Florida Power & Light Company Annual Filing to the Florida Public Service Commission March 2, 2015 Table of Contents Page 2 Executive Summary Section 1: Storm Preparedness / Infrastructure Hardening Pole Inspections 7 System Hardening 18 Storm Preparedness Initiatives 27 Summary Initiative 1 Initiative 2 Initiative 3 Initiative 4 Initiative 5 Initiative 6 Initiative 7 Initiative 8 Initiative 9 Initiative 10 Vegetation Management Trim Cycles. Joint Use Pole Attachment Audits Six-Year Transmission Structure Inspection Cycle Hardening of Existing Transmission Structures. Distribution Geographic Information System (GIS) Post-Storm Forensic Data Collection/Analysis Overhead and Underground Storm Performance Data Increased Coordination with Local Governments Collaborative Research on Hurricane Winds & Storm Surge Natural Disaster Preparedness & Recovery Plans 28 30 42 45 49 53 55 59 62 68 73 75 2015 Storm Season Readiness 77 Section 2: Reliability Appendix Reconciliation of Adjusted to Actual Reliability Indices Distribution Excluded Extreme Weather Events Distribution Excluded Outage Events Feeder Specific Data and Attached Laterals Transmission and Substation Outage Events FPL Emergency Management Plan Severe Storms Brief 1 EXECUTIVE SUMMARY – FPL’s MARCH 2, 2015 FILING In 2014, FPL continued to invest in and take significant steps to strengthen its electrical infrastructure and enhance its emergency response capabilities. Included in this ongoing work were pole inspections, system infrastructure hardening, vegetation management, as well as other storm preparedness initiatives. Additionally, FPL continued to deliver excellent overall reliable service for its customers. In 2015, FPL plans to continue its efforts to accelerate the strengthening of its electric infrastructure against severe weather and maintain its strong everyday reliability for customers. This filing provides details about these efforts and is organized into two major sections: (1) Storm Preparedness/Infrastructure Hardening; and (2) Reliability. The first section concentrates on FPL’s efforts to strengthen its distribution and transmission systems and enhance storm response capabilities. Initiatives addressed in this section include: Pole Inspections; System Hardening; 10 Storm Preparedness Initiatives; and 2015 Storm Season Readiness. The second section of this report includes information about FPL’s service reliability, including 2014 results and 2015 plans for the distribution and transmission systems. The following are brief overviews of each of these two sections: Section 1: STORM PREPAREDNESS/INFRASTRUCTURE HARDENING Pole Inspections Distribution – In 2014, consistent with its FPSC-approved plan, FPL initiated its second eight-year pole inspection cycle. • • In 2014, FPL inspected approximately 1/8 of its pole population and completed all remaining follow-up work resulting from the 2013 pole inspections. In 2015, FPL plans to complete inspections on approximately 1/8 of its pole population, as well as complete all remaining follow-up work resulting from the 2014 pole inspections. Transmission – In 2014, FPL completed all transmission pole/structure inspections consistent with its FPSC-approved plan. • In 2014, FPL performed ground level visual inspections on 100% of its transmission poles/structures. Additionally, FPL performed climbing or bucket truck inspections on approximately 1/6 of its wood poles/structures, 1/6 of all 500kV structures, 1/10 of its other concrete and steel poles/structures and 2 • conducted storm and pre-construction mitigation patrols on all concrete and steel poles/structures. Also, FPL completed all follow-up work resulting from the 2013 inspections. In 2015, FPL plans to conduct ground level visual inspections on 100% of its transmission poles/structures; perform climbing or bucket truck inspections on approximately 1/6 of its wood poles/structures, 1/6 of all 500kV structures and 1/10 of its concrete and steel poles/structures; and complete all follow-up work identified from the 2014 inspections. System Hardening Distribution Consistent with FPL’s FPSC-approved 2013–2015 Electric Infrastructure Storm Hardening Plan (see Order PSC-13-0639-PAA-EI in Docket No. 130132-EI), FPL continued to implement its three-prong approach in 2014 by applying: (1) extreme wind loading criteria (EWL) to critical infrastructure facilities (CIF); (2) incremental hardening, up to and including EWL, to “Community Project” feeders; and (3) construction design guidelines that require EWL for the design and construction of all new overhead facilities, major planned work, relocation projects, and daily work activities. • In 2014, FPL applied EWL on 75 feeder projects serving various CIF, e.g., police/fire stations and water treatment plants, one highway crossing and 16 “01” switches. FPL also applied incremental hardening to 21 “Community Projects”, i.e., feeders that serve essential community needs such as grocery stores, gas stations and pharmacies. Additionally, FPL’s Design Guidelines were applied to all new construction and other construction activities described above. Finally, FPL installed submersible equipment to mitigate the impact of significant water intrusion in six of the 12 vaults in the Miami downtown electric network that are located just at or within the FEMA 100year flood elevation levels. • FPL also continued to promote overhead-to-underground conversions in 2014, completing one project that qualified under its Governmental Adjustment Factor (GAF) tariff. • In 2015, FPL plans to apply EWL on 65 CIF feeder projects, one highway crossing and 16 “01” switches. FPL will also incrementally harden, up to and including EWL, 38 Community Project feeders. FPL’s Design Guidelines will again be used for all new construction activities. Finally, FPL will complete its efforts to install submersible equipment to mitigate the impact of significant water intrusion in the remaining six vaults in the Miami downtown electric network that are located just at or within the FEMA 100-year flood elevation levels. 3 Transmission Storm hardening details for Transmission are provided in Storm Preparedness Initiative No. 4 Storm Preparedness Initiatives (1) Vegetation Trim Cycles – In 2014, FPL continued its three-year average cycle and mid-cycle programs for feeders and its six-year average trim cycle for laterals. (2) Joint Use Audits – Approximately 20 percent of FPL’s jointly used poles are audited annually through its joint use surveys. Additionally, joint use poles are inspected through FPL’s pole inspection program. Survey and inspection results continue to show that through FPL’s joint use processes and procedures, along with cooperation from joint pole owners and third-party attachers, FPL has properly identified and accounted for joint use facilities. (3) Six-year Transmission Structure Inspection Cycle – In 2014, FPL performed ground level visual inspections on 100% of its transmission poles/structures. Additionally, FPL performed climbing or bucket truck inspections on approximately 1/6 of its wood transmission system poles/structures, 1/6 of its 500 kV structures, 1/10 of its other concrete and steel poles/structures and conducted storm and preconstruction mitigation patrols on all concrete and steel poles/structures. (4) Hardening the Transmission System – In 2014, FPL continued executing its plan to replace all wood transmission structures in its system, completed the replacement of all ceramic post insulators with polymer insulators within its system and continued with its installation of flood monitoring equipment in substations that are more susceptible to flooding. (5) Distribution Geographic Information System (GIS) – FPL completed its five originally approved key Distribution GIS improvement initiatives in 2011. These initiatives included developing a post-hurricane forensic analysis tool and the addition of poles, streetlights, joint use survey and hardening level data to the GIS. Updates to the GIS continue as data is collected through inspection cycles and other normal daily work activities. (6) Post-Storm Forensic Collection/Analysis – FPL has post-storm forensic data collection and analysis plans, systems and processes in place and available for use. No major storms affected FPL’s service territory in 2014; therefore, no forensic collection or analysis was required. (7) Overhead (OH) and Underground (UG) Storm Performance – FPL has plans, systems and processes in place to capture OH and UG storm performance. No major storms affected FPL’s service territory in 2014; therefore, no data collection or analysis was required. 4 (8) Increased Coordination with Local Governments – In 2014, FPL continued its efforts to improve local government coordination. Activities included: (1) meetings with county emergency operations managers to discuss critical infrastructure locations in each jurisdiction; (2) inviting federal, state, county and municipal emergency management personnel to participate in FPL’s annual company-wide storm preparedness dry run and; (3) FPL External Affairs managers conducted 483 community presentations, providing information on storm readiness and other topics of community interest. (9) Collaborative Research on Hurricanes/Storm Surge – Collaborative research efforts led by the Public Utility Research Center (PURC) have resulted in greater knowledge of appropriate vegetation management practices during storm and nonstorm periods, wind during storm and non-storm events, and hurricane and damage modeling to further understand the costs and benefits of undergrounding. (10) Natural Disaster Preparedness/Recovery Plans – FPL’s Storm Emergency Plan identifies emergency conditions and the responsibilities and duties of the FPL emergency response organization for severe weather and fires. The plan covers the emergency organization, roles and responsibilities and FPL’s overall severe storm emergency processes. These processes describe the planning activities, restoration practices, public communications, and coordination with government, training, practice exercises and lessons-learned evaluation systems. The plan is reviewed annually and revised as necessary. 2015 Storm Season Readiness FPL’s comprehensive storm plan focuses on readiness, restoration and recovery in order to respond safely and as quickly as possible in the event the electrical infrastructure is damaged by a storm. FPL is well-prepared for the 2015 storm season and continues to train and hone its storm preparedness and response capabilities. In addition to the initiatives to strengthen its system and improve storm preparedness discussed previously, FPL will complete the following additional storm preparedness activities prior to the start of storm season: • Extensive storm restoration training based on employees’ storm roles; • Annual company-wide hurricane dry run in late April/early May; • Management workshops throughout the storm season to keep focus on key storm restoration policies/processes; • Plan for and review of mutual assistance agreements to ensure they are adequate and ready; • Continue to focus on improving outage communications and estimated restoration times to customers; • Clear vegetation from all feeder circuits serving top critical infrastructure (e.g. top CIF hospitals, 911 centers, special needs shelters, police and fire stations, etc.) prior to the peak of hurricane season; and 5 • Implement new technology to be utilized by storm damage assessors to improve damage assessment collection/analysis capabilities. Section 2: RELIABILITY Total FPL System (Distribution and Transmission) – Overall reliability is best gauged by SAIDI (System Average Interruption Duration Index), considered the most relevant and best overall reliability indicator because it encompasses two other standard industry performance metrics for reliability: SAIFI (System Average Interruption Frequency Index) and CAIDI (Customer Average Interruption Duration Index). In 2014, FPL continued to provide strong overall reliability for its customers, achieving an overall adjusted SAIDI of 66.6 minutes (2013 – 65.6 minutes). Distribution – FPL’s 2014 overall adjusted distribution reliability, as measured by SAIDI was 63.8 (2013 – 61.4). 2014 adjusted results for SAIFI were 0.99 interruptions per customer (2013 – 0.89 interruptions). Adjusted 2014 results for CAIDI were 64.5 minutes (2013 – 68.7 minutes) and adjusted MAIFIe for 2014 was 8.7 momentary events (2013 – 9.1 momentary events). Transmission – In 2014, FPL’s Transmission/Substation adjusted SAIDI was 2.8 minutes (2013 – 4.2 minutes), adjusted SAIFI was 0.21 interruptions per customer (2013 – 0.22 interruptions) and adjusted MAIFI was 0.7 momentary events (2013 – 0.7 momentary events). 6 POLE INSPECTIONS 7 Summary – Pole Inspections Distribution In 2014, consistent with its FPSC-approved plan, FPL initiated its second eight-year pole inspection cycle. • In 2014, FPL inspected approximately 1/8 of its pole population, or 146,325 poles, including 133,572 wood poles, and completed all remaining follow-up work identified during the 2013 pole inspections. • In 2015, FPL plans to complete inspections on approximately 1/8 of its pole population, as well as complete all remaining follow-up work identified during the 2014 pole inspections. Transmission In 2014, FPL completed all transmission pole/structure inspections consistent with its FPSC-approved plan. • • In 2014, FPL performed ground level visual inspections on 100% of its transmission poles/structures. Additionally, FPL performed climbing or bucket truck inspections on approximately 1/6 of its wood transmission system poles/structures, 1/6 of its 500 kV structures, 1/10 of its other concrete and steel poles/structures and conducted storm and pre-construction mitigation patrols on all concrete and steel poles/structures. Also, FPL completed all follow-up work identified from the 2013 inspections. In 2015, FPL plans to conduct ground level visual inspections on 100% of its transmission poles/structures. Additionally, FPL plans to perform climbing or bucket truck inspections on 1/6 of its wood poles/structures, 1/6 of its 500kV structures and 1/10 of its other concrete and steel poles/structures and complete all follow-up work identified from the 2014 inspections. 8 Distribution 1. Description of the pole inspection program FPL’s eight-year inspection cycle for all distribution poles targets approximately 1/8 of the system annually; however, the actual number of poles inspected can vary somewhat from year to year. To ensure coverage throughout its service territory, FPL has established nine inspection zones, based on FPL’s management areas and pole population, and annually performs pole inspections and necessary remediation in each of these zones. FPL utilizes Osmose Utility Services (Osmose), an industry-leading pole inspection company, to perform the inspection of all distribution poles in its service territory. Osmose utilizes mobile computing technology to record inspection data and to calculate strength and loading. The loading calculation, span lengths, attachment heights and wire sizes are recorded in the mobile computer to determine whether the remaining pole strength capacity exceeds National Electrical Safety Code (NESC) requirements. This data is then transferred to FPL’s GIS. Pole locations inspected by Osmose are randomly audited by FPL to verify that inspections are completed and meet inspection standards. Inspections include a visual inspection of all distribution poles from the ground-line to the top of the pole to identify visual defects (e.g., woodpecker holes, split tops, decayed tops, cracks, etc.). If, due to the severity of the defects, the poles are not suited for continued service, the poles are designated for replacement. With the exception of Chromium Copper Arsenate treated (CCA) poles less than 16 years of age (modified in October 2014, see discussion below), if the pole passes the aboveground visual inspection, wood poles are excavated to a depth of 18” (where applicable), and sounded and bored to determine the internal condition of the pole. Poles encased in concrete or asphalt are not excavated but sounded and bored to determine their internal condition. Osmose developed/utilizes an inspection process for this condition called “Shell Boring”. All suitable wood poles receive external and/or internal preservative treatment or, if not suitable, are replaced. Strength calculations are also performed on wood poles to determine compliance with NESC requirements. CCA poles less than 16 years (modified in October 2014, see discussion below) of age are subject to a visual, sound and selective bore inspection, but not excavation. A bore inspection is performed if there is any decay indicated from the visual or sound inspection. To ensure that this exception will not compromise existing safety and storm hardening programs, FPL excavates a one percent sample of the CCA poles that would not normally qualify for full excavation. In October 2014, the FPSC approved FPL’s request to modify its pole inspection program by: (1) increasing the excavation exemption for CCA poles from less than 16 years old to less than 28 years old; and (2) exempting any pole from a loading 9 assessment, during the second eight-year cycle, that tested less than 80% of full load during FPL’s initial 8-year cycle. FPL will continue to conduct a one percent sample of exempted CCA poles and will monitor/report on poles with a 70%-80% initial eight-year cycle load test result. Since FPL began to implement this change in late 2014, reporting on this modification will begin with FPL’s next annual filing. Current NESC guidelines, outlined by Table 261-1A Section 26 of the NESC, require that distribution poles meet a minimum of Grade C construction. Building to Grade C is the typical standard for the distribution utility industry. However, FPL’s strength and loading calculations for its distribution poles and pole inspections are based on the NESC’s Grade B construction standard, a higher standard, as outlined by Table 261-1A section 26 of the NESC. 2. 2014 Accomplishments In 2014, FPL inspected approximately 1/8 of its distribution pole population (146,325 in total, including 133,572 wood poles) throughout its service territory Consistent with its Commission-approved exemption, FPL also fully excavated a one percent sample of the CCA poles that would not have been fully excavated under this exemption. From that sample, zero poles failed the excavation portion of the inspection. For 2014, FPL’s distribution pole inspection program costs were approximately $70.1 million, including inspection and remediation costs for wood and concrete poles. 3. Proposed 2015 Plan FPL’s 2015 distribution pole inspection plan includes the inspection of approximately 1/8 of its pole population. FPL will also inspect CCA poles and perform load assessment tests, consistent with its recently approved exemptions and monitoring/sampling requirements. The estimated cost for the 2015 distribution pole inspection program is $50-$60 million, including inspection and remediation costs for wood and concrete poles. 4. NESC compliance for strength and structural integrity The following methods are used by FPL’s vendor to determine NESC compliance for strength and structural integrity of FPL’s poles. Strength Assessment On wood distribution poles, a strength assessment is performed to determine compliance to the NESC standards for strength. The strength assessment is based on a comparison of measured circumference versus original circumference of the pole. The effective circumference is measured and data collected to ensure that the actual condition of the pole meets NESC Grade B requirements as outlined in Table 10 261-1A Section 26 of the NESC. If the pole does not meet the Grade B NESC requirements, the pole will be reinforced or replaced. Loading Assessment On all distribution poles, a loading assessment is also performed and includes a combination of field measurements, span length, attachment heights (including thirdparty attachments) and wire sizes based on FPL construction standards. If NESC requirements are not met, the pole will be reinforced, replaced or the attachments will be relocated. As noted earlier, in October 2014, the FPSC approved FPL’s request to modify its pole inspection program by exempting any pole from a load test assessment, during the second eight-year cycle, that tested less than 80% of full during FPL’s initial 8-year cycle. 5. Summary data and results of 2014 pole inspections As previously discussed, poles are remediated if they do not meet the higher NESC Grade B requirement. Remediation is categorized into two groups (Level 1 and Level 2) in order to allow for more effective scheduling and resource allocation. Level 1 - Remediation that requires more immediate attention. Urgent needs are addressed immediately. 11 Level 2 - Remediation that does not require immediate attention. 6. The cause(s) of each pole failure for poles failing inspections, to the extent that such cause(s) can be discerned in the inspection. Also, the specific actions the company has taken or will take to correct each pole failure. The table below provides a summary of the pole inspection findings for the poles identified as poles requiring remediation. Transmission 7. Description of Pole Inspection Program FPL performs annual ground level visual inspections on 100% of its transmission poles/structures – wood, concrete and steel. FPL also performs climbing or bucket truck inspections on all of its transmission poles/structures on a cyclical basis. In addition to the poles/structures being inspected, the condition of various transmission pole/structure components are assessed, including attachments, insulators, cross-arms, cross-braces, foundations, bolts, conductors, overhead ground wires (OHGW), guy wires, anchors, and bonding. These inspections are performed in accordance with Commission Order PSC-06-0144-PAA-EI in Docket No. 060078-EI, issued on February 27, 2006. An overview of these inspection procedures are outlined below: Wood Poles/Structures Annually, FPL performs ground level visual inspections on 100% of its wood transmission poles/structures, inspecting from the ground-line to the pole top. The visual inspection includes a review of the pole’s/structure’s condition as well as pole attachment conditions. If a wood transmission pole/structure does not pass visual inspection, it is not tested any further and it is designated for replacement. 12 FPL also performs a climbing or bucket truck inspection on all wood transmission poles/structures on a six-year cycle. If a wood pole/structure passes this visual inspection, a sounding test is then performed. If the result of a sounding test warrants further investigation, the wood pole/structure is bored to determine the internal condition of the pole. All bored poles, not designated for replacement, are treated with an appropriate preservative treatment. Concrete and Steel Poles/Structures Annually, FPL performs ground level visual inspections on 100% of its concrete and steel transmission poles/structures. The inspection incorporates an overall assessment of the pole/structure condition (e.g., cracks, chips, exposed rebar, and rust) as well as other pole/structure components including the foundation, all attachments, insulators, guys, cross-braces, cross-arms, and bolts. If a concrete or steel pole/structure fails the inspection, the pole/structure is designated for repair or replacement. From 2006-2013, FPL performed a climbing or bucket truck inspection on all concrete and steel transmission poles/structures on a six-year cycle. In 2014, FPL continued to perform a climbing or bucket truck inspection on all 500 kV structures on a six-year cycle. Climbing or bucket truck inspections for all other steel and concrete poles/structures are now conducted on a 10-year cycle. 8. 2014 Accomplishments In 2014, 100% of FPL’s transmission poles/structures were visually inspected and approximately 1/6 of its wood, 1/6 of its 500kV structures and 1/10 of its other concrete and steel transmission poles/structures were inspected by climbing or from a bucket truck. Additionally, storm and pre-construction mitigation patrols were conducted on all concrete and steel poles/structures. In 2014, FPL incurred $1.8 million of inspection costs and $28.7 million of costs associated with follow-up work identified from the 2013 inspections. 9. Proposed 2015 Plan In 2015, FPL is estimating to incur approximately $1.8 million of expenses to complete its transmission pole/structure inspections and approximately $24.7 million of costs associated with follow-up work identified from the 2014 inspections. 10. NESC compliance for strength and structural integrity The following methods are used during pole/structure inspections for determining NESC strength and structural integrity compliance: Strength Assessment For wood transmission poles/structures, the strength assessment is based upon a comparison of measured circumference versus the original circumference of the 13 pole. If the effective circumference is measured and the actual condition of the pole does not meet NESC requirements as outlined in Table 261-1A Section 26 of the NESC, the pole is designated for reinforcement or replacement. Loading Assessment FPL performs a loading assessment on wood transmission poles/structures with 3rd party attachments. This assessment is based on a combination of pole/structure length, framing configuration, span length, attachment heights (including 3rd party attachments) and conductor size. If the loading does not meet NESC requirements, the pole is designated for reinforcement, replacement or relocation of the third-party attachments. 11. Explanation of the inspected pole selection criteria FPL prioritizes its transmission pole/structure inspections based on factors such as framing configuration (structural loading), transmission components, system importance, customer count, and inspection history for a transmission line section. Other economic efficiencies, such as multiple transmission line sections within the same corridor, are also considered. 12. Inspection Summary Data for the Previous Year Summarized in the following sections are the 2014 inspection results and causes by transmission pole/structure materials: Wood Transmission Poles/Structures FPL’s 2014 results from its six-year cyclical wood transmission pole/structure inspections are in the table, below. In addition, FPL performed its annual ground level visual inspections on 100% of its wood poles/structures. Florida Power & Light Company Annual Wood Pole Inspection Report (Reporting Year 2014) a b c d e f g h i j Method(s) Total # of # of Wood # of Wood # of Poles V=Visual # of Wood # of Poles Total # of Wooden Poles Pole Failure # of Poles E=Excavation Pole requiring Poles Failing Poles in the Designated Wood Poles Rate (%) Overloaded P=Prod Inspection Minor Inspected Inspection Replaced Company for this Annual Planned this Follow -up this Annual S=Sound this Annual this Annual Inventory Replacement this Annual Inspection Annual this Annual Inspection B=Bore Inspection Inspection as of this Annual Inspection Inspection Inspection R= 01-2014 Inspection Resistograph 13,620 2,402 2,427 426 17.6% 589 2,070 n/a 0 V / P/ S / B k l m # of Wood Total # of % of Wood Pole Wood Poles Poles Inspections Inspected Inspeted Planned for (Cumulative) (Cumulative) Next Annual in the 6in the 6Inspection Year Cycle Year Cycle Cycle to Date to Date 2,273 8,000 58.7% If b - c > 0, provide explanation If d - g > 0, provide explanation Description of selection criteria for inspections FPL prioritizes its inspections based on factors such as: framing configuration (structural loading), transmission components, system importance, customer count, and inspection history for a transmission line section. Other economic efficiencies, such as multiple transmission line sections w ithin the same corridor, are also considered. 14 * The replacement quantities in the table above represent the total number of transmission poles/structures replaced not only through its inspection program, but also from relocations, proactive rebuilds and system expansion. Concrete and Steel Transmission Structures FPL performed visual ground level inspections on 100% of its concrete and steel poles/structures and bucket inspections on 1/6 of its 500kV structures and 1/10 of all other concrete and steel poles/structures in 2014. The table below provides FPL’s 2014 concrete and steel transmission pole/structure inspection results. POLE INSPECTION REPORT Company: Florida Power & Light Summary of Concrete & Steel Transmission Pole Inspections Period: January 2014 thru December 2014 Type of Inspection: Concrete & Steel Transmission Structures Visual / Bucket Type of Pole: Average Class: Varies Materials Concrete & Steel Average Vintage Installed Population as of 1/1/2014 2000 51,232 % Planned Percent Inspections Planned & Percent Completed: % Completed 100% 100% 0 0 Reason for Variance/Plan to Address Backlog: No. of inspected poles addressing a prior backlog No. of Structures No. of structures identified for reinforcement: % of Inspection 0 0.0% No. of poles identified for replacement: 60 0.1% No. of structures identified for a change inspection cycle:: No. of structures that required no change in inspection cycle or remediation No. of structures identified as overloaded n/a n/a 51,172 99.9% 0 0.0% 15 13. Identified Inspection Items (by Cause) Summarized below are the cause(s) of the identified transmission pole/structure inspection failures along with specific actions that have or will be taken for each level of priority: Wood Transmission Structures Wood Transmission Structures Level 1 Level 2 NonPriority Ground-Line 8 58 3 Decay, Rot, Insects, Voids Level 1 - Reinforce, Remediate, or Replace in year found Above GroundLine 28 332 63 Wood-Pecker Holes, Decay, Insects Level 2 - Reinforce, Remediate, or Replace the following year Overload (3 Party) 0 0 0 3rd Party Attachments Total 36 390 66 Refer to the Above Inspection Item Primary Cause(s) rd Remediation Non-Priority – No action required To help prioritize and to better plan for future years, FPL has established the following priority levels of inspection reporting: Level 1 Priority - Identified as approaching the minimum NESC requirements for Grade B construction with the potential to fall below the minimum before the end of the current year. These poles/structures are incorporated into current year work plans for reinforcement, remediation, or replacement. The timeframe for completion is typically driven by customer provided access to the facilities and the coordination of a scheduled outage with other facility clearances scheduled on the grid. Level 2 Priority - Identified as approaching the minimum NESC requirements for Grade B construction and will not fall below the minimum prior to the end of the following year. These poles/structures are identified for reinforcement, remediation, or replacement as planned work by the end of the calendar year following inspection. 16 Non-priority – Identified as having reduction in capacity, but still above the minimum NESC requirements. When reported, these structures are documented but do not require specific action until the next inspection. Concrete & Steel Transmission Structures Concrete & Steel Transmission Structures Inspection Item Base of Pole (Identified for Replacement) Level 1 0 Level 2 29 NonPriority 4 Primary Cause(s) Remediation Corrosion Level 1 - Reinforce, Remediate, or Replace in year found Base of Pole (Identified for Repair) 7 24 5 Cracks Level 2 - Reinforce, Remediate, or Replace the following year Total 7 53 9 Refer to the Above Non-Priority – No action required To help prioritize and to better plan for future years, FPL has established the following priority levels of inspection reporting: Level 1 Priority - Identified as approaching the minimum NESC requirements for Grade B construction with the potential to fall below the minimum before the end of the current year. These poles/structures are incorporated into current year work plans for reinforcement, remediation, or replacement. The timeframe for completion is typically driven by customer provided access to the facilities and the coordination of a scheduled outage with other facility clearances scheduled on the grid. Level 2 Priority - Identified as approaching the minimum NESC requirements for Grade B construction and will not fall below the minimum prior to the end of the following year. These poles/structures are identified for reinforcement, remediation, or replacement as planned work by the end of the calendar year following inspection. Non-priority – Identified as having structural deterioration, but still meets all of the NESC strength requirements. When reported, these structures are documented but do not require specific action until the next inspection. 17 SYSTEM HARDENING 18 System Hardening Distribution Consistent with FPL’s FPSC-approved 2013–2015 Electric Infrastructure Storm Hardening Plan (see Order PSC-13-0639-PAA-EI in Docket No. 130132-EI), FPL continued to implement its three-prong approach in 2014 by applying: (1) extreme wind loading criteria (EWL) to critical infrastructure facilities (CIF); (2) incremental hardening, up to and including EWL, to “Community Project” feeders; and (3) construction design guidelines that require EWL for the design and construction of all new overhead facilities, major planned work, relocation projects, and daily work activities. • In 2014, FPL applied EWL on 75 feeder projects serving various CIF, e.g., police/fire stations and water treatment plants, one highway crossing and 16 “01” switches. FPL also applied incremental hardening to 21 “Community Projects”, i.e., feeders that serve essential community needs such as grocery stores, gas stations and pharmacies. Additionally, FPL’s Design Guidelines were applied to all new construction and other construction activities described above. Finally, FPL installed submersible equipment to mitigate the impact of significant water intrusion in six of the 12 vaults in the Miami downtown electric network that are located just at or within the FEMA 100year flood elevation levels. • FPL also continued to promote overhead-to-underground conversions in 2014, completing one project that qualified under its GAF tariff. • In 2015, FPL plans to apply EWL on 65 CIF feeder projects, one highway crossing and 16 “01” switches. FPL will also incrementally harden, up to and including EWL, 38 Community Project feeders. FPL’s Design Guidelines will again be used for all new construction activities. Finally, FPL plans to complete the installation of submersible equipment to mitigate the impact of significant water intrusion in the six remaining vaults in the Miami downtown electric network that are located just at or within the FEMA 100-year flood elevation levels. 19 1. Describe each Storm Hardening activity undertaken in the field during 2014. 2014 CIF Projects 1 2 3 4 5 6 7 8 9 10 Region Broward Broward Broward Broward Broward Broward Broward Broward Broward Broward County Broward Broward Broward Broward Broward Broward Broward Broward Broward Broward Feeder 700236 701434 701735 701937 702031 702432 702631 704262 705764 706462 Primary Facility Sewage Treatment Plant FAA - Air Transportation Critical Well Field Waste Water Booster Pump Station Waste Water Booster Pump Station Critical Well Field FAA - Air Transportation Police Police Fire Station 11 Broward Broward 706665 Police 12 13 14 15 16 17 18 19 20 21 22 Broward Broward Broward Broward Broward Broward Dade Dade Dade Dade Dade Broward Broward Broward Broward Broward Broward Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade 707263 707462 707533 708064 708431 709161 801832 803637 804536 807165 808264 Critical Cellular Facilities (Police & Fire) Sewage Treatment Plant Waste Water Booster Pump Station Non-Special Needs Shelter Critical Cellular Facilities (Police & Fire) FAA - Air Transportation Police Fire Station Fire Station Registered Nursing Home Police 23 Dade Miami-Dade 809667 Police 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Dade Dade Dade Dade Dade Dade East East East East East East East East East East East East Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Palm Beach Palm Beach Martin Palm Beach Martin Palm Beach Martin Palm Beach Palm Beach Palm Beach Palm Beach Martin 809764 810661 811064 811562 811563 811564 400137 400239 401136 402532 403433 404433 404931 405461 405636 405867 405940 408262 Police Fire Station Police Fire Station Fire Station Police Municipal Facility - Convention Center Municipal Facility - City Center Registered Nursing Home FAA - Air Transportation Waste Water Booster Pump Station Waste Water Booster Pump Station Registered Nursing Home Critical Well Field WTP Fire Station Critical Cellular Facilities (Police & Fire) Registered Nursing Home 42 East St Lucie 408461 Critical Cellular Facilities (Police & Fire) 43 44 45 46 47 48 49 50 51 52 53 54 East East North North North North North North North North North North St Lucie Palm Beach Volusia Volusia Volusia Flagler Volusia Volusia Putnam Seminole Brevard Brevard 408765 410362 100837 101039 101138 102361 103834 105062 108431 200832 201231 203331 Sewage Treatment Plant Acute Care Facility Sewage Treatment Plant Police Sewage Treatment Plant Sewage Treatment Plant Critical Well Field Sewage Treatment Plant Critical Cellular Facilities (Police & Fire) Police Waste Water Booster Pump Station Coast Guard Seaport Additional Facility Special Needs Shelter Non-Special Needs Shelter Status Complete* Partial** Partial** Partial** Partial** Complete* Partial** Complete Complete Complete Complete Complete Complete Complete* Cancelled*** Complete Complete* Complete Partial** Partial** Complete Complete* Fire Station FAA - Air Transportation Complete* Complete* Complete Complete Partial** Partial** Complete* Complete* Complete* Complete* Partial** Complete* Complete Complete* Partial** Complete* Complete Complete Partial** Correctional Facility Gas Supply Radio Tower Partial** Complete Complete Complete* Complete Complete* Complete* Complete Complete* Complete* Complete Complete* Partial** *Completed 1st quarter 2015 **Partially complete as of March 2015, to be completed in 2015 ***Project cancelled - CIF relocated to another location/feeder 20 55 56 57 58 59 60 61 62 63 64 Region North North North North North West West West West West County Brevard Volusia Brevard Suwannee Nassau Manatee Manatee Sarasota Collier Lee Feeder 203538 204061 210531 300631 308061 500238 500661 501063 501234 502163 Primary Facility Sewage Treatment Plant Water Plant Lift Station Police Fire Station FAA - Air Transportation Sewage Treatment Plant Booster Pump Station Police Police Registered Nursing Home 65 West Hendry 502462 Sewage Treatment Plant 66 67 68 69 70 West West West West West Collier Lee Lee Collier Manatee 503564 503862 503968 504061 505264 Dialysis Center Fire Station Fire Station Radio Communications Facility Sewage Treatment Plant 71 West Lee 505463 FAA - Air Transportation 72 73 74 75 76 West West West West West Charlotte Charlotte Sarasota Lee Sarasota 505662 506462 507161 508463 508863 Sewage Treatment Plant Critical Cellular Facilities (Police & Fire) Waste Water Booster Pump Station Fire Station Medical Support Facility (Hospital) Additional Facility Sewage Treatment Plant Waste Water Booster Pump Station Telecom Facilities Sewage Treatment Plant Critical Well Field Municipal Facilities Status Partial** Complete Complete Complete Complete Complete* Complete Complete* Complete Complete* Complete Non-Special Needs Shelter Fire Station Registered Nursing Home Critical Cellular Facilities (Police & Fire) Non-Special Needs Shelter Complete* Complete Complete* Partial** Partial** Partial** Complete* Partial** Partial** Complete Complete st *Completed 1 quarter 2015 **Partially complete as of March 2015, to be completed in 2015 ***Project cancelled - CIF relocated to another location/feeder As of March 2015, FPL has hardened 405 feeder projects through its initiative to apply EWL to CIF. 2014 Critical Poles Highway Crossings Number of Highway Crossings Region County Interstate Status 1 1 North Total Brevard I-95 Complete* As of March 2015, FPL has hardened 119 highway crossings through its initiative to apply EWL to Critical Poles. While additional highway crossings have also been hardened through additional initiatives (e.g., pole inspection, daily work activities, etc.), these are not specifically tracked. “01” Switches Number County Substation Status of "01" Region Switches 4 Dade Miami - Dade Various Complete* 3 East Palm Beach Various Complete* 4 North Various Various Complete 3 West Various Various Complete 3 Broward Various Various Complete 17 Total st *Completed 1 quarter 2015 21 As of March 2015, FPL has hardened 254 “01” switches through its initiative to apply EWL to Critical Poles. While additional “01” switches have also been hardened through additional initiatives (e.g., pole inspection, daily work activities, etc.), these are not specifically tracked. 2014 Community Projects 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Region Broward Broward Broward Broward Broward Broward Dade Dade Dade East East East East East North North North North West West West West County Broward Broward Broward Broward Broward Broward Miami-Dade Miami-Dade Miami-Dade Palm Beach Palm Beach St Lucie Palm Beach Palm Beach Volusia Volusia Brevard Brevard Collier Collier Sarasota Lee Feeder 701933 704568 704768 704932 705465 705864 809664 809766 811063 400538 405935 406161 407864 411732 100835 101137 208863 209862 504361 504363 506263 507265 Throughfare Commercial Boulevard University Drive Flamingo Road / Sheridan Street Powerline Road / Hillsboro Boulevard Coral Springs Drive Wiles Road SW 120th Street / SW 137th Avenue SW 8th Street NW 122nd Street / NW 87th Avenue Congress Avenue / Gateway Boulevard Powerline Road / Palmetto Park Road Port St. Lucie Boulevard Military Trail Blue Heron Boulevard Oak Street Wilmette Avenue / US Highway 1 US Highway 1 Viera Boulevard Vanderbilt Beach Road Orange Blossom Drive Desoto Road Tamiami Trail Complete Complete* Partial** Complete Complete* Partial** Partial** Partial** Partial** Complete* Complete Complete Complete* Partial** On Hold*** Complete Partial** Complete Complete Complete* Partial** Partial** Partial** Completion Date 2/28/2015 3/30/2015 12/22/2014 2/28/2015 11/28/2015 8/30/2015 11/30/2015 6/30/2015 2/28/2015 11/13/2014 12/26/2014 2/28/2015 12/31/2015 12/11/2014 4/30/2015 8/21/2014 9/11/2014 2/28/2015 4/30/2015 6/30/2015 6/30/2015 *Completed 1st quarter 2015 **Partially complete as of March 2015, to be completed in 2015 *** Pending a decision from Palm Beach Gardens for OH/UG conversion As of March 2015, FPL has hardened 115 feeder projects through its initiative to apply Incremental Hardening to Community Projects. 2. Describe the process used by your Company to identify the location and select the scope of CIF/Community storm hardening projects. CIF were identified by working with the various municipalities throughout FPL’s system and prioritized using a classification hierarchy (e.g. Acute Care, 911, EOC, Police, etc.). FPL’s feeders serving CIF were then classified by importance and sorted by hierarchy and least cost to harden. The 2014 plan primarily focused on waste water pump stations, sewage treatment plants, as well as police and fire stations. Community Project feeders were identified/selected in order to provide a broad geographic footprint across all communities throughout FPL’s service territory. 3. Provide the costs incurred and any quantified expected benefits Total Distribution hardening costs in 2014 were $154.6 million. This excludes the incremental costs related to applying Design Guidelines on new construction, relocation projects and daily work, as these costs are not specifically tracked. Consistent with the information provided by FPL in Docket Nos. 070301-EI, 100266EI and 130132-EI FPL has estimated that, over an analytical study period of 30 years, the net present value of restoration cost savings per mile of hardened feeder 22 would be approximately 45% to 70% of the cost to harden that mile of feeder for future major storm frequencies in the range of once every three to five years. It is possible that FPL could face major storms more frequently than that, as it did in the 2004-2005 hurricane seasons. If that were the case, then the net present value of restoration cost savings likely would exceed the hardening costs. It is also important to recognize that in addition to restoration cost savings, customers benefit substantially, in many direct and indirect ways, from the reduced number and duration of storm and non-storm related outages resulting from the planned hardening activities. 4. Discuss any 2015 projected activities and budget levels Consistent with its FPSC approved 2013-2015 plan, FPL’s 2015 hardening activities include addressing 65 CIF feeder projects, 38 Community Project feeders, one overhead highway crossing and 16 “01” switches. Additionally, FPL plans to complete the installation of submersible equipment to mitigate the impact of significant water intrusion in the six remaining vaults in the Miami downtown electric network that are located just at or within the FEMA 100-year flood elevation levels. FPL expects total 2015 hardening costs associated with these projects to be approximately $175-$190 million. 23 2015 CIF Projects 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 Region Broward Broward Broward Broward Broward Broward Broward Broward Broward Broward Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade Dade East East East East East East East East East East East East East East East East East North North North North North North West West West West West West West West West West West West West County Broward Broward Broward Broward Broward Broward Broward Broward Broward Broward Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Miami-Dade Okeechobee Palm Beach St Lucie Palm Beach Indian River Palm Beach St Lucie Palm Beach Palm Beach Martin Palm Beach Palm Beach Palm Beach Martin Martin Palm Beach Palm Beach Putnam St Johns Volusia Brevard Volusia Volusia Sarasota Lee Manatee Lee Collier Sarasota Manatee Manatee Manatee Collier Sarasota Collier Collier Feeder 704131 703436 703832 709432 703533 703635 701436 700336 703637 706164 811361 810165 801232 801636 807163 809235 800538 807634 810561 808166 811264 801434 808165 802735 807734 809534 802731 807931 805531 401634 402262 406165 409766 411561 407236 406433 404835 410231 408331 405866 408033 400338 408332 407166 402633 411862 103732 102631 101934 201637 108261 100135 507162 507465 505862 505061 506766 503436 502563 500663 500664 503563 505761 507763 503133 Substation MOFFETT RESERVATION HIGHLANDS ANDREWS DEERFIELD BEACH PALM AIRE PORT PINEHURST PALM AIRE HOLLYBROOK ANHINGA SEAGULL OPA LOCKA PRINCETON PENNSUCO MITCHELL RIVERSIDE KILLIAN JASMINE MILAM EUREKA FULFORD MILAM MARION LEMON CITY VIRGINIA KEY MARION MIAMI LAKES MASTER OKEECHOBEE PRATT TURNPIKE CATCHMENT FELLSMERE JOG SAVANNAH GERMANTOWN CONGRESS MONTEREY DELTRAIL CALDWELL NORTHWOOD MONTEREY CRANE JUNO BEACH EVERNIA PACIFIC LEWIS EDGEWATER PALM BAY LPGA DAYTONA BEACH POLO CORKSCREW BUCKEYE JETPORT VANDERBILT SOUTH VENICE PALMA SOLA CORTEZ CORTEZ ALLIGATOR AUBURN RATTLESNAKE SOLANA Type of Project Police Police Fire Station Other Top CIF Other Top CIF Other Top CIF Other Top CIF Other Top CIF Other Top CIF Police Other Top CIF Other Top CIF Police Fire Station Police Fire Station Other Top CIF Other Top CIF Fire Station Police Fire Station Police Fire Station Other Top CIF Other Top CIF Other Top CIF Top CIF Top CIF Top CIF Other Top CIF Other Top CIF Other Top CIF Other Top CIF Other Top CIF Other Top CIF Fire Station Other Top CIF Other Top CIF Other Top CIF Fire Station 911 Facility Other Top CIF Other Top CIF Other Top CIF Other Top CIF Police Other Top CIF Other Top CIF Other Top CIF Other Top CIF Other Top CIF Fire Station Other Top CIF Other Top CIF Other Top CIF Police Other Top CIF Police Other Top CIF Other Top CIF Police Other Top CIF Police Other Top CIF Other Top CIF 24 Project Address 400 S FEDERAL HWY # CITY HALL 3101 N STATE ROAD 7 121 SW 3RD ST # MAIN FIREHOUSE 2451 NW 16TH ST #PRISON 150 NE 2ND AVE 2300 W COMMERCIAL BLVD # ITS BLDG 3545 SW 2ND AVE #MAINTENANCE 1400 SE 18TH ST #GTL WWTP MAIN 1 3401 W PROSPECT RD # WELL 75 9500 PINES BLVD # FIRE STA 69 28700 SW 217TH AVE #MDAD/AWOS 13910 NW 41ST ST # ANNEX OPA LOCKA #BLDG 40 BAY A 13150 SW 238 ST 9700 NW 97TH AVE 9201 SW 152ND ST 1751 NW 42ND CT #BRIDGE 6 8700 SW 95 AVE #SRM 559 16250 SW 72ND ST 9101 NW 25TH ST 13390 SW 152 ST 358 NE 168TH ST 8825 NW 18TH TER 8989 SW 117TH AVE # SR 536 7700 NE 8TH AVE #STORMPUMP 4400 Rickenbacker Causeway 7707 SW 117TH AVE # POLICE 16699 NW 67TH AVE 3190 NW 119TH ST 100 SW 5TH AVE # BUSNSS OFC SR 710 450 SW THORNHILL DR # MANT 7100 BELVEDERE RD 22 S ORANGE ST # CITY HALL 8100 FOREST HILL BLVD 1665 SE WALTON RD # FIRE STA # 12 345 S CONGRESS AVE # PBC RADIO SYSTEM 4243 SOUTHERN BLVD # PBIA 3441 SE WILLOUGHBY BLVD # HEALTH DEPT 14276 HAGEN RANCH RD # CTRL 2500 NW 1ST AVE # 911/MUN 4200 N AUSTRALIAN AVE 1000 SE RUHNKE ST BLDG 2 2505 SW MARTIN HWY # NURSE 3188 PGA BLVD # COURTHOUSE 500 N DIXIE HWY # FS1 22034 SE 67TH PL # WATER TOWER 1110 WOODLAWN RD # WELL 10-2 500 W OCEAN AVE 1111 CLEARMONT ST NE # WWTP 3651 LPGA BLVD # UVWWTP 1 SHADY PL # WASTEWATER PLAN 5500 VERNA RD #WELL FIELD 16000 AIRPORT HAUL RD # CHILLER 2 4610 BUCKEYE RD # STA-420 10041 DANIELS PKWY # DOT BLDG 15000 LIVINGSTON RD #PARKS N REC MAIN 4531 SR 776 #ANNEX 5801 MARINA DR # CITY 5840 26TH ST W #PROF DEV CTR 5460 GULF OF MEXICO DR # POLICE 3347 TAMIAMI TRL E # JUSTICE 1350 RIDGEWOOD AVE # POLICE 7505 GRAND LELY DR # BLDG K 2900 12TH ST N 2015 Community Projects 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 Region Broward Broward Broward Broward Broward Broward Broward Dade Dade Dade Dade Dade East East East East East East East East East East North North North North North North North North North North West West West West West West County Feeder Broward 704668 Broward 701035 Broward 707265 Broward 703536 Broward 700237 Broward 706064 Broward 702932 Miami-Dade 808270 Miami-Dade 810663 Miami-Dade 810363 Miami-Dade 811065 Miami-Dade 812361 Martin 407032 Palm Beach 401036 Palm Beach 404136 St Lucie 405534 Palm Beach 400535 Palm Beach 406535 Palm Beach 402837 Palm Beach 405632 Palm Beach 407932 Palm Beach 408863 Volusia 204065 Brevard 200534 Volusia 100831 Volusia 109031 Volusia 104835 Brevard 205434 St Johns 104932 Brevard 200733 Brevard 202532 Brevard 203231 Lee 502636 Manatee 505362 Sarasota 501062 Sarasota 500538 Lee 501762 Manatee 502939 Substation SPRINGTREE SAMPLE ROAD FLAMINGO DEERFIELD BEACH HOLLYWOOD HIATUS HAWKINS LINDGREN MONTGOMERY NEWTON PALMETTO URBAN RIO GREENACRES GOLF PRIMAVISTA BOYNTON OSBORNE LANTANA FOUNTAIN QUANTUM ABERDEEN DELTONA MELBOURNE PORT ORANGE WRIGHT TAYLOR MERRITT MOULTRIE COCOA BEACH AURORA INDIALANTIC COLONIAL PARK FRUITVILLE CLARK IONA ONECO 25 Type of Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Community Project Project Address NW 88th Avenue NE 15th Terrace Flamingo Road Deerfield Avenue North 21st Street West Sunrise Boulevard SW 15th Street SW 137th Ave SW 120th Street SW 157th Avenue W 22nd Court NW 107th Avenue NE Savannah Road Military Trail SW 23rd Terrace US Highway 1 Old Boynton Road Military Trail 13th Street Jog Road Highridge Road Jog Road Howland Boulevard Silver Palm Avenue Powers Avenue Derbyshire Road Spruce Creek Road Courtenay Parkway Shores Boulevard West Columbia Lane North Wickham Road Watson Drive Yale Court University Parkway Bell Road Beneva Road San Carlos Boulevard 3rd Avenue West 2015 Critical Poles Highway Crossings Number of Highway Crossings 1 Region County Interstate East Palm Beach I-95 “01” Switches Number of "01" Region County Substation Switches 4 Dade Miami - Dade Various 2 East Palm Beach Various 4 North Various Various 3 West Various Various 3 Broward Various Various 16 Total Transmission 1. Description of Hardening Programs Please refer to FPL’s response to Item 1 – Description of Transmission Hardening Programs, in Initiative 4 of the Storm Preparedness Initiatives section of this filing for a description of FPL’s transmission storm hardening initiatives. 2. Method of Selection Please refer to FPL’s response to Item 2 – Method of Selection, in Initiative 4 of the Storm Preparedness Initiatives section of this filing for a description of the method FPL used to determine the selection of each transmission storm hardening initiative. 3. 2014 Accomplishments Please refer to FPL’s response to Item 4 – 2014 Accomplishments, in Initiative 4 of the Storm Preparedness Initiatives section of this filing for a summary of the 2014 accomplishments for each of the transmission hardening programs. FPL’s 2014 accomplishments are also included in the three tables at the end of Initiative 4, Item 4. 4. Proposed 2015 Plans Please refer to FPL’s response to Item 5 – Proposed 2015 Plans, in Initiative 4 of the Storm Preparedness Initiatives section of this filing for a summary of the 2015 projections for each of the transmission hardening programs. FPL’s 2015 proposed plans are also included in the three tables at the end of Initiative 4, Item 4. 26 STORM PREPAREDNESS INITIATIVES 27 Summary – Storm Preparation Initiatives (1) Vegetation Trim Cycles – In 2014, FPL continued its three-year average cycle and mid-cycle programs for feeders and its six-year average trim cycle for laterals. (2) Joint Use Audits – Approximately 20 percent of FPL’s jointly used poles are audited annually through its joint use surveys. Additionally, joint use poles are inspected through FPL’s pole inspection program. Survey and inspection results continue to show that through FPL’s joint use processes and procedures, along with cooperation from joint pole owners and third-party attachers, FPL has properly identified and accounted for the joint use facilities on its system. (3) Six-year Transmission Structure Inspection Cycle – In 2014, FPL performed ground level visual inspections on 100% of its transmission poles/structures. Additionally, FPL performed climbing or bucket truck inspections on approximately 1/6 of its wood transmission poles/structures, 1/6 of its 500kV structures, 1/10 of its other concrete and steel poles/structures and conducted storm and pre-construction mitigation patrols on all concrete and steel poles/structures. (4) Hardening the Transmission System – In 2014, FPL continued executing its plan to replace all wood transmission structures in its system. Additionally, FPL completed the replacement of all ceramic post insulators with polymer insulators within its system and continued with its installation of flood monitoring equipment in substations that are more susceptible to flooding. (5) Distribution Geographic Information System (GIS) – FPL completed its five originally approved key Distribution GIS improvement initiatives in 2011. These initiatives included developing a post-hurricane forensic analysis tool and the addition of poles, streetlights, joint use survey and hardening level data to the GIS. Updates to the GIS continue as data is collected through inspection cycles and other normal daily work activities. (6) Post-Storm Forensic Collection/Analysis – FPL has post-storm forensic data collection and analysis plans, systems and processes in place and available for use. No major storms affected FPL’s service territory in 2014; therefore, no forensic collection or analysis was required. (7) Overhead (OH) and Underground (UG) Storm Performance – FPL has plans, systems and processes in place to capture OH and UG storm performance. No major storms affected FPL’s service territory in 2014; therefore, no data collection or analysis was required. (8) Increased Coordination with Local Governments – In 2014, FPL continued its efforts to improve local government coordination. Activities included: (1) meetings with county emergency operations managers to discuss critical infrastructure 28 locations in each jurisdiction; (2) inviting federal, state, county and municipal emergency management personnel to participate in FPL’s annual company-wide storm preparedness drill and; (3) FPL External Affairs managers conducted 483 community presentations, providing information on storm readiness and other topics of community interest. (9) Collaborative Research on Hurricanes/Storm Surge – Collaborative research efforts led by the PURC have resulted in greater knowledge of appropriate vegetation management practices during storm and non-storm periods, wind during storm and non-storm events, and hurricane and damage modeling to further understand the costs and benefits of undergrounding. (10) Natural Disaster Preparedness/Recovery Plans – FPL’s Storm Emergency Plan identifies emergency conditions and the responsibilities and duties of the FPL emergency response organization for severe weather and fires. The plan covers the emergency organization, roles and responsibilities and FPL’s overall severe storm emergency processes. These processes describe the planning activities, restoration practices, public communications, and coordination with government, training, practice exercises and lessons-learned evaluation systems. The plan is reviewed annually and revised as necessary. 29 STORM PREPAREDNESS INITIATIVE No. 1 30 Initiative 1 – Vegetation Management Trim Cycles 1. A complete description of the Company’s vegetation management program (policies, guidelines, practices) for 2014 and 2015 in terms of both activity and costs. Tree limbs and branches, especially palm fronds, are among the most common causes of power outages and momentaries. The primary objective of FPL’s distribution vegetation management program is to clear vegetation from the vicinity of distribution facilities and equipment in order to provide safe, reliable and costeffective electric service to its customers. The program is comprised of multiple initiatives designed to reduce the average time customers are without electricity as a result of vegetation-related interruptions. This includes preventive maintenance initiatives (planned cycle and mid-cycle maintenance), corrective maintenance (trouble work and service restoration efforts), customer trim requests, and support of system improvement and expansion projects, which focus on long-term reliability by addressing vegetation that will impact new or upgraded overhead distribution facilities. FPL follows the National Electric Safety Code (NESC), the American National Standards Institute (ANSI) A-300, and all other applicable standards while considering tree species, growth rates and the location of trees to our facilities when performing line clearing. Danger trees (leaning, structurally damaged, or dead) outside of right-of-way (ROW) which cannot be effectively trimmed are candidates for customer-approved removal. On May 30, 2007, the Florida Public Service Commission (FPSC) issued Order No. PSC-07-0468-FOF-EI approving the continuation of FPL’s three-year average trim cycle for feeders and the implementation of a six-year average trim cycle for laterals. FPL maintains its distribution feeder lines on a three-year average trim cycle because it offers the optimal balance of reliability performance and vegetation clearing cost. The primary benefit of properly maintaining feeder lines is that a feeder outage can affect, on average, approximately 1,500 customers, as compared to a lateral line that can affect, on average, approximately 35 customers. FPL enhances its approved feeder trimming plan through its mid-cycle trimming program, which encompasses patrolling and trimming feeders between planned maintenance cycles to address tree conditions that may cause an interruption prior to the next planned cycle trim. Mid-cycle work units typically have a trim age of 12 to 18 months and usually involves certain fast-growing trees that need to be addressed before the next scheduled cycle trim date. Customers often contact FPL with requests to trim trees around lines in their neighborhoods and near their homes. As a result of our discussions with these customers and/or a follow-up investigation, FPL either performs the necessary 31 trimming or determines that the requested trimming can be addressed more efficiently by completing it through the normal scheduled cycle trimming. Finally, a very important component of FPL’s vegetation program is providing information to customers to educate them on our trimming program and practices, safety issues, and the importance of placing trees in the proper location, i.e., FPL’s “Right Tree, Right Place” (RTRP) program. RTRP is a public education program based on FPL’s core belief that providing reliable electric service and sustaining our natural environment can go hand-in-hand and is a win-win partnership between the utility and its customers. In 2014, FPL continued to maintain three and six year average trim cycles for feeders and laterals, respectively, and cleared an additional feeder miles through its mid-cycle program. Additionally, FPL continued to pursue the challenges associated with critical palm removals, customer refusals and danger trees outside the right-ofway. Cost Feeder Miles (Millions) Cycle Mid-Cycle $58.9 4,249 7,244 Lateral Miles Total Cycle 11,493 3,685 2. Definitions of terms: danger tree, demand tree, spot trim, mid-cycle trim Danger Tree – A tree beyond normal clearance specification that has high likelihood to fail and impact facilities. Danger tree failure can be associated with factors such as trees that are leaning, structurally damaged, dead or are a certain tree species. Spot trim – Addresses a specific location vs. entire line segment through hot spot trimming. This includes trouble tickets or reliability-related requests. Demand Trim/Customer Trim Request (CTR) – Addresses tree conditions reported by a customer. FPL will inspect and, if trimming is required for safety or reliability, the necessary work is performed. Mid-cycle Program -- 12 to 18 month patrol and trim cycle to address conditions on feeders that will require trimming prior to scheduled planned maintenance. 