OHIO CAT POWER SYSTEMS SERVICES MCEmax Testing Overview •MCE – Test motors and circuits off line (with the motor de-energized). •Emax - Test motors and circuits on line (with the motor energized and in operation). •MCEmax- Combination of the MCE and the Emax test capabilities in one unit. MCEmax Combination Online & Offline Test System Why Test My Motors Eliminate unexpected failures Reduce production downtime Understand the condition of your motors Quality control for repairs & spares Reduce electrical maintenance costs Increase overall plant reliability Predictive vs. Reactive PdMA Corporation Summary of Motor Failures PdMA Corporation What Shortens a Motors Life? PdMA Corporation Thermal Stress Mechanical Stress Electrical Stress Vol t age and Cur r ent Ti me Domai n - - PUMP #2 Cur r e nt ( A) 12/ 11/ 2003 10: 47: 48 AM Vol t a ge ( V) 1000 600 800 400 600 400 200 200 V 1-2 - 400 - 600 0. 10 0. 09 0. 08 - 200 0 0. 07 0 - 200 - 400 - 800 - 1000 - 600 Environmental Stress Environmental Stress Motor Testing Benefits Motor Reliability Quality Control Trending Troubleshooting PdMA Corporation PROGRAM IMPLEMENTATION Electrical Reliability Program Implementation Steps • Establish a criticality ranking of the • • • • • motors that are to be tested. Determine frequency of testing. Construct a database for the motors in operation as well as spare motors. Review failure history of motors Identify how your motors have failed. Identify staff to perform the testing. Criticality & Test Frequency Assessment Criticality Level Result of Failure Test Frequency -Plant Shutdown Safety/Environmental -Environment Release & Safety 3 month cycles -Large Asset Replacement Value Mission Critical Process Critical Non critical -Partial Plant Shutdown -Significant Production Loss 3-6 month cycles -Process Shutdown 6-12 month cycles -Production Loss -No Production Loss -System Redundancy 12 month cycles MCE Offline Testing in the Field MCE Test Instrument MCE Offline Test Leads How we communicate and relay information about your motors? Fault Zones Power Quality Power Circuit Stator Insulation Air Gap Rotor Fault Zone Analysis Power Circuit PdMA Corporation Power Circuit Testing Online Emax Test – Voltage & Current Current Imbalances & Voltage Imbalances Offline MCE Test – Applied Voltages Resistive Imbalance Inductive Imbalance Test location – Switchgear and/or motor Have you seen this before? Insulation PdMA Corporation Insulation Testing • MCE Testing Only - Resistance to Ground (Mohms) - Polarization Index Testing - Step Voltage Testing • Test Location - Switchgear - Motor - Cables Only MCE Polarization Index • • • 10 minute test RTG readings graphed every 5 seconds Ratio of value at 10 min. to value at 1 min. Dielectric Absorption Ratio • • • 1 minute test RTG readings graphed every 5 seconds Ratio of value at 60 seconds to value at 30 seconds Insulation PdMA Corporation Insulation Failure Stator PdMA Corporation Stator Testing Emax Online Tests - Impedance Imbalance - Current Imbalance - Inrush/Start up tests • MCE Offline Tests - Inductive Imbalance - Rotor Influence Check - Average Inductance Stator Failure Rotor Influence Check Example Stator Failure Examples PdMA Corporation Rotor PdMA Corporation Rotor Testing Emax Online Tests - Current Signature Analysis - Current Demodulation - Inrush Start/up current test • MCE Offline Tests - Average Inductance - Rotor Influence Check - Inductive Imbalance Rotor Cast Rotor Porosity Rotor PdMA Corporation AirGap PdMA Corporation Eccentricity Air Gap Testing Emax Online Tests • Current Signature Analysis • MCE Offline Tests • Rotor Influence Test How do we manage this data? Answer: Ohio CAT Conclusion Reduce failures & increase motor life Reduce maintenance cost Reduce motor repair cost Understand condition of installed motors Manage & communicate motor data Test safely Increase overall plant reliability