2014 Florida Power and Light Company Distribution Reliability Report

advertisement
Florida Power & Light Company
Annual Filing to the Florida Public Service Commission
March 2, 2015
Table of Contents
Page
2
Executive Summary
Section 1: Storm Preparedness / Infrastructure Hardening
Pole Inspections
7
System Hardening
18
Storm Preparedness Initiatives
27
Summary
Initiative 1
Initiative 2
Initiative 3
Initiative 4
Initiative 5
Initiative 6
Initiative 7
Initiative 8
Initiative 9
Initiative 10
Vegetation Management Trim Cycles.
Joint Use Pole Attachment Audits
Six-Year Transmission Structure Inspection Cycle
Hardening of Existing Transmission Structures.
Distribution Geographic Information System (GIS)
Post-Storm Forensic Data Collection/Analysis
Overhead and Underground Storm Performance Data
Increased Coordination with Local Governments
Collaborative Research on Hurricane Winds & Storm Surge
Natural Disaster Preparedness & Recovery Plans
28
30
42
45
49
53
55
59
62
68
73
75
2015 Storm Season Readiness
77
Section 2: Reliability
Appendix
Reconciliation of Adjusted to Actual Reliability Indices
Distribution Excluded Extreme Weather Events
Distribution Excluded Outage Events
Feeder Specific Data and Attached Laterals
Transmission and Substation Outage Events
FPL Emergency Management Plan Severe Storms Brief
1
EXECUTIVE SUMMARY – FPL’s MARCH 2, 2015 FILING
In 2014, FPL continued to invest in and take significant steps to strengthen its
electrical infrastructure and enhance its emergency response capabilities. Included
in this ongoing work were pole inspections, system infrastructure hardening,
vegetation management, as well as other storm preparedness initiatives.
Additionally, FPL continued to deliver excellent overall reliable service for its
customers.
In 2015, FPL plans to continue its efforts to accelerate the strengthening of its
electric infrastructure against severe weather and maintain its strong everyday
reliability for customers.
This filing provides details about these efforts and is organized into two major
sections: (1) Storm Preparedness/Infrastructure Hardening; and (2) Reliability. The
first section concentrates on FPL’s efforts to strengthen its distribution and
transmission systems and enhance storm response capabilities. Initiatives
addressed in this section include: Pole Inspections; System Hardening; 10 Storm
Preparedness Initiatives; and 2015 Storm Season Readiness. The second section of
this report includes information about FPL’s service reliability, including 2014 results
and 2015 plans for the distribution and transmission systems.
The following are brief overviews of each of these two sections:
Section 1: STORM PREPAREDNESS/INFRASTRUCTURE HARDENING
Pole Inspections
Distribution – In 2014, consistent with its FPSC-approved plan, FPL initiated its
second eight-year pole inspection cycle.
•
•
In 2014, FPL inspected approximately 1/8 of its pole population and
completed all remaining follow-up work resulting from the 2013 pole
inspections.
In 2015, FPL plans to complete inspections on approximately 1/8 of its pole
population, as well as complete all remaining follow-up work resulting from
the 2014 pole inspections.
Transmission – In 2014, FPL completed all transmission pole/structure inspections
consistent with its FPSC-approved plan.
•
In 2014, FPL performed ground level visual inspections on 100% of its
transmission poles/structures. Additionally, FPL performed climbing or bucket
truck inspections on approximately 1/6 of its wood poles/structures, 1/6 of all
500kV structures, 1/10 of its other concrete and steel poles/structures and
2
•
conducted storm and pre-construction mitigation patrols on all concrete and
steel poles/structures. Also, FPL completed all follow-up work resulting from
the 2013 inspections.
In 2015, FPL plans to conduct ground level visual inspections on 100% of its
transmission poles/structures; perform climbing or bucket truck inspections
on approximately 1/6 of its wood poles/structures, 1/6 of all 500kV structures
and 1/10 of its concrete and steel poles/structures; and complete all follow-up
work identified from the 2014 inspections.
System Hardening
Distribution
Consistent with FPL’s FPSC-approved 2013–2015 Electric Infrastructure Storm
Hardening Plan (see Order PSC-13-0639-PAA-EI in Docket No. 130132-EI), FPL
continued to implement its three-prong approach in 2014 by applying: (1) extreme
wind loading criteria (EWL) to critical infrastructure facilities (CIF); (2) incremental
hardening, up to and including EWL, to “Community Project” feeders; and (3)
construction design guidelines that require EWL for the design and construction of
all new overhead facilities, major planned work, relocation projects, and daily work
activities.
•
In 2014, FPL applied EWL on 75 feeder projects serving various CIF, e.g.,
police/fire stations and water treatment plants, one highway crossing and 16
“01” switches. FPL also applied incremental hardening to 21 “Community
Projects”, i.e., feeders that serve essential community needs such as grocery
stores, gas stations and pharmacies. Additionally, FPL’s Design Guidelines
were applied to all new construction and other construction activities
described above. Finally, FPL installed submersible equipment to mitigate the
impact of significant water intrusion in six of the 12 vaults in the Miami
downtown electric network that are located just at or within the FEMA 100year flood elevation levels.
•
FPL also continued to promote overhead-to-underground conversions in
2014, completing one project that qualified under its Governmental
Adjustment Factor (GAF) tariff.
•
In 2015, FPL plans to apply EWL on 65 CIF feeder projects, one highway
crossing and 16 “01” switches. FPL will also incrementally harden, up to and
including EWL, 38 Community Project feeders. FPL’s Design Guidelines will
again be used for all new construction activities. Finally, FPL will complete its
efforts to install submersible equipment to mitigate the impact of significant
water intrusion in the remaining six vaults in the Miami downtown electric
network that are located just at or within the FEMA 100-year flood elevation
levels.
3
Transmission
Storm hardening details for Transmission are provided in Storm Preparedness
Initiative No. 4
Storm Preparedness Initiatives
(1) Vegetation Trim Cycles – In 2014, FPL continued its three-year average cycle
and mid-cycle programs for feeders and its six-year average trim cycle for laterals.
(2) Joint Use Audits – Approximately 20 percent of FPL’s jointly used poles are
audited annually through its joint use surveys. Additionally, joint use poles are
inspected through FPL’s pole inspection program. Survey and inspection results
continue to show that through FPL’s joint use processes and procedures, along with
cooperation from joint pole owners and third-party attachers, FPL has properly
identified and accounted for joint use facilities.
(3) Six-year Transmission Structure Inspection Cycle – In 2014, FPL performed
ground level visual inspections on 100% of its transmission poles/structures.
Additionally, FPL performed climbing or bucket truck inspections on approximately
1/6 of its wood transmission system poles/structures, 1/6 of its 500 kV structures,
1/10 of its other concrete and steel poles/structures and conducted storm and preconstruction mitigation patrols on all concrete and steel poles/structures.
(4) Hardening the Transmission System – In 2014, FPL continued executing its plan
to replace all wood transmission structures in its system, completed the replacement
of all ceramic post insulators with polymer insulators within its system and continued
with its installation of flood monitoring equipment in substations that are more
susceptible to flooding.
(5) Distribution Geographic Information System (GIS) – FPL completed its five
originally approved key Distribution GIS improvement initiatives in 2011. These
initiatives included developing a post-hurricane forensic analysis tool and the
addition of poles, streetlights, joint use survey and hardening level data to the GIS.
Updates to the GIS continue as data is collected through inspection cycles and other
normal daily work activities.
(6) Post-Storm Forensic Collection/Analysis – FPL has post-storm forensic data
collection and analysis plans, systems and processes in place and available for use.
No major storms affected FPL’s service territory in 2014; therefore, no forensic
collection or analysis was required.
(7) Overhead (OH) and Underground (UG) Storm Performance – FPL has plans,
systems and processes in place to capture OH and UG storm performance. No
major storms affected FPL’s service territory in 2014; therefore, no data collection or
analysis was required.
4
(8) Increased Coordination with Local Governments – In 2014, FPL continued its
efforts to improve local government coordination. Activities included: (1) meetings
with county emergency operations managers to discuss critical infrastructure
locations in each jurisdiction; (2) inviting federal, state, county and municipal
emergency management personnel to participate in FPL’s annual company-wide
storm preparedness dry run and; (3) FPL External Affairs managers conducted 483
community presentations, providing information on storm readiness and other topics
of community interest.
(9) Collaborative Research on Hurricanes/Storm Surge – Collaborative research
efforts led by the Public Utility Research Center (PURC) have resulted in greater
knowledge of appropriate vegetation management practices during storm and nonstorm periods, wind during storm and non-storm events, and hurricane and damage
modeling to further understand the costs and benefits of undergrounding.
(10) Natural Disaster Preparedness/Recovery Plans – FPL’s Storm Emergency Plan
identifies emergency conditions and the responsibilities and duties of the FPL
emergency response organization for severe weather and fires. The plan covers the
emergency organization, roles and responsibilities and FPL’s overall severe storm
emergency processes. These processes describe the planning activities, restoration
practices, public communications, and coordination with government, training,
practice exercises and lessons-learned evaluation systems. The plan is reviewed
annually and revised as necessary.
2015 Storm Season Readiness
FPL’s comprehensive storm plan focuses on readiness, restoration and recovery in
order to respond safely and as quickly as possible in the event the electrical
infrastructure is damaged by a storm. FPL is well-prepared for the 2015 storm
season and continues to train and hone its storm preparedness and response
capabilities.
In addition to the initiatives to strengthen its system and improve storm
preparedness discussed previously, FPL will complete the following additional storm
preparedness activities prior to the start of storm season:
• Extensive storm restoration training based on employees’ storm roles;
• Annual company-wide hurricane dry run in late April/early May;
• Management workshops throughout the storm season to keep focus on key
storm restoration policies/processes;
• Plan for and review of mutual assistance agreements to ensure they are
adequate and ready;
• Continue to focus on improving outage communications and estimated
restoration times to customers;
• Clear vegetation from all feeder circuits serving top critical infrastructure (e.g.
top CIF hospitals, 911 centers, special needs shelters, police and fire
stations, etc.) prior to the peak of hurricane season; and
5
•
Implement new technology to be utilized by storm damage assessors to
improve damage assessment collection/analysis capabilities.
Section 2: RELIABILITY
Total FPL System (Distribution and Transmission) – Overall reliability is best gauged
by SAIDI (System Average Interruption Duration Index), considered the most
relevant and best overall reliability indicator because it encompasses two other
standard industry performance metrics for reliability: SAIFI (System Average
Interruption Frequency Index) and CAIDI (Customer Average Interruption Duration
Index). In 2014, FPL continued to provide strong overall reliability for its customers,
achieving an overall adjusted SAIDI of 66.6 minutes (2013 – 65.6 minutes).
Distribution – FPL’s 2014 overall adjusted distribution reliability, as measured by
SAIDI was 63.8 (2013 – 61.4). 2014 adjusted results for SAIFI were 0.99
interruptions per customer (2013 – 0.89 interruptions). Adjusted 2014 results for
CAIDI were 64.5 minutes (2013 – 68.7 minutes) and adjusted MAIFIe for 2014 was
8.7 momentary events (2013 – 9.1 momentary events).
Transmission – In 2014, FPL’s Transmission/Substation adjusted SAIDI was 2.8
minutes (2013 – 4.2 minutes), adjusted SAIFI was 0.21 interruptions per customer
(2013 – 0.22 interruptions) and adjusted MAIFI was 0.7 momentary events (2013 –
0.7 momentary events).
6
POLE INSPECTIONS
7
Summary – Pole Inspections
Distribution
In 2014, consistent with its FPSC-approved plan, FPL initiated its second eight-year
pole inspection cycle.
•
In 2014, FPL inspected approximately 1/8 of its pole population, or 146,325
poles, including 133,572 wood poles, and completed all remaining follow-up
work identified during the 2013 pole inspections.
•
In 2015, FPL plans to complete inspections on approximately 1/8 of its pole
population, as well as complete all remaining follow-up work identified during
the 2014 pole inspections.
Transmission
In 2014, FPL completed all transmission pole/structure inspections consistent with
its FPSC-approved plan.
•
•
In 2014, FPL performed ground level visual inspections on 100% of its
transmission poles/structures. Additionally, FPL performed climbing or bucket
truck inspections on approximately 1/6 of its wood transmission system
poles/structures, 1/6 of its 500 kV structures, 1/10 of its other concrete and
steel poles/structures and conducted storm and pre-construction mitigation
patrols on all concrete and steel poles/structures. Also, FPL completed all
follow-up work identified from the 2013 inspections.
In 2015, FPL plans to conduct ground level visual inspections on 100% of its
transmission poles/structures. Additionally, FPL plans to perform climbing or
bucket truck inspections on 1/6 of its wood poles/structures, 1/6 of its 500kV
structures and 1/10 of its other concrete and steel poles/structures and
complete all follow-up work identified from the 2014 inspections.
8
Distribution
1. Description of the pole inspection program
FPL’s eight-year inspection cycle for all distribution poles targets approximately 1/8
of the system annually; however, the actual number of poles inspected can vary
somewhat from year to year. To ensure coverage throughout its service territory,
FPL has established nine inspection zones, based on FPL’s management areas and
pole population, and annually performs pole inspections and necessary remediation
in each of these zones.
FPL utilizes Osmose Utility Services (Osmose), an industry-leading pole inspection
company, to perform the inspection of all distribution poles in its service territory.
Osmose utilizes mobile computing technology to record inspection data and to
calculate strength and loading. The loading calculation, span lengths, attachment
heights and wire sizes are recorded in the mobile computer to determine whether
the remaining pole strength capacity exceeds National Electrical Safety Code
(NESC) requirements. This data is then transferred to FPL’s GIS. Pole locations
inspected by Osmose are randomly audited by FPL to verify that inspections are
completed and meet inspection standards.
Inspections include a visual inspection of all distribution poles from the ground-line to
the top of the pole to identify visual defects (e.g., woodpecker holes, split tops,
decayed tops, cracks, etc.). If, due to the severity of the defects, the poles are not
suited for continued service, the poles are designated for replacement. With the
exception of Chromium Copper Arsenate treated (CCA) poles less than 16 years of
age (modified in October 2014, see discussion below), if the pole passes the aboveground visual inspection, wood poles are excavated to a depth of 18” (where
applicable), and sounded and bored to determine the internal condition of the pole.
Poles encased in concrete or asphalt are not excavated but sounded and bored to
determine their internal condition. Osmose developed/utilizes an inspection process
for this condition called “Shell Boring”. All suitable wood poles receive external
and/or internal preservative treatment or, if not suitable, are replaced. Strength
calculations are also performed on wood poles to determine compliance with NESC
requirements.
CCA poles less than 16 years (modified in October 2014, see discussion below) of
age are subject to a visual, sound and selective bore inspection, but not excavation.
A bore inspection is performed if there is any decay indicated from the visual or
sound inspection. To ensure that this exception will not compromise existing safety
and storm hardening programs, FPL excavates a one percent sample of the CCA
poles that would not normally qualify for full excavation.
In October 2014, the FPSC approved FPL’s request to modify its pole inspection
program by: (1) increasing the excavation exemption for CCA poles from less than
16 years old to less than 28 years old; and (2) exempting any pole from a loading
9
assessment, during the second eight-year cycle, that tested less than 80% of full
load during FPL’s initial 8-year cycle. FPL will continue to conduct a one percent
sample of exempted CCA poles and will monitor/report on poles with a 70%-80%
initial eight-year cycle load test result. Since FPL began to implement this change in
late 2014, reporting on this modification will begin with FPL’s next annual filing.
Current NESC guidelines, outlined by Table 261-1A Section 26 of the NESC, require
that distribution poles meet a minimum of Grade C construction. Building to Grade C
is the typical standard for the distribution utility industry. However, FPL’s strength
and loading calculations for its distribution poles and pole inspections are based on
the NESC’s Grade B construction standard, a higher standard, as outlined by Table
261-1A section 26 of the NESC.
2. 2014 Accomplishments
In 2014, FPL inspected approximately 1/8 of its distribution pole population
(146,325 in total, including 133,572 wood poles) throughout its service territory
Consistent with its Commission-approved exemption, FPL also fully excavated a one
percent sample of the CCA poles that would not have been fully excavated under
this exemption. From that sample, zero poles failed the excavation portion of the
inspection. For 2014, FPL’s distribution pole inspection program costs were
approximately $70.1 million, including inspection and remediation costs for wood
and concrete poles.
3. Proposed 2015 Plan
FPL’s 2015 distribution pole inspection plan includes the inspection of approximately
1/8 of its pole population. FPL will also inspect CCA poles and perform load
assessment tests, consistent with its recently approved exemptions and
monitoring/sampling requirements.
The estimated cost for the 2015 distribution pole inspection program is $50-$60
million, including inspection and remediation costs for wood and concrete poles.
4. NESC compliance for strength and structural integrity
The following methods are used by FPL’s vendor to determine NESC compliance for
strength and structural integrity of FPL’s poles.
Strength Assessment
On wood distribution poles, a strength assessment is performed to determine
compliance to the NESC standards for strength. The strength assessment is based
on a comparison of measured circumference versus original circumference of the
pole. The effective circumference is measured and data collected to ensure that the
actual condition of the pole meets NESC Grade B requirements as outlined in Table
10
261-1A Section 26 of the NESC. If the pole does not meet the Grade B NESC
requirements, the pole will be reinforced or replaced.
Loading Assessment
On all distribution poles, a loading assessment is also performed and includes a
combination of field measurements, span length, attachment heights (including thirdparty attachments) and wire sizes based on FPL construction standards. If NESC
requirements are not met, the pole will be reinforced, replaced or the attachments
will be relocated. As noted earlier, in October 2014, the FPSC approved FPL’s
request to modify its pole inspection program by exempting any pole from a load test
assessment, during the second eight-year cycle, that tested less than 80% of full
during FPL’s initial 8-year cycle.
5. Summary data and results of 2014 pole inspections
As previously discussed, poles are remediated if they do not meet the higher NESC
Grade B requirement. Remediation is categorized into two groups (Level 1 and Level
2) in order to allow for more effective scheduling and resource allocation.
Level 1 - Remediation that requires more immediate attention. Urgent needs are
addressed immediately.
11
Level 2 - Remediation that does not require immediate attention.
6. The cause(s) of each pole failure for poles failing inspections, to the extent
that such cause(s) can be discerned in the inspection. Also, the specific
actions the company has taken or will take to correct each pole failure.
The table below provides a summary of the pole inspection findings for the poles
identified as poles requiring remediation.
Transmission
7. Description of Pole Inspection Program
FPL performs annual ground level visual inspections on 100% of its transmission
poles/structures – wood, concrete and steel. FPL also performs climbing or bucket
truck inspections on all of its transmission poles/structures on a cyclical basis. In
addition to the poles/structures being inspected, the condition of various
transmission pole/structure components are assessed, including attachments,
insulators, cross-arms, cross-braces, foundations, bolts, conductors, overhead
ground wires (OHGW), guy wires, anchors, and bonding. These inspections are
performed in accordance with Commission Order PSC-06-0144-PAA-EI in Docket
No. 060078-EI, issued on February 27, 2006. An overview of these inspection
procedures are outlined below:
Wood Poles/Structures
Annually, FPL performs ground level visual inspections on 100% of its wood
transmission poles/structures, inspecting from the ground-line to the pole top.
The visual inspection includes a review of the pole’s/structure’s condition as
well as pole attachment conditions. If a wood transmission pole/structure
does not pass visual inspection, it is not tested any further and it is
designated for replacement.
12
FPL also performs a climbing or bucket truck inspection on all wood
transmission poles/structures on a six-year cycle. If a wood pole/structure
passes this visual inspection, a sounding test is then performed. If the result
of a sounding test warrants further investigation, the wood pole/structure is
bored to determine the internal condition of the pole. All bored poles, not
designated for replacement, are treated with an appropriate preservative
treatment.
Concrete and Steel Poles/Structures
Annually, FPL performs ground level visual inspections on 100% of its
concrete and steel transmission poles/structures. The inspection incorporates
an overall assessment of the pole/structure condition (e.g., cracks, chips,
exposed rebar, and rust) as well as other pole/structure components including
the foundation, all attachments, insulators, guys, cross-braces, cross-arms,
and bolts. If a concrete or steel pole/structure fails the inspection, the
pole/structure is designated for repair or replacement.
From 2006-2013, FPL performed a climbing or bucket truck inspection on all
concrete and steel transmission poles/structures on a six-year cycle. In 2014,
FPL continued to perform a climbing or bucket truck inspection on all 500 kV
structures on a six-year cycle. Climbing or bucket truck inspections for all
other steel and concrete poles/structures are now conducted on a 10-year
cycle.
8. 2014 Accomplishments
In 2014, 100% of FPL’s transmission poles/structures were visually inspected and
approximately 1/6 of its wood, 1/6 of its 500kV structures and 1/10 of its other
concrete and steel transmission poles/structures were inspected by climbing or from
a bucket truck. Additionally, storm and pre-construction mitigation patrols were
conducted on all concrete and steel poles/structures. In 2014, FPL incurred $1.8
million of inspection costs and $28.7 million of costs associated with follow-up work
identified from the 2013 inspections.
9. Proposed 2015 Plan
In 2015, FPL is estimating to incur approximately $1.8 million of expenses to
complete its transmission pole/structure inspections and approximately $24.7 million
of costs associated with follow-up work identified from the 2014 inspections.
10. NESC compliance for strength and structural integrity
The following methods are used during pole/structure inspections for determining
NESC strength and structural integrity compliance:
Strength Assessment
For wood transmission poles/structures, the strength assessment is based upon a
comparison of measured circumference versus the original circumference of the
13
pole. If the effective circumference is measured and the actual condition of the pole
does not meet NESC requirements as outlined in Table 261-1A Section 26 of the
NESC, the pole is designated for reinforcement or replacement.
Loading Assessment
FPL performs a loading assessment on wood transmission poles/structures with 3rd
party attachments. This assessment is based on a combination of pole/structure
length, framing configuration, span length, attachment heights (including 3rd party
attachments) and conductor size. If the loading does not meet NESC requirements,
the pole is designated for reinforcement, replacement or relocation of the third-party
attachments.
11. Explanation of the inspected pole selection criteria
FPL prioritizes its transmission pole/structure inspections based on factors such as
framing configuration (structural loading), transmission components, system
importance, customer count, and inspection history for a transmission line section.
Other economic efficiencies, such as multiple transmission line sections within the
same corridor, are also considered.
12. Inspection Summary Data for the Previous Year
Summarized in the following sections are the 2014 inspection results and causes by
transmission pole/structure materials:
Wood Transmission Poles/Structures
FPL’s 2014 results from its six-year cyclical wood transmission pole/structure
inspections are in the table, below. In addition, FPL performed its annual ground
level visual inspections on 100% of its wood poles/structures.
Florida Power & Light Company
Annual Wood Pole Inspection Report
(Reporting Year 2014)
a
b
c
d
e
f
g
h
i
j
Method(s)
Total # of
# of Wood
# of Wood
# of Poles
V=Visual
# of Wood # of Poles
Total # of
Wooden
Poles
Pole Failure
# of Poles E=Excavation
Pole
requiring
Poles
Failing
Poles in the
Designated Wood Poles
Rate (%)
Overloaded P=Prod
Inspection
Minor
Inspected Inspection
Replaced
Company
for
this Annual
Planned this
Follow -up this Annual S=Sound
this Annual this Annual
Inventory
Replacement this Annual
Inspection
Annual
this Annual Inspection B=Bore
Inspection Inspection
as of
this Annual Inspection
Inspection
Inspection
R=
01-2014
Inspection
Resistograph
13,620
2,402
2,427
426
17.6%
589
2,070
n/a
0
V / P/ S / B
k
l
m
# of Wood
Total # of
% of Wood
Pole
Wood Poles
Poles
Inspections Inspected
Inspeted
Planned for (Cumulative) (Cumulative)
Next Annual in the 6in the 6Inspection Year Cycle Year Cycle
Cycle
to Date
to Date
2,273
8,000
58.7%
If b - c > 0, provide
explanation
If d - g > 0, provide
explanation
Description of
selection criteria for
inspections
FPL prioritizes its inspections based on factors such as: framing configuration (structural loading), transmission components, system importance,
customer count, and inspection history for a transmission line section. Other economic efficiencies, such as multiple transmission line sections
w ithin the same corridor, are also considered.
14
* The replacement quantities in the table above represent the total number of transmission
poles/structures replaced not only through its inspection program, but also from relocations,
proactive rebuilds and system expansion.
Concrete and Steel Transmission Structures
FPL performed visual ground level inspections on 100% of its concrete and steel
poles/structures and bucket inspections on 1/6 of its 500kV structures and 1/10 of
all other concrete and steel poles/structures in 2014. The table below provides
FPL’s 2014 concrete and steel transmission pole/structure inspection results.
POLE INSPECTION REPORT
Company: Florida Power & Light
Summary of Concrete & Steel Transmission Pole Inspections
Period: January 2014 thru December 2014
Type of Inspection:
Concrete & Steel Transmission Structures
Visual / Bucket
Type of Pole:
Average Class:
Varies
Materials
Concrete & Steel
Average Vintage
Installed Population
as of 1/1/2014
2000
51,232
% Planned
Percent Inspections Planned & Percent Completed:
% Completed
100%
100%
0
0
Reason for Variance/Plan to Address Backlog:
No. of inspected poles addressing a prior backlog
No. of
Structures
No. of structures identified for reinforcement:
% of
Inspection
0
0.0%
No. of poles identified for replacement:
60
0.1%
No. of structures identified for a change inspection cycle::
No. of structures that required no change in inspection cycle or
remediation
No. of structures identified as overloaded
n/a
n/a
51,172
99.9%
0
0.0%
15
13. Identified Inspection Items (by Cause)
Summarized below are the cause(s) of the identified transmission pole/structure
inspection failures along with specific actions that have or will be taken for each level
of priority:
Wood Transmission Structures
Wood Transmission Structures
Level 1
Level
2
NonPriority
Ground-Line
8
58
3
Decay, Rot, Insects,
Voids
Level 1 - Reinforce,
Remediate, or
Replace in year
found
Above GroundLine
28
332
63
Wood-Pecker Holes,
Decay, Insects
Level 2 - Reinforce,
Remediate, or
Replace the following
year
Overload (3
Party)
0
0
0
3rd Party Attachments
Total
36
390
66
Refer to the Above
Inspection Item
Primary Cause(s)
rd
Remediation
Non-Priority – No
action required
To help prioritize and to better plan for future years, FPL has established the
following priority levels of inspection reporting:
Level 1 Priority - Identified as approaching the minimum NESC requirements
for Grade B construction with the potential to fall below the minimum before
the end of the current year. These poles/structures are incorporated into
current year work plans for reinforcement, remediation, or replacement. The
timeframe for completion is typically driven by customer provided access to
the facilities and the coordination of a scheduled outage with other facility
clearances scheduled on the grid.
Level 2 Priority - Identified as approaching the minimum NESC requirements
for Grade B construction and will not fall below the minimum prior to the end
of the following year. These poles/structures are identified for reinforcement,
remediation, or replacement as planned work by the end of the calendar year
following inspection.
16
Non-priority – Identified as having reduction in capacity, but still above the
minimum NESC requirements. When reported, these structures are
documented but do not require specific action until the next inspection.
Concrete & Steel Transmission Structures
Concrete & Steel Transmission Structures
Inspection Item
Base of Pole
(Identified for
Replacement)
Level 1
0
Level 2
29
NonPriority
4
Primary Cause(s)
Remediation
Corrosion
Level 1 - Reinforce,
Remediate, or
Replace in year found
Base of Pole
(Identified for
Repair)
7
24
5
Cracks
Level 2 - Reinforce,
Remediate, or
Replace the following
year
Total
7
53
9
Refer to the Above
Non-Priority – No
action required
To help prioritize and to better plan for future years, FPL has established the
following priority levels of inspection reporting:
Level 1 Priority - Identified as approaching the minimum NESC requirements
for Grade B construction with the potential to fall below the minimum before
the end of the current year. These poles/structures are incorporated into
current year work plans for reinforcement, remediation, or replacement. The
timeframe for completion is typically driven by customer provided access to
the facilities and the coordination of a scheduled outage with other facility
clearances scheduled on the grid.
Level 2 Priority - Identified as approaching the minimum NESC requirements
for Grade B construction and will not fall below the minimum prior to the end
of the following year. These poles/structures are identified for reinforcement,
remediation, or replacement as planned work by the end of the calendar year
following inspection.
Non-priority – Identified as having structural deterioration, but still meets all of
the NESC strength requirements. When reported, these structures are
documented but do not require specific action until the next inspection.
17
SYSTEM HARDENING
18
System Hardening
Distribution
Consistent with FPL’s FPSC-approved 2013–2015 Electric Infrastructure Storm
Hardening Plan (see Order PSC-13-0639-PAA-EI in Docket No. 130132-EI), FPL
continued to implement its three-prong approach in 2014 by applying: (1) extreme
wind loading criteria (EWL) to critical infrastructure facilities (CIF); (2) incremental
hardening, up to and including EWL, to “Community Project” feeders; and (3)
construction design guidelines that require EWL for the design and construction of
all new overhead facilities, major planned work, relocation projects, and daily work
activities.
•
In 2014, FPL applied EWL on 75 feeder projects serving various CIF, e.g.,
police/fire stations and water treatment plants, one highway crossing and 16
“01” switches. FPL also applied incremental hardening to 21 “Community
Projects”, i.e., feeders that serve essential community needs such as grocery
stores, gas stations and pharmacies. Additionally, FPL’s Design Guidelines
were applied to all new construction and other construction activities
described above. Finally, FPL installed submersible equipment to mitigate the
impact of significant water intrusion in six of the 12 vaults in the Miami
downtown electric network that are located just at or within the FEMA 100year flood elevation levels.
•
FPL also continued to promote overhead-to-underground conversions in
2014, completing one project that qualified under its GAF tariff.
•
In 2015, FPL plans to apply EWL on 65 CIF feeder projects, one highway
crossing and 16 “01” switches. FPL will also incrementally harden, up to and
including EWL, 38 Community Project feeders. FPL’s Design Guidelines will
again be used for all new construction activities. Finally, FPL plans to
complete the installation of submersible equipment to mitigate the impact of
significant water intrusion in the six remaining vaults in the Miami downtown
electric network that are located just at or within the FEMA 100-year flood
elevation levels.
19
1. Describe each Storm Hardening activity undertaken in the field during 2014.
2014 CIF Projects
1
2
3
4
5
6
7
8
9
10
Region
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
County
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Feeder
700236
701434
701735
701937
702031
702432
702631
704262
705764
706462
Primary Facility
Sewage Treatment Plant
FAA - Air Transportation
Critical Well Field
Waste Water Booster Pump Station
Waste Water Booster Pump Station
Critical Well Field
FAA - Air Transportation
Police
Police
Fire Station
11
Broward
Broward
706665
Police
12
13
14
15
16
17
18
19
20
21
22
Broward
Broward
Broward
Broward
Broward
Broward
Dade
Dade
Dade
Dade
Dade
Broward
Broward
Broward
Broward
Broward
Broward
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
707263
707462
707533
708064
708431
709161
801832
803637
804536
807165
808264
Critical Cellular Facilities (Police & Fire)
Sewage Treatment Plant
Waste Water Booster Pump Station
Non-Special Needs Shelter
Critical Cellular Facilities (Police & Fire)
FAA - Air Transportation
Police
Fire Station
Fire Station
Registered Nursing Home
Police
23
Dade
Miami-Dade
809667
Police
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Dade
Dade
Dade
Dade
Dade
Dade
East
East
East
East
East
East
East
East
East
East
East
East
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Palm Beach
Palm Beach
Martin
Palm Beach
Martin
Palm Beach
Martin
Palm Beach
Palm Beach
Palm Beach
Palm Beach
Martin
809764
810661
811064
811562
811563
811564
400137
400239
401136
402532
403433
404433
404931
405461
405636
405867
405940
408262
Police
Fire Station
Police
Fire Station
Fire Station
Police
Municipal Facility - Convention Center
Municipal Facility - City Center
Registered Nursing Home
FAA - Air Transportation
Waste Water Booster Pump Station
Waste Water Booster Pump Station
Registered Nursing Home
Critical Well Field
WTP
Fire Station
Critical Cellular Facilities (Police & Fire)
Registered Nursing Home
42
East
St Lucie
408461
Critical Cellular Facilities (Police & Fire)
43
44
45
46
47
48
49
50
51
52
53
54
East
East
North
North
North
North
North
North
North
North
North
North
St Lucie
Palm Beach
Volusia
Volusia
Volusia
Flagler
Volusia
Volusia
Putnam
Seminole
Brevard
Brevard
408765
410362
100837
101039
101138
102361
103834
105062
108431
200832
201231
203331
Sewage Treatment Plant
Acute Care Facility
Sewage Treatment Plant
Police
Sewage Treatment Plant
Sewage Treatment Plant
Critical Well Field
Sewage Treatment Plant
Critical Cellular Facilities (Police & Fire)
Police
Waste Water Booster Pump Station
Coast Guard Seaport
Additional Facility
Special Needs Shelter
Non-Special Needs Shelter
Status
Complete*
Partial**
Partial**
Partial**
Partial**
Complete*
Partial**
Complete
Complete
Complete
Complete
Complete
Complete
Complete*
Cancelled***
Complete
Complete*
Complete
Partial**
Partial**
Complete
Complete*
Fire Station
FAA - Air Transportation
Complete*
Complete*
Complete
Complete
Partial**
Partial**
Complete*
Complete*
Complete*
Complete*
Partial**
Complete*
Complete
Complete*
Partial**
Complete*
Complete
Complete
Partial**
Correctional Facility
Gas Supply
Radio Tower
Partial**
Complete
Complete
Complete*
Complete
Complete*
Complete*
Complete
Complete*
Complete*
Complete
Complete*
Partial**
*Completed 1st quarter 2015
**Partially complete as of March 2015, to be completed in 2015
***Project cancelled - CIF relocated to another location/feeder
20
55
56
57
58
59
60
61
62
63
64
Region
North
North
North
North
North
West
West
West
West
West
County
Brevard
Volusia
Brevard
Suwannee
Nassau
Manatee
Manatee
Sarasota
Collier
Lee
Feeder
203538
204061
210531
300631
308061
500238
500661
501063
501234
502163
Primary Facility
Sewage Treatment Plant
Water Plant Lift Station
Police
Fire Station
FAA - Air Transportation
Sewage Treatment Plant
Booster Pump Station
Police
Police
Registered Nursing Home
65
West
Hendry
502462
Sewage Treatment Plant
66
67
68
69
70
West
West
West
West
West
Collier
Lee
Lee
Collier
Manatee
503564
503862
503968
504061
505264
Dialysis Center
Fire Station
Fire Station
Radio Communications Facility
Sewage Treatment Plant
71
West
Lee
505463
FAA - Air Transportation
72
73
74
75
76
West
West
West
West
West
Charlotte
Charlotte
Sarasota
Lee
Sarasota
505662
506462
507161
508463
508863
Sewage Treatment Plant
Critical Cellular Facilities (Police & Fire)
Waste Water Booster Pump Station
Fire Station
Medical Support Facility (Hospital)
Additional Facility
Sewage Treatment Plant
Waste Water Booster Pump Station
Telecom Facilities
Sewage Treatment Plant
Critical Well Field
Municipal Facilities
Status
Partial**
Complete
Complete
Complete
Complete
Complete*
Complete
Complete*
Complete
Complete*
Complete
Non-Special Needs Shelter
Fire Station
Registered Nursing Home
Critical Cellular Facilities (Police & Fire)
Non-Special Needs Shelter
Complete*
Complete
Complete*
Partial**
Partial**
Partial**
Complete*
Partial**
Partial**
Complete
Complete
st
*Completed 1 quarter 2015
**Partially complete as of March 2015, to be completed in 2015
***Project cancelled - CIF relocated to another location/feeder
As of March 2015, FPL has hardened 405 feeder projects through its initiative to apply EWL to CIF.
2014 Critical Poles
Highway Crossings
Number of
Highway
Crossings
Region
County
Interstate
Status
1
1
North
Total
Brevard
I-95
Complete*
As of March 2015, FPL has hardened 119 highway crossings through its initiative to apply EWL to
Critical Poles. While additional highway crossings have also been hardened through additional
initiatives (e.g., pole inspection, daily work activities, etc.), these are not specifically tracked.
“01” Switches
Number
County
Substation
Status
of "01" Region
Switches
4
Dade Miami - Dade Various
Complete*
3
East
Palm Beach
Various
Complete*
4
North
Various
Various
Complete
3
West
Various
Various
Complete
3
Broward
Various
Various
Complete
17
Total
st
*Completed 1 quarter 2015
21
As of March 2015, FPL has hardened 254 “01” switches through its initiative to apply EWL to Critical
Poles. While additional “01” switches have also been hardened through additional initiatives (e.g.,
pole inspection, daily work activities, etc.), these are not specifically tracked.
2014 Community Projects
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Region
Broward
Broward
Broward
Broward
Broward
Broward
Dade
Dade
Dade
East
East
East
East
East
North
North
North
North
West
West
West
West
County
Broward
Broward
Broward
Broward
Broward
Broward
Miami-Dade
Miami-Dade
Miami-Dade
Palm Beach
Palm Beach
St Lucie
Palm Beach
Palm Beach
Volusia
Volusia
Brevard
Brevard
Collier
Collier
Sarasota
Lee
Feeder
701933
704568
704768
704932
705465
705864
809664
809766
811063
400538
405935
406161
407864
411732
100835
101137
208863
209862
504361
504363
506263
507265
Throughfare
Commercial Boulevard
University Drive
Flamingo Road / Sheridan Street
Powerline Road / Hillsboro Boulevard
Coral Springs Drive
Wiles Road
SW 120th Street / SW 137th Avenue
SW 8th Street
NW 122nd Street / NW 87th Avenue
Congress Avenue / Gateway Boulevard
Powerline Road / Palmetto Park Road
Port St. Lucie Boulevard
Military Trail
Blue Heron Boulevard
Oak Street
Wilmette Avenue / US Highway 1
US Highway 1
Viera Boulevard
Vanderbilt Beach Road
Orange Blossom Drive
Desoto Road
Tamiami Trail
Complete
Complete*
Partial**
Complete
Complete*
Partial**
Partial**
Partial**
Partial**
Complete*
Complete
Complete
Complete*
Partial**
On Hold***
Complete
Partial**
Complete
Complete
Complete*
Partial**
Partial**
Partial**
Completion Date
2/28/2015
3/30/2015
12/22/2014
2/28/2015
11/28/2015
8/30/2015
11/30/2015
6/30/2015
2/28/2015
11/13/2014
12/26/2014
2/28/2015
12/31/2015
12/11/2014
4/30/2015
8/21/2014
9/11/2014
2/28/2015
4/30/2015
6/30/2015
6/30/2015
*Completed 1st quarter 2015
**Partially complete as of March 2015, to be completed in 2015
*** Pending a decision from Palm Beach Gardens for OH/UG conversion
As of March 2015, FPL has hardened 115 feeder projects through its initiative to apply Incremental
Hardening to Community Projects.
2. Describe the process used by your Company to identify the location and
select the scope of CIF/Community storm hardening projects.
CIF were identified by working with the various municipalities throughout FPL’s
system and prioritized using a classification hierarchy (e.g. Acute Care, 911, EOC,
Police, etc.). FPL’s feeders serving CIF were then classified by importance and
sorted by hierarchy and least cost to harden. The 2014 plan primarily focused on
waste water pump stations, sewage treatment plants, as well as police and fire
stations. Community Project feeders were identified/selected in order to provide a
broad geographic footprint across all communities throughout FPL’s service territory.
3. Provide the costs incurred and any quantified expected benefits
Total Distribution hardening costs in 2014 were $154.6 million. This excludes the
incremental costs related to applying Design Guidelines on new construction,
relocation projects and daily work, as these costs are not specifically tracked.
Consistent with the information provided by FPL in Docket Nos. 070301-EI, 100266EI and 130132-EI FPL has estimated that, over an analytical study period of 30
years, the net present value of restoration cost savings per mile of hardened feeder
22
would be approximately 45% to 70% of the cost to harden that mile of feeder for
future major storm frequencies in the range of once every three to five years. It is
possible that FPL could face major storms more frequently than that, as it did in the
2004-2005 hurricane seasons. If that were the case, then the net present value of
restoration cost savings likely would exceed the hardening costs. It is also important
to recognize that in addition to restoration cost savings, customers benefit
substantially, in many direct and indirect ways, from the reduced number and
duration of storm and non-storm related outages resulting from the planned
hardening activities.
4. Discuss any 2015 projected activities and budget levels
Consistent with its FPSC approved 2013-2015 plan, FPL’s 2015 hardening activities
include addressing 65 CIF feeder projects, 38 Community Project feeders, one
overhead highway crossing and 16 “01” switches. Additionally, FPL plans to
complete the installation of submersible equipment to mitigate the impact of
significant water intrusion in the six remaining vaults in the Miami downtown electric
network that are located just at or within the FEMA 100-year flood elevation levels.
FPL expects total 2015 hardening costs associated with these projects to be
approximately $175-$190 million.
23
2015 CIF Projects
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
Region
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
Dade
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
East
North
North
North
North
North
North
West
West
West
West
West
West
West
West
West
West
West
West
West
County
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Miami-Dade
Okeechobee
Palm Beach
St Lucie
Palm Beach
Indian River
Palm Beach
St Lucie
Palm Beach
Palm Beach
Martin
Palm Beach
Palm Beach
Palm Beach
Martin
Martin
Palm Beach
Palm Beach
Putnam
St Johns
Volusia
Brevard
Volusia
Volusia
Sarasota
Lee
Manatee
Lee
Collier
Sarasota
Manatee
Manatee
Manatee
Collier
Sarasota
Collier
Collier
Feeder
704131
703436
703832
709432
703533
703635
701436
700336
703637
706164
811361
810165
801232
801636
807163
809235
800538
807634
810561
808166
811264
801434
808165
802735
807734
809534
802731
807931
805531
401634
402262
406165
409766
411561
407236
406433
404835
410231
408331
405866
408033
400338
408332
407166
402633
411862
103732
102631
101934
201637
108261
100135
507162
507465
505862
505061
506766
503436
502563
500663
500664
503563
505761
507763
503133
Substation
MOFFETT
RESERVATION
HIGHLANDS
ANDREWS
DEERFIELD BEACH
PALM AIRE
PORT
PINEHURST
PALM AIRE
HOLLYBROOK
ANHINGA
SEAGULL
OPA LOCKA
PRINCETON
PENNSUCO
MITCHELL
RIVERSIDE
KILLIAN
JASMINE
MILAM
EUREKA
FULFORD
MILAM
MARION
LEMON CITY
VIRGINIA KEY
MARION
MIAMI LAKES
MASTER
OKEECHOBEE
PRATT
TURNPIKE
CATCHMENT
FELLSMERE
JOG
SAVANNAH
GERMANTOWN
CONGRESS
MONTEREY
DELTRAIL
CALDWELL
NORTHWOOD
MONTEREY
CRANE
JUNO BEACH
EVERNIA
PACIFIC
LEWIS
EDGEWATER
PALM BAY
LPGA
DAYTONA BEACH
POLO
CORKSCREW
BUCKEYE
JETPORT
VANDERBILT
SOUTH VENICE
PALMA SOLA
CORTEZ
CORTEZ
ALLIGATOR
AUBURN
RATTLESNAKE
SOLANA
Type of Project
Police
Police
Fire Station
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Police
Other Top CIF
Other Top CIF
Police
Fire Station
Police
Fire Station
Other Top CIF
Other Top CIF
Fire Station
Police
Fire Station
Police
Fire Station
Other Top CIF
Other Top CIF
Other Top CIF
Top CIF
Top CIF
Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Fire Station
Other Top CIF
Other Top CIF
Other Top CIF
Fire Station
911 Facility
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Police
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Other Top CIF
Fire Station
Other Top CIF
Other Top CIF
Other Top CIF
Police
Other Top CIF
Police
Other Top CIF
Other Top CIF
Police
Other Top CIF
Police
Other Top CIF
Other Top CIF
24
Project Address
400 S FEDERAL HWY # CITY HALL
3101 N STATE ROAD 7
121 SW 3RD ST # MAIN FIREHOUSE
2451 NW 16TH ST #PRISON
150 NE 2ND AVE
2300 W COMMERCIAL BLVD # ITS BLDG
3545 SW 2ND AVE #MAINTENANCE
1400 SE 18TH ST #GTL WWTP MAIN 1
3401 W PROSPECT RD # WELL 75
9500 PINES BLVD # FIRE STA 69
28700 SW 217TH AVE #MDAD/AWOS
13910 NW 41ST ST # ANNEX
OPA LOCKA #BLDG 40 BAY A
13150 SW 238 ST
9700 NW 97TH AVE
9201 SW 152ND ST
1751 NW 42ND CT #BRIDGE 6
8700 SW 95 AVE #SRM 559
16250 SW 72ND ST
9101 NW 25TH ST
13390 SW 152 ST
358 NE 168TH ST
8825 NW 18TH TER
8989 SW 117TH AVE # SR 536
7700 NE 8TH AVE #STORMPUMP
4400 Rickenbacker Causeway
7707 SW 117TH AVE # POLICE
16699 NW 67TH AVE
3190 NW 119TH ST
100 SW 5TH AVE # BUSNSS OFC
SR 710
450 SW THORNHILL DR # MANT
7100 BELVEDERE RD
22 S ORANGE ST # CITY HALL
8100 FOREST HILL BLVD
1665 SE WALTON RD # FIRE STA # 12
345 S CONGRESS AVE # PBC RADIO SYSTEM
4243 SOUTHERN BLVD # PBIA
3441 SE WILLOUGHBY BLVD # HEALTH DEPT
14276 HAGEN RANCH RD # CTRL
2500 NW 1ST AVE # 911/MUN
4200 N AUSTRALIAN AVE
1000 SE RUHNKE ST BLDG 2
2505 SW MARTIN HWY # NURSE
3188 PGA BLVD # COURTHOUSE
500 N DIXIE HWY # FS1
22034 SE 67TH PL # WATER TOWER
1110 WOODLAWN RD # WELL 10-2
500 W OCEAN AVE
1111 CLEARMONT ST NE # WWTP
3651 LPGA BLVD # UVWWTP
1 SHADY PL # WASTEWATER PLAN
5500 VERNA RD #WELL FIELD
16000 AIRPORT HAUL RD # CHILLER 2
4610 BUCKEYE RD # STA-420
10041 DANIELS PKWY # DOT BLDG
15000 LIVINGSTON RD #PARKS N REC MAIN
4531 SR 776 #ANNEX
5801 MARINA DR # CITY
5840 26TH ST W #PROF DEV CTR
5460 GULF OF MEXICO DR # POLICE
3347 TAMIAMI TRL E # JUSTICE
1350 RIDGEWOOD AVE # POLICE
7505 GRAND LELY DR # BLDG K
2900 12TH ST N
2015 Community Projects
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Region
Broward
Broward
Broward
Broward
Broward
Broward
Broward
Dade
Dade
Dade
Dade
Dade
East
East
East
East
East
East
East
East
East
East
North
North
North
North
North
North
North
North
North
North
West
West
West
West
West
West
County
Feeder
Broward
704668
Broward
701035
Broward
707265
Broward
703536
Broward
700237
Broward
706064
Broward
702932
Miami-Dade 808270
Miami-Dade 810663
Miami-Dade 810363
Miami-Dade 811065
Miami-Dade 812361
Martin
407032
Palm Beach 401036
Palm Beach 404136
St Lucie
405534
Palm Beach 400535
Palm Beach 406535
Palm Beach 402837
Palm Beach 405632
Palm Beach 407932
Palm Beach 408863
Volusia
204065
Brevard
200534
Volusia
100831
Volusia
109031
Volusia
104835
Brevard
205434
St Johns
104932
Brevard
200733
Brevard
202532
Brevard
203231
Lee
502636
Manatee
505362
Sarasota
501062
Sarasota
500538
Lee
501762
Manatee
502939
Substation
SPRINGTREE
SAMPLE ROAD
FLAMINGO
DEERFIELD BEACH
HOLLYWOOD
HIATUS
HAWKINS
LINDGREN
MONTGOMERY
NEWTON
PALMETTO
URBAN
RIO
GREENACRES
GOLF
PRIMAVISTA
BOYNTON
OSBORNE
LANTANA
FOUNTAIN
QUANTUM
ABERDEEN
DELTONA
MELBOURNE
PORT ORANGE
WRIGHT
TAYLOR
MERRITT
MOULTRIE
COCOA BEACH
AURORA
INDIALANTIC
COLONIAL
PARK
FRUITVILLE
CLARK
IONA
ONECO
25
Type of Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Community Project
Project Address
NW 88th Avenue
NE 15th Terrace
Flamingo Road
Deerfield Avenue
North 21st Street
West Sunrise Boulevard
SW 15th Street
SW 137th Ave
SW 120th Street
SW 157th Avenue
W 22nd Court
NW 107th Avenue
NE Savannah Road
Military Trail
SW 23rd Terrace
US Highway 1
Old Boynton Road
Military Trail
13th Street
Jog Road
Highridge Road
Jog Road
Howland Boulevard
Silver Palm Avenue
Powers Avenue
Derbyshire Road
Spruce Creek Road
Courtenay Parkway
Shores Boulevard
West Columbia Lane
North Wickham Road
Watson Drive
Yale Court
University Parkway
Bell Road
Beneva Road
San Carlos Boulevard
3rd Avenue West
2015 Critical Poles
Highway Crossings
Number of Highway
Crossings
1
Region
County
Interstate
East
Palm Beach
I-95
“01” Switches
Number of "01"
Region
County
Substation
Switches
4
Dade Miami - Dade Various
2
East
Palm Beach Various
4
North
Various
Various
3
West
Various
Various
3
Broward
Various
Various
16
Total
Transmission
1. Description of Hardening Programs
Please refer to FPL’s response to Item 1 – Description of Transmission
Hardening Programs, in Initiative 4 of the Storm Preparedness Initiatives section
of this filing for a description of FPL’s transmission storm hardening initiatives.
2. Method of Selection
Please refer to FPL’s response to Item 2 – Method of Selection, in Initiative 4 of
the Storm Preparedness Initiatives section of this filing for a description of the
method FPL used to determine the selection of each transmission storm
hardening initiative.
3. 2014 Accomplishments
Please refer to FPL’s response to Item 4 – 2014 Accomplishments, in Initiative 4
of the Storm Preparedness Initiatives section of this filing for a summary of the
2014 accomplishments for each of the transmission hardening programs. FPL’s
2014 accomplishments are also included in the three tables at the end of
Initiative 4, Item 4.
4. Proposed 2015 Plans
Please refer to FPL’s response to Item 5 – Proposed 2015 Plans, in Initiative 4 of
the Storm Preparedness Initiatives section of this filing for a summary of the 2015
projections for each of the transmission hardening programs. FPL’s 2015
proposed plans are also included in the three tables at the end of Initiative 4,
Item 4.
26
STORM PREPAREDNESS
INITIATIVES
27
Summary – Storm Preparation Initiatives
(1) Vegetation Trim Cycles – In 2014, FPL continued its three-year average cycle
and mid-cycle programs for feeders and its six-year average trim cycle for laterals.
(2) Joint Use Audits – Approximately 20 percent of FPL’s jointly used poles are
audited annually through its joint use surveys. Additionally, joint use poles are
inspected through FPL’s pole inspection program. Survey and inspection results
continue to show that through FPL’s joint use processes and procedures, along with
cooperation from joint pole owners and third-party attachers, FPL has properly
identified and accounted for the joint use facilities on its system.
(3) Six-year Transmission Structure Inspection Cycle – In 2014, FPL performed
ground level visual inspections on 100% of its transmission poles/structures.
Additionally, FPL performed climbing or bucket truck inspections on approximately
1/6 of its wood transmission poles/structures, 1/6 of its 500kV structures, 1/10 of its
other concrete and steel poles/structures and conducted storm and pre-construction
mitigation patrols on all concrete and steel poles/structures.
(4) Hardening the Transmission System – In 2014, FPL continued executing its plan
to replace all wood transmission structures in its system. Additionally, FPL
completed the replacement of all ceramic post insulators with polymer insulators
within its system and continued with its installation of flood monitoring equipment in
substations that are more susceptible to flooding.
(5) Distribution Geographic Information System (GIS) – FPL completed its five
originally approved key Distribution GIS improvement initiatives in 2011. These
initiatives included developing a post-hurricane forensic analysis tool and the
addition of poles, streetlights, joint use survey and hardening level data to the GIS.
Updates to the GIS continue as data is collected through inspection cycles and other
normal daily work activities.
(6) Post-Storm Forensic Collection/Analysis – FPL has post-storm forensic data
collection and analysis plans, systems and processes in place and available for use.
No major storms affected FPL’s service territory in 2014; therefore, no forensic
collection or analysis was required.
(7) Overhead (OH) and Underground (UG) Storm Performance – FPL has plans,
systems and processes in place to capture OH and UG storm performance. No
major storms affected FPL’s service territory in 2014; therefore, no data collection or
analysis was required.
(8) Increased Coordination with Local Governments – In 2014, FPL continued its
efforts to improve local government coordination. Activities included: (1) meetings
with county emergency operations managers to discuss critical infrastructure
28
locations in each jurisdiction; (2) inviting federal, state, county and municipal
emergency management personnel to participate in FPL’s annual company-wide
storm preparedness drill and; (3) FPL External Affairs managers conducted 483
community presentations, providing information on storm readiness and other topics
of community interest.
(9) Collaborative Research on Hurricanes/Storm Surge – Collaborative research
efforts led by the PURC have resulted in greater knowledge of appropriate
vegetation management practices during storm and non-storm periods, wind during
storm and non-storm events, and hurricane and damage modeling to further
understand the costs and benefits of undergrounding.
(10) Natural Disaster Preparedness/Recovery Plans – FPL’s Storm Emergency Plan
identifies emergency conditions and the responsibilities and duties of the FPL
emergency response organization for severe weather and fires. The plan covers the
emergency organization, roles and responsibilities and FPL’s overall severe storm
emergency processes. These processes describe the planning activities, restoration
practices, public communications, and coordination with government, training,
practice exercises and lessons-learned evaluation systems. The plan is reviewed
annually and revised as necessary.
29
STORM PREPAREDNESS
INITIATIVE No. 1
30
Initiative 1 – Vegetation Management Trim Cycles
1. A complete description of the Company’s vegetation management program
(policies, guidelines, practices) for 2014 and 2015 in terms of both activity and
costs.
Tree limbs and branches, especially palm fronds, are among the most common
causes of power outages and momentaries. The primary objective of FPL’s
distribution vegetation management program is to clear vegetation from the vicinity
of distribution facilities and equipment in order to provide safe, reliable and costeffective electric service to its customers. The program is comprised of multiple
initiatives designed to reduce the average time customers are without electricity as a
result of vegetation-related interruptions. This includes preventive maintenance
initiatives (planned cycle and mid-cycle maintenance), corrective maintenance
(trouble work and service restoration efforts), customer trim requests, and support of
system improvement and expansion projects, which focus on long-term reliability by
addressing vegetation that will impact new or upgraded overhead distribution
facilities.
FPL follows the National Electric Safety Code (NESC), the American National
Standards Institute (ANSI) A-300, and all other applicable standards while
considering tree species, growth rates and the location of trees to our facilities when
performing line clearing. Danger trees (leaning, structurally damaged, or dead)
outside of right-of-way (ROW) which cannot be effectively trimmed are candidates
for customer-approved removal.
On May 30, 2007, the Florida Public Service Commission (FPSC) issued Order No.
PSC-07-0468-FOF-EI approving the continuation of FPL’s three-year average trim
cycle for feeders and the implementation of a six-year average trim cycle for laterals.
FPL maintains its distribution feeder lines on a three-year average trim cycle
because it offers the optimal balance of reliability performance and vegetation
clearing cost. The primary benefit of properly maintaining feeder lines is that a
feeder outage can affect, on average, approximately 1,500 customers, as compared
to a lateral line that can affect, on average, approximately 35 customers.
FPL enhances its approved feeder trimming plan through its mid-cycle trimming
program, which encompasses patrolling and trimming feeders between planned
maintenance cycles to address tree conditions that may cause an interruption prior
to the next planned cycle trim. Mid-cycle work units typically have a trim age of 12 to
18 months and usually involves certain fast-growing trees that need to be addressed
before the next scheduled cycle trim date.
Customers often contact FPL with requests to trim trees around lines in their
neighborhoods and near their homes. As a result of our discussions with these
customers and/or a follow-up investigation, FPL either performs the necessary
31
trimming or determines that the requested trimming can be addressed more
efficiently by completing it through the normal scheduled cycle trimming.
Finally, a very important component of FPL’s vegetation program is providing
information to customers to educate them on our trimming program and practices,
safety issues, and the importance of placing trees in the proper location, i.e., FPL’s
“Right Tree, Right Place” (RTRP) program. RTRP is a public education program
based on FPL’s core belief that providing reliable electric service and sustaining our
natural environment can go hand-in-hand and is a win-win partnership between the
utility and its customers.
In 2014, FPL continued to maintain three and six year average trim cycles for
feeders and laterals, respectively, and cleared an additional feeder miles through its
mid-cycle program. Additionally, FPL continued to pursue the challenges associated
with critical palm removals, customer refusals and danger trees outside the right-ofway.
Cost
Feeder Miles
(Millions)
Cycle
Mid-Cycle
$58.9
4,249
7,244
Lateral Miles
Total
Cycle
11,493
3,685
2. Definitions of terms: danger tree, demand tree, spot trim, mid-cycle trim
Danger Tree – A tree beyond normal clearance specification that has high likelihood
to fail and impact facilities. Danger tree failure can be associated with factors such
as trees that are leaning, structurally damaged, dead or are a certain tree species.
Spot trim – Addresses a specific location vs. entire line segment through hot spot
trimming. This includes trouble tickets or reliability-related requests.
Demand Trim/Customer Trim Request (CTR) – Addresses tree conditions reported
by a customer. FPL will inspect and, if trimming is required for safety or reliability,
the necessary work is performed.
Mid-cycle Program -- 12 to 18 month patrol and trim cycle to address conditions on
feeders that will require trimming prior to scheduled planned maintenance.
3. The criteria used to determine whether to remove a tree, replace a tree, spot
trim, demand trim, or mid-cycle trim.
Tree removal – Trees which cannot be effectively trimmed to meet clearance
specifications and ANSI A-300 are evaluated based on species and cost to remove.
Palms are a primary removal candidate, especially for feeders.
32
Tree replacement – FPL does not have a tree replacement program. On a targeted
and very limited basis, contribution toward replacement is considered.
Spot trim –Spot trimming addresses a specific location based on reliability
performance.
Demand trim – Tree meeting FPL’s existing Customer Trim Request criteria. (See
Item 12).
Mid-cycle Program – Any feeder not scheduled for maintenance in the current year
is eligible for mid-cycle trimming and typically has a trim age of 12 - 18 months.
4. Provide an analysis of the cost and benefits of the Company’s program vs.
three-year trim cycle program
See Direct Testimony & Exhibits of: Manuel B. Miranda, filed December 20, 2006
(Docket No. 060198-EI).
5. Tree clearing practices in utility easements and authorized rights-of-way
FPL’s line clearing practice is to pre-notify customers of scheduled maintenance
activities. FPL clears lines (within easements and outside of easements) to its
clearance specifications to protect its facilities and maintain reliable service.
6. and 9. Relevant portions of utility tariffs pertaining to utility vegetation
management activities within and outside easements and authorized
rights-of-way
Within easement;
Rule 2.8 Access to Premises:
The duly authorized agents of the company shall have safe access to the
premises of the customer at all reasonable hours for installing, maintaining
and inspecting or removing company’s property, reading meters, trimming
trees within the company’s easements and right of way, and other purposes
incident to performance under or termination of the company’s agreement
with the customer, and in such performance shall not be liable for trespass.
Rule 5.6 Unobstructed Access To Company’s Facilities:
Company shall have perpetual unobstructed access to its overhead and
underground facilities, such as poles, underground cables, pad-mounted
transformers and meters in order to perform repair and maintenance in a
safe, timely and cost-efficient manner.
Outside easements;
There are no specific utility rights to remove trees outside a right-of-way
(ROW). Through FPL’s RTRP efforts, customers are informed and
33
encouraged to take responsibility and carefully consider the mature height of
vegetation planted adjacent to power structures.
7. Tree removal practices for trees that abut and/or intrude into easements and
authorized rights-of-way
Trees identified for removal within an easement or ROW will usually involve
customer contact and a signed Tree Work Authorization (TWA) by the customer. If
removal is not possible, FPL will clear to the extent possible while complying with
applicable line clearing standards and practices. In addition, FPL routinely
communicates with local communities about the various issues concerning tree
removals on residential property and in public ROW.
8. Tree clearing practices outside of easements and authorized rights-of-way
FPL will clear, to the extent possible, any vegetation that encroaches upon its
facilities, to provide for adequate clearances while complying with applicable line
clearing standards and practices.
10. Tree removal practices for trees outside of easements and authorized
rights-of-way
Trees outside an easement or ROW that are targeted for removal will typically
involve customer contact and a signed Tree Work Authorization. If a removal is not
possible, FPL will clear to the extent possible while complying with applicable line
clearing standards and practices.
11. Relevant portions of utility tariffs pertaining to customer vegetation
management obligations as a term or condition of electric service
These General Rules and Regulations are a part of the Company's Tariff covering
the terms and conditions under which Electric Service is supplied by the Company to
the Customer. They are supplemental to the "Rules and Regulations Governing
Electric Service by Electric Utilities" issued by the FPSC.
Company tariffs;
Rule 5.5 Interference With Company’s Facilities:
The customer should not allow trees, vines and shrubs to interfere with the
Company’s adjacent overhead conductors, service wires, pad-mounted
transformers and meter. Such interference may result in an injury to persons,
or may cause the customer’s service to be interrupted. In all cases, the
customer should request the Company to trim or remove trees and other
growth near the Company’s adjacent overhead wires, and under no
circumstances should the customer undertake this work himself, except
around service cables when specifically authorized by and arranged with the
company.
34
Rule 2.9 Right of Way:
The customer shall grant or cause to be granted to the Company and without
cost to the Company all rights, easements, permits and privileges which, in
the opinion of the Company, are necessary for the rendering of service to the
customer.
12. Company practices regarding customer trim requests (also known as
“demand trim” requests)
Customer Trim Requests (CTR) that are inspected and found to be potentially
hazardous are immediately scheduled for clearing. If conditions are inspected and
determined not to potentially hazardous, FPL advises the customer that the work will
be deferred to scheduled maintenance.
13. 2015 projected activities and budget levels
In 2015, FPL’s distribution vegetation management plan includes trimming 11,300
feeder miles (including feeder cycle and mid-cycle miles) and 3,800 lateral cycle
miles. The plan also includes restoration activities and customer trim requests.
Total estimated costs associated with these activities are approximately $63.1
million.
35
14. Include the requirements of applicable orders:
Initiative 1
Three-Year Vegetation Cycle
System Vegetation Management Performance Metrics
2014 System Totals
Reliability
Feeders
Laterals
13,419
22,831
South
2,141
2526
186
5,766
East
3,641
3706
262,136
215,012
North
4,768
9697
12,655,988
31,770,133
3,004
6793
(E) Outages per Mile [B ÷ A]
0.01
0.25
West
Grand
Total
13554.00
22721
(F) Vegetation CI per Mile [C ÷ A]
19.5
9.4
Cycle
Feeders (F)
Mid-cycle
Totals
Laterals
(L)
Cycle
Totals
F+L
(A) Total current system miles
(B) Number of Outages
(C) Customer Interruptions
(D) Customer Minutes of Interruption
Cycle Maintenance Trimming
(G) Number of years in the cycle
3
6
2013
2013
(I) Total miles at beginning of this cycle
13,554
22,722
(J) Total miles cleared this cycle
8,886
14,344
23,230
7,809
31,039
Miles cleared 2014
4,249
7,244
11,493
3,685
15,178
Miles cleared 2013
4,637
7,100
11,737
4,124
15,861
(H) 1st year of this cycle
Miles cleared 2018
Miles cleared 2017
Miles cleared 2016
Miles cleared 2015
(K) Percentage of this cycle completed
65.6%
(L) Planned Maintenance Goal (next year) 2015
4,200
(M) Number of Hotspot Trims
N/A
Cost
34.4%
7,100
11,300
3,800
15,100
N/A
11,855
Totals
(N) All Vegetation Management Costs
$58.9M
(P) Vegetation Budget (current year) 2014
$62.3M
(Q) Vegetation Budget (next year) 2015
$63.1M
36
1) REGIONS - Management Area (MA) Vegetation Management Performance Metrics
2014 DADE
Reliability
Feeders
Laterals
2,099
2,519
66
1,027
83,671
43,967
4,182,153
8,503,359
(E) Outages per Mile [B ÷ A]
0.03
0.41
(F) Vegetation CI per Mile [C ÷ A]
39.9
17.5
(A) Total current system miles
(B) Number of Outages
(C) Customer Interruptions
(D) Customer Minutes of Interruption
Cycle
(G) Number of years in the cycle
Laterals
(L)
Feeders (F)
Cycle Maintenance Trimming
Mid-cycle
Totals
Cycle
Totals
F+L
3
6
(H) 1st year of this cycle
2013
2013
(I) Total miles at beginning of this cycle
2,141
2,526
(J) Total miles cleared this cycle
1,373
1,092
2,465
911
3,376
Miles cleared 2014
670.35
624.00
1,294.35
439.00
1,733
Miles cleared 2013
703
468
1,171
472
1,643
Miles cleared 2018
Miles cleared 2017
Miles cleared 2016
Miles cleared 2015
(K) Percentage of this cycle completed
64.1%
(L) Planned Maintenance Goal (next year) 2015
689
(M) Number of Hotspot Trims
N/A
Cost
36.1%
515
1,204
479
1,683
N/A
4,505
Totals
(N) All Vegetation Management Costs
$8.8M
(P) Vegetation Budget (current year) 2014
$8.5M
(Q) Vegetation Budget (next year) 2015
$8.7M
37
2) REGIONS - Management Area (MA) Vegetation Management Performance Metrics
2014 EAST
Reliability
(A) Total current system miles
(B) Number of Outages
Feeders
Laterals
3,608
3,717
47
1,130
76,813
44,697
3,744,436
6,415,372
(E) Outages per Mile [B ÷ A]
0.01
0.30
(F) Vegetation CI per Mile [C ÷ A]
21.3
12.0
(C) Customer Interruptions
(D) Customer Minutes of Interruption
Cycle
(G) Number of years in the cycle
Laterals
(L)
Feeders (F)
Cycle Maintenance Trimming
Mid-cycle
Totals
Cycle
Totals
F+L
3
6
(H) 1st year of this cycle
2013
2013
(I) Total miles at beginning of this cycle
3,641
3,706
(J) Total miles cleared this cycle
2,359
3,244
5,603
1,219
6,822
Miles cleared 2014
1,096.00
1,498.00
2,594.00
606.00
3,200
Miles cleared 2013
1,263
1,746
3,009
613
3,622
Miles cleared 2018
Miles cleared 2017
Miles cleared 2016
Miles cleared 2015
(K) Percentage of this cycle completed
64.8%
(L) Planned Maintenance Goal (next year) 2015
1,163
(M) Number of Hotspot Trims
N/A
Cost
32.9%
1,683
2,846
597
3,443
N/A
2,491
Totals
(N) All Vegetation Management Costs
$13.8M
(P) Vegetation Budget (current year) 2014
$14.3M
(Q) Vegetation Budget (next year) 2015
$14.9M
38
3) REGIONS - Management Area (MA) Vegetation Management Performance Metrics
2014 NORTH
Reliability
(A) Total current system miles
(B) Number of Outages
(C) Customer Interruptions
Feeders
Laterals
4,729
9,767
53
2,062
65,590
64,165
3,283,785
8,922,436
(E) Outages per Mile [B ÷ A]
0.01
0.21
(F) Vegetation CI per Mile [C ÷ A]
13.9
6.6
(D) Customer Minutes of Interruption
Cycle
(G) Number of years in the cycle
Laterals
(L)
Feeders (F)
Cycle Maintenance Trimming
Mid-cycle
Totals
Cycle
Totals
F+L
3
6
(H) 1st year of this cycle
2013
2013
(I) Total miles at beginning of this cycle
4,768
9,697
(J) Total miles cleared this cycle
3,201
6,144
9,345
3,405
12,750
Miles cleared 2014
1,527
3,144
4,671
1,593
6,264
Miles cleared 2013
1,674
3,000
4,674
1,812
6,486
Miles cleared 2018
Miles cleared 2017
Miles cleared 2016
Miles cleared 2015
(K) Percentage of this cycle completed
67.1%
(L) Planned Maintenance Goal (next year) 2015
1,447
(M) Number of Hotspot Trims
N/A
Cost
35.1%
3,018
4,465
1,523
5,988
N/A
3,273
Totals
(N) All Vegetation Management Costs
$21.9M
(P) Vegetation Budget (current year) 2014
$23.4M
(Q) Vegetation Budget (next year) 2015
$23.2M
39
4) REGIONS - Management Area (MA) Vegetation Management Performance Metrics
2014 WEST
Reliability
(A) Total current system miles
(B) Number of Outages
(C) Customer Interruptions
(D) Customer Minutes of Interruption
Feeders
2,983
Laterals
6,828
20
1,547
36,062
62,183
1,445,614
7,928,966
(E) Outages per Mile [B ÷ A]
0.01
0.23
(F) Vegetation CI per Mile [C ÷ A]
12.1
9.1
Cycle
(G) Number of years in the cycle
Laterals
(L)
Feeders (F)
Cycle Maintenance Trimming
Mid-cycle
Totals
Cycle
Totals
F+L
3
6
(H) 1st year of this cycle
2013
2013
(I) Total miles at beginning of this cycle
3,004
6,793
(J) Total miles cleared this cycle
1,953
3,865
5,817
2,273
5,817
956.00
1,978.00
2,934.00
1,047.00
3,981
997
1,887
2,883
1,226
4,109
Miles cleared 2018
Miles cleared 2017
Miles cleared 2016
Miles cleared 2015
Miles cleared 2014
Miles cleared 2013
(K) Percentage of this cycle completed
65.0%
(L) Planned Maintenance Goal (next year) 2015
902
(M) Number of Hotspot Trims
N/A
Cost
33.5%
1,884
2,785
1,201
3,986
N/A
1,586
Totals
(N) All Vegetation Management Costs
$11.7M
(P) Vegetation Budget (current year) 2014
$12.7M
(Q) Vegetation Budget (next year) 2015
$11.9M
15. Support for continuation of the Company Program, rather than a ThreeYear Cycle program, should be included in this section of the report. Include
all tables and additional analysis supporting continuation of the Company
Program in this section of the report
No new information is available (e.g., no major storms have impacted FPL’s service
territory) that would change the initial analysis/results provided by FPL in Docket No.
060198-EI.
40
16. Local Community Participation
FPL routinely communicates with local communities about the various issues
surrounding line clearing. The issues that are most often discussed are the method
of trimming, clearances, notification and debris. FPL’s practice is to pre-notify
customers of scheduled maintenance activities whose neighborhoods will be
affected by line clearing activities. These communications include an overview of the
scheduled maintenance activities, a safety message and customer contact number
for more information. FPL’s RTRP program is also an example of its outreach to
communities. The program provides information to customers to educate them on
our trimming program and practices, safety issues and the importance of placing
trees in the proper location.
a) ROW tree clearing
FPL’s line clearing practice is to pre-notify customers of scheduled maintenance
activities. FPL clears lines (within easements and outside of easements) to our
clearance specifications to protect our facilities.
b) Easement tree clearing
See response to 16 a., ROW tree clearing.
c) Hard-to-access facilities
See response to 16 a., ROW tree clearing.
d) Danger trees not within ROW or within easements where the utility has
unobstructed authority to remove the danger tree
Danger trees outside an easement or ROW that are targeted for removal will
typically involve customer contact and a Tree Work Authorization (TWA) form,
signed by the customer, authorizing the removal. If a removal is not possible, FPL
will clear the vegetation to the extent possible while complying with applicable line
clearing standards and practices.
e) Trim-back distances
FPL will clear, to the extent possible, any vegetation that may encroach or is in
conflict with our facilities to provide for adequate clearances while complying with
applicable line clearing standards (NESC) and practices (ANSI).
17. Danger Trees
Danger tree failure can be associated with factors, such as trees that are leaning,
structurally damaged and/or dead, as well as certain tree species. While FPL
removed approximately 23,000 trees in 2014, some of which were most likely
danger trees, FPL does not specifically track the identification/removal of danger
trees.
.
41
STORM PREPAREDNESS
INITIATIVE No. 2
42
Initiative 2 – Joint Use Pole Attachment Audits
FPL Overview
FPL administers annual audits of joint use facilities (poles owned and attached to by
FPL or telephone companies) and attachments to its facilities (CATV and
telecommunication attachments). Approximately 20% of the FPL service territory is
audited annually through its joint use surveys in order to determine the number and
ownership of jointly-used poles and associated attachments.
Additionally, joint use poles are inspected as part of FPL’s pole inspection program.
This is described more fully in FPL’s pole inspection reporting requirements
response.
Describe the extent of the audit and results pertaining to pole reliability and
NESC safety matters. The intent is to assure the Commission that utilities
know the status of their facilities and that reasonable efforts are taken to
address pole reliability and NESC safety matters.
In addition to FPL’s pole inspection program, NESC safety audits are conducted by
the FPSC. Apparent NESC variances are identified and recorded by FPSC auditors.
FPL investigates the apparent NESC variances and makes corrections where
necessary. Additionally, as part of FPL’s daily work activities (e.g., construction,
maintenance, reliability initiatives, etc.), NESC safety issues may be identified and
corrected. While the FPSC variances are tracked, FPL does not specifically track
corrective activities completed as part of its daily activities.
a) Percent of system audited.
Feeders: Approximately 20% annually.
Laterals: Approximately 20% annually.
FPL does not specifically maintain/track its joint use audits at this level of detail. See
FPL’s overview above.
b) Date audit conducted? Ongoing – See FPL’s overview above.
c) Date of previous audit? Ongoing – See FPL’s overview above.
d) List of audits conducted annually. Joint use poles, attachments,
strength/loading tests – see FPL’s overview above and FPL’s pole inspection
reporting requirement response.
Suggested Alternatives: None.
43
Joint Use Attachment Audits
JOINT USE AUDITS
(A) Number of company owned distribution poles. (FPL
1,163,099
owned poles at 12/31/14)
(B) Number of company distribution poles leased. (Non236,207
FPL owned poles)
(C) Number of owned distribution pole attachments. (FPL
owned poles w/attachments)
(D) Number of leased distribution pole attachments. (NonFPL owned poles w/attachments) (1)
(E) Number of authorized attachments.
(F) Number of unauthorized attachments.
POLE INSPECTIONS – JOINT USE POLES
(G) Number of distribution poles strength tested.
(H) Number of distribution poles passing strength test. (2)
(I) Number of distribution poles failing strength test
(overloaded). (2)
(J) Number of distribution poles failing strength-test
(other reasons). (2)
(K) Number of distribution poles corrected (strength
failure).
(L) Number of distribution poles corrected (other
reasons).
(M) Number of distribution poles replaced.
FPSC SAFETY AUDITS
(N) Number of apparent NESC violations involving
electric infrastructure.
(O) Number of apparent NESC violations involving thirdparty facilities.
Suggested Alternatives:
834,660
236,207
1,284,863
0
63,900
Grade C – 55,630
Grade B – 51,854
Grade C - 45
(0.08%)
Grade B – 3,821
(7.37%)
Grade C – 8,225
Grade B – 8,225
N/A – see Note 3
N/A – see Note 3
N/A – see Note 3
366
138
None
Notes: (1) Non-FPL owned poles with FPL and another attaching entity (e.g., CATV) = 173,882
(2) NESC required standard = Grade C; FPL Higher Standard =Grade B
(3) K, L, M not tracked at the joint use level
State whether pole rents are jurisdictional or non-jurisdictional. If pole rents
are jurisdictional, then provide an estimate of lost revenue and describe the
company’s efforts to minimize the lost revenue.
“Pole rent” revenues are jurisdictional. There are no lost revenues since back-billings
for joint use pole ownership true-ups, as well as unauthorized attachments are made
retroactively back to the date of the previous audit/true-up.
44
STORM PREPAREDNESS
INITIATIVE No. 3
45
Initiative 3 – Six-Year Transmission Structure Inspection Cycle
1. Description of Inspection Program
Please refer to FPL’s response to Item 7 – Description of Pole Inspection
Program, in the Transmission section of the Pole Inspection Report for a
description of FPL’s transmission inspection program. Included in FPL’s
response are inspection procedures for wood, concrete and steel transmission
structures.
2. 2014 Accomplishments
Transmission Line Inspections
Please refer to FPL’s response to Item 8 – 2014 Accomplishments, in the
Transmission pole inspection section of this report and the tables at the end of
this section.
Substation Inspections
In 2014, FPL completed distribution and transmission inspections in accordance
with its procedures. For 2014, FPL’s substation inspection costs were
approximately $0.6 million. See also the tables at the end of this section.
3. Proposed 2015 Plans
Transmission Line Inspections
Please refer to FPL response to Item 9 – Proposed 2015 Plan, in the
Transmission pole inspection section of this report and the tables at the end of
this section.
Substation Inspections
In 2015, FPL plans include $0.7 million for the scheduled inspections of its
transmission and distribution substations. See also the tables at the end of this
section.
46
6-year Transmission Inspections – Results/Plans
Transmission Circuit, Substation & Other Equipment Inspections
2014
2014
2015
Plan
Actual
Budget $
Actual $
Plan
Budget $
-
1,257
n/a
n/a
n/a
n/a
840
840
898
$1.9M
71.0%
71.7%
-
100%
71.4 %
-
-
615
-
-
615
-
615
615
$0.5M
$0.6M
615
$0.7M
100%
100%
-
100%
100%
-
(G) Transmission equip.
(3)
inspections (other equip)
***
***
***
***
***
***
(H) Percent trans. equip
(3)
inspection comp (other equip)
***
***
***
***
***
***
(A) Total transmission circuits
(B) Transmission circuit
inspections
(C) Percent transmission circuits
inspected
(D) Total transmission
(2)
substations
(E) Transmission substations
(2)
inspected
(F) Percent transmission
(2)
substations inspected
(1)
$2.2M
(1)
$1.8M
(1)
(1)
FPL does not budget or track expenditures based on structure materials. As
such, the dollar amounts shown in the table above represent all transmission
structure inspections regardless of materials.
