Summary of Estimated Capital Revenues - Balanced Plan Fiscal Years 2013 - 2017 Estimated Revenue State Sources Charter School Capital Outlay CO & DS COBI Bonds PECO Bonds - Const. PECO Bonds - Maintenance Subtotal State Sources Local Sources Local Capital Improvement (1.5 mil) Discretionary Capital Improvement ( FY13: .046 mil, FY14: .036 mil) Fund Balance Carried Forward Reserves Restricted Reserve and Project Closeouts Impact Fees Interest Income Miscellaneous Revenue Subtotal Local Sources Other Revenue Sources Interfund Transfer QSCB Referendum Subtotal Other Revenue Sources TOTAL REVENUES FY 2012 Plan Years 3,458,547 1,227,281 4,685,828 17,292,735 5,595,240 2,303,648 12,385,498 37,577,121 190,452,278 1,012,256,570 7,618,091 383,259,341 10,496,857 305,777,858 54,837,202 1,500,000 900,000 16,200 583,745,910 588,431,738 15,219,422 9,000,000 3,450,000 89,500 1,411,127,409 1,448,704,530 Balance from FY 2012 for Ongoing Projects FY 2013 FY 2014 3,458,547 1,119,048 219,250,335 FY 2017 3,458,547 1,119,048 3,458,547 1,119,048 3,458,547 1,119,048 4,577,595 4,577,595 1,720,678 3,572,824 9,871,097 582,970 4,188,123 9,348,688 4,624,551 9,202,146 191,572,002 192,582,616 199,825,767 208,915,212 219,360,973 5,874,875 86,527,523 4,621,982 30,635,732 16,221,163 7,980,307 1,000,000 500,000 4,574,898 1,000,000 750,000 6,264,718 1,000,000 1,000,000 4,379,806 1,000,000 1,000,000 229,340,330 222,371,828 225,160,237 225,740,779 5,000,000 200,000 89,500 289,263,900 - - 219,250,335 FY 2016 3,458,547 1,119,048 - 219,250,335 FY 2015 293,841,495 Page 1 of 10 233,917,925 232,242,925 234,508,925 234,942,925 Summary of Estimated Capital Revenues - Balanced Plan Fiscal Years 2013 - 2017 Project Name Plan Years Unspent Balances from FY 2012 in Previously Approved Projects New Appropriation for FY 2013 New Appropriation for FY 2014 New Appropriation for FY 2015 New Appropriation for FY 2016 New Appropriation for FY 2017 Construction Projects Addition and Remodeling Projects Modernization and Replacement Projects New Schools Subtotal Construction Projects 11,983,064 130,711,382 2,827,552 145,521,998 11,402,255 124,711,382 2,827,552 138,941,189 580,809 6,000,000 6,580,809 Other Items Debt Service Site Acquisition Capital Contingency Restricted Reserve Reserves for Future Years Subtotal Other Items 740,000,000 1,421,116 21,030,688 12,073,528 55,051,281 829,576,613 941,116 21,030,688 12,073,528 31,298,828 65,344,161 148,000,000 23,752,453 171,752,453 148,000,000 120,000 148,120,000 148,000,000 120,000 148,120,000 148,000,000 120,000 148,120,000 148,000,000 120,000 148,120,000 Non-Construction Equipment Facilities Security Education Technology Technology Transportation Subtotal Non-Construction Projects 4,793,423 23,214,685 5,320,693 1,768,651 62,933,121 8,298,002 106,328,576 1,328,423 9,276,361 42,693 144,885 3,674,621 498,002 14,964,986 965,000 13,938,324 1,572,000 303,766 15,233,500 650,000 32,662,590 650,000 910,000 280,000 10,475,000 2,350,000 14,665,000 550,000 910,000 280,000 9,750,000 1,600,000 13,090,000 650,000 976,000 380,000 11,650,000 1,600,000 15,256,000 650,000 910,000 380,000 12,150,000 1,600,000 15,690,000 Transfers to General Fund Required Non-Construction Payments Equipment Maintenance Facilities Maintenance Security Maintenance Education Technology Maintenance Technology Maintenance TEN Maintenance Transportation Maintenance Subtotal Transfers to General Fund 58,492,735 21,625,000 158,280,200 8,307,160 4,768,120 94,910,600 480,158 20,413,370 367,277,343 11,698,547 4,325,000 38,680,200 2,007,160 953,624 21,002,280 96,158 4,082,674 82,845,643 11,698,547 4,325,000 29,900,000 1,600,000 953,624 18,477,080 96,000 4,082,674 71,132,925 11,698,547 4,325,000 29,900,000 1,500,000 953,624 18,477,080 96,000 4,082,674 71,032,925 11,698,547 4,325,000 29,900,000 1,600,000 