3. The criteria used to determine whether to remove a tree, replace a tree, spot trim, demand trim, or mid-cycle trim. Tree removal – Trees which cannot be effectively trimmed to meet clearance specifications and ANSI A-300 are evaluated based on species and cost to remove. Palms are a primary removal candidate, especially for feeders. 32 Tree replacement – FPL does not have a tree replacement program. On a targeted and very limited basis, contribution toward replacement is considered. Spot trim –Spot trimming addresses a specific location based on reliability performance. Demand trim – Tree meeting FPL’s existing Customer Trim Request criteria. (See Item 12). Mid-cycle Program – Any feeder not scheduled for maintenance in the current year is eligible for mid-cycle trimming and typically has a trim age of 12 - 18 months. 4. Provide an analysis of the cost and benefits of the Company’s program vs. three-year trim cycle program See Direct Testimony & Exhibits of: Manuel B. Miranda, filed December 20, 2006 (Docket No. 060198-EI). 5. Tree clearing practices in utility easements and authorized rights-of-way FPL’s line clearing practice is to pre-notify customers of scheduled maintenance activities. FPL clears lines (within easements and outside of easements) to its clearance specifications to protect its facilities and maintain reliable service. 6. and 9. Relevant portions of utility tariffs pertaining to utility vegetation management activities within and outside easements and authorized rights-of-way Within easement; Rule 2.8 Access to Premises: The duly authorized agents of the company shall have safe access to the premises of the customer at all reasonable hours for installing, maintaining and inspecting or removing company’s property, reading meters, trimming trees within the company’s easements and right of way, and other purposes incident to performance under or termination of the company’s agreement with the customer, and in such performance shall not be liable for trespass. Rule 5.6 Unobstructed Access To Company’s Facilities: Company shall have perpetual unobstructed access to its overhead and underground facilities, such as poles, underground cables, pad-mounted transformers and meters in order to perform repair and maintenance in a safe, timely and cost-efficient manner. Outside easements; There are no specific utility rights to remove trees outside a right-of-way (ROW). Through FPL’s RTRP efforts, customers are informed and 33 encouraged to take responsibility and carefully consider the mature height of vegetation planted adjacent to power structures. 7. Tree removal practices for trees that abut and/or intrude into easements and authorized rights-of-way Trees identified for removal within an easement or ROW will usually involve customer contact and a signed Tree Work Authorization (TWA) by the customer. If removal is not possible, FPL will clear to the extent possible while complying with applicable line clearing standards and practices. In addition, FPL routinely communicates with local communities about the various issues concerning tree removals on residential property and in public ROW. 8. Tree clearing practices outside of easements and authorized rights-of-way FPL will clear, to the extent possible, any vegetation that encroaches upon its facilities, to provide for adequate clearances while complying with applicable line clearing standards and practices. 10. Tree removal practices for trees outside of easements and authorized rights-of-way Trees outside an easement or ROW that are targeted for removal will typically involve customer contact and a signed Tree Work Authorization. If a removal is not possible, FPL will clear to the extent possible while complying with applicable line clearing standards and practices. 11. Relevant portions of utility tariffs pertaining to customer vegetation management obligations as a term or condition of electric service These General Rules and Regulations are a part of the Company's Tariff covering the terms and conditions under which Electric Service is supplied by the Company to the Customer. They are supplemental to the "Rules and Regulations Governing Electric Service by Electric Utilities" issued by the FPSC. Company tariffs; Rule 5.5 Interference With Company’s Facilities: The customer should not allow trees, vines and shrubs to interfere with the Company’s adjacent overhead conductors, service wires, pad-mounted transformers and meter. Such interference may result in an injury to persons, or may cause the customer’s service to be interrupted. In all cases, the customer should request the Company to trim or remove trees and other growth near the Company’s adjacent overhead wires, and under no circumstances should the customer undertake this work himself, except around service cables when specifically authorized by and arranged with the company. 34 Rule 2.9 Right of Way: The customer shall grant or cause to be granted to the Company and without cost to the Company all rights, easements, permits and privileges which, in the opinion of the Company, are necessary for the rendering of service to the customer. 12. Company practices regarding customer trim requests (also known as “demand trim” requests) Customer Trim Requests (CTR) that are inspected and found to be potentially hazardous are immediately scheduled for clearing. If conditions are inspected and determined not to potentially hazardous, FPL advises the customer that the work will be deferred to scheduled maintenance. 13. 2015 projected activities and budget levels In 2015, FPL’s distribution vegetation management plan includes trimming 11,300 feeder miles (including feeder cycle and mid-cycle miles) and 3,800 lateral cycle miles. The plan also includes restoration activities and customer trim requests. Total estimated costs associated with these activities are approximately $63.1 million. 35 14. Include the requirements of applicable orders: Initiative 1 Three-Year Vegetation Cycle System Vegetation Management Performance Metrics 2014 System Totals Reliability Feeders Laterals 13,419 22,831 South 2,141 2526 186 5,766 East 3,641 3706 262,136 215,012 North 4,768 9697 12,655,988 31,770,133 3,004 6793 (E) Outages per Mile [B ÷ A] 0.01 0.25 West Grand Total 13554.00 22721 (F) Vegetation CI per Mile [C ÷ A] 19.5 9.4 Cycle Feeders (F) Mid-cycle Totals Laterals (L) Cycle Totals F+L (A) Total current system miles (B) Number of Outages (C) Customer Interruptions (D) Customer Minutes of Interruption Cycle Maintenance Trimming (G) Number of years in the cycle 3 6 2013 2013 (I) Total miles at beginning of this cycle 13,554 22,722 (J) Total miles cleared this cycle 8,886 14,344 23,230 7,809 31,039 Miles cleared 2014 4,249 7,244 11,493 3,685 15,178 Miles cleared 2013 4,637 7,100 11,737 4,124 15,861 (H) 1st year of this cycle Miles cleared 2018 Miles cleared 2017 Miles cleared 2016 Miles cleared 2015 (K) Percentage of this cycle completed 65.6% (L) Planned Maintenance Goal (next year) 2015 4,200 (M) Number of Hotspot Trims N/A Cost 34.4% 7,100 11,300 3,800 15,100 N/A 11,855 Totals (N) All Vegetation Management Costs $58.9M (P) Vegetation Budget (current year) 2014 $62.3M (Q) Vegetation Budget (next year) 2015 $63.1M 36 1) REGIONS - Management Area (MA) Vegetation Management Performance Metrics 2014 DADE Reliability Feeders Laterals 2,099 2,519 66 1,027 83,671 43,967 4,182,153 8,503,359 (E) Outages per Mile [B ÷ A] 0.03 0.41 (F) Vegetation CI per Mile [C ÷ A] 39.9 17.5 (A) Total current system miles (B) Number of Outages (C) Customer Interruptions (D) Customer Minutes of Interruption Cycle (G) Number of years in the cycle Laterals (L) Feeders (F) Cycle Maintenance Trimming Mid-cycle Totals Cycle Totals F+L 3 6 (H) 1st year of this cycle 2013 2013 (I) Total miles at beginning of this cycle 2,141 2,526 (J) Total miles cleared this cycle 1,373 1,092 2,465 911 3,376 Miles cleared 2014 670.35 624.00 1,294.35 439.00 1,733 Miles cleared 2013 703 468 1,171 472 1,643 Miles cleared 2018 Miles cleared 2017 Miles cleared 2016 Miles cleared 2015 (K) Percentage of this cycle completed 64.1% (L) Planned Maintenance Goal (next year) 2015 689 (M) Number of Hotspot Trims N/A Cost 36.1% 515 1,204 479 1,683 N/A 4,505 Totals (N) All Vegetation Management Costs $8.8M (P) Vegetation Budget (current year) 2014 $8.5M (Q) Vegetation Budget (next year) 2015 $8.7M 37 2) REGIONS - Management Area (MA) Vegetation Management Performance Metrics 2014 EAST Reliability (A) Total current system miles (B) Number of Outages Feeders Laterals 3,608 3,717 47 1,130 76,813 44,697 3,744,436 6,415,372 (E) Outages per Mile [B ÷ A] 0.01 0.30 (F) Vegetation CI per Mile [C ÷ A] 21.3 12.0 (C) Customer Interruptions (D) Customer Minutes of Interruption Cycle (G) Number of years in the cycle Laterals (L) Feeders (F) Cycle Maintenance Trimming Mid-cycle Totals Cycle Totals F+L 3 6 (H) 1st year of this cycle 2013 2013 (I) Total miles at beginning of this cycle 3,641 3,706 (J) Total miles cleared this cycle 2,359 3,244 5,603 1,219 6,822 Miles cleared 2014 1,096.00 1,498.00 2,594.00 606.00 3,200 Miles cleared 2013 1,263 1,746 3,009 613 3,622 Miles cleared 2018 Miles cleared 2017 Miles cleared 2016 Miles cleared 2015 (K) Percentage of this cycle completed 64.8% (L) Planned Maintenance Goal (next year) 2015 1,163 (M) Number of Hotspot Trims N/A Cost 32.9% 1,683 2,846 597 3,443 N/A 2,491 Totals (N) All Vegetation Management Costs $13.8M (P) Vegetation Budget (current year) 2014 $14.3M (Q) Vegetation Budget (next year) 2015 $14.9M 38 3) REGIONS - Management Area (MA) Vegetation Management Performance Metrics 2014 NORTH Reliability (A) Total current system miles (B) Number of Outages (C) Customer Interruptions Feeders Laterals 4,729 9,767 53 2,062 65,590 64,165 3,283,785 8,922,436 (E) Outages per Mile [B ÷ A] 0.01 0.21 (F) Vegetation CI per Mile [C ÷ A] 13.9 6.6 (D) Customer Minutes of Interruption Cycle (G) Number of years in the cycle Laterals (L) Feeders (F) Cycle Maintenance Trimming Mid-cycle Totals Cycle Totals F+L 3 6 (H) 1st year of this cycle 2013 2013 (I) Total miles at beginning of this cycle 4,768 9,697 (J) Total miles cleared this cycle 3,201 6,144 9,345 3,405 12,750 Miles cleared 2014 1,527 3,144 4,671 1,593 6,264 Miles cleared 2013 1,674 3,000 4,674 1,812 6,486 Miles cleared 2018 Miles cleared 2017 Miles cleared 2016 Miles cleared 2015 (K) Percentage of this cycle completed 67.1% (L) Planned Maintenance Goal (next year) 2015 1,447 (M) Number of Hotspot Trims N/A Cost 35.1% 3,018 4,465 1,523 5,988 N/A 3,273 Totals (N) All Vegetation Management Costs $21.9M (P) Vegetation Budget (current year) 2014 $23.4M (Q) Vegetation Budget (next year) 2015 $23.2M 39 4) REGIONS - Management Area (MA) Vegetation Management Performance Metrics 2014 WEST Reliability (A) Total current system miles (B) Number of Outages (C) Customer Interruptions (D) Customer Minutes of Interruption Feeders 2,983 Laterals 6,828 20 1,547 36,062 62,183 1,445,614 7,928,966 (E) Outages per Mile [B ÷ A] 0.01 0.23 (F) Vegetation CI per Mile [C ÷ A] 12.1 9.1 Cycle (G) Number of years in the cycle Laterals (L) Feeders (F) Cycle Maintenance Trimming Mid-cycle Totals Cycle Totals F+L 3 6 (H) 1st year of this cycle 2013 2013 (I) Total miles at beginning of this cycle 3,004 6,793 (J) Total miles cleared this cycle 1,953 3,865 5,817 2,273 5,817 956.00 1,978.00 2,934.00 1,047.00 3,981 997 1,887 2,883 1,226 4,109 Miles cleared 2018 Miles cleared 2017 Miles cleared 2016 Miles cleared 2015 Miles cleared 2014 Miles cleared 2013 (K) Percentage of this cycle completed 65.0% (L) Planned Maintenance Goal (next year) 2015 902 (M) Number of Hotspot Trims N/A Cost 33.5% 1,884 2,785 1,201 3,986 N/A 1,586 Totals (N) All Vegetation Management Costs $11.7M (P) Vegetation Budget (current year) 2014 $12.7M (Q) Vegetation Budget (next year) 2015 $11.9M 15. Support for continuation of the Company Program, rather than a ThreeYear Cycle program, should be included in this section of the report. Include all tables and additional analysis supporting continuation of the Company Program in this section of the report No new information is available (e.g., no major storms have impacted FPL’s service territory) that would change the initial analysis/results provided by FPL in Docket No. 060198-EI. 40 16. Local Community Participation FPL routinely communicates with local communities about the various issues surrounding line clearing. The issues that are most often discussed are the method of trimming, clearances, notification and debris. FPL’s practice is to pre-notify customers of scheduled maintenance activities whose neighborhoods will be affected by line clearing activities. These communications include an overview of the scheduled maintenance activities, a safety message and customer contact number for more information. FPL’s RTRP program is also an example of its outreach to communities. The program provides information to customers to educate them on our trimming program and practices, safety issues and the importance of placing trees in the proper location. a) ROW tree clearing FPL’s line clearing practice is to pre-notify customers of scheduled maintenance activities. FPL clears lines (within easements and outside of easements) to our clearance specifications to protect our facilities. b) Easement tree clearing See response to 16 a., ROW tree clearing. c) Hard-to-access facilities See response to 16 a., ROW tree clearing. d) Danger trees not within ROW or within easements where the utility has unobstructed authority to remove the danger tree Danger trees outside an easement or ROW that are targeted for removal will typically involve customer contact and a Tree Work Authorization (TWA) form, signed by the customer, authorizing the removal. If a removal is not possible, FPL will clear the vegetation to the extent possible while complying with applicable line clearing standards and practices. e) Trim-back distances FPL will clear, to the extent possible, any vegetation that may encroach or is in conflict with our facilities to provide for adequate clearances while complying with applicable line clearing standards (NESC) and practices (ANSI). 17. Danger Trees Danger tree failure can be associated with factors, such as trees that are leaning, structurally damaged and/or dead, as well as certain tree species. While FPL removed approximately 23,000 trees in 2014, some of which were most likely danger trees, FPL does not specifically track the identification/removal of danger trees. . 41 STORM PREPAREDNESS INITIATIVE No. 2 42 Initiative 2 – Joint Use Pole Attachment Audits FPL Overview FPL administers annual audits of joint use facilities (poles owned and attached to by FPL or telephone companies) and attachments to its facilities (CATV and telecommunication attachments). Approximately 20% of the FPL service territory is audited annually through its joint use surveys in order to determine the number and ownership of jointly-used poles and associated attachments. Additionally, joint use poles are inspected as part of FPL’s pole inspection program. This is described more fully in FPL’s pole inspection reporting requirements response. Describe the extent of the audit and results pertaining to pole reliability and NESC safety matters. The intent is to assure the Commission that utilities know the status of their facilities and that reasonable efforts are taken to address pole reliability and NESC safety matters. In addition to FPL’s pole inspection program, NESC safety audits are conducted by the FPSC. Apparent NESC variances are identified and recorded by FPSC auditors. FPL investigates the apparent NESC variances and makes corrections where necessary. Additionally, as part of FPL’s daily work activities (e.g., construction, maintenance, reliability initiatives, etc.), NESC safety issues may be identified and corrected. While the FPSC variances are tracked, FPL does not specifically track corrective activities completed as part of its daily activities. a) Percent of system audited. Feeders: Approximately 20% annually. Laterals: Approximately 20% annually. FPL does not specifically maintain/track its joint use audits at this level of detail. See FPL’s overview above. b) Date audit conducted? Ongoing – See FPL’s overview above. c) Date of previous audit? Ongoing – See FPL’s overview above. d) List of audits conducted annually. Joint use poles, attachments, strength/loading tests – see FPL’s overview above and FPL’s pole inspection reporting requirement response. Suggested Alternatives: None. 43 Joint Use Attachment Audits JOINT USE AUDITS (A) Number of company owned distribution poles. (FPL 1,163,099 owned poles at 12/31/14) (B) Number of company distribution poles leased. (Non236,207 FPL owned poles) (C) Number of owned distribution pole attachments. (FPL owned poles w/attachments) (D) Number of leased distribution pole attachments. (NonFPL owned poles w/attachments) (1) (E) Number of authorized attachments. (F) Number of unauthorized attachments. POLE INSPECTIONS – JOINT USE POLES (G) Number of distribution poles strength tested. (H) Number of distribution poles passing strength test. (2) (I) Number of distribution poles failing strength test (overloaded). (2) (J) Number of distribution poles failing strength-test (other reasons). (2) (K) Number of distribution poles corrected (strength failure). (L) Number of distribution poles corrected (other reasons). (M) Number of distribution poles replaced. FPSC SAFETY AUDITS (N) Number of apparent NESC violations involving electric infrastructure. (O) Number of apparent NESC violations involving thirdparty facilities. Suggested Alternatives: 834,660 236,207 1,284,863 0 63,900 Grade C – 55,630 Grade B – 51,854 Grade C - 45 (0.08%) Grade B – 3,821 (7.37%) Grade C – 8,225 Grade B – 8,225 N/A – see Note 3 N/A – see Note 3 N/A – see Note 3 366 138 None Notes: (1) Non-FPL owned poles with FPL and another attaching entity (e.g., CATV) = 173,882 (2) NESC required standard = Grade C; FPL Higher Standard =Grade B (3) K, L, M not tracked at the joint use level State whether pole rents are jurisdictional or non-jurisdictional. If pole rents are jurisdictional, then provide an estimate of lost revenue and describe the company’s efforts to minimize the lost revenue. “Pole rent” revenues are jurisdictional. There are no lost revenues since back-billings for joint use pole ownership true-ups, as well as unauthorized attachments are made retroactively back to the date of the previous audit/true-up. 44 STORM PREPAREDNESS INITIATIVE No. 3 45 Initiative 3 – Six-Year Transmission Structure Inspection Cycle 1. Description of Inspection Program Please refer to FPL’s response to Item 7 – Description of Pole Inspection Program, in the Transmission section of the Pole Inspection Report for a description of FPL’s transmission inspection program. Included in FPL’s response are inspection procedures for wood, concrete and steel transmission structures. 2. 2014 Accomplishments Transmission Line Inspections Please refer to FPL’s response to Item 8 – 2014 Accomplishments, in the Transmission pole inspection section of this report and the tables at the end of this section. Substation Inspections In 2014, FPL completed distribution and transmission inspections in accordance with its procedures. For 2014, FPL’s substation inspection costs were approximately $0.6 million. See also the tables at the end of this section. 3. Proposed 2015 Plans Transmission Line Inspections Please refer to FPL response to Item 9 – Proposed 2015 Plan, in the Transmission pole inspection section of this report and the tables at the end of this section. Substation Inspections In 2015, FPL plans include $0.7 million for the scheduled inspections of its transmission and distribution substations. See also the tables at the end of this section. 46 6-year Transmission Inspections – Results/Plans Transmission Circuit, Substation & Other Equipment Inspections 2014 2014 2015 Plan Actual Budget $ Actual $ Plan Budget $ - 1,257 n/a n/a n/a n/a 840 840 898 $1.9M 71.0% 71.7% - 100% 71.4 % - - 615 - - 615 - 615 615 $0.5M $0.6M 615 $0.7M 100% 100% - 100% 100% - (G) Transmission equip. (3) inspections (other equip) *** *** *** *** *** *** (H) Percent trans. equip (3) inspection comp (other equip) *** *** *** *** *** *** (A) Total transmission circuits (B) Transmission circuit inspections (C) Percent transmission circuits inspected (D) Total transmission (2) substations (E) Transmission substations (2) inspected (F) Percent transmission (2) substations inspected (1) $2.2M (1) $1.8M (1) (1) FPL does not budget or track expenditures based on structure materials. As such, the dollar amounts shown in the table above represent all transmission structure inspections regardless of materials. (2) Values shown for D, E and F include both transmission and distribution substations. FPL does not budget or track these items separately. (3) Items G and H are included within FPL transmission line and/or substation inspections. 47 Non-Wood Transmission Structure Inspections 2014 2014 2015 Plan Actual Budget $ Actual $ Plan Budget $ (A) Total non-wood transmission tower structures n/a 51,232 n/a n/a 53,005 n/a (B)Transmission tower structure inspections 51,232 51,232 $2.2M* $1.8* 53,005 $1.9M* (C) Percent of transmission tower structures inspected** 100% 100% - 100% 100% - * FPL does not budget or track expenditures based on structure materials. The dollar amounts shown in the table above represent all transmission structure inspections regardless of materials. ** 100% visually inspected; bucket truck/climbing inspections conducted on cycles. . Wood Transmission Structure Inspections (1) 2014 2014 2015 Plan Actual Budget $ Actual $ Plan Budget $ (A) Total number of wood transmission poles. - 13,620 - - 11,550 - (B) Number of transmission poles strength tested. 2,402 2,427 - 2,001 - - - - - 0 - - - - - 426 - - - - 0 0 $0.0M n/a 0 n/a (C) Number of transmission poles passing strength test. (D) Number of transmission poles failing strength test (overloaded). (E) Number of transmission poles failing strength test (other reasons). (F) Number of transmission poles corrected (strength failure) (G) Number of transmission poles corrected (other reasons) (H) Total transmission poles replaced. (2) $2.2M (3) $26.1M (3) $26.1M 589 2,070 589 2,070 (2) $1.8M (4) $28.9M (4) $28.9M 2,273 (2) $1.9M (4) 426 $24.7M (4) (4) 426 $24.7M (4) (1) In addition to the 2014 results for its six-year cyclical inspection, FPL performed annual ground level visual inspections on 100% of its wood poles/structures. (2) FPL does not budget or track expenditures based on structure materials. As such, these dollar amounts represent all transmission structure inspections regardless of materials. (3) The replacement quantities provided in (H) represent the total number of transmission structures replaced through all initiatives/activities including condition assessments, relocations, proactive rebuilds, and system expansion. (4) Dollar amounts are only for FPL’s condition assessment follow-up program. 48 STORM PREPAREDNESS INITIATIVE No. 4 49 Initiative 4 – Hardening of Existing Transmission Structures 1. Description of Transmission Hardening Programs Wood Structure Replacement Program In 2006, FPL began its Transmission hardening initiative by targeting replacement of single pole un-guyed wood structures. In 2008, FPL enhanced its hardening initiative to include replacement of all wood transmission structures over the next 25 to 30 years. FPL’s approved 2013-2015 hardening plan accelerates the replacement of wood transmission pole/structures to within the next 10 to 15 years. Replacements are performed as part of maintenance, hardening, relocations and system expansion programs. Ceramic Post (CPOC) Transmission Line Insulators In 2006, FPL implemented a comprehensive plan for replacing existing ceramic post insulators with polymer post insulators on concrete poles. In 2014, FPL completed this initiative and now has replaced all ceramic post insulators on concrete poles within its system. Storm Surge/Flood FPL’s approved 2013-2015 hardening plan includes several storm surge/flood initiatives that better protect certain transmission facilities and expedite restoration of service to customers. This includes water intrusion mitigation, the installation of real-time water level monitoring systems and communication equipment in certain substations and the purchase of additional mobile fleet equipment. 2. Method of Selection FPL's method for selecting its wood pole and ceramic post insulator hardening initiatives for its transmission system was based on performance during the 2004-05 storm seasons. The 2008 enhancement of replacing all wood transmission poles was based on an evaluation of the overall adequacy of the original program to prepare the transmission infrastructure for future storms. The recently approved 2013-2015 storm surge/flood initiatives are in response to lessons learned in 2012 from Hurricane Sandy in the northeastern part of the United States. 3. Prioritizing Programs with the Community Being a network transmission system, FPL’s first priority must be the overall system reliability and stability for the State of Florida. Prioritization factors also include proximity to high wind areas, system importance, customer counts, and coordination with other business unit storm initiatives. Other economic efficiencies, such as opportunities to perform work on multiple transmission line sections within the same corridor, are also considered. The transmission plan also incorporates the distribution hardening plans for communities into its prioritization. 50 For the new 2013-2015 storm surge/flood initiatives, FPL initially selected the 25 substations in its system located below the FEMA 100-year flood elevations as well as other substations that are more susceptible to flooding. 4. 2014 Accomplishments Wood Structure Replacement Program In 2014, FPL replaced 2,070 wood transmission structures. These structures were replaced with FPL’s current design standards of round spun concrete poles. See Table 1 below. Ceramic Post Transmission Line Insulators In 2014, FPL completed its initiative to replace all ceramic post insulators with polymer post insulators on concrete poles within its system. See Table 2 below. Storm Surge/Flood In 2014, FPL installed water-level monitoring systems and communication equipment in 120 of its substations that are more susceptible to flooding. See Table 3 below. 5. Proposed 2015 Plans Replacement of All Wood Transmission Structures In 2015, FPL plans on replacing 1,410 wood transmission structures. These wood structures will be replaced during maintenance, relocations, system expansion, and hardening programs. See Table 1 below. Transmission Hardening Initiatives – Results/Plans Table 1 - Replace All Wood Transmission Structures 2014 (A) Transmission structures hardened (B) Percent planned transmission structures hardening completed 2014 2015 Plan Actual Budget $ Actual $ Plan Budget $ 1,057 2,070(2) $40.6M(1) $41.4M(1) 1,410(2) $44.8M(3) - 196% - 104% - - Table 2 - Ceramic Post Transmission Line Insulators 2014 (A) Transmission structures hardening (C) Percent transmission structures hardening completed 2014 2015 Plan Actual Budget $ Actual $ Plan 590 590 $2.9M $2.9M 0 $0 - 100% - 100% - - 51 Budget $ Table 3 - Storm Surge/Flood 2014 2014 2015 Plan Actual Budget $ Actual $ Plan Budget $ (A) No. of substation flood monitoring equipment installations 120 120 $1.2M $1.0M 0 $0 (A) % flood monitoring installations completed to plan - 100% - 100% - - (1) FPL does not budget or track maintenance expenditures based on structure materials. As such, the dollar amounts shown in the table above represent or include all transmission maintenance, regardless of materials. (2) These wood structures are replaced during hardening, maintenance, relocations and system expansion programs. (3) FPL has established separate budget items for each transmission hardening program and will be able to track hardening program expenditures separately by the specific budget items. However, it will not be able to separately track costs for these same types of improvements accomplished through other normal business activities such as maintenance, relocations, proactive rebuilds, and system expansion. 52 STORM PREPAREDNESS INITIATIVE No. 5 53 Initiative 5 – Distribution Geographic Information System (GIS) Efforts Undertaken at FPL to Meet the Commission Initiative - FPL has completed the following originally approved key initiatives which support the Commission’s objective: 1. Distribution GIS Improvements – Post-Hurricane Forensic Analysis FPL developed a mobile electronic inspection tool that randomly creates routes within the hurricane-force wind area. Field employees travel the routes collecting observed damage and documenting the cause of the damage. This field data is uploaded to a database for further analysis by our staff engineers. This tool replaced the sampling methodology used in 2005. 2. Distribution GIS Improvements – Poles FPL has added inspection records and pole attributes in coordination with its Pole Inspection Program (PIP). Updates to the GIS pole data are on-going with inputs from PIP, hardening and daily work activities. 3. Distribution GIS Improvements – Joint Use Data By year-end 2008, all Joint Use data was added to the GIS. Updates are ongoing as audits are completed and data is received from FPL’s Joint Use vendor. 4. Distribution GIS Improvements – Level of Hardening Level-of-hardening attributes have been added to the GIS system including the load calculation and hardening level. The system continues to be updated as hardening projects and activities are completed 5. Distribution GIS Improvements – Streetlights FPL completed the initial loading of all streetlight data into the FPL Distribution GIS in 2011. As on-going audits and changes in the streetlight inventory from daily work activities are loaded into FPL’s GIS, an interface to its Customer Information System ensures continued accuracy. 54 STORM PREPAREDNESS INITIATIVE No. 6 55 Initiative 6 – Post Storm Forensic Data Collection/Analysis 1. Has Forensics Team been established? Yes. 2. Have forensic measurements been established? If yes, please describe/provide. Forensic measurements have been established and are entered into portable field computers at forensic locations. At each forensic location: - Pictures are taken to show the specific damage and the surrounding area. - GPS Coordinate information is recorded - A data collection form is completed, detailing information such as: o Pole specific information o Wire specific information o Framing and loading information o Tree conditions o Foreign attachments o Surrounding area characteristics o Debris conditions o Soil conditions o Wind speed rating 3. Has a forensics database format been established? Yes. The information captured from the portable field computers via FPL’s mobile mapping and field automation software is uploaded into a Microsoft SQL server database. 4. Describe/provide GIS and forensic data tracking integration Storm track information is imported via a shape file to FPL’s mobile mapping and field automation software for identification of storm affected equipment. From the storm affected distribution pole population, the software then selects the desired random sample size for forensic team routing. FPL’s mobile mapping and field automation software visually identifies the facilities to be patrolled and provides the tools needed to perform forensic work, such as audit trail of route traveled and data collection forms. 56 5. Describe/provide forensics and restoration process integration (Established and documented processes to capture forensic data during a restoration process) General Forensic Process – Overhead Distribution - Obtain information on the storm path and responding wind bands. - Assigned teams cover specific areas in the path of the storm. - Provide random sample and pre-determined route/track to each forensic team. - Utilize the “Tracking” or audit trail function in FPL’s mobile mapping and field automation software to document areas patrolled. - Perform a forensic investigation at each damage location encountered that meets patrol criteria. Damage locations are to include poles, wires or any other equipment that is damaged or that has caused a customer outage. - Utilize portable field computers to complete a data collection form for each observation. Hardened Forensic Process – Overhead Hardened Distribution Feeders - Obtain information on the storm path and responding wind bands. - Assigned teams will cover a statistically significant sample of hardened overhead distribution feeders that experience an interruption within the storm impacted area. - Utilize the “Tracking” or audit trail function in FPL’s mobile mapping and field automation software to document areas patrolled. - Perform a forensic investigation at each damage location encountered that meets patrol criteria. Damage locations are to include poles, wires or any other equipment that is damaged or that has caused a customer outage. - Utilize portable field computers to complete a data collection form for each observation. 6. Describe/provide any forensic data sampling methodology The random sample that is performed by FPL’s mobile mapping and field automation software is a proprietary vendor process that is designed to select poles from the total GIS pole set (all distribution poles in the wind band area) without any consideration of pole attributes or specific pole location data. These random points are the basis for defining forensic team routes for the General Forensic Process. Observations will be made at all damage locations along the routes, including poles, wires, and distribution equipment. The Hardened Forensic Process will also rely on the FPL mobile mapping system, utilizing it to cover a statistically significant sample of hardened overhead distribution feeders. Observations will be made at all damage locations within the selected feeders including poles, wires, and other distribution equipment. 57 7. Describe/provide forensic reporting format used to report forensic results to the Company and Commission Forensic results will be categorized by equipment type and will show failure modes. For pole failures, FPL will provide information on NESC standard strength requirements and whether a criterion was met. 8. Forensic activities and costs incurred in 2014 No major storms affected FPL’s service territory in 2014; therefore, no forensic collection or analysis was required. 9. 2015 projected activities and costs In 2015, the forensic team will participate in FPL’s annual storm dry run event. Costs associated with the storm dry run are not specifically budgeted for or tracked. Forensic costs will be dependent on storm events and the subsequent deployment of the forensic teams. 58 STORM PREPAREDNESS INITIATIVE No. 7 59 Initiative 7 – Overhead and Underground Storm Performance Data Items a–j (all tables) – Though both system and district level data for these metrics are for the most part available during storms on a non-differentiated basis, they are not available for overhead and underground separately. The primary reason is that FPL’s feeders are mostly overhead/underground hybrids. Therefore, FPL is not able to classify a large portion of the data required to calculate these metrics as either overhead or underground. Furthermore, performing the calculations on a subset of data that could be differentiated could yield misleading results. Though not of direct concern for these tables, item b cannot be provided even on a non-differentiated basis because cause codes are not available during storms. Item k (all tables) – Prospectively, equipment performance by type may be available from forensics depending on the specific characteristics associated with any given storm. Data gathering is highly dependent on the storm having sufficient intensity to result in a restoration lasting a number of days. Otherwise, there will be insufficient time for the forensics teams to collect adequate data. Additionally, depending on the nature of the storm, certain types of equipment may not be impacted. For example, there may be little flooding or storm surge. Or, a given storm’s location may disproportionately impact areas with predominantly wood poles or front lot construction. In any case, results will only be statistically significant on system-level basis and, therefore, cannot be provided at a district level. FPL Alternative Plan – FPL can fulfill the spirit of the requested set of metrics with alternatives that demonstrate the performance differences between the overhead and underground facilities during storms. As previously stated, because FPL’s feeders are almost universally overhead/underground hybrids, differentiated performance would be difficult to determine. However, laterals are typically comprised of only a single type of construction so they will be used as a proxy for differentiated system performance. The relative performance results will be derived from two sources. First, forensic field data collection will be conducted during restoration using statistically valid random samples drawn daily for both overhead and underground tickets. Second, post-restoration analysis of available ticket comments will be performed, particularly for underground damage since problems with buried equipment may not be field-observable. FPL Alternative Plan Metrics: o Relative proportion of infrastructure damaged:  Percent of overhead circuits with damage relative to the total overhead circuits in the storm-impacted areas.  Percent of underground circuits with damage relative to the total underground circuits in the storm-impacted areas. 60 o Count of facility damage observed by type (item k on a system level basis). This will include an evaluation of statistical validity based on samples achieved (due to storm characteristics discussed previously).  Overhead – total quantities stratified by pole type, location on lot, etc. (as available)  Underground – total quantities stratified by cable construction method, etc. (as available) o Primary root cause of damage by type. In those instances that can be determined through field observation or post-restoration ticket comments review. o Estimated repair time. This will be interpolated by multiplying the observed damage counts by equipment type by the typical estimated construction man-hours required to repair. Overhead (OH) Storm Data No major storms affected FPL’s service territory in 2014; therefore, no data collection or analysis was required. 61 STORM PREPAREDNESS INITIATIVE No. 8 62 Initiative 8 - Increased Coordination with Local Governments FPL Overview FPL’s External Affairs organization (EA) consists of manager-level employees who are dedicated to meeting the information and communication needs of local governments and communities every day. These individuals interface with members of local governments and community leaders to identify and resolve issues of common concern to the company and the communities it serves. EA is engaged with local governments on critical infrastructure, line clearing, storm readiness, joint use of public rights-of-way, fuel/rate adjustments, undergrounding and other day-to-day issues. FPL’s Account Managers assigned to governmental accounts provide customer service to government accounts and are available to assist with many of the issues that affect local governments, including storm readiness, restoration and recovery. They are also especially helpful to local governments on account issues such as billing, fuel costs, construction and service reliability. FPL conducts meetings with county emergency operations managers to discuss critical infrastructure locations in each jurisdiction. Agreed-upon locations are factored into FPL’s storm restoration and capacity shortage plans. FPL invites local, state and federal emergency response personnel to participate in its annual storm dry-run. This exercise provides FPL the opportunity to share its plans to improve service reliability and storm communications, and solicit input on how FPL and government agencies can better collaborate in emergency situations. FPL maintains an External Response Team that consists of trained representatives who assist EA in meeting the needs of local governments in times of emergency. This team of more than 70 employees staffs county Emergency Operations Centers (EOCs) and interfaces with local officials throughout the FPL service territory. By staffing EOCs, FPL is physically present to provide company updates to county and city officials, as well as obtain information from the EOC to help FPL’s restoration efforts. Describe extra tree trimming and underground conversion projects implemented. Describe any special considerations or options local governments attempted to secure and the utility’s response. FPL meets with all counties and municipalities requesting information on line clearing and underground conversions. This includes working with local governments to establish language in applicable ordinances that encourage citizens to plant the right tree in the right place to avoid interference with overhead facilities and requested meetings and workshops with cities interested in overhead to underground conversions. Discussions have also included special considerations such as using public rights-of-way and the use of underground switch cabinets. 63 Additionally, FPL meets with local governments to explain its efforts to enhance service reliability and provide information on hardening projects within their jurisdiction. FPL meets with local governments that express interest in converting overhead facilities to underground service. Discussions include FPL’s Governmental Adjustment Factor (GAF) tariff, which provides an incentive for applicable overhead to underground conversion projects. In 2014, two municipalities signed the GAF tariff agreement and moved forward with their projects. There were also 20 municipal requests for non-binding/order of magnitude estimates during 2014. Additionally, FPL completed one GAF-qualified project in 2014. Does FPL conduct storm response tests or a dry run in order to test and evaluate its storm preparation and response plans? Yes. In addition to its annual corporate-wide storm dry-run and individual business unit-driven dry-run exercises, FPL takes every opportunity to test its storm preparation and restoration plans to be ready for a potential event. Additionally, depending on the forecasted track of an actual the storm, this may include the activation of FPL’s storm command center and the mobilization and positioning of employees and equipment for rapid restoration. These activities provide opportunities to evaluate plans, systems and communications in order to be even better prepared for the next event. FPL representatives also take part in city/county sponsored drills and exercises upon request and invite key government stakeholders and emergency managers to our annual corporate-wide storm dry run event. What quantifiable indices (metrics), if any are the companies using to assess the effectiveness with which they began implementing initiative #8? ONGOING PROGRAMS a) Number of city/county liaisons initiated. EA and Government Account (GA) Managers routinely interface with city and county government officials to discuss storm-readiness and other issues of concern. The quantity of these interfaces and the unique situational dynamics of each issue make it administratively burdensome (non-productive) to capture on an ongoing basis. FPL does keep track of the number of EOCs that are contacted, as well as the number that are staffed with company representatives. b) Number of periodic communications initiated with cities/counties. EA provides quarterly e-mail communications to city and county governments. FPL also established an online Government Portal website that allows government officials to obtain the latest media releases and information on customer outages, estimated restoration times, FPL crew resources, outage maps and other information. GA account managers also communicate with cities and counties 64 through monthly newsletters that address topics from energy conservation to storm preparation. c) Number of restoration training and assistance programs conducted. EA and other FPL representatives meet with local governments to discuss critical infrastructure locations and provide training on subjects such as how to address/report on downed power lines. d) Number of city/county problem resolution plans. EA and GA Managers interface with city and county governments routinely to discuss storm readiness and other issues of concern. The quantity of these interfaces and the unique situational dynamics of each storm make it administratively burdensome (nonproductive) to capture on an ongoing basis. STORM PREPARATION a) Number of communication links and contingency plans established. FPL is prepared to support all 27 county and seven satellite EOCs, should these locations be impacted by an emergency situation. FPL is able to report on the number of direct links with EOCs activated during emergency conditions. FPL representatives are also available to meet one-on-one with emergency managers, city and county government officials as needed. b) Number of operational contingency plans developed for emergency services. FPL meets with personnel from all county EOC locations to obtain input on critical infrastructure locations within their jurisdiction. This critical infrastructure information is then factored into FPL’s restoration and capacity shortfall plans. In addition, assigned FPL EOC representatives work with the counties to assist with emergency priorities and External Affairs Managers have open communications with counties and cities to address necessary contingencies. Tracking the number of contingency plans is administratively burdensome (non-productive) and does not provide meaningful information. c) Number of public communications plans developed prior to, during and after the storm. FPL develops communication plans for the media and all news/media releases are shared with local governments. Number of communication plans is not meaningful, but counting the number of releases to local governments can be accomplished. d) Number of city/county mitigation guidelines prepared and distributed. See response to b, above. 65 STORM RESTORATION a) Number of emergency communication links maintained. FPL is prepared to support all 27 county and seven satellite EOCs if impacted by an emergency situation. Also, an online Government Portal Web-site allows government officials to obtain the latest media releases and information, including customer outages, estimated restoration times, and FPL crew resource information. b) Number of priority emergency services restored. FPL can report on critical infrastructure locations restored on a daily basis and provides this information its Government Portal website. c) For each tropical storm, hurricane and other emergency event impacting the utilities service area, what community coordination actions does the utility pursue not otherwise in a) and b), above. In addition to outgoing communications and information provided by FPL EOC representatives, FPL External Affairs Managers are made available to interface with public officials to address their concerns. ONGOING INITIATIVES Communications Programs FPL’s External Affairs (EA) managers make presentations to educate communities FPL serves on topics of interest including service reliability, energy conservation, storm readiness and power generation. These presentations help address the informational needs of local community-based organizations. EA managers provided 483 community presentations in 2014. Government/Community Communications FPL’s email network to local elected officials continues to be utilized to share breaking news and important updates to local state and federal public officials in a timely and consistent manner. Government Outreach EA and GA Managers contact government officials prior to storm season through written correspondence and meetings. Government Portal Website FPL’s External Affairs organization implemented a dedicated Government Portal website which was customized with the types of information that government leaders rely on to help with their recovery efforts. This site was not activated during the 2014 storm season. The site contains company-wide and county-specific information that includes: - Media alerts and releases - Customer outage information and outage maps - Maps of impacted areas 66 - Critical infrastructure facility (CIF) information Estimated time of restoration (ETR) information FPL staging site locations and available personnel resources NEW INITIATIVES No new initiatives were developed/implemented in 2014. 67 STORM PREPAREDNESS INITIATIVE No. 9 68 Initiative 9 – Collaborative Research on Hurricane Winds & Storm Surge Collaborative research efforts, led by the Public Utility Research Center (PURC), which began in 2007, have resulted in greater knowledge of: (1) vegetation management during storm and non-storm times; (2) wind during storm and nonstorm events; and (3) hurricane and damage modeling towards further understanding the costs and benefits of undergrounding. PURC’s most recent report is provided in this section. 69 Report on Collaborative Research for Hurricane Hardening Provided by The Public Utility Research Center University of Florida To the Utility Sponsor Steering Committee February 2015 I. Introduction The Florida Public Service Commission (FPSC) issued Order No. PSC-06-00351-PAA-EI on April 25, 2006 (Order 06-0351) directing each investor-owned electric utility (IOU) to establish a plan that increases collaborative research to further the development of storm resilient electric utility infrastructure and technologies that reduce storm restoration costs and outages to customers. This order directed IOUs to solicit participation from municipal electric utilities and rural electric cooperatives in addition to available educational and research organizations. As a means of accomplishing this task, the IOUs joined with the municipal electric utilities and rural electric cooperatives in the state (collectively referred to as the Project Sponsors) to form a Steering Committee of representatives from each utility and entered into a Memorandum of Understanding (MOU) with the University of Florida’s Public Utility Research Center (PURC). This MOU was recently extended by the Research Collaboration Partners through December 31, 2015. PURC manages the work flow and communications, develops work plans, serves as a subject matter expert, conducts research, facilitates the hiring of experts, coordinates with research vendors, advises the Project Sponsors, and provides reports for Project activities. The collaborative research has focused on undergrounding, vegetation management, hurricanewind speeds at granular levels, and improved materials for distribution facilities. This report provides an update on the activities of the Steering Committee since the previous report dated February 2014. 70 II. Undergrounding The collaborative research on undergrounding has been focused on understanding the existing research on the economics and effects of hardening strategies, including undergrounding, so that informed decisions can be made about undergrounding policies and specific undergrounding projects. The collaborative has refined the computer model developed by Quanta Technologies and there has been a collective effort to learn more about the function and functionality of the computer code. PURC and the Project Sponsors have worked to fill information gaps for model inputs and significant efforts have been invested in the area of forensics data collection. Since the state has not been affected by any hurricanes since the database software was completed, there is currently no data. Therefore, future efforts to refine the undergrounding model will occur when such data becomes available. In addition, PURC has worked with doctoral and master’s candidates in the University of Florida Department of Civil and Coastal Engineering to assess some of the inter-relationships between wind speed and other environmental factors on utility equipment damage. PURC has also been contacted by engineering researchers at the University of Wisconsin and North Carolina State University with an interest in the model, though no additional relationships have been established. In addition to universities, PURC was contacted by researchers at the Argonne National Laboratory who expressed interest in modeling the effects of storm damage. The researchers continue to develop a deterministic model, but did use many of the factors that the Collaborative have attempted to quantify. Every researcher that contacts PURC cites the model as the only non-proprietary model of its kind. The research discussed in last year’s report on the relationship between wind speed and rainfall is still under review by the engineering press. Further results of this and related research can likely be used to further refine the model. III. Wind Data Collection The Project Sponsors entered into a wind monitoring agreement with WeatherFlow, Inc., in 2007. Under the agreement, Florida Sponsors agreed to provide WeatherFlow with access to their properties and to allow WeatherFlow to install, maintain and operate portions of their wind monitoring network facilities on utility-owned properties under certain conditions in exchange for access to wind monitoring data generated by WeatherFlow's wind monitoring network in Florida. WeatherFlow’s Florida wind monitoring network includes 50 permanent wind monitoring stations around the coast of Florida, including one or more stations located on utility-owned property. The wind monitoring agreement expired in early 2012; however, the wind, temperature, and barometric pressure data being collected at these stations is being made available to the Project Sponsors on a complimentary basis. IV. Public Outreach 71 In last year’s report we discussed the impact of Hurricane Sandy on greater interest in storm preparedness. PURC researchers discussed the collaborative effort in Florida with the engineering departments of the state regulators in Connecticut, New York, and New Jersey, and regulators in Jamaica, Grenada, and Curacao. While all of the regulators and policymakers showed great interest in the genesis of the collaborative effort, and the results of that effort, they have not, at this point, shown further interest in participating in the research effort. PURC researchers continue to utilize the insight gained through the hurricane hardening research to contribute to the debate on undergrounding in the popular press, and reinforce the state of Florida as a thought leader in this area. On February 13, 2014 PURC Director of Energy Studies Ted Kury was asked to contribute an essay on CNN.com entitled “Burying power lines is not always the answer” where he discussed the economic trade-offs of undergrounding power lines. The essay also provided a link to an Electricity Journal article by Kury and Lynne Holt, another PURC researcher, which discusses Florida’s cooperative approach and holds it up as a “best practice” in regulation. In addition, the October 2014 issue of Costco Connection featured a debate on whether utilities should be required to bury power lines, where Kury provided the “No” position. V. Conclusion In response to the FPSC’s Order 06-0351, IOUs, municipal electric utilities, and rural electric cooperatives joined together and retained PURC to coordinate research on electric infrastructure hardening. The steering committee has taken steps to extend the research collaboration MOU so that the industry will be in a position to focus its research efforts on undergrounding research, granular wind research and vegetation management when significant storm activity affects the state. 72 STORM PREPAREDNESS INITIATIVE No. 10 73 Initiative 10 – Natural Disaster Preparedness and Recovery Plans FPL’s Storm Emergency Plan identifies emergency conditions and the responsibilities and duties of the FPL emergency response organization for severe weather and fires. The plan covers the emergency organization, roles and responsibilities and FPL’s overall severe storm emergency processes. These processes describe the planning activities, restoration practices, public communications, coordination with government, training, practice exercises and lessons learned evaluation systems. The plan is reviewed and revised annually, as necessary. A brief summary of the FPL plan, “FPL Emergency Plan – Severe Storms Brief”, is included in the Appendix of this filing. 74 2015 STORM SEASON READINESS 75 2015 Storm Season Readiness FPL’s comprehensive storm plan focuses on readiness, restoration and recovery in order to respond safely and as quickly as possible in the event the electrical infrastructure is damaged by a storm. FPL is well-prepared for the 2015 storm season and continues to train and hone its storm preparedness and response capabilities. In addition to the initiatives to strengthen its system and improve storm preparedness discussed previously, FPL will complete the following additional storm preparedness activities prior to the start of storm season: • Extensive storm response training based on employees’ storm roles; • Annual company-wide hurricane dry run in late April/early May; • Management workshops throughout the storm season to keep focus on key storm restoration policies/processes; • Plan for and review of mutual assistance agreements to ensure they are adequate and ready; • Continue to focus on improving outage communications and estimated restoration times to customers; • Clear vegetation from all feeder circuits serving top critical infrastructure (e.g. top CIF hospitals, 911 centers, special needs shelters, police and fire stations, etc.) prior to the peak of hurricane season. • Implement new technology to be utilized by storm damage assessors to improve damage assessment collection/analysis capabilities. 76 RELIABILITY 77 Summary – Reliability Total FPL System (Distribution and Transmission) – Overall reliability is best gauged by SAIDI (System Average Interruption Duration Index), considered the most relevant and best overall reliability indicator because it encompasses two other industry standard performance metrics for reliability: SAIFI (System Average Interruption Frequency Index) and CAIDI (Customer Average Interruption Duration Index). In 2014, FPL continued to provide strong overall reliability for its customers, achieving an overall adjusted SAIDI of 66.6 minutes (2013 – 65.6 minutes). Distribution – FPL’s 2014 overall distribution reliability, as measured by SAIDI was 63.8 (2013 - 61.4). 2014 adjusted SAIFI was 0.99 interruptions per customer (2013 – 0.89 interruptions). Adjusted 2014 CAIDI was 64.5 minutes (2013 – 68.7 minutes) and adjusted 2014 MAIFIe was 8.7 momentary events (2013 – 9.1 momentary events). Transmission – In 2014, FPL’s Transmission/Substation adjusted SAIDI was 2.8 minutes (2013 – 4.2 minutes), adjusted SAIFI was 0.21 interruptions per customer (2013 – 0.22 interruptions) and adjusted MAIFI was 0.7 momentary events (2013 – 0.7 momentary events). 78 Distribution Reliability GENERAL 1. Discuss overall performance absent adjustments (Form 102). FPL’s overall unadjusted distribution reliability, as measured by SAIDI, was 70.8 minutes. This unadjusted performance includes approximately 7.0 minutes associated with tornados, named tropical storms, and planned interruptions. 2. Describe the level of detailed reliability data the Company tracks. FPL tracks the following reliability data associated with each individual interruption: customers affected, minutes interrupted, cause of outage, percentage of customers partially restored, device affected by interruption and location of the device. All of the interruption data is compiled to calculate reliability indices which are tracked throughout the year. The reliability indices which FPL tracks include the following: SAIDI, SAIFI, CAIDI, MAIFI, MAIFIe, Lbar, CEMI-3, CEMI-5, CEMI-8, CEMM-35, CEMM-50 and CME (Customer Momentary Experience). 