OSSP Streamline Tailoring for Productivity and Success The “China Buffet” Will McKnight Edaptive Systems Process Improvement Specialist Introduction Describe what the teams actually do Thin process Feedback loops Tailor to fit Be on the same page Monitor and measure Communicate 2 The Process Improvement Structure Management Steering Committee PATs EPG PATs PATs PATs 3 The Project Improvement Structure PPQA EPG Projects MA PAL CM The Business Challenge Change behavior Write process The Business Challenge Model focused process definition The Team Challenge 7 The Plan The Plan The Results 1. Purpose <Describe the value of the main output created by this procedure. Start paragraph with “This procedure”> 1.1 1.2 Entry Criteria <Condition(s) that must be satisfied prior to entering this procedure> <One criteria per line> Input <Work product that is already in existence and consumed by a step within this procedure> <Template consumed by a step within this procedure> <One input per line> Step Executed By Description 1. <Responsible Role> <Action taken to produce result> 2. <STANDARD: Only one action / result per step> 1.3 1.4 Output <Final work product(s) created by executing this procedure> <One output per line> Exit Criteria <Condition(s) that must be met to exit this procedure> <One criteria per line> The Engine 11 The Process Flow Phases Entry Criteria Input Procedure Procedure Exit Criteria © Copyright 2016 Edaptive Systems. All rights reserved. Output 12 The Procedure Template Entry Criteria Inputs Procedure Outputs Exit Criteria 13 The Results Each new procedure becomes a selection available on the “china buffet” The Selection LC Phase Procedure Selection Initiation and Planning EPLC Kick Off EPLC PMP PMP Supplement EPLC PPA Kick Off Lite PMP Lite PMP Supplement Lite PPA Lite EPLC Schedule Schedule lite Remote Kick Off Hi Risk PMP New Client Supplement PPA Full The Tailoring Matrix Project Name: LC Phase Initiation and Planning Lifecycle Activity Kick off Project Management Plan Project Management Plan Supplement Requirements Remote Kick Off EPLC PMP PMP Supplement Lite PPA Population PPA Full Project Schedule EPLC Schedule Business Requirements Documentation Peer Review BRD Approval Design Selected Procedure System Design Document System Requirements Specification Test Case Specification EPLC BRD BRD PR EPLC BRD Approval EPLC SDD SRS Full TCS Detailed The Finale 17 The Lessons Learned • • Capture the as-is first Don’t fix what isn’t broken • Don’t deploy until you are ready to audit and measure • It’s never done in one pass – be prepared to do and do again • The EPG is the facilitator – the project team is the content SME • Make sure everyone is on the same page