Ref: ds_KFF_1008 Ver2.0 Relative Humidity and Temperature Sensor KFTF/AFTF Page 1 of 1 Description Features The KFF range of humidity sensors is used in refrigeration and air conditioning in air ducts or greenhouses and halls. They convert the humidity and temperature measurements into analogue signals of 0...10Vdc or 4...20mA. A capacitive RH sensor and NTC thermistor provide accurate measurements and long term stability. ●● Humidity only or Humidity & Temperature Outputs ●● Optional Direct Thermistor for temperature measurement ●● Choice of outputs Technical Specification Commissioning Power Supply: 24Vac/dc for 0..10Vdc output 15...36Vdc for 4...20mA output max load 500Ω Sensors: Capacitive Humidity sensor, NTC temperature To perform an accurate comparison between a transmitter output and a portable reference, it is essential that the two probes are held adjacent for a minimum of 30 minutes in a stable RH environment. It is not uncommon for test instruments and transmitters to disagree by 10% RH or more when sites measurements are taken incorrectly. “Slings” or other mechanical hygrometer should not be used as reference. Measuring Range: Humidity - 0...100% RH Temp - KFTF 0...50°C AFTF –20°C…+80°C Operating Range: Humidity - 10...90% RH Temp - KFTF 0...50°C AFTF –20°C…+80°C Accuracy: Humidity - ±3% RH 40...60% RH otherwise ±5% Temperature - ±0.8K at 20°C Outputs: 0...10Vdc or 4...20mA Connection: 0.5-1.5 mm cable. Enclosure: Glass reinforced polyamide 72 x 64 x 39.4 mm “Manufactured and supplied to E. C. Products Limited by S+S Regeltechnik GmBH” Wiring KFF-U Order Codes KFF-U Duct RH Sensor 3% 4...20mA KFF-I Duct RH Sensor 3% 0...10Vdc KFTF-U Duct RH & Temperature Sensor 4...20mA KFTF-I Duct RH & Temperature Sensor 0...10Vdc AFTF-U Wall RH & Temperature Sensor 4...20mA AFTF-I Wall RH & Temperature Sensor 0...10Vdc KFF-I KFTF-U/AFTF-U Installation 1. Select a location in the air duct or on the wall where contaminants are a minimum. 2. Mark hole on the duct for cutout and insert the probe into the air ducts by using the bracket provided or mark holes on the wall and secure. Take care do not contaminate the transmitter with dust, dirt and static. 3. Connect wiring to the terminal block. Make connections to the transmitter only after all other electrical installation and test work has been completed. KFTF-I/AFTF-I 4. Ensure the supply voltage is within specification. 5. It is recommended that screened cable be used and that the screen should be earthed at the controller. Control cable should not be run next to power and other cables which may produce significant magnetic noises. 6. Allow 3-5 minutes before functional check. 7. Allow 30 minutes before carrying out pre-commissioning checks. E.C. Products Limited - Head Office EC House, Amberley Way, Hounslow Middlesex, TW4 6BH, United Kingdom Tel: +44 (0)20 8569 4100 Fax: +44 (0)20 8569 4111 ECP reserves the right to change the information contained in this datasheet as and when required without notice. Users must take care to use the information contained in this leaflet. ECP will not accept the liability for damages, loss and expenses that may be caused by omissions and errors in the information provided.