(2)
Values shown for D, E and F include both transmission and distribution
substations. FPL does not budget or track these items separately.
(3)
Items G and H are included within FPL transmission line and/or substation
inspections.
47
Non-Wood Transmission Structure Inspections
2014
2014
2015
Plan
Actual
Budget $
Actual $
Plan
Budget $
(A) Total non-wood transmission
tower structures
n/a
51,232
n/a
n/a
53,005
n/a
(B)Transmission tower structure
inspections
51,232
51,232
$2.2M*
$1.8*
53,005
$1.9M*
(C) Percent of transmission tower
structures inspected**
100%
100%
-
100%
100%
-
*
FPL does not budget or track expenditures based on structure materials. The dollar amounts
shown in the table above represent all transmission structure inspections regardless of materials.
** 100% visually inspected; bucket truck/climbing inspections conducted on cycles.
.
Wood Transmission Structure Inspections (1)
2014
2014
2015
Plan
Actual
Budget $
Actual $
Plan
Budget $
(A) Total number of wood
transmission poles.
-
13,620
-
-
11,550
-
(B) Number of transmission
poles strength tested.
2,402
2,427
-
2,001
-
-
-
-
-
0
-
-
-
-
-
426
-
-
-
-
0
0
$0.0M
n/a
0
n/a
(C) Number of transmission
poles passing strength test.
(D) Number of transmission
poles failing strength test
(overloaded).
(E) Number of transmission
poles failing strength test
(other reasons).
(F) Number of transmission
poles corrected (strength
failure)
(G) Number of transmission
poles corrected (other
reasons)
(H) Total transmission poles
replaced.
(2)
$2.2M
(3)
$26.1M
(3)
$26.1M
589
2,070
589
2,070
(2)
$1.8M
(4)
$28.9M
(4)
$28.9M
2,273
(2)
$1.9M
(4)
426
$24.7M
(4)
(4)
426
$24.7M
(4)
(1)
In addition to the 2014 results for its six-year cyclical inspection, FPL performed annual ground
level visual inspections on 100% of its wood poles/structures.
(2)
FPL does not budget or track expenditures based on structure materials. As such, these dollar
amounts represent all transmission structure inspections regardless of materials.
(3)
The replacement quantities provided in (H) represent the total number of transmission structures
replaced through all initiatives/activities including condition assessments, relocations, proactive
rebuilds, and system expansion.
(4)
Dollar amounts are only for FPL’s condition assessment follow-up program.
48
STORM PREPAREDNESS
INITIATIVE No. 4
49
Initiative 4 – Hardening of Existing Transmission Structures
1. Description of Transmission Hardening Programs
Wood Structure Replacement Program
In 2006, FPL began its Transmission hardening initiative by targeting
replacement of single pole un-guyed wood structures. In 2008, FPL enhanced its
hardening initiative to include replacement of all wood transmission structures
over the next 25 to 30 years. FPL’s approved 2013-2015 hardening plan
accelerates the replacement of wood transmission pole/structures to within the
next 10 to 15 years. Replacements are performed as part of maintenance,
hardening, relocations and system expansion programs.
Ceramic Post (CPOC) Transmission Line Insulators
In 2006, FPL implemented a comprehensive plan for replacing existing ceramic
post insulators with polymer post insulators on concrete poles. In 2014, FPL
completed this initiative and now has replaced all ceramic post insulators on
concrete poles within its system.
Storm Surge/Flood
FPL’s approved 2013-2015 hardening plan includes several storm surge/flood
initiatives that better protect certain transmission facilities and expedite
restoration of service to customers. This includes water intrusion mitigation, the
installation of real-time water level monitoring systems and communication
equipment in certain substations and the purchase of additional mobile fleet
equipment.
2. Method of Selection
FPL's method for selecting its wood pole and ceramic post insulator hardening
initiatives for its transmission system was based on performance during the
2004-05 storm seasons. The 2008 enhancement of replacing all wood
transmission poles was based on an evaluation of the overall adequacy of the
original program to prepare the transmission infrastructure for future storms. The
recently approved 2013-2015 storm surge/flood initiatives are in response to
lessons learned in 2012 from Hurricane Sandy in the northeastern part of the
United States.
3. Prioritizing Programs with the Community
Being a network transmission system, FPL’s first priority must be the overall
system reliability and stability for the State of Florida. Prioritization factors also
include proximity to high wind areas, system importance, customer counts, and
coordination with other business unit storm initiatives. Other economic
efficiencies, such as opportunities to perform work on multiple transmission line
sections within the same corridor, are also considered. The transmission plan
also incorporates the distribution hardening plans for communities into its
prioritization.
50
For the new 2013-2015 storm surge/flood initiatives, FPL initially selected the 25
substations in its system located below the FEMA 100-year flood elevations as
well as other substations that are more susceptible to flooding.
4. 2014 Accomplishments
Wood Structure Replacement Program
In 2014, FPL replaced 2,070 wood transmission structures. These structures
were replaced with FPL’s current design standards of round spun concrete poles.
See Table 1 below.
Ceramic Post Transmission Line Insulators
In 2014, FPL completed its initiative to replace all ceramic post insulators with
polymer post insulators on concrete poles within its system. See Table 2 below.
Storm Surge/Flood
In 2014, FPL installed water-level monitoring systems and communication
equipment in 120 of its substations that are more susceptible to flooding. See
Table 3 below.
5. Proposed 2015 Plans
Replacement of All Wood Transmission Structures
In 2015, FPL plans on replacing 1,410 wood transmission structures. These
wood structures will be replaced during maintenance, relocations, system
expansion, and hardening programs. See Table 1 below.
Transmission Hardening Initiatives – Results/Plans
Table 1 - Replace All Wood Transmission Structures
2014
(A) Transmission structures
hardened
(B) Percent planned transmission
structures hardening completed
2014
2015
Plan
Actual
Budget $
Actual $
Plan
Budget $
1,057
2,070(2)
$40.6M(1)
$41.4M(1)
1,410(2)
$44.8M(3)
-
196%
-
104%
-
-
Table 2 - Ceramic Post Transmission Line Insulators
2014
(A) Transmission structures
hardening
(C) Percent transmission structures
hardening completed
2014
2015
Plan
Actual
Budget $
Actual $
Plan
590
590
$2.9M
$2.9M
0
$0
-
100%
-
100%
-
-
51
Budget $
Table 3 - Storm Surge/Flood
2014
2014
2015
Plan
Actual
Budget $
Actual $
Plan
Budget $
(A) No. of substation flood
monitoring equipment installations
120
120
$1.2M
$1.0M
0
$0
(A) % flood monitoring installations
completed to plan
-
100%
-
100%
-
-
(1)
FPL does not budget or track maintenance expenditures based on structure materials. As such, the
dollar amounts shown in the table above represent or include all transmission maintenance,
regardless of materials.
(2)
These wood structures are replaced during hardening, maintenance, relocations and system
expansion programs.
(3)
FPL has established separate budget items for each transmission hardening program and will be
able to track hardening program expenditures separately by the specific budget items. However, it
will not be able to separately track costs for these same types of improvements accomplished
through other normal business activities such as maintenance, relocations, proactive rebuilds, and
system expansion.
52
STORM PREPAREDNESS
INITIATIVE No. 5
53
Initiative 5 – Distribution Geographic Information System (GIS)
Efforts Undertaken at FPL to Meet the Commission Initiative - FPL has
completed the following originally approved key initiatives which support the
Commission’s objective:
1. Distribution GIS Improvements – Post-Hurricane Forensic Analysis
FPL developed a mobile electronic inspection tool that randomly creates routes
within the hurricane-force wind area. Field employees travel the routes collecting
observed damage and documenting the cause of the damage. This field data is
uploaded to a database for further analysis by our staff engineers. This tool
replaced the sampling methodology used in 2005.
2. Distribution GIS Improvements – Poles
FPL has added inspection records and pole attributes in coordination with its
Pole Inspection Program (PIP). Updates to the GIS pole data are on-going with
inputs from PIP, hardening and daily work activities.
3. Distribution GIS Improvements – Joint Use Data
By year-end 2008, all Joint Use data was added to the GIS. Updates are ongoing as audits are completed and data is received from FPL’s Joint Use vendor.
4. Distribution GIS Improvements – Level of Hardening
Level-of-hardening attributes have been added to the GIS system including the
load calculation and hardening level. The system continues to be updated as
hardening projects and activities are completed
5. Distribution GIS Improvements – Streetlights
FPL completed the initial loading of all streetlight data into the FPL Distribution
GIS in 2011. As on-going audits and changes in the streetlight inventory from
daily work activities are loaded into FPL’s GIS, an interface to its Customer
Information System ensures continued accuracy.
54
STORM PREPAREDNESS
INITIATIVE No. 6
55
Initiative 6 – Post Storm Forensic Data Collection/Analysis
1. Has Forensics Team been established?
Yes.
2. Have forensic measurements been established? If yes, please
describe/provide.
Forensic measurements have been established and are entered into portable
field computers at forensic locations.
At each forensic location:
- Pictures are taken to show the specific damage and the surrounding area.
- GPS Coordinate information is recorded
- A data collection form is completed, detailing information such as:
o Pole specific information
o Wire specific information
o Framing and loading information
o Tree conditions
o Foreign attachments
o Surrounding area characteristics
o Debris conditions
o Soil conditions
o Wind speed rating
3. Has a forensics database format been established?
Yes. The information captured from the portable field computers via FPL’s mobile
mapping and field automation software is uploaded into a Microsoft SQL server
database.
4. Describe/provide GIS and forensic data tracking integration
Storm track information is imported via a shape file to FPL’s mobile mapping and
field automation software for identification of storm affected equipment. From the
storm affected distribution pole population, the software then selects the desired
random sample size for forensic team routing.
FPL’s mobile mapping and field automation software visually identifies the
facilities to be patrolled and provides the tools needed to perform forensic work,
such as audit trail of route traveled and data collection forms.
56
5. Describe/provide forensics and restoration process integration (Established
and documented processes to capture forensic data during a restoration
process)
General Forensic Process – Overhead Distribution
- Obtain information on the storm path and responding wind bands.
- Assigned teams cover specific areas in the path of the storm.
- Provide random sample and pre-determined route/track to each forensic
team.
- Utilize the “Tracking” or audit trail function in FPL’s mobile mapping and
field automation software to document areas patrolled.
- Perform a forensic investigation at each damage location encountered that
meets patrol criteria. Damage locations are to include poles, wires or any
other equipment that is damaged or that has caused a customer outage.
- Utilize portable field computers to complete a data collection form for each
observation.
Hardened Forensic Process – Overhead Hardened Distribution Feeders
- Obtain information on the storm path and responding wind bands.
- Assigned teams will cover a statistically significant sample of hardened
overhead distribution feeders that experience an interruption within the
storm impacted area.
- Utilize the “Tracking” or audit trail function in FPL’s mobile mapping and
field automation software to document areas patrolled.
- Perform a forensic investigation at each damage location encountered that
meets patrol criteria. Damage locations are to include poles, wires or any
other equipment that is damaged or that has caused a customer outage.
- Utilize portable field computers to complete a data collection form for each
observation.
6. Describe/provide any forensic data sampling methodology
The random sample that is performed by FPL’s mobile mapping and field
automation software is a proprietary vendor process that is designed to select
poles from the total GIS pole set (all distribution poles in the wind band area)
without any consideration of pole attributes or specific pole location data. These
random points are the basis for defining forensic team routes for the General
Forensic Process. Observations will be made at all damage locations along the
routes, including poles, wires, and distribution equipment.
The Hardened Forensic Process will also rely on the FPL mobile mapping
system, utilizing it to cover a statistically significant sample of hardened overhead
distribution feeders. Observations will be made at all damage locations within
the selected feeders including poles, wires, and other distribution equipment.
57
7. Describe/provide forensic reporting format used to report forensic results
to the Company and Commission
Forensic results will be categorized by equipment type and will show failure
modes. For pole failures, FPL will provide information on NESC standard
strength requirements and whether a criterion was met.
8. Forensic activities and costs incurred in 2014
No major storms affected FPL’s service territory in 2014; therefore, no forensic
collection or analysis was required.
9. 2015 projected activities and costs
In 2015, the forensic team will participate in FPL’s annual storm dry run event.
Costs associated with the storm dry run are not specifically budgeted for or
tracked. Forensic costs will be dependent on storm events and the subsequent
deployment of the forensic teams.
58
STORM PREPAREDNESS
INITIATIVE No. 7
59
Initiative 7 – Overhead and Underground Storm Performance Data
Items a–j (all tables) – Though both system and district level data for these metrics
are for the most part available during storms on a non-differentiated basis, they are
not available for overhead and underground separately. The primary reason is that
FPL’s feeders are mostly overhead/underground hybrids. Therefore, FPL is not able
to classify a large portion of the data required to calculate these metrics as either
overhead or underground. Furthermore, performing the calculations on a subset of
data that could be differentiated could yield misleading results. Though not of direct
concern for these tables, item b cannot be provided even on a non-differentiated
basis because cause codes are not available during storms.
Item k (all tables) – Prospectively, equipment performance by type may be
available from forensics depending on the specific characteristics associated with
any given storm. Data gathering is highly dependent on the storm having sufficient
intensity to result in a restoration lasting a number of days. Otherwise, there will be
insufficient time for the forensics teams to collect adequate data.
Additionally,
depending on the nature of the storm, certain types of equipment may not be
impacted. For example, there may be little flooding or storm surge. Or, a given
storm’s location may disproportionately impact areas with predominantly wood poles
or front lot construction. In any case, results will only be statistically significant on
system-level basis and, therefore, cannot be provided at a district level.
FPL Alternative Plan – FPL can fulfill the spirit of the requested set of metrics with
alternatives that demonstrate the performance differences between the overhead
and underground facilities during storms. As previously stated, because FPL’s
feeders are almost universally overhead/underground hybrids, differentiated
performance would be difficult to determine. However, laterals are typically
comprised of only a single type of construction so they will be used as a proxy for
differentiated system performance. The relative performance results will be derived
from two sources. First, forensic field data collection will be conducted during
restoration using statistically valid random samples drawn daily for both overhead
and underground tickets. Second, post-restoration analysis of available ticket
comments will be performed, particularly for underground damage since problems
with buried equipment may not be field-observable.
FPL Alternative Plan Metrics:
o Relative proportion of infrastructure damaged:
 Percent of overhead circuits with damage relative to the total
overhead circuits in the storm-impacted areas.
 Percent of underground circuits with damage relative to the total
underground circuits in the storm-impacted areas.
60
o Count of facility damage observed by type (item k on a system level
basis). This will include an evaluation of statistical validity based on
samples achieved (due to storm characteristics discussed previously).
 Overhead – total quantities stratified by pole type, location on lot,
etc. (as available)
 Underground – total quantities stratified by cable construction
method, etc. (as available)
o Primary root cause of damage by type. In those instances that can be
determined through field observation or post-restoration ticket comments
review.
o Estimated repair time. This will be interpolated by multiplying the
observed damage counts by equipment type by the typical estimated
construction man-hours required to repair.
Overhead (OH) Storm Data
No major storms affected FPL’s service territory in 2014; therefore, no data
collection or analysis was required.
61
STORM PREPAREDNESS
INITIATIVE No. 8
62
Initiative 8 - Increased Coordination with Local Governments
FPL Overview
FPL’s External Affairs organization (EA) consists of manager-level employees who
are dedicated to meeting the information and communication needs of local
governments and communities every day. These individuals interface with members
of local governments and community leaders to identify and resolve issues of
common concern to the company and the communities it serves. EA is engaged with
local governments on critical infrastructure, line clearing, storm readiness, joint use
of public rights-of-way, fuel/rate adjustments, undergrounding and other day-to-day
issues.
FPL’s Account Managers assigned to governmental accounts provide customer
service to government accounts and are available to assist with many of the issues
that affect local governments, including storm readiness, restoration and recovery.
They are also especially helpful to local governments on account issues such as
billing, fuel costs, construction and service reliability.
FPL conducts meetings with county emergency operations managers to discuss
critical infrastructure locations in each jurisdiction. Agreed-upon locations are
factored into FPL’s storm restoration and capacity shortage plans. FPL invites local,
state and federal emergency response personnel to participate in its annual storm
dry-run. This exercise provides FPL the opportunity to share its plans to improve
service reliability and storm communications, and solicit input on how FPL and
government agencies can better collaborate in emergency situations.
FPL maintains an External Response Team that consists of trained representatives
who assist EA in meeting the needs of local governments in times of emergency.
This team of more than 70 employees staffs county Emergency Operations Centers
(EOCs) and interfaces with local officials throughout the FPL service territory. By
staffing EOCs, FPL is physically present to provide company updates to county and
city officials, as well as obtain information from the EOC to help FPL’s restoration
efforts.
Describe extra tree trimming and underground conversion projects
implemented. Describe any special considerations or options local
governments attempted to secure and the utility’s response.
FPL meets with all counties and municipalities requesting information on line
clearing and underground conversions. This includes working with local
governments to establish language in applicable ordinances that encourage citizens
to plant the right tree in the right place to avoid interference with overhead facilities
and requested meetings and workshops with cities interested in overhead to
underground conversions. Discussions have also included special considerations
such as using public rights-of-way and the use of underground switch cabinets.
63
Additionally, FPL meets with local governments to explain its efforts to enhance
service reliability and provide information on hardening projects within their
jurisdiction.
FPL meets with local governments that express interest in converting overhead
facilities to underground service. Discussions include FPL’s Governmental
Adjustment Factor (GAF) tariff, which provides an incentive for applicable overhead
to underground conversion projects. In 2014, two municipalities signed the GAF tariff
agreement and moved forward with their projects. There were also 20 municipal
requests for non-binding/order of magnitude estimates during 2014. Additionally,
FPL completed one GAF-qualified project in 2014.
Does FPL conduct storm response tests or a dry run in order to test and
evaluate its storm preparation and response plans?
Yes. In addition to its annual corporate-wide storm dry-run and individual business
unit-driven dry-run exercises, FPL takes every opportunity to test its storm
preparation and restoration plans to be ready for a potential event. Additionally,
depending on the forecasted track of an actual the storm, this may include the
activation of FPL’s storm command center and the mobilization and positioning of
employees and equipment for rapid restoration. These activities provide
opportunities to evaluate plans, systems and communications in order to be even
better prepared for the next event. FPL representatives also take part in city/county
sponsored drills and exercises upon request and invite key government stakeholders
and emergency managers to our annual corporate-wide storm dry run event.
What quantifiable indices (metrics), if any are the companies using to assess
the effectiveness with which they began implementing initiative #8?
ONGOING PROGRAMS
a) Number of city/county liaisons initiated.
EA and Government Account (GA) Managers routinely interface with city and county
government officials to discuss storm-readiness and other issues of concern. The
quantity of these interfaces and the unique situational dynamics of each issue make
it administratively burdensome (non-productive) to capture on an ongoing basis. FPL
does keep track of the number of EOCs that are contacted, as well as the number
that are staffed with company representatives.
b) Number of periodic communications initiated with cities/counties.
EA provides quarterly e-mail communications to city and county governments. FPL
also established an online Government Portal website that allows government
officials to obtain the latest media releases and information on customer outages,
estimated restoration times, FPL crew resources, outage maps and other
information. GA account managers also communicate with cities and counties
64
through monthly newsletters that address topics from energy conservation to storm
preparation.
c) Number of restoration training and assistance programs conducted. EA and
other FPL representatives meet with local governments to discuss critical
infrastructure locations and provide training on subjects such as how to
address/report on downed power lines.
d) Number of city/county problem resolution plans.
EA and GA Managers interface with city and county governments routinely to
discuss storm readiness and other issues of concern. The quantity of these
interfaces and the unique situational dynamics of each storm make it
administratively burdensome (nonproductive) to capture on an ongoing basis.
STORM PREPARATION
a) Number of communication links and contingency plans established.
FPL is prepared to support all 27 county and seven satellite EOCs, should these
locations be impacted by an emergency situation. FPL is able to report on the
number of direct links with EOCs activated during emergency conditions. FPL
representatives are also available to meet one-on-one with emergency managers,
city and county government officials as needed.
b) Number of operational contingency plans developed for emergency
services.
FPL meets with personnel from all county EOC locations to obtain input on critical
infrastructure locations within their jurisdiction. This critical infrastructure information
is then factored into FPL’s restoration and capacity shortfall plans. In addition,
assigned FPL EOC representatives work with the counties to assist with emergency
priorities and External Affairs Managers have open communications with counties
and cities to address necessary contingencies. Tracking the number of contingency
plans is administratively burdensome (non-productive) and does not provide
meaningful information.
c) Number of public communications plans developed prior to, during and
after the storm.
FPL develops communication plans for the media and all news/media releases are
shared with local governments. Number of communication plans is not meaningful,
but counting the number of releases to local governments can be accomplished.
d) Number of city/county mitigation guidelines prepared and distributed.
See response to b, above.
65
STORM RESTORATION
a) Number of emergency communication links maintained. FPL is prepared to
support all 27 county and seven satellite EOCs if impacted by an emergency
situation. Also, an online Government Portal Web-site allows government officials to
obtain the latest media releases and information, including customer outages,
estimated
restoration
times,
and
FPL
crew
resource
information.
b) Number of priority emergency services restored. FPL can report on critical
infrastructure locations restored on a daily basis and provides this information its
Government Portal website.
c) For each tropical storm, hurricane and other emergency event impacting the
utilities service area, what community coordination actions does the utility
pursue not otherwise in a) and b), above. In addition to outgoing communications
and information provided by FPL EOC representatives, FPL External Affairs
Managers are made available to interface with public officials to address their
concerns.
ONGOING INITIATIVES
Communications Programs
FPL’s External Affairs (EA) managers make presentations to educate communities
FPL serves on topics of interest including service reliability, energy conservation,
storm readiness and power generation. These presentations help address the
informational needs of local community-based organizations.
EA managers
provided 483 community presentations in 2014.
Government/Community Communications
FPL’s email network to local elected officials continues to be utilized to share
breaking news and important updates to local state and federal public officials in a
timely and consistent manner.
Government Outreach
EA and GA Managers contact government officials prior to storm season through
written correspondence and meetings.
Government Portal Website
FPL’s External Affairs organization implemented a dedicated Government Portal
website which was customized with the types of information that government leaders
rely on to help with their recovery efforts. This site was not activated during the
2014 storm season.
The site contains company-wide and county-specific
information that includes:
- Media alerts and releases
- Customer outage information and outage maps
- Maps of impacted areas
66
-
Critical infrastructure facility (CIF) information
Estimated time of restoration (ETR) information
FPL staging site locations and available personnel resources
NEW INITIATIVES
No new initiatives were developed/implemented in 2014.
67
STORM PREPAREDNESS
INITIATIVE No. 9
68
Initiative 9 – Collaborative Research on Hurricane Winds & Storm Surge
Collaborative research efforts, led by the Public Utility Research Center (PURC),
which began in 2007, have resulted in greater knowledge of: (1) vegetation
management during storm and non-storm times; (2) wind during storm and nonstorm events; and (3) hurricane and damage modeling towards further
understanding the costs and benefits of undergrounding. PURC’s most recent
report is provided in this section.
69
Report on Collaborative Research for Hurricane
Hardening
Provided by
The Public Utility Research Center
University of Florida
To the
Utility Sponsor Steering Committee
February 2015
I. Introduction
The Florida Public Service Commission (FPSC) issued Order No. PSC-06-00351-PAA-EI on
April 25, 2006 (Order 06-0351) directing each investor-owned electric utility (IOU) to
establish a plan that increases collaborative research to further the development of storm
resilient electric utility infrastructure and technologies that reduce storm restoration costs and
outages to customers. This order directed IOUs to solicit participation from municipal
electric utilities and rural electric cooperatives in addition to available educational and
research organizations. As a means of accomplishing this task, the IOUs joined with the
municipal electric utilities and rural electric cooperatives in the state (collectively referred to
as the Project Sponsors) to form a Steering Committee of representatives from each utility
and entered into a Memorandum of Understanding (MOU) with the University of Florida’s
Public Utility Research Center (PURC). This MOU was recently extended by the Research
Collaboration Partners through December 31, 2015.
PURC manages the work flow and communications, develops work plans, serves as a subject
matter expert, conducts research, facilitates the hiring of experts, coordinates with research
vendors, advises the Project Sponsors, and provides reports for Project activities. The
collaborative research has focused on undergrounding, vegetation management, hurricanewind speeds at granular levels, and improved materials for distribution facilities.
This report provides an update on the activities of the Steering Committee since the previous
report dated February 2014.
70
II. Undergrounding
The collaborative research on undergrounding has been focused on understanding the
existing research on the economics and effects of hardening strategies, including
undergrounding, so that informed decisions can be made about undergrounding policies and
specific undergrounding projects.
The collaborative has refined the computer model developed by Quanta Technologies and
there has been a collective effort to learn more about the function and functionality of the
computer code. PURC and the Project Sponsors have worked to fill information gaps for
model inputs and significant efforts have been invested in the area of forensics data
collection. Since the state has not been affected by any hurricanes since the database software
was completed, there is currently no data. Therefore, future efforts to refine the
undergrounding model will occur when such data becomes available.
In addition, PURC has worked with doctoral and master’s candidates in the University of
Florida Department of Civil and Coastal Engineering to assess some of the inter-relationships
between wind speed and other environmental factors on utility equipment damage. PURC
has also been contacted by engineering researchers at the University of Wisconsin and North
Carolina State University with an interest in the model, though no additional relationships
have been established. In addition to universities, PURC was contacted by researchers at the
Argonne National Laboratory who expressed interest in modeling the effects of storm
damage. The researchers continue to develop a deterministic model, but did use many of the
factors that the Collaborative have attempted to quantify. Every researcher that contacts
PURC cites the model as the only non-proprietary model of its kind.
The research discussed in last year’s report on the relationship between wind speed and
rainfall is still under review by the engineering press. Further results of this and related
research can likely be used to further refine the model.
III. Wind Data Collection
The Project Sponsors entered into a wind monitoring agreement with WeatherFlow, Inc., in
2007. Under the agreement, Florida Sponsors agreed to provide WeatherFlow with access to
their properties and to allow WeatherFlow to install, maintain and operate portions of their
wind monitoring network facilities on utility-owned properties under certain conditions in
exchange for access to wind monitoring data generated by WeatherFlow's wind monitoring
network in Florida. WeatherFlow’s Florida wind monitoring network includes 50 permanent
wind monitoring stations around the coast of Florida, including one or more stations located
on utility-owned property. The wind monitoring agreement expired in early 2012; however,
the wind, temperature, and barometric pressure data being collected at these stations is being
made available to the Project Sponsors on a complimentary basis.
IV. Public Outreach
71
In last year’s report we discussed the impact of Hurricane Sandy on greater interest in storm
preparedness. PURC researchers discussed the collaborative effort in Florida with the
engineering departments of the state regulators in Connecticut, New York, and New Jersey,
and regulators in Jamaica, Grenada, and Curacao. While all of the regulators and
policymakers showed great interest in the genesis of the collaborative effort, and the results
of that effort, they have not, at this point, shown further interest in participating in the
research effort.
PURC researchers continue to utilize the insight gained through the hurricane hardening
research to contribute to the debate on undergrounding in the popular press, and reinforce the
state of Florida as a thought leader in this area. On February 13, 2014 PURC Director of
Energy Studies Ted Kury was asked to contribute an essay on CNN.com entitled “Burying
power lines is not always the answer” where he discussed the economic trade-offs of
undergrounding power lines. The essay also provided a link to an Electricity Journal article
by Kury and Lynne Holt, another PURC researcher, which discusses Florida’s cooperative
approach and holds it up as a “best practice” in regulation. In addition, the October 2014
issue of Costco Connection featured a debate on whether utilities should be required to bury
power lines, where Kury provided the “No” position.
V. Conclusion
In response to the FPSC’s Order 06-0351, IOUs, municipal electric utilities, and rural electric
cooperatives joined together and retained PURC to coordinate research on electric
infrastructure hardening. The steering committee has taken steps to extend the research
collaboration MOU so that the industry will be in a position to focus its research efforts on
undergrounding research, granular wind research and vegetation management when
significant storm activity affects the state.
72
STORM PREPAREDNESS
INITIATIVE No. 10
73
Initiative 10 – Natural Disaster Preparedness and Recovery Plans
FPL’s Storm Emergency Plan identifies emergency conditions and the
responsibilities and duties of the FPL emergency response organization for severe
weather and fires. The plan covers the emergency organization, roles and
responsibilities and FPL’s overall severe storm emergency processes. These
processes describe the planning activities, restoration practices, public
communications, coordination with government, training, practice exercises and
lessons learned evaluation systems. The plan is reviewed and revised annually, as
necessary. A brief summary of the FPL plan, “FPL Emergency Plan – Severe
Storms Brief”, is included in the Appendix of this filing.
74
2015 STORM SEASON READINESS
75
2015 Storm Season Readiness
FPL’s comprehensive storm plan focuses on readiness, restoration and recovery in
order to respond safely and as quickly as possible in the event the electrical
infrastructure is damaged by a storm. FPL is well-prepared for the 2015 storm
season and continues to train and hone its storm preparedness and response
capabilities.
In addition to the initiatives to strengthen its system and improve storm
preparedness discussed previously, FPL will complete the following additional storm
preparedness activities prior to the start of storm season:
• Extensive storm response training based on employees’ storm roles;
• Annual company-wide hurricane dry run in late April/early May;
• Management workshops throughout the storm season to keep focus on key
storm restoration policies/processes;
• Plan for and review of mutual assistance agreements to ensure they are
adequate and ready;
• Continue to focus on improving outage communications and estimated
restoration times to customers;
• Clear vegetation from all feeder circuits serving top critical infrastructure (e.g.
top CIF hospitals, 911 centers, special needs shelters, police and fire
stations, etc.) prior to the peak of hurricane season.
• Implement new technology to be utilized by storm damage assessors to
improve damage assessment collection/analysis capabilities.
76
RELIABILITY
77
Summary – Reliability
Total FPL System (Distribution and Transmission) – Overall reliability is best gauged
by SAIDI (System Average Interruption Duration Index), considered the most
relevant and best overall reliability indicator because it encompasses two other
industry standard performance metrics for reliability: SAIFI (System Average
Interruption Frequency Index) and CAIDI (Customer Average Interruption Duration
Index). In 2014, FPL continued to provide strong overall reliability for its customers,
achieving an overall adjusted SAIDI of 66.6 minutes (2013 – 65.6 minutes).
Distribution – FPL’s 2014 overall distribution reliability, as measured by SAIDI was
63.8 (2013 - 61.4). 2014 adjusted SAIFI was 0.99 interruptions per customer (2013 –
0.89 interruptions). Adjusted 2014 CAIDI was 64.5 minutes (2013 – 68.7 minutes)
and adjusted 2014 MAIFIe was 8.7 momentary events (2013 – 9.1 momentary
events).
Transmission – In 2014, FPL’s Transmission/Substation adjusted SAIDI was 2.8
minutes (2013 – 4.2 minutes), adjusted SAIFI was 0.21 interruptions per customer
(2013 – 0.22 interruptions) and adjusted MAIFI was 0.7 momentary events (2013 –
0.7 momentary events).
78
Distribution Reliability
GENERAL
1. Discuss overall performance absent adjustments (Form 102).
FPL’s overall unadjusted distribution reliability, as measured by SAIDI, was 70.8
minutes. This unadjusted performance includes approximately 7.0 minutes
associated with tornados, named tropical storms, and planned interruptions.
2. Describe the level of detailed reliability data the Company tracks.
FPL tracks the following reliability data associated with each individual interruption:
customers affected, minutes interrupted, cause of outage, percentage of customers
partially restored, device affected by interruption and location of the device. All of
the interruption data is compiled to calculate reliability indices which are tracked
throughout the year. The reliability indices which FPL tracks include the following:
SAIDI, SAIFI, CAIDI, MAIFI, MAIFIe, Lbar, CEMI-3, CEMI-5, CEMI-8, CEMM-35,
CEMM-50 and CME (Customer Momentary Experience).
3. Describe Company efforts to increase critical review of detailed reliability
data.
Daily reports are generated and distributed providing detailed information, such as
the previous day’s interruptions by device, month-to-date and year-to-date reliability
indices. FPL’s management utilizes the information in conducting a daily in-depth
review of key reliability data to identify lessons learned and areas for improvement.
This review also includes an assessment of upcoming weather and potential
impacts, operational risks and a final review of the daily operations plan. FPL’s
management team also conducts monthly reliability reviews of the programs,
objectives and actual performance vs. the plan. On an annual basis, FPL reviews its
reliability performance and outage causes to direct its reliability programs for
continued performance. With the aid of advanced statistical applications, such as
Minitab and Six Sigma analysis, FPL performs statistical analyses to identify
reliability trends and root causes, and measure program benefits.
4. Describe the process used by your company to identify and select the level
of detailed reliability data.
FPL’s reliability data detail has been developed over the years based on industry
practices, internal needs, as well as external requirements (e.g., regulators).
79
5. Discuss adjustments.
Generation Events - None
Transmission Events - See Appendix
Distribution Events - See response to Distribution Reliability Item Nos. 11 & 13
Extreme Weather - See response to Distribution Reliability Item Nos. 7 & 10
6. Discuss adjusted performance.
Distribution - See the summary at the beginning of this reliability section as well as
the response to Item No. 1 above.
EXTREME WEATHER
7. Include in the discussion, the type of weather event, strength (wind
speeds/surge-flood levels), locations affected, source of meteorological
information, and the performance of overhead and underground systems
In 2014, no major storms affected FPL’s service territory; therefore, no data
collection or analysis concerning overhead vs. underground storm performance was
performed.
80
8. Describe the Company’s efforts to avoid or minimize, in terms of costs
incurred and outage duration, any similar events in the future.
As a part of FPL’s continuous improvement philosophy, FPL gathers, after each
extreme weather event, relevant information to critique its processes and
performance. Also, FPL continues to further develop new technology to strengthen
its emergency response, by:
• improving customer outage information available to field restoration crews by
developing mobile applications which combine outage tickets, weather
information, electrical network information, customer energy consumption and
voltage, restoration crew location, meter status and more – all layered on a
map view and available to view on a computer tablet. This makes it easier to
diagnose problems accurately to assist with outage analysis and improve
interactions with our customers
•
expanding the use of smart meter information by creating multiple
applications including restoration confirmation application, which allows
restoration crews to confirm the power status of all smart meters affected by
an outage before leaving the area. This has helped FPL identify embedded
outages, resolve the problem on the first visit, and reduce repeat calls from
customers
•
installing submersible equipment to mitigate the impact of significant water
intrusion in 12 vaults in the Miami downtown electric network that are located
just at or within the FEMA 100-year flood elevation levels.
See also the pole inspections, hardening and storm season readiness sections in
this report.
9. If the method of deriving the weather exclusion is different from the method
used for 2013, please explain the changes and provide the CMI and CI for 2014
using the prior method.
No changes were made to FPL’s exclusion methodology.
10. Provide the 2014 service reliability data for each extreme weather outage
event that is excluded from your Company’s 2014 Annual Distribution
Reliability Report pursuant to Rule 25-6.0455.
The following data is provided in the Appendix:
A) Causation
B) Date
C) CI
D) CMI
E) L-Bar
F) Repair Cost
G) Forensics
81
OTHER DISTRIBUTION ADJUSTMENTS
11. Discuss the causation of each type of distribution event that resulted in
customer outages.
12. Describe the Company’s efforts to avoid or minimize any similar events in
the future in terms of the level of costs incurred and outage duration.
FPL continually evaluates the need for planned crew and customer-requested
outages by determining if there are alternative work methods that could minimize or
prevent such an outage. If an outage is not preventable, FPL works with customers
to schedule necessary outages during times which are more convenient for them
(e.g., nights and weekends).
13. Provide the 2014 service reliability data for each distribution outage event
that is excluded from your Company’s 2014 Annual Distribution Reliability
Report pursuant to Rule 25-6.0455.
The following data is provided in the Appendix:
A) Causation
B) Date
C) CMI
D) CI
E) L-Bar
F) Repair Cost (N/A)
2013 ADJUSTED RELIABILITY CAUSES OF OUTAGE EVENTS
82
13. Five-year patterns/trends in outage causation for each of the top causes of
outage events, including the frequency, duration, restoration time, cost
incurred to restore service, remediation programs and remediation
program costs.
Frequency (SAIFI)
System Avg. Interruption (SAIDI)
Rank
Duration (CAIDI)
PSC Cause Group
2010
2011
2012
2013
2014
2010
2011
2012
2013
2014
2010
2011
2012
2013
1
Defective Equipment
37.4
30.5
27.5
26.5
25.9
0.42
0.40
0.39
0.38
0.41
88.5
75.8
71.5
69.0
2014
63.7
2
Vegetation
11.4
16.2
10.4
10.6
12.9
0.10
0.12
0.09
0.10
0.12
114.4
131.4
109.6
110.0
105.6
3
Other Weather
5.5
13.5
7.2
7.2
7.3
0.07
0.12
0.09
0.09
0.10
83.6
109.4
83.4
77.3
76.0
4
Unknow n
4.0
4.4
4.0
3.9
4.1
0.08
0.08
0.07
0.08
0.10
51.3
51.7
57.2
46.6
40.8
5
Vehicle
4.9
4.4
4.4
3.7
3.1
0.06
0.07
0.07
0.06
0.05
76.0
65.0
60.5
66.1
63.9
6
Animal
3.3
3.4
3.2
3.4
2.9
0.05
0.06
0.06
0.06
0.05
66.1
61.7
55.4
54.7
56.5
7
Lightning
3.7
3.0
3.2
2.3
2.9
0.04
0.03
0.04
0.03
0.04
85.8
88.1
71.5
82.9
71.2
8
All Other Causes
4.7
1.8
1.8
1.6
2.4
0.04
0.04
0.04
0.04
0.08
126.2
51.7
49.2
44.1
31.6
9
Other
2.3
2.4
1.8
2.3
2.2
0.06
0.04
0.05
0.06
0.05
39.8
54.3
36.7
40.6
49.2
System Total
77.3
79.7
63.5
61.4
63.8
0.92
0.97
0.90
0.89
0.99
83.9
82.1
70.8
68.7
64.5
See remediation programs and budget levels in FPL’s response to Distribution
Reliability Item No. 16.
Costs incurred to restore service by cause are not specifically tracked/available.
15. The process used to identify and select the actions to improve the
performance in each of the top causes of outages.
Annually, FPL evaluates its current reliability remediation programs and verifies the
program’s need and/or existence. In addition, FPL proposes new reliability
remediation programs to improve its reliability performance concentrating on the
highest cause codes and those cause codes that have shown trends needing
attention.
83
16. 2015 activities and budget levels addressing each of the top causes of
service outages.
In 2015, FPL has reliability programs aimed at reducing customer interruptions.
These include:
Program*
Program Description
Reduce the number of customers experiencing
multiple amounts of interruptions and
momentaries by identifying and correcting feeders
experiencing the highest number of events and/or
Priority Feeders
customers interrupted. The initiative may
(including inspections)
strengthen feeders up to and including extreme
wind loading standards for additional overall
reliability improvement.
Install and maintain automated lateral reclosers.
This will help mitigate the effects of lateral
interruptions by clearing temporary faults,
ALS
decreasing voltage sags and decreasing field
(Installation and Maintenance)
visits for replacing blown fuses; contributing to a
more reliable system based on model feeder
configuration guidelines.
Install and maintain “smart” automated feeder
switches. This will help mitigate the effects of
feeder interruptions by isolating problematic areas
AFS
(installations and maintenance) and decreasing restoration time; making it a more
reliable system based on model feeder
configuration guidelines.
Integrated program designed to minimize tree and
Vegetation Mgmt**
vine related interruptions.
Provide the necessary feeder capacity to serve all
customers during normal and emergency periods,
System Expansion
and install the infrastructure necessary to support
system contingency.
Reduce the number of direct buried lateral cable
Cable Lateral
failures.
Inspection/Remediation of non-compliant
Handhole Inspections / Padconditions. The purpose of this program is to
mounted Transformers
maintain pad-mount transformer security.
Install and maintain “smart” feeder sensors. This
will help mitigate the effects of feeder interruptions
by identifying problematic areas and decreasing
FCI (Installation & Maintenance)
restoration time; contributing to a more reliable
system based on model feeder configuration
guidelines
Projects targeted to improve reliability for specific
Customer Impact
customers or geographic areas
Reduce the number of Submarine feeder cable
Submarine Cable
failures and reduce customer interruptions.
This program will proactively replace RA switches
in order to enhance system operations and
RA Switch Replacement
reliability.
Reduce the number of direct buried feeder cable
Cable Feeder
failures and reduce customer interruptions.
Address worse performing busses and high
Momentary Outliers
momentary feeders
Inspect vaults and Powell-Esco Switches.
Vault Inspections and repairs (not Program will mitigate vault interruptions and will
help to identify any issues that need to be
including RA Switches)
addressed before an interruption occurs.
Install, relocate, maintain, and control distribution
capacitor banks. This program will help maintain
VAR Management
or improve power factor performance, improve
(installations and maintenance)
system efficiency, reliability, and quality of service
voltage to our customers.
Replace Oil Circuit Reclosers with Electronic
OCR Replacement
Reclosers
Address lateral or OCR's with 3 or more
Outlier Devices
interruptions in a given year
Conduct a visual and infrared inspection of the OH
Overhead Line Inspection &
feeder infrastructure and thus reduce overhead
repairs
interruptions.
Replace small conductor feeder (less than #1/0)
with larger conductor feeder in circuits with
Small Wire Replacement
multiple small wire interruptions. This does not
include feeder mileage past radial OCRs.
* Programs > $1 million
** Also referred to as a Storm Preparedness Initiative 1.
84
2015
Budget
($M)
Impact on which Cause Codes
$149.4
All
$96.1
Vegetation, Unknown
$69.2
All
$63.1
Vegetation, Unknown
$46.5
Remaining Causes
$43.6
Equipment Failure
$19.8
Equipment Failure
$15.2
All
$13.1
Equipment Failure
$8.0
Equipment Failure
$8.0
Equipment Failure
$6.8
Equipment Failure
$4.1
All
$3.1
Equipment Failure
$2.2
Remaining Causes
$2.1
Equipment Failures
$2.0
All
$1.7
Equipment Failure, Vegetation,
Other Weather, Other, Unknown,
Lightning
$1.5
Equipment Failures
THREE-PERCENT FEEDER LIST
17. Identify whether any feeders appearing on the three-percent list more than
once within a consecutive five-year period and any actions implemented to
improve feeder performance.
See FPL’s three-percent list in the Appendix.
See FPL’s responses to Distribution Reliability Question numbers 16 and 18 for
actions that FPL has taken to address these feeders.
18. Process used to identify and select the actions to improve the performance
of feeders on the three-percent feeder list, if any.
FPL evaluates feeder performance on a daily basis and has addressed feeders on
this list through its “Priority Feeder” program and one or more of its other reliability
programs.
The objective of FPL’s Priority Feeder program is to reduce the number of
customers experiencing multiple amounts of interruptions and momentaries by
identifying and correcting feeders experiencing the highest number of events and/or
customers interrupted. The initiative may strengthen feeders up to and including
extreme wind loading standards for additional overall reliability improvement.
19. 2015 activities and budget levels directed at improving feeder
performance.
See response to Distribution Reliability Item No. 16.
85
REGIONAL RELIABILITY INDICES
20. Five-Year patterns/trends in each region’s reliability for each index and on
any overall basis.
(* Note for all indices tables: Ft. Myers (FM) was split into Naples (NA) and
Toledo Blade (TB) in 2011)
Annual SAIDI performance for the Distribution unit and its regions
Data
SAIDI
Region
Boca Raton (BR)
Brevard (BV)
Central Dade (CE)
Central Florida (CF)
Fort Myers (FM)
Gulfstream (GS)
Manasota (MS)
Naples (NA)
North Dade (ND)
North Florida (NF)
Pompano (PM)
South Dade (SD)
Toledo Blade (TB)
Treasure Coast (TC)
West Palm (WB)
West Dade (WD)
Wingate (WG)
All FPL
2010
73.1
71.2
69.4
69.3
79.0
77.0
77.6
91.7
84.4
81.7
70.8
87.6
77.6
79.2
66.7
88.6
80.6
77.3
2011
58.1
115.0
48.8
149.1
*
54.8
66.8
85.5
66.8
130.9
60.9
92.5
98.0
77.8
63.1
69.5
78.0
79.7
2012
63.0
60.6
61.8
61.2
*
60.2
55.4
56.8
63.6
81.2
61.6
81.4
61.7
60.6
54.5
79.1
70.5
63.5
2013
60.5
55.7
50.7
66.7
*
59.2
57.8
53.5
60.0
83.7
48.9
76.6
71.9
71.9
54.5
59.1
70.1
61.4
2014
63.1
69.0
54.2
60.8
*
57.8
56.6
57.5
76.9
76.8
52.0
72.9
72.6
74.5
49.5
72.4
74.5
63.8
Annual SAIFI performance for the Distribution unit and its regions
Data
SAIFI
Region
BR
BV
CE
CF
FM
GS
MS
NA
ND
NF
PM
SD
TB
TC
WB
WD
WG
All FPL
2010
0.93
1.01
0.78
0.91
1.09
0.82
0.91
0.86
0.82
1.02
0.79
1.04
0.96
1.01
0.78
1.15
0.97
0.92
2011
0.92
1.15
0.68
1.19
*
0.81
0.84
0.90
0.78
1.34
0.92
1.14
1.28
0.98
0.87
0.96
1.10
0.97
2012
1.14
0.87
0.72
0.82
*
0.86
0.77
0.86
0.70
1.03
0.84
0.96
0.91
0.95
0.82
1.20
0.99
0.90
86
2013
1.10
0.89
0.67
0.93
*
0.93
0.83
0.68
0.68
1.10
0.69
0.99
1.04
1.08
0.95
0.85
0.99
0.89
2014
1.21
1.14
0.80
0.95
*
0.96
0.83
0.88
0.83
1.06
0.86
0.90
1.16
1.07
0.85
1.20
1.25
0.99
Annual CAIDI performance for the Distribution unit and its regions
Data
CAIDI
Region
BR
BV
CE
CF
FM
GS
MS
NA
ND
NF
PM
SD
TB
TC
WB
WD
WG
All FPL
2010
78.6
70.5
89.4
76.3
72.7
94.2
85.5
107.1
103.2
80.0
89.7
84.1
80.5
78.6
85.3
77.3
82.8
83.9
2011
63.4
99.9
71.5
125.5
*
67.5
79.5
95.5
86.2
97.7
66.4
81.0
76.4
79.7
72.6
72.7
71.1
82.1
2012
55.4
70.0
86.0
74.6
*
70.3
72.0
66.2
90.9
79.0
73.2
84.9
68.0
63.8
66.3
66.1
71.4
70.8
2013
55.0
62.7
75.2
71.4
*
63.3
69.5
79.0
88.4
76.2
70.7
77.4
69.5
66.8
57.3
69.3
71.1
68.7
2014
52.0
60.7
67.8
64.1
*
60.5
68.1
65.6
92.1
72.5
60.6
80.6
62.6
69.4
57.9
60.3
59.5
64.5
Annual MAIFIe performance for the Distribution unit and its regions
Data
MAIFIe
Region
BR
BV
CE
CF
FM
GS
MS
NA
ND
NF
PM
SD
TB
TC
WB
WD
WG
All FPL
2010
6.8
11.2
7.1
10.7
7.6
8.1
7.9
7.7
7.7
13.1
5.9
8.4
17.4
13.3
9.4
8.8
9.6
9.1
2011
8.0
15.2
6.6
13.9
8.0
8.6
7.6
7.5
16.4
7.1
9.0
15.5
15.0
10.6
8.3
10.3
10.1
2012
8.1
10.7
6.2
9.7
8.0
7.4
6.5
7.2
11.6
7.1
7.9
10.9
12.1
9.4
7.5
10.7
8.7
87
2013
8.0
10.1
6.5
9.9
9.0
7.4
7.2
7.3
10.8
7.7
8.0
12.8
14.2
10.2
7.0
10.9
9.1
2014
8.3
9.7
7.6
8.9
9.1
6.7
7.3
9.0
10.3
7.1
8.0
9.6
11.1
8.8
7.9
12.1
8.7
Annual Cust >5 performance for the Distribution unit and its regions
Data
Region
2010
2011 2012 2013
2014
# Cust >5 BR
0.4%
0.4% 1.0% 1.3%
0.9%
BV
0.9%
0.7% 0.2% 0.6%
0.3%
CE
0.4%
0.2% 0.3% 0.1%
0.7%
CF
1.0%
0.9% 1.0% 0.5%
0.5%
FM
0.8%
*
*
*
*
GS
1.0%
0.4% 0.4% 0.5%
0.7%
MS
0.7%
0.5% 0.2% 0.2%
0.3%
NA
0.5%
0.5% 0.2% 0.4%
0.7%
ND
0.7%
0.9% 0.4% 0.5%
0.9%
NF
1.8%
1.7% 0.5% 0.5%
0.6%
PM
0.2%
0.5% 0.2% 0.1%
0.5%
SD
0.7%
1.6% 0.3% 0.7%
0.6%
TB
0.6%
1.3% 0.5% 1.2%
1.3%
TC
1.5%
1.3% 0.6% 0.9%
1.0%
WB
0.8%
0.5% 0.2% 0.7%
1.4%
WD
0.8%
0.5% 2.0% 0.3%
0.6%
WG
0.5%
0.7% 0.2% 0.2%
0.8%
All FPL
0.7%
0.7% 0.5% 0.5%
0.7%
21. The process used to identify and select actions to improve the regional
reliability trends.
See FPL’s response to Distribution Reliability Item No. 3.
22. Discuss any 2014 projected activities and budget levels directed at
improving regional reliability performance.
See FPL’s response to Distribution Reliability Item No. 16. Each program listed
addresses equipment and devices at the management area level.
OVERHEAD – UNDERGROUND RELIABILITY
23. Describe the five year patterns/trends in reliability performance of
underground systems vs. overhead systems.
The majority of FPL's customers are fed from circuits that are a hybrid of both
overhead and underground systems. The methodology used to classify a customer
as overhead (OH) is defined as those customers served by a feeder with combined
feeder and lateral overhead miles greater than or equal to 95% of the total primary
miles. Then, to classify a customer as underground (UG), customers must be served
by a feeder with combined feeder and lateral underground miles greater than or
equal to 95% of the total primary miles. The balance of customers is classified as
Hybrid. According to this methodology, FPL has 159 OH feeders, 442 UG feeders,
with the remaining 2,611 feeders classified as hybrid. This methodology was applied
for FPL’s responses to Distribution Reliability Question Nos. 23 & 26.
88
Five years reliability performance of underground, hybrid and overhead systems
Data
Year
Hybrid
OH
UG
2010
77.9
105.2
44.1
2011
81.0
121.2
26.8
SAIDI
2012
64.4
93.8
25.8
2013
62.7
90.3
21.3
2014
64.5
108.1
19.4
ALL
77.3
79.7
63.5
61.4
63.8
SAIFI
2010
2011
2012
2013
2014
0.94
1.00
0.92
0.91
1.01
1.14
1.20
1.16
1.22
1.35
0.43
0.36
0.35
0.41
0.40
0.92
0.97
0.90
0.89
0.99
CAIDI
2010
2011
2012
2013
2014
82.6
80.9
70.0
68.8
63.8
92.4
100.7
81.0
74.3
80.1
103.3
75.1
72.9
52.3
48.7
83.9
82.1
70.8
68.7
64.5
L BAR
2010
2011
2012
2013
2014
219
197
179
167
166
196
188
165
152
161
380
221
228
208
205
219
196
178
165
166
Historically, FPL’s UG system’s SAIDI performance has been better than its OH
system, primarily driven by a better SAIFI. Also, the CAIDI associated with UG has
generally performed better than OH due to FPL’s looped UG system which allows for
sectionalizing during each restoration event.
24. Describe Company efforts to separately track the reliability of overhead
and underground systems.
FPL continually monitors each feeder interruption with a designation of either
overhead, underground or hybrid system. FPL also utilizes the actual equipment
type that fails to determine the necessary performance of its overhead and
underground systems. For example, FPL has equipment codes that relate
specifically to its overhead system (disconnect switches, insulators, jumpers, wire)
and underground system (cable, switch cabinets, elbow and terminators).
After storm events, FPL performs the activities described in Initiative 7 of FPL’s
approved Storm Preparedness Initiatives.
89
25. Describe the process used by your company to identify and select the
actions to promote underground distribution systems.
GAF Tariff – FPL’s primary tool to promote overhead to underground conversions is
its GAF tariff. The GAF’s goal is to lower storm restoration costs to all customers by
providing an incentive for qualified government-sponsored conversions. Local
governments are in the best position to guarantee the needed 100% customer
service lateral conversion participation. Local governments are also best positioned
to facilitate the construction through managing permitting, securing locations for the
underground facilities, and negotiating with other utility providers.
In 2014, two municipalities signed the GAF tariff agreement and moved forward with
their projects. Additionally, there were 20 municipal requests for non-binding/order
of magnitude estimates during 2014. Finally, FPL completed one qualified GAF
conversion projects in 2014.
Local Community Presentations – FPL conducts numerous presentations with
local community groups who are interested in exploring overhead-to-underground
conversions.
Local Ordinances – There are local ordinances in effect in multiple counties within
FPL’s service territory that require FPL to install facilities underground. In addition,
several municipalities require the customer to bury existing OH lines on or adjacent
to their property when a major renovation is performed.
26. Provide Overhead and Underground Metrics
See FPL’s response to Distribution Reliability Item No. 23 for classification criteria.
CEMI-5 is not available by OH and UG.
The miles below include only primary circuits (Feeders and Laterals).
2014 OH:
Number of miles = 6,413.3
Number of customers = 231,905
Number of Customer Minutes Interrupted (CMI) = 25,078,225
Number of Customers Interruptions (CI) = 313,224
L-Bar = Minutes of Interruption = 1,844,273 = 161
Total Number of Outages
11,447
2014 HYBRID:
Number of miles = 55,200.2
Number of customers = 4,189,664
Number of Customer Minutes Interrupted (CMI) = 270,360,850
Number of Customers Interruptions (CI) = 4,238,545
L-Bar = Minutes of Interruption = 14,577,799 = 166
Total Number of Outages
88,001
90
2014 UG:
Number of miles = 3,126.5
Number of customers = 307,823
Number of Customer Minutes Interrupted (CMI) = 5,965,892
Number of Customers Interruptions (CI) = 122,525
L-Bar = Minutes of Interruption = 225,346 = 205
Total Number of Outages
1,101
RELIABILITY RELATED CUSTOMER COMPLAINTS
27. Provide the five year history for reliability-related* customer complaints.
2010
2011
2012
2013
2014
49**
43**
43**
32**
37
* As defined by the FPSC.
** From the FPSC’s Review of Florida’s Investor-Owned Electric Utilities 2013
Service Reliability Reports.
28. Describe Company efforts to correlate reliability-related complaints with
reliability indices for applicable feeder, lateral and sub region.
FPL addresses reliability complaints on a case-by-case basis. Lessons learned from
issues and resolutions identified may be incorporated into our processes, if deemed
appropriate. FPL also utilizes certain reliability programs, e.g., Customer Impact and
Priority Feeders, to address customer complaints.
91
29. Describe the process used by your company to identify and select
systemic actions to improve reliability due to customer complaints. If no such
program exists explain why.
See response to Distribution Reliability Item No. 28
Transmission Reliability
1. Reliability Adjustments Events (Transmission).
See Appendix.
2. Localized Versus System Wide Events.
None.
3. Description of Reliability Programs.
The transmission and substation reliability initiative is a two-fold program. The first
part consists of on-going assessments and inspections of the transmission and
substation system conditions and the associated mitigation work (as required). The
second part consists of the following targeted reliability areas:
Animals – Program to prevent and mitigate the effects of animal related events to
the transmission and substation system. Animals include (but not limited to) roosting
and prey birds, squirrels, monk parrots, and raccoons.
Equipment – Proactive replacement of both transmission and substation equipment
reaching end of life. Items include (but not limited to) insulators, OHGW, distribution
breakers, transmission breakers, switches, and substation regulators.
Lightning – Items include bonding, grounding, and arrester installations.
Foreign Interference – Outreach and awareness safety program to minimize the
impact of foreign interference (e.g., cranes, balloons, diggers, sailboats, etc.) into
electrical lines
Vegetation Management – FPL performs condition assessments of every
transmission right-of-way with a qualified arborist. Performed every six (6) months,
these assessments include detailed prescriptions based on actual vegetation
conditions. As a result of these assessments, the schedules are established to
complete the identified work; at that point the work is prioritized and executed.
4. Five-Year Reliability Performance
As indicated in the chart below, FPL’s Transmission/Substation SAIDI and SAIFI
performance improved in 2014 vs. 2013 and is better than three out of the previous
four years’ results. Transmission/Substation 2014 MAIFI performance remained
unchanged for the third consecutive year.
92
Transmission/Substation
12 Months ending December 31
SAIDI
SAIFI
MAIFI
2010
4.0
0.29
0.5
2011
3.2
0.25
0.6
2012
2.3
0.18
0.7
2013
4.2
0.22
0.7
2014
2.8
0.21
0.7
5. Description of Company’s Tracking
FPL’s Transmission/Substation group investigates all transmission and substation
outages in order to identify root cause(s)/develop solutions. Reliability performance
is tracked using SAIDI, SAIFI and MAIFI.
6. Method of Program Selections
For program selection, FPL’s Transmission/Substation group utilizes historical
reliability performance, trends, condition assessments and risk ranking.
