Build a Prequalification application for an Existing Generating CMU Company information Identify the CMU and type Connection Agreement information CMU Component Information Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Customer provided CMU identifier 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.3 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 Connection Arrangement Declaration (Transmission or Distribution) 3.1.2 If Transmission connected, Transmission Entry Capacity Declaration or Transmission Entry Capacity Deferral 3.6.3 If Transmission connected and Transmission Entry Capacity Declared, upload Transmission Connection Agreement 3.6.3 If Distribution connected, Distribution Entry Capacity Declaration 3.6.3 If Distribution connected, Distribution Connection Agreement or a letter from the Distribution Network Operator/a letter from the Private Network if not directly connected 3.6.3 BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 Meter Identifier 3.4.3 Connection Capacity 3.4.5 Ordnance Survey Grid Reference 3.4.3 Method used to calculate the connection capacity 3.4.5, 3.5 My EMR> Capacity Market> My CMUs> Add New CMU> Existing Generating CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> Existing Generating CMU> Main Page > Add New Component These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Description and address of the CMU component 3.4.3 Auxiliary Load 3.5B Select “No” to the question regarding deferring CMU Metering Assessment for Settlement, and complete the displayed question on associated load (refer to auction guidelines) 3.6.4 Upload Single Line Diagram (for multiple components, user can upload a .zip file containing all the line diagrams) 3.6.4 Upload metering configuration Solution in “other Metering Information” 3.4.3(v) Despatch Controller/Joint Owner Declarations Applicant Status 3.2 Upload relevant Applicant Declaration 3.2, Exhibit D, F or G Historic Performance Data Date and Capacity of 3 historic performance periods and the 3 settlement periods and the 3 settlement periods 3.6.1 Range of dates which contains the 3 settlement periods 3.6.1 For Non-CMRS Distribution CMU, where applicable, upload a letter confirming historic metered output 3.6.1 For Non-CMRS Distribution CMU, where applicable, upload a letter confirming line loss factors 3.6.1 Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 STOR No Current contract and not the relevant year 3.4.8 STOR Subject of Contract but to Withdraw 3.4.8 Metering Assessment Declarations relating to Low Carbon Declarations relating to Long Term STOR My EMR> Capacity Market> My CMUs> Add New CMU> Existing Generating CMU> Metering Information My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. providers Further Declarations Required Legacy Declarations that are not mandatory to complete Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Declaration of Solvency Not Used Conduct No Market Manipulation Conduct Compiled with all laws Conduct No bribery Act 2010 Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build a Prequalification application for an Existing Interconnector CMU Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Answer if the applicant holds an interconnector licence at the time of making the application 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.1 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info Customer provided CMU identifier 3.4.3 CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 Connection Agreement information Transmission Entry Capacity 3.6A.2 Upload Grid Connection Agreement 3.6A.2 CMU Component Information BMU ID/ Balancing Services ID/Component ID 3.4.3(a)(iv) Generating Technology Class (Interconnector) 3.4.5 Meter Identifier 3.4.3 Connection Capacity 3.4.5 GB Location of the interconnector CMU 3.4.3 Ordnance Survey Grid Reference 3.4.3 Non-GB Part Location 3.6B.1 Forecasted Technical Reliability 3.6B.1 Method used to calculate the connection capacity 3.4.5, 3.5A Description of the Interconnector 3.4.3 Technical Specification 3.6B.1 Company Information Identify the CMU and type My EMR> Capacity Market> My CMUs> Add New CMU> Existing Interconnector CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> Existing Interconnector CMU> Main Page > Add New Component These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Select “No” to the question regarding deferring CMU Metering Assessment for Settlement, and complete the displayed question on associated load (refer to auction guidelines) 3.6A.3 Upload Single Line Diagram (for multiple components, user can upload a .zip file containing all the line diagrams) 3.6A.3 Upload metering configuration Solution in “other Metering Information” 3.4.3(v) Despatch Controller/Joint Owner Declarations Applicant Status 3.2 Upload relevant Applicant Declaration 3.2.8, 3.2.9 Exhibit DA or DB Historic Performance Data Date and Capacity of 3 historic performance periods and the 3 settlement periods 3.6.1 Range of dates which