953,624 18,477,080 96,000 4,082,674 71,132,925 11,698,547 4,325,000 29,900,000 1,600,000 953,624 18,477,080 96,000 4,082,674 71,132,925 293,841,495 233,917,925 232,242,925 234,508,925 234,942,925 Total Capital Budget 1,448,704,530 219,250,335 Page 2 of 10 - - - - Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Construction Projects Project Name Addition and Remodeling Projects Adult Ed Conversion at Old Plumosa Banyan Creek Elem Core Addition Belle Glade Elem Add + Pre-K Benoist Farms Elem Pre-K Boca Raton HS Swimming Pool Carver Middle Core Addition Cholee Lake Elem Pre-K Crestwood Middle Addition DD Eisenhower ES Demo for Playfields Energy Conservation-Green-LEED FHESC Window Replacement Gove ES (old) Demo Heritage Elem LEED EB Indian Pines Elem Pre-K JF Kennedy Middle Athletic Fields Jupiter Middle School Renovation Lake Worth Middle Core Addition Maintenance - West Central Remodel Manatee Elem Addition Pahokee Elementary Remodeling Pahokee High Remodeling Pahokee High Stadium Palm Beach Lakes High Academy/Add Riviera Beach Preparatory Academy Seminole Trails Elem Addition Spanish River High Biotech Academy Transportation - South Addition Transportation - West Central Remodel Wellington Elem Classroom Addition West Tech Ed Center Modifications Whispering Pines Elem Addition Whispering Pines Elem Addition Phase II Total Addition and Remodeling Total Project Budget 5,454,965 7,560,488 4,001,227 3,391,546 300,000 2,101,529 14,598,391 250,000 7,768,357 53,775 2,224,990 1,960,000 1,920,000 1,031,733 14,484,357 1,302,683 5,367,988 13,223,362 14,109,829 500,000 13,964,012 4,498,395 966,898 170,890 21,664,723 1,914,043 4,518,105 9,133,345 158,435,632 Prior Year Expenditures 3,330,038 7,236,180 3,874,445 3,272,895 194,380 1,963,776 14,414,072 141,242 7,464,545 33,530 2,117,728 1,866,768 1,795,505 991,115 13,327,546 1,022,941 3,865,869 12,496,981 13,648,475 1,975 12,866,220 4,457,736 74,114 143,710 21,649,669 1,069,290 4,418,415 8,713,409 146,452,568 Plan Years 2,124,927 324,308 126,782 118,651 105,620 137,753 184,320 108,758 303,812 20,246 107,263 93,232 124,495 40,618 1,156,811 279,742 1,502,119 726,381 461,354 498,025 1,097,792 40,659 892,784 27,181 15,054 844,753 99,690 419,936 11,983,064 Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 2,124,927 324,308 126,782 118,651 105,620 137,753 184,320 108,758 303,812 20,246 107,263 93,232 124,495 40,618 1,156,811 279,742 1,502,119 726,381 461,354 498,025 1,097,792 40,659 392,784 27,181 15,054 844,753 99,690 339,127 11,402,255 Page 3 of 10 500,000 80,809 580,809 - - - - Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Construction Projects (continued) Project Name Modernization and Replacement Projects Galaxy Elem Modernization Gladeview Elem Modernization Gove Elem Modernization North Palm Beach Elem Modernization Northboro Elem Modernization Palm Beach Gardens High Modernization Palm Springs Mid Modernization Plumosa Elem Modernization Rosenwald Elem Modernization Royal Palm School Modernization South Area School of Choice Suncoast High Modernization Wynnebrook ES Modernization Total Modernizations and Replacements New Schools Everglades Elem (03-W) Hope Centennial Elem (06-D) South Area Middle School of Arts (03-LL) Pahokee Area Middle (03-MM) Transportation - West Central Replacement South Area Elem (05-C) Total New Schools Total Construction Projects Total Project Budget Prior Year Expenditures 29,650,055 22,011,248 38,416,148 29,000,000 33,409,133 105,381,964 34,869,138 30,794,290 17,680,622 40,768,677 88,541,495 - 4,820,748 202,030 6,106,623 324,201 31,467,446 104,352,313 34,784,912 30,369,206 267,226 40,291,402 470,522,770 Plan Years Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 24,829,307 21,809,218 32,309,525 28,675,799 1,941,687 1,029,651 84,226 425,084 17,413,396 477,275 