3. Describe Company efforts to increase critical review of detailed reliability data. Daily reports are generated and distributed providing detailed information, such as the previous day’s interruptions by device, month-to-date and year-to-date reliability indices. FPL’s management utilizes the information in conducting a daily in-depth review of key reliability data to identify lessons learned and areas for improvement. This review also includes an assessment of upcoming weather and potential impacts, operational risks and a final review of the daily operations plan. FPL’s management team also conducts monthly reliability reviews of the programs, objectives and actual performance vs. the plan. On an annual basis, FPL reviews its reliability performance and outage causes to direct its reliability programs for continued performance. With the aid of advanced statistical applications, such as Minitab and Six Sigma analysis, FPL performs statistical analyses to identify reliability trends and root causes, and measure program benefits. 4. Describe the process used by your company to identify and select the level of detailed reliability data. FPL’s reliability data detail has been developed over the years based on industry practices, internal needs, as well as external requirements (e.g., regulators). 79 5. Discuss adjustments. Generation Events - None Transmission Events - See Appendix Distribution Events - See response to Distribution Reliability Item Nos. 11 & 13 Extreme Weather - See response to Distribution Reliability Item Nos. 7 & 10 6. Discuss adjusted performance. Distribution - See the summary at the beginning of this reliability section as well as the response to Item No. 1 above. EXTREME WEATHER 7. Include in the discussion, the type of weather event, strength (wind speeds/surge-flood levels), locations affected, source of meteorological information, and the performance of overhead and underground systems In 2014, no major storms affected FPL’s service territory; therefore, no data collection or analysis concerning overhead vs. underground storm performance was performed. 80 8. Describe the Company’s efforts to avoid or minimize, in terms of costs incurred and outage duration, any similar events in the future. As a part of FPL’s continuous improvement philosophy, FPL gathers, after each extreme weather event, relevant information to critique its processes and performance. Also, FPL continues to further develop new technology to strengthen its emergency response, by: • improving customer outage information available to field restoration crews by developing mobile applications which combine outage tickets, weather information, electrical network information, customer energy consumption and voltage, restoration crew location, meter status and more – all layered on a map view and available to view on a computer tablet. This makes it easier to diagnose problems accurately to assist with outage analysis and improve interactions with our customers • expanding the use of smart meter information by creating multiple applications including restoration confirmation application, which allows restoration crews to confirm the power status of all smart meters affected by an outage before leaving the area. This has helped FPL identify embedded outages, resolve the problem on the first visit, and reduce repeat calls from customers • installing submersible equipment to mitigate the impact of significant water intrusion in 12 vaults in the Miami downtown electric network that are located just at or within the FEMA 100-year flood elevation levels. See also the pole inspections, hardening and storm season readiness sections in this report. 9. If the method of deriving the weather exclusion is different from the method used for 2013, please explain the changes and provide the CMI and CI for 2014 using the prior method. No changes were made to FPL’s exclusion methodology. 10. Provide the 2014 service reliability data for each extreme weather outage event that is excluded from your Company’s 2014 Annual Distribution Reliability Report pursuant to Rule 25-6.0455. The following data is provided in the Appendix: A) Causation B) Date C) CI D) CMI E) L-Bar F) Repair Cost G) Forensics 81 OTHER DISTRIBUTION ADJUSTMENTS 11. Discuss the causation of each type of distribution event that resulted in customer outages. 12. Describe the Company’s efforts to avoid or minimize any similar events in the future in terms of the level of costs incurred and outage duration. FPL continually evaluates the need for planned crew and customer-requested outages by determining if there are alternative work methods that could minimize or prevent such an outage. If an outage is not preventable, FPL works with customers to schedule necessary outages during times which are more convenient for them (e.g., nights and weekends). 13. Provide the 2014 service reliability data for each distribution outage event that is excluded from your Company’s 2014 Annual Distribution Reliability Report pursuant to Rule 25-6.0455. The following data is provided in the Appendix: A) Causation B) Date C) CMI D) CI E) L-Bar F) Repair Cost (N/A) 2013 ADJUSTED RELIABILITY CAUSES OF OUTAGE EVENTS 82 13. Five-year patterns/trends in outage causation for each of the top causes of outage events, including the frequency, duration, restoration time, cost incurred to restore service, remediation programs and remediation program costs. Frequency (SAIFI) System Avg. Interruption (SAIDI) Rank Duration (CAIDI) PSC Cause Group 2010 2011 2012 2013 2014 2010 2011 2012 2013 2014 2010 2011 2012 2013 1 Defective Equipment 37.4 30.5 27.5 26.5 25.9 0.42 0.40 0.39 0.38 0.41 88.5 75.8 71.5 69.0 2014 63.7 2 Vegetation 11.4 16.2 10.4 10.6 12.9 0.10 0.12 0.09 0.10 0.12 114.4 131.4 109.6 110.0 105.6 3 Other Weather 5.5 13.5 7.2 7.2 7.3 0.07 0.12 0.09 0.09 0.10 83.6 109.4 83.4 77.3 76.0 4 Unknow n 4.0 4.4 4.0 3.9 4.1 0.08 0.08 0.07 0.08 0.10 51.3 51.7 57.2 46.6 40.8 5 Vehicle 4.9 4.4 4.4 3.7 3.1 0.06 0.07 0.07 0.06 0.05 76.0 65.0 60.5 66.1 63.9 6 Animal 3.3 3.4 3.2 3.4 2.9 0.05 0.06 0.06 0.06 0.05 66.1 61.7 55.4 54.7 56.5 7 Lightning 3.7 3.0 3.2 2.3 2.9 0.04 0.03 0.04 0.03 0.04 85.8 88.1 71.5 82.9 71.2 8 All Other Causes 4.7 1.8 1.8 1.6 2.4 0.04 0.04 0.04 0.04 0.08 126.2 51.7 49.2 44.1 31.6 9 Other 2.3 2.4 1.8 2.3 2.2 0.06 0.04 0.05 0.06 0.05 39.8 54.3 36.7 40.6 49.2 System Total 77.3 79.7 63.5 61.4 63.8 0.92 0.97 0.90 0.89 0.99 83.9 82.1 70.8 68.7 64.5 See remediation programs and budget levels in FPL’s response to Distribution Reliability Item No. 16. Costs incurred to restore service by cause are not specifically tracked/available. 15. The process used to identify and select the actions to improve the performance in each of the top causes of outages. Annually, FPL evaluates its current reliability remediation programs and verifies the program’s need and/or existence. In addition, FPL proposes new reliability remediation programs to improve its reliability performance concentrating on the highest cause codes and those cause codes that have shown trends needing attention. 83 16. 2015 activities and budget levels addressing each of the top causes of service outages. In 2015, FPL has reliability programs aimed at reducing customer interruptions. These include: Program* Program Description Reduce the number of customers experiencing multiple amounts of interruptions and momentaries by identifying and correcting feeders experiencing the highest number of events and/or Priority Feeders customers interrupted. The initiative may (including inspections) strengthen feeders up to and including extreme wind loading standards for additional overall reliability improvement. Install and maintain automated lateral reclosers. This will help mitigate the effects of lateral interruptions by clearing temporary faults, ALS decreasing voltage sags and decreasing field (Installation and Maintenance) visits for replacing blown fuses; contributing to a more reliable system based on model feeder configuration guidelines. Install and maintain “smart” automated feeder switches. This will help mitigate the effects of feeder interruptions by isolating problematic areas AFS (installations and maintenance) and decreasing restoration time; making it a more reliable system based on model feeder configuration guidelines. Integrated program designed to minimize tree and Vegetation Mgmt** vine related interruptions. Provide the necessary feeder capacity to serve all customers during normal and emergency periods, System Expansion and install the infrastructure necessary to support system contingency. Reduce the number of direct buried lateral cable Cable Lateral failures. Inspection/Remediation of non-compliant Handhole Inspections / Padconditions. The purpose of this program is to mounted Transformers maintain pad-mount transformer security. Install and maintain “smart” feeder sensors. This will help mitigate the effects of feeder interruptions by identifying problematic areas and decreasing FCI (Installation & Maintenance) restoration time; contributing to a more reliable system based on model feeder configuration guidelines Projects targeted to improve reliability for specific Customer Impact customers or geographic areas Reduce the number of Submarine feeder cable Submarine Cable failures and reduce customer interruptions. This program will proactively replace RA switches in order to enhance system operations and RA Switch Replacement reliability. Reduce the number of direct buried feeder cable Cable Feeder failures and reduce customer interruptions. Address worse performing busses and high Momentary Outliers momentary feeders Inspect vaults and Powell-Esco Switches. Vault Inspections and repairs (not Program will mitigate vault interruptions and will help to identify any issues that need to be including RA Switches) addressed before an interruption occurs. Install, relocate, maintain, and control distribution capacitor banks. This program will help maintain VAR Management or improve power factor performance, improve (installations and maintenance) system efficiency, reliability, and quality of service voltage to our customers. Replace Oil Circuit Reclosers with Electronic OCR Replacement Reclosers Address lateral or OCR's with 3 or more Outlier Devices interruptions in a given year Conduct a visual and infrared inspection of the OH Overhead Line Inspection & feeder infrastructure and thus reduce overhead repairs interruptions. Replace small conductor feeder (less than #1/0) with larger conductor feeder in circuits with Small Wire Replacement multiple small wire interruptions. This does not include feeder mileage past radial OCRs. * Programs > $1 million ** Also referred to as a Storm Preparedness Initiative 1. 84 2015 Budget ($M) Impact on which Cause Codes $149.4 All $96.1 Vegetation, Unknown $69.2 All $63.1 Vegetation, Unknown $46.5 Remaining Causes $43.6 Equipment Failure $19.8 Equipment Failure $15.2 All $13.1 Equipment Failure $8.0 Equipment Failure $8.0 Equipment Failure $6.8 Equipment Failure $4.1 All $3.1 Equipment Failure $2.2 Remaining Causes $2.1 Equipment Failures $2.0 All $1.7 Equipment Failure, Vegetation, Other Weather, Other, Unknown, Lightning $1.5 Equipment Failures THREE-PERCENT FEEDER LIST 17. Identify whether any feeders appearing on the three-percent list more than once within a consecutive five-year period and any actions implemented to improve feeder performance. See FPL’s three-percent list in the Appendix. See FPL’s responses to Distribution Reliability Question numbers 16 and 18 for actions that FPL has taken to address these feeders. 18. Process used to identify and select the actions to improve the performance of feeders on the three-percent feeder list, if any. FPL evaluates feeder performance on a daily basis and has addressed feeders on this list through its “Priority Feeder” program and one or more of its other reliability programs. The objective of FPL’s Priority Feeder program is to reduce the number of customers experiencing multiple amounts of interruptions and momentaries by identifying and correcting feeders experiencing the highest number of events and/or customers interrupted. The initiative may strengthen feeders up to and including extreme wind loading standards for additional overall reliability improvement. 19. 2015 activities and budget levels directed at improving feeder performance. See response to Distribution Reliability Item No. 16. 85 REGIONAL RELIABILITY INDICES 20. Five-Year patterns/trends in each region’s reliability for each index and on any overall basis. (* Note for all indices tables: Ft. Myers (FM) was split into Naples (NA) and Toledo Blade (TB) in 2011) Annual SAIDI performance for the Distribution unit and its regions Data SAIDI Region Boca Raton (BR) Brevard (BV) Central Dade (CE) Central Florida (CF) Fort Myers (FM) Gulfstream (GS) Manasota (MS) Naples (NA) North Dade (ND) North Florida (NF) Pompano (PM) South Dade (SD) Toledo Blade (TB) Treasure Coast (TC) West Palm (WB) West Dade (WD) Wingate (WG) All FPL 2010 73.1 71.2 69.4 69.3 79.0 77.0 77.6 91.7 84.4 81.7 70.8 87.6 77.6 79.2 66.7 88.6 80.6 77.3 2011 58.1 115.0 48.8 149.1 * 54.8 66.8 85.5 66.8 130.9 60.9 92.5 98.0 77.8 63.1 69.5 78.0 79.7 2012 63.0 60.6 61.8 61.2 * 60.2 55.4 56.8 63.6 81.2 61.6 81.4 61.7 60.6 54.5 79.1 70.5 63.5 2013 60.5 55.7 50.7 66.7 * 59.2 57.8 53.5 60.0 83.7 48.9 76.6 71.9 71.9 54.5 59.1 70.1 61.4 2014 63.1 69.0 54.2 60.8 * 57.8 56.6 57.5 76.9 76.8 52.0 72.9 72.6 74.5 49.5 72.4 74.5 63.8 Annual SAIFI performance for the Distribution unit and its regions Data SAIFI Region BR BV CE CF FM GS MS NA ND NF PM SD TB TC WB WD WG All FPL 2010 0.93 1.01 0.78 0.91 1.09 0.82 0.91 0.86 0.82 1.02 0.79 1.04 0.96 1.01 0.78 1.15 0.97 0.92 2011 0.92 1.15 0.68 1.19 * 0.81 0.84 0.90 0.78 1.34 0.92 1.14 1.28 0.98 0.87 0.96 1.10 0.97 2012 1.14 0.87 0.72 0.82 * 0.86 0.77 0.86 0.70 1.03 0.84 0.96 0.91 0.95 0.82 1.20 0.99 0.90 86 2013 1.10 0.89 0.67 0.93 * 0.93 0.83 0.68 0.68 1.10 0.69 0.99 1.04 1.08 0.95 0.85 0.99 0.89 2014 1.21 1.14 0.80 0.95 * 0.96 0.83 0.88 0.83 1.06 0.86 0.90 1.16 1.07 0.85 1.20 1.25 0.99 Annual CAIDI performance for the Distribution unit and its regions Data CAIDI Region BR BV CE CF FM GS MS NA ND NF PM SD TB TC WB WD WG All FPL 2010 78.6 70.5 89.4 76.3 72.7 94.2 85.5 107.1 103.2 80.0 89.7 84.1 80.5 78.6 85.3 77.3 82.8 83.9 2011 63.4 99.9 71.5 125.5 * 67.5 79.5 95.5 86.2 97.7 66.4 81.0 76.4 79.7 72.6 72.7 71.1 82.1 2012 55.4 70.0 86.0 74.6 * 70.3 72.0 66.2 90.9 79.0 73.2 84.9 68.0 63.8 66.3 66.1 71.4 70.8 2013 55.0 62.7 75.2 71.4 * 63.3 69.5 79.0 88.4 76.2 70.7 77.4 69.5 66.8 57.3 69.3 71.1 68.7 2014 52.0 60.7 67.8 64.1 * 60.5 68.1 65.6 92.1 72.5 60.6 80.6 62.6 69.4 57.9 60.3 59.5 64.5 Annual MAIFIe performance for the Distribution unit and its regions Data MAIFIe Region BR BV CE CF FM GS MS NA ND NF PM SD TB TC WB WD WG All FPL 2010 6.8 11.2 7.1 10.7 7.6 8.1 7.9 7.7 7.7 13.1 5.9 8.4 17.4 13.3 9.4 8.8 9.6 9.1 2011 8.0 15.2 6.6 13.9 8.0 8.6 7.6 7.5 16.4 7.1 9.0 15.5 15.0 10.6 8.3 10.3 10.1 2012 8.1 10.7 6.2 9.7 8.0 7.4 6.5 7.2 11.6 7.1 7.9 10.9 12.1 9.4 7.5 10.7 8.7 87 2013 8.0 10.1 6.5 9.9 9.0 7.4 7.2 7.3 10.8 7.7 8.0 12.8 14.2 10.2 7.0 10.9 9.1 2014 8.3 9.7 7.6 8.9 9.1 6.7 7.3 9.0 10.3 7.1 8.0 9.6 11.1 8.8 7.9 12.1 8.7 Annual Cust >5 performance for the Distribution unit and its regions Data Region 2010 2011 2012 2013 2014 # Cust >5 BR 0.4% 0.4% 1.0% 1.3% 0.9% BV 0.9% 0.7% 0.2% 0.6% 0.3% CE 0.4% 0.2% 0.3% 0.1% 0.7% CF 1.0% 0.9% 1.0% 0.5% 0.5% FM 0.8% * * * * GS 1.0% 0.4% 0.4% 0.5% 0.7% MS 0.7% 0.5% 0.2% 0.2% 0.3% NA 0.5% 0.5% 0.2% 0.4% 0.7% ND 0.7% 0.9% 0.4% 0.5% 0.9% NF 1.8% 1.7% 0.5% 0.5% 0.6% PM 0.2% 0.5% 0.2% 0.1% 0.5% SD 0.7% 1.6% 0.3% 0.7% 0.6% TB 0.6% 1.3% 0.5% 1.2% 1.3% TC 1.5% 1.3% 0.6% 0.9% 1.0% WB 0.8% 0.5% 0.2% 0.7% 1.4% WD 0.8% 0.5% 2.0% 0.3% 0.6% WG 0.5% 0.7% 0.2% 0.2% 0.8% All FPL 0.7% 0.7% 0.5% 0.5% 0.7% 21. The process used to identify and select actions to improve the regional reliability trends. See FPL’s response to Distribution Reliability Item No. 3. 22. Discuss any 2014 projected activities and budget levels directed at improving regional reliability performance. See FPL’s response to Distribution Reliability Item No. 16. Each program listed addresses equipment and devices at the management area level. OVERHEAD – UNDERGROUND RELIABILITY 23. Describe the five year patterns/trends in reliability performance of underground systems vs. overhead systems. The majority of FPL's customers are fed from circuits that are a hybrid of both overhead and underground systems. The methodology used to classify a customer as overhead (OH) is defined as those customers served by a feeder with combined feeder and lateral overhead miles greater than or equal to 95% of the total primary miles. Then, to classify a customer as underground (UG), customers must be served by a feeder with combined feeder and lateral underground miles greater than or equal to 95% of the total primary miles. The balance of customers is classified as Hybrid. According to this methodology, FPL has 159 OH feeders, 442 UG feeders, with the remaining 2,611 feeders classified as hybrid. This methodology was applied for FPL’s responses to Distribution Reliability Question Nos. 23 & 26. 88 Five years reliability performance of underground, hybrid and overhead systems Data Year Hybrid OH UG 2010 77.9 105.2 44.1 2011 81.0 121.2 26.8 SAIDI 2012 64.4 93.8 25.8 2013 62.7 90.3 21.3 2014 64.5 108.1 19.4 ALL 77.3 79.7 63.5 61.4 63.8 SAIFI 2010 2011 2012 2013 2014 0.94 1.00 0.92 0.91 1.01 1.14 1.20 1.16 1.22 1.35 0.43 0.36 0.35 0.41 0.40 0.92 0.97 0.90 0.89 0.99 CAIDI 2010 2011 2012 2013 2014 82.6 80.9 70.0 68.8 63.8 92.4 100.7 81.0 74.3 80.1 103.3 75.1 72.9 52.3 48.7 83.9 82.1 70.8 68.7 64.5 L BAR 2010 2011 2012 2013 2014 219 197 179 167 166 196 188 165 152 161 380 221 228 208 205 219 196 178 165 166 Historically, FPL’s UG system’s SAIDI performance has been better than its OH system, primarily driven by a better SAIFI. Also, the CAIDI associated with UG has generally performed better than OH due to FPL’s looped UG system which allows for sectionalizing during each restoration event. 24. Describe Company efforts to separately track the reliability of overhead and underground systems. FPL continually monitors each feeder interruption with a designation of either overhead, underground or hybrid system. FPL also utilizes the actual equipment type that fails to determine the necessary performance of its overhead and underground systems. For example, FPL has equipment codes that relate specifically to its overhead system (disconnect switches, insulators, jumpers, wire) and underground system (cable, switch cabinets, elbow and terminators). After storm events, FPL performs the activities described in Initiative 7 of FPL’s approved Storm Preparedness Initiatives. 89 25. Describe the process used by your company to identify and select the actions to promote underground distribution systems. GAF Tariff – FPL’s primary tool to promote overhead to underground conversions is its GAF tariff. The GAF’s goal is to lower storm restoration costs to all customers by providing an incentive for qualified government-sponsored conversions. Local governments are in the best position to guarantee the needed 100% customer service lateral conversion participation. Local governments are also best positioned to facilitate the construction through managing permitting, securing locations for the underground facilities, and negotiating with other utility providers. In 2014, two municipalities signed the GAF tariff agreement and moved forward with their projects. Additionally, there were 20 municipal requests for non-binding/order of magnitude estimates during 2014. Finally, FPL completed one qualified GAF conversion projects in 2014. Local Community Presentations – FPL conducts numerous presentations with local community groups who are interested in exploring overhead-to-underground conversions. Local Ordinances – There are local ordinances in effect in multiple counties within FPL’s service territory that require FPL to install facilities underground. In addition, several municipalities require the customer to bury existing OH lines on or adjacent to their property when a major renovation is performed. 26. Provide Overhead and Underground Metrics See FPL’s response to Distribution Reliability Item No. 23 for classification criteria. CEMI-5 is not available by OH and UG. The miles below include only primary circuits (Feeders and Laterals). 2014 OH: Number of miles = 6,413.3 Number of customers = 231,905 Number of Customer Minutes Interrupted (CMI) = 25,078,225 Number of Customers Interruptions (CI) = 313,224 L-Bar = Minutes of Interruption = 1,844,273 = 161 Total Number of Outages 11,447 2014 HYBRID: Number of miles = 55,200.2 Number of customers = 4,189,664 Number of Customer Minutes Interrupted (CMI) = 270,360,850 Number of Customers Interruptions (CI) = 4,238,545 L-Bar = Minutes of Interruption = 14,577,799 = 166 Total Number of Outages 88,001 90 2014 UG: Number of miles = 3,126.5 Number of customers = 307,823 Number of Customer Minutes Interrupted (CMI) = 5,965,892 Number of Customers Interruptions (CI) = 122,525 L-Bar = Minutes of Interruption = 225,346 = 205 Total Number of Outages 1,101 RELIABILITY RELATED CUSTOMER COMPLAINTS 27. Provide the five year history for reliability-related* customer complaints. 2010 2011 2012 2013 2014 49** 43** 43** 32** 37 * As defined by the FPSC. ** From the FPSC’s Review of Florida’s Investor-Owned Electric Utilities 2013 Service Reliability Reports. 28. Describe Company efforts to correlate reliability-related complaints with reliability indices for applicable feeder, lateral and sub region. FPL addresses reliability complaints on a case-by-case basis. Lessons learned from issues and resolutions identified may be incorporated into our processes, if deemed appropriate. FPL also utilizes certain reliability programs, e.g., Customer Impact and Priority Feeders, to address customer complaints. 91 29. Describe the process used by your company to identify and select systemic actions to improve reliability due to customer complaints. If no such program exists explain why. See response to Distribution Reliability Item No. 28 Transmission Reliability 1. Reliability Adjustments Events (Transmission). See Appendix. 2. Localized Versus System Wide Events. None. 3. Description of Reliability Programs. The transmission and substation reliability initiative is a two-fold program. The first part consists of on-going assessments and inspections of the transmission and substation system conditions and the associated mitigation work (as required). The second part consists of the following targeted reliability areas: Animals – Program to prevent and mitigate the effects of animal related events to the transmission and substation system. Animals include (but not limited to) roosting and prey birds, squirrels, monk parrots, and raccoons. Equipment – Proactive replacement of both transmission and substation equipment reaching end of life. Items include (but not limited to) insulators, OHGW, distribution breakers, transmission breakers, switches, and substation regulators. Lightning – Items include bonding, grounding, and arrester installations. Foreign Interference – Outreach and awareness safety program to minimize the impact of foreign interference (e.g., cranes, balloons, diggers, sailboats, etc.) into electrical lines Vegetation Management – FPL performs condition assessments of every transmission right-of-way with a qualified arborist. Performed every six (6) months, these assessments include detailed prescriptions based on actual vegetation conditions. As a result of these assessments, the schedules are established to complete the identified work; at that point the work is prioritized and executed. 4. Five-Year Reliability Performance As indicated in the chart below, FPL’s Transmission/Substation SAIDI and SAIFI performance improved in 2014 vs. 2013 and is better than three out of the previous four years’ results. Transmission/Substation 2014 MAIFI performance remained unchanged for the third consecutive year. 92 Transmission/Substation 12 Months ending December 31 SAIDI SAIFI MAIFI 2010 4.0 0.29 0.5 2011 3.2 0.25 0.6 2012 2.3 0.18 0.7 2013 4.2 0.22 0.7 2014 2.8 0.21 0.7 5. Description of Company’s Tracking FPL’s Transmission/Substation group investigates all transmission and substation outages in order to identify root cause(s)/develop solutions. Reliability performance is tracked using SAIDI, SAIFI and MAIFI. 6. Method of Program Selections For program selection, FPL’s Transmission/Substation group utilizes historical reliability performance, trends, condition assessments and risk ranking. 93 ANNUAL DISTRIBUTION RELIABILITY REPORT 2014 SAIDI = System Average Interruption Duration Index = Sum of All Customer Minutes Interrupted (CMI) Total number of Customers Served (C) 301,706,609 4,729,392 63.8 301,706,609 4,677,076 64.5 4,677,076 4,729,392 0.99 = Sum of All Customer Momentary Interruption Events (CME) Total number of Customers Served (C) 41,140,960 4,729,392 8.7 L BAR = Minutes of Interruption (AO) Total Number of Outages (# of Outages) 16,936,608 101,981 166 %CEMI-5 = Sum of CEMI-5 Customers (# Cust>5) Total number of Customers Served (C) 34,890 4,729,392 0.7% CAIDI = Customer Average Interruption Duration Index = Sum of All Customer Minutes Interrupted (CMI) Total number of Customer Interruptions (CI) SAIFI = System Average Interruption Frequency Index = Total number of Customer Interruptions (CI) Total number of Customers Served (C) MAIFIe = Momentary Average Interruption Event 94 Service Reliability Indices Data Year: 2014 FPL District or Service Area Boca Raton Brevard Central Dade Central Florida Gulfstream Manasota Naples North Dade North Florida Pompano South Dade Toledo Blade Treasure Coast West Palm West Dade Wingate All FPL Customer Served (C ) # of Outages CMI 366,503 5,721 23,116,169 297,877 8,113 20,561,206 282,155 4,802 15,297,899 279,726 6,906 17,019,043 331,643 5,731 19,183,618 378,304 7,561 21,418,955 379,012 6,256 21,805,095 235,112 6,916 18,073,784 150,052 5,031 11,523,232 310,483 4,485 16,145,422 299,919 7,570 21,857,327 254,982 7,445 18,501,035 283,693 7,819 21,125,404 357,064 6,828 17,663,331 254,130 4,591 18,404,052 268,737 6,206 20,011,037 4,729,392 101,981 301,706,609 95 CI 444,842 338,764 225,551 265,682 317,250 314,397 332,280 196,162 158,832 266,346 271,214 295,354 304,210 304,804 304,990 336,398 4,677,076 AO 836,449 1,279,444 973,987 989,699 1,025,973 1,200,537 933,545 1,360,870 693,274 774,707 1,586,689 1,137,293 1,241,577 1,006,015 882,827 1,013,722 16,936,608 CME 3,147,785 2,871,095 2,198,407 2,501,706 2,914,840 2,632,100 2,660,385 1,985,453 1,540,723 2,153,662 2,377,694 2,462,121 3,133,465 3,021,519 2,079,247 3,460,758 41,140,960 # Cust >5 3,270 977 1,872 1,434 2,268 1,254 2,796 2,103 905 1,435 1,816 3,390 2,726 4,953 1,514 2,177 34,890 PSC/ECR 102-1(a) Incorporated by reference in Rule 25-6.0455 Causes of Outage Events – Actual Utility Name: FPL Cause (a) Defective Equipment Request Vegetation Unknown Other Weather Animal Other All Other Causes Lightning Vehicle System Total Number of Outage Events (N) (b) Average Duration (L-Bar) (c) Year: 2014 Average Restoration Time (CAIDI) (d) 34,180 22,510 22,046 11,846 10,617 9,431 9,357 3,440 2,024 882 126,333 190 105 187 124 161 94 148 142 247 252 155 64.3 78.2 105.6 40.6 78.0 56.5 49.0 31.4 69.3 64.2 65.7 PSC/ECR 102-1(b) Incorporated by reference in Rule 25-6.0455 Causes of Outage Events – Adjusted Utility Name: FPL Cause (a) Defective Equipment Vegetation Unknown Other Weather Animal Other All Other Causes Lightning Vehicle System Total Number of Outage Events (N) (b) Average Duration (L-Bar) (c) Year: 2014 Average Restoration Time (CAIDI) (d) 33,733 21,633 11,703 10,141 9,359 9,187 3,410 1,938 877 101,981 190 187 124 160 94 148 142 245 251 166 63.7 105.6 40.8 76.0 56.5 49.2 31.6 71.2 63.9 64.5 96 PSC/ECR 102-2(a) FPL Primary Circuit Id. No. or Name (a) 405461 503862 406762 502462 704261 706661 402131 704666 706163 801134 409361 407861 802435 503961 407665 704570 503564 800333 404234 407866 701031 706861 809764 400737 500834 400834 408164 400663 809667 707931 412164 500662 503264 209862 706067 500661 700642 106233 705764 811064 504061 503263 406935 505364 808731 701233 405637 505761 202036 703233 706165 810365 800633 410362 507265 801634 810264 801433 701933 408662 800538 706066 801834 400731 102034 207364 403735 402133 401031 400833 700441 403433 707462 400935 300632 801736 105761 704262 810061 106062 502837 408765 809761 811361 407661 807163 808166 407863 508161 504763 800632 102361 204264 507962 406161 808264 THREE PERCENT FEEDER LIST - ACTUAL Year 2014 Number of Customers Substation Origin (b) CLINTMOORE ORTIZ ACREAGE LABELLE IMAGINATION NOBHILL TERMINAL SPRINGTREE HOLLYBROOK FRONTON SWEATT TARTAN SOUTH MIAMI ESTERO LOXAHATCHEE MALLARD ALLIGATOR BUENA VISTA BOCA TEECA TARTAN SAMPLE ROAD CONSERVATION SWEETWATER BOCA RATON WHITFIELD PAHOKEE ROSS WABASSO COURT TWINLAKES ALLAPATTAH CORTEZ COCOPLUM YORKE HIATUS CORTEZ VERENA GERONA TRACE PALMETTO CAPRI COCOPLUM DELMAR PARK BOULEVARD PLAYLAND FOUNTAIN AUBURN INDIAN HARBOR WOODLANDS HOLLYBROOK NEWTON LITTLE RIVER MARLIN SAN CARLOS PRINCETON INTERNATIONAL FULFORD HOLY CROSS HOMELAND RIVERSIDE HIATUS BISCAYNE BOCA RATON BULOW WYOMING MONET TERMINAL GREENACRES PAHOKEE OAKLAND PARK JENSEN SAWGRASS BELLE GLADE LIVE OAK 62ND AVE RIVERTON IMAGINATION AVOCADO TOMOKA PAYNE SABAL SWEETWATER ANHINGA LOXAHATCHEE PENNSUCO MILAM TARTAN INTERSTATE ALVA LITTLE RIVER ST JOE BABCOCK MCCALL TURNPIKE LINDGREN Location Residential Commercial (c) (d) (e) Palm Beach 3177 155 Lee 2320 393 Palm Beach 2168 46 Hendry 1404 330 Broward 1875 366 Broward 2031 243 Palm Beach 1467 145 Broward 1480 330 Broward 3360 296 Miami-Dade 1512 325 Okeechobee 650 238 Palm Beach 3114 199 Miami-Dade 929 47 Lee 4207 252 Palm Beach 2449 244 Broward 3414 134 Collier 3125 292 Miami-Dade 1801 159 Palm Beach 2316 85 Palm Beach 2070 203 Broward 1252 128 Broward 1017 235 Miami-Dade 1429 273 Palm Beach 1951 103 Manatee 1358 160 Palm Beach 697 195 Palm Beach 2286 132 Indian River 894 223 Miami-Dade 4 997 Broward 123 416 St Lucie 100 30 Manatee 4337 193 Sarasota 3228 115 Brevard 3114 185 Broward 3299 104 Manatee 3382 313 Broward 2609 190 St Johns 2547 130 Broward 2274 189 Miami-Dade 2450 1281 Collier 4083 450 Sarasota 2984 129 Palm Beach 2282 104 Manatee 3668 286 Miami-Dade 2058 116 Broward 2219 242 Palm Beach 2373 69 Sarasota 3346 266 Brevard 1367 64 Broward 1572 111 Broward 2631 229 Miami-Dade 2429 166 Miami-Dade 1805 156 Palm Beach 2340 240 Lee 2437 602 Miami-Dade 1778 320 Miami-Dade 1960 199 Miami-Dade 1394 214 1427 542 Broward Palm Beach 2208 170 Miami-Dade 1814 104 Broward 1467 46 Miami-Dade 1842 79 Palm Beach 1199 139 Volusia 1660 94 Brevard 1586 98 Palm Beach 1254 88 Palm Beach 990 243 Palm Beach 1630 214 Palm Beach 1376 121 Broward 782 236 Martin 865 86 Broward 827 295 Palm Beach 934 190 Suwannee 534 145 Miami-Dade 950 45 St Johns 1187 125 Broward 1194 130 Miami-Dade 959 290 Volusia 778 53 Sarasota 459 72 St Lucie 372 72 Miami-Dade 1051 22 Miami-Dade 1036 273 Palm Beach 223 136 Miami-Dade 0 395 Miami-Dade 0 367 Palm Beach 3762 136 Sarasota 4423 179 Lee 3434 73 Miami-Dade 3191 570 Flagler 2667 410 Brevard 3272 79 Charlotte 2740 255 St Lucie 3249 222 Miami-Dade 3052 335 Industrial (f) 4 2 3 8 7 5 7 7 3 3 10 2 11 10 7 1 28 2 8 6 4 2 0 9 1 5 3 3 3 2 2 9 7 4 0 18 1 12 0 2 24 7 6 2 1 2 1 9 0 6 3 0 2 2 5 1 1 1 2 13 1 2 0 5 8 2 6 1 1 1 5 0 5 2 1 4 22 2 5 3 3 0 2 6 3 1 1 2 41 7 1 8 0 38 1 0 Other (g) 7 54 149 77 16 24 19 2 4 26 53 6 12 24 230 3 27 24 3 7 14 2 7 4 46 39 108 42 2 9 3 17 92 4 1 35 22 20 2 4 44 34 2 18 6 26 52 7 10 0 2 2 19 16 41 31 19 18 16 20 14 3 28 1 13 54 0 32 69 37 11 5 1 40 37 35 17 17 121 86 6 5 43 93 33 7 5 10 5 404 19 38 64 58 98 2 97 Total (h) 3336 2715 2217 1742 2248 2279 1619 1817 3659 1840 898 3315 987 4469 2700 3549 3445 1962 2409 2279 1384 1254 1702 2063 1519 897 2421 1120 1004 541 132 4539 3350 3303 3403 3713 2800 2689 2463 3733 4557 3120 2392 3956 2175 2463 2443 3621 1431 1689 2863 2595 1963 2582 3044 2099 2160 1609 1971 2391 1919 1515 1921 1343 1762 1686 1348 1234 1845 1498 1023 951 1127 1126 680 999 1334 1326 1254 834 534 444 1075 1315 362 396 368 3900 4643 3514 3762 3085 3351 3033 3472 3387 Number of Outage Events (N) (i) 7 7 7 6 6 6 6 6 6 6 6 6 6 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 Average Duration (L-Bar) (j) 78 20 7 31 13 47 119 2 79 164 46 133 61 75 69 24 24 71 93 33 29 37 19 95 70 49 20 163 76 160 214 55 6 36 24 32 110 4 35 185 320 51 45 92 37 127 67 32 49 225 65 76 108 12 52 51 140 362 144 9 139 142 59 103 13 19 99 48 43 161 127 64 25 133 312 249 310 51 196 57 47 137 66 79 91 262 132 301 76 3 76 1 103 131 65 17 Average No. of Restoration Listed Years Time Last in the (CAIDI) Year? Last 5 (k) (l) (m) 29.4 N 2 12.5 N 0 2.4 N 1 17.0 N 0 6.1 N 1 12.4 N 1 41.6 Y 1 1.9 N 2 43.2 Y 2 29.6 N 0 34.2 N 1 92.3 N 0 40.8 N 1 22.0 N 2 31.5 N 0 23.8 N 0 14.0 N 0 27.0 N 0 36.4 Y 2 14.0 N 0 23.8 N 0 14.2 N 0 17.7 N 0 36.5 Y 1 25.0 N 0 40.1 N 1 26.1 N 0 42.4 Y 1 49.7 Y 1 46.3 N 0 94.7 N 0 40.5 N 0 5.7 N 0 27.2 N 1 13.6 N 1 4.3 N 0 55.5 N 0 3.5 N 0 27.6 N 2 51.8 N 0 72.1 Y 2 45.5 N 0 30.4 N 1 37.2 N 0 26.4 N 0 33.0 N 0 34.7 N 0 22.0 N 0 24.2 N 0 36.2 N 0 58.5 Y 1 54.4 N 0 43.9 N 0 10.0 N 1 21.1 N 1 49.0 N 1 34.2 N 0 60.0 N 0 45.5 N 1 4.9 N 0 33.9 N 1 40.8 N 1 24.6 N 0 33.5 N 0 7.1 Y 2 5.7 N 0 45.7 N 0 16.0 N 0 31.7 N 0 44.2 N 1 62.8 N 0 29.2 N 1 21.2 N 1 34.2 N 0 61.1 N 0 98.1 N 0 61.6 Y 2 20.2 N 1 58.0 N 1 60.9 N 0 38.8 N 0 45.2 N 1 41.2 N 0 29.8 Y 1 29.2 N 0 47.2 N 0 59.9 Y 1 28.7 N 0 42.3 Y 1 3.0 N 0 13.6 N 1 1.3 N 0 13.3 N 0 53.1 N 0 12.0 N 0 11.2 N 0 PSC/ECR 102-2(b) FPL Primary Circuit Id. No. or Name (a) 405461 503862 406762 502462 704261 706661 402131 704666 706163 409361 503961 407665 704570 503564 800333 801134 701031 706861 809764 400737 407861 500834 400834 408164 802435 809667 707931 412164 500662 706067 500661 700642 106233 705764 811064 504061 503263 406935 505364 808731 701233 405637 505761 202036 706165 407866 810365 410362 507265 801634 810264 801433 701933 408662 800538 706066 801834 404234 400731 207364 402133 401031 400833 700441 403433 707462 400935 300632 801736 105761 704262 810061 106062 502837 408765 809761 811361 407661 807163 808166 209862 407863 508161 504763 800632 102361 204264 507962 406161 808264 307761 706164 810265 505665 102032 406534 THREE PERCENT FEEDER LIST - ADJUSTED Year 2014 Number of Customers Substation Origin (b) CLINTMOORE ORTIZ ACREAGE LABELLE IMAGINATION NOBHILL TERMINAL SPRINGTREE HOLLYBROOK SWEATT ESTERO LOXAHATCHEE MALLARD ALLIGATOR BUENA VISTA FRONTON SAMPLE ROAD CONSERVATION SWEETWATER BOCA RATON TARTAN WHITFIELD PAHOKEE ROSS SOUTH MIAMI COURT TWINLAKES ALLAPATTAH CORTEZ HIATUS CORTEZ VERENA GERONA TRACE PALMETTO CAPRI COCOPLUM DELMAR PARK BOULEVARD PLAYLAND FOUNTAIN AUBURN INDIAN HARBOR HOLLYBROOK TARTAN NEWTON MARLIN SAN CARLOS PRINCETON INTERNATIONAL FULFORD HOLY CROSS HOMELAND RIVERSIDE HIATUS BISCAYNE BOCA TEECA BOCA RATON WYOMING TERMINAL GREENACRES PAHOKEE OAKLAND PARK JENSEN SAWGRASS BELLE GLADE LIVE OAK 62ND AVE RIVERTON IMAGINATION AVOCADO TOMOKA PAYNE SABAL SWEETWATER ANHINGA LOXAHATCHEE PENNSUCO MILAM YORKE TARTAN INTERSTATE ALVA LITTLE RIVER ST JOE BABCOCK MCCALL TURNPIKE LINDGREN ONEIL HOLLYBROOK INTERNATIONAL ROTONDA BULOW OSBORNE Location Residential Commercial (c) (d) (e) Palm Beach 3177 155 Lee 2320 393 Palm Beach 2168 46 Hendry 1404 330 Broward 1875 366 Broward 2031 243 Palm Beach 1467 145 Broward 1480 330 Broward 3360 296 Okeechobee 650 238 Lee 4207 252 Palm Beach 2449 244 Broward 3414 134 Collier 3125 292 Miami-Dade 1801 159 Miami-Dade 1512 325 Broward 1252 128 Broward 1017 235 Miami-Dade 1429 273 Palm Beach 1951 103 Palm Beach 3114 199 Manatee 1358 160 Palm Beach 697 195 Palm Beach 2286 132 Miami-Dade 929 47 Miami-Dade 4 997 Broward 123 416 St Lucie 100 30 Manatee 4337 193 Broward 3299 104 Manatee 3382 313 Broward 2609 190 St Johns 2547 130 Broward 2274 189 Miami-Dade 2450 1281 Collier 4083 450 Sarasota 2984 129 Palm Beach 2282 104 Manatee 3668 286 Miami-Dade 2058 116 Broward 2219 242 Palm Beach 2373 69 Sarasota 3346 266 Brevard 1367 64 Broward 2631 229 Palm Beach 2070 203 Miami-Dade 2429 166 Palm Beach 2340 240 Lee 2437 602 Miami-Dade 1778 320 Miami-Dade 1960 199 Miami-Dade 1394 214 Broward 1427 542 Palm Beach 2208 170 Miami-Dade 1814 104 Broward 1467 46 Miami-Dade 1842 79 Palm Beach 2316 85 1199 139 Palm Beach Brevard 1586 98 Palm Beach 990 243 Palm Beach 1630 214 Palm Beach 1376 121 Broward 782 236 Martin 865 86 Broward 827 295 Palm Beach 934 190 Suwannee 534 145 Miami-Dade 950 45 St Johns 1187 125 Broward 1194 130 Miami-Dade 959 290 Volusia 778 53 Sarasota 459 72 St Lucie 372 72 Miami-Dade 1051 22 Miami-Dade 1036 273 Palm Beach 223 136 Miami-Dade 0 395 Miami-Dade 0 367 Brevard 3114 185 Palm Beach 3762 136 Sarasota 4423 179 Lee 3434 73 Miami-Dade 3191 570 Flagler 2667 410 Brevard 3272 79 Charlotte 2740 255 St Lucie 3249 222 Miami-Dade 3052 335 Nassau 2543 379 Broward 2144 483 Miami-Dade 3114 430 Charlotte 2632 432 Volusia 1545 43 Palm Beach 2053 97 Industrial (f) 4 2 3 8 7 5 7 7 3 10 10 7 1 28 2 3 4 2 0 9 2 1 5 3 11 3 2 2 9 0 18 1 12 0 2 24 7 6 2 1 2 1 9 0 3 6 0 2 5 1 1 1 2 13 1 2 0 8 5 2 1 1 1 5 0 5 2 1 4 22 2 5 3 3 0 2 6 3 1 1 4 2 41 7 1 8 0 38 1 0 25 9 1 26 3 3 98 Other (g) 7 54 149 77 16 24 19 2 4 53 24 230 3 27 24 26 14 2 7 4 6 46 39 108 12 2 9 3 17 1 35 22 20 2 4 44 34 2 18 6 26 52 7 10 2 7 2 16 41 31 19 18 16 20 14 3 28 3 1 54 32 69 37 11 5 1 40 37 35 17 17 121 86 6 5 43 93 33 7 5 4 10 5 404 19 38 64 58 98 2 96 3 17 9 17 12 Total (h) 3336 2715 2217 1742 2248 2279 1619 1817 3659 898 4469 2700 3549 3445 1962 1840 1384 1254 1702 2063 3315 1519 897 2421 987 1004 541 132 4539 3403 3713 2800 2689 2463 3733 4557 3120 2392 3956 2175 2463 2443 3621 1431 2863 2279 2595 2582 3044 2099 2160 1609 1971 2391 1919 1515 1921 2409 1343 1686 1234 1845 1498 1023 951 1127 1126 680 999 1334 1326 1254 834 534 444 1075 1315 362 396 368 3303 3900 4643 3514 3762 3085 3351 3033 3472 3387 2947 2636 3545 3090 1591 2153 Number of Outage Events (N) (i) 7 7 7 6 6 6 6 6 6 6 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Average Duration (L-Bar) (j) 78 20 7 31 13 47 119 2 79 46 75 69 24 24 71 157 29 37 19 95 145 70 49 20 49 76 160 214 55 24 32 110 4 35 185 320 51 45 92 37 127 67 32 49 65 27 76 12 52 51 140 362 144 9 139 142 59 117 103 19 48 43 161 127 64 25 133 312 249 310 51 196 57 47 137 66 79 91 262 132 47 301 76 3 76 1 103 131 65 17 111 27 156 81 47 136 Average No. of Restoration Listed Years Time Last in the (CAIDI) Year? Last 5 (k) (l) (m) 29.4 N 2 12.5 N 1 2.4 N 1 17.0 N 0 6.1 Y 2 12.4 N 1 41.6 N 0 1.9 N 2 43.2 Y 1 34.2 N 1 22.0 N 1 31.5 N 0 23.8 N 0 14.0 N 0 27.0 N 0 20.0 N 0 23.8 N 0 14.2 N 0 17.7 N 0 36.5 Y 1 93.7 N 0 25.0 N 0 40.1 N 1 26.1 N 0 38.1 N 1 49.7 Y 1 46.3 N 0 0 94.7 N 40.5 N 0 13.6 N 1 4.3 N 0 55.5 N 0 3.5 N 0 27.6 N 2 51.8 N 0 72.1 Y 1 45.5 N 0 30.4 N 1 37.2 N 0 26.4 N 0 33.0 N 1 34.7 N 0 22.0 N 0 24.2 N 0 58.5 Y 1 12.8 N 1 54.4 N 0 10.0 N 1 21.1 N 1 49.0 N 1 34.2 N 0 60.0 N 0 45.5 N 1 4.9 N 0 33.9 N 1 40.8 N 1 24.6 N 0 52.1 Y 1 0 33.5 N 5.7 N 0 16.0 N 0 31.7 N 0 44.2 N 1 62.8 N 0 29.2 N 1 21.2 N 0 34.2 N 0 61.1 N 0 98.1 N 0 61.6 Y 2 20.2 N 1 58.0 N 1 60.9 N 0 38.8 N 0 45.2 N 1 41.2 N 0 29.8 Y 1 29.2 N 0 47.2 N 0 59.9 Y 1 29.3 N 0 28.7 N 0 42.3 Y 1 3.0 N 0 13.6 N 1 1.3 N 0 13.3 N 0 53.1 N 0 12.0 N 0 11.2 N 0 47.5 N 0 14.2 N 0 39.0 N 0 36.7 N 0 46.7 N 1 66.2 N 0 PSC/ECR 102-3 (a) System Reliability Indices - Actual y FPL District or Service Area (a) Boca Raton Brevard Central Dade Central Florida Gulfstream Manasota Naples North Dade North Florida Pompano South Dade Toledo Blade Treasure Coast West Palm West Dade Wingate All FPL Year: 2014 SAIDI (b) CAIDI (c) SAIFI (d) MAIFIe (e) CEMI5 (f) 74.2 76.2 63.8 67.2 62.4 63.0 63.1 82.6 85.0 58.7 78.6 77.4 81.6 59.1 77.9 82.4 70.8 55.3 60.5 70.6 63.8 60.2 70.3 67.8 93.2 71.0 61.3 82.9 62.7 68.4 61.8 61.2 61.6 65.7 1.34 1.26 0.90 1.05 1.04 0.90 0.93 0.89 1.20 0.96 0.95 1.23 1.19 0.96 1.27 1.34 1.08 8.6 10.0 7.8 9.3 9.2 6.8 7.3 9.3 10.6 7.3 8.1 9.8 11.3 9.2 8.1 12.3 8.9 3,779 1,373 2,092 1,728 2,529 1,480 3,061 2,347 1,176 1,561 1,940 3,634 2,890 5,285 1,597 2,495 38,967 PSC/ECR 102-3 (b) System Reliability Indices - Adjusted FPL District or Service Area (a) Boca Raton Brevard Central Dade Central Florida Gulfstream Manasota Naples North Dade North Florida Pompano South Dade Toledo Blade Treasure Coast West Palm West Dade Wingate All FPL Year: 2014 SAIDI (b) CAIDI (c) SAIFI (d) MAIFIe (e) CEMI5 (f) 63.1 69.0 54.2 60.8 57.8 56.6 57.5 76.9 76.8 52.0 72.9 72.6 74.5 49.5 72.4 74.5 63.8 52.0 60.7 67.8 64.1 60.5 68.1 65.6 92.1 72.5 60.6 80.6 62.6 69.4 57.9 60.3 59.5 64.5 1.21 1.14 0.80 0.95 0.96 0.83 0.88 0.83 1.06 0.86 0.90 1.16 1.07 0.85 1.20 1.25 0.99 8.3 9.7 7.6 8.9 9.1 6.7 7.3 9.0 10.3 7.1 8.0 9.6 11.1 8.8 7.9 12.1 8.7 3,270 977 1,872 1,434 2,268 1,254 2,796 2,103 905 1,435 1,816 3,390 2,726 4,953 1,514 2,177 34,890 99 Actual Data: Customer Minutes of Interruption (CMI), Customer Interruptions (CI) and Documented Exclusions Customer minutes of Interruption (CMI) Customer Interruptions (CI) 2014 Value Reported Actual Data (1) % of Actual 335,022,478 Value 100% % of Actual 5,099,256 100% Documented Exclusions Planned Service Interruptions 22,736,106 7% 290,608 6% Named Storm 7,819,424 2% 100,547 2% Tornadoes 2,760,339 1% 31,025 1% Ice on Lines 0 0% 0 0% Planned Load Management Events 0 0% 0 0% Generation/Transmission Events (2) Extreme Weather (EOC Activation/Fire) Reported Adjusted Data 13,456,309 0 301,706,609 Notes: (1) Excludes Generation/Transmission Events per 25-6.0455(2) (2) Informational Only, as reported actual data already excludes Generation/Transmission Events N/A 0% 90% 982,548 0 4,677,076 N/A 0% 92% Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 CI CMI 1 3 29 2 10 1 1 12 8 1 1 4 1 11 1 543 1 1 1 1 6 8 1 944 122 8 8 8 1 1 6 11 9 6 14 44 83 11 12 38 18 1 143 2 10 87 59 25 49 52 16 2 1 93 144 2,175 250 2,170 186 38 852 1,504 143 124 224 81 1,056 28 25,305 416 155 296 240 552 592 86 44,697 23,180 1,072 336 272 42 450 672 726 657 456 1,330 2,904 5,063 3,245 6,648 2,584 972 531 14,744 234 1,880 4,959 5,782 6,000 4,214 5,772 4,480 482 4 L-Bar Repair Cost 93 48 75 125 217 186 38 71 188 143 124 56 81 96 28 206 416 155 296 240 92 74 86 240 190 134 42 34 42 450 112 66 73 76 95 66 61 295 554 68 54 531 108 117 188 57 98 240 86 111 280 241 4 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 CI 66 812 4 2,414 230 1 3 7 4 6 2,710 46 4,060 1,836 4 1,898 59 1,167 24 11 22 10 5 1 2,702 76 1 3 12 1 637 94 95 52 4 11 50 1,383 11 22 34 10 1 1,210 2 7 1 4 21 50 116 4 6 CMI 13,002 352,180 788 2,414 1,380 213 927 2,135 836 504 97,560 35,742 56,840 439,926 1,476 3,796 20,768 144,013 2,592 231 9,922 1,600 1,085 361 529,285 33,740 226 1,176 2,136 184 101,920 50,854 85,821 55,640 648 1,507 12,200 203,777 10,483 3,124 65,552 2,140 356 4,840 332 1,148 302 140 11,340 6,000 14,500 428 1,506 L-Bar 197 589 197 1 6 213 309 305 209 84 36 777 14 261 369 2 352 278 108 21 718 160 217 361 1,024 628 226 392 178 184 160 541 1,312 1,070 162 137 244 485 953 142 1,928 214 356 4 166 164 302 35 540 120 125 107 251 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 CI CMI 1 1 1 10 4 1 13 1 11 11 4 1 1 1 1 1 1 1 3 5 12 11 1 1 56 44 1 16 6 1 44 8 1 1 6 1 3 1 8 1 11 1 734 1 3 19 16 1 2 1 1 1 8 59 316 83 920 668 55 2,236 71 6,160 1,331 584 114 44 52 68 115 57 14 369 20 1,056 3,322 88 22 7,448 5,720 188 1,968 216 521 792 1,048 19 530 894 57 417 57 240 66 1,386 767 15,305 335 1,380 3,743 4,608 732 172 127 24 59 192 L-Bar Repair Cost 59 316 83 92 167 55 172 71 560 121 146 114 44 52 68 115 57 14 123 4 88 302 88 22 133 130 188 123 36 521 18 131 19 530 149 57 139 57 30 66 126 767 44 335 460 197 288 732 86 127 24 59 24 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Date 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 CI 36 1 1 1 4 20 11 62 39 1 48 4 1 2 1 4 15 1 34 30 2 10 28 4 37 38 35 3 107 1 1 41 11 22 5 6 9 1,314 44 7 8 63 48 35 10 29 18 641 9 3 2,159 198 66 CMI 3,420 14 601 49 1,972 8,540 924 117,614 4,791 154 6,768 620 102 86 18 556 2,025 14 3,672 4,200 288 480 1,288 516 2,183 2,242 3,990 567 5,564 216 55 2,419 583 3,185 1,115 342 3,780 74,682 8,360 791 2,128 3,465 7,344 4,270 1,270 4,495 1,170 21,439 1,638 126 122,723 119,592 9,834 L-Bar 95 14 601 49 493 427 84 1,897 134 154 141 155 102 43 18 139 135 14 108 140 144 48 46 129 59 59 114 189 52 216 55 59 53 338 223 57 420 77 190 113 266 55 153 122 127 155 65 38 182 42 77 604 149 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Date 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 CI CMI 123 2 49 63 6 59 104 2 6 8 3 10 12 9 4 12 34 3 1 65 83 4 16 3 3 2 36 5 11 5 6 3 44 1 3 3 3 10 34 6 1 4 2 1 30 6 1 4 1 1 10 1 3 70,725 356 11,391 7,053 810 40,474 11,545 314 582 2,648 243 1,820 2,688 3,339 1,068 816 5,950 561 164 12,285 14,359 416 2,464 528 1,437 178 2,988 980 792 1,090 2,592 639 2,288 85 321 369 684 250 2,346 1,968 101 520 206 216 4,380 864 9 676 170 248 1,130 46 423 L-Bar Repair Cost 576 178 272 471 135 686 112 157 97 331 81 182 224 371 267 68 175 187 164 189 173 104 154 176 479 89 83 196 72 218 432 213 52 85 108 123 228 25 69 328 101 130 103 216 146 144 9 169 170 248 113 46 141 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tornado Activity Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 CI 1 8 7 5 5 1 2 25 5 1 15 19 8 5 4 1 12 1 2 64 11 34 1 2,006 1 1 104 4 1 1 1 3 6 1 3 12 1 1 4 6 1 1 759 4 1 1 9 1 1 1 11 8 58 CMI 101 1,520 1,918 230 470 33 506 8,750 435 94 8,535 1,482 120 80 676 297 1,872 33 914 11,456 2,893 5,576 124 73,033 87 94 5,616 1,024 107 77 303 1,113 318 113 573 132 121 69 624 1,290 101 150 2,277 1,132 42 6 1,737 49 88 100 1,023 2,760 20,724 L-Bar Repair Cost 101 190 274 46 94 33 253 350 87 94 569 78 15 16 169 297 156 33 457 179 263 164 124 42 87 94 54 256 107 77 303 371 53 113 191 11 121 69 156 215 101 150 3 283 42 6 193 49 88 100 93 345 721 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 CI CMI 4 20 36 3 12 49 1 2 8 46 19 1 11 2 1 1 10 1 3 12 8 20 72 1 7 6 2 1 7 9 8 79 10 4 2 8 8 29 15 1 8 5 1 22 4 3 59 43 22 3 7 2 5 448 420 16,164 1,224 7,668 3,577 84 252 888 12,318 7,258 208 2,453 282 214 31 830 103 249 528 576 2,000 19,008 23 1,526 1,152 240 52 5,341 603 1,672 5,530 2,170 168 322 4,704 808 2,320 2,595 60 2,630 2,395 42 1,848 476 234 58,655 4,429 8,008 366 4,788 564 1,345 L-Bar 112 21 563 408 639 73 84 126 111 633 382 208 223 141 214 31 83 103 83 44 72 100 264 23 218 192 120 52 763 67 209 70 217 42 161 588 101 80 173 60 425 479 42 84 119 78 1,081 103 364 122 684 282 269 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 CI 6 16 5 43 1 1 86 5 27 7 2 33 1 1 1 8 2,110 13 8 2 1 1 4 1 10 7 6 16 8 10 2 98 16 13 94 6 46 28 63 13 29 1 8 1,876 85 73 48 10 89 69 7 88 1,005 CMI 726 960 1,480 11,076 13 87 10,396 955 4,285 1,932 378 2,508 233 170 267 1,976 38,088 286 488 460 57 208 604 51 1,800 714 960 768 2,912 7,220 128 32,794 4,368 4,953 13,818 1,110 5,106 1,900 6,678 3,484 3,567 247 752 147,669 26,775 21,389 3,456 2,510 6,141 14,145 994 6,160 99,921 L-Bar Repair Cost 121 60 296 468 13 87 306 191 253 276 189 76 233 170 267 247 279 22 61 230 57 208 151 51 180 102 160 48 364 722 64 382 273 381 147 185 111 118 106 268 123 247 94 206 315 293 72 251 69 205 142 70 201 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Date 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 CI 1,197 44 20 38 35 1 7 1 5 32 45 8 23 78 19 22 51 15 19 1 9 18 14 10 3 1 19 9 1 5 2 9 1 36 22 12 4 1 43 9 1 1 6 31 12 1 1 970 1 35 6 9 1 CMI 147,618 3,476 2,520 1,862 3,605 112 931 120 1,010 2,272 2,925 872 4,094 5,460 3,363 3,234 5,202 1,740 2,432 64 3,591 2,664 4,648 1,650 561 86 3,536 1,683 147 830 442 2,871 12 10,584 1,562 1,260 984 186 8,542 2,574 103 71 1,098 7,347 1,056 237 60 74,110 47 10,255 720 1,566 59 L-Bar Repair Cost 315 79 126 49 103 112 133 120 202 71 65 109 178 70 177 147 102 116 128 64 399 148 332 165 187 86 187 187 147 166 221 319 12 294 71 105 246 186 218 286 103 71 183 237 88 237 60 711 47 293 120 174 59 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Tropical Storm Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI CMI 1 43 3 65 15 51 34 36 977 16 1 1 1 4 6 11 65 14 6 1 4 2 4 12 10 6 8 20 1 1 8 1 3 3 42 45 3 27 47 3 6 4 7 21 9 14 34 6 1 2 1 3 1 313 9,468 1,152 5,590 2,670 26,874 4,522 55,116 53,123 7,808 112 121 214 612 888 1,067 22,823 756 108 199 1,144 986 1,316 3,984 3,320 1,446 7,104 6,320 539 34 2,168 26 654 312 4,662 10,170 111 12,015 6,063 1,113 276 388 658 1,071 1,053 1,078 2,448 636 86 412 49 156 8 L-Bar 313 534 384 86 178 584 133 1,531 120 488 112 121 214 153 148 97 576 54 18 199 286 493 329 332 332 241 888 316 539 34 271 26 218 104 111 226 37 445 129 371 46 97 94 51 117 77 72 106 86 206 49 52 8 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI 1 2 71 4 6 1 1 6 4 61 3,232 14 22 1 90 1 7 1 2 7 1 2 7 1 1 1 11 1 2 92 1 1 1 4 4 2 4 2 6 21 5 3 1 1 1 8 1 2 1 41 29 1 4 CMI 314 1,142 20,002 1,084 672 94 111 678 1,728 3,660 3,232 2,380 9,333 60 20,650 116 875 388 1,220 476 375 120 952 405 42 229 572 141 74 6,256 48 306 76 276 360 1,176 256 926 414 1,428 1,630 171 536 83 260 2,560 201 126 312 3,116 3,741 265 416 L-Bar Repair Cost 314 571 322 271 112 94 111 113 432 60 1 170 492 60 287 116 125 388 610 68 375 60 136 405 42 229 52 141 37 68 48 306 76 69 90 588 64 463 69 68 326 57 536 83 260 320 201 63 312 76 129 265 104 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI CMI 50 1 1 5 10 3 6 22 1 33 1 2 10 2 4 1 2 9 63 5 1 11 1 2 1 7 6 4 8 11 10 1 4 1 10 8 1 14 3 1 1 6 7 6 8 8 2 1 1 6 1 7 3 1,650 103 170 1,350 2,170 810 960 7,128 536 1,287 267 660 2,210 210 188 75 34 2,034 4,914 520 227 1,199 49 414 92 413 516 840 528 561 460 612 896 85 1,000 544 43 770 531 256 353 2,424 1,141 840 480 512 208 155 54 342 180 161 969 L-Bar Repair Cost 33 103 170 270 217 270 160 324 536 39 267 330 221 105 47 75 17 226 78 104 227 109 49 207 92 59 86 210 66 51 46 612 224 85 100 68 43 55 177 256 353 404 163 140 60 64 104 155 54 57 180 23 323 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI CMI 2 1 1 27 4 1 8 3 6 7 1 1 1 9 2 1 1 24 10 1 3 12 1 7 7 4 1 1 1 2 4 8 6 13 6 14 65 1 6 6 19 7 1 1 25 8 1 54 5 1 2 6 3 148 134 300 1,944 216 196 568 279 348 406 557 21 62 90 92 52 292 4,248 730 93 102 1,236 40 315 217 924 5 113 27 86 356 624 1,056 1,079 108 700 6,305 160 594 1,836 1,748 70 68 86 1,650 136 57 5,778 370 46 56 726 156 L-Bar Repair Cost 74 134 300 72 54 196 71 93 58 58 557 21 62 10 46 52 292 177 73 93 34 103 40 45 31 231 5 113 27 43 89 78 176 83 18 50 97 160 99 306 92 10 68 86 66 17 57 107 74 46 28 121 52 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI 1 1 1 13 31 2 2 9 83 1 2 16 5 1 1 85 1,756 5 8 11 3 6 30 6 1 13 19 1 1 2,495 34 4 4 27 1 2 2 10 23 11 2 7 1 8 21 44 7 1 10 10 1 2 1 CMI 213 570 1 78 163 114 756 333 5,561 100 352 400 275 10 140 4,845 83,704 1,040 136 693 81 528 1,890 126 178 117 973 84 369 115,967 7,140 796 1,152 2,565 157 292 372 720 2,300 506 108 490 55 488 2,646 3,432 805 71 660 1,480 71 178 174 L-Bar Repair Cost 213 570 1 6 12 57 378 37 67 100 176 25 55 10 140 57 67 208 17 63 27 88 63 21 178 9 90 84 369 221 210 199 288 95 157 146 186 72 100 46 54 70 55 61 126 78 115 71 66 148 71 89 174 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI 26 1 11 1 1 1 797 22 2 21 22 1 1 5 2 103 1 4 3 6 3 49 1 4 97 2 1 1 1 90 1,754 4 1 4 1 4 12 1 1 1 9 1 4 1 18 4 1 1 1 1 1 11 30 CMI 5,486 122 880 50 11 49 16,737 1,540 144 4,263 1,210 11 9 1,300 420 11,433 144 92 231 156 117 18,718 36 692 9,894 302 52 115 67 3,330 5,262 156 229 1,000 23 636 3,240 148 70 79 522 59 216 77 1,080 896 227 319 114 61 87 539 4,546 L-Bar Repair Cost 211 122 80 50 11 49 21 70 72 203 55 11 9 260 210 111 144 23 77 26 39 382 36 173 102 151 52 115 67 37 3 39 229 250 23 159 270 148 70 79 58 59 54 77 60 224 227 319 114 61 87 49 164 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI 4 1 13 59 16 1 4 1 27 1 25 8 2 50 1 6 8 1 1 272 9 2 17 1 1 1 1 5 6 1 4 26 36 1 25 7 2 7 10 43 62 12 1 3,775 39 129 8 1 73 77 86 6 117 CMI 448 66 676 4,602 240 61 948 169 2,619 46 1,400 560 28 2,550 65 876 952 107 22 49,232 261 70 1,632 8 28 157 104 1,380 528 101 68 6,786 1,980 103 1,675 322 482 322 3,840 9,245 6,767 1,620 382 3,775 5,382 6,192 1,680 230 5,329 5,621 6,278 1,506 8,307 L-Bar Repair Cost 112 66 52 78 15 61 379 169 259 46 56 70 14 51 65 146 119 107 22 181 29 35 96 8 28 157 104 276 88 101 17 261 55 103 67 46 241 46 384 215 301 135 382 1 138 48 210 230 73 73 73 251 71 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI 7 2 47 7 46 182 17 12 2 43 154 3 333 4 1 4 1 7 3 1 39 10 124 20 1 1 12 45 969 1 7 40 16 1 1 47 1,773 99 1,222 98 1 6 86 4 10 30 30 8 7 10 2 47 1 CMI 189 356 2,350 511 2,438 10,192 714 1,236 98 3,569 9,394 273 22,644 36 56 88 54 531 120 175 2,028 2,620 33,232 1,940 4 182 1,104 12,915 52,326 35 105 5,080 3,872 160 45 4,935 92,274 14,751 80,639 7,938 116 726 6,020 6,108 670 11,430 4,360 2,888 623 2,340 436 4,371 131 L-Bar 27 178 50 73 53 56 42 103 49 83 61 91 68 9 56 22 54 263 40 175 52 262 268 97 4 182 92 287 54 35 15 127 242 160 45 105 163 149 203 81 116 121 70 1,527 67 381 429 361 89 234 218 93 131 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 CI CMI 1 2 19 3 1 4 16 2 1 314 98 11 1 1 5 11 12 9 7 19 2 3 1 1 12 80 1 1 1 1 12 7 1 1 1 2 1 1 1 153 2 20 3 10 1 10 14 8 1 4 30 10 20 179 608 1,501 561 64 304 4,704 272 73 25,120 2,940 8,327 62 223 2,275 2,728 948 810 1,148 1,824 282 1,611 185 201 1,128 4,800 151 132 51 87 5,832 63 43 30 166 218 149 80 271 24,786 94 6,040 225 640 109 740 2,296 1,400 147 192 2,820 2,410 1,860 L-Bar Repair Cost 179 304 79 187 64 76 294 136 73 80 30 757 62 223 455 248 79 90 164 96 141 537 185 201 94 60 151 132 51 87 486 9 43 30 166 109 149 80 271 162 47 302 75 64 109 74 164 175 147 48 94 241 93 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI CMI 11 4 86 10 63 2 7 42 7 1 1 72 1 10 3 1 3 23 13 8 4 12 2 4 1 11 8 1 11 1 5 8 13 8 1 1 12 6 88 14 13 2 71 32 1 45 46 18 12 2 1 1 3 3,327 1,276 5,934 1,360 7,056 118 2,142 10,080 392 343 174 6,308 88 3,320 543 57 126 2,967 3,536 536 356 900 76 2,136 99 550 1,800 33 506 84 825 368 1,664 424 152 359 756 450 5,632 6,048 2,139 662 12,087 1,216 64 4,320 2,668 2,376 4,356 602 144 66 933 L-Bar Repair Cost 357 319 69 136 112 59 306 240 56 343 174 89 88 332 181 57 42 129 272 67 89 75 38 534 99 50 225 33 46 84 165 46 128 53 152 359 63 75 64 432 285 331 177 38 64 96 58 132 363 301 144 66 311 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI 12 1 1 37 1 1 624 2 18 70 5 1 4 27 12 1,050 2 6 55 7 4 4 1 6 1 1 1 18 7 7 13 7 9 20 42 16 1 1 1 103 1 5 5 6 3 8 19 1 129 2 67 4 57 CMI 6,036 30 157 3,848 114 177 26,832 532 3,240 5,740 475 194 532 4,455 984 86,730 346 858 13,200 476 364 464 263 516 204 62 113 2,034 700 707 715 987 648 1,240 12,075 896 490 65 240 3,914 119 825 25 1,812 3 768 2,755 416 4,515 182 3,082 1,100 9,519 L-Bar Repair Cost 503 30 157 104 114 177 43 266 180 82 95 194 133 165 82 461 173 143 240 68 91 116 263 86 204 62 113 113 100 101 55 141 72 62 390 56 490 65 240 38 119 165 5 302 1 96 145 416 35 91 46 275 167 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI 6 1 6 1 155 8 1 23 1 1 1 7 4 8 10 1 6 7 2 3,146 1 166 1 1 11 3 2 1 1 8 1 16 15 11 41 27 1 1 1 17 2 3 1 11 1 1 6 10 6 6 24 18 1 CMI 882 49 126 251 32,860 1,088 658 5,101 67 79 19 371 188 224 1,620 383 624 1,288 220 6,292 132 19,588 110 230 1,034 357 314 242 43 784 87 544 4,140 1,276 6,806 2,235 169 34 277 3,740 92 399 54 1,848 88 9 738 170 540 540 1,992 4,464 134 L-Bar Repair Cost 147 49 21 251 212 136 658 227 67 79 19 53 47 28 162 383 104 184 110 2 132 118 110 230 94 119 157 242 43 98 87 34 276 116 166 95 169 34 277 220 46 133 54 168 88 9 123 17 90 90 83 248 134 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI 20 16 13 7 1,313 3 998 11 1 1 24 2 1 8 40 2 11 3 4 4 1 96 1 5 8 1 7 1 1 1 1 1 1 16 8 15 1 8 1 8 1 2 134 1,780 32 6 1 1 6 7 1 11 5 CMI 4,940 3,360 481 1,736 35,055 399 99,946 660 124 213 14,488 98 484 224 2,720 674 847 270 192 188 80 5,472 67 1,815 3,000 49 812 291 11 336 303 273 242 7,424 1,448 1,200 104 1,072 84 2,616 62 610 14,070 33,820 3,151 1,020 21 48 210 2,723 75 3,916 520 L-Bar Repair Cost 247 210 37 248 27 133 151 60 124 213 751 49 484 28 68 337 77 90 48 47 80 57 67 363 375 49 116 291 11 336 303 273 242 464 181 80 104 134 84 327 62 305 105 19 107 170 21 48 35 389 75 356 104 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI 1,835 43 111 6 3 26 1 7 1 51 38 4 1 12 66 74 60 11 1 2,359 1 8 192 15 7 12 8 8 1 9 1 32 13 27 4 40 4 1 34 2,743 12 41 15 4 73 8 6 99 2 7 1 21 14 CMI 123,975 8,729 10,767 462 237 2,028 304 609 343 2,193 4,560 272 12 1,512 17,358 3,478 4,596 1,881 63 32,795 90 2,376 9,984 3,285 35 684 3,176 2,744 178 207 113 1,440 2,691 15,633 728 4,440 1,116 201 7,990 95,485 2,400 13,120 2,925 1,984 11,388 5,040 444 15,741 318 1,078 73 2,961 2,380 L-Bar Repair Cost 69 203 97 77 79 78 304 87 343 43 120 68 12 126 263 47 126 171 63 58 90 297 52 219 5 57 397 343 178 23 113 45 207 579 182 111 279 201 235 82 200 320 195 496 156 630 74 159 159 154 73 141 170 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI 28 11 93 1 17 2 15 9 44 29 8 62 5,483 4 6 17 80 3 1 3 10 4 13 10 1 37 6 5 4 13 14 6 6 7 2 18 11 8 38 19 4 6 1 2 40 1 14 1 12 1 9 4 21 CMI 9,268 4,543 4,185 107 2,705 44 8,775 1,908 10,296 4,814 88 10,292 88,844 844 1,434 4,114 32,240 915 335 1,014 680 348 2,197 505 55 5,587 1,452 2,495 428 2,825 966 222 1,098 357 182 648 2,057 656 9,416 1,121 552 1,992 42 120 3,160 116 2,072 188 1,560 106 1,224 244 1,365 L-Bar Repair Cost 331 413 45 107 165 22 585 212 234 166 11 166 249 211 239 242 403 305 335 338 68 87 169 334 55 151 242 499 107 413 69 37 183 51 91 36 187 82 476 59 138 332 42 60 79 116 148 188 130 106 136 61 65 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI CMI 1 6 9 1 6 3 1 18 15 5 1 1 1 1 3 1 1 1 8 28 42 7 33 1 1 1 87 1 13 1 112 10 7 5 1 51 9 4 28 1 9 35 114 1 11 5 2 8 1 4 15 36 7 93 456 1,611 262 1,350 366 469 1,069 1,395 235 135 46 66 20 642 63 207 188 552 3,052 14,986 1,393 15,246 187 139 25 5,220 34 1,393 224 15,008 1,190 623 2,855 157 6,426 576 516 2,324 185 2,313 3,220 114 74 1,994 665 242 2,312 201 912 1,755 1,584 2,065 L-Bar Repair Cost 93 76 179 262 225 122 469 63 93 47 135 46 66 20 214 63 207 188 69 109 369 199 462 187 139 25 60 34 109 224 134 119 89 571 157 126 64 129 83 185 257 92 1 74 268 133 121 289 201 228 117 44 295 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI CMI 1 1 1 13 1 1 1 3 4 15 1 2 8 8 1 1 1 122 15 1 1 5 9 2 60 11 2 1 1 1 5 1 1 1 1 2 4 1 1 1 1 1 2 5 1 1 44 72 169 2 1 8 106 667 65 55 2,002 90 164 136 231 908 4,155 113 248 992 976 53 138 316 4,148 1,290 331 124 570 369 112 3,600 1,221 162 50 269 143 615 92 236 173 72 962 104 49 201 52 184 23 54 130 12 83 5,254 9,576 8,450 78 323 2,816 12,190 L-Bar Repair Cost 667 65 55 154 90 164 136 77 227 277 113 124 124 122 53 138 316 34 86 331 124 114 41 56 60 111 81 50 269 143 123 92 236 173 72 481 26 49 201 52 184 23 27 26 12 83 133 133 50 39 323 352 115 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 CI CMI 7 5 18 27 5 2 3 1 9 13 1 3 94 1 17 2 7 130 2 6 4 9 1 4 88 4 8 123 1 8 1 7 14 1 98 42 10 2 9 1 2 1 1 2 1 26 22 1 1 56 3 2 2 105 45 972 2,741 455 522 966 77 1,098 1,300 29 156 10,246 446 629 248 322 8,060 440 330 280 1,647 436 308 4,840 2,120 24 8,979 46 904 63 1,260 6,762 261 18,522 1,596 810 748 2,763 57 86 47 87 64 20 1,144 1,199 60 123 8,442 1,164 118 1,324 L-Bar Repair Cost 15 9 54 193 91 261 322 77 122 100 29 52 109 446 37 124 46 62 220 55 70 183 436 77 55 530 3 73 46 113 63 180 483 261 189 38 81 374 307 57 43 47 87 32 20 44 70 60 123 180 388 59 662 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 CI 1 1 3 2 1 1 2 1 1 11 1 1 1 48 15 1 1 8 14 10 21 1 1 1 1 1 6 40 2 103 1 58 10 9 1 1 1,663 10 11 7 46 8 2 1 1 3 3 2 1 1 4 29 24 CMI 47 176 84 150 111 24 146 84 82 2,464 36 32 1,496 6,672 3,945 93 17 472 1,848 2,920 1,657 422 181 429 63 100 48 5,200 220 17,098 318 8,758 390 1,692 83 212 99,428 240 1,936 378 2,346 672 68 74 36 405 420 74 130 418 772 4,872 2,688 L-Bar 47 176 28 75 111 24 73 84 82 224 36 32 1,496 139 263 93 17 59 132 292 85 422 181 429 63 100 8 139 110 166 318 151 39 188 83 212 84 24 176 54 51 84 34 74 36 135 140 37 130 418 193 168 112 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 CI CMI 3 1 4 1 3 107 5 2 1 34 6 11 1 11 15 1 3 1 1 1 1 5 1 1 33 123 2 5 8 11 67 8 1 9 12 10 12 4 1 1 16 362 2 8 2 968 53 2 15 545 1 1 6 501 227 984 53 24 5,136 580 448 53 6,766 1,608 1,199 122 1,826 1,785 105 24 210 62 99 179 400 82 183 14,487 49,815 424 905 1,576 891 3,953 3,680 131 1,709 1,824 1,390 3,348 672 99 58 864 28,236 98 1,112 760 39,132 4,823 318 1,710 36,515 585 103 492 L-Bar Repair Cost 167 227 246 53 8 48 116 224 53 199 268 109 122 166 119 105 8 210 62 99 179 80 82 183 439 405 212 181 197 81 59 460 131 200 152 139 279 168 99 58 54 78 49 139 380 77 91 159 114 67 585 103 82 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 CI 23 41 7 36 62 1 1 139 28 42 6 1 77 32 1 84 22 9 45 5 1 51 21 25 15 23 57 5 3 5 7 1 11 19 1 1 2,133 5 4 4 88 17 103 61 452 3 6 18 1 17 9 1 102 CMI 5,050 12,751 357 2,196 3,286 82 138 15,151 3,500 4,662 426 99 18,865 1,984 165 4,200 3,542 2,313 7,204 555 770 4,284 882 3,724 7,350 1,035 10,830 705 21 685 364 99 3,531 8,246 227 229 106,425 1,255 1,224 572 3,432 3,995 19,535 24,827 31,188 135 2,454 7,038 266 2,046 1,404 165 10,200 L-Bar Repair Cost 455 311 51 61 53 82 138 109 125 111 71 99 245 62 165 50 161 257 182 111 770 84 42 209 490 45 190 141 7 