Available to any member of the Cooperative for service with one hundred (100) kva or less of required transformer capacity, located within its service area and along Cooperative multi-phase lines that are adequate and suitable for supplying required service.
The type of service rendered under this schedule will be alternating current, sixty (60) hertz, three phase, secondary voltage, of either 208 volts, 240 volts, 277 volts or 480 volts, as requested.
Connection Charge
Energy Charge
January - June
1 st 5 ,000 kWh per month
All above 5 ,000 kWh per month
$50.00 per month
$0.1
40 0 per kWh
$0.1
10 0 per kWh
July - December
1 st 5 ,000 kWh per month
All above 5 ,000 kWh per month
$0.1
4 80 per kWh
$0.11
6 0 per kWh
The minimum monthly charge shall be the connection charge where 30 kva of transformer capacity or less is required. For member requiring in excess of 30 kva of transformer capacity supplied by the Cooperative, the minimum charge shall be increased at the rate of one dollar ($1.00) per kva or fraction thereof required.
1. Service shall be provided based upon the Cooperatives’ rules and regulation as approved by the board of directors.
2. The member will be required to enter into a written agreement stating the character of load, minimum contract period, minimum monthly charge and other charges, if any.
3. All wiring, poles, lines, and other electrical equipment beyond the point where the service wires of the member connect with the service wires of the Cooperative shall be considered the distribution system of the member and shall be furnished by the member except that the meter base shall be furnished and maintained by the Cooperative.
4. All motors or apparatus with inrush current in excess of 250 amps at 240 volts shall require
Cooperative approval.
RushShelby Energy Board Approval – 12/1/15 Effective Date – 1/1/1 6
5. The Cooperative may require corrective measures or devices for any motor or apparatus which in the opinion of the Cooperative will cause voltage fluctuation to other members. Unless otherwise permitted, the maximum primary voltage fluctuation is three percent (3%).
6. The member shall be responsible for installing under voltage or loss of phase relays for the protection of the member’s equipment.
7. Members maintaining their domestic establishment and their facility requiring three-phase service on the same premises may include service to both through the same meter, in which case all service will be billed in accordance with the rates set forth in this schedule.
8. Motors having an individual capacity of 10 horsepower should be three-phase. Exceptions are subject to the approval of the Cooperative.
9. The Cooperative will furnish and maintain at its expense on transformation and service drops, unless otherwise provided for in the Service Rules and Regulations. All wiring, pole lines, wires and other electrical equipment beyond the point where the service wires of the members, which extend from the weather head of the service entrance installed by the member, connect with the service wires of the Cooperative is considered the distribution system of the member and shall be furnished and maintained by the member except that the outdoor meter base and meter shall be furnished and maintained by the Cooperative.
The above rates are subject to a Wholesale Power Cost Adjustment (“WPCA”) Factor, as provided for in Schedule
WPCA.
Refer to Appendix
Refer to Appendix
Refer to Appendix
Refer to Appendix
RushShelby Energy Board Approval – 1 2/1/15 Effective Date – 1/1/1 6
When it is necessary for the personnel of RSE to go to a member’s premises to collect a delinquent bill, a collection fee of twenty-five ($25) dollars per trip shall be charged in lieu of disconnection.
A member that has been disconnected shall be assessed a fee of $25.00 for reconnection during regular business hours. Payment must be made by a credit or debit card over the phone or pay in the office with cash, certified check, or money order during regular business hours, prior to reconnection.
For delinquent bills, the member shall pay in full all amounts due up to and including date of disconnect and shall pay before service is reconnected.
The fee for a seasonal service reconnection shall be $25.00.
Connection of electric service after hours, at the member’s request, will be assessed a connection fee of $75.00 and must be paid prior to connection of electric service.
Bills shall be rendered and due monthly. If bills are not paid on or before the 17th day following the due date, the bill shall have late charges added as follows:
All net billing 3%.
When a payment received on a member’s account, in any form, is returned unpaid for any reason by a financial institution, the member shall be assessed a fee of $25.00.
When a member requests a meter test less than 12 months from their most recent meter test, whether such earlier test was by consumer or Cooperative request, the member shall be required to pay a $25.00 fee for the latest test.
Any member requesting a new service or a service at an existing location transferred into their name shall pay a
$25.00 non-refundable fee for the account creation and activation.
RushShelby Energy Board Approval – 1 2/1 /1 5 Effective Date – 1/1/1 6
All new accounts shall be subject to a deposit of $150 or $300 based upon specific circumstances with a credit report obtained from either a third-party credit reporting agency or RSE credit history.
RushShelby Energy Board Approval – 1 2/1 /1 5 Effective Date – 1/1/1 6