1,716,213 - 24,629,307 18,509,218 32,309,525 28,675,799 1,941,687 1,029,651 84,226 425,084 14,913,396 477,275 339,811,387 130,711,382 124,711,382 25,778,116 30,199,404 37,296,466 93,273,986 24,166,637 30,161,429 36,118,369 1,611,479 37,976 90,446,435 1,611,479 37,976 1,178,097 2,827,552 2,827,552 722,232,388 576,710,390 145,521,998 138,941,189 86,825,282 200,000 3,300,000 2,500,000 1,716,213 6,000,000 - - - - - - - - - - - - 1,178,097 Page 4 of 10 6,580,809 Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Other Items Project Name Debt Service Lease Payments for Certificates of Participation Other Debt Items Total Required Debt Service Site Acquisition Site Acquisition for South Area Elem (05-C) Lease of land for temporary West Central Transportation Facility Site Acquisition Site Acquisition for Melaleuca ES Modernization Total Site Acquisition Contingency Capital Contingency Restricted Reserve Reserve for FY 14 Reserve for FY 15 Reserve for FY 16 Reserve for FY 17 Total Contingency Total Other Items New Appropriation for FY 2012 148,500,000 148,500,000 Plan Years 740,000,000 740,000,000 Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 - 148,000,000 148,000,000 148,000,000 148,000,000 148,000,000 148,000,000 148,000,000 148,000,000 148,000,000 148,000,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 480,000 941,116 941,116 - 1,421,116 941,116 - 21,030,688.46 12,073,528 18,151,028 9,571,163 3,576,637 12,648,783 6,700,000 4,403,670 - 21,030,688 12,073,528 30,799,811 16,271,163 7,980,307 88,155,497 64,403,044 23,752,453 829,576,613 65,344,161 171,752,453 148,500,000 Page 5 of 10 148,120,000 148,120,000 148,120,000 148,120,000 Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Non-Construction Projects and Transfers Project Name Required Non-Construction Payments Charter School Capital Outlay Property and Flood Insurance Total Required Non-Construction Payments Equipment Capital Projects: 10-Book Fund Library Core Collections AV Equipment Replacement Fund Choice Furnishings Classroom Furnishings County-Wide Equipment Musical Instruments Subtotal Equipment Capital Projects Transfers to General Fund: Transfer for Equipment Maintenance Transfer for Copier Maintenance Subtotal Equipment Transfers Total Equipment Facilities Capital Projects: Building Envelope - Verde ES Roof Building Envelope - WT Dwyer High Classroom Technology - LCD Classroom Technology - LCD Adult Ed Cntr County-Wide Custodial Equipment Covered Walkways - AW Dreyfoos HS Covered Walkways - Calusa ES Covered Walkways - Del Prado ES Covered Walkways - Odyssey MS Covered Walkways - Other Projects Covered Walkways - Palm Beach Lakes HS Covered Walkways - South Tech HS Covered Walkways - Verde Elem Environmental Service Contracts HVAC Renovations HVAC Renovations - Jupiter Farms ES HVAC Renovations - Olympic Heights HS HVAC Renovations - Other Projects HVAC Renovations - William T Dwyer HS Interlocals/School Center Funds New Appropriation for FY 2012 Plan Years Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 3,458,547 8,371,000 11,829,547 17,292,735 41,200,000 58,492,735 140,000 300,000 500,000 140,000 1,080,000 640,248 275,315 227,322 3,082,563 567,976 4,793,423 95,973 3,500,000 3,595,973 625,000 21,000,000 21,625,000 4,675,973 26,418,423 1,328,423 112,966 550,000 427,854 172,841 171,493 255,970 300,000 175,230 139,810 690,335 225,610 350,862 319,205 1,225,318 1,370,829 200,000 950,000 18,807 1,800,000 344,342 112,966 250,000 4,000,000 - - 40,248 315 227,322 1,032,563 27,976 1,328,423 - 127,854 172,841 1,493 255,970 3,458,547 8,240,000 11,698,547 3,458,547 8,240,000 11,698,547 3,458,547 8,240,000 11,698,547 3,458,547 8,240,000 11,698,547 3,458,547 8,240,000 11,698,547 200,000 75,000 100,000 50,000 100,000 50,000 100,000 50,000 100,000 50,000 550,000 140,000 965,000 