137 52 99 321 434 227 229 55 251 306 143 39 235 477 407 69 45 409 391 266 318 156 165 100 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Date 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 CI CMI 2 2 1 55 53 1 28 1 79 1 14 13 1 8 1 132 1 1 12 10 3 1 3 14 5 132 1 5 7 57 7 116 1 25 50 112 51 100 20 1 1 12 3 10 1 15 1 10 5 79 21 1 16 116 90 262 7,191 2,862 45 1,540 446 10,902 135 1,624 2,951 65 4,840 141 4,620 502 345 1,248 2,910 696 111 996 1,372 75 10,428 123 900 1,512 7,013 441 41,760 847 650 11,350 2,800 4,437 11,625 1,600 164 148 3,432 237 320 78 1,335 144 700 2,470 6,952 903 214 3,136 L-Bar Repair Cost 58 45 262 387 54 45 55 446 138 135 116 227 65 605 141 35 502 345 104 291 232 111 332 98 15 79 123 180 216 137 63 360 847 26 227 25 87 235 80 164 148 286 79 32 78 89 144 70 494 88 43 214 196 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Hurricane Arthur Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 7/6/2014 CI CMI 102 27 5 1 11 7 1 124 1 1 1 45 1 13 13 6 1 20 14 6 1 1 1 1 1 17 1 17 13 1 16 1 30 97 3 6 32 1 1 2 1 5 3 8 3 1 19 4 1 16 1 1 6 6,982 3,915 125 119 2,871 910 126 16,740 123 171 57 10,710 124 2,262 1,742 438 160 1,320 854 408 169 221 364 115 195 4,233 32 765 4,813 171 5,120 67 5,610 31,234 573 756 3,904 124 176 288 151 315 132 2,104 705 124 4,712 184 252 1,520 233 191 528 L-Bar Repair Cost 140 145 25 119 261 130 126 135 123 171 57 238 124 174 134 73 160 66 61 68 169 221 364 115 195 249 32 45 505 171 320 67 187 322 191 126 122 124 176 144 151 63 44 263 235 124 248 46 252 95 233 191 88 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 CI CMI 4 1 1 35 1 1 38 1 50 8 1 1 1 1 1 1 6 1 1 1 1 1 1 1 3 2 4 1 11 1 9 1 2 1 5 9 12 1 11 14 3 1 3 11 6 4 9 1 4 2 1 1 28 292 77 131 5,530 9 74 2,356 44 15,550 512 85 65 53 290 232 469 468 76 46 312 290 245 29 102 960 22 1,564 78 473 226 9 276 194 249 240 9 12 521 88 882 129 123 300 33 31 176 9 15 384 134 120 46 3,752 L-Bar Repair Cost 73 77 131 158 9 74 62 44 311 64 85 65 53 290 232 469 78 76 46 312 290 245 29 102 320 11 391 78 43 226 1 276 97 249 48 1 1 521 8 63 43 123 100 3 6 44 1 15 96 67 120 46 134 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 CI CMI 2 1 1 10 3 89 20 24 4 1 42 1 1 2 1 4 16 13 157 22 69 2 22 33 8 1 10 10 1 16 84 37 68 27 3 8 174 9 83 5 41 3 4 2 36 332 23 47 37 1 12 1 14 20 154 181 4,270 381 13,054 3,240 1,896 396 120 3,024 317 190 208 134 1,092 3,792 169 8,164 4,026 7,455 20 5,038 6,237 1,152 528 780 1,330 87 3,040 10,332 5,698 5,644 2,808 873 1,048 28,014 2,772 11,537 1,995 9,881 192 816 118 5,148 23,572 3,215 10,857 6,068 233 4,320 471 1,498 L-Bar Repair Cost 10 154 181 427 127 586 162 79 99 120 72 317 190 104 134 273 237 13 52 183 588 10 229 189 352 528 78 133 87 190 123 154 83 104 291 131 161 308 139 399 241 64 204 59 143 71 380 231 164 233 360 471 107 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 CI CMI 8 13 30 13 9 1 5 910 9 42 7 23 29 15 2 1 9 1 180 26 9 16 10 9 3 5 2 5 1 131 26 9 13 10 93 14 1 4 29 110 54 4 18 8 2 7 9 14 79 5 11 8 2 568 2,132 4,890 5,265 1,629 254 845 55,510 3,699 9,660 1,317 2,530 2,900 1,635 336 69 1,908 243 17,640 4,283 1,647 1,552 3,800 540 513 1,080 48 610 166 22,139 2,756 1,611 1,482 3,680 11,229 2,184 138 196 2,755 10,120 14,526 284 2,556 896 94 1,400 855 2,744 6,478 610 5,544 680 198 L-Bar Repair Cost 71 164 163 405 181 254 169 61 411 230 296 110 100 109 168 69 212 243 98 166 183 97 380 60 171 216 24 122 166 169 106 179 114 368 145 156 138 49 95 92 269 71 142 112 47 200 95 196 82 122 504 85 99 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 CI 10 30 1 4 19 1 1 11 10 15 8 2 3 2 1 1 1 10 2 1,024 38 3 47 5 5 7 1 29 1 1 1 2 3 58 1 22 1 2 1 20 3 34 14 1 1 1 1 2 13 1 26 1 11 CMI 890 1,740 236 408 1,757 59 82 858 430 1,892 1,684 74 618 1,126 153 64 307 4,370 82 5,831 3,838 534 8,930 1,755 350 3,122 83 17,545 70 46 70 256 168 11,252 25 2,904 69 860 331 8,060 285 10,105 1,512 143 220 339 354 396 1,222 79 4,446 335 1,320 L-Bar Repair Cost 91 58 236 102 258 59 82 78 43 253 338 37 206 563 153 64 307 437 41 92 101 178 190 351 70 446 83 605 70 46 70 128 56 194 25 132 69 430 331 403 95 320 108 143 220 339 354 198 94 79 171 335 120 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 CI 35 19 4 8 1 1 1 1 266 3,132 58 28 1 4 1 48 26 5 29 1 1 917 2 77 1 1 2 5 10 9 50 9 3 4 1 1 12 169 26 11 3 1 5 1 1 2,475 11 1 1 54 1 1 26 CMI 7,385 1,615 1,308 3,848 207 443 64 46 73,416 283,056 8,526 7,084 188 704 233 5,808 6,344 3,065 11,252 155 141 78,085 186 10,395 191 445 452 2,085 6,270 1,125 5,400 4,023 1,506 1,840 413 170 1,044 14,872 8,164 6,226 561 6 565 481 121 14,850 1,331 105 65 3,348 124 85 3,562 L-Bar Repair Cost 211 85 327 481 207 443 64 46 276 438 147 253 188 176 233 121 244 613 388 155 141 353 93 135 191 445 226 417 627 125 108 447 502 460 413 170 87 88 314 566 187 6 113 481 121 6 121 105 65 62 124 85 137 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 CI 6 1 2,244 1 4 2 4 1 11 1 49 1 7 1 48 1 2 1 8 1 6 60 8 1 13 7 5 10 1 10 1 5 1 1 1 6 7 4 90 22 47 863 2 14 2 47 2 12 58 1 27 1 34 CMI 3,714 25 2,244 81 292 736 992 50 693 195 2,940 196 770 26 5,424 138 460 89 640 89 1,092 9,420 4,176 202 1,480 1,127 1,165 220 48 640 169 165 230 60 77 1,590 259 288 11,670 9,966 4,277 58,456 800 1,890 98 2,914 518 600 13,746 108 2,862 28 32,844 L-Bar Repair Cost 619 25 1 81 73 368 248 50 63 195 60 196 110 26 113 138 230 89 80 89 182 157 522 202 136 161 233 22 48 64 169 33 230 60 77 265 37 72 198 453 91 113 400 135 49 62 259 50 237 108 106 28 966 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 CI CMI 39 49 8 24 90 1 24 52 12 146 70 14 5 1 164 67 11 3 1 4 2 11 4 9 8 35 43 1 772 45 2 5 3 8 46 21 10 13 47 2 114 8 2 4 24 10 50 38 29 1 20 19 9 1,638 2,597 2,016 11,784 25,524 579 3,768 2,678 6,204 67,306 2,310 1,442 1,290 138 54,120 12,328 6,102 177 472 440 116 616 320 1,899 6,664 5,635 11,911 157 24,704 18,086 414 2,420 174 2,876 9,084 4,116 3,120 1,583 15,933 298 14,879 4,424 74 1,292 4,121 1,900 6,403 7,334 9,280 109 2,520 4,446 2,880 L-Bar Repair Cost 42 53 252 491 493 579 157 85 517 461 33 103 258 138 330 184 592 59 472 110 58 56 80 211 833 161 277 157 32 642 207 484 58 507 216 196 312 297 339 149 131 553 37 323 172 190 388 193 320 109 126 234 320 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q10 - Distribution Excluded Extreme Weather Outage Events Causation Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Tornado Touchdown Date 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 CI CMI 3 5 742 4 39 55 21 1 588 1 1 1 6 20 10 1 5 21 38 8 97 18 1 5 1 16 576 4 12 366 3,330 20,492 332 17,862 7,909 2,058 232 71,124 377 64 82 1,752 2,760 3,860 132 2,060 10,899 3,496 512 6,596 1,314 127 1,245 89 2,778 8,640 204 1,380 L-Bar Repair Cost 122 666 66 83 458 389 98 232 438 377 64 82 292 138 386 132 412 519 92 64 68 73 127 249 89 185 15 51 115 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Forensics Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/1/2014 1/1/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 CI CMI 1 4 6 8 8 1 6 4 10 3 9 19 2 16 2 7 32 9 1 6 1 11 9 3 8 37 4 3 8 7 6 4 25 4 9 3 1 25 1 2 13 10 24 4 62 42 9 9 10 2 5 3 91 72 972 864 912 26 318 544 3,410 279 954 969 466 1,968 540 91 1,344 927 62 306 177 3,916 2,448 489 1,480 7,511 188 453 56 1,316 618 744 5,550 396 135 654 31 225 98 184 455 1,060 3,528 168 18,724 4,746 882 279 1,500 118 775 24 L-Bar 91 18 162 108 114 26 53 136 341 93 106 51 233 123 270 13 42 103 62 51 177 356 272 163 185 203 47 151 7 188 103 186 222 99 15 218 31 9 98 92 35 106 147 42 302 113 98 31 150 59 155 8 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST Date 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/2/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 1/3/2014 CI CMI 24 9 6 1 17 5 6 16 10 1 6 7 19 2 10 3 12 8 14 6 57 1 10 5 8 11 14 12 8 1 4 2 2 10 3 12 1 8 4 8 2 35 16 5 6 8 10 10 12 7 1 2,232 207 1,056 3 3,570 240 756 1,040 1,040 234 492 357 4,408 366 30 393 1,140 768 2,800 96 7,467 127 890 460 2,384 616 2,044 1,776 1,000 68 732 142 492 940 222 1,092 134 368 64 96 108 3,955 1,520 100 462 736 880 1,080 1,008 308 76 L-Bar 93 23 176 3 210 48 126 65 104 234 82 51 232 183 3 131 95 96 200 16 131 127 89 92 298 56 146 148 125 68 183 71 246 94 74 91 134 46 16 12 54 113 95 20 77 92 88 108 84 44 76 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/3/2014 1/4/2014 1/4/2014 1/4/2014 1/5/2014 1/5/2014 1/5/2014 1/5/2014 1/5/2014 1/5/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 CI CMI 7 9 1 1 5 10 6 3 1 9 24 11 8 1 8 1 2 17 12 15 3 1 31 10 6 10 1 14 26 6 24 4 1 3 1 12 3 8 1 1 36 1 1 11 3 2 8 4 10 11 5 672 1,899 186 40 860 1,590 2,178 705 184 1,557 4,800 1,782 712 279 880 56 490 1,717 1,776 240 429 97 341 1,930 102 1,400 225 462 5,278 12 360 304 83 165 33 1,584 75 1,528 1 107 576 39 63 3,135 453 56 8 132 1,510 1,650 750 L-Bar 96 211 186 40 172 159 363 235 184 173 200 162 89 279 110 56 245 101 148 16 143 97 11 193 17 140 225 33 203 2 15 76 83 55 33 132 25 191 1 107 16 39 63 285 151 28 1 33 151 150 150 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/6/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 CI CMI 4 2 1 3 5 6 4 2 1 4 4 6 1 5 3 14 1 10 18 1 2 8 12 4 1 1 2 31 3 1 911 2 4 1 9 14 24 14 3 2 7 1 1 19 7 12 8 1 73 15 19 352 352 31 258 355 36 752 86 101 360 88 24 129 325 405 2,170 158 1,230 1,980 108 262 736 1,212 188 51 91 214 93 927 306 84,066 48 812 38 801 4,522 3,024 854 432 136 735 160 151 1,786 1,316 948 664 102 1,825 2,340 2,432 L-Bar 88 176 31 86 71 6 188 43 101 90 22 4 129 65 135 155 158 123 110 108 131 92 101 47 51 91 107 3 309 306 361 24 203 38 89 323 126 61 144 68 105 160 151 94 188 79 83 102 25 156 128 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 CI CMI 1 4 10 1 12 8 4 5 12 3 7 7 2 1 2 10 10 1 4 6 7 15 10 12 8 1 6 2 2 3 4 13 2 2 6 1 6 7 24 6 8 4 2 34 8 2 11 4 6 32 8 31 488 1,010 49 1,404 480 852 45 372 336 1,099 518 376 44 134 1,470 730 91 564 1,146 1,330 2,955 980 2,096 536 88 714 4 376 435 508 260 110 264 240 4 528 854 3,576 906 1,048 188 402 3,774 1,168 178 869 20 72 3,168 312 L-Bar 31 122 101 49 117 60 213 9 31 112 157 74 188 44 67 147 73 91 141 191 190 197 98 209 67 88 119 2 188 145 127 20 55 132 40 4 88 122 149 151 131 47 201 111 146 89 79 5 12 99 39 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/7/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 CI CMI 5 3 10 207 5 3 1 2 2 1 7 4 1 6 12 5 1 4 8 3 3 10 9 6 15 2 2 5 3 8 2 8 9 4 4 3 5 2 3 3 22 4 18 2 1 5 6 4 8 8 7 185 399 1,310 10,557 140 252 139 584 584 142 147 796 104 240 1,008 785 98 96 688 183 624 630 1,107 426 1,275 742 144 590 228 480 108 776 603 512 672 252 460 22 333 207 3,322 260 450 162 82 1,105 264 56 600 88 1,008 L-Bar 37 133 131 51 28 84 139 292 292 142 21 199 104 40 84 157 98 24 86 61 208 63 123 71 85 371 72 118 76 60 54 97 67 128 168 84 92 11 111 69 151 65 25 81 82 221 44 14 75 11 144 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/8/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 CI CMI 2 5 8 15 34 10 2 13 11 1 166 15 38 1 2 3 4 5 2 4 5 5 4 4 9 5 5 1 16 8 35 17 3 17 2 5 4 2 7 7 3 3 4 15 1 4 3 3 8 14 12 302 1,290 872 2,910 6,324 720 64 1,196 957 33 9,462 2,040 2,014 72 198 120 224 75 150 272 235 1,145 372 508 792 70 100 164 1,616 792 3,010 1,173 258 1,802 124 320 344 196 665 343 171 126 664 2,205 380 1,040 201 231 96 4,018 1,164 L-Bar 151 258 109 194 186 72 32 92 87 33 57 136 53 72 99 40 56 15 75 68 47 229 93 127 88 14 20 164 101 99 86 69 86 106 62 64 86 98 95 49 57 42 166 147 380 260 67 77 12 287 97 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 CI CMI 4 6 43 1 11 9 1 15 42 1 4 27 5 3 2 5 6 2 2 1 11 16 5 1 2 3 6 4 2 2 18 1 1 2 16 8 4 12 9 17 4 1 166 38 4 5 1 2 1 2 15 508 270 6,063 30 495 477 69 2,310 7,140 79 956 4,185 135 252 82 410 948 222 206 93 1,034 2,400 60 190 378 396 108 580 354 556 1,098 116 319 640 320 552 348 1,440 549 3,009 568 40 4,316 836 268 825 338 110 5 158 3,765 L-Bar 127 45 141 30 45 53 69 154 170 79 239 155 27 84 41 82 158 111 103 93 94 150 12 190 189 132 18 145 177 278 61 116 319 320 20 69 87 120 61 177 142 40 26 22 67 165 338 55 5 79 251 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/9/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 CI CMI 4 15 6 4 2 5 1 4 12 2 3 8 3 2 7 1 2 3 5 2 1 1 1 4 5 1 3 4 16 12 4 2 3 1 3 4 7 12 1 3 1 3 6 6 4 2 5 8 1 7 2 1,032 1,035 654 580 250 140 65 500 168 134 57 72 75 244 630 216 182 12 340 204 298 45 16 224 325 203 516 396 2,352 1,836 576 4 147 65 597 512 756 1,692 192 138 103 27 546 486 668 158 670 448 125 651 54 L-Bar 258 69 109 145 125 28 65 125 14 67 19 9 25 122 90 216 91 4 68 102 298 45 16 56 65 203 172 99 147 153 144 2 49 65 199 128 108 141 192 46 103 9 91 81 167 79 134 56 125 93 27 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/10/2014 1/11/2014 1/11/2014 1/11/2014 1/11/2014 1/11/2014 1/11/2014 1/11/2014 1/11/2014 1/11/2014 1/12/2014 1/12/2014 1/12/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 CI CMI 2 14 1 6 9 6 17 17 8 1 1 1 1 1 19 23 50 10 2 1 1 1 1 9 7 8 11 5 4 2 1 1 4 1 14 23 7 8 8 7 14 2 3 8 1 6 9 15 6 7 12 148 770 61 432 288 396 1,445 2,839 752 114 53 96 70 186 2,318 3,956 2,950 1,150 14 150 90 111 310 1,962 721 504 1,243 150 880 210 136 150 232 14 966 1,472 518 880 1,464 2,443 686 150 186 2,000 111 906 459 1,215 144 609 732 L-Bar 74 55 61 72 32 66 85 167 94 114 53 96 70 186 122 172 59 115 7 150 90 111 310 218 103 63 113 30 220 105 136 150 58 14 69 64 74 110 183 349 49 75 62 250 111 151 51 81 24 87 61 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 CI CMI 1 6 1 3 2 4 7 12 3 13 6 8 26 8 10 8 3 1 8 1 11 19 7 4 8 1 3 3 19 5 8 7 23 6 2 27 2 1 13 9 3 12 7 3 9 8 19 7 11 4 9 12 210 96 609 356 244 847 120 345 1,222 978 1,560 2,210 976 1,410 608 333 51 1,048 74 1,254 3,458 56 808 584 78 12 117 1,026 950 304 1,050 2,415 390 244 1,269 10 141 1,612 495 90 876 546 45 675 552 228 336 671 380 1,413 L-Bar 12 35 96 203 178 61 121 10 115 94 163 195 85 122 141 76 111 51 131 74 114 182 8 202 73 78 4 39 54 190 38 150 105 65 122 47 5 141 124 55 30 73 78 15 75 69 12 48 61 95 157 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED Date 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/13/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 CI CMI 7 7 3 17 8 1 20 6 6 12 1 2 2 4 1 5 1 5 7 4 6 7 8 1 1 2 12 6 6 1 3 3 1 9 8 43 5 4 11 8 1 12 1 4 26 13 7 6 7 8 2 1,064 147 90 1,445 344 46 3,840 18 504 432 92 60 608 616 169 390 47 205 1,043 380 840 658 928 263 211 18 3,000 1,530 492 176 318 291 46 3,420 1,480 9,030 575 620 1,111 2,304 26 1,344 31 288 598 286 273 1,194 742 1,280 78 L-Bar 152 21 30 85 43 46 192 3 84 36 92 30 304 154 169 78 47 41 149 95 140 94 116 263 211 9 250 255 82 176 106 97 46 380 185 210 115 155 101 288 26 112 31 72 23 22 39 199 106 160 39 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 CI 1 4 7 5 49 12 5 6 3 8 57 4 8 8 4 12 6 3 8 5 2 6 9 9 2 18 12 5 7 26 13 10 5 13 14 1 1 10 2 8 3 6 4 1 28 1,134 7 1 10 17 5 CMI 325 464 749 515 9,408 972 515 12 321 1,128 10,317 48 1,472 1,192 1,012 3,420 678 252 912 505 252 390 1,107 765 54 2,700 120 90 1,029 754 364 60 75 286 1,162 118 47 660 186 1,144 393 342 660 28 84 3,402 798 82 320 2,448 300 L-Bar 325 116 107 103 192 81 103 2 107 141 181 12 184 149 253 285 113 84 114 101 126 65 123 85 27 150 10 18 147 29 28 6 15 22 83 118 47 66 93 143 131 57 165 28 3 3 114 82 32 144 60 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/14/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 CI CMI 2 3 1 5 14 7 11 8 12 7 11 10 2 3 9 29 2 1 7 6 24 24 1 30 15 6 2 1 3 1 2 2 11 8 2 2 3 16 1 5 2 34 8 12 5 1 5 33 10 17 4 62 252 2 580 2,002 49 693 1,616 696 931 1,760 1,360 142 222 2,709 3,799 114 160 2,443 684 5,544 2,304 117 2,850 1,425 822 150 121 120 141 192 248 924 1,552 202 342 165 272 113 230 238 5,066 48 1,968 985 206 1,305 2,541 1,000 85 728 L-Bar 31 84 2 116 143 7 63 202 58 133 160 136 71 74 301 131 57 160 349 114 231 96 117 95 95 137 75 121 40 141 96 124 84 194 101 171 55 17 113 46 119 149 6 164 197 206 261 77 100 5 182 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 CI CMI 12 4 8 1 25 1 1 9 12 11 5 5 7 41 2 14 2 6 4 1 3 7 10 10 26 3 4 1 2 5 1 1 8 8 1 26 6 8 11 8 12 15 2 5 17 6 1 8 8 10 22 2,532 116 528 95 2,525 71 20 558 2,496 726 340 375 560 8,487 444 1,316 398 306 324 47 324 714 360 1,240 1,976 144 76 8 176 195 140 179 72 272 170 2,340 360 648 990 616 1,500 795 58 870 1,989 396 164 680 440 790 770 L-Bar 211 29 66 95 101 71 20 62 208 66 68 75 80 207 222 94 199 51 81 47 108 102 36 124 76 48 19 8 88 39 140 179 9 34 170 90 60 81 90 77 125 53 29 174 117 66 164 85 55 79 35 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/15/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 CI CMI 34 2 5 6 17 1 1 2 4 10 6 5 3 12 10 12 5 11 35 2 15 27 9 1 2 15 4 6 6 7 14 4 7 2 3 8 13 3 3 7 24 8 4 5 1 3 8 8 18 9 16 3,740 112 520 540 119 84 214 168 496 950 402 655 651 1,248 550 2,112 940 1,342 210 134 1,905 3,645 1,746 281 204 1,470 436 72 318 441 182 260 448 164 96 48 2,327 105 411 28 2,976 112 396 195 87 174 832 136 900 1,305 2,768 L-Bar 110 56 104 90 7 84 214 84 124 95 67 131 217 104 55 176 188 122 6 67 127 150 194 281 102 98 109 12 53 63 13 65 64 82 32 6 179 35 137 4 124 14 99 39 87 58 104 17 50 145 173 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED Date 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/16/2014 1/17/2014 CI CMI 1 4 3 9 1 2 9 2 1 2 2 1 13 1 1 1 1 1 8 2 2 6 12 11 13 1 5 6 13 9 12 12 5 6 1 24 10 1 2 13 22 3 7 1 1 3 7 1 1 1 4 417 204 216 945 44 448 882 446 198 448 448 223 1,612 223 223 223 223 223 1,672 70 48 666 108 220 2,197 110 960 540 2,353 1,017 264 948 960 624 87 1,224 730 15 134 260 330 204 728 96 134 96 357 26 94 119 384 L-Bar 417 51 72 105 44 224 98 223 198 224 224 223 124 223 223 223 223 223 209 35 24 111 9 20 169 110 192 90 181 113 22 79 192 104 87 51 73 15 67 20 15 68 104 96 134 32 51 26 94 119 96 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST Date 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 1/17/2014 CI CMI 4 10 10 4 9 10 3 9 2 14 8 10 2 1 3 6 8 14 3 7 26 13 3 3 5 5 15 4 7 8 11 16 50 5 11 1 3 10 11 2 1 3 6 4 11 16 18 9 23 1 1 416 950 980 324 432 400 315 630 48 2,590 160 520 106 231 1,167 816 1,024 322 339 49 4,394 1,378 171 120 225 595 2,190 156 168 1,312 1,441 1,504 5,300 125 418 99 150 1,190 2,970 546 89 147 1,278 132 418 1,136 630 1,107 299 59 17 L-Bar 104 95 98 81 48 40 105 70 24 185 20 52 53 231 389 136 128 23 113 7 169 106 57 40 45 119 146 39 24 164 131 94 106 25 38 99 50 119 270 273 89 49 213 33 38 71 35 123 13 59 17 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/17/2014 1/17/2014 1/17/2014 1/18/2014 1/18/2014 1/18/2014 1/18/2014 1/18/2014 1/18/2014 1/18/2014 1/18/2014 1/19/2014 1/19/2014 1/19/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 CI CMI 15 13 4 1 1 5 4 8 24 6 1 21 2 1 1 8 2 8 7 1 14 3 3 12 1 12 24 20 7 1 3 12 4 1 8 4 7 10 20 7 12 8 9 13 7 26 5 4 5 2 7 1,320 442 168 11 341 425 484 128 1,104 1,332 144 2,436 86 112 60 1,752 456 1,024 413 100 1,386 258 102 1,248 85 336 2,832 1,860 329 141 45 408 556 99 712 1,000 546 1,460 1,320 686 828 432 1,134 2,691 413 442 475 388 1,230 186 735 L-Bar 88 34 42 11 341 85 121 16 46 222 144 116 43 112 60 219 228 128 59 100 99 86 34 104 85 28 118 93 47 141 15 34 139 99 89 250 78 146 66 98 69 54 126 207 59 17 95 97 246 93 105 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/20/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 CI CMI 8 2 7 8 10 34 2 13 1 9 1 10 4 25 19 1 3 4 3 11 18 1 11 2 9 36 4 11 10 6 30 1 20 2 9 15 12 75 11 24 7 5 2 2 5 6 6 6 4 12 3 944 144 1,344 904 510 4,148 194 1,456 111 414 145 980 44 1,200 1,482 186 375 392 555 1,012 1,530 144 1,694 46 414 1,728 424 506 1,110 666 1,350 44 860 84 882 525 528 10,500 671 1,392 1,218 350 94 86 925 1,560 894 120 36 96 228 L-Bar 118 72 192 113 51 122 97 112 111 46 145 98 11 48 78 186 125 98 185 92 85 144 154 23 46 48 106 46 111 111 45 44 43 42 98 35 44 140 61 58 174 70 47 43 185 260 149 20 9 8 76 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 CI CMI 8 10 9 3 8 3 3 1 8 15 19 5 128 8 7 4 2 19 7 10 11 3 1 5 2 5 23 1 4 10 8 1 10 20 20 8 3 4 1 11 10 5 12 3 13 9 1 3 17 9 20 232 160 135 462 888 183 300 109 1,080 165 1,729 1,505 3,456 624 735 700 88 2,337 14 730 2,002 975 161 115 174 200 1,786 234 340 220 1,456 49 60 960 2,060 120 339 312 37 1,188 90 655 780 975 767 1,116 41 63 1,955 216 4,340 L-Bar 29 16 15 154 111 61 100 109 135 11 91 301 27 78 105 175 44 123 2 73 182 325 161 23 87 40 81 234 85 22 182 49 6 48 103 15 113 78 37 108 9 131 65 325 59 124 41 21 115 24 217 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 CI CMI 1 4 3 30 11 1 10 21 1 3 9 13 15 1 3 9 1 3 6 18 3 38 7 12 18 3 10 2 3 6 14 7 29 12 32 11 26 9 2 1 8 10 10 8 8 1 7 1 8 13 11 200 76 309 1,680 1,067 61 920 1,176 86 234 315 104 2,640 115 96 693 162 639 756 2,268 612 5,054 938 2,040 3,186 75 1,960 246 429 558 742 1,085 11,049 1,152 11,072 22 3,848 1,008 76 11 32 760 1,420 1,624 832 148 105 81 1,376 1,040 165 L-Bar 200 19 103 56 97 61 92 56 86 78 35 8 176 115 32 77 162 213 126 126 204 133 134 170 177 25 196 123 143 93 53 155 381 96 346 2 148 112 38 11 4 76 142 203 104 148 15 81 172 80 15 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/22/2014 1/23/2014 1/23/2014 1/23/2014 CI CMI 6 11 3 19 5 8 4 9 7 8 2 3 8 7 8 7 1 30 4 2 5 4 4 15 2 7 5 7 14 1 9 11 12 11 1 2 1 5 27 11 7 1 7 11 2 14 1 1 11 6 5 726 880 168 266 370 1,240 116 414 546 472 410 93 848 98 880 735 41 810 276 134 370 312 2,752 1,485 332 224 330 805 392 24 549 550 1,980 44 133 192 16 305 2,619 110 602 21 546 528 314 1,092 60 68 1,133 876 670 L-Bar 121 80 56 14 74 155 29 46 78 59 205 31 106 14 110 105 41 27 69 67 74 78 688 99 166 32 66 115 28 24 61 50 165 4 133 96 16 61 97 10 86 21 78 48 157 78 60 68 103 146 134 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 CI CMI 3 16 5 1 1 10 1 3 6 4 3 3 6 5 10 4 38 6 2 14 53 2 1 2 40 5 7 36 8 12 7 1 2 3 15 1 5 1 4 3 13 11 4 12 2 8 8 4 1 4 8 528 1,552 1,245 234 93 1,900 175 429 726 872 801 417 498 1,145 380 584 4,978 918 112 126 8,003 150 78 448 5,440 215 329 3,564 8 192 511 45 274 486 585 217 1,590 184 784 144 4,433 3,773 200 1,560 298 1,040 1,336 388 45 364 360 L-Bar 176 97 249 234 93 190 175 143 121 218 267 139 83 229 38 146 131 153 56 9 151 75 78 224 136 43 47 99 1 16 73 45 137 162 39 217 318 184 196 48 341 343 50 130 149 130 167 97 45 91 45 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/23/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 CI CMI 14 6 10 6 10 1 7 1 8 13 25 4 15 2 6 4 8 4 10 8 7 6 1 5 10 1 4 7 4 1 7 8 8 4 12 3 6 9 3 3 1 2 4 4 1 11 7 5 24 24 1 1,330 522 210 192 1,210 122 483 112 832 936 1,775 248 915 152 492 516 880 436 850 888 448 408 146 310 1,460 93 232 700 348 129 98 392 768 364 96 285 276 117 72 180 38 378 468 236 229 1,837 777 370 3,672 4,296 181 L-Bar 95 87 21 32 121 122 69 112 104 72 71 62 61 76 82 129 110 109 85 111 64 68 146 62 146 93 58 100 87 129 14 49 96 91 8 95 46 13 24 60 38 189 117 59 229 167 111 74 153 179 181 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 CI CMI 6 8 8 1 36 38 1 1 39 10 8 10 32 8 31 5 5 1 5 5 4 36 15 4 2 1 9 13 3 2 7 3 7 7 8 4 1 2 2 1 1 7 5 2 1 5 7 3 9 5 10 222 680 1,080 107 7,884 8,474 233 220 8,151 1,030 80 540 3,296 1,240 12,834 795 1,260 366 1,000 965 196 3,636 1,605 140 640 80 54 1,079 246 236 1,036 75 413 1,057 712 420 157 308 194 116 173 875 655 144 51 505 56 210 81 485 220 L-Bar 37 85 135 107 219 223 233 220 209 103 10 54 103 155 414 159 252 366 200 193 49 101 107 35 320 80 6 83 82 118 148 25 59 151 89 105 157 154 97 116 173 125 131 72 51 101 8 70 9 97 22 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/24/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/25/2014 1/26/2014 1/26/2014 1/26/2014 1/26/2014 1/26/2014 1/26/2014 1/26/2014 1/26/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 CI CMI 16 4 3 93 12 3 12 4 12 1 6 1 12 8 2 1 1 6 6 1 42 9 6 3 8 130 1 1 16 1 1 1 31 14 6 1 7 11 8 16 8 27 34 1 8 4 33 6 7 7 2 992 1,148 492 20,373 1,404 219 1,080 72 1,044 40 258 9 1,464 264 28 459 45 2,388 246 439 10,542 2,745 1,752 372 56 520 81 42 2,528 410 201 187 3,100 1,372 114 144 1,183 1,265 1,080 2,400 936 1,134 5,100 118 624 556 11,583 588 980 777 616 L-Bar 62 287 164 241 117 73 90 18 87 40 43 9 122 33 14 459 45 398 41 439 251 305 292 124 7 4 81 42 158 410 201 187 100 98 19 144 169 115 135 150 117 42 150 118 78 139 351 98 140 111 308 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 CI CMI 41 5 13 3 3 4 5 10 3 2 9 5 2 4 10 10 15 13 6 4 8 6 8 6 8 8 9 9 8 74 8 10 32 122 9 3 33 8 12 8 1 8 5 8 2 4 9 4 2 19 9 6,847 620 26 162 162 216 1,210 1,040 282 6 252 325 136 1,040 2,580 1,030 2,175 1,911 318 284 2,152 1,272 2,392 1,398 120 864 963 1,557 600 9,768 48 750 256 3,172 45 42 5,148 424 504 832 156 640 400 1,432 360 364 270 144 340 722 540 L-Bar 167 124 2 54 54 54 242 104 94 3 28 65 68 260 258 103 145 147 53 71 269 212 299 233 15 108 107 173 75 132 6 75 8 26 5 14 156 53 42 104 156 80 80 179 180 91 30 36 170 38 60 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/27/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 CI CMI 8 25 8 11 2 6 4 31 1 1 1 2 9 8 11 7 10 10 80 12 5 4 8 1 6 6 6 33 11 7 7 8 4 4 5 7 8 12 3 12 4 6 3 46 1 11 4 6 9 8 12 136 2,275 104 440 144 672 524 1,302 210 72 41 46 1,125 1,104 1,463 910 1,570 590 10,800 2,124 230 460 3,184 70 72 498 840 924 1,067 679 854 1,992 1,036 408 275 616 456 1,548 348 5,796 292 1,116 495 3,036 80 2,717 388 816 675 312 264 L-Bar 17 91 13 40 72 112 131 42 210 72 41 23 125 138 133 130 157 59 135 177 46 115 398 70 12 83 140 28 97 97 122 249 259 102 55 88 57 129 116 483 73 186 165 66 80 247 97 136 75 39 22 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/28/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 CI CMI 4 6 3 13 4 6 3 1 10 4 1 1 9 5 19 4 11 14 8 8 1 20 11 11 12 3 9 1 13 13 21 13 4 4 8 8 15 7 8 8 2 4 33 105 6 9 6 8 12 8 3 652 660 231 637 28 660 570 334 580 584 97 199 792 310 2,166 168 913 1,456 496 768 391 740 715 44 1,272 489 351 284 1,625 1,612 1,554 715 244 404 832 360 105 168 312 400 246 156 495 4,725 708 1,035 312 2,384 1,656 272 258 L-Bar 163 110 77 49 7 110 190 334 58 146 97 199 88 62 114 42 83 104 62 96 391 37 65 4 106 163 39 284 125 124 74 55 61 101 104 45 7 24 39 50 123 39 15 45 118 115 52 298 138 34 86 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 CI CMI 6 2 13 3 11 1 17 20 2 9 13 12 1 10 1 3 2 2 1 8 11 7 4 14 11 8 24 12 8 1 8 32 1 9 16 11 1 22 2 32 1 12 3 15 17 3 20 9 1 8 2 726 458 988 459 528 91 391 340 180 693 923 912 113 550 65 210 92 150 96 416 836 70 176 42 2,090 224 2,232 816 920 66 376 2,752 50 1,143 32 825 23 1,650 166 8,512 38 1,344 42 540 1,496 141 120 963 96 792 118 L-Bar 121 229 76 153 48 91 23 17 90 77 71 76 113 55 65 70 46 75 96 52 76 10 44 3 190 28 93 68 115 66 47 86 50 127 2 75 23 75 83 266 38 112 14 36 88 47 6 107 96 99 59 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/29/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 CI CMI 4 19 13 1 6 21 9 3 5 2 15 8 425 5 10 1 1 1 7 12 9 4 8 4 8 5 1 8 3 4 4 4 6 9 12 11 3 8 9 6 6 1 9 6 10 9 5 6 12 19 14 460 570 1,105 47 492 2,226 36 21 210 72 90 152 7,225 810 370 452 35 120 546 1,860 774 460 408 304 3,176 625 169 1,696 357 136 388 780 2,220 1,710 372 583 591 1,368 1,458 1,356 1,356 100 1,269 666 120 81 620 1,230 144 5,187 756 L-Bar 115 30 85 47 82 106 4 7 42 36 6 19 17 162 37 452 35 120 78 155 86 115 51 76 397 125 169 212 119 34 97 195 370 190 31 53 197 171 162 226 226 100 141 111 12 9 124 205 12 273 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/30/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 CI CMI 6 3 20 7 3 12 29 5 6 15 10 11 8 2 4 3 3 8 4 184 12 8 1 5 2 12 1 1 6 31 6 3 2 8 8 7 8 4 34 5 4 2 2 1 3 11 4 12 5 1 5 306 3 1,280 1,008 27 564 6,960 450 84 1,350 710 770 104 116 128 15 87 616 348 2,208 156 368 57 615 176 1,116 220 196 480 5,611 714 135 280 1,824 1,568 609 56 396 3,944 360 992 304 120 229 246 352 552 2,616 655 613 455 L-Bar 51 1 64 144 9 47 240 90 14 90 71 70 13 58 32 5 29 77 87 12 13 46 57 123 88 93 220 196 80 181 119 45 140 228 196 87 7 99 116 72 248 152 60 229 82 32 138 218 131 613 91 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 1/31/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/1/2014 2/2/2014 2/2/2014 2/2/2014 2/2/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 CI CMI 5 6 1 1 4 10 10 6 3 5 14 1 17 6 1 8 1 2 1 1 10 1 74 5 3 5 3 7 1 18 6 10 2 1 77 1 22 1 2 2 2 1 5 4 1 3 18 20 8 1 7 400 222 56 157 20 40 330 456 351 240 70 29 1,462 264 37 368 299 88 6 116 1,680 179 7,770 635 756 1,005 984 1,218 51 2,808 900 970 40 126 1,386 114 2,772 300 358 224 386 140 690 788 145 399 1,638 980 56 386 1,155 L-Bar 80 37 56 157 5 4 33 76 117 48 5 29 86 44 37 46 299 44 6 116 168 179 105 127 252 201 328 174 51 156 150 97 20 126 18 114 126 300 179 112 193 140 138 197 145 133 91 49 7 386 165 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 CI CMI 1 5 10 24 5 2 52 3 10 16 10 12 25 8 12 3 12 4 11 3 2 16 10 3 1 8 9 7 1 13 8 1 14 10 13 6 6 4 1 8 3 4 15 8 21 14 12 5 28 5 2 157 340 1,920 1,272 10 658 22,828 846 990 1,840 130 1,224 2,475 2,704 960 123 1,284 552 2,805 108 210 160 1,000 78 208 16 1,242 630 118 4,693 1,144 10 2,072 160 52 480 1,014 180 127 304 414 412 345 784 756 1,036 1,236 115 3,388 180 186 L-Bar 157 68 192 53 2 329 439 282 99 115 13 102 99 338 80 41 107 138 255 36 105 10 100 26 208 2 138 90 118 361 143 10 148 16 4 80 169 45 127 38 138 103 23 98 36 74 103 23 121 36 93 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/3/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 CI CMI 5 13 6 12 4 1 9 12 6 2 9 8 5 7 12 1 11 6 4 5 4 2 1 1 18 4 1 1 5 8 1 1 15 2 8 3 1 6 5 8 1 6 1 15 5 5 3 5 8 5 25 340 2,002 444 1,896 372 58 1,386 192 912 110 243 584 840 581 1,044 134 484 624 180 710 288 444 220 85 3,492 316 60 210 710 520 5 68 2,655 40 1,336 957 579 306 475 216 72 678 14 1,530 355 615 189 925 384 325 5,600 L-Bar 68 154 74 158 93 58 154 16 152 55 27 73 168 83 87 134 44 104 45 142 72 222 220 85 194 79 60 210 142 65 5 68 177 20 167 319 579 51 95 27 72 113 14 102 71 123 63 185 48 65 224 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 CI CMI 11 5 1 1 7 7 1 8 1 3 23 3 16 7 17 1 2 8 7 52 8 2 6 8 4 3 11 3 6 3 4 22 14 4 12 3 14 5 27 1 1 9 2 1 3 10 17 8 15 7 14 253 685 281 121 721 742 104 1,904 233 351 322 435 704 931 952 171 252 840 238 6,500 304 194 2,334 408 428 57 11 540 762 111 256 748 574 212 588 165 2,198 55 1,593 30 188 846 332 184 315 3,270 918 184 825 1,050 826 L-Bar 23 137 281 121 103 106 104 238 233 117 14 145 44 133 56 171 126 105 34 125 38 97 389 51 107 19 1 180 127 37 64 34 41 53 49 55 157 11 59 30 188 94 166 184 105 327 54 23 55 150 59 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/4/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 CI CMI 9 3 12 5 5 4 6 2 1 1 2 2 58 1 6 1 11 5 3 13 4 9 1 4 6 1 9 5 21 1 1 1 5 18 3 1 18 9 1 1 1 1 3 21 1 17 1 9 8 8 8 423 744 2,304 820 150 112 162 374 37 9 60 134 1,334 44 810 92 682 225 123 1,313 368 900 115 644 420 267 153 815 3,654 212 82 20 100 486 453 16 1,098 198 154 153 108 229 603 1,218 167 2,006 47 1,035 624 1,392 688 L-Bar 47 248 192 164 30 28 27 187 37 9 30 67 23 44 135 92 62 45 41 101 92 100 115 161 70 267 17 163 174 212 82 20 20 27 151 16 61 22 154 153 108 229 201 58 167 118 47 115 78 174 86 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 CI CMI 1 5 1 151 6 5 6 59 9 1 11 1 3 11 11 2 1 5 4 7 95 8 18 8 17 3 17 17 5 15 1 2 1 1 3 1 6 1 9 12 9 4 4 9 5 2 7 1 1 7 6 85 810 36 34,428 1,266 1,490 966 5,900 612 69 66 134 435 1,445 1,518 280 308 1,640 324 840 15,865 1,352 1,458 400 1,479 204 3,825 1,462 500 2,055 6 230 265 24 111 69 1,140 59 756 1,500 585 224 484 360 435 184 679 45 25 553 492 L-Bar 85 162 36 228 211 298 161 100 68 69 6 134 145 231 138 140 308 328 81 120 167 169 81 50 87 68 225 86 100 137 6 115 265 24 37 69 190 59 84 125 65 56 121 40 87 92 97 45 25 79 82 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/5/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 CI CMI 8 18 14 124 2 1 1 4 6 1 8 10 7 9 1 6 18 5 12 5 3 13 6 2 12 2 5 7 1 4 5 3 5 7 1 2 3 6 4 1 23 1 3 1 11 9 19 8 3 6 1 832 1,296 1,652 26,660 190 22 122 192 654 121 752 900 644 801 105 396 918 330 1,248 405 633 2,262 420 186 1,080 64 40 98 58 124 195 48 1,040 392 157 316 171 204 360 53 5,727 172 546 83 935 1,044 8,968 504 393 228 247 L-Bar 104 72 118 215 95 22 122 48 109 121 94 90 92 89 105 66 51 66 104 81 211 174 70 93 90 32 8 14 58 31 39 16 208 56 157 158 57 34 90 53 249 172 182 83 85 116 472 63 131 38 247 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 CI CMI 3 2 41 1 4 1 6 3 9 7 5 4 4 13 3 7 19 17 22 17 6 5 12 8 20 12 1 5 3 4 3 2 8 7 3 5 7 2 4 3 3 6 13 3 16 2 13 19 8 1 1 429 284 5,494 145 904 35 708 168 2,223 539 405 468 184 533 537 357 304 170 1,122 901 1,398 400 1,488 1,336 1,960 24 80 390 294 396 642 216 1,072 756 360 1,050 728 234 324 402 63 60 2,392 870 2,112 162 611 2,600 2,080 231 84 L-Bar 143 142 134 145 226 35 118 56 247 77 81 117 46 41 179 51 16 10 51 53 233 80 124 167 98 2 80 78 98 99 214 108 134 108 120 210 104 117 81 134 21 10 184 290 132 81 47 200 260 231 84 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/6/2014 2/7/2014 2/7/2014 CI CMI 24 4 2 13 3 5 10 7 8 7 11 44 15 13 1 8 17 7 7 11 8 2 2 4 10 2 1 6 58 3 44 1 8 1 4 8 6 11 6 3 5 1 2 3 2 2 1 5 1 1 1 2,544 592 54 1,079 585 280 700 224 1,056 945 1,287 264 1,605 1,040 1 656 102 1,148 588 1,122 504 244 202 608 1,020 234 58 82 464 30 2,860 232 872 42 84 512 42 572 198 282 400 27 56 75 48 146 25 390 6 231 79 L-Bar 106 148 27 83 195 56 70 32 132 135 117 6 107 80 1 82 6 164 84 102 63 122 101 152 102 117 58 39 8 10 65 232 109 42 21 64 7 52 33 94 80 27 28 25 24 73 25 78 6 231 79 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 CI CMI 3 2 1 5 27 48 2 6 6 1 5 8 1 25 5 2 2 3 2 10 8 6 15 4 8 6 4 8 1 3 3 12 25 6 27 1 3 8 4 3 5 8 1 1 4 19 3 7 1 6 39 579 162 130 1,130 4,158 14,064 298 270 288 100 60 336 195 1,875 625 134 66 120 138 990 1,712 1,242 1,515 408 784 552 96 50 55 27 48 60 425 54 2,349 43 246 440 300 156 335 280 174 44 468 1,995 69 1,008 36 384 117 L-Bar 193 81 130 226 154 293 149 45 48 100 12 42 195 75 125 67 33 40 69 99 214 207 101 102 98 92 24 43 55 9 16 5 17 9 87 43 82 55 75 52 67 35 174 44 117 105 23 144 36 64 3 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/7/2014 2/8/2014 2/8/2014 2/8/2014 2/8/2014 2/8/2014 2/8/2014 2/8/2014 2/9/2014 2/9/2014 2/9/2014 2/9/2014 2/9/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 CI CMI 10 8 7 13 4 3 4 4 1 2 3 2 2 38 6 15 1 1 1 1 1 15 11 12 9 15 5 24 8 8 6 7 15 7 9 1 11 5 6 8 3 4 1 8 1 26 9 7 3 1 8 380 256 182 156 356 261 88 240 122 4 792 344 316 8,854 828 2,610 37 365 165 83 149 945 572 900 1,314 495 885 1,632 248 440 546 609 2,265 294 18 148 1,639 300 774 600 174 272 220 1,592 200 3,952 864 1,148 57 307 1,520 L-Bar 38 32 26 12 89 87 22 60 122 2 264 172 158 233 138 174 37 365 165 83 149 63 52 75 146 33 177 68 31 55 91 87 151 42 2 148 149 60 129 75 58 68 220 199 200 152 96 164 19 307 190 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 CI CMI 2 6 8 4 8 52 9 5 2 20 3 8 5 10 8 19 6 247 15 6 7 5 9 17 3 6 18 2 1 6 10 3 27 3 2 8 11 7 4 18 1 11 14 15 2 18 1 6 5 7 4 388 1,314 1,672 872 824 11,128 144 585 74 1,620 348 40 280 730 40 1,596 480 10,621 2,190 444 546 310 1,602 1,955 48 378 108 136 83 1,050 670 315 1,080 189 194 544 165 553 448 1,512 19 220 1,960 60 162 468 28 426 565 322 520 L-Bar 194 219 209 218 103 214 16 117 37 81 116 5 56 73 5 84 80 43 146 74 78 62 178 115 16 63 6 68 83 175 67 105 40 63 97 68 15 79 112 84 19 20 140 4 81 26 28 71 113 46 130 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/10/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 CI CMI 10 1 2 4 3 32 5 1 8 6 1 12 18 4 3 2 9 6 38 5 11 2 7 6 6 11 1 13 4 89 2 7 32 7 8 2 9 1 1 1 14 1 1 5 103 14 1 4 5 9 4 140 154 210 192 285 1,216 65 321 536 600 49 852 2,196 340 318 214 603 918 494 900 781 344 924 1,392 90 770 34 3,029 72 1,780 400 147 9,856 441 2,800 402 594 2 84 273 210 76 31 880 1,751 798 122 356 475 819 144 L-Bar 14 154 105 48 95 38 13 321 67 100 49 71 122 85 106 107 67 153 13 180 71 172 132 232 15 70 34 233 18 20 200 21 308 63 350 201 66 2 84 273 15 76 31 176 17 57 122 89 95 91 36 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/11/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 CI CMI 1 6 5 4 5 1 2 6 2 25 1 8 1 2 1 6 4 7 9 8 14 8 6 7 7 2 1 7 5 8 7 1 26 3 6 1 13 1 3 15 9 4 2 1 1 9 1 10 32 6 38 68 258 610 488 595 314 204 468 174 2,800 56 760 30 134 231 90 680 567 468 600 280 144 54 441 889 252 59 364 450 600 518 34 1,430 273 444 115 1,378 138 261 1,110 171 320 156 31 111 657 305 500 3,840 726 380 L-Bar 68 43 122 122 119 314 102 78 87 112 56 95 30 67 231 15 170 81 52 75 20 18 9 63 127 126 59 52 90 75 74 34 55 91 74 115 106 138 87 74 19 80 78 31 111 73 305 50 120 121 10 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 CI CMI 3 4 1 2 84 5 11 4 6 32 8 6 6 8 9 10 12 111 4 4 1 5 63 5 3 3 7 12 1 2 1 9 3 12 2 1 1 9 107 2 1 5 13 4 7 85 30 7 8 2 12 723 224 60 810 4,116 655 825 420 90 128 184 438 48 536 585 1,390 3,096 22,200 464 180 134 545 1,197 1,525 558 465 581 1,656 28 334 29 288 690 672 266 33 16 729 19,153 140 5 400 1,261 168 910 14,450 1,560 364 32 174 780 L-Bar 241 56 60 405 49 131 75 105 15 4 23 73 8 67 65 139 258 200 116 45 134 109 19 305 186 155 83 138 28 167 29 32 230 56 133 33 16 81 179 70 5 80 97 42 130 170 52 52 4 87 65 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/12/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 CI CMI 5 3 6 6 17 5 631 1 2 1 1 1 10 10 16 26 8 6 1 1 6 6 4 9 13 1 4 3 4 7 1 2 2 2 9 12 6 8 1 10 12 12 6 6 2 5 2 6 2 6 2 350 60 438 600 1,530 650 3,155 36 120 73 387 116 630 640 1,152 2,990 400 474 60 18 264 402 168 1,260 1,521 72 492 519 404 707 113 288 480 234 1,116 636 846 1,120 126 1,010 444 3,228 546 540 72 475 420 390 192 498 74 L-Bar 70 20 73 100 90 130 5 36 60 73 387 116 63 64 72 115 50 79 60 18 44 67 42 140 117 72 123 173 101 101 113 144 240 117 124 53 141 140 126 101 37 269 91 90 36 95 210 65 96 83 37 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/13/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 CI CMI 2 10 5 8 6 33 16 13 19 4 3 9 4 6 8 2 8 8 3 7 1 2 6 13 1 1 1 1 4 20 3 8 1 8 10 7 7 8 3 8 7 11 1 7 12 3 14 1 6 2 3 226 890 545 1,432 330 3,135 2,128 1,248 38 128 123 207 300 1,188 120 30 320 480 174 385 193 20 348 1,144 103 152 35 96 448 1,940 891 56 155 176 280 581 574 1,632 363 2,456 1,960 638 79 1,057 648 219 1,554 54 408 198 351 L-Bar 113 89 109 179 55 95 133 96 2 32 41 23 75 198 15 15 40 60 58 55 193 10 58 88 103 152 35 96 112 97 297 7 155 22 28 83 82 204 121 307 280 58 79 151 54 73 111 54 68 99 117 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/14/2014 2/15/2014 2/15/2014 2/15/2014 2/15/2014 2/15/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/16/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 CI CMI 6 9 3 12 1 2 3 1 3 1 18 1 1 10 14 1 4 9 9 15 11 9 13 4 1 5 7 6 6 11 10 5 1 2 5 1 7 14 12 31 13 12 7 1 5 33 1 3 18 13 2 702 243 42 888 200 116 1,182 107 312 139 3,672 119 382 1,800 4,494 285 606 1,908 1,085 180 2,464 423 4,212 252 176 345 448 564 462 3,234 1,080 345 109 124 440 135 56 210 1,032 3,410 832 816 210 177 420 1,287 16 660 144 2,327 104 L-Bar 117 27 14 74 200 58 394 107 104 139 204 119 382 180 321 285 168 212 141 12 224 47 324 63 176 69 64 94 77 294 108 69 109 62 88 135 8 15 86 110 64 68 30 177 84 39 16 220 8 179 52 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/17/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 CI CMI 4 4 3 8 4 14 2 7 6 1 12 2 10 15 7 11 6 14 7 4 31 2 4 8 4 3 21 10 7 5 1 8 1 6 12 9 24 4 5 4 6 4 6 12 1 1 6 3 5 1 7 240 244 816 696 232 2,436 38 553 246 57 624 176 950 375 469 704 546 504 371 96 248 134 256 312 240 387 3,717 530 553 460 154 96 149 504 3,204 693 2,760 300 805 1,444 1,170 344 1,998 1,032 20 18 450 186 390 101 749 L-Bar 60 61 272 87 58 174 19 79 41 57 52 88 95 25 67 64 91 36 53 24 8 67 64 39 60 129 177 53 79 92 154 12 149 84 267 77 115 75 161 361 195 86 333 86 20 18 75 62 78 101 107 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 2/18/2014 CI CMI 3 13 10 8 49 1 1 25 8 8 151 11 1 3 5 5 1 8 1 12 9 1 11 8 1 12 1 10 25 6 8 4 10 5 15 10 6 6 8 25 6 2 1 5 5 3 9 9 8 13 2 183 39 340 1,160 11,074 138 52 3,150 128 64 65,383 803 18 375 70 1,030 82 224 4 1,044 2,376 155 2,266 1,016 112 612 72 1,090 2,825 222 280 512 140 500 1,485 790 288 420 120 6,500 366 264 9 305 545 294 576 216 528 130 136 L-Bar 61 3 34 145 226 138 52 126 16 8 433 73 18 125 14 206 82 28 4 87 264 155 206 127 112 51 72 109 113 37 35 128 14 100 99 79 48 70 15 260 61 132 9 61 109 98 64 24 66 10 68 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 2/18/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 CI CMI 5 34 9 8 7 8 23 11 55 8 1 15 2 13 3 1 9 30 3 7 4 8 3 5 5 19 2 2 2 2 2 3 6 2 1 5 1 9 2 7 2 7 7 1 8 16 10 45 6 8 7 495 2,142 594 1,960 952 720 2,760 99 7,645 1,472 113 1,605 362 1,690 198 197 2,430 1,530 51 987 68 1,376 468 560 380 1,501 226 340 108 254 446 117 432 76 78 935 274 351 196 518 108 462 707 51 792 896 1,090 5,445 372 632 406 L-Bar 99 63 66 245 136 90 120 9 139 184 113 107 181 130 66 197 270 51 17 141 17 172 156 112 76 79 113 170 54 127 223 39 72 38 78 187 274 39 98 74 54 66 101 51 99 56 109 121 62 79 58 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/19/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 CI CMI 6 1 4 11 9 1 17 8 8 14 6 2 2 8 1 8 2 9 9 11 1 2 2 6 36 6 2 6 8 6 6 1 29 7 4 3 1 4 11 23 3 8 5 11 11 5 3 8 11 4 4 288 73 156 33 333 39 1,241 760 880 1,918 546 146 166 664 25 512 106 117 279 1,749 572 488 172 732 6,372 714 126 618 328 270 456 139 5,278 1,246 592 147 134 44 1,276 1,679 447 800 780 517 550 385 456 56 55 276 524 L-Bar 48 73 39 3 37 39 73 95 110 137 91 73 83 83 25 64 53 13 31 159 572 244 86 122 177 119 63 103 41 45 76 139 182 178 148 49 134 11 116 73 149 100 156 47 50 77 152 7 5 69 131 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 CI CMI 11 3 13 2 6 8 9 3 8 5 8 26 2 7 5 1 3 2 3 7 39 8 4 9 23 12 4 9 4 2 2 19 2 4 1 3 37 4 4 7 32 4 2 1 5 8 1 2 15 5 4 3,091 321 2,366 554 1,134 304 630 315 24 220 536 2,028 78 497 230 182 420 148 498 308 2,496 224 384 1,980 1,794 540 416 684 428 94 124 684 240 344 56 144 4,884 180 136 140 4,960 100 26 76 655 24 124 224 1,935 700 108 L-Bar 281 107 182 277 189 38 70 105 3 44 67 78 39 71 46 182 140 74 166 44 64 28 96 220 78 45 104 76 107 47 62 36 120 86 56 48 132 45 34 20 155 25 13 76 131 3 124 112 129 140 27 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/20/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 CI CMI 4 4 12 11 4 10 6 4 2 3 4 2 2 23 10 1 1 7 2 9 10 8 10 14 32 8 8 5 10 6 9 51 12 12 3 2 8 9 20 3 4 149 8 9 14 4 5 29 23 12 14 176 180 552 1,199 372 110 606 328 208 42 268 240 8 805 310 347 102 182 112 1,134 1,260 1,008 1,260 1,358 7,492 248 800 330 1,330 1,002 522 15,096 2,136 1,584 543 92 672 18 260 141 408 20,860 2,464 1,584 182 364 435 87 4,945 132 420 L-Bar 44 45 46 109 93 11 101 82 104 14 67 120 4 35 31 347 102 26 56 126 126 126 126 97 336 31 100 66 133 167 58 296 178 132 181 46 84 2 13 47 102 140 308 176 13 91 87 3 215 11 30 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/21/2014 2/22/2014 2/22/2014 2/22/2014 2/22/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/23/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 CI 1 4 5 7 1 9 10 10 13 7 1 22 14 13 4 1,682 3 22 3 12 4 1 17 2 1 3 1 5 12 6 4 8 2 11 14 1 5 3 23 15 11 3 8 8 2 6 8 15 6 31 4 CMI 30 204 400 252 71 837 1,590 920 1,183 49 71 352 2,534 3,185 136 68,962 627 3,344 516 2,376 32 53 3,451 826 151 69 48 760 156 288 592 1,344 154 770 2,310 75 540 405 1,081 60 660 135 448 872 192 1,452 776 750 492 6,727 404 L-Bar 30 51 80 36 71 93 159 92 91 7 71 16 181 245 34 41 209 152 172 198 8 53 203 413 151 23 48 152 13 48 148 168 77 70 165 75 108 135 47 4 60 45 56 109 96 242 97 50 82 217 101 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 CI CMI 16 4 4 3 4 22 9 13 7 2 5 8 1 2 12 1 5 8 7 8 9 58 5 4 5 5 5 2 4 4 10 18 4 4 5 7 5 2 3 6 4 1 40 9 2 2 5 4 12 3 4 2,272 12 72 294 592 2,156 1,242 559 1,484 252 495 752 47 192 2,436 138 710 40 623 560 774 9,628 70 52 195 60 55 20 40 36 1,010 1,674 488 400 485 539 465 154 186 528 556 155 5,000 189 324 68 290 304 60 222 436 L-Bar 142 3 18 98 148 98 138 43 212 126 99 94 47 96 203 138 142 5 89 70 86 166 14 13 39 12 11 10 10 9 101 93 122 100 97 77 93 77 62 88 139 155 125 21 162 34 58 76 5 74 109 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/24/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 CI CMI 4 2 4 2 2 7 2 17 1 8 7 8 1 1 7 6 6 2 4 5 4 7 5 4 10 1 5 1 2 9 165 5 29 13 6 8 62 7 19 17 23 18 8 2 2 4 4 1 3 2 8 196 242 12 68 134 672 274 374 35 624 1,260 344 56 33 1,106 768 396 244 280 965 332 1,218 470 36 1,220 394 295 150 1,018 585 26,730 965 5,162 676 330 832 10,850 364 3,800 408 2,576 3,474 120 246 106 572 344 167 549 490 720 L-Bar 49 121 3 34 67 96 137 22 35 78 180 43 56 33 158 128 66 122 70 193 83 174 94 9 122 394 59 150 509 65 162 193 178 52 55 104 175 52 200 24 112 193 15 123 53 143 86 167 183 245 90 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/25/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 CI CMI 6 1 3 8 12 6 3 5 2 6 9 4 3 3 4 7 1 25 2 14 6 1 1 11 4 23 4 4 5 1 6 4 9 1 27 4 1 1 13 26 3 62 1 6 1 41 8 2 5 2 11 2,112 137 366 200 72 462 387 85 114 414 297 100 153 159 320 350 87 2,700 274 70 990 12 7 33 304 1,196 460 300 500 101 696 556 270 51 2,565 56 105 277 3,549 2,730 336 27,714 234 870 241 10,496 1,824 162 460 178 836 L-Bar 352 137 122 25 6 77 129 17 57 69 33 25 51 53 80 50 87 108 137 5 165 12 7 3 76 52 115 75 100 101 116 139 30 51 95 14 105 277 273 105 112 447 234 145 241 256 228 81 92 89 76 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 CI CMI 2 11 5 8 15 6 43 1 1 9 5 4 7 8 1 4 3 6 4 4 7 24 21 9 1 8 4 5 50 43 5 10 16 43 4 45 3 2 32 4 2 3 1 9 3 14 4 2 8 29 4 314 1,232 490 848 5,700 576 516 60 322 990 55 484 105 552 70 1,256 174 330 492 272 868 4,128 2,247 1,188 145 136 368 220 1,650 301 505 960 3,184 3,612 288 13,950 396 58 1,696 312 270 33 129 693 546 1,036 320 248 432 2,929 400 L-Bar 157 112 98 106 380 96 12 60 322 110 11 121 15 69 70 314 58 55 123 68 124 172 107 132 145 17 92 44 33 7 101 96 199 84 72 310 132 29 53 78 135 11 129 77 182 74 80 124 54 101 100 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/26/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 CI CMI 4 7 19 8 5 11 11 4 3 3 1 6 3 11 5 1 3 4 3 16 6 7 31 1 1 8 7 10 16 5 1 9 4 8 1 8 1 18 16 6 3 3 6 4 3 9 5 12 4 2 5 436 112 1,387 808 455 924 814 232 306 561 104 546 402 528 185 83 249 136 87 176 120 707 4,402 230 360 776 413 120 1,344 205 85 2,169 592 32 442 1,184 235 504 3,248 120 126 1,287 1,374 680 45 612 505 2,604 304 414 425 L-Bar 109 16 73 101 91 84 74 58 102 187 104 91 134 48 37 83 83 34 29 11 20 101 142 230 360 97 59 12 84 41 85 241 148 4 442 148 235 28 203 20 42 429 229 170 15 68 101 217 76 207 85 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/27/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 CI CMI 16 21 11 4 4 7 6 1 6 4 4 2 8 12 8 1 3 2 7 1 8 1 1 1 2 8 72 1 2 11 3 7 2 10 1 2 5 4 14 1 7 21 25 1 1 14 1 8 8 5 1 624 1,974 297 888 712 161 324 10 648 348 568 432 456 1,032 560 164 228 538 266 80 848 97 10 17 190 1,408 432 39 214 1,067 228 91 96 430 77 96 885 356 1,834 217 147 4,956 8,475 163 87 2,478 221 1,592 1,592 460 92 L-Bar 39 94 27 222 178 23 54 10 108 87 142 216 57 86 70 164 76 269 38 80 106 97 10 17 95 176 6 39 107 97 76 13 48 43 77 48 177 89 131 217 21 236 339 163 87 177 221 199 199 92 92 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 2/28/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/1/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 CI CMI 6 1 5 5 85 2 17 17 19 3 5 3 1 42 16 1 4 4 12 5 2 1 2 2 1 3 9 4 6 2 13 2 8 1 1 1 1 2 1 5 2 20 2 23 8 1 1 5 7 1 1 636 102 345 1,345 11,815 576 2,652 2,482 2,774 108 470 27 161 3,528 1,216 38 1,056 314 1,632 1,000 82 1 224 44 223 207 144 332 198 36 130 126 72 156 80 494 113 638 132 485 228 80 420 7,636 280 82 272 1,100 763 229 299 L-Bar 106 102 69 269 139 288 156 146 146 36 94 9 161 84 76 38 264 101 136 200 41 1 112 22 223 69 16 83 33 18 10 63 9 156 80 494 113 319 132 97 114 4 210 332 35 82 272 220 109 229 299 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/2/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 CI CMI 1 1 4 8 1 2 5 8 15 7 12 3 2 101 9 6 4 3 5 3 13 9 14 12 8 32 3 7 15 3 9 9 1 1 3 6 11 1 1 7 3 2 7 8 7 1 1 60 12 12 10 232 232 364 712 40 184 70 640 930 154 1,740 216 284 28,078 1,242 74 356 423 695 765 1,014 108 1,190 1,872 2,856 3,104 357 1,141 2,385 273 747 117 50 135 303 522 1,166 120 70 273 264 50 287 336 56 91 79 1,020 552 984 710 L-Bar 232 232 91 89 40 92 14 80 62 22 145 72 142 278 138 27 89 141 139 255 78 12 85 156 357 97 119 163 159 91 83 13 50 135 101 87 106 120 70 39 88 25 41 42 8 91 79 17 46 82 71 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/3/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 CI CMI 2 2 2 2 2 13 3 6 6 1 2 11 14 13 3 2 10 11 1 2 1 3 4 11 5 6 7 5 3 14 13 33 3 9 3 5 1 1 7 5 10 15 23 8 11 8 2 1 4 4 1 16 148 254 46 218 1,638 228 18 30 107 52 616 406 403 114 16 310 187 50 140 83 561 168 781 60 864 336 270 264 840 78 2,013 258 1,233 39 705 120 75 1,176 665 530 2,730 3,220 1,232 550 1,088 282 87 492 412 434 L-Bar 8 74 127 23 109 126 76 3 5 107 26 56 29 31 38 8 31 17 50 70 83 187 42 71 12 144 48 54 88 60 6 61 86 137 13 141 120 75 168 133 53 182 140 154 50 136 141 87 123 103 434 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 CI CMI 2 2 4 2 2 8 15 32 1 15 7 15 1 2 10 12 3 1 9 2 1 3 8 29 6 3 4 9 6 9 7 25 1 7 4 7 11 7 5 11 1 4 9 1 10 1 2 1 36 2 4 866 250 516 266 22 64 1,905 4,864 95 2,265 189 1,950 50 172 400 108 300 61 504 138 134 660 56 4,698 318 1,080 204 450 300 441 1,533 2,250 125 2,023 436 91 748 287 115 396 74 88 504 71 1,790 58 508 37 2,124 232 432 L-Bar 433 125 129 133 11 8 127 152 95 151 27 130 50 86 40 9 100 61 56 69 134 220 7 162 53 360 51 50 50 49 219 90 125 289 109 13 68 41 23 36 74 22 56 71 179 58 254 37 59 116 108 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/4/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 CI CMI 9 5 4 4 8 16 10 15 9 11 8 16 16 1 2 8 2 3 1 6 1 5 4 4 1 2 5 5 6 6 39 1 4 4 5 2 1 24 3 1 3 21 1 1 1 6 6 1 6 8 1 594 885 704 700 1,392 2,128 1,410 2,160 1,035 539 496 976 1,072 85 60 416 178 276 181 36 126 570 440 152 34 248 640 550 288 222 39 96 956 352 175 84 80 1,752 234 87 312 882 11 155 148 2,304 642 339 216 1,576 60 L-Bar 66 177 176 175 174 133 141 144 115 49 62 61 67 85 30 52 89 92 181 6 126 114 110 38 34 124 128 110 48 37 1 96 239 88 35 42 80 73 78 87 104 42 11 155 148 384 107 339 36 197 60 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 CI CMI 2 7 1 9 2 4 8 8 3 10 2 10 11 5 6 1 4 7 9 2 16 7 11 1 8 7 8 1 27 27 3 10 1 8 4 4 5 6 23 1 9 16 10 3 13 1 1 7 26 7 12 96 266 358 450 260 156 664 1,000 1,035 1,670 498 1,500 1,617 730 876 116 752 1,092 621 198 2,224 1,435 44 56 1,248 469 400 83 3,186 1,863 345 1,070 27 72 144 1,284 775 504 782 136 252 864 1,100 312 858 109 128 777 4,056 14 828 L-Bar 48 38 358 50 130 39 83 125 345 167 249 150 147 146 146 116 188 156 69 99 139 205 4 56 156 67 50 83 118 69 115 107 27 9 36 321 155 84 34 136 28 54 110 104 66 109 128 111 156 2 69 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/5/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 CI CMI 4 7 5 9 6 22 4 7 1 3 1 2 14 1 3 8 2 2 9 4 6 34 2 1 3 8 10 2 1 2 1 5 12 1 3 9 1 14 1 9 1 6 1 8 7 4 33 13 3 1 1 304 21 140 801 1,050 440 740 119 71 294 220 366 896 65 531 696 178 292 1,323 20 264 1,972 64 41 105 456 130 204 15 202 104 550 408 97 675 873 188 1,764 131 1,935 55 102 81 1,592 476 424 2,607 3,237 225 152 154 L-Bar 76 3 28 89 175 20 185 17 71 98 220 183 64 65 177 87 89 146 147 5 44 58 32 41 35 57 13 102 15 101 104 110 34 97 225 97 188 126 131 215 55 17 81 199 68 106 79 249 75 152 154 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/6/2014 3/7/2014 CI CMI 1 50 141 3 8 8 10 15 10 8 16 20 18 17 2 14 10 6 7 20 9 59 5 6 8 6 2 5 25 34 2 3 2 103 8 2 6 3 75 3 4 5 22 8 8 8 1 39 17 30 1 28 4,277 32,994 453 824 112 690 3,720 1,040 240 1,232 1,880 702 340 154 2,982 2,050 1,116 252 2,500 342 59 85 510 784 588 12 725 3,825 2,312 270 306 170 25,853 448 232 498 282 13,050 57 44 554 1,694 736 32 1,480 146 2,847 85 3,270 223 L-Bar 28 106 234 151 103 14 69 248 104 30 77 94 39 20 77 213 205 186 36 125 38 1 17 85 98 98 6 145 153 68 135 102 85 251 56 116 83 94 174 19 11 187 77 92 4 185 146 73 5 109 223 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/7/2014 3/8/2014 CI CMI 1 1 1 10 3 1 2 3 10 6 4 9 4 6 4 1 4 2 42 1 36 6 3 1 5 4 37 2 37 4 7 5 1 9 1 12 6 44 2 8 9 4 4 6 1 2 2 1 8 1 2 47 1,215 65 340 111 56 268 450 1,970 36 56 792 256 750 96 168 108 290 4,410 19 6,660 72 264 112 75 208 6,734 90 6,734 80 203 165 48 468 283 192 1,104 616 362 536 738 24 152 324 68 152 406 81 168 586 1,268 L-Bar 47 1,215 65 34 37 56 134 150 197 6 14 88 64 125 24 168 27 145 105 19 185 12 88 112 15 52 182 45 182 20 29 33 48 52 283 16 184 14 181 67 82 6 38 54 68 76 203 81 21 586 634 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/8/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/9/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 CI 16 5 1 9 3 2 4 1 1 1,649 22 4 2 4 1 6 2 49 18 31 8 3 6 4 10 12 2 30 1 1 1 1 2 5 7 4 6 4 8 12 1 7 27 1 19 50 9 9 4 9 2 CMI 3,024 420 34 1,773 1,038 240 528 128 162 54,417 88 36 28 108 207 222 178 1,029 2,862 7,068 1,776 657 1,260 656 1,720 276 280 2,040 117 589 329 246 204 965 749 208 912 568 832 72 124 987 3,078 23 2,318 7,150 360 207 72 1,278 68 L-Bar 189 84 34 197 346 120 132 128 162 33 4 9 14 27 207 37 89 21 159 228 222 219 210 164 172 23 140 68 117 589 329 246 102 193 107 52 152 142 104 6 124 141 114 23 122 143 40 23 18 142 34 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 CI CMI 1 25 8 5 4 7 11 14 10 1 13 27 5 4 13 10 9 2 1 8 6 1 3 2 2 2 17 9 29 4 9 24 2 9 1 2 6 3 4 2 6 7 12 13 7 35 11 34 2 10 10 53 2,025 640 565 460 133 1,562 1,988 1,510 139 4,394 1,026 845 548 1,625 1,110 999 154 134 472 816 77 36 88 176 186 2,448 2,124 7,656 336 198 3,312 28 684 234 616 108 30 320 116 366 735 1,428 455 504 4,725 286 5,100 214 1,300 1,300 L-Bar 53 81 80 113 115 19 142 142 151 139 338 38 169 137 125 111 111 77 134 59 136 77 12 44 88 93 144 236 264 84 22 138 14 76 234 308 18 10 80 58 61 105 119 35 72 135 26 150 107 130 130 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/10/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 CI CMI 7 12 1 6 1 6 1 34 14 26 4 3 1 1 20 5 7 14 6 6 1 2 4 8 4 1 1 7 8 23 60 5 4 4 1 1 2 35 39 1 9 7 10 10 52 49 8 10 49 1 2 133 144 58 348 191 480 107 4,420 1,344 4,888 384 72 36 2 2,340 25 756 700 420 522 105 212 760 528 644 237 251 483 648 3,519 4,320 30 116 340 121 96 284 9,730 6,903 95 288 735 590 1,680 8,944 9,702 1,416 1,950 1,519 77 188 L-Bar 19 12 58 58 191 80 107 130 96 188 96 24 36 2 117 5 108 50 70 87 105 106 190 66 161 237 251 69 81 153 72 6 29 85 121 96 142 278 177 95 32 105 59 168 172 198 177 195 31 77 94 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 CI CMI 4 4 2 6 53 1 6 3 4 3 1 8 2 1 1 1 1 6 7 2 12 6 7 9 5 59 3 8 8 2 1 8 5 2 9 15 3 4 6 8 1 8 15 3 10 5 1 11 4 1 2 184 680 120 666 1,166 59 1,128 324 424 219 187 816 206 97 57 131 78 360 1,225 186 528 288 329 261 215 2,087 114 280 240 140 100 320 625 144 549 2,010 819 284 1,386 1,920 146 560 525 312 780 600 4 902 124 315 164 L-Bar 46 170 60 111 22 59 188 108 106 73 187 102 103 97 57 131 78 60 175 93 44 48 47 29 43 76 38 35 30 70 100 40 125 72 61 134 273 71 231 240 146 70 35 104 78 120 11 82 31 315 82 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/11/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 CI CMI 5 53 20 24 8 2 2 8 13 8 6 5 22 3 10 9 2 36 1 2 8 4 2 22 9 18 9 1 2 8 8 7 7 97 9 15 10 1 17 3 223 11 13 7 52 9 8 9 17 12 8 35 5,194 1,980 2,832 544 156 158 8 169 1,016 708 375 550 252 1,020 603 260 2,124 101 198 40 4 20 1,452 729 2,124 1,629 101 182 1,080 1,000 266 462 1,843 801 1,275 1,000 155 119 165 48,614 781 3,523 490 9,620 1,152 1,896 612 2,397 720 296 L-Bar 7 98 99 118 68 78 79 1 13 127 118 75 25 84 102 67 130 59 101 99 5 19 10 66 81 118 181 101 91 135 125 38 66 19 89 85 100 155 7 55 218 71 271 70 185 128 237 68 141 60 37 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 CI CMI 3 10 1 8 6 8 2 11 7 10 7 6 3 1 7 2 1 5 18 7 18 2 11 11 8 6 7 3 1 4 2 5 8 13 1 18 6 2 17 25 5 11 11 6 16 25 14 9 8 6 9 75 280 190 1,360 210 1,224 446 2,453 1,582 3,020 1,197 1,062 651 126 1,491 348 96 570 4,338 238 2,466 8 561 1,705 496 114 707 318 91 672 22 280 360 689 76 1,206 168 66 1,377 2,000 35 462 1,133 244 1,536 725 14 513 728 708 774 L-Bar 25 28 190 170 35 153 223 223 226 302 171 177 217 126 213 174 96 114 241 34 137 4 51 155 62 19 101 106 91 168 11 56 45 53 76 67 28 33 81 80 7 42 103 120 96 29 1 57 91 118 86 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/12/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 CI CMI 13 13 2 6 5 8 30 6 9 1 9 3 1 3 5 12 2 13 6 9 2 4 1 10 1 1 7 2 1 9 6 44 4 26 26 4 43 40 13 12 7 1 57 9 16 14 1 6 2 6 6 871 975 142 228 1,155 640 1,470 72 378 117 207 288 170 462 360 636 158 2,899 426 72 182 280 180 1,450 14 98 602 118 143 117 444 6,644 460 2,392 2,366 124 15,179 15,440 1,118 2,628 189 289 17,043 396 1,696 700 68 654 8 246 1,002 L-Bar 67 75 71 38 231 80 49 12 42 117 23 96 170 154 72 53 79 223 71 8 91 70 180 145 14 98 86 59 143 13 74 151 115 92 91 31 353 386 86 219 27 289 299 44 106 50 68 109 4 41 167 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/13/2014 CI CMI 3 3 7 9 4 28 17 2 3 10 5 4 42 20 11 7 1 9 13 7 7 2 1 4 10 2 1 4 5 1 2 4 2 1 7 1 7 2 27 4 1 2 1 2 1 2 1 3 2 2 2 66 495 812 1,053 396 3,500 2,873 56 501 1,680 335 76 4,788 2,040 1,188 140 81 1,026 169 448 56 252 107 216 2,310 32 103 552 580 100 142 348 62 85 721 66 112 302 1,269 276 122 26 109 148 162 204 41 408 156 48 62 L-Bar 22 165 116 117 99 125 169 28 167 168 67 19 114 102 108 20 81 114 13 64 8 126 107 54 231 16 103 138 116 100 71 87 31 85 103 66 16 151 47 69 122 13 109 74 162 102 41 136 78 24 31 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 3/13/2014 3/13/2014 3/13/2014 3/13/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 CI CMI 1 6 1 19 14 1 84 6 4 8 14 14 13 5 2 8 1 17 4 2 5 1 3 10 7 4 2 3 7 8 4 6 7 11 2 10 6 14 108 3 14 1 13 6 164 36 1 9 1 2 5 59 102 174 1,254 3,486 172 840 462 520 808 98 1,148 975 420 140 1,240 58 136 316 258 645 349 258 1,650 560 668 148 12 1,407 176 40 372 266 1,298 340 1,160 204 28 11,664 285 2,380 78 1,261 516 2,132 1,764 36 819 119 234 295 L-Bar 59 17 174 66 249 172 10 77 130 101 7 82 75 84 70 155 58 8 79 129 129 349 86 165 80 167 74 4 201 22 10 62 38 118 170 116 34 2 108 95 170 78 97 86 13 49 36 91 119 117 59 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/14/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/15/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/16/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 CI CMI 61 6 138 1 6 1 1 6 6 1 3 3 4 8 14 1 7 2 9 40 40 1 1 2 4 23 2 1 7 9 1 23 2 7 1 12 14 9 1 5 8 7 5 15 13 1 6 11 3 1 3 8,957 216 828 53 546 47 130 24 912 212 873 702 788 1,448 588 71 392 34 216 1,440 720 135 557 184 944 7,153 376 71 665 2,979 191 10,511 566 665 1 1,776 3,054 1,530 14 520 1,136 833 560 750 169 68 1,026 671 483 147 660 L-Bar 162 36 6 53 91 47 130 4 152 212 291 234 197 181 42 71 56 17 24 36 18 135 557 92 236 311 188 71 95 331 191 457 283 95 1 148 411 170 14 104 142 119 112 50 13 68 171 61 161 147 220 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/17/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 CI CMI 4 6 6 7 7 1 7 17 1 7 10 3 45 3 38 10 14 5 8 7 2 6 5 11 104 16 4 1 6 2 4 46 11 264 19 8 10 7 1 20 3 1 6 1 1 6 8 10 7 9 9 880 1,320 1,080 1,253 553 1,735 1,211 2,210 41 147 1,150 516 6,030 99 532 2,690 280 330 672 595 138 462 605 44 8,320 1,584 40 105 594 110 200 322 1,221 705 1,824 760 550 602 42 1,240 222 36 84 124 59 834 1,982 1,110 301 891 171 L-Bar 220 220 180 179 79 1,735 173 130 41 21 115 172 134 33 14 269 20 66 84 85 69 77 121 4 80 99 10 105 99 55 50 7 111 148 96 95 55 86 42 62 74 36 14 124 59 139 283 111 43 99 19 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 CI CMI 6 6 7 5 1 1 7 2 8 1 9 5 5 9 5 1 42 48 1 9 9 25 223 11 3 4 2 2 4 4 17 1 12 9 3 16 9 3 3 9 3 2 57 25 28 8 12 3 3 4 4 456 804 455 555 107 197 357 126 1,368 155 846 130 60 1,278 90 204 6,846 7,440 88 2,961 2,646 3,325 43,485 1,320 411 68 140 334 612 792 1,224 198 1,572 1,935 87 1,312 153 105 309 135 309 66 10,629 2,475 5,936 1,320 2,472 633 615 1,220 820 L-Bar 76 134 65 111 107 197 51 63 171 155 94 26 12 142 18 204 163 155 88 329 294 133 195 120 137 17 70 167 153 198 72 198 131 215 29 82 17 35 103 15 103 33 197 99 212 165 206 211 205 305 205 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/18/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 CI 16 3 3 6 1 12 8 1 14 8 9 8 2 7 5 3 5 27 1 14 1 1 11 5 42 2 3 3 5 1 4 1 1 1 2 1,920 6 2 8 3 25 8 1 1 1 1 1 6 3 36 23 CMI 3,280 612 612 1,224 21 168 56 45 1,064 40 612 104 168 700 365 117 265 3,672 24 1,862 118 122 1,375 385 8,148 72 54 507 300 33 344 63 331 38 326 103,680 486 206 688 264 1,175 784 549 101 548 547 213 444 489 13,392 5,635 L-Bar 205 204 204 204 21 14 7 45 76 5 68 13 84 100 73 39 53 136 24 133 118 122 125 77 194 36 18 169 60 33 86 63 331 38 163 54 81 103 86 88 47 98 549 101 548 547 213 74 163 372 245 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 CI CMI 7 3 8 8 11 9 5 1 15 24 28 11 2 10 58 12 1 11 2 2 46 5 7 6 6 1 8 4 4 5 7 9 15 3 13 5 10 4 29 21 14 3 6 1 5 28 2 107 11 11 1 693 201 8 1,384 3,542 792 840 60 1,245 4,128 5,768 1,320 454 250 6,670 552 151 44 88 184 5,106 225 546 312 264 43 656 760 572 220 539 1,098 975 273 2,444 80 500 240 1,073 945 924 96 438 52 195 2,632 112 35,524 814 726 102 L-Bar 99 67 1 173 322 88 168 60 83 193 206 120 227 25 115 46 151 4 44 92 111 45 78 52 44 43 82 190 143 44 77 122 65 91 188 16 50 60 37 45 66 32 73 52 39 94 56 332 74 66 102 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/19/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 CI CMI 3 7 4 1 10 6 8 3 1 24 2 9 3 1 1 2 1 1 9 1 1 8 1 1 1 2 11 13 5 41 7 10 27 11 12 41 25 4 8 5 34 1 14 90 1 1 28 35 8 2 1 246 861 104 103 60 