93
ANNUAL DISTRIBUTION RELIABILITY REPORT 2014
SAIDI
= System Average Interruption Duration Index
= Sum of All Customer Minutes Interrupted (CMI)
Total number of Customers Served (C)
301,706,609
4,729,392
63.8
301,706,609
4,677,076
64.5
4,677,076
4,729,392
0.99
= Sum of All Customer Momentary Interruption Events (CME)
Total number of Customers Served (C)
41,140,960
4,729,392
8.7
L BAR
= Minutes of Interruption (AO)
Total Number of Outages (# of Outages)
16,936,608
101,981
166
%CEMI-5
= Sum of CEMI-5 Customers (# Cust>5)
Total number of Customers Served (C)
34,890
4,729,392
0.7%
CAIDI
= Customer Average Interruption Duration Index
= Sum of All Customer Minutes Interrupted (CMI)
Total number of Customer Interruptions (CI)
SAIFI
= System Average Interruption Frequency Index
= Total number of Customer Interruptions (CI)
Total number of Customers Served (C)
MAIFIe
= Momentary Average Interruption Event
94
Service Reliability Indices Data
Year: 2014
FPL
District or
Service Area
Boca Raton
Brevard
Central Dade
Central Florida
Gulfstream
Manasota
Naples
North Dade
North Florida
Pompano
South Dade
Toledo Blade
Treasure Coast
West Palm
West Dade
Wingate
All FPL
Customer
Served (C ) # of Outages
CMI
366,503
5,721
23,116,169
297,877
8,113
20,561,206
282,155
4,802
15,297,899
279,726
6,906
17,019,043
331,643
5,731
19,183,618
378,304
7,561
21,418,955
379,012
6,256
21,805,095
235,112
6,916
18,073,784
150,052
5,031
11,523,232
310,483
4,485
16,145,422
299,919
7,570
21,857,327
254,982
7,445
18,501,035
283,693
7,819
21,125,404
357,064
6,828
17,663,331
254,130
4,591
18,404,052
268,737
6,206
20,011,037
4,729,392
101,981
301,706,609
95
CI
444,842
338,764
225,551
265,682
317,250
314,397
332,280
196,162
158,832
266,346
271,214
295,354
304,210
304,804
304,990
336,398
4,677,076
AO
836,449
1,279,444
973,987
989,699
1,025,973
1,200,537
933,545
1,360,870
693,274
774,707
1,586,689
1,137,293
1,241,577
1,006,015
882,827
1,013,722
16,936,608
CME
3,147,785
2,871,095
2,198,407
2,501,706
2,914,840
2,632,100
2,660,385
1,985,453
1,540,723
2,153,662
2,377,694
2,462,121
3,133,465
3,021,519
2,079,247
3,460,758
41,140,960
# Cust >5
3,270
977
1,872
1,434
2,268
1,254
2,796
2,103
905
1,435
1,816
3,390
2,726
4,953
1,514
2,177
34,890
PSC/ECR 102-1(a)
Incorporated by reference in Rule 25-6.0455
Causes of Outage Events – Actual
Utility Name: FPL
Cause
(a)
Defective Equipment
Request
Vegetation
Unknown
Other Weather
Animal
Other
All Other Causes
Lightning
Vehicle
System Total
Number of
Outage
Events (N)
(b)
Average
Duration
(L-Bar)
(c)
Year: 2014
Average
Restoration
Time
(CAIDI)
(d)
34,180
22,510
22,046
11,846
10,617
9,431
9,357
3,440
2,024
882
126,333
190
105
187
124
161
94
148
142
247
252
155
64.3
78.2
105.6
40.6
78.0
56.5
49.0
31.4
69.3
64.2
65.7
PSC/ECR 102-1(b)
Incorporated by reference in Rule 25-6.0455
Causes of Outage Events – Adjusted
Utility Name: FPL
Cause
(a)
Defective Equipment
Vegetation
Unknown
Other Weather
Animal
Other
All Other Causes
Lightning
Vehicle
System Total
Number of
Outage
Events (N)
(b)
Average
Duration
(L-Bar)
(c)
Year: 2014
Average
Restoration
Time
(CAIDI)
(d)
33,733
21,633
11,703
10,141
9,359
9,187
3,410
1,938
877
101,981
190
187
124
160
94
148
142
245
251
166
63.7
105.6
40.8
76.0
56.5
49.2
31.6
71.2
63.9
64.5
96
PSC/ECR 102-2(a)
FPL
Primary
Circuit
Id. No. or
Name
(a)
405461
503862
406762
502462
704261
706661
402131
704666
706163
801134
409361
407861
802435
503961
407665
704570
503564
800333
404234
407866
701031
706861
809764
400737
500834
400834
408164
400663
809667
707931
412164
500662
503264
209862
706067
500661
700642
106233
705764
811064
504061
503263
406935
505364
808731
701233
405637
505761
202036
703233
706165
810365
800633
410362
507265
801634
810264
801433
701933
408662
800538
706066
801834
400731
102034
207364
403735
402133
401031
400833
700441
403433
707462
400935
300632
801736
105761
704262
810061
106062
502837
408765
809761
811361
407661
807163
808166
407863
508161
504763
800632
102361
204264
507962
406161
808264
THREE PERCENT FEEDER LIST - ACTUAL
Year 2014
Number of Customers
Substation
Origin
(b)
CLINTMOORE
ORTIZ
ACREAGE
LABELLE
IMAGINATION
NOBHILL
TERMINAL
SPRINGTREE
HOLLYBROOK
FRONTON
SWEATT
TARTAN
SOUTH MIAMI
ESTERO
LOXAHATCHEE
MALLARD
ALLIGATOR
BUENA VISTA
BOCA TEECA
TARTAN
SAMPLE ROAD
CONSERVATION
SWEETWATER
BOCA RATON
WHITFIELD
PAHOKEE
ROSS
WABASSO
COURT
TWINLAKES
ALLAPATTAH
CORTEZ
COCOPLUM
YORKE
HIATUS
CORTEZ
VERENA
GERONA
TRACE
PALMETTO
CAPRI
COCOPLUM
DELMAR
PARK
BOULEVARD
PLAYLAND
FOUNTAIN
AUBURN
INDIAN HARBOR
WOODLANDS
HOLLYBROOK
NEWTON
LITTLE RIVER
MARLIN
SAN CARLOS
PRINCETON
INTERNATIONAL
FULFORD
HOLY CROSS
HOMELAND
RIVERSIDE
HIATUS
BISCAYNE
BOCA RATON
BULOW
WYOMING
MONET
TERMINAL
GREENACRES
PAHOKEE
OAKLAND PARK
JENSEN
SAWGRASS
BELLE GLADE
LIVE OAK
62ND AVE
RIVERTON
IMAGINATION
AVOCADO
TOMOKA
PAYNE
SABAL
SWEETWATER
ANHINGA
LOXAHATCHEE
PENNSUCO
MILAM
TARTAN
INTERSTATE
ALVA
LITTLE RIVER
ST JOE
BABCOCK
MCCALL
TURNPIKE
LINDGREN
Location
Residential Commercial
(c)
(d)
(e)
Palm Beach
3177
155
Lee
2320
393
Palm Beach
2168
46
Hendry
1404
330
Broward
1875
366
Broward
2031
243
Palm Beach
1467
145
Broward
1480
330
Broward
3360
296
Miami-Dade
1512
325
Okeechobee
650
238
Palm Beach
3114
199
Miami-Dade
929
47
Lee
4207
252
Palm Beach
2449
244
Broward
3414
134
Collier
3125
292
Miami-Dade
1801
159
Palm Beach
2316
85
Palm Beach
2070
203
Broward
1252
128
Broward
1017
235
Miami-Dade
1429
273
Palm Beach
1951
103
Manatee
1358
160
Palm Beach
697
195
Palm Beach
2286
132
Indian River
894
223
Miami-Dade
4
997
Broward
123
416
St Lucie
100
30
Manatee
4337
193
Sarasota
3228
115
Brevard
3114
185
Broward
3299
104
Manatee
3382
313
Broward
2609
190
St Johns
2547
130
Broward
2274
189
Miami-Dade
2450
1281
Collier
4083
450
Sarasota
2984
129
Palm Beach
2282
104
Manatee
3668
286
Miami-Dade
2058
116
Broward
2219
242
Palm Beach
2373
69
Sarasota
3346
266
Brevard
1367
64
Broward
1572
111
Broward
2631
229
Miami-Dade
2429
166
Miami-Dade
1805
156
Palm Beach
2340
240
Lee
2437
602
Miami-Dade
1778
320
Miami-Dade
1960
199
Miami-Dade
1394
214
1427
542
Broward
Palm Beach
2208
170
Miami-Dade
1814
104
Broward
1467
46
Miami-Dade
1842
79
Palm Beach
1199
139
Volusia
1660
94
Brevard
1586
98
Palm Beach
1254
88
Palm Beach
990
243
Palm Beach
1630
214
Palm Beach
1376
121
Broward
782
236
Martin
865
86
Broward
827
295
Palm Beach
934
190
Suwannee
534
145
Miami-Dade
950
45
St Johns
1187
125
Broward
1194
130
Miami-Dade
959
290
Volusia
778
53
Sarasota
459
72
St Lucie
372
72
Miami-Dade
1051
22
Miami-Dade
1036
273
Palm Beach
223
136
Miami-Dade
0
395
Miami-Dade
0
367
Palm Beach
3762
136
Sarasota
4423
179
Lee
3434
73
Miami-Dade
3191
570
Flagler
2667
410
Brevard
3272
79
Charlotte
2740
255
St Lucie
3249
222
Miami-Dade
3052
335
Industrial
(f)
4
2
3
8
7
5
7
7
3
3
10
2
11
10
7
1
28
2
8
6
4
2
0
9
1
5
3
3
3
2
2
9
7
4
0
18
1
12
0
2
24
7
6
2
1
2
1
9
0
6
3
0
2
2
5
1
1
1
2
13
1
2
0
5
8
2
6
1
1
1
5
0
5
2
1
4
22
2
5
3
3
0
2
6
3
1
1
2
41
7
1
8
0
38
1
0
Other
(g)
7
54
149
77
16
24
19
2
4
26
53
6
12
24
230
3
27
24
3
7
14
2
7
4
46
39
108
42
2
9
3
17
92
4
1
35
22
20
2
4
44
34
2
18
6
26
52
7
10
0
2
2
19
16
41
31
19
18
16
20
14
3
28
1
13
54
0
32
69
37
11
5
1
40
37
35
17
17
121
86
6
5
43
93
33
7
5
10
5
404
19
38
64
58
98
2
97
Total
(h)
3336
2715
2217
1742
2248
2279
1619
1817
3659
1840
898
3315
987
4469
2700
3549
3445
1962
2409
2279
1384
1254
1702
2063
1519
897
2421
1120
1004
541
132
4539
3350
3303
3403
3713
2800
2689
2463
3733
4557
3120
2392
3956
2175
2463
2443
3621
1431
1689
2863
2595
1963
2582
3044
2099
2160
1609
1971
2391
1919
1515
1921
1343
1762
1686
1348
1234
1845
1498
1023
951
1127
1126
680
999
1334
1326
1254
834
534
444
1075
1315
362
396
368
3900
4643
3514
3762
3085
3351
3033
3472
3387
Number of
Outage
Events
(N)
(i)
7
7
7
6
6
6
6
6
6
6
6
6
6
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
3
3
3
3
3
3
3
3
Average
Duration
(L-Bar)
(j)
78
20
7
31
13
47
119
2
79
164
46
133
61
75
69
24
24
71
93
33
29
37
19
95
70
49
20
163
76
160
214
55
6
36
24
32
110
4
35
185
320
51
45
92
37
127
67
32
49
225
65
76
108
12
52
51
140
362
144
9
139
142
59
103
13
19
99
48
43
161
127
64
25
133
312
249
310
51
196
57
47
137
66
79
91
262
132
301
76
3
76
1
103
131
65
17
Average
No. of
Restoration Listed Years
Time
Last in the
(CAIDI)
Year? Last 5
(k)
(l)
(m)
29.4
N
2
12.5
N
0
2.4
N
1
17.0
N
0
6.1
N
1
12.4
N
1
41.6
Y
1
1.9
N
2
43.2
Y
2
29.6
N
0
34.2
N
1
92.3
N
0
40.8
N
1
22.0
N
2
31.5
N
0
23.8
N
0
14.0
N
0
27.0
N
0
36.4
Y
2
14.0
N
0
23.8
N
0
14.2
N
0
17.7
N
0
36.5
Y
1
25.0
N
0
40.1
N
1
26.1
N
0
42.4
Y
1
49.7
Y
1
46.3
N
0
94.7
N
0
40.5
N
0
5.7
N
0
27.2
N
1
13.6
N
1
4.3
N
0
55.5
N
0
3.5
N
0
27.6
N
2
51.8
N
0
72.1
Y
2
45.5
N
0
30.4
N
1
37.2
N
0
26.4
N
0
33.0
N
0
34.7
N
0
22.0
N
0
24.2
N
0
36.2
N
0
58.5
Y
1
54.4
N
0
43.9
N
0
10.0
N
1
21.1
N
1
49.0
N
1
34.2
N
0
60.0
N
0
45.5
N
1
4.9
N
0
33.9
N
1
40.8
N
1
24.6
N
0
33.5
N
0
7.1
Y
2
5.7
N
0
45.7
N
0
16.0
N
0
31.7
N
0
44.2
N
1
62.8
N
0
29.2
N
1
21.2
N
1
34.2
N
0
61.1
N
0
98.1
N
0
61.6
Y
2
20.2
N
1
58.0
N
1
60.9
N
0
38.8
N
0
45.2
N
1
41.2
N
0
29.8
Y
1
29.2
N
0
47.2
N
0
59.9
Y
1
28.7
N
0
42.3
Y
1
3.0
N
0
13.6
N
1
1.3
N
0
13.3
N
0
53.1
N
0
12.0
N
0
11.2
N
0
PSC/ECR 102-2(b)
FPL
Primary
Circuit
Id. No. or
Name
(a)
405461
503862
406762
502462
704261
706661
402131
704666
706163
409361
503961
407665
704570
503564
800333
801134
701031
706861
809764
400737
407861
500834
400834
408164
802435
809667
707931
412164
500662
706067
500661
700642
106233
705764
811064
504061
503263
406935
505364
808731
701233
405637
505761
202036
706165
407866
810365
410362
507265
801634
810264
801433
701933
408662
800538
706066
801834
404234
400731
207364
402133
401031
400833
700441
403433
707462
400935
300632
801736
105761
704262
810061
106062
502837
408765
809761
811361
407661
807163
808166
209862
407863
508161
504763
800632
102361
204264
507962
406161
808264
307761
706164
810265
505665
102032
406534
THREE PERCENT FEEDER LIST - ADJUSTED
Year 2014
Number of Customers
Substation
Origin
(b)
CLINTMOORE
ORTIZ
ACREAGE
LABELLE
IMAGINATION
NOBHILL
TERMINAL
SPRINGTREE
HOLLYBROOK
SWEATT
ESTERO
LOXAHATCHEE
MALLARD
ALLIGATOR
BUENA VISTA
FRONTON
SAMPLE ROAD
CONSERVATION
SWEETWATER
BOCA RATON
TARTAN
WHITFIELD
PAHOKEE
ROSS
SOUTH MIAMI
COURT
TWINLAKES
ALLAPATTAH
CORTEZ
HIATUS
CORTEZ
VERENA
GERONA
TRACE
PALMETTO
CAPRI
COCOPLUM
DELMAR
PARK
BOULEVARD
PLAYLAND
FOUNTAIN
AUBURN
INDIAN HARBOR
HOLLYBROOK
TARTAN
NEWTON
MARLIN
SAN CARLOS
PRINCETON
INTERNATIONAL
FULFORD
HOLY CROSS
HOMELAND
RIVERSIDE
HIATUS
BISCAYNE
BOCA TEECA
BOCA RATON
WYOMING
TERMINAL
GREENACRES
PAHOKEE
OAKLAND PARK
JENSEN
SAWGRASS
BELLE GLADE
LIVE OAK
62ND AVE
RIVERTON
IMAGINATION
AVOCADO
TOMOKA
PAYNE
SABAL
SWEETWATER
ANHINGA
LOXAHATCHEE
PENNSUCO
MILAM
YORKE
TARTAN
INTERSTATE
ALVA
LITTLE RIVER
ST JOE
BABCOCK
MCCALL
TURNPIKE
LINDGREN
ONEIL
HOLLYBROOK
INTERNATIONAL
ROTONDA
BULOW
OSBORNE
Location
Residential Commercial
(c)
(d)
(e)
Palm Beach
3177
155
Lee
2320
393
Palm Beach
2168
46
Hendry
1404
330
Broward
1875
366
Broward
2031
243
Palm Beach
1467
145
Broward
1480
330
Broward
3360
296
Okeechobee
650
238
Lee
4207
252
Palm Beach
2449
244
Broward
3414
134
Collier
3125
292
Miami-Dade
1801
159
Miami-Dade
1512
325
Broward
1252
128
Broward
1017
235
Miami-Dade
1429
273
Palm Beach
1951
103
Palm Beach
3114
199
Manatee
1358
160
Palm Beach
697
195
Palm Beach
2286
132
Miami-Dade
929
47
Miami-Dade
4
997
Broward
123
416
St Lucie
100
30
Manatee
4337
193
Broward
3299
104
Manatee
3382
313
Broward
2609
190
St Johns
2547
130
Broward
2274
189
Miami-Dade
2450
1281
Collier
4083
450
Sarasota
2984
129
Palm Beach
2282
104
Manatee
3668
286
Miami-Dade
2058
116
Broward
2219
242
Palm Beach
2373
69
Sarasota
3346
266
Brevard
1367
64
Broward
2631
229
Palm Beach
2070
203
Miami-Dade
2429
166
Palm Beach
2340
240
Lee
2437
602
Miami-Dade
1778
320
Miami-Dade
1960
199
Miami-Dade
1394
214
Broward
1427
542
Palm Beach
2208
170
Miami-Dade
1814
104
Broward
1467
46
Miami-Dade
1842
79
Palm Beach
2316
85
1199
139
Palm Beach
Brevard
1586
98
Palm Beach
990
243
Palm Beach
1630
214
Palm Beach
1376
121
Broward
782
236
Martin
865
86
Broward
827
295
Palm Beach
934
190
Suwannee
534
145
Miami-Dade
950
45
St Johns
1187
125
Broward
1194
130
Miami-Dade
959
290
Volusia
778
53
Sarasota
459
72
St Lucie
372
72
Miami-Dade
1051
22
Miami-Dade
1036
273
Palm Beach
223
136
Miami-Dade
0
395
Miami-Dade
0
367
Brevard
3114
185
Palm Beach
3762
136
Sarasota
4423
179
Lee
3434
73
Miami-Dade
3191
570
Flagler
2667
410
Brevard
3272
79
Charlotte
2740
255
St Lucie
3249
222
Miami-Dade
3052
335
Nassau
2543
379
Broward
2144
483
Miami-Dade
3114
430
Charlotte
2632
432
Volusia
1545
43
Palm Beach
2053
97
Industrial
(f)
4
2
3
8
7
5
7
7
3
10
10
7
1
28
2
3
4
2
0
9
2
1
5
3
11
3
2
2
9
0
18
1
12
0
2
24
7
6
2
1
2
1
9
0
3
6
0
2
5
1
1
1
2
13
1
2
0
8
5
2
1
1
1
5
0
5
2
1
4
22
2
5
3
3
0
2
6
3
1
1
4
2
41
7
1
8
0
38
1
0
25
9
1
26
3
3
98
Other
(g)
7
54
149
77
16
24
19
2
4
53
24
230
3
27
24
26
14
2
7
4
6
46
39
108
12
2
9
3
17
1
35
22
20
2
4
44
34
2
18
6
26
52
7
10
2
7
2
16
41
31
19
18
16
20
14
3
28
3
1
54
32
69
37
11
5
1
40
37
35
17
17
121
86
6
5
43
93
33
7
5
4
10
5
404
19
38
64
58
98
2
96
3
17
9
17
12
Total
(h)
3336
2715
2217
1742
2248
2279
1619
1817
3659
898
4469
2700
3549
3445
1962
1840
1384
1254
1702
2063
3315
1519
897
2421
987
1004
541
132
4539
3403
3713
2800
2689
2463
3733
4557
3120
2392
3956
2175
2463
2443
3621
1431
2863
2279
2595
2582
3044
2099
2160
1609
1971
2391
1919
1515
1921
2409
1343
1686
1234
1845
1498
1023
951
1127
1126
680
999
1334
1326
1254
834
534
444
1075
1315
362
396
368
3303
3900
4643
3514
3762
3085
3351
3033
3472
3387
2947
2636
3545
3090
1591
2153
Number of
Outage
Events
(N)
(i)
7
7
7
6
6
6
6
6
6
6
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
Average
Duration
(L-Bar)
(j)
78
20
7
31
13
47
119
2
79
46
75
69
24
24
71
157
29
37
19
95
145
70
49
20
49
76
160
214
55
24
32
110
4
35
185
320
51
45
92
37
127
67
32
49
65
27
76
12
52
51
140
362
144
9
139
142
59
117
103
19
48
43
161
127
64
25
133
312
249
310
51
196
57
47
137
66
79
91
262
132
47
301
76
3
76
1
103
131
65
17
111
27
156
81
47
136
Average
No. of
Restoration Listed Years
Time
Last in the
(CAIDI)
Year? Last 5
(k)
(l)
(m)
29.4
N
2
12.5
N
1
2.4
N
1
17.0
N
0
6.1
Y
2
12.4
N
1
41.6
N
0
1.9
N
2
43.2
Y
1
34.2
N
1
22.0
N
1
31.5
N
0
23.8
N
0
14.0
N
0
27.0
N
0
20.0
N
0
23.8
N
0
14.2
N
0
17.7
N
0
36.5
Y
1
93.7
N
0
25.0
N
0
40.1
N
1
26.1
N
0
38.1
N
1
49.7
Y
1
46.3
N
0
0
94.7
N
40.5
N
0
13.6
N
1
4.3
N
0
55.5
N
0
3.5
N
0
27.6
N
2
51.8
N
0
72.1
Y
1
45.5
N
0
30.4
N
1
37.2
N
0
26.4
N
0
33.0
N
1
34.7
N
0
22.0
N
0
24.2
N
0
58.5
Y
1
12.8
N
1
54.4
N
0
10.0
N
1
21.1
N
1
49.0
N
1
34.2
N
0
60.0
N
0
45.5
N
1
4.9
N
0
33.9
N
1
40.8
N
1
24.6
N
0
52.1
Y
1
0
33.5
N
5.7
N
0
16.0
N
0
31.7
N
0
44.2
N
1
62.8
N
0
29.2
N
1
21.2
N
0
34.2
N
0
61.1
N
0
98.1
N
0
61.6
Y
2
20.2
N
1
58.0
N
1
60.9
N
0
38.8
N
0
45.2
N
1
41.2
N
0
29.8
Y
1
29.2
N
0
47.2
N
0
59.9
Y
1
29.3
N
0
28.7
N
0
42.3
Y
1
3.0
N
0
13.6
N
1
1.3
N
0
13.3
N
0
53.1
N
0
12.0
N
0
11.2
N
0
47.5
N
0
14.2
N
0
39.0
N
0
36.7
N
0
46.7
N
1
66.2
N
0
PSC/ECR 102-3 (a)
System Reliability Indices - Actual
y
FPL
District or Service
Area
(a)
Boca Raton
Brevard
Central Dade
Central Florida
Gulfstream
Manasota
Naples
North Dade
North Florida
Pompano
South Dade
Toledo Blade
Treasure Coast
West Palm
West Dade
Wingate
All FPL
Year: 2014
SAIDI
(b)
CAIDI
(c)
SAIFI
(d)
MAIFIe
(e)
CEMI5
(f)
74.2
76.2
63.8
67.2
62.4
63.0
63.1
82.6
85.0
58.7
78.6
77.4
81.6
59.1
77.9
82.4
70.8
55.3
60.5
70.6
63.8
60.2
70.3
67.8
93.2
71.0
61.3
82.9
62.7
68.4
61.8
61.2
61.6
65.7
1.34
1.26
0.90
1.05
1.04
0.90
0.93
0.89
1.20
0.96
0.95
1.23
1.19
0.96
1.27
1.34
1.08
8.6
10.0
7.8
9.3
9.2
6.8
7.3
9.3
10.6
7.3
8.1
9.8
11.3
9.2
8.1
12.3
8.9
3,779
1,373
2,092
1,728
2,529
1,480
3,061
2,347
1,176
1,561
1,940
3,634
2,890
5,285
1,597
2,495
38,967
PSC/ECR 102-3 (b)
System Reliability Indices - Adjusted
FPL
District or Service
Area
(a)
Boca Raton
Brevard
Central Dade
Central Florida
Gulfstream
Manasota
Naples
North Dade
North Florida
Pompano
South Dade
Toledo Blade
Treasure Coast
West Palm
West Dade
Wingate
All FPL
Year: 2014
SAIDI
(b)
CAIDI
(c)
SAIFI
(d)
MAIFIe
(e)
CEMI5
(f)
63.1
69.0
54.2
60.8
57.8
56.6
57.5
76.9
76.8
52.0
72.9
72.6
74.5
49.5
72.4
74.5
63.8
52.0
60.7
67.8
64.1
60.5
68.1
65.6
92.1
72.5
60.6
80.6
62.6
69.4
57.9
60.3
59.5
64.5
1.21
1.14
0.80
0.95
0.96
0.83
0.88
0.83
1.06
0.86
0.90
1.16
1.07
0.85
1.20
1.25
0.99
8.3
9.7
7.6
8.9
9.1
6.7
7.3
9.0
10.3
7.1
8.0
9.6
11.1
8.8
7.9
12.1
8.7
3,270
977
1,872
1,434
2,268
1,254
2,796
2,103
905
1,435
1,816
3,390
2,726
4,953
1,514
2,177
34,890
99
Actual Data: Customer Minutes of Interruption (CMI), Customer Interruptions (CI) and Documented Exclusions
Customer minutes of Interruption (CMI)
Customer Interruptions (CI)
2014
Value
Reported Actual Data (1)
% of Actual
335,022,478
Value
100%
% of Actual
5,099,256
100%
Documented Exclusions
Planned Service Interruptions
22,736,106
7%
290,608
6%
Named Storm
7,819,424
2%
100,547
2%
Tornadoes
2,760,339
1%
31,025
1%
Ice on Lines
0
0%
0
0%
Planned Load Management
Events
0
0%
0
0%
Generation/Transmission
Events (2)
Extreme Weather (EOC
Activation/Fire)
Reported Adjusted Data
13,456,309
0
301,706,609
Notes:
(1) Excludes Generation/Transmission Events per 25-6.0455(2)
(2) Informational Only, as reported actual data already excludes Generation/Transmission Events
N/A
0%
90%
982,548
0
4,677,076
N/A
0%
92%
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
CI
CMI
1
3
29
2
10
1
1
12
8
1
1
4
1
11
1
543
1
1
1
1
6
8
1
944
122
8
8
8
1
1
6
11
9
6
14
44
83
11
12
38
18
1
143
2
10
87
59
25
49
52
16
2
1
93
144
2,175
250
2,170
186
38
852
1,504
143
124
224
81
1,056
28
25,305
416
155
296
240
552
592
86
44,697
23,180
1,072
336
272
42
450
672
726
657
456
1,330
2,904
5,063
3,245
6,648
2,584
972
531
14,744
234
1,880
4,959
5,782
6,000
4,214
5,772
4,480
482
4
L-Bar
Repair Cost
93
48
75
125
217
186
38
71
188
143
124
56
81
96
28
206
416
155
296
240
92
74
86
240
190
134
42
34
42
450
112
66
73
76
95
66
61
295
554
68
54
531
108
117
188
57
98
240
86
111
280
241
4
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
CI
66
812
4
2,414
230
1
3
7
4
6
2,710
46
4,060
1,836
4
1,898
59
1,167
24
11
22
10
5
1
2,702
76
1
3
12
1
637
94
95
52
4
11
50
1,383
11
22
34
10
1
1,210
2
7
1
4
21
50
116
4
6
CMI
13,002
352,180
788
2,414
1,380
213
927
2,135
836
504
97,560
35,742
56,840
439,926
1,476
3,796
20,768
144,013
2,592
231
9,922
1,600
1,085
361
529,285
33,740
226
1,176
2,136
184
101,920
50,854
85,821
55,640
648
1,507
12,200
203,777
10,483
3,124
65,552
2,140
356
4,840
332
1,148
302
140
11,340
6,000
14,500
428
1,506
L-Bar
197
589
197
1
6
213
309
305
209
84
36
777
14
261
369
2
352
278
108
21
718
160
217
361
1,024
628
226
392
178
184
160
541
1,312
1,070
162
137
244
485
953
142
1,928
214
356
4
166
164
302
35
540
120
125
107
251
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
CI
CMI
1
1
1
10
4
1
13
1
11
11
4
1
1
1
1
1
1
1
3
5
12
11
1
1
56
44
1
16
6
1
44
8
1
1
6
1
3
1
8
1
11
1
734
1
3
19
16
1
2
1
1
1
8
59
316
83
920
668
55
2,236
71
6,160
1,331
584
114
44
52
68
115
57
14
369
20
1,056
3,322
88
22
7,448
5,720
188
1,968
216
521
792
1,048
19
530
894
57
417
57
240
66
1,386
767
15,305
335
1,380
3,743
4,608
732
172
127
24
59
192
L-Bar
Repair Cost
59
316
83
92
167
55
172
71
560
121
146
114
44
52
68
115
57
14
123
4
88
302
88
22
133
130
188
123
36
521
18
131
19
530
149
57
139
57
30
66
126
767
44
335
460
197
288
732
86
127
24
59
24
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Date
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
CI
36
1
1
1
4
20
11
62
39
1
48
4
1
2
1
4
15
1
34
30
2
10
28
4
37
38
35
3
107
1
1
41
11
22
5
6
9
1,314
44
7
8
63
48
35
10
29
18
641
9
3
2,159
198
66
CMI
3,420
14
601
49
1,972
8,540
924
117,614
4,791
154
6,768
620
102
86
18
556
2,025
14
3,672
4,200
288
480
1,288
516
2,183
2,242
3,990
567
5,564
216
55
2,419
583
3,185
1,115
342
3,780
74,682
8,360
791
2,128
3,465
7,344
4,270
1,270
4,495
1,170
21,439
1,638
126
122,723
119,592
9,834
L-Bar
95
14
601
49
493
427
84
1,897
134
154
141
155
102
43
18
139
135
14
108
140
144
48
46
129
59
59
114
189
52
216
55
59
53
338
223
57
420
77
190
113
266
55
153
122
127
155
65
38
182
42
77
604
149
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Date
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
CI
CMI
123
2
49
63
6
59
104
2
6
8
3
10
12
9
4
12
34
3
1
65
83
4
16
3
3
2
36
5
11
5
6
3
44
1
3
3
3
10
34
6
1
4
2
1
30
6
1
4
1
1
10
1
3
70,725
356
11,391
7,053
810
40,474
11,545
314
582
2,648
243
1,820
2,688
3,339
1,068
816
5,950
561
164
12,285
14,359
416
2,464
528
1,437
178
2,988
980
792
1,090
2,592
639
2,288
85
321
369
684
250
2,346
1,968
101
520
206
216
4,380
864
9
676
170
248
1,130
46
423
L-Bar
Repair Cost
576
178
272
471
135
686
112
157
97
331
81
182
224
371
267
68
175
187
164
189
173
104
154
176
479
89
83
196
72
218
432
213
52
85
108
123
228
25
69
328
101
130
103
216
146
144
9
169
170
248
113
46
141
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tornado Activity
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
CI
1
8
7
5
5
1
2
25
5
1
15
19
8
5
4
1
12
1
2
64
11
34
1
2,006
1
1
104
4
1
1
1
3
6
1
3
12
1
1
4
6
1
1
759
4
1
1
9
1
1
1
11
8
58
CMI
101
1,520
1,918
230
470
33
506
8,750
435
94
8,535
1,482
120
80
676
297
1,872
33
914
11,456
2,893
5,576
124
73,033
87
94
5,616
1,024
107
77
303
1,113
318
113
573
132
121
69
624
1,290
101
150
2,277
1,132
42
6
1,737
49
88
100
1,023
2,760
20,724
L-Bar
Repair Cost
101
190
274
46
94
33
253
350
87
94
569
78
15
16
169
297
156
33
457
179
263
164
124
42
87
94
54
256
107
77
303
371
53
113
191
11
121
69
156
215
101
150
3
283
42
6
193
49
88
100
93
345
721
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
CI
CMI
4
20
36
3
12
49
1
2
8
46
19
1
11
2
1
1
10
1
3
12
8
20
72
1
7
6
2
1
7
9
8
79
10
4
2
8
8
29
15
1
8
5
1
22
4
3
59
43
22
3
7
2
5
448
420
16,164
1,224
7,668
3,577
84
252
888
12,318
7,258
208
2,453
282
214
31
830
103
249
528
576
2,000
19,008
23
1,526
1,152
240
52
5,341
603
1,672
5,530
2,170
168
322
4,704
808
2,320
2,595
60
2,630
2,395
42
1,848
476
234
58,655
4,429
8,008
366
4,788
564
1,345
L-Bar
112
21
563
408
639
73
84
126
111
633
382
208
223
141
214
31
83
103
83
44
72
100
264
23
218
192
120
52
763
67
209
70
217
42
161
588
101
80
173
60
425
479
42
84
119
78
1,081
103
364
122
684
282
269
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
CI
6
16
5
43
1
1
86
5
27
7
2
33
1
1
1
8
2,110
13
8
2
1
1
4
1
10
7
6
16
8
10
2
98
16
13
94
6
46
28
63
13
29
1
8
1,876
85
73
48
10
89
69
7
88
1,005
CMI
726
960
1,480
11,076
13
87
10,396
955
4,285
1,932
378
2,508
233
170
267
1,976
38,088
286
488
460
57
208
604
51
1,800
714
960
768
2,912
7,220
128
32,794
4,368
4,953
13,818
1,110
5,106
1,900
6,678
3,484
3,567
247
752
147,669
26,775
21,389
3,456
2,510
6,141
14,145
994
6,160
99,921
L-Bar
Repair Cost
121
60
296
468
13
87
306
191
253
276
189
76
233
170
267
247
279
22
61
230
57
208
151
51
180
102
160
48
364
722
64
382
273
381
147
185
111
118
106
268
123
247
94
206
315
293
72
251
69
205
142
70
201
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Date
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
CI
1,197
44
20
38
35
1
7
1
5
32
45
8
23
78
19
22
51
15
19
1
9
18
14
10
3
1
19
9
1
5
2
9
1
36
22
12
4
1
43
9
1
1
6
31
12
1
1
970
1
35
6
9
1
CMI
147,618
3,476
2,520
1,862
3,605
112
931
120
1,010
2,272
2,925
872
4,094
5,460
3,363
3,234
5,202
1,740
2,432
64
3,591
2,664
4,648
1,650
561
86
3,536
1,683
147
830
442
2,871
12
10,584
1,562
1,260
984
186
8,542
2,574
103
71
1,098
7,347
1,056
237
60
74,110
47
10,255
720
1,566
59
L-Bar
Repair Cost
315
79
126
49
103
112
133
120
202
71
65
109
178
70
177
147
102
116
128
64
399
148
332
165
187
86
187
187
147
166
221
319
12
294
71
105
246
186
218
286
103
71
183
237
88
237
60
711
47
293
120
174
59
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Tropical Storm
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
CMI
1
43
3
65
15
51
34
36
977
16
1
1
1
4
6
11
65
14
6
1
4
2
4
12
10
6
8
20
1
1
8
1
3
3
42
45
3
27
47
3
6
4
7
21
9
14
34
6
1
2
1
3
1
313
9,468
1,152
5,590
2,670
26,874
4,522
55,116
53,123
7,808
112
121
214
612
888
1,067
22,823
756
108
199
1,144
986
1,316
3,984
3,320
1,446
7,104
6,320
539
34
2,168
26
654
312
4,662
10,170
111
12,015
6,063
1,113
276
388
658
1,071
1,053
1,078
2,448
636
86
412
49
156
8
L-Bar
313
534
384
86
178
584
133
1,531
120
488
112
121
214
153
148
97
576
54
18
199
286
493
329
332
332
241
888
316
539
34
271
26
218
104
111
226
37
445
129
371
46
97
94
51
117
77
72
106
86
206
49
52
8
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
1
2
71
4
6
1
1
6
4
61
3,232
14
22
1
90
1
7
1
2
7
1
2
7
1
1
1
11
1
2
92
1
1
1
4
4
2
4
2
6
21
5
3
1
1
1
8
1
2
1
41
29
1
4
CMI
314
1,142
20,002
1,084
672
94
111
678
1,728
3,660
3,232
2,380
9,333
60
20,650
116
875
388
1,220
476
375
120
952
405
42
229
572
141
74
6,256
48
306
76
276
360
1,176
256
926
414
1,428
1,630
171
536
83
260
2,560
201
126
312
3,116
3,741
265
416
L-Bar
Repair Cost
314
571
322
271
112
94
111
113
432
60
1
170
492
60
287
116
125
388
610
68
375
60
136
405
42
229
52
141
37
68
48
306
76
69
90
588
64
463
69
68
326
57
536
83
260
320
201
63
312
76
129
265
104
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
CMI
50
1
1
5
10
3
6
22
1
33
1
2
10
2
4
1
2
9
63
5
1
11
1
2
1
7
6
4
8
11
10
1
4
1
10
8
1
14
3
1
1
6
7
6
8
8
2
1
1
6
1
7
3
1,650
103
170
1,350
2,170
810
960
7,128
536
1,287
267
660
2,210
210
188
75
34
2,034
4,914
520
227
1,199
49
414
92
413
516
840
528
561
460
612
896
85
1,000
544
43
770
531
256
353
2,424
1,141
840
480
512
208
155
54
342
180
161
969
L-Bar
Repair Cost
33
103
170
270
217
270
160
324
536
39
267
330
221
105
47
75
17
226
78
104
227
109
49
207
92
59
86
210
66
51
46
612
224
85
100
68
43
55
177
256
353
404
163
140
60
64
104
155
54
57
180
23
323
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
CMI
2
1
1
27
4
1
8
3
6
7
1
1
1
9
2
1
1
24
10
1
3
12
1
7
7
4
1
1
1
2
4
8
6
13
6
14
65
1
6
6
19
7
1
1
25
8
1
54
5
1
2
6
3
148
134
300
1,944
216
196
568
279
348
406
557
21
62
90
92
52
292
4,248
730
93
102
1,236
40
315
217
924
5
113
27
86
356
624
1,056
1,079
108
700
6,305
160
594
1,836
1,748
70
68
86
1,650
136
57
5,778
370
46
56
726
156
L-Bar
Repair Cost
74
134
300
72
54
196
71
93
58
58
557
21
62
10
46
52
292
177
73
93
34
103
40
45
31
231
5
113
27
43
89
78
176
83
18
50
97
160
99
306
92
10
68
86
66
17
57
107
74
46
28
121
52
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
1
1
1
13
31
2
2
9
83
1
2
16
5
1
1
85
1,756
5
8
11
3
6
30
6
1
13
19
1
1
2,495
34
4
4
27
1
2
2
10
23
11
2
7
1
8
21
44
7
1
10
10
1
2
1
CMI
213
570
1
78
163
114
756
333
5,561
100
352
400
275
10
140
4,845
83,704
1,040
136
693
81
528
1,890
126
178
117
973
84
369
115,967
7,140
796
1,152
2,565
157
292
372
720
2,300
506
108
490
55
488
2,646
3,432
805
71
660
1,480
71
178
174
L-Bar
Repair Cost
213
570
1
6
12
57
378
37
67
100
176
25
55
10
140
57
67
208
17
63
27
88
63
21
178
9
90
84
369
221
210
199
288
95
157
146
186
72
100
46
54
70
55
61
126
78
115
71
66
148
71
89
174
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
26
1
11
1
1
1
797
22
2
21
22
1
1
5
2
103
1
4
3
6
3
49
1
4
97
2
1
1
1
90
1,754
4
1
4
1
4
12
1
1
1
9
1
4
1
18
4
1
1
1
1
1
11
30
CMI
5,486
122
880
50
11
49
16,737
1,540
144
4,263
1,210
11
9
1,300
420
11,433
144
92
231
156
117
18,718
36
692
9,894
302
52
115
67
3,330
5,262
156
229
1,000
23
636
3,240
148
70
79
522
59
216
77
1,080
896
227
319
114
61
87
539
4,546
L-Bar
Repair Cost
211
122
80
50
11
49
21
70
72
203
55
11
9
260
210
111
144
23
77
26
39
382
36
173
102
151
52
115
67
37
3
39
229
250
23
159
270
148
70
79
58
59
54
77
60
224
227
319
114
61
87
49
164
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
4
1
13
59
16
1
4
1
27
1
25
8
2
50
1
6
8
1
1
272
9
2
17
1
1
1
1
5
6
1
4
26
36
1
25
7
2
7
10
43
62
12
1
3,775
39
129
8
1
73
77
86
6
117
CMI
448
66
676
4,602
240
61
948
169
2,619
46
1,400
560
28
2,550
65
876
952
107
22
49,232
261
70
1,632
8
28
157
104
1,380
528
101
68
6,786
1,980
103
1,675
322
482
322
3,840
9,245
6,767
1,620
382
3,775
5,382
6,192
1,680
230
5,329
5,621
6,278
1,506
8,307
L-Bar
Repair Cost
112
66
52
78
15
61
379
169
259
46
56
70
14
51
65
146
119
107
22
181
29
35
96
8
28
157
104
276
88
101
17
261
55
103
67
46
241
46
384
215
301
135
382
1
138
48
210
230
73
73
73
251
71
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
7
2
47
7
46
182
17
12
2
43
154
3
333
4
1
4
1
7
3
1
39
10
124
20
1
1
12
45
969
1
7
40
16
1
1
47
1,773
99
1,222
98
1
6
86
4
10
30
30
8
7
10
2
47
1
CMI
189
356
2,350
511
2,438
10,192
714
1,236
98
3,569
9,394
273
22,644
36
56
88
54
531
120
175
2,028
2,620
33,232
1,940
4
182
1,104
12,915
52,326
35
105
5,080
3,872
160
45
4,935
92,274
14,751
80,639
7,938
116
726
6,020
6,108
670
11,430
4,360
2,888
623
2,340
436
4,371
131
L-Bar
27
178
50
73
53
56
42
103
49
83
61
91
68
9
56
22
54
263
40
175
52
262
268
97
4
182
92
287
54
35
15
127
242
160
45
105
163
149
203
81
116
121
70
1,527
67
381
429
361
89
234
218
93
131
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
CI
CMI
1
2
19
3
1
4
16
2
1
314
98
11
1
1
5
11
12
9
7
19
2
3
1
1
12
80
1
1
1
1
12
7
1
1
1
2
1
1
1
153
2
20
3
10
1
10
14
8
1
4
30
10
20
179
608
1,501
561
64
304
4,704
272
73
25,120
2,940
8,327
62
223
2,275
2,728
948
810
1,148
1,824
282
1,611
185
201
1,128
4,800
151
132
51
87
5,832
63
43
30
166
218
149
80
271
24,786
94
6,040
225
640
109
740
2,296
1,400
147
192
2,820
2,410
1,860
L-Bar
Repair Cost
179
304
79
187
64
76
294
136
73
80
30
757
62
223
455
248
79
90
164
96
141
537
185
201
94
60
151
132
51
87
486
9
43
30
166
109
149
80
271
162
47
302
75
64
109
74
164
175
147
48
94
241
93
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
CMI
11
4
86
10
63
2
7
42
7
1
1
72
1
10
3
1
3
23
13
8
4
12
2
4
1
11
8
1
11
1
5
8
13
8
1
1
12
6
88
14
13
2
71
32
1
45
46
18
12
2
1
1
3
3,327
1,276
5,934
1,360
7,056
118
2,142
10,080
392
343
174
6,308
88
3,320
543
57
126
2,967
3,536
536
356
900
76
2,136
99
550
1,800
33
506
84
825
368
1,664
424
152
359
756
450
5,632
6,048
2,139
662
12,087
1,216
64
4,320
2,668
2,376
4,356
602
144
66
933
L-Bar
Repair Cost
357
319
69
136
112
59
306
240
56
343
174
89
88
332
181
57
42
129
272
67
89
75
38
534
99
50
225
33
46
84
165
46
128
53
152
359
63
75
64
432
285
331
177
38
64
96
58
132
363
301
144
66
311
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
12
1
1
37
1
1
624
2
18
70
5
1
4
27
12
1,050
2
6
55
7
4
4
1
6
1
1
1
18
7
7
13
7
9
20
42
16
1
1
1
103
1
5
5
6
3
8
19
1
129
2
67
4
57
CMI
6,036
30
157
3,848
114
177
26,832
532
3,240
5,740
475
194
532
4,455
984
86,730
346
858
13,200
476
364
464
263
516
204
62
113
2,034
700
707
715
987
648
1,240
12,075
896
490
65
240
3,914
119
825
25
1,812
3
768
2,755
416
4,515
182
3,082
1,100
9,519
L-Bar
Repair Cost
503
30
157
104
114
177
43
266
180
82
95
194
133
165
82
461
173
143
240
68
91
116
263
86
204
62
113
113
100
101
55
141
72
62
390
56
490
65
240
38
119
165
5
302
1
96
145
416
35
91
46
275
167
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
6
1
6
1
155
8
1
23
1
1
1
7
4
8
10
1
6
7
2
3,146
1
166
1
1
11
3
2
1
1
8
1
16
15
11
41
27
1
1
1
17
2
3
1
11
1
1
6
10
6
6
24
18
1
CMI
882
49
126
251
32,860
1,088
658
5,101
67
79
19
371
188
224
1,620
383
624
1,288
220
6,292
132
19,588
110
230
1,034
357
314
242
43
784
87
544
4,140
1,276
6,806
2,235
169
34
277
3,740
92
399
54
1,848
88
9
738
170
540
540
1,992
4,464
134
L-Bar
Repair Cost
147
49
21
251
212
136
658
227
67
79
19
53
47
28
162
383
104
184
110
2
132
118
110
230
94
119
157
242
43
98
87
34
276
116
166
95
169
34
277
220
46
133
54
168
88
9
123
17
90
90
83
248
134
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
20
16
13
7
1,313
3
998
11
1
1
24
2
1
8
40
2
11
3
4
4
1
96
1
5
8
1
7
1
1
1
1
1
1
16
8
15
1
8
1
8
1
2
134
1,780
32
6
1
1
6
7
1
11
5
CMI
4,940
3,360
481
1,736
35,055
399
99,946
660
124
213
14,488
98
484
224
2,720
674
847
270
192
188
80
5,472
67
1,815
3,000
49
812
291
11
336
303
273
242
7,424
1,448
1,200
104
1,072
84
2,616
62
610
14,070
33,820
3,151
1,020
21
48
210
2,723
75
3,916
520
L-Bar
Repair Cost
247
210
37
248
27
133
151
60
124
213
751
49
484
28
68
337
77
90
48
47
80
57
67
363
375
49
116
291
11
336
303
273
242
464
181
80
104
134
84
327
62
305
105
19
107
170
21
48
35
389
75
356
104
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
1,835
43
111
6
3
26
1
7
1
51
38
4
1
12
66
74
60
11
1
2,359
1
8
192
15
7
12
8
8
1
9
1
32
13
27
4
40
4
1
34
2,743
12
41
15
4
73
8
6
99
2
7
1
21
14
CMI
123,975
8,729
10,767
462
237
2,028
304
609
343
2,193
4,560
272
12
1,512
17,358
3,478
4,596
1,881
63
32,795
90
2,376
9,984
3,285
35
684
3,176
2,744
178
207
113
1,440
2,691
15,633
728
4,440
1,116
201
7,990
95,485
2,400
13,120
2,925
1,984
11,388
5,040
444
15,741
318
1,078
73
2,961
2,380
L-Bar
Repair Cost
69
203
97
77
79
78
304
87
343
43
120
68
12
126
263
47
126
171
63
58
90
297
52
219
5
57
397
343
178
23
113
45
207
579
182
111
279
201
235
82
200
320
195
496
156
630
74
159
159
154
73
141
170
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
28
11
93
1
17
2
15
9
44
29
8
62
5,483
4
6
17
80
3
1
3
10
4
13
10
1
37
6
5
4
13
14
6
6
7
2
18
11
8
38
19
4
6
1
2
40
1
14
1
12
1
9
4
21
CMI
9,268
4,543
4,185
107
2,705
44
8,775
1,908
10,296
4,814
88
10,292
88,844
844
1,434
4,114
32,240
915
335
1,014
680
348
2,197
505
55
5,587
1,452
2,495
428
2,825
966
222
1,098
357
182
648
2,057
656
9,416
1,121
552
1,992
42
120
3,160
116
2,072
188
1,560
106
1,224
244
1,365
L-Bar
Repair Cost
331
413
45
107
165
22
585
212
234
166
11
166
249
211
239
242
403
305
335
338
68
87
169
334
55
151
242
499
107
413
69
37
183
51
91
36
187
82
476
59
138
332
42
60
79
116
148
188
130
106
136
61
65
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
CMI
1
6
9
1
6
3
1
18
15
5
1
1
1
1
3
1
1
1
8
28
42
7
33
1
1
1
87
1
13
1
112
10
7
5
1
51
9
4
28
1
9
35
114
1
11
5
2
8
1
4
15
36
7
93
456
1,611
262
1,350
366
469
1,069
1,395
235
135
46
66
20
642
63
207
188
552
3,052
14,986
1,393
15,246
187
139
25
5,220
34
1,393
224
15,008
1,190
623
2,855
157
6,426
576
516
2,324
185
2,313
3,220
114
74
1,994
665
242
2,312
201
912
1,755
1,584
2,065
L-Bar
Repair Cost
93
76
179
262
225
122
469
63
93
47
135
46
66
20
214
63
207
188
69
109
369
199
462
187
139
25
60
34
109
224
134
119
89
571
157
126
64
129
83
185
257
92
1
74
268
133
121
289
201
228
117
44
295
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
CMI
1
1
1
13
1
1
1
3
4
15
1
2
8
8
1
1
1
122
15
1
1
5
9
2
60
11
2
1
1
1
5
1
1
1
1
2
4
1
1
1
1
1
2
5
1
1
44
72
169
2
1
8
106
667
65
55
2,002
90
164
136
231
908
4,155
113
248
992
976
53
138
316
4,148
1,290
331
124
570
369
112
3,600
1,221
162
50
269
143
615
92
236
173
72
962
104
49
201
52
184
23
54
130
12
83
5,254
9,576
8,450
78
323
2,816
12,190
L-Bar
Repair Cost
667
65
55
154
90
164
136
77
227
277
113
124
124
122
53
138
316
34
86
331
124
114
41
56
60
111
81
50
269
143
123
92
236
173
72
481
26
49
201
52
184
23
27
26
12
83
133
133
50
39
323
352
115
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
CI
CMI
7
5
18
27
5
2
3
1
9
13
1
3
94
1
17
2
7
130
2
6
4
9
1
4
88
4
8
123
1
8
1
7
14
1
98
42
10
2
9
1
2
1
1
2
1
26
22
1
1
56
3
2
2
105
45
972
2,741
455
522
966
77
1,098
1,300
29
156
10,246
446
629
248
322
8,060
440
330
280
1,647
436
308
4,840
2,120
24
8,979
46
904
63
1,260
6,762
261
18,522
1,596
810
748
2,763
57
86
47
87
64
20
1,144
1,199
60
123
8,442
1,164
118
1,324
L-Bar
Repair Cost
15
9
54
193
91
261
322
77
122
100
29
52
109
446
37
124
46
62
220
55
70
183
436
77
55
530
3
73
46
113
63
180
483
261
189
38
81
374
307
57
43
47
87
32
20
44
70
60
123
180
388
59
662
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
CI
1
1
3
2
1
1
2
1
1
11
1
1
1
48
15
1
1
8
14
10
21
1
1
1
1
1
6
40
2
103
1
58
10
9
1
1
1,663
10
11
7
46
8
2
1
1
3
3
2
1
1
4
29
24
CMI
47
176
84
150
111
24
146
84
82
2,464
36
32
1,496
6,672
3,945
93
17
472
1,848
2,920
1,657
422
181
429
63
100
48
5,200
220
17,098
318
8,758
390
1,692
83
212
99,428
240
1,936
378
2,346
672
68
74
36
405
420
74
130
418
772
4,872
2,688
L-Bar
47
176
28
75
111
24
73
84
82
224
36
32
1,496
139
263
93
17
59
132
292
85
422
181
429
63
100
8
139
110
166
318
151
39
188
83
212
84
24
176
54
51
84
34
74
36
135
140
37
130
418
193
168
112
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
CI
CMI
3
1
4
1
3
107
5
2
1
34
6
11
1
11
15
1
3
1
1
1
1
5
1
1
33
123
2
5
8
11
67
8
1
9
12
10
12
4
1
1
16
362
2
8
2
968
53
2
15
545
1
1
6
501
227
984
53
24
5,136
580
448
53
6,766
1,608
1,199
122
1,826
1,785
105
24
210
62
99
179
400
82
183
14,487
49,815
424
905
1,576
891
3,953
3,680
131
1,709
1,824
1,390
3,348
672
99
58
864
28,236
98
1,112
760
39,132
4,823
318
1,710
36,515
585
103
492
L-Bar
Repair Cost
167
227
246
53
8
48
116
224
53
199
268
109
122
166
119
105
8
210
62
99
179
80
82
183
439
405
212
181
197
81
59
460
131
200
152
139
279
168
99
58
54
78
49
139
380
77
91
159
114
67
585
103
82
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
CI
23
41
7
36
62
1
1
139
28
42
6
1
77
32
1
84
22
9
45
5
1
51
21
25
15
23
57
5
3
5
7
1
11
19
1
1
2,133
5
4
4
88
17
103
61
452
3
6
18
1
17
9
1
102
CMI
5,050
12,751
357
2,196
3,286
82
138
15,151
3,500
4,662
426
99
18,865
1,984
165
4,200
3,542
2,313
7,204
555
770
4,284
882
3,724
7,350
1,035
10,830
705
21
685
364
99
3,531
8,246
227
229
106,425
1,255
1,224
572
3,432
3,995
19,535
24,827
31,188
135
2,454
7,038
266
2,046
1,404
165
10,200
L-Bar
Repair Cost
455
311
51
61
53
82
138
109
125
111
71
99
245
62
165
50
161
257
182
111
770
84
42
209
490
45
190
141
7
137
52
99
321
434
227
229
55
251
306
143
39
235
477
407
69
45
409
391
266
318
156
165
100
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Date
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
CI
CMI
2
2
1
55
53
1
28
1
79
1
14
13
1
8
1
132
1
1
12
10
3
1
3
14
5
132
1
5
7
57
7
116
1
25
50
112
51
100
20
1
1
12
3
10
1
15
1
10
5
79
21
1
16
116
90
262
7,191
2,862
45
1,540
446
10,902
135
1,624
2,951
65
4,840
141
4,620
502
345
1,248
2,910
696
111
996
1,372
75
10,428
123
900
1,512
7,013
441
41,760
847
650
11,350
2,800
4,437
11,625
1,600
164
148
3,432
237
320
78
1,335
144
700
2,470
6,952
903
214
3,136
L-Bar
Repair Cost
58
45
262
387
54
45
55
446
138
135
116
227
65
605
141
35
502
345
104
291
232
111
332
98
15
79
123
180
216
137
63
360
847
26
227
25
87
235
80
164
148
286
79
32
78
89
144
70
494
88
43
214
196
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Hurricane Arthur
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
7/6/2014
CI
CMI
102
27
5
1
11
7
1
124
1
1
1
45
1
13
13
6
1
20
14
6
1
1
1
1
1
17
1
17
13
1
16
1
30
97
3
6
32
1
1
2
1
5
3
8
3
1
19
4
1
16
1
1
6
6,982
3,915
125
119
2,871
910
126
16,740
123
171
57
10,710
124
2,262
1,742
438
160
1,320
854
408
169
221
364
115
195
4,233
32
765
4,813
171
5,120
67
5,610
31,234
573
756
3,904
124
176
288
151
315
132
2,104
705
124
4,712
184
252
1,520
233
191
528
L-Bar
Repair Cost
140
145
25
119
261
130
126
135
123
171
57
238
124
174
134
73
160
66
61
68
169
221
364
115
195
249
32
45
505
171
320
67
187
322
191
126
122
124
176
144
151
63
44
263
235
124
248
46
252
95
233
191
88
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
CI
CMI
4
1
1
35
1
1
38
1
50
8
1
1
1
1
1
1
6
1
1
1
1
1
1
1
3
2
4
1
11
1
9
1
2
1
5
9
12
1
11
14
3
1
3
11
6
4
9
1
4
2
1
1
28
292
77
131
5,530
9
74
2,356
44
15,550
512
85
65
53
290
232
469
468
76
46
312
290
245
29
102
960
22
1,564
78
473
226
9
276
194
249
240
9
12
521
88
882
129
123
300
33
31
176
9
15
384
134
120
46
3,752
L-Bar
Repair Cost
73
77
131
158
9
74
62
44
311
64
85
65
53
290
232
469
78
76
46
312
290
245
29
102
320
11
391
78
43
226
1
276
97
249
48
1
1
521
8
63
43
123
100
3
6
44
1
15
96
67
120
46
134
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
CI
CMI
2
1
1
10
3
89
20
24
4
1
42
1
1
2
1
4
16
13
157
22
69
2
22
33
8
1
10
10
1
16
84
37
68
27
3
8
174
9
83
5
41
3
4
2
36
332
23
47
37
1
12
1
14
20
154
181
4,270
381
13,054
3,240
1,896
396
120
3,024
317
190
208
134
1,092
3,792
169
8,164
4,026
7,455
20
5,038
6,237
1,152
528
780
1,330
87
3,040
10,332
5,698
5,644
2,808
873
1,048
28,014
2,772
11,537
1,995
9,881
192
816
118
5,148
23,572
3,215
10,857
6,068
233
4,320
471
1,498
L-Bar
Repair Cost
10
154
181
427
127
586
162
79
99
120
72
317
190
104
134
273
237
13
52
183
588
10
229
189
352
528
78
133
87
190
123
154
83
104
291
131
161
308
139
399
241
64
204
59
143
71
380
231
164
233
360
471
107
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
CI
CMI
8
13
30
13
9
1
5
910
9
42
7
23
29
15
2
1
9
1
180
26
9
16
10
9
3
5
2
5
1
131
26
9
13
10
93
14
1
4
29
110
54
4
18
8
2
7
9
14
79
5
11
8
2
568
2,132
4,890
5,265
1,629
254
845
55,510
3,699
9,660
1,317
2,530
2,900
1,635
336
69
1,908
243
17,640
4,283
1,647
1,552
3,800
540
513
1,080
48
610
166
22,139
2,756
1,611
1,482
3,680
11,229
2,184
138
196
2,755
10,120
14,526
284
2,556
896
94
1,400
855
2,744
6,478
610
5,544
680
198
L-Bar
Repair Cost
71
164
163
405
181
254
169
61
411
230
296
110
100
109
168
69
212
243
98
166
183
97
380
60
171
216
24
122
166
169
106
179
114
368
145
156
138
49
95
92
269
71
142
112
47
200
95
196
82
122
504
85
99
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
CI
10
30
1
4
19
1
1
11
10
15
8
2
3
2
1
1
1
10
2
1,024
38
3
47
5
5
7
1
29
1
1
1
2
3
58
1
22
1
2
1
20
3
34
14
1
1
1
1
2
13
1
26
1
11
CMI
890
1,740
236
408
1,757
59
82
858
430
1,892
1,684
74
618
1,126
153
64
307
4,370
82
5,831
3,838
534
8,930
1,755
350
3,122
83
17,545
70
46
70
256
168
11,252
25
2,904
69
860
331
8,060
285
10,105
1,512
143
220
339
354
396
1,222
79
4,446
335
1,320
L-Bar
Repair Cost
91
58
236
102
258
59
82
78
43
253
338
37
206
563
153
64
307
437
41
92
101
178
190
351
70
446
83
605
70
46
70
128
56
194
25
132
69
430
331
403
95
320
108
143
220
339
354
198
94
79
171
335
120
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
CI
35
19
4
8
1
1
1
1
266
3,132
58
28
1
4
1
48
26
5
29
1
1
917
2
77
1
1
2
5
10
9
50
9
3
4
1
1
12
169
26
11
3
1
5
1
1
2,475
11
1
1
54
1
1
26
CMI
7,385
1,615
1,308
3,848
207
443
64
46
73,416
283,056
8,526
7,084
188
704
233
5,808
6,344
3,065
11,252
155
141
78,085
186
10,395
191
445
452
2,085
6,270
1,125
5,400
4,023
1,506
1,840
413
170
1,044
14,872
8,164
6,226
561
6
565
481
121
14,850
1,331
105
65
3,348
124
85
3,562
L-Bar
Repair Cost
211
85
327
481
207
443
64
46
276
438
147
253
188
176
233
121
244
613
388
155
141
353
93
135
191
445
226
417
627
125
108
447
502
460
413
170
87
88
314
566
187
6
113
481
121
6
121
105
65
62
124
85
137
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
CI
6
1
2,244
1
4
2
4
1
11
1
49
1
7
1
48
1
2
1
8
1
6
60
8
1
13
7
5
10
1
10
1
5
1
1
1
6
7
4
90
22
47
863
2
14
2
47
2
12
58
1
27
1
34
CMI
3,714
25
2,244
81
292
736
992
50
693
195
2,940
196
770
26
5,424
138
460
89
640
89
1,092
9,420
4,176
202
1,480
1,127
1,165
220
48
640
169
165
230
60
77
1,590
259
288
11,670
9,966
4,277
58,456
800
1,890
98
2,914
518
600
13,746
108
2,862
28
32,844
L-Bar
Repair Cost
619
25
1
81
73
368
248
50
63
195
60
196
110
26
113
138
230
89
80
89
182
157
522
202
136
161
233
22
48
64
169
33
230
60
77
265
37
72
198
453
91
113
400
135
49
62
259
50
237
108
106
28
966
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
CI
CMI
39
49
8
24
90
1
24
52
12
146
70
14
5
1
164
67
11
3
1
4
2
11
4
9
8
35
43
1
772
45
2
5
3
8
46
21
10
13
47
2
114
8
2
4
24
10
50
38
29
1
20
19
9
1,638
2,597
2,016
11,784
25,524
579
3,768
2,678
6,204
67,306
2,310
1,442
1,290
138
54,120
12,328
6,102
177
472
440
116
616
320
1,899
6,664
5,635
11,911
157
24,704
18,086
414
2,420
174
2,876
9,084
4,116
3,120
1,583
15,933
298
14,879
4,424
74
1,292
4,121
1,900
6,403
7,334
9,280
109
2,520
4,446
2,880
L-Bar
Repair Cost
42
53
252
491
493
579
157
85
517
461
33
103
258
138
330
184
592
59
472
110
58
56
80
211
833
161
277
157
32
642
207
484
58
507
216
196
312
297
339
149
131
553
37
323
172
190
388
193
320
109
126
234
320
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q10 - Distribution Excluded Extreme Weather Outage Events
Causation
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Tornado Touchdown
Date
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
CI
CMI
3
5
742
4
39
55
21
1
588
1
1
1
6
20
10
1
5
21
38
8
97
18
1
5
1
16
576
4
12
366
3,330
20,492
332
17,862
7,909
2,058
232
71,124
377
64
82
1,752
2,760
3,860
132
2,060
10,899
3,496
512
6,596
1,314
127
1,245
89
2,778
8,640
204
1,380
L-Bar
Repair Cost
122
666
66
83
458
389
98
232
438
377
64
82
292
138
386
132
412
519
92
64
68
73
127
249
89
185
15
51
115
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Forensics
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/1/2014
1/1/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
CI
CMI
1
4
6
8
8
1
6
4
10
3
9
19
2
16
2
7
32
9
1
6
1
11
9
3
8
37
4
3
8
7
6
4
25
4
9
3
1
25
1
2
13
10
24
4
62
42
9
9
10
2
5
3
91
72
972
864
912
26
318
544
3,410
279
954
969
466
1,968
540
91
1,344
927
62
306
177
3,916
2,448
489
1,480
7,511
188
453
56
1,316
618
744
5,550
396
135
654
31
225
98
184
455
1,060
3,528
168
18,724
4,746
882
279
1,500
118
775
24
L-Bar
91
18
162
108
114
26
53
136
341
93
106
51
233
123
270
13
42
103
62
51
177
356
272
163
185
203
47
151
7
188
103
186
222
99
15
218
31
9
98
92
35
106
147
42
302
113
98
31
150
59
155
8
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/2/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
1/3/2014
CI
CMI
24
9
6
1
17
5
6
16
10
1
6
7
19
2
10
3
12
8
14
6
57
1
10
5
8
11
14
12
8
1
4
2
2
10
3
12
1
8
4
8
2
35
16
5
6
8
10
10
12
7
1
2,232
207
1,056
3
3,570
240
756
1,040
1,040
234
492
357
4,408
366
30
393
1,140
768
2,800
96
7,467
127
890
460
2,384
616
2,044
1,776
1,000
68
732
142
492
940
222
1,092
134
368
64
96
108
3,955
1,520
100
462
736
880
1,080
1,008
308
76
L-Bar
93
23
176
3
210
48
126
65
104
234
82
51
232
183
3
131
95
96
200
16
131
127
89
92
298
56
146
148
125
68
183
71
246
94
74
91
134
46
16
12
54
113
95
20
77
92
88
108
84
44
76
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/3/2014
1/4/2014
1/4/2014
1/4/2014
1/5/2014
1/5/2014
1/5/2014
1/5/2014
1/5/2014
1/5/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
CI
CMI
7
9
1
1
5
10
6
3
1
9
24
11
8
1
8
1
2
17
12
15
3
1
31
10
6
10
1
14
26
6
24
4
1
3
1
12
3
8
1
1
36
1
1
11
3
2
8
4
10
11
5
672
1,899
186
40
860
1,590
2,178
705
184
1,557
4,800
1,782
712
279
880
56
490
1,717
1,776
240
429
97
341
1,930
102
1,400
225
462
5,278
12
360
304
83
165
33
1,584
75
1,528
1
107
576
39
63
3,135
453
56
8
132
1,510
1,650
750
L-Bar
96
211
186
40
172
159
363
235
184
173
200
162
89
279
110
56
245
101
148
16
143
97
11
193
17
140
225
33
203
2
15
76
83
55
33
132
25
191
1
107
16
39
63
285
151
28
1
33
151
150
150
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/6/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
CI
CMI
4
2
1
3
5
6
4
2
1
4
4
6
1
5
3
14
1
10
18
1
2
8
12
4
1
1
2
31
3
1
911
2
4
1
9
14
24
14
3
2
7
1
1
19
7
12
8
1
73
15
19
352
352
31
258
355
36
752
86
101
360
88
24
129
325
405
2,170
158
1,230
1,980
108
262
736
1,212
188
51
91
214
93
927
306
84,066
48
812
38
801
4,522
3,024
854
432
136
735
160
151
1,786
1,316
948
664
102
1,825
2,340
2,432
L-Bar
88
176
31
86
71
6
188
43
101
90
22
4
129
65
135
155
158
123
110
108
131
92
101
47
51
91
107
3
309
306
361
24
203
38
89
323
126
61
144
68
105
160
151
94
188
79
83
102
25
156
128
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
CI
CMI
1
4
10
1
12
8
4
5
12
3
7
7
2
1
2
10
10
1
4
6
7
15
10
12
8
1
6
2
2
3
4
13
2
2
6
1
6
7
24
6
8
4
2
34
8
2
11
4
6
32
8
31
488
1,010
49
1,404
480
852
45
372
336
1,099
518
376
44
134
1,470
730
91
564
1,146
1,330
2,955
980
2,096
536
88
714
4
376
435
508
260
110
264
240
4
528
854
3,576
906
1,048
188
402
3,774
1,168
178
869
20
72
3,168
312
L-Bar
31
122
101
49
117
60
213
9
31
112
157
74
188
44
67
147
73
91
141
191
190
197
98
209
67
88
119
2
188
145
127
20
55
132
40
4
88
122
149
151
131
47
201
111
146
89
79
5
12
99
39
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/7/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
CI
CMI
5
3
10
207
5
3
1
2
2
1
7
4
1
6
12
5
1
4
8
3
3
10
9
6
15
2
2
5
3
8
2
8
9
4
4
3
5
2
3
3
22
4
18
2
1
5
6
4
8
8
7
185
399
1,310
10,557
140
252
139
584
584
142
147
796
104
240
1,008
785
98
96
688
183
624
630
1,107
426
1,275
742
144
590
228
480
108
776
603
512
672
252
460
22
333
207
3,322
260
450
162
82
1,105
264
56
600
88
1,008
L-Bar
37
133
131
51
28
84
139
292
292
142
21
199
104
40
84
157
98
24
86
61
208
63
123
71
85
371
72
118
76
60
54
97
67
128
168
84
92
11
111
69
151
65
25
81
82
221
44
14
75
11
144
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/8/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
CI
CMI
2
5
8
15
34
10
2
13
11
1
166
15
38
1
2
3
4
5
2
4
5
5
4
4
9
5
5
1
16
8
35
17
3
17
2
5
4
2
7
7
3
3
4
15
1
4
3
3
8
14
12
302
1,290
872
2,910
6,324
720
64
1,196
957
33
9,462
2,040
2,014
72
198
120
224
75
150
272
235
1,145
372
508
792
70
100
164
1,616
792
3,010
1,173
258
1,802
124
320
344
196
665
343
171
126
664
2,205
380
1,040
201
231
96
4,018
1,164
L-Bar
151
258
109
194
186
72
32
92
87
33
57
136
53
72
99
40
56
15
75
68
47
229
93
127
88
14
20
164
101
99
86
69
86
106
62
64
86
98
95
49
57
42
166
147
380
260
67
77
12
287
97
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
CI
CMI
4
6
43
1
11
9
1
15
42
1
4
27
5
3
2
5
6
2
2
1
11
16
5
1
2
3
6
4
2
2
18
1
1
2
16
8
4
12
9
17
4
1
166
38
4
5
1
2
1
2
15
508
270
6,063
30
495
477
69
2,310
7,140
79
956
4,185
135
252
82
410
948
222
206
93
1,034
2,400
60
190
378
396
108
580
354
556
1,098
116
319
640
320
552
348
1,440
549
3,009
568
40
4,316
836
268
825
338
110
5
158
3,765
L-Bar
127
45
141
30
45
53
69
154
170
79
239
155
27
84
41
82
158
111
103
93
94
150
12
190
189
132
18
145
177
278
61
116
319
320
20
69
87
120
61
177
142
40
26
22
67
165
338
55
5
79
251
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/9/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
CI
CMI
4
15
6
4
2
5
1
4
12
2
3
8
3
2
7
1
2
3
5
2
1
1
1
4
5
1
3
4
16
12
4
2
3
1
3
4
7
12
1
3
1
3
6
6
4
2
5
8
1
7
2
1,032
1,035
654
580
250
140
65
500
168
134
57
72
75
244
630
216
182
12
340
204
298
45
16
224
325
203
516
396
2,352
1,836
576
4
147
65
597
512
756
1,692
192
138
103
27
546
486
668
158
670
448
125
651
54
L-Bar
258
69
109
145
125
28
65
125
14
67
19
9
25
122
90
216
91
4
68
102
298
45
16
56
65
203
172
99
147
153
144
2
49
65
199
128
108
141
192
46
103
9
91
81
167
79
134
56
125
93
27
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/10/2014
1/11/2014
1/11/2014
1/11/2014
1/11/2014
1/11/2014
1/11/2014
1/11/2014
1/11/2014
1/11/2014
1/12/2014
1/12/2014
1/12/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
CI
CMI
2
14
1
6
9
6
17
17
8
1
1
1
1
1
19
23
50
10
2
1
1
1
1
9
7
8
11
5
4
2
1
1
4
1
14
23
7
8
8
7
14
2
3
8
1
6
9
15
6
7
12
148
770
61
432
288
396
1,445
2,839
752
114
53
96
70
186
2,318
3,956
2,950
1,150
14
150
90
111
310
1,962
721
504
1,243
150
880
210
136
150
232
14
966
1,472
518
880
1,464
2,443
686
150
186
2,000
111
906
459
1,215
144
609
732
L-Bar
74
55
61
72
32
66
85
167
94
114
53
96
70
186
122
172
59
115
7
150
90
111
310
218
103
63
113
30
220
105
136
150
58
14
69
64
74
110
183
349
49
75
62
250
111
151
51
81
24
87
61
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
CI
CMI
1
6
1
3
2
4
7
12
3
13
6
8
26
8
10
8
3
1
8
1
11
19
7
4
8
1
3
3
19
5
8
7
23
6
2
27
2
1
13
9
3
12
7
3
9
8
19
7
11
4
9
12
210
96
609
356
244
847
120
345
1,222
978
1,560
2,210
976
1,410
608
333
51
1,048
74
1,254
3,458
56
808
584
78
12
117
1,026
950
304
1,050
2,415
390
244
1,269
10
141
1,612
495
90
876
546
45
675
552
228
336
671
380
1,413
L-Bar
12
35
96
203
178
61
121
10
115
94
163
195
85
122
141
76
111
51
131
74
114
182
8
202
73
78
4
39
54
190
38
150
105
65
122
47
5
141
124
55
30
73
78
15
75
69
12
48
61
95
157
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
Date
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/13/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
CI
CMI
7
7
3
17
8
1
20
6
6
12
1
2
2
4
1
5
1
5
7
4
6
7
8
1
1
2
12
6
6
1
3
3
1
9
8
43
5
4
11
8
1
12
1
4
26
13
7
6
7
8
2
1,064
147
90
1,445
344
46
3,840
18
504
432
92
60
608
616
169
390
47
205
1,043
380
840
658
928
263
211
18
3,000
1,530
492
176
318
291
46
3,420
1,480
9,030
575
620
1,111
2,304
26
1,344
31
288
598
286
273
1,194
742
1,280
78
L-Bar
152
21
30
85
43
46
192
3
84
36
92
30
304
154
169
78
47
41
149
95
140
94
116
263
211
9
250
255
82
176
106
97
46
380
185
210
115
155
101
288
26
112
31
72
23
22
39
199
106
160
39
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
CI
1
4
7
5
49
12
5
6
3
8
57
4
8
8
4
12
6
3
8
5
2
6
9
9
2
18
12
5
7
26
13
10
5
13
14
1
1
10
2
8
3
6
4
1
28
1,134
7
1
10
17
5
CMI
325
464
749
515
9,408
972
515
12
321
1,128
10,317
48
1,472
1,192
1,012
3,420
678
252
912
505
252
390
1,107
765
54
2,700
120
90
1,029
754
364
60
75
286
1,162
118
47
660
186
1,144
393
342
660
28
84
3,402
798
82
320
2,448
300
L-Bar
325
116
107
103
192
81
103
2
107
141
181
12
184
149
253
285
113
84
114
101
126
65
123
85
27
150
10
18
147
29
28
6
15
22
83
118
47
66
93
143
131
57
165
28
3
3
114
82
32
144
60
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/14/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
CI
CMI
2
3
1
5
14
7
11
8
12
7
11
10
2
3
9
29
2
1
7
6
24
24
1
30
15
6
2
1
3
1
2
2
11
8
2
2
3
16
1
5
2
34
8
12
5
1
5
33
10
17
4
62
252
2
580
2,002
49
693
1,616
696
931
1,760
1,360
142
222
2,709
3,799
114
160
2,443
684
5,544
2,304
117
2,850
1,425
822
150
121
120
141
192
248
924
1,552
202
342
165
272
113
230
238
5,066
48
1,968
985
206
1,305
2,541
1,000
85
728
L-Bar
31
84
2
116
143
7
63
202
58
133
160
136
71
74
301
131
57
160
349
114
231
96
117
95
95
137
75
121
40
141
96
124
84
194
101
171
55
17
113
46
119
149
6
164
197
206
261
77
100
5
182
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
CI
CMI
12
4
8
1
25
1
1
9
12
11
5
5
7
41
2
14
2
6
4
1
3
7
10
10
26
3
4
1
2
5
1
1
8
8
1
26
6
8
11
8
12
15
2
5
17
6
1
8
8
10
22
2,532
116
528
95
2,525
71
20
558
2,496
726
340
375
560
8,487
444
1,316
398
306
324
47
324
714
360
1,240
1,976
144
76
8
176
195
140
179
72
272
170
2,340
360
648
990
616
1,500
795
58
870
1,989
396
164
680
440
790
770
L-Bar
211
29
66
95
101
71
20
62
208
66
68
75
80
207
222
94
199
51
81
47
108
102
36
124
76
48
19
8
88
39
140
179
9
34
170
90
60
81
90
77
125
53
29
174
117
66
164
85
55
79
35
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/15/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
CI
CMI
34
2
5
6
17
1
1
2
4
10
6
5
3
12
10
12
5
11
35
2
15
27
9
1
2
15
4
6
6
7
14
4
7
2
3
8
13
3
3
7
24
8
4
5
1
3
8
8
18
9
16
3,740
112
520
540
119
84
214
168
496
950
402
655
651
1,248
550
2,112
940
1,342
210
134
1,905
3,645
1,746
281
204
1,470
436
72
318
441
182
260
448
164
96
48
2,327
105
411
28
2,976
112
396
195
87
174
832
136
900
1,305
2,768
L-Bar
110
56
104
90
7
84
214
84
124
95
67
131
217
104
55
176
188
122
6
67
127
150
194
281
102
98
109
12
53
63
13
65
64
82
32
6
179
35
137
4
124
14
99
39
87
58
104
17
50
145
173
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
Date
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/16/2014
1/17/2014
CI
CMI
1
4
3
9
1
2
9
2
1
2
2
1
13
1
1
1
1
1
8
2
2
6
12
11
13
1
5
6
13
9
12
12
5
6
1
24
10
1
2
13
22
3
7
1
1
3
7
1
1
1
4
417
204
216
945
44
448
882
446
198
448
448
223
1,612
223
223
223
223
223
1,672
70
48
666
108
220
2,197
110
960
540
2,353
1,017
264
948
960
624
87
1,224
730
15
134
260
330
204
728
96
134
96
357
26
94
119
384
L-Bar
417
51
72
105
44
224
98
223
198
224
224
223
124
223
223
223
223
223
209
35
24
111
9
20
169
110
192
90
181
113
22
79
192
104
87
51
73
15
67
20
15
68
104
96
134
32
51
26
94
119
96
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
Date
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
1/17/2014
CI
CMI
4
10
10
4
9
10
3
9
2
14
8
10
2
1
3
6
8
14
3
7
26
13
3
3
5
5
15
4
7
8
11
16
50
5
11
1
3
10
11
2
1
3
6
4
11
16
18
9
23
1
1
416
950
980
324
432
400
315
630
48
2,590
160
520
106
231
1,167
816
1,024
322
339
49
4,394
1,378
171
120
225
595
2,190
156
168
1,312
1,441
1,504
5,300
125
418
99
150
1,190
2,970
546
89
147
1,278
132
418
1,136
630
1,107
299
59
17
L-Bar
104
95
98
81
48
40
105
70
24
185
20
52
53
231
389
136
128
23
113
7
169
106
57
40
45
119
146
39
24
164
131
94
106
25
38
99
50
119
270
273
89
49
213
33
38
71
35
123
13
59
17
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/17/2014
1/17/2014
1/17/2014
1/18/2014
1/18/2014
1/18/2014
1/18/2014
1/18/2014
1/18/2014
1/18/2014
1/18/2014
1/19/2014
1/19/2014
1/19/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
CI
CMI
15
13
4
1
1
5
4
8
24
6
1
21
2
1
1
8
2
8
7
1
14
3
3
12
1
12
24
20
7
1
3
12
4
1
8
4
7
10
20
7
12
8
9
13
7
26
5
4
5
2
7
1,320
442
168
11
341
425
484
128
1,104
1,332
144
2,436
86
112
60
1,752
456
1,024
413
100
1,386
258
102
1,248
85
336
2,832
1,860
329
141
45
408
556
99
712
1,000
546
1,460
1,320
686
828
432
1,134
2,691
413
442
475
388
1,230
186
735
L-Bar
88
34
42
11
341
85
121
16
46
222
144
116
43
112
60
219
228
128
59
100
99
86
34
104
85
28
118
93
47
141
15
34
139
99
89
250
78
146
66
98
69
54
126
207
59
17
95
97
246
93
105
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/20/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
CI
CMI
8
2
7
8
10
34
2
13
1
9
1
10
4
25
19
1
3
4
3
11
18
1
11
2
9
36
4
11
10
6
30
1
20
2
9
15
12
75
11
24
7
5
2
2
5
6
6
6
4
12
3
944
144
1,344
904
510
4,148
194
1,456
111
414
145
980
44
1,200
1,482
186
375
392
555
1,012
1,530
144
1,694
46
414
1,728
424
506
1,110
666
1,350
44
860
84
882
525
528
10,500
671
1,392
1,218
350
94
86
925
1,560
894
120
36
96
228
L-Bar
118
72
192
113
51
122
97
112
111
46
145
98
11
48
78
186
125
98
185
92
85
144
154
23
46
48
106
46
111
111
45
44
43
42
98
35
44
140
61
58
174
70
47
43
185
260
149
20
9
8
76
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
CI
CMI
8
10
9
3
8
3
3
1
8
15
19
5
128
8
7
4
2
19
7
10
11
3
1
5
2
5
23
1
4
10
8
1
10
20
20
8
3
4
1
11
10
5
12
3
13
9
1
3
17
9
20
232
160
135
462
888
183
300
109
1,080
165
1,729
1,505
3,456
624
735
700
88
2,337
14
730
2,002
975
161
115
174
200
1,786
234
340
220
1,456
49
60
960
2,060
120
339
312
37
1,188
90
655
780
975
767
1,116
41
63
1,955
216
4,340
L-Bar
29
16
15
154
111
61
100
109
135
11
91
301
27
78
105
175
44
123
2
73
182
325
161
23
87
40
81
234
85
22
182
49
6
48
103
15
113
78
37
108
9
131
65
325
59
124
41
21
115
24
217
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/21/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
CI
CMI
1
4
3
30
11
1
10
21
1
3
9
13
15
1
3
9
1
3
6
18
3
38
7
12
18
3
10
2
3
6
14
7
29
12
32
11
26
9
2
1
8
10
10
8
8
1
7
1
8
13
11
200
76
309
1,680
1,067
61
920
1,176
86
234
315
104
2,640
115
96
693
162
639
756
2,268
612
5,054
938
2,040
3,186
75