400,000 100,000 650,000 300,000 100,000 550,000 400,000 100,000 650,000 400,000 100,000 650,000 125,000 4,200,000 4,325,000 125,000 4,200,000 4,325,000 125,000 4,200,000 4,325,000 125,000 4,200,000 4,325,000 125,000 4,200,000 4,325,000 5,290,000 4,975,000 4,875,000 4,975,000 4,975,000 550,000 300,000 170,000 300,000 175,230 139,810 690,335 225,610 350,862 375,783 1,370,829 319,205 849,535 200,000 950,000 18,807 1,800,000 344,342 Page 6 of 10 Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Non-Construction Projects and Transfers (continued) Project Name Facilities (continued) Minor Projects Minor Projects - Assigned Portables Portables - Boynton Beach HS Restrooms Portables - Calusa ES CSR Portables - North Grade ES Portables - Other Projects Portables - Sabal Palm Portables - Sabal Palm Demo Portables - Verde ES Portables - Verde ES CSR Portables - West Central Transportation Relocatables - Leasing Roof Replacement Roof Replacement - Belle Glade ES Roof Replacement - Cypress Trails ES Roof Replacement - Pahokee HS Bldg 2 Roof Replacement - Pioneer Park ES Safety Safety - FHESC Halon Fire System Safety - Fire Alarm Repl-Crestwood MS Safety - Fire Alarm Repl-Grove Park ES Safety - Fire Alarm Repl-Santaluces HS Safety - Fire Alarm Repl-Spanish River HS Safety - Lighting Replacement - Jupiter MS Traffic Project - Boca Raton Middle Traffic Project - Everglades Elem Subtotal Facilities Capital Projects Transfers to General Fund: Transfer for ADA Compliance Transfer for Athletic Playfields Transfer for BEMP Transfer for CSIR Work Orders Transfer for Environmental Control Transfer for Maintenance of Facilities Transfer for Fencing Transfer for Fire/Life/Safety Transfer for HVAC Maintenance Transfer for Maintenance Projects Transfer for Preventative Maintenance Transfer for Playground Maintenance Subtotal Facilities Transfers Total Facilities New Appropriation for FY 2012 - Plan Years 6,804,600 119,192 333,347 2,216,755 500,000 500,000 131,095 468,659 500,000 238,825 114,305 375,000 140,000 20,279 122,351 1,600,000 811,655 350,000 1,600,000 100,397 120,452 850,000 500,000 521,965 180,934 500,000 183,000 315,000 23,214,685 1,800,000 150,000 300,000 2,000,000 1,010,857 25,929,850 75,000 1,056,962 500,000 3,997,500 2,575,000 300,000 39,695,169 4,500,000 2,000,000 4,092,337 122,464,990 3,857,000 13,130,873 8,235,000 158,280,200 46,499,769 181,494,885 2,554,600 - Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 119,192 283,347 2,216,755.46 50,000 500,000 500,000 131,095 468,659 500,000 238,825 114,305 375,000 140,000 20,279 122,351 11,655 397 120,452 1,600,000 800,000 350,000 1,600,000 100,000 850,000 500,000 521,965 180,934 500,000 183,000 315,000 9,276,361 9,276,361 Page 7 of 10 13,938,324 900,000 892,337 30,464,990 1,057,000 3,130,873 2,235,000 38,680,200 52,618,524 - - - - 900,000 900,000 900,000 900,000 500,000 500,000 500,000 500,000 800,000 23,000,000 800,000 23,000,000 800,000 23,000,000 800,000 23,000,000 700,000 700,000 700,000 700,000 2,500,000 1,500,000 2,500,000 1,500,000 2,500,000 1,500,000 2,500,000 1,500,000 29,900,000 29,900,000 29,900,000 29,900,000 29,900,000 29,900,000 29,900,000 29,900,000 Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Non-Construction Projects and Transfers (continued) Project Name Security Capital Projects: Intrusion Alarm Upgrades BDAs Card Access Key Boxes Card Access at High Schools Card Access at Middle Schools Card Access at Elementary Schools Radios Inside Buildings Portable Radios Radios - South ITV Storage Enhancement at 20 Sites Video Server at School Police School Bus Video Network System Video Conversion from Analog to IP Video Surveillance Schools Video Surveillance High Schools Video Surveillance at Middle Schools Video Surveillance at Elementary Schools Subtotal Security Capital