84 80 336 91 960 216 648 357 142 128 90 143 116 360 100 130 416 122 51 165 362 1,221 1,287 430 6,437 602 720 2,727 968 564 9,922 1,550 444 648 605 4,284 142 210 15,930 227 188 980 5,985 976 136 67 L-Bar 82 123 26 103 6 14 10 112 91 40 108 72 119 142 128 45 143 116 40 100 130 52 122 51 165 181 111 99 86 157 86 72 101 88 47 242 62 111 81 121 126 142 15 177 227 188 35 171 122 68 67 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 CI CMI 3 10 3 7 7 6 18 2 1 24 17 4 11 2 6 8 12 3 8 67 1 5 1 1 3 5 8 25 10 1 1 7 4 13 2 8 3 9 5 2 1 12 3 4 15 2 2 4 1 3 7 222 970 225 1,918 861 672 378 614 307 456 561 388 473 240 414 352 732 309 2,184 10,787 81 775 85 90 180 675 752 1,150 440 244 12 1,078 164 1,599 334 440 240 369 270 368 145 312 222 604 435 172 298 556 38 480 322 L-Bar 74 97 75 274 123 112 21 307 307 19 33 97 43 120 69 44 61 103 273 161 81 155 85 90 60 135 94 46 44 244 12 154 41 123 167 55 80 41 54 184 145 26 74 151 29 86 149 139 38 160 46 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/20/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 CI CMI 1 6 1 10 17 12 1 1 3 12 12 1 4 6 6 11 2 2 9 5 8 2 9 17 9 1 2 7 4 9 4 8 11 9 32 6 3 1 4 5 21 8 2 1 4 4 9 8 7 14 6 121 78 29 1,280 391 480 63 96 15 132 276 174 584 300 492 3,322 262 132 1,008 230 752 154 1,269 799 1,395 80 435 945 284 387 96 1,424 1,782 522 480 954 198 293 352 75 4,641 1,856 144 69 344 328 630 64 784 1,820 330 L-Bar 121 13 29 128 23 40 63 96 5 11 23 174 146 50 82 302 131 66 112 46 94 77 141 47 155 80 325 135 71 43 24 178 162 58 15 159 66 293 88 15 221 232 72 69 86 82 70 8 112 130 55 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/21/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/22/2014 3/23/2014 3/23/2014 3/23/2014 3/23/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 CI CMI 6 29 40 5 9 2 1 2 2 2 1 3 1 2 3 3 4 24 7 32 9 1 42 3 1 16 1 2 3 2 1 1 6 4 4 2 3 8 6 14 2 8 2 5 5 12 11 71 1 10 6 426 9,251 1,120 405 3,033 38 42 66 86 64 44 129 20 44 36 105 124 768 168 192 1,719 108 4,032 990 140 368 13 40 105 12 48 207 246 556 148 16 717 784 6 1,064 164 488 66 1,335 160 888 99 10,011 103 780 510 L-Bar 71 319 28 81 337 19 42 33 43 32 44 43 20 22 12 35 31 32 24 6 191 108 96 330 140 23 13 20 35 6 48 207 41 139 37 8 239 98 1 76 82 61 33 267 32 74 9 141 103 78 85 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 CI CMI 2 88 12 1 9 19 10 2 5 1 4 13 6 9 7 4 6 5 2 10 1 8 1 7 10 5 8 6 6 7 18 7 9 3 1 12 3 9 11 6 131 2 11 1 5 1 8 2 2 4 4 314 11,264 36 106 1,242 2,717 1,060 164 545 41 636 1,066 432 639 182 324 180 470 304 550 123 776 26 987 980 460 712 522 516 672 1,062 539 603 321 67 48 288 810 1,408 558 6,288 190 726 58 235 5 1,344 126 214 488 300 L-Bar 157 128 3 106 138 143 106 82 109 41 159 82 72 71 26 81 30 94 152 55 123 97 26 141 98 92 89 87 86 96 59 77 67 107 67 4 96 90 128 93 48 95 66 58 47 5 168 63 107 122 75 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/24/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 CI CMI 8 6 3 9 2 3 1 1 16 1 10 1 4 51 71 1 10 4 12 2 3 1 4 5 12 161 17 17 12 2 7 2 10 2 33 30 4 1 6 9 10 11 3 3 6 1 6 2 12 4 2 488 336 174 171 14 72 83 253 2,176 11 280 149 396 1,938 9,940 221 120 456 1,140 58 168 64 508 575 2,364 58,926 1,258 1,156 1,185 314 1,540 494 760 180 3,036 3,000 252 469 984 630 1,130 682 300 231 1,416 165 528 228 528 100 138 L-Bar 61 56 58 19 7 24 83 253 136 11 28 149 99 38 140 221 12 114 95 29 56 64 127 115 197 366 74 68 305 157 220 247 76 90 92 100 63 469 164 70 113 62 100 77 236 165 88 114 44 25 69 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/25/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 CI CMI 5 5 13 6 7 11 2 11 4 6 2 1 2 5 11 3 12 1 16 9 3 5 1 7 4 1 1 8 8 68 12 47 176 3 6 2 4 5 9 5 8 9 10 1 7 41 10 2 1 12 1 365 1,365 338 450 574 407 146 583 92 420 132 120 216 480 385 84 336 167 960 567 321 1,190 88 868 308 64 165 448 712 23,460 1,056 1,880 80,256 732 774 416 476 1,660 567 360 1,648 2,448 2,710 34 924 9,840 1,340 52 107 852 170 L-Bar 73 273 26 75 82 37 73 53 23 70 66 120 108 96 35 28 29 167 60 63 107 238 88 124 77 64 165 56 89 345 88 40 456 244 129 208 119 332 63 72 206 272 271 34 132 240 134 26 107 71 170 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 3/26/2014 CI CMI 14 1 7 12 9 4 8 13 2 16 10 2 6 22 4 4 41 10 3 12 22 2 2 4 4 1 1 3 2 3 3 6 6 4 16 29 6 1 1 2 2 1 9 4 3 8 4 4 10 1 13 1,988 104 322 804 558 460 560 598 168 1,056 220 206 246 836 640 620 4,838 40 297 744 1,738 164 350 352 360 83 103 438 132 81 36 96 804 536 2,240 1,856 414 130 150 188 132 293 702 232 294 704 280 328 500 168 715 L-Bar 142 104 46 67 62 115 70 46 84 66 22 103 41 38 160 155 118 4 99 62 79 82 175 88 90 83 103 146 66 27 12 16 134 134 140 64 69 130 150 94 66 293 78 58 98 88 70 82 50 168 55 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/26/2014 3/26/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 CI CMI 19 12 14 412 1 73 13 4 3 2 5 7 12 4 9 3 1 12 7 1 1 1 1 6 6 4 9 1 5 8 14 8 4 6 2 1 33 7 9 4 9 9 5 24 23 7 1 11 11 72 2 4,389 1,668 1,540 30,076 84 11,753 793 220 252 114 1,275 959 1,044 436 1,602 276 182 2,100 1,141 172 69 87 30 654 582 432 1,062 385 45 384 1,330 688 460 798 2 173 1,188 1,085 1,305 644 1,755 1,053 285 2,040 1,955 994 73 594 198 12,672 128 L-Bar 231 139 110 73 84 161 61 55 84 57 255 137 87 109 178 92 182 175 163 172 69 87 30 109 97 108 118 385 9 48 95 86 115 133 1 173 36 155 145 161 195 117 57 85 85 142 73 54 18 176 64 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/27/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 CI CMI 4 9 5 1 5 2 7 1 1 8 9 7 1 11 1 9 3 1 4 1 8 4 13 13 1 24 283 12 7 1 4 18 2 8 47 3 4 16 4 1 9 7 1 8 7 13 9 3 10 6 12 276 981 400 38 230 98 581 145 93 1,704 414 952 153 847 114 612 717 76 80 82 712 224 845 1,430 134 9,312 52,072 2,100 1,176 38 516 3,312 208 1,376 4,794 195 288 480 208 205 459 91 159 1,456 245 1,573 918 264 130 840 1,908 L-Bar 69 109 80 38 46 49 83 145 93 213 46 136 153 77 114 68 239 76 20 82 89 56 65 110 134 388 184 175 168 38 129 184 104 172 102 65 72 30 52 205 51 13 159 182 35 121 102 88 13 140 159 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/28/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/29/2014 3/30/2014 3/30/2014 3/30/2014 3/30/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 CI 16 8 1 5 8 1 32 5 8 1 9 2 3 9 2 11 7 2 1 7 1 1,276 1 1 7 2 1 1 1 10 4 6 7 1 19 10 3 3 17 1 10 24 14 3 4 13 3 1 31 9 4 CMI 976 752 25 455 336 170 2,464 310 48 163 36 56 216 432 118 253 1,134 304 113 217 12 21,692 254 309 238 238 38 47 36 590 572 138 133 133 570 390 144 828 1,207 142 1,390 2,736 168 129 808 710 105 75 3,875 783 236 L-Bar 61 94 25 91 42 170 77 62 6 163 4 28 72 48 59 23 162 152 113 31 12 17 254 309 34 119 38 47 36 59 143 23 19 133 30 39 48 276 71 142 139 114 12 43 202 83 35 75 125 87 59 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 CI CMI 23 1 8 9 6 5 9 2 6 3 9 33 10 5 4 16 25 2 5 6 21 1 3 3 6 1 1 1 9 5 3 3 3 1 15 39 1 9 9 8 18 18 2 6 9 11 6 1 4 6 4 2,921 80 880 981 798 640 972 42 402 201 549 2,013 930 755 324 1,056 2,600 128 75 42 1,176 132 507 537 114 238 158 126 189 735 135 249 696 167 1,395 507 82 1,161 747 568 1,152 828 8 564 1,359 1,474 858 172 588 414 256 L-Bar 127 80 110 109 133 128 108 21 67 67 61 61 93 151 81 66 104 64 15 7 56 132 169 179 19 238 158 126 21 147 45 83 232 167 93 13 82 129 83 71 64 46 4 94 151 134 143 172 147 69 64 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 3/31/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 CI 1 8 1 1 6 8 2 1 2 2 14 2 13 2 1 6 10 6 5 5 3,008 22 8 12 18 8 7 1 1 7 4 4 18 1 8 20 14 5 7 4 10 2 5 1 6 2 18 12 11 2 3 CMI 120 712 81 168 84 520 32 45 10 214 672 154 325 134 31 108 1,200 798 460 870 147,392 2,200 720 864 990 2,272 2,590 43 136 616 524 456 2,250 100 168 1,900 252 440 504 224 550 264 775 19 774 54 2,070 1,056 1,551 164 195 L-Bar 120 89 81 168 14 65 16 45 5 107 48 77 25 67 31 18 120 133 92 174 49 100 90 72 55 284 370 43 136 88 131 114 125 100 21 95 18 88 72 56 55 132 155 19 129 27 115 88 141 82 65 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/1/2014 CI CMI 10 18 1 3 3 10 5 8 3 3 8 10 6 9 3 4 49 7 1 12 8 12 5 6 1 13 1 4 2 8 9 13 7 6 3 1 5 1 3 2 8 14 1 4 1 1 18 9 5 1 1 750 774 229 834 231 1,340 575 2,288 141 429 2,240 1,860 768 1,278 387 300 5,684 1,169 117 828 1,816 180 750 378 153 689 9 568 218 312 1,674 2,314 63 156 471 201 540 30 309 230 304 1,050 106 440 86 76 1,548 675 120 93 25 L-Bar 75 43 229 278 77 134 115 286 47 143 280 186 128 142 129 75 116 167 117 69 227 15 150 63 153 53 9 142 109 39 186 178 9 26 157 201 108 30 103 115 38 75 106 110 86 76 86 75 24 93 25 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/1/2014 4/1/2014 4/1/2014 4/1/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 CI CMI 69 24 1 1 13 11 19 17 32 1 2 7 6 13 1 21 1 7 1 21 10 8 72 41 10 7 20 1 12 21 4 1 4 9 2 13 2 1 2 10 29 1 15 2 1 11 3 14 42 5 5 138 3,768 59 59 1,495 1,386 950 833 3,136 28 146 714 18 4,654 131 6,594 114 994 46 6,783 2,760 2,336 33,912 5,371 1,740 665 2,180 157 552 42 592 241 208 621 600 1,391 144 81 112 2,170 6,003 84 180 72 234 2,387 246 2,212 19,908 550 240 L-Bar 2 157 59 59 115 126 50 49 98 28 73 102 3 358 131 314 114 142 46 323 276 292 471 131 174 95 109 157 46 2 148 241 52 69 300 107 72 81 56 217 207 84 12 36 234 217 82 158 474 110 48 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 CI CMI 9 1 4 12 2 38 3 2 7 4 3 5 9 9 3 9 2 6 5 1 3 7 24 5 20 19 9 1 8 6 2 37 11 2 6 1 17 3 21 2 11 2 1 2 4 1 8 1 23 8 1 252 157 644 228 182 76 276 172 420 304 225 125 684 729 66 270 142 858 490 180 45 486 1,704 355 960 1,577 555 15 144 402 202 2,442 638 176 6 67 1,751 333 1,575 94 1,837 186 70 174 308 65 712 1 2,231 1,088 168 L-Bar 28 157 161 19 91 2 92 86 60 76 75 25 76 81 22 30 71 143 98 180 15 74 71 71 48 83 169 15 18 67 101 66 58 88 1 67 103 111 75 47 167 93 70 87 77 65 89 1 97 136 168 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/2/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 CI CMI 22 2 4 4 1 2 1 1 1 7 3 21 3 16 9 2 8 6 10 1 1 1 23 4 2 3 8 1 4 1 1 1 1 7 1 1 11 8 18 5 5 8 24 2 6 8 2 10 1 8 5 3,102 378 80 556 138 240 260 162 116 469 48 1,491 342 1,856 774 398 584 864 2,320 212 349 240 3,381 488 260 399 1,040 217 220 107 87 45 129 588 13 99 1,331 1,392 3,258 565 300 1,832 3,672 160 1,086 968 250 1,060 271 480 670 L-Bar 141 189 20 139 138 120 260 162 116 67 16 71 114 116 86 199 73 144 232 212 349 240 147 122 130 133 130 217 55 107 87 45 129 84 13 99 121 174 181 113 60 229 153 80 181 121 125 106 271 60 134 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/3/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 CI CMI 13 2 8 1 2 1 9 3 4 3 3 2 1 49 5 8 1 47 1 5 1 15 12 5 5 2 3 2 1 7 2 2 31 6 9 1 2 9 5 6 4 9 16 4 1 1 7 3 1 3 2 2,080 316 40 114 152 92 504 126 184 48 171 108 191 1,421 285 488 48 2,867 90 125 84 375 1,356 285 320 60 87 108 73 483 196 538 4,898 1,314 1,314 40 296 243 540 1,764 80 468 32 500 294 382 406 396 81 210 30 L-Bar 160 158 5 114 76 92 56 42 46 16 57 54 191 29 57 61 48 61 90 25 84 25 113 57 64 30 29 54 73 69 98 269 158 219 146 40 148 27 108 294 20 52 2 125 294 382 58 132 81 70 15 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/4/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/5/2014 4/6/2014 4/6/2014 4/6/2014 4/7/2014 CI 5 8 4 7 4 7 3 9 6 50 2 1 3 6 8 4 13 1 5 3 3 6 8 8 1 12 6 1 4 1 5 14 1,598 1,656 1,598 6 1 4 1 5 6 1 2 3 3 11 1,707 25 4 15 3 CMI 315 544 252 112 236 91 201 1,269 204 3,040 174 112 456 78 728 152 1,924 232 85 375 57 582 536 1,176 41 252 84 46 912 45 40 1,316 4,794 38,088 12,784 3,258 303 304 102 540 48 75 110 300 642 979 44,382 2,800 128 3,105 279 L-Bar 63 68 63 16 62 13 67 141 34 76 87 112 152 13 91 38 148 232 17 125 19 97 67 147 41 21 14 46 228 45 8 94 3 23 8 543 303 76 102 108 8 75 55 100 214 89 26 112 32 207 93 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 CI CMI 1 36 4 5 8 37 78 4 1 4 17 6 1 28 7 1 4 33 5 10 12 5 2 3 63 3 3 1 9 1 4 26 2 6 3 4 6 1 7 3 7 4 6 62 2 3 6 24 6 7 25 152 4,356 404 625 120 4,514 234 236 86 920 4,879 1,812 226 3,724 1,589 111 608 7,260 35 740 180 370 156 480 8,568 627 33 24 756 35 204 572 910 72 108 16 408 70 448 330 518 292 456 4,588 42 357 6 2,544 2,334 623 3,150 L-Bar 152 121 101 125 15 122 3 59 86 230 287 302 226 133 227 111 152 220 7 74 15 74 78 160 136 209 11 24 84 35 51 22 455 12 36 4 68 70 64 110 74 73 76 74 21 119 1 106 389 89 126 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/7/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 CI CMI 1 6 7 3 5 12 7 9 10 1 4 10 12 11 4 1 9 8 1 7 2 7 42 4 5 1 7 1 2 6 1 1 2 17 3 12 2 8 10 10 29 2 6 5 15 2 16 1 8 8 2 65 114 973 258 305 1,140 728 72 20 96 52 1,470 1,668 1,518 340 18 792 80 62 259 20 658 294 8 800 91 168 21 234 540 76 103 170 4,813 951 396 406 592 1,390 1,900 2,494 300 1,650 525 1,620 382 1,840 101 32 976 108 L-Bar 65 19 139 86 61 95 104 8 2 96 13 147 139 138 85 18 88 10 62 37 10 94 7 2 160 91 24 21 117 90 76 103 85 320 317 33 203 74 139 190 86 150 275 105 108 191 115 101 4 122 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/8/2014 4/9/2014 CI CMI 5 4 5 7 4 4 27 10 1 7 20 6 1 6 21 11 15 43 37 6 7 8 7 35 12 9 11 6 8 10 2 6 8 18 2 7 1 4 105 8 3 42 2 1 25 21 50 4 12 8 10 1,060 412 430 385 204 976 11,610 680 71 574 8,120 270 150 648 2,667 1,617 1,050 3,139 2,516 270 189 728 119 2,310 120 180 319 798 32 2,540 76 246 976 1,656 16 210 49 432 4,725 472 99 5,166 116 57 2,325 1,155 6,850 256 228 296 1,380 L-Bar 212 103 86 55 51 244 430 68 71 82 406 45 150 108 127 147 70 73 68 45 27 91 17 66 10 20 29 133 4 254 38 41 122 92 8 30 49 108 45 59 33 123 58 57 93 55 137 64 19 37 138 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 CI CMI 1 22 37 4 3 20 1 15 3 2 4 8 20 10 1 11 6 7 11 9 61 18 1 10 15 2 1 7 4 8 4 13 1 10 9 1 3 23 48 1 3 4 16 10 12 1 13 31 4 14 1 107 5,830 12,395 380 423 1,580 116 1,140 561 176 744 1,656 5,360 670 153 176 990 77 1,078 1,053 7,381 828 247 460 5,445 158 367 693 436 184 136 624 193 3,080 99 23 111 1,909 672 53 195 872 1,584 1,950 1,476 103 351 2,666 152 1,246 12 L-Bar 107 265 335 95 141 79 116 76 187 88 186 207 268 67 153 16 165 11 98 117 121 46 247 46 363 79 367 99 109 23 34 48 193 308 11 23 37 83 14 53 65 218 99 195 123 103 27 86 38 89 12 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 4/9/2014 CI CMI 7 8 1 1 8 11 20 4 26 6 6 1 1 4 1 1 7 1 24 2 2 1 4 11 2 21 1 14 2 1 8 2 20 1 1 3 3 1 7 13 22 8 1 4 4 3 1 4 2 1 1 329 80 265 67 136 836 1,580 496 1,950 1,026 972 3 150 448 35 161 861 265 2,520 24 250 50 48 2,266 186 1,449 181 1,666 150 79 864 116 2,920 167 110 9 306 14 252 2,145 1,936 928 115 184 240 222 49 304 48 77 63 L-Bar 47 10 265 67 17 76 79 124 75 171 162 3 150 112 35 161 123 265 105 12 125 50 12 206 93 69 181 119 75 79 108 58 146 167 110 3 102 14 36 165 88 116 115 46 60 74 49 76 24 77 63 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/9/2014 4/9/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 CI CMI 1 7 2 5 1 1 10 9 1 22 5 5 12 85 1 2 5 5 8 6 19 34 21 4 3 8 19 11 78 34 1 18 2 1 4 6 4 2 1 1 11 12 10 5 7 11 1 1 3 1 5 224 679 76 90 76 45 3,820 549 67 374 1,385 355 1,968 1,615 185 140 490 750 56 144 1,843 3,264 3,801 100 318 784 6,099 3,531 5,850 3,162 321 882 150 68 752 336 980 208 276 56 1,540 1,620 1,440 575 1,001 2,530 311 127 210 29 620 L-Bar 224 97 38 18 76 45 382 61 67 17 277 71 164 19 185 70 98 150 7 24 97 96 181 25 106 98 321 321 75 93 321 49 75 68 188 56 245 104 276 56 140 135 144 115 143 230 311 127 70 29 124 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/10/2014 4/11/2014 4/11/2014 CI CMI 1 76 2 2 7 9 8 8 7 19 7 12 20 1 25 1 3 8 8 7 4 3 15 30 4 5 5 1 3 3 4 1 6 4 3 22 10 3 3 15 14 2 1 2 2 1 8 15 14 14 1 36 3,040 244 68 259 522 40 1,200 651 1,786 1,274 1,224 2,680 51 6,075 54 321 544 760 1,827 100 363 1,815 3,630 220 545 110 9 264 207 660 67 108 432 285 946 830 240 516 1,950 1,134 134 51 122 90 148 344 2,970 126 1,022 188 L-Bar 36 40 122 34 37 58 5 150 93 94 182 102 134 51 243 54 107 68 95 261 25 121 121 121 55 109 22 9 88 69 165 67 18 108 95 43 83 80 172 130 81 67 51 61 45 148 43 198 9 73 188 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 CI CMI 8 22 2 6 20 25 4 21 8 2 1 1 2 1 1 3 4 2 2 8 2 8 8 2 4 2 16 24 12 14 42 13 1 63 1 23 24 2 4 12 6 4 7 1 8 2 4 4 1 4 3 1,176 1,584 182 282 1,620 2,000 176 2,436 880 220 72 13 706 333 256 159 376 122 186 192 30 104 224 182 68 244 3,168 4,752 2,388 2,786 9,996 468 32 4,914 200 1,564 1,920 294 120 2,136 798 300 882 91 1,016 12 476 196 38 516 354 L-Bar 147 72 91 47 81 80 44 116 110 110 72 13 353 333 256 53 94 61 93 24 15 13 28 91 17 122 198 198 199 199 238 36 32 78 200 68 80 147 30 178 133 75 126 91 127 6 119 49 38 129 118 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/11/2014 4/12/2014 4/12/2014 4/12/2014 4/12/2014 4/12/2014 4/12/2014 4/13/2014 4/13/2014 4/13/2014 4/13/2014 4/13/2014 4/13/2014 4/13/2014 4/13/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 CI CMI 2 2 26 2 4 1 6 9 4 5 28 3 3 1 14 19 1 1 1 5 41 3 12 8 2 4 4 8 2 11 36 11 1 1 1 9 15 2 3 7 4 4 9 1 30 8 2 5 6 4 4 102 296 2,470 54 276 301 2,406 306 540 715 28 384 138 143 2,744 2,926 62 102 251 330 1,353 636 2,184 1,848 6 288 1,520 856 376 2,002 7,308 902 449 193 191 729 75 246 525 539 180 772 1,530 53 7,230 928 58 625 354 136 268 L-Bar 51 148 95 27 69 301 401 34 135 143 1 128 46 143 196 154 62 102 251 66 33 212 182 231 3 72 380 107 188 182 203 82 449 193 191 81 5 123 175 77 45 193 170 53 241 116 29 125 59 34 67 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 CI CMI 3 8 96 6 12 4 1 1 5 4 7 4 12 7 8 18 2 1 2 11 1 8 9 8 10 7 4 6 12 6 7 10 8 8 16 1 1 4 1 9 1 30 4 7 2 2 2 5 1 1 3 543 552 8,928 1,368 2,796 116 95 270 600 516 497 176 1,164 847 1,656 2,232 70 176 20 1,529 76 608 981 1,144 1,430 336 136 870 1,248 384 420 1,190 1,568 408 1,328 1 1 160 49 450 163 5,730 484 651 92 92 92 425 44 42 114 L-Bar 181 69 93 228 233 29 95 270 120 129 71 44 97 121 207 124 35 176 10 139 76 76 109 143 143 48 34 145 104 64 60 119 196 51 83 1 1 40 49 50 163 191 121 93 46 46 46 85 44 42 38 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/14/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 CI CMI 4 13 1 8 1 5 11 2 3 5 1 7 1 18 1 1 1 1 7 4 17 12 1 18 8 6 9 9 3 10 1 7 37 144 5 1 8 8 4 11 7 10 10 27 1 2 36 2 4 9 8 476 104 1 504 86 110 660 118 501 185 72 581 196 486 61 233 133 310 630 172 1,071 3,684 101 1,656 976 786 414 891 372 2,390 114 63 6,623 8,064 815 28 504 1,368 292 1,562 196 1,960 1,110 2,808 334 342 11,556 358 1,068 1,494 360 L-Bar 119 8 1 63 86 22 60 59 167 37 72 83 196 27 61 233 133 310 90 43 63 307 101 92 122 131 46 99 124 239 114 9 179 56 163 28 63 171 73 142 28 196 111 104 334 171 321 179 267 166 45 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/15/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 CI CMI 6 12 6 3 10 7 3 24 1 8 7 9 1 4 74 14 20 6 19 3 6 12 6 7 7 4 3 13 3 5 3 4 3 5 8 28 1 1 1 24 30 4 14 17 14 10 1 7 1 1 5 48 1,608 408 219 250 1,169 324 2,376 94 64 385 864 212 452 74 238 1,600 444 285 156 654 288 402 42 280 356 303 273 171 180 420 240 390 790 32 3,752 39 26 124 3,960 6,450 64 924 816 3,234 420 133 294 160 132 215 L-Bar 8 134 68 73 25 167 108 99 94 8 55 96 212 113 1 17 80 74 15 52 109 24 67 6 40 89 101 21 57 36 140 60 130 158 4 134 39 26 124 165 215 16 66 48 231 42 133 42 160 132 43 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 CI CMI 3 3 26 5 44 3 15 3 21 10 1 4 4 12 7 7 3 4 3 9 10 2 8 8 29 37 8 9 3 84 4 3 9 9 8 13 1 2 2 1 1 33 7 5 4 4 3 8 3 2 2 408 264 9,464 420 6,468 366 5,550 270 2,268 630 60 596 944 3,036 1,400 2,135 306 196 198 639 1,240 192 1,440 832 3,509 8,510 720 1,197 42 1,092 840 609 972 468 168 2,002 23 278 136 87 83 2,079 49 1,105 732 116 255 576 18 348 318 L-Bar 136 88 364 84 147 122 370 90 108 63 60 149 236 253 200 305 102 49 66 71 124 96 180 104 121 230 90 133 14 13 210 203 108 52 21 154 23 139 68 87 83 63 7 221 183 29 85 72 6 174 159 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/16/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 CI CMI 2 1 10 34 2 5 2 6 19 34 18 1 8 4 4 6 8 12 14 2 3 1 4 1 39 4 1 7 6 1 5 21 1 25 8 5 5 14 13 21 2 1 7 8 4 1 11 7 11 11 1 68 19 50 2,618 242 195 208 432 1,482 2,652 1,170 114 272 232 380 198 648 648 84 172 60 145 440 61 156 152 4 315 696 116 585 1,512 50 4,375 1,848 720 595 2,198 767 6,405 100 256 434 1,408 696 100 704 805 1,254 2,552 305 L-Bar 34 19 5 77 121 39 104 72 78 78 65 114 34 58 95 33 81 54 6 86 20 145 110 61 4 38 4 45 116 116 117 72 50 175 231 144 119 157 59 305 50 256 62 176 174 100 64 115 114 232 305 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 CI CMI 45 17 4 28 43 2 1 11 9 4 2 8 3 7 2 9 11 6 2 9 9 3 3 8 8 9 8 3 2 6 2 9 10 2 4 2 15 6 10 9 2 4 7 18 4 10 1 1 1 1 25 11,790 68 64 10,416 5,848 300 142 726 729 272 136 472 612 455 426 1,701 209 162 118 972 252 30 186 2,488 320 1,341 1,152 24 98 1,014 310 378 380 204 100 326 1,545 654 560 1,611 100 184 168 1,584 308 570 11 47 185 49 650 L-Bar 262 4 16 372 136 150 142 66 81 68 68 59 204 65 213 189 19 27 59 108 28 10 62 311 40 149 144 8 49 169 155 42 38 102 25 163 103 109 56 179 50 46 24 88 77 57 11 47 185 49 26 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/17/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 CI 3 1 5 2 11 1 8 3 1 3 14 1 1 5 2 1 43 2 14 45 2 136 25 1,092 8 7 6 7 1 11 18 2 11 8 12 6 6 2 1 6 8 1 3 10 12 6 23 2 1 11 7 CMI 111 13 115 88 1,650 7 384 282 72 420 98 53 46 605 242 106 6,579 46 504 5,670 160 9,928 1,350 1,092 928 728 462 721 77 154 1,512 80 495 1,344 720 834 756 250 58 786 1,136 108 69 1,390 192 828 5,635 204 39 891 392 L-Bar 37 13 23 44 150 7 48 94 72 140 7 53 46 121 121 106 153 23 36 126 80 73 54 1 116 104 77 103 77 14 84 40 45 168 60 139 126 125 58 131 142 108 23 139 16 138 245 102 39 81 56 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/18/2014 4/19/2014 4/19/2014 4/19/2014 4/19/2014 4/19/2014 4/19/2014 4/19/2014 4/20/2014 4/20/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 CI 1 8 13 19 2 5 2 10 2 3 3 3 1 5 6 6 3 33 17 33 4 4 1 3 24 14 1 1 1 2 12 1,612 4 8 3 2 19 2 4 4 26 8 85 6 1 17 1 3 8 4 25 CMI 188 416 273 2,375 14 410 504 1,830 326 423 462 18 79 190 1,074 966 141 3,168 289 759 88 264 229 102 11,304 4,018 136 54 5 194 492 30,628 468 504 351 194 1,292 628 1,008 1,040 1,612 721 9,265 36 181 6,970 253 456 1,216 608 9,400 L-Bar 188 52 21 125 7 82 252 183 163 141 154 6 79 38 179 161 47 96 17 23 22 66 229 34 471 287 136 54 5 97 41 19 117 63 117 97 68 314 252 260 62 252 109 6 181 410 253 152 152 152 376 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED Date 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 CI CMI 2 7 1 4 10 11 6 7 2 3 1 1 2 4 2 61 10 8 1 2 9 8 2 2 41 6 23 1 2 6 7 1 2 26 1 7 2 1 4 4 2 1 1 8 2 14 1 1 6 26 8 154 252 48 640 840 957 384 1,099 174 315 94 93 174 244 376 4,758 1,400 1,256 132 106 279 488 328 58 8,323 24 299 50 114 582 1,099 44 466 3,796 64 791 46 77 1,016 348 308 32 98 368 170 1,190 33 437 24 4,290 816 L-Bar 77 36 48 160 84 87 69 157 87 105 94 93 87 61 188 78 140 157 132 53 31 61 164 29 203 4 13 50 57 97 157 44 233 146 64 113 23 77 254 87 154 32 98 46 85 85 33 437 4 165 102 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/21/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 CI CMI 6 22 1 8 12 1 4 1 23 2 1 2 2 2 1 1 3 7 6 9 57 4 8 3 2 2 8 27 12 5 4 24 4 105 21 91 9 9 3 146 137 11 6 6 6 9 1 1 1 12 2 24 264 126 976 250 114 272 169 1,817 188 67 184 202 234 201 49 426 1,190 510 1,296 12,312 564 1,400 357 420 148 1,832 3,267 312 500 344 4,536 496 20,685 3,507 34,216 3,798 54 282 52,706 47,539 539 954 510 456 1,062 116 165 191 840 282 L-Bar 4 12 126 122 74 114 68 169 79 94 67 92 101 117 201 49 142 170 85 144 216 141 175 119 210 74 229 121 26 100 86 189 124 197 167 376 422 6 94 361 347 49 159 85 76 118 116 165 191 70 141 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 CI CMI 10 2 9 5 4 10 9 1 5 8 7 9 4 4 2 3 2 4 8 8 68 5 8 1 4 4 14 1 6 4 10 5 26 3 1 1 9 3 5 7 7 1 5 2 3 10 8 8 6 6 5 420 92 2,277 330 268 720 1,179 181 780 656 1,099 2,358 328 104 92 117 224 348 624 592 8,704 240 520 41 116 36 364 73 360 280 1,090 745 3,380 18 90 66 819 372 335 413 1,239 54 245 438 123 570 432 464 600 798 640 L-Bar 42 46 253 66 67 72 131 181 156 82 157 262 82 26 46 39 112 87 78 74 128 48 65 41 29 9 26 73 60 70 109 149 130 6 90 66 91 124 67 59 177 54 49 219 41 57 54 58 100 133 128 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/22/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 CI CMI 15 3 4 4 11 4 7 7 4 1 2 7 5 7 2 1 4 3 1 7 28 10 1 15 11 4 1 5 9 4 8 50 4 41 6 1 14 9 5 2 3 1 12 3 10 3 12 6 7 13 45 1,155 126 316 244 704 184 385 672 332 104 160 651 1,195 455 282 115 352 15 306 2,373 3,192 940 61 4,305 2,783 428 69 325 1,764 692 720 8,450 668 5,371 588 106 2,030 1,350 285 78 81 73 4,044 330 1,060 366 1,116 1,476 511 2,717 12,780 L-Bar 77 42 79 61 64 46 55 96 83 104 80 93 239 65 141 115 88 5 306 339 114 94 61 287 253 107 69 65 196 173 90 169 167 131 98 106 145 150 57 39 27 73 337 110 106 122 93 246 73 209 284 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 4/23/2014 CI CMI 17 8 10 10 16 16 2 8 12 1 3 1 12 6 10 79 1 8 2 4 5 9 10 9 9 3 1 2 19 8 5 1 9 5 6 1 2 19 10 17 8 4 2 4 7 6 27 22 5 4 4 323 1,888 1,770 210 3,072 2,432 142 272 696 34 207 56 1,260 570 1,370 11,297 91 1,464 58 64 250 531 1,760 1,089 558 174 118 250 19 200 255 255 594 560 126 69 220 1,919 310 731 376 572 156 152 161 546 2,565 4,686 625 104 76 L-Bar 19 236 177 21 192 152 71 34 58 34 69 56 105 95 137 143 91 183 29 16 50 59 176 121 62 58 118 125 1 25 51 255 66 112 21 69 110 101 31 43 47 143 78 38 23 91 95 213 125 26 19 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 CI CMI 1 1 4 13 6 1 1 30 6 13 1 9 109 37 4 4 1 1 1 14 2 11 7 5 2 14 8 4 8 9 5 2 2 6 36 2 8 6 1 8 1 8 21 2 3 6 61 2 6 7 9 370 182 172 507 774 237 56 4,140 552 624 187 81 18,748 13,727 424 624 152 157 63 1,806 114 594 1,001 110 126 546 1,288 464 576 27 555 174 72 408 6,372 180 1,424 312 136 1,056 145 848 1,071 168 243 414 1,037 88 330 133 162 L-Bar 370 182 43 39 129 237 56 138 92 48 187 9 172 371 106 156 152 157 63 129 57 54 143 22 63 39 161 116 72 3 111 87 36 68 177 90 178 52 136 132 145 106 51 84 81 69 17 44 55 19 18 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/24/2014 4/25/2014 4/25/2014 CI CMI 1 8 9 6 2 11 10 9 8 6 4 6 3 1 13 11 7 8 16 1 12 2 11 4 22 9 6 7 9 8 1 3 8 1 7 1 107 5 1 2 3 1 1 1 6 4 5 1 1 8 1 16 320 522 180 92 572 490 441 528 312 424 1,008 267 128 1,027 693 875 168 1,216 44 540 90 539 672 1,210 1,332 870 308 54 1,464 38 102 1,384 91 63 18 3,103 100 66 112 321 63 164 89 546 16 1,160 79 373 1,152 84 L-Bar 16 40 58 30 46 52 49 49 66 52 106 168 89 128 79 63 125 21 76 44 45 45 49 168 55 148 145 44 6 183 38 34 173 91 9 18 29 20 66 56 107 63 164 89 91 4 232 79 373 144 84 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/25/2014 4/26/2014 4/26/2014 4/26/2014 CI CMI 1 2 16 46 6 1 2 25 13 8 1 8 40 3 12 23 3 5 65 1 2 1 1 9 10 19 10 5 10 9 2 7 3 9 9 1 39 1 6 1 9 9 6 2 20 1 10 1 4 1 1 135 242 1,152 3,634 30 69 188 1,125 1,664 1,208 10 744 6,920 279 2,136 1,978 291 295 1,560 16 54 131 138 702 210 2,356 410 10 540 594 316 819 96 189 3,699 23 4,680 84 102 79 198 261 612 352 2,780 184 2,220 16 1,068 241 33 L-Bar 135 121 72 79 5 69 94 45 128 151 10 93 173 93 178 86 97 59 24 16 27 131 138 78 21 124 41 2 54 66 158 117 32 21 411 23 120 84 17 79 22 29 102 176 139 184 222 16 267 241 33 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/26/2014 4/27/2014 4/27/2014 4/27/2014 4/27/2014 4/27/2014 4/27/2014 4/27/2014 4/27/2014 4/27/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 CI 2 9 6 8 3 56 18 1 16 1 48 4 1 15 1 1 5 2,338 17 14 7 10 6 1 1 37 2 4 14 1 8 1 1 3 13 7 1 4 4 10 41 1 2 12 1 6 8 7 4 4 8 CMI 536 1,782 1,494 176 396 896 270 98 864 163 6,240 1,256 67 2,025 204 54 25 32,732 2,091 784 637 850 456 128 86 1,591 278 40 406 5 512 62 158 294 2,158 1,757 55 192 164 650 1,353 206 378 288 171 144 728 588 240 168 552 L-Bar 268 198 249 22 132 16 15 98 54 163 130 314 67 135 204 54 5 14 123 56 91 85 76 128 86 43 139 10 29 5 64 62 158 98 166 251 55 48 41 65 33 206 189 24 171 24 91 84 60 42 69 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/28/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 CI CMI 3 3 4 15 1 7 8 17 5 10 33 9 10 1 7 2 6 4 6 8 21 86 8 1 9 6 9 60 3 4 4 3 4 1 3 12 3 12 12 9 8 8 11 1 6 1 7 5 3 2 6 252 165 220 1,035 54 273 296 2,448 535 750 4,422 837 670 127 812 62 384 392 540 496 1,008 1,548 656 76 261 780 963 840 180 80 260 348 108 195 279 372 216 804 756 585 440 304 594 124 36 45 791 540 531 364 474 L-Bar 84 55 55 69 54 39 37 144 107 75 134 93 67 127 116 31 64 98 90 62 48 18 82 76 29 130 107 14 60 20 65 116 27 195 93 31 72 67 63 65 55 38 54 124 6 45 113 108 177 182 79 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 CI CMI 6 6 4 21 12 10 7 1 23 4 1 9 8 1 1 7 1 4 8 4 52 13 3 20 9 8 8 1 10 8 25 8 11 5 1 10 2 1 6 12 7 8 3 1 7 10 10 2 4 10 4 888 18 120 5,103 60 160 728 36 4,600 692 71 801 888 125 40 77 101 248 32 8 5,824 1,261 87 6,020 828 472 1,544 69 370 1,096 2,225 1,328 1,485 10 44 150 530 88 12 864 371 640 441 101 602 1,270 410 196 568 600 8 L-Bar 148 3 30 243 5 16 104 36 200 173 71 89 111 125 40 11 101 62 4 2 112 97 29 301 92 59 193 69 37 137 89 166 135 2 44 15 265 88 2 72 53 80 147 101 86 127 41 98 142 60 2 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/29/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 CI 54 2 9 5 13 9 4 10 5 1 6 2,321 2 11 2 1 5 6 8 5 16 6 11 1 6 4 2 1 28 15 5 7 9 2 8 12 2 9 11 46 4 8 31 25 1 9 1 15 8 2 12 CMI 2,484 38 684 5 4,043 639 624 500 45 110 408 78,914 420 110 186 70 40 384 544 175 480 294 715 155 276 192 30 259 3,500 975 330 826 423 256 1,896 1,068 726 549 2,035 4,462 424 1,040 2,790 5,025 289 630 358 255 760 430 1,068 L-Bar 46 19 76 1 311 71 156 50 9 110 68 34 210 10 93 70 8 64 68 35 30 49 65 155 46 48 15 259 125 65 66 118 47 128 237 89 363 61 185 97 106 130 90 201 289 70 358 17 95 215 89 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 4/30/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 CI CMI 6 2 4 19 29 17 7 4 9 10 9 1 10 9 9 1 7 11 3 11 8 54 5 24 6 8 9 8 8 10 4 1 4 1 9 1 1 5 1 7 1 4 1 2 7 11 6 9 11 15 1 1,008 326 44 3,040 7,482 3,774 539 508 828 930 567 250 60 1,233 99 247 658 935 111 121 624 9,774 65 3,768 192 440 513 480 496 650 280 54 156 101 531 232 18 75 60 882 133 628 285 538 1,673 704 474 576 638 2,010 145 L-Bar 168 163 11 160 258 222 77 127 92 93 63 250 6 137 11 247 94 85 37 11 78 181 13 157 32 55 57 60 62 65 70 54 39 101 59 232 18 15 60 126 133 157 285 269 239 64 79 64 58 134 145 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST Date 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 CI CMI 12 8 10 8 28 5 8 33 36 6 2 3 10 5 10 3 31 5 25 1 12 9 2 6 2 10 51 1 4 8 2 10 6 7 2 2 3 37 8 10 8 7 11 2 4 1 4 9 5 4 1 612 632 2,100 160 4,368 850 312 4,059 8,892 258 404 468 890 1,055 1,080 42 2,542 570 3,625 274 600 819 52 432 56 520 11,369 323 172 960 150 560 78 259 308 174 126 7,696 360 980 352 483 374 128 296 176 224 630 365 196 144 L-Bar 51 79 210 20 156 170 39 123 247 43 202 156 89 211 115 14 82 114 145 274 50 91 26 72 28 52 331 323 43 120 75 56 13 37 154 87 42 208 45 98 44 69 34 64 74 176 56 70 73 49 144 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/1/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/2/2014 CI CMI 8 1 1 4 3 6 3 7 10 4 11 1 8 66 30 2 3 6 10 5 2 7 1 2 9 11 10 6 6 6 3 10 7 1 1 7 6 10 1 3 6 3 7 17 9 7 12 9 6 8 1 552 118 109 268 105 546 288 28 115 332 990 146 40 660 2,400 130 186 276 70 5 108 245 57 318 423 176 1,390 606 390 192 63 330 126 294 98 35 858 110 38 327 18 18 1,316 1,394 1,008 441 252 324 48 352 9 L-Bar 69 118 109 67 35 91 96 4 61 83 90 146 5 10 80 65 62 46 7 1 54 35 57 159 47 16 139 101 65 32 21 33 18 294 98 5 143 11 38 109 3 6 188 82 112 63 21 36 8 44 9 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/2/2014 5/2/2014 5/2/2014 5/2/2014 5/3/2014 5/3/2014 5/3/2014 5/3/2014 5/3/2014 5/4/2014 5/4/2014 5/4/2014 5/4/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 CI CMI 1 1 4 2 1 1 2 10 2 1 1 16 17 5 9 29 10 3 6 18 1 8 3 7 83 5 5 28 2 9 12 1 2 6 3 8 4 5 3 4 4 5 4 10 5 1 1 2 37 9 2 180 106 440 840 98 419 604 280 126 55 61 160 1,853 405 648 3,915 860 459 522 2,502 268 248 156 98 11,786 795 390 3,696 104 954 2,064 228 368 234 213 1,096 636 535 708 152 572 85 236 710 470 274 247 152 3,404 963 94 L-Bar 180 106 110 420 98 419 302 28 63 55 61 10 109 81 72 135 86 153 87 139 268 31 52 14 142 159 78 132 52 106 172 228 184 39 71 137 159 107 236 38 143 17 59 71 94 274 247 76 92 107 47 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/5/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 CI CMI 10 1 2 8 5 7 7 1 3 1 6 8 1 5 1 2 3 1 2 4 37 1 3 11 2 1 2 1 1 4 5 1 3 6 5 8 2 12 1 12 21 19 7 6 1 4 4 10 7 1 8 1,610 39 154 824 370 1,197 637 100 39 114 180 680 559 275 128 92 285 61 298 284 2,627 31 186 682 92 133 170 44 29 388 300 63 198 564 40 136 412 300 29 3,036 3,486 4,123 455 360 155 244 1,008 2,060 434 94 608 L-Bar 161 39 77 103 74 171 91 100 13 114 30 85 559 55 128 46 95 61 149 71 71 31 62 62 46 133 85 44 29 97 60 63 66 94 8 17 206 25 29 253 166 217 65 60 155 61 252 206 62 94 76 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 CI CMI 10 5 2 6 3 21 3 1 3 11 4 6 4 10 9 1 4 5 49 2 3 10 12 9 2 13 2 1 11 3 7 2 3 1 1 9 8 10 14 4 8 3 19 9 7 7 5 1 1 3 2 790 485 226 1,074 204 840 171 218 117 1,111 472 18 408 1,530 576 99 1,028 10 11,809 280 267 1,450 240 54 390 2,353 260 105 275 33 259 374 138 6 51 729 1,272 1,750 1,064 80 600 657 1,425 612 441 427 1,015 64 69 189 460 L-Bar 79 97 113 179 68 40 57 218 39 101 118 3 102 153 64 99 257 2 241 140 89 145 20 6 195 181 130 105 25 11 37 187 46 6 51 81 159 175 76 20 75 219 75 68 63 61 203 64 69 63 230 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/6/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 CI CMI 8 2 4 42 24 11 4 6 1 3 43 20 17 8 12 2 12 7 9 3 5 12 4 2 10 9 6 2 7 7 1 6 5 11 12 13 3 3 3 10 8 5 6 12 4 1 56 2 33 8 6 24 106 696 42 7,560 1,298 184 396 79 144 3,397 40 68 488 360 76 2,076 1,148 612 429 60 84 208 130 740 252 174 306 455 602 120 618 455 1,518 2,100 871 396 336 33 1,350 440 60 390 2,292 264 339 3,416 232 7,095 120 2,178 L-Bar 3 53 174 1 315 118 46 66 79 48 79 2 4 61 30 38 173 164 68 143 12 7 52 65 74 28 29 153 65 86 120 103 91 138 175 67 132 112 11 135 55 12 65 191 66 339 61 116 215 15 363 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 CI CMI 12 1 8 3 4 25 9 6 10 1 2 3 5 19 1 1 1 23 10 10 1 1 3 14 13 2 18 8 23 9 11 1 6 1 8 9 10 1 3 7 2 12 10 2 6 4 1 3 3 7 2 2,364 173 744 522 332 2,875 504 882 480 174 358 177 465 1,330 97 4 87 46 90 3,080 196 315 573 3,108 1,404 120 162 544 1,472 1,557 1,243 93 156 131 600 603 490 69 228 560 12 864 950 184 756 264 138 48 153 497 160 L-Bar 197 173 93 174 83 115 56 147 48 174 179 59 93 70 97 4 87 2 9 308 196 315 191 222 108 60 9 68 64 173 113 93 26 131 75 67 49 69 76 80 6 72 95 92 126 66 138 16 151 71 80 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/7/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 CI CMI 6 9 5 2 8 8 1 2 3 14 12 4 6 4 6 8 1 16 8 1 1 1 10 6 10 5 1 6 4 1 8 1 5 2 8 40 5 4 9 33 2 21 6 1 6 6 7 3 3 3 8 1,032 603 345 60 288 288 65 106 675 756 1,956 196 666 472 432 2,184 127 1,104 832 29 115 114 850 1,542 1,670 760 35 30 1,160 101 584 114 225 402 56 1,040 630 408 585 1,947 182 1,743 306 33 186 690 1,071 249 114 192 1,080 L-Bar 172 67 69 30 36 36 65 53 225 54 163 49 111 118 72 273 127 69 104 29 115 114 85 257 167 152 35 5 290 101 73 114 45 201 7 26 126 102 65 59 91 83 51 33 31 115 153 83 38 64 135 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/8/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 CI CMI 10 3 8 7 2 1 8 4 30 11 9 1 12 3 7 6 1 18 5 68 7 4 13 6 12 2 2 6 10 2 3 3 7 5 2 4 5 14 1 8 2 1 4 1 7 1 1 2 22 2 4 360 261 848 1,638 114 23 800 64 1,650 374 225 162 1,020 264 210 1,146 25 108 185 748 35 416 442 402 24 40 14 516 1,020 36 183 195 560 275 244 316 945 1,120 140 272 954 377 88 71 392 73 252 70 2,486 6 180 L-Bar 36 87 106 234 57 23 100 16 55 34 25 162 85 88 30 191 25 6 37 11 5 104 34 67 2 20 7 86 102 18 61 65 80 55 122 79 189 80 140 34 477 377 22 71 56 73 252 35 113 3 45 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/9/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/10/2014 5/11/2014 5/11/2014 CI CMI 3 1 2 9 12 9 4 12 62 20 27 3 22 2 1 16 1 2 10 37 6 7 2 3 1 1 1 12 4 3 1 1 2 4 1 2 3 16 7 2 3 32 1 1 4 1 1 4 1 1 1 381 47 16 1,035 936 765 48 780 8,804 2,340 3,240 291 3,894 32 50 896 74 30 600 2,516 228 105 26 279 123 26 62 1,680 564 87 49 42 94 188 65 124 84 1,776 2,072 216 597 6,208 210 273 20 33 41 20 75 71 485 L-Bar 127 47 8 115 78 85 12 65 142 117 120 97 177 16 50 56 74 15 60 68 38 15 13 93 123 26 62 140 141 29 49 42 47 47 65 62 28 111 296 108 199 194 210 273 5 33 41 5 75 71 485 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 CI CMI 2 2 11 11 8 4 10 16 7 7 2 2 7 10 2 8 3 13 1 7 3 6 14 3 5 18 2 5 7 5 16 1 4 11 5 4 9 9 5 6 4 4 1 7 2 3 5 9 11 2 4 182 248 1,760 616 688 312 870 4,672 329 154 176 202 574 400 132 1,136 465 351 113 238 183 396 1,008 216 280 1,278 50 40 1,085 720 2,592 62 168 1,298 130 68 918 486 240 282 280 728 95 651 78 108 310 369 1,276 284 504 L-Bar 91 124 160 56 86 78 87 292 47 22 88 101 82 40 66 142 155 27 113 34 61 66 72 72 56 71 25 8 155 144 162 62 42 118 26 17 102 54 48 47 70 182 95 93 39 36 62 41 116 142 126 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED Date 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/12/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 CI CMI 10 7 10 9 11 1 6 7 2 2 2 5 8 8 8 11 1 1 1 2 7 12 2 13 2 6 5 4 1 1 3 2 8 5 3 2 6 4 2 2 12 8 4 7 4 7 2 1 6 18 9 1,360 406 820 567 2,057 66 648 329 202 240 50 425 1,120 160 824 825 92 114 291 220 700 900 250 416 94 336 360 88 16 28 426 22 320 360 210 96 138 564 40 18 3,636 632 672 637 320 637 514 505 408 3,060 585 L-Bar 136 58 82 63 187 66 108 47 101 120 25 85 140 20 103 75 92 114 291 110 100 75 125 32 47 56 72 22 16 28 142 11 40 72 70 48 23 141 20 9 303 79 168 91 80 91 257 505 68 170 65 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 CI CMI 1 1 1 1 12 9 2 4 1 14 1 1 1 2 1 2 10 1 2 2 6 8 11 9 6 16 23 1 6 8 5 2 4 3 8 7 5 1 1 11 7 31 34 8 1 6 14 14 1 14 2 191 49 308 102 1,248 1,476 372 680 172 1,302 1 60 118 70 339 422 330 223 126 4 972 400 1,551 540 324 2,512 3,611 199 312 64 280 80 392 531 544 364 1,495 161 24 671 245 2,356 2,856 424 77 384 490 490 91 490 528 L-Bar 191 49 308 102 104 164 186 170 172 93 1 60 118 35 339 211 33 223 63 2 162 50 141 60 54 157 157 199 52 8 56 40 98 177 68 52 299 161 24 61 35 76 84 53 77 64 35 35 91 35 264 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 5/13/2014 CI 1 14 2 5 2 2 1 2 17 1 6 5 2 94 9 2,620 2 7 2 3 5 7 85 4 14 8 2 4 6 4 6 1 2 4 7 5 1 6 11 5 8 4 7 4 7 1 2 1 7 1 21 CMI 198 532 52 325 264 36 238 356 306 185 354 490 64 38,164 693 62,880 132 308 324 483 230 406 680 56 42 376 112 272 330 748 426 107 62 512 1,169 660 80 456 407 315 232 228 84 352 441 44 38 58 455 96 1,176 L-Bar 198 38 26 65 132 18 238 178 18 185 59 98 32 406 77 24 66 44 162 161 46 58 8 14 3 47 56 68 55 187 71 107 31 128 167 132 80 76 37 63 29 57 12 88 63 44 19 58 65 96 56 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 CI CMI 5 1 6 1 7 42 8 25 25 2 2 1 22 14 21 1 73 5 12 121 16 36 21 9 8 7 1 8 2 10 8 8 26 40 10 3 4 3 8 2 7 1 5 3 20 10 4 7 1 3 1 410 33 690 117 483 14,490 616 1,775 1,875 238 404 180 1,122 630 105 88 3,066 45 2,232 1,452 1,808 14,760 2,205 5,130 1,920 245 146 712 234 1,510 584 1,776 1,118 24,160 880 432 244 498 720 178 49 75 385 216 1,780 2,500 256 350 162 174 50 L-Bar 82 33 115 117 69 345 77 71 75 119 202 180 51 45 5 88 42 9 186 12 113 410 105 570 240 35 146 89 117 151 73 222 43 604 88 144 61 166 90 89 7 75 77 72 89 250 64 50 162 58 50 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED Date 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/14/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 CI CMI 8 8 1 8 2 10 1 4 1 2 3 189 9 2 8 10 4 2 1 1 156 12 9 11 1 25 11 33 22 11 1 7 66 4 9 1 5 5 3 6 2 2 2 10 23 10 3 13 2 5 4 1,816 1,816 106 312 270 400 119 32 150 270 57 11,340 387 242 16 330 468 24 87 90 24,180 1,716 639 1,001 187 1,125 770 4,257 2,860 176 230 819 3,300 448 567 82 225 540 348 594 116 72 20 350 9,683 240 15 26 334 1,730 328 L-Bar 227 227 106 39 135 40 119 8 150 135 19 60 43 121 2 33 117 12 87 90 155 143 71 91 187 45 70 129 130 16 230 117 50 112 63 82 45 108 116 99 58 36 10 35 421 24 5 2 167 346 82 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/15/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 CI CMI 12 1 5 2 4 12 4 2 6 1 4 25 25 10 1 1 1 1 2 1 1 1 1 2 4 18 11 2 17 9 22 3 2 11 1 1 1 3 1 1 2 8 11 9 2 1 45 46 4 2 3 1,188 48 1,620 224 140 636 980 56 606 11 360 2,250 2,225 380 125 59 96 88 196 184 122 66 65 3 108 18 341 132 561 1,026 3,256 468 168 2,057 77 99 46 147 264 262 62 1,752 99 909 294 36 11,250 1,242 36 306 732 L-Bar 99 48 324 112 35 53 245 28 101 11 90 90 89 38 125 59 96 88 98 184 122 66 65 2 27 1 31 66 33 114 148 156 84 187 77 99 46 49 264 262 31 219 9 101 147 36 250 27 9 153 244 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/16/2014 5/17/2014 5/17/2014 5/17/2014 5/17/2014 5/17/2014 5/17/2014 5/17/2014 CI 8 4 4 4 20 12 2 12 12 5 4 1 9 9 4 1 1 1 6 4 4 8 19 8 6 13 4 11 11 9 4 3 2 1 1 8 12 4 8 15 1 3 1 14 1 1 1 13 1,276 1 1 CMI 824 24 4 96 1,240 216 142 120 912 1,510 420 65 315 900 316 161 86 135 1,050 160 396 496 2,679 1,104 714 1,027 12 407 143 234 252 72 40 33 129 408 144 152 136 255 395 12 495 490 150 1,289 84 1,105 5,104 105 43 L-Bar 103 6 1 24 62 18 71 10 76 302 105 65 35 100 79 161 86 135 175 40 99 62 141 138 119 79 3 37 13 26 63 24 20 33 129 51 12 38 17 17 395 4 495 35 150 1,289 84 85 4 105 43 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 5/17/2014 5/17/2014 5/17/2014 5/17/2014 5/17/2014 5/17/2014 5/18/2014 5/18/2014 5/18/2014 5/18/2014 5/18/2014 5/18/2014 5/18/2014 5/18/2014 5/18/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 CI CMI 1 2 2 1 4 9 8 4 4 1 2 1 1 8 1 2 5 4 23 2 10 1 4 1 21 2 4 6 8 3 7 2 9 12 9 7 1 3 14 7 6 4 5 13 11 7 5 5 5 2 1 188 186 184 125 64 279 784 1,108 140 174 264 123 16 872 261 618 400 776 1,426 116 570 88 236 57 420 50 320 180 1,368 627 1,218 194 9 840 1,107 112 152 519 1,008 35 594 212 1,270 1,417 2,310 721 25 200 365 34 296 L-Bar 188 93 92 125 16 31 98 277 35 174 132 123 16 109 261 309 80 194 62 58 57 88 59 57 20 25 80 30 171 209 174 97 1 70 123 16 152 173 72 5 99 53 254 109 210 103 5 40 73 17 296 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 5/19/2014 CI CMI 4 9 6 1 10 14 16 38 6 6 22 4 3 1 1 1 1 8 4 6 3 10 13 11 4 5 1 3 2 6 2 10 7 2 2 1 14 15 7 7 7 2 19 4 5 2 3 15 16 5 1 256 342 378 382 110 378 320 3,230 1,128 696 4,730 636 51 80 137 79 207 760 204 324 60 660 455 1,430 588 170 50 114 78 612 132 760 49 254 42 9 126 510 371 910 364 164 2,546 828 345 82 720 2,730 1,568 440 64 L-Bar 64 38 63 382 11 27 20 85 188 116 215 159 17 80 137 79 207 95 51 54 20 66 35 130 147 34 50 38 39 102 66 76 7 127 21 9 9 34 53 130 52 82 134 207 69 41 240 182 98 88 64 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/19/2014 5/19/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 CI CMI 1 1 1 1 1 16 51 1 1 1 7 6 11 14 10 9 1 7 4 5 34 2 2 4 13 9 8 1 11 1 8 1 1 18 2 1 1 1 1 25 1 7 6 9 4 11 7 2 7 1 2 136 415 340 86 28 3,472 7,017 93 81 106 539 630 374 896 1,770 729 158 1,085 232 285 8,194 92 86 884 4,368 252 160 111 858 117 1,352 116 115 4,410 206 112 105 111 104 1,600 103 910 102 900 136 1,881 504 234 182 190 380 L-Bar 136 415 340 86 28 217 147 93 81 106 77 105 34 64 177 81 158 155 58 57 241 46 43 221 336 28 20 111 78 117 169 116 115 245 103 112 105 111 104 64 103 130 17 100 34 171 72 117 26 190 190 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 CI CMI 6 8 2 2 19 1 4 8 5 5 4 5 1 16 24 4 4 8 1 3 8 10 8 11 4 1 6 2 9 5 7 6 18 3 11 5 6 3 2 9 3 3 1 1 2 4 1 1 5 3 2 318 120 238 196 5,092 81 632 880 245 230 184 225 114 816 7,536 724 268 712 336 675 336 50 544 1,078 720 171 1,062 26 549 315 903 474 1,242 126 88 865 408 330 170 1,197 255 96 174 291 180 324 132 54 555 159 30 L-Bar 53 15 119 98 268 81 158 110 49 46 46 45 114 51 314 181 67 89 336 225 42 5 68 98 180 171 177 13 61 63 129 79 69 42 8 173 68 110 85 133 85 32 174 291 90 81 132 54 111 53 15 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/20/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 CI CMI 3 1 2 11 1 4 1 5 11 3 1 13 9 4 85 5 10 11 8 5 8 12 2 4 9 2 2 49 1 2 10 5 1 13 38 3 2 2 1 8 126 2 2 8 4 7 2 2 2 9 1 66 52 40 1,298 685 472 129 240 1,573 255 147 806 765 136 7,225 890 770 517 144 540 592 612 116 332 819 300 76 19,747 176 230 1,810 300 6 1,794 9,994 222 134 268 166 520 18,648 250 160 208 584 1,141 148 412 16 765 218 L-Bar 22 52 20 118 685 118 129 48 143 85 147 62 85 34 85 178 77 47 18 108 74 51 58 83 91 150 38 403 176 115 181 60 6 138 263 74 67 134 166 65 148 125 80 26 146 163 74 206 8 85 218 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/21/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 CI CMI 23 10 35 2 1 1 3 28 2 1 2 7 1 6 1 7 3 8 5 6 15 6 4 8 12 1 2 1 1 12 3 5 1 4 13 1 2 1 4 3 1 16 9 7 5 3 1 16 5 9 8 3,680 420 3,528 178 210 51 474 2,128 252 27 260 497 49 216 129 154 354 544 295 282 585 222 396 328 348 33 222 94 120 1,392 21 680 65 640 1,105 49 64 55 56 258 413 304 2,448 441 675 324 92 1,248 495 801 584 L-Bar 160 42 108 89 210 51 158 76 126 27 130 71 49 36 129 22 118 68 59 47 39 37 99 41 29 33 111 94 120 116 7 136 65 160 85 49 32 55 14 86 413 19 272 63 135 108 92 78 99 89 73 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 CI CMI 6 3 1 6 6 6 1 4 12 5 1 4 1 6 2 7 1 41 11 23 2 5 2 2 5 2 1 3 5 3 5 3 10 4 4 2 11 5 6 8 5 1 19 2 2 2 2 1 11 3 3 330 624 55 330 342 420 90 504 1,680 460 94 104 236 366 52 1,232 148 4,018 2,222 4,600 322 545 202 196 645 104 22 45 320 783 505 636 1,190 184 384 278 473 390 510 56 635 100 2,280 86 28 184 310 91 1,441 252 339 L-Bar 55 208 55 55 57 70 90 126 140 92 94 26 236 61 26 176 148 98 202 200 161 109 101 98 129 52 22 15 64 261 101 212 119 46 96 139 43 78 85 7 127 100 120 43 14 92 155 91 131 84 113 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/22/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 CI CMI 2 2 7 1 5 2 1 1 9 7 2 1 1 1 6 11 5 3 2 7 7 3 8 2 24 17 1 8 4 5 3 15 6 1 2 12 7 6 1 31 9 2 2 14 97 97 14 2 8 2 2 236 40 1,582 93 565 204 40 145 1,449 371 210 82 44 64 204 814 120 513 60 399 42 801 1,744 176 120 1,071 95 88 1,196 250 72 2,835 366 84 192 48 917 1,002 30 124 738 16 16 1,778 15,035 15,035 770 96 1,120 48 64 L-Bar 118 20 226 93 113 102 40 145 161 53 105 82 44 64 34 74 24 171 30 57 6 267 218 88 5 63 95 11 299 50 24 189 61 84 96 4 131 167 30 4 82 8 8 127 155 155 55 48 140 24 32 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/23/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/24/2014 5/25/2014 5/25/2014 5/25/2014 5/25/2014 5/25/2014 5/26/2014 5/26/2014 5/26/2014 5/26/2014 5/26/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 CI CMI 1 1 2 1 2 16 1 4 2 2 4 7 1 2 24 6 1 8 15 4 5 1 5 1 5 10 1 2 1 1 8 18 4 1 1 3 2 2 3 1 2 1 12 4 6 8 5 6 11 24 11 36 8 104 130 252 736 31 72 228 156 432 35 244 266 96 612 205 5,024 7,629 1,036 815 208 240 157 430 3,240 19 8 59 125 1,528 1,422 280 92 90 168 26 306 519 113 452 105 1,428 108 786 888 700 978 968 1,464 2,200 L-Bar 36 8 52 130 126 46 31 18 114 78 108 5 244 133 4 102 205 628 707 259 163 208 48 157 86 324 19 4 59 125 191 79 70 92 90 56 13 153 173 113 226 105 119 27 131 111 140 163 88 61 200 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 CI CMI 2 3 1 61 8 84 10 7 3 8 10 64 10 5 2 2 12 24 14 2 1 10 1 7 5 1 2 2 1 15 4 19 15 15 25 5 2 2 39 12 2 6 4 8 9 2 1 1 7 6 1 982 69 85 4,392 464 26,544 610 511 60 88 60 7,872 1,790 1,060 354 162 72 480 126 116 16 1,190 19 1,267 1,030 14 284 190 89 5,790 560 7,372 5,820 5,790 9,750 1,955 82 26 1,287 744 486 504 316 592 405 54 84 61 476 612 128 L-Bar 491 23 85 72 58 316 61 73 20 11 6 123 179 212 177 81 6 20 9 58 16 119 19 181 206 14 142 95 89 386 140 388 388 386 390 391 41 13 33 62 243 84 79 74 45 27 84 61 68 102 128 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/27/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 CI CMI 4 9 12 4 2 34 10 14 3 1 1 11 15 2 3 7 7 2 6 1 5 8 1 7 8 69 16 10 2 2 2 15 11 2 11 88 8 5 2 4 8 12 1 4 60 10 1 1 3 10 6 440 711 2,136 140 238 2,006 760 84 24 89 72 1,089 795 20 129 364 945 304 114 99 750 808 6 994 584 12,213 432 700 254 398 292 2,490 693 118 4,400 46,024 976 565 230 68 72 1,464 18 312 10,980 1,330 131 174 219 780 198 L-Bar 110 79 178 35 119 59 76 6 8 89 72 99 53 10 43 52 135 152 19 99 150 101 6 142 73 177 27 70 127 199 146 166 63 59 400 523 122 113 115 17 9 122 18 78 183 133 131 174 73 78 33 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 5/28/2014 CI CMI 8 7 3 18 3 2 1 11 3 2 9 12 5 1 3 3 1 5 10 4 18 10 1 58 1 30 1 7 9 4 5 3 5 4 2 3 23 1 2 1 16 4 11 3 3 1 3 30 30 1 1 512 567 372 900 306 402 129 1,914 561 66 1,044 1,740 615 253 660 321 55 105 710 608 288 750 130 1,682 208 5,430 199 182 693 596 450 207 650 368 88 84 828 110 2 107 1,056 152 253 24 1,017 25 3 1,950 3,510 67 86 L-Bar 64 81 124 50 102 201 129 174 187 33 116 145 123 253 220 107 55 21 71 152 16 75 130 29 208 181 199 26 77 149 90 69 130 92 44 28 36 110 1 107 66 38 23 8 339 25 1 65 117 67 86 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 5/28/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 CI CMI 14 18 1 6 2 10 14 1 4 9 17 5 1 9 13 6 8 6 32 8 8 4 33 5 293 5 10 36 1 6 2 11 3 1 2 2 1 4 11 7 5 22 9 12 7 3 1 2 1 6 7 2,338 2,898 141 1,074 232 1,450 2,016 372 604 1,125 884 2,240 104 594 2,002 198 752 270 2,336 848 904 128 5,247 395 879 120 560 4,608 43 858 166 352 296 363 320 146 40 84 946 581 230 1,804 378 2,112 854 288 14 52 107 378 833 L-Bar 167 161 141 179 116 145 144 372 151 125 52 448 104 66 154 33 94 45 73 106 113 32 159 79 3 24 56 128 43 143 83 32 294 363 160 73 40 21 86 83 46 82 42 176 122 96 14 26 107 63 119 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/29/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 CI CMI 60 4 3 10 2 13 8 8 10 5 4 4 1 7 3 32 18 20 8 17 5 1 9 1 1 3 4 4 1 9 7 9 1 11 2 1 1 29 2 24 26 7 10 2 11 7 17 9 10 4 1 2,220 504 114 630 114 1,066 848 736 290 145 288 56 48 812 57 5,504 1,638 800 1,744 442 390 83 18 21 100 54 144 568 149 684 217 396 47 88 422 182 147 696 1,002 432 6,214 2,268 270 332 638 595 3,349 702 2,130 520 92 L-Bar 37 126 38 63 57 82 106 92 29 29 72 14 48 116 19 172 91 40 218 26 78 83 2 21 100 18 36 142 149 76 31 44 47 8 211 182 147 24 501 18 239 324 27 166 58 85 197 78 213 130 92 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/30/2014 5/31/2014 5/31/2014 5/31/2014 5/31/2014 5/31/2014 5/31/2014 5/31/2014 5/31/2014 6/1/2014 6/1/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 CI 3 13 43 35 6 16 63 10 10 16 9 26 7 36 6 8 5 8 2 36 1 2 4 6 64 36 3 7 4 14 1 2 1 7 4 1,450 4 1 3 1 3 3 4 1 33 2 26 1 10 7 8 CMI 504 13 1,075 2,940 78 80 10,647 2,470 90 3,168 495 2,548 574 972 30 1,008 1,095 664 142 2,160 90 174 260 540 4,672 2,556 537 287 308 364 77 106 123 1,092 392 37,700 1,160 392 192 6 213 483 188 94 2,277 268 1,456 98 980 882 1,920 L-Bar 168 1 25 84 13 5 169 247 9 198 55 98 82 27 5 126 219 83 71 60 90 87 65 90 73 71 179 41 77 26 77 53 123 156 98 26 290 392 64 6 71 161 47 94 69 134 56 98 98 126 240 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 CI CMI 4 7 4 2 2 4 6 1 2 8 17 6 1 4 6 1 2 14 3 6 4 5 7 2 8 13 8 6 20 7 12 6 5 14 1 3 3 1 1 1 2 2 5 5 9 5 3 3 2 2 3 772 1,470 428 294 292 204 372 157 118 744 17 690 55 136 744 43 50 56 117 570 328 505 924 58 944 1,118 824 18 460 133 528 384 990 1,904 51 327 108 36 142 142 56 30 1,090 290 522 290 174 180 38 196 543 L-Bar 193 210 107 147 146 51 62 157 59 93 1 115 55 34 124 43 25 4 39 95 82 101 132 29 118 86 103 3 23 19 44 64 198 136 51 109 36 36 142 142 28 15 218 58 58 58 58 60 19 98 181 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/2/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 CI CMI 8 6 6 9 6 1 2 3 4 2 6 1 3 1 1 10 27 9 6 6 8 17 17 39 2 1 15 44 4 9 11 1 10 10 9 8 4 5 1 2 4 11 7 1 3 24 2 5 1 8 12 704 60 510 972 564 99 194 156 296 248 504 116 189 148 126 830 2,700 486 360 162 2,056 4,760 1,326 9,711 302 28 2,880 5,764 364 261 154 502 1,750 780 333 1,480 616 910 208 190 252 1,298 245 182 1,035 696 226 285 4 776 2,064 L-Bar 88 10 85 108 94 99 97 52 74 124 84 116 63 148 126 83 100 54 60 27 257 280 78 249 151 28 192 131 91 29 14 502 240 78 37 185 154 182 208 95 63 118 35 182 345 29 113 57 4 97 172 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/3/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 CI CMI 12 8 8 4 4 2 9 7 2 12 8 61 2 2 4 2 27 4 5 1 3 2 1 4 7 11 3 2 4 5 1 9 1 1 1 1 20 11 13 11 7 3 7 8 8 11 2 2 2 10 3 1,824 176 1,648 292 60 198 567 798 182 912 488 488 184 64 284 110 972 528 310 93 342 334 141 604 441 869 249 186 372 185 70 594 19 46 77 46 2,000 110 2,262 4,169 1,001 2,052 735 1,176 2,408 1,507 196 578 140 250 168 L-Bar 152 22 206 73 15 99 63 114 91 76 61 8 92 32 71 55 36 132 62 93 114 167 141 151 63 79 83 93 93 37 70 66 19 46 77 46 100 10 174 379 143 684 105 147 301 137 98 289 70 25 56 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 CI CMI 63 73 19 6 62 5 17 23 5 7 8 21 42 2 3 9 4 14 6 7 2 1 37 3 6 7 6 2 6 8 7 1 7 8 53 5 6 8 7 7 8 8 8 2 26 2 5 12 11 10 3 8,316 3,212 1,178 234 11,966 45 51 2,622 540 504 248 2,940 672 240 168 2,628 148 1,316 648 959 200 113 5,032 69 228 126 114 122 228 304 420 60 266 304 11,713 25 378 440 385 1,344 432 408 808 398 6,370 146 270 60 286 1,250 318 L-Bar 132 44 62 39 193 9 3 114 108 72 31 140 16 120 56 292 37 94 108 137 100 113 136 23 38 18 19 61 38 38 60 60 38 38 221 5 63 55 55 192 54 51 101 199 245 73 54 5 26 125 106 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation Date CI CMI L-Bar Repair Cost PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6 7 16 29 18 6 5 1 4 13 2 9 3 31 5 3 3 18 8 3 6 5 1 9 1 2 17 36 917 2,928 2,610 2,052 390 280 91 396 663 114 693 240 3,813 555 33 117 2,340 352 276 378 10 112 621 29 204 1,955 6 131 183 90 114 65 56 91 99 51 57 77 80 123 111 11 39 130 44 92 63 2 112 69 29 102 115 N N N N N N N N N N N N N N N N N N N N N N N N N N N PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/4/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 5 5 6 4 1 8 9 5 1 1 23 396 5 1 4 5 7 36 36 1 6 12 350 1,020 294 100 60 624 648 260 90 293 989 11,088 675 121 200 525 1,358 11,628 3,024 66 408 480 70 204 49 25 60 78 72 52 90 293 43 28 135 121 50 105 194 323 84 66 68 40 N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 CI CMI 8 18 7 17 6 5 12 1 18 80 2 1 1 11 4 1 49 9 1 8 7 1 2 6 4 2 4 4 8 15 4 12 6 11 1 27 27 5 8 1 9 1 6 4 15 19 15 68 11 6 5 696 3,456 553 4,794 6 310 4,296 62 918 6,000 432 33 43 2,871 400 66 21,462 864 74 560 483 116 216 498 824 420 112 668 8 3,525 676 1,572 1,050 638 75 1,485 7,722 60 1,840 53 801 111 420 256 180 5,491 2,850 12,920 704 636 705 L-Bar 87 192 79 282 1 62 358 62 51 75 216 33 43 261 100 66 438 96 74 70 69 116 108 83 206 210 28 167 1 235 169 131 175 58 75 55 286 12 230 53 89 111 70 64 12 289 190 190 64 106 141 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/5/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 CI CMI 3 7 13 2 1 12 2 12 4 4 6 6 2 2 5 7 1 1 3 7 4 6 2 1 2 1 2 1 8 13 3 9 13 3 5 6 2 5 10 1 4 8 12 4 9 4 1 1 14 5 3 276 14 975 66 41 1,224 164 792 348 20 210 540 114 14 200 966 160 178 234 119 20 36 52 206 38 135 132 181 576 1,690 342 1,314 1,066 213 1,280 342 104 180 610 56 320 408 1,080 168 333 156 164 153 686 470 162 L-Bar 92 2 75 33 41 102 82 66 87 5 35 90 57 7 40 138 160 178 78 17 5 6 26 206 19 135 66 181 72 130 114 146 82 71 256 57 52 36 61 56 80 51 90 42 37 39 164 153 49 94 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST Date 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/6/2014 6/7/2014 6/7/2014 6/7/2014 6/7/2014 6/7/2014 6/7/2014 6/7/2014 6/7/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 6/8/2014 CI 2 20 10 4 10 67 4 3 8 5 1 157 1 1 8 4 75 10 3 12 14 5 3 2,343 6 12 1 2 1 9 7 4 25 13 19 6 1 8 2 12 1 8 4 309 6 1 1 1 6 1 1 CMI 134 300 2,720 460 1,640 10,452 240 954 168 65 92 18,526 56 60 72 424 3,525 1,570 297 1,092 924 915 300 49,203 102 144 94 30 200 576 287 60 1,200 1,989 9,405 1,338 72 1,352 46 1,188 48 5,112 160 188,799 858 33 30 79 414 129 166 L-Bar 67 15 272 115 164 156 60 318 21 13 92 118 56 60 9 106 47 157 99 91 66 183 100 21 17 12 94 15 200 64 41 15 48 153 495 223 72 169 23 99 48 639 40 611 143 33 30 79 69 129 166 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 CI CMI 9 4 1 25 7 7 20 3 4 24 2 2 5 2 13 6 8 3 4 18 3 2 16 7 5 6 13 1 16 1 6 1 9 41 12 1 3 14 6 3 3 24 52 2 2 3 4 11 4 2 1 162 68 99 1,350 791 1,316 780 225 528 408 164 150 355 456 5,057 1,584 1,480 231 316 1,386 72 28 4,384 903 680 534 1,729 99 1,680 18 1,200 304 162 2,378 276 107 324 84 906 93 219 2,976 1,508 58 176 240 452 803 296 204 63 L-Bar 18 17 99 54 113 188 39 75 132 17 82 75 71 228 389 264 185 77 79 77 24 14 274 129 136 89 133 99 105 18 200 304 18 58 23 107 108 6 151 31 73 124 29 29 88 80 113 73 74 102 63 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/9/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 CI CMI 5 3 12 39 10 5 16 59 3 3 11 2 8 12 1 8 1 1 5 29 12 1 7 5 1 18 3 2 25 1 7 1 1 3 23 1 2 12 51 3 8 1 3 2 1 2 3 3 1 3 8 485 264 1,032 3,159 610 50 2,480 236 330 186 594 118 272 1,068 13 336 125 170 525 870 252 117 1,617 445 50 774 195 210 3,050 272 119 177 79 207 1,288 112 200 2,388 2,907 150 1,256 268 282 72 173 238 93 906 158 318 24 L-Bar 97 88 86 81 61 10 155 4 110 62 54 59 34 89 13 42 125 170 105 30 21 117 231 89 50 43 65 105 122 272 17 177 79 69 56 112 100 199 57 50 157 268 94 36 173 119 31 302 158 106 3 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 CI CMI 1 12 6 3 1 1 4 2 4 2 2 7 24 2 12 1 1 11 4 3 12 2 1 4 3 5 9 8 25 10 30 3 1 5 4 4 1 25 3 13 9 10 1 8 2 27 4 1 6 8 1 53 2,928 726 42 66 11 928 282 764 78 1,296 721 1,320 216 780 113 35 2,981 316 93 624 164 164 324 54 965 1,944 1,624 6,850 1,170 4,170 303 45 365 340 8 89 3,625 366 1,430 306 680 330 496 92 1,512 456 169 432 424 29 L-Bar 53 244 121 14 66 11 232 141 191 39 648 103 55 108 65 113 35 271 79 31 52 82 164 81 18 193 216 203 274 117 139 101 45 73 85 2 89 145 122 110 34 68 330 62 46 56 114 169 72 53 29 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/10/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 CI CMI 2 10 1 2 1 11 1 3 1 8 71 28 1 14 1 2 10 1 3 1 1 7 8 5 8 3 3 7 6 1 8 5 1 17 2 1 7 2 4 1 8 4 7 6 3 8 3 16 8 6 12 108 290 241 244 65 429 40 141 33 304 2,769 140 102 2,982 204 254 1,020 81 279 224 113 616 696 815 288 225 177 553 480 71 440 170 70 102 178 102 35 358 1,168 254 1,240 112 1,246 864 186 616 219 1,584 448 894 204 L-Bar 54 29 241 122 65 39 40 47 33 38 39 5 102 213 204 127 102 81 93 224 113 88 87 163 36 75 59 79 80 71 55 34 70 6 89 102 5 179 292 254 155 28 178 144 62 77 73 99 56 149 17 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 CI CMI 3 12 1 9 2 1 22 22 10 12 9 1 2 3 1 6 4 7 5 11 10 1 11 9 13 6 3 19 16 4 5 8 1 5 2 23 13 4 2 11 1 8 58 1 4 6 1 8 17 6 4 627 1,404 49 531 156 215 2,596 2,574 1,190 144 315 113 84 231 151 1,944 196 1,106 105 1,837 480 114 1,265 36 1,963 438 252 1,274 1,008 164 190 536 83 385 198 23 1,027 268 234 737 287 48 1,192 60 332 1,602 78 1,896 187 486 688 L-Bar 209 117 49 59 78 215 118 117 119 12 35 113 42 77 151 324 49 158 21 167 48 114 115 4 151 73 84 146 63 41 38 67 83 77 99 1 79 67 117 67 287 6 190 60 83 267 78 237 11 81 172 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/11/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 CI CMI 1 1 5 25 2 42 16 2 21 6 1 3 8 1 11 9 3 10 6 1 1 2 1 10 7 1 1 3 4 4 5 4 1 4 8 11 6 15 1 2 2 1 1 5 8 4 1 1 10 7 12 90 20 55 1,125 44 2,478 1,680 64 567 336 173 378 1,152 36 539 981 318 750 570 75 39 74 83 1,620 112 23 169 507 584 672 480 304 97 172 544 1,749 486 3,975 547 288 132 132 109 780 640 132 120 207 680 798 1,380 L-Bar 90 20 11 45 22 59 105 32 27 56 173 126 144 36 49 109 106 75 95 75 39 37 83 162 16 23 169 169 146 168 96 76 97 43 68 159 81 265 547 144 66 132 109 156 80 33 120 207 68 114 115 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/12/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 CI CMI 1 1 3 7 3 13 2 1 1 8 2 1 5 2 3 1 2 1 9 1 6 1 2 14 1 12 7 9 1 6 9 3 5 1 1 1 2 6 3 7 13 12 7 12 2 6 3 4 5 8 3 106 51 144 847 33 169 260 154 108 848 240 102 640 22 147 54 256 71 225 180 1,026 98 166 70 114 264 406 108 81 222 918 459 180 50 47 91 16 162 294 917 2,613 2,184 952 1,500 620 714 483 932 780 1,112 543 L-Bar 106 51 48 121 11 13 130 154 108 106 120 102 128 11 49 54 128 71 25 180 171 98 83 5 114 22 58 12 81 37 102 153 36 50 47 91 8 27 98 131 201 182 136 125 310 119 161 233 156 139 181 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/13/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/14/2014 6/15/2014 CI CMI 23 9 6 1 6 26 2 1 15 8 4 4 7 20 9 4 2 6 1 1 4 8 1 2 9 4 5 6 1 14 1 1 2 4 15 15 5 2 1 1 1 12 121 6 7 1 2 2 1 1 17 3,726 927 642 75 924 676 222 123 1,770 2,240 192 600 1,078 1,180 387 608 202 1,644 302 301 16 272 42 12 342 360 115 612 70 1,456 166 87 10 1,148 1,155 1,230 150 102 7 86 260 1,200 9,317 1,236 1,687 161 72 470 243 53 2,805 L-Bar 162 103 107 75 154 26 111 123 118 280 48 150 154 59 43 152 101 274 302 301 4 34 42 6 38 90 23 102 70 104 166 87 5 287 77 82 30 51 7 86 260 100 77 206 241 161 36 235 243 53 165 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 6/15/2014 6/15/2014 6/15/2014 6/15/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 CI CMI 2 1 1 2 9 16 11 6 6 8 6 1 5 8 6 4 6 10 20 8 4 1 52 24 1 9 8 33 33 1 5 8 16 7 2 3 16 2 5 2 10 22 2 5 8 7 10 10 19 4 5 76 35 157 376 1,386 1,504 1,771 1,308 540 536 1,038 103 935 1,992 420 328 492 720 1,260 40 456 104 3,380 1,152 93 1,935 608 5,940 4,950 119 715 1,056 384 1,127 178 327 3,024 242 905 178 220 2,112 148 105 688 798 40 360 3,268 244 295 L-Bar 38 35 157 188 154 94 161 218 90 67 173 103 187 249 70 82 82 72 63 5 114 104 65 48 93 215 76 180 150 119 143 132 24 161 89 109 189 121 181 89 22 96 74 21 86 114 4 36 172 61 59 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/16/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 CI CMI 1 14 6 6 4 17 11 3 10 1 10 9 18 1 1 8 13 4 1 10 83 9 7 1 4 2 