contains the 3 settlement periods 3.6.1 Declarations relating to Low Carbon Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Declarations relating to Long Term STOR providers Further Declarations Required STOR No Current contract and not the relevant year 3.4.8 STOR Subject of Contract but to Withdraw 3.4.8 Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Legacy Declarations that are not mandatory to complete Declaration of Solvency Not Used Conduct No Market Manipulation Conduct Compiled with all laws Metering Assessment My EMR> Capacity Market> My CMUs> Add New CMU> Existing Interconnector CMU> Metering Information My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Conduct No bribery Act 2010 Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build a Prequalification application for New Build Generating CMU Company information Identify the CMU and type Connection Agreement information Planning Consent and legal right to use land CMU Component Information Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Customer provided CMU identifier 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.3 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 Connection Arrangement Declaration (Transmission or Distribution) 3.1.2 If Transmission connected, Transmission Entry Capacity Declaration. 3.7.3 Upload Transmission Connection Agreement 3.7.3 If Distribution connected, Distribution Entry Capacity Declaration or Distribution Entry Capacity Deferral Declaration 3.7.3 If Distribution Entry Capacity declared, upload Distribution Connection Agreement or connection offer/ a letter from the Distribution Network Operator 3.7.3 For private network connections, if Distribution Connection deferred, a letter from the owner of the private network 3.7.3 Declare that a planning consent has been obtained or will be obtained by 17 working days prior to the auction 3.7.1 Upload planning consent if it has been obtained 3.7.1 BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 My EMR> Capacity Market> My CMUs> Add New CMU> New Build Generating CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> New These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Meter Identifier 3.4.3 Connection Capacity 3.4.5 Ordnance Survey Grid Reference 3.4.3 Method used to calculate the connection capacity 3.4.5, 3.5 Description and address of the CMU component 3.4.3 Auxiliary Load 3.5B Description of construction works and explanation how CMU will meet extended years criteria 3.7.2 Schedule of achieving milestones 3.7.2 Total Project Spend 3.7.2 Select option that quantifies the £/kw capital expenditure 3.7.2 Construction Declaration 3.7.2 Metering Assessment Select “Yes” to defer CMU Metering Assessment for Settlement 8.3.3(ba) Despatch Controller/Joint Owner Declarations Applicant Status ( this should be the legal owner for new build CMU) 3.2 Declarations relating to Low Carbon Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Construction Plan Build Generating CMU> Main Page > Add New Component My EMR> Capacity Market> My CMUs> Add New CMU> New Build Generating CMU> Construction Plan My EMR> Capacity Market> My CMUs> Add New CMU> New Build Generating CMU> Metering Information My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Declarations relating to Long Term STOR providers Further Declarations Required Legacy Declarations that are not mandatory to complete STOR No Current contract and not the relevant year 3.4.8 STOR Subject of Contract but to Withdraw 3.4.8 Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Declaration of Solvency Not Used Conduct No Market Manipulation Conduct Compiled with all laws Conduct No bribery Act 2010 Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build a Prequalification application for New Build Interconnector CMU Information Field Relevan t Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Answer if the applicant holds an interconnector licence at the time of making the application 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.1 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info Customer provided CMU identifier 3.4.3 CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 Connection Agreement information Connection Arrangement Declaration. 