OSSP Streamline Tailoring for Productivity and

OSSP Streamline Tailoring for Productivity and Success
The “China Buffet”
Will McKnight
Edaptive Systems
Process Improvement Specialist
Introduction
Describe what the teams actually do
Thin process
Feedback loops
Tailor to fit
Be on the same page
Monitor and measure
Communicate
2
The Process Improvement Structure
Management
Steering
Committee
PATs
EPG
PATs
PATs
PATs
3
The Project Improvement Structure
PPQA
EPG
Projects
MA
PAL
CM
The Business Challenge
Change
behavior
Write
process
The Business Challenge
Model focused
process definition
The Team Challenge
7
The Plan
The Plan
The Results
1. Purpose
<Describe the value of the main output created by this procedure. Start paragraph with “This
procedure”>
1.1


1.2



Entry Criteria
<Condition(s) that must be satisfied prior to entering this procedure>
<One criteria per line>
Input
<Work product that is already in existence and consumed by a step within this procedure>
<Template consumed by a step within this procedure>
<One input per line>
Step
Executed By
Description
1.
<Responsible Role>
<Action taken to produce result>
2.
<STANDARD: Only one action / result per step>
1.3


1.4


Output
<Final work product(s) created by executing this procedure>
<One output per line>
Exit Criteria
<Condition(s) that must be met to exit this procedure>
<One criteria per line>
The Engine
11
The Process Flow
Phases
Entry Criteria
Input
Procedure
Procedure
Exit Criteria
© Copyright 2016 Edaptive Systems. All rights reserved.
Output
12
The Procedure Template
Entry Criteria
Inputs
Procedure
Outputs
Exit Criteria
13
The Results
Each new
procedure
becomes a
selection
available on the
“china buffet”
The Selection
LC Phase
Procedure Selection
Initiation and
Planning
EPLC Kick Off
EPLC PMP
PMP Supplement
EPLC PPA
Kick Off Lite
PMP Lite
PMP Supplement Lite
PPA Lite
EPLC Schedule
Schedule lite
Remote Kick Off
Hi Risk PMP
New Client Supplement
PPA Full
The Tailoring Matrix
Project Name:
LC Phase
Initiation and Planning
Lifecycle Activity
Kick off
Project Management Plan
Project Management Plan Supplement
Requirements
Remote Kick Off
EPLC PMP
PMP Supplement Lite
PPA Population
PPA Full
Project Schedule
EPLC Schedule
Business Requirements Documentation
Peer Review
BRD Approval
Design
Selected Procedure
System Design Document
System Requirements Specification
Test Case Specification
EPLC BRD
BRD PR
EPLC BRD Approval
EPLC SDD
SRS Full
TCS Detailed
The Finale
17
The Lessons Learned
•
•
Capture the as-is first
Don’t fix what isn’t broken
•
Don’t deploy until you are
ready to audit and measure
•
It’s never done in one pass
– be prepared to do and do
again
•
The EPG is the facilitator –
the project team is the
content SME
•
Make sure everyone is on
the same page