4 8 3 3 3 1 4 13 3 2 2 8 8 6 1 1 17 8 2 3 5 1 31 29 8 106 154 450 126 364 2,329 880 354 1,260 317 540 603 1,800 80 98 640 3,081 412 88 10 83 1,386 469 96 448 396 304 656 21 162 435 487 232 65 219 128 174 1,288 536 270 428 156 1,309 496 152 84 465 278 6,045 5,539 8 L-Bar 106 11 75 21 91 137 80 118 126 317 54 67 100 80 98 80 237 103 88 1 1 154 67 96 112 198 76 82 7 54 145 487 58 5 73 64 87 161 67 45 428 156 77 62 76 28 93 278 195 191 1 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 CI CMI 3 4 3 59 2 39 6 9 9 5 8 3 1 22 4 24 2 8 4 7 3 1 47 12 1 6 5 8 9 9 3 2 5 4 18 5 14 7 26 7 9 6 9 2 8 4 1 5 10 8 1 3 4 564 9,912 222 3,393 312 540 873 715 560 321 271 2,706 420 1,512 160 488 424 1,008 105 111 10,387 1,068 83 822 510 168 207 396 3 254 90 128 1,368 280 434 1,120 2,704 105 657 180 585 202 1,008 348 190 90 550 528 44 L-Bar 1 1 188 168 111 87 52 60 97 143 70 107 271 123 105 63 80 61 106 144 35 111 221 89 83 137 102 21 23 44 1 127 18 32 76 56 31 160 104 15 73 30 65 101 126 87 190 18 55 66 44 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/17/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 CI CMI 6 1 1 8 6 1 1 4 1 10 58 12 1 3 2 9 8 5 5 8 7 1 10 6 8 10 3 4 11 1 12 4 18 6 5 5 3 5 12 2 1 7 12 4 8 2 2 2 6 5 2 156 59 18 736 342 39 105 220 75 240 12,354 1,704 84 300 178 720 552 945 285 472 406 96 2,940 624 1,176 850 537 664 913 52 1,272 516 2,916 264 570 450 177 860 1,524 268 149 665 1,572 580 344 682 682 40 480 1,070 412 L-Bar 26 59 18 92 57 39 105 55 75 24 213 142 84 100 89 80 69 189 57 59 58 96 294 104 147 85 179 166 83 52 106 129 162 44 114 90 59 172 127 134 149 95 131 145 43 341 341 20 80 214 206 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 CI CMI 8 2 1 7 8 13 2 10 6 2 5 93 2 6 4 10 6 8 7 8 12 9 1 10 1 3 1 49 3 7 1 9 9 1 12 2 12 14 1 2 7 1 1 24 1 1 49 4 2 6 3 528 450 21 840 992 2,795 14 1,290 330 150 95 14,694 214 906 340 730 498 816 1,267 360 144 378 289 710 24 387 160 4,557 258 462 157 1,026 801 192 132 366 504 658 94 72 385 133 193 2,856 191 178 3,871 360 202 1,002 132 L-Bar 66 225 21 120 124 215 7 129 55 75 19 158 107 151 85 73 83 102 181 45 12 42 289 71 24 129 160 93 86 66 157 114 89 192 11 183 42 47 94 36 55 133 193 119 191 178 79 90 101 167 44 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/18/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 CI CMI 3 12 9 6 2 6 1 2 1 1 1 1 12 6 1 4 3 5 1 7 27 15 2 1 1 6 11 6 16 3 12 2 2 1 2 7 12 6 1 8 25 8 10 4 11 1 89 3 1 12 7 9 1,368 549 84 120 570 64 124 110 30 93 61 192 300 76 296 117 705 71 224 1,917 1,050 264 81 81 462 616 396 3,200 447 240 96 318 175 56 1,071 876 630 77 1,408 5,325 1,208 740 44 2,299 239 7,763 201 163 1,692 343 L-Bar 3 114 61 14 60 95 64 62 110 30 93 61 16 50 76 74 39 141 71 32 71 70 132 81 81 77 56 66 200 149 20 48 159 175 28 153 73 105 77 176 213 151 74 11 209 239 113 67 163 141 49 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 CI CMI 2 15 3 12 11 11 9 14 7 4 2 2 8 8 7 7 10 4 20 2 3 4 2 4 1 8 3 8 1 2 14 1 1 1 7 3 1 8 1 3 1 1 1 8 13 6 41 12 2 15 9 306 15 201 60 2,057 726 531 770 77 464 136 282 2,344 1,512 483 343 1,940 1,024 2,080 338 222 704 118 724 424 56 219 1,256 199 364 868 69 193 192 364 459 81 448 13 201 40 69 52 1,416 663 24 3,403 696 260 360 1,593 L-Bar 153 1 67 5 187 66 59 55 11 116 68 141 293 189 69 49 194 256 104 169 74 176 59 181 424 7 73 157 199 182 62 69 193 192 52 153 81 56 13 67 40 69 52 177 51 4 83 58 130 24 177 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/19/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 CI CMI 5 4 6 1 11 1 25 20 4 8 24 1 2 7 2 2 4 8 2 8 9 1 22 11 6 4 1 4 1 2 7 7 5 1 6 11 10 1 1 27 12 35 9 11 11 3 12 5 1 13 14 245 468 342 18 231 34 3,250 2,320 160 1,040 1,920 92 16 637 214 64 428 440 120 1,144 567 141 1,012 693 84 228 56 228 182 342 259 945 880 296 1,014 2,123 2,250 43 90 2,079 564 1,645 1,107 693 737 330 2,112 220 190 6,448 112 L-Bar 49 117 57 18 21 34 130 116 40 130 80 92 8 91 107 32 107 55 60 143 63 141 46 63 14 57 56 57 182 171 37 135 176 296 169 193 225 43 90 77 47 47 123 63 67 110 176 44 190 496 8 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 6/20/2014 CI CMI 1 12 1 9 8 27 5 7 6 3 1 2 15 1 2 1 1 9 4 3 1 3 1 10 12 7 3 2 4 2 4 1 4 7 3 2 2 9 6 5 7 1 4 2 1 4 3 1 5 2 2 101 1,500 350 684 728 1,134 620 483 372 915 327 150 1,830 66 102 51 50 450 44 333 24 57 110 820 1,740 84 54 62 280 230 128 107 152 539 90 198 178 1,890 258 195 294 42 84 36 190 28 102 32 60 478 468 L-Bar 101 125 350 76 91 42 124 69 62 305 327 75 122 66 51 51 50 50 11 111 24 19 110 82 145 12 18 31 70 115 32 107 38 77 30 99 89 210 43 39 42 42 21 18 190 7 34 32 12 239 234 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/20/2014 6/20/2014 6/20/2014 6/21/2014 6/21/2014 6/21/2014 6/21/2014 6/21/2014 6/21/2014 6/21/2014 6/21/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/22/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 CI 1 4 1 2 5 3 15 5 2 1 8 3 1 1 14 4 3 25 1 28 2 3 2 9 1,334 2 4 1 1 5 9 14 2 4 6 6 1 6 10 5 8 1 3 7 8 10 13 2 17 8 5 CMI 154 80 352 396 60 165 585 875 22 30 16 375 119 314 9,618 204 243 2,200 79 2,128 44 30 160 1,620 48,024 270 860 91 424 470 882 1,106 132 1,112 558 456 163 1,770 2,880 1,485 968 157 24 98 1,256 680 13 280 2,006 288 1,005 L-Bar 154 20 353 198 12 55 39 175 11 30 2 125 119 314 687 51 81 88 79 76 22 10 80 180 36 135 215 91 424 94 98 79 66 278 93 76 163 295 288 297 121 157 8 14 157 68 1 140 118 36 201 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 CI CMI 27 3 4 4 10 8 15 4 8 7 14 11 2 29 3 5 18 8 20 4 3 2 4 2 1 1 10 1 10 2 18 39 3 10 4 5 9 1 9 10 6 4 6 85 1 12 4 4 1 2 7 1,080 330 96 132 2,120 144 2,280 444 1,392 469 42 946 414 4,872 180 565 2,538 1,720 2,760 260 237 118 328 92 21 140 580 47 1,370 246 1,980 2,730 12 1,180 680 95 423 141 819 1,290 114 664 348 850 55 696 284 256 113 226 973 L-Bar 40 110 24 33 212 18 152 111 174 67 3 86 207 168 60 113 141 215 138 65 79 59 82 46 21 140 58 47 137 123 110 70 4 118 170 19 47 141 91 129 19 166 58 10 55 58 71 64 113 113 139 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/23/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 CI CMI 4 6 8 8 4 4 1 2 3 8 1 6 11 5 10 9 8 3 36 8 26 1 17 6 24 7 27 8 1 33 1 8 2 3 3 2 9 6 1 1 2 7 9 28 1 16 26 3 9 5 6 208 888 464 128 376 268 125 40 333 328 72 1,098 19 1,000 680 342 584 834 11,988 912 8,658 493 1,156 870 600 1,323 9,531 992 492 3,432 114 736 90 336 99 146 1,053 66 6 249 452 1,099 1,962 8,988 64 4,768 7,748 408 1,656 505 252 L-Bar 52 148 58 16 94 67 125 20 111 41 72 183 9 200 68 38 73 278 333 114 333 493 68 145 25 189 353 124 492 104 114 92 45 112 33 73 117 11 6 249 226 157 218 321 64 298 298 136 184 101 42 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 CI CMI 14 10 1 5 10 4 15 7 3 5 5 15 3 1 1 5 1 17 13 11 11 4 4 10 1 3 10 3 4 3 3 1 4 5 3 1 4 4 6 6 6 7 5 6 12 7 6 5 1 10 13 210 60 60 305 1,030 700 1,230 35 999 85 335 75 252 239 219 250 217 1,513 130 803 418 264 240 1,490 94 327 480 360 1,180 282 384 16 164 440 90 238 1,088 248 276 420 876 672 195 414 2,016 826 330 185 77 910 1,326 L-Bar 15 6 60 61 103 175 82 5 333 17 67 5 84 239 219 50 217 89 10 73 38 66 60 149 94 109 48 120 295 94 128 16 41 88 30 238 272 62 46 70 146 96 39 69 168 118 55 37 77 91 102 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/24/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 CI CMI 14 8 5 1 6 5 4 1 2 6 7 3 1 6 2 2 4 7 2 1 2 11 4 5 1 26 4 2 2 9 2 1 4 11 33 4 10 4 4 5 9 1 2 1 29 2 12 7 12 4 3 1,078 400 430 83 54 30 576 195 114 24 966 312 338 732 420 74 484 84 332 71 278 44 128 80 135 2,548 436 178 296 3,114 112 196 684 924 4,554 972 800 972 972 1,065 585 131 156 45 2,581 350 408 693 2,328 552 429 L-Bar 77 50 86 83 9 6 144 195 57 4 138 104 338 122 210 37 121 12 166 71 139 4 32 16 135 98 109 89 148 346 56 196 171 84 138 243 80 243 243 213 65 131 78 45 89 175 34 99 194 138 143 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 CI CMI 1 5 12 32 1 7 2 3 16 3 8 4 8 10 3 6 5 10 6 18 12 10 8 38 8 14 8 2 25 13 39 7 4 8 17 12 1 3 5 2 24 6 10 6 1 13 3 2 14 6 2 84 795 1,128 384 275 1,484 4 597 288 471 1,144 212 1,096 480 528 450 340 1,700 1,074 1,530 408 1,110 496 1,938 760 406 1,440 420 3,475 663 312 539 268 1,592 1,581 576 97 156 105 56 3,600 558 580 360 78 1,911 534 340 742 504 214 L-Bar 84 159 94 12 275 212 2 199 18 157 143 53 137 48 176 75 68 170 179 85 34 111 62 51 95 29 180 210 139 51 8 77 67 199 93 48 97 52 21 28 150 93 58 60 78 147 178 170 53 84 107 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/25/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 CI CMI 1 7 5 8 14 8 1 1 12 8 1 2 1 1 5 7 1 7 2 4 4 4 4 12 5 2 32 7 3 1 3 3 4 14 3 2 8 6 12 12 7 3 29 9 2 15 42 19 4 3 1 15 434 400 704 546 1,408 102 156 1,308 544 94 224 58 84 560 1,050 118 294 166 672 532 232 308 696 205 110 448 882 294 73 282 531 192 546 156 306 768 372 552 492 455 183 5,191 495 270 495 10,206 2,888 672 297 178 L-Bar 15 62 80 88 39 176 102 156 109 68 94 112 58 84 112 150 118 42 83 168 133 58 77 58 41 55 14 126 98 73 94 177 48 39 52 153 96 62 46 41 65 61 179 55 135 33 243 152 168 99 178 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 CI CMI 11 10 17 8 4 13 10 10 2 4 9 8 20 12 10 2 10 10 2 11 9 7 24 17 5 2 5 8 3 75 5 7 4 7 6 5 6 2 1 3 3 7 8 10 4 2 50 7 4 2 2 451 410 1,275 328 748 533 560 450 212 508 1,377 896 4,560 1,008 440 154 30 2,700 216 1,177 594 3,255 8,328 1,904 325 168 1,745 800 240 6,975 960 1,064 756 504 168 405 78 232 74 219 57 994 952 1,110 536 392 28,950 385 64 4 230 L-Bar 41 41 75 41 187 41 56 45 106 127 153 112 228 84 44 77 3 270 108 107 66 465 347 112 65 84 349 100 80 93 192 152 189 72 28 81 13 116 74 73 19 142 119 111 134 196 579 55 16 2 115 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 6/26/2014 CI 16 16 39 5 6 14 8 5 36 9 2 11 11 9 7 11 2 1 1,712 2,577 8 1 1 1 3 33 75 3 3 4 2 6 1 83 2 5 1 17 5 5 2 1 1 1 69 4 10 7 1 8 17 CMI 848 272 546 655 42 1,414 72 95 684 1,719 138 1,419 33 396 35 2,266 188 337 1,712 2,577 56 81 200 121 27 1,089 2,400 483 288 192 158 408 116 18,509 326 780 88 694 375 230 152 97 92 104 5,727 188 410 630 119 872 2,805 L-Bar 53 17 14 131 7 101 9 19 19 191 69 129 3 44 5 206 94 337 1 1 7 81 200 121 9 33 32 161 96 48 79 68 116 223 163 156 88 72 75 46 76 97 92 104 83 47 41 90 119 109 165 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/27/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 CI CMI 9 6 1 10 2 8 7 10 3 1 24 12 1 4 8 2 1 8 20 8 27 2 8 7 13 56 10 2 4 28 3 6 4 45 3 28 11 7 4 3 7 3 1 6 6 3 1 1 1 1 3 801 930 60 1,100 324 1,144 994 1,130 342 36 2,160 12 178 220 848 274 172 1,688 4,520 528 3,537 190 968 2,121 2,639 3,080 220 736 192 560 174 102 184 6,885 120 700 462 1,204 668 480 42 222 137 618 138 1,071 76 83 284 523 33 L-Bar 89 155 60 110 162 143 142 113 114 36 90 1 178 55 106 137 172 211 226 66 131 95 121 303 203 55 22 368 48 20 58 17 46 153 40 25 42 172 167 160 6 74 137 103 23 357 76 83 284 523 11 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/28/2014 6/29/2014 6/29/2014 6/29/2014 6/29/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 CI CMI 1 15 5 1 4 4 5 3 6 1 2 10 6 4 4 16 5 4 7 1 2 1 1 12 5 4 4 1 6 11 4 10 10 32 5 8 10 8 1 29 10 10 1 1 33 2 79 7 2 1 1 311 1,665 30 339 24 28 600 36 36 13 66 410 138 596 1,280 80 175 412 455 161 164 105 7 1,836 365 740 640 138 1,002 682 664 1,180 30 3,360 1,065 1,816 2,940 512 158 8,294 540 800 234 247 2,475 150 20,303 357 152 75 267 L-Bar 311 111 6 339 6 7 120 12 6 13 33 41 23 149 320 5 35 103 65 161 82 105 7 153 73 185 160 138 167 62 166 118 3 105 213 227 294 64 158 286 54 80 234 247 75 75 257 51 76 75 267 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 6/30/2014 7/1/2014 7/1/2014 7/1/2014 7/1/2014 7/2/2014 7/2/2014 CI CMI 2 1 2 10 5 16 9 9 1 1 2 8 7 9 15 2 12 7 10 3 6 6 7 4 7 7 1 3 2 6 5 8 8 11 2 4 7 2 11 4 1 13 2 11 8 12 22 11 6 6 5 80 52 212 580 590 2,064 1,125 1,125 109 109 218 520 427 900 1,635 114 936 483 130 270 280 504 371 228 630 182 240 295 150 60 70 32 400 902 100 272 427 58 528 972 106 1,207 204 836 360 1,728 2,134 429 216 1,320 1,095 L-Bar 40 52 106 58 118 129 125 125 109 109 109 65 61 100 109 57 78 69 13 90 74 84 53 57 90 26 240 131 75 10 14 4 50 82 50 68 61 29 48 243 266 139 102 76 45 144 97 39 36 220 219 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/2/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 CI CMI 9 4 8 2 7 5 8 14 3 1 1 2 4 2 4 1 2 1 1 5 1 16 1 61 1 16 7 1 2 4 9 4 6 9 8 6 7 4 6 7 15 7 8 4 3 58 5 4 6 2 8 1,323 208 560 128 448 110 888 1,078 198 251 55 98 388 42 12 63 118 121 90 195 24 1,440 72 2,257 14 912 707 286 92 156 666 288 450 342 1,368 768 896 640 270 1,428 2,175 714 512 444 741 9,628 10 240 1,764 446 368 L-Bar 147 52 70 64 64 22 111 77 66 251 55 49 97 21 3 63 59 121 90 39 24 90 72 37 14 57 101 286 46 39 74 72 75 38 171 128 128 160 45 204 145 102 64 111 247 166 2 60 294 223 46 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/3/2014 7/4/2014 7/4/2014 7/4/2014 7/4/2014 7/5/2014 7/5/2014 7/5/2014 7/5/2014 CI CMI 1 14 22 17 10 11 10 4 9 29 3 4 5 1 69 3 12 7 4 2 1 1 30 2 1 19 7 2 1 6 8 1 1 2 1 6 15 1 3 1 7 1 1 262 6 4 1 2 5 6 16 125 826 7,062 1,037 550 440 1,180 392 729 3,828 738 432 925 307 10,350 234 732 546 452 234 63 84 4,290 238 21 418 525 198 497 120 872 80 12 304 274 618 1,905 69 24 117 84 147 50 786 150 28 13 56 840 438 576 L-Bar 125 59 321 61 55 40 118 98 81 132 246 108 185 307 150 78 61 78 113 117 63 84 143 119 21 22 75 99 497 20 109 80 12 152 274 103 127 69 8 117 12 147 50 3 25 7 13 28 168 73 36 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/6/2014 7/6/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 CI CMI 1 8 8 11 7 1 1 412 13 8 8 6 8 15 5 2 4 20 2 8 8 1 4 11 6 6 12 14 1 25 11 8 7 1 4 8 5 4 7 11 5 1 8 3 9 4 7 6 11 22 4 182 176 568 990 770 24 294 8,652 3,874 2,248 2,256 312 384 255 905 206 248 3,040 580 1,808 1,736 214 152 1,419 894 1,428 1,320 294 40 3,975 1,221 640 28 154 96 568 410 200 196 55 150 31 1,384 201 576 40 35 408 880 550 316 L-Bar 182 22 71 90 110 24 294 21 298 281 282 52 48 17 181 103 62 152 290 226 217 214 38 129 149 238 110 21 40 159 111 80 4 154 24 71 82 50 28 5 30 31 173 67 64 10 5 68 80 25 79 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/7/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 CI CMI 1 3 10 19 4 17 9 3 5 5 14 13 25 14 1 16 6 1 13 11 6 5 1 1 4 4 9 1 13 8 9 4 1 1 9 17 1 3 8 6 10 10 1 14 27 1 5 7 1 2 6 123 156 1,360 57 400 765 1,134 171 325 435 728 767 2,025 1,610 100 144 108 24 507 176 384 625 165 7 196 296 936 158 962 1,200 684 368 301 156 999 4,964 158 291 680 426 1,320 1,230 222 1,848 3,996 97 595 434 48 350 780 L-Bar 123 52 136 3 100 45 126 57 65 87 52 59 81 115 100 9 18 24 39 16 64 125 165 7 49 74 104 158 74 150 76 92 301 156 111 292 158 97 85 71 132 123 222 132 148 97 119 62 48 175 130 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 CI CMI 1 3 5 1 1 3 6 3 4 17 10 1 4 1 4 12 6 3 8 10 5 4 6 4 3 1 16 8 7 3 5 7 1 4 8 7 1 6 6 14 1 6 4 9 15 3 14 5 3 11 6 60 261 930 159 114 393 330 225 936 153 1,928 253 880 116 956 2,724 1,314 609 368 270 495 580 126 288 384 182 224 520 427 432 320 693 47 144 192 1,253 204 6 798 168 9 354 288 792 1,245 405 168 30 390 572 378 L-Bar 60 87 186 159 114 131 55 75 234 9 193 253 220 116 239 227 219 203 46 27 99 145 21 72 128 182 14 65 61 144 64 99 47 36 24 179 204 1 133 12 9 59 72 88 83 135 12 6 130 52 63 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/8/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 CI CMI 2 3 1 2 3 4 3 9 9 3 4 1 1 6 73 1 1 1 1 2 12 4 11 8 5 9 5 10 1 13 15 5 16 6 8 1 8 9 17 23 1 8 9 10 6 8 1 15 10 10 4 90 33 28 10 324 276 45 333 1,080 321 184 27 75 132 1,314 896 86 353 80 446 12 708 583 392 475 441 595 960 89 572 735 550 80 834 1,056 94 8 1,711 272 2,714 295 664 198 1,300 2,220 568 197 45 650 290 668 L-Bar 45 11 28 5 108 69 15 37 120 107 46 27 75 22 18 896 86 353 80 223 1 177 53 49 95 49 119 96 89 44 49 110 5 139 132 94 1 224 16 118 295 83 22 130 370 71 197 3 65 29 167 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/9/2014 CI CMI 11 8 4 4 8 1 14 1 13 10 5 1 2 4 6 10 9 7 14 2 21 2 13 8 3 6 5 5 7 9 10 1 3 12 19 1 12 13 12 1 3 10 1 5 7 8 5 11 2 2 38 341 1,392 252 164 336 162 1,386 61 2,262 370 100 272 80 112 528 680 459 882 280 470 1,134 84 377 512 387 648 475 830 371 882 340 112 216 564 2,280 150 396 130 204 232 102 1,580 37 365 14 1,096 645 33 46 146 2,052 L-Bar 31 174 63 41 42 162 99 61 174 37 20 272 40 28 88 68 51 126 20 235 54 42 29 64 129 108 95 166 53 98 34 112 72 47 120 150 33 10 17 232 34 158 37 73 2 137 129 3 23 73 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/9/2014 7/9/2014 7/9/2014 7/9/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 CI CMI 1 1 10 22 1 3 12 7 5 5 5 10 16 1 2 12 3 3 26 5 17 1 1 1 12 7 3 4 9 2 13 1 4 7 11 6 9 11 3 8 1 12 10 9 5 6 4 7 8 1 19 178 78 650 990 245 306 636 658 395 305 125 2,300 720 93 206 1,020 339 396 4,264 230 4,403 72 71 276 588 1,477 66 232 963 370 442 122 204 3,227 341 642 432 264 27 1,336 113 1,356 970 1,449 110 84 512 266 680 10 6,859 L-Bar 178 78 65 45 245 102 53 94 79 61 25 230 45 93 103 85 113 132 164 46 259 72 71 276 49 211 22 58 107 185 34 122 51 461 31 107 48 24 9 167 113 113 97 161 22 14 128 38 85 10 361 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/10/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 CI CMI 5 18 5 10 25 8 8 6 3 4 13 2 4 1 1 12 4 4 3 6 1 12 19 3 14 8 11 1 10 4 1 1 15 4 1 1 9 2 5 10 15 7 3 1 26 11 1 1 1 1 17 725 360 415 570 3,950 224 120 426 609 324 130 12 470 58 56 1,128 12 768 534 228 76 600 1,539 303 2,772 456 1,353 954 270 216 9 15 1,470 272 78 209 1,656 264 195 1,470 390 343 330 96 1,144 1,991 276 101 71 68 1,972 L-Bar 145 20 83 57 158 28 15 71 203 81 10 6 127 58 56 94 3 192 178 38 76 50 81 101 198 57 123 954 27 54 9 15 98 68 78 209 184 132 39 147 26 49 110 96 44 181 276 101 71 68 116 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/11/2014 7/12/2014 7/12/2014 7/12/2014 7/12/2014 7/12/2014 7/12/2014 7/12/2014 7/12/2014 7/13/2014 7/13/2014 7/13/2014 7/13/2014 7/13/2014 CI CMI 3 17 1 8 1 10 6 8 3 2 1 2 8 3 1 1 3 5 9 6 3 1 1 1 1 1 10 2 13 3 5 8 3 8 3 11 1 16 4 1 1 5 11 2 1 1 5 1 1 2 1 231 493 145 504 11 630 378 664 189 238 181 110 112 429 5 337 138 435 1,242 108 204 11 208 64 112 72 1,370 70 975 144 310 24 126 648 222 33 146 1,792 484 126 286 880 319 12 234 40 465 53 295 184 382 L-Bar 77 29 145 63 11 63 63 83 63 119 181 55 14 143 5 337 46 87 154 18 68 11 208 64 112 72 137 35 75 48 62 3 42 81 74 3 146 112 121 126 286 176 29 6 234 40 93 53 295 92 382 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 CI CMI 1 1 1 2 1 3 5 3 23 11 1 12 3 3 2 8 37 12 7 10 1 5 1 1 3 2 1 8 6 2 11 22 12 1 1 1 1 3 3 7 6 2 1 13 13 7 1 4 1 10 1 88 112 133 198 205 558 70 108 115 1,441 239 7,380 309 546 298 32 3,885 1,500 294 960 24 835 94 49 87 488 152 1,584 978 206 1,111 2,244 2,472 59 42 30 126 453 420 168 1,050 352 118 3,809 3,796 1,372 113 20 58 1,320 3 L-Bar 88 112 133 99 205 186 14 36 5 131 239 615 103 182 149 4 105 125 42 96 24 167 94 49 29 244 152 198 163 103 101 102 206 59 42 30 126 151 140 24 175 176 118 293 292 196 113 5 58 132 3 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/14/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 CI CMI 7 3 3 13 4 7 1 3 2 16 5 1 1 3 1 10 12 1 4 6 2 7 23 11 1 1 9 1 1 3 8 1 8 2 6 5 2 7 7 3 9 22 2 3 2 2 3 28 1 12 12 273 450 12 78 108 678 25 423 190 1,584 485 89 51 300 49 930 756 270 272 348 166 1,582 23 1,078 65 115 2,952 24 40 669 960 80 456 392 372 820 382 791 1,106 264 405 8,338 374 363 346 142 231 84 190 672 1,428 L-Bar 39 150 4 6 27 138 25 141 95 99 97 89 51 100 49 93 63 270 68 58 83 226 1 98 65 115 328 24 40 223 120 80 57 196 62 164 191 113 158 88 45 379 187 121 173 71 77 3 190 56 119 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 CI CMI 2 12 6 7 2 6 1 3 1 7 8 1 38 3 1 1 8 3 6 4 1 6 6 11 1 2 16 3 6 8 1 7 4 1 1 8 7 6 6 1 13 7 11 2 9 3 15 7 2 6 8 122 804 576 623 474 510 87 309 274 1,379 1,568 72 15,466 537 77 238 584 417 1,176 460 211 450 882 902 186 62 1,808 300 162 864 71 322 244 147 76 584 1,799 108 300 153 3,718 1,120 1,540 190 684 18 210 490 62 84 776 L-Bar 61 67 96 89 237 85 87 103 274 197 196 72 407 179 77 238 73 139 196 115 211 75 147 82 186 31 113 100 27 108 71 46 61 147 76 73 257 18 50 153 286 160 140 95 76 6 14 70 31 14 97 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/15/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 CI CMI 1 13 3 5 4 9 5 3 29 10 1 25 1 1 5 4 1 16 2 1 35 15 8 27 1 26 1 8 1 23 12 7 2 1 2 6 6 12 9 9 1 2 8 4 10 4 1 3 11 2 11 113 1,274 255 150 468 63 335 15 870 1,880 86 1,875 49 366 1,700 512 137 2,016 406 153 3,500 405 880 756 166 1,560 355 640 106 3,841 2,664 595 392 113 288 912 516 1,284 846 1,125 93 228 1,384 404 1,790 732 33 390 924 168 2,178 L-Bar 113 98 85 30 117 7 67 5 30 188 86 75 49 366 340 128 137 126 203 153 100 27 110 28 166 60 355 80 106 167 222 85 196 113 144 152 86 107 94 125 93 114 173 101 179 183 33 130 84 84 198 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST Date 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 CI CMI 7 3 1 2 2 14 1 1 2 4 1 7 4 2 10 2 6 6 2 12 10 5 1 1 5 7 8 2 19 12 63 11 9 1 1 127 11 2 7 1 3 3 7 5 1 11 19 3 11 31 44 168 204 75 352 52 2,800 3 34 612 372 179 168 140 182 270 86 300 702 232 1,224 220 390 22 110 580 469 128 16 2,204 624 5,859 297 225 76 39 1,270 1,650 20 826 175 231 522 756 30 17 638 1,311 24 495 3,038 968 L-Bar 24 68 75 176 26 200 3 34 306 93 179 24 35 91 27 43 50 117 116 102 22 78 22 110 116 67 16 8 116 52 93 27 25 76 39 10 150 10 118 175 77 174 108 6 17 58 69 8 45 98 22 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/16/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 CI CMI 7 15 1 1 1 2 3 4 9 29 1 1 11 14 7 10 7 2 2 2 1 3 10 3 1 64 5 4 7 6 1 13 4 10 9 7 1 2 4 1 12 6 8 3 1 2 5 15 12 7 5 546 255 281 113 52 168 93 40 297 13,949 58 1 11 868 749 2,160 1,078 270 218 466 38 231 920 297 347 10,944 443 548 1,120 24 120 936 184 1,940 729 1,659 68 80 308 412 528 786 160 540 139 262 385 1,545 1,596 1,127 1,625 L-Bar 78 17 281 113 52 84 31 10 33 481 58 1 1 62 107 216 154 135 109 233 38 77 92 99 347 171 91 137 160 4 120 72 46 194 81 237 68 40 77 412 44 131 20 180 139 131 77 103 133 161 325 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/17/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 CI CMI 9 2 10 1 2 13 60 6 2 2 6 12 11 5 3 9 2 2 3 6 6 1 4 3 2 8 4 1 4 3 1 3 10 7 12 1 11 1 1 1 7 1 1 5 1 2 5 7 1 2 3 1,080 86 2,020 117 12 663 540 564 238 296 198 1,548 1,716 365 351 2,196 168 250 72 420 264 46 428 207 72 408 336 241 716 180 396 18 130 91 1,788 193 1,177 167 221 87 105 173 340 945 575 294 1,300 413 151 292 216 L-Bar 120 43 202 117 6 51 9 94 119 148 33 129 156 73 117 244 84 125 24 70 44 46 107 69 36 51 84 241 179 60 396 6 13 13 149 193 107 167 221 87 15 173 340 189 575 147 260 59 151 146 72 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 CI CMI 4 10 7 4 16 8 4 4 4 2 1 1 25 1 8 1 9 16 3 9 6 12 8 1 5 12 2 24 3 2 9 4 3 4 7 6 3 11 3 2 9 7 10 4 5 3 7 1 5 1 2 332 1,780 777 220 272 144 672 312 648 50 234 28 2,175 144 936 138 513 1,456 255 3,465 420 420 744 283 140 84 228 96 135 32 63 468 1,167 132 1,190 30 288 1,067 39 24 1,422 525 280 688 315 108 343 61 615 179 240 L-Bar 83 178 111 55 17 18 168 78 162 25 234 28 87 144 117 138 57 91 85 385 70 35 93 283 28 7 114 4 45 16 7 117 389 33 170 5 96 97 13 12 158 75 28 172 63 36 49 61 123 179 120 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/18/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/19/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/20/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 CI CMI 2 14 6 90 3 1 7 1 3 10 1 15 1 6 1 12 10 1 1 1 1 1 2 9 1 1 1 7 41 1 10 14 20 7 11 4 3 12 4 13 3 1 4 3 39 26 11 2 1 14 9 62 1,792 36 540 303 470 168 22 498 850 290 2,385 72 18 467 1,980 2,510 330 271 22 474 346 336 2,727 215 72 77 231 9,553 78 1,520 504 2,780 7 704 352 339 1,260 196 3,848 306 158 436 261 6,123 4,394 209 258 149 952 1,215 L-Bar 31 128 6 6 101 470 24 22 166 85 290 159 72 3 467 193 251 330 271 22 474 346 168 303 215 72 77 33 233 78 152 36 139 1 64 88 113 105 49 296 102 158 109 87 157 169 19 129 149 68 135 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 CI 1 6 2 7 5 17 8 1 5 4 2 1 2 1 7 4 4 2 15 5 4 10 1 12 32 4 34 1 10 11 3,326 1 1 1 4 13 2 26 7 4 6 1 3 5 10 9 9 2 8 1 1 CMI 208 618 534 847 40 1,955 1,000 88 395 340 302 185 198 88 959 300 272 18 1,005 445 264 10 95 864 288 408 2,652 82 1,760 924 36,586 101 416 245 676 1,508 42 2,652 98 100 768 134 117 80 440 810 522 92 352 44 100 L-Bar 208 103 267 121 8 115 125 88 79 85 151 185 99 88 137 75 68 9 67 89 66 1 95 72 9 102 78 82 176 84 11 101 416 245 169 116 21 102 14 25 128 134 39 16 44 90 58 46 44 44 100 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/21/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 CI CMI 3 11 10 2 2 3 27 6 1 4 50 40 31 1 2 8 2 12 2 5 6 12 1 4 2 6 3 23 7 1 12 11 1 3 2 1 1 1 7 1 1 1 1 1 3 9 6 4 6 9 2 399 110 1,120 52 184 423 2,943 552 113 364 7,000 4,880 4,030 69 166 640 148 2,772 206 155 1,398 2,616 202 372 20 1,278 240 1,656 469 113 2,124 396 266 429 170 121 186 184 357 174 165 37 68 331 234 1,440 132 84 72 513 598 L-Bar 133 10 112 26 92 141 109 92 113 91 140 122 130 69 83 80 74 231 103 31 233 218 202 93 10 213 80 72 67 113 177 36 266 143 85 121 186 184 51 174 165 37 68 331 78 160 22 21 12 57 299 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/22/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 CI CMI 7 22 6 8 7 6 91 1 10 5 4 8 7 2 1 3 3 2 60 16 1 1 6 1 10 8 11 1 4 6 1 10 4 1 3 3 12 14 6 21 2 1 3 13 1 4 1 29 14 2 5 385 5,522 264 64 2,100 1,728 4,095 197 670 400 796 520 56 168 44 258 495 60 9,000 912 118 172 642 220 1,450 336 902 9 344 402 155 860 252 32 78 42 996 28 60 2,499 618 207 363 1,235 20 508 101 3,103 1,330 218 745 L-Bar 55 251 44 8 300 288 45 197 67 80 199 65 8 84 44 86 165 30 150 57 118 172 107 220 145 42 82 9 86 67 155 86 63 32 26 14 83 2 10 119 309 207 121 95 20 127 101 107 95 109 149 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 CI CMI 9 1 15 8 24 4 238 8 1 2 1 8 1 4 11 1 16 4 5 7 8 3 1 4 25 1 5 3 5 2 7 4 10 12 14 25 5 15 1 17 15 4 1 8 4 1 1 25 6 6 7 1,899 230 825 1,160 2,712 708 6,902 104 156 188 215 696 80 240 1,683 130 1,792 868 855 560 656 153 66 780 4,225 239 170 237 645 306 952 196 1,890 2,004 2,520 1,475 290 2,160 186 2,975 1,470 264 290 920 32 112 237 2,550 396 366 231 L-Bar 211 230 55 145 113 177 29 13 156 94 215 87 80 60 153 130 112 217 171 80 82 51 66 195 169 239 34 79 129 153 136 49 189 167 180 59 58 144 186 175 98 66 290 115 8 112 237 102 66 61 33 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED Date 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/23/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 CI CMI 1 12 1 4 1 1 13 3 4 1 9 32 1 2 3 5 1 8 40 9 1 4 1 1 1 1 3 2 1 16 2 1 2 5 8 1 1 9 3 6 6 16 2 10 8 5 10 8 17 15 3 155 780 134 44 180 35 3,913 174 448 49 243 8,640 197 126 42 380 183 176 4,480 441 26 40 54 144 12 104 42 82 153 2,272 80 124 244 330 880 126 206 747 351 348 390 752 230 300 248 775 50 16 1,292 4,770 318 L-Bar 155 65 134 11 180 35 301 58 112 49 27 270 197 63 14 76 183 22 112 49 26 10 54 144 12 104 14 41 153 142 40 124 122 66 110 126 206 83 117 58 65 47 115 146 31 155 5 2 76 318 106 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 CI CMI 5 63 4 2 169 5 11 2 11 25 22 8 3 2 1 4 2 60 10 17 38 9 2 2 1 4 12 3 1 1 1 3 2 1 4 8 2 36 1 1 3 8 3 8 11 7 6 11 6 1 1 525 31,500 540 102 15,548 445 2,068 258 88 125 2,420 1,088 399 22 250 76 700 7,560 250 3,128 38 1,098 264 370 497 80 300 159 152 110 433 243 210 66 76 968 216 1,584 139 124 1,581 144 333 616 99 777 666 2,959 1,176 173 57 L-Bar 105 500 135 51 92 89 188 129 8 5 110 136 133 11 250 19 350 126 25 184 1 122 132 185 497 20 25 53 152 110 433 81 105 66 19 121 108 44 139 124 527 18 111 77 9 111 111 269 196 173 57 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/24/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/25/2014 7/26/2014 CI CMI 14 4 2 2 1 2 25 5 3 7 3 1 2 4 1 1 24 2 3 1 4 1 85 1 1 35 1 1 10 10 6 3 19 6 8 2 10 8 3 4 8 1 62 31 1 3 6 7 7 1 2 1,176 524 116 274 17 182 100 640 138 224 489 98 82 380 94 258 1,368 222 465 119 120 116 8,160 263 233 5,530 120 282 1,300 1,320 942 561 1,197 1,338 1,256 20 2,160 1,024 312 332 288 60 434 6,200 236 300 372 413 238 535 48 L-Bar 84 131 58 137 17 91 4 128 46 32 163 98 41 95 94 258 57 111 155 119 30 116 96 263 233 158 120 282 130 132 157 187 63 223 157 10 216 128 104 83 36 60 7 200 236 100 62 59 34 535 24 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 7/26/2014 7/26/2014 7/27/2014 7/27/2014 7/27/2014 7/27/2014 7/27/2014 7/27/2014 7/27/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 CI CMI 1 1 8 1 4 1 3 1 3 2 1 6 3 2 2 3 5 2 5 8 2 63 7 8 6 7 2 3 4 8 11 1 1 26 4 14 1 9 6 4 3 7 8 1 10 6 5 1 29 1 7 226 29 2,512 84 32 310 714 42 141 254 104 786 165 160 444 645 1,040 470 45 768 238 6,174 280 792 24 581 208 549 320 1,872 1,100 30 163 52 576 182 55 747 18 344 174 1,708 2,352 358 1,360 1,050 300 238 58 35 154 L-Bar 226 29 314 84 8 310 238 42 47 127 104 131 55 80 222 215 208 235 9 96 119 98 40 99 4 83 104 183 80 234 100 30 163 2 144 13 55 83 3 86 58 244 294 358 136 175 60 238 2 35 22 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/28/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 CI CMI 3 8 12 18 1 20 8 12 3 5 12 7 10 8 7 2 1 5 2 6 4 6 12 11 1 1 29 1 7 6 39 12 8 3 1 1 1 3 1 15 1 6 2 1 8 2 1 3 15 1 12 117 48 720 558 21 2,500 864 1,344 201 630 1,008 637 830 664 581 26 74 490 52 66 256 102 348 946 121 110 1,537 1,420 798 876 819 1,140 56 90 500 17 189 138 110 2,580 385 1,254 282 145 1,216 242 122 408 2,250 36 552 L-Bar 39 6 60 31 21 125 108 112 67 126 84 91 83 83 83 13 74 98 26 11 64 17 29 86 121 110 53 1,420 114 146 21 95 7 30 500 17 189 46 110 172 385 209 141 145 152 121 122 136 150 36 46 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 CI CMI 1 13 14 2 8 1 14 1 2 1 1 7 1 1 14 13 27 5 3 13 4 8 1 16 1 12 1 5 2 13 27 2 4 1 4 9 6 13 6 6 11 14 4 2 8 4 9 164 2 4 9 11 1,664 938 378 16 95 5,138 191 476 61 274 609 469 383 2,408 1,040 3,456 2,545 219 1,417 260 1,072 68 1,936 232 24 77 1,610 320 962 189 254 152 125 20 972 30 1,326 1,008 1,032 616 896 436 112 2,272 660 1,566 23,288 60 128 162 L-Bar 11 128 67 189 2 95 367 191 238 61 274 87 469 383 172 80 128 509 73 109 65 134 68 121 232 2 77 322 160 74 7 127 38 125 5 108 5 102 168 172 56 64 109 56 284 165 174 142 30 32 18 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/29/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 CI CMI 9 1 3 8 3 1 3 1 1 1 13 1 20 8 1 4 2 6 12 1 14 34 2 1 6 2 6 1 4 6 6 18 11 4 5 8 7 2 2 4 1 2 3 4 2 14 4 13 3 1 7 1,710 35 516 520 246 102 84 72 319 314 247 167 1,900 40 495 276 248 78 1,368 91 210 1,088 130 68 786 72 36 24 272 540 450 468 363 172 80 864 259 374 200 64 33 214 723 640 82 1,008 292 1,118 189 70 1,015 L-Bar 190 35 172 65 82 102 28 72 319 314 19 167 95 5 495 69 124 13 114 91 15 32 65 68 131 36 6 24 68 90 75 26 33 43 16 108 37 187 100 16 33 107 241 160 41 72 73 86 63 70 145 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 CI CMI 2 3 1 4 3 84 2 7 3 1 42 15 1 6 3 1 2 7 9 6 9 6 6 1 2 5 1 9 1 9 3 3 15 51 2 2 6 45 5 13 1 1 1 10 8 103 14 2 8 3 35 130 171 58 416 537 22,344 268 1,120 507 60 6,300 945 37 936 177 26 42 679 324 594 576 468 18 60 162 270 61 1,827 46 729 462 426 1,350 5,355 22 156 720 6,030 500 2,769 60 253 49 1,230 568 412 1,064 274 1,816 111 280 L-Bar 65 57 58 104 179 266 134 160 169 60 150 63 37 156 59 26 21 97 36 99 64 78 3 60 81 54 61 203 46 81 154 142 90 105 11 78 120 134 100 213 60 253 49 123 71 4 76 137 227 37 8 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/30/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 CI CMI 10 10 13 9 6 9 2 3 17 3 3 9 1 1 1 3 12 8 3 7 3 4 1 7 10 7 1 22 4 6 1 2 1 5 1 1 7 7 10 67 20 1 13 3 7 4 5 9 9 6 7 130 610 728 1,089 1,518 1,773 242 366 1,156 114 153 1,215 87 78 99 114 1,560 112 276 126 363 476 227 147 130 1,113 78 506 384 1,290 132 144 33 785 83 79 469 420 620 5,226 2,220 129 2,639 237 805 476 965 99 1,035 243 770 L-Bar 13 61 56 121 253 197 121 122 68 38 51 135 87 78 99 38 130 14 92 18 121 119 227 21 13 159 78 23 96 215 132 72 33 157 83 79 67 60 62 78 111 129 203 79 115 119 193 11 115 118 110 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 CI CMI 10 3 138 2 5 13 1 2 3 16 3 2 10 4 2 6 4 1 4 10 4 8 2 5 2 2 1 29 1 7 124 6 11 24 11 13 1 8 1 21 1 1 3 9 32 20 2 13 2 1 18 370 99 51,336 228 45 2,717 103 50 939 1,200 414 54 460 220 216 714 1,140 112 548 2,400 60 1,392 476 180 486 418 69 7,830 198 1,973 17,112 1,614 3,509 3,936 3,509 4,147 80 2,136 76 1,701 109 57 336 117 256 3,720 526 741 94 113 972 L-Bar 37 33 372 114 9 209 103 25 313 75 138 27 46 55 108 119 285 112 137 240 15 174 238 36 243 209 69 270 198 365 138 269 319 164 319 319 80 267 76 81 109 57 112 13 8 186 263 57 47 113 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 7/31/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 CI CMI 54 2 5 1 1 13 2 1 2 7 1 11 71 1 8 3 5 1 3 2 1 7 8 2 1 4 2 5 1 4 4 1 1 3 12 1 17 1 2 14 8 9 1 1 4 2 4 2 3 9 1 1,674 228 960 115 172 780 42 47 282 77 63 176 852 117 72 144 765 265 555 118 49 371 136 162 116 32 80 200 1 48 132 13 145 171 540 81 238 142 204 3,444 1,168 1,242 87 118 256 122 372 294 654 1,800 111 L-Bar 31 114 192 115 172 60 21 47 141 11 63 16 12 117 9 48 153 265 185 59 49 53 17 81 116 8 40 40 1 12 33 13 145 57 45 81 14 142 102 246 146 138 87 118 64 61 93 147 218 200 111 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST Date 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/1/2014 8/2/2014 8/2/2014 8/2/2014 8/2/2014 8/2/2014 8/2/2014 8/2/2014 CI CMI 1 2 23 13 4 6 1 1 1 3 1 3 1 3 2 7 2 1 6 31 2 33 234 1 15 2 8 4 6 2 5 8 1 5 8 10 6 23 1 2 16 6 4 1 1 5 1 1 1 3 1 22 148 1,012 2,327 916 1,278 96 50 48 375 198 273 76 591 248 315 328 69 600 3,131 236 5,346 56,394 198 195 20 64 656 864 76 320 48 18 130 960 1,210 30 874 89 14 208 480 220 5 120 1,230 110 78 34 69 113 L-Bar 22 74 44 179 229 213 96 50 48 125 198 91 76 197 124 45 164 69 100 101 118 162 241 198 13 10 8 164 144 38 64 6 18 26 120 121 5 38 89 7 13 80 55 5 120 246 110 78 34 23 113 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/3/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 CI CMI 1 2 3 1 7 1 1 1 6 1 2 4 12 6 12 25 46 5 9 1 26 1 11 20 5 37 70 26 10 10 4 2 23 4 2 6 1 4 26 12 31 3 4 2 1 3 6 1 11 16 1 63 426 138 58 784 438 264 261 1,110 251 158 484 3,108 204 1,692 5,150 2,852 830 1,431 222 3,770 82 836 2,900 310 5,772 1,120 2,912 730 1,920 20 158 3,151 540 236 78 62 424 2,340 144 3,813 339 224 96 108 378 285 7 792 1,280 62 L-Bar 63 213 46 58 112 438 264 261 185 251 79 121 259 34 141 206 62 166 159 222 145 82 76 145 62 156 16 112 73 192 5 79 137 135 118 13 62 106 90 12 123 113 56 48 108 126 170 7 72 80 62 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/4/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 CI CMI 4 5 2 12 2 25 24 14 4 1 24 1 1 21 6 3 2 2 2 3 4 25 2 19 9 11 8 7 1 1 2 2 2 17 11 3 4 8 2 1 4 8 8 7 1 33 6 3 3 28 24 1,212 490 60 648 158 4,275 4,488 210 748 62 5,952 12 34 1,260 210 204 348 76 86 429 688 3,450 86 2,432 270 319 88 168 87 99 186 428 366 340 1,199 426 580 1,864 218 116 328 1,880 1,120 1,015 112 2,673 138 240 603 7,728 13,440 L-Bar 303 98 30 54 79 171 187 15 187 62 248 12 34 60 35 68 174 38 43 143 172 138 43 128 30 29 11 24 87 99 93 214 183 20 109 142 145 233 109 116 82 235 140 145 112 81 23 80 201 276 560 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 CI CMI 5 9 17 20 21 9 3 34 2 36 25 9 8 2 4 1 8 27 1 19 1 10 11 4 4 9 1 1 20 1 3 18 3 6 9 7 18 4 3 1 4 1 7 10 12 1 34 4 7 51 1 945 675 2,788 3,280 3,864 3,429 510 3,060 182 7,344 2,600 216 1,072 210 228 84 1,672 8,073 232 4,560 75 540 165 28 712 612 38 314 940 175 798 1,566 735 540 1,053 119 1,602 56 27 173 364 184 1,764 460 648 69 2,822 56 28 663 140 L-Bar 189 75 164 164 184 381 170 90 91 204 104 24 134 105 57 84 209 299 232 240 75 54 15 7 178 68 38 314 47 175 266 87 245 90 117 17 89 14 9 173 91 184 252 46 54 69 83 14 4 13 140 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/5/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 CI CMI 6 24 1 8 3 6 6 6 15 13 10 2 36 4 4 23 1 1 8 7 39 6 2 2 10 21 34 1 2 1 11 1 2 1 2 1 2 2 2 10 5 2 13 2 1 1 4 5 12 1 7 258 3,072 88 2,400 561 1,824 630 1,194 3,435 676 360 32 7,308 324 320 3,404 171 6 760 574 1,950 84 50 134 160 2,331 4,420 59 54 46 187 169 138 222 192 136 222 318 128 1,110 695 304 975 358 275 207 848 905 3,672 459 2,758 L-Bar 43 128 88 300 187 304 105 199 229 52 36 16 203 81 80 148 171 6 95 82 50 14 25 67 16 111 130 59 27 46 17 169 69 222 96 136 111 159 64 111 139 152 75 179 275 207 212 181 306 459 394 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 CI CMI 33 5 4 4 3 1 2 1 1 25 15 4 25 74 3 99 3 69 2 20 6 6 5 1 3 6 4 5 6 13 1 1 4 27 1 8 1 1 1 10 24 12 8 2 7 5 4 6 8 1 112 5,808 905 728 676 486 185 194 376 87 2,400 705 416 4,150 10,064 420 25,839 198 759 320 1,920 192 264 315 182 141 396 356 745 828 1,105 222 7 508 1,809 90 1,104 27 81 74 990 480 708 611 382 413 735 776 552 1,240 21 7,504 L-Bar 176 181 182 169 162 185 97 376 87 96 47 104 166 136 140 261 66 11 160 96 32 44 63 182 47 66 89 149 138 85 222 7 127 67 90 138 27 81 74 99 20 59 157 191 59 147 194 92 155 21 67 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/6/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 CI CMI 4 13 4 13 1 2 3 25 2 23 11 3 3 3 3 4 4 51 1 5 2 22 1 15 1 1 4 4 1 25 6 2 18 13 1 6 12 31 68 97 1 3 3 4 7 2 2 14 2 2 2 156 1,300 32 1,300 24 274 402 2,850 78 1,564 693 204 330 135 129 412 428 2,142 175 30 98 1,320 171 720 30 53 188 880 67 3,075 834 236 324 2,990 109 342 1,848 11,656 11,016 14,942 97 135 432 388 434 140 232 2,002 1,208 128 44 L-Bar 39 100 8 100 24 137 134 114 39 68 63 68 110 45 43 103 107 42 175 6 49 60 171 48 30 53 47 220 67 123 139 118 18 230 109 57 154 376 162 186 97 45 144 97 62 70 116 143 604 64 22 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 CI CMI 23 10 6 1 12 21 1 1 5 21 3 10 3 8 3 12 23 4 7 4 10 59 7 4 8 5 2 51 6 8 16 6 1 4 11 6 1 13 1 10 1 29 2 49 6 2 8 2 55 9 1 4,347 480 954 82 888 2,772 71 8 595 1,491 156 40 3 896 420 780 4,876 628 336 432 440 12,921 2,093 1,176 728 300 368 6,885 810 496 1,728 156 190 216 187 204 25 1,469 139 10 319 4,553 400 6,076 996 402 1,544 196 10,065 540 90 L-Bar 189 48 159 82 74 132 71 8 119 71 52 4 1 112 140 65 212 157 48 108 44 219 299 294 91 60 184 135 135 62 108 26 190 54 17 34 25 113 139 1 319 157 200 124 166 201 193 98 183 60 90 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 8/7/2014 CI CMI 8 6 2 11 1 13 11 6 23 12 8 1 4 2 8 48 1 8 1 24 1 1 1 4 2 8 4 2 4 16 14 1 2 5 1 1 3 5 8 6 11 4 6 1 2 4 1 1 7 7 11 744 570 108 1,232 94 637 770 426 5,313 2,904 480 23 152 526 688 1,056 39 88 50 1,176 116 10 19 268 206 1,856 420 144 380 1,440 420 79 80 50 22 57 51 235 688 294 704 336 330 130 216 388 96 73 98 84 583 L-Bar 93 95 54 112 94 49 70 71 231 242 60 23 38 263 86 22 39 11 50 49 116 10 19 67 103 232 105 72 95 90 30 79 40 10 22 57 17 47 86 49 64 84 55 130 108 97 96 73 14 12 53 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 8/7/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 CI CMI 3 1 1 1 1 1 1 2 7 1 1 2 2 2 4 7 2 3 9 4 1 5 1 1 11 9 1 1 4 4 1 5 2 9 8 5 69 1 7 1 2 9 1 3 10 10 4 2 7 1 9 273 228 100 61 168 113 111 158 791 37 71 342 26 208 428 1,078 152 456 198 496 11 755 125 21 1,694 198 90 32 912 820 102 160 214 1,053 1,344 15 5,175 58 42 593 556 279 69 60 460 410 720 170 329 147 63 L-Bar 91 228 100 61 168 113 111 79 113 37 71 171 13 104 107 154 76 152 22 124 11 151 125 21 154 22 90 32 228 205 102 32 107 117 168 3 75 58 6 593 278 31 69 20 46 41 180 85 47 147 7 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/8/2014 8/9/2014 8/9/2014 8/10/2014 8/10/2014 8/10/2014 8/10/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 CI CMI 26 21 8 4 1 4 3 1 1 2 1 9 19 2 1 9 1 3 5 3 4 1 16 13 12 3 13 3 9 5 1 1 2 24 8 37 10 6 1 1 5 30 8 1 2 11 1 3 8 3 17 624 84 72 356 174 276 123 4 238 184 98 1,332 5,035 1,056 116 3,060 103 585 605 288 428 245 5,616 2,249 1,548 315 2,067 849 3,699 2,670 202 220 110 3,624 152 1,369 170 336 121 239 130 5,580 1,096 112 144 1,386 121 138 192 426 1,190 L-Bar 24 4 9 89 174 69 41 4 238 92 98 148 265 528 116 340 103 195 121 96 107 245 351 173 129 105 159 283 411 534 202 220 55 151 19 37 17 56 121 239 26 186 137 112 72 126 121 46 24 142 70 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 8/11/2014 CI CMI 17 8 3 8 1 1 9 1 4 3 5 3 8 4 14 15 1 1 1 5 2 4 5 3 2 9 9 5 2 12 4 5 15 1 68 5 1 1 5 1 12 3 1 34 3 26 1 2 1 1 1 3,060 744 120 1,152 206 175 54 45 316 78 710 291 40 640 1,008 960 118 180 153 1,130 154 316 65 189 168 657 864 495 32 1,596 392 750 1,410 87 1,700 385 96 94 420 78 180 186 209 2,176 288 1,768 109 108 18 29 88 L-Bar 180 93 40 144 206 175 6 45 79 26 142 97 5 160 72 64 118 180 153 226 77 79 13 63 84 73 96 99 16 133 98 150 94 87 25 77 96 94 84 78 15 62 209 64 96 68 109 54 18 29 88 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST Date 8/11/2014 8/11/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 CI CMI 4 36 2 1 4 6 1 17 18 1 3 1 11 5 2 24 16 4 2 17 4 8 8 4 7 7 3 2 6 2 2 7 4 2 19 4 4 1 13 11 67 18 12 8 8 7 1 6 1 1 9 268 9,252 860 73 416 744 106 1,207 1,422 182 1,287 117 1,397 1,275 208 4,440 2,608 456 218 1,683 580 680 968 272 812 658 303 286 822 142 638 2,289 1,244 622 1,558 584 256 211 117 1,441 13,467 2,538 1,452 560 200 175 53 312 105 51 135 L-Bar 67 257 430 73 104 124 106 71 79 182 429 117 127 255 104 185 163 114 109 99 145 85 121 68 116 94 101 143 137 71 319 327 311 311 82 146 64 211 9 131 201 141 121 70 25 25 53 52 105 51 15 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/12/2014 8/13/2014 CI CMI 6 15 5 2 9 3 3 2 2 2 1 3 3 9 13 8 1 3 1 7 8 2 4 5 2 7 7 4 11 5 2 12 1 9 1 4 11 3 6 5 1 10 6 5 2 13 3 1 4 103 2 150 585 125 140 1,269 342 213 374 94 84 67 207 300 1,548 1,014 1,280 165 549 26 70 1,088 186 1,828 175 160 469 245 276 1,287 345 224 504 43 171 84 248 594 126 1,098 245 49 540 576 10 156 429 789 33 116 4,635 120 L-Bar 25 39 25 70 141 114 71 187 47 42 67 69 100 172 78 160 165 183 26 10 136 93 457 35 80 67 35 69 117 69 112 42 43 19 84 62 54 42 183 49 49 54 96 2 78 33 263 33 29 45 60 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 CI CMI 4 8 5 20 10 4 6 12 3 3 1 13 6 8 2 2 4 2 2 10 1 4 9 2 8 4 17 20 2 7 9 58 7 3 11 16 67 8 12 6 9 8 2 3 4 13 4 1 30 12 4 568 376 1,110 4,340 670 444 162 888 582 222 213 52 894 424 314 378 120 230 128 890 54 316 675 104 80 96 5,015 6,320 196 182 27 2,320 518 117 869 1,552 2,211 304 888 978 126 48 156 120 1,036 1,144 412 172 4,290 816 332 L-Bar 142 47 222 217 67 111 27 74 194 74 213 4 149 53 157 189 30 115 64 89 54 79 75 52 10 24 295 316 98 26 3 40 74 39 79 97 33 38 74 163 14 6 78 40 259 88 103 172 143 68 83 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/13/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 CI 7 7 2 11 2 11 1 7 19 7 35 12 3 1 9 1 5 4 8 8 6 2 10 4 1 2 4 13 1 3 10 1 4 12 7 1 2 8 1 12 1 1 8 1,458 1 3 2 1 1 14 97 CMI 539 525 54 990 756 1,177 4 651 2,223 812 280 660 105 42 36 154 625 216 64 1,112 240 58 630 132 8 214 172 546 23 123 670 12 652 864 49 81 268 520 36 1,260 87 127 2,864 1,458 199 126 158 250 92 1,456 68,191 L-Bar 77 75 27 90 378 107 4 93 117 116 8 55 35 42 4 154 125 54 8 139 40 29 63 33 8 107 43 42 23 41 67 12 163 72 7 81 134 65 36 105 87 127 358 1 199 42 79 250 92 104 703 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 CI CMI 24 23 3 13 10 38 20 1 1 9 1 7 4 7 30 3 5 73 1 2 18 2 4 2 4 1 1 1 10 44 8 4 11 8 12 9 1 5 7 3 2 3 2 13 1 3 1 7 2 3 6 2,712 2,668 399 2,444 2,290 6,954 1,720 176 176 1,773 186 462 696 742 3,600 327 455 5,256 389 592 1,962 220 300 286 580 211 76 128 2,100 10,076 1,480 200 1,133 32 804 1,548 34 35 658 120 122 759 120 1,261 81 45 335 497 174 39 492 L-Bar 113 116 133 188 229 183 86 176 176 197 186 66 174 106 120 109 91 72 389 296 109 110 75 143 145 211 76 128 210 229 185 50 103 4 67 172 34 7 94 40 61 253 60 97 81 15 335 71 87 13 82 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/14/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 CI CMI 3 9 4 11 2 3 4 139 6 4 17 1 9 11 6 32 9 6 8 2 1 12 1 12 3 8 5 1 5 60 5 2 1 13 20 12 4 7 9 14 1 3 2 20 20 9 1 10 7 3 43 579 603 736 781 516 402 976 1,946 408 32 2,040 37 36 198 1,674 7,008 522 336 16 6 35 132 77 36 198 136 520 142 230 8,760 335 176 92 2,119 300 288 280 840 882 1,316 101 198 300 2,280 100 720 156 800 1,043 465 4,214 L-Bar 193 67 184 71 258 134 244 14 68 8 120 37 4 18 279 219 58 56 2 3 35 11 77 3 66 17 104 142 46 146 67 88 92 163 15 24 70 120 98 94 101 66 150 114 5 80 156 80 149 155 98 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/15/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/16/2014 8/17/2014 8/17/2014 8/17/2014 8/17/2014 8/17/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 CI 4 11 10 6 36 7 3 10 1 1 11 1 14 9 14 12 36 1 18 11 18 1 8 1 37 2,895 2 5 11 18 5 49 1 13 1 2 2 1 1 4 1 3 3 5 8 9 25 2 11 1 8 CMI 744 77 130 330 936 28 24 10 35 159 231 111 28 666 4,144 72 4,104 144 54 88 1,260 106 120 102 1,813 89,745 1,176 715 2,255 306 780 2,401 172 325 482 46 280 206 33 472 269 786 255 1,395 400 2,070 2,075 250 1,408 231 928 L-Bar 186 7 13 55 26 4 8 1 35 159 21 111 2 74 296 6 114 144 3 8 70 106 15 102 49 31 588 143 205 17 156 49 172 25 482 23 140 206 33 118 269 262 85 279 50 230 83 125 128 231 116 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 CI CMI 16 13 4 9 9 9 4 4 3 5 6 4 4 3 19 10 1 12 2 10 12 6 10 1 1 7 9 5 4 16 4 4 11 11 1 7 5 4 17 5 3 12 4 8 4 3 1 5 12 4 17 800 897 744 1,377 1,746 945 100 12 276 1,020 624 300 740 234 1,482 210 194 1,464 232 950 2,664 348 710 151 112 273 1,089 480 896 2,176 12 884 935 1,760 45 49 140 280 867 75 528 1,356 24 1,224 152 183 67 5 1,152 364 3,315 L-Bar 50 69 186 153 194 105 25 3 92 204 104 75 185 78 78 21 194 122 116 95 222 58 71 151 112 39 121 96 224 136 3 221 85 160 45 7 28 70 51 15 176 113 6 153 38 61 67 1 96 91 195 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/18/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 CI CMI 2 4 5 6 3 4 5 13 12 7 2 4 1 12 10 10 6 1 8 10 4 8 13 4 1 3 7 13 1 2 8 2 8 2 1 7 10 40 13 65 1 7 1 1 12 10 7 9 2 19 3 148 72 465 186 48 392 190 793 1,248 336 444 128 323 960 1,190 330 330 142 624 770 504 400 104 16 214 219 322 1,287 428 114 1,016 506 464 116 162 959 1,010 16,960 533 130 75 2,023 274 26 936 2,440 952 675 134 1,501 342 L-Bar 74 18 93 31 16 98 38 61 104 48 222 32 323 80 119 33 55 142 78 77 126 50 8 4 214 73 46 99 428 57 127 253 58 58 162 137 101 424 41 2 75 289 274 26 78 244 136 75 67 79 114 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 CI CMI 2 4 3 6 12 11 4 8 5 16 7 3 2 1 29 5 10 4 1 1 1 2 11 2 3 2 82 7 2 3 11 5 2 4 6 29 13 10 5 3 7 3 8 1 6 5 5 1 1 12 1 298 960 429 1,140 1,944 1,848 356 416 360 1,008 35 348 198 255 1,885 240 210 300 77 205 1 46 429 16 249 160 17,876 1,645 8 219 814 140 44 48 270 2,958 1,755 640 90 369 161 384 48 18 342 340 395 62 73 1,296 97 L-Bar 149 240 143 190 162 168 89 52 72 63 5 116 99 255 65 48 21 75 77 205 1 23 39 8 83 80 218 235 4 73 74 28 22 12 45 102 135 64 18 123 23 128 6 18 57 68 79 62 73 108 97 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/19/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 CI 15 2 1 21 2 2,722 2,865 1 1 1 3 2 1 2 9 12 9 10 4 8 6 4 2 7 1 2 6 14 17 5 1 1 6 4 9 10 6 11 9 2 10 9 2 5 1 2 3 1 2 4 2 CMI 45 246 248 777 58 78,938 74,490 123 1,042 160 12 292 225 342 36 1,608 1,620 1,320 520 760 1,266 748 298 476 230 92 960 1,092 323 270 313 58 912 732 1,242 3,760 108 5,137 2,898 210 1,080 603 420 375 82 280 342 261 96 216 182 L-Bar 3 123 248 37 29 29 26 123 1,042 160 4 146 225 171 4 134 180 132 130 95 211 187 149 68 230 46 160 78 19 54 313 58 152 183 138 376 18 467 322 105 108 67 210 75 82 140 114 261 48 54 91 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/20/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 CI CMI 1 8 1 2 9 7 5 5 1 2 121 15 7 6 9 13 22 16 6 13 3 1 2 2 22 10 1 2 12 1 17 4 6 10 5 5 1 9 1 4 1 1 10 2 12 6 2 5 17 19 5 136 472 88 94 1,332 1,764 940 920 142 230 17,424 870 609 30 765 2,483 1,738 928 156 1,053 102 81 254 242 4,488 1,090 137 158 132 174 238 76 306 670 260 40 53 261 97 388 108 428 1,700 178 1,332 516 354 545 1,751 1,957 305 L-Bar 136 59 88 47 148 252 188 184 142 115 144 58 87 5 85 191 79 58 26 81 34 81 127 121 204 109 137 79 11 174 14 19 51 67 52 8 53 29 97 97 108 428 170 89 111 86 177 109 103 103 61 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 CI CMI 9 3 3 3 1 10 2 1 6 1 31 1 1 1 4 1 1 1 18 3 5 3 8 144 4 38 11 2 6 1 2 8 1 15 7 6 9 4 1 3 4 4 9 7 12 40 5 6 1 8 7 333 336 393 219 124 1,520 258 324 378 190 4,774 89 147 450 288 188 188 166 1,062 423 270 417 504 25,920 268 1,900 3,872 208 414 21 552 520 96 1,530 1,029 546 1,287 928 18 201 228 716 1,152 595 324 480 550 600 80 1,096 84 L-Bar 37 112 131 73 124 152 129 324 63 190 154 89 147 450 72 188 188 166 59 141 54 139 63 180 67 50 352 104 69 21 276 65 96 102 147 91 143 232 18 67 57 179 128 85 27 12 110 100 80 137 12 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/21/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 CI CMI 3 2 12 3 1 2 12 6 13 18 3 1 12 4 3 5 2 1 8 6 3 6 3 6 2 1 3 7 10 8 10 26 2 11 1 2 1 12 7 3 5 3 12 4 1 9 13 9 13 3 4 450 304 1,176 306 96 124 2,004 462 754 450 354 23 684 128 363 230 270 144 312 834 186 108 339 48 434 54 192 1,974 1,070 648 1,410 1,872 98 110 86 162 32 660 147 114 200 243 216 1,884 181 117 169 1,755 442 66 20 L-Bar 150 152 98 102 96 62 167 77 58 25 118 23 57 32 121 46 135 144 39 139 62 18 113 8 217 54 64 282 107 81 141 72 49 10 86 81 32 55 21 38 40 81 18 471 181 13 13 195 34 22 5 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/22/2014 8/23/2014 8/23/2014 8/23/2014 8/23/2014 8/24/2014 8/24/2014 8/24/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 CI CMI 2 5 1 5 5 3 2 1 17 2 5 2 10 26 2 7 1 6 5 1 7 4 10 1 1 9 1 6 3 7 14 1 12 9 3 15 4 1 1 1 1 1 1 1 1 1 1 1 18 8 15 218 110 135 335 315 189 168 16 1,207 354 205 126 180 1,846 206 1,127 82 96 25 92 1,330 56 440 179 136 180 51 630 15 273 140 60 132 342 156 2,730 80 79 117 137 151 162 185 190 333 113 89 163 1,152 896 5,385 L-Bar 109 22 135 67 63 63 84 16 71 177 41 63 18 71 103 161 82 16 5 92 190 14 44 179 136 20 51 105 5 39 10 60 11 38 52 182 20 79 117 137 151 162 185 190 333 113 89 163 64 112 359 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED Date 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 CI CMI 6 8 2 7 2 10 1 1 2 5 2 4 1 3 12 7 18 9 2 4 1 4 4 1 6 8 9 14 18 8 1 1 1 9 1 9 16 2 1 1 4 6 11 1 3 4 9 4 9 2 8 420 488 178 2,891 242 680 114 1 382 795 498 28 51 357 1,524 1,414 1,872 693 304 292 190 96 136 230 558 800 414 854 1,458 392 71 141 20 954 88 1,584 5,872 38 59 221 132 222 1,573 138 48 248 882 124 603 22 328 L-Bar 70 61 89 413 121 68 114 1 191 159 249 7 51 119 127 202 104 77 152 73 190 24 34 230 93 100 46 61 81 49 71 141 20 106 88 176 367 19 59 221 33 37 143 138 16 62 98 31 67 11 41 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/25/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 CI CMI 3 82 6 1 1 9 11 7 1 1 1 25 7 16 31 1 2 2 8 6 4 1 2 4 1 10 1 4 1 8 3 4 8 10 4 8 4 16 8 12 8 15 12 2 10 3 1 6 2 4 1 618 4,182 696 69 100 1,044 484 119 190 125 344 10,875 1,659 5,872 2,232 126 88 256 272 132 752 221 208 408 115 3,420 422 116 72 216 432 76 872 660 236 472 636 240 408 648 1,016 1,935 3,120 336 1,740 642 29 144 32 76 164 L-Bar 206 51 116 69 100 116 44 17 190 125 344 435 237 367 72 126 44 128 34 22 188 221 104 102 115 342 422 29 72 27 144 19 109 66 59 59 159 15 51 54 127 129 260 168 174 214 29 24 16 19 164 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST Date 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 8/26/2014 CI CMI 2 184 15 25 13 1 8 1 1 3 1 1 6 18 2 2 11 1 2 7 4 5 1 3 1 10 9 6 11 10 1 4 8 2 1 6 6 6 1 12 12 1 1 4 5 2 1 1 1 2 1 296 25,392 2,070 3,650 2,158 72 1,040 49 19 444 40 148 456 1,386 26 164 539 95 202 798 408 255 125 108 20 730 99 846 825 1,320 103 232 472 158 152 438 426 48 70 684 204 241 149 264 385 120 161 158 66 70 44 L-Bar 148 138 138 146 166 72 130 49 19 148 40 148 76 77 13 82 49 95 101 114 102 51 125 36 20 73 11 141 75 132 103 58 59 79 152 73 71 8 70 57 17 241 149 66 77 60 161 158 66 35 44 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 8/26/2014 8/26/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 CI 2,012 46 1 14 2 1 5 6 28 8 2 23 8 17 21 27 11 1 16 4 1 1 1 12 2 8 8 1 65 7 4 12 4 1 15 6 5 22 6 37 3 42 3 56 8 2 2 2 6 2 1 CMI 82,492 4,508 117 896 306 89 2,265 138 2,212 200 138 1,656 960 221 315 324 1,001 93 4,224 908 399 80 86 1,272 224 616 1,192 282 2,925 63 156 864 484 96 1,605 564 1,620 5,588 390 3,293 177 1,554 420 1,288 384 230 230 230 846 118 88 L-Bar 41 98 117 64 153 89 453 23 79 25 69 72 120 13 15 12 91 93 264 227 399 80 86 106 112 77 149 282 45 9 39 72 121 96 107 94 324 254 65 89 59 37 140 23 48 115 115 115 141 59 88 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/27/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 CI CMI 7 1 13 7 10 8 13 4 10 5 33 93 5 1 6 47 10 1 6 25 3 3 2 4 4 2 4 4 12 89 4 4 18 12 3 11 2 7 3 43 2 3 7 1 1 2 7 1 60 6 2 385 148 39 308 50 536 1,144 292 180 670 3,564 5,022 650 90 348 329 280 111 564 5,157 666 345 64 140 448 130 736 48 48 10,413 148 68 3,294 708 24 418 282 973 96 387 44 348 504 83 173 252 28 57 1,140 1,272 206 L-Bar 55 148 3 44 5 67 88 73 18 134 108 54 130 90 58 7 28 111 94 368 222 115 32 35 112 65 184 12 4 117 37 17 183 59 8 38 141 139 32 9 22 116 72 83 173 126 4 57 19 212 103 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 CI CMI 11 12 8 16 1 2 1 1 4 1 12 14 5 5 1 1 20 3 2 11 4 6 1 5 9 8 2 861 8 11 12 9 5 1 4 1 34 11 12 5 1 1 18 8 4 5 2 8 8 8 1 4,642 1,068 392 1,072 325 318 78 104 16 82 696 1,918 740 440 84 9 880 204 142 2,772 432 1,422 236 145 999 4,384 56 43,568 312 2,321 360 1,287 735 67 444 137 7,684 627 504 1,450 173 67 1,476 576 24 685 254 680 728 16 137 L-Bar 422 89 49 67 325 159 78 104 4 82 58 137 148 88 84 9 44 68 71 252 108 237 236 29 111 548 28 58 39 211 30 143 147 67 111 137 226 57 42 290 173 67 82 72 6 137 127 85 91 2 137 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/28/2014 8/29/2014 8/29/2014 8/29/2014 CI 1 8 3 3 6 72 11 2 3 16 4 4 4 6 4 4 13 4 10 13 5 6 2 11 7 125 1 2 6 11 8 10 20 4 5 8 4 10 4 7 8 7 2,126 539 7 1 2 15 6 5 2 CMI 11 936 192 342 1,404 720 99 782 144 256 800 108 48 474 20 232 663 200 100 702 445 360 154 781 217 1,125 4 52 432 77 24 1,870 640 220 325 440 72 1,520 424 357 544 924 21,260 539 42 127 158 3,735 1,008 645 942 L-Bar 11 117 64 114 234 10 9 391 48 16 200 27 12 79 5 58 51 50 10 54 89 60 77 71 31 9 4 26 72 7 3 187 44 55 65 55 18 152 106 51 68 132 10 1 6 127 79 249 168 129 471 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 8/29/2014 CI CMI 4 4 12 2 8 4 10 1 5 1 1 4 1 5 1 97 15 2 1 3 10 6 6 2 2 7 3 2 11 7 2 2 5 3 4 10 1 4 7 4 5 8 3 2 3 8 6 1 5 4 8 444 652 1,008 130 704 784 1,700 227 1,045 402 86 8 311 315 128 3,589 1,620 18 32 99 30 264 318 102 82 1,414 825 932 110 791 288 214 1,140 141 76 2,390 139 244 280 76 365 280 282 162 228 160 594 32 650 224 792 L-Bar 111 163 84 65 88 196 170 227 209 402 86 2 311 63 128 37 108 9 32 33 3 44 53 51 41 202 275 466 10 113 144 107 228 47 19 239 139 61 40 19 73 35 94 81 76 20 99 32 130 56 99 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 8/29/2014 8/29/2014 8/29/2014 8/30/2014 8/30/2014 8/30/2014 8/30/2014 8/30/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 CI CMI 4 1 5 3 4 1 1 2 859 1 2 6 6 12 15 31 10 1 36 3 6 12 1 28 8 16 3 1 1 4 4 7 5 23 1 14 10 3 18 8 2 2 10 4 2 11 6 6 6 3 2 472 330 290 747 864 112 261 64 12,885 178 214 648 606 2,292 1,110 806 1,140 55 11,196 132 810 492 108 6,552 808 5,008 123 129 72 8 312 2,345 25 3,085 156 1,316 140 486 1,026 560 100 120 20 136 38 539 510 510 1,224 243 420 L-Bar 118 330 58 249 216 112 261 32 15 178 107 108 101 191 74 26 114 55 311 44 135 41 108 234 101 313 41 129 72 2 78 335 5 140 156 94 14 162 57 70 50 60 2 34 19 49 85 85 204 81 210 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/2/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 CI CMI 8 4 6 31 4 4 4 44 11 53 7 4 1 4 1 3 8 6 20 17 30 6 10 11 6 3 7 40 1 9 8 5 3 2 2 59 47 57 13 2 1 5 7 9 1 34 1 12 5 6 3 312 504 966 4,681 148 204 784 880 825 11,183 448 776 101 228 27 135 1,048 654 8,760 2,227 2,670 948 530 330 750 126 469 4,400 38 423 416 1,035 153 292 828 5,133 3,995 4,845 1,105 2 132 315 812 1,593 109 10,880 94 576 225 504 381 L-Bar 39 126 161 151 37 51 196 20 75 211 64 194 101 57 27 45 131 109 438 131 89 158 53 30 125 42 67 110 38 47 52 207 51 146 414 87 85 85 85 1 132 63 116 177 109 320 94 48 45 84 127 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 CI CMI 9 12 12 9 21 42 5 3 22 5 2 8 1 12 7 8 1 1 1 1 3 1 8 1 12 4 8 28 11 2 4 5 4 6 1 6 6 7 6 2 9 1 9 1 2 5 1 9 7 7 2 45 1,356 480 243 3,360 2,856 525 249 1,518 535 8 1,072 115 192 98 696 72 334 121 89 261 83 48 74 432 240 56 10,220 33 140 444 755 424 618 24 696 222 259 540 232 117 134 450 124 184 220 98 18 581 497 214 L-Bar 5 113 40 27 160 68 105 83 69 107 4 134 115 16 14 87 72 334 121 89 87 83 6 74 36 60 7 365 3 70 111 151 106 103 24 116 37 37 90 116 13 134 50 124 92 44 98 2 83 71 107 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/3/2014 9/4/2014 9/4/2014 9/4/2014 CI CMI 2 3 11 10 11 11 10 6 30 6 3 1 3 16 3 12 12 15 12 23 20 11 14 25 5 13 2 3 28 9 8 2 4 2 10 27 11 2 9 2 1 2 1 8 13 2 1 11 1 2 2 90 555 407 310 330 319 1,010 552 1,650 798 120 73 126 928 294 12 708 720 69 9,430 8,160 4,477 5,684 11,550 30 832 216 204 1,288 45 32 316 344 100 100 1,728 77 240 90 312 188 112 43 544 1,209 412 209 880 107 34 22 L-Bar 45 185 37 31 30 29 101 92 55 133 40 73 42 58 98 1 59 48 36 410 408 407 406 462 6 64 108 68 46 5 4 158 86 50 10 64 7 120 10 156 188 56 43 68 93 206 209 80 107 17 11 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 CI CMI 1 16 1 16 3 7 2 12 2 8 1 3 1 2 1 2 1 1 8 2 19 1 9 11 8 12 6 16 12 14 8 19 4 2 1 15 4 5 21 6 33 32 6 15 3 7 8 2 10 7 5 4 1,792 631 1,504 96 833 200 576 124 1,928 278 207 151 184 76 162 66 22 952 222 665 432 909 704 944 516 192 532 156 1,680 488 2,033 756 200 75 1,185 316 290 4,032 198 8,283 1,568 192 1,350 480 56 1,032 318 360 1,820 105 L-Bar 4 112 631 94 32 119 100 48 62 241 278 69 151 92 76 81 66 22 119 111 35 432 101 64 118 43 32 56 13 120 61 107 189 100 75 79 79 58 196 33 251 49 32 90 160 8 129 159 36 260 21 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED Date 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/4/2014 9/5/2014 9/5/2014 CI 9 2 5 4 6 2 4 6 8 3 8 25 7 9 12 7 1 8 8 3 2 8 11 21 4 2 6 2 5 12 4 2 1 6 9 11 6 7 15 14 7 8 10 1 5 16 2 2,638 9 1 1 CMI 306 84 15 88 1,704 130 640 396 680 75 256 1,575 406 1,215 264 35 202 712 704 195 154 848 1,617 588 556 14 126 130 15 252 536 96 93 1,032 288 143 78 84 180 168 350 1,648 950 177 55 2,736 920 10,552 441 102 29 L-Bar 34 42 3 22 284 65 160 66 85 25 32 63 58 135 22 5 202 89 88 65 77 106 147 28 139 7 21 65 3 21 134 48 93 172 32 13 13 12 12 12 50 206 95 177 11 171 460 4 49 102 29 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 CI CMI 2 4 8 2 5 1 18 1 5 8 9 13 4 1 1 12 3 5 1 1 34 2 9 10 3 18 3 3 1 18 30 10 9 8 3 3 10 2 3 3 2 4 6 2 18 11 7 7 8 1 5 180 504 1,104 424 805 152 1,134 12 240 1,144 918 1,287 516 74 102 2,196 282 450 17 196 11,458 302 927 420 54 2,484 270 126 93 1,368 2,550 1,080 549 608 120 120 900 914 294 297 208 336 522 102 198 220 378 336 480 102 110 L-Bar 90 126 138 212 161 152 63 12 48 143 102 99 129 74 102 183 94 90 17 196 337 151 103 42 18 138 90 42 93 76 85 108 61 76 40 40 90 457 98 99 104 84 87 51 11 20 54 48 60 102 22 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/5/2014 9/6/2014 9/6/2014 9/6/2014 9/6/2014 9/6/2014 9/7/2014 9/7/2014 9/7/2014 9/7/2014 9/7/2014 9/7/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 CI CMI 2 8 35 3 1 5 7 5 13 11 1 5 14 8 12 14 1 66 1 5 4 16 1 8 2 1 2 1 9 5 16 2 1 1 1 1 1 166 9 1 10 1 1 1 11 1 15 17 3 4 18 208 456 315 378 25 745 532 845 2,379 242 129 2,585 1,064 584 588 560 69 4,488 49 250 56 1,744 44 312 198 35 26 116 54 35 368 178 1 136 145 14 35 7,968 3,357 48 310 56 68 137 165 83 2,685 1,258 3 484 3,600 L-Bar 104 57 9 126 25 149 76 169 183 22 129 517 76 73 49 40 69 68 49 50 14 109 44 39 99 35 13 116 6 7 23 89 1 136 145 14 35 48 373 48 31 56 68 137 15 83 179 74 1 121 200 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 CI CMI 8 1 16 1 1 6 6 7 8 4 1 2 1 7 6 1 2 2 1 3 17 1 6 12 4 1 12 15 8 15 6 8 1 1 5 4 3 10 5 4 8 8 18 14 13 1 13 20 1 10 6 24 116 1,376 27 40 390 720 763 872 288 133 310 146 714 1,842 126 24 170 64 657 17 106 828 276 236 101 720 2,640 664 1,005 1,416 1,216 88 178 1,260 360 195 90 895 276 104 1,344 1,332 966 312 208 962 1,460 111 1,050 378 L-Bar 3 116 86 27 40 65 120 109 109 72 133 155 146 102 307 126 12 85 64 219 1 106 138 23 59 101 60 176 83 67 236 152 88 178 252 90 65 9 179 69 13 168 74 69 24 208 74 73 111 105 63 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/8/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 CI CMI 2 7 4 3 6 13 16 9 17 1 7 3 6 8 8 11 2 2 17 4 1 1 6 6 3 2 6 9 1 13 2 5 1 1 147 1 22 1 18 9 1 9 10 8 9 1 2 2 2 2 1 362 329 300 99 108 871 1,072 954 1,258 60 112 474 552 312 272 671 10 78 1,071 616 354 136 630 72 138 360 456 1,116 93 195 40 350 30 69 12,054 98 1,980 91 1,656 873 58 1,062 630 400 1,773 252 152 154 846 232 116 L-Bar 181 47 75 33 18 67 67 106 74 60 16 158 92 39 34 61 5 39 63 154 354 136 105 12 46 180 76 124 93 15 20 70 30 69 82 98 90 91 92 97 58 118 63 50 197 252 76 77 423 116 116 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 CI CMI 7 7 14 1 1 3 2 5 6 17 17 2 1 8 3 1 3 1 11 5 6 2 3 6 10 5 8 2 1 3 18 9 6 7 6 7 6 5 6 2 11 7 8 3 9 2 9 1 3 10 9 595 147 1,792 556 42 228 310 25 876 51 714 380 75 120 366 89 75 51 605 265 144 216 21 1,038 160 235 2,144 300 89 1,029 1,296 2,331 558 2,324 462 980 342 100 294 74 1,309 98 344 603 270 96 594 144 297 2,040 315 L-Bar 85 21 128 556 42 76 155 5 146 3 42 190 75 15 122 89 25 51 55 53 24 108 7 173 16 47 268 150 89 343 72 259 93 332 77 140 57 20 49 37 119 14 43 201 30 48 66 144 99 204 35 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/9/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 CI CMI 81 6 1 1 2 3 10 2 1 6 4 4 11 12 8 4 11 2 