1,960
246
429
558
742
1,085
11,049
1,152
11,072
22
3,848
1,008
76
11
32
760
1,420
1,624
832
148
105
81
1,376
1,040
165
L-Bar
200
19
103
56
97
61
92
56
86
78
35
8
176
115
32
77
162
213
126
126
204
133
134
170
177
25
196
123
143
93
53
155
381
96
346
2
148
112
38
11
4
76
142
203
104
148
15
81
172
80
15
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/22/2014
1/23/2014
1/23/2014
1/23/2014
CI
CMI
6
11
3
19
5
8
4
9
7
8
2
3
8
7
8
7
1
30
4
2
5
4
4
15
2
7
5
7
14
1
9
11
12
11
1
2
1
5
27
11
7
1
7
11
2
14
1
1
11
6
5
726
880
168
266
370
1,240
116
414
546
472
410
93
848
98
880
735
41
810
276
134
370
312
2,752
1,485
332
224
330
805
392
24
549
550
1,980
44
133
192
16
305
2,619
110
602
21
546
528
314
1,092
60
68
1,133
876
670
L-Bar
121
80
56
14
74
155
29
46
78
59
205
31
106
14
110
105
41
27
69
67
74
78
688
99
166
32
66
115
28
24
61
50
165
4
133
96
16
61
97
10
86
21
78
48
157
78
60
68
103
146
134
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
CI
CMI
3
16
5
1
1
10
1
3
6
4
3
3
6
5
10
4
38
6
2
14
53
2
1
2
40
5
7
36
8
12
7
1
2
3
15
1
5
1
4
3
13
11
4
12
2
8
8
4
1
4
8
528
1,552
1,245
234
93
1,900
175
429
726
872
801
417
498
1,145
380
584
4,978
918
112
126
8,003
150
78
448
5,440
215
329
3,564
8
192
511
45
274
486
585
217
1,590
184
784
144
4,433
3,773
200
1,560
298
1,040
1,336
388
45
364
360
L-Bar
176
97
249
234
93
190
175
143
121
218
267
139
83
229
38
146
131
153
56
9
151
75
78
224
136
43
47
99
1
16
73
45
137
162
39
217
318
184
196
48
341
343
50
130
149
130
167
97
45
91
45
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/23/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
CI
CMI
14
6
10
6
10
1
7
1
8
13
25
4
15
2
6
4
8
4
10
8
7
6
1
5
10
1
4
7
4
1
7
8
8
4
12
3
6
9
3
3
1
2
4
4
1
11
7
5
24
24
1
1,330
522
210
192
1,210
122
483
112
832
936
1,775
248
915
152
492
516
880
436
850
888
448
408
146
310
1,460
93
232
700
348
129
98
392
768
364
96
285
276
117
72
180
38
378
468
236
229
1,837
777
370
3,672
4,296
181
L-Bar
95
87
21
32
121
122
69
112
104
72
71
62
61
76
82
129
110
109
85
111
64
68
146
62
146
93
58
100
87
129
14
49
96
91
8
95
46
13
24
60
38
189
117
59
229
167
111
74
153
179
181
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
CI
CMI
6
8
8
1
36
38
1
1
39
10
8
10
32
8
31
5
5
1
5
5
4
36
15
4
2
1
9
13
3
2
7
3
7
7
8
4
1
2
2
1
1
7
5
2
1
5
7
3
9
5
10
222
680
1,080
107
7,884
8,474
233
220
8,151
1,030
80
540
3,296
1,240
12,834
795
1,260
366
1,000
965
196
3,636
1,605
140
640
80
54
1,079
246
236
1,036
75
413
1,057
712
420
157
308
194
116
173
875
655
144
51
505
56
210
81
485
220
L-Bar
37
85
135
107
219
223
233
220
209
103
10
54
103
155
414
159
252
366
200
193
49
101
107
35
320
80
6
83
82
118
148
25
59
151
89
105
157
154
97
116
173
125
131
72
51
101
8
70
9
97
22
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/24/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/25/2014
1/26/2014
1/26/2014
1/26/2014
1/26/2014
1/26/2014
1/26/2014
1/26/2014
1/26/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
CI
CMI
16
4
3
93
12
3
12
4
12
1
6
1
12
8
2
1
1
6
6
1
42
9
6
3
8
130
1
1
16
1
1
1
31
14
6
1
7
11
8
16
8
27
34
1
8
4
33
6
7
7
2
992
1,148
492
20,373
1,404
219
1,080
72
1,044
40
258
9
1,464
264
28
459
45
2,388
246
439
10,542
2,745
1,752
372
56
520
81
42
2,528
410
201
187
3,100
1,372
114
144
1,183
1,265
1,080
2,400
936
1,134
5,100
118
624
556
11,583
588
980
777
616
L-Bar
62
287
164
241
117
73
90
18
87
40
43
9
122
33
14
459
45
398
41
439
251
305
292
124
7
4
81
42
158
410
201
187
100
98
19
144
169
115
135
150
117
42
150
118
78
139
351
98
140
111
308
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
CI
CMI
41
5
13
3
3
4
5
10
3
2
9
5
2
4
10
10
15
13
6
4
8
6
8
6
8
8
9
9
8
74
8
10
32
122
9
3
33
8
12
8
1
8
5
8
2
4
9
4
2
19
9
6,847
620
26
162
162
216
1,210
1,040
282
6
252
325
136
1,040
2,580
1,030
2,175
1,911
318
284
2,152
1,272
2,392
1,398
120
864
963
1,557
600
9,768
48
750
256
3,172
45
42
5,148
424
504
832
156
640
400
1,432
360
364
270
144
340
722
540
L-Bar
167
124
2
54
54
54
242
104
94
3
28
65
68
260
258
103
145
147
53
71
269
212
299
233
15
108
107
173
75
132
6
75
8
26
5
14
156
53
42
104
156
80
80
179
180
91
30
36
170
38
60
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/27/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
CI
CMI
8
25
8
11
2
6
4
31
1
1
1
2
9
8
11
7
10
10
80
12
5
4
8
1
6
6
6
33
11
7
7
8
4
4
5
7
8
12
3
12
4
6
3
46
1
11
4
6
9
8
12
136
2,275
104
440
144
672
524
1,302
210
72
41
46
1,125
1,104
1,463
910
1,570
590
10,800
2,124
230
460
3,184
70
72
498
840
924
1,067
679
854
1,992
1,036
408
275
616
456
1,548
348
5,796
292
1,116
495
3,036
80
2,717
388
816
675
312
264
L-Bar
17
91
13
40
72
112
131
42
210
72
41
23
125
138
133
130
157
59
135
177
46
115
398
70
12
83
140
28
97
97
122
249
259
102
55
88
57
129
116
483
73
186
165
66
80
247
97
136
75
39
22
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/28/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
CI
CMI
4
6
3
13
4
6
3
1
10
4
1
1
9
5
19
4
11
14
8
8
1
20
11
11
12
3
9
1
13
13
21
13
4
4
8
8
15
7
8
8
2
4
33
105
6
9
6
8
12
8
3
652
660
231
637
28
660
570
334
580
584
97
199
792
310
2,166
168
913
1,456
496
768
391
740
715
44
1,272
489
351
284
1,625
1,612
1,554
715
244
404
832
360
105
168
312
400
246
156
495
4,725
708
1,035
312
2,384
1,656
272
258
L-Bar
163
110
77
49
7
110
190
334
58
146
97
199
88
62
114
42
83
104
62
96
391
37
65
4
106
163
39
284
125
124
74
55
61
101
104
45
7
24
39
50
123
39
15
45
118
115
52
298
138
34
86
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
CI
CMI
6
2
13
3
11
1
17
20
2
9
13
12
1
10
1
3
2
2
1
8
11
7
4
14
11
8
24
12
8
1
8
32
1
9
16
11
1
22
2
32
1
12
3
15
17
3
20
9
1
8
2
726
458
988
459
528
91
391
340
180
693
923
912
113
550
65
210
92
150
96
416
836
70
176
42
2,090
224
2,232
816
920
66
376
2,752
50
1,143
32
825
23
1,650
166
8,512
38
1,344
42
540
1,496
141
120
963
96
792
118
L-Bar
121
229
76
153
48
91
23
17
90
77
71
76
113
55
65
70
46
75
96
52
76
10
44
3
190
28
93
68
115
66
47
86
50
127
2
75
23
75
83
266
38
112
14
36
88
47
6
107
96
99
59
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/29/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
CI
CMI
4
19
13
1
6
21
9
3
5
2
15
8
425
5
10
1
1
1
7
12
9
4
8
4
8
5
1
8
3
4
4
4
6
9
12
11
3
8
9
6
6
1
9
6
10
9
5
6
12
19
14
460
570
1,105
47
492
2,226
36
21
210
72
90
152
7,225
810
370
452
35
120
546
1,860
774
460
408
304
3,176
625
169
1,696
357
136
388
780
2,220
1,710
372
583
591
1,368
1,458
1,356
1,356
100
1,269
666
120
81
620
1,230
144
5,187
756
L-Bar
115
30
85
47
82
106
4
7
42
36
6
19
17
162
37
452
35
120
78
155
86
115
51
76
397
125
169
212
119
34
97
195
370
190
31
53
197
171
162
226
226
100
141
111
12
9
124
205
12
273
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/30/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
CI
CMI
6
3
20
7
3
12
29
5
6
15
10
11
8
2
4
3
3
8
4
184
12
8
1
5
2
12
1
1
6
31
6
3
2
8
8
7
8
4
34
5
4
2
2
1
3
11
4
12
5
1
5
306
3
1,280
1,008
27
564
6,960
450
84
1,350
710
770
104
116
128
15
87
616
348
2,208
156
368
57
615
176
1,116
220
196
480
5,611
714
135
280
1,824
1,568
609
56
396
3,944
360
992
304
120
229
246
352
552
2,616
655
613
455
L-Bar
51
1
64
144
9
47
240
90
14
90
71
70
13
58
32
5
29
77
87
12
13
46
57
123
88
93
220
196
80
181
119
45
140
228
196
87
7
99
116
72
248
152
60
229
82
32
138
218
131
613
91
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
1/31/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/1/2014
2/2/2014
2/2/2014
2/2/2014
2/2/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
CI
CMI
5
6
1
1
4
10
10
6
3
5
14
1
17
6
1
8
1
2
1
1
10
1
74
5
3
5
3
7
1
18
6
10
2
1
77
1
22
1
2
2
2
1
5
4
1
3
18
20
8
1
7
400
222
56
157
20
40
330
456
351
240
70
29
1,462
264
37
368
299
88
6
116
1,680
179
7,770
635
756
1,005
984
1,218
51
2,808
900
970
40
126
1,386
114
2,772
300
358
224
386
140
690
788
145
399
1,638
980
56
386
1,155
L-Bar
80
37
56
157
5
4
33
76
117
48
5
29
86
44
37
46
299
44
6
116
168
179
105
127
252
201
328
174
51
156
150
97
20
126
18
114
126
300
179
112
193
140
138
197
145
133
91
49
7
386
165
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
CI
CMI
1
5
10
24
5
2
52
3
10
16
10
12
25
8
12
3
12
4
11
3
2
16
10
3
1
8
9
7
1
13
8
1
14
10
13
6
6
4
1
8
3
4
15
8
21
14
12
5
28
5
2
157
340
1,920
1,272
10
658
22,828
846
990
1,840
130
1,224
2,475
2,704
960
123
1,284
552
2,805
108
210
160
1,000
78
208
16
1,242
630
118
4,693
1,144
10
2,072
160
52
480
1,014
180
127
304
414
412
345
784
756
1,036
1,236
115
3,388
180
186
L-Bar
157
68
192
53
2
329
439
282
99
115
13
102
99
338
80
41
107
138
255
36
105
10
100
26
208
2
138
90
118
361
143
10
148
16
4
80
169
45
127
38
138
103
23
98
36
74
103
23
121
36
93
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/3/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
CI
CMI
5
13
6
12
4
1
9
12
6
2
9
8
5
7
12
1
11
6
4
5
4
2
1
1
18
4
1
1
5
8
1
1
15
2
8
3
1
6
5
8
1
6
1
15
5
5
3
5
8
5
25
340
2,002
444
1,896
372
58
1,386
192
912
110
243
584
840
581
1,044
134
484
624
180
710
288
444
220
85
3,492
316
60
210
710
520
5
68
2,655
40
1,336
957
579
306
475
216
72
678
14
1,530
355
615
189
925
384
325
5,600
L-Bar
68
154
74
158
93
58
154
16
152
55
27
73
168
83
87
134
44
104
45
142
72
222
220
85
194
79
60
210
142
65
5
68
177
20
167
319
579
51
95
27
72
113
14
102
71
123
63
185
48
65
224
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
CI
CMI
11
5
1
1
7
7
1
8
1
3
23
3
16
7
17
1
2
8
7
52
8
2
6
8
4
3
11
3
6
3
4
22
14
4
12
3
14
5
27
1
1
9
2
1
3
10
17
8
15
7
14
253
685
281
121
721
742
104
1,904
233
351
322
435
704
931
952
171
252
840
238
6,500
304
194
2,334
408
428
57
11
540
762
111
256
748
574
212
588
165
2,198
55
1,593
30
188
846
332
184
315
3,270
918
184
825
1,050
826
L-Bar
23
137
281
121
103
106
104
238
233
117
14
145
44
133
56
171
126
105
34
125
38
97
389
51
107
19
1
180
127
37
64
34
41
53
49
55
157
11
59
30
188
94
166
184
105
327
54
23
55
150
59
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/4/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
CI
CMI
9
3
12
5
5
4
6
2
1
1
2
2
58
1
6
1
11
5
3
13
4
9
1
4
6
1
9
5
21
1
1
1
5
18
3
1
18
9
1
1
1
1
3
21
1
17
1
9
8
8
8
423
744
2,304
820
150
112
162
374
37
9
60
134
1,334
44
810
92
682
225
123
1,313
368
900
115
644
420
267
153
815
3,654
212
82
20
100
486
453
16
1,098
198
154
153
108
229
603
1,218
167
2,006
47
1,035
624
1,392
688
L-Bar
47
248
192
164
30
28
27
187
37
9
30
67
23
44
135
92
62
45
41
101
92
100
115
161
70
267
17
163
174
212
82
20
20
27
151
16
61
22
154
153
108
229
201
58
167
118
47
115
78
174
86
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
CI
CMI
1
5
1
151
6
5
6
59
9
1
11
1
3
11
11
2
1
5
4
7
95
8
18
8
17
3
17
17
5
15
1
2
1
1
3
1
6
1
9
12
9
4
4
9
5
2
7
1
1
7
6
85
810
36
34,428
1,266
1,490
966
5,900
612
69
66
134
435
1,445
1,518
280
308
1,640
324
840
15,865
1,352
1,458
400
1,479
204
3,825
1,462
500
2,055
6
230
265
24
111
69
1,140
59
756
1,500
585
224
484
360
435
184
679
45
25
553
492
L-Bar
85
162
36
228
211
298
161
100
68
69
6
134
145
231
138
140
308
328
81
120
167
169
81
50
87
68
225
86
100
137
6
115
265
24
37
69
190
59
84
125
65
56
121
40
87
92
97
45
25
79
82
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/5/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
CI
CMI
8
18
14
124
2
1
1
4
6
1
8
10
7
9
1
6
18
5
12
5
3
13
6
2
12
2
5
7
1
4
5
3
5
7
1
2
3
6
4
1
23
1
3
1
11
9
19
8
3
6
1
832
1,296
1,652
26,660
190
22
122
192
654
121
752
900
644
801
105
396
918
330
1,248
405
633
2,262
420
186
1,080
64
40
98
58
124
195
48
1,040
392
157
316
171
204
360
53
5,727
172
546
83
935
1,044
8,968
504
393
228
247
L-Bar
104
72
118
215
95
22
122
48
109
121
94
90
92
89
105
66
51
66
104
81
211
174
70
93
90
32
8
14
58
31
39
16
208
56
157
158
57
34
90
53
249
172
182
83
85
116
472
63
131
38
247
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
CI
CMI
3
2
41
1
4
1
6
3
9
7
5
4
4
13
3
7
19
17
22
17
6
5
12
8
20
12
1
5
3
4
3
2
8
7
3
5
7
2
4
3
3
6
13
3
16
2
13
19
8
1
1
429
284
5,494
145
904
35
708
168
2,223
539
405
468
184
533
537
357
304
170
1,122
901
1,398
400
1,488
1,336
1,960
24
80
390
294
396
642
216
1,072
756
360
1,050
728
234
324
402
63
60
2,392
870
2,112
162
611
2,600
2,080
231
84
L-Bar
143
142
134
145
226
35
118
56
247
77
81
117
46
41
179
51
16
10
51
53
233
80
124
167
98
2
80
78
98
99
214
108
134
108
120
210
104
117
81
134
21
10
184
290
132
81
47
200
260
231
84
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/6/2014
2/7/2014
2/7/2014
CI
CMI
24
4
2
13
3
5
10
7
8
7
11
44
15
13
1
8
17
7
7
11
8
2
2
4
10
2
1
6
58
3
44
1
8
1
4
8
6
11
6
3
5
1
2
3
2
2
1
5
1
1
1
2,544
592
54
1,079
585
280
700
224
1,056
945
1,287
264
1,605
1,040
1
656
102
1,148
588
1,122
504
244
202
608
1,020
234
58
82
464
30
2,860
232
872
42
84
512
42
572
198
282
400
27
56
75
48
146
25
390
6
231
79
L-Bar
106
148
27
83
195
56
70
32
132
135
117
6
107
80
1
82
6
164
84
102
63
122
101
152
102
117
58
39
8
10
65
232
109
42
21
64
7
52
33
94
80
27
28
25
24
73
25
78
6
231
79
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
CI
CMI
3
2
1
5
27
48
2
6
6
1
5
8
1
25
5
2
2
3
2
10
8
6
15
4
8
6
4
8
1
3
3
12
25
6
27
1
3
8
4
3
5
8
1
1
4
19
3
7
1
6
39
579
162
130
1,130
4,158
14,064
298
270
288
100
60
336
195
1,875
625
134
66
120
138
990
1,712
1,242
1,515
408
784
552
96
50
55
27
48
60
425
54
2,349
43
246
440
300
156
335
280
174
44
468
1,995
69
1,008
36
384
117
L-Bar
193
81
130
226
154
293
149
45
48
100
12
42
195
75
125
67
33
40
69
99
214
207
101
102
98
92
24
43
55
9
16
5
17
9
87
43
82
55
75
52
67
35
174
44
117
105
23
144
36
64
3
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/7/2014
2/8/2014
2/8/2014
2/8/2014
2/8/2014
2/8/2014
2/8/2014
2/8/2014
2/9/2014
2/9/2014
2/9/2014
2/9/2014
2/9/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
CI
CMI
10
8
7
13
4
3
4
4
1
2
3
2
2
38
6
15
1
1
1
1
1
15
11
12
9
15
5
24
8
8
6
7
15
7
9
1
11
5
6
8
3
4
1
8
1
26
9
7
3
1
8
380
256
182
156
356
261
88
240
122
4
792
344
316
8,854
828
2,610
37
365
165
83
149
945
572
900
1,314
495
885
1,632
248
440
546
609
2,265
294
18
148
1,639
300
774
600
174
272
220
1,592
200
3,952
864
1,148
57
307
1,520
L-Bar
38
32
26
12
89
87
22
60
122
2
264
172
158
233
138
174
37
365
165
83
149
63
52
75
146
33
177
68
31
55
91
87
151
42
2
148
149
60
129
75
58
68
220
199
200
152
96
164
19
307
190
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
CI
CMI
2
6
8
4
8
52
9
5
2
20
3
8
5
10
8
19
6
247
15
6
7
5
9
17
3
6
18
2
1
6
10
3
27
3
2
8
11
7
4
18
1
11
14
15
2
18
1
6
5
7
4
388
1,314
1,672
872
824
11,128
144
585
74
1,620
348
40
280
730
40
1,596
480
10,621
2,190
444
546
310
1,602
1,955
48
378
108
136
83
1,050
670
315
1,080
189
194
544
165
553
448
1,512
19
220
1,960
60
162
468
28
426
565
322
520
L-Bar
194
219
209
218
103
214
16
117
37
81
116
5
56
73
5
84
80
43
146
74
78
62
178
115
16
63
6
68
83
175
67
105
40
63
97
68
15
79
112
84
19
20
140
4
81
26
28
71
113
46
130
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/10/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
CI
CMI
10
1
2
4
3
32
5
1
8
6
1
12
18
4
3
2
9
6
38
5
11
2
7
6
6
11
1
13
4
89
2
7
32
7
8
2
9
1
1
1
14
1
1
5
103
14
1
4
5
9
4
140
154
210
192
285
1,216
65
321
536
600
49
852
2,196
340
318
214
603
918
494
900
781
344
924
1,392
90
770
34
3,029
72
1,780
400
147
9,856
441
2,800
402
594
2
84
273
210
76
31
880
1,751
798
122
356
475
819
144
L-Bar
14
154
105
48
95
38
13
321
67
100
49
71
122
85
106
107
67
153
13
180
71
172
132
232
15
70
34
233
18
20
200
21
308
63
350
201
66
2
84
273
15
76
31
176
17
57
122
89
95
91
36
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/11/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
CI
CMI
1
6
5
4
5
1
2
6
2
25
1
8
1
2
1
6
4
7
9
8
14
8
6
7
7
2
1
7
5
8
7
1
26
3
6
1
13
1
3
15
9
4
2
1
1
9
1
10
32
6
38
68
258
610
488
595
314
204
468
174
2,800
56
760
30
134
231
90
680
567
468
600
280
144
54
441
889
252
59
364
450
600
518
34
1,430
273
444
115
1,378
138
261
1,110
171
320
156
31
111
657
305
500
3,840
726
380
L-Bar
68
43
122
122
119
314
102
78
87
112
56
95
30
67
231
15
170
81
52
75
20
18
9
63
127
126
59
52
90
75
74
34
55
91
74
115
106
138
87
74
19
80
78
31
111
73
305
50
120
121
10
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
CI
CMI
3
4
1
2
84
5
11
4
6
32
8
6
6
8
9
10
12
111
4
4
1
5
63
5
3
3
7
12
1
2
1
9
3
12
2
1
1
9
107
2
1
5
13
4
7
85
30
7
8
2
12
723
224
60
810
4,116
655
825
420
90
128
184
438
48
536
585
1,390
3,096
22,200
464
180
134
545
1,197
1,525
558
465
581
1,656
28
334
29
288
690
672
266
33
16
729
19,153
140
5
400
1,261
168
910
14,450
1,560
364
32
174
780
L-Bar
241
56
60
405
49
131
75
105
15
4
23
73
8
67
65
139
258
200
116
45
134
109
19
305
186
155
83
138
28
167
29
32
230
56
133
33
16
81
179
70
5
80
97
42
130
170
52
52
4
87
65
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/12/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
CI
CMI
5
3
6
6
17
5
631
1
2
1
1
1
10
10
16
26
8
6
1
1
6
6
4
9
13
1
4
3
4
7
1
2
2
2
9
12
6
8
1
10
12
12
6
6
2
5
2
6
2
6
2
350
60
438
600
1,530
650
3,155
36
120
73
387
116
630
640
1,152
2,990
400
474
60
18
264
402
168
1,260
1,521
72
492
519
404
707
113
288
480
234
1,116
636
846
1,120
126
1,010
444
3,228
546
540
72
475
420
390
192
498
74
L-Bar
70
20
73
100
90
130
5
36
60
73
387
116
63
64
72
115
50
79
60
18
44
67
42
140
117
72
123
173
101
101
113
144
240
117
124
53
141
140
126
101
37
269
91
90
36
95
210
65
96
83
37
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/13/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
CI
CMI
2
10
5
8
6
33
16
13
19
4
3
9
4
6
8
2
8
8
3
7
1
2
6
13
1
1
1
1
4
20
3
8
1
8
10
7
7
8
3
8
7
11
1
7
12
3
14
1
6
2
3
226
890
545
1,432
330
3,135
2,128
1,248
38
128
123
207
300
1,188
120
30
320
480
174
385
193
20
348
1,144
103
152
35
96
448
1,940
891
56
155
176
280
581
574
1,632
363
2,456
1,960
638
79
1,057
648
219
1,554
54
408
198
351
L-Bar
113
89
109
179
55
95
133
96
2
32
41
23
75
198
15
15
40
60
58
55
193
10
58
88
103
152
35
96
112
97
297
7
155
22
28
83
82
204
121
307
280
58
79
151
54
73
111
54
68
99
117
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/14/2014
2/15/2014
2/15/2014
2/15/2014
2/15/2014
2/15/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/16/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
CI
CMI
6
9
3
12
1
2
3
1
3
1
18
1
1
10
14
1
4
9
9
15
11
9
13
4
1
5
7
6
6
11
10
5
1
2
5
1
7
14
12
31
13
12
7
1
5
33
1
3
18
13
2
702
243
42
888
200
116
1,182
107
312
139
3,672
119
382
1,800
4,494
285
606
1,908
1,085
180
2,464
423
4,212
252
176
345
448
564
462
3,234
1,080
345
109
124
440
135
56
210
1,032
3,410
832
816
210
177
420
1,287
16
660
144
2,327
104
L-Bar
117
27
14
74
200
58
394
107
104
139
204
119
382
180
321
285
168
212
141
12
224
47
324
63
176
69
64
94
77
294
108
69
109
62
88
135
8
15
86
110
64
68
30
177
84
39
16
220
8
179
52
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/17/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
CI
CMI
4
4
3
8
4
14
2
7
6
1
12
2
10
15
7
11
6
14
7
4
31
2
4
8
4
3
21
10
7
5
1
8
1
6
12
9
24
4
5
4
6
4
6
12
1
1
6
3
5
1
7
240
244
816
696
232
2,436
38
553
246
57
624
176
950
375
469
704
546
504
371
96
248
134
256
312
240
387
3,717
530
553
460
154
96
149
504
3,204
693
2,760
300
805
1,444
1,170
344
1,998
1,032
20
18
450
186
390
101
749
L-Bar
60
61
272
87
58
174
19
79
41
57
52
88
95
25
67
64
91
36
53
24
8
67
64
39
60
129
177
53
79
92
154
12
149
84
267
77
115
75
161
361
195
86
333
86
20
18
75
62
78
101
107
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
2/18/2014
CI
CMI
3
13
10
8
49
1
1
25
8
8
151
11
1
3
5
5
1
8
1
12
9
1
11
8
1
12
1
10
25
6
8
4
10
5
15
10
6
6
8
25
6
2
1
5
5
3
9
9
8
13
2
183
39
340
1,160
11,074
138
52
3,150
128
64
65,383
803
18
375
70
1,030
82
224
4
1,044
2,376
155
2,266
1,016
112
612
72
1,090
2,825
222
280
512
140
500
1,485
790
288
420
120
6,500
366
264
9
305
545
294
576
216
528
130
136
L-Bar
61
3
34
145
226
138
52
126
16
8
433
73
18
125
14
206
82
28
4
87
264
155
206
127
112
51
72
109
113
37
35
128
14
100
99
79
48
70
15
260
61
132
9
61
109
98
64
24
66
10
68
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
2/18/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
CI
CMI
5
34
9
8
7
8
23
11
55
8
1
15
2
13
3
1
9
30
3
7
4
8
3
5
5
19
2
2
2
2
2
3
6
2
1
5
1
9
2
7
2
7
7
1
8
16
10
45
6
8
7
495
2,142
594
1,960
952
720
2,760
99
7,645
1,472
113
1,605
362
1,690
198
197
2,430
1,530
51
987
68
1,376
468
560
380
1,501
226
340
108
254
446
117
432
76
78
935
274
351
196
518
108
462
707
51
792
896
1,090
5,445
372
632
406
L-Bar
99
63
66
245
136
90
120
9
139
184
113
107
181
130
66
197
270
51
17
141
17
172
156
112
76
79
113
170
54
127
223
39
72
38
78
187
274
39
98
74
54
66
101
51
99
56
109
121
62
79
58
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/19/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
CI
CMI
6
1
4
11
9
1
17
8
8
14
6
2
2
8
1
8
2
9
9
11
1
2
2
6
36
6
2
6
8
6
6
1
29
7
4
3
1
4
11
23
3
8
5
11
11
5
3
8
11
4
4
288
73
156
33
333
39
1,241
760
880
1,918
546
146
166
664
25
512
106
117
279
1,749
572
488
172
732
6,372
714
126
618
328
270
456
139
5,278
1,246
592
147
134
44
1,276
1,679
447
800
780
517
550
385
456
56
55
276
524
L-Bar
48
73
39
3
37
39
73
95
110
137
91
73
83
83
25
64
53
13
31
159
572
244
86
122
177
119
63
103
41
45
76
139
182
178
148
49
134
11
116
73
149
100
156
47
50
77
152
7
5
69
131
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
CI
CMI
11
3
13
2
6
8
9
3
8
5
8
26
2
7
5
1
3
2
3
7
39
8
4
9
23
12
4
9
4
2
2
19
2
4
1
3
37
4
4
7
32
4
2
1
5
8
1
2
15
5
4
3,091
321
2,366
554
1,134
304
630
315
24
220
536
2,028
78
497
230
182
420
148
498
308
2,496
224
384
1,980
1,794
540
416
684
428
94
124
684
240
344
56
144
4,884
180
136
140
4,960
100
26
76
655
24
124
224
1,935
700
108
L-Bar
281
107
182
277
189
38
70
105
3
44
67
78
39
71
46
182
140
74
166
44
64
28
96
220
78
45
104
76
107
47
62
36
120
86
56
48
132
45
34
20
155
25
13
76
131
3
124
112
129
140
27
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/20/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
CI
CMI
4
4
12
11
4
10
6
4
2
3
4
2
2
23
10
1
1
7
2
9
10
8
10
14
32
8
8
5
10
6
9
51
12
12
3
2
8
9
20
3
4
149
8
9
14
4
5
29
23
12
14
176
180
552
1,199
372
110
606
328
208
42
268
240
8
805
310
347
102
182
112
1,134
1,260
1,008
1,260
1,358
7,492
248
800
330
1,330
1,002
522
15,096
2,136
1,584
543
92
672
18
260
141
408
20,860
2,464
1,584
182
364
435
87
4,945
132
420
L-Bar
44
45
46
109
93
11
101
82
104
14
67
120
4
35
31
347
102
26
56
126
126
126
126
97
336
31
100
66
133
167
58
296
178
132
181
46
84
2
13
47
102
140
308
176
13
91
87
3
215
11
30
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/21/2014
2/22/2014
2/22/2014
2/22/2014
2/22/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/23/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
CI
1
4
5
7
1
9
10
10
13
7
1
22
14
13
4
1,682
3
22
3
12
4
1
17
2
1
3
1
5
12
6
4
8
2
11
14
1
5
3
23
15
11
3
8
8
2
6
8
15
6
31
4
CMI
30
204
400
252
71
837
1,590
920
1,183
49
71
352
2,534
3,185
136
68,962
627
3,344
516
2,376
32
53
3,451
826
151
69
48
760
156
288
592
1,344
154
770
2,310
75
540
405
1,081
60
660
135
448
872
192
1,452
776
750
492
6,727
404
L-Bar
30
51
80
36
71
93
159
92
91
7
71
16
181
245
34
41
209
152
172
198
8
53
203
413
151
23
48
152
13
48
148
168
77
70
165
75
108
135
47
4
60
45
56
109
96
242
97
50
82
217
101
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
CI
CMI
16
4
4
3
4
22
9
13
7
2
5
8
1
2
12
1
5
8
7
8
9
58
5
4
5
5
5
2
4
4
10
18
4
4
5
7
5
2
3
6
4
1
40
9
2
2
5
4
12
3
4
2,272
12
72
294
592
2,156
1,242
559
1,484
252
495
752
47
192
2,436
138
710
40
623
560
774
9,628
70
52
195
60
55
20
40
36
1,010
1,674
488
400
485
539
465
154
186
528
556
155
5,000
189
324
68
290
304
60
222
436
L-Bar
142
3
18
98
148
98
138
43
212
126
99
94
47
96
203
138
142
5
89
70
86
166
14
13
39
12
11
10
10
9
101
93
122
100
97
77
93
77
62
88
139
155
125
21
162
34
58
76
5
74
109
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/24/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
CI
CMI
4
2
4
2
2
7
2
17
1
8
7
8
1
1
7
6
6
2
4
5
4
7
5
4
10
1
5
1
2
9
165
5
29
13
6
8
62
7
19
17
23
18
8
2
2
4
4
1
3
2
8
196
242
12
68
134
672
274
374
35
624
1,260
344
56
33
1,106
768
396
244
280
965
332
1,218
470
36
1,220
394
295
150
1,018
585
26,730
965
5,162
676
330
832
10,850
364
3,800
408
2,576
3,474
120
246
106
572
344
167
549
490
720
L-Bar
49
121
3
34
67
96
137
22
35
78
180
43
56
33
158
128
66
122
70
193
83
174
94
9
122
394
59
150
509
65
162
193
178
52
55
104
175
52
200
24
112
193
15
123
53
143
86
167
183
245
90
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/25/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
CI
CMI
6
1
3
8
12
6
3
5
2
6
9
4
3
3
4
7
1
25
2
14
6
1
1
11
4
23
4
4
5
1
6
4
9
1
27
4
1
1
13
26
3
62
1
6
1
41
8
2
5
2
11
2,112
137
366
200
72
462
387
85
114
414
297
100
153
159
320
350
87
2,700
274
70
990
12
7
33
304
1,196
460
300
500
101
696
556
270
51
2,565
56
105
277
3,549
2,730
336
27,714
234
870
241
10,496
1,824
162
460
178
836
L-Bar
352
137
122
25
6
77
129
17
57
69
33
25
51
53
80
50
87
108
137
5
165
12
7
3
76
52
115
75
100
101
116
139
30
51
95
14
105
277
273
105
112
447
234
145
241
256
228
81
92
89
76
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
CI
CMI
2
11
5
8
15
6
43
1
1
9
5
4
7
8
1
4
3
6
4
4
7
24
21
9
1
8
4
5
50
43
5
10
16
43
4
45
3
2
32
4
2
3
1
9
3
14
4
2
8
29
4
314
1,232
490
848
5,700
576
516
60
322
990
55
484
105
552
70
1,256
174
330
492
272
868
4,128
2,247
1,188
145
136
368
220
1,650
301
505
960
3,184
3,612
288
13,950
396
58
1,696
312
270
33
129
693
546
1,036
320
248
432
2,929
400
L-Bar
157
112
98
106
380
96
12
60
322
110
11
121
15
69
70
314
58
55
123
68
124
172
107
132
145
17
92
44
33
7
101
96
199
84
72
310
132
29
53
78
135
11
129
77
182
74
80
124
54
101
100
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/26/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
CI
CMI
4
7
19
8
5
11
11
4
3
3
1
6
3
11
5
1
3
4
3
16
6
7
31
1
1
8
7
10
16
5
1
9
4
8
1
8
1
18
16
6
3
3
6
4
3
9
5
12
4
2
5
436
112
1,387
808
455
924
814
232
306
561
104
546
402
528
185
83
249
136
87
176
120
707
4,402
230
360
776
413
120
1,344
205
85
2,169
592
32
442
1,184
235
504
3,248
120
126
1,287
1,374
680
45
612
505
2,604
304
414
425
L-Bar
109
16
73
101
91
84
74
58
102
187
104
91
134
48
37
83
83
34
29
11
20
101
142
230
360
97
59
12
84
41
85
241
148
4
442
148
235
28
203
20
42
429
229
170
15
68
101
217
76
207
85
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/27/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
CI
CMI
16
21
11
4
4
7
6
1
6
4
4
2
8
12
8
1
3
2
7
1
8
1
1
1
2
8
72
1
2
11
3
7
2
10
1
2
5
4
14
1
7
21
25
1
1
14
1
8
8
5
1
624
1,974
297
888
712
161
324
10
648
348
568
432
456
1,032
560
164
228
538
266
80
848
97
10
17
190
1,408
432
39
214
1,067
228
91
96
430
77
96
885
356
1,834
217
147
4,956
8,475
163
87
2,478
221
1,592
1,592
460
92
L-Bar
39
94
27
222
178
23
54
10
108
87
142
216
57
86
70
164
76
269
38
80
106
97
10
17
95
176
6
39
107
97
76
13
48
43
77
48
177
89
131
217
21
236
339
163
87
177
221
199
199
92
92
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
2/28/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/1/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
CI
CMI
6
1
5
5
85
2
17
17
19
3
5
3
1
42
16
1
4
4
12
5
2
1
2
2
1
3
9
4
6
2
13
2
8
1
1
1
1
2
1
5
2
20
2
23
8
1
1
5
7
1
1
636
102
345
1,345
11,815
576
2,652
2,482
2,774
108
470
27
161
3,528
1,216
38
1,056
314
1,632
1,000
82
1
224
44
223
207
144
332
198
36
130
126
72
156
80
494
113
638
132
485
228
80
420
7,636
280
82
272
1,100
763
229
299
L-Bar
106
102
69
269
139
288
156
146
146
36
94
9
161
84
76
38
264
101
136
200
41
1
112
22
223
69
16
83
33
18
10
63
9
156
80
494
113
319
132
97
114
4
210
332
35
82
272
220
109
229
299
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/2/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
CI
CMI
1
1
4
8
1
2
5
8
15
7
12
3
2
101
9
6
4
3
5
3
13
9
14
12
8
32
3
7
15
3
9
9
1
1
3
6
11
1
1
7
3
2
7
8
7
1
1
60
12
12
10
232
232
364
712
40
184
70
640
930
154
1,740
216
284
28,078
1,242
74
356
423
695
765
1,014
108
1,190
1,872
2,856
3,104
357
1,141
2,385
273
747
117
50
135
303
522
1,166
120
70
273
264
50
287
336
56
91
79
1,020
552
984
710
L-Bar
232
232
91
89
40
92
14
80
62
22
145
72
142
278
138
27
89
141
139
255
78
12
85
156
357
97
119
163
159
91
83
13
50
135
101
87
106
120
70
39
88
25
41
42
8
91
79
17
46
82
71
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/3/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
CI
CMI
2
2
2
2
2
13
3
6
6
1
2
11
14
13
3
2
10
11
1
2
1
3
4
11
5
6
7
5
3
14
13
33
3
9
3
5
1
1
7
5
10
15
23
8
11
8
2
1
4
4
1
16
148
254
46
218
1,638
228
18
30
107
52
616
406
403
114
16
310
187
50
140
83
561
168
781
60
864
336
270
264
840
78
2,013
258
1,233
39
705
120
75
1,176
665
530
2,730
3,220
1,232
550
1,088
282
87
492
412
434
L-Bar
8
74
127
23
109
126
76
3
5
107
26
56
29
31
38
8
31
17
50
70
83
187
42
71
12
144
48
54
88
60
6
61
86
137
13
141
120
75
168
133
53
182
140
154
50
136
141
87
123
103
434
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
CI
CMI
2
2
4
2
2
8
15
32
1
15
7
15
1
2
10
12
3
1
9
2
1
3
8
29
6
3
4
9
6
9
7
25
1
7
4
7
11
7
5
11
1
4
9
1
10
1
2
1
36
2
4
866
250
516
266
22
64
1,905
4,864
95
2,265
189
1,950
50
172
400
108
300
61
504
138
134
660
56
4,698
318
1,080
204
450
300
441
1,533
2,250
125
2,023
436
91
748
287
115
396
74
88
504
71
1,790
58
508
37
2,124
232
432
L-Bar
433
125
129
133
11
8
127
152
95
151
27
130
50
86
40
9
100
61
56
69
134
220
7
162
53
360
51
50
50
49
219
90
125
289
109
13
68
41
23
36
74
22
56
71
179
58
254
37
59
116
108
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/4/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
CI
CMI
9
5
4
4
8
16
10
15
9
11
8
16
16
1
2
8
2
3
1
6
1
5
4
4
1
2
5
5
6
6
39
1
4
4
5
2
1
24
3
1
3
21
1
1
1
6
6
1
6
8
1
594
885
704
700
1,392
2,128
1,410
2,160
1,035
539
496
976
1,072
85
60
416
178
276
181
36
126
570
440
152
34
248
640
550
288
222
39
96
956
352
175
84
80
1,752
234
87
312
882
11
155
148
2,304
642
339
216
1,576
60
L-Bar
66
177
176
175
174
133
141
144
115
49
62
61
67
85
30
52
89
92
181
6
126
114
110
38
34
124
128
110
48
37
1
96
239
88
35
42
80
73
78
87
104
42
11
155
148
384
107
339
36
197
60
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
CI
CMI
2
7
1
9
2
4
8
8
3
10
2
10
11
5
6
1
4
7
9
2
16
7
11
1
8
7
8
1
27
27
3
10
1
8
4
4
5
6
23
1
9
16
10
3
13
1
1
7
26
7
12
96
266
358
450
260
156
664
1,000
1,035
1,670
498
1,500
1,617
730
876
116
752
1,092
621
198
2,224
1,435
44
56
1,248
469
400
83
3,186
1,863
345
1,070
27
72
144
1,284
775
504
782
136
252
864
1,100
312
858
109
128
777
4,056
14
828
L-Bar
48
38
358
50
130
39
83
125
345
167
249
150
147
146
146
116
188
156
69
99
139
205
4
56
156
67
50
83
118
69
115
107
27
9
36
321
155
84
34
136
28
54
110
104
66
109
128
111
156
2
69
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/5/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
CI
CMI
4
7
5
9
6
22
4
7
1
3
1
2
14
1
3
8
2
2
9
4
6
34
2
1
3
8
10
2
1
2
1
5
12
1
3
9
1
14
1
9
1
6
1
8
7
4
33
13
3
1
1
304
21
140
801
1,050
440
740
119
71
294
220
366
896
65
531
696
178
292
1,323
20
264
1,972
64
41
105
456
130
204
15
202
104
550
408
97
675
873
188
1,764
131
1,935
55
102
81
1,592
476
424
2,607
3,237
225
152
154
L-Bar
76
3
28
89
175
20
185
17
71
98
220
183
64
65
177
87
89
146
147
5
44
58
32
41
35
57
13
102
15
101
104
110
34
97
225
97
188
126
131
215
55
17
81
199
68
106
79
249
75
152
154
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/6/2014
3/7/2014
CI
CMI
1
50
141
3
8
8
10
15
10
8
16
20
18
17
2
14
10
6
7
20
9
59
5
6
8
6
2
5
25
34
2
3
2
103
8
2
6
3
75
3
4
5
22
8
8
8
1
39
17
30
1
28
4,277
32,994
453
824
112
690
3,720
1,040
240
1,232
1,880
702
340
154
2,982
2,050
1,116
252
2,500
342
59
85
510
784
588
12
725
3,825
2,312
270
306
170
25,853
448
232
498
282
13,050
57
44
554
1,694
736
32
1,480
146
2,847
85
3,270
223
L-Bar
28
106
234
151
103
14
69
248
104
30
77
94
39
20
77
213
205
186
36
125
38
1
17
85
98
98
6
145
153
68
135
102
85
251
56
116
83
94
174
19
11
187
77
92
4
185
146
73
5
109
223
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/7/2014
3/8/2014
CI
CMI
1
1
1
10
3
1
2
3
10
6
4
9
4
6
4
1
4
2
42
1
36
6
3
1
5
4
37
2
37
4
7
5
1
9
1
12
6
44
2
8
9
4
4
6
1
2
2
1
8
1
2
47
1,215
65
340
111
56
268
450
1,970
36
56
792
256
750
96
168
108
290
4,410
19
6,660
72
264
112
75
208
6,734
90
6,734
80
203
165
48
468
283
192
1,104
616
362
536
738
24
152
324
68
152
406
81
168
586
1,268
L-Bar
47
1,215
65
34
37
56
134
150
197
6
14
88
64
125
24
168
27
145
105
19
185
12
88
112
15
52
182
45
182
20
29
33
48
52
283
16
184
14
181
67
82
6
38
54
68
76
203
81
21
586
634
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/8/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/9/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
CI
16
5
1
9
3
2
4
1
1
1,649
22
4
2
4
1
6
2
49
18
31
8
3
6
4
10
12
2
30
1
1
1
1
2
5
7
4
6
4
8
12
1
7
27
1
19
50
9
9
4
9
2
CMI
3,024
420
34
1,773
1,038
240
528
128
162
54,417
88
36
28
108
207
222
178
1,029
2,862
7,068
1,776
657
1,260
656
1,720
276
280
2,040
117
589
329
246
204
965
749
208
912
568
832
72
124
987
3,078
23
2,318
7,150
360
207
72
1,278
68
L-Bar
189
84
34
197
346
120
132
128
162
33
4
9
14
27
207
37
89
21
159
228
222
219
210
164
172
23
140
68
117
589
329
246
102
193
107
52
152
142
104
6
124
141
114
23
122
143
40
23
18
142
34
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
CI
CMI
1
25
8
5
4
7
11
14
10
1
13
27
5
4
13
10
9
2
1
8
6
1
3
2
2
2
17
9
29
4
9
24
2
9
1
2
6
3
4
2
6
7
12
13
7
35
11
34
2
10
10
53
2,025
640
565
460
133
1,562
1,988
1,510
139
4,394
1,026
845
548
1,625
1,110
999
154
134
472
816
77
36
88
176
186
2,448
2,124
7,656
336
198
3,312
28
684
234
616
108
30
320
116
366
735
1,428
455
504
4,725
286
5,100
214
1,300
1,300
L-Bar
53
81
80
113
115
19
142
142
151
139
338
38
169
137
125
111
111
77
134
59
136
77
12
44
88
93
144
236
264
84
22
138
14
76
234
308
18
10
80
58
61
105
119
35
72
135
26
150
107
130
130
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/10/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
CI
CMI
7
12
1
6
1
6
1
34
14
26
4
3
1
1
20
5
7
14
6
6
1
2
4
8
4
1
1
7
8
23
60
5
4
4
1
1
2
35
39
1
9
7
10
10
52
49
8
10
49
1
2
133
144
58
348
191
480
107
4,420
1,344
4,888
384
72
36
2
2,340
25
756
700
420
522
105
212
760
528
644
237
251
483
648
3,519
4,320
30
116
340
121
96
284
9,730
6,903
95
288
735
590
1,680
8,944
9,702
1,416
1,950
1,519
77
188
L-Bar
19
12
58
58
191
80
107
130
96
188
96
24
36
2
117
5
108
50
70
87
105
106
190
66
161
237
251
69
81
153
72
6
29
85
121
96
142
278
177
95
32
105
59
168
172
198
177
195
31
77
94
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
CI
CMI
4
4
2
6
53
1
6
3
4
3
1
8
2
1
1
1
1
6
7
2
12
6
7
9
5
59
3
8
8
2
1
8
5
2
9
15
3
4
6
8
1
8
15
3
10
5
1
11
4
1
2
184
680
120
666
1,166
59
1,128
324
424
219
187
816
206
97
57
131
78
360
1,225
186
528
288
329
261
215
2,087
114
280
240
140
100
320
625
144
549
2,010
819
284
1,386
1,920
146
560
525
312
780
600
4
902
124
315
164
L-Bar
46
170
60
111
22
59
188
108
106
73
187
102
103
97
57
131
78
60
175
93
44
48
47
29
43
76
38
35
30
70
100
40
125
72
61
134
273
71
231
240
146
70
35
104
78
120
11
82
31
315
82
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/11/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
CI
CMI
5
53
20
24
8
2
2
8
13
8
6
5
22
3
10
9
2
36
1
2
8
4
2
22
9
18
9
1
2
8
8
7
7
97
9
15
10
1
17
3
223
11
13
7
52
9
8
9
17
12
8
35
5,194
1,980
2,832
544
156
158
8
169
1,016
708
375
550
252
1,020
603
260
2,124
101
198
40
4
20
1,452
729
2,124
1,629
101
182
1,080
1,000
266
462
1,843
801
1,275
1,000
155
119
165
48,614
781
3,523
490
9,620
1,152
1,896
612
2,397
720
296
L-Bar
7
98
99
118
68
78
79
1
13
127
118
75
25
84
102
67
130
59
101
99
5
19
10
66
81
118
181
101
91
135
125
38
66
19
89
85
100
155
7
55
218
71
271
70
185
128
237
68
141
60
37
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
CI
CMI
3
10
1
8
6
8
2
11
7
10
7
6
3
1
7
2
1
5
18
7
18
2
11
11
8
6
7
3
1
4
2
5
8
13
1
18
6
2
17
25
5
11
11
6
16
25
14
9
8
6
9
75
280
190
1,360
210
1,224
446
2,453
1,582
3,020
1,197
1,062
651
126
1,491
348
96
570
4,338
238
2,466
8
561
1,705
496
114
707
318
91
672
22
280
360
689
76
1,206
168
66
1,377
2,000
35
462
1,133
244
1,536
725
14
513
728
708
774
L-Bar
25
28
190
170
35
153
223
223
226
302
171
177
217
126
213
174
96
114
241
34
137
4
51
155
62
19
101
106
91
168
11
56
45
53
76
67
28
33
81
80
7
42
103
120
96
29
1
57
91
118
86
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/12/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
CI
CMI
13
13
2
6
5
8
30
6
9
1
9
3
1
3
5
12
2
13
6
9
2
4
1
10
1
1
7
2
1
9
6
44
4
26
26
4
43
40
13
12
7
1
57
9
16
14
1
6
2
6
6
871
975
142
228
1,155
640
1,470
72
378
117
207
288
170
462
360
636
158
2,899
426
72
182
280
180
1,450
14
98
602
118
143
117
444
6,644
460
2,392
2,366
124
15,179
15,440
1,118
2,628
189
289
17,043
396
1,696
700
68
654
8
246
1,002
L-Bar
67
75
71
38
231
80
49
12
42
117
23
96
170
154
72
53
79
223
71
8
91
70
180
145
14
98
86
59
143
13
74
151
115
92
91
31
353
386
86
219
27
289
299
44
106
50
68
109
4
41
167
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/13/2014
CI
CMI
3
3
7
9
4
28
17
2
3
10
5
4
42
20
11
7
1
9
13
7
7
2
1
4
10
2
1
4
5
1
2
4
2
1
7
1
7
2
27
4
1
2
1
2
1
2
1
3
2
2
2
66
495
812
1,053
396
3,500
2,873
56
501
1,680
335
76
4,788
2,040
1,188
140
81
1,026
169
448
56
252
107
216
2,310
32
103
552
580
100
142
348
62
85
721
66
112
302
1,269
276
122
26
109
148
162
204
41
408
156
48
62
L-Bar
22
165
116
117
99
125
169
28
167
168
67
19
114
102
108
20
81
114
13
64
8
126
107
54
231
16
103
138
116
100
71
87
31
85
103
66
16
151
47
69
122
13
109
74
162
102
41
136
78
24
31
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/13/2014
3/13/2014
3/13/2014
3/13/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
CI
CMI
1
6
1
19
14
1
84
6
4
8
14
14
13
5
2
8
1
17
4
2
5
1
3
10
7
4
2
3
7
8
4
6
7
11
2
10
6
14
108
3
14
1
13
6
164
36
1
9
1
2
5
59
102
174
1,254
3,486
172
840
462
520
808
98
1,148
975
420
140
1,240
58
136
316
258
645
349
258
1,650
560
668
148
12
1,407
176
40
372
266
1,298
340
1,160
204
28
11,664
285
2,380
78
1,261
516
2,132
1,764
36
819
119
234
295
L-Bar
59
17
174
66
249
172
10
77
130
101
7
82
75
84
70
155
58
8
79
129
129
349
86
165
80
167
74
4
201
22
10
62
38
118
170
116
34
2
108
95
170
78
97
86
13
49
36
91
119
117
59
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/14/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/15/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/16/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
CI
CMI
61
6
138
1
6
1
1
6
6
1
3
3
4
8
14
1
7
2
9
40
40
1
1
2
4
23
2
1
7
9
1
23
2
7
1
12
14
9
1
5
8
7
5
15
13
1
6
11
3
1
3
8,957
216
828
53
546
47
130
24
912
212
873
702
788
1,448
588
71
392
34
216
1,440
720
135
557
184
944
7,153
376
71
665
2,979
191
10,511
566
665
1
1,776
3,054
1,530
14
520
1,136
833
560
750
169
68
1,026
671
483
147
660
L-Bar
162
36
6
53
91
47
130
4
152
212
291
234
197
181
42
71
56
17
24
36
18
135
557
92
236
311
188
71
95
331
191
457
283
95
1
148
411
170
14
104
142
119
112
50
13
68
171
61
161
147
220
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/17/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
CI
CMI
4
6
6
7
7
1
7
17
1
7
10
3
45
3
38
10
14
5
8
7
2
6
5
11
104
16
4
1
6
2
4
46
11
264
19
8
10
7
1
20
3
1
6
1
1
6
8
10
7
9
9
880
1,320
1,080
1,253
553
1,735
1,211
2,210
41
147
1,150
516
6,030
99
532
2,690
280
330
672
595
138
462
605
44
8,320
1,584
40
105
594
110
200
322
1,221
705
1,824
760
550
602
42
1,240
222
36
84
124
59
834
1,982
1,110
301
891
171
L-Bar
220
220
180
179
79
1,735
173
130
41
21
115
172
134
33
14
269
20
66
84
85
69
77
121
4
80
99
10
105
99
55
50
7
111
148
96
95
55
86
42
62
74
36
14
124
59
139
283
111
43
99
19
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
CI
CMI
6
6
7
5
1
1
7
2
8
1
9
5
5
9
5
1
42
48
1
9
9
25
223
11
3
4
2
2
4
4
17
1
12
9
3
16
9
3
3
9
3
2
57
25
28
8
12
3
3
4
4
456
804
455
555
107
197
357
126
1,368
155
846
130
60
1,278
90
204
6,846
7,440
88
2,961
2,646
3,325
43,485
1,320
411
68
140
334
612
792
1,224
198
1,572
1,935
87
1,312
153
105
309
135
309
66
10,629
2,475
5,936
1,320
2,472
633
615
1,220
820
L-Bar
76
134
65
111
107
197
51
63
171
155
94
26
12
142
18
204
163
155
88
329
294
133
195
120
137
17
70
167
153
198
72
198
131
215
29
82
17
35
103
15
103
33
197
99
212
165
206
211
205
305
205
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/18/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
CI
16
3
3
6
1
12
8
1
14
8
9
8
2
7
5
3
5
27
1
14
1
1
11
5
42
2
3
3
5
1
4
1
1
1
2
1,920
6
2
8
3
25
8
1
1
1
1
1
6
3
36
23
CMI
3,280
612
612
1,224
21
168
56
45
1,064
40
612
104
168
700
365
117
265
3,672
24
1,862
118
122
1,375
385
8,148
72
54
507
300
33
344
63
331
38
326
103,680
486
206
688
264
1,175
784
549
101
548
547
213
444
489
13,392
5,635
L-Bar
205
204
204
204
21
14
7
45
76
5
68
13
84
100
73
39
53
136
24
133
118
122
125
77
194
36
18
169
60
33
86
63
331
38
163
54
81
103
86
88
47
98
549
101
548
547
213
74
163
372
245
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
CI
CMI
7
3
8
8
11
9
5
1
15
24
28
11
2
10
58
12
1
11
2
2
46
5
7
6
6
1
8
4
4
5
7
9
15
3
13
5
10
4
29
21
14
3
6
1
5
28
2
107
11
11
1
693
201
8
1,384
3,542
792
840
60
1,245
4,128
5,768
1,320
454
250
6,670
552
151
44
88
184
5,106
225
546
312
264
43
656
760
572
220
539
1,098
975
273
2,444
80
500
240
1,073
945
924
96
438
52
195
2,632
112
35,524
814
726
102
L-Bar
99
67
1
173
322
88
168
60
83
193
206
120
227
25
115
46
151
4
44
92
111
45
78
52
44
43
82
190
143
44
77
122
65
91
188
16
50
60
37
45
66
32
73
52
39
94
56
332
74
66
102
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/19/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
CI
CMI
3
7
4
1
10
6
8
3
1
24
2
9
3
1
1
2
1
1
9
1
1
8
1
1
1
2
11
13
5
41
7
10
27
11
12
41
25
4
8
5
34
1
14
90
1
1
28
35
8
2
1
246
861
104
103
60
84
80
336
91
960
216
648
357
142
128
90
143
116
360
100
130
416
122
51
165
362
1,221
1,287
430
6,437
602
720
2,727
968
564
9,922
1,550
444
648
605
4,284
142
210
15,930
227
188
980
5,985
976
136
67
L-Bar
82
123
26
103
6
14
10
112
91
40
108
72
119
142
128
45
143
116
40
100
130
52
122
51
165
181
111
99
86
157
86
72
101
88
47
242
62
111
81
121
126
142
15
177
227
188
35
171
122
68
67
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
CI
CMI
3
10
3
7
7
6
18
2
1
24
17
4
11
2
6
8
12
3
8
67
1
5
1
1
3
5
8
25
10
1
1
7
4
13
2
8
3
9
5
2
1
12
3
4
15
2
2
4
1
3
7
222
970
225
1,918
861
672
378
614
307
456
561
388
473
240
414
352
732
309
2,184
10,787
81
775
85
90
180
675
752
1,150
440
244
12
1,078
164
1,599
334
440
240
369
270
368
145
312
222
604
435
172
298
556
38
480
322
L-Bar
74
97
75
274
123
112
21
307
307
19
33
97
43
120
69
44
61
103
273
161
81
155
85
90
60
135
94
46
44
244
12
154
41
123
167
55
80
41
54
184
145
26
74
151
29
86
149
139
38
160
46
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/20/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
CI
CMI
1
6
1
10
17
12
1
1
3
12
12
1
4
6
6
11
2
2
9
5
8
2
9
17
9
1
2
7
4
9
4
8
11
9
32
6
3
1
4
5
21
8
2
1
4
4
9
8
7
14
6
121
78
29
1,280
391
480
63
96
15
132
276
174
584
300
492
3,322
262
132
1,008
230
752
154
1,269
799
1,395
80
435
945
284
387
96
1,424
1,782
522
480
954
198
293
352
75
4,641
1,856
144
69
344
328
630
64
784
1,820
330
L-Bar
121
13
29
128
23
40
63
96
5
11
23
174
146
50
82
302
131
66
112
46
94
77
141
47
155
80
325
135
71
43
24
178
162
58
15
159
66
293
88
15
221
232
72
69
86
82
70
8
112
130
55
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/21/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/22/2014
3/23/2014
3/23/2014
3/23/2014
3/23/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
CI
CMI
6
29
40
5
9
2
1
2
2
2
1
3
1
2
3
3
4
24
7
32
9
1
42
3
1
16
1
2
3
2
1
1
6
4
4
2
3
8
6
14
2
8
2
5
5
12
11
71
1
10
6
426
9,251
1,120
405
3,033
38
42
66
86
64
44
129
20
44
36
105
124
768
168
192
1,719
108
4,032
990
140
368
13
40
105
12
48
207
246
556
148
16
717
784
6
1,064
164
488
66
1,335
160
888
99
10,011
103
780
510
L-Bar
71
319
28
81
337
19
42
33
43
32
44
43
20
22
12
35
31
32
24
6
191
108
96
330
140
23
13
20
35
6
48
207
41
139
37
8
239
98
1
76
82
61
33
267
32
74
9
141
103
78
85
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
CI
CMI
2
88
12
1
9
19
10
2
5
1
4
13
6
9
7
4
6
5
2
10
1
8
1
7
10
5
8
6
6
7
18
7
9
3
1
12
3
9
11
6
131
2
11
1
5
1
8
2
2
4
4
314
11,264
36
106
1,242
2,717
1,060
164
545
41
636
1,066
432
639
182
324
180
470
304
550
123
776
26
987
980
460
712
522
516
672
1,062
539
603
321
67
48
288
810
1,408
558
6,288
190
726
58
235
5
1,344
126
214
488
300
L-Bar
157
128
3
106
138
143
106
82
109
41
159
82
72
71
26
81
30
94
152
55
123
97
26
141
98
92
89
87
86
96
59
77
67
107
67
4
96
90
128
93
48
95
66
58
47
5
168
63
107
122
75
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/24/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
CI
CMI
8
6
3
9
2
3
1
1
16
1
10
1
4
51
71
1
10
4
12
2
3
1
4
5
12
161
17
17
12
2
7
2
10
2
33
30
4
1
6
9
10
11
3
3
6
1
6
2
12
4
2
488
336
174
171
14
72
83
253
2,176
11
280
149
396
1,938
9,940
221
120
456
1,140
58
168
64
508
575
2,364
58,926
1,258
1,156
1,185
314
1,540
494
760
180
3,036
3,000
252
469
984
630
1,130
682
300
231
1,416
165
528
228
528
100
138
L-Bar
61
56
58
19
7
24
83
253
136
11
28
149
99
38
140
221
12
114
95
29
56
64
127
115
197
366
74
68
305
157
220
247
76
90
92
100
63
469
164
70
113
62
100
77
236
165
88
114
44
25
69
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/25/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
CI
CMI
5
5
13
6
7
11
2
11
4
6
2
1
2
5
11
3
12
1
16
9
3
5
1
7
4
1
1
8
8
68
12
47
176
3
6
2
4
5
9
5
8
9
10
1
7
41
10
2
1
12
1
365
1,365
338
450
574
407
146
583
92
420
132
120
216
480
385
84
336
167
960
567
321
1,190
88
868
308
64
165
448
712
23,460
1,056
1,880
80,256
732
774
416
476
1,660
567
360
1,648
2,448
2,710
34
924
9,840
1,340
52
107
852
170
L-Bar
73
273
26
75
82
37
73
53
23
70
66
120
108
96
35
28
29
167
60
63
107
238
88
124
77
64
165
56
89
345
88
40
456
244
129
208
119
332
63
72
206
272
271
34
132
240
134
26
107
71
170
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
3/26/2014
CI
CMI
14
1
7
12
9
4
8
13
2
16
10
2
6
22
4
4
41
10
3
12
22
2
2
4
4
1
1
3
2
3
3
6
6
4
16
29
6
1
1
2
2
1
9
4
3
8
4
4
10
1
13
1,988
104
322
804
558
460
560
598
168
1,056
220
206
246
836
640
620
4,838
40
297
744
1,738
164
350
352
360
83
103
438
132
81
36
96
804
536
2,240
1,856
414
130
150
188
132
293
702
232
294
704
280
328
500
168
715
L-Bar
142
104
46
67
62
115
70
46
84
66
22
103
41
38
160
155
118
4
99
62
79
82
175
88
90
83
103
146
66
27
12
16
134
134
140
64
69
130
150
94
66
293
78
58
98
88
70
82
50
168
55
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/26/2014
3/26/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
CI
CMI
19
12
14
412
1
73
13
4
3
2
5
7
12
4
9
3
1
12
7
1
1
1
1
6
6
4
9
1
5
8
14
8
4
6
2
1
33
7
9
4
9
9
5
24
23
7
1
11
11
72
2
4,389
1,668
1,540
30,076
84
11,753
793
220
252
114
1,275
959
1,044
436
1,602
276
182
2,100
1,141
172
69
87
30
654
582
432
1,062
385
45
384
1,330
688
460
798
2
173
1,188
1,085
1,305
644
1,755
1,053
285
2,040
1,955
994
73
594
198
12,672
128
L-Bar
231
139
110
73
84
161
61
55
84
57
255
137
87
109
178
92
182
175
163
172
69
87
30
109
97
108
118
385
9
48
95
86
115
133
1
173
36
155
145
161
195
117
57
85
85
142
73
54
18
176
64
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/27/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
CI
CMI
4
9
5
1
5
2
7
1
1
8
9
7
1
11
1
9
3
1
4
1
8
4
13
13
1
24
283
12
7
1
4
18
2
8
47
3
4
16
4
1
9
7
1
8
7
13
9
3
10
6
12
276
981
400
38
230
98
581
145
93
1,704
414
952
153
847
114
612
717
76
80
82
712
224
845
1,430
134
9,312
52,072
2,100
1,176
38
516
3,312
208
1,376
4,794
195
288
480
208
205
459
91
159
1,456
245
1,573
918
264
130
840
1,908
L-Bar
69
109
80
38
46
49
83
145
93
213
46
136
153
77
114
68
239
76
20
82
89
56
65
110
134
388
184
175
168
38
129
184
104
172
102
65
72
30
52
205
51
13
159
182
35
121
102
88
13
140
159
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/28/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/29/2014
3/30/2014
3/30/2014
3/30/2014
3/30/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
CI
16
8
1
5
8
1
32
5
8
1
9
2
3
9
2
11
7
2
1
7
1
1,276
1
1
7
2
1
1
1
10
4
6
7
1
19
10
3
3
17
1
10
24
14
3
4
13
3
1
31
9
4
CMI
976
752
25
455
336
170
2,464
310
48
163
36
56
216
432
118
253
1,134
304
113
217
12
21,692
254
309
238
238
38
47
36
590
572
138
133
133
570
390
144
828
1,207
142
1,390
2,736
168
129
808
710
105
75
3,875
783
236
L-Bar
61
94
25
91
42
170
77
62
6
163
4
28
72
48
59
23
162
152
113
31
12
17
254
309
34
119
38
47
36
59
143
23
19
133
30
39
48
276
71
142
139
114
12
43
202
83
35
75
125
87
59
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
CI
CMI
23
1
8
9
6
5
9
2
6
3
9
33
10
5
4
16
25
2
5
6
21
1
3
3
6
1
1
1
9
5
3
3
3
1
15
39
1
9
9
8
18
18
2
6
9
11
6
1
4
6
4
2,921
80
880
981
798
640
972
42
402
201
549
2,013
930
755
324
1,056
2,600
128
75
42
1,176
132
507
537
114
238
158
126
189
735
135
249
696
167
1,395
507
82
1,161
747
568
1,152
828
8
564
1,359
1,474
858
172
588
414
256
L-Bar
127
80
110
109
133
128
108
21
67
67
61
61
93
151
81
66
104
64
15
7
56
132
169
179
19
238
158
126
21
147
45
83
232
167
93
13
82
129
83
71
64
46
4
94
151
134
143
172
147
69
64
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
3/31/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
CI
1
8
1
1
6
8
2
1
2
2
14
2
13
2
1
6
10
6
5
5
3,008
22
8
12
18
8
7
1
1
7
4
4
18
1
8
20
14
5
7
4
10
2
5
1
6
2
18
12
11
2
3
CMI
120
712
81
168
84
520
32
45
10
214
672
154
325
134
31
108
1,200
798
460
870
147,392
2,200
720
864
990
2,272
2,590
43
136
616
524
456
2,250
100
168
1,900
252
440
504
224
550
264
775
19
774
54
2,070
1,056
1,551
164
195
L-Bar
120
89
81
168
14
65
16
45
5
107
48
77
25
67
31
18
120
133
92
174
49
100
90
72
55
284
370
43
136
88
131
114
125
100
21
95
18
88
72
56
55
132
155
19
129
27
115
88
141
82
65
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/1/2014
CI
CMI
10
18
1
3
3
10
5
8
3
3
8
10
6
9
3
4
49
7
1
12
8
12
5
6
1
13
1
4
2
8
9
13
7
6
3
1
5
1
3
2
8
14
1
4
1
1
18
9
5
1
1
750
774
229
834
231
1,340
575
2,288
141
429
2,240
1,860
768
1,278
387
300
5,684
1,169
117
828
1,816
180
750
378
153
689
9
568
218
312
1,674
2,314
63
156
471
201
540
30
309
230
304
1,050
106
440
86
76
1,548
675
120
93
25
L-Bar
75
43
229
278
77
134
115
286
47
143
280
186
128
142
129
75
116
167
117
69
227
15
150
63
153
53
9
142
109
39
186
178
9
26
157
201
108
30
103
115
38
75
106
110
86
76
86
75
24
93
25
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/1/2014
4/1/2014
4/1/2014
4/1/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
CI
CMI
69
24
1
1
13
11
19
17
32
1
2
7
6
13
1
21
1
7
1
21
10
8
72
41
10
7
20
1
12
21
4
1
4
9
2
13
2
1
2
10
29
1
15
2
1
11
3
14
42
5
5
138
3,768
59
59
1,495
1,386
950
833
3,136
28
146
714
18
4,654
131
6,594
114
994
46
6,783
2,760
2,336
33,912
5,371
1,740
665
2,180
157
552
42
592
241
208
621
600
1,391
144
81
112
2,170
6,003
84
180
72
234
2,387
246
2,212
19,908
550
240
L-Bar
2
157
59
59
115
126
50
49
98
28
73
102
3
358
131
314
114
142
46
323
276
292
471
131
174
95
109
157
46
2
148
241
52
69
300
107
72
81
56
217
207
84
12
36
234
217
82
158
474
110
48
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
CI
CMI
9
1
4
12
2
38
3
2
7
4
3
5
9
9
3
9
2
6
5
1
3
7
24
5
20
19
9
1
8
6
2
37
11
2
6
1
17
3
21
2
11
2
1
2
4
1
8
1
23
8
1
252
157
644
228
182
76
276
172
420
304
225
125
684
729
66
270
142
858
490
180
45
486
1,704
355
960
1,577
555
15
144
402
202
2,442
638
176
6
67
1,751
333
1,575
94
1,837
186
70
174
308
65
712
1
2,231
1,088
168
L-Bar
28
157
161
19
91
2
92
86
60
76
75
25
76
81
22
30
71
143
98
180
15
74
71
71
48
83
169
15
18
67
101
66
58
88
1
67
103
111
75
47
167
93
70
87
77
65
89
1
97
136
168
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/2/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
CI
CMI
22
2
4
4
1
2
1
1
1
7
3
21
3
16
9
2
8
6
10
1
1
1
23
4
2
3
8
1
4
1
1
1
1
7
1
1
11
8
18
5
5
8
24
2
6
8
2
10
1
8
5
3,102
378
80
556
138
240
260
162
116
469
48
1,491
342
1,856
774
398
584
864
2,320
212
349
240
3,381
488
260
399
1,040
217
220
107
87
45
129
588
13
99
1,331
1,392
3,258
565
300
1,832
3,672
160
1,086
968
250
1,060
271
480
670
L-Bar
141
189
20
139
138
120
260
162
116
67
16
71
114
116
86
199
73
144
232
212
349
240
147
122
130
133
130
217
55
107
87
45
129
84
13
99
121
174
181
113
60
229
153
80
181
121
125
106
271
60
134
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/3/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
CI
CMI
13
2
8
1
2
1
9
3
4
3
3
2
1
49
5
8
1
47
1
5
1
15
12
5
5
2
3
2
1
7
2
2
31
6
9
1
2
9
5
6
4
9
16
4
1
1
7
3
1
3
2
2,080
316
40
114
152
92
504
126
184
48
171
108
191
1,421
285
488
48
2,867
90
125
84
375
1,356
285
320
60
87
108
73
483
196
538
4,898
1,314
1,314
40
296
243
540
1,764
80
468
32
500
294
382
406
396
81
210
30
L-Bar
160
158
5
114
76
92
56
42
46
16
57
54
191
29
57
61
48
61
90
25
84
25
113
57
64
30
29
54
73
69
98
269
158
219
146
40
148
27
108
294
20
52
2
125
294
382
58
132
81
70
15
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/4/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/5/2014
4/6/2014
4/6/2014
4/6/2014
4/7/2014
CI
5
8
4
7
4
7
3
9
6
50
2
1
3
6
8
4
13
1
5
3
3
6
8
8
1
12
6
1
4
1
5
14
1,598
1,656
1,598
6
1
4
1
5
6
1
2
3
3
11
1,707
25
4
15
3
CMI
315
544
252
112
236
91
201
1,269
204
3,040
174
112
456
78
728
152
1,924
232
85
375
57
582
536
1,176
41
252
84
46
912
45
40
1,316
4,794
38,088
12,784
3,258
303
304
102
540
48
75
110
300
642
979
44,382
2,800
128
3,105
279
L-Bar
63
68
63
16
62
13
67
141
34
76
87
112
152
13
91
38
148
232
17
125
19
97
67
147
41
21
14
46
228
45
8
94
3
23
8
543
303
76
102
108
8
75
55
100
214
89
26
112
32
207
93
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
CI
CMI
1
36
4
5
8
37
78
4
1
4
17
6
1
28
7
1
4
33
5
10
12
5
2
3
63
3
3
1
9
1
4
26
2
6
3
4
6
1
7
3
7
4
6
62
2
3
6
24
6
7
25
152
4,356
404
625
120
4,514
234
236
86
920
4,879
1,812
226
3,724
1,589
111
608
7,260
35
740
180
370
156
480
8,568
627
33
24
756
35
204
572
910
72
108
16
408
70
448
330
518
292
456
4,588
42
357
6
2,544
2,334
623
3,150
L-Bar
152
121
101
125
15
122
3
59
86
230
287
302
226
133
227
111
152
220
7
74
15
74
78
160
136
209
11
24
84
35
51
22
455
12
36
4
68
70
64
110
74
73
76
74
21
119
1
106
389
89
126
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/7/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
CI
CMI
1
6
7
3
5
12
7
9
10
1
4
10
12
11
4
1
9
8
1
7
2
7
42
4
5
1
7
1
2
6
1
1
2
17
3
12
2
8
10
10
29
2
6
5
15
2
16
1
8
8
2
65
114
973
258
305
1,140
728
72
20
96
52
1,470
1,668
1,518
340
18
792
80
62
259
20
658
294
8
800
91
168
21
234
540
76
103
170
4,813
951
396
406
592
1,390
1,900
2,494
300
1,650
525
1,620
382
1,840
101
32
976
108
L-Bar
65
19
139
86
61
95
104
8
2
96
13
147
139
138
85
18
88
10
62
37
10
94
7
2
160
91
24
21
117
90
76
103
85
320
317
33
203
74
139
190
86
150
275
105
108
191
115
101
4
122
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/8/2014
4/9/2014
CI
CMI
5
4
5
7
4
4
27
10
1
7
20
6
1
6
21
11
15
43
37
6
7
8
7
35
12
9
11
6
8
10
2
6
8
18
2
7
1
4
105
8
3
42
2
1
25
21
50
4
12
8
10
1,060
412
430
385
204
976
11,610
680
71
574
8,120
270
150
648
2,667
1,617
1,050
3,139
2,516
270
189
728
119
2,310
120
180
319
798
32
2,540
76
246
976
1,656
16
210
49
432
4,725
472
99
5,166
116
57
2,325
1,155
6,850
256
228
296
1,380
L-Bar
212
103
86
55
51
244
430
68
71
82
406
45
150
108
127
147
70
73
68
45
27
91
17
66
10
20
29
133
4
254
38
41
122
92
8
30
49
108
45
59
33
123
58
57
93
55
137
64
19
37
138
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
CI
CMI
1
22
37
4
3
20
1
15
3
2
4
8
20
10
1
11
6
7
11
9
61
18
1
10
15
2
1
7
4
8
4
13
1
10
9
1
3
23
48
1
3
4
16
10
12
1
13
31
4
14
1
107
5,830
12,395
380
423
1,580
116
1,140
561
176
744
1,656
5,360
670
153
176
990
77
1,078
1,053
7,381
828
247
460
5,445
158
367
693
436
184
136
624
193
3,080
99
23
111
1,909
672
53
195
872
1,584
1,950
1,476
103
351
2,666
152
1,246
12
L-Bar
107
265
335
95
141
79
116
76
187
88
186
207
268
67
153
16
165
11
98
117
121
46
247
46
363
79
367
99
109
23
34
48
193
308
11
23
37
83
14
53
65
218
99
195
123
103
27
86
38
89
12
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
4/9/2014
CI
CMI
7
8
1
1
8
11
20
4
26
6
6
1
1
4
1
1
7
1
24
2
2
1
4
11
2
21
1
14
2
1
8
2
20
1
1
3
3
1
7
13
22
8
1
4
4
3
1
4
2
1
1
329
80
265
67
136
836
1,580
496
1,950
1,026
972
3
150
448
35
161
861
265
2,520
24
250
50
48
2,266
186
1,449
181
1,666
150
79
864
116
2,920
167
110
9
306
14
252
2,145
1,936
928
115
184
240
222
49
304
48
77
63
L-Bar
47
10
265
67
17
76
79
124
75
171
162
3
150
112
35
161
123
265
105
12
125
50
12
206
93
69
181
119
75
79
108
58
146
167
110
3
102
14
36
165
88
116
115
46
60
74
49
76
24
77
63
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/9/2014
4/9/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
CI
CMI
1
7
2
5
1
1
10
9
1
22
5
5
12
85
1
2
5
5
8
6
19
34
21
4
3
8
19
11
78
34
1
18
2
1
4
6
4
2
1
1
11
12
10
5
7
11
1
1
3
1
5
224
679
76
90
76
45
3,820
549
67
374
1,385
355
1,968
1,615
185
140
490
750
56
144
1,843
3,264
3,801
100
318
784
6,099
3,531
5,850
3,162
321
882
150
68
752
336
980
208
276
56
1,540
1,620
1,440
575
1,001
2,530
311
127
210
29
620
L-Bar
224
97
38
18
76
45
382
61
67
17
277
71
164
19
185
70
98
150
7
24
97
96
181
25
106
98
321
321
75
93
321
49
75
68
188
56
245
104
276
56
140
135
144
115
143
230
311
127
70
29
124
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/10/2014
4/11/2014
4/11/2014
CI
CMI
1
76
2
2
7
9
8
8
7
19
7
12
20
1
25
1
3
8
8
7
4
3
15
30
4
5
5
1
3
3
4
1
6
4
3
22
10
3
3
15
14
2
1
2
2
1
8
15
14
14
1
36
3,040
244
68
259
522
40
1,200
651
1,786
1,274
1,224
2,680
51
6,075
54
321
544
760
1,827
100
363
1,815
3,630
220
545
110
9
264
207
660
67
108
432
285
946
830
240
516
1,950
1,134
134
51
122
90
148
344
2,970
126
1,022
188
L-Bar
36
40
122
34
37
58
5
150
93
94
182
102
134
51
243
54
107
68
95
261
25
121
121
121
55
109
22
9
88
69
165
67
18
108
95
43
83
80
172
130
81
67
51
61
45
148
43
198
9
73
188
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
CI
CMI
8
22
2
6
20
25
4
21
8
2
1
1
2
1
1
3
4
2
2
8
2
8
8
2
4
2
16
24
12
14
42
13
1
63
1
23
24
2
4
12
6
4
7
1
8
2
4
4
1
4
3
1,176
1,584
182
282
1,620
2,000
176
2,436
880
220
72
13
706
333
256
159
376
122
186
192
30
104
224
182
68
244
3,168
4,752
2,388
2,786
9,996
468
32
4,914
200
1,564
1,920
294
120
2,136
798
300
882
91
1,016
12
476
196
38
516
354
L-Bar
147
72
91
47
81
80
44
116
110
110
72
13
353
333
256
53
94
61
93
24
15
13
28
91
17
122
198
198
199
199
238
36
32
78
200
68
80
147
30
178
133
75
126
91
127
6
119
49
38
129
118
