Microsoft Project - Stawell draft execution Gantt

advertisement
Project: Stawell
Id
1
Taak
Duur
Begindatum
Einddatum
Execution
65,2 wkn vri 1-4-16
vri 30-6-17
2
landleveling
6 wkn
vri 1-4-16
don 12-5-16
3
gridconnection
1 wk
maa 15-8-16
vri 19-8-16
4
6 wkn
vri 13-5-16
don 23-6-16
5
preparation of construction site, laydown area,
service dirth roads, etc
groundworks of the stormwater retention basin
6 wkn
vri 24-6-16
don 4-8-16
6
foundations greenhouse and technical area
4 wkn
maa 15-8-16
vri 9-9-16
7
8 wkn
maa 15-8-16
vri 7-10-16
8
preparation and execution of the concrete slab for
packing hall
concrete slab curing
3 wkn
maa 10-10-16
vri 28-10-16
9
concrete slab for HST
4 wkn
maa 10-10-16
vri 4-11-16
10
HST floor curring
3 wkn
maa 7-11-16
vri 25-11-16
11
Building/welding HST
8 wkn
maa 28-11-16
vri 20-1-17
12
in the ground heating transport piping
3 wkn
maa 12-9-16
vri 30-9-16
13
erection of greenhouse structure, aluminium and
glazing
electrical connection of gh vents
16 wkn
maa 3-10-16
vri 20-1-17
2 wkn
maa 9-1-17
vri 20-1-17
maa 31-10-16
vri 9-12-16
16
erection of structure and cladding of packing hall and 6 wkn
technicall rooms
placing boiler, manifold, possible chp etc
20 wkn
maa 12-12-16
vri 28-4-17
17
in the ground piping in the irrigation room
4 wkn
maa 12-12-16
vri 6-1-17
18
built the inside of the irrigation room
20 wkn
maa 9-1-17
vri 26-5-17
19
maa 12-12-16
vri 28-4-17
maa 6-3-17
vri 23-6-17
21
make office and toilets change rooms inside packing 20 wkn
hall
coldstorage and sorting and packing machines inside 16 wkn
the packing hall
wall heating pipes
3 wkn
maa 9-1-17
vri 27-1-17
22
in the ground irrigation pipes in the greenhouse
2 wkn
maa 16-1-17
vri 27-1-17
23
growlights in the ground cabeling
1 wk
maa 9-1-17
vri 13-1-17
24
screen endwall works
2 wkn
maa 16-1-17
vri 27-1-17
25
sunscreen overhead wires and motors and axes
4 wkn
maa 30-1-17
vri 24-2-17
26
all electrical works in gh
13 wkn
maa 30-1-17
vri 28-4-17
27
final ground leveling inside gh
2 wkn
maa 20-2-17
vri 3-3-17
28
mounting of AHU,s
8 wkn
maa 6-2-17
vri 31-3-17
29
delevery of minitransformers
2 wkn
maa 6-2-17
vri 17-2-17
30
pipeheating welding inside gh
4 wkn
maa 27-2-17
vri 24-3-17
31
overhead cropwires
2 wkn
maa 27-3-17
vri 7-4-17
32
concrete middle math
3 wkn
maa 10-4-17
vri 28-4-17
33
curing middle path
2 wkn
maa 1-5-17
vri 12-5-17
34
making and placing crop gutters
1 wk
maa 15-5-17
vri 19-5-17
35
growlight fixtures
1 wk
maa 22-5-17
vri 26-5-17
36
screencloth
1 wk
maa 29-5-17
vri 2-6-17
37
ground covers and driplines
1 wk
maa 5-6-17
vri 9-6-17
38
commisioning and testing
2 wkn
maa 12-6-17
vri 23-6-17
39
planting
1 wk
maa 26-6-17
vri 30-6-17
14
15
20
Project: Stawell
Datum: don 25-2-16
Pagina: 1
Taak
2016
2017
1ste kwartaal
2de kwartaal
3de kwartaal
4de kwartaal
1ste kwartaal
2de kwartaal
3de kwartaal
53 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
Mijlpaal
Deelproject
Download