1 6 6 8 1 1 7 8 1 1 2 1 3 22 7 7 1 6 24 7 2 3 8 2 6 7 31 54 5 1 21 20 5 6,561 66 122 65 58 585 30 84 101 216 240 184 506 828 384 860 869 196 187 468 36 1,304 57 34 1,092 176 103 182 154 168 129 3,102 462 2,506 115 486 2,448 1,750 158 537 488 530 114 1,218 992 3,294 235 59 777 2,460 375 L-Bar 81 11 122 65 29 195 3 42 101 36 60 46 46 69 48 215 79 98 187 78 6 163 57 34 156 22 103 182 77 168 43 141 66 358 115 81 102 250 79 179 61 265 19 174 32 61 47 59 37 123 75 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 CI CMI 2 1 1 37 2 4 6 6 1 12 7 5 9 7 4 1 2 14 5 5 5 4 4 1 1 12 6 4 1 4 10 19 1 4 8 7 3 1 20 1 4 6 9 2 2 5 16 7 8 1 18 134 168 101 1,332 302 600 810 708 160 3,237 112 515 477 182 68 134 312 1,134 410 505 1,105 264 508 105 69 1,104 228 372 206 664 1,610 2,014 102 520 368 721 474 74 5,320 49 788 438 459 156 96 350 48 490 1,504 58 342 L-Bar 67 168 101 36 151 150 135 118 160 275 16 103 53 26 17 134 156 81 82 101 221 66 127 105 69 92 38 93 206 166 161 106 102 130 46 103 158 74 266 49 197 73 51 78 48 70 3 70 188 58 19 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/10/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 CI CMI 2 17 3 2 4 1 2 6 1 2 4 2 24 1 4 2 1 2 6 1 1 4 28 1 7 2 3 1 5 9 2 3 2 6 10 1 9 2 7 5 16 8 4 1 1 7 7 4 7 26 3 294 3,230 261 176 224 64 204 576 52 130 364 86 1,608 107 496 84 7 458 342 115 5 152 2,296 148 994 106 339 92 335 1,242 214 129 82 510 750 45 522 260 133 135 2,608 104 472 72 166 119 168 492 28 156 234 L-Bar 147 190 87 88 56 64 102 96 52 65 91 43 67 107 124 42 7 229 57 115 5 38 82 148 142 53 113 92 67 138 107 43 41 85 75 45 58 130 19 27 163 13 118 72 166 17 24 123 4 6 78 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 CI CMI 29 2 5 30 1 6 35 8 1 7 2 1 3 15 3 16 6 6 7 2 6 2 6 22 29 4 14 4 4 9 3 11 1 11 2 1 44 1 5 1 3 2 20 9 12 6 3 4 16 2 2 4,321 188 140 4,320 320 66 560 40 150 350 324 84 234 240 147 1,616 936 258 42 272 426 334 90 946 957 272 280 24 128 675 252 1,034 44 1,001 170 145 10,640 76 215 81 660 118 540 486 768 330 231 432 1,520 48 334 L-Bar 149 94 28 144 320 11 16 5 150 50 162 84 78 16 49 101 156 43 6 136 71 167 15 43 33 68 20 6 32 75 84 94 44 91 85 145 299 76 43 81 220 59 27 54 64 55 77 108 95 24 167 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/11/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 CI CMI 15 4 1 9 2 13 1 2 4 11 6 9 3 4 20 1 4 9 6 10 3 1 9 1 2 1 3 18 6 16 8 3 100 8 7 1 1 1 7 1 1 108 6 4 4 1 9 8 7 2 64 180 376 65 828 196 1,417 56 182 116 1,232 468 738 567 228 220 102 144 711 654 780 111 31 414 229 28 208 186 3,168 366 640 304 57 10,000 472 763 98 76 114 532 153 162 18,468 30 300 544 30 504 16 294 112 34,944 L-Bar 12 94 65 92 98 109 56 91 29 112 78 82 189 57 11 102 36 79 109 78 37 31 46 229 14 208 62 176 61 40 38 19 100 59 109 98 76 114 76 153 162 171 5 75 136 30 56 2 42 56 546 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED Date 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/12/2014 CI CMI 5 9 1 4 52 9 6 57 28 1 2 2 1 13 1 5 6 7 1 22 2 1 2 3 3 3 7 12 3 9 12 7 6 5 6 4 6 16 1 8 2 1 3 2 12 4 22 1 1 2 14 500 333 486 296 1,300 549 330 114 3,136 134 8 4 182 1,638 29 155 294 266 23 2,244 166 29 56 324 768 171 476 264 81 432 456 231 132 40 42 12 24 368 15 40 120 33 84 112 72 152 1,188 6 311 6 154 L-Bar 100 37 486 74 25 61 55 2 112 134 4 2 182 126 29 31 49 38 23 102 83 29 28 108 256 57 68 22 27 48 38 33 22 8 7 3 4 23 15 5 60 33 28 56 6 38 54 6 311 3 11 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/12/2014 9/12/2014 9/12/2014 9/12/2014 9/13/2014 9/13/2014 9/13/2014 9/13/2014 9/13/2014 9/13/2014 9/13/2014 9/13/2014 9/13/2014 9/14/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 CI 1 1 4 1 11 1,108 9 8 1 3 2 1 1,796 9 2 4 4 4 3 6 1 13 7 17 8 4 7 16 1 1 3 11 1 3 3 1 2 15 4 3 6 6 7 2 10 2 11 21 9 39 1 CMI 57 76 8 43 572 23,268 225 696 69 39 238 29 43,104 1,782 634 1,104 1,108 1,108 831 1,722 286 3,588 770 255 368 44 1,365 1,312 36 264 78 187 56 129 114 40 300 1,290 452 123 384 156 651 294 1,890 130 1,540 1,365 1,629 2,223 7 L-Bar 57 76 2 43 52 21 25 87 69 13 119 29 24 198 317 276 277 277 277 287 286 276 110 15 46 11 195 82 36 264 26 17 56 43 38 40 150 86 113 41 64 26 93 147 189 65 140 65 181 57 7 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 CI CMI 2 1 4 1 1 2 3 3 9 9 2 11 8 2 14 2 8 16 5 9 3 4 7 2 8 9 7 46 12 3 6 8 3 11 12 11 8 132 10 3 7 8 33 2 8 8 10 4 21 6 8 358 57 884 166 206 478 132 426 324 9 190 1,001 608 798 1,036 12 1,392 512 155 630 690 640 385 124 880 153 637 4,140 1,212 69 684 536 363 418 636 682 1,520 4,752 420 336 903 1,160 1,782 320 616 456 750 128 1,533 390 488 L-Bar 179 57 221 166 206 239 44 142 36 1 95 91 76 399 74 6 174 32 31 70 230 160 55 62 110 17 91 90 101 23 114 67 121 38 53 62 190 36 42 112 129 145 54 160 77 57 75 32 73 65 61 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/15/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 CI CMI 6 8 3 17 2 1 1 1 2 3 1 9 8 8 1 3 6 3 3 13 6 6 4 14 3 3 3 18 1 1 1 1 1 9 2 12 7 12 5 1 1 2 6 6 8 1 1 1 1 2 12 18 592 90 935 48 165 87 293 234 240 135 2,115 456 928 569 267 870 336 183 1,001 492 222 1,244 168 531 306 363 4,410 535 43 153 38 238 495 324 3,036 294 276 180 86 230 2 1,056 312 368 139 19 574 32 56 3,252 L-Bar 3 74 30 55 24 165 87 353 117 80 135 235 57 116 569 89 145 112 61 77 82 37 311 12 177 102 121 255 535 43 153 38 238 55 162 253 42 23 36 86 230 1 176 52 46 139 19 574 32 28 271 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 CI CMI 2 24 12 80 16 18 14 6 9 6 2 12 3 12 1 7 3 1 1 1 2 5 10 1 4 3 21 11 1 16 26 2 2 2 10 12 10 1 14 5 9 1 9 25 2 12 2 1 11 8 8 184 1,224 732 4,400 816 1,350 1,162 342 504 114 362 888 87 888 105 378 222 36 76 34 106 365 440 1 224 105 3,213 1,045 136 1,808 3,146 62 70 298 1,090 456 380 353 1,442 645 1,368 56 441 1,200 184 312 122 30 583 344 640 L-Bar 92 51 61 55 51 75 83 57 56 19 181 74 29 74 105 54 74 36 76 34 53 73 44 1 56 35 153 95 136 113 121 31 35 149 109 38 38 353 103 129 152 56 49 48 92 26 61 30 53 43 80 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/16/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 CI CMI 4 5 3 3 2 13 7 59 1 6 7 4 1 7 6 4 10 1 1 16 1 8 1 4 1 1 4 1 3 9 1 1 5 7 7 33 16 11 7 16 4 2 1 100 5 8 9 4 6 8 1 140 160 222 75 34 650 301 8,319 51 108 574 216 36 161 30 584 50 85 53 192 129 1,168 219 688 166 106 176 98 525 657 84 233 525 504 1,134 14,949 3,904 2,618 483 1,017 408 846 94 11,400 95 856 1,728 52 162 2,152 68 L-Bar 35 32 74 25 17 50 43 141 51 18 82 54 36 23 5 146 5 85 53 12 129 146 219 172 166 106 44 98 175 73 84 233 105 72 162 453 244 238 69 144 102 423 94 114 19 107 192 13 27 269 68 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 CI CMI 1 8 5 1 80 1 2 1 4 25 4 8 6 12 2 28 2 2 40 1 6 9 11 1 1 12 1 1 8 93 4 1 4 7 5 9 15 9 1 12 1 2 6 12 4 5 9 1 1 5 6 150 624 1,205 83 4,160 149 14 306 140 8,275 1,384 296 516 1,476 110 2,800 94 132 2,420 120 564 81 2,255 221 56 288 94 184 1,736 4,371 364 183 580 406 1,405 1,863 825 441 116 372 81 66 2,142 612 576 585 45 138 70 45 378 L-Bar 150 78 241 83 52 149 7 306 35 331 346 37 86 123 55 100 47 66 222 120 94 9 205 221 56 24 94 184 217 47 91 183 145 58 281 207 55 49 116 31 81 33 357 51 144 117 5 138 70 9 63 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/17/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 CI CMI 2 1 3 14 8 10 4 23 12 21 1 42 100 14 19 1 1 4 4 7 8 3 7 7 1 6 3 3 1 6 8 1 2 2 3 1 12 34 35 22 1 1 17 8 1 1 7 10 21 11 8 154 24 180 952 728 750 344 8,510 684 2,163 66 1,050 3,000 686 817 80 26 480 560 1,134 672 408 490 126 88 888 1,047 288 750 480 944 232 378 223 234 28 576 10,336 4,830 3,234 28 151 1,003 1,176 168 7 427 260 2,142 2,992 392 L-Bar 77 24 60 68 91 75 86 370 57 103 66 25 30 49 43 80 26 120 140 162 84 136 70 18 88 148 349 96 750 80 118 232 189 138 78 28 48 304 138 147 28 151 59 147 168 7 61 26 102 272 49 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 CI CMI 4 15 7 4 7 25 2 4 4 1 1 2 1 12 3 5 3 4 3 1 1 1 81 15 5 3 1 1 7 6 5 4 16 1 22 3 23 16 1 81 4 1 1 4 4 1 1 6 18 1 4 192 2,175 7 680 1,505 500 28 52 188 73 476 920 134 360 885 595 1,395 1,856 1,392 14 12 126 4,455 570 560 33 50 15 973 666 630 440 2,112 130 4,158 252 3,151 3,152 14 9,153 104 140 327 312 200 224 40 24 612 154 836 L-Bar 48 145 1 170 215 20 14 13 47 73 476 460 134 30 295 119 465 464 464 14 12 126 55 38 112 11 50 15 139 111 126 110 132 130 189 84 137 197 14 113 26 140 347 78 50 224 40 4 34 154 209 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/18/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 CI CMI 36 6 2 6 2 1 1 1 5 7 3 6 1 1 1 14 6 29 1 2 35 3 6 4 12 6 5 2 19 4 4 1 1 8 8 1 7 72 1 2 5 18 4 2 1 13 8 17 4 7 7 3,564 522 10 1,674 230 74 55 259 470 168 171 204 4 5 4 1,456 708 3,422 104 52 1,085 78 72 196 984 480 70 6 1,862 168 340 70 48 168 240 194 1,897 7,560 42 264 310 3,078 56 188 205 1,157 2,768 935 124 434 14 L-Bar 99 87 5 279 115 74 55 259 94 24 57 34 4 5 4 104 118 118 104 26 31 26 12 49 82 80 14 3 98 42 85 70 48 21 30 194 271 105 42 132 62 171 14 94 205 89 346 55 31 62 2 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 9/19/2014 CI CMI 12 1 8 6 8 164 2 2 1 4 6 15 4 8 2 4 8 5 79 35 51 1 1 10 4 2 2 8 2 1 8 21 16 1 12 8 1 8 9 9 1 9 4 9 14 9 1 1 7 1 3 36 86 856 12 608 53,956 282 2 92 172 486 1,140 644 1,304 278 480 168 620 12,008 3,255 4,896 50 82 810 104 140 308 328 536 58 904 126 80 61 228 136 151 96 243 18 115 261 52 1,395 14 99 34 65 7 197 69 L-Bar 3 86 107 2 76 329 141 1 92 43 81 76 161 163 139 120 21 124 152 93 96 50 82 81 26 70 154 41 268 58 113 6 5 61 19 17 151 12 27 2 115 29 13 155 1 11 34 65 1 197 23 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/19/2014 9/19/2014 9/19/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/20/2014 9/21/2014 9/21/2014 9/21/2014 9/21/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 CI CMI 6 51 1 1 8 9 11 5 1 11 15 1 1 1 1 1 1 6 10 2 7 3 35 1 15 9 7 19 4 23 3 2 2 8 11 9 16 1 1 5 15 2 22 13 3 8 9 149 4 10 1 366 4,488 208 251 1,696 1,755 2,200 45 160 154 3,705 57 412 113 47 188 310 480 4,550 140 826 123 12,985 178 2,589 1,350 1,127 4,617 32 2,162 69 650 754 456 88 216 8,144 255 83 400 2,580 310 3,058 2,171 204 232 3,924 19,370 164 970 105 L-Bar 61 88 208 251 212 195 200 9 160 14 247 57 412 113 47 188 310 80 455 70 118 41 371 178 430 150 161 243 8 94 23 325 377 57 8 24 509 255 83 80 172 155 139 167 68 29 436 130 41 97 105 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/22/2014 CI CMI 3 8 8 1 4 3 2 2 11 8 2 1 1 1 1 9 9 1 9 10 1 25 2 9 3 9 1 3 10 11 8 1 7 16 15 8 7 11 4 1 5 1 1 16 8 10 12 4 5 11 1 318 176 168 103 728 1,062 150 108 154 408 458 129 274 512 33 27 27 62 27 30 46 3,075 326 468 369 189 80 189 760 1,188 1,440 242 497 848 3,975 1,072 21 44 376 136 185 129 156 224 72 1,000 828 64 795 187 25 L-Bar 106 22 21 103 182 354 75 54 14 51 229 129 274 512 33 3 3 62 3 3 46 123 163 52 123 21 80 63 76 108 180 242 71 53 265 134 3 4 94 136 37 129 156 14 9 100 69 16 159 17 25 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/22/2014 9/22/2014 9/22/2014 9/22/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 CI 1 6 2,411 1 10 7 2 1 7 12 10 12 1 1 8 6 2 8 1 1 5 36 1 5 3 1 31 6 1 6 3 1 21 1 6 9 9 2 26 1 4 2 36 1 98 14 4 2 1 11 6 CMI 29 78 55,453 184 980 441 206 178 462 2,016 440 408 166 185 288 318 326 840 99 54 980 13,392 341 2,670 1,914 656 2,015 984 83 990 1,878 634 2,079 647 420 450 882 72 3,172 170 196 46 12,816 250 13,818 1,456 16 110 77 1,012 42 L-Bar 29 13 23 184 98 63 103 178 66 168 44 34 166 185 36 53 163 105 99 54 196 372 341 534 638 656 65 164 83 165 626 634 99 647 70 50 98 36 122 170 49 23 356 250 141 104 4 55 77 92 7 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/23/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 CI CMI 14 3 3 7 9 1 6 9 3 14 4 11 8 12 10 7 1 6 5 25 8 21 11 22 8 6 3 5 3 5 2 2 3 35 6 6 1 1 11 392 9 14 1 8 5 6 13 16 1 3 1 868 219 732 462 873 243 84 513 99 980 848 1,089 1,520 984 2,310 434 103 846 45 3,150 712 126 1,397 1,870 728 24 306 70 360 60 158 18 426 1,715 186 678 256 44 1,122 13,720 1,278 1,022 89 1,072 400 336 1,118 5,632 68 390 15 L-Bar 62 73 244 66 97 243 14 57 33 70 212 99 190 82 231 62 103 141 9 126 89 6 127 85 91 4 102 14 120 12 79 9 142 49 31 113 256 44 102 35 142 73 89 134 80 56 86 352 68 130 15 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/24/2014 CI CMI 10 8 5 3 6 8 11 32 9 2 8 2 10 5 13 4 6 6 2 10 6 6 4 7 2 2 8 1 24 5 4 1 12 2 6 5 7 9 8 2 4 6 10 8 5 4 2 3 1 12 26 150 640 280 627 834 1,672 935 12,096 783 636 176 112 1,240 235 1,547 456 456 576 202 1,060 636 636 264 1,015 462 434 320 115 3,504 110 248 265 168 416 654 420 658 621 184 320 340 312 1,340 296 580 772 102 204 135 2,136 2,808 L-Bar 15 80 56 209 139 209 85 378 87 318 22 56 124 47 119 114 76 96 101 106 106 106 66 145 231 217 40 115 146 22 62 265 14 208 109 84 94 69 23 160 85 52 134 37 116 193 51 68 135 178 108 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/24/2014 9/24/2014 9/24/2014 9/24/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 CI 1 1 1 1 8 1,636 1 1 1 9 9 1 1 3 7 4 11 1 1 8 6 8 5 2 1 7 10 10 1 17 21 2 1 4 9 3 1 22 6 1 9 11 3 5 5 1 31 3 14 3 11 CMI 62 142 177 7 960 39,264 114 405 49 711 549 113 144 525 1,099 496 605 54 86 304 180 368 420 244 156 21 490 950 229 765 735 206 89 812 576 429 309 682 1,250 113 1,116 33 369 265 2,485 50 4,526 99 840 183 33 L-Bar 62 142 177 7 120 24 114 405 49 79 61 113 144 175 157 124 55 54 86 38 30 46 84 122 156 3 49 95 229 45 35 103 89 203 64 143 309 31 312 113 124 3 123 53 497 50 146 33 60 61 3 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 CI CMI 9 1 11 23 13 24 1 1 5 5 1 4 24 3 5 1 2 4 1 7 2 2 6 16 1 10 10 3 12 2 10 1 7 17 1 18 23 3 8 1 8 7 24 15 22 4 5 1 2 12 5 36 101 594 2,645 1,209 3,240 191 203 205 270 35 76 1,296 135 50 107 134 196 101 322 154 238 144 1,024 83 440 10 30 720 196 1,030 156 287 782 216 900 138 426 8 90 192 203 1,464 15 506 248 25 192 42 276 825 L-Bar 4 101 54 115 93 135 191 203 41 54 35 19 54 45 10 107 67 49 101 46 77 119 24 64 83 44 1 10 60 98 103 156 41 46 216 50 6 142 1 90 24 29 61 1 23 62 5 192 21 23 165 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/25/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 CI 5 2 3 2 9 4 6 5 3 13 7 3 5 13 12 1 24 10 2 3 3 8 630 1 4 2,085 1 1 6 15 1 150 1 3 3 7 26 1 11 5 38 2 44 24 6 1 7 4 2 34 1 CMI 705 768 3 100 18 44 306 70 105 130 224 519 205 923 2,244 80 4,944 860 282 117 549 720 10,710 111 340 20,850 186 121 48 1,320 97 33,450 78 240 873 35 5,434 66 583 200 4,104 116 4,400 4,080 36 117 1,897 360 168 3,366 115 L-Bar 141 384 1 50 2 11 51 14 35 10 32 173 41 71 187 80 206 86 141 39 183 90 17 111 85 10 186 121 8 88 97 223 78 80 291 5 209 66 53 40 108 58 100 170 6 117 271 90 84 99 115 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/26/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/27/2014 9/28/2014 9/28/2014 9/28/2014 9/29/2014 9/29/2014 9/29/2014 CI CMI 7 13 9 1 4 12 4 6 3 10 1 4 4 6 7 8 7 5 5 8 1 3 25 23 4 14 1 1 6 6 5 1 2 1 104 1 4 4 1 20 9 3 2 1 1 5 10 4 2 1 7 700 676 630 115 604 192 564 840 333 520 38 276 792 648 700 368 238 135 310 472 53 81 2,550 4,071 508 686 73 81 498 108 180 119 692 227 34,424 95 116 836 64 1,900 783 960 276 174 80 875 2,340 332 128 278 168 L-Bar 100 52 70 115 151 16 141 140 111 52 38 69 198 108 100 46 34 27 62 59 53 27 102 177 127 49 73 81 83 18 36 119 346 227 331 95 29 209 64 95 87 320 138 174 80 175 234 83 64 278 24 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 CI CMI 28 2 1 9 12 1 1 16 2 3 5 2 29 19 2 4 2 12 2 7 14 14 8 8 1 2 3 3 3 4 10 3 11 11 2 22 10 6 10 3 2 4 1 4 2 2 4 5 12 2 7 5,404 182 122 90 1,284 7 115 192 26 153 560 130 4,089 2,546 66 216 56 156 82 539 2,604 994 96 616 165 838 726 372 315 576 910 150 110 2,123 88 3,608 50 1,170 180 45 378 36 180 116 222 36 444 425 180 76 175 L-Bar 193 91 122 10 107 7 115 12 13 51 112 65 141 134 33 54 28 13 41 77 186 71 12 77 165 419 242 124 105 144 91 50 10 193 44 164 5 195 18 15 189 9 180 29 111 18 111 85 15 38 25 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/29/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 CI CMI 6 38 8 2 1 25 4 13 3 1 8 6 1 3 1 12 1 10 1 4 1 1 2 2 10 4 2 5 13 22 15 13 11 1 4 1 20 1 1 9 3 8 16 5 1 5 1 1 25 1 1 462 3,420 720 110 74 3,175 824 598 291 54 216 312 121 363 121 24 152 240 456 248 116 76 140 84 1,650 60 182 5 767 1,914 315 2,158 121 144 380 45 1,940 241 15 1,494 342 2,672 672 400 236 220 15 163 4,125 273 280 L-Bar 77 90 90 55 74 127 206 46 97 54 27 52 121 121 121 2 152 24 456 62 116 76 70 42 165 15 91 1 59 87 21 166 11 144 95 45 97 241 15 166 114 334 42 80 236 44 15 163 165 273 280 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 CI CMI 2 1 4 10 2 1 6 7 5 5 13 10 19 4 1 7 15 9 4 1 3 10 3 30 29 1 4 1 13 13 7 14 3 1 2 1 118 1 3 10 1 9 5 3 7 1 23 2 9 6 4 78 218 220 1,360 266 350 636 1,043 555 1,195 897 410 3,781 616 190 889 780 198 48 176 234 1,020 363 4,050 4,002 209 216 201 1,456 52 217 1,190 333 65 130 65 13,806 52 750 1,690 18 1,539 490 135 231 66 4,623 128 1,125 696 108 L-Bar 39 218 55 136 133 350 106 149 111 239 69 41 199 154 190 127 52 22 12 176 78 102 121 135 138 209 54 201 112 4 31 85 111 65 65 65 117 52 250 169 18 171 98 45 33 66 201 64 125 116 27 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 9/30/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 CI CMI 21 2 9 3 19 4 11 5 3 6 1 34 49 1 3 3 1 2 3 15 8 3 1 13 28 2 1 2 10 2 1 1 6 2 10 1 1 7 14 28 1 3 5 8 1 5 4 14 1 25 2 399 188 1,251 99 2,299 444 1,133 135 180 504 64 4,590 147 37 249 267 105 312 177 765 80 81 156 65 2,800 24 50 114 1,000 158 257 100 1,806 136 1,000 89 334 539 560 6,440 444 318 910 596 20 785 688 700 264 3,725 124 L-Bar 19 94 139 33 121 111 103 27 60 84 64 135 3 37 83 89 105 156 59 51 10 27 156 5 100 12 50 57 100 79 257 100 301 68 100 89 334 77 40 230 444 106 182 135 20 157 172 50 264 149 62 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 CI CMI 6 8 2 1 4 6 62 8 1 1 40 27 4 8 22 6 6 2 2 1 3 2 2 3 10 2 4 6 20 2 7 12 2 4 3 3 2 7 1 1 10 8 8 13 8 3 10 2 1 1 15 528 1,064 220 222 48 156 14,942 368 121 143 6,880 4,644 164 712 2,442 1,182 840 222 92 32 387 44 168 54 1,920 296 384 96 6,840 62 203 3,360 894 1,720 1,287 510 130 35 88 77 1,000 264 256 884 72 258 950 14 50 58 1,245 L-Bar 88 133 110 222 12 26 241 46 121 143 172 172 41 89 111 197 140 111 46 32 129 22 84 18 192 148 96 16 342 31 29 280 447 430 429 170 65 5 88 77 100 33 32 68 9 86 95 7 50 58 83 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/1/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 CI CMI 24 7 3 26 1 8 4 1 1 9 7 6 10 3 15 9 1 2 25 1 14 1 13 7 7 1 1 5 10 9 5 14 22 13 8 1 7 10 21 12 3 6 5 4 8 40 1 17 5 7 2 1,584 469 324 6,708 96 480 388 123 150 648 406 66 620 168 1,095 234 113 246 4,725 143 140 140 897 1,540 301 110 109 5 1,070 594 665 1,064 2,816 2,314 4,808 36 1,057 1,630 3,948 1,176 3 1,194 490 184 808 4,720 127 1,275 220 154 698 L-Bar 66 67 108 258 96 60 97 123 150 72 58 11 62 56 73 26 113 123 189 143 10 140 69 220 43 110 109 1 107 66 133 76 128 178 601 36 151 163 188 98 1 199 98 46 101 118 127 75 44 22 349 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 CI CMI 2 24 11 10 4 9 4 4 12 7 1 1 13 7 1 3 2 4 2 6 6 3 10 18 2 2 5 87 1 1 1 2 2 11 4 2 10 2 9 2 10 2 2 3 1 1 1 31 3 17 1 144 3,552 1,386 1,110 240 1,899 24 244 1,644 826 75 305 1,131 1,246 38 81 134 900 498 342 18 357 1,030 1,152 580 118 1,515 20,793 58 101 60 152 102 979 492 38 2,320 128 72 172 1,390 348 96 537 3 5 167 992 255 1,377 70 L-Bar 72 148 126 111 60 211 6 61 137 118 75 305 87 178 38 27 67 225 249 57 3 119 103 64 290 59 303 239 58 101 60 76 51 89 123 19 232 64 8 86 139 174 48 179 3 5 167 32 85 81 70 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/2/2014 10/3/2014 CI CMI 1 4 1 8 9 25 8 1 7 8 1 7 1 20 749 4 1 4 17 9 7 15 53 7 11 1 1 9 7 24 8 6 3 4 3 4 2 6 3 1 1 1 306 14 7 980 1 1 6 1 1 7 628 2 336 234 2,350 1,184 18 791 168 44 497 143 3,080 6,741 372 78 168 1,445 936 1,498 1,305 106 56 649 101 102 171 763 2,328 112 990 204 36 150 536 252 288 153 109 101 116 1,530 2,254 2,513 1,960 83 340 1,392 347 77 L-Bar 7 157 2 42 26 94 148 18 113 21 44 71 143 154 9 93 78 42 85 104 214 87 2 8 59 101 102 19 109 97 14 165 68 9 50 134 126 48 51 109 101 116 5 161 359 2 83 340 232 347 77 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 CI 2 24 1 2 24 1 12 1 1 3 2 25 3 2 7 2 6 2 1 5 17 2 10 3 1 4 7 4 7 2 2 8 2 1 202 2,040 91 3 1 24 4 2 11 24 3 1 6 1 11 1 1 CMI 330 4,200 86 142 3,816 98 816 52 128 315 38 2,700 375 284 273 62 402 34 32 185 3,570 90 970 174 98 780 364 744 462 74 86 56 278 86 11,514 30,600 18,837 87 58 2,664 492 212 792 4,224 417 126 876 162 418 125 36 L-Bar 165 175 86 71 159 98 68 52 128 105 19 108 125 142 39 31 67 17 32 37 210 45 97 58 98 195 52 186 66 37 43 7 139 86 57 15 207 29 58 111 123 106 72 176 139 126 146 162 38 125 36 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/3/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/4/2014 10/5/2014 10/5/2014 10/5/2014 10/5/2014 10/5/2014 10/5/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 CI CMI 2 1 3 6 4 9 17 21 5 2 1 6 1 1 24 1 1 15 1 9 3 11 5 3 1 1 1 1 1 8 4 1 6 3 1 634 1 1 3 1 1 298 5 9 40 15 1 25 18 4 1 36 19 36 96 468 360 425 504 155 542 1 264 175 121 456 11 128 435 127 648 948 1,592 1,020 204 129 145 144 116 43 464 128 107 558 315 49 6,974 225 253 54 95 103 166,880 125 1,656 760 60 296 3,350 4,140 364 446 L-Bar 18 19 12 16 117 40 25 24 31 271 1 44 175 121 19 11 128 29 127 72 316 304 204 68 129 145 144 116 43 58 32 107 93 105 49 11 225 253 18 95 103 560 25 184 19 4 296 134 230 91 446 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 CI CMI 2 8 1 16 8 3 6 7 12 17 6 15 13 7 6 3 1 4 2 3 1 1 8 33 17 31 14 5 4 5 54 47 15 2 9 2 4 1 5 2 7 3 4 12 2 7 2 6 4 14 12 224 2,272 182 4,320 32 75 438 217 4,392 2,448 606 2,475 2,145 875 1,074 129 143 40 516 774 104 19 544 4,026 1,479 1,311 1,064 80 88 50 8,532 6,486 300 170 153 60 20 30 635 204 728 555 508 2,088 20 966 164 1,116 140 616 444 L-Bar 112 284 182 270 4 25 73 31 366 144 101 165 165 125 179 43 143 10 258 258 104 19 68 122 87 81 76 16 22 10 158 138 20 85 17 30 5 30 127 102 104 185 127 174 10 138 82 186 35 44 37 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 CI CMI 8 1 7 8 4 4 5 1 1 7 4 3 1 10 4 26 1 10 5 1 1 1 17 1 2 3 3 12 3 5 1 10 1 1 14 6 7 29 1 10 21 3 3 27 12 3 9 4 2 5 2 1,192 274 532 400 760 724 905 102 136 1,064 564 45 84 330 28 3,458 74 430 410 279 97 96 1,666 60 20 111 108 2,688 306 170 84 90 139 137 1,540 738 182 203 77 560 882 444 186 2,835 828 165 1,044 500 54 410 68 L-Bar 149 274 76 50 190 181 181 102 136 152 141 15 84 33 7 133 74 43 82 279 97 96 98 60 10 37 36 224 102 34 84 9 139 137 110 123 26 7 77 56 42 148 62 105 69 55 116 125 27 82 34 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/6/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 CI CMI 5 26 25 5 6 12 4 3 1 1 17 8 3 1 1 5 3 22 2 5 1 1 1 29 7 10 8 7 8 5 27 1 1 4 3 9 10 1 4 6 1 1 5 9 23 1 2 4 39 1 10 120 104 1,850 695 366 1,992 48 2,022 74 122 1,054 1,600 63 179 398 935 303 4,004 196 175 89 89 202 97 1,050 110 664 777 912 250 405 131 336 1,356 969 909 1,478 177 424 714 202 212 20 2,142 11,776 48 324 904 6,357 34 360 L-Bar 24 4 74 139 61 166 12 674 74 122 62 200 21 179 398 187 101 182 98 35 89 89 202 69 150 11 83 111 114 50 15 131 336 339 323 101 173 177 106 119 202 212 4 238 512 48 162 226 163 34 36 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 CI CMI 8 1 1 3 12 3 2 1 1 11 27 3 1 15 10 3 6 10 8 3 7 7 1 12 11 11 3 10 4 17 1 7 10 12 5 2 2 1 8 37 3 1 21 21 7 12 7 8 3 17 1 528 16 195 1,227 228 114 412 204 108 605 4,131 285 186 765 1,410 99 912 1,220 128 330 1,603 84 131 924 814 1,078 564 270 224 901 44 434 510 588 30 268 4 17 880 592 45 66 147 4,872 126 876 917 528 45 1,207 122 L-Bar 66 16 195 409 19 38 206 204 108 55 153 95 186 51 141 33 152 122 16 110 229 12 131 77 74 98 188 27 56 53 44 62 51 49 6 134 2 17 110 16 15 66 7 232 18 73 131 66 15 71 122 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/7/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 CI CMI 9 7 7 15 2 26 27 4 2 4 3 3 5 2 1 15 3 7 5 4 1 6 23 5 21 14 1 1 3 2 8 1 1 2 8 2 3 1 4 1 2 4 4 4 1 1 7 12 7 2 25 531 609 133 405 164 4,290 3,726 176 118 240 213 330 320 8 67 1,290 252 560 30 140 8 240 2,277 400 294 1,344 117 149 255 88 2,144 142 93 76 2,040 276 297 65 332 102 1,024 2,016 1,920 832 303 115 1,169 1,020 140 24 3,725 L-Bar 59 87 19 27 82 165 138 44 59 60 71 110 64 4 67 86 84 80 6 35 8 40 99 80 14 96 117 149 85 44 268 142 93 38 255 138 99 65 83 102 512 504 480 208 303 115 167 85 20 12 149 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 CI CMI 4 8 3 8 4 4 2 4 4 4 4 6 1 1 3 2 5 12 6 4 8 11 4 4 10 1 2 5 1 4 9 1 7 2 4 4 5 4 12 19 15 3 8 15 7 1 9 3 6 4 5 556 2,152 174 632 436 344 248 168 708 132 1,292 1,884 15 313 939 134 345 960 990 624 688 1,023 396 168 1,146 88 154 465 88 752 1,521 60 49 10 192 8 175 452 2,700 1,482 225 405 1,312 495 119 209 2,007 456 876 104 645 L-Bar 139 269 58 79 109 86 124 42 177 33 323 314 15 313 313 67 69 80 165 156 86 93 99 42 264 88 77 93 88 188 169 60 7 5 48 2 35 113 225 78 15 135 164 33 17 209 223 152 146 26 129 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/8/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 CI CMI 2 2 3 10 5 1 1 18 13 2 7 8 1 2 1 5 8 3 11 2 6 2 10 1 4 1 1 2 1 1 1 22 3 2 2 1 1 21 1 4 69 1 4 6 5 26 6 94 3 4 21 162 112 402 590 375 66 107 1,098 1,131 234 1,078 856 66 272 74 180 584 273 1,243 130 468 118 1,180 203 492 180 84 176 92 103 98 176 252 154 46 91 76 5,817 123 644 2,139 88 584 348 775 11,050 414 3,196 15 508 1,827 L-Bar 81 56 134 59 75 66 107 61 87 117 154 107 66 136 74 36 73 91 113 65 78 59 118 203 123 180 84 88 92 103 98 8 84 77 23 91 76 277 123 161 31 88 146 58 155 425 69 34 5 127 87 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 CI CMI 8 8 4 2 6 7 16 1 5 5 1 6 8 1 1 9 34 1 1 3 6 2 39 4 21 13 1 26 1 5 22 4 10 2 7 1 6 28 4 6 1 1 1 8 16 1 5 5 8 1 3 1,544 1,672 804 214 384 651 896 76 370 535 246 294 216 78 138 135 3,094 185 184 492 546 18 1,248 772 567 1,677 228 390 87 755 594 16 700 98 147 140 510 1,120 36 174 122 212 129 472 240 16 130 365 448 17 249 L-Bar 193 209 201 107 64 93 56 76 74 107 246 49 27 78 138 15 91 185 184 164 91 9 32 193 27 129 228 15 87 151 27 4 70 49 21 140 85 40 9 29 122 212 129 59 15 16 26 73 56 17 83 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 CI CMI 1 11 10 7 9 2 2 10 18 7 2 2 1 10 6 9 1 2 8 900 144 16 6 6 4 1 12 1 6 10 1 8 5 2 10 8 1 8 8 2 6 1 2 16 4 2 2 2 9 2 13 122 495 470 1,057 2,547 224 350 1,150 900 784 162 52 3 1,730 834 1,260 39 54 456 34,200 432 592 468 378 600 100 444 80 288 1,310 151 408 905 36 900 680 113 824 992 58 18 117 126 2,976 56 68 430 380 18 358 403 L-Bar 122 45 47 151 283 112 175 115 50 112 81 26 3 173 139 140 39 27 57 38 3 37 78 63 150 100 37 80 48 131 151 51 181 18 90 85 113 103 124 29 3 117 63 186 14 34 215 190 2 179 31 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/9/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 CI CMI 3 4 8 2 11 8 2 4 12 7 1 4 17 1 1 2 5 1 2 1 1 1 13 9 4 4 18 3 1 8 1 3 11 2 1 9 12 2 3 3 6 1 9 8 9 19 9 15 10 5 3 189 372 704 42 198 136 382 460 72 1,743 88 1,188 1,785 135 89 334 495 53 454 105 70 94 598 522 524 532 810 240 81 416 50 360 825 390 297 576 144 168 330 264 54 116 594 1,136 675 551 675 3,855 1,260 290 213 L-Bar 63 93 88 21 18 17 191 115 6 249 88 297 105 135 89 167 99 53 227 105 70 94 46 58 131 133 45 80 81 52 50 120 75 195 297 64 12 84 110 88 9 116 66 142 75 29 75 257 126 58 71 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/10/2014 10/11/2014 10/11/2014 CI CMI 1 6 7 2 2 4 17 2 12 2 5 42 1 8 16 6 1 1 1 8 3 10 3 49 3 1 2 5 18 10 2 6 1 4 1 7 2 6 2 4 7 12 5 7 1 1 9 1 1 5 23 88 798 329 116 8 360 714 106 552 158 500 1,260 159 280 448 582 50 232 123 440 87 390 342 12,887 102 21 386 420 1,818 700 96 228 147 836 178 119 96 516 50 332 1,148 288 130 182 82 141 99 469 205 960 5,888 L-Bar 88 133 47 58 4 90 42 53 46 79 100 30 159 35 28 97 50 232 123 55 29 39 114 263 34 21 193 84 101 70 48 38 147 209 178 17 48 86 25 83 164 24 26 26 82 141 11 469 205 252 256 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 10/11/2014 10/11/2014 10/11/2014 10/11/2014 10/11/2014 10/11/2014 10/12/2014 10/12/2014 10/12/2014 10/12/2014 10/12/2014 10/12/2014 10/12/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 CI CMI 1 2 13 4 94 9 3 1 2 4 1 8 5 14 9 1 2 3 30 5 3 5 1 1 14 2 4 12 1 7 9 6 8 8 3 1 4 3 6 3 5 1 15 1 12 2 8 14 2 1 4 239 98 390 456 10,810 18 402 364 74 296 58 1,472 915 2,940 1,233 21 174 510 1,800 290 222 725 136 93 2,310 286 812 1,632 41 1,050 1,395 54 16 16 273 309 532 393 384 381 985 72 990 35 1,104 98 720 910 408 107 640 L-Bar 239 49 30 114 115 2 134 364 37 74 58 184 183 210 137 21 87 170 60 58 74 145 136 93 165 143 203 136 41 150 155 9 2 2 91 309 133 131 64 127 197 72 66 35 92 49 90 65 204 107 160 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/13/2014 10/14/2014 10/14/2014 10/14/2014 CI CMI 7 1 30 3 28 1 4 4 8 2 4 5 24 7 1 1 5 1 4 2 177 2 5 8 5 1 7 9 34 6 4 3 7 8 8 8 3 9 3 5 5 31 5 2 1 4 1 8 14 3 28 1,008 180 1,668 435 5,264 124 492 356 168 286 476 205 2,184 721 113 112 185 129 120 250 5,664 126 335 120 175 75 147 18 2,822 300 236 183 469 16 528 640 90 1,125 396 210 510 3,441 450 102 107 1,256 93 272 2,184 423 2,828 L-Bar 144 180 187 145 188 124 123 89 21 143 119 41 91 103 113 112 37 129 30 125 32 63 67 15 35 75 21 2 83 50 59 61 67 2 66 80 30 125 132 42 102 111 90 51 107 314 93 34 156 141 101 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 CI 3,223 11 7 7 2 4 4 5 11 2 6 14 3 4 4 17 6 1 1 4 4 22 4 2 4 26 15 1 47 6 4 1 18 1 6 4 7 16 13 12 2 1 9 6 15 2 5 5 5 1 2 CMI 29,007 1,177 980 399 408 424 660 395 1,199 300 612 4,760 210 420 152 3,927 474 1 264 104 404 2,222 404 202 404 3,094 1,560 30 8,413 84 184 163 378 181 540 172 1,498 3,216 1,131 1,632 262 206 765 372 2,235 1,056 25 2,500 50 72 210 L-Bar 9 107 140 57 204 106 165 79 109 150 102 340 70 105 38 231 79 1 264 26 101 101 101 101 101 119 104 30 179 14 46 163 21 181 90 43 214 201 87 136 131 206 85 62 149 528 5 500 10 72 105 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 CI CMI 4 19 8 12 1 2 4 2 2 5 32 9 2 4 4 4 7 7 18 4 9 1 6 8 3 2 2 1 5 6 1 1 12 5 14 14 10 5 2 8 1 19 1 1 2 2 7 2 8 7 5 40 1,387 408 312 151 132 296 262 222 125 3,098 1,539 16 680 1,052 452 189 238 666 412 495 177 348 296 444 392 240 128 740 114 72 92 48 340 840 1,554 170 95 20 1,168 143 1,121 76 40 212 98 357 260 656 602 150 L-Bar 10 73 51 26 151 66 74 131 111 25 212 171 8 170 263 113 27 34 37 103 55 177 58 37 148 196 120 128 148 19 72 92 4 68 60 111 17 19 10 146 143 59 76 40 106 49 51 130 82 86 30 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/14/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 CI CMI 2 1 4 5 19 17 16 5 14 1 1 1 26 8 2 1 2 15 7 2 1 8 7 36 4 5 3 3 6 4 8 5 3 1 19 2 2 3 22 8 9 2 19 6 8 8 1 1 4 2 3 208 49 60 265 1,216 1,207 688 420 1,358 135 104 50 962 120 246 223 156 1,245 504 76 6 1,112 1,036 5,256 8 460 354 327 768 324 624 165 384 63 4,142 244 380 603 2,354 1,168 18 256 2,736 360 1,976 528 39 109 960 544 246 L-Bar 104 49 15 53 64 71 43 84 97 135 104 50 37 15 123 223 78 83 72 38 6 139 148 146 2 92 118 109 128 81 78 33 128 63 218 122 190 201 107 146 2 128 144 60 247 66 39 109 240 272 82 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 CI CMI 2 7 4 2 4 9 3 3 1 1 42 117 4 1 8 6 1 1 1 2 2 38 15 4 12 5 15 11 7 1 9 4 1 6 1 6 4 1 5 1 9 1 1 1 1 18 1 4 1 8 1 416 259 1,228 212 1,200 1,476 549 396 53 271 420 12,987 604 96 1,276 372 194 265 52 192 260 4,256 1,680 796 864 380 1,950 2,981 189 61 315 144 143 486 339 216 368 235 385 88 1,224 123 37 273 112 1,152 35 192 269 528 30 L-Bar 208 37 307 106 300 164 183 132 53 271 10 111 151 96 189 62 194 265 52 96 130 112 112 199 72 76 130 271 27 61 35 36 143 81 339 36 92 235 77 88 136 123 37 273 112 64 35 48 269 66 30 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/15/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 CI CMI 5 8 9 2 30 1 23 1 3 1 6 6 15 7 1 4 1 24 4 3 1 1 1 2 1 1 1 3 2 2 118 5 8 1 8 2 1 9 2 8 6 5 2 3 5 1 10 49 50 79 1 805 640 1,467 240 4,620 120 4,577 13 249 8 186 150 1,935 1,106 171 708 142 2,256 212 513 171 1 289 390 23 292 194 189 116 128 31,388 285 1,509 126 2,216 88 28 1,017 204 800 342 315 184 582 930 119 1,860 10,437 10,950 17,222 117 L-Bar 161 80 163 120 154 120 199 13 83 8 31 25 129 158 171 177 142 94 53 171 171 1 289 195 23 292 194 63 58 64 266 57 207 126 277 44 28 113 102 100 57 63 92 194 186 119 186 213 219 218 117 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 CI CMI 48 15 46 4 16 2 2 2 1 6 4 5 4 12 1 1 6 12 1 3 5 7 1 2 1 8 2 2 1 4 5 1 21 1 8 54 2 2 7 12 9 10 11 4 5 6 4 3 2 4 8 10,512 3,660 10,074 240 1,696 66 174 46 34 396 316 440 556 2,148 159 103 582 1,896 104 93 300 1,134 168 166 192 520 378 54 186 464 880 127 3,003 99 320 594 150 38 392 204 468 660 220 316 920 438 48 279 178 792 280 L-Bar 219 244 219 60 106 33 87 23 34 66 79 88 139 179 159 103 97 158 104 31 60 162 168 83 192 65 189 27 186 116 176 127 143 99 40 11 75 19 56 17 52 66 20 79 184 73 12 93 89 198 35 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/16/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 CI CMI 1 6 1 2 1 7 3 2 4 1 2 7 1 7 9 5 1 5 1 6 1 3 1 1 2 1 3 3 2 2 10 2 4 8 5 13 1 2 54 1 2 2 11 11 10 8 1 2 5 1 3 103 234 46 166 78 406 354 252 172 60 192 175 67 119 252 435 50 820 26 282 15 180 113 200 124 208 126 210 20 194 60 408 700 1,352 385 286 146 90 3,618 100 42 216 231 715 340 648 228 54 60 137 159 L-Bar 103 39 46 83 78 58 118 126 43 60 96 25 67 17 28 87 50 164 26 47 15 60 113 200 62 208 42 70 10 97 6 204 175 169 77 22 146 45 67 100 21 108 21 65 34 81 228 27 12 137 53 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 CI CMI 5 4 13 3 5 10 3 1 1 6 13 10 6 9 5 6 3 8 10 1 11 47 8 2 41 2 8 3 4 3 4 3 5 3 1 49 22 4 6 2 3 8 4 4 33 4 1 1 6 9 1 675 60 1,937 168 1,215 1,140 156 283 100 618 2,379 110 600 54 50 192 528 608 1,110 83 429 5,136 768 82 2,050 100 440 15 612 237 272 63 205 540 165 10,976 2,772 820 30 142 234 160 32 216 6,204 68 29 132 114 594 21 L-Bar 135 15 149 56 243 114 52 283 100 103 183 11 100 6 10 32 176 76 111 83 39 219 96 41 50 50 55 5 153 79 68 21 41 180 165 224 126 205 5 71 78 20 8 54 188 17 29 132 19 66 21 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/17/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/18/2014 10/19/2014 10/19/2014 10/19/2014 10/19/2014 10/19/2014 10/19/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 CI CMI 1 1 1 4 3 7 4 1 4 8 10 2 2 37 9 1 1 1 1 10 1 5 1 3 4 4 6 7 1 1 7 1 11 1 9 5 1 4 1 3 1 3 1 3 4 5 1 2 9 9 1 65 255 82 332 30 49 68 47 328 1,336 2,020 40 264 1,702 1,494 512 79 207 107 1,540 216 1,590 223 543 104 148 222 2,072 12 286 966 80 1,617 184 441 805 172 76 47 210 90 354 14 252 256 350 135 170 828 828 102 L-Bar 65 255 82 83 10 7 17 47 82 167 202 20 132 46 166 512 79 207 107 154 216 318 223 181 26 37 37 296 12 286 138 80 147 184 49 161 172 19 47 70 90 118 14 84 64 70 135 85 92 92 102 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 CI CMI 5 2 4 6 9 3 3 6 6 3 2 9 4 9 3 12 4 5 4 18 4 4 2 14 4 4 2 6 1 2 2 1 6 2 3 3 8 8 9 1 1 2 2 2 3 10 1 1 9 2 12 455 182 356 288 369 435 582 552 228 120 246 378 264 18 81 468 576 385 620 3,240 460 252 134 616 548 400 278 360 144 38 208 100 612 444 333 63 552 800 1,161 72 75 96 240 290 516 3,110 5 9 333 158 108 L-Bar 91 91 89 48 41 145 194 92 38 40 123 42 66 2 27 39 144 77 155 180 115 63 67 44 137 100 139 60 144 19 104 100 102 222 111 21 69 100 129 72 75 48 120 145 172 311 5 9 37 79 9 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/20/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 CI CMI 27 1 6 1 9 4 3 4 4 1 2 8 1 1 1 1 2 6 6 10 44 4 8 9 5 8 5 26 8 4 6 6 20 6 3 14 2 3 1 1 1 8 11 1 1 4 7 1 1 14 2 3,618 198 378 712 18 352 348 356 488 135 336 392 151 33 11 47 236 366 528 1,830 88 4 656 1,314 200 888 945 2,600 496 4 330 432 2,460 564 45 322 372 897 124 123 157 440 902 317 163 360 1,204 101 108 1,512 208 L-Bar 134 198 63 712 2 88 116 89 122 135 168 49 151 33 11 47 118 61 88 183 2 1 82 146 40 111 189 100 62 1 55 72 123 94 15 23 186 299 124 123 157 55 82 317 163 90 172 101 108 108 104 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 CI CMI 3 3 6 2 4 6 2 9 25 5 1 3 1 1 3 20 6 2 17 19 6 10 1 18 9 7 2 1 3 2 4 5 14 2 46 4 8 1 1 1 6 6 16 2 1 78 18 6 5 2 2 798 153 78 496 116 1,122 582 2,169 775 45 143 30 12 211 264 2,120 1,068 232 2,788 2,470 1,542 270 1 72 558 574 26 116 111 194 176 370 2,422 64 7,912 628 1,360 86 106 153 1,086 360 1,936 46 367 780 2,232 186 385 34 506 L-Bar 266 51 13 248 29 187 291 241 31 9 143 10 12 211 88 106 178 116 164 130 257 27 1 4 62 82 13 116 37 97 44 74 173 32 172 157 170 86 106 153 181 60 121 23 367 10 124 31 77 17 253 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/21/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 CI CMI 1 10 13 1 4 9 25 3 9 2 7 19 8 8 4 6 28 5 3 2 10 5 2 1 1 1 3 2 5 18 18 4 2 8 23 6 6 1 6 5 5 1 1 2 1 2 16 5 7 8 8 23 1,040 2,080 25 68 1,476 3,950 231 81 124 819 1,007 320 608 4 852 5,040 360 216 62 520 105 244 271 5 53 15 80 415 1,332 72 112 82 344 1,955 372 108 67 1,068 275 625 79 22 192 140 64 3,536 225 959 248 168 L-Bar 23 104 160 25 17 164 158 77 9 62 117 53 40 76 1 142 180 72 72 31 52 21 122 271 5 53 5 40 83 74 4 28 41 43 85 62 18 67 178 55 125 79 22 96 140 32 221 45 137 31 21 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 CI CMI 4 1 27 18 1 32 13 5 4 8 6 21 3 1 6 3 9 11 10 2 25 10 1 2 2 9 8 9 1 4 5 32 1 13 4 2 5 3 11 1 2 17 25 1 24 11 6 3 2 18 15 644 227 4,050 1,512 72 8,000 1,079 405 572 232 762 1,449 204 38 426 699 360 242 1,630 94 1,850 1,460 35 92 384 1,575 432 1,512 148 668 490 7,488 130 195 100 216 310 342 616 193 160 1,241 1,050 164 1,008 198 516 453 58 1,494 1,305 L-Bar 161 227 150 84 72 250 83 81 143 29 127 69 68 38 71 233 40 22 163 47 74 146 35 46 192 175 54 168 148 167 98 234 130 15 25 108 62 114 56 193 80 73 42 164 42 18 86 151 29 83 87 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/22/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 CI CMI 7 1 3 6 27 16 2 6 18 3 4 1 1 3 4 1 2 14 22 9 2 1 17 1 7 1 13 5 5 2 1 20 1 11 7 1 1 7 1 2 2 5 2 11 14 18 9 2 26 3 3 868 10 144 318 567 1,584 418 186 1,548 285 528 7 71 279 96 228 248 1,372 2,310 900 310 76 2,295 98 203 64 117 235 325 144 64 1,680 85 506 1,449 45 81 1,036 190 274 186 220 452 836 1,750 1,116 1,494 440 8,424 684 822 L-Bar 124 10 48 53 21 99 209 31 86 95 132 7 71 93 24 228 124 98 105 100 155 76 135 98 29 64 9 47 65 72 64 84 85 46 207 45 81 148 190 137 93 44 226 76 125 62 166 220 324 228 274 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 CI CMI 2 4 2 1 1 37 6 2 1 3 9 2 8 26 4 6 2 10 2 1 5 8 23 1 3 2 8 13 1 5 27 4 1 5 4 5 1 1 1 10 1 3 11 10 1 18 8 8 12 2 3 550 276 496 86 96 15,133 1,716 372 165 144 837 48 248 1,924 40 600 172 1,310 64 128 195 280 6,394 134 279 32 584 208 35 240 324 472 55 805 224 100 94 149 124 170 60 315 319 300 49 1,296 848 344 684 190 48 L-Bar 275 69 248 86 96 409 286 186 165 48 93 24 31 74 10 100 86 131 32 128 39 35 278 134 93 16 73 16 35 48 12 118 55 161 56 20 94 149 124 17 60 105 29 30 49 72 106 43 57 95 16 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/23/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 CI CMI 1 18 3 6 2 1 2 6 26 2 1 14 2 39 3 6 11 4 1 4 1 3 9 18 2 5 1 2 10 6 18 9 6 7 11 4 4 13 1 1 1 1 11 6 3 7 1 3 6 2 1 103 1,800 105 882 20 90 30 408 598 30 57 280 266 624 159 672 1,188 632 102 712 166 186 909 1,944 118 140 174 216 40 90 2,178 135 90 98 154 56 228 1,599 99 64 221 74 1,617 510 267 1,123 71 207 270 458 114 L-Bar 103 100 35 147 10 90 15 68 23 15 57 20 133 16 53 112 108 158 102 178 166 62 101 108 59 28 174 108 4 15 121 15 15 14 14 14 57 123 99 64 221 74 147 85 89 191 71 69 45 229 114 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/24/2014 10/25/2014 10/25/2014 10/25/2014 10/25/2014 10/25/2014 10/25/2014 10/25/2014 10/25/2014 10/25/2014 CI CMI 3 2 2 7 87 3 11 1 2 9 4 14 11 2 3 8 5 4 1 4 3 6 2 5 6 1 1 1 8 2 8 1 1 5 1 13 2 1 8 1 8 1 1 1 2 5 1 4 5 1 2 159 56 86 1,183 2,436 315 990 223 78 72 64 2,282 671 116 93 688 315 732 86 68 123 240 186 230 444 153 14 197 960 130 296 38 169 335 196 390 118 108 216 59 200 211 121 34 578 1,440 282 424 140 59 48 L-Bar 53 28 43 169 28 105 90 223 39 8 16 163 61 58 31 86 63 183 86 17 41 40 93 46 74 153 14 197 120 65 37 38 169 67 196 30 59 108 27 59 25 211 121 34 289 288 282 106 28 59 24 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/25/2014 10/25/2014 10/25/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/26/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 CI CMI 1 2 1 4 23 7 1 10 2 3 3 1 1 15 98 16 1 1 2 3 6 6 15 19 2 5 25 3 1 17 3 7 12 11 2 4 2 11 12 13 4 19 2 14 3 10 2 2 6 2 10 74 608 206 900 5,865 4,060 154 490 12 57 54 71 197 2,385 11,368 3,136 196 195 122 276 1,530 66 3,060 209 210 870 4,275 318 287 3,026 99 798 2,496 484 306 256 48 2,420 156 754 508 1,653 212 1,736 210 200 204 70 234 120 260 L-Bar 74 304 206 225 255 580 154 49 6 19 18 71 197 159 116 196 196 195 61 92 255 11 204 11 105 174 171 106 287 178 33 114 208 44 153 64 24 220 13 58 127 87 106 124 70 20 102 35 39 60 26 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 CI CMI 8 3 3 7 12 6 20 9 2 10 1 5 5 12 1 11 10 1 1 12 5 9 2 4 4 6 6 24 1 1 25 1 1 8 9 13 8 4 16 13 2 12 10 8 9 5 3 8 4 20 1 184 195 168 462 108 378 1,500 828 72 700 93 140 140 372 56 165 860 57 199 636 935 1,287 170 76 56 216 84 2,280 159 184 3,600 24 45 56 531 1,157 640 436 1,184 1,664 116 828 800 552 630 45 357 864 460 2,700 150 L-Bar 23 65 56 66 9 63 75 92 36 70 93 28 28 31 56 15 86 57 199 53 187 143 85 19 14 36 14 95 159 184 144 24 45 7 59 89 80 109 74 128 58 69 80 69 70 9 119 108 115 135 150 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/27/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 CI 1 2 1 3 10 25 2 10 8 10 4 11 1 1,155 2 1 3 10 29 2 10 11 3 8 15 5 6 1 4 3 2 10 8 1 2 3 5 3 4 46 22 5 79 24 9 1 7 1 6 18 21 CMI 129 144 252 252 1,850 2,525 276 70 336 740 940 737 22 65,786 214 807 108 1,590 348 208 670 1,276 423 848 1,020 350 630 241 308 171 126 400 1,264 91 206 219 565 231 454 690 1,122 1,520 10,428 2,856 783 129 469 64 1,278 630 2,100 L-Bar 129 72 252 84 185 101 138 7 42 74 235 67 22 96 107 807 36 159 12 104 67 116 141 106 68 70 105 241 77 57 63 40 158 91 103 73 113 77 138 15 51 304 132 119 87 129 67 64 213 35 100 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 CI CMI 2 26 8 7 1 15 5 2 7 2 6 31 1 1 2 4 5 4 1 12 2 9 62 2 22 6 8 13 5 2 5 138 7 2 5 6 15 15 2 3 1 4 2 1 1 22 12 3 3 3 4 30 4,420 312 497 325 450 5 458 427 122 1,686 2,077 28 134 458 140 460 300 28 876 344 1,485 9,858 404 4,708 534 560 2,093 545 186 440 13,662 434 272 270 150 2,250 1,695 170 339 91 80 246 122 46 3,498 2,928 147 84 585 4 L-Bar 15 170 39 71 325 30 1 229 61 61 281 67 28 134 229 35 92 75 28 73 172 165 159 202 214 89 70 161 109 93 88 99 62 136 54 25 150 113 85 113 91 20 123 122 46 159 244 49 28 195 1 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/28/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 CI CMI 3 10 6 9 19 22 7 8 3 1 2 1 2 2 2 1 11 1 2 5 26 3 9 7 11 7 3 5 8 7 8 6 8 7 4 2 3 13 3 7 26 6 9 24 3 20 10 1 11 3 21 123 810 480 585 1,805 3,586 63 424 234 44 184 130 54 228 128 37 979 83 120 185 3,718 420 882 175 715 427 348 320 488 903 912 54 1,246 693 280 220 546 1,690 606 413 832 780 1,575 3,768 342 3,260 920 27 1,771 387 2,688 L-Bar 41 81 80 65 95 163 9 53 78 44 92 130 27 114 64 37 89 83 60 37 143 140 98 25 65 61 116 64 61 129 114 9 211 99 70 110 182 130 202 59 32 130 175 157 114 163 92 27 161 129 128 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 CI CMI 1 1 48 1 7 5 6 3 7 1 19 8 2 2 5 8 3 14 12 7 7 8 1 15 2 11 9 5 9 2 7 1 63 2 6 326 13 8 4 25 1 4 7 3 24 3 25 8 15 6 39 51 164 2,736 209 1,260 365 360 87 798 108 304 1,760 460 176 935 280 330 1,106 372 49 357 32 197 1,380 220 1,397 81 150 513 160 427 60 6,237 182 684 14,344 1,612 1,248 100 2,475 23 668 399 84 3,792 429 3,275 1,424 885 666 4,524 L-Bar 51 164 57 209 180 73 60 29 114 108 16 220 230 88 187 35 110 79 31 7 51 4 197 92 110 127 9 30 57 80 61 60 99 91 114 44 124 156 25 99 23 167 57 28 158 143 131 178 59 111 116 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/29/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 CI CMI 2 2 2 5 11 12 5 3 1 4 6 12 12 8 3 1 1 3 3 2 1 7 2 1 8 4 4 1 2 1 3 8 3 7 2 3 1 7 1 19 1 1 6 9 6 7 11 4 7 1 23 452 60 216 550 682 1,224 65 24 156 196 672 240 960 592 186 87 131 111 84 10 34 497 120 27 104 732 744 69 102 31 315 1,152 135 413 62 75 86 140 60 2,584 299 505 708 1,062 696 826 1,298 472 1,624 394 2,622 L-Bar 226 30 108 110 62 102 13 8 156 49 112 20 80 74 62 87 131 37 28 5 34 71 60 27 13 183 186 69 51 31 105 144 45 59 31 25 86 20 60 136 299 505 118 118 116 118 118 118 232 394 114 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 CI CMI 1 8 4 6 5 2 6 7 2 115 2 2 18 1 3 65 9 13 9 4 6 8 25 22 45 3 4 1 11 12 153 9 1 2 4 11 7 7 10 4 11 15 12 39 2 9 3 1 3 1 31 409 296 332 480 420 124 936 350 246 13,800 52 388 1,386 188 174 2,535 1,953 299 1,125 316 2,166 936 4,000 484 26,730 129 296 114 253 1,044 306 90 80 138 220 506 1,533 525 100 240 649 2,520 456 7,488 228 207 957 63 180 61 2,914 L-Bar 409 37 83 80 84 62 156 50 123 120 26 194 77 188 58 39 217 23 125 79 361 117 160 22 594 43 74 114 23 87 2 10 80 69 55 46 219 75 10 60 59 168 38 192 114 23 319 63 60 61 94 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/30/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 CI CMI 2 1 14 1 14 6 5 3 7 24 4 26 2 1 1 4 2 1 1 2 7 8 2 2 2 7 1 1 5 1 4 7 1 5 4 8 2 1 1 1 8 6 5 1 13 13 2 1 219 1 8 92 95 1,022 105 224 390 95 261 287 576 260 390 40 123 50 524 240 137 117 160 259 1,232 2 172 254 224 86 158 535 32 440 742 57 215 388 496 368 41 94 85 1,000 648 240 56 325 1,222 284 126 41,172 56 40 L-Bar 46 95 149 105 16 65 19 87 41 24 65 15 20 123 50 131 120 137 117 80 37 154 1 86 127 32 86 158 107 32 110 106 57 43 97 62 184 41 94 85 125 108 48 56 25 94 142 126 188 56 5 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 10/31/2014 11/1/2014 11/1/2014 11/1/2014 11/1/2014 11/1/2014 11/1/2014 11/1/2014 11/2/2014 11/2/2014 11/2/2014 11/2/2014 CI CMI 3 3 9 1 8 5 9 7 4 1 2 1 7 4 4 1 3 3 2 5 6 5 10 6 2 3 12 12 7 4 5 4 6 1 3 8 1 1 8 5 2 1 7 2 2 3 2 1 22 8 1 120 183 297 111 1,480 410 1,827 294 148 189 354 167 1,428 476 300 101 345 27 30 865 312 315 620 528 14 336 24 660 35 84 75 80 18 11 30 40 43 49 760 1,565 274 189 609 44 244 234 52 129 550 160 128 L-Bar 40 61 33 111 185 82 203 42 37 189 177 167 204 119 75 101 115 9 15 173 52 63 62 88 7 112 2 55 5 21 15 20 3 11 10 5 43 49 95 313 137 189 87 22 122 78 26 129 25 20 128 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/2/2014 11/2/2014 11/2/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 CI CMI 1 28 1 3 13 13 6 22 2 42 7 8 7 21 26 26 2 34 1 2 18 20 1 12 11 17 16 1 4 39 3 2 5 2 1 4 3 1 1 9 4 7 1 1 2 6 1 3 7 1 25 53 3,332 210 84 4,186 624 552 5,698 76 3,276 651 1,528 847 1,659 2,210 2,574 248 3,094 50 710 2,916 2,380 105 684 1,881 2,108 2,112 104 532 9,633 54 62 660 226 373 1,036 441 100 130 963 844 938 109 106 62 102 166 36 56 41 2,325 L-Bar 53 119 210 28 322 48 92 259 38 78 93 191 121 79 85 99 124 91 50 355 162 119 105 57 171 124 132 104 133 247 18 31 132 113 373 259 147 100 130 107 211 134 109 106 31 17 166 12 8 41 93 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/3/2014 11/4/2014 CI CMI 8 34 12 6 7 2 3 6 10 5 6 5 5 16 7 1 3 1 11 18 1 5 3 2 11 7 3 7 6 10 4 6 7 2 5 25 3 2 3 3 5 3 2 14 2 1 9 2 272 1 10 920 2,380 660 462 840 92 69 372 70 525 216 475 215 2,608 70 104 591 61 1,540 1,818 152 10 27 332 1,089 91 237 861 408 250 368 222 840 428 295 1,475 156 34 24 165 180 528 42 1,638 234 133 315 124 24,504 9 2,870 L-Bar 115 70 55 77 120 46 23 62 7 105 36 95 43 163 10 104 197 61 140 101 152 2 9 166 99 13 79 123 68 25 92 37 120 214 59 59 52 17 8 55 36 176 21 117 117 133 35 62 96 9 287 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 CI CMI 2 4 24 2 25 15 7 2 3 4 3 33 3 3 1 2 3 2 19 13 8 1 6 6 9 15 2 4 6 2 7 6 4 4 2 7 1 105 12 19 142 4 1 2 14 3 8 1 2 15 15 90 116 3,024 212 3,500 1,455 840 684 72 316 48 3,135 114 384 98 80 339 38 1,121 1,183 368 133 654 492 72 1,905 278 720 1,062 360 182 774 804 892 222 742 29 19,005 864 1,140 15,052 28 9 196 28 63 480 83 94 315 1,095 L-Bar 45 29 126 106 140 97 120 342 24 79 16 95 38 128 98 40 113 19 59 91 46 133 109 82 8 127 139 180 177 180 26 129 201 223 111 106 29 181 72 60 106 7 9 98 2 21 60 83 47 21 73 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST Date 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 CI CMI 2 14 4 8 1 5 4 26 2 3 10 2 15 8 3 3 1 6 1 30 1 15 13 25 21 25 50 1 26 2 2 8 7 2 2 5 12 2 4 2 2 3 7 14 2 23 19 4 2 6 3 82 1,134 308 552 156 1,030 308 4,160 30 132 470 296 1,380 888 57 24 141 340 118 5,220 33 150 1,937 3,150 1,764 3,550 2,350 124 2,288 420 26 280 1,183 126 64 245 444 332 140 44 100 213 462 56 282 2,323 190 940 114 84 138 L-Bar 41 81 77 69 156 206 77 160 15 44 47 148 92 111 19 8 141 94 118 174 33 10 149 126 84 142 47 124 88 210 13 35 169 63 32 49 37 166 35 22 50 71 66 4 141 101 10 235 57 14 46 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/4/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 CI CMI 25 12 18 19 2 1 9 3 26 5 1 1 4 2 5 1 3 6 5 1 7 5 2 2 3 10 8 18 4 2 2 1 1 4 10 8 5 10 5 2 2 26 4 35 1 1 2 2 1 1 14 1,075 936 2,358 2,793 130 96 1,071 138 2,600 505 94 32 812 94 205 143 549 618 360 14 2,177 875 152 232 1,077 1,120 1,056 2,664 500 120 146 218 219 1,208 320 1,576 50 730 675 218 92 4,186 192 4,970 103 127 396 64 160 134 56 L-Bar 43 78 131 147 65 96 119 46 100 101 94 32 203 47 41 143 183 103 72 14 311 175 76 116 359 112 132 148 125 60 73 218 219 302 32 197 10 73 135 109 46 161 48 142 103 127 198 32 160 134 4 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 CI CMI 27 2 8 2 3 3 1 11 8 46 2 14 1 10 54 1 2 7 2 7 7 2 43 91 9 8 7 6 5 8 4 18 4 1 3 3 6 2 2 11 5 2 6 5 22 3 3 2 5 1 1 297 422 848 260 498 489 269 88 392 1,104 364 1,274 273 410 8,370 58 116 210 186 49 49 18 129 364 792 1,768 385 336 275 344 124 5,040 336 186 669 21 480 66 184 22 45 222 258 750 4,884 150 336 160 235 89 95 L-Bar 11 211 106 130 166 163 269 8 49 24 182 91 273 41 155 58 58 30 93 7 7 9 3 4 88 221 55 56 55 43 31 280 84 186 223 7 80 33 92 2 9 111 43 150 222 50 112 80 47 89 95 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED Date 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/5/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 CI CMI 33 28 1 3 19 3 5 3 7 2 1 4 3 7 2 14 1 12 3 2 4 1 9 1 5 1 1 2 1 3 4 2 2 1 2 8 10 1 18 1 4 2 1 1 1 1 1 1 1 1 5 1,320 2,884 49 90 2,185 465 425 21 308 206 106 920 246 49 252 70 224 60 90 432 652 166 1,539 163 245 48 85 54 88 411 244 84 154 97 130 592 1,050 99 1,800 63 224 60 144 185 138 121 105 236 74 232 1,410 L-Bar 40 103 49 30 115 155 85 7 44 103 106 230 82 7 126 5 224 5 30 216 163 166 171 163 49 48 85 27 88 137 61 42 77 97 65 74 105 99 100 63 56 30 144 185 138 121 105 236 74 232 282 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 CI CMI 2 19 4 1 1 1 3 1 17 16 28 12 20 2 300 9 127 1 5 1 6 1 1 73 6 10 8 6 4 1 1 1 25 12 8 2 16 4 3 11 1 1 7 17 1 3 6 8 1 2 12 226 2,413 1,200 106 84 111 33 65 1,717 1,312 2,716 2,904 2,000 216 41,400 585 19,558 147 210 107 582 211 499 8,395 810 200 512 606 700 169 59 90 3,300 3,324 32 366 4,544 700 212 792 113 263 875 2,074 98 171 336 224 194 110 780 L-Bar 113 127 300 106 84 111 11 65 101 82 97 242 100 108 138 65 154 147 42 107 97 211 499 115 135 20 64 101 175 169 59 90 132 277 4 183 284 175 150 72 113 263 125 122 98 57 56 28 194 55 65 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/6/2014 11/7/2014 CI CMI 14 27 3 6 1 5 4 115 2 1 3 9 1 2 2 4 1 1 56 22 2 2 2 1 6 1 2 4 3 2 2 1 9 8 1 2 34 7 3 2 2 1 1 9 4 2 7 9 28 1 2 238 324 222 306 62 505 212 1,610 98 55 315 171 28 776 34 152 45 82 504 286 206 292 340 58 54 2 248 100 129 238 154 84 261 48 103 276 7,072 756 42 68 158 120 157 288 400 366 539 1,350 5,292 123 206 L-Bar 17 12 74 51 62 101 53 14 49 55 105 19 28 388 17 38 45 82 9 13 103 146 170 58 9 2 124 25 43 119 77 84 29 6 103 138 208 108 14 34 79 120 157 32 100 183 77 150 189 123 103 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 11/7/2014 CI CMI 1 1 3 1 1 3 38 63 7 34 2 10 7 8 19 7 9 67 3 69 22 18 10 8 2 1 16 2 3 1 5 6 24 5 16 13 9 9 7 4 11 7 1 2 11 5 2 2 2 3 2 378 290 570 105 102 384 532 756 861 7,242 298 1,220 924 80 4,731 1,323 1,719 1,072 27 966 836 3,060 700 64 250 201 3,296 278 582 215 790 240 144 55 304 260 612 576 63 156 462 371 47 130 1,122 205 54 72 10 75 76 L-Bar 378 290 190 105 102 128 14 12 123 213 149 122 132 10 249 189 191 16 9 14 38 170 70 8 125 201 206 139 194 215 158 40 6 11 19 20 68 64 9 39 42 53 47 65 102 41 27 36 5 25 38 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/7/2014 11/7/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/8/2014 11/9/2014 11/9/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 CI CMI 1 1 2 10 2 7 7 1 1 2 1 4 2 11 1 1 6 1 5 1 1 10 4 12 1 11 11 10 8 77 16 7 1 11 26 1 1 6 12 1 7 18 28 1 7 1 25 18 16 1 5 123 18 260 380 20 329 469 37 81 32 115 32 292 814 127 202 60 148 695 265 172 790 420 1,908 46 1,023 88 810 864 6,329 304 784 183 781 3,770 125 5 780 768 57 735 1,908 4,004 116 833 34 1,900 972 1,648 48 920 L-Bar 263 18 130 38 10 47 67 37 81 16 115 8 146 74 127 202 10 148 139 265 172 79 105 159 46 93 8 81 108 169 19 112 183 71 145 125 5 130 64 57 105 106 143 116 119 34 76 54 103 48 184 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/10/2014 11/11/2014 11/11/2014 11/11/2014 CI CMI 1 1 11 4 8 5 3 4 17 1 23 1 1 1 3 10 9 17 2 9 4 2 7 11 6 18 4 1 5 1 3 6 4 3 3 7 4 12 9 1 4 22 12 8 1 1 8 8 3 17 24 27 180 1,111 268 512 605 447 112 2,023 22 3,312 90 83 34 162 890 972 2,159 86 81 272 92 868 44 444 1,746 972 179 1,405 81 153 12 140 54 240 707 1,092 264 963 79 16 2,266 792 88 57 74 264 552 240 1,768 6,552 L-Bar 27 180 101 67 64 121 149 28 119 22 144 90 83 34 54 89 108 127 43 9 68 46 124 4 74 97 243 179 281 81 51 2 35 18 80 101 273 22 107 79 4 103 66 11 57 74 33 69 80 104 273 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/11/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 CI CMI 6 1 1 1 11 4 2 3 56 41 8 2 5 4 9 7 6 2 1 8 1 8 1 6 9 1 1 16 5 2 11 9 1 5 1 2 8 5 2 5 19 1 2 3 5 1 1 1 6 1 20 744 136 74 93 1,430 44 124 456 8,904 16,687 728 176 1,510 560 990 259 96 226 295 520 180 1,048 97 558 1,233 31 93 1,856 390 118 1,551 963 144 455 22 250 248 800 38 620 380 115 162 174 450 175 285 139 594 72 1,980 L-Bar 124 136 74 93 130 11 62 152 159 407 91 88 302 140 110 37 16 113 295 65 180 131 97 93 137 31 93 116 78 59 141 107 144 91 22 125 31 160 19 124 20 115 81 58 90 175 285 139 99 72 99 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 CI CMI 11 7 23 11 8 8 15 1 3 1 2 5 55 32 1 39 1 6 1 6 26 16 1 2 1 52 19 8 1 127 16 17 1 2 2 8 10 3 10 4 2 6 11 2 7 9 8 2 8 15 24 1,298 875 3,105 759 880 1,824 1,005 219 117 470 94 1,785 11,660 2,432 186 1,170 155 1,110 62 540 2,340 1,168 196 440 51 10,972 1,634 1,584 120 889 1,408 1,258 185 38 62 456 1,780 345 1,950 672 102 678 957 100 70 1,296 56 178 48 510 840 L-Bar 118 182 135 69 110 228 67 219 39 470 47 357 212 76 186 30 155 185 62 90 90 73 196 220 51 211 86 198 120 7 88 74 185 19 31 57 178 115 195 168 51 113 87 50 10 144 7 89 6 34 35 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 CI CMI 7 4 13 3 8 27 4 8 8 16 5 5 1 81 8 1 27 1 10 1 2 11 11 6 6 2 7 1 9 6 17 6 26 53 3 1 8 2 4 1 7 2 3 1 1 6 1 14 11 9 4 588 280 637 249 312 3,888 640 592 344 1,936 230 410 70 1,377 384 74 1,809 40 90 117 600 1,760 737 618 294 60 434 163 774 666 1,258 336 1,404 2,650 174 19 648 126 308 138 588 226 429 105 61 48 180 1,414 143 702 136 L-Bar 84 70 49 83 39 144 160 74 43 121 46 82 70 17 48 74 67 40 9 117 300 160 67 103 49 30 62 163 86 111 74 56 54 50 58 19 81 63 77 138 84 113 143 105 61 8 180 101 13 78 34 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/12/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 CI CMI 2 11 2 15 10 2 1 2 24 1 1 3 3 10 7 3 5 9 10 13 1 8 6 6 9 2 1 4 14 6 1 1 5 7 19 6 10 8 4 1 4 2 8 8 6 4 29 8 1 27 1 168 77 148 1,575 840 522 242 168 3,552 163 137 102 261 640 616 366 945 2,133 1,850 1,066 138 240 278 576 243 116 111 1,216 1,652 366 27 83 250 252 817 1,668 640 1,912 116 277 300 150 216 1,088 942 924 899 464 70 2,565 90 L-Bar 84 7 74 105 84 261 257 84 148 163 137 34 87 64 88 122 189 237 185 82 138 30 67 96 27 58 111 304 118 61 27 83 50 36 43 278 64 239 29 277 75 75 27 136 157 231 31 58 70 95 90 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 CI CMI 2 2 9 25 2 40 1 1 13 1 3 6 5 6 14 4 7 6 47 3 3 3 1 2 7 3 8 1 5 19 15 2 10 5 2 5 1 1 1 1 2 1 1 13 5 7 1 14 7 5 6 166 738 171 1,625 406 18,800 87 145 65 261 303 36 805 84 784 288 42 456 658 66 324 21 321 320 490 138 624 123 55 1,349 1,080 378 90 700 166 285 81 128 60 72 140 250 148 1,794 380 245 190 280 168 250 414 L-Bar 83 369 19 65 203 470 87 145 5 261 101 6 161 14 56 72 6 76 14 22 108 7 321 160 70 46 78 123 11 71 72 189 9 140 83 57 81 128 60 72 70 250 148 138 76 35 190 20 24 50 69 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/13/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 CI CMI 1 8 2 13 2 1 1 2 2 4 2 1 5 5 8 3 74 7 2 6 1 15 1 2 2 12 1 5 6 2 50 3 1 8 62 7 4 3 7 2 1 2 5 2 4 8 5 4 3 6 6 95 32 144 104 260 64 278 514 38 1,384 28 163 895 455 1,336 243 9,176 294 308 1,650 236 390 140 156 132 132 110 285 138 78 4,150 324 350 2,144 2,356 154 160 327 203 94 120 238 575 186 260 800 600 116 21 60 48 L-Bar 95 4 72 8 130 64 278 257 19 346 14 163 179 91 167 81 124 42 154 275 236 26 140 78 66 11 110 57 23 39 83 108 350 268 38 22 40 109 29 47 120 119 115 93 65 100 120 29 7 10 8 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED Date 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/14/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/15/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/16/2014 11/17/2014 11/17/2014 CI 5 2 11 5 7 7 1 33 14 2 1 2 3 1 1 12 2 6 7 9 8 5 4 1 1 1 1 10 3 3 1 3 5 2,196 4 7 7 2 2 5 4 1 5 30 1 14 9 4 7 1 2 CMI 880 88 1,111 530 196 651 6 2,409 658 184 381 132 69 233 48 600 16 450 49 81 72 95 24 55 89 35 107 1,400 57 195 179 114 350 68,076 24 4,956 5,026 140 336 2,020 224 128 435 2,940 56 602 216 280 1,428 254 266 L-Bar 176 44 101 106 28 93 6 73 47 92 381 66 23 233 48 50 8 75 7 9 9 19 6 55 89 35 107 140 19 65 179 38 70 31 6 708 718 70 168 404 56 128 87 98 56 43 24 70 204 254 133 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 CI 2 3 1 4 11 26 10 1 20 3 1 6 12 7 5 32 16 7 1 8 1 6 8 15 8 1 7 1 6 1 4 8 4 9 2 20 2 18 1,546 8 15 4 10 1 1 1 2 10 1 2 1 CMI 152 312 227 580 1,958 2,080 1,200 155 4,900 414 20 384 3,504 567 450 18,176 2,832 378 348 440 75 1,044 1,016 1,995 400 81 630 177 1,062 79 188 440 472 1,314 152 7,480 102 2,556 51,018 464 315 316 20 222 83 94 166 730 124 16 211 L-Bar 76 104 227 145 178 80 120 155 245 138 20 64 292 81 90 568 177 54 348 55 75 174 127 133 50 81 90 177 177 79 47 55 118 146 76 374 51 142 33 58 21 79 2 222 83 94 83 73 124 8 211 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/17/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 CI 1 2 23 1 2 7 8 10 16 11 1 9 1 10 18 8 4 1 3 10 11 1 8 1 1 15 4 8 6 26 8 1 1,986 1 1 4 11 38 1 8 10 53 53 5 6 5 1 10 16 1 2 CMI 281 300 2,323 122 130 1,127 416 100 2,608 352 56 720 73 410 666 480 224 88 225 10 1,276 39 72 384 174 630 112 96 996 1,352 680 236 3,972 91 76 96 1,254 9,196 134 832 780 159 5,830 295 702 295 131 260 464 28 382 L-Bar 281 150 101 122 65 161 52 10 163 32 56 80 73 41 37 60 56 88 75 1 116 39 9 384 174 42 28 12 166 52 85 236 2 91 76 24 114 242 134 104 78 3 110 59 117 59 131 26 29 28 191 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 CI CMI 16 13 8 1 1 6 4 4 11 25 2 2 14 2 1 6 2 1 4 3 3 11 2 9 6 1 8 31 1 15 1 10 14 13 18 2 1 14 4 2 3 7 3 1 4 2 3 142 3 6 12 1,760 507 1,072 203 91 876 456 84 583 3,150 62 362 2,590 974 1 1,650 254 2 836 627 141 2,156 60 567 276 209 960 248 9 2,340 72 70 812 520 1,908 100 20 98 428 22 66 889 12 26 176 146 234 5,822 480 234 1,692 L-Bar 110 39 134 203 91 146 114 21 53 126 31 181 185 487 1 275 127 2 209 209 47 196 30 63 46 209 120 8 9 156 72 7 58 40 106 50 20 7 107 11 22 127 4 26 44 73 78 41 160 39 141 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/18/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 CI 1 5 6 3 3 1 1 1 2 1 1 2 1 5 1,425 2 10 7 1 31 1 12 60 1 1 3 3 7 52 2 14 16 2 7 2 13 2 5 6 8 8 6 11 10 3 14 1 3 6 9 8 CMI 149 615 708 342 129 19 35 34 166 44 50 94 264 840 25,650 138 780 833 74 3,906 73 1,548 11,640 114 291 504 246 714 2,132 146 1,232 2,224 136 1,141 152 845 530 10 1,008 1,320 168 954 1,826 770 243 2,422 209 309 594 90 856 L-Bar 149 123 118 114 43 19 35 34 83 44 50 47 264 168 18 69 78 119 74 126 73 129 194 114 291 168 82 102 41 73 88 139 68 163 76 65 265 2 168 165 21 159 166 77 81 173 209 103 99 10 107 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 11/19/2014 CI CMI 7 1 7 21 7 9 1 5 6 7 23 2 6 4 1 18 3 26 8 1 10 3 3 1 2 12 6 8 2 22 6 1 7 13 2 1 1 2 4 1 2 29 8 4 1 1 2 7 2 1 11 798 108 371 1,890 567 1,008 211 365 246 672 2,438 100 966 348 17 1,854 120 4,602 312 112 190 306 159 79 84 912 696 904 178 1,474 870 146 777 1,482 118 142 44 134 484 108 204 261 840 24 62 60 342 483 96 68 1,243 L-Bar 114 108 53 90 81 112 211 73 41 96 106 50 161 87 17 103 40 177 39 112 19 102 53 79 42 76 116 113 89 67 145 146 111 114 59 142 44 67 121 108 102 9 105 6 62 60 171 69 48 68 113 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/19/2014 11/19/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 CI CMI 15 1 5 1 7 4 10 3 4 6 1 2 34 1 1 2 7 4 6 20 11 11 1 3 21 8 22 1 2 7 11 4 1 7 1 2 4 24 6 10 2 10 12 2 26 1 7 8 6 9 5 3,690 351 230 59 602 272 2,850 225 500 306 157 88 10,098 209 184 476 518 192 120 3,180 77 935 104 279 819 312 110 282 336 2,338 286 536 117 1,162 45 556 204 1,536 666 510 222 820 2,508 82 962 90 56 1,104 1,194 693 905 L-Bar 246 351 46 59 86 68 285 75 125 51 157 44 297 209 184 238 74 48 20 159 7 85 104 93 39 39 5 282 168 334 26 134 117 166 45 278 51 64 111 51 111 82 209 41 37 90 8 138 199 77 181 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/20/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 CI CMI 2 1 8 2 2 5 1 18 42 4 7 22 1 5 2 3 1 2 11 4 1 8 6 1 1 3 9 7 1 1 1 8 15 6 10 12 10 1 1 16 1 1 9 2 1 16 5 1 1 1 1 238 92 