equipments shall be sole responsibility of the contractor. 118. The Compliances of all Central / State Govt., rules, safety and insurance rules etc. and that of local body, is a must condition for the agency. 119. The Contractor has to deploy minimum 8 to 10 skill labours / fitters at site daily failing to which GETCO shall have a right to deduct Rs. 1,000/- per day from the bill. 120. During the stringing work of line if any EHT / 11KV / L.T. line comes on the way the Contractor has to dismantle, restringing, kept on original position etc. work to be carried out. No any charges will be paid extra for this work. The work is to be carried out in co-ordination with concern DISCOM personnel for proper identification of feeder / LT line and you have to strictly observe all the safety rules of GETCO. 121. The bidder shall specifically note that GETCO will not pay any extra amount to wards any type of claim except for the description indicated in Schedule “B‟. The party has to carry out all other / additional required activities / work as directed by Engineer in charge which is not mentioned in Schedule but required to be completed as per the site condition and for this work no extra Payment shall be made by GETCO 122. It will be bidder‟s sole responsibility for erection of complete line / equipment in all respect as per the provision of I.E. rules and procedures and as per the instruction of Engineer in charge. 123. In addition to the general of the construction particular attention shall be paid to the final finish and every effort shall be made to have the entire work contented wish standard of workmanship by the Contractor. Executive Engineer (Const.) GETCO, ANJAR. Page Signature Of Contractor 18 124. No any idling / gang mobilization charge will be paid by GETCO in any circumstances. GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED TRANSMISSION CIRCLE, ANJAR. CONSTRUCTION DIVISION – ANJAR. TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS (1) Wages to be paid at time of payment etc. by the contractor. (A) The contractor shall pay minimum prevailing rates per day or as may be specified hereafter or rates fixed under the minimum wages Act. Whichever is higher. The wages or very contract labour employed by him under this contact shall be paid by him before the expiry of 7th day of the month in respective of which the wages are payable ( i.e. wages of a month have to be paid by him in the first week of the next month). The payment shall be disbursed in the presence of management representative during the working hours in factory premises and the contractor shall get the entries certified in the register of wages by the representative of the GETCO. Any default will result in cancellation of contract forthwith or also the contractor shall be paid punishable to the extent of Rs.100/- fine per each day. The contractor shall give his telephone number and address to the GETCO so that in case of labour troubles etc. the contractor can be contacted. The contractor shall arrange to have his office outside the factory premises and the contractor shall keep himself present throughout the working hours. (B) (A) (B) (C) (D) (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) Person below the age of 18 years shall not be employed for the work. No. female worker shall be employed in the night shift between 7 p.m. to 6 a.m. Contractor shall maintain a valid labor license under the contract labour (Regulation and Abolition) Act for employing necessary manpower to be required by him. In the absence of such license the contract shall be liable to be terminated without assigning any reason thereof. The contractor shall at his own expenses comply with all labour laws and keep the GETCO indemnified in respective thereof. Some of the major liabilities under various labour and industrial laws which the contractor shall comply with are as under :Payment of contribution by way of employer‟s contribution towards provident fund, family pension scheme, Deposit linked insurance scheme, Administrative charge etc. at the rates make applicable from time to time by Government of Gujarat/Government of India or other statutory authority. Payment of deposit in respect of each contract labour at the rate of Rs. 30/- with the office of Commissioner of Labour as per the Contract Labour (Regulation and Abolition Act). Licence Fees as prescribed under the Contract (Regulation and Abolition) Act and rules framed there under depending upon the number of work men employed by the Contractor. Paid Leave facility and wages as per the provision of the Factory Act at the rate of one day for every 20 days of working. Identity Cards as prescribed under the Factories Act with Photo affixed thereto, the same for identification. Payment of retrenchment compensation, Notice pay and other liabilities as per Industrial Disputes Act. any payment to the Contractor‟s employees arising out of any claim or disputes under the Industrial Disputes Act. 1947 or any other labour laws. Payment of Compensation in case of accidental injury. Provision of crèche if the female labours employed are more than 30 numbers. Maternity Leave as per the Maternity Benefit Act. The above are some of the major liabilities of the Contractor in addition of other liabilities prescribed under the various labour laws in force from time to time from statutory Authorities likes State Government / Government of India which the Contractor shall have to comply with. 19 Labour Laws :- Page (2) (5) (6) (7) (8) (9) (10) (11) Signature of Contractor With rubber stamp. Executive Engineer (Const.) GETCO, ANJAR. 20 (4) Provident fund & Family pension Scheme:The contractor shall submit along with his bill (month wise) a statement regarding deduction against employees provident fund and family pension scheme in respective of each concerned employee, provident fund and family pension scheme at the rate at admissible ( or at the rate made applicable by the Government from time to time) of the wages. The contractor‟s contribution and his workers contribution towards provident fund and family pension scheme shall be deposited by the contractor with regional Provident Fund Commissioner, Ahmedabad. Deposit Linked Insurance Scheme:The contractor shall have to deposit ½ % of the wage in respect of employees who is a member of the Provident Fund as the contribution to the deposit. Linked insurance Scheme with Regional Provident Fund Commissioner, Ahmedabad. Administrative Charges:Administrative charges for maintaining provident fund A/C shall be deposited by the contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable. Paid Leave Facility:Paid leave facility at the rate of one day for every twenty days worked by the contract labour shall be provided by the contractor to his workers. He shall maintain leave Records/leave cards for individual labourer which shall be duly verified and approved/certified by the authorized officer of the GETCO. Workmen’s compensation fund & Employer’s Liability Insurance:The contractor shall cover all his employees under workmen‟s compensation fund and under the liability insurance. The contractor shall employ adequate number of experienced staff at site for dial supervision and for maintenance of various register and records required under the law and contract No. payment for supervision