3.7.3(aa) Upload Grid Connection Agreement 3.7.3(aa) Planning Consent Declare that planning consent has been obtained or will be obtained by 17 working days prior to the auction 3.7.1 Upload planning consent if it has been obtained 3.7.1 BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class (Interconnector) 3.4.5 Meter Identifier 3.4.3 Connection Capacity 3.4.5 GB Location of the interconnector CMU 3.4.3 Ordnance Survey Grid Reference 3.4.3 Non-GB Part Location 3.6B.1 Forecasted Technical Reliability 3.6B.1 Method used to calculate the connection capacity 3.4.5, 3.5A Company information Identify the CMU and type CMU Component Information My EMR> Capacity Market> My CMUs> Add New CMU> New Build Interconnector CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> New Build Interconnector CMU> Main Page > Add New Component These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Description of the Interconnector 3.4.3 Technical Specification 3.6B.1 Description of construction works 3.7.2 Schedule of achieving milestones 3.7.2 Total Project Spend 3.7.2 Construction Declaration 3.7.2 Metering Assessment Select “Yes” to defer CMU Metering Assessment for Settlement 8.3.3(ba) Despatch Controller/Joint Owner Declarations Applicant Status 3.2 Upload relevant Applicant Declaration 3.2.8, 3.2.9, Exhibit DC Declarations relating to Low Carbon Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 STOR No Current contract and not the relevant year 3.4.8 STOR Subject of Contract but to Withdraw 3.4.8 Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Declaration of Solvency Not Used Conduct No Market Manipulation Construction Plan Declarations relating to Long Term STOR providers Further Declarations Required Legacy Declarations that are not My EMR> Capacity Market> My CMUs> Add New CMU> New Build Interconnector CMU> Construction Plan My EMR> Capacity Market> My CMUs> Add New CMU> New Build Interconnector CMU> Metering Information My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. mandatory to complete Conduct Compiled with all laws Conduct No bribery Act 2010 Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build a Prequalification application for Refurbishing Generating CMU Company information Identify the CMU and type Pre-Refurb Connection Agreement information Post-Refurb Connection Agreement information Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Customer provided CMU identifier 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.3 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 Pre-Refurb Connection Arrangement Declaration (Transmission or Distribution) 3.1.2 If Transmission connected, Transmission Entry Capacity Declaration or Transmission Entry Capacity Deferral 3.8.2, 3.6.3 If Transmission connected and Transmission Entry Capacity Declared, upload Transmission Connection Agreement 3.8.2, 3.6.3 If Distribution connected, Distribution Entry Capacity Declaration 3.8.2, 3.6.3 If Distribution connected, Distribution Connection Agreement or a letter from the Distribution Network Operator/a letter from the Private Network if not directly connected 3.8.2, 3.6.3 Post-Refurb Connection Arrangement Declaration (Transmission or Distribution) 3.1.2 If Transmission connected, Transmission Entry Capacity Declaration. 3.8.1, 3.7.3 Upload Transmission Connection Agreement 3.8.1, 3.7.3 If Distribution connected, Distribution Entry Capacity Declaration or Distribution Entry Capacity Deferral Declaration 3.8.1, 3.7.3 If Distribution Entry Capacity declared, upload Distribution Connection Agreement or connection 3.8.1, 3.7.3 My EMR> Capacity Market> My CMUs> Add New CMU> Refurbishing Generating CMU> Main Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. offer/ a letter from the Distribution Network Operator Planning Consent Pre-Refurb CMU Component Information Post-Refurb CMU Component Information Construction Plan For private network connection, if Distribution Connection deferred, a letter from the owner of the private network 3.8.1, 3.7.3 Select the declaration that is pertinent to the Refurbishing CMU 3.8.1, 3.7.1 Upload planning consent if it has been obtained 3.8.1, 3.7.1 BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 Meter Identifier 3.4.3 Connection Capacity 3.4.5 Ordnance Survey Grid Reference 3.4.3 Methods used to calculate the connection capacity 3.4.5, 3.5 Descriptions and address of the CMU component 3.4.3 Auxiliary Loads 3.5B BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 Meter Identifier 3.4.3 Connection Capacity 3.4.5 Ordnance Survey Grid Reference 3.4.3 Methods used to calculate the connection capacity 3.4.5, 3.5 Descriptions and address of the CMU component 3.4.3 Auxiliary Loads 3.5B Description of construction works and explanation how CMU will meet extended years criteria 3.8.1, 3.7.2 Schedule of achieving milestones (no Backfeed milestone required) 3.8.1, 3.7.2 Total Project Spend 3.8.1, 3.7.2 Select option that quantifies the £/kw capital expenditure 3.8.1, 3.7.2 Construction Declaration 3.8.1, 3.7.2 My EMR> Capacity Market> My CMUs> Add New CMU> Refurbishing Generating CMU> Main Page > Add New Component>Select Pre-Refurbishment CMU in the dropdown list towards the bottom of the page My EMR> Capacity Market> My CMUs> Add New CMU> Refurbishing Generating CMU> Main Page > Add New Component>Select Post-Refurbishment CMU in the dropdown list towards the bottom of the page My EMR> Capacity Market> My CMUs> Add New CMU> Refurbishing Generating CMU > > Construction Plan These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Select “No” to the question regarding deferring CMU Metering Assessment for Settlement, and complete the displayed question on associated load (refer to auction guidelines) 3.8.2, 3.6.4 