CHANGE ORDER Distribution to: 0 0 0 0 PROJECT: College of the Desert OWNER AROIITECT CONTRACTOR FJELD 0 0 0 0 INSPECTOR OSA eflY AGeNCY OTHER CHANGE ORDER NO.: 003 DATE OF tSSUANCE: Aprit I, 2014 Project Name: Visual Arts C-OWOG'-lz. TO: Roy E. Whitehead, Inc. 2245 Via Cerro Riverside, CA 92509 Bid Package 06 - Casework & Millwork 210021 PROJECT NO.: DSAAPPL. # 04-112272 New Construction CONTRACT FOR: CONTRACT DATE: March I, 2013 Action: Request the Board of Trustees approve the contract changes contained in tile below referenced Exhibits. You are directed to make the following changes in this Contract: Reference attached Change Order Item. EXHIBIT CONTRACTOR PCO COST # Exhibit A BP06-COR-00I ASI #05 (Allowance) Exhibit B Trade Contractor Allowance Reconciliation $0.00 TOTAL CHANGE ORDER AMOUNT $ (77.00) $ (77.00) / Not valid until signed by the Owner, Architect and Contractor. Contract Sum or Contract Time . Signature of the Contractor indicates his agreement herewith, in cluding any adjustment in The original Contract Sum was Net change by previously authorized Change Orders The Contract Sum prior to this Change Order was The Contract Sum will be increased or decreased by this Change Order The new Contract Sum including this Change Order will be The Contract Time will be changed by [OJ Days. The Date of Completion as of the date of this Change Order therefore is: Contractor: / $ $ $ $ $ 92,900.00 / 5,720.73 98.620.73 (77 .00) 98.543.73 / 0- r/ o April I, 2014 ~ ..." M:tcJ.~ II II. P. Date: I Name (Printed): FINAL PRIME TRADE CONTRACT CHANGE ORDER: Acceptance of this Change Order (hereinafter CO) represents full and final settlement of all costs and claims, known or unknown, real or imagined, against the Desert Community College District for work, labor, materials, equipment or services provided under this contract and any CO's thereto and hereby releases the Oese rt Community College District from the same. Th is does not alter this contractor's ob ligations under the contract documents. Date of Board \\ pproval / f O -'I.£..l Bond gmt, Verification Su bm itted by:....:\\M..-.-"'-='---_ I have reviewed the figures submitted by the Contractor and they have been reviewed by the District. I believe this request is valid and recommend for your acceptance. Date: Architect: Perkins & Will Const. Mgt. Rep.: Gilbane Bond Planning PM: Gregg Capper. EISPRO Inspector of Record: Dave McKnig ht Owner: Steve Renew CO D Directo r of Facilities Owner: Lisa Howell CO D VP of Administrative Services Date of BoaI'd Approval Bond Mgmt, Verification Submitted by: _ __ .. ITEM CO ' Requested by: Referen ce Justification Time Extension DI STRI CT Exhibit A I BP06·COR·001 - Roy E. Whitehead , tnc. - ASt #05 District Changes H14 · BUtLDtN G COST, DI STRt CT ADDED OR DELETEDIREDU CED SCOPE None AD DIDEDUCT. ITEM CO ..' Requ ested by: Reference Justification Time Extension $0.00 DI STRI CT Exhibit B - Th is change order is to reconcile the ba lance of the trade co ntractor allowance associated with Bid Package tl06 and return any unused fu nds to the District. Final Contract Closeo ut· Roy E. Whitehead, Inc. None AODIDEDUCT. $ (77.00) TOTAL CHANGE ORDER AMOUNT:~$F======l(i;i77~/ ~O:f) CODE LE GEND ' A B C o SITE COST, UNFORESEEN FIELD CONDITION SITE COST, ERROR AND/OR OMISSION SITE COST, OISTRICT ADDEO OR DELETEOfREDUCEO SCOPE SITE COST, AGENCY OR CODE REVISION E F BU ILDING COST, UNFORESEEN FIELD CONDITION G BUILDING COST. ERROR ANDIOR OMISSION H J K BUILDING COST, OISTRICT ADDED OR DELETED/REDUCED SCOPE L CONTRACT ADMINISTRATIVE ISSUE SITE COST, CONTRACTOR IMPAC T TO ANOTHER CONTRACTOR BUILDING COST, AGENCY OR CODE REVISION BUILDING COST, CONTRACTOR IMPACT TO ANOTHER CONTRACTOR Note: "I" has been omitted to avo id confu sion with "1" 1 2 3 CONTRACTOR GENERATED CONSTRUCTION MANAGER GENERATED ARCHITECT/ENGINEER GENERATED 4 DISTRICT GENERATED 5 INSPECTOR OR AGENCY GENERATED College of the Desert Visual Arts Building Ch ange Management Log · Detail by Bi d Package Bid Package #06 • Casewo rk & Millwork - ROY E. _ ~@IUS COR No. ~ ASI ;D~es I Screen Dryer ' ;abinel pending i ' In I Change Orde, - I :; IS 'S . is 1,000.00 ~ (923.00) / ' 77.00 Tota l Olstrict Approved Al lowance Total Committed Allowance Allowance Balance Remaining S S S Tolal Contract Value Total Approved Change Orders S S 92,900.00 '" 5,720.73 / ' Revi sed Tolal Contract Value Unused Allowa nce to be Returned to District Final Contract Value S 98,620.73 / ' / . (77.00) 98,54 3,73 s - S is IS S 923.' / Is S S 923.00 S / ',5 15.48 CO#