shall be admissible. Contractor to Identify the GETCO:The contractor shall indemnify the GETCO and every member officer and employees of the GETCO also, engineering in charge and his staff against all actions, proceeding, claims demands, costs and expenses which may be made against the GETCO or Government for or in respective of formance of his obligation under the contract documents. The GETCO shall not liable for or in respective of or in consequence of any accident or injury to any workman or other person in the employment of the contractor or his sub-contractor and the contractor shall indemnify and keep indemnified the GETCO against all such damage and compensation and against all claims, demands, proceedings costs, charges and expenses whatever in respective thereof in relation thereto. Workmen’s compensation and employer’s liability insurance:Insurance shall be affected for the entire contractor‟s employee engaged in the performance of this contract. If any of the work is subject the contractor shall require the sub-contractor to provide workmen‟s compensation and employer‟s liability insurance for the latter‟s employees unless such employees are covered under the contractor‟s insurance. The GETCO reserves the right to terminate this rate contract at any time during its tendency without giving notice of termination or any reasons thereof. The GETCO will be entitled to deduct directly from the bills, to be paid to the contractor any sum or payable by you and which sum/sums the GETCO is required to pay as principal employer on account of your default in respect of all liabilities referred to in above clauses. Page (3) Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com SPECIAL CONDITION FOR USE OF CEMENT IN WORK 1. The rate in Schedule “B” is inclusive of Cement Cost. Contractor has to purchase fresh 43 grade cement confirming to as per IS-8112 and of approved brand by GETCO. 2. Contractor has to construct “Pucca Godown” at site of the work so that Cement bags can be properly preserved to avoid damage due to any kind of Water. 3. The contractor shall have to procure cement by purchasing from the open market according to line requirement and keep sufficient quantities to avoid delay in work. Same quantity of cement is to be utilized from his own stock. Account of cement utilized at each location duly certified by concerned GETCO‟s supervisor and engineer in charge of work. The account is required to be maintain and submitted with each RA bill. No payment shall be made toward cost of cement bags utilized in each running bills without submission of cement consumption details. No wastage is permitted as same is to be procured by the contractor at his own cost from the authorized dealer approved by the GETCO. No wastages towards cement is permitted. 4. Cement should give the required strength of cement concrete. 5. To bring sufficient and timely cement at site is full responsibility of contractor. Nothing extra will be paid on account of any reason to maintain progress of work and to complete the work in Schedule time. 6. Contractor has to submit material A/c for consumption of cement used with every bill. In case of not submitting the same, bill will not be passed. Contractor has to submit the copy of cement purchase Bill along with each RA Bill/ Final Bill. 7. No negative variation will be allowed for consumption in cement then prescribed as per Booklet of Technical Specification of GETCO/Mix Design and nothing will be paid extra for over consumption. 8. Contractor is fully responsible for safety of cement at site, nothing will be paid extra on account of safety. 9. If GETCO‟s authorized representative wants to check cement stock at site, contractor has to allow for the same at any time. 10. Contractor has to maintain day-to-day cement consumption/balance at site. Page Contd.....2nd 21 11. As far as possible, Contractor has to maintain supply of cement of only one bread & grade through out the work and on account of closer/shortage of approved brand, cement of other brand in accordance No.(01) will be allowed by Engineer-in-Charge. ::2:: 12. Minimum cement Consumption considered for cement concrete:a) M-20 : 6.5 Bags per CMT b) M-15 : 4.5 Bags per CMT 13 Contractor will be allowed to carry out work only after Physical Verification of cement brought at site. 14. The tor Steel bards required for RCC type foundation shall be procured by the contractor in advance to avoid delay in the work. 15. No wastage is permitted for reinforcement steel and as reinforcement steel is to be procured by the contractor at his own cost. NO over lapping of RCC is permitted in foundation work. 16. GETCO reserves right to test the quality of steel and cement procured by the contractor at any Govt. Recognized Laboratory and intended to be used for the tower foundation works. The test results shall be binding to the contractor closer /shortage of approved brand, cement of other brand in accordance of condition No.(01) will be allowed by Engineer-in-Charge. 17. Contractor will be allowed to carry out work only after physical verification of cement brought at site. 18. The Cement and Steel of the fallowing companies/suppliers who are manufacturing for supplying are to be provided by contractor. Name of Manufacturer of Cement Name of Manufacturer/supplier of structural steel/coils/bars/etc. Narmada Cement Company Ltd. Steel Authority of India. Gujarat Ambuja Cement Co. Ltd. Tata Iron & Steel Co. Ltd. Saurashtra Cement Jindal Siddhi Cement Lloyds J.K. Cement Essar Steel Ltd. L & T Cement (Ultratech) Ispat Shri Digvihaya Cement Co. Ltd. Bhawalka Steel Industries Ltd. Mumbai. Binani Cement Sun Vijay Rolling and Engineer, Nagpur. Vikram Cement Shri Bajranga Alloys Ltd. Raipur. Sanghi Cement Unique Structres and Towers Ltd. Raipur. Shah Alloys Ltd. Ahmedabad. EXECUTIVE ENGINEER (CONST) GETCO: ANJAR 22 SIGNATURE OF CONTRACTOR Page Sr. No. 1 2 3 4 5 6 7 8 9 10 Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com TECHNICAL INSTRUCTIONS TO THE BIDDER The works shall be carried out strictly as per the erection manuals and shall fully comply with the relevant Indian Standard. The IE rules and Acts in force time to time shall also be applicable during tendency of the contract. The Statutory requirement of central government and stage government shall be complied with by the successful Bidder. Any complications arising out of it shall have to set right by the contractor without any financial implication to the Purchaser. The Purchaser will make all the technical data drawing and catalogues for equipment to be erected available to the contractor. Purchaser shall also make available to the contractor the layout of switchyard and also drawing of the control room and also related works equipment drawings. The erection contractor shall however not remain contended with the drawings, manual and catalogue as well as lay out drawing given by the Purchaser but shall also exercise his own judgment and shall prepare the working drawing required for erection or shall assist the purchaser in making them. Further while erecting the equipment or carrying out other activities related to the contractual work, the contractor shall adhere to the latest engineering practices for erection and construction and shall also keep Engineer in charge posted about the ways and means adopted by him for construction activities. Signature of Contractor 23 EXECUTIVE ENGINEER (CONST) GETCO: ANJAR Page Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com ERECTION AND COMMISSIONING TOOLS & TACKLES The Contractor shall provide all tools/tackles jigs and fixtures winches, alignment tools, welding sets, testing kits, testing meters/instruments, breaker handling devices all consumable items and construction equipment as required to install the equipments and to complete the work in all respects and shall necessarily include (but not limited to) bolts, nuts, rivets, welding rods, shims, wedges, packing sheets, packing compounds, oil installation and protection of individual equipment in storage and during erection, testing and commissioning. This shall also cover proper alignment, tack welding tagging laying marking of and connection of cables, fabrication supply and installation of all support structures for installation of various electrical equipment and cables. Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables) shall also be arranged by the contractor. Erection testing & commissioning of various equipment shall be done strictly as per manufacturer‟s instructions. Successful bidder shall submit proposed test procedure to the purchaser for approval well in advance and shall not commence testing until approval is conveyed. All additional iron framework erected to put the equipment in operational condition shall be provided with two coats of primer and two top cots of finish paint. Special care shall be taken to make the enclosed equipment protected against entry of rates, lizard, and creeping reptiles, which may create electrical short circuits. EXECUTIVE ENGINEER (CONST) GETCO: ANJAR 24 Signature of Contractor Page Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com COMPLETION OF ERECTION (GENERAL) Equipment shall be considered to have been completely erected when the following activities have been completed. Moving of all equipments to the respective foundations. Fixing of anchor bolts or tack welding as required. Leveling and alignment of equipment. Assembling of all accessories such as relays, CTs, PTs, instruments etc. as described in the job specifications. Drying of equipment as required and testing of oil for dielectric strength. Filtration and filling of oil as required. Cable laying, termination with continuity checks. Applying of finishing coat of pain wherever required. Mounting of lighting fixtures & connections. Testing of all system with operation of all protection system. EXECUTIVE ENGINEER (CONST) GETCO: ANJAR Page 25 Signature of Contractor Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com 2. 3. 4. 5. 6. 7. 8. 9. Erection of switchyard structures shall mean erection of gantry column, beams, equipment support structure and lighting, mask, VHF masks, watch and ward observation posts if any. The foundation work of switchyard structure is not in the scope of this tender. The foundation with concreted anchor bolts shall be made available by purchaser well in time to enable the contractor of this work to get a clear working front. The switchyard structure shall be made available to the contractor in the knocked down condition either at site or from any other store of GETCO in radius of 100 KMs. Small parts like cleat, plate fastners step bolts and other accessories (if any) shall also be supplied as above separately. Before Commencement of the erection work, the contractor shall check cast foundations and anchor bolts for their individual ad mutual distances and also for the correctness of concreted bolts in terms of number and verticality. In case of any disagreement with the lay out drawing, the matter may be referred to Engineer in charge for remedial measures who in turn will arrange such remedial measures, However, the contractor shall also render necessary assistance in the matter. The erection of structure shall be done strictly as per the approval set of structure drawings to be given by the Purchaser. The erected column for bringing the structure in alignment or bringing the structure in plumb shall be allowed. The erection of column/beams shall be done in phased manner on already erected column. The elevation faces the beam should be first fastened to the column one and thereafter plan bracings should provide one by one to complete the beam geocentric pre-stressing of beam member for alignment should be avoided. In case of difficulty in fabricated material or otherwise, the engineer in charge should be contacted for remedial measure who in turn will take necessary action. However the contractor shall also render necessary assistance in this work to Engineer in charge for speedy completion of work. The load points, rings bracing shall also be provided as per drawings. The Cross-connected beams should be perfectly at right angle and matching with respective faces of the column. No. column or beams shall be erected with missing members. The method of erection is not being dealt with in details here. However, while making the rigging arrangement, it should be ensured that no column beam or part thereof is damaged due to misjudgment. All the members, plates, cleats, bolts, buts and other accessories should be fitted to the column, beam support structure as per the approved drawing. After the erection of beam and column, the bolt, nuts should be properly tightened and centre punched. The thread protruding bout should be dented in the contact Page 1. 26 ERECTION OF SWITCHYARD STRUCTURES 12. 13. 14. 15. 16. 17. 18. EXECUTIVE ENGINEER (CONST) GETCO: ANJAR Signature of Contractor 27 11. Page 10. surface of nut at 3 point 120 degrees apart to eliminate loosening of bolt due to vibration. The stringing of bus bas conductor be done only after getting certificate from engineer. In charge that all bolts & nuts are provided as per approved drawing and tightened. The equipment support structure should also be erected like gently column. They should well be in plumb with all members fitted as per approved drawings and bolt nuts properly tightened. The contractor shall also take care to see that the alignment of foundation of equipment support structure is well done. The equipment support structures shall be erected as per the approved drawings. All the structure to be erected in line level and in plumb as per instruction of Engineer-in-charge. If any structures falls after erection but before grouting then it is responsibilities of Contractor to bet replace damaged members at his cost. After taking delivery of the structures from GETCO stores than contractor is fully responsible for safe custody and theft which will be at Contractor‟s cost till completion. During erection due care is to be taken for any damage to any equipment in side the S/S yard and any damage to the equipment is at Contractor‟s Cost. Required tools, tackles, ropes, spanners and skilled labours etc. are to be arrange by the Contractor at his cost. All bolt and nuts to be fixed properly and spring washer, flat, washer to be used as per drawing. If any minor fabrication / modification is required during erection to the structure i.e. holes, cutting, which is to be carried out by the Contractor at free of cost. Any loose materials which obstacles during the erection is to be shifted by the contractor for which no extra charges is to be paid. Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. All the equipment to be opened carefully and any damage during opening of equipment cases or during shifting of at erection places will be at Contractor‟s cost. Before erection of equipment it should be cleaned properly or if required may be washed as per instruction Engineer-in-charge. Before erection initial testing of equipment whatever is required is to be done with the help of Engineer-in-charge for which no any extra charge will be paid. Arrangement of erection is to be get inspected by Engineer-in-charge before erection of equipment and its structure. No any extra charges is to be paid if any equipment is required to change its position as per requirement after erection. Within the sub-station yard no any extra shifting charge will be paid to the Contractor for any equipment. The detailed drawings of equipments can be seen from this office during any working day and the equipments which are to be erected can also be seen physically at Wankaner/ Gondal store during any working day and time. The erection work should be carried out according to the specification as per instructions and programmed laid out by the Engineer in charge. Contractor has to ensure safe shifting and shifting and erection of all accessories/ equipments as per standard norms. The contractor has to arrange for minor fabrication (if required) at free cost & follow all labour laws I.E. Rules safety rules, Insurance rules, GETCO rules at his risk & cost. All the equipment to be opened carefully and any damage during opening of equipment cases or during shifting of at erection places will be at Contractor‟s cost. Before erection of equipment it should be cleaned properly or if required may be washed as per instruction Engineer-in-charge. Before erection initial testing of equipment whatever is required is to be done with the help of Engineer-in-charge for which no any extra charge will be paid. Arrangement of erection is to be get inspected by Engineer-in-charge before erection of equipment and its structure. No any extra charges is to be paid if any equipment is required to change its position as per requirement after erection. Within the sub-station yard no any extra shifting charge will be paid to the Contractor for any equipment. The detailed drawings of equipments can be seen from this office during any working day and the equipments which are to be erected can also be seen physically at Wankaner/ Gondal store during any working day and time. Page 1. 28 ERECTION OF EQUIPMENTS 17. The erection work should be carried out according to the specification as per instructions and programmed laid out by the Engineer in charge. Contractor has to ensure safe shifting and shifting and erection of all accessories/ equipments as per standard norms. 18. The contractor has to arrange for minor fabrication (if required) at free cost & follow all labour laws I.E. Rules safety rules, Insurance rules, GETCO rules at his risk & cost. 19. The Secondary equipments like Breaker, CT, CVT, PT, LA (Surge arrestors) wave trap etc. Shall be procured by the contractor from the site store centre or other store centers of the purchaser and transported to the site at the cost of contractor. The contractor shall also do loading and unloading of the equipment. 20. After the arrival of equipment at site, packing shall be gently removed without causing any damage to the equipment. The equipment shall be checked for its correctness of dimension, make etc. as per the approved drawing. The equipment then shall be cleaned by a piece of cloth and made ready for erection. 21. The equipment shall be mounted on the ready pedestal (of masonry) or steel structure as the case may be and checked the same for its verticality. Construction of masonry pedestal is not in the scope of this work. 22. All the clamp connector and fitting shall be provided as per the approved drawing of equipment by the purchaser except “T” connector to be provided on buses. 23. In case of CT, PT by CVT, the junction box or terminal box of the equipment shall be opened, cleaned and all their connections should be checked. 24. The arcing horns or corona control rings shall be provided as per the approved drawing. Similarly all fittings etc. shall also be provided as per the approved drawings. 25. The electrical connection of the equipments through jumpers or through 4” aluminum pipe shall be carried out kiosk or to the control relay panels. The connection of high voltage terminal of equipment shall not be resorted to, unless secondary connection or cabling work to control equipment is over. Testing of equipment shall also be done to ensure the correct wiring sequence of the equipment and continuity before energizing equipment by EHV. 26. Polarity of the equipment to be connected on HV side should be checked prior to erection. The oil level (if any) of the equipment should be checked for its totality. If level is found to be inadequate, topping filling of oil should be resorted to. The purchaser free of cost will supply the quantity of oil required. 27. Fuse, links, etc provided in the secondary box of the equipment shall be checked for their position and continuity and any lacuna observed will be set right before taking the equipment for commercial use. 29 EXECUTIVE ENGINEER (CONST) GETCO: ANJAR Page Signature of Contractor Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com Purchaser intent to procure SF6 circuit breaker for the voltage class of 400/200 KV switchyards. The purchaser shall procure switchyard SF6 circuit breaker. 2. The circuit breaker shall be taken delivery from the site/other stores of purchaser and transported to the work place will in time on loading/unloading. The crates containing the insulators and important parts and accessories shall be opened carefully keeping them in their proper position. Insulator parts and other accessories shall be thoroughly cleaned for any deposits of dust or other particles. 3. The breaker shall be brought on the pedestal of masonry or steel frame as the case may be in up right position without any inclination. The main parts of the equipments shall be assembled as per approved drawing to be submitted by purchaser. The purchaser shall requisition service of commissioning engineer of circuit breaker manufacturer. However, the contractor will not remain contended with the instruction and guidelines given by the commissioning engineer and shall also use his judgment in better erection of commissioning practice of circuit breaker. 4. After the placement of circuit breaker in position the kiosk of the breaker shall be thoroughly inspected and any lacuna found shall be reported to the engineer in charge of the work. The HT terminal connection shall be done only after the terminals of the equipment kiosk are made to the marshaling kiosk and or the control/relay panels. Polarity of the equipments shall also be ensured before physical erection. 5. The method of erection of breaker is not dealt with in details, however, it is recommended that breaker poles shall be erected only by using telescopic crane or other suitable mechanical arrangement. The rigging should be tool proof. 