(Algiers, Algeria, 26 – 27 September 2011 ) Conformity

advertisement
ITU Regional Workshop on
B id i
Bridging
the
th Standardization
St d di ti
Gap
G
and Interactive Training Session
(Al i
(Algiers,
Al
Algeria,
i 26 – 27 S
September
b
2011 )
Conformity Control Activities
Tunisia Case Study
Sami Trimech
Cooperation Director - CERT
Algiers, Algeria, 26-27 September 2011
CERT Positioning
Telecommunication Research and Studies
Center
Created since 1988
Public Consultancy Company
T h i l assistance
Technical
i t
tto IT sector
t
institutions (operators, regulator..)
In Charge of Terminals Homologation
(Type approval)
Own laboratory (tests beds)
Algiers, Algeria, 26-27 September 2011
2
Homologation
Objectives
1.
To guarantee the quality of the data-processing
park in Tunisia
2.
To take care of the respect
p
of the international
standards of the data processing equipments
3
3.
To assist the services concerned (customs, trade,
etc.) with the identification and the classification
of the data processing equipments
4.
To work out annual statistics regarding the
evolution of the data-processing
p
gp
park
Algiers, Algeria, 26-27 September 2011
3
Homologation
Process -1
Mandatory for terminals to be
commercialized
Special authorization for temporary
admission
Special authorization for equipment
sed inte
nall (Confo
mit
to be used
internally
(Conformity
Certificate)
Algiers, Algeria, 26-27 September 2011
4
Homologation
Process -2
Phase 1 : Homologation
IImporter/vendor
/
d send
d samples
l and
d technical
h i l
documentation
Samples tested using test beds (protocols
tests)
/
Certificate delivered/not
delivered – 3 y
years
validity
Phase 2 : Consumption Authorization
Shipping (Importer/vendor)
Sampling (CERT border offices)
Conformity check (vs Homologated Terminals)
Authorization delivery
Algiers, Algeria, 26-27 September 2011
5
Homologation
Process -3
For Telecom Operator
No Homologation
g
requested
q
((Own uses))
A Conformity Certificate is needed
On Border Control
Technical Procedure is currently discussed
No Mutual Agreement is considered
Algiers, Algeria, 26-27 September 2011
6
NEXT
Homologation (A posteriori )
Mutual Recognition Agreement will be considered
Context: Association Agreement with UE
Objectives:
Improve the competitiveness of Tunisian industry
Improve the competitiveness of Tunisian industry
Protect the Tunisian consumer
Environment protection from electromagnetic
Environment protection from electromagnetic radiation
Implement a national quality systems (industrial
Implement a national quality systems (industrial exportation)
I
Increase awareness
Algiers, Algeria, 26-27 September 2011
7
NEXT
Control System Evolution Phases
Phase 1
Phase 1
Free entrance of CE marked terminals from Europe to Tunisia and other side (80% of Tunisian Electrical
Tunisia and other side (80% of Tunisian Electrical Exportation to Europe)
Suspected terminals will be controlled
Suspected terminals will be controlled
Other origins will be controlled
CERT lab provide conformity testing services to
CERT lab, provide conformity testing services to tunisian suppliers Phase 2
Phase 2
Only CE marked terminals will be allowed for entrance
Suspected terminals will be controlled
Suspected terminals will be controlled
Algiers, Algeria, 26-27 September 2011
8
NEXT
EMC Laboratory
L b
t
(ongoing)
(
i )
SAC- Semi Anechoic Chamber -10 m
FAC- Fully-Anechoic test Chamber -5m
(phase2)
SAR- Specific Absorption Rate Lab (phase2)
Metrology Lab
Low Voltage Directive Lab
Open area test site
Algiers, Algeria, 26-27 September 2011
9
NEXT
Accreditation in Compliance with
ISO EN 17025 (Testing and Calibration
Lab Competence)
Algiers, Algeria, 26-27 September 2011
10
NEXT
Coverage
Telecommunication equipments
f
h l
Information
technology
equipment
Measurement devices
Car’s electrical devices
Household electrical products
Hospital equipments
Algiers, Algeria, 26-27 September 2011
11
NEXT
Services
Confomity testing (CE marks,…)
Supporting suppliers in the development
of terminals
Drafting testing methodologies
Increasing awareness
Trainings
Algiers, Algeria, 26-27 September 2011
12
NEXT
Actual Situation
New specific building (40%)
Facilities (bidding phase)
Training (25%)
Tests
T t protocol
t
l (100%)
Accreditation (0%)
Provisional Starting Date: June 2012
Algiers, Algeria, 26-27 September 2011
13
NEXT
Project Funding
CERT (60%)
European Community (20%)
Tunisian Governement (20%)
Algiers, Algeria, 26-27 September 2011
14
GROUND FLOOR PLAN DRAWING
Algiers, Algeria, 26-27 September 2011
15
FRONTAL FACE
Algiers, Algeria, 26-27 September 2011
16
Thank you
Sami.trimech@cert.mincom.tn
D:+21670834701
M:+21698381738
F:+21670834700
Algiers, Algeria, 26-27 September 2011
17
Download