• • • • • • • • To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions and other hazards please read all warnings and instructions included with and on the fixture box and all fixture labels. Before installing, servicing or performing routine maintenance upon this equipment, follow these general precautions. Installation and service of luminaires should be performed by a qualified licensed electrician. Maintenance of the luminaires should be performed by person(s) familiar with the luminaires’ construction and operation and any hazards involved. Regular fixture maintenance programs are recommended. It will occasionally be necessary to clean the outside of the refractor/lens. Frequency of cleaning will depend on ambient dirt level and minimum light output which is acceptable to user. Refractor/lens should be washed in a solution of warm water and any mild, non-­‐ abrasive household detergent, rinsed with clean water and wiped dry. Should optical assembly become dirty on the inside, wipe refractor/lens and clean in above manner, replacing damaged gaskets as necessary. DO NOT INSTALL DAMAGED PRODUCT! This luminaire has been properly packed so that no parts should have been damaged during transit. Inspect to confirm. Any part damaged or broken during or after assembly should be replaced. If the lamp is marked (Hg) it contains Mercury. Follow all disposal laws. See www.lamprecycle.org. These instructions do not purport to cover all details or variations in equipment nor to provide every possible contingency to meet in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s or owner’s purposes, this matter should be referred to Acuity Brands Lighting, Inc., a parent company of Peerless Lighting. ü ü ü ü ü WARNING RISK OF ELECTRIC SHOCK Disconnect or turn off power before installation or servicing. Verify that supply voltage is correct by comparing it with the luminaire label information. Make all electrical and grounded connections in accordance with the National Electrical Code (NEC) and any applicable local code requirements. All wiring connections should be capped with UL approved recognized wire connectors. To prevent fixture row from over-­‐current: By adding the input current of each fixture section marked on the fixture, the total current per power feed must not exceed the maximum line wire amperage marked on the fixture and the power feed cord/wire amperage rating whichever is the least. ü ü ü ü WARNING RISK OF BURN Allow lamp/luminaire to cool before handling. Do not touch hot lens, lamp, guard or enclosure. Do not exceed maximum wattage marked on luminaire label. Follow all lamp manufacturer’s warnings, recommendations and restrictions on lamp operation including but not limited to: ballast type, burning position, replacement and recycling. Use only lamps that comply with ANSI standards. ü ü CAUTION RISK OF INJURY Wear gloves and safety glasses at all times when removing luminaire from carton, installing, servicing or performing maintenance. Avoid direct eye exposure to the light source while it is on. ü ü CAUTION RISK OF FIRE materials that can Keep combustible and other burn away from lamp/lens. Do not operate in close proximity to persons, combustible materials or substances affected by heat or drying. Please see p roduct installation instructions for additional warnings or any applicable regulatory statements. Failure to follow any of these and Conditions, please visit www.PeerlessLighting.com. instructions could void product warranties. For a complete listing of product Terms Peerless Lighting, an Acuity Brands Company, assumes no responsibility for claims arising out of improper or careless installation or handling of its products. Part Number: PIN004101 Description: “INSTR, IMPORTANT SAFETY OUTDOOR” Revision: B Effective Date: 04/2012 ECO3665 Station Pendant Mount INSTALLATION INSTRUCTIONS STM9 M99 PIN003900 Rev. C 04/19/12 ECO3626 These installation instructions are used for installing the following luminaires and kits: Fixture Mounting Kit STM9 STM9FK/SK F1B STM9FK/SK F3A STM9FK/SK F3B WARNING: Please read the “important safety instructions” prior to installation of this product. A) Cable Mounting – F1B Luminaire Row Installation .................................................................... page 2 B) Stem Mounting – F3A Luminaire Row Installation ..................................................................... page 3 C) Stem Mounting – F3B Luminaire