6. The operating mechanism in the breaker Kiosk and contacts as well as the power supply circuits (AC/DC) shall be property checked for its operation worthiness. All piping for gas/air shall be laid as per the approved drawing. The air receiver or compressor shall be positioned as per the relevant drawing. Minor fittings and fabrication or grouting work required to place these articles or accessories shall be done by the contractor without any extra cost to the purchaser. In case of breakers with spring mechanism the trials of the mechanism by actuating should be done to ensure it‟s line worthiness. Page 1. 30 ERECTION OF CIRCUIT BREAKER 7. 8. EHV side of the breaker should be aligned to a incoming and outgoing bus conductor of 4” IPS aluminum tubular pipes. Whiles erecting the breaker, the operating mechanism without the porcelain insulator should be laid perfectly to avoid any mal functioning of the breaker. Earthing points of the breaker as well as attached kiosk be connected to earth grid by means of risers already available nearby the equipment. The purchaser free of cost shall make pieces of galvanized earthing strips available. Any other erection checks and pre-cautions indicated in the manual furnished by the respective supplier of the equipment shall be studied well by the contractor and the provisions there of shall be implemented as far as possible. 2. 3. 4. 5. 6. Isolators of dis-connectors for the 200 KV and 66 KV switchyard shall be with or without earth blade type. They are also further categorized as pantograph type of centre breakers type etc. The isolators shall be procured by the contractor from the site stores of the purchaser and transported to the work site. All the spare parts shall be properly unpacked cleaned and made ready for erection. Before erection, the contractor shall obtained copies of approved drawing of respective equipments. The isolators shall be erected on the ready galvanized structures. The purchaser along with support structure shall supply pantograph isolators. However, foundation for them will be available readily at the respective points in the switchyard. The contractor shall check the erected support structure for their alignment vertically and tightness of fasteners before mounting the isolators part on them. The contractor shall also verify the mounting arrangement for the operating mechanism on this structure and suitable for the same. In case of any shortcoming the matter may be reported to engineer in charge. Any modification of trivial nature for the structure of fixtures shall be carried out free of cost. The parts of the isolators, fixed and moving contacts earthing rode etc. shall be handled very carefully to avoid breakage or distortions. The erection shall be carried out using mechanized erection tools. The polarity of the isolator polls shall be properly identified and also the direction of the opening should be pre-determined. It should be ensured that in the entire switchyard the isolator open and close uniformly (direction point). The operating mechanism for the line contacts shall be thoroughly checked for their accessories as per approved drawing and it should be ensured that all the connection fuses links dehumidifiers lighting sockets electric motors are in their proper position. Any deviation form the approved should be got sat right with the help of engineer in charge. Position any deviation from the approved drawing should be got set right with the help of Engineer –in-Charge. While erecting the isolator, it should be ensured that it should be properly aligned with respect to bus conductors or line conductors or 4” IPS tubular aluminum bus bard provided in the switchyard. The erected isolator shall be within the plumb. The operating mechanism rods, pole and rotation insulators shall be checked for their proper function. The testing of the wiring to the kiosk should also be done to ensure its operation worthiness The final commissioning of the isolator should be done only after connection to control panel is affected. However prior to that it should be ensured that the physical movement of the fixed and moving contacts and reach of them is within the prescribed limit. Page 1. 31 ERECTION OF ISOLATORS 7. The pantograph isolator shall be erected along with the tubular structure on the ready foundation. It is very much essential to align pantograph isolator longitudinally and laterally which is also in tandem. The vertical movement of the pantograph arms should be properly checked and aligned with the horizontal contact bar hanging from the line / bus conductors so that the moving contacts of the pantograph isolator grips the horizontal contacting bar. In center of the moving contact. The master and follower operating mechanism should be checked for their sequence of operation and fit should be ensured that the circuits are exactly as per the circuit diagram approved by the purchaser. ERECTION OF CONTROL & RELAY PANELS 3. 4. 5. 6. 7. 8. EXECUTIVE ENGINEER (CONST) GETCO: ANJAR Signature of Contractor 32 2. The contractor shall procure the control and relay. Panel from site store or any other stores of the purchaser and transport the same to the erection site. The cases containing the panel shall be unpacked carefully and shall be nicely cleaned. Any of external damage is observed, same shall be brought to the notice of Engineer incharge. The panel shall be unpacked in up side position. After an external visual inspection, the panel door shall be opened and checked for the circuit connection, terminal connector, dehumidifier, power connection etc. A front side of the panel shall be checked for the meter indicator, hooter, semaphore indicators etc. for their position, rating and dimension by comparing them with the approved drawing. The over all dimension of the panel should also be verified. Any lacuna in the equipments, circuits, fittings, dimensions etc. observed shall be brought to the notice of Engineer in charge who will try to impose remedial measures. The relay panel should also be checked for type of schemes adopted for protection, internal connection, fascia indicator etc. Any difference observed should be brought to the notice of Engineer in charge who will take necessary action. After all the inspection of control panel and relay panel is over, the equipment will be transported from inspection room to their respective place in the switchyard. The panel shall be erected along cut outs provided in the slab concrete, it is decided by Engineer in charge or which is approved by authorized drawing. The size and number of cores of cables be brought from the equipment to control panel, control panel to relay panel and back to equipment shall be pre- determined by study. The panel for communication and tale control protection system shall be erected at the separate space provided for them in the control room and shall be distinctly away from site control panels. Connections and circuit of PLCC panels shall be altogether different from that of control and relay panel for feeder. The contractor shall synchronize the activities of panel erection in such a may that cabling work from the control room to field kiosk and thereafter to the equipment kiosk shall be suitably checked as per the approved drawing as well as actually field – testing requirement. After the erection of control panel and relay, panel, all the equipments, accessories indicators etc. along with the internal wiring and other accessories provided with the kiosk of the panels. Page 1. Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com ** TECHNICAL SPECIFICATION ** Sub-station structures and equipment earthing. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Executive Engineer (Const.) GETCO, Anjar. 33 2. Earthing pits are to be excavated as per standard drawing and as per instruction of Engineer-in-charge of s/s. Generally in rocky / soft rock strata mesh type earthing are to be provided from scrap / flat which will be given to the contractor at free of cost for which account to be submitted and necessary fabrication welding, joining with pipe is to be done by the contractor. Back filling and watering of earthing pits is to be done in the presence of GETCO Supervisor only. Contractor has to arrange watering in such way that resistivity of each pit should comes to the required limit. For laying of earthing strip in side the sub-station yard for equipment and s/s structure contractor has to be carried out as per the specification is to be laid properly by making welding joint and bolth wherever is required. In case of hard strata contractor has to fill-up earthing trench after laying of strip by black cotton soil. All earthing joints are to be welded with structure of equipment by means of proper welding and bolts with structure and with the earthing pits. All the welded joints are to be painted with Aluminum Paint. For earthing GETCO will supply only G. I. Strip & Scrap for mesh, remaining materials such as salt-cock pipe etc. is to be supplied by the contractor. All earthing joints including the earthing trench is to be made over lapped with earthing strip. The drilling of the bore should be carried out as per specification given in standard Corporate office approved drawing. The bore should be fill up with black cotton soil & bentonite powder as per instruction of E.I.C. The welding joint, bolting, over lapping of round bar, G.I. plate etc. as per standard Corporate office approved drawing. The arrangement of riser for earthing system of all equipments are as per standard Corporate office approved drawing. The laying of earthing strip is as per earth mat layout plan as per standard Corporate office approved drawing. The laying of earthing strip in excavated trench size 0.6 x 0.3 & fully back filling with black cotton soil with pouring of water. The design of earthing system should be as per standard Corporate office approved drawing. The approved drawing of earthing system design available with SDO/D.O. Page 1. Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com ** TECHNICAL SPECIFICATION ** Bus bar / Earth wire stringing. 1. For stringing of conductor any size or any type is to be utilized which must be properly cut after taking correct measurement. 2. Conductor to be spread in a straight condition and no any twist is permitted if any twist is there than same is to be replaced by the Contractor at his cost. 3. No any scratches should be allowed during spreading bus conductor. 4. All disc. Insulators are to be cleaned and all the ‘W’ pin must be ensured before fixing to the conductor. 5. Before taking the tension of bus conductor on gantry beam, beam tension plate bolt, nuts to be checked and tighten. No over tension is to be allowed during tensioning of conductor and sag of conductor is to be kept as per instruction of Engineer-in-charge. 6. Wherever spacer are required to be provide at regular interval as per instruction of Engineer-in-charge. 7. Jumpering is to be done as per standard practice however it must be done with taking proper care of clearance between conductor and column. Page 34 Executive Engineer (Const.) GETCO, Anjar. Regd. Office: Construction division Office, 220KV S/S Compound, ANJAR - KUTCH – 370 110. Telephone No. (02836) 245784 Fax No.(02836) 241588 E-mail:- eeconstanj@yahoo.co.in E-mail:- b.thumar@getcogujarat.com Page (1) Laying and termination of control cable work shall generally includes following. a) Control and power cable from individual equipments kiosk to the field kiosk. b) Laying and termination of Control and LT Power cable from field – kiosk to control room equipment (i.e. LT switchgear, DC battery and control panel / relay panel). c) Laying and termination of cable from the transformer kiosk to transformer panel and up to AC / DC supply source. d) Laying and termination of control cables from control panel to relay panel and vice a versa. e) Laying & Termination of cable from DC/AC source, battery room LT switchgear room to control / relay panel. f) Laying & Termination of Control / Power cable from Diesel generating set terminals to LT switchgear room. g) Laying & Termination of cable from 11KV / 400V distribution transformer to LT switchgear room. h) Laying & Termination of cables from station transformer to distribution transformer in the switchyard as well as in the residential quarter area. i) Laying & Termination of LT power cable from station transformer to fire protection system kiosk (If required). j) Laying & Termination of control cable from communication and Tele-protection equipment to their respective equipment and panel. (2) The Contractor shall first of all prepare cable schedule after studying the various control schemes, protection schemes and metering scheme as well as communication, scheme etc. as per the approved drawing which the purchaser makes available. The cable schedule shall be got approved from engineer in charge of the work. (3) „The contractor shall procure‟ the required size of control and power cable from the purchaser‟s site store to any other stores from where the same allotted and transport it to its site store. (4) The control cables shall be terminated using correct type of lugs and further prodded with ferules giving the identification number of various cores of the cable. Correct type of tools fro termination shall be used to secure a rigid connection of the cable tray along with the cable trenches. Normally mild steel, racks and cable trays are provided in the cable trench. However, the purchaser may it its‟ own discretion prefer to utilize fiber reinforced poly propylene (FRP) cable racks and trays. In such an event, the racks trays, will be supplied by the purchaser to the contractor in a knocked down condition. The contractor shall assemble the rack and provide trays on them as per the approved drawing given by the purchaser. If FRP trays and racks are to be utilized, the contractor will have to take extra care while laying the cable through different layer and racks to avoid any displacement or 35 LAYING OF CONTROL CABLES & TERMINATIONS (5) (6) (7) distortion of the FRP racks. However, if the laying of prefabricated FRP racks and trays fall in the scope or FRP rack / tray supplier. the contractor shills co-ordinate and synchronize his cable laying activities with respective supplier of FRP rack / trays. Utmost care shall be taken by the contractor to prevent damage to outer insulation and the armors of the cables. No joint to the cable shall be permitted. Unless situation so warrants and Engineer in charge permits the same. After laying all the power and control cable shall be properly identified giving the serial either a number and details of end connections. GENERAL PRECAUTIONS FOR HANDLING CABLES: Page (8) LAYING OF CABLES (UNDERGROUND SYSTEM) : 1. Cables shall be so laid in ground in such a way that these will not interferes with other underground structures. All water pipes sewage lines or other structures, which become exposed by excavation shall be properly supported and protected from injury until the filling has been rammed solidly in places under and round them. Any telephone of other cables coming in the way is to be properly shield/diverted as directed by the engineer-in-charge. Cable shall be laid at a minimum depth of 600mm from ground level excavation will generally be in ordinary soil. The width of the trench shall be sufficiently for laying or required number of cables. The surface of the ground after back filling the earth shall be made goods go as to confirm in all respects to the surrounded ground and to the entire satisfaction to site engineer. 