Upload Single Line Diagram (for multiple components, user can upload a .zip file containing all the line diagrams) 3.8.2, 3.6.4 Upload metering configuration Solution in “other Metering Information” 3.4.3 (v) Post-refurb Metering Assessment Select “Yes” to defer CMU Metering Assessment for Settlement 8.3.3(ba) Despatch Controller/Joint Owner Declarations Applicant Status 3.2 Upload relevant Applicant Declaration 3.2, Exhibit D Pre-refurb Metering Assessment My EMR> Capacity Market> My CMUs> Add New CMU> Refurbishing Generating CMU > Metering Information (Pre-Refurb) My EMR> Capacity Market> My CMUs> Add New CMU> Refurbishing Generating CMU > Metering Information (Post-Refurb) My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page If choose to opt-out Pre-Refurbishment CMU Opt-out Declaration Select “Yes” to the question 3.8.2(b) Opt-out Notification Select Opt-Out Reason and provide a summary 3.8.2(b), 3.11.2(f) Opt-out year 3.8.2(b), 3.11.2(e) My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Refurbishing CMU Structure My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Opt-Out Notification These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Further Opt-out Declarations Conduct declarations 3.8.2(b), 3.11.5 If choose not to opt-out Pre-Refurbishment CMU Opt-out Declaration Select “No” to the question 3.8.2(b) Historic Performance Data Date and Capacity of 3 historic performance periods and the 3 settlement periods 3.8.2, 3.6.1 Range of dates which contains the 3 settlement periods 3.8.2, 3.6.1 For Non-CMRS Distribution CMU, where applicable, upload a letter confirming historic metered output 3.8.2, 3.6.1 For Non-CMRS Distribution CMU, where applicable, upload a letter confirming line loss factors 3.8.2, 3.6.1 Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 STOR No Current contract and not the relevant year 3.4.8 My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Refurbishing CMU Structure My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page (Pre-Refurb) Declarations relating to Low Carbon Declarations My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page (Post-Refurb) These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. relating to Long Term STOR providers Further Declarations Required Legacy Declarations that are not mandatory to complete STOR Subject of Contract but to Withdraw 3.4.8 Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Declaration of Solvency Not Used Conduct No Market Manipulation Conduct Compiled with all laws Conduct No bribery Act 2010 Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build a Prequalification application for Proven DSR CMU Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Customer provided CMU identifier 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.3 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 DSR Test Certificate Upload DSR Test Certificate 3.9.1 CMU Component Information BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 Meter Identifier 3.4.3 DSR Capacity 3.4.5 Ordnance Survey Grid Reference 3.4.3 Metering Test Certificate or Metering Configuration if applicable 3.4.3(v), 3.4.3(vi) Description and address of the CMU component 3.4.3 Auxiliary Load 3.5B Upload Business Model and make Business Model Declaration 3.9.3 Company information Identify the CMU and type Business Model My EMR> Capacity Market> My CMUs> Add New CMU> Proven DSR CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> Proven DSR CMU > Main Page > Add New Component My EMR> Capacity Market> My CMUs> Add New CMU> Proven DSR CMU> These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Business Model Select “No” to the question regarding deferring CMU Metering Assessment for Settlement, and complete the displayed question on associated load (refer to auction guidelines) 3.9.4 Upload Single Line Diagram (for multiple components, user can upload a .zip file containing all the line diagrams) 3.9.4 Upload metering configuration Solution in “other Metering Information” 3.4.3(v) Despatch Controller/Joint Owner Declarations Applicant Status 3.2 Upload relevant Applicant Declaration 3.2, Exhibit D, F or G Declarations relating to Low Carbon Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Declarations relating to Long Term STOR providers STOR No Current contract and not the relevant year 3.4.8 STOR Subject of Contract but to Withdraw 3.4.8 Further Declarations Required Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Legacy Declarations that are not mandatory to Declaration of Solvency Not Used Conduct No Market Manipulation Metering Assessment My EMR> Capacity Market> My CMUs> Add New CMU> Proven DSR CMU> Metering Information My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. complete Conduct Compiled with all laws Conduct No bribery Act 2010 Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build a Prequalification application for Unproven DSR CMU Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.4.1 Authorised Person, Contact