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/11/2014
4/12/2014
4/12/2014
4/12/2014
4/12/2014
4/12/2014
4/12/2014
4/13/2014
4/13/2014
4/13/2014
4/13/2014
4/13/2014
4/13/2014
4/13/2014
4/13/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
CI
CMI
2
2
26
2
4
1
6
9
4
5
28
3
3
1
14
19
1
1
1
5
41
3
12
8
2
4
4
8
2
11
36
11
1
1
1
9
15
2
3
7
4
4
9
1
30
8
2
5
6
4
4
102
296
2,470
54
276
301
2,406
306
540
715
28
384
138
143
2,744
2,926
62
102
251
330
1,353
636
2,184
1,848
6
288
1,520
856
376
2,002
7,308
902
449
193
191
729
75
246
525
539
180
772
1,530
53
7,230
928
58
625
354
136
268
L-Bar
51
148
95
27
69
301
401
34
135
143
1
128
46
143
196
154
62
102
251
66
33
212
182
231
3
72
380
107
188
182
203
82
449
193
191
81
5
123
175
77
45
193
170
53
241
116
29
125
59
34
67
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
CI
CMI
3
8
96
6
12
4
1
1
5
4
7
4
12
7
8
18
2
1
2
11
1
8
9
8
10
7
4
6
12
6
7
10
8
8
16
1
1
4
1
9
1
30
4
7
2
2
2
5
1
1
3
543
552
8,928
1,368
2,796
116
95
270
600
516
497
176
1,164
847
1,656
2,232
70
176
20
1,529
76
608
981
1,144
1,430
336
136
870
1,248
384
420
1,190
1,568
408
1,328
1
1
160
49
450
163
5,730
484
651
92
92
92
425
44
42
114
L-Bar
181
69
93
228
233
29
95
270
120
129
71
44
97
121
207
124
35
176
10
139
76
76
109
143
143
48
34
145
104
64
60
119
196
51
83
1
1
40
49
50
163
191
121
93
46
46
46
85
44
42
38
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/14/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
CI
CMI
4
13
1
8
1
5
11
2
3
5
1
7
1
18
1
1
1
1
7
4
17
12
1
18
8
6
9
9
3
10
1
7
37
144
5
1
8
8
4
11
7
10
10
27
1
2
36
2
4
9
8
476
104
1
504
86
110
660
118
501
185
72
581
196
486
61
233
133
310
630
172
1,071
3,684
101
1,656
976
786
414
891
372
2,390
114
63
6,623
8,064
815
28
504
1,368
292
1,562
196
1,960
1,110
2,808
334
342
11,556
358
1,068
1,494
360
L-Bar
119
8
1
63
86
22
60
59
167
37
72
83
196
27
61
233
133
310
90
43
63
307
101
92
122
131
46
99
124
239
114
9
179
56
163
28
63
171
73
142
28
196
111
104
334
171
321
179
267
166
45
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/15/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
CI
CMI
6
12
6
3
10
7
3
24
1
8
7
9
1
4
74
14
20
6
19
3
6
12
6
7
7
4
3
13
3
5
3
4
3
5
8
28
1
1
1
24
30
4
14
17
14
10
1
7
1
1
5
48
1,608
408
219
250
1,169
324
2,376
94
64
385
864
212
452
74
238
1,600
444
285
156
654
288
402
42
280
356
303
273
171
180
420
240
390
790
32
3,752
39
26
124
3,960
6,450
64
924
816
3,234
420
133
294
160
132
215
L-Bar
8
134
68
73
25
167
108
99
94
8
55
96
212
113
1
17
80
74
15
52
109
24
67
6
40
89
101
21
57
36
140
60
130
158
4
134
39
26
124
165
215
16
66
48
231
42
133
42
160
132
43
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
CI
CMI
3
3
26
5
44
3
15
3
21
10
1
4
4
12
7
7
3
4
3
9
10
2
8
8
29
37
8
9
3
84
4
3
9
9
8
13
1
2
2
1
1
33
7
5
4
4
3
8
3
2
2
408
264
9,464
420
6,468
366
5,550
270
2,268
630
60
596
944
3,036
1,400
2,135
306
196
198
639
1,240
192
1,440
832
3,509
8,510
720
1,197
42
1,092
840
609
972
468
168
2,002
23
278
136
87
83
2,079
49
1,105
732
116
255
576
18
348
318
L-Bar
136
88
364
84
147
122
370
90
108
63
60
149
236
253
200
305
102
49
66
71
124
96
180
104
121
230
90
133
14
13
210
203
108
52
21
154
23
139
68
87
83
63
7
221
183
29
85
72
6
174
159
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/16/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
CI
CMI
2
1
10
34
2
5
2
6
19
34
18
1
8
4
4
6
8
12
14
2
3
1
4
1
39
4
1
7
6
1
5
21
1
25
8
5
5
14
13
21
2
1
7
8
4
1
11
7
11
11
1
68
19
50
2,618
242
195
208
432
1,482
2,652
1,170
114
272
232
380
198
648
648
84
172
60
145
440
61
156
152
4
315
696
116
585
1,512
50
4,375
1,848
720
595
2,198
767
6,405
100
256
434
1,408
696
100
704
805
1,254
2,552
305
L-Bar
34
19
5
77
121
39
104
72
78
78
65
114
34
58
95
33
81
54
6
86
20
145
110
61
4
38
4
45
116
116
117
72
50
175
231
144
119
157
59
305
50
256
62
176
174
100
64
115
114
232
305
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
CI
CMI
45
17
4
28
43
2
1
11
9
4
2
8
3
7
2
9
11
6
2
9
9
3
3
8
8
9
8
3
2
6
2
9
10
2
4
2
15
6
10
9
2
4
7
18
4
10
1
1
1
1
25
11,790
68
64
10,416
5,848
300
142
726
729
272
136
472
612
455
426
1,701
209
162
118
972
252
30
186
2,488
320
1,341
1,152
24
98
1,014
310
378
380
204
100
326
1,545
654
560
1,611
100
184
168
1,584
308
570
11
47
185
49
650
L-Bar
262
4
16
372
136
150
142
66
81
68
68
59
204
65
213
189
19
27
59
108
28
10
62
311
40
149
144
8
49
169
155
42
38
102
25
163
103
109
56
179
50
46
24
88
77
57
11
47
185
49
26
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/17/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
CI
3
1
5
2
11
1
8
3
1
3
14
1
1
5
2
1
43
2
14
45
2
136
25
1,092
8
7
6
7
1
11
18
2
11
8
12
6
6
2
1
6
8
1
3
10
12
6
23
2
1
11
7
CMI
111
13
115
88
1,650
7
384
282
72
420
98
53
46
605
242
106
6,579
46
504
5,670
160
9,928
1,350
1,092
928
728
462
721
77
154
1,512
80
495
1,344
720
834
756
250
58
786
1,136
108
69
1,390
192
828
5,635
204
39
891
392
L-Bar
37
13
23
44
150
7
48
94
72
140
7
53
46
121
121
106
153
23
36
126
80
73
54
1
116
104
77
103
77
14
84
40
45
168
60
139
126
125
58
131
142
108
23
139
16
138
245
102
39
81
56
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/18/2014
4/19/2014
4/19/2014
4/19/2014
4/19/2014
4/19/2014
4/19/2014
4/19/2014
4/20/2014
4/20/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
CI
1
8
13
19
2
5
2
10
2
3
3
3
1
5
6
6
3
33
17
33
4
4
1
3
24
14
1
1
1
2
12
1,612
4
8
3
2
19
2
4
4
26
8
85
6
1
17
1
3
8
4
25
CMI
188
416
273
2,375
14
410
504
1,830
326
423
462
18
79
190
1,074
966
141
3,168
289
759
88
264
229
102
11,304
4,018
136
54
5
194
492
30,628
468
504
351
194
1,292
628
1,008
1,040
1,612
721
9,265
36
181
6,970
253
456
1,216
608
9,400
L-Bar
188
52
21
125
7
82
252
183
163
141
154
6
79
38
179
161
47
96
17
23
22
66
229
34
471
287
136
54
5
97
41
19
117
63
117
97
68
314
252
260
62
252
109
6
181
410
253
152
152
152
376
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
Date
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
CI
CMI
2
7
1
4
10
11
6
7
2
3
1
1
2
4
2
61
10
8
1
2
9
8
2
2
41
6
23
1
2
6
7
1
2
26
1
7
2
1
4
4
2
1
1
8
2
14
1
1
6
26
8
154
252
48
640
840
957
384
1,099
174
315
94
93
174
244
376
4,758
1,400
1,256
132
106
279
488
328
58
8,323
24
299
50
114
582
1,099
44
466
3,796
64
791
46
77
1,016
348
308
32
98
368
170
1,190
33
437
24
4,290
816
L-Bar
77
36
48
160
84
87
69
157
87
105
94
93
87
61
188
78
140
157
132
53
31
61
164
29
203
4
13
50
57
97
157
44
233
146
64
113
23
77
254
87
154
32
98
46
85
85
33
437
4
165
102
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/21/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
CI
CMI
6
22
1
8
12
1
4
1
23
2
1
2
2
2
1
1
3
7
6
9
57
4
8
3
2
2
8
27
12
5
4
24
4
105
21
91
9
9
3
146
137
11
6
6
6
9
1
1
1
12
2
24
264
126
976
250
114
272
169
1,817
188
67
184
202
234
201
49
426
1,190
510
1,296
12,312
564
1,400
357
420
148
1,832
3,267
312
500
344
4,536
496
20,685
3,507
34,216
3,798
54
282
52,706
47,539
539
954
510
456
1,062
116
165
191
840
282
L-Bar
4
12
126
122
74
114
68
169
79
94
67
92
101
117
201
49
142
170
85
144
216
141
175
119
210
74
229
121
26
100
86
189
124
197
167
376
422
6
94
361
347
49
159
85
76
118
116
165
191
70
141
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
CI
CMI
10
2
9
5
4
10
9
1
5
8
7
9
4
4
2
3
2
4
8
8
68
5
8
1
4
4
14
1
6
4
10
5
26
3
1
1
9
3
5
7
7
1
5
2
3
10
8
8
6
6
5
420
92
2,277
330
268
720
1,179
181
780
656
1,099
2,358
328
104
92
117
224
348
624
592
8,704
240
520
41
116
36
364
73
360
280
1,090
745
3,380
18
90
66
819
372
335
413
1,239
54
245
438
123
570
432
464
600
798
640
L-Bar
42
46
253
66
67
72
131
181
156
82
157
262
82
26
46
39
112
87
78
74
128
48
65
41
29
9
26
73
60
70
109
149
130
6
90
66
91
124
67
59
177
54
49
219
41
57
54
58
100
133
128
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/22/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
CI
CMI
15
3
4
4
11
4
7
7
4
1
2
7
5
7
2
1
4
3
1
7
28
10
1
15
11
4
1
5
9
4
8
50
4
41
6
1
14
9
5
2
3
1
12
3
10
3
12
6
7
13
45
1,155
126
316
244
704
184
385
672
332
104
160
651
1,195
455
282
115
352
15
306
2,373
3,192
940
61
4,305
2,783
428
69
325
1,764
692
720
8,450
668
5,371
588
106
2,030
1,350
285
78
81
73
4,044
330
1,060
366
1,116
1,476
511
2,717
12,780
L-Bar
77
42
79
61
64
46
55
96
83
104
80
93
239
65
141
115
88
5
306
339
114
94
61
287
253
107
69
65
196
173
90
169
167
131
98
106
145
150
57
39
27
73
337
110
106
122
93
246
73
209
284
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
4/23/2014
CI
CMI
17
8
10
10
16
16
2
8
12
1
3
1
12
6
10
79
1
8
2
4
5
9
10
9
9
3
1
2
19
8
5
1
9
5
6
1
2
19
10
17
8
4
2
4
7
6
27
22
5
4
4
323
1,888
1,770
210
3,072
2,432
142
272
696
34
207
56
1,260
570
1,370
11,297
91
1,464
58
64
250
531
1,760
1,089
558
174
118
250
19
200
255
255
594
560
126
69
220
1,919
310
731
376
572
156
152
161
546
2,565
4,686
625
104
76
L-Bar
19
236
177
21
192
152
71
34
58
34
69
56
105
95
137
143
91
183
29
16
50
59
176
121
62
58
118
125
1
25
51
255
66
112
21
69
110
101
31
43
47
143
78
38
23
91
95
213
125
26
19
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
CI
CMI
1
1
4
13
6
1
1
30
6
13
1
9
109
37
4
4
1
1
1
14
2
11
7
5
2
14
8
4
8
9
5
2
2
6
36
2
8
6
1
8
1
8
21
2
3
6
61
2
6
7
9
370
182
172
507
774
237
56
4,140
552
624
187
81
18,748
13,727
424
624
152
157
63
1,806
114
594
1,001
110
126
546
1,288
464
576
27
555
174
72
408
6,372
180
1,424
312
136
1,056
145
848
1,071
168
243
414
1,037
88
330
133
162
L-Bar
370
182
43
39
129
237
56
138
92
48
187
9
172
371
106
156
152
157
63
129
57
54
143
22
63
39
161
116
72
3
111
87
36
68
177
90
178
52
136
132
145
106
51
84
81
69
17
44
55
19
18
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/24/2014
4/25/2014
4/25/2014
CI
CMI
1
8
9
6
2
11
10
9
8
6
4
6
3
1
13
11
7
8
16
1
12
2
11
4
22
9
6
7
9
8
1
3
8
1
7
1
107
5
1
2
3
1
1
1
6
4
5
1
1
8
1
16
320
522
180
92
572
490
441
528
312
424
1,008
267
128
1,027
693
875
168
1,216
44
540
90
539
672
1,210
1,332
870
308
54
1,464
38
102
1,384
91
63
18
3,103
100
66
112
321
63
164
89
546
16
1,160
79
373
1,152
84
L-Bar
16
40
58
30
46
52
49
49
66
52
106
168
89
128
79
63
125
21
76
44
45
45
49
168
55
148
145
44
6
183
38
34
173
91
9
18
29
20
66
56
107
63
164
89
91
4
232
79
373
144
84
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/25/2014
4/26/2014
4/26/2014
4/26/2014
CI
CMI
1
2
16
46
6
1
2
25
13
8
1
8
40
3
12
23
3
5
65
1
2
1
1
9
10
19
10
5
10
9
2
7
3
9
9
1
39
1
6
1
9
9
6
2
20
1
10
1
4
1
1
135
242
1,152
3,634
30
69
188
1,125
1,664
1,208
10
744
6,920
279
2,136
1,978
291
295
1,560
16
54
131
138
702
210
2,356
410
10
540
594
316
819
96
189
3,699
23
4,680
84
102
79
198
261
612
352
2,780
184
2,220
16
1,068
241
33
L-Bar
135
121
72
79
5
69
94
45
128
151
10
93
173
93
178
86
97
59
24
16
27
131
138
78
21
124
41
2
54
66
158
117
32
21
411
23
120
84
17
79
22
29
102
176
139
184
222
16
267
241
33
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/26/2014
4/27/2014
4/27/2014
4/27/2014
4/27/2014
4/27/2014
4/27/2014
4/27/2014
4/27/2014
4/27/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
CI
2
9
6
8
3
56
18
1
16
1
48
4
1
15
1
1
5
2,338
17
14
7
10
6
1
1
37
2
4
14
1
8
1
1
3
13
7
1
4
4
10
41
1
2
12
1
6
8
7
4
4
8
CMI
536
1,782
1,494
176
396
896
270
98
864
163
6,240
1,256
67
2,025
204
54
25
32,732
2,091
784
637
850
456
128
86
1,591
278
40
406
5
512
62
158
294
2,158
1,757
55
192
164
650
1,353
206
378
288
171
144
728
588
240
168
552
L-Bar
268
198
249
22
132
16
15
98
54
163
130
314
67
135
204
54
5
14
123
56
91
85
76
128
86
43
139
10
29
5
64
62
158
98
166
251
55
48
41
65
33
206
189
24
171
24
91
84
60
42
69
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/28/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
CI
CMI
3
3
4
15
1
7
8
17
5
10
33
9
10
1
7
2
6
4
6
8
21
86
8
1
9
6
9
60
3
4
4
3
4
1
3
12
3
12
12
9
8
8
11
1
6
1
7
5
3
2
6
252
165
220
1,035
54
273
296
2,448
535
750
4,422
837
670
127
812
62
384
392
540
496
1,008
1,548
656
76
261
780
963
840
180
80
260
348
108
195
279
372
216
804
756
585
440
304
594
124
36
45
791
540
531
364
474
L-Bar
84
55
55
69
54
39
37
144
107
75
134
93
67
127
116
31
64
98
90
62
48
18
82
76
29
130
107
14
60
20
65
116
27
195
93
31
72
67
63
65
55
38
54
124
6
45
113
108
177
182
79
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
CI
CMI
6
6
4
21
12
10
7
1
23
4
1
9
8
1
1
7
1
4
8
4
52
13
3
20
9
8
8
1
10
8
25
8
11
5
1
10
2
1
6
12
7
8
3
1
7
10
10
2
4
10
4
888
18
120
5,103
60
160
728
36
4,600
692
71
801
888
125
40
77
101
248
32
8
5,824
1,261
87
6,020
828
472
1,544
69
370
1,096
2,225
1,328
1,485
10
44
150
530
88
12
864
371
640
441
101
602
1,270
410
196
568
600
8
L-Bar
148
3
30
243
5
16
104
36
200
173
71
89
111
125
40
11
101
62
4
2
112
97
29
301
92
59
193
69
37
137
89
166
135
2
44
15
265
88
2
72
53
80
147
101
86
127
41
98
142
60
2
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/29/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
CI
54
2
9
5
13
9
4
10
5
1
6
2,321
2
11
2
1
5
6
8
5
16
6
11
1
6
4
2
1
28
15
5
7
9
2
8
12
2
9
11
46
4
8
31
25
1
9
1
15
8
2
12
CMI
2,484
38
684
5
4,043
639
624
500
45
110
408
78,914
420
110
186
70
40
384
544
175
480
294
715
155
276
192
30
259
3,500
975
330
826
423
256
1,896
1,068
726
549
2,035
4,462
424
1,040
2,790
5,025
289
630
358
255
760
430
1,068
L-Bar
46
19
76
1
311
71
156
50
9
110
68
34
210
10
93
70
8
64
68
35
30
49
65
155
46
48
15
259
125
65
66
118
47
128
237
89
363
61
185
97
106
130
90
201
289
70
358
17
95
215
89
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
4/30/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
CI
CMI
6
2
4
19
29
17
7
4
9
10
9
1
10
9
9
1
7
11
3
11
8
54
5
24
6
8
9
8
8
10
4
1
4
1
9
1
1
5
1
7
1
4
1
2
7
11
6
9
11
15
1
1,008
326
44
3,040
7,482
3,774
539
508
828
930
567
250
60
1,233
99
247
658
935
111
121
624
9,774
65
3,768
192
440
513
480
496
650
280
54
156
101
531
232
18
75
60
882
133
628
285
538
1,673
704
474
576
638
2,010
145
L-Bar
168
163
11
160
258
222
77
127
92
93
63
250
6
137
11
247
94
85
37
11
78
181
13
157
32
55
57
60
62
65
70
54
39
101
59
232
18
15
60
126
133
157
285
269
239
64
79
64
58
134
145
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
Date
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
CI
CMI
12
8
10
8
28
5
8
33
36
6
2
3
10
5
10
3
31
5
25
1
12
9
2
6
2
10
51
1
4
8
2
10
6
7
2
2
3
37
8
10
8
7
11
2
4
1
4
9
5
4
1
612
632
2,100
160
4,368
850
312
4,059
8,892
258
404
468
890
1,055
1,080
42
2,542
570
3,625
274
600
819
52
432
56
520
11,369
323
172
960
150
560
78
259
308
174
126
7,696
360
980
352
483
374
128
296
176
224
630
365
196
144
L-Bar
51
79
210
20
156
170
39
123
247
43
202
156
89
211
115
14
82
114
145
274
50
91
26
72
28
52
331
323
43
120
75
56
13
37
154
87
42
208
45
98
44
69
34
64
74
176
56
70
73
49
144
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/1/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/2/2014
CI
CMI
8
1
1
4
3
6
3
7
10
4
11
1
8
66
30
2
3
6
10
5
2
7
1
2
9
11
10
6
6
6
3
10
7
1
1
7
6
10
1
3
6
3
7
17
9
7
12
9
6
8
1
552
118
109
268
105
546
288
28
115
332
990
146
40
660
2,400
130
186
276
70
5
108
245
57
318
423
176
1,390
606
390
192
63
330
126
294
98
35
858
110
38
327
18
18
1,316
1,394
1,008
441
252
324
48
352
9
L-Bar
69
118
109
67
35
91
96
4
61
83
90
146
5
10
80
65
62
46
7
1
54
35
57
159
47
16
139
101
65
32
21
33
18
294
98
5
143
11
38
109
3
6
188
82
112
63
21
36
8
44
9
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/2/2014
5/2/2014
5/2/2014
5/2/2014
5/3/2014
5/3/2014
5/3/2014
5/3/2014
5/3/2014
5/4/2014
5/4/2014
5/4/2014
5/4/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
CI
CMI
1
1
4
2
1
1
2
10
2
1
1
16
17
5
9
29
10
3
6
18
1
8
3
7
83
5
5
28
2
9
12
1
2
6
3
8
4
5
3
4
4
5
4
10
5
1
1
2
37
9
2
180
106
440
840
98
419
604
280
126
55
61
160
1,853
405
648
3,915
860
459
522
2,502
268
248
156
98
11,786
795
390
3,696
104
954
2,064
228
368
234
213
1,096
636
535
708
152
572
85
236
710
470
274
247
152
3,404
963
94
L-Bar
180
106
110
420
98
419
302
28
63
55
61
10
109
81
72
135
86
153
87
139
268
31
52
14
142
159
78
132
52
106
172
228
184
39
71
137
159
107
236
38
143
17
59
71
94
274
247
76
92
107
47
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/5/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
CI
CMI
10
1
2
8
5
7
7
1
3
1
6
8
1
5
1
2
3
1
2
4
37
1
3
11
2
1
2
1
1
4
5
1
3
6
5
8
2
12
1
12
21
19
7
6
1
4
4
10
7
1
8
1,610
39
154
824
370
1,197
637
100
39
114
180
680
559
275
128
92
285
61
298
284
2,627
31
186
682
92
133
170
44
29
388
300
63
198
564
40
136
412
300
29
3,036
3,486
4,123
455
360
155
244
1,008
2,060
434
94
608
L-Bar
161
39
77
103
74
171
91
100
13
114
30
85
559
55
128
46
95
61
149
71
71
31
62
62
46
133
85
44
29
97
60
63
66
94
8
17
206
25
29
253
166
217
65
60
155
61
252
206
62
94
76
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
CI
CMI
10
5
2
6
3
21
3
1
3
11
4
6
4
10
9
1
4
5
49
2
3
10
12
9
2
13
2
1
11
3
7
2
3
1
1
9
8
10
14
4
8
3
19
9
7
7
5
1
1
3
2
790
485
226
1,074
204
840
171
218
117
1,111
472
18
408
1,530
576
99
1,028
10
11,809
280
267
1,450
240
54
390
2,353
260
105
275
33
259
374
138
6
51
729
1,272
1,750
1,064
80
600
657
1,425
612
441
427
1,015
64
69
189
460
L-Bar
79
97
113
179
68
40
57
218
39
101
118
3
102
153
64
99
257
2
241
140
89
145
20
6
195
181
130
105
25
11
37
187
46
6
51
81
159
175
76
20
75
219
75
68
63
61
203
64
69
63
230
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/6/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
CI
CMI
8
2
4
42
24
11
4
6
1
3
43
20
17
8
12
2
12
7
9
3
5
12
4
2
10
9
6
2
7
7
1
6
5
11
12
13
3
3
3
10
8
5
6
12
4
1
56
2
33
8
6
24
106
696
42
7,560
1,298
184
396
79
144
3,397
40
68
488
360
76
2,076
1,148
612
429
60
84
208
130
740
252
174
306
455
602
120
618
455
1,518
2,100
871
396
336
33
1,350
440
60
390
2,292
264
339
3,416
232
7,095
120
2,178
L-Bar
3
53
174
1
315
118
46
66
79
48
79
2
4
61
30
38
173
164
68
143
12
7
52
65
74
28
29
153
65
86
120
103
91
138
175
67
132
112
11
135
55
12
65
191
66
339
61
116
215
15
363
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
CI
CMI
12
1
8
3
4
25
9
6
10
1
2
3
5
19
1
1
1
23
10
10
1
1
3
14
13
2
18
8
23
9
11
1
6
1
8
9
10
1
3
7
2
12
10
2
6
4
1
3
3
7
2
2,364
173
744
522
332
2,875
504
882
480
174
358
177
465
1,330
97
4
87
46
90
3,080
196
315
573
3,108
1,404
120
162
544
1,472
1,557
1,243
93
156
131
600
603
490
69
228
560
12
864
950
184
756
264
138
48
153
497
160
L-Bar
197
173
93
174
83
115
56
147
48
174
179
59
93
70
97
4
87
2
9
308
196
315
191
222
108
60
9
68
64
173
113
93
26
131
75
67
49
69
76
80
6
72
95
92
126
66
138
16
151
71
80
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/7/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
CI
CMI
6
9
5
2
8
8
1
2
3
14
12
4
6
4
6
8
1
16
8
1
1
1
10
6
10
5
1
6
4
1
8
1
5
2
8
40
5
4
9
33
2
21
6
1
6
6
7
3
3
3
8
1,032
603
345
60
288
288
65
106
675
756
1,956
196
666
472
432
2,184
127
1,104
832
29
115
114
850
1,542
1,670
760
35
30
1,160
101
584
114
225
402
56
1,040
630
408
585
1,947
182
1,743
306
33
186
690
1,071
249
114
192
1,080
L-Bar
172
67
69
30
36
36
65
53
225
54
163
49
111
118
72
273
127
69
104
29
115
114
85
257
167
152
35
5
290
101
73
114
45
201
7
26
126
102
65
59
91
83
51
33
31
115
153
83
38
64
135
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/8/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
CI
CMI
10
3
8
7
2
1
8
4
30
11
9
1
12
3
7
6
1
18
5
68
7
4
13
6
12
2
2
6
10
2
3
3
7
5
2
4
5
14
1
8
2
1
4
1
7
1
1
2
22
2
4
360
261
848
1,638
114
23
800
64
1,650
374
225
162
1,020
264
210
1,146
25
108
185
748
35
416
442
402
24
40
14
516
1,020
36
183
195
560
275
244
316
945
1,120
140
272
954
377
88
71
392
73
252
70
2,486
6
180
L-Bar
36
87
106
234
57
23
100
16
55
34
25
162
85
88
30
191
25
6
37
11
5
104
34
67
2
20
7
86
102
18
61
65
80
55
122
79
189
80
140
34
477
377
22
71
56
73
252
35
113
3
45
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/9/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/10/2014
5/11/2014
5/11/2014
CI
CMI
3
1
2
9
12
9
4
12
62
20
27
3
22
2
1
16
1
2
10
37
6
7
2
3
1
1
1
12
4
3
1
1
2
4
1
2
3
16
7
2
3
32
1
1
4
1
1
4
1
1
1
381
47
16
1,035
936
765
48
780
8,804
2,340
3,240
291
3,894
32
50
896
74
30
600
2,516
228
105
26
279
123
26
62
1,680
564
87
49
42
94
188
65
124
84
1,776
2,072
216
597
6,208
210
273
20
33
41
20
75
71
485
L-Bar
127
47
8
115
78
85
12
65
142
117
120
97
177
16
50
56
74
15
60
68
38
15
13
93
123
26
62
140
141
29
49
42
47
47
65
62
28
111
296
108
199
194
210
273
5
33
41
5
75
71
485
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
CI
CMI
2
2
11
11
8
4
10
16
7
7
2
2
7
10
2
8
3
13
1
7
3
6
14
3
5
18
2
5
7
5
16
1
4
11
5
4
9
9
5
6
4
4
1
7
2
3
5
9
11
2
4
182
248
1,760
616
688
312
870
4,672
329
154
176
202
574
400
132
1,136
465
351
113
238
183
396
1,008
216
280
1,278
50
40
1,085
720
2,592
62
168
1,298
130
68
918
486
240
282
280
728
95
651
78
108
310
369
1,276
284
504
L-Bar
91
124
160
56
86
78
87
292
47
22
88
101
82
40
66
142
155
27
113
34
61
66
72
72
56
71
25
8
155
144
162
62
42
118
26
17
102
54
48
47
70
182
95
93
39
36
62
41
116
142
126
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
Date
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/12/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
CI
CMI
10
7
10
9
11
1
6
7
2
2
2
5
8
8
8
11
1
1
1
2
7
12
2
13
2
6
5
4
1
1
3
2
8
5
3
2
6
4
2
2
12
8
4
7
4
7
2
1
6
18
9
1,360
406
820
567
2,057
66
648
329
202
240
50
425
1,120
160
824
825
92
114
291
220
700
900
250
416
94
336
360
88
16
28
426
22
320
360
210
96
138
564
40
18
3,636
632
672
637
320
637
514
505
408
3,060
585
L-Bar
136
58
82
63
187
66
108
47
101
120
25
85
140
20
103
75
92
114
291
110
100
75
125
32
47
56
72
22
16
28
142
11
40
72
70
48
23
141
20
9
303
79
168
91
80
91
257
505
68
170
65
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
CI
CMI
1
1
1
1
12
9
2
4
1
14
1
1
1
2
1
2
10
1
2
2
6
8
11
9
6
16
23
1
6
8
5
2
4
3
8
7
5
1
1
11
7
31
34
8
1
6
14
14
1
14
2
191
49
308
102
1,248
1,476
372
680
172
1,302
1
60
118
70
339
422
330
223
126
4
972
400
1,551
540
324
2,512
3,611
199
312
64
280
80
392
531
544
364
1,495
161
24
671
245
2,356
2,856
424
77
384
490
490
91
490
528
L-Bar
191
49
308
102
104
164
186
170
172
93
1
60
118
35
339
211
33
223
63
2
162
50
141
60
54
157
157
199
52
8
56
40
98
177
68
52
299
161
24
61
35
76
84
53
77
64
35
35
91
35
264
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
5/13/2014
CI
1
14
2
5
2
2
1
2
17
1
6
5
2
94
9
2,620
2
7
2
3
5
7
85
4
14
8
2
4
6
4
6
1
2
4
7
5
1
6
11
5
8
4
7
4
7
1
2
1
7
1
21
CMI
198
532
52
325
264
36
238
356
306
185
354
490
64
38,164
693
62,880
132
308
324
483
230
406
680
56
42
376
112
272
330
748
426
107
62
512
1,169
660
80
456
407
315
232
228
84
352
441
44
38
58
455
96
1,176
L-Bar
198
38
26
65
132
18
238
178
18
185
59
98
32
406
77
24
66
44
162
161
46
58
8
14
3
47
56
68
55
187
71
107
31
128
167
132
80
76
37
63
29
57
12
88
63
44
19
58
65
96
56
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
CI
CMI
5
1
6
1
7
42
8
25
25
2
2
1
22
14
21
1
73
5
12
121
16
36
21
9
8
7
1
8
2
10
8
8
26
40
10
3
4
3
8
2
7
1
5
3
20
10
4
7
1
3
1
410
33
690
117
483
14,490
616
1,775
1,875
238
404
180
1,122
630
105
88
3,066
45
2,232
1,452
1,808
14,760
2,205
5,130
1,920
245
146
712
234
1,510
584
1,776
1,118
24,160
880
432
244
498
720
178
49
75
385
216
1,780
2,500
256
350
162
174
50
L-Bar
82
33
115
117
69
345
77
71
75
119
202
180
51
45
5
88
42
9
186
12
113
410
105
570
240
35
146
89
117
151
73
222
43
604
88
144
61
166
90
89
7
75
77
72
89
250
64
50
162
58
50
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
Date
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/14/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
CI
CMI
8
8
1
8
2
10
1
4
1
2
3
189
9
2
8
10
4
2
1
1
156
12
9
11
1
25
11
33
22
11
1
7
66
4
9
1
5
5
3
6
2
2
2
10
23
10
3
13
2
5
4
1,816
1,816
106
312
270
400
119
32
150
270
57
11,340
387
242
16
330
468
24
87
90
24,180
1,716
639
1,001
187
1,125
770
4,257
2,860
176
230
819
3,300
448
567
82
225
540
348
594
116
72
20
350
9,683
240
15
26
334
1,730
328
L-Bar
227
227
106
39
135
40
119
8
150
135
19
60
43
121
2
33
117
12
87
90
155
143
71
91
187
45
70
129
130
16
230
117
50
112
63
82
45
108
116
99
58
36
10
35
421
24
5
2
167
346
82
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/15/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
CI
CMI
12
1
5
2
4
12
4
2
6
1
4
25
25
10
1
1
1
1
2
1
1
1
1
2
4
18
11
2
17
9
22
3
2
11
1
1
1
3
1
1
2
8
11
9
2
1
45
46
4
2
3
1,188
48
1,620
224
140
636
980
56
606
11
360
2,250
2,225
380
125
59
96
88
196
184
122
66
65
3
108
18
341
132
561
1,026
3,256
468
168
2,057
77
99
46
147
264
262
62
1,752
99
909
294
36
11,250
1,242
36
306
732
L-Bar
99
48
324
112
35
53
245
28
101
11
90
90
89
38
125
59
96
88
98
184
122
66
65
2
27
1
31
66
33
114
148
156
84
187
77
99
46
49
264
262
31
219
9
101
147
36
250
27
9
153
244
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/16/2014
5/17/2014
5/17/2014
5/17/2014
5/17/2014
5/17/2014
5/17/2014
5/17/2014
CI
8
4
4
4
20
12
2
12
12
5
4
1
9
9
4
1
1
1
6
4
4
8
19
8
6
13
4
11
11
9
4
3
2
1
1
8
12
4
8
15
1
3
1
14
1
1
1
13
1,276
1
1
CMI
824
24
4
96
1,240
216
142
120
912
1,510
420
65
315
900
316
161
86
135
1,050
160
396
496
2,679
1,104
714
1,027
12
407
143
234
252
72
40
33
129
408
144
152
136
255
395
12
495
490
150
1,289
84
1,105
5,104
105
43
L-Bar
103
6
1
24
62
18
71
10
76
302
105
65
35
100
79
161
86
135
175
40
99
62
141
138
119
79
3
37
13
26
63
24
20
33
129
51
12
38
17
17
395
4
495
35
150
1,289
84
85
4
105
43
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
5/17/2014
5/17/2014
5/17/2014
5/17/2014
5/17/2014
5/17/2014
5/18/2014
5/18/2014
5/18/2014
5/18/2014
5/18/2014
5/18/2014
5/18/2014
5/18/2014
5/18/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
CI
CMI
1
2
2
1
4
9
8
4
4
1
2
1
1
8
1
2
5
4
23
2
10
1
4
1
21
2
4
6
8
3
7
2
9
12
9
7
1
3
14
7
6
4
5
13
11
7
5
5
5
2
1
188
186
184
125
64
279
784
1,108
140
174
264
123
16
872
261
618
400
776
1,426
116
570
88
236
57
420
50
320
180
1,368
627
1,218
194
9
840
1,107
112
152
519
1,008
35
594
212
1,270
1,417
2,310
721
25
200
365
34
296
L-Bar
188
93
92
125
16
31
98
277
35
174
132
123
16
109
261
309
80
194
62
58
57
88
59
57
20
25
80
30
171
209
174
97
1
70
123
16
152
173
72
5
99
53
254
109
210
103
5
40
73
17
296
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
5/19/2014
CI
CMI
4
9
6
1
10
14
16
38
6
6
22
4
3
1
1
1
1
8
4
6
3
10
13
11
4
5
1
3
2
6
2
10
7
2
2
1
14
15
7
7
7
2
19
4
5
2
3
15
16
5
1
256
342
378
382
110
378
320
3,230
1,128
696
4,730
636
51
80
137
79
207
760
204
324
60
660
455
1,430
588
170
50
114
78
612
132
760
49
254
42
9
126
510
371
910
364
164
2,546
828
345
82
720
2,730
1,568
440
64
L-Bar
64
38
63
382
11
27
20
85
188
116
215
159
17
80
137
79
207
95
51
54
20
66
35
130
147
34
50
38
39
102
66
76
7
127
21
9
9
34
53
130
52
82
134
207
69
41
240
182
98
88
64
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/19/2014
5/19/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
CI
CMI
1
1
1
1
1
16
51
1
1
1
7
6
11
14
10
9
1
7
4
5
34
2
2
4
13
9
8
1
11
1
8
1
1
18
2
1
1
1
1
25
1
7
6
9
4
11
7
2
7
1
2
136
415
340
86
28
3,472
7,017
93
81
106
539
630
374
896
1,770
729
158
1,085
232
285
8,194
92
86
884
4,368
252
160
111
858
117
1,352
116
115
4,410
206
112
105
111
104
1,600
103
910
102
900
136
1,881
504
234
182
190
380
L-Bar
136
415
340
86
28
217
147
93
81
106
77
105
34
64
177
81
158
155
58
57
241
46
43
221
336
28
20
111
78
117
169
116
115
245
103
112
105
111
104
64
103
130
17
100
34
171
72
117
26
190
190
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
CI
CMI
6
8
2
2
19
1
4
8
5
5
4
5
1
16
24
4
4
8
1
3
8
10
8
11
4
1
6
2
9
5
7
6
18
3
11
5
6
3
2
9
3
3
1
1
2
4
1
1
5
3
2
318
120
238
196
5,092
81
632
880
245
230
184
225
114
816
7,536
724
268
712
336
675
336
50
544
1,078
720
171
1,062
26
549
315
903
474
1,242
126
88
865
408
330
170
1,197
255
96
174
291
180
324
132
54
555
159
30
L-Bar
53
15
119
98
268
81
158
110
49
46
46
45
114
51
314
181
67
89
336
225
42
5
68
98
180
171
177
13
61
63
129
79
69
42
8
173
68
110
85
133
85
32
174
291
90
81
132
54
111
53
15
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/20/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
CI
CMI
3
1
2
11
1
4
1
5
11
3
1
13
9
4
85
5
10
11
8
5
8
12
2
4
9
2
2
49
1
2
10
5
1
13
38
3
2
2
1
8
126
2
2
8
4
7
2
2
2
9
1
66
52
40
1,298
685
472
129
240
1,573
255
147
806
765
136
7,225
890
770
517
144
540
592
612
116
332
819
300
76
19,747
176
230
1,810
300
6
1,794
9,994
222
134
268
166
520
18,648
250
160
208
584
1,141
148
412
16
765
218
L-Bar
22
52
20
118
685
118
129
48
143
85
147
62
85
34
85
178
77
47
18
108
74
51
58
83
91
150
38
403
176
115
181
60
6
138
263
74
67
134
166
65
148
125
80
26
146
163
74
206
8
85
218
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/21/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
CI
CMI
23
10
35
2
1
1
3
28
2
1
2
7
1
6
1
7
3
8
5
6
15
6
4
8
12
1
2
1
1
12
3
5
1
4
13
1
2
1
4
3
1
16
9
7
5
3
1
16
5
9
8
3,680
420
3,528
178
210
51
474
2,128
252
27
260
497
49
216
129
154
354
544
295
282
585
222
396
328
348
33
222
94
120
1,392
21
680
65
640
1,105
49
64
55
56
258
413
304
2,448
441
675
324
92
1,248
495
801
584
L-Bar
160
42
108
89
210
51
158
76
126
27
130
71
49
36
129
22
118
68
59
47
39
37
99
41
29
33
111
94
120
116
7
136
65
160
85
49
32
55
14
86
413
19
272
63
135
108
92
78
99
89
73
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
CI
CMI
6
3
1
6
6
6
1
4
12
5
1
4
1
6
2
7
1
41
11
23
2
5
2
2
5
2
1
3
5
3
5
3
10
4
4
2
11
5
6
8
5
1
19
2
2
2
2
1
11
3
3
330
624
55
330
342
420
90
504
1,680
460
94
104
236
366
52
1,232
148
4,018
2,222
4,600
322
545
202
196
645
104
22
45
320
783
505
636
1,190
184
384
278
473
390
510
56
635
100
2,280
86
28
184
310
91
1,441
252
339
L-Bar
55
208
55
55
57
70
90
126
140
92
94
26
236
61
26
176
148
98
202
200
161
109
101
98
129
52
22
15
64
261
101
212
119
46
96
139
43
78
85
7
127
100
120
43
14
92
155
91
131
84
113
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/22/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
CI
CMI
2
2
7
1
5
2
1
1
9
7
2
1
1
1
6
11
5
3
2
7
7
3
8
2
24
17
1
8
4
5
3
15
6
1
2
12
7
6
1
31
9
2
2
14
97
97
14
2
8
2
2
236
40
1,582
93
565
204
40
145
1,449
371
210
82
44
64
204
814
120
513
60
399
42
801
1,744
176
120
1,071
95
88
1,196
250
72
2,835
366
84
192
48
917
1,002
30
124
738
16
16
1,778
15,035
15,035
770
96
1,120
48
64
L-Bar
118
20
226
93
113
102
40
145
161
53
105
82
44
64
34
74
24
171
30
57
6
267
218
88
5
63
95
11
299
50
24
189
61
84
96
4
131
167
30
4
82
8
8
127
155
155
55
48
140
24
32
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/23/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/24/2014
5/25/2014
5/25/2014
5/25/2014
5/25/2014
5/25/2014
5/26/2014
5/26/2014
5/26/2014
5/26/2014
5/26/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
CI
CMI
1
1
2
1
2
16
1
4
2
2
4
7
1
2
24
6
1
8
15
4
5
1
5
1
5
10
1
2
1
1
8
18
4
1
1
3
2
2
3
1
2
1
12
4
6
8
5
6
11
24
11
36
8
104
130
252
736
31
72
228
156
432
35
244
266
96
612
205
5,024
7,629
1,036
815
208
240
157
430
3,240
19
8
59
125
1,528
1,422
280
92
90
168
26
306
519
113
452
105
1,428
108
786
888
700
978
968
1,464
2,200
L-Bar
36
8
52
130
126
46
31
18
114
78
108
5
244
133
4
102
205
628
707
259
163
208
48
157
86
324
19
4
59
125
191
79
70
92
90
56
13
153
173
113
226
105
119
27
131
111
140
163
88
61
200
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
CI
CMI
2
3
1
61
8
84
10
7
3
8
10
64
10
5
2
2
12
24
14
2
1
10
1
7
5
1
2
2
1
15
4
19
15
15
25
5
2
2
39
12
2
6
4
8
9
2
1
1
7
6
1
982
69
85
4,392
464
26,544
610
511
60
88
60
7,872
1,790
1,060
354
162
72
480
126
116
16
1,190
19
1,267
1,030
14
284
190
89
5,790
560
7,372
5,820
5,790
9,750
1,955
82
26
1,287
744
486
504
316
592
405
54
84
61
476
612
128
L-Bar
491
23
85
72
58
316
61
73
20
11
6
123
179
212
177
81
6
20
9
58
16
119
19
181
206
14
142
95
89
386
140
388
388
386
390
391
41
13
33
62
243
84
79
74
45
27
84
61
68
102
128
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/27/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
CI
CMI
4
9
12
4
2
34
10
14
3
1
1
11
15
2
3
7
7
2
6
1
5
8
1
7
8
69
16
10
2
2
2
15
11
2
11
88
8
5
2
4
8
12
1
4
60
10
1
1
3
10
6
440
711
2,136
140
238
2,006
760
84
24
89
72
1,089
795
20
129
364
945
304
114
99
750
808
6
994
584
12,213
432
700
254
398
292
2,490
693
118
4,400
46,024
976
565
230
68
72
1,464
18
312
10,980
1,330
131
174
219
780
198
L-Bar
110
79
178
35
119
59
76
6
8
89
72
99
53
10
43
52
135
152
19
99
150
101
6
142
73
177
27
70
127
199
146
166
63
59
400
523
122
113
115
17
9
122
18
78
183
133
131
174
73
78
33
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
5/28/2014
CI
CMI
8
7
3
18
3
2
1
11
3
2
9
12
5
1
3
3
1
5
10
4
18
10
1
58
1
30
1
7
9
4
5
3
5
4
2
3
23
1
2
1
16
4
11
3
3
1
3
30
30
1
1
512
567
372
900
306
402
129
1,914
561
66
1,044
1,740
615
253
660
321
55
105
710
608
288
750
130
1,682
208
5,430
199
182
693
596
450
207
650
368
88
84
828
110
2
107
1,056
152
253
24
1,017
25
3
1,950
3,510
67
86
L-Bar
64
81
124
50
102
201
129
174
187
33
116
145
123
253
220
107
55
21
71
152
16
75
130
29
208
181
199
26
77
149
90
69
130
92
44
28
36
110
1
107
66
38
23
8
339
25
1
65
117
67
86
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/28/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
CI
CMI
14
18
1
6
2
10
14
1
4
9
17
5
1
9
13
6
8
6
32
8
8
4
33
5
293
5
10
36
1
6
2
11
3
1
2
2
1
4
11
7
5
22
9
12
7
3
1
2
1
6
7
2,338
2,898
141
1,074
232
1,450
2,016
372
604
1,125
884
2,240
104
594
2,002
198
752
270
2,336
848
904
128
5,247
395
879
120
560
4,608
43
858
166
352
296
363
320
146
40
84
946
581
230
1,804
378
2,112
854
288
14
52
107
378
833
L-Bar
167
161
141
179
116
145
144
372
151
125
52
448
104
66
154
33
94
45
73
106
113
32
159
79
3
24
56
128
43
143
83
32
294
363
160
73
40
21
86
83
46
82
42
176
122
96
14
26
107
63
119
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/29/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
CI
CMI
60
4
3
10
2
13
8
8
10
5
4
4
1
7
3
32
18
20
8
17
5
1
9
1
1
3
4
4
1
9
7
9
1
11
2
1
1
29
2
24
26
7
10
2
11
7
17
9
10
4
1
2,220
504
114
630
114
1,066
848
736
290
145
288
56
48
812
57
5,504
1,638
800
1,744
442
390
83
18
21
100
54
144
568
149
684
217
396
47
88
422
182
147
696
1,002
432
6,214
2,268
270
332
638
595
3,349
702
2,130
520
92
L-Bar
37
126
38
63
57
82
106
92
29
29
72
14
48
116
19
172
91
40
218
26
78
83
2
21
100
18
36
142
149
76
31
44
47
8
211
182
147
24
501
18
239
324
27
166
58
85
197
78
213
130
92
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/30/2014
5/31/2014
5/31/2014
5/31/2014
5/31/2014
5/31/2014
5/31/2014
5/31/2014
5/31/2014
6/1/2014
6/1/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
CI
3
13
43
35
6
16
63
10
10
16
9
26
7
36
6
8
5
8
2
36
1
2
4
6
64
36
3
7
4
14
1
2
1
7
4
1,450
4
1
3
1
3
3
4
1
33
2
26
1
10
7
8
CMI
504
13
1,075
2,940
78
80
10,647
2,470
90
3,168
495
2,548
574
972
30
1,008
1,095
664
142
2,160
90
174
260
540
4,672
2,556
537
287
308
364
77
106
123
1,092
392
37,700
1,160
392
192
6
213
483
188
94
2,277
268
1,456
98
980
882
1,920
L-Bar
168
1
25
84
13
5
169
247
9
198
55
98
82
27
5
126
219
83
71
60
90
87
65
90
73
71
179
41
77
26
77
53
123
156
98
26
290
392
64
6
71
161
47
94
69
134
56
98
98
126
240
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
CI
CMI
4
7
4
2
2
4
6
1
2
8
17
6
1
4
6
1
2
14
3
6
4
5
7
2
8
13
8
6
20
7
12
6
5
14
1
3
3
1
1
1
2
2
5
5
9
5
3
3
2
2
3
772
1,470
428
294
292
204
372
157
118
744
17
690
55
136
744
43
50
56
117
570
328
505
924
58
944
1,118
824
18
460
133
528
384
990
1,904
51
327
108
36
142
142
56
30
1,090
290
522
290
174
180
38
196
543
L-Bar
193
210
107
147
146
51
62
157
59
93
1
115
55
34
124
43
25
4
39
95
82
101
132
29
118
86
103
3
23
19
44
64
198
136
51
109
36
36
142
142
28
15
218
58
58
58
58
60
19
98
181
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/2/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
CI
CMI
8
6
6
9
6
1
2
3
4
2
6
1
3
1
1
10
27
9
6
6
8
17
17
39
2
1
15
44
4
9
11
1
10
10
9
8
4
5
1
2
4
11
7
1
3
24
2
5
1
8
12
704
60
510
972
564
99
194
156
296
248
504
116
189
148
126
830
2,700
486
360
162
2,056
4,760
1,326
9,711
302
28
2,880
5,764
364
261
154
502
1,750
780
333
1,480
616
910
208
190
252
1,298
245
182
1,035
696
226
285
4
776
2,064
L-Bar
88
10
85
108
94
99
97
52
74
124
84
116
63
148
126
83
100
54
60
27
257
280
78
249
151
28
192
131
91
29
14
502
240
78
37
185
154
182
208
95
63
118
35
182
345
29
113
57
4
97
172
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/3/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
CI
CMI
12
8
8
4
4
2
9
7
2
12
8
61
2
2
4
2
27
4
5
1
3
2
1
4
7
11
3
2
4
5
1
9
1
1
1
1
20
11
13
11
7
3
7
8
8
11
2
2
2
10
3
1,824
176
1,648
292
60
198
567
798
182
912
488
488
184
64
284
110
972
528
310
93
342
334
141
604
441
869
249
186
372
185
70
594
19
46
77
46
2,000
110
2,262
4,169
1,001
2,052
735
1,176
2,408
1,507
196
578
140
250
168
L-Bar
152
22
206
73
15
99
63
114
91
76
61
8
92
32
71
55
36
132
62
93
114
167
141
151
63
79
83
93
93
37
70
66
19
46
77
46
100
10
174
379
143
684
105
147
301
137
98
289
70
25
56
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
CI
CMI
63
73
19
6
62
5
17
23
5
7
8
21
42
2
3
9
4
14
6
7
2
1
37
3
6
7
6
2
6
8
7
1
7
8
53
5
6
8
7
7
8
8
8
2
26
2
5
12
11
10
3
8,316
3,212
1,178
234
11,966
45
51
2,622
540
504
248
2,940
672
240
168
2,628
148
1,316
648
959
200
113
5,032
69
228
126
114
122
228
304
420
60
266
304
11,713
25
378
440
385
1,344
432
408
808
398
6,370
146
270
60
286
1,250
318
L-Bar
132
44
62
39
193
9
3
114
108
72
31
140
16
120
56
292
37
94
108
137
100
113
136
23
38
18
19
61
38
38
60
60
38
38
221
5
63
55
55
192
54
51
101
199
245
73
54
5
26
125
106
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
Date
CI
CMI
L-Bar
Repair Cost
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6
7
16
29
18
6
5
1
4
13
2
9
3
31
5
3
3
18
8
3
6
5
1
9
1
2
17
36
917
2,928
2,610
2,052
390
280
91
396
663
114
693
240
3,813
555
33
117
2,340
352
276
378
10
112
621
29
204
1,955
6
131
183
90
114
65
56
91
99
51
57
77
80
123
111
11
39
130
44
92
63
2
112
69
29
102
115
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/4/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
5
5
6
4
1
8
9
5
1
1
23
396
5
1
4
5
7
36
36
1
6
12
350
1,020
294
100
60
624
648
260
90
293
989
11,088
675
121
200
525
1,358
11,628
3,024
66
408
480
70
204
49
25
60
78
72
52
90
293
43
28
135
121
50
105
194
323
84
66
68
40
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
CI
CMI
8
18
7
17
6
5
12
1
18
80
2
1
1
11
4
1
49
9
1
8
7
1
2
6
4
2
4
4
8
15
4
12
6
11
1
27
27
5
8
1
9
1
6
4
15
19
15
68
11
6
5
696
3,456
553
4,794
6
310
4,296
62
918
6,000
432
33
43
2,871
400
66
21,462
864
74
560
483
116
216
498
824
420
112
668
8
3,525
676
1,572
1,050
638
75
1,485
7,722
60
1,840
53
801
111
420
256
180
5,491
2,850
12,920
704
636
705
L-Bar
87
192
79
282
1
62
358
62
51
75
216
33
43
261
100
66
438
96
74
70
69
116
108
83
206
210
28
167
1
235
169
131
175
58
75
55
286
12
230
53
89
111
70
64
12
289
190
190
64
106
141
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/5/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
CI
CMI
3
7
13
2
1
12
2
12
4
4
6
6
2
2
5
7
1
1
3
7
4
6
2
1
2
1
2
1
8
13
3
9
13
3
5
6
2
5
10
1
4
8
12
4
9
4
1
1
14
5
3
276
14
975
66
41
1,224
164
792
348
20
210
540
114
14
200
966
160
178
234
119
20
36
52
206
38
135
132
181
576
1,690
342
1,314
1,066
213
1,280
342
104
180
610
56
320
408
1,080
168
333
156
164
153
686
470
162
L-Bar
92
2
75
33
41
102
82
66
87
5
35
90
57
7
40
138
160
178
78
17
5
6
26
206
19
135
66
181
72
130
114
146
82
71
256
57
52
36
61
56
80
51
90
42
37
39
164
153
49
94
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/6/2014
6/7/2014
6/7/2014
6/7/2014
6/7/2014
6/7/2014
6/7/2014
6/7/2014
6/7/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
6/8/2014
CI
2
20
10
4
10
67
4
3
8
5
1
157
1
1
8
4
75
10
3
12
14
5
3
2,343
6
12
1
2
1
9
7
4
25
13
19
6
1
8
2
12
1
8
4
309
6
1
1
1
6
1
1
CMI
134
300
2,720
460
1,640
10,452
240
954
168
65
92
18,526
56
60
72
424
3,525
1,570
297
1,092
924
915
300
49,203
102
144
94
30
200
576
287
60
1,200
1,989
9,405
1,338
72
1,352
46
1,188
48
5,112
160
188,799
858
33
30
79
414
129
166
L-Bar
67
15
272
115
164
156
60
318
21
13
92
118
56
60
9
106
47
157
99
91
66
183
100
21
17
12
94
15
200
64
41
15
48
153
495
223
72
169
23
99
48
639
40
611
143
33
30
79
69
129
166
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
CI
CMI
9
4
1
25
7
7
20
3
4
24
2
2
5
2
13
6
8
3
4
18
3
2
16
7
5
6
13
1
16
1
6
1
9
41
12
1
3
14
6
3
3
24
52
2
2
3
4
11
4
2
1
162
68
99
1,350
791
1,316
780
225
528
408
164
150
355
456
5,057
1,584
1,480
231
316
1,386
72
28
4,384
903
680
534
1,729
99
1,680
18
1,200
304
162
2,378
276
107
324
84
906
93
219
2,976
1,508
58
176
240
452
803
296
204
63
L-Bar
18
17
99
54
113
188
39
75
132
17
82
75
71
228
389
264
185
77
79
77
24
14
274
129
136
89
133
99
105
18
200
304
18
58
23
107
108
6
151
31
73
124
29
29
88
80
113
73
74
102
63
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/9/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
CI
CMI
5
3
12
39
10
5
16
59
3
3
11
2
8
12
1
8
1
1
5
29
12
1
7
5
1
18
3
2
25
1
7
1
1
3
23
1
2
12
51
3
8
1
3
2
1
2
3
3
1
3
8
485
264
1,032
3,159
610
50
2,480
236
330
186
594
118
272
1,068
13
336
125
170
525
870
252
117
1,617
445
50
774
195
210
3,050
272
119
177
79
207
1,288
112
200
2,388
2,907
150
1,256
268
282
72
173
238
93
906
158
318
24
L-Bar
97
88
86
81
61
10
155
4
110
62
54
59
34
89
13
42
125
170
105
30
21
117
231
89
50
43
65
105
122
272
17
177
79
69
56
112
100
199
57
50
157
268
94
36
173
119
31
302
158
106
3
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
CI
CMI
1
12
6
3
1
1
4
2
4
2
2
7
24
2
12
1
1
11
4
3
12
2
1
4
3
5
9
8
25
10
30
3
1
5
4
4
1
25
3
13
9
10
1
8
2
27
4
1
6
8
1
53
2,928
726
42
66
11
928
282
764
78
1,296
721
1,320
216
780
113
35
2,981
316
93
624
164
164
324
54
965
1,944
1,624
6,850
1,170
4,170
303
45
365
340
8
89
3,625
366
1,430
306
680
330
496
92
1,512
456
169
432
424
29
L-Bar
53
244
121
14
66
11
232
141
191
39
648
103
55
108
65
113
35
271
79
31
52
82
164
81
18
193
216
203
274
117
139
101
45
73
85
2
89
145
122
110
34
68
330
62
46
56
114
169
72
53
29
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/10/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
CI
CMI
2
10
1
2
1
11
1
3
1
8
71
28
1
14
1
2
10
1
3
1
1
7
8
5
8
3
3
7
6
1
8
5
1
17
2
1
7
2
4
1
8
4
7
6
3
8
3
16
8
6
12
108
290
241
244
65
429
40
141
33
304
2,769
140
102
2,982
204
254
1,020
81
279
224
113
616
696
815
288
225
177
553
480
71
440
170
70
102
178
102
35
358
1,168
254
1,240
112
1,246
864
186
616
219
1,584
448
894
204
L-Bar
54
29
241
122
65
39
40
47
33
38
39
5
102
213
204
127
102
81
93
224
113
88
87
163
36
75
59
79
80
71
55
34
70
6
89
102
5
179
292
254
155
28
178
144
62
77
73
99
56
149
17
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
CI
CMI
3
12
1
9
2
1
22
22
10
12
9
1
2
3
1
6
4
7
5
11
10
1
11
9
13
6
3
19
16
4
5
8
1
5
2
23
13
4
2
11
1
8
58
1
4
6
1
8
17
6
4
627
1,404
49
531
156
215
2,596
2,574
1,190
144
315
113
84
231
151
1,944
196
1,106
105
1,837
480
114
1,265
36
1,963
438
252
1,274
1,008
164
190
536
83
385
198
23
1,027
268
234
737
287
48
1,192
60
332
1,602
78
1,896
187
486
688
L-Bar
209
117
49
59
78
215
118
117
119
12
35
113
42
77
151
324
49
158
21
167
48
114
115
4
151
73
84
146
63
41
38
67
83
77
99
1
79
67
117
67
287
6
190
60
83
267
78
237
11
81
172
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/11/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
CI
CMI
1
1
5
25
2
42
16
2
21
6
1
3
8
1
11
9
3
10
6
1
1
2
1
10
7
1
1
3
4
4
5
4
1
4
8
11
6
15
1
2
2
1
1
5
8
4
1
1
10
7
12
90
20
55
1,125
44
2,478
1,680
64
567
336
173
378
1,152
36
539
981
318
750
570
75
39
74
83
1,620
112
23
169
507
584
672
480
304
97
172
544
1,749
486
3,975
547
288
132
132
109
780
640
132
120
207
680
798
1,380
L-Bar
90
20
11
45
22
59
105
32
27
56
173
126
144
36
49
109
106
75
95
75
39
37
83
162
16
23
169
169
146
168
96
76
97
43
68
159
81
265
547
144
66
132
109
156
80
33
120
207
68
114
115
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/12/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
CI
CMI
1
1
3
7
3
13
2
1
1
8
2
1
5
2
3
1
2
1
9
1
6
1
2
14
1
12
7
9
1
6
9
3
5
1
1
1
2
6
3
7
13
12
7
12
2
6
3
4
5
8
3
106
51
144
847
33
169
260
154
108
848
240
102
640
22
147
54
256
71
225
180
1,026
98
166
70
114
264
406
108
81
222
918
459
180
50
47
91
16
162
294
917
2,613
2,184
952
1,500
620
714
483
932
780
1,112
543
L-Bar
106
51
48
121
11
13
130
154
108
106
120
102
128
11
49
54
128
71
25
180
171
98
83
5
114
22
58
12
81
37
102
153
36
50
47
91
8
27
98
131
201
182
136
125
310
119
161
233
156
139
181
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/13/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/14/2014
6/15/2014
CI
CMI
23
9
6
1
6
26
2
1
15
8
4
4
7
20
9
4
2
6
1
1
4
8
1
2
9
4
5
6
1
14
1
1
2
4
15
15
5
2
1
1
1
12
121
6
7
1
2
2
1
1
17
3,726
927
642
75
924
676
222
123
1,770
2,240
192
600
1,078
1,180
387
608
202
1,644
302
301
16
272
42
12
342
360
115
612
70
1,456
166
87
10
1,148
1,155
1,230
150
102
7
86
260
1,200
9,317
1,236
1,687
161
72
470
243
53
2,805
L-Bar
162
103
107
75
154
26
111
123
118
280
48
150
154
59
43
152
101
274
302
301
4
34
42
6
38
90
23
102
70
104
166
87
5
287
77
82
30
51
7
86
260
100
77
206
241
161
36
235
243
53
165
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
6/15/2014
6/15/2014
6/15/2014
6/15/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
CI
CMI
2
1
1
2
9
16
11
6
6
8
6
1
5
8
6
4
6
10
20
8
4
1
52
24
1
9
8
33
33
1
5
8
16
7
2
3
16
2
5
2
10
22
2
5
8
7
10
10
19
4
5
76
35
157
376
1,386
1,504
1,771
1,308
540
536
1,038
103
935
1,992
420
328
492
720
1,260
40
456
104
3,380
1,152
93
1,935
608
5,940
4,950
119
715
1,056
384
1,127
178
327
3,024
242
905
178
220
2,112
148
105
688
798
40
360
3,268
244
295
L-Bar
38
35
157
188
154
94
161
218
90
67
173
103
187
249
70
82
82
72
63
5
114
104
65
48
93
215
76
180
150
119
143
132
24
161
89
109
189
121
181
89
22
96
74
21
86
114
4
36
172
61
59
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/16/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
CI
CMI
1
14
6
6
4
17
11
3
10
1
10
9
18
1
1
8
13
4
1
10
83
9
7
1
4
2
4
8
3
3
3
1
4
13
3
2
2
8
8
6
1
1
17
8
2
3
5
1
31
29
8
106
154
450
126
364
2,329
880
354
1,260
317
540
603
1,800
80
98
640
3,081
412
88
10
83
1,386
469
96
448
396
304
656
21
162
435
487
232
65
219
128
174
1,288
536
270
428
156
1,309
496
152
84
465
278
6,045
5,539
8
L-Bar
106
11
75
21
91
137
80
118
126
317
54
67
100
80
98
80
237
103
88
1
1
154
67
96
112
198
76
82
7
54
145
487
58
5
73
64
87
161
67
45
428
156
77
62
76
28
93
278
195
191
1
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
CI
CMI
3
4
3
59
2
39
6
9
9
5
8
3
1
22
4
24
2
8
4
7
3
1
47
12
1
6
5
8
9
9
3
2
5
4
18
5
14
7
26
7
9
6
9
2
8
4
1
5
10
8
1
3
4
564
9,912
222
3,393
312
540
873
715
560
321
271
2,706
420
1,512
160
488
424
1,008
105
111
10,387
1,068
83
822
510
168
207
396
3
254
90
128
1,368
280
434
1,120
2,704
105
657
180
585
202
1,008
348
190
90
550
528
44
L-Bar
1
1
188
168
111
87
52
60
97
143
70
107
271
123
105
63
80
61
106
144
35
111
221
89
83
137
102
21
23
44
1
127
18
32
76
56
31
160
104
15
73
30
65
101
126
87
190
18
55
66
44
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/17/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
CI
CMI
6
1
1
8
6
1
1
4
1
10
58
12
1
3
2
9
8
5
5
8
7
1
10
6
8
10
3
4
11
1
12
4
18
6
5
5
3
5
12
2
1
7
12
4
8
2
2
2
6
5
2
156
59
18
736
342
39
105
220
75
240
12,354
1,704
84
300
178
720
552
945
285
472
406
96
2,940
624
1,176
850
537
664
913
52
1,272
516
2,916
264
570
450
177
860
1,524
268
149
665
1,572
580
344
682
682
40
480
1,070
412
L-Bar
26
59
18
92
57
39
105
55
75
24
213
142
84
100
89
80
69
189
57
59
58
96
294
104
147
85
179
166
83
52
106
129
162
44
114
90
59
172
127
134
149
95
131
145
43
341
341
20
80
214
206
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
CI
CMI
8
2
1
7
8
13
2
10
6
2
5
93
2
6
4
10
6
8
7
8
12
9
1
10
1
3
1
49
3
7
1
9
9
1
12
2
12
14
1
2
7
1
1
24
1
1
49
4
2
6
3
528
450
21
840
992
2,795
14
1,290
330
150
95
14,694
214
906
340
730
498
816
1,267
360
144
378
289
710
24
387
160
4,557
258
462
157
1,026
801
192
132
366
504
658
94
72
385
133
193
2,856
191
178
3,871
360
202
1,002
132
L-Bar
66
225
21
120
124
215
7
129
55
75
19
158
107
151
85
73
83
102
181
45
12
42
289
71
24
129
160
93
86
66
157
114
89
192
11
183
42
47
94
36
55
133
193
119
191
178
79
90
101
167
44
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/18/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
CI
CMI
3
12
9
6
2
6
1
2
1
1
1
1
12
6
1
4
3
5
1
7
27
15
2
1
1
6
11
6
16
3
12
2
2
1
2
7
12
6
1
8
25
8
10
4
11
1
89
3
1
12
7
9
1,368
549
84
120
570
64
124
110
30
93
61
192
300
76
296
117
705
71
224
1,917
1,050
264
81
81
462
616
396
3,200
447
240
96
318
175
56
1,071
876
630
77
1,408
5,325
1,208
740
44
2,299
239
7,763
201
163
1,692
343
L-Bar
3
114
61
14
60
95
64
62
110
30
93
61
16
50
76
74
39
141
71
32
71
70
132
81
81
77
56
66
200
149
20
48
159
175
28
153
73
105
77
176
213
151
74
11
209
239
113
67
163
141
49
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
CI
CMI
2
15
3
12
11
11
9
14
7
4
2
2
8
8
7
7
10
4
20
2
3
4
2
4
1
8
3
8
1
2
14
1
1
1
7
3
1
8
1
3
1
1
1
8
13
6
41
12
2
15
9
306
15
201
60
2,057
726
531
770
77
464
136
282
2,344
1,512
483
343
1,940
1,024
2,080
338
222
704
118
724
424
56
219
1,256
199
364
868
69
193
192
364
459
81
448
13
201
40
69
52
1,416
663
24
3,403
696
260
360
1,593
L-Bar
153
1
67
5
187
66
59
55
11
116
68
141
293
189
69
49
194
256
104
169
74
176
59
181
424
7
73
157
199
182
62
69
193
192
52
153
81
56
13
67
40
69
52
177
51
4
83
58
130
24
177
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/19/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
CI
CMI
5
4
6
1
11
1
25
20
4
8
24
1
2
7
2
2
4
8
2
8
9
1
22
11
6
4
1
4
1
2
7
7
5
1
6
11
10
1
1
27
12
35
9
11
11
3
12
5
1
13
14
245
468
342
18
231
34
3,250
2,320
160
1,040
1,920
92
16
637
214
64
428
440
120
1,144
567
141
1,012
693
84
228
56
228
182
342
259
945
880
296
1,014
2,123
2,250
43
90
2,079
564
1,645
1,107
693
737
330
2,112
220
190
6,448
112
L-Bar
49
117
57
18
21
34
130
116
40
130
80
92
8
91
107
32
107
55
60
143
63
141
46
63
14
57
56
57
182
171
37
135
176
296
169
193
225
43
90
77
47
47
123
63
67
110
176
44
190
496
8
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
6/20/2014
CI
CMI
1
12
1
9
8
27
5
7
6
3
1
2
15
1
2
1
1
9
4
3
1
3
1
10
12
7
3
2
4
2
4
1
4
7
3
2
2
9
6
5
7
1
4
2
1
4
3
1
5
2
2
101
1,500
350
684
728
1,134
620
483
372
915
327
150
1,830
66
102
51
50
450
44
333
24
57
110
820
1,740
84
54
62
280
230
128
107
152
539
90
198
178
1,890
258
195
294
42
84
36
190
28
102
32
60
478
468
L-Bar
101
125
350
76
91
42
124
69
62
305
327
75
122
66
51
51
50
50
11
111
24
19
110
82
145
12
18
31
70
115
32
107
38
77
30
99
89
210
43
39
42
42
21
18
190
7
34
32
12
239
234
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/20/2014
6/20/2014
6/20/2014
6/21/2014
6/21/2014
6/21/2014
6/21/2014
6/21/2014
6/21/2014
6/21/2014
6/21/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/22/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
CI
1
4
1
2
5
3
15
5
2
1
8
3
1
1
14
4
3
25
1
28
2
3
2
9
1,334
2
4
1
1
5
9
14
2
4
6
6
1
6
10
5
8
1
3
7
8
10
13
2
17
8
5
CMI
154
80
352
396
60
165
585
875
22
30
16
375
119
314
9,618
204
243
2,200
79
2,128
44
30
160
1,620
48,024
270
860
91
424
470
882
1,106
132
1,112
558
456
163
1,770
2,880
1,485
968
157
24
98
1,256
680
13
280
2,006
288
1,005
L-Bar
154
20
353
198
12
55
39
175
11
30
2
125
119
314
687
51
81
88
79
76
22
10
80
180
36
135
215
91
424
94
98
79
66
278
93
76
163
295
288
297
121
157
8
14
157
68
1
140
118
36
201
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
CI
CMI
27
3
4
4
10
8
15
4
8
7
14
11
2
29
3
5
18
8
20
4
3
2
4
2
1
1
10
1
10
2
18
39
3
10
4
5
9
1
9
10
6
4
6
85
1
12
4
4
1
2
7
1,080
330
96
132
2,120
144
2,280
444
1,392
469
42
946
414
4,872
180
565
2,538
1,720
2,760
260
237
118
328
92
21
140
580
47
1,370
246
1,980
2,730
12
1,180
680
95
423
141
819
1,290
114
664
348
850
55
696
284
256
113
226
973
L-Bar
40
110
24
33
212
18
152
111
174
67
3
86
207
168
60
113
141
215
138
65
79
59
82
46
21
140
58
47
137
123
110
70
4
118
170
19
47
141
91
129
19
166
58
10
55
58
71
64
113
113
139
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/23/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
CI
CMI
4
6
8
8
4
4
1
2
3
8
1
6
11
5
10
9
8
3
36
8
26
1
17
6
24
7
27
8
1
33
1
8
2
3
3
2
9
6
1
1
2
7
9
28
1
16
26
3
9
5
6
208
888
464
128
376
268
125
40
333
328
72
1,098
19
1,000
680
342
584
834
11,988
912
8,658
493
1,156
870
600
1,323
9,531
992
492
3,432
114
736
90
336
99
146
1,053
66
6
249
452
1,099
1,962
8,988
64
4,768
7,748
408
1,656
505
252
L-Bar
52
148
58
16
94
67
125
20
111
41
72
183
9
200
68
38
73
278
333
114
333
493
68
145
25
189
353
124
492
104
114
92
45
112
33
73
117
11
6
249
226
157
218
321
64
298
298
136
184
101
42
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
CI
CMI
14
10
1
5
10
4
15
7
3
5
5
15
3
1
1
5
1
17
13
11
11
4
4
10
1
3
10
3
4
3
3
1
4
5
3
1
4
4
6
6
6
7
5
6
12
7
6
5
1
10
13
210
60
60
305
1,030
700
1,230
35
999
85
335
75
252
239
219
250
217
1,513
130
803
418
264
240
1,490
94
327
480
360
1,180
282
384
16
164
440
90
238
1,088
248
276
420
876
672
195
414
2,016
826
330
185
77
910
1,326
L-Bar
15
6
60
61
103
175
82
5
333
17
67
5
84
239
219
50
217
89
10
73
38
66
60
149
94
109
48
120
295
94
128
16
41
88
30
238
272
62
46
70
146
96
39
69
168
118
55
37
77
91
102
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/24/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
CI
CMI
14
8
5
1
6
5
4
1
2
6
7
3
1
6
2
2
4
7
2
1
2
11
4
5
1
26
4
2
2
9
2
1
4
11
33
4
10
4
4
5
9
1
2
1
29
2
12
7
12
4
3
1,078
400
430
83
54
30
576
195
114
24
966
312
338
732
420
74
484
84
332
71
278
44
128
80
135
2,548
436
178
296
3,114
112
196
684
924
4,554
972
800
972
972
1,065
585
131
156
45
2,581
350
408
693
2,328
552
429
L-Bar
77
50
86
83
9
6
144
195
57
4
138
104
338
122
210
37
121
12
166
71
139
4
32
16
135
98
109
89
148
346
56
196
171
84
138
243
80
243
243
213
65
131
78
45
89
175
34
99
194
138
143
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
CI
CMI
1
5
12
32
1
7
2
3
16
3
8
4
8
10
3
6
5
10
6
18
12
10
8
38
8
14
8
2
25
13
39
7
4
8
17
12
1
3
5
2
24
6
10
6
1
13
3
2
14
6
2
84
795
1,128
384
275
1,484
4
597
288
471
1,144
212
1,096
480
528
450
340
1,700
1,074
1,530
408
1,110
496
1,938
760
406
1,440
420
3,475
663
312
539
268
1,592
1,581
576
97
156
105
56
3,600
558
580
360
78
1,911
534
340
742
504
214
L-Bar
84
159
94
12
275
212
2
199
18
157
143
53
137
48
176
75
68
170
179
85
34
111
62
51
95
29
180
210
139
51
8
77
67
199
93
48
97
52
21
28
150
93
58
60
78
147
178
170
53
84
107
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/25/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
CI
CMI
1
7
5
8
14
8
1
1
12
8
1
2
1
1
5
7
1
7
2
4
4
4
4
12
5
2
32
7
3
1
3
3
4
14
3
2
8
6
12
12
7
3
29
9
2
15
42
19
4
3
1
15
434
400
704
546
1,408
102
156
1,308
544
94
224
58
84
560
1,050
118
294
166
672
532
232
308
696
205
110
448
882
294
73
282
531
192
546
156
306
768
372
552
492
455
183
5,191
495
270
495
10,206
2,888
672
297
178
L-Bar
15
62
80
88
39
176
102
156
109
68
94
112
58
84
112
150
118
42
83
168
133
58
77
58
41
55
14
126
98
73
94
177
48
39
52
153
96
62
46
41
65
61
179
55
135
33
243
152
168
99
178
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
CI
CMI
11
10
17
8
4
13
10
10
2
4
9
8
20
12
10
2
10
10
2
11
9
7
24
17
5
2
5
8
3
75
5
7
4
7
6
5
6
2
1
3
3
7
8
10
4
2
50
7
4
2
2
451
410
1,275
328
748
533
560
450
212
508
1,377
896
4,560
1,008
440
154
30
2,700
216
1,177
594
3,255
8,328
1,904
325
168
1,745
800
240
6,975
960
1,064
756
504
168
405
78
232
74
219
57
994
952
1,110
536
392
28,950
385
64
4
230
L-Bar
41
41
75
41
187
41
56
45
106
127
153
112
228
84
44
77
3
270
108
107
66
465
347
112
65
84
349
100
80
93
192
152
189
72
28
81
13
116
74
73
19
142
119
111
134
196
579
55
16
2
115
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
6/26/2014
CI
16
16
39
5
6
14
8
5
36
9
2
11
11
9
7
11
2
1
1,712
2,577
8
1
1
1
3
33
75
3
3
4
2
6
1
83
2
5
1
17
5
5
2
1
1
1
69
4
10
7
1
8
17
CMI
848
272
546
655
42
1,414
72
95
684
1,719
138
1,419
33
396
35
2,266
188
337
1,712
2,577
56
81
200
121
27
1,089
2,400
483
288
192
158
408
116
18,509
326
780
88
694
375
230
152
97
92
104
5,727
188
410
630
119
872
2,805
L-Bar
53
17
14
131
7
101
9
19
19
191
69
129
3
44
5
206
94
337
1
1
7
81
200
121
9
33
32
161
96
48
79
68
116
223
163
156
88
72
75
46
76
97
92
104
83
47
41
90
119
109
165
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/27/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
CI
CMI
9
6
1
10
2
8
7
10
3
1
24
12
1
4
8
2
1
8
20
8
27
2
8
7
13
56
10
2
4
28
3
6
4
45
3
28
11
7
4
3
7
3
1
6
6
3
1
1
1
1
3
801
930
60
1,100
324
1,144
994
1,130
342
36
2,160
12
178
220
848
274
172
1,688
4,520
528
3,537
190
968
2,121
2,639
3,080
220
736
192
560
174
102
184
6,885
120
700
462
1,204
668
480
42
222
137
618
138
1,071
76
83
284
523
33
L-Bar
89
155
60
110
162
143
142
113
114
36
90
1
178
55
106
137
172
211
226
66
131
95
121
303
203
55
22
368
48
20
58
17
46
153
40
25
42
172
167
160
6
74
137
103
23
357
76
83
284
523
11
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/28/2014
6/29/2014
6/29/2014
6/29/2014
6/29/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
CI
CMI
1
15
5
1
4
4
5
3
6
1
2
10
6
4
4
16
5
4
7
1
2
1
1
12
5
4
4
1
6
11
4
10
10
32
5
8
10
8
1
29
10
10
1
1
33
2
79
7
2
1
1
311
1,665
30
339
24
28
600
36
36
13
66
410
138
596
1,280
80
175
412
455
161
164
105
7
1,836
365
740
640
138
1,002
682
664
1,180
30
3,360
1,065
1,816
2,940
512
158
8,294
540
800
234
247
2,475
150
20,303
357
152
75
267
L-Bar
311
111
6
339
6
7
120
12
6
13
33
41
23
149
320
5
35
103
65
161
82
105
7
153
73
185
160
138
167
62
166
118
3
105
213
227
294
64
158
286
54
80
234
247
75
75
257
51
76
75
267
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
6/30/2014
7/1/2014
7/1/2014
7/1/2014
7/1/2014
7/2/2014
7/2/2014
CI
CMI
2
1
2
10
5
16
9
9
1
1
2
8
7
9
15
2
12
7
10
3
6
6
7
4
7
7
1
3
2
6
5
8
8
11
2
4
7
2
11
4
1
13
2
11
8
12
22
11
6
6
5
80
52
212
580
590
2,064
1,125
1,125
109
109
218
520
427
900
1,635
114
936
483
130
270
280
504
371
228
630
182
240
295
150
60
70
32
400
902
100
272
427
58
528
972
106
1,207
204
836
360
1,728
2,134
429
216
1,320
1,095
L-Bar
40
52
106
58
118
129
125
125
109
109
109
65
61
100
109
57
78
69
13
90
74
84
53
57
90
26
240
131
75
10
14
4
50
82
50
68
61
29
48
243
266
139
102
76
45
144
97
39
36
220
219
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/2/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
CI
CMI
9
4
8
2
7
5
8
14
3
1
1
2
4
2
4
1
2
1
1
5
1
16
1
61
1
16
7
1
2
4
9
4
6
9
8
6
7
4
6
7
15
7
8
4
3
58
5
4
6
2
8
1,323
208
560
128
448
110
888
1,078
198
251
55
98
388
42
12
63
118
121
90
195
24
1,440