2. For laying cable and clamping on structure for flood lighting clamps are to be provided at approximately one meter distance. To fix the clamp on structure either 5mm diameter bolts are to be welded on structure of hold can be drilled on structure leg in such a way that 2 core cable can be clamped in straight run on structure up to the flood lighting terminals. For wall mounted fixtures the cable shall be laid on wall by using grooved wooden base block, G. I. Saddle screws etc. 3. Joints in the cable throughout its length of laying shall be avoided as per as possible and if unavoidable prior approval of site engineer shall be taken. If allowed proper straight through epoxy joint shall be made without any additional cost. A loop of one meter of each length of cable shall be left near each street light pole. Also a loop of one meter shall be provided on both ends of the cable. This additional length shall be used for fresh termination on in figure. Cable for this loop shall be paid for supply and laying. 36 1. The cable shall be supplied for site wound on wooden drum as per as possible. For smaller length and sizes cable in property coiled form can be accepted. The cables will be laid by mounting the drum of the cable on drum carriage. Where the carriage axle and the cable laid out from the drum in on case the cable will be rolled on as it produces kinks which may damage the conductor. 2. Sharp bending and kinking of cables shall be avoided. The binding radius for PVC insulated and sheath Before laying cables these shall be tested for physical continuity absence of cross phasing insulation resistance to earth and between conductor insulation resistance tests shall be carried out with 500/1000 volts meager. 3. armored cable shall not be less than 10 „D‟ where „D‟ is overall dia of the cable. Armored cables never concealed in roads without G. I. pipes or R. C. C. pipes ( required pipes will be supplied by the contractor ) After drawing cable the and of pipe shall be sealed with cotton/bituminous compound. TERMINATION AND JOINTING OF CABLES: On both ends of cables suitable size braes heavy duty. Cable glands shall be used before it enters junction box/main L.T Panel/joint box etc. Armor of cable shall be connected to earth point. EXECUTIVE ENGINEER (CONST) GETCO – ANJAR 37 __________________ Signature of contractor with Rubber stamp Page (9) Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 GRAM: TRANSGRID Phone No.(02836) 245784 Fax No.(02836) 241588 CIRCLE OFFICE, Nr. ST Bus Stand, ANJAR - KUTCH – 370 110. E - Mail:- anjarsetr@yahoo.co.in price T E N D E R BID C O P Y NAME OF WORK: Page 51 Erection of 2 no's 66 kV feeder bay Structure / Equipment, Bus Bar Stringing and Earthing work at 66 kV Khambhara sub - station for proposed LILO line from Anjar-Khedoi line. GUJARAT ENERGY TRANSMISSION CORPORATION LTD Const Division, Anjar. NAME OF WORK: ERECTION OF 2 No's 66 KV FEEDER BAY STRUCTURE / EQUIPMENT, BUS BAR STRINING AND EARTHING WORK AT 66KV KHAMBHARA SUB - STATION. FOR PROPOSED LILO LINE FROM ANJAR-KHEDOI LINE. // SCHEDULE "B" \\ Sr. No. DESCRIPTION EST. QTY. RATE UNIT 1 Erection of S/S structure & eqipment including punching of nut bolts. Rates are inclusive of shifting of same upto erection site from its S/S store. (A) 66 KV (Sor item D -11) 7 1800.00 MT 12600.00 2 Erection of 66 KV breaker (all type/make) including fixing of all its accessories, fittings,connections etc. complete as per owner's / supplier's instruction manual and as per instruction of engineer in charge including individual & interpole wiring of operating box and that with M.K.BOX. Erection is to be carried out by using required capacity of crane only. Rates are inclusive of dragging/loading/unloading of same from site store to erection site. With out crane is permitted. (Sor item D -2) 2 4000.00 Set of 3 pole. 8000.00 6 300.00 Per Phase 1800.00 2 Set of 2500.00 3 phase 5000.00 2 1800.00 Set of 3 phase 3600.00 6 450.00 Per Phase 2700.00 3 4 5 6 Erection of LA's (all type/make) on it's erected structures including complete dragging /loading /unloading of the same from site store to erection site and fixing of required clamps, connectors, corona rings, surge counter and other accessories etc. as per instruction of Engineer-in-charge. (Sor item D -4) (D) 66 KV Erection of centre break isolator (all make) with earth blade on its erected structure consisting of 3 base channels with porcelain/solid core insulator including interconnected piping with operating mechanism and accessories with final adjustment for simultaneous operating & closing. The rates are inclusive of dragging/loading/ unloading of the same from site store to erection site.as per instructions of Engineer-in-charge. (Sor item D -5) (A) 66 KV -DO - but for with out earth blade complete. (Sor item D -6) (B) 66 KV Erection of CT/PT (all type/make) on it's erected structure including complete dragging/ loading/ unloading of same from site store to erection site and fixing of required clamps,connectors as per instructions of Engineer-in-charge. (Sor item D -3) (D) 66 KV CT/PT (without crane permitted) AMOUNT Sr. No. DESCRIPTION 7 Erection of 66KV PLCC equipment on feeder bay. The consist of erection of wave trap of gantry, erection of CVT/ CC Coupling Filter/ with earth switch & required accessories. Rates are inclusive of shifting of same upto erection site from its S/S store. Also this includes providing & termination of CVT/ CC / HF Terminal to coupling filter by 16mm2 copper cable by lugging at both end & as per instruction of EIC / EE {PLCC}/ D.E. {PLCC}/ D.E. {Const} (NON SOR). As Per Order No. 0809/DN/ANJ/PRJ/23B-1/W-846/4661 dtd 17.12.2008 8 9 EST. QTY. 2 RATE UNIT Per 2500.00 Feeder bay AMOUNT 5000.00 Installation of earthing strips including digging of 600 mm depth and 450 mm wide trench/fixing on structure as per attached drawing including fixing arrangement with two bolts arrangement, jointing, with nut - bolts and lap welding and appLaying zinc rich paint on added joints including supply of GI nuts & bolts as per specification.(Soritem D-7) 350 (B) 50 x 6 mm G.I. strip Grouting of all structures including leveling with ratio1:2:4 mix.including supply of cement. 