Details 3.4.1 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Customer provided CMU identifier 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.3 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 DSR Test Confirm TSR Test will be completed 3.10.2 CMU Component Information BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 Meter Identifier 3.4.3 DSR Capacity 3.4.5 Method used to calculate the DSR capacity 3.4.5, 3.5 Metering Test Certificate or Metering Configuration if applicable 3.4.3(v), 3.4.3(vi) Description and address of the CMU component 3.4.3 Auxiliary Load 3.5B Upload Business Plan and make Business Plan Declaration 3.10.1 Company information Identify the CMU and type Business Plan My EMR> Capacity Market> My CMUs> Add New CMU> Unproven DSR CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> Unproven DSR CMU > Main Page > Add New Component My EMR> Capacity Market> My CMUs> Add New CMU> Unproven DSR CMU> Business These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Model Select whether to defer CMU Metering Assessment for Settlement 3.10.2 Upload Single Line Diagram (for multiple components, user can upload a .zip file containing all the line diagrams) 3.9.4 Despatch Controller/Joint Owner Declarations Applicant Status 3.2 Upload relevant Applicant Declaration 3.2, Exhibit D, F or G Declarations relating to Low Carbon Select one from “LCE no Current Benefit and not the Relevant year”, “LCE Current benefit but not Relevant Year” or “LCE - Application made but not Determined”, and upload relevant supporting document 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Low Carbon Grant Status 3.4.7 Acknowledge Low Carbon Exclusion Status 3.4.7 Declarations relating to Long Term STOR providers STOR No Current contract and not the relevant year 3.4.8 STOR Subject of Contract but to Withdraw 3.4.8 Further Declarations Required Declaration that application is correct 3.12.1 MPAN Declaration 3.4.3 Legacy Declarations that are not mandatory to complete Declaration of Solvency Not Used Conduct No Market Manipulation Conduct Compiled with all laws Conduct No bribery Act 2010 Metering Assessment My EMR> Capacity Market> My CMUs> Add New CMU> Unproven DSR CMU > Metering Information My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Company and CMU Summary Page My EMR> Capacity Market> My Applications> Add New Application> New Prequalification Application for an Auction> Application Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Conduct no Offer to Pay any Officer Conduct No Information Disclosure These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Build an opt-out notification for an Auction Company information Identify the CMU and type CMU Component Information Despatch Controller/Joint Owner Declarations Information Field Relevant Rules Portal Location Name, address, corporate registration number 3.11.2 Authorised Person, Contact Details 3.11.2 Certificate of Incorporation 3.4.2 Prequalification Certificate Certificate of Conduct Customer provided CMU identifier 3.12.3, Exhibit A 3.12.4, Exhibit C 3.4.3 My EMR> Companies> Details (this information is included in the company registration process) My EMR> Companies> Additional Info CMU Name 3.4.3 Classification of CMU (CMRS or Non CMRS) 3.1.2 Connection Arrangement Declaration (Transmission or Distribution) 3.1.2 BMU ID/ Balancing Services ID/Component ID 3.4.3 Generating Technology Class 3.4.5 Meter Identifier 3.4.3 Connection Capacity 3.4.5 Ordnance Survey Grid Reference 3.4.3 Method used to calculate the connection capacity Description and address of the CMU component 3.4.5, 3.5, 3.5A 3.4.3 Auxiliary Load 3.5B Applicant Status 3.2 Upload relevant Applicant Declaration 3.2, Exhibit D, DA or DB My EMR> Capacity Market> My CMUs> Add New CMU> Applicable CMU> Main Page My EMR> Capacity Market> My CMUs> Add New CMU> Applicable CMU> Main Page > Add New Component My EMR> Capacity Market> My Applications> Add New Application> New Opt-out Notification for an Auction> Company and CMU Summary Page These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist. Opt-out Information Further Opt-out Declarations Select Opt-Out Reason and provide a summary 3.11.2(f) Opt-out year 3.11.2(e) Conduct declarations 3.11.5 My EMR> Capacity Market> My Applications> Add New Application> New Opt-out Notification for an Auction > Opt-out Notification These checklists are prepared in good faith by National Grid in order to assist potential Applicants for Capacity Market Auctions. This checklist should not be treated by Applicants as the definitive list of obligations required to make an Application for the Capacity Market Auctions and should always be read in conjunctions with the Capacity Market Rules 2015, the Capacity Market Regulations or the Auction Guidelines 2015. In the event of any discrepancy with the Capacity Market Rules 2015 or the Capacity Market Regulations or the Auction Guidelines, those documents take precedence over this checklist.