72
2,257
14
912
707
286
92
156
666
288
450
342
1,368
768
896
640
270
1,428
2,175
714
512
444
741
9,628
10
240
1,764
446
368
L-Bar
147
52
70
64
64
22
111
77
66
251
55
49
97
21
3
63
59
121
90
39
24
90
72
37
14
57
101
286
46
39
74
72
75
38
171
128
128
160
45
204
145
102
64
111
247
166
2
60
294
223
46
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/3/2014
7/4/2014
7/4/2014
7/4/2014
7/4/2014
7/5/2014
7/5/2014
7/5/2014
7/5/2014
CI
CMI
1
14
22
17
10
11
10
4
9
29
3
4
5
1
69
3
12
7
4
2
1
1
30
2
1
19
7
2
1
6
8
1
1
2
1
6
15
1
3
1
7
1
1
262
6
4
1
2
5
6
16
125
826
7,062
1,037
550
440
1,180
392
729
3,828
738
432
925
307
10,350
234
732
546
452
234
63
84
4,290
238
21
418
525
198
497
120
872
80
12
304
274
618
1,905
69
24
117
84
147
50
786
150
28
13
56
840
438
576
L-Bar
125
59
321
61
55
40
118
98
81
132
246
108
185
307
150
78
61
78
113
117
63
84
143
119
21
22
75
99
497
20
109
80
12
152
274
103
127
69
8
117
12
147
50
3
25
7
13
28
168
73
36
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/6/2014
7/6/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
CI
CMI
1
8
8
11
7
1
1
412
13
8
8
6
8
15
5
2
4
20
2
8
8
1
4
11
6
6
12
14
1
25
11
8
7
1
4
8
5
4
7
11
5
1
8
3
9
4
7
6
11
22
4
182
176
568
990
770
24
294
8,652
3,874
2,248
2,256
312
384
255
905
206
248
3,040
580
1,808
1,736
214
152
1,419
894
1,428
1,320
294
40
3,975
1,221
640
28
154
96
568
410
200
196
55
150
31
1,384
201
576
40
35
408
880
550
316
L-Bar
182
22
71
90
110
24
294
21
298
281
282
52
48
17
181
103
62
152
290
226
217
214
38
129
149
238
110
21
40
159
111
80
4
154
24
71
82
50
28
5
30
31
173
67
64
10
5
68
80
25
79
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/7/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
CI
CMI
1
3
10
19
4
17
9
3
5
5
14
13
25
14
1
16
6
1
13
11
6
5
1
1
4
4
9
1
13
8
9
4
1
1
9
17
1
3
8
6
10
10
1
14
27
1
5
7
1
2
6
123
156
1,360
57
400
765
1,134
171
325
435
728
767
2,025
1,610
100
144
108
24
507
176
384
625
165
7
196
296
936
158
962
1,200
684
368
301
156
999
4,964
158
291
680
426
1,320
1,230
222
1,848
3,996
97
595
434
48
350
780
L-Bar
123
52
136
3
100
45
126
57
65
87
52
59
81
115
100
9
18
24
39
16
64
125
165
7
49
74
104
158
74
150
76
92
301
156
111
292
158
97
85
71
132
123
222
132
148
97
119
62
48
175
130
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
CI
CMI
1
3
5
1
1
3
6
3
4
17
10
1
4
1
4
12
6
3
8
10
5
4
6
4
3
1
16
8
7
3
5
7
1
4
8
7
1
6
6
14
1
6
4
9
15
3
14
5
3
11
6
60
261
930
159
114
393
330
225
936
153
1,928
253
880
116
956
2,724
1,314
609
368
270
495
580
126
288
384
182
224
520
427
432
320
693
47
144
192
1,253
204
6
798
168
9
354
288
792
1,245
405
168
30
390
572
378
L-Bar
60
87
186
159
114
131
55
75
234
9
193
253
220
116
239
227
219
203
46
27
99
145
21
72
128
182
14
65
61
144
64
99
47
36
24
179
204
1
133
12
9
59
72
88
83
135
12
6
130
52
63
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/8/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
CI
CMI
2
3
1
2
3
4
3
9
9
3
4
1
1
6
73
1
1
1
1
2
12
4
11
8
5
9
5
10
1
13
15
5
16
6
8
1
8
9
17
23
1
8
9
10
6
8
1
15
10
10
4
90
33
28
10
324
276
45
333
1,080
321
184
27
75
132
1,314
896
86
353
80
446
12
708
583
392
475
441
595
960
89
572
735
550
80
834
1,056
94
8
1,711
272
2,714
295
664
198
1,300
2,220
568
197
45
650
290
668
L-Bar
45
11
28
5
108
69
15
37
120
107
46
27
75
22
18
896
86
353
80
223
1
177
53
49
95
49
119
96
89
44
49
110
5
139
132
94
1
224
16
118
295
83
22
130
370
71
197
3
65
29
167
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/9/2014
CI
CMI
11
8
4
4
8
1
14
1
13
10
5
1
2
4
6
10
9
7
14
2
21
2
13
8
3
6
5
5
7
9
10
1
3
12
19
1
12
13
12
1
3
10
1
5
7
8
5
11
2
2
38
341
1,392
252
164
336
162
1,386
61
2,262
370
100
272
80
112
528
680
459
882
280
470
1,134
84
377
512
387
648
475
830
371
882
340
112
216
564
2,280
150
396
130
204
232
102
1,580
37
365
14
1,096
645
33
46
146
2,052
L-Bar
31
174
63
41
42
162
99
61
174
37
20
272
40
28
88
68
51
126
20
235
54
42
29
64
129
108
95
166
53
98
34
112
72
47
120
150
33
10
17
232
34
158
37
73
2
137
129
3
23
73
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/9/2014
7/9/2014
7/9/2014
7/9/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
CI
CMI
1
1
10
22
1
3
12
7
5
5
5
10
16
1
2
12
3
3
26
5
17
1
1
1
12
7
3
4
9
2
13
1
4
7
11
6
9
11
3
8
1
12
10
9
5
6
4
7
8
1
19
178
78
650
990
245
306
636
658
395
305
125
2,300
720
93
206
1,020
339
396
4,264
230
4,403
72
71
276
588
1,477
66
232
963
370
442
122
204
3,227
341
642
432
264
27
1,336
113
1,356
970
1,449
110
84
512
266
680
10
6,859
L-Bar
178
78
65
45
245
102
53
94
79
61
25
230
45
93
103
85
113
132
164
46
259
72
71
276
49
211
22
58
107
185
34
122
51
461
31
107
48
24
9
167
113
113
97
161
22
14
128
38
85
10
361
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/10/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
CI
CMI
5
18
5
10
25
8
8
6
3
4
13
2
4
1
1
12
4
4
3
6
1
12
19
3
14
8
11
1
10
4
1
1
15
4
1
1
9
2
5
10
15
7
3
1
26
11
1
1
1
1
17
725
360
415
570
3,950
224
120
426
609
324
130
12
470
58
56
1,128
12
768
534
228
76
600
1,539
303
2,772
456
1,353
954
270
216
9
15
1,470
272
78
209
1,656
264
195
1,470
390
343
330
96
1,144
1,991
276
101
71
68
1,972
L-Bar
145
20
83
57
158
28
15
71
203
81
10
6
127
58
56
94
3
192
178
38
76
50
81
101
198
57
123
954
27
54
9
15
98
68
78
209
184
132
39
147
26
49
110
96
44
181
276
101
71
68
116
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/11/2014
7/12/2014
7/12/2014
7/12/2014
7/12/2014
7/12/2014
7/12/2014
7/12/2014
7/12/2014
7/13/2014
7/13/2014
7/13/2014
7/13/2014
7/13/2014
CI
CMI
3
17
1
8
1
10
6
8
3
2
1
2
8
3
1
1
3
5
9
6
3
1
1
1
1
1
10
2
13
3
5
8
3
8
3
11
1
16
4
1
1
5
11
2
1
1
5
1
1
2
1
231
493
145
504
11
630
378
664
189
238
181
110
112
429
5
337
138
435
1,242
108
204
11
208
64
112
72
1,370
70
975
144
310
24
126
648
222
33
146
1,792
484
126
286
880
319
12
234
40
465
53
295
184
382
L-Bar
77
29
145
63
11
63
63
83
63
119
181
55
14
143
5
337
46
87
154
18
68
11
208
64
112
72
137
35
75
48
62
3
42
81
74
3
146
112
121
126
286
176
29
6
234
40
93
53
295
92
382
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
CI
CMI
1
1
1
2
1
3
5
3
23
11
1
12
3
3
2
8
37
12
7
10
1
5
1
1
3
2
1
8
6
2
11
22
12
1
1
1
1
3
3
7
6
2
1
13
13
7
1
4
1
10
1
88
112
133
198
205
558
70
108
115
1,441
239
7,380
309
546
298
32
3,885
1,500
294
960
24
835
94
49
87
488
152
1,584
978
206
1,111
2,244
2,472
59
42
30
126
453
420
168
1,050
352
118
3,809
3,796
1,372
113
20
58
1,320
3
L-Bar
88
112
133
99
205
186
14
36
5
131
239
615
103
182
149
4
105
125
42
96
24
167
94
49
29
244
152
198
163
103
101
102
206
59
42
30
126
151
140
24
175
176
118
293
292
196
113
5
58
132
3
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/14/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
CI
CMI
7
3
3
13
4
7
1
3
2
16
5
1
1
3
1
10
12
1
4
6
2
7
23
11
1
1
9
1
1
3
8
1
8
2
6
5
2
7
7
3
9
22
2
3
2
2
3
28
1
12
12
273
450
12
78
108
678
25
423
190
1,584
485
89
51
300
49
930
756
270
272
348
166
1,582
23
1,078
65
115
2,952
24
40
669
960
80
456
392
372
820
382
791
1,106
264
405
8,338
374
363
346
142
231
84
190
672
1,428
L-Bar
39
150
4
6
27
138
25
141
95
99
97
89
51
100
49
93
63
270
68
58
83
226
1
98
65
115
328
24
40
223
120
80
57
196
62
164
191
113
158
88
45
379
187
121
173
71
77
3
190
56
119
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
CI
CMI
2
12
6
7
2
6
1
3
1
7
8
1
38
3
1
1
8
3
6
4
1
6
6
11
1
2
16
3
6
8
1
7
4
1
1
8
7
6
6
1
13
7
11
2
9
3
15
7
2
6
8
122
804
576
623
474
510
87
309
274
1,379
1,568
72
15,466
537
77
238
584
417
1,176
460
211
450
882
902
186
62
1,808
300
162
864
71
322
244
147
76
584
1,799
108
300
153
3,718
1,120
1,540
190
684
18
210
490
62
84
776
L-Bar
61
67
96
89
237
85
87
103
274
197
196
72
407
179
77
238
73
139
196
115
211
75
147
82
186
31
113
100
27
108
71
46
61
147
76
73
257
18
50
153
286
160
140
95
76
6
14
70
31
14
97
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/15/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
CI
CMI
1
13
3
5
4
9
5
3
29
10
1
25
1
1
5
4
1
16
2
1
35
15
8
27
1
26
1
8
1
23
12
7
2
1
2
6
6
12
9
9
1
2
8
4
10
4
1
3
11
2
11
113
1,274
255
150
468
63
335
15
870
1,880
86
1,875
49
366
1,700
512
137
2,016
406
153
3,500
405
880
756
166
1,560
355
640
106
3,841
2,664
595
392
113
288
912
516
1,284
846
1,125
93
228
1,384
404
1,790
732
33
390
924
168
2,178
L-Bar
113
98
85
30
117
7
67
5
30
188
86
75
49
366
340
128
137
126
203
153
100
27
110
28
166
60
355
80
106
167
222
85
196
113
144
152
86
107
94
125
93
114
173
101
179
183
33
130
84
84
198
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
Date
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
CI
CMI
7
3
1
2
2
14
1
1
2
4
1
7
4
2
10
2
6
6
2
12
10
5
1
1
5
7
8
2
19
12
63
11
9
1
1
127
11
2
7
1
3
3
7
5
1
11
19
3
11
31
44
168
204
75
352
52
2,800
3
34
612
372
179
168
140
182
270
86
300
702
232
1,224
220
390
22
110
580
469
128
16
2,204
624
5,859
297
225
76
39
1,270
1,650
20
826
175
231
522
756
30
17
638
1,311
24
495
3,038
968
L-Bar
24
68
75
176
26
200
3
34
306
93
179
24
35
91
27
43
50
117
116
102
22
78
22
110
116
67
16
8
116
52
93
27
25
76
39
10
150
10
118
175
77
174
108
6
17
58
69
8
45
98
22
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/16/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
CI
CMI
7
15
1
1
1
2
3
4
9
29
1
1
11
14
7
10
7
2
2
2
1
3
10
3
1
64
5
4
7
6
1
13
4
10
9
7
1
2
4
1
12
6
8
3
1
2
5
15
12
7
5
546
255
281
113
52
168
93
40
297
13,949
58
1
11
868
749
2,160
1,078
270
218
466
38
231
920
297
347
10,944
443
548
1,120
24
120
936
184
1,940
729
1,659
68
80
308
412
528
786
160
540
139
262
385
1,545
1,596
1,127
1,625
L-Bar
78
17
281
113
52
84
31
10
33
481
58
1
1
62
107
216
154
135
109
233
38
77
92
99
347
171
91
137
160
4
120
72
46
194
81
237
68
40
77
412
44
131
20
180
139
131
77
103
133
161
325
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/17/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
CI
CMI
9
2
10
1
2
13
60
6
2
2
6
12
11
5
3
9
2
2
3
6
6
1
4
3
2
8
4
1
4
3
1
3
10
7
12
1
11
1
1
1
7
1
1
5
1
2
5
7
1
2
3
1,080
86
2,020
117
12
663
540
564
238
296
198
1,548
1,716
365
351
2,196
168
250
72
420
264
46
428
207
72
408
336
241
716
180
396
18
130
91
1,788
193
1,177
167
221
87
105
173
340
945
575
294
1,300
413
151
292
216
L-Bar
120
43
202
117
6
51
9
94
119
148
33
129
156
73
117
244
84
125
24
70
44
46
107
69
36
51
84
241
179
60
396
6
13
13
149
193
107
167
221
87
15
173
340
189
575
147
260
59
151
146
72
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
CI
CMI
4
10
7
4
16
8
4
4
4
2
1
1
25
1
8
1
9
16
3
9
6
12
8
1
5
12
2
24
3
2
9
4
3
4
7
6
3
11
3
2
9
7
10
4
5
3
7
1
5
1
2
332
1,780
777
220
272
144
672
312
648
50
234
28
2,175
144
936
138
513
1,456
255
3,465
420
420
744
283
140
84
228
96
135
32
63
468
1,167
132
1,190
30
288
1,067
39
24
1,422
525
280
688
315
108
343
61
615
179
240
L-Bar
83
178
111
55
17
18
168
78
162
25
234
28
87
144
117
138
57
91
85
385
70
35
93
283
28
7
114
4
45
16
7
117
389
33
170
5
96
97
13
12
158
75
28
172
63
36
49
61
123
179
120
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/18/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/19/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/20/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
CI
CMI
2
14
6
90
3
1
7
1
3
10
1
15
1
6
1
12
10
1
1
1
1
1
2
9
1
1
1
7
41
1
10
14
20
7
11
4
3
12
4
13
3
1
4
3
39
26
11
2
1
14
9
62
1,792
36
540
303
470
168
22
498
850
290
2,385
72
18
467
1,980
2,510
330
271
22
474
346
336
2,727
215
72
77
231
9,553
78
1,520
504
2,780
7
704
352
339
1,260
196
3,848
306
158
436
261
6,123
4,394
209
258
149
952
1,215
L-Bar
31
128
6
6
101
470
24
22
166
85
290
159
72
3
467
193
251
330
271
22
474
346
168
303
215
72
77
33
233
78
152
36
139
1
64
88
113
105
49
296
102
158
109
87
157
169
19
129
149
68
135
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
CI
1
6
2
7
5
17
8
1
5
4
2
1
2
1
7
4
4
2
15
5
4
10
1
12
32
4
34
1
10
11
3,326
1
1
1
4
13
2
26
7
4
6
1
3
5
10
9
9
2
8
1
1
CMI
208
618
534
847
40
1,955
1,000
88
395
340
302
185
198
88
959
300
272
18
1,005
445
264
10
95
864
288
408
2,652
82
1,760
924
36,586
101
416
245
676
1,508
42
2,652
98
100
768
134
117
80
440
810
522
92
352
44
100
L-Bar
208
103
267
121
8
115
125
88
79
85
151
185
99
88
137
75
68
9
67
89
66
1
95
72
9
102
78
82
176
84
11
101
416
245
169
116
21
102
14
25
128
134
39
16
44
90
58
46
44
44
100
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/21/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
CI
CMI
3
11
10
2
2
3
27
6
1
4
50
40
31
1
2
8
2
12
2
5
6
12
1
4
2
6
3
23
7
1
12
11
1
3
2
1
1
1
7
1
1
1
1
1
3
9
6
4
6
9
2
399
110
1,120
52
184
423
2,943
552
113
364
7,000
4,880
4,030
69
166
640
148
2,772
206
155
1,398
2,616
202
372
20
1,278
240
1,656
469
113
2,124
396
266
429
170
121
186
184
357
174
165
37
68
331
234
1,440
132
84
72
513
598
L-Bar
133
10
112
26
92
141
109
92
113
91
140
122
130
69
83
80
74
231
103
31
233
218
202
93
10
213
80
72
67
113
177
36
266
143
85
121
186
184
51
174
165
37
68
331
78
160
22
21
12
57
299
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/22/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
CI
CMI
7
22
6
8
7
6
91
1
10
5
4
8
7
2
1
3
3
2
60
16
1
1
6
1
10
8
11
1
4
6
1
10
4
1
3
3
12
14
6
21
2
1
3
13
1
4
1
29
14
2
5
385
5,522
264
64
2,100
1,728
4,095
197
670
400
796
520
56
168
44
258
495
60
9,000
912
118
172
642
220
1,450
336
902
9
344
402
155
860
252
32
78
42
996
28
60
2,499
618
207
363
1,235
20
508
101
3,103
1,330
218
745
L-Bar
55
251
44
8
300
288
45
197
67
80
199
65
8
84
44
86
165
30
150
57
118
172
107
220
145
42
82
9
86
67
155
86
63
32
26
14
83
2
10
119
309
207
121
95
20
127
101
107
95
109
149
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
CI
CMI
9
1
15
8
24
4
238
8
1
2
1
8
1
4
11
1
16
4
5
7
8
3
1
4
25
1
5
3
5
2
7
4
10
12
14
25
5
15
1
17
15
4
1
8
4
1
1
25
6
6
7
1,899
230
825
1,160
2,712
708
6,902
104
156
188
215
696
80
240
1,683
130
1,792
868
855
560
656
153
66
780
4,225
239
170
237
645
306
952
196
1,890
2,004
2,520
1,475
290
2,160
186
2,975
1,470
264
290
920
32
112
237
2,550
396
366
231
L-Bar
211
230
55
145
113
177
29
13
156
94
215
87
80
60
153
130
112
217
171
80
82
51
66
195
169
239
34
79
129
153
136
49
189
167
180
59
58
144
186
175
98
66
290
115
8
112
237
102
66
61
33
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
Date
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/23/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
CI
CMI
1
12
1
4
1
1
13
3
4
1
9
32
1
2
3
5
1
8
40
9
1
4
1
1
1
1
3
2
1
16
2
1
2
5
8
1
1
9
3
6
6
16
2
10
8
5
10
8
17
15
3
155
780
134
44
180
35
3,913
174
448
49
243
8,640
197
126
42
380
183
176
4,480
441
26
40
54
144
12
104
42
82
153
2,272
80
124
244
330
880
126
206
747
351
348
390
752
230
300
248
775
50
16
1,292
4,770
318
L-Bar
155
65
134
11
180
35
301
58
112
49
27
270
197
63
14
76
183
22
112
49
26
10
54
144
12
104
14
41
153
142
40
124
122
66
110
126
206
83
117
58
65
47
115
146
31
155
5
2
76
318
106
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
CI
CMI
5
63
4
2
169
5
11
2
11
25
22
8
3
2
1
4
2
60
10
17
38
9
2
2
1
4
12
3
1
1
1
3
2
1
4
8
2
36
1
1
3
8
3
8
11
7
6
11
6
1
1
525
31,500
540
102
15,548
445
2,068
258
88
125
2,420
1,088
399
22
250
76
700
7,560
250
3,128
38
1,098
264
370
497
80
300
159
152
110
433
243
210
66
76
968
216
1,584
139
124
1,581
144
333
616
99
777
666
2,959
1,176
173
57
L-Bar
105
500
135
51
92
89
188
129
8
5
110
136
133
11
250
19
350
126
25
184
1
122
132
185
497
20
25
53
152
110
433
81
105
66
19
121
108
44
139
124
527
18
111
77
9
111
111
269
196
173
57
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/24/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/25/2014
7/26/2014
CI
CMI
14
4
2
2
1
2
25
5
3
7
3
1
2
4
1
1
24
2
3
1
4
1
85
1
1
35
1
1
10
10
6
3
19
6
8
2
10
8
3
4
8
1
62
31
1
3
6
7
7
1
2
1,176
524
116
274
17
182
100
640
138
224
489
98
82
380
94
258
1,368
222
465
119
120
116
8,160
263
233
5,530
120
282
1,300
1,320
942
561
1,197
1,338
1,256
20
2,160
1,024
312
332
288
60
434
6,200
236
300
372
413
238
535
48
L-Bar
84
131
58
137
17
91
4
128
46
32
163
98
41
95
94
258
57
111
155
119
30
116
96
263
233
158
120
282
130
132
157
187
63
223
157
10
216
128
104
83
36
60
7
200
236
100
62
59
34
535
24
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
7/26/2014
7/26/2014
7/27/2014
7/27/2014
7/27/2014
7/27/2014
7/27/2014
7/27/2014
7/27/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
CI
CMI
1
1
8
1
4
1
3
1
3
2
1
6
3
2
2
3
5
2
5
8
2
63
7
8
6
7
2
3
4
8
11
1
1
26
4
14
1
9
6
4
3
7
8
1
10
6
5
1
29
1
7
226
29
2,512
84
32
310
714
42
141
254
104
786
165
160
444
645
1,040
470
45
768
238
6,174
280
792
24
581
208
549
320
1,872
1,100
30
163
52
576
182
55
747
18
344
174
1,708
2,352
358
1,360
1,050
300
238
58
35
154
L-Bar
226
29
314
84
8
310
238
42
47
127
104
131
55
80
222
215
208
235
9
96
119
98
40
99
4
83
104
183
80
234
100
30
163
2
144
13
55
83
3
86
58
244
294
358
136
175
60
238
2
35
22
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/28/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
CI
CMI
3
8
12
18
1
20
8
12
3
5
12
7
10
8
7
2
1
5
2
6
4
6
12
11
1
1
29
1
7
6
39
12
8
3
1
1
1
3
1
15
1
6
2
1
8
2
1
3
15
1
12
117
48
720
558
21
2,500
864
1,344
201
630
1,008
637
830
664
581
26
74
490
52
66
256
102
348
946
121
110
1,537
1,420
798
876
819
1,140
56
90
500
17
189
138
110
2,580
385
1,254
282
145
1,216
242
122
408
2,250
36
552
L-Bar
39
6
60
31
21
125
108
112
67
126
84
91
83
83
83
13
74
98
26
11
64
17
29
86
121
110
53
1,420
114
146
21
95
7
30
500
17
189
46
110
172
385
209
141
145
152
121
122
136
150
36
46
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
CI
CMI
1
13
14
2
8
1
14
1
2
1
1
7
1
1
14
13
27
5
3
13
4
8
1
16
1
12
1
5
2
13
27
2
4
1
4
9
6
13
6
6
11
14
4
2
8
4
9
164
2
4
9
11
1,664
938
378
16
95
5,138
191
476
61
274
609
469
383
2,408
1,040
3,456
2,545
219
1,417
260
1,072
68
1,936
232
24
77
1,610
320
962
189
254
152
125
20
972
30
1,326
1,008
1,032
616
896
436
112
2,272
660
1,566
23,288
60
128
162
L-Bar
11
128
67
189
2
95
367
191
238
61
274
87
469
383
172
80
128
509
73
109
65
134
68
121
232
2
77
322
160
74
7
127
38
125
5
108
5
102
168
172
56
64
109
56
284
165
174
142
30
32
18
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/29/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
CI
CMI
9
1
3
8
3
1
3
1
1
1
13
1
20
8
1
4
2
6
12
1
14
34
2
1
6
2
6
1
4
6
6
18
11
4
5
8
7
2
2
4
1
2
3
4
2
14
4
13
3
1
7
1,710
35
516
520
246
102
84
72
319
314
247
167
1,900
40
495
276
248
78
1,368
91
210
1,088
130
68
786
72
36
24
272
540
450
468
363
172
80
864
259
374
200
64
33
214
723
640
82
1,008
292
1,118
189
70
1,015
L-Bar
190
35
172
65
82
102
28
72
319
314
19
167
95
5
495
69
124
13
114
91
15
32
65
68
131
36
6
24
68
90
75
26
33
43
16
108
37
187
100
16
33
107
241
160
41
72
73
86
63
70
145
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
CI
CMI
2
3
1
4
3
84
2
7
3
1
42
15
1
6
3
1
2
7
9
6
9
6
6
1
2
5
1
9
1
9
3
3
15
51
2
2
6
45
5
13
1
1
1
10
8
103
14
2
8
3
35
130
171
58
416
537
22,344
268
1,120
507
60
6,300
945
37
936
177
26
42
679
324
594
576
468
18
60
162
270
61
1,827
46
729
462
426
1,350
5,355
22
156
720
6,030
500
2,769
60
253
49
1,230
568
412
1,064
274
1,816
111
280
L-Bar
65
57
58
104
179
266
134
160
169
60
150
63
37
156
59
26
21
97
36
99
64
78
3
60
81
54
61
203
46
81
154
142
90
105
11
78
120
134
100
213
60
253
49
123
71
4
76
137
227
37
8
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/30/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
CI
CMI
10
10
13
9
6
9
2
3
17
3
3
9
1
1
1
3
12
8
3
7
3
4
1
7
10
7
1
22
4
6
1
2
1
5
1
1
7
7
10
67
20
1
13
3
7
4
5
9
9
6
7
130
610
728
1,089
1,518
1,773
242
366
1,156
114
153
1,215
87
78
99
114
1,560
112
276
126
363
476
227
147
130
1,113
78
506
384
1,290
132
144
33
785
83
79
469
420
620
5,226
2,220
129
2,639
237
805
476
965
99
1,035
243
770
L-Bar
13
61
56
121
253
197
121
122
68
38
51
135
87
78
99
38
130
14
92
18
121
119
227
21
13
159
78
23
96
215
132
72
33
157
83
79
67
60
62
78
111
129
203
79
115
119
193
11
115
118
110
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
CI
CMI
10
3
138
2
5
13
1
2
3
16
3
2
10
4
2
6
4
1
4
10
4
8
2
5
2
2
1
29
1
7
124
6
11
24
11
13
1
8
1
21
1
1
3
9
32
20
2
13
2
1
18
370
99
51,336
228
45
2,717
103
50
939
1,200
414
54
460
220
216
714
1,140
112
548
2,400
60
1,392
476
180
486
418
69
7,830
198
1,973
17,112
1,614
3,509
3,936
3,509
4,147
80
2,136
76
1,701
109
57
336
117
256
3,720
526
741
94
113
972
L-Bar
37
33
372
114
9
209
103
25
313
75
138
27
46
55
108
119
285
112
137
240
15
174
238
36
243
209
69
270
198
365
138
269
319
164
319
319
80
267
76
81
109
57
112
13
8
186
263
57
47
113
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
7/31/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
CI
CMI
54
2
5
1
1
13
2
1
2
7
1
11
71
1
8
3
5
1
3
2
1
7
8
2
1
4
2
5
1
4
4
1
1
3
12
1
17
1
2
14
8
9
1
1
4
2
4
2
3
9
1
1,674
228
960
115
172
780
42
47
282
77
63
176
852
117
72
144
765
265
555
118
49
371
136
162
116
32
80
200
1
48
132
13
145
171
540
81
238
142
204
3,444
1,168
1,242
87
118
256
122
372
294
654
1,800
111
L-Bar
31
114
192
115
172
60
21
47
141
11
63
16
12
117
9
48
153
265
185
59
49
53
17
81
116
8
40
40
1
12
33
13
145
57
45
81
14
142
102
246
146
138
87
118
64
61
93
147
218
200
111
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
Date
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/1/2014
8/2/2014
8/2/2014
8/2/2014
8/2/2014
8/2/2014
8/2/2014
8/2/2014
CI
CMI
1
2
23
13
4
6
1
1
1
3
1
3
1
3
2
7
2
1
6
31
2
33
234
1
15
2
8
4
6
2
5
8
1
5
8
10
6
23
1
2
16
6
4
1
1
5
1
1
1
3
1
22
148
1,012
2,327
916
1,278
96
50
48
375
198
273
76
591
248
315
328
69
600
3,131
236
5,346
56,394
198
195
20
64
656
864
76
320
48
18
130
960
1,210
30
874
89
14
208
480
220
5
120
1,230
110
78
34
69
113
L-Bar
22
74
44
179
229
213
96
50
48
125
198
91
76
197
124
45
164
69
100
101
118
162
241
198
13
10
8
164
144
38
64
6
18
26
120
121
5
38
89
7
13
80
55
5
120
246
110
78
34
23
113
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/3/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
CI
CMI
1
2
3
1
7
1
1
1
6
1
2
4
12
6
12
25
46
5
9
1
26
1
11
20
5
37
70
26
10
10
4
2
23
4
2
6
1
4
26
12
31
3
4
2
1
3
6
1
11
16
1
63
426
138
58
784
438
264
261
1,110
251
158
484
3,108
204
1,692
5,150
2,852
830
1,431
222
3,770
82
836
2,900
310
5,772
1,120
2,912
730
1,920
20
158
3,151
540
236
78
62
424
2,340
144
3,813
339
224
96
108
378
285
7
792
1,280
62
L-Bar
63
213
46
58
112
438
264
261
185
251
79
121
259
34
141
206
62
166
159
222
145
82
76
145
62
156
16
112
73
192
5
79
137
135
118
13
62
106
90
12
123
113
56
48
108
126
170
7
72
80
62
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/4/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
CI
CMI
4
5
2
12
2
25
24
14
4
1
24
1
1
21
6
3
2
2
2
3
4
25
2
19
9
11
8
7
1
1
2
2
2
17
11
3
4
8
2
1
4
8
8
7
1
33
6
3
3
28
24
1,212
490
60
648
158
4,275
4,488
210
748
62
5,952
12
34
1,260
210
204
348
76
86
429
688
3,450
86
2,432
270
319
88
168
87
99
186
428
366
340
1,199
426
580
1,864
218
116
328
1,880
1,120
1,015
112
2,673
138
240
603
7,728
13,440
L-Bar
303
98
30
54
79
171
187
15
187
62
248
12
34
60
35
68
174
38
43
143
172
138
43
128
30
29
11
24
87
99
93
214
183
20
109
142
145
233
109
116
82
235
140
145
112
81
23
80
201
276
560
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
CI
CMI
5
9
17
20
21
9
3
34
2
36
25
9
8
2
4
1
8
27
1
19
1
10
11
4
4
9
1
1
20
1
3
18
3
6
9
7
18
4
3
1
4
1
7
10
12
1
34
4
7
51
1
945
675
2,788
3,280
3,864
3,429
510
3,060
182
7,344
2,600
216
1,072
210
228
84
1,672
8,073
232
4,560
75
540
165
28
712
612
38
314
940
175
798
1,566
735
540
1,053
119
1,602
56
27
173
364
184
1,764
460
648
69
2,822
56
28
663
140
L-Bar
189
75
164
164
184
381
170
90
91
204
104
24
134
105
57
84
209
299
232
240
75
54
15
7
178
68
38
314
47
175
266
87
245
90
117
17
89
14
9
173
91
184
252
46
54
69
83
14
4
13
140
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/5/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
CI
CMI
6
24
1
8
3
6
6
6
15
13
10
2
36
4
4
23
1
1
8
7
39
6
2
2
10
21
34
1
2
1
11
1
2
1
2
1
2
2
2
10
5
2
13
2
1
1
4
5
12
1
7
258
3,072
88
2,400
561
1,824
630
1,194
3,435
676
360
32
7,308
324
320
3,404
171
6
760
574
1,950
84
50
134
160
2,331
4,420
59
54
46
187
169
138
222
192
136
222
318
128
1,110
695
304
975
358
275
207
848
905
3,672
459
2,758
L-Bar
43
128
88
300
187
304
105
199
229
52
36
16
203
81
80
148
171
6
95
82
50
14
25
67
16
111
130
59
27
46
17
169
69
222
96
136
111
159
64
111
139
152
75
179
275
207
212
181
306
459
394
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
CI
CMI
33
5
4
4
3
1
2
1
1
25
15
4
25
74
3
99
3
69
2
20
6
6
5
1
3
6
4
5
6
13
1
1
4
27
1
8
1
1
1
10
24
12
8
2
7
5
4
6
8
1
112
5,808
905
728
676
486
185
194
376
87
2,400
705
416
4,150
10,064
420
25,839
198
759
320
1,920
192
264
315
182
141
396
356
745
828
1,105
222
7
508
1,809
90
1,104
27
81
74
990
480
708
611
382
413
735
776
552
1,240
21
7,504
L-Bar
176
181
182
169
162
185
97
376
87
96
47
104
166
136
140
261
66
11
160
96
32
44
63
182
47
66
89
149
138
85
222
7
127
67
90
138
27
81
74
99
20
59
157
191
59
147
194
92
155
21
67
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/6/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
CI
CMI
4
13
4
13
1
2
3
25
2
23
11
3
3
3
3
4
4
51
1
5
2
22
1
15
1
1
4
4
1
25
6
2
18
13
1
6
12
31
68
97
1
3
3
4
7
2
2
14
2
2
2
156
1,300
32
1,300
24
274
402
2,850
78
1,564
693
204
330
135
129
412
428
2,142
175
30
98
1,320
171
720
30
53
188
880
67
3,075
834
236
324
2,990
109
342
1,848
11,656
11,016
14,942
97
135
432
388
434
140
232
2,002
1,208
128
44
L-Bar
39
100
8
100
24
137
134
114
39
68
63
68
110
45
43
103
107
42
175
6
49
60
171
48
30
53
47
220
67
123
139
118
18
230
109
57
154
376
162
186
97
45
144
97
62
70
116
143
604
64
22
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
CI
CMI
23
10
6
1
12
21
1
1
5
21
3
10
3
8
3
12
23
4
7
4
10
59
7
4
8
5
2
51
6
8
16
6
1
4
11
6
1
13
1
10
1
29
2
49
6
2
8
2
55
9
1
4,347
480
954
82
888
2,772
71
8
595
1,491
156
40
3
896
420
780
4,876
628
336
432
440
12,921
2,093
1,176
728
300
368
6,885
810
496
1,728
156
190
216
187
204
25
1,469
139
10
319
4,553
400
6,076
996
402
1,544
196
10,065
540
90
L-Bar
189
48
159
82
74
132
71
8
119
71
52
4
1
112
140
65
212
157
48
108
44
219
299
294
91
60
184
135
135
62
108
26
190
54
17
34
25
113
139
1
319
157
200
124
166
201
193
98
183
60
90
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
8/7/2014
CI
CMI
8
6
2
11
1
13
11
6
23
12
8
1
4
2
8
48
1
8
1
24
1
1
1
4
2
8
4
2
4
16
14
1
2
5
1
1
3
5
8
6
11
4
6
1
2
4
1
1
7
7
11
744
570
108
1,232
94
637
770
426
5,313
2,904
480
23
152
526
688
1,056
39
88
50
1,176
116
10
19
268
206
1,856
420
144
380
1,440
420
79
80
50
22
57
51
235
688
294
704
336
330
130
216
388
96
73
98
84
583
L-Bar
93
95
54
112
94
49
70
71
231
242
60
23
38
263
86
22
39
11
50
49
116
10
19
67
103
232
105
72
95
90
30
79
40
10
22
57
17
47
86
49
64
84
55
130
108
97
96
73
14
12
53
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
8/7/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
CI
CMI
3
1
1
1
1
1
1
2
7
1
1
2
2
2
4
7
2
3
9
4
1
5
1
1
11
9
1
1
4
4
1
5
2
9
8
5
69
1
7
1
2
9
1
3
10
10
4
2
7
1
9
273
228
100
61
168
113
111
158
791
37
71
342
26
208
428
1,078
152
456
198
496
11
755
125
21
1,694
198
90
32
912
820
102
160
214
1,053
1,344
15
5,175
58
42
593
556
279
69
60
460
410
720
170
329
147
63
L-Bar
91
228
100
61
168
113
111
79
113
37
71
171
13
104
107
154
76
152
22
124
11
151
125
21
154
22
90
32
228
205
102
32
107
117
168
3
75
58
6
593
278
31
69
20
46
41
180
85
47
147
7
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/8/2014
8/9/2014
8/9/2014
8/10/2014
8/10/2014
8/10/2014
8/10/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
CI
CMI
26
21
8
4
1
4
3
1
1
2
1
9
19
2
1
9
1
3
5
3
4
1
16
13
12
3
13
3
9
5
1
1
2
24
8
37
10
6
1
1
5
30
8
1
2
11
1
3
8
3
17
624
84
72
356
174
276
123
4
238
184
98
1,332
5,035
1,056
116
3,060
103
585
605
288
428
245
5,616
2,249
1,548
315
2,067
849
3,699
2,670
202
220
110
3,624
152
1,369
170
336
121
239
130
5,580
1,096
112
144
1,386
121
138
192
426
1,190
L-Bar
24
4
9
89
174
69
41
4
238
92
98
148
265
528
116
340
103
195
121
96
107
245
351
173
129
105
159
283
411
534
202
220
55
151
19
37
17
56
121
239
26
186
137
112
72
126
121
46
24
142
70
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
8/11/2014
CI
CMI
17
8
3
8
1
1
9
1
4
3
5
3
8
4
14
15
1
1
1
5
2
4
5
3
2
9
9
5
2
12
4
5
15
1
68
5
1
1
5
1
12
3
1
34
3
26
1
2
1
1
1
3,060
744
120
1,152
206
175
54
45
316
78
710
291
40
640
1,008
960
118
180
153
1,130
154
316
65
189
168
657
864
495
32
1,596
392
750
1,410
87
1,700
385
96
94
420
78
180
186
209
2,176
288
1,768
109
108
18
29
88
L-Bar
180
93
40
144
206
175
6
45
79
26
142
97
5
160
72
64
118
180
153
226
77
79
13
63
84
73
96
99
16
133
98
150
94
87
25
77
96
94
84
78
15
62
209
64
96
68
109
54
18
29
88
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
Date
8/11/2014
8/11/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
CI
CMI
4
36
2
1
4
6
1
17
18
1
3
1
11
5
2
24
16
4
2
17
4
8
8
4
7
7
3
2
6
2
2
7
4
2
19
4
4
1
13
11
67
18
12
8
8
7
1
6
1
1
9
268
9,252
860
73
416
744
106
1,207
1,422
182
1,287
117
1,397
1,275
208
4,440
2,608
456
218
1,683
580
680
968
272
812
658
303
286
822
142
638
2,289
1,244
622
1,558
584
256
211
117
1,441
13,467
2,538
1,452
560
200
175
53
312
105
51
135
L-Bar
67
257
430
73
104
124
106
71
79
182
429
117
127
255
104
185
163
114
109
99
145
85
121
68
116
94
101
143
137
71
319
327
311
311
82
146
64
211
9
131
201
141
121
70
25
25
53
52
105
51
15
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/12/2014
8/13/2014
CI
CMI
6
15
5
2
9
3
3
2
2
2
1
3
3
9
13
8
1
3
1
7
8
2
4
5
2
7
7
4
11
5
2
12
1
9
1
4
11
3
6
5
1
10
6
5
2
13
3
1
4
103
2
150
585
125
140
1,269
342
213
374
94
84
67
207
300
1,548
1,014
1,280
165
549
26
70
1,088
186
1,828
175
160
469
245
276
1,287
345
224
504
43
171
84
248
594
126
1,098
245
49
540
576
10
156
429
789
33
116
4,635
120
L-Bar
25
39
25
70
141
114
71
187
47
42
67
69
100
172
78
160
165
183
26
10
136
93
457
35
80
67
35
69
117
69
112
42
43
19
84
62
54
42
183
49
49
54
96
2
78
33
263
33
29
45
60
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
CI
CMI
4
8
5
20
10
4
6
12
3
3
1
13
6
8
2
2
4
2
2
10
1
4
9
2
8
4
17
20
2
7
9
58
7
3
11
16
67
8
12
6
9
8
2
3
4
13
4
1
30
12
4
568
376
1,110
4,340
670
444
162
888
582
222
213
52
894
424
314
378
120
230
128
890
54
316
675
104
80
96
5,015
6,320
196
182
27
2,320
518
117
869
1,552
2,211
304
888
978
126
48
156
120
1,036
1,144
412
172
4,290
816
332
L-Bar
142
47
222
217
67
111
27
74
194
74
213
4
149
53
157
189
30
115
64
89
54
79
75
52
10
24
295
316
98
26
3
40
74
39
79
97
33
38
74
163
14
6
78
40
259
88
103
172
143
68
83
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/13/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
CI
7
7
2
11
2
11
1
7
19
7
35
12
3
1
9
1
5
4
8
8
6
2
10
4
1
2
4
13
1
3
10
1
4
12
7
1
2
8
1
12
1
1
8
1,458
1
3
2
1
1
14
97
CMI
539
525
54
990
756
1,177
4
651
2,223
812
280
660
105
42
36
154
625
216
64
1,112
240
58
630
132
8
214
172
546
23
123
670
12
652
864
49
81
268
520
36
1,260
87
127
2,864
1,458
199
126
158
250
92
1,456
68,191
L-Bar
77
75
27
90
378
107
4
93
117
116
8
55
35
42
4
154
125
54
8
139
40
29
63
33
8
107
43
42
23
41
67
12
163
72
7
81
134
65
36
105
87
127
358
1
199
42
79
250
92
104
703
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
CI
CMI
24
23
3
13
10
38
20
1
1
9
1
7
4
7
30
3
5
73
1
2
18
2
4
2
4
1
1
1
10
44
8
4
11
8
12
9
1
5
7
3
2
3
2
13
1
3
1
7
2
3
6
2,712
2,668
399
2,444
2,290
6,954
1,720
176
176
1,773
186
462
696
742
3,600
327
455
5,256
389
592
1,962
220
300
286
580
211
76
128
2,100
10,076
1,480
200
1,133
32
804
1,548
34
35
658
120
122
759
120
1,261
81
45
335
497
174
39
492
L-Bar
113
116
133
188
229
183
86
176
176
197
186
66
174
106
120
109
91
72
389
296
109
110
75
143
145
211
76
128
210
229
185
50
103
4
67
172
34
7
94
40
61
253
60
97
81
15
335
71
87
13
82
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/14/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
CI
CMI
3
9
4
11
2
3
4
139
6
4
17
1
9
11
6
32
9
6
8
2
1
12
1
12
3
8
5
1
5
60
5
2
1
13
20
12
4
7
9
14
1
3
2
20
20
9
1
10
7
3
43
579
603
736
781
516
402
976
1,946
408
32
2,040
37
36
198
1,674
7,008
522
336
16
6
35
132
77
36
198
136
520
142
230
8,760
335
176
92
2,119
300
288
280
840
882
1,316
101
198
300
2,280
100
720
156
800
1,043
465
4,214
L-Bar
193
67
184
71
258
134
244
14
68
8
120
37
4
18
279
219
58
56
2
3
35
11
77
3
66
17
104
142
46
146
67
88
92
163
15
24
70
120
98
94
101
66
150
114
5
80
156
80
149
155
98
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/15/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/16/2014
8/17/2014
8/17/2014
8/17/2014
8/17/2014
8/17/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
CI
4
11
10
6
36
7
3
10
1
1
11
1
14
9
14
12
36
1
18
11
18
1
8
1
37
2,895
2
5
11
18
5
49
1
13
1
2
2
1
1
4
1
3
3
5
8
9
25
2
11
1
8
CMI
744
77
130
330
936
28
24
10
35
159
231
111
28
666
4,144
72
4,104
144
54
88
1,260
106
120
102
1,813
89,745
1,176
715
2,255
306
780
2,401
172
325
482
46
280
206
33
472
269
786
255
1,395
400
2,070
2,075
250
1,408
231
928
L-Bar
186
7
13
55
26
4
8
1
35
159
21
111
2
74
296
6
114
144
3
8
70
106
15
102
49
31
588
143
205
17
156
49
172
25
482
23
140
206
33
118
269
262
85
279
50
230
83
125
128
231
116
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
CI
CMI
16
13
4
9
9
9
4
4
3
5
6
4
4
3
19
10
1
12
2
10
12
6
10
1
1
7
9
5
4
16
4
4
11
11
1
7
5
4
17
5
3
12
4
8
4
3
1
5
12
4
17
800
897
744
1,377
1,746
945
100
12
276
1,020
624
300
740
234
1,482
210
194
1,464
232
950
2,664
348
710
151
112
273
1,089
480
896
2,176
12
884
935
1,760
45
49
140
280
867
75
528
1,356
24
1,224
152
183
67
5
1,152
364
3,315
L-Bar
50
69
186
153
194
105
25
3
92
204
104
75
185
78
78
21
194
122
116
95
222
58
71
151
112
39
121
96
224
136
3
221
85
160
45
7
28
70
51
15
176
113
6
153
38
61
67
1
96
91
195
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/18/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
CI
CMI
2
4
5
6
3
4
5
13
12
7
2
4
1
12
10
10
6
1
8
10
4
8
13
4
1
3
7
13
1
2
8
2
8
2
1
7
10
40
13
65
1
7
1
1
12
10
7
9
2
19
3
148
72
465
186
48
392
190
793
1,248
336
444
128
323
960
1,190
330
330
142
624
770
504
400
104
16
214
219
322
1,287
428
114
1,016
506
464
116
162
959
1,010
16,960
533
130
75
2,023
274
26
936
2,440
952
675
134
1,501
342
L-Bar
74
18
93
31
16
98
38
61
104
48
222
32
323
80
119
33
55
142
78
77
126
50
8
4
214
73
46
99
428
57
127
253
58
58
162
137
101
424
41
2
75
289
274
26
78
244
136
75
67
79
114
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
CI
CMI
2
4
3
6
12
11
4
8
5
16
7
3
2
1
29
5
10
4
1
1
1
2
11
2
3
2
82
7
2
3
11
5
2
4
6
29
13
10
5
3
7
3
8
1
6
5
5
1
1
12
1
298
960
429
1,140
1,944
1,848
356
416
360
1,008
35
348
198
255
1,885
240
210
300
77
205
1
46
429
16
249
160
17,876
1,645
8
219
814
140
44
48
270
2,958
1,755
640
90
369
161
384
48
18
342
340
395
62
73
1,296
97
L-Bar
149
240
143
190
162
168
89
52
72
63
5
116
99
255
65
48
21
75
77
205
1
23
39
8
83
80
218
235
4
73
74
28
22
12
45
102
135
64
18
123
23
128
6
18
57
68
79
62
73
108
97
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/19/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
CI
15
2
1
21
2
2,722
2,865
1
1
1
3
2
1
2
9
12
9
10
4
8
6
4
2
7
1
2
6
14
17
5
1
1
6
4
9
10
6
11
9
2
10
9
2
5
1
2
3
1
2
4
2
CMI
45
246
248
777
58
78,938
74,490
123
1,042
160
12
292
225
342
36
1,608
1,620
1,320
520
760
1,266
748
298
476
230
92
960
1,092
323
270
313
58
912
732
1,242
3,760
108
5,137
2,898
210
1,080
603
420
375
82
280
342
261
96
216
182
L-Bar
3
123
248
37
29
29
26
123
1,042
160
4
146
225
171
4
134
180
132
130
95
211
187
149
68
230
46
160
78
19
54
313
58
152
183
138
376
18
467
322
105
108
67
210
75
82
140
114
261
48
54
91
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/20/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
CI
CMI
1
8
1
2
9
7
5
5
1
2
121
15
7
6
9
13
22
16
6
13
3
1
2
2
22
10
1
2
12
1
17
4
6
10
5
5
1
9
1
4
1
1
10
2
12
6
2
5
17
19
5
136
472
88
94
1,332
1,764
940
920
142
230
17,424
870
609
30
765
2,483
1,738
928
156
1,053
102
81
254
242
4,488
1,090
137
158
132
174
238
76
306
670
260
40
53
261
97
388
108
428
1,700
178
1,332
516
354
545
1,751
1,957
305
L-Bar
136
59
88
47
148
252
188
184
142
115
144
58
87
5
85
191
79
58
26
81
34
81
127
121
204
109
137
79
11
174
14
19
51
67
52
8
53
29
97
97
108
428
170
89
111
86
177
109
103
103
61
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
CI
CMI
9
3
3
3
1
10
2
1
6
1
31
1
1
1
4
1
1
1
18
3
5
3
8
144
4
38
11
2
6
1
2
8
1
15
7
6
9
4
1
3
4
4
9
7
12
40
5
6
1
8
7
333
336
393
219
124
1,520
258
324
378
190
4,774
89
147
450
288
188
188
166
1,062
423
270
417
504
25,920
268
1,900
3,872
208
414
21
552
520
96
1,530
1,029
546
1,287
928
18
201
228
716
1,152
595
324
480
550
600
80
1,096
84
L-Bar
37
112
131
73
124
152
129
324
63
190
154
89
147
450
72
188
188
166
59
141
54
139
63
180
67
50
352
104
69
21
276
65
96
102
147
91
143
232
18
67
57
179
128
85
27
12
110
100
80
137
12
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/21/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
CI
CMI
3
2
12
3
1
2
12
6
13
18
3
1
12
4
3
5
2
1
8
6
3
6
3
6
2
1
3
7
10
8
10
26
2
11
1
2
1
12
7
3
5
3
12
4
1
9
13
9
13
3
4
450
304
1,176
306
96
124
2,004
462
754
450
354
23
684
128
363
230
270
144
312
834
186
108
339
48
434
54
192
1,974
1,070
648
1,410
1,872
98
110
86
162
32
660
147
114
200
243
216
1,884
181
117
169
1,755
442
66
20
L-Bar
150
152
98
102
96
62
167
77
58
25
118
23
57
32
121
46
135
144
39
139
62
18
113
8
217
54
64
282
107
81
141
72
49
10
86
81
32
55
21
38
40
81
18
471
181
13
13
195
34
22
5
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/22/2014
8/23/2014
8/23/2014
8/23/2014
8/23/2014
8/24/2014
8/24/2014
8/24/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
CI
CMI
2
5
1
5
5
3
2
1
17
2
5
2
10
26
2
7
1
6
5
1
7
4
10
1
1
9
1
6
3
7
14
1
12
9
3
15
4
1
1
1
1
1
1
1
1
1
1
1
18
8
15
218
110
135
335
315
189
168
16
1,207
354
205
126
180
1,846
206
1,127
82
96
25
92
1,330
56
440
179
136
180
51
630
15
273
140
60
132
342
156
2,730
80
79
117
137
151
162
185
190
333
113
89
163
1,152
896
5,385
L-Bar
109
22
135
67
63
63
84
16
71
177
41
63
18
71
103
161
82
16
5
92
190
14
44
179
136
20
51
105
5
39
10
60
11
38
52
182
20
79
117
137
151
162
185
190
333
113
89
163
64
112
359
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
Date
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
CI
CMI
6
8
2
7
2
10
1
1
2
5
2
4
1
3
12
7
18
9
2
4
1
4
4
1
6
8
9
14
18
8
1
1
1
9
1
9
16
2
1
1
4
6
11
1
3
4
9
4
9
2
8
420
488
178
2,891
242
680
114
1
382
795
498
28
51
357
1,524
1,414
1,872
693
304
292
190
96
136
230
558
800
414
854
1,458
392
71
141
20
954
88
1,584
5,872
38
59
221
132
222
1,573
138
48
248
882
124
603
22
328
L-Bar
70
61
89
413
121
68
114
1
191
159
249
7
51
119
127
202
104
77
152
73
190
24
34
230
93
100
46
61
81
49
71
141
20
106
88
176
367
19
59
221
33
37
143
138
16
62
98
31
67
11
41
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/25/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
CI
CMI
3
82
6
1
1
9
11
7
1
1
1
25
7
16
31
1
2
2
8
6
4
1
2
4
1
10
1
4
1
8
3
4
8
10
4
8
4
16
8
12
8
15
12
2
10
3
1
6
2
4
1
618
4,182
696
69
100
1,044
484
119
190
125
344
10,875
1,659
5,872
2,232
126
88
256
272
132
752
221
208
408
115
3,420
422
116
72
216
432
76
872
660
236
472
636
240
408
648
1,016
1,935
3,120
336
1,740
642
29
144
32
76
164
L-Bar
206
51
116
69
100
116
44
17
190
125
344
435
237
367
72
126
44
128
34
22
188
221
104
102
115
342
422
29
72
27
144
19
109
66
59
59
159
15
51
54
127
129
260
168
174
214
29
24
16
19
164
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
Date
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
8/26/2014
CI
CMI
2
184
15
25
13
1
8
1
1
3
1
1
6
18
2
2
11
1
2
7
4
5
1
3
1
10
9
6
11
10
1
4
8
2
1
6
6
6
1
12
12
1
1
4
5
2
1
1
1
2
1
296
25,392
2,070
3,650
2,158
72
1,040
49
19
444
40
148
456
1,386
26
164
539
95
202
798
408
255
125
108
20
730
99
846
825
1,320
103
232
472
158
152
438
426
48
70
684
204
241
149
264
385
120
161
158
66
70
44
L-Bar
148
138
138
146
166
72
130
49
19
148
40
148
76
77
13
82
49
95
101
114
102
51
125
36
20
73
11
141
75
132
103
58
59
79
152
73
71
8
70
57
17
241
149
66
77
60
161
158
66
35
44
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
8/26/2014
8/26/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
CI
2,012
46
1
14
2
1
5
6
28
8
2
23
8
17
21
27
11
1
16
4
1
1
1
12
2
8
8
1
65
7
4
12
4
1
15
6
5
22
6
37
3
42
3
56
8
2
2
2
6
2
1
CMI
82,492
4,508
117
896
306
89
2,265
138
2,212
200
138
1,656
960
221
315
324
1,001
93
4,224
908
399
80
86
1,272
224
616
1,192
282
2,925
63
156
864
484
96
1,605
564
1,620
5,588
390
3,293
177
1,554
420
1,288
384
230
230
230
846
118
88
L-Bar
41
98
117
64
153
89
453
23
79
25
69
72
120
13
15
12
91
93
264
227
399
80
86
106
112
77
149
282
45
9
39
72
121
96
107
94
324
254
65
89
59
37
140
23
48
115
115
115
141
59
88
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/27/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
CI
CMI
7
1
13
7
10
8
13
4
10
5
33
93
5
1
6
47
10
1
6
25
3
3
2
4
4
2
4
4
12
89
4
4
18
12
3
11
2
7
3
43
2
3
7
1
1
2
7
1
60
6
2
385
148
39
308
50
536
1,144
292
180
670
3,564
5,022
650
90
348
329
280
111
564
5,157
666
345
64
140
448
130
736
48
48
10,413
148
68
3,294
708
24
418
282
973
96
387
44
348
504
83
173
252
28
57
1,140
1,272
206
L-Bar
55
148
3
44
5
67
88
73
18
134
108
54
130
90
58
7
28
111
94
368
222
115
32
35
112
65
184
12
4
117
37
17
183
59
8
38
141
139
32
9
22
116
72
83
173
126
4
57
19
212
103
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
CI
CMI
11
12
8
16
1
2
1
1
4
1
12
14
5
5
1
1
20
3
2
11
4
6
1
5
9
8
2
861
8
11
12
9
5
1
4
1
34
11
12
5
1
1
18
8
4
5
2
8
8
8
1
4,642
1,068
392
1,072
325
318
78
104
16
82
696
1,918
740
440
84
9
880
204
142
2,772
432
1,422
236
145
999
4,384
56
43,568
312
2,321
360
1,287
735
67
444
137
7,684
627
504
1,450
173
67
1,476
576
24
685
254
680
728
16
137
L-Bar
422
89
49
67
325
159
78
104
4
82
58
137
148
88
84
9
44
68
71
252
108
237
236
29
111
548
28
58
39
211
30
143
147
67
111
137
226
57
42
290
173
67
82
72
6
137
127
85
91
2
137
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/28/2014
8/29/2014
8/29/2014
8/29/2014
CI
1
8
3
3
6
72
11
2
3
16
4
4
4
6
4
4
13
4
10
13
5
6
2
11
7
125
1
2
6
11
8
10
20
4
5
8
4
10
4
7
8
7
2,126
539
7
1
2
15
6
5
2
CMI
11
936
192
342
1,404
720
99
782
144
256
800
108
48
474
20
232
663
200
100
702
445
360
154
781
217
1,125
4
52
432
77
24
1,870
640
220
325
440
72
1,520
424
357
544
924
21,260
539
42
127
158
3,735
1,008
645
942
L-Bar
11
117
64
114
234
10
9
391
48
16
200
27
12
79
5
58
51
50
10
54
89
60
77
71
31
9
4
26
72
7
3
187
44
55
65
55
18
152
106
51
68
132
10
1
6
127
79
249
168
129
471
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
8/29/2014
CI
CMI
4
4
12
2
8
4
10
1
5
1
1
4
1
5
1
97
15
2
1
3
10
6
6
2
2
7
3
2
11
7
2
2
5
3
4
10
1
4
7
4
5
8
3
2
3
8
6
1
5
4
8
444
652
1,008
130
704
784
1,700
227
1,045
402
86
8
311
315
128
3,589
1,620
18
32
99
30
264
318
102
82
1,414
825
932
110
791
288
214
1,140
141
76
2,390
139
244
280
76
365
280
282
162
228
160
594
32
650
224
792
L-Bar
111
163
84
65
88
196
170
227
209
402
86
2
311
63
128
37
108
9
32
33
3
44
53
51
41
202
275
466
10
113
144
107
228
47
19
239
139
61
40
19
73
35
94
81
76
20
99
32
130
56
99
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
8/29/2014
8/29/2014
8/29/2014
8/30/2014
8/30/2014
8/30/2014
8/30/2014
8/30/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
CI
CMI
4
1
5
3
4
1
1
2
859
1
2
6
6
12
15
31
10
1
36
3
6
12
1
28
8
16
3
1
1
4
4
7
5
23
1
14
10
3
18
8
2
2
10
4
2
11
6
6
6
3
2
472
330
290
747
864
112
261
64
12,885
178
214
648
606
2,292
1,110
806
1,140
55
11,196
132
810
492
108
6,552
808
5,008
123
129
72
8
312
2,345
25
3,085
156
1,316
140
486
1,026
560
100
120
20
136
38
539
510
510
1,224
243
420
L-Bar
118
330
58
249
216
112
261
32
15
178
107
108
101
191
74
26
114
55
311
44
135
41
108
234
101
313
41
129
72
2
78
335
5
140
156
94
14
162
57
70
50
60
2
34
19
49
85
85
204
81
210
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/2/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
CI
CMI
8
4
6
31
4
4
4
44
11
53
7
4
1
4
1
3
8
6
20
17
30
6
10
11
6
3
7
40
1
9
8
5
3
2
2
59
47
57
13
2
1
5
7
9
1
34
1
12
5
6
3
312
504
966
4,681
148
204
784
880
825
11,183
448
776
101
228
27
135
1,048
654
8,760
2,227
2,670
948
530
330
750
126
469
4,400
38
423
416
1,035
153
292
828
5,133
3,995
4,845
1,105
2
132
315
812
1,593
109
10,880
94
576
225
504
381
L-Bar
39
126
161
151
37
51
196
20
75
211
64
194
101
57
27
45
131
109
438
131
89
158
53
30
125
42
67
110
38
47
52
207
51
146
414
87
85
85
85
1
132
63
116
177
109
320
94
48
45
84
127
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
CI
CMI
9
12
12
9
21
42
5
3
22
5
2
8
1
12
7
8
1
1
1
1
3
1
8
1
12
4
8
28
11
2
4
5
4
6
1
6
6
7
6
2
9
1
9
1
2
5
1
9
7
7
2
45
1,356
480
243
3,360
2,856
525
249
1,518
535
8
1,072
115
192
98
696
72
334
121
89
261
83
48
74
432
240
56
10,220
33
140
444
755
424
618
24
696
222
259
540
232
117
134
450
124
184
220
98
18
581
497
214
L-Bar
5
113
40
27
160
68
105
83
69
107
4
134
115
16
14
87
72
334
121
89
87
83
6
74
36
60
7
365
3
70
111
151
106
103
24
116
37
37
90
116
13
134
50
124
92
44
98
2
83
71
107
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/3/2014
9/4/2014
9/4/2014
9/4/2014
CI
CMI
2
3
11
10
11
11
10
6
30
6
3
1
3
16
3
12
12
15
12
23
20
11
14
25
5
13
2
3
28
9
8
2
4
2
10
27
11
2
9
2
1
2
1
8
13
2
1
11
1
2
2
90
555
407
310
330
319
1,010
552
1,650
798
120
73
126
928
294
12
708
720
69
9,430
8,160
4,477
5,684
11,550
30
832
216
204
1,288
45
32
316
344
100
100
1,728
77
240
90
312
188
112
43
544
1,209
412
209
880
107
34
22
L-Bar
45
185
37
31
30
29
101
92
55
133
40
73
42
58
98
1
59
48
36
410
408
407
406
462
6
64
108
68
46
5
4
158
86
50
10
64
7
120
10
156
188
56
43
68
93
206
209
80
107
17
11
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
CI
CMI
1
16
1
16
3
7
2
12
2
8
1
3
1
2
1
2
1
1
8
2
19
1
9
11
8
12
6
16
12
14
8
19
4
2
1
15
4
5
21
6
33
32
6
15
3
7
8
2
10
7
5
4
1,792
631
1,504
96
833
200
576
124
1,928
278
207
151
184
76
162
66
22
952
222
665
432
909
704
944
516
192
532
156
1,680
488
2,033
756
200
75
1,185
316
290
4,032
198
8,283
1,568
192
1,350
480
56
1,032
318
360
1,820
105
L-Bar
4
112
631
94
32
119
100
48
62
241
278
69
151
92
76
81
66
22
119
111
35
432
101
64
118
43
32
56
13
120
61
107
189
100
75
79
79
58
196
33
251
49
32
90
160
8
129
159
36
260
21
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
Date
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/4/2014
9/5/2014
9/5/2014
CI
9
2
5
4
6
2
4
6
8
3
8
25
7
9
12
7
1
8
8
3
2
8
11
21
4
2
6
2
5
12
4
2
1
6
9
11
6
7
15
14
7
8
10
1
5
16
2
2,638
9
1
1
CMI
306
84
15
88
1,704
130
640
396
680
75
256
1,575
406
1,215
264
35
202
712
704
195
154
848
1,617
588
556
14
126
130
15
252
536
96
93
1,032
288
143
78
84
180
168
350
1,648
950
177
55
2,736
920
10,552
441
102
29
L-Bar
34
42
3
22
284
65
160
66
85
25
32
63
58
135
22
5
202
89
88
65
77
106
147
28
139
7
21
65
3
21
134
48
93
172
32
13
13
12
12
12
50
206
95
177
11
171
460
4
49
102
29
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
CI
CMI
2
4
8
2
5
1
18
1
5
8
9
13
4
1
1
12
3
5
1
1
34
2
9
10
3
18
3
3
1
18
30
10
9
8
3
3
10
2
3
3
2
4
6
2
18
11
7
7
8
1
5
180
504
1,104
424
805
152
1,134
12
240
1,144
918
1,287
516
74
102
2,196
282
450
17
196
11,458
302
927
420
54
2,484
270
126
93
1,368
2,550
1,080
549
608
120
120
900
914
294
297
208
336
522
102
198
220
378
336
480
102
110
L-Bar
90
126
138
212
161
152
63
12
48
143
102
99
129
74
102
183
94
90
17
196
337
151
103
42
18
138
90
42
93
76
85
108
61
76
40
40
90
457
98
99
104
84
87
51
11
20
54
48
60
102
22
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/5/2014
9/6/2014
9/6/2014
9/6/2014
9/6/2014
9/6/2014
9/7/2014
9/7/2014
9/7/2014
9/7/2014
9/7/2014
9/7/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
CI
CMI
2
8
35
3
1
5
7
5
13
11
1
5
14
8
12
14
1
66
1
5
4
16
1
8
2
1
2
1
9
5
16
2
1
1
1
1
1
166
9
1
10
1
1
1
11
1
15
17
3
4
18
208
456
315
378
25
745
532
845
2,379
242
129
2,585
1,064
584
588
560
69
4,488
49
250
56
1,744
44
312
198
35
26
116
54
35
368
178
1
136
145
14
35
7,968
3,357
48
310
56
68
137
165
83
2,685
1,258
3
484
3,600
L-Bar
104
57
9
126
25
149
76
169
183
22
129
517
76
73
49
40
69
68
49
50
14
109
44
39
99
35
13
116
6
7
23
89
1
136
145
14
35
48
373
48
31
56
68
137
15
83
179
74
1
121
200
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
CI
CMI
8
1
16
1
1
6
6
7
8
4
1
2
1
7
6
1
2
2
1
3
17
1
6
12
4
1
12
15
8
15
6
8
1
1
5
4
3
10
5
4
8
8
18
14
13
1
13
20
1
10
6
24
116
1,376
27
40
390
720
763
872
288
133
310
146
714
1,842
126
24
170
64
657
17
106
828
276
236
101
720
2,640
664
1,005
1,416
1,216
88
178
1,260
360
195
90
895
276
104
1,344
1,332
966
312
208
962
1,460
111
1,050
378
L-Bar
3
116
86
27
40
65
120
109
109
72
133
155
146
102
307
126
12
85
64
219
1
106
138
23
59
101
60
176
83
67
236
152
88
178
252
90
65
9
179
69
13
168
74
69
24
208
74
73
111
105
63
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/8/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
CI
CMI
2
7
4
3
6
13
16
9
17
1
7
3
6
8
8
11
2
2
17
4
1
1
6
6
3
2
6
9
1
13
2
5
1
1
147
1
22
1
18
9
1
9
10
8
9
1
2
2
2
2
1
362
329
300
99
108
871
1,072
954
1,258
60
112
474
552
312
272
671
10
78
1,071
616
354
136
630
72
138
360
456
1,116
93
195
40
350
30
69
12,054
98
1,980
91
1,656
873
58
1,062
630
400
1,773
252
152
154
846
232
116
L-Bar
181
47
75
33
18
67
67
106
74
60
16
158
92
39
34
61
5
39
63
154
354
136
105
12
46
180
76
124
93
15
20
70
30
69
82
98
90
91
92
97
58
118
63
50
197
252
76
77
423
116
116
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
CI
CMI
7
7
14
1
1
3
2
5
6
17
17
2
1
8
3
1
3
1
11
5
6
2
3
6
10
5
8
2
1
3
18
9
6
7
6
7
6
5
6
2
11
7
8
3
9
2
9
1
3
10
9
595
147
1,792
556
42
228
310
25
876
51
714
380
75
120
366
89
75
51
605
265
144
216
21
1,038
160
235
2,144
300
89
1,029
1,296
2,331
558
2,324
462
980
342
100
294
74
1,309
98
344
603
270
96
594
144
297
2,040
315
L-Bar
85
21
128
556
42
76
155
5
146
3
42
190
75
15
122
89
25
51
55
53
24
108
7
173
16
47
268
150
89
343
72
259
93
332
77
140
57
20
49
37
119
14
43
201
30
48
66
144
99
204
35
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/9/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
CI
CMI
81
6
1
1
2
3
10
2
1
6
4
4
11
12
8
4
11
2
1
6
6
8
1
1
7
8
1
1
2
1
3
22
7
7
1
6
24
7
2
3
8
2
6
7
31
54
5
1
21
20
5
6,561
66
122
65
58
585
30
84
101
216
240
184
506
828
384
860
869
196
187
468
36
1,304
57
34
1,092
176
103
182
154
168
129
3,102
462
2,506
115
486
2,448
1,750
158
537
488
530
114
1,218
992
3,294
235
59
777
2,460
375
L-Bar
81
11
122
65
29
195
3
42
101
36
60
46
46
69
48
215
79
98
187
78
6
163
57
34
156
22
103
182
77
168
43
141
66
358
115
81
102
250
79
179
61
265
19
174
32
61
47
59
37
123
75
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
CI
CMI
2
1
1
37
2
4
6
6
1
12
7
5
9
7
4
1
2
14
5
5
5
4
4
1
1
12
6
4
1
4
10
19
1
4
8
7
3
1
20
1
4
6
9
2
2
5
16
7
8
1
18
134
168
101
1,332
302
600
810
708
160
3,237
112
515
477
182
68
134
312
1,134
410
505
1,105
264
508
105
69
1,104
228
372
206
664
1,610
2,014
102
520
368
721
474
74
5,320
49
788
438
459
156
96
350
48
490
1,504
58
342
L-Bar
67
168
101
36
151
150
135
118
160
275
16
103
53
26
17
134
156
81
82
101
221
66
127
105
69
92
38
93
206
166
161
106
102
130
46
103
158
74
266
49
197
73
51
78
48
70
3
70
188
58
19
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/10/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
CI
CMI
2
17
3
2
4
1
2
6
1
2
4
2
24
1
4
2
1
2
6
1
1
4
28
1
7
2
3
1
5
9
2
3
2
6
10
1
9
2
7
5
16
8
4
1
1
7
7
4
7
26
3
294
3,230
261
176
224
64
204
576
52
130
364
86
1,608
107
496
84
7
458
342
115
5
152
2,296
148
994
106
339
92
335
1,242
214
129
82
510
750
45
522
260
133
135
2,608
104
472
72
166
119
168
492
28
156
234
L-Bar
147
190
87
88
56
64
102
96
52
65
91
43
67
107
124
42
7
229
57
115
5
38
82
148
142
53
113
92
67
138
107
43
41
85
75
45
58
130
19
27
163
13
118
72
166
17
24
123
4
6
78
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
CI
CMI
29
2
5
30
1
6
35
8
1
7
2
1
3
15
3
16
6
6
7
2
6
2
6
22
29
4
14
4
4
9
3
11
1
11
2
1
44
1
5
1
3
2
20
9
12
6
3
4
16
2
2
4,321
188
140
4,320
320
66
560
40
150
350
324
84
234
240
147
1,616
936
258
42
272
426
334
90
946
957
272
280
24
128
675
252
1,034
44
1,001
170
145
10,640
76
215
81
660
118
540
486
768
330
231
432
1,520
48
334
L-Bar
149
94
28
144
320
11
16
5
150
50
162
84
78
16
49
101
156
43
6
136
71
167
15
43
33
68
20
6
32
75
84
94
44
91
85
145
299
76
43
81
220
59
27
54
64
55
77
108
95
24
167
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/11/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
CI
CMI
15
4
1
9
2
13
1
2
4
11
6
9
3
4
20
1
4
9
6
10
3
1
9
1
2
1
3
18
6
16
8
3
100
8
7
1
1
1
7
1
1
108
6
4
4
1
9
8
7
2
64
180
376
65
828
196
1,417
56
182
116
1,232
468
738
567
228
220
102
144
711
654
780
111
31
414
229
28
208
186
3,168
366
640
304
57
10,000
472
763
98
76
114
532
153
162
18,468
30
300
544
30
504
16
294
112
34,944
L-Bar
12
94
65
92
98
109
56
91
29
112
78
82
189
57
11
102
36
79
109
78
37
31
46
229
14
208
62
176
61
40
38
19
100
59
109
98
76
114
76
153
162
171
5
75
136
30
56
2
42
56
546
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
Date
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/12/2014
CI
CMI
5
9
1
4
52
9
6
57
28
1
2
2
1
13
1
5
6
7
1
22
2
1
2
3
3
3
7
12
3
9
12
7
6
5
6
4
6
16
1
8
2
1
3
2
12
4
22
1
1
2
14
500
333
486
296
1,300
549
330
114
3,136
134
8
4
182
1,638
29
155
294
266
23
2,244
166
29
56
324
768
171
476
264
81
432
456
231
132
40
42
12
24
368
15
40
120
33
84
112
72
152
1,188
6
311
6
154
L-Bar
100
37
486
74
25
61
55
2
112
134
4
2
182
126
29
31
49
38
23
102
83
29
28
108
256
57
68
22
27
48
38
33
22
8
7
3
4
23
15
5
60
33
28
56
6
38
54
6
311
3
11
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/12/2014
9/12/2014
9/12/2014
9/12/2014
9/13/2014
9/13/2014
9/13/2014
9/13/2014
9/13/2014
9/13/2014
9/13/2014
9/13/2014
9/13/2014
9/14/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
CI
1
1
4
1
11
1,108
9
8
1
3
2
1
1,796
9
2
4
4
4
3
6
1
13
7
17
8
4
7
16
1
1
3
11
1
3
3
1
2
15
4
3
6
6
7
2
10
2
11
21
9
39
1
CMI
57
76
8
43
572
23,268
225
696
69
39
238
29
43,104
1,782
634
1,104
1,108
1,108
831
1,722
286
3,588
770
255
368
44
1,365
1,312
36
264
78
187
56
129
114
40
300
1,290
452
123
384
156
651
294
1,890
130
1,540
1,365
1,629
2,223
7
L-Bar
57
76
2
43
52
21
25
87
69
13
119
29
24
198
317
276
277
277
277
287
286
276
110
15
46
11
195
82
36
264
26
17
56
43
38
40
150
86
113
41
64
26
93
147
189
65
140
65
181
57
7
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
CI
CMI
2
1
4
1
1
2
3
3
9
9
2
11
8
2
14
2
8
16
5
9
3
4
7
2
8
9
7
46
12
3
6
8
3
11
12
11
8
132
10
3
7
8
33
2
8
8
10
4
21
6
8
358
57
884
166
206
478
132
426
324
9
190
1,001
608
798
1,036
12
1,392
512
155
630
690
640
385
124
880
153
637
4,140
1,212
69
684
536
363
418
636
682
1,520
4,752
420
336
903
1,160
1,782
320
616
456
750
128
1,533
390
488
L-Bar
179
57
221
166
206
239
44
142
36
1
95
91
76
399
74
6
174
32
31
70
230
160
55
62
110
17
91
90
101
23
114
67
121
38
53
62
190
36
42
112
129
145
54
160
77
57
75
32
73
65
61
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/15/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
CI
CMI
6
8
3
17
2
1
1
1
2
3
1
9
8
8
1
3
6
3
3
13
6
6
4
14
3
3
3
18
1
1
1
1
1
9
2
12
7
12
5
1
1
2
6
6
8
1
1
1
1
2
12
18
592
90
935
48
165
87
293
234
240
135
2,115
456
928
569
267
870
336
183
1,001
492
222
1,244
168
531
306
363
4,410
535
43
153
38
238
495
324
3,036
294
276
180
86
230
2
1,056
312
368
139
19
574
32
56
3,252
L-Bar
3
74
30
55
24
165
87
353
117
80
135
235
57
116
569
89
145
112
61
77
82
37
311
12
177
102
121
255
535
43
153
38
238
55
162
253
42
23
36
86
230
1
176
52
46
139
19
574
32
28
271
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
CI
CMI
2
24
12
80
16
18
14
6
9
6
2
12
3
12
1
7
3
1
1
1
2
5
10
1
4
3
21
11
1
16
26
2
2
2
10
12
10
1
14
5
9
1
9
25
2
12
2
1
11
8
8
184
1,224
732
4,400
816
1,350
1,162
342
504
114
362
888
87
888
105
378
222
36
76
34
106
365
440
1
224
105
3,213
1,045
136
1,808
3,146
62
70
298
1,090
456
380
353
1,442
645
1,368
56
441
1,200
184
312
122
30
583
344
640
L-Bar
92
51
61
55
51
75
83
57
56
19
181
74
29
74
105
54
74
36
76
34
53
73
44
1
56
35
153
95
136
113
121
31
35
149
109
38
38
353
103
129
152
56
49
48
92
26
61
30
53
43
80
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/16/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
CI
CMI
4
5
3
3
2
13
7
59
1
6
7
4
1
7
6
4
10
1
1
16
1
8
1
4
1
1
4
1
3
9
1
1
5
7
7
33
16
11
7
16
4
2
1
100
5
8
9
4
6
8
1
140
160
222
75
34
650
301
8,319
51
108
574
216
36
161
30
584
50
85
53
192
129
1,168
219
688
166
106
176
98
525
657
84
233
525
504
1,134
14,949
3,904
2,618
483
1,017
408
846
94
11,400
95
856
1,728
52
162
2,152
68
L-Bar
35
32
74
25
17
50
43
141
51
18
82
54
36
23
5
146
5
85
53
12
129
146
219
172
166
106
44
98
175
73
84
233
105
72
162
453
244
238
69
144
102
423
94
114
19
107
192
13
27
269
68
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
CI
CMI
1
8
5
1
80
1
2
1
4
25
4
8
6
12
2
28
2
2
40
1
6
9
11
1
1
12
1
1
8
93
4
1
4
7
5
9
15
9
1
12
1
2
6
12
4
5
9
1
1
5
6
150
624
1,205
83
4,160
149
14
306
140
8,275
1,384
296
516
1,476
110
2,800
94
132
2,420
120
564
81
2,255
221
56
288
94
184
1,736
4,371
364
183
580
406
1,405
1,863
825
441
116
372
81
66
2,142
612
576
585
45
138
70
45
378
L-Bar
150
78
241
83
52
149
7
306
35
331
346
37
86
123
55
100
47
66
222
120
94
9
205
221
56
24
94
184
217
47
91
183
145
58
281
207
55
49
116
31
81
33
357
51
144
117
5
138
70
9
63
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/17/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
CI
CMI
2
1
3
14
8
10
4
23
12
21
1
42
100
14
19
1
1
4
4
7
8
3
7
7
1
6
3
3
1
6
8
1
2
2
3
1
12
34
35
22
1
1
17
8
1
1
7
10
21
11
8
154
24
180
952
728
750
344
8,510
684
2,163
66
1,050
3,000
686
817
80
26
480
560
1,134
672
408
490
126
88
888
1,047
288
750
480
944
232
378
223
234
28
576
10,336
4,830
3,234
28
151
1,003
1,176
168
7
427
260
2,142
2,992
392
L-Bar
77
24
60
68
91
75
86
370
57
103
66
25
30
49
43
80
26
120
140
162
84
136
70
18
88
148
349
96
750
80
118
232
189
138
78
28
48
304
138
147
28
151
59
147
168
7
61
26
102
272
49
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
CI
CMI
4
15
7
4
7
25
2
4
4
1
1
2
1
12
3
5
3
4
3
1
1
1
81
15
5
3
1
1
7
6
5
4
16
1
22
3
23
16
1
81
4
1
1
4
4
1
1
6
18
1
4
192
2,175
7
680
1,505
500
28
52
188
73
476
920
134
360
885
595
1,395
1,856
1,392
14
12
126
4,455
570
560
33
50
15
973
666
630
440
2,112
130
4,158
252
3,151
3,152
14
9,153
104
140
327
312
200
224
40
24
612
154
836
L-Bar
48
145
1
170
215
20
14
13
47
73
476
460
134
30
295
119
465
464
464
14