1 (Sor item A -6) Installation of earthing pits as per drawing attached herewith by providing 100 mm inner diameter cast iron pipe of min 13 mm thickness and 3000 mm length. Work incudes fabrication and fixing of GI strips for earthing connection as per drawing attached. Excavated earth pits should be filled by mixture of coke-charcoal, salt and sand up to top. Further this includes providing of Brick masonry chamber of size 450 mm x 450 mm & depth upto 1000 mm as per the instruction of engineer in charge including light type C.I. cover with frame and applying 12 mm thick cement plaster in 1:3 inside 10 and to all the exposed faces upto 300 mm below. Foundation level, curing etc. complete. Extra earth should be removed away from the site S/S premises or refilling earthing pits if required. All required materials for this job such as C.I. pipe cover with frame, salt, cement, sand, charcoal, gravel bricks etc. to be supplied by the contractor. Required bolts, nuts and washers, number plates or painted plates also shall be arranged by the Contractor. Tentative quantity of salt and charcoal shall be 2.5 cu.m. (SOR Part D - 18) 10 22.00 Mtr. 7700.00 3900.00 CMT. 3900.00 6800.00 No. 68000.00 Sr. No. 11 12 13 14 15 16 DESCRIPTION EST. QTY. Erection of control panel, relay panel,or C.R. panel or RTC panel including grouting of panel,jointing with adjoing panel including required fabrication for entry of control cables and complete verming 2 proffing. Job includes supply of required bolts,nuts etc and shifting of panel from S/S site to work site.(Sor item H -1) (D) 66 KV Fabrication in Sub Station / Equipment structure required as per instruction of engineer in charge 1 (NON SOR) As Per Order No. W.O.NO:CDA/AB/ W698/2007/3072 DT: 30.6.2007 Erection of Polycone/solid core Bus post insulator on it's erected structure including complete fixing accessories and shifting of same loading and 4 unloading from it site store to erection site.as per instruction of engineer in charge.(Sor item D - 8) 66 KV Transportation of any store material/Equipment from Any store to work site including Loading Unloading. Each trip will be consider as10.0 MT 8 Vol. trip (Sor item C -9) (1) With in Range of 70 KMS {2} More than 70 KMS 700 Preparing of cable & Control Wiring Schedules based on the Schematic drawings supplied by the Board for the switch yard & control room equipments as mentioned below:- REF : W..O. 2 NO.08-09/DN/ANJ/PRJ/23B-1/W-846/4661 DTD.17.12.08 OF 66KV SUKHPAR SS (B) Complete set euip. of two 66 kV Feeder or Transformer of 66kv or any other scheme.(NON SOR ITEM) Laying of 1.1 KV PVC armored copper / aluminum cable inside hume pipe / cable trench including binding /clamping of cable with GI wire as per requirement including supply and fixing of identification tags on both ends and at distance every 100 mtrs for following size. (SOR item H-7) A) 2C x 2.5 mm 2 , 2 C x3.5 mm 2 ,4C x 2.5 mm 2 ,7 C x 2.5 mm2 , 4C x 4 mm2 Copper control cable 150 or any equivalent size of all LT cable B) 12C x 2.5 mm , 12C x 4 mm 2 , 12 C x 6mm 2 ,19 C x 2.5 mm2 , 27C x 2.5 mm 2 , Copper control 350 cable , 3.5 C or 4 C x 10 mm 2 , 70 mm2 aluminum armored or unarmored LT power cable RATE UNIT AMOUNT 500.00 Per No. 1000.00 3000.00 3000.00 L.S. 200.00 Per No. One trip of 20 3125.00 girder/r ail or 9 MT 5.00 MT/KM 800.00 25000.00 3500.00 1500.00 Job 3000.00 4.50 Per RMtr. 675.00 7.50 Per RMtr 2625.00 Sr. No. DESCRIPTION EST. QTY. RATE UNIT 15.00 Per Rmtr/ 450.00 40 18.00 Per Rmtr/ 720.00 A) 2CX2.5mm2, 4CX2.5mm2, 7CX2.5mm2, 4CX4mm2, etc. copper control cable or any equivalents size of all L.T. control cable. 30 200.00 End 6000.00 B)12CX2.5mm2, 12CX4mm2, 12CX6mm2, 19CX5mm2, 27CX2.5mm2, 2CX35mm copper control cable 3.5c or 4CX10mm2, to 70mm2 aluminum armored or unarmored L.T. control cable. 16 350.00 End 5600.00 30 15 100.00 160.00 Mtr. Mtr. 3000.00 2400.00 10 10 25.00 35.00 Mtr. Mtr. 250.00 350.00 20 15 30.00 35.00 No. No. 600.00 525.00 Laying of 1.1 KV PVC armored copper / aluminum cable in ground by digging trench of suitable width and 450 mm depth in any type of soil including supply and fixing of identification tag on both end and at distance every 100 mtrs for following size (Sor Item H - 8). 17 A) 2C x2.5 mm 2 2Cx3.5 mm 2 , 4C x 2.5 mm 2 7 C x 2.5 mm 2 , 4C x 4 mm2 copper control cable or any equivalent size of all LT cable B) 12 C x 2.5 mm 2 , 12 C x 6 mm 2 , 19 C x 2.5 mm 2 , 27 C x 2.5 mm2, copper control cable , 3.5C or 4 C x 10 mm 2 ,70 mm 2 aluminum armored or unarmored LT power cable. 30 AMOUNT Termination of the control cable at panel/M.K.box/equipments including supply of required size of cable glands,lugs,ferrules,PVC binding taps-buttons,and incuding dressing/shaping drilling of holes in glands nuts for following size. ( Non SOR) Ref : 09-10/DN/ANJ/PRJ/W-903/4726 dtd 17.11.09 of 66 kV Nirona s/s 18 Providing and fixing 'B' class G.I. pipes of following size for cable protection including fixing with the structures.( Non SOR) Ref : 09-10/DN/ANJ/PRJ/W19 903/4726 dtd 17.11.09 of 66 kV Nirona s/s {A} 25mm dia {C} 50mm dia Providisng & Fixing PVC pipes of heavy duty and flexible PVC Pipe of following size for Cable protection including fixing with equipment Str. (NON 20 SOR) Ref : 09-10/DN/ANJ/PRJ/ W-903/4726 dtd 17.11.09 of 66 kV Nirona s/s {A} 25mm dia {C} 50mm dia Providing and fixing of connectors of Approved make of following size and type including fixing hardware. ( Non SOR) Ref : 09-10/DN/ANJ/PRJ/ W21 903/4726 dtd 17.11.09 of 66 kV Nirona s/s A) Stud type 5 mm dia. Size. B) Stud type with disconnecting link. Sr. No. DESCRIPTION EST. QTY. RATE UNIT 12.00 Rmt./ Single Cond. 1620.00 6 150.00 NO 900.00 6 100.00 NO 600.00 (3) 66 KV BREAKER 2 500.00 NO 1000.00 (4) 66 KV GI STRUCTURE 7 90.00 MT 630.00 1 60.00 MT 60.00 2 3625.00 No. 7250.00 5 80.00 JOB WORK 400.00 4 50.00 NO 200.00 Preparing and fixing of required length of jumper in switch yard on Bus and equipment.tensioning 22 &dressing of jumpers complate as per instruction 135 of engineer in charge.(Sor item D -16) (C) Single MOOSE/ZEBRA/PANTHER Loading & Un-Loading of structure,equipment,etc. (including stacking) (Sor item F - 3) (1) 66 KV CT & PT 23 (2) 66 KV LA (5) CONTROL & POWER CABLE DRUM Providing & Fixing of SMC type outdoor all weather proof junction bx for CT & PT terminations with 20 nos. of disconnecting type "Elmex" make 24 connectors as per instruction of Engineer-in-charge. . (NON SOR) BFL Project A/T No. CE(Project)/ACE/V/ EPC / 66KV/03/V/3264, Dtd:31.05.2006. Item No.24. Provide & fixing on 200 mm dia Alluminium disc for equipment name plate.with black &white colour 25 complete as per instruction of EIC(NON SOR) .W.O.NO:CDA/AB/W-698/2007/3072 DT: 30.6.2007 Provide & fixing radium name plate for 66 kv feeder name on panel & YARD complete work 26 asper instruction of EIC.(NON SOR). W.O.NO: CDA/AB/W-698/2007/3072 DT: 30.6.2007 TOTAL AMOUNT RS. 190455.00 { RUPEES ONE LACS NINTY NINTY THOUSAND FOUR HUNDRED FIFTY FIVE ONLY } Note : Service Tax will be reimbursed to contractor after producing proof of such payment made to appropriate authority. Executive Engineer, Construction Division, GETCO, Anjar CERTIFICATE I/ We am / are willing to carry out the above work at________________(in figure) ______________________________________________(in words) % the tender amount work out as Rs. _________________________(in figure) Rupees in words) __________________________________________________ __________________________________________________________________ Signature of Contractor, (With Rubber Stamp & Date) Supdt. Of A/c D.O. ANJAR. Dy. Engineer (Tech) D.O. ANJAR. Exe. Eng. (Const.) D.O. ANJAR.