496 216 50 155 51 738 756 640 434 1,650 211 485 118 288 119 500 77 520 33 624 24 179 150 120 747 441 188 55 199 472 495 270 930 24 540 82 259 304 79 50 1,116 382 168 2,000 540 143 122 58 88 L-Bar 119 92 62 108 25 31 51 41 18 160 62 75 211 97 59 96 119 250 7 130 33 78 4 179 150 40 83 63 188 55 199 59 33 45 93 2 54 82 259 19 79 50 124 191 168 125 108 143 122 58 88 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 CI CMI 7 16 2 3 14 8 3 8 1 10 8 13 8 3 62 8 7 7 2 2 3 5 26 1 18 8 44 9 4 8 13 2 7 8 42 4 1 1 1 4 15 26 6 18 4 5 8 1 6 8 4 385 1,792 384 183 1,162 120 591 528 79 1,930 1,592 5,551 840 549 2,666 24 539 819 166 64 258 400 286 118 126 664 220 963 256 512 390 60 1,113 984 588 96 118 42 117 16 1,455 4,680 36 414 328 45 88 27 576 24 132 L-Bar 55 112 192 61 83 15 197 66 79 193 199 427 105 183 43 3 77 117 83 32 86 80 11 118 7 83 5 107 64 64 30 30 159 123 14 24 118 42 117 4 97 180 6 23 82 9 11 27 96 3 33 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED Date 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/21/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/22/2014 11/23/2014 11/23/2014 11/23/2014 11/23/2014 11/23/2014 11/23/2014 11/23/2014 11/24/2014 CI CMI 5 7 8 17 1 7 5 1 4 9 9 13 3 4 3 1 11 1 42 3 18 3 1 1 10 2 1 21 80 8 2 10 2 1 2 1 1 2 1 1 1 1 1 10 17 1 4 1 2 1 2 195 448 40 2,958 94 455 1,250 83 348 1,053 630 572 546 40 225 13 99 137 336 411 90 72 293 151 630 182 166 2,961 8,720 1,792 510 1,280 186 207 330 71 111 180 145 54 51 232 40 380 1,802 30 176 92 24 223 192 L-Bar 39 64 5 174 94 65 250 83 87 117 70 44 182 10 75 13 9 137 8 137 5 24 293 151 63 91 166 141 109 224 255 128 93 207 165 71 111 90 145 54 51 232 40 38 106 30 44 92 12 223 96 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 CI CMI 4 1 12 8 3 3 1 1 9 2 1 2 2 1 96 10 14 4 8 4 2 10 6 1 2 7 3 24 35 9 8 8 2 7 9 8 28 1 3 2 6 56 7 6 1 2 12 3 8 5 4 456 138 2,904 376 1,470 354 61 149 1,107 304 48 214 276 114 20,279 130 6,692 424 48 8 90 770 438 89 254 581 204 7,152 2,905 63 224 488 110 1,057 990 1,136 3,528 185 324 182 870 6,608 1,127 366 173 160 1,872 447 592 590 300 L-Bar 114 138 242 47 490 118 61 149 123 152 48 107 138 114 504 13 478 106 6 2 45 77 73 89 127 83 68 298 83 7 28 61 55 151 110 142 126 185 108 91 145 118 161 61 173 80 156 149 74 118 75 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/24/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 CI 2 8 3 1 8 4 22 10 8 11 2 3 7 1 15 5 4 2 10 7 11 4 6 9 6 8 1 3 2 2,043 1,739 1 1 10 1 10 2 2 5 5 7 2 3 6 7 9 1 3 3 1 3 CMI 28 392 96 96 496 588 1,100 520 1,960 825 340 90 553 92 660 20 764 252 700 217 979 256 660 1,485 1,014 80 128 261 118 73,548 62,604 150 170 960 84 710 130 2 715 505 504 74 288 570 1,218 1,143 102 222 282 33 894 L-Bar 14 49 32 96 62 147 50 52 245 75 170 30 79 92 44 4 191 126 70 31 89 64 110 165 169 10 128 87 59 36 36 150 170 96 84 71 65 1 143 101 72 37 96 95 174 127 102 74 94 33 298 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 11/25/2014 CI CMI 38 11 4 4 14 11 7 4 44 10 9 8 103 1 30 13 3 2 6 4 5 18 9 3 4 10 6 4 5 2 4 11 21 20 8 5 1 7 1 3 26 8 17 1 8 3 5 6 5 11 1 4,446 396 148 580 56 2,211 1,925 316 5,104 2,270 1,962 1,744 24,514 22 6,540 1,287 300 94 1,278 608 930 2,952 387 270 100 1,240 372 444 150 98 432 759 378 3,340 232 350 84 42 130 12 182 56 17 7 1,264 18 460 360 30 847 272 L-Bar 117 36 37 145 4 201 275 79 116 227 218 218 238 22 218 99 100 47 213 152 186 164 43 90 25 124 62 111 30 49 108 69 18 167 29 70 84 6 130 4 7 7 1 7 158 6 92 60 6 77 272 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 11/25/2014 11/25/2014 11/25/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/26/2014 11/27/2014 11/27/2014 11/28/2014 11/28/2014 11/28/2014 11/29/2014 11/29/2014 11/29/2014 11/29/2014 11/29/2014 CI CMI 1 1 16 17 30 9 7 8 1 12 11 1 11 52 6 3 1 1 6 4 8 10 8 8 1 10 4 3 2 4 5 7 7 1 3 22 1 2 5 6 9 1 1 1 5 8 1 2 2 1 2 50 126 3,952 2,482 4,710 459 441 352 57 1,308 2,112 184 550 10,972 246 258 14 168 936 252 664 700 64 936 198 670 420 78 118 176 530 280 1,001 48 57 286 286 236 580 24 666 104 220 200 125 224 90 290 136 68 110 L-Bar 50 126 247 146 157 51 63 44 57 109 192 184 50 211 41 86 14 168 156 63 83 70 8 117 198 67 105 26 59 44 106 40 143 48 19 13 286 118 116 4 74 104 220 200 25 28 90 145 68 68 55 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 11/29/2014 11/30/2014 11/30/2014 11/30/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 CI CMI 1 18 1 6 1 1 6 6 5 2 13 6 4 8 4 1 11 1 8 7 17 4 9 1 4 5 7 2 41 12 2 1 5 18 6 1 7 2 2 5 18 1 1 4 3 7 2 4 4 83 8 322 1,278 31 114 138 87 1,206 1,050 395 172 650 924 504 624 700 21 121 92 4,008 371 221 628 2,538 90 196 545 119 60 12,269 624 44 112 730 1,746 432 99 742 188 518 290 1,584 116 87 200 90 686 26 56 280 10,624 1,016 L-Bar 322 71 31 19 138 87 201 175 79 86 50 154 126 78 175 21 11 92 501 53 13 157 282 90 49 109 17 30 322 52 22 112 146 97 72 99 106 94 259 58 88 116 87 50 30 98 13 14 70 128 127 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/1/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 CI CMI 1 5 18 3 1 1 2 17 3 5 2 3 1 5 1 3 1 1 4 1 10 1 1 2 3 8 2 5 3 6 8 1 8 2 1 1 27 1 1 1 1 2 8 6 18 3 4 2 9 16 3 6 560 2,016 165 164 59 266 1,411 174 495 152 87 139 685 204 12 47 2 68 99 450 174 118 204 84 664 34 745 24 294 880 58 104 200 353 35 13,338 161 67 80 118 204 1,136 804 1,332 354 468 354 63 1,120 321 L-Bar 6 112 112 55 164 59 133 83 58 99 76 29 139 137 204 4 47 2 17 99 45 174 118 102 28 83 17 149 8 49 110 58 13 100 353 35 494 161 67 80 118 102 142 134 74 118 117 177 7 70 107 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 CI CMI 17 7 7 8 1 10 15 31 1 7 4 4 13 8 2 29 4 1 1 4 40 1 6 1 1 31 127 3 16 34 2 126 2 9 2 1 2 2 1 61 1 5 17 17 3 10 11 21 23 4 9 2,533 2,695 1,505 288 207 2,430 2,985 2,232 270 2,009 124 292 3,731 32 110 9,164 400 34 278 372 8,200 26 1,170 251 241 6,820 2,413 48 480 6,426 122 23,562 18 27 42 111 632 318 27 10,614 138 1,280 1,088 1,088 327 1,090 1,342 6,363 6,785 100 459 L-Bar 149 385 215 36 207 243 199 72 270 287 31 73 287 4 55 316 100 34 278 93 205 26 195 251 241 220 19 16 30 189 61 187 9 3 21 111 316 159 27 174 138 256 64 64 109 109 122 303 295 25 51 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/2/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 CI 6 5 5 1 12 1 1 5 2 20 6 1 3 5 2 18 2 17 1 8 4 1 3 1 1 3 7 5 1,839 3 4 8 3 2 3 2 2 18 1 1 1 2 14 2 19 98 16 1 2 8 1 CMI 318 210 995 167 72 54 10 305 288 2,600 312 36 63 445 102 1,476 112 1,343 73 176 160 114 93 73 62 192 679 5 66,204 129 180 24 243 68 378 38 60 1,314 26 221 238 176 5,439 196 3,914 53,704 1,040 41 212 808 25 L-Bar 53 42 199 167 6 54 10 61 144 130 52 36 21 89 51 82 56 79 73 22 40 114 31 73 62 64 97 1 36 43 45 3 81 34 126 19 30 73 26 221 238 88 416 98 206 548 65 41 106 101 25 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 CI CMI 9 16 8 8 2 3 1 1 6 4 12 29 7 6 4 5 1 21 6 2 15 25 4 1 10 4 1 22 1 1 1 2 3 137 9 22 5 14 1 5 2 3 7 2 7 1 16 10 1 5 1 1,611 832 848 2,712 138 276 240 13 114 88 4,092 7,134 476 54 28 105 192 7,329 1,116 194 885 1,400 140 62 2,590 112 141 6,182 83 214 68 580 84 959 1,656 6,512 425 6,440 28 390 214 450 966 340 119 18 880 1,250 25 750 41 L-Bar 179 52 106 339 69 92 240 13 19 22 341 246 68 9 7 21 192 349 186 97 59 56 35 62 259 28 141 281 83 214 68 290 28 7 184 296 85 460 28 78 107 150 138 170 17 18 55 125 25 150 41 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/3/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 CI CMI 1 2 9 9 15 1 3 7 2 13 1 3 1 19 4 4 6 4 1 6 4 2 2 6 4 1 11 7 2 2 1 12 5 2 4 1 1 4 3 3 1 1 3 4 21 2 8 3 3 26 5 93 34 360 414 2,760 64 330 126 172 949 78 78 85 1,121 420 32 84 620 35 204 568 258 124 336 244 201 1,122 931 102 238 56 564 1,347 68 456 43 42 48 783 204 39 21 585 988 11,256 344 464 189 474 2,392 320 L-Bar 93 17 40 46 184 64 110 18 86 73 78 26 85 59 105 8 14 155 35 34 142 129 62 56 61 201 102 133 51 119 56 47 343 34 114 43 42 12 261 68 39 21 195 247 536 172 58 63 158 92 64 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 CI CMI 1 8 2 4 5 8 10 6 1 10 7 29 2 14 83 26 2 1 7 4 21 2 3 67 10 2 24 1 13 12 1 3 9 3 6 10 6 5 6 11 8 1 5 1 3 2 1 2 1 6 7 144 1,152 112 996 275 488 1,710 312 118 200 21 8,787 146 4,438 11,205 6,630 110 130 1,239 176 8,778 98 420 13,735 1,870 316 1,896 240 4,108 1,476 100 207 666 519 372 3,170 282 610 126 2,134 704 20 240 65 816 150 183 58 58 330 630 L-Bar 144 144 56 249 55 61 171 52 118 20 3 303 73 317 135 255 55 130 177 44 418 49 140 205 187 158 79 240 316 123 100 69 74 173 62 317 47 122 21 194 88 20 48 65 272 75 183 29 58 55 90 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 CI CMI 5 8 1 6 8 3 3 11 5 1 4 6 7 15 11 17 2 7 1 6 8 6 27 2 2 1 2 6 2 3 7 1 3 1 12 3 1 2 1 9 69 37 8 2 3 8 1 3 2 3 8 570 720 103 570 320 267 384 231 255 97 700 252 168 2,415 1,100 1,088 56 546 104 216 688 558 3,483 124 568 47 140 426 32 408 112 49 366 118 384 108 144 6 15 504 483 1,221 328 192 150 520 40 156 70 651 1,176 L-Bar 114 90 103 95 40 89 128 21 51 97 175 42 24 161 100 64 28 78 104 36 86 93 129 62 284 47 70 71 16 136 16 49 122 118 32 36 144 3 15 56 7 33 41 96 50 65 40 52 35 217 147 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/4/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 CI CMI 5 8 2 1 3 1 1 6 5 1 11 3 8 2 1 1 5 1 17 1 1 3 1 7 2 4 3 1 1 8 5 3 2 13 2 3 6 1 5 2 21 1 7 3 3 2 1 1 1 4 4 800 328 42 121 615 232 183 1,446 1,870 240 1,122 750 1,064 238 217 226 700 416 4,692 184 87 516 46 1,946 260 212 309 162 97 2,128 755 87 166 156 300 246 252 269 1,220 180 1,827 102 259 645 489 76 233 84 133 192 184 L-Bar 160 41 21 121 205 232 183 241 374 240 102 250 133 119 217 226 140 416 276 184 87 172 46 278 130 53 103 162 97 266 151 29 83 12 150 82 42 269 244 90 87 102 37 215 163 38 233 84 133 48 46 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/5/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 CI CMI 1 8 15 4 2 1 2 8 3 13 4 3 6 3 3 12 3 1 4 2 4 6 4 1 3 1 1 3 2 14 3 16 1 1 3 29 1 1 4 14 10 14 12 1 17 1 2 2 35 4 3 38 448 135 476 720 24 158 376 369 1,326 1,248 453 1,014 27 357 396 369 120 248 76 288 1,098 660 28 264 57 144 171 164 2,926 297 720 138 230 396 1,653 124 29 376 826 1,440 644 612 238 289 397 534 196 2,520 104 420 L-Bar 38 56 9 119 360 24 79 47 123 102 312 151 169 9 119 33 123 120 62 38 72 183 165 28 88 57 144 57 82 209 99 45 138 230 132 57 124 29 94 59 144 46 51 238 17 397 267 98 72 26 140 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/6/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/7/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 CI 1 1 2 3 2 10 1 10 3 1 10 1 1 3 1,500 1,678 2 1 16 1 15 1 1 1 2 1 2 1 1 8 2 4 1 11 5 9 7 10 16 8 1 12 7 2 8 9 19 5 4 17 12 CMI 146 145 296 279 84 830 37 990 174 116 610 17 29 315 46,500 46,984 1,146 146 672 188 1,185 162 173 58 34 42 46 107 23 168 208 436 163 869 340 819 812 1,070 2,272 1,880 475 2,616 1,897 142 440 351 760 1,345 68 867 996 L-Bar 146 145 148 93 42 83 37 99 58 116 61 17 29 105 31 28 573 146 42 188 79 162 173 58 17 42 23 107 23 21 104 109 163 79 68 91 241 107 142 235 475 218 271 71 55 39 40 269 17 51 83 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED Date 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 CI CMI 8 1 1 8 7 10 8 8 1 9 9 4 1 3 16 5 8 8 26 6 12 1 7 2 1 3 6 1 2 8 3 8 10 6 16 1 3 5 2 14 8 2 7 7 8 6 12 13 7 4 7 800 48 9 1,088 203 1,080 952 952 185 621 126 412 9 30 1,056 980 520 440 7,930 522 1,644 213 1,001 500 131 75 378 99 168 728 303 768 1,080 690 4,160 134 216 5 102 2,268 2,504 304 1,127 875 2,008 372 1,176 1,313 140 480 350 L-Bar 100 48 9 136 29 108 119 119 185 69 14 103 9 10 66 196 65 55 305 87 137 213 143 250 131 25 63 99 84 91 101 96 108 115 260 134 72 1 51 162 313 152 161 125 251 62 98 101 20 120 50 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/8/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 CI 7 4 1,467 6 1 1 1 9 2 2 7 4 10 8 1 8 7 5 4 3 5 9 1 1 7 17 4 1 2 36 3 1 5 9 19 1 5 7 10 6 2 6 31 1 5 1 10 6 1 9 10 CMI 518 232 13,203 444 70 95 25 1,053 144 238 448 168 850 480 94 608 364 425 68 147 470 234 54 45 791 867 408 209 126 8,352 348 71 905 666 3,230 57 415 385 890 588 246 1,314 620 274 30 167 3,260 360 168 225 1,810 L-Bar 74 58 9 74 70 95 25 117 72 119 64 42 85 60 94 76 52 85 17 49 94 26 54 45 113 51 102 209 63 232 116 71 181 74 170 57 83 55 89 98 123 219 20 274 6 167 326 60 168 25 181 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 CI CMI 4 8 5 140 139 5 5 3 11 3 24 1 12 7 7 32 26 2 10 4 15 4 6 6 10 7 2 13 11 3 2 4 1 2 2 1 8 2 2 8 9 1 5 1 29 1 2 15 13 1 12 520 616 110 67,060 66,581 920 470 483 407 498 3,720 2 84 1,015 259 4,064 10,114 118 900 256 3,105 456 66 270 2,210 1,526 436 1,339 22 222 232 460 168 70 250 64 328 166 34 368 72 73 230 205 2,088 93 90 1,410 104 29 792 L-Bar 130 77 22 479 479 184 94 161 37 166 155 2 7 145 37 127 389 59 90 64 207 114 11 45 221 218 218 103 2 74 116 115 168 35 125 64 41 83 17 46 8 73 46 205 72 93 45 94 8 29 66 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/9/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 CI CMI 5 9 3 1 10 4 4 7 6 1 185 6 8 1 14 1 1 1 1 1 12 11 10 1 1 1 3 10 2 1 4 1 4 8 5 8 4 7 1 1 1 2 1 3 4 7 13 1 2 10 6 270 936 30 210 880 964 492 497 426 60 3,885 546 1,272 50 1,596 42 42 41 41 181 876 858 1,380 41 120 15 237 970 332 36 348 45 500 104 675 656 32 742 251 388 293 248 127 180 876 574 1,196 252 532 1,810 360 L-Bar 54 104 10 210 88 241 123 71 71 60 21 91 159 50 114 42 42 41 41 181 73 78 138 41 120 15 79 97 166 36 87 45 125 13 135 82 8 106 251 388 293 124 127 60 219 82 92 252 266 181 60 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 CI CMI 25 4 16 4 1 4 2 35 3 20 4 19 12 3 7 12 22 6 4 4 8 8 8 7 10 21 4 25 1 38 4 4 143 4 8 48 26 1 34 4 12 19 6 1 92 2 13 8 2 10 5 8,025 260 2,752 456 229 324 156 17,500 846 1,500 508 2,812 2,052 507 1,456 624 4,488 306 268 204 520 1,232 1,784 343 1,240 2,835 528 3,825 4 8,436 48 136 2,717 76 32 4,800 2,002 116 3,094 52 2,712 2,147 882 63 14,812 130 169 384 152 180 195 L-Bar 321 65 172 114 229 81 78 500 282 75 127 148 171 169 208 52 204 51 67 51 65 154 223 49 124 135 132 153 4 222 12 34 19 19 4 100 77 116 91 13 226 113 147 63 161 65 13 48 76 18 39 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 12/10/2014 CI CMI 3 2 1 3 4 7 5 2 17 1 154 3 6 2 8 12 9 16 3 5 6 1 10 2 1 2 5 6 6 5 10 6 2 1 1 3 3 5 2 1 2 1 1 2 1 3 1 1 1 1 1 849 470 67 489 416 637 570 72 1,921 68 5,544 291 108 132 336 1,248 306 1,424 159 370 102 81 1,070 302 133 172 370 432 282 455 150 750 80 192 177 201 441 575 284 125 232 113 12 34 54 150 138 50 123 171 76 L-Bar 283 235 67 163 104 91 114 36 113 68 36 97 18 66 42 104 34 89 53 74 17 81 107 151 133 86 74 72 47 91 15 125 40 192 177 67 147 115 142 125 116 113 12 17 54 50 138 50 123 171 76 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 CI CMI 13 1 2 1 19 14 22 6 8 4 1 1 8 2 1 1 27 5 1 10 4 1 1 1 7 4 1 3 2 7 3 1 8 1 3 17 1 1 4 8 3 3 3 1 4 4 3 1 1 8 29 780 12 238 125 1,558 686 1,474 720 672 444 207 44 808 978 45 75 4,590 375 127 730 876 88 77 85 1,036 296 75 228 146 763 201 282 152 35 498 136 340 140 1,424 160 201 405 297 163 752 476 213 72 80 16 2,349 L-Bar 60 12 119 125 82 49 67 120 84 111 207 44 101 489 45 75 170 75 127 73 219 88 77 85 148 74 75 76 73 109 67 282 19 35 166 8 340 140 356 20 67 135 99 163 188 119 71 72 80 2 81 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED Date 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 CI CMI 8 12 7 354 5 2 3 6 5 6 16 9 46 11 1 7 4 3 48 1 8 3 2 6 8 13 5 4 3 2 175 4 9 5 2 31 2 2 8 5 1 10 1 1 12 1 4 1 1 8 11 472 552 1,064 8,850 695 140 1,047 708 650 90 1,488 1,017 276 1,419 69 1,071 244 306 6,480 144 392 213 134 510 968 1,443 120 628 96 274 7,175 164 684 365 40 5,456 190 230 16 540 84 500 98 74 1,620 82 640 97 390 536 682 L-Bar 59 46 152 25 139 70 349 118 130 15 93 113 6 129 69 153 61 102 135 144 49 71 67 85 121 111 24 157 32 137 41 41 76 73 20 176 95 115 2 108 84 50 98 74 135 82 160 97 390 67 62 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/11/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 CI CMI 2 4 1 1 15 7 1 2 16 2 1 70 5 4 2 7 2 1 2 12 8 10 6 8 1 4 2 17 18 4 2 9 9 61 1 1 8 2 3 2 5 1 3 1 7 1 3 2 6 14 2 338 424 20 54 150 483 156 164 272 86 131 280 350 384 386 651 184 98 362 732 1,720 820 1,206 776 121 72 54 34 4,770 60 98 1,089 918 2,501 67 108 856 138 342 374 165 282 525 122 56 54 411 120 150 280 166 L-Bar 169 106 20 54 10 69 156 82 17 43 131 4 70 96 193 93 92 98 181 61 215 82 201 97 121 18 27 2 265 15 49 121 102 41 67 108 107 69 114 187 33 282 175 122 8 54 137 60 25 20 83 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/12/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 CI CMI 3 3 4 9 11 2 4 1 4 25 2 3 8 3 1 1 2 1 3 3 9 15 2 6 4 1 2 2 8 4 2 1 1 2 1 1 2 3 3 8 6 4 1 10 2 4 36 3 2 1 3 30 246 216 198 1,265 362 464 24 12 2,075 114 141 1,024 180 132 91 194 43 114 99 1,044 210 244 30 84 104 158 378 416 548 74 161 486 142 246 104 630 1,128 489 456 1,026 744 236 940 52 356 1,080 180 42 71 162 L-Bar 10 82 54 22 115 181 116 24 3 83 57 47 128 60 132 91 97 43 38 33 116 14 122 5 21 104 79 189 52 137 37 161 486 71 246 104 315 376 163 57 171 186 236 94 26 89 30 60 21 71 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/13/2014 12/14/2014 12/14/2014 12/14/2014 12/14/2014 12/14/2014 12/14/2014 12/14/2014 12/14/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 CI CMI 3 2 2 7 1 19 6 1 24 8 1 1 1 10 1 1 1 167 7 10 1 1 1 4 5 7 8 1 1 5 12 3 8 9 8 4 7 4 5 41 17 3 8 2 16 1 6 45 1 2 5 9 136 110 504 41 3,078 354 61 1,752 640 3,678 297 65 820 28 375 173 167 112 740 81 168 214 1,072 530 749 456 99 170 330 2,196 510 1,072 1,242 1,328 328 616 116 65 16,687 1,904 90 1,224 268 1,616 128 324 3,465 86 130 1,045 L-Bar 3 68 55 72 41 162 59 61 73 80 3,678 297 65 82 28 375 173 1 16 74 81 168 214 268 106 107 57 99 170 66 183 170 134 138 166 82 88 29 13 407 112 30 153 134 101 128 54 77 86 65 209 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 CI CMI 11 48 7 3 6 2 2 1 5 1 6 1 6 4 1 6 10 26 1 3 8 2 8 14 4 7 116 7 1 5 10 5 2 1 11 1 2 1 1 4 2 10 4 9 2 17 16 1 2 7 6 1,221 618 1,624 21 456 108 252 8 640 18 2,478 118 642 188 236 462 580 1,664 26 234 312 80 720 2,338 156 455 4,176 35 150 205 540 325 306 51 264 106 238 299 137 184 208 1,500 592 855 52 2,278 1,008 200 200 497 582 L-Bar 111 115 232 7 76 54 126 8 128 18 413 118 107 47 236 77 58 64 26 78 39 40 90 167 39 65 36 5 150 41 54 65 153 51 24 106 119 299 137 46 104 150 148 95 26 134 63 200 100 71 97 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/15/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 CI CMI 4 5 8 4 1 9 4 3 4 1 2 10 2 3 4 3 4 4 5 6 2 3 1 1 2 1 1 9 1 1 5 6 9 1 4 7 6 19 32 1 3 9 16 39 2 4 1 25 119 4 9 564 70 456 448 22 540 324 390 460 89 184 90 52 9 344 216 284 496 195 234 104 279 142 51 290 39 159 801 314 383 915 846 1,107 124 836 839 750 1,159 1,664 165 696 738 3,840 4,446 336 184 64 2,975 18,207 928 576 L-Bar 141 14 57 112 22 60 81 130 115 89 92 9 26 3 86 72 71 124 39 39 52 93 142 51 145 39 159 89 314 383 183 141 123 124 209 135 125 61 52 165 232 82 240 114 168 46 64 119 153 232 64 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 CI CMI 6 9 10 10 10 19 19 10 8 4 3 8 6 51 2 8 8 3 7 1 6 10 1 5 16 4 8 26 5 12 3 1 1 8 2 1 2 3 1 3 5 3 8 8 28 96 8 1 2 5 1 36 279 310 300 300 551 6,688 290 968 296 174 384 486 7,446 256 448 352 309 623 196 810 2,670 126 30 3,024 552 1,232 780 280 204 63 54 56 976 60 71 162 555 112 63 1,215 489 1,712 712 1,652 1,056 808 75 140 320 74 L-Bar 6 31 31 30 30 29 352 29 121 74 58 48 81 146 128 56 44 103 89 196 135 267 126 6 189 138 154 30 56 17 21 54 56 122 30 71 81 185 112 21 243 163 214 89 59 11 101 75 70 64 74 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 CI CMI 7 7 7 9 6 3 9 7 14 28 2 2 1 15 5 1 18 7 1 10 3 4 4 4 1 10 1 2 1 4 8 11 2 3 19 8 4 2 2 4 6 2 3 1 4 1 9 3 5 4 2 637 770 770 990 660 165 774 385 742 476 10 246 125 1,515 1,245 232 2,178 196 135 600 165 524 560 184 54 250 112 92 196 404 984 1,408 176 261 1,045 992 496 298 168 348 624 174 405 109 264 108 171 429 60 312 310 L-Bar 91 110 110 110 110 55 86 55 53 17 5 123 125 101 249 232 121 28 135 60 55 131 140 46 54 25 112 46 196 101 123 128 88 87 55 124 124 149 84 87 104 87 135 109 66 108 19 143 12 78 155 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/16/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 CI CMI 1 3 1 7 2 7 15 2 2 2 1 42 9 4 1 3 4 3 6 11 2 1 15 2 5 1 12 10 2 4 8 1 2 12 1 3 6 1 1 1 1 123 11 1 3 1 2 10 4 8 7 23 78 84 105 152 189 1,140 180 482 508 220 3,864 765 184 135 390 892 402 510 319 250 250 2,415 382 670 215 864 1,230 14 516 536 135 306 3,996 205 360 552 18 165 220 282 10,209 264 66 465 128 228 2,480 496 1,976 35 L-Bar 23 26 84 15 76 27 76 90 241 254 220 92 85 46 135 130 223 134 85 29 125 250 161 191 134 215 72 123 7 129 67 135 153 333 205 120 92 18 165 220 282 83 24 66 155 128 114 248 124 247 5 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 CI CMI 8 7 4 1 14 42 8 2 1 9 6 1 3 26 3 5 1 3 3 13 12 10 2 4 3 7 1 1 9 6 2 19 8 3 4 5 11 11 5 12 11 2 1 4 2 2 3 4 3 1 2 944 1,176 400 268 1,456 4,032 128 96 128 351 1,050 106 606 2,028 279 140 291 186 210 2,509 2,316 660 202 360 90 385 222 29 423 336 36 2,033 1,024 351 192 190 1,474 66 335 600 616 288 254 964 210 320 459 16 336 102 246 L-Bar 118 168 100 268 104 96 16 48 128 39 175 106 202 78 93 28 291 62 70 193 193 66 101 90 30 55 222 29 47 56 18 107 128 117 48 38 134 6 67 50 56 144 254 241 105 160 153 4 112 102 123 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/17/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 CI CMI 7 1 1 4 1 10 1 10 4 3 1 3 2 1 27 1 1 1 15 1 3 23 2 10 1 17 4 1 11 7 10 28 1 1 15 17 2 63 7 2 1 5 8 7 11 2 7 7 6 9 1 875 159 107 252 56 690 93 590 512 36 62 258 382 379 7,074 271 404 76 1,770 91 297 5,198 36 760 45 1,700 684 67 286 469 2,410 7,560 136 54 1,365 1,326 4 4,536 938 594 227 140 944 973 759 278 1,029 259 288 405 276 L-Bar 125 159 107 63 56 69 93 59 128 12 62 86 191 379 262 271 404 76 118 91 99 226 18 76 45 100 171 67 26 67 241 270 136 54 91 78 2 72 134 297 227 28 118 139 69 139 147 37 48 45 276 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 CI CMI 7 3 9 12 3 7 4 1 5 6 9 216 8 30 1 4 3 7 5 6 7 4 1 1 8 18 3 2 7 1 1 67 10 3 8 24 7 48 1 19 1 7 2 4 4 8 1 2 2 7 3 280 291 1,332 2,328 234 588 160 138 200 240 909 3,024 1,232 3,180 18 208 33 1,617 860 1,032 1,204 164 336 429 192 990 129 296 406 25 13 6,901 790 162 1,024 720 952 2,016 89 1,691 85 448 26 40 84 304 73 362 222 665 120 L-Bar 40 97 148 194 78 84 40 138 40 40 101 14 154 106 18 52 11 231 172 172 172 41 336 429 24 55 43 148 58 25 13 103 79 54 128 30 136 42 89 89 85 64 13 10 21 38 73 181 111 95 40 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/18/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 CI CMI 1 5 8 8 2 181 5 1 5 5 4 2 40 1 5 3 3 5 1 2 7 9 8 2 8 1 1 15 1 4 3 2 2 2 1 3 17 3 2 3 10 6 38 5 25 2 1 2 1 1 13 346 315 560 544 206 8,507 965 11 320 275 420 46 2,160 71 790 453 411 550 21 40 266 819 736 62 80 84 19 120 140 364 219 22 238 60 1,448 54 9,231 1,677 72 195 330 630 494 480 5,375 22 180 534 39 75 1,326 L-Bar 346 63 70 68 103 47 193 11 64 55 105 23 54 71 158 151 137 110 21 20 38 91 92 31 10 84 19 8 140 91 73 11 119 30 1,448 18 543 559 36 65 33 105 13 96 215 11 180 267 39 75 102 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 12/19/2014 CI CMI 1 1 1 10 1 11 9 5 5 6 15 16 1 15 224 8 1 19 1 12 5 18 5 2 15 5 15 1 7 4 17 13 4 5 6 3 2 12 11 10 8 5 4 1 3 1 1 11 4 2 9 322 229 63 470 197 99 1,242 120 1,475 522 435 1,344 103 225 40,320 1,400 117 513 209 204 420 54 525 420 2,775 595 225 99 252 84 204 286 392 335 1,026 237 220 1,068 429 800 336 290 116 117 69 41 127 77 416 26 1,080 L-Bar 322 229 63 47 197 9 138 24 295 87 29 84 103 15 180 175 117 27 209 17 84 3 105 210 185 119 15 99 36 21 12 22 98 67 171 79 110 89 39 80 42 58 29 117 23 41 127 7 104 13 120 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 12/19/2014 12/19/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/20/2014 12/21/2014 12/21/2014 12/21/2014 12/21/2014 12/21/2014 12/21/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 CI CMI 1 2 1 2 4 8 3 3 2 1 4 1 4 2 4 5 7 7 17 2 1 1 1 2 1 15 24 9 4 31 2 4 2 3 13 12 2 1 1 4 31 2 2 31 3 2 3 31 4 10 1 41 264 115 442 212 280 180 24 132 154 416 15 120 216 148 260 308 182 833 484 201 194 175 90 165 1,350 2,784 513 228 3,689 208 312 198 126 1,365 2,040 318 289 288 784 3,627 180 48 4,836 312 156 216 3,906 24 50 95 L-Bar 41 132 115 221 53 35 60 8 66 154 104 15 30 108 37 52 44 26 49 242 201 194 175 45 165 90 116 57 57 119 104 78 99 42 105 170 159 289 288 196 117 90 24 156 104 78 72 126 6 5 95 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 CI CMI 8 8 11 1 4 7 8 6 6 5 4 3 26 4 4 4 3 12 1 17 3 7 7 7 9 9 9 9 12 13 1 1 1 6 13 1 2 8 1 11 10 5 28 2 5 2 3 8 241 5 4 752 952 682 34 808 875 104 588 840 40 672 105 8,892 36 712 680 180 1,164 120 2,108 327 875 791 595 792 648 792 954 2,124 130 243 201 113 318 1,287 138 70 584 19 2,323 1,530 75 560 306 30 264 273 456 2,289 490 228 L-Bar 94 119 62 34 202 125 13 98 140 8 168 35 342 9 178 170 60 97 120 124 109 125 113 85 88 72 88 106 177 10 243 201 113 53 99 138 35 73 19 290 153 15 20 153 6 132 91 57 17 98 57 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/22/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 CI CMI 1 6 1 9 10 10 1 1 3 8 1 1 33 1 2 6 9 5 4 14 3 23 2 1 14 4 2 34 3 58 10 2 6 3 5 3 3 1 1 8 1 9 47 10 6 7 5 4 7 8 4 39 420 144 783 850 30 22 113 186 192 222 11 2,673 52 184 222 1,233 410 216 1,344 207 2,208 232 79 4,648 632 10 2,108 147 19,662 1,470 360 726 480 495 309 261 102 81 776 135 387 5,593 60 2,118 189 410 104 623 520 176 L-Bar 39 70 144 87 85 3 22 113 62 24 222 11 81 52 92 37 137 82 54 96 69 96 116 79 332 158 5 62 49 339 147 180 121 160 99 103 87 102 81 97 135 43 119 6 353 27 82 26 89 65 44 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED Date 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 CI CMI 7 2 3 22 9 5 2 7 8 7 5 2 8 2 8 2 10 2 1 32 3 14 15 1 98 1 11 6 17 1 3 9 9 7 17 8 6 11 2 3 9 2 12 3 14 3 10 8 4 1 25 539 122 192 638 504 570 80 7 216 721 610 138 480 180 472 212 2,280 100 46 3,584 219 266 165 120 2,254 87 33 588 2,312 42 435 27 882 392 1,054 264 1,272 1,353 262 426 81 190 288 579 2,240 147 730 16 68 15 175 L-Bar 77 61 64 29 56 114 40 1 27 103 122 69 60 90 59 106 228 50 46 112 73 19 11 120 23 87 3 98 136 42 145 3 98 56 62 33 212 123 131 142 9 95 24 193 160 49 73 2 17 15 7 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/23/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/24/2014 12/26/2014 12/26/2014 12/26/2014 12/26/2014 12/26/2014 12/26/2014 12/26/2014 12/26/2014 CI CMI 4 8 2 2 2 3 4 7 5 7 5 7 15 2 9 13 2 3 2 1 2 1 1 4 13 12 1 16 3 3 6 7 1 7 21 7 5 7 8 2 14 5 13 4 3 1 1 6 4 8 3 152 472 52 148 250 135 260 147 460 224 285 420 75 68 729 442 214 222 92 67 434 64 129 444 130 492 60 1,328 177 246 180 1,582 106 966 4,536 245 350 1,225 56 116 2,184 330 234 388 18 71 70 144 40 2,104 18 L-Bar 38 59 26 74 125 45 65 21 92 32 57 60 5 34 81 34 107 74 46 67 217 64 129 111 10 41 60 83 59 82 30 226 106 138 216 35 70 175 7 58 156 66 18 97 6 71 70 24 10 263 6 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/26/2014 12/26/2014 12/26/2014 12/26/2014 12/27/2014 12/27/2014 12/27/2014 12/27/2014 12/27/2014 12/27/2014 12/28/2014 12/28/2014 12/28/2014 12/28/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 CI CMI 3 4 10 1 17 11 165 5 149 6 4 1 3 2 2 1 2 7 2 1 3 39 2 3 9 2 40 11 1 8 6 4 1 7 7 2 11 30 1 9 6 8 4 16 3 1 19 4 6 2 7 15 484 150 15 3,825 2,530 6,105 100 1,788 234 244 103 549 144 228 56 488 791 234 51 159 4,992 44 417 765 126 7,520 4,312 104 3,488 306 132 124 2,506 336 136 1,199 9,180 145 1,872 276 408 240 688 315 17 1,159 560 540 268 378 L-Bar 5 121 15 15 225 230 37 20 12 39 61 103 183 72 114 56 244 113 117 51 53 128 22 139 85 63 188 392 104 436 51 33 124 358 48 68 109 306 145 208 46 51 60 43 105 17 61 140 90 134 54 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/29/2014 CI CMI 2 5 1 9 7 8 4 2 2 103 5 2 1 1 25 24 5 3 3 1 3 5 8 6 1 1 1 2 8 3 2 4 8 11 16 16 3 2 19 6 2 4 2 1 10 4 4 4 2 2 24 36 480 95 657 84 136 20 244 158 1,957 160 208 121 36 4,525 2,136 90 147 582 116 120 930 312 192 154 214 25 270 952 504 94 92 776 671 1,600 1,904 99 136 3,097 318 162 72 28 96 880 392 408 240 200 200 3,984 L-Bar 18 96 95 73 12 17 5 122 79 19 32 104 121 36 181 89 18 49 194 116 40 186 39 32 154 214 25 135 119 168 47 23 97 61 100 119 33 68 163 53 81 18 14 96 88 98 102 60 100 100 166 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/29/2014 12/29/2014 12/29/2014 12/29/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 CI CMI 1 39 2 1 10 11 13 1 1 2 2 4 2 8 4 11 3 23 1 19 4 1 28 28 1 2 12 8 5 8 15 23 3 1 25 5 4 10 29 4 8 20 6 10 1 8 6 5 1 3 3 100 663 474 97 840 913 1,183 64 194 384 210 732 368 1,432 356 957 624 5,359 147 2,584 344 127 9,212 3,668 156 20 1,668 864 1,130 616 4,725 6,532 423 178 4,100 1,575 324 750 7,163 684 2,104 1,760 150 850 199 1,208 882 565 22 282 498 L-Bar 100 17 237 97 84 83 91 64 194 192 105 183 184 179 89 87 208 233 147 136 86 127 329 131 156 10 139 108 226 77 315 284 141 178 164 315 81 75 247 171 263 88 25 85 199 151 147 113 22 94 166 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED CUSTOMER REQUEST CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 CI CMI 124 4 1 1 5 3 8 2 3 7 13 11 11 105 2 1 1 8 4 6 10 8 6 5 10 6 3 6 4 5 4 1 6 11 8 9 1 1 8 9 15 3 1 1 4 3 8 8 3 31 20 1,612 404 64 177 1,015 633 328 160 216 784 663 825 2,343 840 364 216 216 336 232 612 130 1,504 624 620 1,430 282 156 300 188 420 612 84 786 770 408 1,062 28 140 104 675 1,335 144 117 82 600 408 384 992 105 9,610 660 L-Bar 13 101 64 177 203 211 41 80 72 112 51 75 213 8 182 216 216 42 58 102 13 188 104 124 143 47 52 50 47 84 153 84 131 70 51 118 28 140 13 75 89 48 117 82 150 136 48 124 35 310 33 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED Date 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/30/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 CI CMI 1 8 24 3 1 5 8 4 1 1 1 3 18 2 6 1 11 15 1 7 10 6 10 1 10 1 1 1 12 5 1 4 4 1 23 6 61 4 10 5 11 5 2 5 24 6 8 1 1 11 9 12 920 3,048 114 31 270 304 540 52 319 183 300 1,782 336 846 111 968 1,575 33 351 380 468 840 153 510 6 188 90 660 1,735 140 560 364 301 3,956 54 4,859 648 140 40 814 60 304 70 1,464 300 1,824 113 83 814 1,557 L-Bar 12 115 127 38 31 54 38 135 52 319 183 100 99 168 141 111 88 105 33 73 38 78 84 153 51 6 188 90 55 347 140 140 91 301 172 9 89 162 14 8 74 12 152 14 61 50 228 113 83 74 173 Repair Cost N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N Q13 - Distribution Excluded Outage Events Causation PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED PLANNED CUSTOMER REQUEST PLANNED PLANNED PLANNED CUSTOMER REQUEST Date 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 12/31/2014 CI CMI 1 3 13 3 7 2 1 85 4 5 6 1 100 1 3 9 8 6 10 5 1 67 6 91 27 385 90 70 1,445 700 35 684 3 1,700 65 216 270 384 504 30 330 200 L-Bar 67 2 7 9 55 45 70 17 175 7 114 3 17 65 72 30 48 84 3 66 200 Repair Cost N N N N N N N N N N N N N N N N N N N N N Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U Feeder ID# Sub Region FDR Type Custs OH Lat UG Lat Hybrid Lat OH Fdr & OCR Miles 403231 BR Hybrid 1770 13 35 4 4.7 0.5 7.3 3.9 12.0 4.4 16.4 4261 205303 Looped 0.27 9.27 57 13.20 403232 BR Hybrid 1685 8 33 6 4.3 0.0 2.2 3.0 6.5 3.0 9.5 2258 67489 Looped -0.20 7.90 22 13.20 403233 BR Hybrid 1 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Looped 0.05 13.05 0 13.20 403234 BR Hybrid 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Looped -0.44 5.26 0 13.20 403235 BR Hybrid 611 1 27 0 2.1 0.2 0.8 1.8 2.9 2.0 4.9 80 3547 Looped 0.00 4.10 5 13.20 403236 BR Hybrid 602 0 22 0 1.2 1.8 0.0 5.5 1.2 7.3 8.5 371 16156 Looped -0.37 6.73 2 13.20 403237 BR Hybrid 898 8 28 2 3.3 0.8 2.0 5.0 5.3 5.8 11.1 54 4817 Looped 0.11 6.11 12 13.20 403238 BR Hybrid 4 0 0 0 0.4 1.0 0.0 0.0 0.4 1.0 1.4 0 0 Looped 0.38 0.88 0 13.20 403239 BR Hybrid 26 0 6 0 0.6 2.9 0.0 0.2 0.6 3.1 3.7 0 0 Looped -0.54 7.76 0 13.20 403240 BR Hybrid 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Looped -0.28 0.22 0 13.20 400731 BR Hybrid 1342 9 25 1 1.8 2.2 1.1 2.1 2.9 4.3 7.2 5692 219714 Looped 0.00 6.50 17 13.20 400732 BR Hybrid 1232 3 28 2 1.2 2.6 1.2 2.1 2.4 4.7 7.1 169 19593 Looped 1.02 6.62 12 13.20 400733 BR Hybrid 758 8 15 5 3.3 0.9 3.0 1.5 6.3 2.4 8.7 789 15338 Looped 0.58 7.38 20 13.20 400734 BR Hybrid 1234 0 21 0 0.6 0.9 0.0 0.5 0.6 1.4 2.0 14 1049 Looped 0.42 4.62 4 13.20 400735 BR Hybrid 1638 14 24 4 3.4 0.1 2.8 2.7 6.2 2.8 9.0 274 20133 Looped 0.37 5.97 16 13.20 400736 BR Hybrid 1062 23 7 3 2.3 0.3 6.0 0.8 8.3 1.1 9.4 1726 123822 Looped 0.07 6.07 53 13.20 400737 BR Hybrid 2063 5 37 4 4.9 2.8 1.3 4.0 6.2 6.8 13.0 6044 244262 Looped 0.46 8.56 28 13.20 400738 BR Hybrid 825 1 26 0 0.7 2.7 0.1 2.3 0.8 5.0 5.8 773 50157 Looped -0.09 7.31 6 13.20 400739 BR Hybrid 1914 18 20 5 2.9 2.5 4.8 2.5 7.7 5.0 12.7 2683 172576 Looped 0.71 8.71 32 13.20 400740 BR Hybrid 817 5 14 6 2.0 1.4 2.2 2.4 4.2 3.8 8.0 1085 40753 Looped 0.44 6.24 24 13.20 404231 BR Hybrid 2079 5 40 5 2.2 0.6 2.9 11.8 5.1 12.4 17.5 4151 117038 Looped 0.62 8.22 37 13.20 404232 BR Hybrid 2140 11 30 4 2.5 1.0 3.2 6.9 5.7 7.9 13.6 205 29559 Looped 0.30 6.10 15 13.20 404233 BR Hybrid 2494 2 40 0 2.4 0.4 0.4 2.8 2.8 3.2 6.0 140 11204 Looped 1.94 7.14 8 13.20 404234 BR Hybrid 2413 4 24 2 2.1 2.7 1.0 5.0 3.1 7.7 10.8 5704 332548 Looped -0.39 7.31 25 13.20 404235 BR Hybrid 248 1 22 0 2.7 0.6 0.1 2.0 2.8 2.6 5.4 5 714 Looped -0.03 5.77 5 13.20 404236 BR Hybrid 558 9 12 1 1.9 1.8 2.2 2.3 4.1 4.1 8.2 122 7557 Looped 0.18 3.78 14 13.20 404237 BR Hybrid 453 0 25 0 1.5 1.8 0.0 6.3 1.5 8.1 9.6 157 12595 Looped 0.17 5.77 6 13.20 404238 BR UG 63 0 17 0 0.2 2.2 0.0 3.5 0.2 5.7 5.9 1 42 Looped -0.03 7.57 1 13.20 404239 BR Hybrid 1422 7 28 2 4.9 0.4 3.6 5.7 8.5 6.1 14.6 2101 177476 Looped -0.23 5.27 40 13.20 404240 BR UG 1397 0 28 0 0.8 3.0 0.0 13.0 0.8 16.0 16.8 36 6093 Looped 0.49 7.99 3 13.20 404241 BR Hybrid 1159 1 32 1 2.1 1.9 0.4 6.1 2.5 8.0 10.5 1482 31495 Looped 0.10 6.10 12 13.20 404242 BR Hybrid 438 5 15 4 1.4 1.0 0.7 0.9 2.1 1.9 4.0 487 59963 Looped -0.02 4.68 6 13.20 405931 BR Hybrid 1033 0 26 0 1.6 1.6 0.0 13.6 1.6 15.2 16.8 23 2223 Looped 0.01 7.11 8 13.20 405932 BR Hybrid 1320 0 29 0 2.8 0.7 0.0 14.0 2.8 14.7 17.5 342 48832 Looped -0.02 6.58 20 13.20 405933 BR Hybrid 1024 0 14 0 1.3 0.2 0.0 3.4 1.3 3.6 4.9 219 14655 Looped -0.07 2.63 7 13.20 405934 BR Hybrid 1318 1 25 0 2.3 1.9 0.1 12.1 2.4 14.0 16.4 347 32976 Looped 0.27 6.87 15 13.20 405935 BR Hybrid 1177 0 22 0 1.0 1.4 0.0 8.0 1.0 9.4 10.4 1244 19353 Looped 0.07 6.97 6 13.20 405936 BR UG 1523 0 26 0 0.7 3.1 0.0 11.2 0.7 14.3 15.0 5181 308492 Looped -0.29 5.51 28 13.20 405937 BR UG 763 0 19 0 0.0 2.2 0.0 8.8 0.0 11.0 11.0 164 22806 Looped 0.50 6.20 11 13.20 405938 BR Hybrid 315 2 8 0 0.4 3.2 0.2 3.1 0.6 6.3 6.9 13 3151 Looped -0.58 5.02 3 13.20 405939 BR Hybrid 1787 1 23 0 1.3 2.7 0.0 14.9 1.3 17.6 18.9 2099 45870 Looped 0.78 6.58 12 13.20 405940 BR Hybrid 1998 5 32 2 3.1 2.8 0.9 14.2 4.0 17.0 21.0 3498 56504 Looped -0.40 7.00 21 13.20 408031 BR Hybrid 890 8 22 3 2.3 0.1 1.7 2.4 4.0 2.5 6.5 146 17451 Looped 0.13 4.43 13 13.20 408032 BR Hybrid 1784 12 22 6 3.7 0.1 4.7 2.1 8.4 2.2 10.6 614 110602 Looped -0.03 7.87 35 13.20 408033 BR Hybrid 1036 10 21 5 3.8 0.2 3.0 1.3 6.8 1.5 8.3 1186 88270 Looped -1.20 6.00 26 13.20 408034 BR Hybrid 1379 13 17 1 3.3 0.0 5.5 0.5 8.8 0.5 9.3 4019 296279 Looped 0.01 5.72 43 13.20 408035 BR Hybrid 1566 12 24 3 4.0 1.0 2.6 2.8 6.6 3.8 10.4 2422 119654 Looped -0.49 5.81 18 13.20 405461 BR Hybrid 3353 6 71 0 4.6 2.7 1.0 25.8 5.6 28.5 34.1 16786 498646 Looped -0.68 11.92 24 22.90 Voltage Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U Feeder ID# Sub Region FDR Type Custs OH Lat UG Lat Hybrid Lat OH Fdr & OCR Miles 405462 BR Hybrid 3017 1 41 2 3.7 4.6 0.5 31.2 4.2 35.8 40.0 6798 265796 Looped -0.48 11.62 39 22.90 405463 BR Hybrid 1601 1 39 0 3.8 2.6 0.1 26.4 3.9 29.0 32.9 356 27381 Looped -0.37 13.43 21 22.90 405464 BR Hybrid 2222 1 39 2 2.4 4.8 0.8 30.6 3.2 35.4 38.6 6864 229584 Looped 0.25 13.15 38 22.90 405465 BR Hybrid 2137 0 35 0 2.2 5.1 0.0 29.5 2.2 34.6 36.8 4505 250856 Looped -0.96 11.74 14 22.90 405466 BR Hybrid 1443 2 33 3 4.5 2.0 1.8 17.4 6.3 19.4 25.7 540 50766 Looped -0.32 6.98 22 22.90 405467 BR Hybrid 1718 2 35 1 2.3 3.4 0.2 24.2 2.5 27.6 30.1 202 18148 Looped -0.81 12.39 18 22.90 405468 BR UG 1385 0 24 1 0.1 5.1 0.1 18.1 0.2 23.2 23.4 2851 155916 Looped -0.39 7.91 9 22.90 405469 BR UG 1436 0 28 0 0.0 4.4 0.0 20.4 0.0 24.8 24.8 67 11183 Looped -0.28 11.82 5 22.90 406931 BR Hybrid 1495 0 23 0 2.2 0.3 0.0 11.1 2.2 11.4 13.6 407 41540 Looped -0.13 5.97 11 13.20 406932 BR UG 1380 0 19 0 0.6 1.6 0.0 10.3 0.6 11.9 12.5 1504 72754 Looped 0.46 5.36 6 13.20 406933 BR Hybrid 936 0 24 0 1.0 0.7 0.0 8.6 1.0 9.3 10.3 80 14527 Looped 0.24 6.54 3 13.20 406934 BR UG 1664 0 25 0 0.4 2.5 0.0 9.9 0.4 12.4 12.8 169 16391 Looped 0.24 6.84 7 13.20 406935 BR Hybrid 2391 0 24 0 1.0 3.8 0.0 10.6 1.0 14.4 15.4 9027 311636 Looped 0.20 5.90 17 13.20 406936 BR Hybrid 1851 0 27 1 3.3 2.0 0.2 13.2 3.5 15.2 18.7 200 17043 Looped -1.46 6.74 7 13.20 406937 BR UG 1779 0 28 0 0.5 2.7 0.0 12.7 0.5 15.4 15.9 1945 88104 Looped 0.06 7.16 14 13.20 404831 BR Hybrid 2236 18 33 4 5.5 0.3 6.2 9.2 11.7 9.5 21.2 4190 212213 Looped 0.11 8.41 59 13.20 404832 BR Hybrid 2319 5 53 3 5.1 2.3 1.4 15.8 6.5 18.1 24.6 3256 160073 Looped 0.73 8.03 32 13.20 404833 BR Hybrid 2871 12 40 1 4.1 0.6 3.7 14.6 7.8 15.2 23.0 410 37800 Looped 0.30 8.50 28 13.20 404834 BR Hybrid 1676 1 36 3 2.8 0.2 0.6 9.4 3.4 9.6 13.0 257 22740 Looped 0.27 6.17 19 13.20 404835 BR Hybrid 1985 19 19 7 4.9 0.1 7.1 4.1 12.0 4.2 16.2 506 50835 Looped 0.19 4.99 40 13.20 404836 BR Hybrid 1713 10 62 3 4.0 0.8 1.2 4.0 5.2 4.8 10.0 38 5191 Looped -1.09 8.31 15 13.20 404837 BR Hybrid 1566 11 26 8 4.7 0.2 5.3 4.3 10.0 4.5 14.5 4869 96574 Looped -0.24 6.96 48 13.20 404838 BR Hybrid 2479 9 53 10 4.5 0.5 2.8 8.3 7.3 8.8 16.1 2994 316646 Looped 0.68 8.68 38 13.20 404839 BR Hybrid 1712 30 26 9 3.9 0.9 7.0 1.7 10.9 2.6 13.5 1680 140865 Looped -1.01 5.99 71 13.20 404840 BR Hybrid 2015 9 20 0 2.7 0.6 3.1 7.6 5.8 8.2 14.0 2511 120673 Looped -0.78 6.42 35 13.20 409861 BR Hybrid 3789 2 46 1 4.1 2.2 0.7 16.2 4.8 18.4 23.2 4482 396977 Looped 0.89 9.39 26 22.90 409862 BR Hybrid 3972 2 43 2 3.7 1.1 0.6 13.1 4.3 14.2 18.5 4051 398868 Looped 1.67 11.17 12 22.90 404731 BR Hybrid 953 6 21 3 4.2 0.3 3.5 3.9 7.7 4.2 11.9 439 64611 Looped 0.23 7.13 31 13.20 404732 BR Hybrid 1643 27 9 3 3.8 0.1 11.9 2.2 15.7 2.3 18.0 4174 147664 Looped -0.22 7.88 72 13.20 404733 BR Hybrid 1143 1 18 0 2.0 0.1 0.6 9.7 2.6 9.8 12.4 255 47654 Looped 0.11 5.61 16 13.20 404734 BR Hybrid 1834 1 20 0 3.8 2.7 0.1 9.4 3.9 12.1 16.0 1995 79798 Looped -0.05 6.65 19 13.20 404735 BR Hybrid 1904 6 24 1 3.6 1.4 3.1 12.7 6.7 14.1 20.8 716 116068 Looped 0.01 7.11 48 13.20 404736 BR Hybrid 1435 3 21 1 1.3 1.9 0.2 4.3 1.5 6.2 7.7 1886 72495 Looped -0.05 5.45 5 13.20 404737 BR Hybrid 751 4 6 5 1.4 0.2 4.3 1.5 5.7 1.7 7.4 648 90185 Looped 0.07 3.27 18 13.20 404738 BR Hybrid 606 5 22 2 1.7 1.0 0.5 0.7 2.2 1.7 3.9 1217 50518 Looped 0.08 4.08 6 13.20 404739 BR Hybrid 2131 11 35 8 2.9 1.6 4.7 4.5 7.6 6.1 13.7 535 56735 Looped 0.44 8.24 41 13.20 404740 BR UG 796 1 18 0 0.3 3.0 0.1 14.8 0.4 17.8 18.2 56 7609 Looped 0.12 7.72 16 13.20 404331 BR UG 1 0 0 0 0.0 0.2 0.0 0.0 0.0 0.2 0.2 0 0 Looped -0.11 4.79 0 13.20 404332 BR UG 0 0 0 0 0.0 0.2 0.0 0.0 0.0 0.2 0.2 0 0 Looped 0.02 3.52 0 13.20 404333 BR Hybrid 347 6 15 4 2.7 0.5 0.8 3.3 3.5 3.8 7.3 434 17800 Looped 0.69 7.99 20 13.20 404334 BR Hybrid 350 1 26 0 1.6 1.5 0.1 6.5 1.7 8.0 9.7 0 0 Looped 0.05 7.35 0 13.20 404335 BR Hybrid 300 0 14 0 0.7 1.6 0.0 4.5 0.7 6.1 6.8 9 1394 Looped -0.10 4.10 5 13.20 404336 BR Hybrid 1015 6 42 3 4.1 1.5 3.0 8.3 7.1 9.8 16.9 1189 23464 Looped 0.16 8.86 23 13.20 404337 BR Hybrid 275 2 31 0 1.8 3.0 0.8 2.3 2.6 5.3 7.9 369 13426 Looped -0.26 8.64 11 13.20 404338 BR Hybrid 577 0 20 0 2.2 2.1 0.0 8.4 2.2 10.5 12.7 284 11746 Looped -0.51 5.79 8 13.20 404339 BR UG 2 0 1 0 0.0 1.6 0.0 0.0 0.0 1.6 1.6 0 0 Looped -0.05 6.05 0 13.20 406861 BR Hybrid 2032 0 40 1 1.7 2.9 0.2 23.7 1.9 26.6 28.5 122 29476 Looped 0.15 8.25 11 22.90 406862 BR Hybrid 1506 3 27 1 3.5 2.6 1.7 18.1 5.2 20.7 25.9 501 62378 Looped 0.29 9.19 28 22.90 Voltage Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U Feeder ID# Sub Region FDR Type Custs OH Lat UG Lat Hybrid Lat OH Fdr & OCR Miles 406863 BR Hybrid 2110 0 40 0 3.0 3.9 0.0 30.2 3.0 34.1 37.1 138 14637 Looped -0.44 12.36 10 22.90 406864 BR Hybrid 2149 1 35 0 5.3 1.3 0.1 19.0 5.4 20.3 25.7 1703 126492 Looped -0.18 8.02 14 22.90 406865 BR Hybrid 1988 0 42 0 4.3 6.7 0.0 27.3 4.3 34.0 38.3 4042 133218 Looped 0.08 12.68 7 22.90 406866 BR Hybrid 3519 0 49 0 2.9 2.6 0.1 22.5 3.0 25.1 28.1 4604 305265 Looped -0.21 8.79 34 22.90 406867 BR Hybrid 3358 1 33 1 3.4 1.8 0.3 21.9 3.7 23.7 27.4 634 70356 Looped 0.65 7.85 17 22.90 410031 BR Hybrid 1011 0 24 1 2.4 0.7 0.4 6.1 2.8 6.8 9.6 1380 52694 Looped -0.41 5.19 5 13.20 410032 BR Hybrid 90 2 16 0 0.8 0.9 0.2 1.2 1.0 2.1 3.1 2 550 Looped 0.43 5.93 2 13.20 410033 BR UG 48 0 16 0 0.0 2.2 0.0 4.5 0.0 6.7 6.7 1 11 Looped -0.70 7.20 1 13.20 409961 BR Hybrid 1779 14 47 2 8.4 7.9 4.6 33.9 13.0 41.8 54.8 406 46528 Looped 1.67 11.87 33 22.90 409962 BR Hybrid 1702 4 33 2 7.8 1.0 1.6 16.5 9.4 17.5 26.9 701 111699 Looped 0.16 10.26 24 22.90 409963 BR Hybrid 2690 26 73 5 15.7 2.6 10.4 22.3 26.1 24.9 51.0 6640 303411 Looped 2.99 14.49 50 22.90 409631 BR Hybrid 189 1 27 0 2.4 0.3 0.1 2.6 2.5 2.9 5.4 188 5821 Looped 0.12 5.72 3 13.20 409632 BR Hybrid 175 0 8 0 0.3 0.7 0.1 1.0 0.4 1.7 2.1 0 0 Looped 0.06 0.96 0 13.20 409633 BR Hybrid 2319 0 43 4 3.6 0.3 1.3 15.2 4.9 15.5 20.4 1527 161769 Looped 1.26 10.36 30 13.20 409634 BR Hybrid 1034 0 17 1 1.1 1.9 0.9 6.1 2.0 8.0 10.0 74 8634 Looped -0.09 6.91 4 13.20 405031 BR Hybrid 1748 0 39 0 2.5 0.5 0.0 10.1 2.5 10.6 13.1 1905 34252 Looped 0.19 6.69 19 13.20 405032 BR Hybrid 2063 5 34 0 2.9 0.8 0.3 11.8 3.2 12.6 15.8 676 91669 Looped -0.31 8.69 20 13.20 405033 BR Hybrid 758 0 19 0 3.0 0.2 0.0 9.4 3.0 9.6 12.6 179 18873 Looped -0.25 4.25 11 13.20 405034 BR Hybrid 1094 0 22 1 2.5 0.9 0.8 12.7 3.3 13.6 16.9 470 35543 Looped -0.35 6.05 15 13.20 405035 BR Hybrid 1952 3 26 0 3.4 1.1 1.6 10.1 5.0 11.2 16.2 2645 69166 Looped 0.13 7.13 28 13.20 405036 BR Hybrid 2468 0 39 0 3.7 0.0 0.0 12.7 3.7 12.7 16.4 2805 165346 Looped 0.62 7.32 11 13.20 405037 BR UG 1385 0 15 0 0.2 3.9 0.0 17.1 0.2 21.0 21.2 1528 118898 Looped 0.36 7.06 7 13.20 405038 BR Hybrid 895 2 21 0 1.6 2.6 0.1 13.2 1.7 15.8 17.5 138 14434 Looped 0.10 5.70 9 13.20 405039 BR Hybrid 1544 2 31 1 2.7 1.7 0.8 14.1 3.5 15.8 19.3 140 21219 Looped -0.40 6.40 14 13.20 408861 BR Hybrid 2587 4 52 3 4.5 4.5 2.0 26.1 6.5 30.6 37.1 165 18934 Looped 1.43 14.03 16 22.90 408862 BR Hybrid 2937 1 49 1 4.6 2.8 0.3 25.9 4.9 28.7 33.6 3487 258761 Looped 0.65 11.85 22 22.90 408863 BR UG 3110 0 57 0 1.5 6.9 0.0 32.4 1.5 39.3 40.8 3434 237851 Looped 0.50 13.60 21 22.90 408864 BR Hybrid 2609 1 44 0 2.2 4.8 0.1 27.2 2.3 32.0 34.3 111 9235 Looped 0.38 12.68 6 22.90 408865 BR Hybrid 2631 1 46 1 4.5 3.4 0.9 31.9 5.4 35.3 40.7 5996 368796 Looped 0.95 14.25 27 22.90 400531 BR Hybrid 1177 16 22 2 2.8 0.1 3.2 5.6 6.0 5.7 11.7 435 43819 Looped 0.07 4.77 20 13.20 400532 BR Hybrid 1091 4 32 1 3.8 1.5 0.4 8.6 4.2 10.1 14.3 622 15778 Looped 0.04 6.64 11 13.20 400533 BR Hybrid 1480 17 26 5 3.5 1.1 3.8 3.2 7.3 4.3 11.6 293 39867 Looped -0.15 5.55 33 13.20 400534 BR Hybrid 363 5 1 2 0.9 0.0 2.5 0.8 3.4 0.8 4.2 492 45256 Looped 0.05 1.65 16 13.20 400535 BR Hybrid 2043 21 22 2 3.8 0.3 5.4 4.4 9.2 4.7 13.9 473 44203 Looped 0.10 5.80 43 13.20 400536 BR Hybrid 1853 25 13 2 4.5 0.2 6.8 1.2 11.3 1.4 12.7 838 109305 Looped 0.12 5.82 47 13.20 400537 BR Hybrid 441 2 22 0 2.1 0.2 0.5 1.9 2.6 2.1 4.7 76 7612 Looped -0.47 2.83 3 13.20 400538 BR Hybrid 2216 0 40 1 2.8 0.8 0.2 8.6 3.0 9.4 12.4 2867 37236 Looped -0.28 7.22 13 13.20 400539 BR Hybrid 362 1 23 1 1.2 2.1 1.2 2.4 2.4 4.5 6.9 487 44907 Looped -0.06 6.14 12 13.20 405861 BR Hybrid 3118 6 58 2 4.5 1.4 1.6 20.8 6.1 22.2 28.3 8549 365453 Looped 0.00 9.90 37 22.90 405862 BR Hybrid 5070 1 70 1 6.4 1.5 0.5 28.9 6.9 30.4 37.3 873 87235 Looped -0.14 11.16 31 22.90 405863 BR Hybrid 3039 0 42 0 3.7 3.9 0.0 29.7 3.7 33.6 37.3 7822 296766 Looped -2.32 11.28 26 22.90 405864 BR Hybrid 1962 2 34 1 4.4 5.1 2.3 21.6 6.7 26.7 33.4 5788 72331 Looped 0.58 12.28 28 22.90 405865 BR Hybrid 3895 20 59 2 7.6 2.3 3.3 28.1 10.9 30.4 41.3 478 53060 Looped 0.20 11.50 43 22.90 405866 BR Hybrid 4218 3 55 2 5.1 0.8 0.8 26.7 5.9 27.5 33.4 3162 219607 Looped 0.61 10.71 30 22.90 405867 BR Hybrid 3389 5 49 9 4.8 0.7 2.3 16.4 7.1 17.1 24.2 2997 140772 Looped -0.47 10.93 39 22.90 405868 BR Hybrid 4845 1 84 0 5.8 5.9 0.2 33.5 6.0 39.4 45.4 6523 105737 Looped 0.52 11.92 18 22.90 405869 BR Hybrid 3009 12 53 2 5.7 2.7 2.5 31.2 8.2 33.9 42.1 3992 181384 Looped 1.04 10.14 36 22.90 405631 BR Hybrid 2585 8 40 1 4.7 1.3 1.2 14.6 5.9 15.9 21.8 119 12825 Looped 0.27 7.97 17 13.20 Voltage Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U OH Lat UG Lat Hybrid Lat OH Fdr & OCR Miles 2208 2 44 2 2.6 0.1 0.7 12.0 3.3 12.1 15.4 428 57044 Looped 0.46 7.86 27 13.20 2581 17 33 1 3.8 1.1 5.6 10.0 9.4 11.1 20.5 482 67705 Looped 0.14 8.44 35 13.20 Hybrid 2996 12 38 2 5.1 0.5 7.3 7.3 12.4 7.8 20.2 787 108336 Looped -0.53 8.17 38 13.20 BR Hybrid 1777 6 27 0 3.2 0.1 0.6 8.1 3.8 8.2 12.0 3651 178428 Looped 0.05 4.05 13 13.20 405636 BR Hybrid 2925 1 43 0 5.1 0.2 0.1 21.3 5.2 21.5 26.7 677 107191 Looped -0.08 8.42 38 13.20 405637 BR Hybrid 2443 27 25 3 5.1 0.8 10.2 10.6 15.3 11.4 26.7 8404 348755 Looped 0.16 8.66 50 13.20 405638 BR Hybrid 2141 0 37 0 3.5 0.5 0.1 16.4 3.6 16.9 20.5 2852 129945 Looped 0.28 7.88 26 13.20 405639 BR Hybrid 226 1 4 0 0.5 0.8 0.0 1.2 0.5 2.0 2.5 30 2376 Looped 0.00 0.00 3 13.20 404131 BR Hybrid 1813 12 36 2 4.0 0.1 4.1 13.8 8.1 13.9 22.0 633 70960 Looped 0.61 6.71 53 13.20 404132 BR Hybrid 2576 12 37 8 3.3 0.9 3.8 5.6 7.1 6.5 13.6 290 20902 Looped -0.43 7.47 24 13.20 404133 BR Hybrid 627 4 7 1 1.1 0.1 4.2 0.7 5.3 0.8 6.1 1228 98339 Looped 0.11 3.21 41 13.20 404134 BR Hybrid 1275 6 30 4 4.1 0.6 2.1 9.2 6.2 9.8 16.0 1575 78817 Looped 0.27 7.17 25 13.20 404135 BR Hybrid 2137 26 21 11 6.1 0.2 9.2 7.1 15.3 7.3 22.6 4936 219763 Looped 0.22 8.52 71 13.20 404136 BR Hybrid 4403 25 46 11 4.7 0.3 6.3 9.5 11.0 9.8 20.8 2932 360495 Looped 0.34 8.44 76 13.20 404137 BR Hybrid 1897 1 48 1 5.8 1.1 0.4 16.0 6.2 17.1 23.3 255 27562 Looped 0.07 7.47 19 13.20 404138 BR Hybrid 1657 1 31 2 2.3 2.7 0.4 8.9 2.7 11.6 14.3 1935 58623 Looped 0.15 7.25 11 13.20 404139 BR Hybrid 2481 2 70 0 4.0 0.4 0.2 14.1 4.2 14.5 18.7 182 18410 Looped 0.13 7.93 21 13.20 404140 BR UG 2 0 2 0 0.0 0.6 0.0 0.3 0.0 0.9 0.9 0 0 Looped -0.10 4.70 0 13.20 401031 BR Hybrid 1846 37 7 6 4.7 0.0 12.6 1.0 17.3 1.0 18.3 5871 294286 Looped 1.16 8.56 105 13.20 401032 BR Hybrid 2420 31 29 3 4.0 0.0 8.8 4.5 12.8 4.5 17.3 833 111664 Looped 0.19 5.49 50 13.20 401033 BR Hybrid 1651 25 22 11 4.3 0.5 8.1 10.4 12.4 10.9 23.3 640 99081 Looped 0.51 7.41 58 13.20 401034 BR Hybrid 965 11 23 2 3.3 0.1 2.1 6.0 5.4 6.1 11.5 258 34669 Looped -0.01 3.29 27 13.20 401035 BR Hybrid 2997 7 32 2 3.4 0.4 1.5 14.5 4.9 14.9 19.8 826 90129 Looped 0.31 8.01 50 13.20 401036 BR Hybrid 2408 19 35 4 5.1 0.1 5.5 8.9 10.6 9.0 19.6 5496 216202 Looped 0.12 8.82 57 13.20 409531 BR Hybrid 1303 11 23 4 3.7 0.0 1.6 7.5 5.3 7.5 12.8 312 33241 Looped 0.03 5.43 13 13.20 409532 BR Hybrid 1760 2 28 2 3.1 0.3 1.5 17.5 4.6 17.8 22.4 511 53644 Looped 0.22 5.72 29 13.20 409533 BR Hybrid 3383 16 21 5 2.9 1.1 6.4 13.5 9.3 14.6 23.9 5206 384265 Looped 0.30 7.50 46 13.20 409534 BR UG 2798 0 41 0 1.2 3.9 0.0 20.2 1.2 24.1 25.3 409 37381 Looped 0.01 6.61 19 13.20 402831 BR Hybrid 1580 25 26 5 5.3 0.1 10.3 4.3 15.6 4.4 20.0 2291 111357 Looped -0.16 8.34 53 13.20 402832 BR OH 1139 28 3 4 6.1 0.0 7.0 0.5 13.1 0.5 13.6 1837 85154 Looped -0.01 5.89 34 13.20 402833 BR Hybrid 1993 12 29 3 4.6 1.7 5.3 4.1 9.9 5.8 15.7 6545 227960 Looped -0.86 8.34 42 13.20 402834 BR Hybrid 1630 3 25 3 3.0 1.2 1.3 2.4 4.3 3.6 7.9 1643 13419 Looped 0.06 6.06 9 13.20 402835 BR Hybrid 2631 11 68 4 4.3 2.5 3.7 7.5 8.0 10.0 18.0 2993 149510 Looped -0.38 7.22 36 13.20 402836 BR Hybrid 1201 10 24 2 3.4 0.7 4.1 2.9 7.5 3.6 11.1 488 48188 Looped 0.06 5.06 32 13.20 402837 BR Hybrid 2225 13 10 3 2.6 0.0 7.5 3.6 10.1 3.6 13.7 782 132306 Looped 0.21 6.11 63 13.20 402838 BR Hybrid 3107 21 37 5 3.7 1.1 7.1 8.0 10.8 9.1 19.9 4344 363948 Looped 0.02 7.72 64 13.20 402839 BR Hybrid 2837 27 13 6 3.3 0.6 9.7 2.5 13.0 3.1 16.1 4469 279360 Looped 0.49 8.39 75 13.20 401931 BR Hybrid 1737 40 35 9 4.7 1.7 8.2 7.3 12.9 9.0 21.9 2594 238272 Looped 0.15 8.35 58 13.20 401932 BR Hybrid 1440 8 23 7 1.7 0.7 3.1 0.9 4.8 1.6 6.4 2276 148365 Looped -0.55 6.25 28 13.20 401933 BR Hybrid 1514 28 25 7 4.9 0.4 6.5 1.4 11.4 1.8 13.2 301 33349 Looped 0.02 7.12 33 13.20 401934 BR Hybrid 1436 20 34 1 3.6 0.4 3.3 3.1 6.9 3.5 10.4 4267 180326 Looped 0.24 6.24 25 13.20 401935 BR Hybrid 1506 33 16 4 3.5 0.2 8.7 1.7 12.2 1.9 14.1 804 87957 Looped 0.38 6.48 76 13.20 401936 BR Hybrid 583 18 22 2 5.0 0.5 2.6 1.5 7.6 2.0 9.6 159 17000 Looped 0.20 6.20 19 13.20 401937 BR Hybrid 1591 7 30 5 3.9 0.4 3.0 1.9 6.9 2.3 9.2 794 68128 Looped 0.07 6.77 40 13.20 401938 BR Hybrid 826 21 8 3 3.0 0.3 5.9 2.7 8.9 3.0 11.9 209 38156 Looped 0.06 4.66 36 13.20 410361 BR Hybrid 2405 19 33 8 4.8 6.0 11.4 25.3 16.2 31.3 47.5 2946 197501 Looped 3.05 12.65 55 22.90 410362 BR Hybrid 2586 16 66 1 2.7 6.7 7.5 33.2 10.2 39.9 50.1 7459 114769 Looped 0.90 15.20 34 22.90 410363 BR Hybrid 3645 19 82 1 5.6 13.2 5.7 51.6 11.3 64.8 76.1 288 28296 Looped 1.35 15.35 37 22.90 Feeder ID# Sub Region FDR Type Custs 405632 BR Hybrid 405633 BR Hybrid 405634 BR 405635 Voltage Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U OH Lat UG Lat Hybrid Lat OH Fdr & OCR Miles 1623 6 30 0 2.3 0.9 0.3 13.1 2.6 14.0 16.6 58 7048 Looped -0.23 7.37 2 13.20 1642 17 37 0 4.6 1.0 4.7 13.4 9.3 14.4 23.7 2041 111145 Looped 0.85 6.55 41 13.20 Hybrid 1574 23 30 1 4.6 2.6 7.1 13.4 11.7 16.0 27.7 3583 134625 Looped 0.63 7.73 30 13.20 BR Hybrid 2156 1 43 3 4.8 0.1 1.0 22.0 5.8 22.1 27.9 7732 526389 Looped 2.50 6.30 25 13.20 406535 BR Hybrid 2306 13 32 1 4.0 0.7 8.6 7.0 12.6 7.7 20.3 3618 165606 Looped -0.03 9.17 62 13.20 406536 BR Hybrid 2369 19 39 4 4.7 0.3 3.7 17.2 8.4 17.5 25.9 5154 121749 Looped 0.67 8.97 35 13.20 406537 BR Hybrid 220 0 13 1 0.6 1.8 0.1 1.6 0.7 3.4 4.1 1 349 Looped 0.04 5.14 1 13.20 407931 BR Hybrid 3240 26 40 10 5.7 0.1 8.7 7.2 14.4 7.3 21.7 4318 203978 Looped 0.50 9.40 74 13.20 407932 BR Hybrid 2804 0 62 0 2.1 5.0 0.0 13.3 2.1 18.3 20.4 3034 38645 Looped -0.02 7.38 14 13.20 407933 BR Hybrid 1161 12 38 3 3.7 2.0 1.9 6.3 5.6 8.3 13.9 130 15451 Looped -1.77 7.83 21 13.20 407934 BR UG 1020 0 17 0 0.0 2.0 0.0 3.1 0.0 5.1 5.1 0 0 Looped 0.61 3.51 0 13.20 407935 BR Hybrid 2379 1 48 0 3.8 1.4 0.2 18.5 4.0 19.9 23.9 4974 250084 Looped 0.93 8.13 14 13.20 407936 BR Hybrid 2112 28 14 7 5.1 0.4 10.1 1.6 15.2 2.0 17.2 2536 204814 Looped -0.11 6.69 37 13.20 407861 BR Hybrid 3317 6 67 4 10.2 1.9 1.0 24.6 11.2 26.5 37.7 6328 590933 Looped 0.29 11.69 32 22.90 407862 BR Hybrid 2408 11 42 0 5.4 1.7 2.0 22.7 7.4 24.4 31.8 584 81343 Looped -0.68 11.12 35 22.90 407863 BR Hybrid 3904 5 71 4 3.7 1.5 1.4 26.8 5.1 28.3 33.4 11982 374249 Looped 0.32 13.52 19 22.90 407864 BR Hybrid 4001 24 58 6 5.9 0.4 7.6 23.8 13.5 24.2 37.7 3313 263569 Looped 0.03 11.33 73 22.90 407865 BR Hybrid 3721 1 58 1 5.4 0.8 0.1 24.0 5.5 24.8 30.3 4642 148515 Looped 0.96 11.26 36 22.90 407866 BR Hybrid 2281 5 56 0 5.5 3.0 2.1 25.6 7.6 28.6 36.2 8029 146343 Looped -3.18 9.12 36 22.90 400931 BR Hybrid 272 6 4 3 5.1 0.1 2.3 0.4 7.4 0.5 7.9 75 5462 Looped 0.10 3.70 10 13.20 400932 BR Hybrid 648 21 13 0 5.6 0.2 6.8 1.4 12.4 1.6 14.0 239 18083 Looped 0.07 3.17 25 13.20 400933 BR Hybrid 2112 38 10 6 6.1 0.0 8.7 2.6 14.8 2.6 17.4 2417 120918 Looped 0.60 8.60 57 13.20 400934 BR OH 1693 68 15 4 36.9 0.3 26.1 1.3 63.0 1.6 64.6 1382 156485 Looped -0.01 7.79 79 13.20 400935 BR Hybrid 1129 40 22 3 9.8 0.1 9.8 1.6 19.6 1.7 21.3 3906 148066 Looped 0.42 4.72 36 13.20 402031 BR OH 111 20 4 0 57.8 0.1 16.2 0.2 74.0 0.3 74.3 117 22129 Looped 0.06 1.46 32 13.20 402032 BR Hybrid 1339 42 23 5 20.0 0.1 10.4 6.5 30.4 6.6 37.0 1457 34252 Looped 0.09 5.79 36 13.20 409231 BR Hybrid 20 4 10 0 2.3 0.1 1.6 0.9 3.9 1.0 4.9 2 433 Looped 0.00 1.10 2 13.20 400831 BR Hybrid 321 10 3 0 6.6 0.0 3.1 1.0 9.7 1.0 10.7 216 25583 Looped -0.01 0.99 10 13.20 400832 BR OH 336 13 1 1 45.9 0.0 5.6 0.2 51.5 0.2 51.7 689 91149 Looped 0.03 0.83 24 13.20 400833 BR Hybrid 1504 56 8 3 8.2 0.0 11.2 1.1 19.4 1.1 20.5 5398 281206 Looped -0.02 4.48 58 13.20 400834 BR OH 894 37 15 6 16.2 0.2 15.2 1.3 31.4 1.5 32.9 6047 273668 Looped 0.28 5.78 53 13.20 403801 BR Hybrid 0 0 0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0 Looped -6.62 5.08 0 4.10 403631 BR Hybrid 30 11 6 1 16.9 0.0 1.1 1.7 18.0 1.7 19.7 70 5626 Looped -0.80 3.70 14 13.20 403632 BR Hybrid 1122 26 19 1 54.7 0.8 8.5 2.8 63.2 3.6 66.8 1504 125459 Looped -0.88 4.72 47 13.20 403633 BR OH 847 44 14 4 18.3 0.5 19.6 1.3 37.9 1.8 39.7 744 72802 Looped 0.28 5.28 58 13.20 403634 BR OH 158 14 10 2 64.4 0.6 25.7 1.9 90.1 2.5 92.6 403 17452 Looped -0.48 1.72 43 13.20 413231 BR Hybrid 95 3 7 1 5.8 0.4 0.9 0.3 6.7 0.7 7.4 83 10042 Looped 0.00 2.60 3 13.20 413232 BR Hybrid 636 34 12 2 21.7 1.5 16.0 1.2 37.7 2.7 40.4 935 33968 Looped 0.68 5.78 18 13.20 706361 GS Hybrid 1750 1 42 0 3.2 3.3 0.1 18.0 3.3 21.3 24.6 3753 182384 Looped 0.48 13.48 17 22.90 706362 GS Hybrid 1769 2 33 0 2.9 2.3 0.2 17.7 3.1 20.0 23.1 6929 262255 Looped 0.28 10.88 14 22.90 706363 GS Hybrid 1345 1 24 1 1.7 4.9 1.8 15.4 3.5 20.3 23.8 129 14203 Looped 0.51 9.21 2 22.90 706364 GS Hybrid 1482 0 22 0 2.8 1.1 0.0 15.1 2.8 16.2 19.0 231 52565 Looped 0.47 8.47 14 22.90 706365 GS Hybrid 1328 0 26 0 1.0 3.4 0.0 12.8 1.0 16.2 17.2 170 35326 Looped 0.07 6.87 10 22.90 706366 GS Hybrid 1 0 4 0 5.9 1.5 0.0 0.6 5.9 2.1 8.0 6 1771 Looped -0.01 9.99 6 22.90 706367 GS Hybrid 1507 0 32 0 1.2 5.3 0.0 14.8 1.2 20.1 21.3 1588 74940 Looped 0.07 13.17 7 22.90 700831 GS OH 837 9 0 1 1.7 0.1 5.9 0.0 7.6 0.1 7.7 638 69068 Looped -0.02 5.08 41 13.20 700832 GS Hybrid 1506 25 5 4 3.9 0.1 6.8 0.5 10.7 0.6 11.3 1147 151085 Looped 0.24 6.64 77 13.20 700833 GS Hybrid 1144 24 14 5 2.9 0.0 3.8 1.2 6.7 1.2 7.9 358 82540 Looped -0.13 5.47 30 13.20 Feeder ID# Sub Region FDR Type Custs 406531 BR Hybrid 406532 BR Hybrid 406533 BR 406534 Voltage Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Lat Hybrid Lat OH Fdr & OCR Miles UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U Feeder ID# Sub Region FDR Type Custs OH Lat 700834 GS Hybrid 1264 21 4 8 4.0 1.0 6.1 0.7 10.1 1.7 11.8 2575 169404 Looped 0.48 4.98 56 13.20 700835 GS Hybrid 1376 12 12 0 2.0 0.1 4.8 2.0 6.8 2.1 8.9 473 47428 Looped -0.30 4.40 28 13.20 700836 GS Hybrid 1307 26 9 5 4.5 1.3 7.1 0.7 11.6 2.0 13.6 4085 286030 Looped 0.31 6.61 48 13.20 700837 GS OH 1693 18 3 2 3.1 0.2 6.9 0.1 10.0 0.3 10.3 1543 145952 Looped 0.37 6.47 76 13.20 700838 GS Hybrid 1551 27 3 3 2.1 0.8 7.7 0.4 9.8 1.2 11.0 2540 177841 Looped 0.42 6.02 85 13.20 700839 GS Hybrid 894 9 6 2 2.4 0.9 5.8 1.8 8.2 2.7 10.9 1556 164526 Looped 0.04 5.84 64 13.20 700840 GS Hybrid 1376 13 3 3 2.6 0.7 4.4 0.2 7.0 0.9 7.9 702 91542 Looped 1.02 4.02 42 13.20 700841 GS UG 7 0 7 0 0.0 1.7 0.0 0.7 0.0 2.4 2.4 0 0 Looped -0.53 0.07 0 13.20 700842 GS OH 1771 23 3 1 3.5 0.2 8.1 0.1 11.6 0.3 11.9 906 136859 Looped 0.27 6.77 96 13.20 700843 GS Hybrid 1333 25 2 1 2.9 1.1 6.0 1.1 8.9 2.2 11.1 602 105273 Looped -0.60 5.40 56 13.20 700844 GS Hybrid 1625 33 3 1 2.2 1.2 10.5 1.0 12.7 2.2 14.9 594 116734 Looped 0.45 7.15 60 13.20 709731 GS Hybrid 1 0 0 0 0.4 1.0 0.0 0.0 0.4 1.0 1.4 0 0 Looped 0.40 1.90 0 13.20 706961 GS Hybrid 1941 7 42 1 6.4 1.7 3.6 20.1 10.0 21.8 31.8 4804 284066 Looped 0.86 13.56 39 22.90 706962 GS Hybrid 1055 0 18 0 2.3 3.4 0.1 12.4 2.4 15.8 18.2 84 11053 Looped 0.17 6.27 6 22.90 706963 GS UG 1872 0 27 0 0.5 2.4 0.0 14.1 0.5 16.5 17.0 254 7054 Looped 0.12 9.32 7 22.90 706964 GS Hybrid 2405 5 48 4 11.4 2.6 4.1 19.4 15.5 22.0 37.5 4743 96560 Looped 0.04 13.74 18 22.90 707661 GS Hybrid 727 13 13 4 4.7 0.2 5.8 8.5 10.5 8.7 19.2 282 29666 Looped 0.16 5.46 25 22.90 707662 GS Hybrid 1938 0 25 0 1.7 2.2 0.0 17.1 1.7 19.3 21.0 2499 93854 Looped 0.50 11.00 20 22.90 707663 GS Hybrid 2439 0 36 0 1.4 2.3 0.0 21.7 1.4 24.0 25.4 1425 125324 Looped 0.85 11.85 8 22.90 707664 GS UG 1618 2 42 1 0.7 7.3 0.3 15.2 1.0 22.5 23.5 67 14470 Looped 1.06 12.16 5 22.90 707665 GS UG 1431 1 26 1 0.5 3.4 0.3 11.9 0.8 15.3 16.1 1277 137531 Looped 0.35 7.75 10 22.90 701531 GS Hybrid 1459 21 12 4 2.7 0.0 3.5 2.6 6.2 2.6 8.8 405 63515 Looped 0.14 5.34 33 13.20 701532 GS Hybrid 1827 14 21 10 4.6 0.5 3.4 5.5 8.0 6.0 14.0 191 23366 Looped 0.44 6.44 22 13.20 701533 GS Hybrid 1751 16 24 3 4.5 0.9 3.5 3.6 8.0 4.5 12.5 312 40908 Looped 0.38 7.98 36 13.20 701534 GS Hybrid 1939 28 13 6 4.0 0.5 7.0 1.8 11.0 2.3 13.3 670 62893 Looped 0.44 7.34 55 13.20 701535 GS Hybrid 1598 30 7 5 4.4 0.2 5.3 1.0 9.7 1.2 10.9 281 35138 Looped 0.44 6.34 43 13.20 701536 GS Hybrid 2893 10 35 5 3.1 0.3 2.7 7.7 5.8 8.0 13.8 3777 233351 Looped 0.54 6.94 31 13.20 701537 GS Hybrid 924 11 17 1 4.6 2.2 3.3 2.1 7.9 4.3 12.2 2054 69600 Looped 0.46 4.76 28 13.20 701538 GS Hybrid 1724 14 16 2 3.5 0.3 3.1 2.3 6.6 2.6 9.2 567 93897 Looped 1.30 7.30 29 13.20 702531 GS Hybrid 1320 5 28 1 2.6 1.4 0.8 12.2 3.4 13.6 17.0 353 44253 Looped 0.36 5.26 17 13.20 702532 GS Hybrid 59 0 20 1 1.2 1.2 0.9 3.3 2.1 4.5 6.6 6 966 Looped 0.60 7.00 2 13.20 702533 GS Hybrid 602 1 16 0 2.2 0.1 0.1 5.5 2.3 5.6 7.9 834 35792 Looped -0.52 5.48 14 13.20 702534 GS Hybrid 1655 2 41 2 3.3 0.6 0.5 12.5 3.8 13.1 16.9 3225 153774 Looped 0.63 7.73 13 13.20 702535 GS Hybrid 2398 6 39 1 2.2 3.0 1.2 16.7 3.4 19.7 23.1 452 42499 Looped 2.07 10.27 28 13.20 702536 GS Hybrid 1156 1 32 0 2.8 0.3 0.1 5.1 2.9 5.4 8.3 150 11107 Looped 0.23 6.83 8 13.20 702537 GS Hybrid 1089 2 23 0 1.9 0.8 0.1 2.5 2.0 3.3 5.3 67 7180 Looped 0.22 6.12 3 13.20 702538 GS UG 2 0 0 0 0.0 2.6 0.0 0.0 0.0 2.6 2.6 0 0 Looped 0.02 6.12 0 13.20 702031 GS Hybrid 834 3 24 2 2.5 1.3 1.5 4.9 4.0 6.2 10.2 1026 48017 Looped -0.29 6.81 7 13.20 702032 GS Hybrid 1716 23 13 4 3.5 0.2 4.9 3.3 8.4 3.5 11.9 2660 212639 Looped 0.13 6.03 62 13.20 702033 GS Hybrid 1686 1 35 2 1.7 1.3 1.0 10.3 2.7 11.6 14.3 447 27794 Looped 0.23 7.83 22 13.20 702034 GS Hybrid 1907 27 8 2 3.9 0.7 8.0 3.1 11.9 3.8 15.7 1033 70569 Looped 0.65 7.95 49 13.20 702035 GS Hybrid 1588 10 24 8 3.2 0.3 2.3 6.3 5.5 6.6 12.1 1715 153736 Looped 0.08 7.38 28 13.20 702036 GS Hybrid 1456 4 6 7 2.2 0.8 3.1 6.9 5.3 7.7 13.0 431 54893 Looped -0.09 6.31 19 13.20 702037 GS Hybrid 1685 33 4 6 4.0 0.5 9.5 1.4 13.5 1.9 15.4 426 62944 Looped 0.13 7.73 66 13.20 702038 GS Hybrid 2196 4 47 1 2.6 3.4 0.9 13.9 3.5 17.3 20.8 2304 106565 Looped 2.20 7.80 9 13.20 707261 GS Hybrid 2201 0 24 0 3.3 2.5 0.0 19.4 3.3 21.9 25.2 2138 109081 Looped 0.30 10.60 19 22.90 707262 GS Hybrid 2319 0 27 0 1.8 4.5 0.0 20.0 1.8 24.5 26.3 392 63958 Looped 0.79 10.29 27 22.90 707263 GS Hybrid 3224 17 57 1 4.8 5.3 4.5 27.1 9.3 32.4 41.7 6485 307551 Looped 0.03 15.73 39 22.90 Voltage Feeder Specific Data and Attached Laterals A B C D E F G H I J K L M N O P UG Fdr Miles OH Lat Miles UG Lat Miles Total OH Miles Total UG Miles Total Miles FDR CI FDR CMI Q R S T Is the Load Feeder growth Peak Load Number of FDR N Circuit (MVA D pk 2014 Looped? 14-pk 13) (MVA) U Custs OH Lat UG Lat Hybrid Lat OH Fdr & OCR Miles Hybrid 842 0 64 0 6.3 1.6 0.0 8.2 6.3 9.8 16.1 845 22005 Looped 0.80 17.00 7 22.90 Hybrid 3254 0 33 0 3.0 1.8 0.1 14.9 3.1 16.7 19.8 1035 123129 Looped 0.02 10.92 18 22.90 GS Hybrid 1668 1 15 0 3.2 0.4 0.4 9.4 3.6 9.8 13.4 650 97277 Looped 0.00 5.30 13 22.90 707267 GS Hybrid 4190 10 48 0 3.8 2.5 6.2 18.4 10.0 20.9 30.9 2340 121725 Looped -1.83 14.07 52 22.90 700931 GS Hybrid 2396 22 20 9 4.7 0.2 6.2 2.2 10.9 2.4 13.3 2809 92284 Looped -0.14 6.96 35 13.20 700932 GS Hybrid 1849 3 20 1 2.3 2.1 0.6 4.9 2.9 7.0 9.9 18 3085 Looped -0.24 6.16 4 13.20 700933 GS Hybrid 1173 2 4 5 0.4 2.7 0.9 0.5 1.3 3.2 4.5 591 1754 Looped -0.11 2.19 3 13.20 700934 GS Hybrid 2197 5 23 3 2.2 0.9 2.6 3.5 4.8 4.4 9.2 2642 205758 Looped 0.12 5.52 28 13.20 700935 GS UG 996 0 4 0 0.0 1.2 0.0 1.9 0.0 3.1 3.1 0 0 Looped 0.42 2.62 0 13.20 700936 GS Hybrid 2327 10 14 5 2.4 0.2 4.1 2.7 6.5 2.9 9.4 1167 154421 Looped 0.23 5.13 36 13.20 700937 GS Hybrid 1097 0 22 2 1.6 0.0 0.3 2.5 1.9 2.5 4.4 3 475 Looped -0.38 2.52 3 13.20 700941 GS UG 438 0 20 1 0.0 3.6 0.2 10.2 0.2 13.8 14.0 17 1719 Looped -0.16 3.44 10 13.20 700961 GS UG 1958 0 13 0 0.0 3.7 0.0 0.9 0.0 4.6 4.6 1953 1953 Looped -0.13 4.47 1 22.90 700962 GS UG 1175 0 6 0 0.0 4.0 0.0 0.7 0.0 4.7 4.7 0 0 Looped 0.04 3.94 0 22.90 700963 GS UG 1548 0 7 0 0.0 3.6 0.0 1.4 0.0 5.0 5.0 0 0 Looped 0.25 8.45 0 22.90 700964 GS UG 2298 0 9 0 0.0 3.2 0.0 2.0 0.0 5.2 5.2 71 2681 Looped 0.17 6.57 3 22.90 700965 GS UG 1473 0 3 0 0.0 2.9 0.0 0.6 0.0 3.5 3.5 0 0 Looped -0.07 2.83 0 22.90 700966 GS UG 1848 0 17 0 0.0 3.2 0.0 6.1 0.0 9.3 9.3 13 3243 Looped 0.47 7.17 5 22.90 700967 GS UG 1957 0 10 0 0.0 4.7 0.0 2.8 0.0 7.5 7.5 0 0 Looped 0.10 6.20 0 22.90 700968 GS UG 1634 0 17 0 0.0 5.1 0.0 6.4 0.0 11.5 11.5 116 21437 Looped 0.26 7.96 6 22.90 703831 GS Hybrid 2374 24 28 10 4.1 0.2 6.2 3.3 10.3 3.5 13.8 5686 331272 Looped 0.46 8.66 53 13.20 703832 GS Hybrid 1485 25 12 6 3.0 0.0 7.1 0.8 10.1 0.8 10.9 869 85474 Looped 0.19 6.09 45 13.20 703833 GS Hybrid 1238 10 18 1 2.4 0.0 1.8 5.4 4.2 5.4 9.6 302 61740 Looped 0.07 4.57 31 13.20 703834 GS Hybrid 510 3 4 2 1.4 1.5 2.4 3.1 3.8 4.6 8.4 800 142897 Looped 0.07 3.47 35 13.20 703835 GS Hybrid 608 5 20 3 2.5 0.3 4.1 1.9 6.6 2.2 8.8 864 77107 Looped 0.05 8.95 23 13.20 706161 GS Hybrid 3686 0 52 0 3.9 1.7 0.0 13.6 3.9 15.3 19.2 585