12
126
55
38
112
11
50
15
139
111
126
110
132
130
189
84
137
197
14
113
26
140
347
78
50
224
40
4
34
154
209
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/18/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
CI
CMI
36
6
2
6
2
1
1
1
5
7
3
6
1
1
1
14
6
29
1
2
35
3
6
4
12
6
5
2
19
4
4
1
1
8
8
1
7
72
1
2
5
18
4
2
1
13
8
17
4
7
7
3,564
522
10
1,674
230
74
55
259
470
168
171
204
4
5
4
1,456
708
3,422
104
52
1,085
78
72
196
984
480
70
6
1,862
168
340
70
48
168
240
194
1,897
7,560
42
264
310
3,078
56
188
205
1,157
2,768
935
124
434
14
L-Bar
99
87
5
279
115
74
55
259
94
24
57
34
4
5
4
104
118
118
104
26
31
26
12
49
82
80
14
3
98
42
85
70
48
21
30
194
271
105
42
132
62
171
14
94
205
89
346
55
31
62
2
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
9/19/2014
CI
CMI
12
1
8
6
8
164
2
2
1
4
6
15
4
8
2
4
8
5
79
35
51
1
1
10
4
2
2
8
2
1
8
21
16
1
12
8
1
8
9
9
1
9
4
9
14
9
1
1
7
1
3
36
86
856
12
608
53,956
282
2
92
172
486
1,140
644
1,304
278
480
168
620
12,008
3,255
4,896
50
82
810
104
140
308
328
536
58
904
126
80
61
228
136
151
96
243
18
115
261
52
1,395
14
99
34
65
7
197
69
L-Bar
3
86
107
2
76
329
141
1
92
43
81
76
161
163
139
120
21
124
152
93
96
50
82
81
26
70
154
41
268
58
113
6
5
61
19
17
151
12
27
2
115
29
13
155
1
11
34
65
1
197
23
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/19/2014
9/19/2014
9/19/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/20/2014
9/21/2014
9/21/2014
9/21/2014
9/21/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
CI
CMI
6
51
1
1
8
9
11
5
1
11
15
1
1
1
1
1
1
6
10
2
7
3
35
1
15
9
7
19
4
23
3
2
2
8
11
9
16
1
1
5
15
2
22
13
3
8
9
149
4
10
1
366
4,488
208
251
1,696
1,755
2,200
45
160
154
3,705
57
412
113
47
188
310
480
4,550
140
826
123
12,985
178
2,589
1,350
1,127
4,617
32
2,162
69
650
754
456
88
216
8,144
255
83
400
2,580
310
3,058
2,171
204
232
3,924
19,370
164
970
105
L-Bar
61
88
208
251
212
195
200
9
160
14
247
57
412
113
47
188
310
80
455
70
118
41
371
178
430
150
161
243
8
94
23
325
377
57
8
24
509
255
83
80
172
155
139
167
68
29
436
130
41
97
105
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/22/2014
CI
CMI
3
8
8
1
4
3
2
2
11
8
2
1
1
1
1
9
9
1
9
10
1
25
2
9
3
9
1
3
10
11
8
1
7
16
15
8
7
11
4
1
5
1
1
16
8
10
12
4
5
11
1
318
176
168
103
728
1,062
150
108
154
408
458
129
274
512
33
27
27
62
27
30
46
3,075
326
468
369
189
80
189
760
1,188
1,440
242
497
848
3,975
1,072
21
44
376
136
185
129
156
224
72
1,000
828
64
795
187
25
L-Bar
106
22
21
103
182
354
75
54
14
51
229
129
274
512
33
3
3
62
3
3
46
123
163
52
123
21
80
63
76
108
180
242
71
53
265
134
3
4
94
136
37
129
156
14
9
100
69
16
159
17
25
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/22/2014
9/22/2014
9/22/2014
9/22/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
CI
1
6
2,411
1
10
7
2
1
7
12
10
12
1
1
8
6
2
8
1
1
5
36
1
5
3
1
31
6
1
6
3
1
21
1
6
9
9
2
26
1
4
2
36
1
98
14
4
2
1
11
6
CMI
29
78
55,453
184
980
441
206
178
462
2,016
440
408
166
185
288
318
326
840
99
54
980
13,392
341
2,670
1,914
656
2,015
984
83
990
1,878
634
2,079
647
420
450
882
72
3,172
170
196
46
12,816
250
13,818
1,456
16
110
77
1,012
42
L-Bar
29
13
23
184
98
63
103
178
66
168
44
34
166
185
36
53
163
105
99
54
196
372
341
534
638
656
65
164
83
165
626
634
99
647
70
50
98
36
122
170
49
23
356
250
141
104
4
55
77
92
7
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/23/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
CI
CMI
14
3
3
7
9
1
6
9
3
14
4
11
8
12
10
7
1
6
5
25
8
21
11
22
8
6
3
5
3
5
2
2
3
35
6
6
1
1
11
392
9
14
1
8
5
6
13
16
1
3
1
868
219
732
462
873
243
84
513
99
980
848
1,089
1,520
984
2,310
434
103
846
45
3,150
712
126
1,397
1,870
728
24
306
70
360
60
158
18
426
1,715
186
678
256
44
1,122
13,720
1,278
1,022
89
1,072
400
336
1,118
5,632
68
390
15
L-Bar
62
73
244
66
97
243
14
57
33
70
212
99
190
82
231
62
103
141
9
126
89
6
127
85
91
4
102
14
120
12
79
9
142
49
31
113
256
44
102
35
142
73
89
134
80
56
86
352
68
130
15
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/24/2014
CI
CMI
10
8
5
3
6
8
11
32
9
2
8
2
10
5
13
4
6
6
2
10
6
6
4
7
2
2
8
1
24
5
4
1
12
2
6
5
7
9
8
2
4
6
10
8
5
4
2
3
1
12
26
150
640
280
627
834
1,672
935
12,096
783
636
176
112
1,240
235
1,547
456
456
576
202
1,060
636
636
264
1,015
462
434
320
115
3,504
110
248
265
168
416
654
420
658
621
184
320
340
312
1,340
296
580
772
102
204
135
2,136
2,808
L-Bar
15
80
56
209
139
209
85
378
87
318
22
56
124
47
119
114
76
96
101
106
106
106
66
145
231
217
40
115
146
22
62
265
14
208
109
84
94
69
23
160
85
52
134
37
116
193
51
68
135
178
108
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/24/2014
9/24/2014
9/24/2014
9/24/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
CI
1
1
1
1
8
1,636
1
1
1
9
9
1
1
3
7
4
11
1
1
8
6
8
5
2
1
7
10
10
1
17
21
2
1
4
9
3
1
22
6
1
9
11
3
5
5
1
31
3
14
3
11
CMI
62
142
177
7
960
39,264
114
405
49
711
549
113
144
525
1,099
496
605
54
86
304
180
368
420
244
156
21
490
950
229
765
735
206
89
812
576
429
309
682
1,250
113
1,116
33
369
265
2,485
50
4,526
99
840
183
33
L-Bar
62
142
177
7
120
24
114
405
49
79
61
113
144
175
157
124
55
54
86
38
30
46
84
122
156
3
49
95
229
45
35
103
89
203
64
143
309
31
312
113
124
3
123
53
497
50
146
33
60
61
3
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
CI
CMI
9
1
11
23
13
24
1
1
5
5
1
4
24
3
5
1
2
4
1
7
2
2
6
16
1
10
10
3
12
2
10
1
7
17
1
18
23
3
8
1
8
7
24
15
22
4
5
1
2
12
5
36
101
594
2,645
1,209
3,240
191
203
205
270
35
76
1,296
135
50
107
134
196
101
322
154
238
144
1,024
83
440
10
30
720
196
1,030
156
287
782
216
900
138
426
8
90
192
203
1,464
15
506
248
25
192
42
276
825
L-Bar
4
101
54
115
93
135
191
203
41
54
35
19
54
45
10
107
67
49
101
46
77
119
24
64
83
44
1
10
60
98
103
156
41
46
216
50
6
142
1
90
24
29
61
1
23
62
5
192
21
23
165
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/25/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
CI
5
2
3
2
9
4
6
5
3
13
7
3
5
13
12
1
24
10
2
3
3
8
630
1
4
2,085
1
1
6
15
1
150
1
3
3
7
26
1
11
5
38
2
44
24
6
1
7
4
2
34
1
CMI
705
768
3
100
18
44
306
70
105
130
224
519
205
923
2,244
80
4,944
860
282
117
549
720
10,710
111
340
20,850
186
121
48
1,320
97
33,450
78
240
873
35
5,434
66
583
200
4,104
116
4,400
4,080
36
117
1,897
360
168
3,366
115
L-Bar
141
384
1
50
2
11
51
14
35
10
32
173
41
71
187
80
206
86
141
39
183
90
17
111
85
10
186
121
8
88
97
223
78
80
291
5
209
66
53
40
108
58
100
170
6
117
271
90
84
99
115
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/26/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/27/2014
9/28/2014
9/28/2014
9/28/2014
9/29/2014
9/29/2014
9/29/2014
CI
CMI
7
13
9
1
4
12
4
6
3
10
1
4
4
6
7
8
7
5
5
8
1
3
25
23
4
14
1
1
6
6
5
1
2
1
104
1
4
4
1
20
9
3
2
1
1
5
10
4
2
1
7
700
676
630
115
604
192
564
840
333
520
38
276
792
648
700
368
238
135
310
472
53
81
2,550
4,071
508
686
73
81
498
108
180
119
692
227
34,424
95
116
836
64
1,900
783
960
276
174
80
875
2,340
332
128
278
168
L-Bar
100
52
70
115
151
16
141
140
111
52
38
69
198
108
100
46
34
27
62
59
53
27
102
177
127
49
73
81
83
18
36
119
346
227
331
95
29
209
64
95
87
320
138
174
80
175
234
83
64
278
24
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
CI
CMI
28
2
1
9
12
1
1
16
2
3
5
2
29
19
2
4
2
12
2
7
14
14
8
8
1
2
3
3
3
4
10
3
11
11
2
22
10
6
10
3
2
4
1
4
2
2
4
5
12
2
7
5,404
182
122
90
1,284
7
115
192
26
153
560
130
4,089
2,546
66
216
56
156
82
539
2,604
994
96
616
165
838
726
372
315
576
910
150
110
2,123
88
3,608
50
1,170
180
45
378
36
180
116
222
36
444
425
180
76
175
L-Bar
193
91
122
10
107
7
115
12
13
51
112
65
141
134
33
54
28
13
41
77
186
71
12
77
165
419
242
124
105
144
91
50
10
193
44
164
5
195
18
15
189
9
180
29
111
18
111
85
15
38
25
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/29/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
CI
CMI
6
38
8
2
1
25
4
13
3
1
8
6
1
3
1
12
1
10
1
4
1
1
2
2
10
4
2
5
13
22
15
13
11
1
4
1
20
1
1
9
3
8
16
5
1
5
1
1
25
1
1
462
3,420
720
110
74
3,175
824
598
291
54
216
312
121
363
121
24
152
240
456
248
116
76
140
84
1,650
60
182
5
767
1,914
315
2,158
121
144
380
45
1,940
241
15
1,494
342
2,672
672
400
236
220
15
163
4,125
273
280
L-Bar
77
90
90
55
74
127
206
46
97
54
27
52
121
121
121
2
152
24
456
62
116
76
70
42
165
15
91
1
59
87
21
166
11
144
95
45
97
241
15
166
114
334
42
80
236
44
15
163
165
273
280
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
CI
CMI
2
1
4
10
2
1
6
7
5
5
13
10
19
4
1
7
15
9
4
1
3
10
3
30
29
1
4
1
13
13
7
14
3
1
2
1
118
1
3
10
1
9
5
3
7
1
23
2
9
6
4
78
218
220
1,360
266
350
636
1,043
555
1,195
897
410
3,781
616
190
889
780
198
48
176
234
1,020
363
4,050
4,002
209
216
201
1,456
52
217
1,190
333
65
130
65
13,806
52
750
1,690
18
1,539
490
135
231
66
4,623
128
1,125
696
108
L-Bar
39
218
55
136
133
350
106
149
111
239
69
41
199
154
190
127
52
22
12
176
78
102
121
135
138
209
54
201
112
4
31
85
111
65
65
65
117
52
250
169
18
171
98
45
33
66
201
64
125
116
27
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
9/30/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
CI
CMI
21
2
9
3
19
4
11
5
3
6
1
34
49
1
3
3
1
2
3
15
8
3
1
13
28
2
1
2
10
2
1
1
6
2
10
1
1
7
14
28
1
3
5
8
1
5
4
14
1
25
2
399
188
1,251
99
2,299
444
1,133
135
180
504
64
4,590
147
37
249
267
105
312
177
765
80
81
156
65
2,800
24
50
114
1,000
158
257
100
1,806
136
1,000
89
334
539
560
6,440
444
318
910
596
20
785
688
700
264
3,725
124
L-Bar
19
94
139
33
121
111
103
27
60
84
64
135
3
37
83
89
105
156
59
51
10
27
156
5
100
12
50
57
100
79
257
100
301
68
100
89
334
77
40
230
444
106
182
135
20
157
172
50
264
149
62
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
CI
CMI
6
8
2
1
4
6
62
8
1
1
40
27
4
8
22
6
6
2
2
1
3
2
2
3
10
2
4
6
20
2
7
12
2
4
3
3
2
7
1
1
10
8
8
13
8
3
10
2
1
1
15
528
1,064
220
222
48
156
14,942
368
121
143
6,880
4,644
164
712
2,442
1,182
840
222
92
32
387
44
168
54
1,920
296
384
96
6,840
62
203
3,360
894
1,720
1,287
510
130
35
88
77
1,000
264
256
884
72
258
950
14
50
58
1,245
L-Bar
88
133
110
222
12
26
241
46
121
143
172
172
41
89
111
197
140
111
46
32
129
22
84
18
192
148
96
16
342
31
29
280
447
430
429
170
65
5
88
77
100
33
32
68
9
86
95
7
50
58
83
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/1/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
CI
CMI
24
7
3
26
1
8
4
1
1
9
7
6
10
3
15
9
1
2
25
1
14
1
13
7
7
1
1
5
10
9
5
14
22
13
8
1
7
10
21
12
3
6
5
4
8
40
1
17
5
7
2
1,584
469
324
6,708
96
480
388
123
150
648
406
66
620
168
1,095
234
113
246
4,725
143
140
140
897
1,540
301
110
109
5
1,070
594
665
1,064
2,816
2,314
4,808
36
1,057
1,630
3,948
1,176
3
1,194
490
184
808
4,720
127
1,275
220
154
698
L-Bar
66
67
108
258
96
60
97
123
150
72
58
11
62
56
73
26
113
123
189
143
10
140
69
220
43
110
109
1
107
66
133
76
128
178
601
36
151
163
188
98
1
199
98
46
101
118
127
75
44
22
349
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
CI
CMI
2
24
11
10
4
9
4
4
12
7
1
1
13
7
1
3
2
4
2
6
6
3
10
18
2
2
5
87
1
1
1
2
2
11
4
2
10
2
9
2
10
2
2
3
1
1
1
31
3
17
1
144
3,552
1,386
1,110
240
1,899
24
244
1,644
826
75
305
1,131
1,246
38
81
134
900
498
342
18
357
1,030
1,152
580
118
1,515
20,793
58
101
60
152
102
979
492
38
2,320
128
72
172
1,390
348
96
537
3
5
167
992
255
1,377
70
L-Bar
72
148
126
111
60
211
6
61
137
118
75
305
87
178
38
27
67
225
249
57
3
119
103
64
290
59
303
239
58
101
60
76
51
89
123
19
232
64
8
86
139
174
48
179
3
5
167
32
85
81
70
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/2/2014
10/3/2014
CI
CMI
1
4
1
8
9
25
8
1
7
8
1
7
1
20
749
4
1
4
17
9
7
15
53
7
11
1
1
9
7
24
8
6
3
4
3
4
2
6
3
1
1
1
306
14
7
980
1
1
6
1
1
7
628
2
336
234
2,350
1,184
18
791
168
44
497
143
3,080
6,741
372
78
168
1,445
936
1,498
1,305
106
56
649
101
102
171
763
2,328
112
990
204
36
150
536
252
288
153
109
101
116
1,530
2,254
2,513
1,960
83
340
1,392
347
77
L-Bar
7
157
2
42
26
94
148
18
113
21
44
71
143
154
9
93
78
42
85
104
214
87
2
8
59
101
102
19
109
97
14
165
68
9
50
134
126
48
51
109
101
116
5
161
359
2
83
340
232
347
77
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
CI
2
24
1
2
24
1
12
1
1
3
2
25
3
2
7
2
6
2
1
5
17
2
10
3
1
4
7
4
7
2
2
8
2
1
202
2,040
91
3
1
24
4
2
11
24
3
1
6
1
11
1
1
CMI
330
4,200
86
142
3,816
98
816
52
128
315
38
2,700
375
284
273
62
402
34
32
185
3,570
90
970
174
98
780
364
744
462
74
86
56
278
86
11,514
30,600
18,837
87
58
2,664
492
212
792
4,224
417
126
876
162
418
125
36
L-Bar
165
175
86
71
159
98
68
52
128
105
19
108
125
142
39
31
67
17
32
37
210
45
97
58
98
195
52
186
66
37
43
7
139
86
57
15
207
29
58
111
123
106
72
176
139
126
146
162
38
125
36
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/3/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/4/2014
10/5/2014
10/5/2014
10/5/2014
10/5/2014
10/5/2014
10/5/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
CI
CMI
2
1
3
6
4
9
17
21
5
2
1
6
1
1
24
1
1
15
1
9
3
11
5
3
1
1
1
1
1
8
4
1
6
3
1
634
1
1
3
1
1
298
5
9
40
15
1
25
18
4
1
36
19
36
96
468
360
425
504
155
542
1
264
175
121
456
11
128
435
127
648
948
1,592
1,020
204
129
145
144
116
43
464
128
107
558
315
49
6,974
225
253
54
95
103
166,880
125
1,656
760
60
296
3,350
4,140
364
446
L-Bar
18
19
12
16
117
40
25
24
31
271
1
44
175
121
19
11
128
29
127
72
316
304
204
68
129
145
144
116
43
58
32
107
93
105
49
11
225
253
18
95
103
560
25
184
19
4
296
134
230
91
446
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
CI
CMI
2
8
1
16
8
3
6
7
12
17
6
15
13
7
6
3
1
4
2
3
1
1
8
33
17
31
14
5
4
5
54
47
15
2
9
2
4
1
5
2
7
3
4
12
2
7
2
6
4
14
12
224
2,272
182
4,320
32
75
438
217
4,392
2,448
606
2,475
2,145
875
1,074
129
143
40
516
774
104
19
544
4,026
1,479
1,311
1,064
80
88
50
8,532
6,486
300
170
153
60
20
30
635
204
728
555
508
2,088
20
966
164
1,116
140
616
444
L-Bar
112
284
182
270
4
25
73
31
366
144
101
165
165
125
179
43
143
10
258
258
104
19
68
122
87
81
76
16
22
10
158
138
20
85
17
30
5
30
127
102
104
185
127
174
10
138
82
186
35
44
37
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
CI
CMI
8
1
7
8
4
4
5
1
1
7
4
3
1
10
4
26
1
10
5
1
1
1
17
1
2
3
3
12
3
5
1
10
1
1
14
6
7
29
1
10
21
3
3
27
12
3
9
4
2
5
2
1,192
274
532
400
760
724
905
102
136
1,064
564
45
84
330
28
3,458
74
430
410
279
97
96
1,666
60
20
111
108
2,688
306
170
84
90
139
137
1,540
738
182
203
77
560
882
444
186
2,835
828
165
1,044
500
54
410
68
L-Bar
149
274
76
50
190
181
181
102
136
152
141
15
84
33
7
133
74
43
82
279
97
96
98
60
10
37
36
224
102
34
84
9
139
137
110
123
26
7
77
56
42
148
62
105
69
55
116
125
27
82
34
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/6/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
CI
CMI
5
26
25
5
6
12
4
3
1
1
17
8
3
1
1
5
3
22
2
5
1
1
1
29
7
10
8
7
8
5
27
1
1
4
3
9
10
1
4
6
1
1
5
9
23
1
2
4
39
1
10
120
104
1,850
695
366
1,992
48
2,022
74
122
1,054
1,600
63
179
398
935
303
4,004
196
175
89
89
202
97
1,050
110
664
777
912
250
405
131
336
1,356
969
909
1,478
177
424
714
202
212
20
2,142
11,776
48
324
904
6,357
34
360
L-Bar
24
4
74
139
61
166
12
674
74
122
62
200
21
179
398
187
101
182
98
35
89
89
202
69
150
11
83
111
114
50
15
131
336
339
323
101
173
177
106
119
202
212
4
238
512
48
162
226
163
34
36
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
CI
CMI
8
1
1
3
12
3
2
1
1
11
27
3
1
15
10
3
6
10
8
3
7
7
1
12
11
11
3
10
4
17
1
7
10
12
5
2
2
1
8
37
3
1
21
21
7
12
7
8
3
17
1
528
16
195
1,227
228
114
412
204
108
605
4,131
285
186
765
1,410
99
912
1,220
128
330
1,603
84
131
924
814
1,078
564
270
224
901
44
434
510
588
30
268
4
17
880
592
45
66
147
4,872
126
876
917
528
45
1,207
122
L-Bar
66
16
195
409
19
38
206
204
108
55
153
95
186
51
141
33
152
122
16
110
229
12
131
77
74
98
188
27
56
53
44
62
51
49
6
134
2
17
110
16
15
66
7
232
18
73
131
66
15
71
122
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/7/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
CI
CMI
9
7
7
15
2
26
27
4
2
4
3
3
5
2
1
15
3
7
5
4
1
6
23
5
21
14
1
1
3
2
8
1
1
2
8
2
3
1
4
1
2
4
4
4
1
1
7
12
7
2
25
531
609
133
405
164
4,290
3,726
176
118
240
213
330
320
8
67
1,290
252
560
30
140
8
240
2,277
400
294
1,344
117
149
255
88
2,144
142
93
76
2,040
276
297
65
332
102
1,024
2,016
1,920
832
303
115
1,169
1,020
140
24
3,725
L-Bar
59
87
19
27
82
165
138
44
59
60
71
110
64
4
67
86
84
80
6
35
8
40
99
80
14
96
117
149
85
44
268
142
93
38
255
138
99
65
83
102
512
504
480
208
303
115
167
85
20
12
149
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
CI
CMI
4
8
3
8
4
4
2
4
4
4
4
6
1
1
3
2
5
12
6
4
8
11
4
4
10
1
2
5
1
4
9
1
7
2
4
4
5
4
12
19
15
3
8
15
7
1
9
3
6
4
5
556
2,152
174
632
436
344
248
168
708
132
1,292
1,884
15
313
939
134
345
960
990
624
688
1,023
396
168
1,146
88
154
465
88
752
1,521
60
49
10
192
8
175
452
2,700
1,482
225
405
1,312
495
119
209
2,007
456
876
104
645
L-Bar
139
269
58
79
109
86
124
42
177
33
323
314
15
313
313
67
69
80
165
156
86
93
99
42
264
88
77
93
88
188
169
60
7
5
48
2
35
113
225
78
15
135
164
33
17
209
223
152
146
26
129
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/8/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
CI
CMI
2
2
3
10
5
1
1
18
13
2
7
8
1
2
1
5
8
3
11
2
6
2
10
1
4
1
1
2
1
1
1
22
3
2
2
1
1
21
1
4
69
1
4
6
5
26
6
94
3
4
21
162
112
402
590
375
66
107
1,098
1,131
234
1,078
856
66
272
74
180
584
273
1,243
130
468
118
1,180
203
492
180
84
176
92
103
98
176
252
154
46
91
76
5,817
123
644
2,139
88
584
348
775
11,050
414
3,196
15
508
1,827
L-Bar
81
56
134
59
75
66
107
61
87
117
154
107
66
136
74
36
73
91
113
65
78
59
118
203
123
180
84
88
92
103
98
8
84
77
23
91
76
277
123
161
31
88
146
58
155
425
69
34
5
127
87
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
CI
CMI
8
8
4
2
6
7
16
1
5
5
1
6
8
1
1
9
34
1
1
3
6
2
39
4
21
13
1
26
1
5
22
4
10
2
7
1
6
28
4
6
1
1
1
8
16
1
5
5
8
1
3
1,544
1,672
804
214
384
651
896
76
370
535
246
294
216
78
138
135
3,094
185
184
492
546
18
1,248
772
567
1,677
228
390
87
755
594
16
700
98
147
140
510
1,120
36
174
122
212
129
472
240
16
130
365
448
17
249
L-Bar
193
209
201
107
64
93
56
76
74
107
246
49
27
78
138
15
91
185
184
164
91
9
32
193
27
129
228
15
87
151
27
4
70
49
21
140
85
40
9
29
122
212
129
59
15
16
26
73
56
17
83
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
CI
CMI
1
11
10
7
9
2
2
10
18
7
2
2
1
10
6
9
1
2
8
900
144
16
6
6
4
1
12
1
6
10
1
8
5
2
10
8
1
8
8
2
6
1
2
16
4
2
2
2
9
2
13
122
495
470
1,057
2,547
224
350
1,150
900
784
162
52
3
1,730
834
1,260
39
54
456
34,200
432
592
468
378
600
100
444
80
288
1,310
151
408
905
36
900
680
113
824
992
58
18
117
126
2,976
56
68
430
380
18
358
403
L-Bar
122
45
47
151
283
112
175
115
50
112
81
26
3
173
139
140
39
27
57
38
3
37
78
63
150
100
37
80
48
131
151
51
181
18
90
85
113
103
124
29
3
117
63
186
14
34
215
190
2
179
31
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/9/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
CI
CMI
3
4
8
2
11
8
2
4
12
7
1
4
17
1
1
2
5
1
2
1
1
1
13
9
4
4
18
3
1
8
1
3
11
2
1
9
12
2
3
3
6
1
9
8
9
19
9
15
10
5
3
189
372
704
42
198
136
382
460
72
1,743
88
1,188
1,785
135
89
334
495
53
454
105
70
94
598
522
524
532
810
240
81
416
50
360
825
390
297
576
144
168
330
264
54
116
594
1,136
675
551
675
3,855
1,260
290
213
L-Bar
63
93
88
21
18
17
191
115
6
249
88
297
105
135
89
167
99
53
227
105
70
94
46
58
131
133
45
80
81
52
50
120
75
195
297
64
12
84
110
88
9
116
66
142
75
29
75
257
126
58
71
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/10/2014
10/11/2014
10/11/2014
CI
CMI
1
6
7
2
2
4
17
2
12
2
5
42
1
8
16
6
1
1
1
8
3
10
3
49
3
1
2
5
18
10
2
6
1
4
1
7
2
6
2
4
7
12
5
7
1
1
9
1
1
5
23
88
798
329
116
8
360
714
106
552
158
500
1,260
159
280
448
582
50
232
123
440
87
390
342
12,887
102
21
386
420
1,818
700
96
228
147
836
178
119
96
516
50
332
1,148
288
130
182
82
141
99
469
205
960
5,888
L-Bar
88
133
47
58
4
90
42
53
46
79
100
30
159
35
28
97
50
232
123
55
29
39
114
263
34
21
193
84
101
70
48
38
147
209
178
17
48
86
25
83
164
24
26
26
82
141
11
469
205
252
256
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/11/2014
10/11/2014
10/11/2014
10/11/2014
10/11/2014
10/11/2014
10/12/2014
10/12/2014
10/12/2014
10/12/2014
10/12/2014
10/12/2014
10/12/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
CI
CMI
1
2
13
4
94
9
3
1
2
4
1
8
5
14
9
1
2
3
30
5
3
5
1
1
14
2
4
12
1
7
9
6
8
8
3
1
4
3
6
3
5
1
15
1
12
2
8
14
2
1
4
239
98
390
456
10,810
18
402
364
74
296
58
1,472
915
2,940
1,233
21
174
510
1,800
290
222
725
136
93
2,310
286
812
1,632
41
1,050
1,395
54
16
16
273
309
532
393
384
381
985
72
990
35
1,104
98
720
910
408
107
640
L-Bar
239
49
30
114
115
2
134
364
37
74
58
184
183
210
137
21
87
170
60
58
74
145
136
93
165
143
203
136
41
150
155
9
2
2
91
309
133
131
64
127
197
72
66
35
92
49
90
65
204
107
160
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/13/2014
10/14/2014
10/14/2014
10/14/2014
CI
CMI
7
1
30
3
28
1
4
4
8
2
4
5
24
7
1
1
5
1
4
2
177
2
5
8
5
1
7
9
34
6
4
3
7
8
8
8
3
9
3
5
5
31
5
2
1
4
1
8
14
3
28
1,008
180
1,668
435
5,264
124
492
356
168
286
476
205
2,184
721
113
112
185
129
120
250
5,664
126
335
120
175
75
147
18
2,822
300
236
183
469
16
528
640
90
1,125
396
210
510
3,441
450
102
107
1,256
93
272
2,184
423
2,828
L-Bar
144
180
187
145
188
124
123
89
21
143
119
41
91
103
113
112
37
129
30
125
32
63
67
15
35
75
21
2
83
50
59
61
67
2
66
80
30
125
132
42
102
111
90
51
107
314
93
34
156
141
101
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
CI
3,223
11
7
7
2
4
4
5
11
2
6
14
3
4
4
17
6
1
1
4
4
22
4
2
4
26
15
1
47
6
4
1
18
1
6
4
7
16
13
12
2
1
9
6
15
2
5
5
5
1
2
CMI
29,007
1,177
980
399
408
424
660
395
1,199
300
612
4,760
210
420
152
3,927
474
1
264
104
404
2,222
404
202
404
3,094
1,560
30
8,413
84
184
163
378
181
540
172
1,498
3,216
1,131
1,632
262
206
765
372
2,235
1,056
25
2,500
50
72
210
L-Bar
9
107
140
57
204
106
165
79
109
150
102
340
70
105
38
231
79
1
264
26
101
101
101
101
101
119
104
30
179
14
46
163
21
181
90
43
214
201
87
136
131
206
85
62
149
528
5
500
10
72
105
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
CI
CMI
4
19
8
12
1
2
4
2
2
5
32
9
2
4
4
4
7
7
18
4
9
1
6
8
3
2
2
1
5
6
1
1
12
5
14
14
10
5
2
8
1
19
1
1
2
2
7
2
8
7
5
40
1,387
408
312
151
132
296
262
222
125
3,098
1,539
16
680
1,052
452
189
238
666
412
495
177
348
296
444
392
240
128
740
114
72
92
48
340
840
1,554
170
95
20
1,168
143
1,121
76
40
212
98
357
260
656
602
150
L-Bar
10
73
51
26
151
66
74
131
111
25
212
171
8
170
263
113
27
34
37
103
55
177
58
37
148
196
120
128
148
19
72
92
4
68
60
111
17
19
10
146
143
59
76
40
106
49
51
130
82
86
30
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/14/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
CI
CMI
2
1
4
5
19
17
16
5
14
1
1
1
26
8
2
1
2
15
7
2
1
8
7
36
4
5
3
3
6
4
8
5
3
1
19
2
2
3
22
8
9
2
19
6
8
8
1
1
4
2
3
208
49
60
265
1,216
1,207
688
420
1,358
135
104
50
962
120
246
223
156
1,245
504
76
6
1,112
1,036
5,256
8
460
354
327
768
324
624
165
384
63
4,142
244
380
603
2,354
1,168
18
256
2,736
360
1,976
528
39
109
960
544
246
L-Bar
104
49
15
53
64
71
43
84
97
135
104
50
37
15
123
223
78
83
72
38
6
139
148
146
2
92
118
109
128
81
78
33
128
63
218
122
190
201
107
146
2
128
144
60
247
66
39
109
240
272
82
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
CI
CMI
2
7
4
2
4
9
3
3
1
1
42
117
4
1
8
6
1
1
1
2
2
38
15
4
12
5
15
11
7
1
9
4
1
6
1
6
4
1
5
1
9
1
1
1
1
18
1
4
1
8
1
416
259
1,228
212
1,200
1,476
549
396
53
271
420
12,987
604
96
1,276
372
194
265
52
192
260
4,256
1,680
796
864
380
1,950
2,981
189
61
315
144
143
486
339
216
368
235
385
88
1,224
123
37
273
112
1,152
35
192
269
528
30
L-Bar
208
37
307
106
300
164
183
132
53
271
10
111
151
96
189
62
194
265
52
96
130
112
112
199
72
76
130
271
27
61
35
36
143
81
339
36
92
235
77
88
136
123
37
273
112
64
35
48
269
66
30
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/15/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
CI
CMI
5
8
9
2
30
1
23
1
3
1
6
6
15
7
1
4
1
24
4
3
1
1
1
2
1
1
1
3
2
2
118
5
8
1
8
2
1
9
2
8
6
5
2
3
5
1
10
49
50
79
1
805
640
1,467
240
4,620
120
4,577
13
249
8
186
150
1,935
1,106
171
708
142
2,256
212
513
171
1
289
390
23
292
194
189
116
128
31,388
285
1,509
126
2,216
88
28
1,017
204
800
342
315
184
582
930
119
1,860
10,437
10,950
17,222
117
L-Bar
161
80
163
120
154
120
199
13
83
8
31
25
129
158
171
177
142
94
53
171
171
1
289
195
23
292
194
63
58
64
266
57
207
126
277
44
28
113
102
100
57
63
92
194
186
119
186
213
219
218
117
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
CI
CMI
48
15
46
4
16
2
2
2
1
6
4
5
4
12
1
1
6
12
1
3
5
7
1
2
1
8
2
2
1
4
5
1
21
1
8
54
2
2
7
12
9
10
11
4
5
6
4
3
2
4
8
10,512
3,660
10,074
240
1,696
66
174
46
34
396
316
440
556
2,148
159
103
582
1,896
104
93
300
1,134
168
166
192
520
378
54
186
464
880
127
3,003
99
320
594
150
38
392
204
468
660
220
316
920
438
48
279
178
792
280
L-Bar
219
244
219
60
106
33
87
23
34
66
79
88
139
179
159
103
97
158
104
31
60
162
168
83
192
65
189
27
186
116
176
127
143
99
40
11
75
19
56
17
52
66
20
79
184
73
12
93
89
198
35
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/16/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
CI
CMI
1
6
1
2
1
7
3
2
4
1
2
7
1
7
9
5
1
5
1
6
1
3
1
1
2
1
3
3
2
2
10
2
4
8
5
13
1
2
54
1
2
2
11
11
10
8
1
2
5
1
3
103
234
46
166
78
406
354
252
172
60
192
175
67
119
252
435
50
820
26
282
15
180
113
200
124
208
126
210
20
194
60
408
700
1,352
385
286
146
90
3,618
100
42
216
231
715
340
648
228
54
60
137
159
L-Bar
103
39
46
83
78
58
118
126
43
60
96
25
67
17
28
87
50
164
26
47
15
60
113
200
62
208
42
70
10
97
6
204
175
169
77
22
146
45
67
100
21
108
21
65
34
81
228
27
12
137
53
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
CI
CMI
5
4
13
3
5
10
3
1
1
6
13
10
6
9
5
6
3
8
10
1
11
47
8
2
41
2
8
3
4
3
4
3
5
3
1
49
22
4
6
2
3
8
4
4
33
4
1
1
6
9
1
675
60
1,937
168
1,215
1,140
156
283
100
618
2,379
110
600
54
50
192
528
608
1,110
83
429
5,136
768
82
2,050
100
440
15
612
237
272
63
205
540
165
10,976
2,772
820
30
142
234
160
32
216
6,204
68
29
132
114
594
21
L-Bar
135
15
149
56
243
114
52
283
100
103
183
11
100
6
10
32
176
76
111
83
39
219
96
41
50
50
55
5
153
79
68
21
41
180
165
224
126
205
5
71
78
20
8
54
188
17
29
132
19
66
21
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/17/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/18/2014
10/19/2014
10/19/2014
10/19/2014
10/19/2014
10/19/2014
10/19/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
CI
CMI
1
1
1
4
3
7
4
1
4
8
10
2
2
37
9
1
1
1
1
10
1
5
1
3
4
4
6
7
1
1
7
1
11
1
9
5
1
4
1
3
1
3
1
3
4
5
1
2
9
9
1
65
255
82
332
30
49
68
47
328
1,336
2,020
40
264
1,702
1,494
512
79
207
107
1,540
216
1,590
223
543
104
148
222
2,072
12
286
966
80
1,617
184
441
805
172
76
47
210
90
354
14
252
256
350
135
170
828
828
102
L-Bar
65
255
82
83
10
7
17
47
82
167
202
20
132
46
166
512
79
207
107
154
216
318
223
181
26
37
37
296
12
286
138
80
147
184
49
161
172
19
47
70
90
118
14
84
64
70
135
85
92
92
102
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
CI
CMI
5
2
4
6
9
3
3
6
6
3
2
9
4
9
3
12
4
5
4
18
4
4
2
14
4
4
2
6
1
2
2
1
6
2
3
3
8
8
9
1
1
2
2
2
3
10
1
1
9
2
12
455
182
356
288
369
435
582
552
228
120
246
378
264
18
81
468
576
385
620
3,240
460
252
134
616
548
400
278
360
144
38
208
100
612
444
333
63
552
800
1,161
72
75
96
240
290
516
3,110
5
9
333
158
108
L-Bar
91
91
89
48
41
145
194
92
38
40
123
42
66
2
27
39
144
77
155
180
115
63
67
44
137
100
139
60
144
19
104
100
102
222
111
21
69
100
129
72
75
48
120
145
172
311
5
9
37
79
9
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/20/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
CI
CMI
27
1
6
1
9
4
3
4
4
1
2
8
1
1
1
1
2
6
6
10
44
4
8
9
5
8
5
26
8
4
6
6
20
6
3
14
2
3
1
1
1
8
11
1
1
4
7
1
1
14
2
3,618
198
378
712
18
352
348
356
488
135
336
392
151
33
11
47
236
366
528
1,830
88
4
656
1,314
200
888
945
2,600
496
4
330
432
2,460
564
45
322
372
897
124
123
157
440
902
317
163
360
1,204
101
108
1,512
208
L-Bar
134
198
63
712
2
88
116
89
122
135
168
49
151
33
11
47
118
61
88
183
2
1
82
146
40
111
189
100
62
1
55
72
123
94
15
23
186
299
124
123
157
55
82
317
163
90
172
101
108
108
104
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
CI
CMI
3
3
6
2
4
6
2
9
25
5
1
3
1
1
3
20
6
2
17
19
6
10
1
18
9
7
2
1
3
2
4
5
14
2
46
4
8
1
1
1
6
6
16
2
1
78
18
6
5
2
2
798
153
78
496
116
1,122
582
2,169
775
45
143
30
12
211
264
2,120
1,068
232
2,788
2,470
1,542
270
1
72
558
574
26
116
111
194
176
370
2,422
64
7,912
628
1,360
86
106
153
1,086
360
1,936
46
367
780
2,232
186
385
34
506
L-Bar
266
51
13
248
29
187
291
241
31
9
143
10
12
211
88
106
178
116
164
130
257
27
1
4
62
82
13
116
37
97
44
74
173
32
172
157
170
86
106
153
181
60
121
23
367
10
124
31
77
17
253
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/21/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
CI
CMI
1
10
13
1
4
9
25
3
9
2
7
19
8
8
4
6
28
5
3
2
10
5
2
1
1
1
3
2
5
18
18
4
2
8
23
6
6
1
6
5
5
1
1
2
1
2
16
5
7
8
8
23
1,040
2,080
25
68
1,476
3,950
231
81
124
819
1,007
320
608
4
852
5,040
360
216
62
520
105
244
271
5
53
15
80
415
1,332
72
112
82
344
1,955
372
108
67
1,068
275
625
79
22
192
140
64
3,536
225
959
248
168
L-Bar
23
104
160
25
17
164
158
77
9
62
117
53
40
76
1
142
180
72
72
31
52
21
122
271
5
53
5
40
83
74
4
28
41
43
85
62
18
67
178
55
125
79
22
96
140
32
221
45
137
31
21
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
CI
CMI
4
1
27
18
1
32
13
5
4
8
6
21
3
1
6
3
9
11
10
2
25
10
1
2
2
9
8
9
1
4
5
32
1
13
4
2
5
3
11
1
2
17
25
1
24
11
6
3
2
18
15
644
227
4,050
1,512
72
8,000
1,079
405
572
232
762
1,449
204
38
426
699
360
242
1,630
94
1,850
1,460
35
92
384
1,575
432
1,512
148
668
490
7,488
130
195
100
216
310
342
616
193
160
1,241
1,050
164
1,008
198
516
453
58
1,494
1,305
L-Bar
161
227
150
84
72
250
83
81
143
29
127
69
68
38
71
233
40
22
163
47
74
146
35
46
192
175
54
168
148
167
98
234
130
15
25
108
62
114
56
193
80
73
42
164
42
18
86
151
29
83
87
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/22/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
CI
CMI
7
1
3
6
27
16
2
6
18
3
4
1
1
3
4
1
2
14
22
9
2
1
17
1
7
1
13
5
5
2
1
20
1
11
7
1
1
7
1
2
2
5
2
11
14
18
9
2
26
3
3
868
10
144
318
567
1,584
418
186
1,548
285
528
7
71
279
96
228
248
1,372
2,310
900
310
76
2,295
98
203
64
117
235
325
144
64
1,680
85
506
1,449
45
81
1,036
190
274
186
220
452
836
1,750
1,116
1,494
440
8,424
684
822
L-Bar
124
10
48
53
21
99
209
31
86
95
132
7
71
93
24
228
124
98
105
100
155
76
135
98
29
64
9
47
65
72
64
84
85
46
207
45
81
148
190
137
93
44
226
76
125
62
166
220
324
228
274
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
CI
CMI
2
4
2
1
1
37
6
2
1
3
9
2
8
26
4
6
2
10
2
1
5
8
23
1
3
2
8
13
1
5
27
4
1
5
4
5
1
1
1
10
1
3
11
10
1
18
8
8
12
2
3
550
276
496
86
96
15,133
1,716
372
165
144
837
48
248
1,924
40
600
172
1,310
64
128
195
280
6,394
134
279
32
584
208
35
240
324
472
55
805
224
100
94
149
124
170
60
315
319
300
49
1,296
848
344
684
190
48
L-Bar
275
69
248
86
96
409
286
186
165
48
93
24
31
74
10
100
86
131
32
128
39
35
278
134
93
16
73
16
35
48
12
118
55
161
56
20
94
149
124
17
60
105
29
30
49
72
106
43
57
95
16
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/23/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
CI
CMI
1
18
3
6
2
1
2
6
26
2
1
14
2
39
3
6
11
4
1
4
1
3
9
18
2
5
1
2
10
6
18
9
6
7
11
4
4
13
1
1
1
1
11
6
3
7
1
3
6
2
1
103
1,800
105
882
20
90
30
408
598
30
57
280
266
624
159
672
1,188
632
102
712
166
186
909
1,944
118
140
174
216
40
90
2,178
135
90
98
154
56
228
1,599
99
64
221
74
1,617
510
267
1,123
71
207
270
458
114
L-Bar
103
100
35
147
10
90
15
68
23
15
57
20
133
16
53
112
108
158
102
178
166
62
101
108
59
28
174
108
4
15
121
15
15
14
14
14
57
123
99
64
221
74
147
85
89
191
71
69
45
229
114
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/24/2014
10/25/2014
10/25/2014
10/25/2014
10/25/2014
10/25/2014
10/25/2014
10/25/2014
10/25/2014
10/25/2014
CI
CMI
3
2
2
7
87
3
11
1
2
9
4
14
11
2
3
8
5
4
1
4
3
6
2
5
6
1
1
1
8
2
8
1
1
5
1
13
2
1
8
1
8
1
1
1
2
5
1
4
5
1
2
159
56
86
1,183
2,436
315
990
223
78
72
64
2,282
671
116
93
688
315
732
86
68
123
240
186
230
444
153
14
197
960
130
296
38
169
335
196
390
118
108
216
59
200
211
121
34
578
1,440
282
424
140
59
48
L-Bar
53
28
43
169
28
105
90
223
39
8
16
163
61
58
31
86
63
183
86
17
41
40
93
46
74
153
14
197
120
65
37
38
169
67
196
30
59
108
27
59
25
211
121
34
289
288
282
106
28
59
24
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/25/2014
10/25/2014
10/25/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/26/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
CI
CMI
1
2
1
4
23
7
1
10
2
3
3
1
1
15
98
16
1
1
2
3
6
6
15
19
2
5
25
3
1
17
3
7
12
11
2
4
2
11
12
13
4
19
2
14
3
10
2
2
6
2
10
74
608
206
900
5,865
4,060
154
490
12
57
54
71
197
2,385
11,368
3,136
196
195
122
276
1,530
66
3,060
209
210
870
4,275
318
287
3,026
99
798
2,496
484
306
256
48
2,420
156
754
508
1,653
212
1,736
210
200
204
70
234
120
260
L-Bar
74
304
206
225
255
580
154
49
6
19
18
71
197
159
116
196
196
195
61
92
255
11
204
11
105
174
171
106
287
178
33
114
208
44
153
64
24
220
13
58
127
87
106
124
70
20
102
35
39
60
26
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
CI
CMI
8
3
3
7
12
6
20
9
2
10
1
5
5
12
1
11
10
1
1
12
5
9
2
4
4
6
6
24
1
1
25
1
1
8
9
13
8
4
16
13
2
12
10
8
9
5
3
8
4
20
1
184
195
168
462
108
378
1,500
828
72
700
93
140
140
372
56
165
860
57
199
636
935
1,287
170
76
56
216
84
2,280
159
184
3,600
24
45
56
531
1,157
640
436
1,184
1,664
116
828
800
552
630
45
357
864
460
2,700
150
L-Bar
23
65
56
66
9
63
75
92
36
70
93
28
28
31
56
15
86
57
199
53
187
143
85
19
14
36
14
95
159
184
144
24
45
7
59
89
80
109
74
128
58
69
80
69
70
9
119
108
115
135
150
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/27/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
CI
1
2
1
3
10
25
2
10
8
10
4
11
1
1,155
2
1
3
10
29
2
10
11
3
8
15
5
6
1
4
3
2
10
8
1
2
3
5
3
4
46
22
5
79
24
9
1
7
1
6
18
21
CMI
129
144
252
252
1,850
2,525
276
70
336
740
940
737
22
65,786
214
807
108
1,590
348
208
670
1,276
423
848
1,020
350
630
241
308
171
126
400
1,264
91
206
219
565
231
454
690
1,122
1,520
10,428
2,856
783
129
469
64
1,278
630
2,100
L-Bar
129
72
252
84
185
101
138
7
42
74
235
67
22
96
107
807
36
159
12
104
67
116
141
106
68
70
105
241
77
57
63
40
158
91
103
73
113
77
138
15
51
304
132
119
87
129
67
64
213
35
100
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
CI
CMI
2
26
8
7
1
15
5
2
7
2
6
31
1
1
2
4
5
4
1
12
2
9
62
2
22
6
8
13
5
2
5
138
7
2
5
6
15
15
2
3
1
4
2
1
1
22
12
3
3
3
4
30
4,420
312
497
325
450
5
458
427
122
1,686
2,077
28
134
458
140
460
300
28
876
344
1,485
9,858
404
4,708
534
560
2,093
545
186
440
13,662
434
272
270
150
2,250
1,695
170
339
91
80
246
122
46
3,498
2,928
147
84
585
4
L-Bar
15
170
39
71
325
30
1
229
61
61
281
67
28
134
229
35
92
75
28
73
172
165
159
202
214
89
70
161
109
93
88
99
62
136
54
25
150
113
85
113
91
20
123
122
46
159
244
49
28
195
1
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/28/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
CI
CMI
3
10
6
9
19
22
7
8
3
1
2
1
2
2
2
1
11
1
2
5
26
3
9
7
11
7
3
5
8
7
8
6
8
7
4
2
3
13
3
7
26
6
9
24
3
20
10
1
11
3
21
123
810
480
585
1,805
3,586
63
424
234
44
184
130
54
228
128
37
979
83
120
185
3,718
420
882
175
715
427
348
320
488
903
912
54
1,246
693
280
220
546
1,690
606
413
832
780
1,575
3,768
342
3,260
920
27
1,771
387
2,688
L-Bar
41
81
80
65
95
163
9
53
78
44
92
130
27
114
64
37
89
83
60
37
143
140
98
25
65
61
116
64
61
129
114
9
211
99
70
110
182
130
202
59
32
130
175
157
114
163
92
27
161
129
128
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
CI
CMI
1
1
48
1
7
5
6
3
7
1
19
8
2
2
5
8
3
14
12
7
7
8
1
15
2
11
9
5
9
2
7
1
63
2
6
326
13
8
4
25
1
4
7
3
24
3
25
8
15
6
39
51
164
2,736
209
1,260
365
360
87
798
108
304
1,760
460
176
935
280
330
1,106
372
49
357
32
197
1,380
220
1,397
81
150
513
160
427
60
6,237
182
684
14,344
1,612
1,248
100
2,475
23
668
399
84
3,792
429
3,275
1,424
885
666
4,524
L-Bar
51
164
57
209
180
73
60
29
114
108
16
220
230
88
187
35
110
79
31
7
51
4
197
92
110
127
9
30
57
80
61
60
99
91
114
44
124
156
25
99
23
167
57
28
158
143
131
178
59
111
116
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/29/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
CI
CMI
2
2
2
5
11
12
5
3
1
4
6
12
12
8
3
1
1
3
3
2
1
7
2
1
8
4
4
1
2
1
3
8
3
7
2
3
1
7
1
19
1
1
6
9
6
7
11
4
7
1
23
452
60
216
550
682
1,224
65
24
156
196
672
240
960
592
186
87
131
111
84
10
34
497
120
27
104
732
744
69
102
31
315
1,152
135
413
62
75
86
140
60
2,584
299
505
708
1,062
696
826
1,298
472
1,624
394
2,622
L-Bar
226
30
108
110
62
102
13
8
156
49
112
20
80
74
62
87
131
37
28
5
34
71
60
27
13
183
186
69
51
31
105
144
45
59
31
25
86
20
60
136
299
505
118
118
116
118
118
118
232
394
114
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
CI
CMI
1
8
4
6
5
2
6
7
2
115
2
2
18
1
3
65
9
13
9
4
6
8
25
22
45
3
4
1
11
12
153
9
1
2
4
11
7
7
10
4
11
15
12
39
2
9
3
1
3
1
31
409
296
332
480
420
124
936
350
246
13,800
52
388
1,386
188
174
2,535
1,953
299
1,125
316
2,166
936
4,000
484
26,730
129
296
114
253
1,044
306
90
80
138
220
506
1,533
525
100
240
649
2,520
456
7,488
228
207
957
63
180
61
2,914
L-Bar
409
37
83
80
84
62
156
50
123
120
26
194
77
188
58
39
217
23
125
79
361
117
160
22
594
43
74
114
23
87
2
10
80
69
55
46
219
75
10
60
59
168
38
192
114
23
319
63
60
61
94
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/30/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
CI
CMI
2
1
14
1
14
6
5
3
7
24
4
26
2
1
1
4
2
1
1
2
7
8
2
2
2
7
1
1
5
1
4
7
1
5
4
8
2
1
1
1
8
6
5
1
13
13
2
1
219
1
8
92
95
1,022
105
224
390
95
261
287
576
260
390
40
123
50
524
240
137
117
160
259
1,232
2
172
254
224
86
158
535
32
440
742
57
215
388
496
368
41
94
85
1,000
648
240
56
325
1,222
284
126
41,172
56
40
L-Bar
46
95
149
105
16
65
19
87
41
24
65
15
20
123
50
131
120
137
117
80
37
154
1
86
127
32
86
158
107
32
110
106
57
43
97
62
184
41
94
85
125
108
48
56
25
94
142
126
188
56
5
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
10/31/2014
11/1/2014
11/1/2014
11/1/2014
11/1/2014
11/1/2014
11/1/2014
11/1/2014
11/2/2014
11/2/2014
11/2/2014
11/2/2014
CI
CMI
3
3
9
1
8
5
9
7
4
1
2
1
7
4
4
1
3
3
2
5
6
5
10
6
2
3
12
12
7
4
5
4
6
1
3
8
1
1
8
5
2
1
7
2
2
3
2
1
22
8
1
120
183
297
111
1,480
410
1,827
294
148
189
354
167
1,428
476
300
101
345
27
30
865
312
315
620
528
14
336
24
660
35
84
75
80
18
11
30
40
43
49
760
1,565
274
189
609
44
244
234
52
129
550
160
128
L-Bar
40
61
33
111
185
82
203
42
37
189
177
167
204
119
75
101
115
9
15
173
52
63
62
88
7
112
2
55
5
21
15
20
3
11
10
5
43
49
95
313
137
189
87
22
122
78
26
129
25
20
128
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/2/2014
11/2/2014
11/2/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
CI
CMI
1
28
1
3
13
13
6
22
2
42
7
8
7
21
26
26
2
34
1
2
18
20
1
12
11
17
16
1
4
39
3
2
5
2
1
4
3
1
1
9
4
7
1
1
2
6
1
3
7
1
25
53
3,332
210
84
4,186
624
552
5,698
76
3,276
651
1,528
847
1,659
2,210
2,574
248
3,094
50
710
2,916
2,380
105
684
1,881
2,108
2,112
104
532
9,633
54
62
660
226
373
1,036
441
100
130
963
844
938
109
106
62
102
166
36
56
41
2,325
L-Bar
53
119
210
28
322
48
92
259
38
78
93
191
121
79
85
99
124
91
50
355
162
119
105
57
171
124
132
104
133
247
18
31
132
113
373
259
147
100
130
107
211
134
109
106
31
17
166
12
8
41
93
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/3/2014
11/4/2014
CI
CMI
8
34
12
6
7
2
3
6
10
5
6
5
5
16
7
1
3
1
11
18
1
5
3
2
11
7
3
7
6
10
4
6
7
2
5
25
3
2
3
3
5
3
2
14
2
1
9
2
272
1
10
920
2,380
660
462
840
92
69
372
70
525
216
475
215
2,608
70
104
591
61
1,540
1,818
152
10
27
332
1,089
91
237
861
408
250
368
222
840
428
295
1,475
156
34
24
165
180
528
42
1,638
234
133
315
124
24,504
9
2,870
L-Bar
115
70
55
77
120
46
23
62
7
105
36
95
43
163
10
104
197
61
140
101
152
2
9
166
99
13
79
123
68
25
92
37
120
214
59
59
52
17
8
55
36
176
21
117
117
133
35
62
96
9
287
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
CI
CMI
2
4
24
2
25
15
7
2
3
4
3
33
3
3
1
2
3
2
19
13
8
1
6
6
9
15
2
4
6
2
7
6
4
4
2
7
1
105
12
19
142
4
1
2
14
3
8
1
2
15
15
90
116
3,024
212
3,500
1,455
840
684
72
316
48
3,135
114
384
98
80
339
38
1,121
1,183
368
133
654
492
72
1,905
278
720
1,062
360
182
774
804
892
222
742
29
19,005
864
1,140
15,052
28
9
196
28
63
480
83
94
315
1,095
L-Bar
45
29
126
106
140
97
120
342
24
79
16
95
38
128
98
40
113
19
59
91
46
133
109
82
8
127
139
180
177
180
26
129
201
223
111
106
29
181
72
60
106
7
9
98
2
21
60
83
47
21
73
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
Date
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
CI
CMI
2
14
4
8
1
5
4
26
2
3
10
2
15
8
3
3
1
6
1
30
1
15
13
25
21
25
50
1
26
2
2
8
7
2
2
5
12
2
4
2
2
3
7
14
2
23
19
4
2
6
3
82
1,134
308
552
156
1,030
308
4,160
30
132
470
296
1,380
888
57
24
141
340
118
5,220
33
150
1,937
3,150
1,764
3,550
2,350
124
2,288
420
26
280
1,183
126
64
245
444
332
140
44
100
213
462
56
282
2,323
190
940
114
84
138
L-Bar
41
81
77
69
156
206
77
160
15
44
47
148
92
111
19
8
141
94
118
174
33
10
149
126
84
142
47
124
88
210
13
35
169
63
32
49
37
166
35
22
50
71
66
4
141
101
10
235
57
14
46
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/4/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
CI
CMI
25
12
18
19
2
1
9
3
26
5
1
1
4
2
5
1
3
6
5
1
7
5
2
2
3
10
8
18
4
2
2
1
1
4
10
8
5
10
5
2
2
26
4
35
1
1
2
2
1
1
14
1,075
936
2,358
2,793
130
96
1,071
138
2,600
505
94
32
812
94
205
143
549
618
360
14
2,177
875
152
232
1,077
1,120
1,056
2,664
500
120
146
218
219
1,208
320
1,576
50
730
675
218
92
4,186
192
4,970
103
127
396
64
160
134
56
L-Bar
43
78
131
147
65
96
119
46
100
101
94
32
203
47
41
143
183
103
72
14
311
175
76
116
359
112
132
148
125
60
73
218
219
302
32
197
10
73
135
109
46
161
48
142
103
127
198
32
160
134
4
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
CI
CMI
27
2
8
2
3
3
1
11
8
46
2
14
1
10
54
1
2
7
2
7
7
2
43
91
9
8
7
6
5
8
4
18
4
1
3
3
6
2
2
11
5
2
6
5
22
3
3
2
5
1
1
297
422
848
260
498
489
269
88
392
1,104
364
1,274
273
410
8,370
58
116
210
186
49
49
18
129
364
792
1,768
385
336
275
344
124
5,040
336
186
669
21
480
66
184
22
45
222
258
750
4,884
150
336
160
235
89
95
L-Bar
11
211
106
130
166
163
269
8
49
24
182
91
273
41
155
58
58
30
93
7
7
9
3
4
88
221
55
56
55
43
31
280
84
186
223
7
80
33
92
2
9
111
43
150
222
50
112
80
47
89
95
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
Date
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/5/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
CI
CMI
33
28
1
3
19
3
5
3
7
2
1
4
3
7
2
14
1
12
3
2
4
1
9
1
5
1
1
2
1
3
4
2
2
1
2
8
10
1
18
1
4
2
1
1
1
1
1
1
1
1
5
1,320
2,884
49
90
2,185
465
425
21
308
206
106
920
246
49
252
70
224
60
90
432
652
166
1,539
163
245
48
85
54
88
411
244
84
154
97
130
592
1,050
99
1,800
63
224
60
144
185
138
121
105
236
74
232
1,410
L-Bar
40
103
49
30
115
155
85
7
44
103
106
230
82
7
126
5
224
5
30
216
163
166
171
163
49
48
85
27
88
137
61
42
77
97
65
74
105
99
100
63
56
30
144
185
138
121
105
236
74
232
282
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
CI
CMI
2
19
4
1
1
1
3
1
17
16
28
12
20
2
300
9
127
1
5
1
6
1
1
73
6
10
8
6
4
1
1
1
25
12
8
2
16
4
3
11
1
1
7
17
1
3
6
8
1
2
12
226
2,413
1,200
106
84
111
33
65
1,717
1,312
2,716
2,904
2,000
216
41,400
585
19,558
147
210
107
582
211
499
8,395
810
200
512
606
700
169
59
90
3,300
3,324
32
366
4,544
700
212
792
113
263
875
2,074
98
171
336
224
194
110
780
L-Bar
113
127
300
106
84
111
11
65
101
82
97
242
100
108
138
65
154
147
42
107
97
211
499
115
135
20
64
101
175
169
59
90
132
277
4
183
284
175
150
72
113
263
125
122
98
57
56
28
194
55
65
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/6/2014
11/7/2014
CI
CMI
14
27
3
6
1
5
4
115
2
1
3
9
1
2
2
4
1
1
56
22
2
2
2
1
6
1
2
4
3
2
2
1
9
8
1
2
34
7
3
2
2
1
1
9
4
2
7
9
28
1
2
238
324
222
306
62
505
212
1,610
98
55
315
171
28
776
34
152
45
82
504
286
206
292
340
58
54
2
248
100
129
238
154
84
261
48
103
276
7,072
756
42
68
158
120
157
288
400
366
539
1,350
5,292
123
206
L-Bar
17
12
74
51
62
101
53
14
49
55
105
19
28
388
17
38
45
82
9
13
103
146
170
58
9
2
124
25
43
119
77
84
29
6
103
138
208
108
14
34
79
120
157
32
100
183
77
150
189
123
103
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
11/7/2014
CI
CMI
1
1
3
1
1
3
38
63
7
34
2
10
7
8
19
7
9
67
3
69
22
18
10
8
2
1
16
2
3
1
5
6
24
5
16
13
9
9
7
4
11
7
1
2
11
5
2
2
2
3
2
378
290
570
105
102
384
532
756
861
7,242
298
1,220
924
80
4,731
1,323
1,719
1,072
27
966
836
3,060
700
64
250
201
3,296
278
582
215
790
240
144
55
304
260
612
576
63
156
462
371
47
130
1,122
205
54
72
10
75
76
L-Bar
378
290
190
105
102
128
14
12
123
213
149
122
132
10
249
189
191
16
9
14
38
170
70
8
125
201
206
139
194
215
158
40
6
11
19
20
68
64
9
39
42
53
47
65
102
41
27
36
5
25
38
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/7/2014
11/7/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/8/2014
11/9/2014
11/9/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
CI
CMI
1
1
2
10
2
7
7
1
1
2
1
4
2
11
1
1
6
1
5
1
1
10
4
12
1
11
11
10
8
77
16
7
1
11
26
1
1
6
12
1
7
18
28
1
7
1
25
18
16
1
5
123
18
260
380
20
329
469
37
81
32
115
32
292
814
127
202
60
148
695
265
172
790
420
1,908
46
1,023
88
810
864
6,329
304
784
183
781
3,770
125
5
780
768
57
735
1,908
4,004
116
833
34
1,900
972
1,648
48
920
L-Bar
263
18
130
38
10
47
67
37
81
16
115
8
146
74
127
202
10
148
139
265
172
79
105
159
46
93
8
81
108
169
19
112
183
71
145
125
5
130
64
57
105
106
143
116
119
34
76
54
103
48
184
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/10/2014
11/11/2014
11/11/2014
11/11/2014
CI
CMI
1
1
11
4
8
5
3
4
17
1
23
1
1
1
3
10
9
17
2
9
4
2
7
11
6
18
4
1
5
1
3
6
4
3
3
7
4
12
9
1
4
22
12
8
1
1
8
8
3
17
24
27
180
1,111
268
512
605
447
112
2,023
22
3,312
90
83
34
162
890
972
2,159
86
81
272
92
868
44
444
1,746
972
179
1,405
81
153
12
140
54
240
707
1,092
264
963
79
16
2,266
792
88
57
74
264
552
240
1,768
6,552
L-Bar
27
180
101
67
64
121
149
28
119
22
144
90
83
34
54
89
108
127
43
9
68
46
124
4
74
97
243
179
281
81
51
2
35
18
80
101
273
22
107
79
4
103
66
11
57
74
33
69
80
104
273
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/11/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
CI
CMI
6
1
1
1
11
4
2
3
56
41
8
2
5
4
9
7
6
2
1
8
1
8
1
6
9
1
1
16
5
2
11
9
1
5
1
2
8
5
2
5
19
1
2
3
5
1
1
1
6
1
20
744
136
74
93
1,430
44
124
456
8,904
16,687
728
176
1,510
560
990
259
96
226
295
520
180
1,048
97
558
1,233
31
93
1,856
390
118
1,551
963
144
455
22
250
248
800
38
620
380
115
162
174
450
175
285
139
594
72
1,980
L-Bar
124
136
74
93
130
11
62
152
159
407
91
88
302
140
110
37
16
113
295
65
180
131
97
93
137
31
93
116
78
59
141
107
144
91
22
125
31
160
19
124
20
115
81
58
90
175
285
139
99
72
99
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
CI
CMI
11
7
23
11
8
8
15
1
3
1
2
5
55
32
1
39
1
6
1
6
26
16
1
2
1
52
19
8
1
127
16
17
1
2
2
8
10
3
10
4
2
6
11
2
7
9
8
2
8
15
24
1,298
875
3,105
759
880
1,824
1,005
219
117
470
94
1,785
11,660
2,432
186
1,170
155
1,110
62
540
2,340
1,168
196
440
51
10,972
1,634
1,584
120
889
1,408
1,258
185
38
62
456
1,780
345
1,950
672
102
678
957
100
70
1,296
56
178
48
510
840
L-Bar
118
182
135
69
110
228
67
219
39
470
47
357
212
76
186
30
155
185
62
90
90
73
196
220
51
211
86
198
120
7
88
74
185
19
31
57
178
115
195
168
51
113
87
50
10
144
7
89
6
34
35
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
CI
CMI
7
4
13
3
8
27
4
8
8
16
5
5
1
81
8
1
27
1
10
1
2
11
11
6
6
2
7
1
9
6
17
6
26
53
3
1
8
2
4
1
7
2
3
1
1
6
1
14
11
9
4
588
280
637
249
312
3,888
640
592
344
1,936
230
410
70
1,377
384
74
1,809
40
90
117
600
1,760
737
618
294
60
434
163
774
666
1,258
336
1,404
2,650
174
19
648
126
308
138
588
226
429
105
61
48
180
1,414
143
702
136
L-Bar
84
70
49
83
39
144
160
74
43
121
46
82
70
17
48
74
67
40
9
117
300
160
67
103
49
30
62
163
86
111
74
56
54
50
58
19
81
63
77
138
84
113
143
105
61
8
180
101
13
78
34
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/12/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
CI
CMI
2
11
2
15
10
2
1
2
24
1
1
3
3
10
7
3
5
9
10
13
1
8
6
6
9
2
1
4
14
6
1
1
5
7
19
6
10
8
4
1
4
2
8
8
6
4
29
8
1
27
1
168
77
148
1,575
840
522
242
168
3,552
163
137
102
261
640
616
366
945
2,133
1,850
1,066
138
240
278
576
243
116
111
1,216
1,652
366
27
83
250
252
817
1,668
640
1,912
116
277
300
150
216
1,088
942
924
899
464
70
2,565
90
L-Bar
84
7
74
105
84
261
257
84
148
163
137
34
87
64
88
122
189
237
185
82
138
30
67
96
27
58
111
304
118
61
27
83
50
36
43
278
64
239
29
277
75
75
27
136
157
231
31
58
70
95
90
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
CI
CMI
2
2
9
25
2
40
1
1
13
1
3
6
5
6
14
4
7
6
47
3
3
3
1
2
7
3
8
1
5
19
15
2
10
5
2
5
1
1
1
1
2
1
1
13
5
7
1
14
7
5
6
166
738
171
1,625
406
18,800
87
145
65
261
303
36
805
84
784
288
42
456
658
66
324
21
321
320
490
138
624
123
55
1,349
1,080
378
90
700
166
285
81
128
60
72
140
250
148
1,794
380
245
190
280
168
250
414
L-Bar
83
369
19
65
203
470
87
145
5
261
101
6
161
14
56
72
6
76
14
22
108
7
321
160
70
46
78
123
11
71
72
189
9
140
83
57
81
128
60
72
70
250
148
138
76
35
190
20
24
50
69
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/13/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
CI
CMI
1
8
2
13
2
1
1
2
2
4
2
1
5
5
8
3
74
7
2
6
1
15
1
2
2
12
1
5
6
2
50
3
1
8
62
7
4
3
7
2
1
2
5
2
4
8
5
4
3
6
6
95
32
144
104
260
64
278
514
38
1,384
28
163
895
455
1,336
243
9,176
294
308
1,650
236
390
140
156
132
132
110
285
138
78
4,150
324
350
2,144
2,356
154
160
327
203
94
120
238
575
186
260
800
600
116
21
60
48
L-Bar
95
4
72
8
130
64
278
257
19
346
14
163
179
91
167
81
124
42
154
275
236
26
140
78
66
11
110
57
23
39
83
108
350
268
38
22
40
109
29
47
120
119
115
93
65
100
120
29
7
10
8
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/14/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/15/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/16/2014
11/17/2014
11/17/2014
CI
5
2
11
5
7
7
1
33
14
2
1
2
3
1
1
12
2
6
7
9
8
5
4
1
1
1
1
10
3
3
1
3
5
2,196
4
7
7
2
2
5
4
1
5
30
1
14
9
4
7
1
2
CMI
880
88
1,111
530
196
651
6
2,409
658
184
381
132
69
233
48
600
16
450
49
81
72
95
24
55
89
35
107
1,400
57
195
179
114
350
68,076
24
4,956
5,026
140
336
2,020
224
128
435
2,940
56
602
216
280
1,428
254
266
L-Bar
176
44
101
106
28
93
6
73
47
92
381
66
23
233
48
50
8
75
7
9
9
19
6
55
89
35
107
140
19
65
179
38
70
31
6
708
718
70
168
404
56
128
87
98
56
43
24
70
204
254
133
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
CI
2
3
1
4
11
26
10
1
20
3
1
6
12
7
5
32
16
7
1
8
1
6
8
15
8
1
7
1
6
1
4
8
4
9
2
20
2
18
1,546
8
15
4
10
1
1
1
2
10
1
2
1
CMI
152
312
227
580
1,958
2,080
1,200
155
4,900
414
20
384
3,504
567
450
18,176
2,832
378
348
440
75
1,044
1,016
1,995
400
81
630
177
1,062
79
188
440
472
1,314
152
7,480
102
2,556
51,018
464
315
316
20
222
83
94
166
730
124
16
211
L-Bar
76
104
227
145
178
80
120
155
245
138
20
64
292
81
90
568
177
54
348
55
75
174
127
133
50
81
90
177
177
79
47
55
118
146
76
374
51
142
33
58
21
79
2
222
83
94
83
73
124
8
211
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/17/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
CI
1
2
23
1
2
7
8
10
16
11
1
9
1
10
18
8
4
1
3
10
11
1
8
1
1
15
4
8
6
26
8
1
1,986
1
1
4
11
38
1
8
10
53
53
5
6
5
1
10
16
1
2
CMI
281
300
2,323
122
130
1,127
416
100
2,608
352
56
720
73
410
666
480
224
88
225
10
1,276
39
72
384
174
630
112
96
996
1,352
680
236
3,972
91
76
96
1,254
9,196
134
832
780
159
5,830
295
702
295
131
260
464
28
382
L-Bar
281
150
101
122
65
161
52
10
163
32
56
80
73
41
37
60
56
88
75
1
116
39
9
384
174
42
28
12
166
52
85
236
2
91
76
24
114
242
134
104
78
3
110
59
117
59
131
26
29
28
191
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
CI
CMI
16
13
8
1
1
6
4
4
11
25
2
2
14
2
1
6
2
1
4
3
3
11
2
9
6
1
8
31
1
15
1
10
14
13
18
2
1
14
4
2
3
7
3
1
4
2
3
142
3
6
12
1,760
507
1,072
203
91
876
456
84
583
3,150
62
362
2,590
974
1
1,650
254
2
836
627
141
2,156
60
567
276
209
960
248
9
2,340
72
70
812
520
1,908
100
20
98
428
22
66
889
12
26
176
146
234
5,822
480
234
1,692
L-Bar
110
39
134
203
91
146
114
21
53
126
31
181
185
487
1
275
127
2
209
209
47
196
30
63
46
209
120
8
9
156
72
7
58
40
106
50
20
7
107
11
22
127
4
26
44
73
78
41
160
39
141
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/18/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
CI
1
5
6
3
3
1
1
1
2
1
1
2
1
5
1,425
2
10
7
1
31
1
12
60
1
1
3
3
7
52
2
14
16
2
7
2
13
2
5
6
8
8
6
11
10
3
14
1
3
6
9
8
CMI
149
615
708
342
129
19
35
34
166
44
50
94
264
840
25,650
138
780
833
74
3,906
73
1,548
11,640
114
291
504
246
714
2,132
146
1,232
2,224
136
1,141
152
845
530
10
1,008
1,320
168
954
1,826
770
243
2,422
209
309
594
90
856
L-Bar
149
123
118
114
43
19
35
34
83
44
50
47
264
168
18
69
78
119
74
126
73
129
194
114
291
168
82
102
41
73
88
139
68
163
76
65
265
2
168
165
21
159
166
77
81
173
209
103
99
10
107
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
11/19/2014
CI
CMI
7
1
7
21
7
9
1
5
6
7
23
2
6
4
1
18
3
26
8
1
10
3
3
1
2
12
6
8
2
22
6
1
7
13
2
1
1
2
4
1
2
29
8
4
1
1
2
7
2
1
11
798
108
371
1,890
567
1,008
211
365
246
672
2,438
100
966
348
17
1,854
120
4,602
312
112
190
306
159
79
84
912
696
904
178
1,474
870
146
777
1,482
118
142
44
134
484
108
204
261
840
24
62
60
342
483
96
68
1,243
L-Bar
114
108
53
90
81
112
211
73
41
96
106
50
161
87
17
103
40
177
39
112
19
102
53
79
42
76
116
113
89
67
145
146
111
114
59
142
44
67
121
108
102
9
105
6
62
60
171
69
48
68
113
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/19/2014
11/19/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
CI
CMI
15
1
5
1
7
4
10
3
4
6
1
2
34
1
1
2
7
4
6
20
11
11
1
3
21
8
22
1
2
7
11
4
1
7
1
2
4
24
6
10
2
10
12
2
26
1
7
8
6
9
5
3,690
351
230
59
602
272
2,850
225
500
306
157
88
10,098
209
184
476
518
192
120
3,180
77
935
104
279
819
312
110
282
336
2,338
286
536
117
1,162
45
556
204
1,536
666
510
222
820
2,508
82
962
90
56
1,104
1,194
693
905
L-Bar
246
351
46
59
86
68
285
75
125
51
157
44
297
209
184
238
74
48
20
159
7
85
104
93
39
39
5
282
168
334
26
134
117
166
45
278
51
64
111
51
111
82
209
41
37
90
8
138
199
77
181
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/20/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
CI
CMI
2
1
8
2
2
5
1
18
42
4
7
22
1
5
2
3
1
2
11
4
1
8
6
1
1
3
9
7
1
1
1
8
15
6
10
12
10
1
1
16
1
1
9
2
1
16
5
1
1
1
1
238
92
496
216
50
155
51
738
756
640
434
1,650
211
485
118
288
119
500
77
520
33
624
24
179
150
120
747
441
188
55
199
472
495
270
930
24
540
82
259
304
79
50
1,116
382
168
2,000
540
143
122
58
88
L-Bar
119
92
62
108
25
31
51
41
18
160
62
75
211
97
59
96
119
250
7
130
33
78
4
179
150
40
83
63
188
55
199
59
33
45
93
2
54
82
259
19
79
50
124
191
168
125
108
143
122
58
88
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
CI
CMI
7
16
2
3
14
8
3
8
1
10
8
13
8
3
62
8
7
7
2
2
3
5
26
1
18
8
44
9
4
8
13
2
7
8
42
4
1
1
1
4
15
26
6
18
4
5
8
1
6
8
4
385
1,792
384
183
1,162
120
591
528
79
1,930
1,592
5,551
840
549
2,666
24
539
819
166
64
258
400
286
118
126
664
220
963
256
512
390
60
1,113
984
588
96
118
42
117
16
1,455
4,680
36
414
328
45
88
27
576
24
132
L-Bar
55
112
192
61
83
15
197
66
79
193
199
427
105
183
43
3
77
117
83
32
86
80
11
118
7
83
5
107
64
64
30
30
159
123
14
24
118
42
117
4
97
180
6
23
82
9
11
27
96
3
33
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
Date
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/21/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/22/2014
11/23/2014
11/23/2014
11/23/2014
11/23/2014
11/23/2014
11/23/2014
11/23/2014
11/24/2014
CI
CMI
5
7
8
17
1
7
5
1
4
9
9
13
3
4
3
1
11
1
42
3
18
3
1
1
10
2
1
21
80
8
2
10
2
1
2
1
1
2
1
1
1
1
1
10
17
1
4
1
2
1
2
195
448
40
2,958
94
455
1,250
83
348
1,053
630
572
546
40
225
13
99
137
336
411
90
72
293
151
630
182
166
2,961
8,720
1,792
510
1,280
186
207
330
71
111
180
145
54
51
232
40
380
1,802
30
176
92
24
223
192
L-Bar
39
64
5
174
94
65
250
83
87
117
70
44
182
10
75
13
9
137
8
137
5
24
293
151
63
91
166
141
109
224
255
128
93
207
165
71
111
90
145
54
51
232
40
38
106
30
44
92
12
223
96
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
CI
CMI
4
1
12
8
3
3
1
1
9
2
1
2
2
1
96
10
14
4
8
4
2
10
6
1
2
7
3
24
35
9
8
8
2
7
9
8
28
1
3
2
6
56
7
6
1
2
12
3
8
5
4
456
138
2,904
376
1,470
354
61
149
1,107
304
48
214
276
114
20,279
130
6,692
424
48
8
90
770
438
89
254
581
204
7,152
2,905
63
224
488
110
1,057
990
1,136
3,528
185
324
182
870
6,608
1,127
366
173
160
1,872
447
592
590
300
L-Bar
114
138
242
47
490
118
61
149
123
152
48
107
138
114
504
13
478
106
6
2
45
77
73
89
127
83
68
298
83
7
28
61
55
151
110
142
126
185
108
91
145
118
161
61
173
80
156
149
74
118
75
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/24/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
CI
2
8
3
1
8
4
22
10
8
11
2
3
7
1
15
5
4
2
10
7
11
4
6
9
6
8
1
3
2
2,043
1,739
1
1
10
1
10
2
2
5
5
7
2
3
6
7
9
1
3
3
1
3
CMI
28
392
96
96
496
588
1,100
520
1,960
825
340
90
553
92
660
20
764
252
700
217
979
256
660
1,485
1,014
80
128
261
118
73,548
62,604
150
170
960
84
710
130
2
715
505
504
74
288
570
1,218
1,143
102
222
282
33
894
L-Bar
14
49
32
96
62
147
50
52
245
75
170
30
79
92
44
4
191
126
70
31
89
64
110
165
169
10
128
87
59
36
36
150
170
96
84
71
65
1
143
101
72
37
96
95
174
127
102
74
94
33
298
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
11/25/2014
CI
CMI
38
11
4
4
14
11
7
4
44
10
9
8
103
1
30
13
3
2
6
4
5
18
9
3
4
10
6
4
5
2
4
11
21
20
8
5
1
7
1
3
26
8
17
1
8
3
5
6
5
11
1
4,446
396
148
580
56
2,211
1,925
316
5,104
2,270
1,962
1,744
24,514
22
6,540
1,287
300
94
1,278
608
930
2,952
387
270
100
1,240
372
444
150
98
432
759
378
3,340
232
350
84
42
130
12
182
56
17
7
1,264
18
460
360
30
847
272
L-Bar
117
36
37
145
4
201
275
79
116
227
218
218
238
22
218
99
100
47
213
152
186
164
43
90
25
124
62
111
30
49
108
69
18
167
29
70
84
6
130
4
7
7
1
7
158
6
92
60
6
77
272
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
11/25/2014
11/25/2014
11/25/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/26/2014
11/27/2014
11/27/2014
11/28/2014
11/28/2014
11/28/2014
11/29/2014
11/29/2014
11/29/2014
11/29/2014
11/29/2014
CI
CMI
1
1
16
17
30
9
7
8
1
12
11
1
11
52
6
3
1
1
6
4
8
10
8
8
1
10
4
3
2
4
5
7
7
1
3
22
1
2
5
6
9
1
1
1
5
8
1
2
2
1
2
50
126
3,952
2,482
4,710
459
441
352
57
1,308
2,112
184
550
10,972
246
258
14
168
936
252
664
700
64
936
198
670
420
78
118
176
530
280
1,001
48
57
286
286
236
580
24
666
104
220
200
125
224
90
290
136
68
110
L-Bar
50
126
247
146
157
51