Run Installation ..................................................................... page 4 D) TRL Option and Additional Cable Mounting Kit Installations ..................................................... page 4 10" MIN Luminaire Overview 10" MIN Direct “STARTER” SECTION “JOINER ” SECTION Warning: Distance between luminaire and wall/ceiling should be greater than 10”. Indirect symmetric (SYM) “ENDER” SECTION Indirect Asymmetric Hinge (ASH) Indirect Asymmetric Latch (ASL) F3B STEM MOUNTING 110-23/32 61-1/2 98-3/4 CABLE F1B/STEM F3A MOUNTING SPACE 49-1/2 CABLE F1B/STEM F3A MOUNTING SPACE 4-6/16 95-1/4 STEM F3B MOUNTING SPACE 3-5/16 9-13/16 46 STEM F3B MOUNTING SPACE 4-5/16 8 Ft Version 4 Ft Version 1 STM9 PIN003900 Rev. C 08/19/12 ECO3626 A) Cable Mounting Luminaire – F1B Luminaire Row Installation Hanger XXX PIN000000 Rev. X 00/00/00 ECO0000 Latch Bushing Hanger 1. Install the bushing with nut and washer on the hanger. 2. Slide in the hanger to the luminaire and connect the wire harness. 3. Release the latch and open the door. Set screws Door 4. Joining Fluorescent Luminaire: Join two luminaires with two provided screws. Be sure the “O” rings are in position. 5. Joining LED Luminaire: Remove filler plate by unscrewing (2) #8 screws as shown in illustration. Join two luminaires with (2) ¼” screws. Make sure the “O” rings are in position. Install filler plate back in luminaire. Cord Manager U bracket Cable 6. Close the door. See page 4 for TRL option where temper resistance latch is provided. Install the set screws to secure the hanger. Be sure the hanger does not block the latch. Cable Gripper Bushing 7. Install the cable retainer to the top hanger bracket. Install the U bracket to building structure with proper fasteners and reinforcement. The J-Box location must be able to reach the power feed cord from the luminaire. 8. Install the bushing on the hanger and securely fasten the cable gripper. 9. Use cord manager to snap onto aircraft cable and cord for F1B FK. No power cord and cord manager needed for F1B SK. 2 STM9 PIN003900 Rev. C 08/19/12 ECO3626 B) Stem Mounting Luminaire – F3A Luminaire Row Installation Stem Wave washer & nut Hanger Hanger XXX PIN000000 Rev. X 00/00/00 ECO0000 Latch 1. Install the stem on the hanger. 2. Slide in the hanger and connect the wire harness. 3. Release the latch and open the doors. Set screws Door 4. Joining Fluorescent Luminaire: Join two luminaires with two provided screws. Be sure the “O” rings are in position. 5. Joining LED Luminaire: Remove filler plate by unscrewing (2) #8 screws as shown in illustration. Join two luminaires with (2) ¼” screws. Make sure the “O” rings are in position. Install filler plate back in luminaire. 6. Close the door. See page 4 for TRL. U bracket Set screws Wave washer & nut Stem 7. Install set screws to secure the hanger. 8. Install the stem on the U mounting bracket. Install the U mounting bracket to the J-box. 9. F3B SK is without power feed hole. 3 PIN003900 Rev. C 08/19/12 ECO3626 STM9 C) Stem Mounting Luminaire – F3B Luminaire Row Installation PIN000000 Rev. X 00/00/00 ECO0000 XXX Latch 1. Connect wire harness. Release . latches and open the doors. 2. Joining Fluorescent Luminaire: Join two luminaires with two provided screws. Be sure the “O” rings are in position. 3. Joining LED Luminaire: Remove filler plate by unscrewing (2) #8 screws as shown in illustration. Join two luminaires with (2) ¼” screws. Make sure the “O” rings are in position. Install filler plate back in luminaire. Stem Weather Proof J-box Cap Set screw Door 4. Close the door. 5. Insert cap onto stem. Be sure the “O”ring is in place inside the threaded hole on the housing. Insert power wires into stem as needed. Screw the stem into the hole and tighten. Slide down the cap and secure with the set screw. 6. Install the weather proof J-box on the ceiling by proper screws and reinforcement. Splice wires and engage stem with full threads to the cover and screw the cover and gasket securely to complete the installation. D) TRL option Set Screw TRL (Temper Resistance Latch) Option Note: Loosen/Tighten the set screw to open/lock the latch. Please refer to mounting instructions for dry/damp location cable mounting kits F1, F1A, F2, F4A, F4B, F4C, F4A APF, F4B APF, and F4C APF during installation. The installation instruction sheet can be obtained from the mounting kits or downloaded from http://www.PeerlessLighting.com/resources/refDocs.aspx. 4