Projects Transfers to General Fund: Transfer for Security Subtotal Security Transfers Total Security Educational Technology Capital Projects: Digital Divide Technology Tools Subtotal Education Technology Projects Transfers to General Fund: Transfer for Edline Transfer for Equipment Maintenance Subtotal Educational Technology Transfers Total Educational Technology New Appropriation for FY 2012 - Plan Years Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 329,000 711 465,000 120,000 160,000 200,000 393,350 531,000 450,000 320,000 66,000 630,000 500,000 355,632 160,000 240,000 400,000 5,320,693 80,000 80,000 80,000 80,000 80,000 30,000 40,000 50,000 80,000 50,000 80,000 30,000 40,000 50,000 80,000 50,000 80,000 30,000 40,000 50,000 80,000 50,000 80,000 30,000 40,000 50,000 80,000 50,000 80,000 80,000 80,000 120,000 100,000 120,000 100,000 80,000 66,000 120,000 100,000 120,000 100,000 1,572,000 40,000 60,000 100,000 910,000 40,000 60,000 100,000 910,000 40,000 60,000 100,000 976,000 40,000 60,000 100,000 910,000 42,693 2,037,911 2,037,911 8,307,160 8,307,160 - 2,007,160 2,007,160 1,600,000 1,600,000 1,500,000 1,500,000 1,600,000 1,600,000 1,600,000 1,600,000 2,037,911 13,627,853 42,693 3,579,160 2,510,000 2,410,000 2,576,000 2,510,000 85,000 283,766 368,766 358,739 1,409,912 1,768,651 38,739 106,146 144,885 303,766 303,766 80,000 200,000 280,000 80,000 200,000 280,000 80,000 300,000 380,000 80,000 300,000 380,000 450,000 503,624 953,624 2,250,000 2,518,120 4,768,120 450,000 503,624 953,624 450,000 503,624 953,624 450,000 503,624 953,624 450,000 503,624 953,624 450,000 503,624 953,624 1,322,390 6,536,771 1,257,390 1,233,624 1,233,624 1,333,624 1,333,624 - 9,000 711 - 23,350 9,632 144,885 Page 8 of 10 145,000 50,000 331,000 450,000 150,000 100,000 346,000 Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Non-Construction Projects and Transfers (continued) Project Name Technology Capital Projects: Application Monitoring BYOD CAFM Computer Admin Refresh Computer Refresh 4.8 to1 Disaster Recovery Disk Storage District Server Refresh Green Data Center Optimization Hardware/Software Intrusion Prevention IT Service Mgmt Upgrade Mobile Device Management Pseries Consolidation Replace Obsolete Data Backup SAN School LAN Switch Security Student Information Systems System Lifecycle Management Endpoint Security TEN Broadcast on IP Infrastructure Windows License FTE Model Wireless Infrastructure Subtotal Technology Projects Transfers to General Fund: Transfer for Application Systems Transfer for Business Operating Systems Transfer for CAFM Implementation Transfer for Data Warehouse Transfer for Equipment Maintenance Transfer for ERP Transfer for FTE Reporting Transfer for IT Security Transfer for Portal Project Transfer for Project Management Initiative Transfer for School Center Admin Technology Transfer for Secondary Tech Maintenance Transfer for Technology Infrastructure Maintenance Transfer for Technology Subtotal Technology Transfers Total Technology New Appropriation for FY 2012 295,000 Plan Years Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 495,000 347,150 12,127,464 502,587 5,250,000 2,045,121 21,108,287 567,980 937,467 417,673 501,597 195,106 1,500,000 276,466 250,000 527,000 800,000 2,000,000 8,274,599 820,990 300,000 2,500,000 3,000,000 5,008,182 6,150,067 62,933,121 413,527 1,750,165 379,160 3,594,140 188,320 4,271,542 825,499 39,500 58,907 776,628 2,698,807 1,882,640 9,128,830 5,083,745 13,936,055 15,358,575 7,120,397 97,500 1,411,480 14,493,780 376,528 1,928,830 1,083,745 3,136,055 3,358,575 1,520,397 19,500 282,296 2,898,756 376,528 1,800,000 1,000,000 2,700,000 3,000,000 1,400,000 19,500 282,296 2,898,756 376,528 1,800,000 1,000,000 2,700,000 3,000,000 1,400,000 19,500 282,296 2,898,756 376,528 1,800,000 1,000,000 2,700,000 3,000,000 