63
44
57
109
192
184
50
211
41
86
14
168
156
63
83
70
8
117
198
67
105
26
59
44
106
40
143
48
19
13
286
118
116
4
74
104
220
200
25
28
90
145
68
68
55
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
11/29/2014
11/30/2014
11/30/2014
11/30/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
CI
CMI
1
18
1
6
1
1
6
6
5
2
13
6
4
8
4
1
11
1
8
7
17
4
9
1
4
5
7
2
41
12
2
1
5
18
6
1
7
2
2
5
18
1
1
4
3
7
2
4
4
83
8
322
1,278
31
114
138
87
1,206
1,050
395
172
650
924
504
624
700
21
121
92
4,008
371
221
628
2,538
90
196
545
119
60
12,269
624
44
112
730
1,746
432
99
742
188
518
290
1,584
116
87
200
90
686
26
56
280
10,624
1,016
L-Bar
322
71
31
19
138
87
201
175
79
86
50
154
126
78
175
21
11
92
501
53
13
157
282
90
49
109
17
30
322
52
22
112
146
97
72
99
106
94
259
58
88
116
87
50
30
98
13
14
70
128
127
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/1/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
CI
CMI
1
5
18
3
1
1
2
17
3
5
2
3
1
5
1
3
1
1
4
1
10
1
1
2
3
8
2
5
3
6
8
1
8
2
1
1
27
1
1
1
1
2
8
6
18
3
4
2
9
16
3
6
560
2,016
165
164
59
266
1,411
174
495
152
87
139
685
204
12
47
2
68
99
450
174
118
204
84
664
34
745
24
294
880
58
104
200
353
35
13,338
161
67
80
118
204
1,136
804
1,332
354
468
354
63
1,120
321
L-Bar
6
112
112
55
164
59
133
83
58
99
76
29
139
137
204
4
47
2
17
99
45
174
118
102
28
83
17
149
8
49
110
58
13
100
353
35
494
161
67
80
118
102
142
134
74
118
117
177
7
70
107
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
CI
CMI
17
7
7
8
1
10
15
31
1
7
4
4
13
8
2
29
4
1
1
4
40
1
6
1
1
31
127
3
16
34
2
126
2
9
2
1
2
2
1
61
1
5
17
17
3
10
11
21
23
4
9
2,533
2,695
1,505
288
207
2,430
2,985
2,232
270
2,009
124
292
3,731
32
110
9,164
400
34
278
372
8,200
26
1,170
251
241
6,820
2,413
48
480
6,426
122
23,562
18
27
42
111
632
318
27
10,614
138
1,280
1,088
1,088
327
1,090
1,342
6,363
6,785
100
459
L-Bar
149
385
215
36
207
243
199
72
270
287
31
73
287
4
55
316
100
34
278
93
205
26
195
251
241
220
19
16
30
189
61
187
9
3
21
111
316
159
27
174
138
256
64
64
109
109
122
303
295
25
51
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/2/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
CI
6
5
5
1
12
1
1
5
2
20
6
1
3
5
2
18
2
17
1
8
4
1
3
1
1
3
7
5
1,839
3
4
8
3
2
3
2
2
18
1
1
1
2
14
2
19
98
16
1
2
8
1
CMI
318
210
995
167
72
54
10
305
288
2,600
312
36
63
445
102
1,476
112
1,343
73
176
160
114
93
73
62
192
679
5
66,204
129
180
24
243
68
378
38
60
1,314
26
221
238
176
5,439
196
3,914
53,704
1,040
41
212
808
25
L-Bar
53
42
199
167
6
54
10
61
144
130
52
36
21
89
51
82
56
79
73
22
40
114
31
73
62
64
97
1
36
43
45
3
81
34
126
19
30
73
26
221
238
88
416
98
206
548
65
41
106
101
25
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
CI
CMI
9
16
8
8
2
3
1
1
6
4
12
29
7
6
4
5
1
21
6
2
15
25
4
1
10
4
1
22
1
1
1
2
3
137
9
22
5
14
1
5
2
3
7
2
7
1
16
10
1
5
1
1,611
832
848
2,712
138
276
240
13
114
88
4,092
7,134
476
54
28
105
192
7,329
1,116
194
885
1,400
140
62
2,590
112
141
6,182
83
214
68
580
84
959
1,656
6,512
425
6,440
28
390
214
450
966
340
119
18
880
1,250
25
750
41
L-Bar
179
52
106
339
69
92
240
13
19
22
341
246
68
9
7
21
192
349
186
97
59
56
35
62
259
28
141
281
83
214
68
290
28
7
184
296
85
460
28
78
107
150
138
170
17
18
55
125
25
150
41
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/3/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
CI
CMI
1
2
9
9
15
1
3
7
2
13
1
3
1
19
4
4
6
4
1
6
4
2
2
6
4
1
11
7
2
2
1
12
5
2
4
1
1
4
3
3
1
1
3
4
21
2
8
3
3
26
5
93
34
360
414
2,760
64
330
126
172
949
78
78
85
1,121
420
32
84
620
35
204
568
258
124
336
244
201
1,122
931
102
238
56
564
1,347
68
456
43
42
48
783
204
39
21
585
988
11,256
344
464
189
474
2,392
320
L-Bar
93
17
40
46
184
64
110
18
86
73
78
26
85
59
105
8
14
155
35
34
142
129
62
56
61
201
102
133
51
119
56
47
343
34
114
43
42
12
261
68
39
21
195
247
536
172
58
63
158
92
64
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
CI
CMI
1
8
2
4
5
8
10
6
1
10
7
29
2
14
83
26
2
1
7
4
21
2
3
67
10
2
24
1
13
12
1
3
9
3
6
10
6
5
6
11
8
1
5
1
3
2
1
2
1
6
7
144
1,152
112
996
275
488
1,710
312
118
200
21
8,787
146
4,438
11,205
6,630
110
130
1,239
176
8,778
98
420
13,735
1,870
316
1,896
240
4,108
1,476
100
207
666
519
372
3,170
282
610
126
2,134
704
20
240
65
816
150
183
58
58
330
630
L-Bar
144
144
56
249
55
61
171
52
118
20
3
303
73
317
135
255
55
130
177
44
418
49
140
205
187
158
79
240
316
123
100
69
74
173
62
317
47
122
21
194
88
20
48
65
272
75
183
29
58
55
90
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
CI
CMI
5
8
1
6
8
3
3
11
5
1
4
6
7
15
11
17
2
7
1
6
8
6
27
2
2
1
2
6
2
3
7
1
3
1
12
3
1
2
1
9
69
37
8
2
3
8
1
3
2
3
8
570
720
103
570
320
267
384
231
255
97
700
252
168
2,415
1,100
1,088
56
546
104
216
688
558
3,483
124
568
47
140
426
32
408
112
49
366
118
384
108
144
6
15
504
483
1,221
328
192
150
520
40
156
70
651
1,176
L-Bar
114
90
103
95
40
89
128
21
51
97
175
42
24
161
100
64
28
78
104
36
86
93
129
62
284
47
70
71
16
136
16
49
122
118
32
36
144
3
15
56
7
33
41
96
50
65
40
52
35
217
147
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/4/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
CI
CMI
5
8
2
1
3
1
1
6
5
1
11
3
8
2
1
1
5
1
17
1
1
3
1
7
2
4
3
1
1
8
5
3
2
13
2
3
6
1
5
2
21
1
7
3
3
2
1
1
1
4
4
800
328
42
121
615
232
183
1,446
1,870
240
1,122
750
1,064
238
217
226
700
416
4,692
184
87
516
46
1,946
260
212
309
162
97
2,128
755
87
166
156
300
246
252
269
1,220
180
1,827
102
259
645
489
76
233
84
133
192
184
L-Bar
160
41
21
121
205
232
183
241
374
240
102
250
133
119
217
226
140
416
276
184
87
172
46
278
130
53
103
162
97
266
151
29
83
12
150
82
42
269
244
90
87
102
37
215
163
38
233
84
133
48
46
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/5/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
CI
CMI
1
8
15
4
2
1
2
8
3
13
4
3
6
3
3
12
3
1
4
2
4
6
4
1
3
1
1
3
2
14
3
16
1
1
3
29
1
1
4
14
10
14
12
1
17
1
2
2
35
4
3
38
448
135
476
720
24
158
376
369
1,326
1,248
453
1,014
27
357
396
369
120
248
76
288
1,098
660
28
264
57
144
171
164
2,926
297
720
138
230
396
1,653
124
29
376
826
1,440
644
612
238
289
397
534
196
2,520
104
420
L-Bar
38
56
9
119
360
24
79
47
123
102
312
151
169
9
119
33
123
120
62
38
72
183
165
28
88
57
144
57
82
209
99
45
138
230
132
57
124
29
94
59
144
46
51
238
17
397
267
98
72
26
140
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/6/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/7/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
CI
1
1
2
3
2
10
1
10
3
1
10
1
1
3
1,500
1,678
2
1
16
1
15
1
1
1
2
1
2
1
1
8
2
4
1
11
5
9
7
10
16
8
1
12
7
2
8
9
19
5
4
17
12
CMI
146
145
296
279
84
830
37
990
174
116
610
17
29
315
46,500
46,984
1,146
146
672
188
1,185
162
173
58
34
42
46
107
23
168
208
436
163
869
340
819
812
1,070
2,272
1,880
475
2,616
1,897
142
440
351
760
1,345
68
867
996
L-Bar
146
145
148
93
42
83
37
99
58
116
61
17
29
105
31
28
573
146
42
188
79
162
173
58
17
42
23
107
23
21
104
109
163
79
68
91
241
107
142
235
475
218
271
71
55
39
40
269
17
51
83
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
Date
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
CI
CMI
8
1
1
8
7
10
8
8
1
9
9
4
1
3
16
5
8
8
26
6
12
1
7
2
1
3
6
1
2
8
3
8
10
6
16
1
3
5
2
14
8
2
7
7
8
6
12
13
7
4
7
800
48
9
1,088
203
1,080
952
952
185
621
126
412
9
30
1,056
980
520
440
7,930
522
1,644
213
1,001
500
131
75
378
99
168
728
303
768
1,080
690
4,160
134
216
5
102
2,268
2,504
304
1,127
875
2,008
372
1,176
1,313
140
480
350
L-Bar
100
48
9
136
29
108
119
119
185
69
14
103
9
10
66
196
65
55
305
87
137
213
143
250
131
25
63
99
84
91
101
96
108
115
260
134
72
1
51
162
313
152
161
125
251
62
98
101
20
120
50
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/8/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
CI
7
4
1,467
6
1
1
1
9
2
2
7
4
10
8
1
8
7
5
4
3
5
9
1
1
7
17
4
1
2
36
3
1
5
9
19
1
5
7
10
6
2
6
31
1
5
1
10
6
1
9
10
CMI
518
232
13,203
444
70
95
25
1,053
144
238
448
168
850
480
94
608
364
425
68
147
470
234
54
45
791
867
408
209
126
8,352
348
71
905
666
3,230
57
415
385
890
588
246
1,314
620
274
30
167
3,260
360
168
225
1,810
L-Bar
74
58
9
74
70
95
25
117
72
119
64
42
85
60
94
76
52
85
17
49
94
26
54
45
113
51
102
209
63
232
116
71
181
74
170
57
83
55
89
98
123
219
20
274
6
167
326
60
168
25
181
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
CI
CMI
4
8
5
140
139
5
5
3
11
3
24
1
12
7
7
32
26
2
10
4
15
4
6
6
10
7
2
13
11
3
2
4
1
2
2
1
8
2
2
8
9
1
5
1
29
1
2
15
13
1
12
520
616
110
67,060
66,581
920
470
483
407
498
3,720
2
84
1,015
259
4,064
10,114
118
900
256
3,105
456
66
270
2,210
1,526
436
1,339
22
222
232
460
168
70
250
64
328
166
34
368
72
73
230
205
2,088
93
90
1,410
104
29
792
L-Bar
130
77
22
479
479
184
94
161
37
166
155
2
7
145
37
127
389
59
90
64
207
114
11
45
221
218
218
103
2
74
116
115
168
35
125
64
41
83
17
46
8
73
46
205
72
93
45
94
8
29
66
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/9/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
CI
CMI
5
9
3
1
10
4
4
7
6
1
185
6
8
1
14
1
1
1
1
1
12
11
10
1
1
1
3
10
2
1
4
1
4
8
5
8
4
7
1
1
1
2
1
3
4
7
13
1
2
10
6
270
936
30
210
880
964
492
497
426
60
3,885
546
1,272
50
1,596
42
42
41
41
181
876
858
1,380
41
120
15
237
970
332
36
348
45
500
104
675
656
32
742
251
388
293
248
127
180
876
574
1,196
252
532
1,810
360
L-Bar
54
104
10
210
88
241
123
71
71
60
21
91
159
50
114
42
42
41
41
181
73
78
138
41
120
15
79
97
166
36
87
45
125
13
135
82
8
106
251
388
293
124
127
60
219
82
92
252
266
181
60
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
CI
CMI
25
4
16
4
1
4
2
35
3
20
4
19
12
3
7
12
22
6
4
4
8
8
8
7
10
21
4
25
1
38
4
4
143
4
8
48
26
1
34
4
12
19
6
1
92
2
13
8
2
10
5
8,025
260
2,752
456
229
324
156
17,500
846
1,500
508
2,812
2,052
507
1,456
624
4,488
306
268
204
520
1,232
1,784
343
1,240
2,835
528
3,825
4
8,436
48
136
2,717
76
32
4,800
2,002
116
3,094
52
2,712
2,147
882
63
14,812
130
169
384
152
180
195
L-Bar
321
65
172
114
229
81
78
500
282
75
127
148
171
169
208
52
204
51
67
51
65
154
223
49
124
135
132
153
4
222
12
34
19
19
4
100
77
116
91
13
226
113
147
63
161
65
13
48
76
18
39
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
12/10/2014
CI
CMI
3
2
1
3
4
7
5
2
17
1
154
3
6
2
8
12
9
16
3
5
6
1
10
2
1
2
5
6
6
5
10
6
2
1
1
3
3
5
2
1
2
1
1
2
1
3
1
1
1
1
1
849
470
67
489
416
637
570
72
1,921
68
5,544
291
108
132
336
1,248
306
1,424
159
370
102
81
1,070
302
133
172
370
432
282
455
150
750
80
192
177
201
441
575
284
125
232
113
12
34
54
150
138
50
123
171
76
L-Bar
283
235
67
163
104
91
114
36
113
68
36
97
18
66
42
104
34
89
53
74
17
81
107
151
133
86
74
72
47
91
15
125
40
192
177
67
147
115
142
125
116
113
12
17
54
50
138
50
123
171
76
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
CI
CMI
13
1
2
1
19
14
22
6
8
4
1
1
8
2
1
1
27
5
1
10
4
1
1
1
7
4
1
3
2
7
3
1
8
1
3
17
1
1
4
8
3
3
3
1
4
4
3
1
1
8
29
780
12
238
125
1,558
686
1,474
720
672
444
207
44
808
978
45
75
4,590
375
127
730
876
88
77
85
1,036
296
75
228
146
763
201
282
152
35
498
136
340
140
1,424
160
201
405
297
163
752
476
213
72
80
16
2,349
L-Bar
60
12
119
125
82
49
67
120
84
111
207
44
101
489
45
75
170
75
127
73
219
88
77
85
148
74
75
76
73
109
67
282
19
35
166
8
340
140
356
20
67
135
99
163
188
119
71
72
80
2
81
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
Date
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
CI
CMI
8
12
7
354
5
2
3
6
5
6
16
9
46
11
1
7
4
3
48
1
8
3
2
6
8
13
5
4
3
2
175
4
9
5
2
31
2
2
8
5
1
10
1
1
12
1
4
1
1
8
11
472
552
1,064
8,850
695
140
1,047
708
650
90
1,488
1,017
276
1,419
69
1,071
244
306
6,480
144
392
213
134
510
968
1,443
120
628
96
274
7,175
164
684
365
40
5,456
190
230
16
540
84
500
98
74
1,620
82
640
97
390
536
682
L-Bar
59
46
152
25
139
70
349
118
130
15
93
113
6
129
69
153
61
102
135
144
49
71
67
85
121
111
24
157
32
137
41
41
76
73
20
176
95
115
2
108
84
50
98
74
135
82
160
97
390
67
62
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/11/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
CI
CMI
2
4
1
1
15
7
1
2
16
2
1
70
5
4
2
7
2
1
2
12
8
10
6
8
1
4
2
17
18
4
2
9
9
61
1
1
8
2
3
2
5
1
3
1
7
1
3
2
6
14
2
338
424
20
54
150
483
156
164
272
86
131
280
350
384
386
651
184
98
362
732
1,720
820
1,206
776
121
72
54
34
4,770
60
98
1,089
918
2,501
67
108
856
138
342
374
165
282
525
122
56
54
411
120
150
280
166
L-Bar
169
106
20
54
10
69
156
82
17
43
131
4
70
96
193
93
92
98
181
61
215
82
201
97
121
18
27
2
265
15
49
121
102
41
67
108
107
69
114
187
33
282
175
122
8
54
137
60
25
20
83
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/12/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
CI
CMI
3
3
4
9
11
2
4
1
4
25
2
3
8
3
1
1
2
1
3
3
9
15
2
6
4
1
2
2
8
4
2
1
1
2
1
1
2
3
3
8
6
4
1
10
2
4
36
3
2
1
3
30
246
216
198
1,265
362
464
24
12
2,075
114
141
1,024
180
132
91
194
43
114
99
1,044
210
244
30
84
104
158
378
416
548
74
161
486
142
246
104
630
1,128
489
456
1,026
744
236
940
52
356
1,080
180
42
71
162
L-Bar
10
82
54
22
115
181
116
24
3
83
57
47
128
60
132
91
97
43
38
33
116
14
122
5
21
104
79
189
52
137
37
161
486
71
246
104
315
376
163
57
171
186
236
94
26
89
30
60
21
71
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/13/2014
12/14/2014
12/14/2014
12/14/2014
12/14/2014
12/14/2014
12/14/2014
12/14/2014
12/14/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
CI
CMI
3
2
2
7
1
19
6
1
24
8
1
1
1
10
1
1
1
167
7
10
1
1
1
4
5
7
8
1
1
5
12
3
8
9
8
4
7
4
5
41
17
3
8
2
16
1
6
45
1
2
5
9
136
110
504
41
3,078
354
61
1,752
640
3,678
297
65
820
28
375
173
167
112
740
81
168
214
1,072
530
749
456
99
170
330
2,196
510
1,072
1,242
1,328
328
616
116
65
16,687
1,904
90
1,224
268
1,616
128
324
3,465
86
130
1,045
L-Bar
3
68
55
72
41
162
59
61
73
80
3,678
297
65
82
28
375
173
1
16
74
81
168
214
268
106
107
57
99
170
66
183
170
134
138
166
82
88
29
13
407
112
30
153
134
101
128
54
77
86
65
209
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
CI
CMI
11
48
7
3
6
2
2
1
5
1
6
1
6
4
1
6
10
26
1
3
8
2
8
14
4
7
116
7
1
5
10
5
2
1
11
1
2
1
1
4
2
10
4
9
2
17
16
1
2
7
6
1,221
618
1,624
21
456
108
252
8
640
18
2,478
118
642
188
236
462
580
1,664
26
234
312
80
720
2,338
156
455
4,176
35
150
205
540
325
306
51
264
106
238
299
137
184
208
1,500
592
855
52
2,278
1,008
200
200
497
582
L-Bar
111
115
232
7
76
54
126
8
128
18
413
118
107
47
236
77
58
64
26
78
39
40
90
167
39
65
36
5
150
41
54
65
153
51
24
106
119
299
137
46
104
150
148
95
26
134
63
200
100
71
97
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/15/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
CI
CMI
4
5
8
4
1
9
4
3
4
1
2
10
2
3
4
3
4
4
5
6
2
3
1
1
2
1
1
9
1
1
5
6
9
1
4
7
6
19
32
1
3
9
16
39
2
4
1
25
119
4
9
564
70
456
448
22
540
324
390
460
89
184
90
52
9
344
216
284
496
195
234
104
279
142
51
290
39
159
801
314
383
915
846
1,107
124
836
839
750
1,159
1,664
165
696
738
3,840
4,446
336
184
64
2,975
18,207
928
576
L-Bar
141
14
57
112
22
60
81
130
115
89
92
9
26
3
86
72
71
124
39
39
52
93
142
51
145
39
159
89
314
383
183
141
123
124
209
135
125
61
52
165
232
82
240
114
168
46
64
119
153
232
64
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
CI
CMI
6
9
10
10
10
19
19
10
8
4
3
8
6
51
2
8
8
3
7
1
6
10
1
5
16
4
8
26
5
12
3
1
1
8
2
1
2
3
1
3
5
3
8
8
28
96
8
1
2
5
1
36
279
310
300
300
551
6,688
290
968
296
174
384
486
7,446
256
448
352
309
623
196
810
2,670
126
30
3,024
552
1,232
780
280
204
63
54
56
976
60
71
162
555
112
63
1,215
489
1,712
712
1,652
1,056
808
75
140
320
74
L-Bar
6
31
31
30
30
29
352
29
121
74
58
48
81
146
128
56
44
103
89
196
135
267
126
6
189
138
154
30
56
17
21
54
56
122
30
71
81
185
112
21
243
163
214
89
59
11
101
75
70
64
74
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
CI
CMI
7
7
7
9
6
3
9
7
14
28
2
2
1
15
5
1
18
7
1
10
3
4
4
4
1
10
1
2
1
4
8
11
2
3
19
8
4
2
2
4
6
2
3
1
4
1
9
3
5
4
2
637
770
770
990
660
165
774
385
742
476
10
246
125
1,515
1,245
232
2,178
196
135
600
165
524
560
184
54
250
112
92
196
404
984
1,408
176
261
1,045
992
496
298
168
348
624
174
405
109
264
108
171
429
60
312
310
L-Bar
91
110
110
110
110
55
86
55
53
17
5
123
125
101
249
232
121
28
135
60
55
131
140
46
54
25
112
46
196
101
123
128
88
87
55
124
124
149
84
87
104
87
135
109
66
108
19
143
12
78
155
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/16/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
CI
CMI
1
3
1
7
2
7
15
2
2
2
1
42
9
4
1
3
4
3
6
11
2
1
15
2
5
1
12
10
2
4
8
1
2
12
1
3
6
1
1
1
1
123
11
1
3
1
2
10
4
8
7
23
78
84
105
152
189
1,140
180
482
508
220
3,864
765
184
135
390
892
402
510
319
250
250
2,415
382
670
215
864
1,230
14
516
536
135
306
3,996
205
360
552
18
165
220
282
10,209
264
66
465
128
228
2,480
496
1,976
35
L-Bar
23
26
84
15
76
27
76
90
241
254
220
92
85
46
135
130
223
134
85
29
125
250
161
191
134
215
72
123
7
129
67
135
153
333
205
120
92
18
165
220
282
83
24
66
155
128
114
248
124
247
5
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
CI
CMI
8
7
4
1
14
42
8
2
1
9
6
1
3
26
3
5
1
3
3
13
12
10
2
4
3
7
1
1
9
6
2
19
8
3
4
5
11
11
5
12
11
2
1
4
2
2
3
4
3
1
2
944
1,176
400
268
1,456
4,032
128
96
128
351
1,050
106
606
2,028
279
140
291
186
210
2,509
2,316
660
202
360
90
385
222
29
423
336
36
2,033
1,024
351
192
190
1,474
66
335
600
616
288
254
964
210
320
459
16
336
102
246
L-Bar
118
168
100
268
104
96
16
48
128
39
175
106
202
78
93
28
291
62
70
193
193
66
101
90
30
55
222
29
47
56
18
107
128
117
48
38
134
6
67
50
56
144
254
241
105
160
153
4
112
102
123
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/17/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
CI
CMI
7
1
1
4
1
10
1
10
4
3
1
3
2
1
27
1
1
1
15
1
3
23
2
10
1
17
4
1
11
7
10
28
1
1
15
17
2
63
7
2
1
5
8
7
11
2
7
7
6
9
1
875
159
107
252
56
690
93
590
512
36
62
258
382
379
7,074
271
404
76
1,770
91
297
5,198
36
760
45
1,700
684
67
286
469
2,410
7,560
136
54
1,365
1,326
4
4,536
938
594
227
140
944
973
759
278
1,029
259
288
405
276
L-Bar
125
159
107
63
56
69
93
59
128
12
62
86
191
379
262
271
404
76
118
91
99
226
18
76
45
100
171
67
26
67
241
270
136
54
91
78
2
72
134
297
227
28
118
139
69
139
147
37
48
45
276
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
CI
CMI
7
3
9
12
3
7
4
1
5
6
9
216
8
30
1
4
3
7
5
6
7
4
1
1
8
18
3
2
7
1
1
67
10
3
8
24
7
48
1
19
1
7
2
4
4
8
1
2
2
7
3
280
291
1,332
2,328
234
588
160
138
200
240
909
3,024
1,232
3,180
18
208
33
1,617
860
1,032
1,204
164
336
429
192
990
129
296
406
25
13
6,901
790
162
1,024
720
952
2,016
89
1,691
85
448
26
40
84
304
73
362
222
665
120
L-Bar
40
97
148
194
78
84
40
138
40
40
101
14
154
106
18
52
11
231
172
172
172
41
336
429
24
55
43
148
58
25
13
103
79
54
128
30
136
42
89
89
85
64
13
10
21
38
73
181
111
95
40
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/18/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
CI
CMI
1
5
8
8
2
181
5
1
5
5
4
2
40
1
5
3
3
5
1
2
7
9
8
2
8
1
1
15
1
4
3
2
2
2
1
3
17
3
2
3
10
6
38
5
25
2
1
2
1
1
13
346
315
560
544
206
8,507
965
11
320
275
420
46
2,160
71
790
453
411
550
21
40
266
819
736
62
80
84
19
120
140
364
219
22
238
60
1,448
54
9,231
1,677
72
195
330
630
494
480
5,375
22
180
534
39
75
1,326
L-Bar
346
63
70
68
103
47
193
11
64
55
105
23
54
71
158
151
137
110
21
20
38
91
92
31
10
84
19
8
140
91
73
11
119
30
1,448
18
543
559
36
65
33
105
13
96
215
11
180
267
39
75
102
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
12/19/2014
CI
CMI
1
1
1
10
1
11
9
5
5
6
15
16
1
15
224
8
1
19
1
12
5
18
5
2
15
5
15
1
7
4
17
13
4
5
6
3
2
12
11
10
8
5
4
1
3
1
1
11
4
2
9
322
229
63
470
197
99
1,242
120
1,475
522
435
1,344
103
225
40,320
1,400
117
513
209
204
420
54
525
420
2,775
595
225
99
252
84
204
286
392
335
1,026
237
220
1,068
429
800
336
290
116
117
69
41
127
77
416
26
1,080
L-Bar
322
229
63
47
197
9
138
24
295
87
29
84
103
15
180
175
117
27
209
17
84
3
105
210
185
119
15
99
36
21
12
22
98
67
171
79
110
89
39
80
42
58
29
117
23
41
127
7
104
13
120
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
12/19/2014
12/19/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/20/2014
12/21/2014
12/21/2014
12/21/2014
12/21/2014
12/21/2014
12/21/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
CI
CMI
1
2
1
2
4
8
3
3
2
1
4
1
4
2
4
5
7
7
17
2
1
1
1
2
1
15
24
9
4
31
2
4
2
3
13
12
2
1
1
4
31
2
2
31
3
2
3
31
4
10
1
41
264
115
442
212
280
180
24
132
154
416
15
120
216
148
260
308
182
833
484
201
194
175
90
165
1,350
2,784
513
228
3,689
208
312
198
126
1,365
2,040
318
289
288
784
3,627
180
48
4,836
312
156
216
3,906
24
50
95
L-Bar
41
132
115
221
53
35
60
8
66
154
104
15
30
108
37
52
44
26
49
242
201
194
175
45
165
90
116
57
57
119
104
78
99
42
105
170
159
289
288
196
117
90
24
156
104
78
72
126
6
5
95
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
CI
CMI
8
8
11
1
4
7
8
6
6
5
4
3
26
4
4
4
3
12
1
17
3
7
7
7
9
9
9
9
12
13
1
1
1
6
13
1
2
8
1
11
10
5
28
2
5
2
3
8
241
5
4
752
952
682
34
808
875
104
588
840
40
672
105
8,892
36
712
680
180
1,164
120
2,108
327
875
791
595
792
648
792
954
2,124
130
243
201
113
318
1,287
138
70
584
19
2,323
1,530
75
560
306
30
264
273
456
2,289
490
228
L-Bar
94
119
62
34
202
125
13
98
140
8
168
35
342
9
178
170
60
97
120
124
109
125
113
85
88
72
88
106
177
10
243
201
113
53
99
138
35
73
19
290
153
15
20
153
6
132
91
57
17
98
57
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/22/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
CI
CMI
1
6
1
9
10
10
1
1
3
8
1
1
33
1
2
6
9
5
4
14
3
23
2
1
14
4
2
34
3
58
10
2
6
3
5
3
3
1
1
8
1
9
47
10
6
7
5
4
7
8
4
39
420
144
783
850
30
22
113
186
192
222
11
2,673
52
184
222
1,233
410
216
1,344
207
2,208
232
79
4,648
632
10
2,108
147
19,662
1,470
360
726
480
495
309
261
102
81
776
135
387
5,593
60
2,118
189
410
104
623
520
176
L-Bar
39
70
144
87
85
3
22
113
62
24
222
11
81
52
92
37
137
82
54
96
69
96
116
79
332
158
5
62
49
339
147
180
121
160
99
103
87
102
81
97
135
43
119
6
353
27
82
26
89
65
44
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
Date
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
CI
CMI
7
2
3
22
9
5
2
7
8
7
5
2
8
2
8
2
10
2
1
32
3
14
15
1
98
1
11
6
17
1
3
9
9
7
17
8
6
11
2
3
9
2
12
3
14
3
10
8
4
1
25
539
122
192
638
504
570
80
7
216
721
610
138
480
180
472
212
2,280
100
46
3,584
219
266
165
120
2,254
87
33
588
2,312
42
435
27
882
392
1,054
264
1,272
1,353
262
426
81
190
288
579
2,240
147
730
16
68
15
175
L-Bar
77
61
64
29
56
114
40
1
27
103
122
69
60
90
59
106
228
50
46
112
73
19
11
120
23
87
3
98
136
42
145
3
98
56
62
33
212
123
131
142
9
95
24
193
160
49
73
2
17
15
7
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/23/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/24/2014
12/26/2014
12/26/2014
12/26/2014
12/26/2014
12/26/2014
12/26/2014
12/26/2014
12/26/2014
CI
CMI
4
8
2
2
2
3
4
7
5
7
5
7
15
2
9
13
2
3
2
1
2
1
1
4
13
12
1
16
3
3
6
7
1
7
21
7
5
7
8
2
14
5
13
4
3
1
1
6
4
8
3
152
472
52
148
250
135
260
147
460
224
285
420
75
68
729
442
214
222
92
67
434
64
129
444
130
492
60
1,328
177
246
180
1,582
106
966
4,536
245
350
1,225
56
116
2,184
330
234
388
18
71
70
144
40
2,104
18
L-Bar
38
59
26
74
125
45
65
21
92
32
57
60
5
34
81
34
107
74
46
67
217
64
129
111
10
41
60
83
59
82
30
226
106
138
216
35
70
175
7
58
156
66
18
97
6
71
70
24
10
263
6
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/26/2014
12/26/2014
12/26/2014
12/26/2014
12/27/2014
12/27/2014
12/27/2014
12/27/2014
12/27/2014
12/27/2014
12/28/2014
12/28/2014
12/28/2014
12/28/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
CI
CMI
3
4
10
1
17
11
165
5
149
6
4
1
3
2
2
1
2
7
2
1
3
39
2
3
9
2
40
11
1
8
6
4
1
7
7
2
11
30
1
9
6
8
4
16
3
1
19
4
6
2
7
15
484
150
15
3,825
2,530
6,105
100
1,788
234
244
103
549
144
228
56
488
791
234
51
159
4,992
44
417
765
126
7,520
4,312
104
3,488
306
132
124
2,506
336
136
1,199
9,180
145
1,872
276
408
240
688
315
17
1,159
560
540
268
378
L-Bar
5
121
15
15
225
230
37
20
12
39
61
103
183
72
114
56
244
113
117
51
53
128
22
139
85
63
188
392
104
436
51
33
124
358
48
68
109
306
145
208
46
51
60
43
105
17
61
140
90
134
54
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/29/2014
CI
CMI
2
5
1
9
7
8
4
2
2
103
5
2
1
1
25
24
5
3
3
1
3
5
8
6
1
1
1
2
8
3
2
4
8
11
16
16
3
2
19
6
2
4
2
1
10
4
4
4
2
2
24
36
480
95
657
84
136
20
244
158
1,957
160
208
121
36
4,525
2,136
90
147
582
116
120
930
312
192
154
214
25
270
952
504
94
92
776
671
1,600
1,904
99
136
3,097
318
162
72
28
96
880
392
408
240
200
200
3,984
L-Bar
18
96
95
73
12
17
5
122
79
19
32
104
121
36
181
89
18
49
194
116
40
186
39
32
154
214
25
135
119
168
47
23
97
61
100
119
33
68
163
53
81
18
14
96
88
98
102
60
100
100
166
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/29/2014
12/29/2014
12/29/2014
12/29/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
CI
CMI
1
39
2
1
10
11
13
1
1
2
2
4
2
8
4
11
3
23
1
19
4
1
28
28
1
2
12
8
5
8
15
23
3
1
25
5
4
10
29
4
8
20
6
10
1
8
6
5
1
3
3
100
663
474
97
840
913
1,183
64
194
384
210
732
368
1,432
356
957
624
5,359
147
2,584
344
127
9,212
3,668
156
20
1,668
864
1,130
616
4,725
6,532
423
178
4,100
1,575
324
750
7,163
684
2,104
1,760
150
850
199
1,208
882
565
22
282
498
L-Bar
100
17
237
97
84
83
91
64
194
192
105
183
184
179
89
87
208
233
147
136
86
127
329
131
156
10
139
108
226
77
315
284
141
178
164
315
81
75
247
171
263
88
25
85
199
151
147
113
22
94
166
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
CUSTOMER REQUEST
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
CI
CMI
124
4
1
1
5
3
8
2
3
7
13
11
11
105
2
1
1
8
4
6
10
8
6
5
10
6
3
6
4
5
4
1
6
11
8
9
1
1
8
9
15
3
1
1
4
3
8
8
3
31
20
1,612
404
64
177
1,015
633
328
160
216
784
663
825
2,343
840
364
216
216
336
232
612
130
1,504
624
620
1,430
282
156
300
188
420
612
84
786
770
408
1,062
28
140
104
675
1,335
144
117
82
600
408
384
992
105
9,610
660
L-Bar
13
101
64
177
203
211
41
80
72
112
51
75
213
8
182
216
216
42
58
102
13
188
104
124
143
47
52
50
47
84
153
84
131
70
51
118
28
140
13
75
89
48
117
82
150
136
48
124
35
310
33
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
Date
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
CI
CMI
1
8
24
3
1
5
8
4
1
1
1
3
18
2
6
1
11
15
1
7
10
6
10
1
10
1
1
1
12
5
1
4
4
1
23
6
61
4
10
5
11
5
2
5
24
6
8
1
1
11
9
12
920
3,048
114
31
270
304
540
52
319
183
300
1,782
336
846
111
968
1,575
33
351
380
468
840
153
510
6
188
90
660
1,735
140
560
364
301
3,956
54
4,859
648
140
40
814
60
304
70
1,464
300
1,824
113
83
814
1,557
L-Bar
12
115
127
38
31
54
38
135
52
319
183
100
99
168
141
111
88
105
33
73
38
78
84
153
51
6
188
90
55
347
140
140
91
301
172
9
89
162
14
8
74
12
152
14
61
50
228
113
83
74
173
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Q13 - Distribution Excluded Outage Events
Causation
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
PLANNED
PLANNED
PLANNED
CUSTOMER REQUEST
Date
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
12/31/2014
CI
CMI
1
3
13
3
7
2
1
85
4
5
6
1
100
1
3
9
8
6
10
5
1
67
6
91
27
385
90
70
1,445
700
35
684
3
1,700
65
216
270
384
504
30
330
200
L-Bar
67
2
7
9
55
45
70
17
175
7
114
3
17
65
72
30
48
84
3
66
200
Repair Cost
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
Feeder ID#
Sub
Region
FDR Type
Custs
OH Lat
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
403231
BR
Hybrid
1770
13
35
4
4.7
0.5
7.3
3.9
12.0
4.4
16.4
4261
205303
Looped
0.27
9.27
57
13.20
403232
BR
Hybrid
1685
8
33
6
4.3
0.0
2.2
3.0
6.5
3.0
9.5
2258
67489
Looped
-0.20
7.90
22
13.20
403233
BR
Hybrid
1
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
0
Looped
0.05
13.05
0
13.20
403234
BR
Hybrid
0
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
0
Looped
-0.44
5.26
0
13.20
403235
BR
Hybrid
611
1
27
0
2.1
0.2
0.8
1.8
2.9
2.0
4.9
80
3547
Looped
0.00
4.10
5
13.20
403236
BR
Hybrid
602
0
22
0
1.2
1.8
0.0
5.5
1.2
7.3
8.5
371
16156
Looped
-0.37
6.73
2
13.20
403237
BR
Hybrid
898
8
28
2
3.3
0.8
2.0
5.0
5.3
5.8
11.1
54
4817
Looped
0.11
6.11
12
13.20
403238
BR
Hybrid
4
0
0
0
0.4
1.0
0.0
0.0
0.4
1.0
1.4
0
0
Looped
0.38
0.88
0
13.20
403239
BR
Hybrid
26
0
6
0
0.6
2.9
0.0
0.2
0.6
3.1
3.7
0
0
Looped
-0.54
7.76
0
13.20
403240
BR
Hybrid
0
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
0
Looped
-0.28
0.22
0
13.20
400731
BR
Hybrid
1342
9
25
1
1.8
2.2
1.1
2.1
2.9
4.3
7.2
5692
219714
Looped
0.00
6.50
17
13.20
400732
BR
Hybrid
1232
3
28
2
1.2
2.6
1.2
2.1
2.4
4.7
7.1
169
19593
Looped
1.02
6.62
12
13.20
400733
BR
Hybrid
758
8
15
5
3.3
0.9
3.0
1.5
6.3
2.4
8.7
789
15338
Looped
0.58
7.38
20
13.20
400734
BR
Hybrid
1234
0
21
0
0.6
0.9
0.0
0.5
0.6
1.4
2.0
14
1049
Looped
0.42
4.62
4
13.20
400735
BR
Hybrid
1638
14
24
4
3.4
0.1
2.8
2.7
6.2
2.8
9.0
274
20133
Looped
0.37
5.97
16
13.20
400736
BR
Hybrid
1062
23
7
3
2.3
0.3
6.0
0.8
8.3
1.1
9.4
1726
123822
Looped
0.07
6.07
53
13.20
400737
BR
Hybrid
2063
5
37
4
4.9
2.8
1.3
4.0
6.2
6.8
13.0
6044
244262
Looped
0.46
8.56
28
13.20
400738
BR
Hybrid
825
1
26
0
0.7
2.7
0.1
2.3
0.8
5.0
5.8
773
50157
Looped
-0.09
7.31
6
13.20
400739
BR
Hybrid
1914
18
20
5
2.9
2.5
4.8
2.5
7.7
5.0
12.7
2683
172576
Looped
0.71
8.71
32
13.20
400740
BR
Hybrid
817
5
14
6
2.0
1.4
2.2
2.4
4.2
3.8
8.0
1085
40753
Looped
0.44
6.24
24
13.20
404231
BR
Hybrid
2079
5
40
5
2.2
0.6
2.9
11.8
5.1
12.4
17.5
4151
117038
Looped
0.62
8.22
37
13.20
404232
BR
Hybrid
2140
11
30
4
2.5
1.0
3.2
6.9
5.7
7.9
13.6
205
29559
Looped
0.30
6.10
15
13.20
404233
BR
Hybrid
2494
2
40
0
2.4
0.4
0.4
2.8
2.8
3.2
6.0
140
11204
Looped
1.94
7.14
8
13.20
404234
BR
Hybrid
2413
4
24
2
2.1
2.7
1.0
5.0
3.1
7.7
10.8
5704
332548
Looped
-0.39
7.31
25
13.20
404235
BR
Hybrid
248
1
22
0
2.7
0.6
0.1
2.0
2.8
2.6
5.4
5
714
Looped
-0.03
5.77
5
13.20
404236
BR
Hybrid
558
9
12
1
1.9
1.8
2.2
2.3
4.1
4.1
8.2
122
7557
Looped
0.18
3.78
14
13.20
404237
BR
Hybrid
453
0
25
0
1.5
1.8
0.0
6.3
1.5
8.1
9.6
157
12595
Looped
0.17
5.77
6
13.20
404238
BR
UG
63
0
17
0
0.2
2.2
0.0
3.5
0.2
5.7
5.9
1
42
Looped
-0.03
7.57
1
13.20
404239
BR
Hybrid
1422
7
28
2
4.9
0.4
3.6
5.7
8.5
6.1
14.6
2101
177476
Looped
-0.23
5.27
40
13.20
404240
BR
UG
1397
0
28
0
0.8
3.0
0.0
13.0
0.8
16.0
16.8
36
6093
Looped
0.49
7.99
3
13.20
404241
BR
Hybrid
1159
1
32
1
2.1
1.9
0.4
6.1
2.5
8.0
10.5
1482
31495
Looped
0.10
6.10
12
13.20
404242
BR
Hybrid
438
5
15
4
1.4
1.0
0.7
0.9
2.1
1.9
4.0
487
59963
Looped
-0.02
4.68
6
13.20
405931
BR
Hybrid
1033
0
26
0
1.6
1.6
0.0
13.6
1.6
15.2
16.8
23
2223
Looped
0.01
7.11
8
13.20
405932
BR
Hybrid
1320
0
29
0
2.8
0.7
0.0
14.0
2.8
14.7
17.5
342
48832
Looped
-0.02
6.58
20
13.20
405933
BR
Hybrid
1024
0
14
0
1.3
0.2
0.0
3.4
1.3
3.6
4.9
219
14655
Looped
-0.07
2.63
7
13.20
405934
BR
Hybrid
1318
1
25
0
2.3
1.9
0.1
12.1
2.4
14.0
16.4
347
32976
Looped
0.27
6.87
15
13.20
405935
BR
Hybrid
1177
0
22
0
1.0
1.4
0.0
8.0
1.0
9.4
10.4
1244
19353
Looped
0.07
6.97
6
13.20
405936
BR
UG
1523
0
26
0
0.7
3.1
0.0
11.2
0.7
14.3
15.0
5181
308492
Looped
-0.29
5.51
28
13.20
405937
BR
UG
763
0
19
0
0.0
2.2
0.0
8.8
0.0
11.0
11.0
164
22806
Looped
0.50
6.20
11
13.20
405938
BR
Hybrid
315
2
8
0
0.4
3.2
0.2
3.1
0.6
6.3
6.9
13
3151
Looped
-0.58
5.02
3
13.20
405939
BR
Hybrid
1787
1
23
0
1.3
2.7
0.0
14.9
1.3
17.6
18.9
2099
45870
Looped
0.78
6.58
12
13.20
405940
BR
Hybrid
1998
5
32
2
3.1
2.8
0.9
14.2
4.0
17.0
21.0
3498
56504
Looped
-0.40
7.00
21
13.20
408031
BR
Hybrid
890
8
22
3
2.3
0.1
1.7
2.4
4.0
2.5
6.5
146
17451
Looped
0.13
4.43
13
13.20
408032
BR
Hybrid
1784
12
22
6
3.7
0.1
4.7
2.1
8.4
2.2
10.6
614
110602
Looped
-0.03
7.87
35
13.20
408033
BR
Hybrid
1036
10
21
5
3.8
0.2
3.0
1.3
6.8
1.5
8.3
1186
88270
Looped
-1.20
6.00
26
13.20
408034
BR
Hybrid
1379
13
17
1
3.3
0.0
5.5
0.5
8.8
0.5
9.3
4019
296279
Looped
0.01
5.72
43
13.20
408035
BR
Hybrid
1566
12
24
3
4.0
1.0
2.6
2.8
6.6
3.8
10.4
2422
119654
Looped
-0.49
5.81
18
13.20
405461
BR
Hybrid
3353
6
71
0
4.6
2.7
1.0
25.8
5.6
28.5
34.1
16786
498646
Looped
-0.68
11.92
24
22.90
Voltage
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
Feeder ID#
Sub
Region
FDR Type
Custs
OH Lat
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
405462
BR
Hybrid
3017
1
41
2
3.7
4.6
0.5
31.2
4.2
35.8
40.0
6798
265796
Looped
-0.48
11.62
39
22.90
405463
BR
Hybrid
1601
1
39
0
3.8
2.6
0.1
26.4
3.9
29.0
32.9
356
27381
Looped
-0.37
13.43
21
22.90
405464
BR
Hybrid
2222
1
39
2
2.4
4.8
0.8
30.6
3.2
35.4
38.6
6864
229584
Looped
0.25
13.15
38
22.90
405465
BR
Hybrid
2137
0
35
0
2.2
5.1
0.0
29.5
2.2
34.6
36.8
4505
250856
Looped
-0.96
11.74
14
22.90
405466
BR
Hybrid
1443
2
33
3
4.5
2.0
1.8
17.4
6.3
19.4
25.7
540
50766
Looped
-0.32
6.98
22
22.90
405467
BR
Hybrid
1718
2
35
1
2.3
3.4
0.2
24.2
2.5
27.6
30.1
202
18148
Looped
-0.81
12.39
18
22.90
405468
BR
UG
1385
0
24
1
0.1
5.1
0.1
18.1
0.2
23.2
23.4
2851
155916
Looped
-0.39
7.91
9
22.90
405469
BR
UG
1436
0
28
0
0.0
4.4
0.0
20.4
0.0
24.8
24.8
67
11183
Looped
-0.28
11.82
5
22.90
406931
BR
Hybrid
1495
0
23
0
2.2
0.3
0.0
11.1
2.2
11.4
13.6
407
41540
Looped
-0.13
5.97
11
13.20
406932
BR
UG
1380
0
19
0
0.6
1.6
0.0
10.3
0.6
11.9
12.5
1504
72754
Looped
0.46
5.36
6
13.20
406933
BR
Hybrid
936
0
24
0
1.0
0.7
0.0
8.6
1.0
9.3
10.3
80
14527
Looped
0.24
6.54
3
13.20
406934
BR
UG
1664
0
25
0
0.4
2.5
0.0
9.9
0.4
12.4
12.8
169
16391
Looped
0.24
6.84
7
13.20
406935
BR
Hybrid
2391
0
24
0
1.0
3.8
0.0
10.6
1.0
14.4
15.4
9027
311636
Looped
0.20
5.90
17
13.20
406936
BR
Hybrid
1851
0
27
1
3.3
2.0
0.2
13.2
3.5
15.2
18.7
200
17043
Looped
-1.46
6.74
7
13.20
406937
BR
UG
1779
0
28
0
0.5
2.7
0.0
12.7
0.5
15.4
15.9
1945
88104
Looped
0.06
7.16
14
13.20
404831
BR
Hybrid
2236
18
33
4
5.5
0.3
6.2
9.2
11.7
9.5
21.2
4190
212213
Looped
0.11
8.41
59
13.20
404832
BR
Hybrid
2319
5
53
3
5.1
2.3
1.4
15.8
6.5
18.1
24.6
3256
160073
Looped
0.73
8.03
32
13.20
404833
BR
Hybrid
2871
12
40
1
4.1
0.6
3.7
14.6
7.8
15.2
23.0
410
37800
Looped
0.30
8.50
28
13.20
404834
BR
Hybrid
1676
1
36
3
2.8
0.2
0.6
9.4
3.4
9.6
13.0
257
22740
Looped
0.27
6.17
19
13.20
404835
BR
Hybrid
1985
19
19
7
4.9
0.1
7.1
4.1
12.0
4.2
16.2
506
50835
Looped
0.19
4.99
40
13.20
404836
BR
Hybrid
1713
10
62
3
4.0
0.8
1.2
4.0
5.2
4.8
10.0
38
5191
Looped
-1.09
8.31
15
13.20
404837
BR
Hybrid
1566
11
26
8
4.7
0.2
5.3
4.3
10.0
4.5
14.5
4869
96574
Looped
-0.24
6.96
48
13.20
404838
BR
Hybrid
2479
9
53
10
4.5
0.5
2.8
8.3
7.3
8.8
16.1
2994
316646
Looped
0.68
8.68
38
13.20
404839
BR
Hybrid
1712
30
26
9
3.9
0.9
7.0
1.7
10.9
2.6
13.5
1680
140865
Looped
-1.01
5.99
71
13.20
404840
BR
Hybrid
2015
9
20
0
2.7
0.6
3.1
7.6
5.8
8.2
14.0
2511
120673
Looped
-0.78
6.42
35
13.20
409861
BR
Hybrid
3789
2
46
1
4.1
2.2
0.7
16.2
4.8
18.4
23.2
4482
396977
Looped
0.89
9.39
26
22.90
409862
BR
Hybrid
3972
2
43
2
3.7
1.1
0.6
13.1
4.3
14.2
18.5
4051
398868
Looped
1.67
11.17
12
22.90
404731
BR
Hybrid
953
6
21
3
4.2
0.3
3.5
3.9
7.7
4.2
11.9
439
64611
Looped
0.23
7.13
31
13.20
404732
BR
Hybrid
1643
27
9
3
3.8
0.1
11.9
2.2
15.7
2.3
18.0
4174
147664
Looped
-0.22
7.88
72
13.20
404733
BR
Hybrid
1143
1
18
0
2.0
0.1
0.6
9.7
2.6
9.8
12.4
255
47654
Looped
0.11
5.61
16
13.20
404734
BR
Hybrid
1834
1
20
0
3.8
2.7
0.1
9.4
3.9
12.1
16.0
1995
79798
Looped
-0.05
6.65
19
13.20
404735
BR
Hybrid
1904
6
24
1
3.6
1.4
3.1
12.7
6.7
14.1
20.8
716
116068
Looped
0.01
7.11
48
13.20
404736
BR
Hybrid
1435
3
21
1
1.3
1.9
0.2
4.3
1.5
6.2
7.7
1886
72495
Looped
-0.05
5.45
5
13.20
404737
BR
Hybrid
751
4
6
5
1.4
0.2
4.3
1.5
5.7
1.7
7.4
648
90185
Looped
0.07
3.27
18
13.20
404738
BR
Hybrid
606
5
22
2
1.7
1.0
0.5
0.7
2.2
1.7
3.9
1217
50518
Looped
0.08
4.08
6
13.20
404739
BR
Hybrid
2131
11
35
8
2.9
1.6
4.7
4.5
7.6
6.1
13.7
535
56735
Looped
0.44
8.24
41
13.20
404740
BR
UG
796
1
18
0
0.3
3.0
0.1
14.8
0.4
17.8
18.2
56
7609
Looped
0.12
7.72
16
13.20
404331
BR
UG
1
0
0
0
0.0
0.2
0.0
0.0
0.0
0.2
0.2
0
0
Looped
-0.11
4.79
0
13.20
404332
BR
UG
0
0
0
0
0.0
0.2
0.0
0.0
0.0
0.2
0.2
0
0
Looped
0.02
3.52
0
13.20
404333
BR
Hybrid
347
6
15
4
2.7
0.5
0.8
3.3
3.5
3.8
7.3
434
17800
Looped
0.69
7.99
20
13.20
404334
BR
Hybrid
350
1
26
0
1.6
1.5
0.1
6.5
1.7
8.0
9.7
0
0
Looped
0.05
7.35
0
13.20
404335
BR
Hybrid
300
0
14
0
0.7
1.6
0.0
4.5
0.7
6.1
6.8
9
1394
Looped
-0.10
4.10
5
13.20
404336
BR
Hybrid
1015
6
42
3
4.1
1.5
3.0
8.3
7.1
9.8
16.9
1189
23464
Looped
0.16
8.86
23
13.20
404337
BR
Hybrid
275
2
31
0
1.8
3.0
0.8
2.3
2.6
5.3
7.9
369
13426
Looped
-0.26
8.64
11
13.20
404338
BR
Hybrid
577
0
20
0
2.2
2.1
0.0
8.4
2.2
10.5
12.7
284
11746
Looped
-0.51
5.79
8
13.20
404339
BR
UG
2
0
1
0
0.0
1.6
0.0
0.0
0.0
1.6
1.6
0
0
Looped
-0.05
6.05
0
13.20
406861
BR
Hybrid
2032
0
40
1
1.7
2.9
0.2
23.7
1.9
26.6
28.5
122
29476
Looped
0.15
8.25
11
22.90
406862
BR
Hybrid
1506
3
27
1
3.5
2.6
1.7
18.1
5.2
20.7
25.9
501
62378
Looped
0.29
9.19
28
22.90
Voltage
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
Feeder ID#
Sub
Region
FDR Type
Custs
OH Lat
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
406863
BR
Hybrid
2110
0
40
0
3.0
3.9
0.0
30.2
3.0
34.1
37.1
138
14637
Looped
-0.44
12.36
10
22.90
406864
BR
Hybrid
2149
1
35
0
5.3
1.3
0.1
19.0
5.4
20.3
25.7
1703
126492
Looped
-0.18
8.02
14
22.90
406865
BR
Hybrid
1988
0
42
0
4.3
6.7
0.0
27.3
4.3
34.0
38.3
4042
133218
Looped
0.08
12.68
7
22.90
406866
BR
Hybrid
3519
0
49
0
2.9
2.6
0.1
22.5
3.0
25.1
28.1
4604
305265
Looped
-0.21
8.79
34
22.90
406867
BR
Hybrid
3358
1
33
1
3.4
1.8
0.3
21.9
3.7
23.7
27.4
634
70356
Looped
0.65
7.85
17
22.90
410031
BR
Hybrid
1011
0
24
1
2.4
0.7
0.4
6.1
2.8
6.8
9.6
1380
52694
Looped
-0.41
5.19
5
13.20
410032
BR
Hybrid
90
2
16
0
0.8
0.9
0.2
1.2
1.0
2.1
3.1
2
550
Looped
0.43
5.93
2
13.20
410033
BR
UG
48
0
16
0
0.0
2.2
0.0
4.5
0.0
6.7
6.7
1
11
Looped
-0.70
7.20
1
13.20
409961
BR
Hybrid
1779
14
47
2
8.4
7.9
4.6
33.9
13.0
41.8
54.8
406
46528
Looped
1.67
11.87
33
22.90
409962
BR
Hybrid
1702
4
33
2
7.8
1.0
1.6
16.5
9.4
17.5
26.9
701
111699
Looped
0.16
10.26
24
22.90
409963
BR
Hybrid
2690
26
73
5
15.7
2.6
10.4
22.3
26.1
24.9
51.0
6640
303411
Looped
2.99
14.49
50
22.90
409631
BR
Hybrid
189
1
27
0
2.4
0.3
0.1
2.6
2.5
2.9
5.4
188
5821
Looped
0.12
5.72
3
13.20
409632
BR
Hybrid
175
0
8
0
0.3
0.7
0.1
1.0
0.4
1.7
2.1
0
0
Looped
0.06
0.96
0
13.20
409633
BR
Hybrid
2319
0
43
4
3.6
0.3
1.3
15.2
4.9
15.5
20.4
1527
161769
Looped
1.26
10.36
30
13.20
409634
BR
Hybrid
1034
0
17
1
1.1
1.9
0.9
6.1
2.0
8.0
10.0
74
8634
Looped
-0.09
6.91
4
13.20
405031
BR
Hybrid
1748
0
39
0
2.5
0.5
0.0
10.1
2.5
10.6
13.1
1905
34252
Looped
0.19
6.69
19
13.20
405032
BR
Hybrid
2063
5
34
0
2.9
0.8
0.3
11.8
3.2
12.6
15.8
676
91669
Looped
-0.31
8.69
20
13.20
405033
BR
Hybrid
758
0
19
0
3.0
0.2
0.0
9.4
3.0
9.6
12.6
179
18873
Looped
-0.25
4.25
11
13.20
405034
BR
Hybrid
1094
0
22
1
2.5
0.9
0.8
12.7
3.3
13.6
16.9
470
35543
Looped
-0.35
6.05
15
13.20
405035
BR
Hybrid
1952
3
26
0
3.4
1.1
1.6
10.1
5.0
11.2
16.2
2645
69166
Looped
0.13
7.13
28
13.20
405036
BR
Hybrid
2468
0
39
0
3.7
0.0
0.0
12.7
3.7
12.7
16.4
2805
165346
Looped
0.62
7.32
11
13.20
405037
BR
UG
1385
0
15
0
0.2
3.9
0.0
17.1
0.2
21.0
21.2
1528
118898
Looped
0.36
7.06
7
13.20
405038
BR
Hybrid
895
2
21
0
1.6
2.6
0.1
13.2
1.7
15.8
17.5
138
14434
Looped
0.10
5.70
9
13.20
405039
BR
Hybrid
1544
2
31
1
2.7
1.7
0.8
14.1
3.5
15.8
19.3
140
21219
Looped
-0.40
6.40
14
13.20
408861
BR
Hybrid
2587
4
52
3
4.5
4.5
2.0
26.1
6.5
30.6
37.1
165
18934
Looped
1.43
14.03
16
22.90
408862
BR
Hybrid
2937
1
49
1
4.6
2.8
0.3
25.9
4.9
28.7
33.6
3487
258761
Looped
0.65
11.85
22
22.90
408863
BR
UG
3110
0
57
0
1.5
6.9
0.0
32.4
1.5
39.3
40.8
3434
237851
Looped
0.50
13.60
21
22.90
408864
BR
Hybrid
2609
1
44
0
2.2
4.8
0.1
27.2
2.3
32.0
34.3
111
9235
Looped
0.38
12.68
6
22.90
408865
BR
Hybrid
2631
1
46
1
4.5
3.4
0.9
31.9
5.4
35.3
40.7
5996
368796
Looped
0.95
14.25
27
22.90
400531
BR
Hybrid
1177
16
22
2
2.8
0.1
3.2
5.6
6.0
5.7
11.7
435
43819
Looped
0.07
4.77
20
13.20
400532
BR
Hybrid
1091
4
32
1
3.8
1.5
0.4
8.6
4.2
10.1
14.3
622
15778
Looped
0.04
6.64
11
13.20
400533
BR
Hybrid
1480
17
26
5
3.5
1.1
3.8
3.2
7.3
4.3
11.6
293
39867
Looped
-0.15
5.55
33
13.20
400534
BR
Hybrid
363
5
1
2
0.9
0.0
2.5
0.8
3.4
0.8
4.2
492
45256
Looped
0.05
1.65
16
13.20
400535
BR
Hybrid
2043
21
22
2
3.8
0.3
5.4
4.4
9.2
4.7
13.9
473
44203
Looped
0.10
5.80
43
13.20
400536
BR
Hybrid
1853
25
13
2
4.5
0.2
6.8
1.2
11.3
1.4
12.7
838
109305
Looped
0.12
5.82
47
13.20
400537
BR
Hybrid
441
2
22
0
2.1
0.2
0.5
1.9
2.6
2.1
4.7
76
7612
Looped
-0.47
2.83
3
13.20
400538
BR
Hybrid
2216
0
40
1
2.8
0.8
0.2
8.6
3.0
9.4
12.4
2867
37236
Looped
-0.28
7.22
13
13.20
400539
BR
Hybrid
362
1
23
1
1.2
2.1
1.2
2.4
2.4
4.5
6.9
487
44907
Looped
-0.06
6.14
12
13.20
405861
BR
Hybrid
3118
6
58
2
4.5
1.4
1.6
20.8
6.1
22.2
28.3
8549
365453
Looped
0.00
9.90
37
22.90
405862
BR
Hybrid
5070
1
70
1
6.4
1.5
0.5
28.9
6.9
30.4
37.3
873
87235
Looped
-0.14
11.16
31
22.90
405863
BR
Hybrid
3039
0
42
0
3.7
3.9
0.0
29.7
3.7
33.6
37.3
7822
296766
Looped
-2.32
11.28
26
22.90
405864
BR
Hybrid
1962
2
34
1
4.4
5.1
2.3
21.6
6.7
26.7
33.4
5788
72331
Looped
0.58
12.28
28
22.90
405865
BR
Hybrid
3895
20
59
2
7.6
2.3
3.3
28.1
10.9
30.4
41.3
478
53060
Looped
0.20
11.50
43
22.90
405866
BR
Hybrid
4218
3
55
2
5.1
0.8
0.8
26.7
5.9
27.5
33.4
3162
219607
Looped
0.61
10.71
30
22.90
405867
BR
Hybrid
3389
5
49
9
4.8
0.7
2.3
16.4
7.1
17.1
24.2
2997
140772
Looped
-0.47
10.93
39
22.90
405868
BR
Hybrid
4845
1
84
0
5.8
5.9
0.2
33.5
6.0
39.4
45.4
6523
105737
Looped
0.52
11.92
18
22.90
405869
BR
Hybrid
3009
12
53
2
5.7
2.7
2.5
31.2
8.2
33.9
42.1
3992
181384
Looped
1.04
10.14
36
22.90
405631
BR
Hybrid
2585
8
40
1
4.7
1.3
1.2
14.6
5.9
15.9
21.8
119
12825
Looped
0.27
7.97
17
13.20
Voltage
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
OH Lat
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
2208
2
44
2
2.6
0.1
0.7
12.0
3.3
12.1
15.4
428
57044
Looped
0.46
7.86
27
13.20
2581
17
33
1
3.8
1.1
5.6
10.0
9.4
11.1
20.5
482
67705
Looped
0.14
8.44
35
13.20
Hybrid
2996
12
38
2
5.1
0.5
7.3
7.3
12.4
7.8
20.2
787
108336
Looped
-0.53
8.17
38
13.20
BR
Hybrid
1777
6
27
0
3.2
0.1
0.6
8.1
3.8
8.2
12.0
3651
178428
Looped
0.05
4.05
13
13.20
405636
BR
Hybrid
2925
1
43
0
5.1
0.2
0.1
21.3
5.2
21.5
26.7
677
107191
Looped
-0.08
8.42
38
13.20
405637
BR
Hybrid
2443
27
25
3
5.1
0.8
10.2
10.6
15.3
11.4
26.7
8404
348755
Looped
0.16
8.66
50
13.20
405638
BR
Hybrid
2141
0
37
0
3.5
0.5
0.1
16.4
3.6
16.9
20.5
2852
129945
Looped
0.28
7.88
26
13.20
405639
BR
Hybrid
226
1
4
0
0.5
0.8
0.0
1.2
0.5
2.0
2.5
30
2376
Looped
0.00
0.00
3
13.20
404131
BR
Hybrid
1813
12
36
2
4.0
0.1
4.1
13.8
8.1
13.9
22.0
633
70960
Looped
0.61
6.71
53
13.20
404132
BR
Hybrid
2576
12
37
8
3.3
0.9
3.8
5.6
7.1
6.5
13.6
290
20902
Looped
-0.43
7.47
24
13.20
404133
BR
Hybrid
627
4
7
1
1.1
0.1
4.2
0.7
5.3
0.8
6.1
1228
98339
Looped
0.11
3.21
41
13.20
404134
BR
Hybrid
1275
6
30
4
4.1
0.6
2.1
9.2
6.2
9.8
16.0
1575
78817
Looped
0.27
7.17
25
13.20
404135
BR
Hybrid
2137
26
21
11
6.1
0.2
9.2
7.1
15.3
7.3
22.6
4936
219763
Looped
0.22
8.52
71
13.20
404136
BR
Hybrid
4403
25
46
11
4.7
0.3
6.3
9.5
11.0
9.8
20.8
2932
360495
Looped
0.34
8.44
76
13.20
404137
BR
Hybrid
1897
1
48
1
5.8
1.1
0.4
16.0
6.2
17.1
23.3
255
27562
Looped
0.07
7.47
19
13.20
404138
BR
Hybrid
1657
1
31
2
2.3
2.7
0.4
8.9
2.7
11.6
14.3
1935
58623
Looped
0.15
7.25
11
13.20
404139
BR
Hybrid
2481
2
70
0
4.0
0.4
0.2
14.1
4.2
14.5
18.7
182
18410
Looped
0.13
7.93
21
13.20
404140
BR
UG
2
0
2
0
0.0
0.6
0.0
0.3
0.0
0.9
0.9
0
0
Looped
-0.10
4.70
0
13.20
401031
BR
Hybrid
1846
37
7
6
4.7
0.0
12.6
1.0
17.3
1.0
18.3
5871
294286
Looped
1.16
8.56
105
13.20
401032
BR
Hybrid
2420
31
29
3
4.0
0.0
8.8
4.5
12.8
4.5
17.3
833
111664
Looped
0.19
5.49
50
13.20
401033
BR
Hybrid
1651
25
22
11
4.3
0.5
8.1
10.4
12.4
10.9
23.3
640
99081
Looped
0.51
7.41
58
13.20
401034
BR
Hybrid
965
11
23
2
3.3
0.1
2.1
6.0
5.4
6.1
11.5
258
34669
Looped
-0.01
3.29
27
13.20
401035
BR
Hybrid
2997
7
32
2
3.4
0.4
1.5
14.5
4.9
14.9
19.8
826
90129
Looped
0.31
8.01
50
13.20
401036
BR
Hybrid
2408
19
35
4
5.1
0.1
5.5
8.9
10.6
9.0
19.6
5496
216202
Looped
0.12
8.82
57
13.20
409531
BR
Hybrid
1303
11
23
4
3.7
0.0
1.6
7.5
5.3
7.5
12.8
312
33241
Looped
0.03
5.43
13
13.20
409532
BR
Hybrid
1760
2
28
2
3.1
0.3
1.5
17.5
4.6
17.8
22.4
511
53644
Looped
0.22
5.72
29
13.20
409533
BR
Hybrid
3383
16
21
5
2.9
1.1
6.4
13.5
9.3
14.6
23.9
5206
384265
Looped
0.30
7.50
46
13.20
409534
BR
UG
2798
0
41
0
1.2
3.9
0.0
20.2
1.2
24.1
25.3
409
37381
Looped
0.01
6.61
19
13.20
402831
BR
Hybrid
1580
25
26
5
5.3
0.1
10.3
4.3
15.6
4.4
20.0
2291
111357
Looped
-0.16
8.34
53
13.20
402832
BR
OH
1139
28
3
4
6.1
0.0
7.0
0.5
13.1
0.5
13.6
1837
85154
Looped
-0.01
5.89
34
13.20
402833
BR
Hybrid
1993
12
29
3
4.6
1.7
5.3
4.1
9.9
5.8
15.7
6545
227960
Looped
-0.86
8.34
42
13.20
402834
BR
Hybrid
1630
3
25
3
3.0
1.2
1.3
2.4
4.3
3.6
7.9
1643
13419
Looped
0.06
6.06
9
13.20
402835
BR
Hybrid
2631
11
68
4
4.3
2.5
3.7
7.5
8.0
10.0
18.0
2993
149510
Looped
-0.38
7.22
36
13.20
402836
BR
Hybrid
1201
10
24
2
3.4
0.7
4.1
2.9
7.5
3.6
11.1
488
48188
Looped
0.06
5.06
32
13.20
402837
BR
Hybrid
2225
13
10
3
2.6
0.0
7.5
3.6
10.1
3.6
13.7
782
132306
Looped
0.21
6.11
63
13.20
402838
BR
Hybrid
3107
21
37
5
3.7
1.1
7.1
8.0
10.8
9.1
19.9
4344
363948
Looped
0.02
7.72
64
13.20
402839
BR
Hybrid
2837
27
13
6
3.3
0.6
9.7
2.5
13.0
3.1
16.1
4469
279360
Looped
0.49
8.39
75
13.20
401931
BR
Hybrid
1737
40
35
9
4.7
1.7
8.2
7.3
12.9
9.0
21.9
2594
238272
Looped
0.15
8.35
58
13.20
401932
BR
Hybrid
1440
8
23
7
1.7
0.7
3.1
0.9
4.8
1.6
6.4
2276
148365
Looped
-0.55
6.25
28
13.20
401933
BR
Hybrid
1514
28
25
7
4.9
0.4
6.5
1.4
11.4
1.8
13.2
301
33349
Looped
0.02
7.12
33
13.20
401934
BR
Hybrid
1436
20
34
1
3.6
0.4
3.3
3.1
6.9
3.5
10.4
4267
180326
Looped
0.24
6.24
25
13.20
401935
BR
Hybrid
1506
33
16
4
3.5
0.2
8.7
1.7
12.2
1.9
14.1
804
87957
Looped
0.38
6.48
76
13.20
401936
BR
Hybrid
583
18
22
2
5.0
0.5
2.6
1.5
7.6
2.0
9.6
159
17000
Looped
0.20
6.20
19
13.20
401937
BR
Hybrid
1591
7
30
5
3.9
0.4
3.0
1.9
6.9
2.3
9.2
794
68128
Looped
0.07
6.77
40
13.20
401938
BR
Hybrid
826
21
8
3
3.0
0.3
5.9
2.7
8.9
3.0
11.9
209
38156
Looped
0.06
4.66
36
13.20
410361
BR
Hybrid
2405
19
33
8
4.8
6.0
11.4
25.3
16.2
31.3
47.5
2946
197501
Looped
3.05
12.65
55
22.90
410362
BR
Hybrid
2586
16
66
1
2.7
6.7
7.5
33.2
10.2
39.9
50.1
7459
114769
Looped
0.90
15.20
34
22.90
410363
BR
Hybrid
3645
19
82
1
5.6
13.2
5.7
51.6
11.3
64.8
76.1
288
28296
Looped
1.35
15.35
37
22.90
Feeder ID#
Sub
Region
FDR Type
Custs
405632
BR
Hybrid
405633
BR
Hybrid
405634
BR
405635
Voltage
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
OH Lat
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
1623
6
30
0
2.3
0.9
0.3
13.1
2.6
14.0
16.6
58
7048
Looped
-0.23
7.37
2
13.20
1642
17
37
0
4.6
1.0
4.7
13.4
9.3
14.4
23.7
2041
111145
Looped
0.85
6.55
41
13.20
Hybrid
1574
23
30
1
4.6
2.6
7.1
13.4
11.7
16.0
27.7
3583
134625
Looped
0.63
7.73
30
13.20
BR
Hybrid
2156
1
43
3
4.8
0.1
1.0
22.0
5.8
22.1
27.9
7732
526389
Looped
2.50
6.30
25
13.20
406535
BR
Hybrid
2306
13
32
1
4.0
0.7
8.6
7.0
12.6
7.7
20.3
3618
165606
Looped
-0.03
9.17
62
13.20
406536
BR
Hybrid
2369
19
39
4
4.7
0.3
3.7
17.2
8.4
17.5
25.9
5154
121749
Looped
0.67
8.97
35
13.20
406537
BR
Hybrid
220
0
13
1
0.6
1.8
0.1
1.6
0.7
3.4
4.1
1
349
Looped
0.04
5.14
1
13.20
407931
BR
Hybrid
3240
26
40
10
5.7
0.1
8.7
7.2
14.4
7.3
21.7
4318
203978
Looped
0.50
9.40
74
13.20
407932
BR
Hybrid
2804
0
62
0
2.1
5.0
0.0
13.3
2.1
18.3
20.4
3034
38645
Looped
-0.02
7.38
14
13.20
407933
BR
Hybrid
1161
12
38
3
3.7
2.0
1.9
6.3
5.6
8.3
13.9
130
15451
Looped
-1.77
7.83
21
13.20
407934
BR
UG
1020
0
17
0
0.0
2.0
0.0
3.1
0.0
5.1
5.1
0
0
Looped
0.61
3.51
0
13.20
407935
BR
Hybrid
2379
1
48
0
3.8
1.4
0.2
18.5
4.0
19.9
23.9
4974
250084
Looped
0.93
8.13
14
13.20
407936
BR
Hybrid
2112
28
14
7
5.1
0.4
10.1
1.6
15.2
2.0
17.2
2536
204814
Looped
-0.11
6.69
37
13.20
407861
BR
Hybrid
3317
6
67
4
10.2
1.9
1.0
24.6
11.2
26.5
37.7
6328
590933
Looped
0.29
11.69
32
22.90
407862
BR
Hybrid
2408
11
42
0
5.4
1.7
2.0
22.7
7.4
24.4
31.8
584
81343
Looped
-0.68
11.12
35
22.90
407863
BR
Hybrid
3904
5
71
4
3.7
1.5
1.4
26.8
5.1
28.3
33.4
11982
374249
Looped
0.32
13.52
19
22.90
407864
BR
Hybrid
4001
24
58
6
5.9
0.4
7.6
23.8
13.5
24.2
37.7
3313
263569
Looped
0.03
11.33
73
22.90
407865
BR
Hybrid
3721
1
58
1
5.4
0.8
0.1
24.0
5.5
24.8
30.3
4642
148515
Looped
0.96
11.26
36
22.90
407866
BR
Hybrid
2281
5
56
0
5.5
3.0
2.1
25.6
7.6
28.6
36.2
8029
146343
Looped
-3.18
9.12
36
22.90
400931
BR
Hybrid
272
6
4
3
5.1
0.1
2.3
0.4
7.4
0.5
7.9
75
5462
Looped
0.10
3.70
10
13.20
400932
BR
Hybrid
648
21
13
0
5.6
0.2
6.8
1.4
12.4
1.6
14.0
239
18083
Looped
0.07
3.17
25
13.20
400933
BR
Hybrid
2112
38
10
6
6.1
0.0
8.7
2.6
14.8
2.6
17.4
2417
120918
Looped
0.60
8.60
57
13.20
400934
BR
OH
1693
68
15
4
36.9
0.3
26.1
1.3
63.0
1.6
64.6
1382
156485
Looped
-0.01
7.79
79
13.20
400935
BR
Hybrid
1129
40
22
3
9.8
0.1
9.8
1.6
19.6
1.7
21.3
3906
148066
Looped
0.42
4.72
36
13.20
402031
BR
OH
111
20
4
0
57.8
0.1
16.2
0.2
74.0
0.3
74.3
117
22129
Looped
0.06
1.46
32
13.20
402032
BR
Hybrid
1339
42
23
5
20.0
0.1
10.4
6.5
30.4
6.6
37.0
1457
34252
Looped
0.09
5.79
36
13.20
409231
BR
Hybrid
20
4
10
0
2.3
0.1
1.6
0.9
3.9
1.0
4.9
2
433
Looped
0.00
1.10
2
13.20
400831
BR
Hybrid
321
10
3
0
6.6
0.0
3.1
1.0
9.7
1.0
10.7
216
25583
Looped
-0.01
0.99
10
13.20
400832
BR
OH
336
13
1
1
45.9
0.0
5.6
0.2
51.5
0.2
51.7
689
91149
Looped
0.03
0.83
24
13.20
400833
BR
Hybrid
1504
56
8
3
8.2
0.0
11.2
1.1
19.4
1.1
20.5
5398
281206
Looped
-0.02
4.48
58
13.20
400834
BR
OH
894
37
15
6
16.2
0.2
15.2
1.3
31.4
1.5
32.9
6047
273668
Looped
0.28
5.78
53
13.20
403801
BR
Hybrid
0
0
0
0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0
0
Looped
-6.62
5.08
0
4.10
403631
BR
Hybrid
30
11
6
1
16.9
0.0
1.1
1.7
18.0
1.7
19.7
70
5626
Looped
-0.80
3.70
14
13.20
403632
BR
Hybrid
1122
26
19
1
54.7
0.8
8.5
2.8
63.2
3.6
66.8
1504
125459
Looped
-0.88
4.72
47
13.20
403633
BR
OH
847
44
14
4
18.3
0.5
19.6
1.3
37.9
1.8
39.7
744
72802
Looped
0.28
5.28
58
13.20
403634
BR
OH
158
14
10
2
64.4
0.6
25.7
1.9
90.1
2.5
92.6
403
17452
Looped
-0.48
1.72
43
13.20
413231
BR
Hybrid
95
3
7
1
5.8
0.4
0.9
0.3
6.7
0.7
7.4
83
10042
Looped
0.00
2.60
3
13.20
413232
BR
Hybrid
636
34
12
2
21.7
1.5
16.0
1.2
37.7
2.7
40.4
935
33968
Looped
0.68
5.78
18
13.20
706361
GS
Hybrid
1750
1
42
0
3.2
3.3
0.1
18.0
3.3
21.3
24.6
3753
182384
Looped
0.48
13.48
17
22.90
706362
GS
Hybrid
1769
2
33
0
2.9
2.3
0.2
17.7
3.1
20.0
23.1
6929
262255
Looped
0.28
10.88
14
22.90
706363
GS
Hybrid
1345
1
24
1
1.7
4.9
1.8
15.4
3.5
20.3
23.8
129
14203
Looped
0.51
9.21
2
22.90
706364
GS
Hybrid
1482
0
22
0
2.8
1.1
0.0
15.1
2.8
16.2
19.0
231
52565
Looped
0.47
8.47
14
22.90
706365
GS
Hybrid
1328
0
26
0
1.0
3.4
0.0
12.8
1.0
16.2
17.2
170
35326
Looped
0.07
6.87
10
22.90
706366
GS
Hybrid
1
0
4
0
5.9
1.5
0.0
0.6
5.9
2.1
8.0
6
1771
Looped
-0.01
9.99
6
22.90
706367
GS
Hybrid
1507
0
32
0
1.2
5.3
0.0
14.8
1.2
20.1
21.3
1588
74940
Looped
0.07
13.17
7
22.90
700831
GS
OH
837
9
0
1
1.7
0.1
5.9
0.0
7.6
0.1
7.7
638
69068
Looped
-0.02
5.08
41
13.20
700832
GS
Hybrid
1506
25
5
4
3.9
0.1
6.8
0.5
10.7
0.6
11.3
1147
151085
Looped
0.24
6.64
77
13.20
700833
GS
Hybrid
1144
24
14
5
2.9
0.0
3.8
1.2
6.7
1.2
7.9
358
82540
Looped
-0.13
5.47
30
13.20
Feeder ID#
Sub
Region
FDR Type
Custs
406531
BR
Hybrid
406532
BR
Hybrid
406533
BR
406534
Voltage
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
Feeder ID#
Sub
Region
FDR Type
Custs
OH Lat
700834
GS
Hybrid
1264
21
4
8
4.0
1.0
6.1
0.7
10.1
1.7
11.8
2575
169404
Looped
0.48
4.98
56
13.20
700835
GS
Hybrid
1376
12
12
0
2.0
0.1
4.8
2.0
6.8
2.1
8.9
473
47428
Looped
-0.30
4.40
28
13.20
700836
GS
Hybrid
1307
26
9
5
4.5
1.3
7.1
0.7
11.6
2.0
13.6
4085
286030
Looped
0.31
6.61
48
13.20
700837
GS
OH
1693
18
3
2
3.1
0.2
6.9
0.1
10.0
0.3
10.3
1543
145952
Looped
0.37
6.47
76
13.20
700838
GS
Hybrid
1551
27
3
3
2.1
0.8
7.7
0.4
9.8
1.2
11.0
2540
177841
Looped
0.42
6.02
85
13.20
700839
GS
Hybrid
894
9
6
2
2.4
0.9
5.8
1.8
8.2
2.7
10.9
1556
164526
Looped
0.04
5.84
64
13.20
700840
GS
Hybrid
1376
13
3
3
2.6
0.7
4.4
0.2
7.0
0.9
7.9
702
91542
Looped
1.02
4.02
42
13.20
700841
GS
UG
7
0
7
0
0.0
1.7
0.0
0.7
0.0
2.4
2.4
0
0
Looped
-0.53
0.07
0
13.20
700842
GS
OH
1771
23
3
1
3.5
0.2
8.1
0.1
11.6
0.3
11.9
906
136859
Looped
0.27
6.77
96
13.20
700843
GS
Hybrid
1333
25
2
1
2.9
1.1
6.0
1.1
8.9
2.2
11.1
602
105273
Looped
-0.60
5.40
56
13.20
700844
GS
Hybrid
1625
33
3
1
2.2
1.2
10.5
1.0
12.7
2.2
14.9
594
116734
Looped
0.45
7.15
60
13.20
709731
GS
Hybrid
1
0
0
0
0.4
1.0
0.0
0.0
0.4
1.0
1.4
0
0
Looped
0.40
1.90
0
13.20
706961
GS
Hybrid
1941
7
42
1
6.4
1.7
3.6
20.1
10.0
21.8
31.8
4804
284066
Looped
0.86
13.56
39
22.90
706962
GS
Hybrid
1055
0
18
0
2.3
3.4
0.1
12.4
2.4
15.8
18.2
84
11053
Looped
0.17
6.27
6
22.90
706963
GS
UG
1872
0
27
0
0.5
2.4
0.0
14.1
0.5
16.5
17.0
254
7054
Looped
0.12
9.32
7
22.90
706964
GS
Hybrid
2405
5
48
4
11.4
2.6
4.1
19.4
15.5
22.0
37.5
4743
96560
Looped
0.04
13.74
18
22.90
707661
GS
Hybrid
727
13
13
4
4.7
0.2
5.8
8.5
10.5
8.7
19.2
282
29666
Looped
0.16
5.46
25
22.90
707662
GS
Hybrid
1938
0
25
0
1.7
2.2
0.0
17.1
1.7
19.3
21.0
2499
93854
Looped
0.50
11.00
20
22.90
707663
GS
Hybrid
2439
0
36
0
1.4
2.3
0.0
21.7
1.4
24.0
25.4
1425
125324
Looped
0.85
11.85
8
22.90
707664
GS
UG
1618
2
42
1
0.7
7.3
0.3
15.2
1.0
22.5
23.5
67
14470
Looped
1.06
12.16
5
22.90
707665
GS
UG
1431
1
26
1
0.5
3.4
0.3
11.9
0.8
15.3
16.1
1277
137531
Looped
0.35
7.75
10
22.90
701531
GS
Hybrid
1459
21
12
4
2.7
0.0
3.5
2.6
6.2
2.6
8.8
405
63515
Looped
0.14
5.34
33
13.20
701532
GS
Hybrid
1827
14
21
10
4.6
0.5
3.4
5.5
8.0
6.0
14.0
191
23366
Looped
0.44
6.44
22
13.20
701533
GS
Hybrid
1751
16
24
3
4.5
0.9
3.5
3.6
8.0
4.5
12.5
312
40908
Looped
0.38
7.98
36
13.20
701534
GS
Hybrid
1939
28
13
6
4.0
0.5
7.0
1.8
11.0
2.3
13.3
670
62893
Looped
0.44
7.34
55
13.20
701535
GS
Hybrid
1598
30
7
5
4.4
0.2
5.3
1.0
9.7
1.2
10.9
281
35138
Looped
0.44
6.34
43
13.20
701536
GS
Hybrid
2893
10
35
5
3.1
0.3
2.7
7.7
5.8
8.0
13.8
3777
233351
Looped
0.54
6.94
31
13.20
701537
GS
Hybrid
924
11
17
1
4.6
2.2
3.3
2.1
7.9
4.3
12.2
2054
69600
Looped
0.46
4.76
28
13.20
701538
GS
Hybrid
1724
14
16
2
3.5
0.3
3.1
2.3
6.6
2.6
9.2
567
93897
Looped
1.30
7.30
29
13.20
702531
GS
Hybrid
1320
5
28
1
2.6
1.4
0.8
12.2
3.4
13.6
17.0
353
44253
Looped
0.36
5.26
17
13.20
702532
GS
Hybrid
59
0
20
1
1.2
1.2
0.9
3.3
2.1
4.5
6.6
6
966
Looped
0.60
7.00
2
13.20
702533
GS
Hybrid
602
1
16
0
2.2
0.1
0.1
5.5
2.3
5.6
7.9
834
35792
Looped
-0.52
5.48
14
13.20
702534
GS
Hybrid
1655
2
41
2
3.3
0.6
0.5
12.5
3.8
13.1
16.9
3225
153774
Looped
0.63
7.73
13
13.20
702535
GS
Hybrid
2398
6
39
1
2.2
3.0
1.2
16.7
3.4
19.7
23.1
452
42499
Looped
2.07
10.27
28
13.20
702536
GS
Hybrid
1156
1
32
0
2.8
0.3
0.1
5.1
2.9
5.4
8.3
150
11107
Looped
0.23
6.83
8
13.20
702537
GS
Hybrid
1089
2
23
0
1.9
0.8
0.1
2.5
2.0
3.3
5.3
67
7180
Looped
0.22
6.12
3
13.20
702538
GS
UG
2
0
0
0
0.0
2.6
0.0
0.0
0.0
2.6
2.6
0
0
Looped
0.02
6.12
0
13.20
702031
GS
Hybrid
834
3
24
2
2.5
1.3
1.5
4.9
4.0
6.2
10.2
1026
48017
Looped
-0.29
6.81
7
13.20
702032
GS
Hybrid
1716
23
13
4
3.5
0.2
4.9
3.3
8.4
3.5
11.9
2660
212639
Looped
0.13
6.03
62
13.20
702033
GS
Hybrid
1686
1
35
2
1.7
1.3
1.0
10.3
2.7
11.6
14.3
447
27794
Looped
0.23
7.83
22
13.20
702034
GS
Hybrid
1907
27
8
2
3.9
0.7
8.0
3.1
11.9
3.8
15.7
1033
70569
Looped
0.65
7.95
49
13.20
702035
GS
Hybrid
1588
10
24
8
3.2
0.3
2.3
6.3
5.5
6.6
12.1
1715
153736
Looped
0.08
7.38
28
13.20
702036
GS
Hybrid
1456
4
6
7
2.2
0.8
3.1
6.9
5.3
7.7
13.0
431
54893
Looped
-0.09
6.31
19
13.20
702037
GS
Hybrid
1685
33
4
6
4.0
0.5
9.5
1.4
13.5
1.9
15.4
426
62944
Looped
0.13
7.73
66
13.20
702038
GS
Hybrid
2196
4
47
1
2.6
3.4
0.9
13.9
3.5
17.3
20.8
2304
106565
Looped
2.20
7.80
9
13.20
707261
GS
Hybrid
2201
0
24
0
3.3
2.5
0.0
19.4
3.3
21.9
25.2
2138
109081
Looped
0.30
10.60
19
22.90
707262
GS
Hybrid
2319
0
27
0
1.8
4.5
0.0
20.0
1.8
24.5
26.3
392
63958
Looped
0.79
10.29
27
22.90
707263
GS
Hybrid
3224
17
57
1
4.8
5.3
4.5
27.1
9.3
32.4
41.7
6485
307551
Looped
0.03
15.73
39
22.90
Voltage
Feeder Specific Data and Attached Laterals
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
UG Fdr
Miles
OH Lat
Miles
UG Lat
Miles
Total OH
Miles
Total UG
Miles
Total
Miles
FDR CI
FDR CMI
Q
R
S
T
Is the
Load
Feeder
growth Peak Load Number
of FDR N
Circuit (MVA D pk
2014
Looped? 14-pk 13)
(MVA)
U
Custs
OH Lat
UG Lat
Hybrid
Lat
OH Fdr
& OCR
Miles
Hybrid
842
0
64
0
6.3
1.6
0.0
8.2
6.3
9.8
16.1
845
22005
Looped
0.80
17.00
7
22.90
Hybrid
3254
0
33
0
3.0
1.8
0.1
14.9
3.1
16.7
19.8
1035
123129
Looped
0.02
10.92
18
22.90
GS
Hybrid
1668
1
15
0
3.2
0.4
0.4
9.4
3.6
9.8
13.4
650
97277
Looped
0.00
5.30
13
22.90
707267
GS
Hybrid
4190
10
48
0
3.8
2.5
6.2
18.4
10.0
20.9
30.9
2340
121725
Looped
-1.83
14.07
52
22.90
700931
GS
Hybrid
2396
22
20
9
4.7
0.2
6.2
2.2
10.9
2.4
13.3
2809
92284
Looped
-0.14
6.96
35
13.20
700932
GS
Hybrid
1849
3
20
1
2.3
2.1
0.6
4.9
2.9
7.0
9.9
18
3085
Looped
-0.24
6.16
4
13.20
700933
GS
Hybrid
1173
2
4
5
0.4
2.7
0.9
0.5
1.3
3.2
4.5
591
1754
Looped
-0.11
2.19
3
13.20
700934
GS
Hybrid
2197
5
23
3
2.2
0.9
2.6
3.5
4.8
4.4
9.2
2642
205758
Looped
0.12
5.52
28
13.20
700935
GS
UG
996
0
4
0
0.0
1.2
0.0
1.9
0.0
3.1
3.1
0
0
Looped
0.42
2.62
0
13.20
700936
GS
Hybrid
2327
10
14
5
2.4
0.2
4.1
2.7
6.5
2.9
9.4
1167
154421
Looped
0.23
5.13
36
13.20
700937
GS
Hybrid
1097
0
22
2
1.6
0.0
0.3
2.5
1.9
2.5
4.4
3
475
Looped
-0.38
2.52
3
13.20
700941
GS
UG
438
0
20
1
0.0
3.6
0.2
10.2
0.2
13.8
14.0
17
1719
Looped
-0.16
3.44
10
13.20
700961
GS
UG
1958
0
13
0
0.0
3.7
0.0
0.9
0.0
4.6
4.6
1953
1953
Looped
-0.13
4.47
1
22.90
700962
GS
UG
1175
0
6
0
0.0
4.0
0.0
0.7
0.0
4.7
4.7
0
0
Looped
0.04
3.94
0
22.90
700963
GS
UG
1548
0
7
0
0.0
3.6
0.0
1.4
0.0
5.0
5.0
0
0
Looped
0.25
8.45
0
22.90
700964
GS
UG
2298
0
9
0
0.0
3.2
0.0
2.0
0.0
5.2
5.2
71
2681
Looped
0.17
6.57
3
22.90
700965
GS
UG
1473
0
3
0
0.0
2.9
0.0
0.6
0.0
3.5
3.5
0
0
Looped
-0.07
2.83
0
22.90
700966
GS
UG
1848
0
17
0
0.0
3.2
0.0
6.1
0.0
9.3
9.3
13
3243
Looped
0.47
7.17
5
22.90
700967
GS
UG
1957
0
10
0
0.0
4.7
0.0
2.8
0.0
7.5
7.5
0
0
Looped
0.10
6.20
0
22.90
700968
GS
UG
1634
0
17
0
0.0
5.1
0.0
6.4
0.0
11.5
11.5
116
21437
Looped
0.26
7.96
6
22.90
703831
GS
Hybrid
2374
24
28
10
4.1
0.2
6.2
3.3
10.3
3.5
13.8
5686
331272
Looped
0.46
8.66
53
13.20
703832
GS
Hybrid
1485
25
12
6
3.0
0.0
7.1
0.8
10.1
0.8
10.9
869
85474
Looped
0.19
6.09
45
13.20
703833
GS
Hybrid
1238
10
18
1
2.4
0.0
1.8
5.4
4.2
5.4
9.6
302
61740
Looped
0.07
4.57
31
13.20
703834
GS
Hybrid
510
3
4
2
1.4
1.5
2.4
3.1
3.8
4.6
8.4
800
142897
Looped
0.07
3.47
35
13.20
703835
GS
Hybrid
608
5
20
3
2.5
0.3
4.1
1.9
6.6
2.2
8.8
864
77107
Looped
0.05
8.95
23
13.20
706161
GS
Hybrid
3686
0
52
0
3.9
1.7
0.0
13.6
3.9
15.3
19.2
585