1,400,000 19,500 282,296 2,898,756 376,528 1,800,000 1,000,000 2,700,000 3,000,000 1,400,000 19,500 282,296 2,898,756 5,723,650 6,397,598 21,002,280 5,000,000 5,000,000 5,000,000 5,000,000 20,719,845 26,397,598 94,910,600 18,477,080 18,477,080 18,477,080 18,477,080 32,847,309 157,843,721 36,235,780 28,952,080 28,227,080 30,127,080 30,627,080 812,028 406,334 4,816,513 134,010 300,072 312,126 101,793 1,245,438 300,000 1,950,000 612,000 12,587 200,000 80,000 350,000 70,000 900,000 70,000 2,000,000 70,000 2,000,000 450,621 2,608,287 147,980 177,467 57,673 11,597 45,106 494,500 100,000 400,000 100,000 230,000 50,000 500,000 45,000 200,000 5,000,000 80,000 120,000 80,000 80,000 40,000 250,000 45,000 250,000 300,000 4,500,000 80,000 80,000 60,000 60,000 20,000 250,000 30,000 300,000 4,500,000 80,000 80,000 60,000 60,000 20,000 250,000 30,000 300,000 4,500,000 80,000 80,000 60,000 60,000 20,000 250,000 30,000 800,000 400,000 300,000 400,000 400,000 400,000 400,000 400,000 500,000 400,000 1,000,000 4,150,000 15,233,500 500,000 700,000 1,000,000 500,000 10,475,000 500,000 700,000 1,000,000 500,000 9,750,000 700,000 800,000 1,000,000 500,000 11,650,000 300,000 800,000 800,000 1,000,000 500,000 12,150,000 96,466 527,000 24,599 33,990 8,182 67 3,674,621 3,674,621 Page 9 of 10 6,650,000 787,000 Summary of Estimated Capital Revenues - Balanced Plan Project List Fiscal Years 2013 - 2017 Non-Construction Projects and Transfers (continued) Project Name The Education Network (TEN) Transfers to General Fund: Transfer for TEN Maintenance S Total TEN Transportation Capital Projects: Fuel Station Pump Replacement Bus Routing System GPS Hardware - Transportation Replacement of Bus Washers (Cancelled) School Busses Vehicles - District-Wide Subtotal Transportation Projects Transfers to General Fund: Transfer for Transportation Maintenance Transfer for Contracted Transportation Subtotal Transportation Transfers Total Transportation Sub-total Non-Construction Projects Sub-total Non-Construction Transfers Total Non-Construction Projects and Transfers New Appropriation for FY 2012 96,158 96,158 - 480,158 480,158 150,000 400,000 850,000 6,400,000 498,002 8,298,002 - 96,158 96,158 96,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000 1,600,000 1,600,000 1,600,000 1,600,000 650,000 2,350,000 1,600,000 1,600,000 1,600,000 3,482,674 600,000 4,082,674 3,482,674 600,000 4,082,674 3,482,674 600,000 4,082,674 3,482,674 600,000 4,082,674 3,482,674 600,000 4,082,674 150,000 500,000 498,002 498,002 400,000 350,000 517,196 1,500,000 2,017,196 17,413,370 3,000,000 20,413,370 2,017,196 28,711,372 498,002 4,732,674 6,432,674 5,682,674 5,682,674 5,682,674 20,380,830 80,945,423 106,328,576 367,277,343 14,964,986 - 32,662,590 82,845,643 14,665,000 71,132,925 13,090,000 71,032,925 15,256,000 71,132,925 15,690,000 71,132,925 101,326,253 473,605,919 14,964,986 115,508,233 85,797,925 84,122,925 86,388,925 86,822,925 1,448,704,530 219,250,335 293,841,495 233,917,925 232,242,925 234,508,925 234,942,925 1,448,704,530 1,448,704,530 - 219,250,335 219,250,335 - 293,841,495 293,841,495 - 233,917,925 233,917,925 - 232,242,925 232,242,925 - 234,508,925 234,508,925 - 234,942,925 234,942,925 - Total Capital Budget Total Revenues Total Capital Budget Balance/(Shortfall) Plan Years Unspent Balances from FY 2012 in New New New New New Previously Appropriation for Appropriation for Appropriation for Appropriation for Appropriation for Approved Projects FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 - - Additional projects that could not be included in this document due to insufficient funding can be viewed in the Unbalanced version of this document. Such projects that would increase the capacity for students are also included in the Tentative District Educational Facilities Plan Page 10 of 10